Loading...
HomeMy WebLinkAboutCHECK LISTi Florida Building Code, Sixth, Edition .(N17) -:Energy Conservation EnergyGauge Summit® Fla/Com-2017, Effective Date: Dec 31, 2017 IECC 2015 -Total Building Perforrnance Compliance Option i Check List Applications for compliance with the Florida Building Code, Energy Conservation shall include: This Checklist Checklist DEC 0 4 MB The full compliance report generated by the software that contains the proje t gT, Lucie County, Permitting summary, compliance summary, certifications and detailed component comp rance reports. The compliance report must include the full input report generated by the software as contigous part of the compliance report. Boxes appropriately checked in the Mandatory Section of the complaince report. WARNING: INPUT REPORT NOT GENERATED. To include input report in final submission, go to the Project Form, Settings Tab and check the box - "Append Input Report to Compliance Output Report" Then rerun your calculation SCANNED BY St. Lucie County r- EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 10/14/2018 Page I of 14 PROJECT SUMMARY Short Dear: Missionary FI - GC Owner: Enter Owner's name here Addressl: Hammond Rd & Steel Blvd Address2: Description: Missionary Flights- Garage Clol City: Fort Pierce State: FL Zip: 34946 Type: Warehouse Class: New Finished building Jurisdiction: FORT PIERCE, ST LUCIE COUNTY, FL (661100) Conditioned Area: 161 SF Conditioned & UnConditioned Area: 161 SF No of Stories: I Area entered from Plans 161 SF Permit No: 0 Max Tonnage 0.8 If different, write in: EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Dale: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2016 - Total Building Performance Compliance Option 10/14/2018 Page 2 of 14 Component Design Criteria Result Gross Energy Cost (in $) 43.0 81.0 PASSED LIGHTING CONTROLS EXTERNAL LIGHTING HVAC SYSTEM PLANT WATER HEATING SYSTEMS PIPING SYSTEMS Met all required compliance from Check List? PASSES PASSES PASSES No Entry PASSES PASSES Yes/No/NA IMPORTANT MESSAGE Info 5009 -- -- -- An input report of this design building must be submitted along with this EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option 10/14/2018 Page 3 of 14 CERTIFICATIONS I hereby certify that the plans and specifications covered by this calculation are in compliance with the Florida Energy Code Prepared By: David R. ]ones Building Official: Date: " ! u — 1 '; Date: I certify that this building is in compliance with the Florida Energy Efficiency Code Owner Agent: Date: If Required by Florida law, I hereby certify (') that the system design is in compliance with the Florida Energy Efficiency Code Architect: Electrical Designer: David R. Jones Lighting Designer: David R. Jones Mechanical Designer: David R. Jones Plumbing Designer: David R. Jones Reg No: Reg No: 41042 Reg No: 41042 Reg No: 41042 Reg No: 41042 (•) Signature is required where Florida Law requires design to be performed by registered design professionals. Typed names and registration numbers may be used where all relevant information is contained on signed/sealed plans. 16 1 EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 % .1 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option - 10/14/2018 Page 4�of-14 . Project: Missionary FI - GC Title: Missionary Flights - Garage Closet Type: Warehouse Building End Uses 1) Proposed 2) Baseline Total 2.70 6.00 $43 $95 ELECTRICITY(MBtutkWhl$) 2.70 6.00 803 1761 $43 $95 AREA LIGHTS 0.80 1.60 121 468 $12 $25 MISC EQUIPMT 0.30 0.30 94 94 $5 $5 PUMPS & MISC 0.10 0.10 19 21 $1 $1 SPACE COOL 1.00 1.40 306 417 $17 $22 SPACE HEAT 0.20 0.30 70 93 $4 $5 VENT FANS 0.30 2.30 93 668 $5 $36 Credits Applied: None PASSES Passing Criteria = 81 Design (including any credits) = 43 Passing requires Proposed Building cost to be at most 85% of Baseline cost. This Proposed Building is at 45.8% EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 10/14/2018 Page 5 of 14 Project: Missionary FI - GC Title: Missionary Flights - Garage Closet Type: Warehouse (WEA File: FL ST LUCIE CO INTL.tm3) External Lighting Compliance Description Category Tradable? Allowance Area or Length ELPA CLP (W/Unit) or No. of Units (W) (W) (Sgft or ft) Ext Light 1 Main entries Yes 30.00 16.0 480 30 Tradable Surfaces: 30 (W) Allowance for Tradable: 1230 (W) PASSES All External Lighting: 30 (W) Complicance check includes a excess/Base allowance of 750.00(W) Project: Missionary FI - GC Title: Missionary Flights - Garage Closet Type: Warehouse (WEAFile: FL ST LUCIE CO INTL.tm3) Lighting Controls Compliance Acronym Ashrae Description Area Design Min Compli- ID (sq.ft) CP CP ance Closet 30,001 Fine Material Storage 161 1 1 PASSES PASSES Project: Missionary FI - GC Title: Missionary Flights - Garage Closet Type: Warehouse (WEA File: FL ST LUCIE CO INTL.tm3) System Report Compliance System 1 System Constant Volume Air Cooled No. of Units Split System < 65000 Btu/hr 1 Component Category Capacity Design ER Design IPLV Comp- Eff Criteria IPLV Criteria liance Cooling System Air Conditioners Air Cooled 9000 23.20 13.00 8.00 PASSES Split System < 65000 Btu/h Cooling Capacity Heating System Heat Pumps Air Cooled 10900 11.00 8.20 PASSES (Heating Mode) Split System < 65000 Btu/h Cooling Capacity Air Handling Air Handler (Supply) - 300 0.10 0.82 PASSES System -Supply Constant Volume PASSES EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Dale: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option 10/14/2018 Page 6 of 14 Plant Compliance Description Installed Size Design Min Design Min Category Comp No Eff ER IPLV IPLV liance None Project: Missionary FI = GC Title: Missionary Flights - Garage Closet Type: Warehouse (WEAFile: FL ST LUCIE CO INTL.tm3) Water Heater Compliance Design Min Design Max Comp D Description Type Category Eff Eff Loss Loss liance Water Heater 1 Electric water heater <= 12 [kW) 0.99 0.97 PASSES PASSES Project: Missionary FI - GC Title: Missionary Flights - Garage Closet Type: Warehouse (WEA File: FL ST LUCIE CO INTL.tm3) Piping System Compliance Category Pipe Dia Is Operating Ins Cond Ins Req Ins Compliance [inches] Runout? Temp [Btu-in/hr Thick [in] Thick [in1 1171 SF.F1 Heating System (Steam, Steam 0.75 False 105.00 0.28 1.00 0.50 PASSES Condensate, & Hot Water) Cooling Systems (Chilled Water, Brine 0.50 False 45.00 0.28 0.50 0.50 PASSES and Refrigerant) PASSES EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option 10/14/2018 Page 7 of 14 Mandatory Requirements (as applicable) Mandatory requirements compiled by US Department of Energy and Pacific Northwest National Laboratory. Adopted with permission Topic Section Component Description Yes NIA Exempt Insulation C303.2 Envelope Below -grade wall insulation installed per IT ❑ ❑ El 2. To be checked by Men Reviewer Plan Review C103.2 Envelope Plans and/or specifications provide all information with which compliance can be determined for the El El building envelope and document where exceptions to the standard are claimed. manufacturer's instructions. Insulation C303.2 Envelope Slab edge insulation installed per manufacturers �❑ instructions. Insulation C303.2 Envelope Above -grade wall insulation installed per manufacturers instructions. Insulation C402.3 Envelope High-albeda roofs satisfy one of the following: � EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Dale: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option 10/14/2018 Page 8 of 14 A Plan Review C103.2 Plan Review C103.2 Plan Review C103.2 Plan Review C103.2 Insulation C402.2.5 Insulation C402.2.6 HVAC C402.2.6 Insulation C402.2.6 Air Leakage C402.5.7 SYSTEM -SPECIFIC C403.2.12.3 HVAC C403.2.13 HVAC C403.2.4.2 SYSTEM_SPECIFIC SYSTEM -SPECIFIC SYSTEM -SPECIFIC HVAC C403.2.4.4 C403.2.4.7 C403.2.5 C403.2.6.1 SYSTEM -SPECIFIC C403.4.1.1 SYSTEM -SPECIFIC C403.4.1.3 SYSTEM -SPECIFIC C403.4.2 Mechanical Plans, specifications, and/or calculations provide all information with which compliance can be determined for the mechanical systems and equipment and document where exceptions to the standard are claimed. Load calculations per acceptable engineering st Mechanical Plans, specifications, and/or calculations provide all Information with which compliance can be determined for the service water heating systems and equipment and document where exceptions to the standard are claimed. Hot water system sized per manufact Interior Lighting Plans, specifications, and/or calculations provide all information with which compliance can be determined for the Interior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided shoul Exterior Lighting Plans, specifications, and/or calculations provide all information with which compliance can be determined for the exterior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided shout Envelope Slab edge insulation depth/length. Slab insulation extending away from building is covered by pavement or>=10 inches of soil. Project Radiant heating systems panels insulated to >=R-3.5 on face opposite space being heated. Mechanical Thermally Ineffective panel surfaces of sensible healing panels have insulation>= R-3.5. Envelope - Radiant panels and associated components, designed for heat transfer from the panel surfaces to the occupants or indoor space are insulated with a minimum of R-3.5. Envelope Vestibules are installed on all building entrances. Doors have self -closing devices. Mechanical Fans have efficiency grade (FEG) >= 67. The total efficiency of the fan at the design point of operation <=15% of maximum total efficiency of the fan. Mechanical Unenclosed spaces that are heated use only radiant heat Mechanical Each zone equipped with setback controls using automatic time clock or programmable control system. Mechanical Zone isolation devices and controls installed where applicable. Mechanical Fault detection and diagnostics Installed with air-cooled unitary DX units having economizers. Mechanical Hot water boilers supplying heat via one- or two -pipe systems include outdoor setback control. Mechanical Demand control ventilation provided for spaces >500 ft2 and>25 people/1000 ft2 occupant density and served by systems with air side economizer, auto modulating outside air damper control, or design airflow>3,000 cfm. Mechanical Hydronic and multizone HVAC system controls areVAV fans driven by mechanical or electrical variable speed drive per Table C403.4.1.1. Mechanical Reset static pressure setpoint for DDC controlled VAV boxes reporting to central controller based on the zones requiring the most pressure. Mechanical Temperature reset by representative building loads in pumping systems for chiller and boiler systems>500,000 Btu/h. ■ ■ ■ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Dale: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option 10/14/2018 Page 9 of 14 SYSTEM —SPECIFIC C403.4.2.3.2.1 Mechanical Closed-circuit cooling tower within heat pump loop ❑ El have either automatic bypass valve or lower leakage positive closure dampers. Open -circuit tower within heat pump loop have automatic valve to bypass all heat pump water flow around the tower. Open- or cl SYSTEM —SPECIFIC C403.4.2.4 Mechanical Hydronic systems greater than 500,000 Btu/h ❑ ❑ ❑ designed for variable fluid flow. SYSTEM —SPECIFIC C403.4.2.5 Mechanical System turndown requirement met through multiple single -input boilers, one or more modulating boilers, or a combination of single4nput and modulating boilers. Boiler input between 1.0 MBtu/h and 5 MBtu/h has 3:1 turndown ratio, boiler input between 5.0 SYSTEM —SPECIFIC C403.4.2.6 Mechanical Chilled water plants with multiple chillers have El El El capability to reduce flow automatically through the chiller plant when a chiller is shut down. Boiler plants with multiple boilers have the capability to reduce flow automatically through the boiler plant SYSTEM —SPECIFIC C403.4.3, Mechanical Fan systems with motors>=7.5 hp associated C403.4.3.2 with heat rejection equipment to have capability to operate at 2/3 of full -speed and auto speed controls to control the leaving fluid temperature or condensing temp/pressure of heat rejection device. SYSTEM —SPECIFIC C403.4.4.5 Mechanical Multiple zone HVAC systems have supply air temperature reset controls. SYSTEM —SPECIFIC C403.4A.6 Mechanical Multiple zone VAV systems with DDC of individual zone boxes have static pressure setpoint reset controls. SYSTEM —SPECIFIC C404.2.1 Mechanical Gas -fired water-heatingequipment installed in ❑ new buildings: where a singular piece of water -heating equipment>= 1,000 kBtu/h serves the entire building, thermal efficiency >= 90 Et. Where multiple pieces of water -healing equipment serve the building wi SYSTEM —SPECIFIC C404.4 Mechanical All piping insulated in accordance with section details and Table C403.2.10. SYSTEM —SPECIFIC C404.5, C404.5.1, Mechanical Heated water supply piping conforms to pipe ❑ El C404.5.2 length and volume requirements. Refer to section details. SYSTEM —SPECIFIC C404.6.3 Mechanical Pumps that circulate water between a heater and storage tank have controls that limit operation from startup to <= 5 minutes after end of heating cycle. SYSTEM —SPECIFIC C404.7 Mechanical Water distribution system that pumps water fromEl 1-1 ❑ a heated -water supply pipe back to the heated -water source through a cold -water supply pipe Is a demand recirculation water system. Pumps within this system have controls that start the Wattage G405.5.1 pump upon receiving Exterior Lighting Exterior lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Plan Review C405.6 Project Group R-2 dwelling units have separate electrical ❑ El meters. Plan Review C406 Project Plans, specifications, and/or calculations provide ❑ all Information with which compliance can be determined for the additional energy efficiency package options. SYSTEM —SPECIFIC C40B.2.2.2 Mechanical HVAC hydronic heating and cooling coils have ❑ ❑ means to balance and have pressure test connections. SYSTEM —SPECIFIC C408.2.2.2 Mechanical HVAC hydronic heating and cooling coils have ❑ means to balance and have pressure test connections. EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Dale: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 10/14/2018 Page 10 of 14 413o 11 Osed S[OZ/4I/01 uopdo aouepdwoo aoueuuoyad Oulppng jejol- SIOZ 003I uogenlasuoo 66)au3 - QUoz) uoplp3 ylxlS'opoo Oulplmg epuolj LL0Z'16080:Ole09np0ag3 elemlloSjuepdwoo0'l-LtOZWVl'LIOZ-woo/el3®l!wwnSa6negABlau3 ❑ ❑ 'swop offien Xoop Bulpeol Ile uo pallelsul sleaslayleaM adolanu3 9'S'ZOb3 o6eyeaq i!V ' pamolle wagm wedwep glneiB 3loa4o'salty a6eHeal wnwlxew leave pue asn ui iou uaym lnys Almllewolne PUP siedwep E'b'Z'0170 pazuolow eney swalsAs lsneyxa pue lie ioopinp ed0lanu3 'S'S'Z063 a6eyea� jlV -asolo Allmpewolne legl sJadwep SI"Z'E0 0 El El ❑ pazuolow eney sluan Uegs Jolenala pue nelS ed0lanu3 'S'S'Z04o 960NOGI JIV adolanua leuuagl ayl ep!sul wwl palelos!'wool a ui pasopua to adolanua lewiayl Bulppnq eql eplslno palmol am buluado lie uopsngwm pue smuepdde egl'smuepdde Bulwnq lanl uopsngwm uado of lie uopsngwm riep!nwd spnp lie uopsngwm uado aiagM ad019nu3 E'S'ZOCo a6elleag HIV •sluawellnbai a6exesl lie Bupaaw Be El El ❑ pelagel Ole sloop pue uopegsaual lllnq-/uopej edolanu3 6•S'Z063'Z'S'Z063 a6eyeag J!V •�auuew panwdde ue ul paleas we suopegauad iaweq AV 'ZU/wp b0'0 => GOexeal lie Apulasse a6wane pue jauuew panwdde ue ul paleas sl leyl lalueq El❑ ❑ ale snonupum a sulelum adolanua Bulpllnq egl ed0lanu3 Z'Z'L'S'Z06o 06exeal AV 7auuew panwdde ue ui paleas we suopwlaued l8lueq-0V 'ZU[wjo b00'0 => Allllgeauued leualew pue Jauuew panwdde ue ul paleas sl leyl lalueq ❑ ❑ ❑ ne snonupum a sulelum adolanua Bulpllnq ayl ed0l0nu3 VZ'L'S'Z04o e6"ea-1 ny .9bujeal lie ezlwlulw of leualew 6u!ddelm algeauuad-loden wnlslow yIIm paddwm to padduls la4leam'pal9xsu6'paAlnm'paleas we adolanua ❑ lemagl Bulpllnq eyl ul aBexeal lle to sawnos IIV ed0lanu3 1,TS'Z063 que>fe91 lb 99lwew panwdde ue ul paleas we suopwlaued laweq AV 'iauuew panwdde ue ui palsal to papwlsuoo jay1!a pue jauuew panwdde ue ul paleas sl legl lalueq ❑ ❑ ❑ lle snonupum a sulelum adolanua 6ulppnq eyl 9d0l0nu3 L'97043 a6exeaj -0V 'ZU/wlo Ob'0 => e6eyeal ne llwp of pawaap pue palsal uaaq sey legl lalueq ❑ ❑ ❑ 1!e snonupum a sulelum adolanua Bulpl!ne ad0l0nu3 97043 e6eyea-1 -0V 'Al6ulp 000e palpsul sl uopelnsul )l luepdwm luawwmbei slyl 1peyy'6uplm papuedsns e to dol uo pallelsul aq iouum sluawallnbw ❑ ❑ ❑ uopelnsul low eyl leave of popuslui uopelnsul ad0l8nu3 ZZ'Z06o uopelnsul 'S-m to Hoope uopelnsul 4l!n+ ❑ ❑ ❑ slow to lanai ayl of palelnsui ul Ole sgim igBgAxg edolanu3 Z"Z'Z063 uopelnsul -uopelnsul ElEl SL'b-m eney woop anbedo 6ul6uuns-u0N edolanu3 eTZ043 uopelnsul •uolpadsul uopepuno3 Buunp mmo of paau hew uopelnsul uopepunol pasodxe lol uopmpuaq •leualew an!palwd e ❑ ❑ ❑ yl!m e6ewep woq papalwd sl uopelnsul joualx3 ed0l8nu3 l"Z'EOEo uopelnsul 'selunlpa aoueualulew luawdlnba PUB 6uldmspuel'pupx'wnls!ow'ly6lluns 'a6ewep lsule60 papalwd uopelnsul louapc3 ad0lanu3 L'Z'EOEo uopelnsul 'sgels lempMs l0 6uppap to oplslapun yl!m popoo luaueuuad ui papelsul uopelnsul gels lempms jo Allneo'suolpngsu! ri spwnpelnuew lad papelsul uopelnsul Joold edolanu3 b'Z'Z043'Z'E0E3 uopelnsul 'papinwd salmgipm to slagel muewjoyad of Be padwm we spinpwd uopwlsaued ed019nu3 E'LT= uopwlsaued 'OWN yllm muepimoe ul pales spnpwd uopwlsaued adolanu3 ETC= uopwlsaued 'elep luenalw laglo pue anlen-m 6upinwd olmpym uopelnsul jo amen-m [I El ❑ 4MM palagel sl uopelnsui adolanua bUtpllne adolanu3 L'EOE3 uopelnsul •ZL ul E=> sl adols low agl waym AM papelsul sl uopelnsu! IIJNsool pwnod to umole 'suolpngsul ❑ s„ 3Vwnpelnuew lad pallelsul uopelnsul loom 8d0l9nu3 L'EOE3 uopelnsul bl3o ZI aged HIMPI/0I uopdp amegdwoo a0ueuuopad 6uiplme Ielol- 9IOZ 0031 u00e/ua£u0D A61au3 - (806 u011ip3 q)xIS'opop 6uiplmg epuol j 80Z'I600p:a)epan008.43'alemyoS)uepdw030'I-LIOZWVj'LI0Z-wo0/ejj®)lwwnSa6neDA13 u3 Belem ❑ El ❑s11u21 a6elols 6u0e!nona-uou uo pallelsw scion leaH leo!uegoaW E"1,0173 31d133dS W31SAS N!oedeo %9Z - g/n18A ObZ< El El :ol pal!w!I ssedAq seB loH In!ueyoalnl 9'1"EOb3 0Id133dS W31SAS ualem loq oaiNos )o eupeagald loy pallelsul sl uolpalal leag dead Jo / 09 apinoid jo j.99 of jelem El ❑ ❑ yeaq um 1e41 walsAs Aanooaj leag jasuapuo3 IMIUB439W 9'1'E043 31d133dS W31SAS auoz goes of Bull000 pue Bugeaq nuonbas pue Bullom 17-l'9'b'b'£Ob0 ❑ ❑ ❑ pue Buneag snoauelinwls llwp um sloqum auoZ 180!uegoON 'S'b'b'EOb3 0Id133dS W31SAS •)Io s! dq Ol< walsAs Bu!dwnd LAM dwnd IU04 oluoipA4 uagm moU Jalem go ❑ ❑ ❑ ings of PwPOPaluj amen opewolne uoplsodoml Im!uegoaW E'E71"E043 OIdl03d1 W31SAS 'do OE=> of ainpuedwal Alddns 6upom pue 6u!leaq 1!wp of sloqum lsw aneq pue haAmBUego eio}aq sjq b lseel le ioy epow ouo ui uopelado molle'deSl=< puegpeap e mope of sloqum aneq welsAs uopnquls!p El ❑ ❑ gowwm a Bulsn swalsAs oluapAq adldoml lmlumpayy Z'Z'b'£043 3Id133dS W31SAS "o'm Z' L=> lulodlas japmlum ❑ ❑ ❑ os palmol slosuas ounssaid ollelS aneq sue) AVA Ieoluegoapy ZVVeo43 0Id103dSW31SAS 'Bupsol 05"eal qe ❑ ❑ ❑ sannbai uwnlm lalem'ul £< Buggiado Hiompn0 Im!umpayy E'l'6'Z'£043 OId133dS W31SAS vo!padsul uo!lepunoj Buunp mmo of paau Aew uo!lmpuaA a lapun io ul Pallwsu! we swnuald io El El El spnp eiagM •palelnsul swnuald pue spnp OVAH spnp IMIU8409W BZ'£043 OVAH 'N!oedn u6!sap jo ssal jo %09 0l suel alelnpow io eBels of Nlaedeo pue uo!palap lueu!weyum opewolne El El ❑ seq uopel!luan oBeleB BupPed posolou3 leo!uegoaW Z'9'Z'E040 OVAH • -pallelsul slollum opewolne aneq swalsAs uolpalwd ezow j 'sloilum of uopoouum 9'117'E043 ❑ ❑ ❑ aminl iol slosuas walsAs Bulllaw n!/mouS POWWOW S'b'Z'E063 3VAH ❑ ❑ ❑ -slollum Pals wnw!ldo apnlou! swelsAS Im!uegoaW E'Z117'£043 0Id133dS W31SAS dngoeq moq-0y'apwano luedn000 moq-Z'lloolo Aep-L:(I�)j.99 Z'Z'4'Z'EObO El ❑ ❑ Pue(leaq) j.9S of goeq!aS:sloquoO opewolnV InluegoaW 'I'Z'4Z"E063 3VAH El El Elsuopo!gsw delmo lulodlas aneq sloqum amleladwal Im!ue4oaW E'l'b'Z'E0b3 OVAH ❑ ❑ ❑ 'puegpeap I.y S e aneg slollum apelsouuagj Im!umpayy Z'l'b'Z'£063 OVAH ❑ ❑ ❑ puegpeap j.y S e aneq slwlum opelsouuagl InNeyoapy Z'l'b'Z'E0b0 OVAH 'popaau loll uagm uo Bu!wm wmy leaq eouelslsw El El ❑ oupala leluawalddns luaAwd slwlum dwnd IBOH Iso!ue43M I'I'b'Z'MCI 31d133d5 W31SAS wwsAs uopmU!Plwngap/uopmUlp!wnq pa:Iwsui jad m!Aep loqum N!plwnq auo wnwlulW 'loqum lelsouuagl e El El ❑ Aq papoqum sI auoz Woo of Bupom PUB 6upeaH 1nluelpaW VVZ'E043 0IdI03dS W31SAS '(E)E'Z'£043 algal of q elouloo j led se Nuo luawmeldw iol polagel El El El 'uI Zb Aq •u! 91. s9na919 gl!m Mid PUB OVld IeolumpaW E'Z'E043 31d109dS W31SAS ❑ ❑ paguaA Aoua!owa luawdlnba 3VAH ImluegoaW E7"E043 OVAH 'uolloodsul uopepunoj Buunp mmo of paau Aew uopmppaA'gels a ,spun io ul pallelsul sl ❑ ❑ ❑ 6u!d!d watIM •ssawlo!gl uo!lelnsu! Bu!d!d 3VAH Im!ueyoaW OVZ'E040 31j133dS W31SAS wnpeawd leuopolndwm lualenmba panadde us Aq Ja E91, P ENUIS V33V/3V-dHSV/ISNV 411m muepiome u! palelmlm ❑ ❑ ❑ spool u6!sop luawdlnba pue swalsAs OVAH Ieo!uegoaW Vz'£O4O OVAH '6u!snoq aneu!wnl pue gs!ug joualu! uaamlaq IesS'palagel pue paleu 31 eq PUB uopeglUul ❑ ❑ ❑ 11w!l of adolanue lemagl ui sageulwm nl passaa odOIOAU3 9'S'ZOb3 a8mleal nV SYSTEM C404.3 Mechanical Heat traps installed on supply and discharge —SPECIFIC piping of noncirculating systems. SYSTEM C404.3 Mechanical Heat traps installed on supply and discharge —SPECIFIC piping of non -circulating systems. SYSTEM C404.6.1 Mechanical Controls are installed that limit the operation of a —SPECIFIC recirculation pump installed to maintain temperature of a storage tank. System return pipe Is a dedicated return pipe or a cold water supply pipe. SYSTEM C404.6.1, C404.6.2 Mechanical Automatic time switches installed to automatically —SPECIFIC switch off the recirculating hot-water system or heat trace. SYSTEM C404.9.1 Mechanical Pool heaters are equipped with on/off switch and —SPECIFIC no continuously burning pilot light. SYSTEM —SPECIFIC C404.9.2 Mechanical Time switches are installed on all pool heaters and pumps. SYSTEM —SPECIFIC C404.9.2 Mechanical Time switches are installed on all pool heaters and pumps. SYSTEM C404.9.3 Mechanical Vapor retardant pool covers are provided for —SPECIFIC heated pools and permanently Installed spas. Controls C405.2.1 Interior Lighting Lighting controls Installed to uniformly reduce the lighting load by at least 50%. Controls C405.2.1 Interior Lighting Ocoupancy sensors installed In required spaces. Controls C405.2.1, Interior Lighting Independent lighting controls installed per C405.2.2.3 approved lighting plans and all manual controls readily accessible and visible to occupants. Controls C405.2.2.1 Interior Lighting Automatic controls to shut off all building lighting installed in all buildings. Controls C405.2.3 Interior Lighting Daylight zones provided with individual controls that control the lights independent of general area lighting. Controls C405.2.3, Interior Lighting Primary sidelighted areas are equipped with C405.2.3.1, required lighting controls. C405.2.3.2 Controls C405.2.3, Interior Lighting Enclosed spaces with daylight area under C405.2.3.1, skylights and rooftop monitors are equipped with C405.2.3.3 required lighting controls. Controls C405.2.4 Interior Lighting Separate lighting control devices for specific uses installed per approved lighting plans. Wattage C405.2.4 Interior Lighting Additional Interior lighting power allowed for special functions per the approved lighting plans and is automatically controlled and separated from general lighting. Controls C405.2.5 Exterior Lighting Automatic lighting controls for exterior lighting installed. Controls will be daylight controlled, set based on business operation time -of -day, or reduce connected lighting > 30%. Wattage C405.4.1 Interior Lighting Interior installed lamp and fixture lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed wafts. MandatoryAdditional Eff C406.4 Project Enhanced digital lighting controls efficiency package: Interior lighting has following enhanced lighting controls in accordance with Section C405.2.2: Luminaires capable of continuous dimming and being addressed individually, <= 8uuminaires controlled in Mandatory Additional Eff C406.6 Project Dedicate outdoor air system efficiency package: Buildings with hydronic and/or multiple -zone HVAC systems are equipped with an Independent ventilation system designed to provide>= 100-percent outdoor air to each individual occupied space, as specified by ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 011"01 EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option 10/14/2018 Page 13 of 14 Mandatory Additional Eff C406.7, C406.7.1 HVAC C408.2.2.1 HVAC C408.2.2.1 Testing C408.2.3.2 Project Mechanical Mechanical Mechanical Enhanced Service Water Heat System efficiency package. One of the following SWH system enhancements must satisfy 60 percent of hot water requirements, or 100 percent if the building otherwise complies with heat recovery per Section C403.4.5: Waste heat re Air outlets and zone terminal devices have means for air balancing. Air outlets and zone terminal devices have means for air balancing. HVAC control systems have been tested to ensure proper operation, calibration and adjustment of controls. ❑ ❑ ❑ ❑ El ❑ ❑ ❑ i 4. To be by Inspector at Project Completion and Prior to Issuance of checked P Certificate of Occupancy Post Construction C303.3, C408.2.5.2 Interior Lighting Furnished 08M instructions for systems and equipment to the building owner or designated Post Construction C303.3, C408.2.5.3 Mechanical representative. Furnished 08M manuals for HVAC systems within 90 days of system acceptance. Fenestration C402.4.2.2 Envelope Skylights in office, storage, automotive service, ❑ ❑ ri manufacturing, non-refdgerated warehouse, retail store, and distdbudon/sorting area have a measured haze value > 90 percent unless designed to exclude direct sunlight Post Construction C408.2.1 Mechanical Commissioning plan developed by registered El 1:1 ❑ design professional or approved agency. Post Construction C408.2.3.1 Mechanical HVAC equipment has been tested to ensure proper operation. Post Construction C408.2.3.3 Mechanical Economizers have been tested to ensure proper El ❑ operation. Post Construction C408.2.4 Mechanical Preliminary commissioning report completed and ❑ ❑ certified by registered design professional or Post Construction C408.2.5.1 Mechanical approved agency. Famished HVAC es -built drawings submitted ❑ ❑ ❑ within 90 days of system acceptance. Post Construction C408.2.5.1 Interior Lighting Furnished as-bulit drawings for electric power El 11 systems within 90 days of system acceptance. Post Construction C408.2.5.3 Mechanical An air and/or hydronic system balancing report is ❑ provided for HVAC systems. Post Construction C408.2.5.4 Mechanical Final commissioning report due to building owner ❑ ❑ within 90 days of receipt of certificate of Post Construction C408.3 Interior Lighting occupancy. Lighting systems have been tested to ensure proper calibration, adjustment, programming, and operation. EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Dale: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option 10/14/2018 Page 14 of 14 EnergyGauge Summit® v6.00 INPUT DATA REPORT Project Name: Project Title: Address: State: Zip: Owner: Proiect Information MissionaryFl - GC Orientation: Missionary Flights - Garage Closet Building Type: Hammond Rd & Steel Blvd Building Classification: FL No.of Stories: 34946 GrossArea: Enter Owner's name here 0 Deg Clockwise. Walls & Windows will be rotated accordingly Warehouse New Finished building I 161 SF Zones No Acronym Description Type Area [all Multiplier Total Area Istl 1 Garage Closet warehouse CONDITIONED 161.0 1 161.0 ❑ Spaces No Acronym Description Type _ Depth lftl Width Height Multi lftl lftl plier Total Area lst] Total Volume let] 10/14/2018 EnergyGauge Summit® v6.00 In Zone: Garage Closet 1 Closet closet Fine Material Storage 1.00 161.00 9.00 1 161.0 1449.0 ❑ Lighting No Type Category No. of Watts per Power Control Type No.of Luminaires Luminaire [W] Ctrl pis In Zone: Garage Closet In Space: Closet l LED General Lighting 1 72 72 Occupancy sensor without I Daylighting Walls (Walls will be rotated clockwise by building rotation value) No Description Type Width H(Efcc) Multi Area Orientation Conductance Heat Dens. R-Value [ft] [ft] plier ]sf] [Btu/hr. A. F] Capacity [Ib/cf] [h.sLFBtu] [Bm1sf.F] In Zone: Garage Closet 1 wall .75" stucco, 6" hvc, 8.50 9.00 1 76.5 North 0.1637 14.624 102.50 6.1 ❑ R5 ins, 1/2" gypsum 2 wall .75" stucco, 6" hvc, 19.00 9.00 1 171.0 East 0.1637 14.624 102.50 6.1 ❑ R5 ins, 1/2" gypsum 3 wall .75" stucco, 6" hvc, 8.00 9.00 1 72.0 South 0.1637 14.624 102.50 6.1 ❑ R5 ins, 1/2" gypsum 4 wall 0.75 in. stucco, 19.00 9.00 1 171.0 West 0.1118 1.183 14.94 8.9 ❑ 2x4xl6' cc, R1lBatt, 0.5 in. gyp Windows (Windows will be rotated clockwise by building rotation value) No Description Orientation Shaded U SHGC Vis.Tra W H(Effec) Multi Total Area [Btu/hr sf F] IN [ft] plier [sf] In Zone: Garage Closet In Wall: East 1 window East Yes 1.2500 0.82 0.76 3.00 5.00 1 15.0 ❑ 10/14/2018 EnergyGauge Summit® v6.00 Doors No Description Type Shaded? Width H (Effec) Multi Area Cond. Dens. Heat Cap. R-Value [ft] [R] plier [sQ [Btuthr. st: F] [lb/cQ ]Btu/sf. FI [h.sEFBtu] In Zone: Garage Closet In Wall: South 1 Door Solid core flush No 3.00 7.00 1 21.0 0.3504 0.00 0.00 2.85 ❑ (2.25) Roofs No Description Type Width H (Effec) Multi Area Tilt Cond. Heat Cap Dens. R-Value [ft] [ft] plier [sQ [deg] [Btu/hr. SE F] [Btu/sf. F] [lb/cQ [h.sLFBtu] In Zone: Garage Closet I Roof ShngU1/2"WD 161.00 1.00 1 161.0 0.00 0.0471 1.40 10.89 21.2 ❑ DeCIdWD Truss/6Batt/Gyp Brd Skylights No Description Type U SHGC Vis.Trans W H (Effec) Multiplier Area Total Area [Btu/hr sfF1 Ift] Ift] [Sf] ISf] In Zone: In Roof. El Floors No Description Type Width H (Effec) Multi Area Cond. Heat Cap. Dens. R-Value [ft] [ft] plier Ist] [Btu/hr. sf. F] [Btu/sf. F] [lb/cQ [h.sEFBtu] In Zone: Garage Closet 10/14/2018 EnergyGauge Summit® v6.00 1 Floor 1 0. soil, concrete 161.00 1.00 1 161.0 0.2681 34.00 113.33 3.73 Q floor, carpet and rubber pad Systems System 1 System Constant Volume Air Cooled Split System <65000 Btu/hr No. Of Units 1 Component Category Capacity Efficiency IPLV 1 Cooling System 2 Heating System 3 Air Handling System -Supply 9000.00 23.20 8.00 10900.00 11.00 300.00 0.10 ID Plant Equipment Category Size Inst.No Ell. IPLV Water Heaters W-Heater Description Capacity Cap.Unit I/P lit. Efficiency Loss I Electric water heater 1 [Gal] 5 [kW] 0.9900 [Ef] [Btu/h] ❑ Ext-Lighting Description Category No. of Watts per Area/Len/No. of units Control Type Wattage Luminaires Luminaire [sfIlt/No] [W] 1 Ext Light 1 Main entries 3 10 16.00 Astronomical Timer Conte 30.00 ❑ 10/14/2018 EnergyGauge Summit® v6.00 4 Piping Operating Insulation Nomonal pipe Insulation Is Runout? No Type Temperature Conductivity Diameter Thickness [F] [ Btu-in/h.sLF] [in] [in] 1 Heating System (Steam, Steam Condensate, & 105.00 0.28 0.75 1.00 No ❑ Hot Water) 2 Cooling Systems (Chilled Water, Brine and 45.00 0.28 0.50 0.50 No ❑ Refrigerant) Fenestration Used Glass Name Glass Type No. of SHGC VLT Conductance Panes [Btu/h.sf.F] ASH ULSgIC1rAl1 User Defined 1 1.2500 0.8200 0.7600 El Materials Used Only R-Value RValue Thickness Conductivity Density SpecscHeat Mat No Acronym Description Used [h.sf.FBtu] [ft] IBtu/h.ft.F] [lb/cf] [Btu/Ib.F] 187 Mat1187 GYP OR PLAS No 0.4533 0.0417 0.0920 50.00 0.2000 Li BOARD,1/2IN 178 Mat1178 CARPET W/RUBBER PAD Yes 1.2300 ❑ 265 Mat1265 Soil, 1 R No 2.0000 1.0000 0.5000 100.00 0.2000 1:1 48 Matl48 6 in. Heavyweight concrete No 0.5000 0.5000 1.0000 140.00 0.2000 ❑ 267 Matl267 0.75" stucco No 0.1563 0.0625 0.4000 16.00 0.2000 ❑ 266 Mat1266 2x4@I6"oc+Rll Batt No 8.3343 0.2917 0.0350 9.70 0.2000 ❑ 23 Mat123 6 in. Insulation No 20.0000 0.5000 0.0250 5.70 0.2000 ❑ 279 Mat1279 Solid core flush (2.25") Yes 2.8537 ❑ 10/14/2018 EnergyGauge Summit® v6.00 5 81 Matl8l ASPHALT -ROOFING, Yes 0.1500 ❑ ROLL 244 Mm1244 PLYWOOD, 1/21N No 0.6318 0.0417 0.0660 34.00 0.2900 ❑ 1011 ApLbMat1011 R-5 Generic Insulation No 5.0000 0.1091 0.0218 0.30 0.2000 ❑ Constructs Used No Name Simple Massless Conductance Heat Capacity Density RValue Construct Construct [Btu/h.sLF] [Btu/sf.F] ]Ib/ct] [h.sLFBtu] 1009 0.75 in. stucco, 2x4xl6" oc, RllBatt, 0.5 in. No No 0.11 1.18 14.94 8.9 ❑ gyp Layer Material Material Thickness Framing No. [ft] Factor 1 267 0.75" stucco 0.0625 0.000 ❑ 2 266 2x4@16" oc+R11 Batt 0.2917 0.000 ❑ 3 187 GYP OR PLAS BOARD,1/2IN 0.0417 0.000 ❑ No Name Simple Massless Conductance Heat Capacity Density RValue Construct Construct [Btu/h.sf.F] [Btu/sf.F] [lb/ct] ]h.sf.FBtu] 1039 ShngU1/2"WD Deck/WD Truss/6Batt/Gyp No No 0.05 1.40 10.89 21.2 ❑ Brd Layer Material Material Thickness Framing No. [ft] Factor 1 81 ASPHALT -ROOFING, ROLL 0.000 ❑ 2 244 PLYWOOD, 1/2IN 0.0417 0.000 ❑ 3 23 6 in. Insulation 0.5000 0.000 ❑ 4 187 GYP OR PLAS BOARD, 1/2IN 0.0417 0.000 ❑ 10/1412018 EnergyGauge Summit® v6.00 Simple Massless Conductance Heat Capacity Density RValue No Name Construct Construct [Btu/h.sf.F] [Btu/sEF] [lb/cf] [h.sEFBru] 1057 1 ft. soil, concrete floor, carpet and rubber pad No No 0.27 34.00 113.33 3.7 ❑ Layer Material Material Thickness Framing No. IN Factor 1 265 Soil, 1 ft 1.0000 0.000 ❑ 2 48 6 in. Heavyweight concrete 0.5000 0.000 ❑ 3 178 CARPET W/RUBBER PAD 0.000 ❑ Simple Massless Conductance Heat Capacity Density RValue No Name Construct Construct [Btu/h.sf.F] [Btu/sEF] [Ib/cf] (h.sf.FBtu] 1058 Solid core flush (2.25) No Yes 0.35 2.9 ❑ Layer Material Material Thickness Framing No. [ft] Factor 1 279 Solid core flush (2.25") 0.000 ❑ Simple Massless Conductance Heat Capacity Density RValue No Name Construct Construct [Btu/h.sEF] ]Btu/sEF] [lb/cf] [h.sEFBtu] 1069 .75" stucco, 6" hvc,R5 ins, 1/2" gypsum No No 0.16 14.62 102.50 6.1 ❑ Layer Material Material Thickness Framing No. [ft] Factor 1 267 0.75" stucco 0.0625 0.000 ❑ 2 48 6 in. Heavyweight concrete 0.5000 0.000 ❑ 3 1011 R-5 Generic Insulation 0.1091 0.000 ❑ 4 187 GYP OR PLAS BOARD,1/21N 0.0417 0.000 ❑ 10/14/2018 EnergyGauge Summit® v6.00 PER ACCA MANUAL N SUMMER OA11A. - 91 DEG. D.B: 79 DEG. W.Bl75 DEG. D.B: 64 DEG. W.B., INDOOR DESIGN R.H. - 559/6I GR. WATER DIFF. - 60 WINTER O.A.AA. - 47 DEG. D.BJ70 DEG. D.B. Pmj Missionary Flights Phase II Garage DATE 13-Ocb18 COOLING CALCULATIONS SYSTEM 1 TIME MONTH LATITUDE Wheat 16 JULY 24 SENS gain OA ROOF ROOF WALL WIND WIND WIND WIND WIND MISC LIGHTS PPL ROOM ROOM CFM RM ROOM SENS SENS SENS SENS SENS SENS SENS SENS BTUH SENS BTUH BTUH CFM RM PPL HEAT TRAN-KW 1 Garage Closet 483 1485 637 879 0 0 0 1500 341 0 5857 285 0 0 1.09 60 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 TOT 483 1485 637 879 0 0 0 1500 341 0 5857 285 0 0 1.09 OA TOT EST SYS SYS RM TOT OA TOT. ROOM OA ery ON ery std ON std KW HT -KW TONS TOT SHR SHR SENS SENS LAT LAT LAT sensible latent oa as oa on BTUH ratio ratio temp tam latent latent 0.00 1.09 0.51 5857 1.00 1.00 5857 0 0 0 0 1.00 1.00 16.00 16.00 60.00 60.00 Jones 6 Conde, LLC 4440 PDA Boulevard Palm Beach Gardens, FL 33410 Certificate of Authorization 029783 Tel (561) 309.9017 Engineer David R Jones, PE 041042 /0 -2-CP EnE u • P IECC 2015-Total Building Performance Compliance Option Check List Applications for compliance with the Florida Building Code, Energy Conservation shall include: 1111�This Checklist The full compliance report generated by the software that contains the project summary, compliance summary, certifications and detailed component compliance reports. The compliance report must include the full input report generated by the software as comigous part of the compliance report. Boxes appropriately checked in the Mandatory Section of the complaince report. WARNING: INPUT REPORT NOT GENERATED. To include input report in final submission, go to the Project Form, Settings Tab and check the box - "Append Input Report to Compliance Output Report" Then rerun your calculation SCANNED BY St. Lucie County RECgIVED DEC 042018 ST. Lucie county, Permitting .�c Na! EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option W 8/23/2018 Pa e I of 16 1 �t2-or�}2 PROJECT SUMMARY Short Dear: Missionary Flights Description: Missionary Flights Owner: Enter Owner's name here Addressl: Hammond Rd & Steel Blvd City: Fort Pierce Address2: State: FL Zip: 34946 Type: Dormitory Class: Jurisdiction: FORT PIERCE, ST LUCIE COUNTY, FL (661100) Conditioned Area: 6587 SF Conditioned & UnConditioned Area: 6587 SF No of Stories: 1 Area entered from Plans 6587 SF Permit No: 0 Max Tonnage 4 If different, write in: EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 8/23/2018 Page 2 of 16 Component Design Criteria Result Gross Energy Cost (in $) 2,801.0 4,164.0 PASSED LIGHTING CONTROLS EXTERNAL LIGHTING HVAC SYSTEM PLANT WATER HEATING SYSTEMS PIPING SYSTEMS Met all required compliance from Check List? PASSES PASSES PASSES No Entry PASSES PASSES Yes/No/NA IMPORTANT MESSAGE Info 5009 -- -- -- An input report of this design building must be submitted along with this EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option 8/23/2018 Page 3 of 16 8/23/2018 CERTIFICATIONS I hereby certify that the plans and specifications covered by this calculation are in compliance with the Florida Energy Code Prepared By: David R. Jones Building Official: Date: 10 . //(e( - lb Date: I certify that this building is in compliance with the FLorida Energy Efficiency Code Owner Agent: Date: If Required by Florida law, 1 hereby certify (`) that the system design is in compliance with the Florida Energy Efficiency Code Architect: Reg No: Electrical Designer: David R. Jones Reg No: 41042 Lighting Designer: David R. Jones Reg No: 41042 Mechanical Designer: David R. Jones Reg No: 41042 Plumbing Designer: David R. Jones Reg No: 41042 (') Signature is required where Florida Law requires design to be performed by registered design professionals. Typed names and registration numbers may be used where all relevant information is contained on signed/sealed plans. IL EnergyGauge Summit® FlalCom-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 �' tt � Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option' ` Page 4 of 16 - Project: Missionary Flights Title: Missionary Flights Type: Dormitory (WEA File: FL ST LUCIE CO INTLAW) Building End Uses 1) Proposed 2) Baseline Total 180.70 316.00 $2,801 $4,899 ELECTRICITY(MBtu/kWh)$) 180.70 316.00 52954 92608 $2,801 $4,899 AREA LIGHTS 19.20 61.20 5613 17931 $297 $949 MISC EQUIPMT 53.40 53.40 15659 15659 $828 $828 PUMPS & MISC 0.50 0.10 137 43 $7 $2 SPACE COOL 73.30 105.40 21476 30884 $1,136 $1,634 SPACE HEAT 7.90 13.30 2325 3900 $123 $206 VENT FANS 26.40 82.60 7744 24191 $410 $1,280 Credits Applied: None PASSES Passing Criteria = 4164 Design (including any credits) = 2801 Passing requires Proposed Building cost to be at most 85% of Baseline cost. This Proposed Building is at 57.2% EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option 8/2312018 Page 5 of 16 8/23/2018 Project: Missionary Flights Title: Missionary Flights Type: Dormitory (WEA File: FL ST LUCIE CO_INTL.tm3) External Lighting Compliance Description Category Tradable? Allowance Area or Length ELPA CLP (W/Unit) or No.of Units (W). (W) (Sgft or it) Ext Light 1 Main entries Yes 30.00 6.0 180 33 Ext Light 2 Main entries Yes 30.00 6.0 180 20 Tradable Surfaces: 53 (W) Allowance for Tradable: 1110 (W) PASSES All External Lighting: 53 (W) Complicance check includes a excess/Base allowance of 750.00(W) Project: Missionary Flights Title: Missionary Flights Type: Dormitory (WEA File: FL_ST_LUCIE_CO_INTL.tm3) Lighting Controls Compliance Acronym Ashrae Description Area Design Min Compli- ID (sq.ft) CP CP ance Laundry 17 Office - Enclosed 218 1 1 PASSES Pwdr 6 Toilet and Washroom 67 1 1 PASSES Storage/Bedroom 30,002 Medium/Bulky Material Storage 117 1 1 PASSES Office 17 Office - Enclosed 119 1 1 PASSES Corridor 5 Corridor 878 2 1 PASSES Women's Bunk 7,001 Dormotory Living Quarters 431 1 1 PASSES Showers 6 Toilet and Washroom 442 2 1 PASSES Apartment 16,001 Private Living Space 744 6 1 PASSES Game Room 9,001 Playing Area 325 1 1 PASSES Men's Bunk 7,001 Dormotory Living Quarters 440 1 1 PASSES Showers 6 Toilet and Washroom 528 2 1 PASSES Kitchen/Pantry 7 Food Service - Kitchen 435 1 1 PASSES Meeting Room 15 Conference/meeting (Multiple 1,843 2 1 PASSES Functions) PASSES EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2615 -Total Building Performance Compliance Option Page 6 of 16 Project: Missionary Flights Title: Missionary Flights Type: Dormitory (WEA File: FL ST LUCIE CO INTL.tm3) System Report Compliance System I System Constant Volume Air Cooled No. of Units Split System < 65000 Btu/hr 1 Component Category Capacity Design Eff Design IPLV Comp - Elf Criteria IPLV Criteria liance Cooling System Air Conditioners Air Cooled 48000 14.50 13.00 8.00 PASSES Split System < 65000 Btu/h Cooling Capacity Heating System .Electric Furnace 27000 1.00 1.00 PASSES Air Handling Air Handler (Supply) - 1600 0.30 0.82 PASSES System -Supply Constant Volume System 2 System Constant Volume Air Cooled No. of Units Split System < 65000 Btu/hr 1 Component Category Capacity Design Eff Design IPLV Comp - Elf Criteria IPLV Criteria liance Cooling System Air Conditioners Air Cooled 24000 16.00 13.00 8.00 PASSES Split System < 65000 Btu/h Cooling Capacity Heating System Electric Furnace 17000 1.00 1.00 PASSES Air Handling Air Handler (Supply) - 800 0.30 0.82 PASSES System -Supply Constant Volume System 3 System Constant Volume Air Cooled No. of Units Split System <65000 Btu/hr 1 Component Category Capacity Design Elf Design IPLV Comp - Elf Criteria IPLV Criteria liance Cooling System Air Conditioners Air Cooled 42000 14.50 13.00 8.00 PASSES Split System < 65000 Btu/h Cooling Capacity Heating System Electric Furnace 27000 1.00 1.00 PASSES Air Handling Air Handler (Supply) - 1400 0.30 0.82 PASSES System -Supply Constant Volume System 4 System Constant Volume Air Cooled No. of Units Split System < 65000 Btu/hr I Component Category Capacity Design Elf Design IPLV Comp - Eli Criteria IPLV Criteria liance EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option 8/23/2018 •Page 7 of 16 8/23/2018 Cooling System Air Conditioners Air Cooled 48000 14.50 13.00 8.00 PASSES Split System < 65000 Btu/h Cooling Capacity Heating System Electric Furnace 14000 1.00 1.00 PASSES Air Handling Air Handler (Supply) - 1600 0.30 0.82 PASSES System -Supply Constant Volume System 5-6 System Constant Volume Air Cooled No. of Units Split System < 65000 Btu/hr 2 Component Category Capacity Design Eff Design IPLV Comp- Eff Criteria IPLV Criteria liance Cooling System Air Conditioners Air Cooled 48000 14.50 13.00 8.00 PASSES Split System < 65000 Btu/h Cooling Capacity Heating System Electric Furnace 27000 1.00 1.00 PASSES Air Handling Air Handler(Supply)- 1600 0.30 0.82 PASSES System -Supply Constant Volume PASSES Plant Compliance Description Installed Size Design Min Design Min Category Comp No Eff Eff IPLV IPLV liance None EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option Page 8 of 16 8/23/2018 Project: Missionary Flights Title: Missionary Flights Type: Dormitory (WEA File: FL ST LUCIE CO INTL.tm3) Water Heater Compliance D Description Type Category Design Min Eft FIT Design Max Comp Loss Loss liance Water Heater 1 Electric water heater <= 12 [kW] 0.85 0.81 PASSES Water Heater 2 Electric water heater <= 12 [kW] 0.95 0.92 PASSES Water Heater 3 Electric water heater <= 12 [kW] 0.95 0.92 PASSES PASSES Project: Missionary Flights Title: Missionary Flights Type: Dormitory (WEA File: FL ST LUCIE CO_INTL.tm3) Piping System Compliance Category Pipe Dia Is Operating Ins Cond Ins Req Ins Compliance [inches] Runout? Temp [Btu-in/hr Thick [in] Thick ]in] IF] SF.F] Domestic and Service Hot Water 0.75 False 110.00 0.28 1.00 0.50 PASSES Systems Cooling Systems (Chilled Water, Brine 1.00 False 45.00 0.28 0.75 0.50 PASSES and Refrigerant) Cooling Systems (Chilled Water, Brine 0.75 False 45.00 0.28 0.75 0.50 PASSES and Refrigerant) Cooling Systems (Chilled Water, Brine 1.00 False 45.00 0.28 0.75 0.50 PASSES and Refrigerant) Cooling Systems (Chilled Water, Brine 1.00 False 45.00 0.28 0.75 0.50 PASSES and Refrigerant) Cooling Systems (Chilled Water, Brine 1.00 False 45.00 0.28 0.75 0.50 PASSES and Refrigerant) Cooling Systems (Chilled Water, Brine 1.00 False 45.00 0.28 0.75 0.50 PASSES and Refrigerant) PASSES EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option Page 9 of 16 Mandatory Requirements (as applicable) Mandatory requirements compiled by US Department of Energy and Pacific Northwest National Laboratory. Adopted with permission Topic Section Component Description Yes NIA Exempt Insulation C303.2 Envelope Below -grade wall Insulation installed per manufacturer's instructions. Insulation C303.2 Envelope Slab edge insulation installed per manufacturer's �❑ Instructions. Insulation C303.2 Envelope Above -grade wall insulation installed per E manufacturer's Instructions. Insulation C402.3 Envelope High-albedo roofs satisfy one of the following: �❑ 3-year-aged solar reflectance>= 0.55 and thermal emlttance>=0.75 or 3-year-aged solar reflectance Indexed Fenestration C402.4.4 Envelope U-factor off opaque doors associated with the �❑ ❑ building thermal envelope meets requirements. SYSTEM —SPECIFIC C403.2.12.1 Mechanical HVAC fan systems at design conditions do not exceed allowable fan system motor nameplate hp or fan system bhp. SYSTEM —SPECIFIC C403.2.12.2 Mechanical HVAC fan motors not oversized beyond allowable _ El ❑ ffLLJAJA limits. SYSTEM —SPECIFIC C403.2.3(8) Table Mechanical Heat Rejection Equipment: Minimum Efficiency El fEl Requirement meet those listed in Table HVAC C403.2.7 Mechanical Exhaust air energy recovery on systems meeting Ei EGJf Table C403.2.7(1) and C403.2.7(2). SYSTEM —SPECIFIC C403.3 Mechanical Air economizers provided where required, meet the requirements for design capacity, control signal, ventilation controls, high -limit shut -of, integrated economizer control, and provide a means to relieve excess outside air during operation. /❑ SYSTEM —SPECIFIC C403.3.2 Mechanical Economizer operation will not increase heating ❑ _ ILTJY energy use during normal operation. SYSTEM —SPECIFIC C403.3.4, Mechanical Water economizers provided where required, ❑ 011�0 C403.3.4.1, meet the requirements for design capacity, C403.3.4.2, maximum pressure drop and integrated C403.3.1 economizer control. SYSTEM —SPECIFIC C403.4.2:1 Mechanical Three -pipe hydroniydronic systems using a common ❑ I�Jy/❑ return for hot and chilled water are not used. SYSTEM —SPECIFIC C403.4.2.3.1 Mechanical Hydronic heat pump systems connected to a common water loop meet heat rejection and heat addition requirements. SYSTEM —SPECIFIC C403.4.3.4 Mechanical Open -circuit cooling towers having water cooled ❑ fLJA'b chiller systems and multiple or vairable speed condenser pumps, are designed so that tower cells can run in parallel with larger of flow crtieria. /❑ C404.2 Mechanical Service water heating equipment meets efficiency jL'��J{ El requirements. Wattage C405.3 Interior Lighting Exit signs do not exceed 5 watts per face. Plan Review C103.2 Envelope Plans and/or specifications provide all information with which compliance can be determined for the building envelope and document where exceptions to the standard are claimed. EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option 8/23/2018 Page 10 of 16 Plan Review C103.2 Mechanical Plans, specifications, and/or calculations provide ❑ all information with which compliance can be determined for the mechanical systems and equipment and document where exceptions to the standard are claimed. Load calculations per acceptable engineering st Plan Review C103.2 Mechanical Plans, specifications, and/or calculations provide El ❑ ❑ all information with which compliance can be determined for the service water heating systems and equipment and document where exceptions to the standard are claimed. Hot water system sized per manufact Plan Review C103.2 Interior Lighting Plans, specifications, and/or calculations provide all information with which compliance can be determined for the Interior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided shout Plan Review C103.2 Exterior Lighting Plans, specifications, and/or calculations provide ❑ all information with which compliance can be determined for the exterior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided shoul Insulation C402.2.5 Envelope Slab edge insulation depth/length. Slab insulation ❑ extending away from building is covered by pavement or>= 10 inches of soil. Insulation C402.2.6 Project Radiant heating systems panels insulated to ❑ ❑ ❑ >=R-3.5 on face opposite space being heated. HVAC C402.2.6 Mechanical Thermally ineffective panel surfaces of sensible 11 1-3 heating panels have insulation>= R-3.5. Insulation C402.2.6 Envelope Radiant panels and associated components, El ❑ designed for heat transfer from the panel surfaces to the occupants or indoor space are Insulated with a minimum of R-3.5. Air Leakage C402.5.7 Envelope Vestibules are Installed on all building entrances. ❑ ❑ ❑ Doors have self -dosing devices. SYSTEM —SPECIFIC C403.2.12.3 Mechanical Fans have efficiency grade (FEG)>= 67. The total efficiency of the fan at the design point of operation -=15% of maximum total efficiency of the fan. HVAC C403.2.13 Mechanical Unenclosed spaces that are heated use only radiant heat. HVAC C403.2.4.2 Mechanical Each zone equipped with setback controls using ❑ ❑ El automatic time clack or programmable control system. SYSTEM -SPECIFIC C403.2.4.4 Mechanical Zone Isolation devices and controls Installed where applicable. SYSTEM —SPECIFIC C403.2.4.7 Mechanical Fault detection and diagnostics installed with air-cooled unitary DX units having economizers. SYSTEM —SPECIFIC C403.2.5 Mechanical Hot water boilers supplying heat via one -or two -pipe systems Include outdoor setback control. HVAC C403.2.6.1 Mechanical Demand control ventilation provided for spaces ❑ ❑ ❑ >500 ft2 and>25 people/1000 112 occupant density and served by systems with air side economizer, auto modulating outside air damper Control, or design airflow>3,000 dim. SYSTEM —SPECIFIC C403.4.1.1 Mechanical Hydronic and multizone HVAC system controls areVAV fans driven by mechanical or electrical variable speed drive per Table C403.4.1.1. SYSTEM —SPECIFIC C403.4.1.3 Mechanical Reset static pressure setpoint for DDC controlled VAV boxes reporting to central controller based on the zones requiring the most pressure. SYSTEM_SPECIFIC C403.4.2 Mechanical Temperature reset by representative building loads in pumping systems for chiller and boiler systems >500,000 Btu/h. EnergyGauge Summit®Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option 8/23/2018 Page 11 of 16 SYSTEM —SPECIFIC C403.4.2.3.2.1 Mechanical Closed.circuit cooling tower within heat pump loop u u u have either automatic bypass valve or lower leakage positive closure dampers. Open -circuit tower within heat pump loop have automatic valve to bypass all heat pump water flow around the tower. Open- or cl SYSTEM —SPECIFIC C403.4.2.4 Mechanical Hydronic systems greater than 500,000 Btu/h designed for variable fluid flow. SYSTEM —SPECIFIC C403.4.2.5 Mechanical System turndown requirement met through multiple single -Input boilers, one or more modulating boilers, or a combination of single -input and modulating boilers. Boiler input between 1.0 MBtu/h and 5 MBtu/h has 3:1 turndown ratio, boiler Input between 5.0 SYSTEM —SPECIFIC C403.4.2.6 Mechanical Chilled water plants with multiple chillers have capability to reduce flow automatically through the chiller plant when a chiller is shut down. Boiler plants with multiple boilers have the capability to reduce flow automatically through the boiler plant SYSTEM SPECIFIC C403.4.3, Mechanical Fan systems with motors >=7.5 hp associated 1:1 El C403.4.3.2 with heal rejection equipment to have capability to operate at 2/3 of full -speed and auto speed controls to control the leaving fluid temperature or condensing temp/pressure of heat rejection device. SYSTEM —SPECIFIC C403.4.4.5 Mechanical Multiple zone HVAC systems have supply air temperature reset controls. SYSTEM —SPECIFIC C403.4.4.6 Mechanical Multiple zone VAV systems with DDC of individual zone boxes have static pressure setpoint reset controls. SYSTEM SPECIFIC C404.2.1 Mechanical Gas -fired water -heating equipment installed in new buildings: where a singular piece of water-heafing equipment>= 1,000 kBtu/h serves the entire building, thermal efficiency >= 90 Et. Where multiple pieces of water -heating equipment serve the building wi SYSTEM SPECIFIC C404.4 Mechanical All piping insulated in accordance with section 1:1 El details and Table C403.2.10. SYSTEM SPECIFIC C404.5, C404.5.1, Mechanical Healed water supply piping conforms to pipe C404.5.2 length and volume requirements. Refer to section details. SYSTEM —SPECIFIC C404.6.3 Mechanical Pumps that circulate water between a heater and ri storage tank have controls that limit operation from startup to <= 5 minutes after end of heating cycle. SYSTEM —SPECIFIC C404.7 Mechanical Water distribution system that pumps water from a heated -water supply pipe back to the heated -water source through a cold -water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving Wattage C405.5.1 Exterior Lighting Exterior lighting power is consistent with what is ❑ ❑ ❑ shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Plan Review C405.6 Project Group R-2 dwelling units have separate electrical meters. Plan Review C408 Project Plans, specifications, and/or calculations provide all information with which compliance can be determined for the additional energy efficiency package options. SYSTEM —SPECIFIC C408.2.2.2 Mechanical HVAC hydronic heating and cooling coils have ❑ ❑ means to balance and have pressure test connections. SYSTEM SPECIFIC C408.2.2.2 Mechanical HVAC hydronic heating and cooling coils have ❑ ❑ ❑ means to balance and have pressure test connections. EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option 8/23/2018 Page 12 of 16 Insulation C303.1 Envelope Roof insulation installed per manufacturer3E' s instmctions. Blown or poured loose -fill Insulation is Installed only where the roof slope is <=3 in 12. Insulation C303.1 Envelope Building envelope insulation Is labeled with R-value or insulation certificate providing R-value and other relevant data. Fenestration C303.1.3 Envelope Fenestration products rated in accordance with ❑ NFRC. Fenestration C303.1.3 Envelope Fenestration products are certified as to performance labels or certificates provided. Insulation C303.2, C402.2.4 Envelope Floor insulation Installed per manufacturers El ❑ instructions. Cavity or structural slab insulation installed in permanent contact with underside of decking or structural slabs. Insulation C303.2.1 Envelope Exterior insulation protected against damage, ❑ ❑ ❑ sunlight, moisture, wind, landscaping and equipment maintenance activities. Insulation C303.2.1 Envelope Exterior Insulation is protected from damage with a protective material. Verifcation for exposed foundation insulation may need to occur during Foundation Inspection. Insulation C402.1.3 Envelope Non -swinging opaque doors have R-4.75 ❑ ❑ insulation. Insulation C402.2.2 Envelope Skylight curbs are insulated to the level of roofs ❑ El ❑ with insulation above deck or R-5. Insulation C402.2.2 Envelope Insulation intended to meet the roof insulation ❑ requirements cannot be installed on top of a suspended ceiling. Mark this requirement compliant if insulation is installed accordingly. Air Leakage C402.5 Envelope Building envelope contains a continuous air ❑ El ❑ barrier that has been tested and deemed to limit air leakage <= 0.40 cfm/112. Air Leakage C402.5.1 Envelope The building envelope contains a continuous air ❑ ❑ ❑ barrier that is sealed in an approved manner and either constructed or tested in an approved manner. Air barrier penetrations are sealed in an approved manner. Air Leakage C402.5.1.1 Envelope All sources of air leakage in the building thermal ❑ ❑ ❑ envelope are sealed, caulked, gasketed, weather stripped or wrapped with moisture vapor -permeable wrapping material to minimize air leakage. Air Leakage C402.5.1.2.1 Envelope The building envelope contains a continuous air barrier that Is sealed in an approved manner and material permeability <= 0.004 cfMft2. Air barrier penetrations are sealed in an approved manner. Air Leakage C402.5.1.2.2 Envelope The building envelope contains a continuous airEl El ❑ barrier that is sealed in an approved manner and average assembly air leakage <= 0.04 cfm/ft2. Air barrier penetrations are sealed in an approved Air Leakage C402.5.2, C402.5.4 Envelope manner. Factory -built fenestration and doors are labeled ❑ ❑ as meeting air leakage requirements. Air Leakage C402.5.3 Envelope Where open combustion air ducts provide combustion air to open combustion fuel burning appliances, the appliances and combustion air opening are located outside the building thermal envelope or enclosed in a room, isolated from inside the thermal envelope Air Leakage C402.5.5, Envelope Stair and elevator shaft vents have motorized ❑ El ❑ C403.2.4.3 dampers that automatically close. Air Leakage C402.5.5, Envelope Outdoor air and exhaust systems have motorized C403.2.4.3 dampers that automatically shut when not in use and meet maximum leakage rates. Check gravity dampers where allowed. Air Leakage C402.5.6 Envelope Weatherseals installed on all loading dock cargo doors. EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 8/23/2018 Page 13 of 16 Air Leakage C402.5.8 Envelope Recessed luminaires in thermal envelope to limit ❑ ❑ Li infiltration and be IC rated and labeled. Seal between interior finish and luminaire housing. HVAC C403.2.1 Mechanical HVAC systems and equipment design loads ❑El ❑ calculated in accordance with ANSI/ASHRAE/ACCA Standard 183 or by an approved equivalent computational procedure SYSTEM_SPECIFIC C403.2.10 Mechanical HVAC piping Insulation thickness. Where piping Is Installed in or under a slab, verification may need to occur during Foundation Inspection. HVAC C403.2.3 Mechanical HVAC equipment efficiency verified. SYSTEM_SPECIFIC C403.2.3 Mechanical PTAC and PTHP with sleeves 16 in. by 42 in. labeled for replacement only as per Footnote b to Table C403.2.3(3). SYSTEM_SPECIFIC C403.2.4.1 Mechanical Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. SYSTEM_SPECIFIC C403.2.4.1.1 Mechanical Heat pump controls prevent supplemental electric EI ❑ El resistance heat from coming on when not needed. HVAC C403.2.4.1.2 Mechanical Thermostatic controls have a 5 A-F deadband. ❑1:1 ❑ HVAC C403.2.4.1.2 Mechanical Thermostatic controls have a 5 A-F deadband. ❑ El ❑ HVAC C403.2.4.1.3 Mechanical Temperature controls have setpoint overlap restrictions. HVAC C403.2.4.2.1, Mechanical Automatic Controls: Setback to 55'F (heat) and El El El C403.2.4.22 85'F (cool); 7-day clock, 2-hour occupant override, 10-hour backup SYSTEM_SPECIFIC C403.2.4.2.3 Mechanical Systems include optimum start controls. El 11 ❑ HVAC C403.2.4.5, Mechanical Snowlce melting system sensors for future ❑ ❑ C403.2.4.6 connection to controls. Freeze protection systems have automatic controls installed. HVAC C403.2.6.2 Mechanical Enclosed parking garage ventilation has automatic contaminant detection and capacity to stage or modulate fans to 50% or less of design HVAC C403.2.9 Mechanical capacity. HVAC duds and plenums insulated. Where ducts El ❑ 11 or plenums are Installed In or under a slab, verification may need to occur during Foundation SYSTEM_SPECIFIC C403.2.9.1.3 Mechanical Inspeclion. Ductwork operating>3 in. water column requires El ❑ 11 air leakage testing. SYSTEM_SPECIFIC C403.4.1.2 Mechanical VAV fans have static pressure sensors located so El ❑ controller setpoint <=1.2 w.c.. SYSTEM_SPECIFIC C403.4.2.2 Mechanical Two -pipe hydronic systems using a common El ❑ 11 distribution system have controls to allow a deadband >=15°17, allow operation in one mode for at least 4 hrs before changeover, and have rest controls to limit heating and cooling supply SYSTEM_SPECIFIC C403.4.2.3.3 Mechanical temperature to <=30 OF. Two-posifion automatic valve interlocked to shut off water flow when hydronic heat pump with pumping system>10 hp is off. SYSTEM_SPECIFIC C403.4.4.5, Mechanical Zone controls can limit simultaneous heating and F-1 El El C403.4A.5.14 cooling and sequence heating and cooling to each SYSTEM_SPECIFIC C403.4.5 Mechanical zone. Condenser heat recovery system that can heat ❑ ❑ water to 85°F or provide 60 % of peak heat rejection is installed for preheating of service hot water. SYSTEM_SPECIFIC C403.4.6 Mechanical Hot gas bypass limited to: <=240 kBtu/h - 50 % capacity, >240 kBtu/h -25% capacity SYSTEM_SPECIFIC C404.3 Mechanical Heat traps installed on non -circulating storage watertanks. EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 8/23/2018 Page 14 of 16 9130 SI a8ed SIOZ/£Z/S uo!fdo 9ouepdwo0 a3uew0pad Bu!ppng lalol- SLOZ 0031 uolleruasuo0 A6iau3 - (UOZ) uopip3 p!S'apo0 Bu!ppq epuol j LIOZ'lCOad:sledaA!pag3'eiemyoSluelldwo00'l-LlOZWV1'L 0Z-w00/elj(pllwwnSa6negA618u3 Aq payloads se'aoeds paldn=o lenplA!pu! pea o111e ioopino lueoied-00L x ep!Aad of pau6lsop walsAs uollelquan luapuadapu) ue yllm paddlnbe we swelsh OVAH auoz-a!dll!nw jo1pue o!umpA44l!m sbu!ppq ❑ ❑ ❑ :aBeyoed Aaua!o4a walsAs ne loopino aleolpao pafwd 9'9040 B31eu0111PPVAIolepueW u! papwluoo salleulwnl 9=>'Allenp!n!pu! passappe Buloq pue Bulwwlp snonu!{u=lo algedm saneulwnl Z'Z'SObO uolpas 41!m mueplo=e u! sloquoo Bup46ll paaueyua Bu!mollol se4 Bup46!l loua{ul :aBelped ❑ ❑ ❑ Aouap!49 sloilum Bu!74B!I Ie11Blp pmue4u3 pelwd b'9040 831euo!11PPV AlolepueW 's4em pamolle of lenbe jo uegl ssal we s1lem pasodad Bulleilsuowep'sueld 6u4g6!1 panoidde eql uo umogs sl leym 411m luals!suoo ❑ ❑ ❑ sl lamod 6u114611 wnlxg pue dwel pallelsul jouolul Bu046!1 �oValul l'b'SO40 aBePepA ' % OE < 6u.14611 papauum aonpal io'Aep-p-aw!l uo0wado ssou!snq uo paseq las'pallalum 14611AEP aq Il!m slw{u00-pallelsul ❑ ❑ ❑ 6u1146I loi alxa lot sloqu= bug46p ogewolnV Bug4611 loualx3 SZ'9040 slaluoo '6up4611 IwauaB wal palwedas pue pallwlum Alleollewolne sl pue sueld Bull4Bll panoldde eyl lad suolpunl lepads ❑ ❑ ❑ iol pamolle jamod Bu114611 loualul IeuoplppV Bu04611 iopalul b'Z'S000 e6epem Sueld Bupg611 Panadde iad pape{su1 El El ❑ sasn o9loads jol saolnap I011u00Bw14611 alwedaS Bu9gB!1 ioualul 4'Z'SObO slaluoo ,slaluoo Bug4Bp pannbw E'E'Z'SObO yllm padd!nbe we slolluow dollow pue s{4611AYs 'L'E'noto El El El lapun ewe 146pAep 4l!m smeds pasolou3 6u1J46ll iouelul 'E'no40 sloquao Z'E'Z'SO40 'slwlum BueyBll pwmbw L'E'Z'SOvo ❑ ❑ ❑ 411m paddmbe we seam pal4Bpepls Aew j BuI14Bll Jopelul 'E'Z'SO40 sloquoo Bul1y6!1 ewe lwaua6lo luapuadaput sl4B1l a4l lwlum le41 ❑ ❑ ❑ sloqum IenpIAIPUI 411m papinad sauoz 146!IAeo 6up4611 Joualul E'Z'SO40 slaluoo ,s6ulPllnq Ile ul pallelsul ❑ ❑ ❑ 6u0yBll Bu!pl!nq Ile go 1n4s of slalu=opewolnV 6u6g611 joualul CZ'Z'9O4o slaluoo •sluednoao of alglslA pue alglssame AI!Pew slollum lemma Ile pue sueld Bu11y611 panwdde E'Z'Z'5040 ❑ ❑ ❑ iad pallelsw slwlum BuiWil luepuadopul 6u946111opalul 'L'not-3 slaluoo ❑ ❑ ❑ —eds palnbw ul pallelsu! wosuas Aouedn=0 6ug4611 lopalul 1.7'5040 slaluoo '%OS iseal le Aq peol BullgB!l ❑ ❑ ❑ a41 mnpw Almollun of pallelsu! slonu= Bw14611 Bu!148!1 lopalol L'Z'SO4o slmluo0 'seds pallelsul gluauewad pue stood palea4 ❑ ❑ ❑ 101 papinad we wanm load luepielai lodeA l=lueLpaW E'8'000 01d103dS W31SdS sdwnd pue ❑ ❑ ❑ waleay Imd Ile uo pallelsu! we s94o1!ms awl ImNm4oaW Z'6'00bO 01d103dS W31SAS sdwnd pue ❑ ❑ ❑ waleay lord Ile uo pallelsul we sa4ollms awl I=lumpoll Z'6'0040 01dI03dS W31SAS '146!l loud Bulwnq Alsnonupoo ou El El ❑ pue 4ol!ms Maluo 41!m padd!nba we walea4 load IM!ue40aW V6'4040 01d103dS W31SAS .men 1894 jo walsAs lalem-loq Bu0elnomai a418o 4allms ❑ ❑ ❑ Alleo4ewolne of pallelsul s9go1!ms aw11 opewolnV ImIumpaW Z'e'40b0'l'9'4040 01d103dS W31SAS •edld Alddns la{em plm a to adld wnlw poleopop a sl adld wnlw ujwsAS'8uel a6wols a Io wnlwadwal ulelulew of pallelsul dwnd uollelnwpa El El El e 10 uo!lwedo ayl l!w!11e41 pallelsul we slaluoo leo!ueyoalry l'e'4040 01d103dS W31SAS 'swalsAs Bullelmjrwou to Buldld ❑ ❑ ❑ e6le4oslp pue Aiddns uo pallelsul sden leaH IeolueyoaW E'4040 01d103dS W31SAS swalsAs Bupelnap-uou to Buldld ❑ ❑ ❑ eBleyoslp pue Nddns uo pallelsul sdwl leaH IeolueyoaW E'4040 01d103dS W318AS Mandatory Additional Eff C406.7, C406.7.1 Project HVAC C408.2.2.1 Mechanical HVAC C408.2.2.1 Mechanical Testing C408.2.3.2 Mechanical Enhanced Service Water Heat System efficiency package. One of the following SWH system enhancements must satisfy 60 percent of hot water requirements, or 100 percent if the building otherwise complies with heat recovery per Section C403.4.5: Waste heat re Air outlets and zone terminal devices have means for air balancing. Air outlets and zone terminal devices have means for air balancing. HVAC control systems have been tested to ensure proper operation, calibration and adjustment of controls. Post Construction C303.3, C408.2.5.2 Interior Lighting Furnished O&M instructions for systems and equipment to the building owner or designated representative. Post Construction C303.3, C408.2.5.3 Mechanical Furnished O&M manuals for HVAC systems within 90 days of system acceptance. Fenestration C402.4.2.2 Envelope Skylights in office, storage, automotive service, manufacturing, non -refrigerated warehouse, retail store, and distribution/sorting area have a measured haze value > 90 percent unless designed to exclude direct sunlight. Post Construction C408.2.1 Mechanical Commissioning plan developed by registered design professional or approved agency. Post Construction C408.2.3.1 Mechanical HVAC equipment has been tested to ensure proper operation. Post Construction C408.2.3.3 Mechanical Economizers have been tested to ensure proper operation. Post Construction C408.2.4 Mechanical Preliminary commissioning report completed and certified by registered design professional or approved agency. Post Construction C408.2.5.1 Mechanical Furnished HVAC as -built drawings submitted within 90 days of system acceptance. Post Construction C408.2.5.1 Interior Lighting Furnished as -built drawings for electric power systems within 90 days of system acceptance. Post Construction C408.2.5.3 Mechanical An air and/or hydronic system balancing report is provided for HVAC systems. Post Construction C408.2.5.4 Mechanical Final commissioning report due to building owner within 90 days of receipt of certificate of occupancy. Post Construction C408.3 Interior Lighting Lighting systems have been tested to ensure proper calibration, adjustment, programming, and operation. ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software.. Effective Dale: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option 8/23/2018 Page 16 of 16 EnergyGauge Summit® v6.00 INPUT DATA REPORT Project Name: ProjectTitle: J Address: State: Zip: Owner: Missionary Flights Missionary Flights Hammond Rd & Steel Blvd FL 34946 Enter Owner's name here Pro*ect Information Orientation: Building Type: Building Classification: No.of Stories: GrossArea: 0 Deg Clockwise. Walls & Windows will be rotated accordingly Dormitory ] 6587 SF Zones No Acronym Description Type Area Multiplier TotalArea fstl lsfl 1 Womens Dormitory CONDITIONED 2272.0 1 2272.0 ❑ 2 Apt Living Quarters CONDITIONED 744.0 1 744.0 ❑ 3 Men's Dormitory CONDITIONED 1293.0 1 1293.0 ❑ 4 Kitchen/Pantr Kitchen/Pantry CONDITIONED 435.0 1 435.0 ❑ y 5 Meeting Conference CONDITIONED 1843.0 1 1843.0 ❑ 8/23/2018 EnergyGauge Summit® v6.00 1 Spaces No Acronym Description Type Depth Width Height Multi Total Area Total Volume Ift] Ift] Ift] plier Ist] Icf] In Zone: Women's I Laundry Laundry Office - Enclosed 1.00 218.00 10.00 1 218.0 2180.0 ❑ 2 Pwdr Restroom Toilet and Washroom 1.00 67.00 10.00 1 67.0 670.0 3 StorageBedroonStorage Medium/Bulky Material 1.00 117.00 10.00 1 117.0 1170.0 Storage 4 Office Office Office - Enclosed 1.00 119.00 10.00 1 119.0 1190.0. El 5 Corridor Corridor Corridor 1.00 878.00 10.00 1 878.0 8780.0 El 6 Women's Bunk Dormitory Dornrotory Living Quarters 1.00 431.00 10.00 1 431.0 4310.0 ❑ 7 Showers Restroom Toilet and Washroom 1.00 442.00 10.00 1 442.0 4420.0 ❑ In Zone: Apt 1 Apartment Apt Private Living Space 1.00 744.00 10.00 1 744.0 7440.0 In Zone: Men's 1 Game Room Play Playing Area 1.00 325.00 10.00 1 325.0 3250.0 ❑ 2 Men's Bunk Dormitory Dormotory Living Quarters 1.00 440.00 10.00 1 440.0 4400.0 ❑ 3 Showers Restroom Toilet and Washroom 1.00 528.00 10.00 1 528.0 5.280.0 ❑ In Zone: Kitchen/Pantry 1 Kitchen/Pantry Kitchen Food Service - Kitchen 1.00 435.00 10.00 1 435.0 4350.0 El In Zone: Meeting 1 Meeting Room Conference Conferencelmeeting 100.00 18.43 10.00 1 1843.0 - 18430.0 ❑ (Multiple Functions) Lighting No Type Category No. of Watts per Power Control Type No.of Luminaires Luminaire ]W] Ctrl pts In Zone: Women's 8/23/2018 EnergyGauge Summit® v6.00 In Space: Laundry 1 LED General Lighting 2 35 70 Occupancy sensor without 1 El Daylighting In Space: Pwdr 1 LED General Lighting 1 25 25 Occupancy sensor without I Daylighting In Space: StorageBedroom 1 LED General Lighting 4 20 80 Occupancy sensor without 1 ❑ Daylighting In Space: Offlce I LED General Lighting 4 20 80 Occupancy sensor without 1 El Daylighting In Space: Corridor 1 LED General Lighting 2 22 44 Occupancy sensor without 1 Daylighting 2 LED General Lighting 12 10 120 Occupancy sensor without 1 ❑ Daylighting In Space: Women's Bunk 1 LED General Lighting 6 20 120 Manual On/Of 1 In Space: Showers 1 LED General Lighting 2 36 72 Occupancy sensor without 1 ❑ Daylighting 2 LED General Lighting 6 10 60 Occupancy sensor without 1 Daylighting In Zone: Apt In Space: Apartment 1 LED General Lighting 19 10 190 Manual On/Off 6 ❑ In Zone: Men's In Space: Game Room I LED General Lighting 8 20 160 Occupancy sensor without 1 ❑ Daylighting In Space: Men's Bunk 1 LED General Lighting 6 20 120 Manual On/Off I In Space: Showers I LED General Lighting 3 36 108 Occupancy sensor without 1 ❑ Daylighting 2 LED General Lighting 9 10 90 Occupancy sensor without 1 Daylighting In Zone: Kitchen/Pantry In Space: Kitchen/Pantry 8/23/2018 EnergyGauge Summit® v6.00 3 I LED General Lighting 5 36 180 Occupancy sensor without 1 ❑ Daylighting In Zone: Meeting In Space: Meeting Room 1 LED General Lighting 12 20 240 Occupancy sensor without I Daylighting 2 LED General Lighting 2 30 60 Manual On/Off 1 ❑ Walls (Walls will be rotated clockwise by building rotation value) No Description Type Width H(Effec) Multi Area Orientation Conductance Heat Dens. R-Value [ft] [R] plier [stj [Btulhr. A. Fj Capacity [Ib/cfj [h.sf.FBtu] [Btu/sf.F] In Zone: Women's I wall .75" stucco, 6" hvc, 70.00 10.00 1 700.0 North 0.1637 14.624 102.50 6.1 ❑ R5 ins, 1/2" gypsum 2 wall .75" stucco, 6" hvc, 2.00 10.00 1 20.0 East 0.1637 14.624 102.50 6.1 ❑ R5 ins, 1/2" gypsum 3 wall .75" stucco, 6" hvc, 6.50 10.00 1 65.0 South 0.1637 14.624 102.50 6.1 ❑ R5 ins, 1/2" gypsum 4 wall .75" stucco, 6" hvc, 37.50 10.00 1 375.0 West 0.1637 14.624 102.50 6.1 ❑ R5 ins, 1/2" gypsum In Zone: Apt 1 wall .75" stucco, 6" hvc, 15.00 10.00 1 150.0 East 0.1637 14.624 102.50 6.1 ❑ R5 ins, 1/2" gypsum 2 wall .75" stucco, 6" hvc, 26.00 10.00 1 260.0 South 0.1637 14.624 102.50 6.1 ❑ R5 ins, 1/2" gypsum 3 wall .75" stucco, 6" hvc, 26.50 10.00 1 265.0 West 0.1637 14.624 102.50 6.1 ❑ R5 ins, 1/2" gypsum In Zone: Men's 1 wall .75" stucco, 6" hvc, 54.00 10.00 1 540.0 South 0.1637 14.624 102.50 6.1 ❑ R5 ins, 1/2" gypsum 2 wall .75" stucco, 6" hvc, 4.50 10.00 1 45.0 West 0.1637 14.624 102.50 6.1 ❑ R5 ins, 1/2" gypsum In Zone: Kitchen/Pantry I wall .75" stucco, 6" hvc, 23.00 10.00 1 230.0 North 0.1637 14.624 102.50 6.1 ❑ R5 ins, 1/2" gypsum In Zone: Meeting 1 wall .75" stucco, 6" hvc, 34.00 10.00 1 340.0 North 0.1637 14.624 102.50 6.1 ❑ R5 ins, 1/2" gypsum 8/23/2018 EnergyGauge Summit® v6.00 2 wall .75" stucco, 6" hvc, 50.50 10.00 1 505.0 East 0.1637 14.624 102.50 6.1 ❑ R5 ins, 1/2" gypsum 3 wall .75" stucco, 6" hve, 40.00 10.00 1 400.0 South 0.1637 14.624 102.50 6.1 ❑ R5 ins, 1/2" gypsum Windows (Windows will be rotated clockwise by building rotation value) No Description Orientation Shaded U SHGC Vis.Tra W H(Effec) Multi Total Area [Btu/hr sfF1 [it] [ft] plier [sf] In Zone: Apt In Wall: East 1 window East Yes 1.2500 0.82 0.76 3.00 7.00 1 21.0 In Wall: South 1 window South Yes 1.2500 0.82 0.76 6.00 5.00 1 30.0 In Wall: West 1 window West Yes 1.2500 0.82 0.76 6.00 5.00 2 60.0 In Zone: Kitchen/Pantry In Wall: North 2 window North Yes 1.2500 0.82 0.76 3.00 5.00 1 15.0 In Zone: Meeting In Wall: East 1 window East Yes 1.2500 0.82 0.76 3.00 5.00 4 60.0 In Wall: North 1 window North Yes 1.2500 0.82 0.76 3.00 7.00 1 21.0 2 window North Yes 1.2500 0.82 0.76 6.00 7.00 1 42.0 In Wall: South I window South Yes 1.2500 0.82 0.76 6.00 7.00 1 42.0 2 window South Yes 1.2500 0.82 0.76 3.00 5.00 2 30.0 In Zone: Men's In Wall: South I window South Yes 1.2500 0.82 0.76 3.00 5.00 1 15.0 2 window South Yes 1.2500 0.82 0.76 6.00 5.00 1 30.0 8123/2018 EnergyGauge Summit® v6.00 5 In Zone: Women's In Wall: North 2 window North Yes 1.2500 0.82 0.76 3.00 7.00 1 21.0 3 window North Yes 1.2500 0.82 0.76 3.00 5.00 2 30.0 e In Wall: South 4 window South Yes 1.2500 0.82 0.76 3.00 7.00 1 21.0 In Wall: West 4 window West Yes 1.2500 0.82 0.76 3.00 5.00 1 15.0 El Doors No Description Type Shaded? Width H (Effec) Multi Area Cond. Dens. Heat Cap. R-Value [ft] [ft] plier ]sf] jBtu/hr. A. F] [lb/cq IBtu/sf. F] [h.sf.FBtu] In Zone: Women's In Wall: West 1 Door Solid core flush No 3.00 7.00 1 21.0 0.3504 0.00 0.00 2.85 ❑ (2.25) Roofs No Description Type Width H (Effec) Multi Area Tilt Cond. Hcat Cap Dens. R-Value IN IN plier [st] [deg] jBW/hr. SL F] [Btu/sf. F] [lb/cq [h.sf.FBtu] In Zone: Women's 1 Roof Shngl/l/2"WD 22.72 100.00 1 2272.0 0.00 0.0471 1.40 10.89 21.2 ❑ Deck/WD Truss/6"Batt/Gyp Brd In Zone: Apt 1 Roof ShngVI/2"WD 7.44 100.00 1 744.0 0.00 0.0471 1.40 10.89 21.2 ❑ Deck/WD Tmss/6"Batt/Gyp Brd In Zone: Men's I Roof Shngl/l/2"WD 12.93 100.00 1 1293.0 0.00 0.0471 1.40 10.89 21.2 ❑ Deck/WD Truss/6"Batt/Gyp Brd In Zone: Kitchen/Pantry 8/23/2018 EncrgyGauge Summit® v6.00 I Roof Shngl/1/2"WD 4.35 100.00 1 435.0 0.00 0.0471 1.40 10.89 21.2 ❑ Deck/WD Truss/6"Batt/Gyp Brd In Zone: Meeting 1 Roof Shngl/l/2"WD 18.43 100.00 1 1843.0 0.00 0.0471 1.40 10.89 21.2 ❑ Deck/WD Tmss/6"Batt/Gyp Brd Skylights No Description Type U SHGC Vis.Trans W H(Effec) Multiplier Area Total Ana [Btu/hr sf F] [ft[ Vt[ [Sf] [sf] In Zone: In Roof: Floors No Description Type Width H (Effec) Multi Area Cond. Heat Cap. Dens. R-Value [ft] [ft] plier [sf] [Btulhr. sf. F] [Btu/sf. F] [Ib/cf] [h.sf.FBtu] In Zone: Women's I Floor 1 ft. soil, concrete 22.72 100.00 1 2272.0 0.2681 34.00 113.33 3.73 ❑ floor, carpet and - rubber pad In Zone: Apt 1 Floor 1 ft. soil, concrete 7.44 100.00 1 744.0 0.2681 34.00 113.33 3.73 ❑ floor, carpet and rubber pad In Zone: Men's 1 Floor 1 ft. soil, concrete 12.93 100.00 1 1293.0 0.2681 34.00 113.33 3.73 ❑ floor, carpet and rubber pad In Zone: Kitchen/Pantry I Floor I ft. soil, concrete 4.35 100.00 1 435.0 0.2681 34.00 113.33 3.73 ❑ floor, carpet and rubber pad In Zone: Meeting 8/23/2018 EnergyGauge Summit® v6.00 1 Floor 1 0. soil, concrete 18.43 100.00 1 1843.0 0.2681 34.00 113.33 3.73 0 floor, carpet and rubber pad Systems System 1 System Constant Volume Air Cooled Split No. Of Units 1 System < 65000 Btu/hr Component Category Capacity ERciency IPLV I Cooling System 48000.00 14.50 8.00 2 Heating System 27000.00 I.00 ID 3 Air Handling System -Supply 1600.00 0.30 ID System 2 System Constant Volume Air Cooled Split No. Of Units I System < 65000 Btu/hr Component Category Capacity Efficiency IPLV 1 Cooling System 24000.00 16.00 8.00 2 Heating System 17000.00 1.00 3 Air Handling System -Supply 800.00 0.30 System 3 System Constant Volume Air Cooled Split No. Of Units 1 System < 65000 Btu/hr Component Category Capacity Efficiency IPLV 1 Cooling System 42000.00 14.50 8.00 2 Heating System 27000.00 1.00 ❑ 3 Air Handling System -Supply 1400.00 0.30 ID System 4 System Constant Volume Air Cooled Split No. Of Units 1 System < 65000 Btu/hr Component Category Capacity Efficiency IPLV 1 Cooling System 48000.00 14.50 8.00 2 Heating System 14000.00 1.00 ❑ 3 Air Handling System -Supply 1600.00 0.30 ❑ 8/23/2018 EnergyGauge Summit® v6.00 System 5-6 System Constant Volume Air Cooled Split System < 65000 Btu/hr No. Of Units 2 Component Category Capacity Efficiency IPLV 1 Cooling System 2 Heating System 3 Air Handling System -Supply 48000.00 14.50 8.00 27000.00 1.00 1600.00 0.30 ❑ ❑ ❑ Plant Equipment Category Size Inst.No ER. IPLV El Water Heaters W-Heater Description Capacity Cap.Unit UP Rt. Efficiency Loss I Electric water heater 2 Electric water heater 3 Electric water heater 120 [Gal] 40 [Gal] 40 [Gal] 11 [kW] 0.8500 [Et] 5 [kW] 0.9500 [Ef] 5 [kW] 0.9500 [Et] [Btu/h] [Btu/h] [Btu/h] ❑ ❑ ❑ Ext-Lighting Description Category No. of Watts per Area/Len/No. of units Control Type Wattage Luminaires Luminaire [sf/ft/No] IW] 1 Ext Light 1 Main entries 3 11 6.00 Astronomical Timer Conn 33.00 ❑ 2 Ext Light 2 Main entries 2 10 6.00 Astronomical Timer Contra 20.00 ❑ Piping Operating Insulation Nomonal pipe Insulation Is Runout? No Type Temperature Conductivity Diameter Thickness IF] ] Btu-in/h.sLF] [in] [in] 8/23/2018 EnergyGauge Summit® v6.00 I Domestic and Service Hot Water Systems 110.00 0.28 0.75 1.00 No ❑ 2 Cooling Systems (Chilled Water, Brine and 45.00 0.28 1.00 0.75 No ❑ Refrigerant) 3 Cooling Systems (Chilled Water, Brine and 45.00 0.28 0.75 0.75 No ❑ Refrigerant) 4 Cooling Systems (Chilled Water, Brine and 45.00 0.28 1.00 0.75 No ❑ Refrigerant) 5 Cooling Systems (Chilled Water, Brine and 45.00 0.28 1.00 0.75 No ❑ Refrigerant) 6 Cooling Systems (Chilled Water, Brine and 45.00 0.28 1.00 0.75 No ❑ Refrigerant) 7 Cooling Systems (Chilled Water, Brine and 45.00 0.28 1.00 0.75 No ❑ Refrigerant) Fenestration Used Glass Name Glass Type No. of SHGC VLT Conductance Panes [Btu/h.sEF] ASHULSgICIrAII User Defined 1 1.2500 0.8200 0.7600 ❑ Front Materials Used Only R-Value RValue Thickness Conductivity Density Spec�eHeat Mat No Acronym Description Used 1h.sf.FBtu] [ft] [Btu/h.ft.F] [lb/cf] [Btu/Ib.F] 187 Mat1187 GYP OR PLAS No 0.4533 0.0417 0.0920 50.00 0.2000 Li BOARD,1/21N 178 Mat1178 CARPET W/RUBBER PAD Yes 1.2300 ❑ 265 Mat1265 Soil, 1 ft No 2.0000 I.0000 0.5000 100.00 0.2000 1:1 48 Mat148 6 in. Heavyweight concrete No 0.5000 0.5000 1.0000 140.00 0.2000 ❑ 267 Mat1267 0.75" stucco No 0.1563 0.0625 0.4000 16.00 0.2000 ❑ 23 Mat123 6 in. Insulation No 20.0000 0.5000 0.0250 5.70 0.2000 ❑ 279 Mat1279 Solid core flush (2.25") Yes 2.8537 ❑ 8/2312018 EnergyGauge Summit® v6.00 10 81 Matl81 ASPHALT -ROOFING, Yes 0.1500 ❑ ROLL 244 Mat1244 PLYWOOD, 1/21N No 0.6318 0.0417 0.0660 34.00 0.2900 ❑ 1011 ApLbMat1011 R-5 Generic Insulation No 5.0000 0.1091 0.0218 0.30 0.2000 ❑ Constructs Used Simple Massless Conductance Heat Capacity Density RValue No Name Construct Construct [Bto/h.sLF] [Btu/sf.F] [Ib/ct] [h.sLFBtul 1039 ShngVI/2"WDDeck/WDTruss/6'Batt/Gyp No No 0.05 1.40 10.89 21.2 ❑ Brd Layer Material Material Thickness Framing No. [ft] Factor 1 81 ASPHALT -ROOFING, ROLL 0.000 ❑ 2 244 PLYWOOD, 112IN 0.0417 0.000 ❑ 3 23 6 in. Insulation 0.5000 0.000 ❑ 4 187 GYP OR PLAS BOARD,I/2IN 0.0417 0.000 ❑ Simple Massless Conductance Heat Capacity Density RValue No Name Construct Construct [Btu/h.sLF] [Btu/sLF] [Ib/cf] ]h.sf.FBtu] 1057 1 ft. soil, concrete floor, carpet and rubber pad No No 0.27 34.00 113.33 3.7 ❑ Layer Material Material Thickness Framing No. [ft] Factor 1 265 Soil, 1 ft 1.0000 0.000 2 48 6 in. Heavyweight concrete 0.5000 0.000 ❑ 3 178 CARPET W/RUBBER PAD 0.000 ❑ 8/23/2018 EnergyGauge Summit® v6.00 11 Simple Massless Conductance Heat Capacity Density RValue No Name Construct Construct [Btu/h.sfF] [Btu/sfF] [Ib/cf[ jh.sfFBtuj 1058 Solid core flush (2.25) No Yes 0.35 2.9 ❑ Layer Material Material Thickness Framing No. IN Factor 1 279 Solid core flush (2.25") 0.000 ❑ Simple Massless Conductance Heat Capacity Density RValue No Name Construct Construct [Btu/h.sfFI [Btu/sfF] [Ib/cf] [h.sfFBtul 1069 .75" stucco, 6" hvc, R5 ins, 1/2" gypsum No No 0.16 14.62 102.50 6.1 ❑ Layer Material Material Thickness Framing No. [ft] Factor 1 267 0.75" stucco 0.0625 0.000 ❑ 2 48 6 in. Heavyweight concrete 0.5000 0.000 ❑ 3 1011 R-5 Generic Insulation 0.1091 0.000 ❑ 4 187 GYP OR PLAS BOARD, WIN 0.0417 0,000 ❑ 8/23/2018 EnergyGauge Summit® v6.00 12 PERACCA MANUALN SUMMER OAJIA.-91 DEG.D.B:79 DEG. W3175 DEG. D.B.-64 DEG. W.B., INDOOR DESIGN R.H.-55No/GR. WATER DIFF.-60 WINTER OAAA.-47 DEG. D.B170 DEG. D.B. Pmj Missionary Flights DATE 13-Oct-18 COOLING CALCULATIONS SYSTEM 1-2 TIME MONTH LATITUDE Wheat 16 JULY 24 SENS gain OA ROOF ROOF WALL WIND WIND WIND WIND WIND MISC LIGHTS PPL ROOM ROOM CFM RM SENS SENS SENS SENS SENS SENS SENS SENS BTUH SENS BTUH BTUH CFM RM PPL 16 Meeting Room 5529 3735 878 1756 3515 1202 1683 1600 6461 20250 50169 2445 360 60 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 60 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 TOT 5529 3735 878 1756 3515 1202 1683 1600 5461 20250 50169 2445 360 OA TOT EST SYS SYS RM TOT OA TOT. ROOM OA KW HT -KW TONS TOT SHR SHR SENS SENS LAT LAT LAT BTUH 3.54 7.62 7.91 90922 0.62 0.71 56398 6229 34524 20260 14274 SYSTEM 3 TIME MONTH LATITUDE wheat 16 JULY 24 SENS gain OA ROOF ROOF WALL WIND WIND WIND WIND WIND MISC LIGHTS PPL ROOM ROOM CFM RM SENS SENS SENS SENS SENS SENS SENS SENS BTUH SENS BTUH BTUH CFM RM PPL 13 Pantry 405 195 0 0 0 0 0 1500 683 250 3336 163 12 14 Mchen 900 510 627 0 0 0 0 25700 1365 1760 33938 1654 138 28 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 20 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 25 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 TOT 1305 705 627 0 0 0 0 27200 2048 2000 37273 1816 150 OA TOT EST SYS SYS RM TOT OA TOT. ROOM OA KW HT -KW TONS TOT SHR SHR SENS SENS LAT LAT LAT BTUH 1.47 2.11 4.16 47800 0.83 0.95 39864 2590 7936 2000 5936 Jones S Conde, LLC 4440 PGA Boulevard Palm Beach Gardens, FL 33410 Certificate of Author&at/on #29793 Tel (561) 309.9017 Engineer. Bawd R Jones, PE 041042 ROOM HEAT TRAM -KW 81 4.08 0 0.00 0 0.00 81 4.08 ON eN ON Std am Old sensible latent as as ca oa ratio ratio temp tam latent latent 1.00 1.00 16.00 16.00 60.00 60.00 ROOM HEAT TRAN-KW 1 0.15 7 0.49 0 0.00 0 0.00 0 0.00 8 0.64 a" am ery Old ery std sensible latent as os oa as ratio ratio temp tom latent latent 1.00 1.00 16.00 16.00 60.00 60.00 0 mm��OR mq mYo�a3D m rmOOW oonlmmAON+ m o+ofn+o 'm mZ pp0 1 `-gym aef a �� and WxiC 35SN nmm moC a'3n C y00 tj0m�oO O 333 �' A� 20� O O 3>> ZOO O %i SbD sfppa m mmm n WT and fe WT o 5 b 5Z D am 3x s M, �mZ Pao a z O r W N O O m mw mVm b0 m 16 + V W m m oo a 00o R Op 00 00 0 0 00 0 +m m p ZO S ZO S N q (Tu fO mfWil o{mn mT w mtmnW NT O A N O O A N W V O+ P A m 1J0 O O O U P O A m JJ$$ O inD u m+mN +m ZD 2D m mm� Z> m m o ooNooOobN Wr m 000NNN Wr- o N m� No mm N~ V m W WW (ZAD W~ m N m y0 Cp V N 0 0 0 O V O O N V V W O O O N O S ZZ ZZ m m m WO NO Z m oomoo0oo0 0 000000 0 czz N~ N~ O towWo m +yy o 000000000 o 00000o W A C OyW ZZ wCU ZZ Z W 2 00 m i WO m + 0 000000000 C � o 000000 m ZZ o xN ZZ N of 0 0000moboo WO o 00000o WO � Wv m3_ Wm ym 3_ � ma o CW O A� n a fn cW n o 000000000 20 o m00000 SO D (� mo WE:mo m, X A N~ J N N+ mm N NN Z~ N + w+ N O Om W O O O w A W O+ W W N O coo.. A m W T (� m y m-I 9 m m °D + -1' m W L Z V NJVN N '1Z V Z fall OVV CrZ 'O P W N O N U U O S W m W O O N N = W b O O O O O O O O O O N O O O O O O O s0 w +m o m m+m +mom �0& m sfWi omfJil mm3 0 03 =312 Xm N N b N O N W m V A W N N W W O O W V N •C O V N m O O O O O W V w SO + TO a sy0 p TO N O N N N b m Nw KO O 0 4f L N N i 0 o a ooag' oNN o w 000Nwm 3 V 5D 3D W 50 XD 0 o AmN+ W tll + W O O O N m N N O O Tm 9m N O O N w V+ O O N m O O O m w V amZ ti=O �wz DSO o f'n ��O o a go R w 00000.000 + + 0000003 O m OOdNOIOOP01� O m N 00041 N.P� O + O O O m P P N O P P O O m O O O b+ b +UM um 0ff� +m FS O ^ O ^ O O \, 9 m3 Z Wd Z o' o 0 m m Saw mFEE m= ma o^ e o e Missionary Flights 2 Apartmerit FORT PIERCE, FL MANUAL V/ASHRAE CALCULATION RESULTS SUMMER O.A./I.A. - 91 DEG. D.B./75 DEG. D.B. WINTER O.A./I.A. - 47 DEG. D.B./70 DEG. D.B. system room room 6.00 num name 1 Bedroom 1 2 Bedroom 2 3 Bath 4 Living/Dining/Kitchen 60 - 60 - SUB TOTALS TOTALS Jones & Conde, LLC 4440 PGA Boulevard Palm Beach Gardens, FL 33410 Certificate of Authorization #29783 Tel (561) 309-9017 Engineer. David R Jones, PE #41042 approx kw calc total cfm heat tons 4900.70 180 0.45 5270.20 193 0.52 541.65 20 0.10 12472.73 457 1.76 0.00 0 0.00 0.00 0 0.00 23185.28 850 2.82 23185.28 2.0