Loading...
HomeMy WebLinkAboutSHINGLES APPLICATION INSTRUCTIONS0 Dynasty Armourzone. Shingles App.1.10 on Instructions DIRECTIONS NOTE: SHINGLES MUST BE APPLIED PROPERLY. WE ASSUME NO RESPONSIBILITY FOR LEAKS OR DEFECTS RESULTING FROM POOR APPLICATION OR FAILURE TO PROPERLY PREPARE THE SURFACE TO BE ROOFED OVER, OR FAILURE TO PROVIDE PROPER VENTILATION IN ACCORDANCE WITH MINIMUM PROPERTY STANDARDS REQUIREMENTS. REVIEW ALLAPPLICABLE BUILDING CODES, MINIMUM PROPERTY STANDARDS AND REQUIREMENTS PRIOR TO APPLYING THESE SHINGLES USING THE APPLICATION INSTRUCTIONS FOUND ON THE WRAPPER. PLEASE USE CAUTION WHEN STACKING BUNDLES ON SLOPED ROOFS. ROOF DECK: Must be smooth, firm, dry and securely nailed. Plywood must be exterior grade, conforming to building code requirements. Half -inch plywood is recommended for best deck performance. The installation of asphalt shingles on dimensional lumber (including shiplap/board decks) is not recommended as it may potentially cause buckling problems. Buckling is not covered by our Limited Warranty. REROOFING:. Split and re -nail curled or buckled shingles, replace any missing shingles, remove loose or protruding nails, and sweep surface clean. Roof slope should be 4:12 or steeper. For slopes 4:12 to 2:12, see special underlayment requirements outlined below. Never apply asphalt shingles to roof slopes less than 2:12. EAVE PROTECTION: Apply eave protection as per building code requirements, overhanging eaves by a nominal 1/4" minimum and extending up the roof at least 24" beyond the interior wall line. Ice & Water Protector is recommended for best performance, applied according to instructions printed on each wrapper. UNDERLAYMENT: For areas where the roof slope is less than 4" per foot down to 2" per foot, use one layer of ICE AND WATER PROTECTOR,. applied according to instructions printed on each wrapper. Alternately, use 2 layers of asphalt saturated felt (or equivalent), the first sheet overlapping the eave protection by 19", followed by full 36" widths overlapping each preceding course by 19". (NOTE: IF THESE PROCEDURES ARE FOLLOWED, SHINGLES APPLIED TO SLOPES 3:12 TO 4:12 WILL BE WARRANTED FOR THE FULL WARRANTY TERM FOR THE SHINGLE. SHINGLES ON SLOPES 2:12 TO 3:12 WILL BE WARRANTED FOR 12 YEARS.) For areas where the roof slope is 6" per foot down to 4" per foot, it is strongly recommended to cover the remainder of the deck with one ply asphalt saturated felt (or equivalent) laid parallel to the eaves, with 2" horizontal laps and 4 end laps. Apply metal drip edges on top of any underlay along rake edges and directly to the deck along eaves. CHALK LINES: Sufficient chalk lines should be struck to ensure accurate vertical and horizontal alignment of shingles. Vertical chalk lines every4 to S shingle lengths are recommended: FLASHINGS: Base flashing should be in place before shingles are applied. Cap flashings of sheet metal and base flashing of metal or mineral surfaced roofing should be used at chimneys, skylights, vents, walls and other vertical surfaces and sealed with asphalt plastic cement. Flashing shall conform to the requirements of applicable building codes and good roofing practice. P-, EN -Omar -Al urmneAPPIma7rovAZFx-20t5-05_reformaned 2015-05 KQDynasty Armourzone Shingles Application Instructions NAILING: Use galvanized (zinc coated) roofing nails, 11 or 12 gauge, with at least 3/80 diameter heads, long enough to penetrate through plywood or 3/4" into boards. Use 4 nails per shingle placed in the nailing area, either between the lines or on the lines, spaced as shown below. Drive nails straight so that nail head is flush with, but not cutting into shingle surface. NAILING ON STEEP SLOPES: On slopes of 21" per foot (600) or more, use 6 instead of 4 nails per shingle placed as shown below. Ensure that no nail is within 24 of a joint/cutout of the underlying shingle. NOTE: Each nail MUST penetrate both layers of the shingle by nailing into the lower nail line only. Normal nail zone cannot be used to ensure penetrating both layers. Seal down each shingle at time of application with three 1' diameter (approx. size and thickness of a quarter) spots of asphalt plastic cement placed underthe shingle 2" above the bottom edge and equally spaced along the shingle. Apply plastic cement in moderation since excessive amounts may cause blistering. CAUTION: Shingles should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the heat of direct sunlight. When application conditions might limit the effectiveness of the sealing strip, such as in cool weather or in areas subject to high winds or blowing dust, shingle adherence should be ensured through manual sealing as described above. To ensure coverage under the High Wind Resistance Limited Wind Resistance Warranty, - Manual sealing is not required in the state of Florida. - Starter strip shingles must he used at all eaves Rake application ofstarterstrips is not required. OPEN METAL VALLEY: (FIGURE 1) For longer roof performance, metal valleys are recommended. Complete valley flashing before shingles are applied. Center a 360 width strip of ICE & WATER PROTECTOR (A) in the valley. Ensure flashing is tight to the deck, then fasten with only enough nails to hold In place, nailing at the edges only. Center a minimum 24" wide, minimum 28 gauge pre-finished/galvanized metal valley liner (8) in the valley, and fasten with only enough nails to hold in place, nailing at the edges only. Snap two chalk lines (C) the full length of the valley, 6" apart at the top and increasing NAILS CEMENT STEEP SLOPE NAIL PLACEMENT Dynasty Armourzone Shingles Application Instructions In width V8° per foot towards the bottom. When the shingles are being applied, lay them over the valley flashing, trim the ends to the chalk line, and M a 2" triangle off the comerto direct water into the valley (D). Embed the valley end of each shingle into a 3" band of asphalt plastic cement (E), and nail the shingles 2" back from the chalk line, 7 3/8" down from the top edge of the shingle. CLOSED CUT OR WOVEN VALLEYS ARE ALSO ACCEPTABLE. STARTER COURSE: (FIGURE 2) Use Leading Edge Plus shingles or if 3-tab shingles are used, cut off the tabs along a line level with the top of the cutouts. Install the starter course with the factory applied sealant adjacent to the eaves overhanging the rake edge and eaves by a nominal 1/4" minimum. Begin starter course (A) with a shingle cut 4° short so that joints will not coincide with joints between first course shingles. FIRST COURSE: Start with a complete shingle applied flush with starter course at rake and eave (B). Nail as described above and continue across roof with full shingles. SECOND, THIRD AND FOURTH COURSES: (FIGURE 2) Trim on 10°, 20°, and 30° respectively, from the left end of the starting shingle and apply to overhang rake edge by 1/4° to 318u. Continue each course across the roof with full shingles butting ends loosely. Align the bottom edge of the shingles with the tops of the saw teeth of the shingles in the underlying course (Q. Note that other offsets between 4° -10" are permitted. c FIFTH AND SUCCEEDING COURSES: Repeat the sequence of the first four courses up the roof. For maximum wind protection, cement shingles at rake edges. Panty 3 FirtiRF t r Ion WOMEN a A DWPEOW CONSTRUCTION MATERIALS TECHNOLOGIES October 27, 2017 IKO Industries, Ltd 120 Hay Rd. Wilmington, DE 19809 Re: FBC FL17800 Sir(s), PRI Construction Materials Technologies has completed a technical review and attached sealed shingle instructions in compliance the 2017 Florida Building Code. This review was completed based on the receipt of following evidence from IKO Industries, Ltd: 1) IKO DynastyArmourzone Shingles Application Instructions (EN-Dynasty_Annourzona_Mpins_8TTDYAZEFS-2015-01_reformatted 2015-02) 2) ASTM D3161 I FBC (HVHZ) TAB 107 Test Report (PRI Project No. IKO-125-02-01) 3) FBC (HVHZ) TAB 100 Test Report (PRI Project No. IKO-148-02-01) The attached instructions should be used in conjunction with the published'manufacturees application Instructions and applicable code. In the event the Instructions conflict, these Instructions shall govem. Statement of Independence: PRI Construction Materials Technologies and/or DucT. Nguyen, FL P.E. do not have nor plan to acquire a financial Interest in any company manufacturing or distributing products for which the test reports are issued. Signed: C Signed: 624 Brad Grzybcyfaid Due T. uyen� Managing D rector Florida Pagislere Professional Engl en er P.E. Number: 65034 Data: October 27, 2017 Date: October 27, 2017 Attachments: A) IKO Dynasty Anhourzone Shingles Application instructions iKo-186-02.01 PM0m2ud nMdnWsTmhndoybs,LLO. 641211eWIldn Twm FL35810 TeL813621.577r F=8138n5348 eanmtmatel tes6i@t rdom WebSde:ttltPN"PdWUGm IKO Installation Instructions for Asphalt shingles Page 2 of 2 IKO Dynasty Armourzone Shingle Application Instructions (ASTM D3161, Class F — IKO Dynasty Armourrone Laminated Shingle) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT, THESE INSTRUCTIONS WILL GOVERN. ROOF DECK: Solidly sheathed and fastened deck conforming to 2017 FBC. UNDERLAYMENT: Applied in accordance with building code requirements. For auras where the roof slope is less than 4" per foot down to 2" per foot, use 2 layers of underlayment conforming to building code requirements, the first sheet overlapping the eave protection by 19", followed by full 36" widths overlapping each preceding course by 19" or other Approved underlayments in accordance with the qualified application instructions. For areas where the roof slope is 4" per foot or greater, cover the deck with one ply of underlayment laid parallel to the eaves, with 2" horizontal laps and 4" end laps. Apply metal drip edges on top of any underlay along_ rake edges and directly to the deck along eaves in accordance with building code requirements. NAILING: Use galvanized (zinc coated) roofing nails,11 or 12 gauge, with at least 3/6" diameter heads, long enough to penetrate through plywood or We into boards. Use 4 nails per shingle placed in the nailing area, either between the lines or on the lines, spaced as shown below. Nailing area is 1-1/4" wide and located 6- 5/16" to 7-9116" below the top edge. Drive nails straight so that nail head is flush with, but not cutting into shingle surface. Additional for FBC (HVHZ): Asphaltic shingles shall be installed in accordance with RAS 116. Installation shall be limited to a roof mean height of 33'. Use 6 approved roofing nails (e.g. approved 12 gauge by 1-1/4" corrosion -resistant annular ring shank roofing nails) per shingle as shown below for steep slope nail placement, except asphalt plastic cement is not required. NAILING ON STEEP SLOPES: For steep slopes of 21" perfoot (600) or more, use 6 nails per shingle placed as shown below. Ensure that no nail is within 2" of ajoint/cutout of the underlying shingle. Seal down each shingle at time of application with three I" diameter (approx. size and thickness of quarter) spots of asphalt plastic cement placed under the shingle 2" above the bottom edge and equally spaced along the shingle. Apply plastic cement in moderation since excessive amounts may cause blistering. CAUTION: Shingles should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the heat of direct sunlight EXPOSURE: Installed shingles shall have a maximum average exposure of 5-7/8". STEEP SLOPE NAIL PLACEMENT PR0:nsh ft MsbaleIsTed=b9les,LLr- 641211eEgeri3dw Twpa,FL33010 T&III £ -5M Fas81346 ,WO ema1:maRMabtssfU@p4c tmm WebS3e:hWJAww.pdwd=