HomeMy WebLinkAboutWINDOW-DOOR SCHEDULEFIE COPY
twl,4za—1 8(Z-
M
, 0-9, a.
��` �
_ �l ,�'
���
.fit?
� � • ��.
—__wow"
I 1
*WIndow Replacement using existing shutters to comply weth impact protection wiff require the
existing shutters to meet the requirements of the FBC Sth Edition (2014) Residential R301.2.1.2
TOTAL GLAZED OPENING AREA FOR STRUCTRE: S.F.
PERCENTAGE OF NEW GI AZED Alf FA,: VP
(TOTAL INSTALLED GLAZED AREA DIVIDED BY TOTAL GLAZED OPENINGS FOR STRUCTURE)
NOTE: The replacement of more than 25% of the aggregate area of exterior glazing (windows & doors) in one & two family
dwellings within a 12 month period will require impact protection on all proposed glazed opening replacement (approved
shutters or impact resistant glazing) as per FBC Sth Edition (2014) EXISTING BUILDING 706.4.
"" FRW
SH — SINGLE HUNG AWN — AWNING SL— SLIDING
DR—DOUBLEH NG CAS —CASEMENT r =�rili v