HomeMy WebLinkAboutCHECK LISTi
Florida Building Code, Sixth, Edition .(N17) -:Energy Conservation
EnergyGauge Summit® Fla/Com-2017, Effective Date: Dec 31, 2017
IECC 2015 -Total Building Perforrnance Compliance Option
i
Check List
Applications for compliance with the Florida Building Code, Energy Conservation shall
include: This Checklist
Checklist
DEC 0 4 MB
The full compliance report generated by the software that contains the proje t gT, Lucie County, Permitting
summary, compliance summary, certifications and detailed component comp rance
reports.
The compliance report must include the full input report generated by the software as
contigous part of the compliance report.
Boxes appropriately checked in the Mandatory Section of the complaince report.
WARNING: INPUT REPORT NOT GENERATED.
To include input report in final submission, go to the Project Form, Settings Tab and check
the box - "Append Input Report to Compliance Output Report"
Then rerun your calculation
SCANNED
BY
St. Lucie County
r-
EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option
10/14/2018 Page I of 14
PROJECT SUMMARY
Short Dear: Missionary FI - GC
Owner: Enter Owner's name here
Addressl: Hammond Rd & Steel Blvd
Address2:
Description: Missionary Flights- Garage Clol
City:
Fort Pierce
State:
FL
Zip:
34946
Type: Warehouse Class: New Finished building
Jurisdiction: FORT PIERCE, ST LUCIE COUNTY, FL (661100)
Conditioned Area: 161 SF Conditioned & UnConditioned Area: 161 SF
No of Stories: I Area entered from Plans 161 SF
Permit No: 0 Max Tonnage 0.8
If different, write in:
EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Dale: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2016 - Total Building Performance Compliance Option
10/14/2018 Page 2 of 14
Component Design Criteria Result
Gross Energy Cost (in $) 43.0 81.0 PASSED
LIGHTING CONTROLS
EXTERNAL LIGHTING
HVAC SYSTEM
PLANT
WATER HEATING SYSTEMS
PIPING SYSTEMS
Met all required compliance from Check List?
PASSES
PASSES
PASSES
No Entry
PASSES
PASSES
Yes/No/NA
IMPORTANT MESSAGE
Info 5009 -- -- -- An input report of this design building must be submitted along with this
EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option
10/14/2018 Page 3 of 14
CERTIFICATIONS
I hereby certify that the plans and specifications covered by this calculation are in compliance with the
Florida Energy Code
Prepared By:
David R. ]ones
Building Official:
Date:
" ! u —
1 ';
Date:
I certify that this building is in compliance with the Florida Energy Efficiency Code
Owner Agent:
Date:
If Required by Florida law, I hereby certify (') that the system design is in compliance with the Florida Energy
Efficiency Code
Architect:
Electrical Designer: David R. Jones
Lighting Designer: David R. Jones
Mechanical Designer: David R. Jones
Plumbing Designer: David R. Jones
Reg No:
Reg No: 41042
Reg No: 41042
Reg No: 41042
Reg No: 41042
(•) Signature is required where Florida Law requires design to be performed by registered design
professionals. Typed names and registration numbers may be used where all relevant information is
contained on signed/sealed plans.
16
1
EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 % .1
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option -
10/14/2018 Page 4�of-14 .
Project: Missionary FI - GC
Title: Missionary Flights - Garage Closet
Type: Warehouse
Building End Uses
1) Proposed
2) Baseline
Total
2.70
6.00
$43
$95
ELECTRICITY(MBtutkWhl$)
2.70
6.00
803
1761
$43
$95
AREA LIGHTS
0.80
1.60
121
468
$12
$25
MISC EQUIPMT
0.30
0.30
94
94
$5
$5
PUMPS & MISC
0.10
0.10
19
21
$1
$1
SPACE COOL
1.00
1.40
306
417
$17
$22
SPACE HEAT
0.20
0.30
70
93
$4
$5
VENT FANS
0.30
2.30
93
668
$5
$36
Credits Applied: None
PASSES
Passing Criteria = 81
Design (including any credits) = 43
Passing requires Proposed Building cost to be at most 85% of
Baseline cost. This Proposed Building is at 45.8%
EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option
10/14/2018 Page 5 of 14
Project: Missionary FI - GC
Title: Missionary Flights - Garage Closet
Type: Warehouse
(WEA File: FL ST LUCIE CO INTL.tm3)
External Lighting Compliance
Description Category Tradable? Allowance
Area or Length
ELPA CLP
(W/Unit)
or No. of Units
(W) (W)
(Sgft or ft)
Ext Light 1 Main entries Yes 30.00
16.0
480 30
Tradable Surfaces: 30 (W) Allowance for Tradable: 1230 (W)
PASSES
All External Lighting: 30 (W)
Complicance check includes a excess/Base allowance of 750.00(W)
Project: Missionary FI - GC
Title: Missionary Flights - Garage Closet
Type: Warehouse
(WEAFile: FL ST LUCIE CO INTL.tm3)
Lighting Controls Compliance
Acronym Ashrae Description Area
Design
Min Compli-
ID (sq.ft)
CP
CP ance
Closet 30,001 Fine Material Storage 161
1
1 PASSES
PASSES
Project: Missionary FI - GC
Title: Missionary Flights - Garage Closet
Type: Warehouse
(WEA File: FL ST LUCIE CO INTL.tm3)
System Report Compliance
System 1 System
Constant Volume Air Cooled
No. of Units
Split System < 65000 Btu/hr
1
Component Category
Capacity
Design ER Design
IPLV Comp-
Eff Criteria IPLV
Criteria liance
Cooling System Air Conditioners Air Cooled
9000
23.20 13.00 8.00
PASSES
Split System < 65000 Btu/h
Cooling Capacity
Heating System Heat Pumps Air Cooled
10900
11.00 8.20
PASSES
(Heating Mode) Split System
< 65000 Btu/h Cooling
Capacity
Air Handling Air Handler (Supply) -
300
0.10 0.82
PASSES
System -Supply Constant Volume
PASSES
EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Dale: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option
10/14/2018 Page 6 of 14
Plant Compliance
Description Installed Size Design Min Design Min Category Comp
No Eff ER IPLV IPLV liance
None
Project: Missionary FI = GC
Title: Missionary Flights - Garage Closet
Type: Warehouse
(WEAFile: FL ST LUCIE CO INTL.tm3)
Water Heater Compliance
Design Min
Design
Max Comp
D
Description Type
Category
Eff Eff
Loss
Loss liance
Water Heater 1 Electric water heater <= 12 [kW) 0.99 0.97
PASSES
PASSES
Project: Missionary FI - GC
Title: Missionary Flights - Garage Closet
Type: Warehouse
(WEA File: FL ST LUCIE CO INTL.tm3)
Piping System Compliance
Category
Pipe Dia Is Operating Ins Cond
Ins
Req Ins Compliance
[inches] Runout? Temp [Btu-in/hr
Thick [in]
Thick [in1
1171 SF.F1
Heating System (Steam, Steam
0.75 False 105.00 0.28
1.00
0.50 PASSES
Condensate, & Hot Water)
Cooling Systems (Chilled Water, Brine
0.50 False 45.00 0.28
0.50
0.50 PASSES
and Refrigerant)
PASSES
EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option
10/14/2018 Page 7 of 14
Mandatory Requirements (as applicable) Mandatory requirements compiled by US Department
of Energy and Pacific Northwest National Laboratory.
Adopted with permission
Topic Section Component Description Yes NIA Exempt
Insulation C303.2 Envelope Below -grade wall insulation installed per IT ❑ ❑
El
2. To be checked by Men Reviewer
Plan Review C103.2 Envelope Plans and/or specifications provide all information
with which compliance can be determined for the
El El
building envelope and document where
exceptions to the standard are claimed.
manufacturer's instructions.
Insulation
C303.2
Envelope
Slab edge insulation installed per manufacturers
�❑
instructions.
Insulation
C303.2
Envelope
Above -grade wall insulation installed per
manufacturers instructions.
Insulation
C402.3
Envelope
High-albeda roofs satisfy one of the following:
�
EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Dale: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option
10/14/2018 Page 8 of 14
A
Plan Review C103.2
Plan Review C103.2
Plan Review C103.2
Plan Review C103.2
Insulation
C402.2.5
Insulation
C402.2.6
HVAC
C402.2.6
Insulation
C402.2.6
Air Leakage
C402.5.7
SYSTEM -SPECIFIC
C403.2.12.3
HVAC
C403.2.13
HVAC
C403.2.4.2
SYSTEM_SPECIFIC
SYSTEM -SPECIFIC
SYSTEM -SPECIFIC
HVAC
C403.2.4.4
C403.2.4.7
C403.2.5
C403.2.6.1
SYSTEM -SPECIFIC C403.4.1.1
SYSTEM -SPECIFIC C403.4.1.3
SYSTEM -SPECIFIC C403.4.2
Mechanical
Plans, specifications, and/or calculations provide
all information with which compliance can be
determined for the mechanical systems and
equipment and document where exceptions to the
standard are claimed. Load calculations per
acceptable engineering st
Mechanical
Plans, specifications, and/or calculations provide
all Information with which compliance can be
determined for the service water heating systems
and equipment and document where exceptions
to the standard are claimed. Hot water system
sized per manufact
Interior Lighting
Plans, specifications, and/or calculations provide
all information with which compliance can be
determined for the Interior lighting and electrical
systems and equipment and document where
exceptions to the standard are claimed.
Information provided shoul
Exterior Lighting
Plans, specifications, and/or calculations provide
all information with which compliance can be
determined for the exterior lighting and electrical
systems and equipment and document where
exceptions to the standard are claimed.
Information provided shout
Envelope
Slab edge insulation depth/length. Slab insulation
extending away from building is covered by
pavement or>=10 inches of soil.
Project
Radiant heating systems panels insulated to
>=R-3.5 on face opposite space being heated.
Mechanical
Thermally Ineffective panel surfaces of sensible
healing panels have insulation>= R-3.5.
Envelope -
Radiant panels and associated components,
designed for heat transfer from the panel surfaces
to the occupants or indoor space are insulated
with a minimum of R-3.5.
Envelope
Vestibules are installed on all building entrances.
Doors have self -closing devices.
Mechanical
Fans have efficiency grade (FEG) >= 67. The total
efficiency of the fan at the design point of
operation <=15% of maximum total efficiency of
the fan.
Mechanical
Unenclosed spaces that are heated use only
radiant heat
Mechanical
Each zone equipped with setback controls using
automatic time clock or programmable control
system.
Mechanical
Zone isolation devices and controls installed
where applicable.
Mechanical
Fault detection and diagnostics Installed with
air-cooled unitary DX units having economizers.
Mechanical
Hot water boilers supplying heat via one- or
two -pipe systems include outdoor setback control.
Mechanical
Demand control ventilation provided for spaces
>500 ft2 and>25 people/1000 ft2 occupant
density and served by systems with air side
economizer, auto modulating outside air damper
control, or design airflow>3,000 cfm.
Mechanical
Hydronic and multizone HVAC system controls
areVAV fans driven by mechanical or electrical
variable speed drive per Table C403.4.1.1.
Mechanical
Reset static pressure setpoint for DDC controlled
VAV boxes reporting to central controller based on
the zones requiring the most pressure.
Mechanical
Temperature reset by representative building
loads in pumping systems for chiller and boiler
systems>500,000 Btu/h.
■ ■ ■
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Dale: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option
10/14/2018 Page 9 of 14
SYSTEM —SPECIFIC C403.4.2.3.2.1
Mechanical Closed-circuit cooling tower within heat pump loop
❑
El
have either automatic bypass valve or lower
leakage positive closure dampers. Open -circuit
tower within heat pump loop have automatic valve
to bypass all heat pump water flow around the
tower. Open- or cl
SYSTEM —SPECIFIC C403.4.2.4
Mechanical Hydronic systems greater than 500,000 Btu/h
❑
❑
❑
designed for variable fluid flow.
SYSTEM —SPECIFIC C403.4.2.5
Mechanical System turndown requirement met through
multiple single -input boilers, one or more
modulating boilers, or a combination of
single4nput and modulating boilers.
Boiler input between 1.0 MBtu/h and 5 MBtu/h
has 3:1 turndown ratio, boiler input between 5.0
SYSTEM —SPECIFIC C403.4.2.6
Mechanical Chilled water plants with multiple chillers have
El
El
El
capability to reduce flow automatically through the
chiller plant when a chiller is shut down.
Boiler plants with multiple boilers have the
capability to reduce flow automatically through the
boiler plant
SYSTEM —SPECIFIC C403.4.3,
Mechanical Fan systems with motors>=7.5 hp associated
C403.4.3.2
with heat rejection equipment to have capability to
operate at 2/3 of full -speed and auto speed
controls to control the leaving fluid temperature or
condensing temp/pressure of heat rejection
device.
SYSTEM —SPECIFIC C403.4.4.5
Mechanical Multiple zone HVAC systems have supply air
temperature reset controls.
SYSTEM —SPECIFIC C403.4A.6
Mechanical Multiple zone VAV systems with DDC of individual
zone boxes have static pressure setpoint reset
controls.
SYSTEM —SPECIFIC C404.2.1
Mechanical Gas -fired water-heatingequipment installed in
❑
new buildings: where a singular piece of
water -heating equipment>= 1,000 kBtu/h serves
the entire building, thermal efficiency >= 90 Et.
Where multiple pieces of water -healing
equipment serve the building wi
SYSTEM —SPECIFIC C404.4
Mechanical All piping insulated in accordance with section
details and Table C403.2.10.
SYSTEM —SPECIFIC C404.5, C404.5.1,
Mechanical Heated water supply piping conforms to pipe
❑
El
C404.5.2
length and volume requirements. Refer to section
details.
SYSTEM —SPECIFIC C404.6.3
Mechanical Pumps that circulate water between a heater and
storage tank have controls that limit operation
from startup to <= 5 minutes after end of heating
cycle.
SYSTEM —SPECIFIC C404.7
Mechanical Water distribution system that pumps water fromEl
1-1
❑
a heated -water supply pipe back to the
heated -water source through a cold -water supply
pipe Is
a demand recirculation water system. Pumps
within this system have controls that start the
Wattage G405.5.1
pump upon receiving
Exterior Lighting Exterior lighting power is consistent with what is
shown on the approved lighting plans,
demonstrating proposed watts are less than or
equal to allowed watts.
Plan Review C405.6
Project Group R-2 dwelling units have separate electrical
❑
El
meters.
Plan Review C406
Project Plans, specifications, and/or calculations provide
❑
all Information with which compliance can be
determined for the additional energy efficiency
package options.
SYSTEM —SPECIFIC C40B.2.2.2
Mechanical HVAC hydronic heating and cooling coils have
❑
❑
means to balance and have pressure test
connections.
SYSTEM —SPECIFIC C408.2.2.2
Mechanical HVAC hydronic heating and cooling coils have
❑
means to balance and have pressure test
connections.
EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Dale: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option
10/14/2018 Page 10 of 14
413o 11 Osed S[OZ/4I/01
uopdo aouepdwoo aoueuuoyad Oulppng jejol- SIOZ 003I uogenlasuoo 66)au3 - QUoz) uoplp3 ylxlS'opoo Oulplmg epuolj
LL0Z'16080:Ole09np0ag3 elemlloSjuepdwoo0'l-LtOZWVl'LIOZ-woo/el3®l!wwnSa6negABlau3
❑
❑
'swop
offien Xoop Bulpeol Ile uo pallelsul sleaslayleaM
adolanu3 9'S'ZOb3
o6eyeaq i!V
' pamolle wagm wedwep
glneiB 3loa4o'salty a6eHeal wnwlxew leave pue
asn ui iou uaym lnys Almllewolne PUP siedwep
E'b'Z'0170
pazuolow eney swalsAs lsneyxa pue lie ioopinp
ed0lanu3 'S'S'Z063
a6eyea� jlV
-asolo Allmpewolne legl sJadwep
SI"Z'E0 0
El
El
❑
pazuolow eney sluan Uegs Jolenala pue nelS
ed0lanu3 'S'S'Z04o
960NOGI JIV
adolanua leuuagl ayl ep!sul
wwl palelos!'wool a ui pasopua to adolanua
lewiayl Bulppnq eql eplslno palmol am buluado
lie uopsngwm pue smuepdde egl'smuepdde
Bulwnq lanl uopsngwm uado of lie uopsngwm
riep!nwd
spnp lie uopsngwm uado aiagM
ad019nu3 E'S'ZOCo
a6elleag HIV
•sluawellnbai a6exesl lie Bupaaw Be
El
El
❑
pelagel Ole sloop pue uopegsaual lllnq-/uopej
edolanu3 6•S'Z063'Z'S'Z063
a6eyeag J!V
•�auuew
panwdde ue ul paleas we suopegauad iaweq AV
'ZU/wp b0'0 => GOexeal lie Apulasse a6wane
pue jauuew panwdde ue ul paleas sl leyl lalueq
El❑
❑
ale snonupum a sulelum adolanua Bulpllnq egl
ed0lanu3 Z'Z'L'S'Z06o
06exeal AV
7auuew panwdde ue ui paleas we suopwlaued
l8lueq-0V 'ZU[wjo b00'0 => Allllgeauued leualew
pue Jauuew panwdde ue ul paleas sl leyl lalueq
❑
❑
❑
ne snonupum a sulelum adolanua Bulpllnq ayl
ed0l0nu3 VZ'L'S'Z04o
e6"ea-1 ny
.9bujeal lie
ezlwlulw of leualew 6u!ddelm algeauuad-loden
wnlslow yIIm paddwm to padduls
la4leam'pal9xsu6'paAlnm'paleas we adolanua
❑
lemagl Bulpllnq eyl ul aBexeal lle to sawnos IIV
ed0lanu3 1,TS'Z063
que>fe91 lb
99lwew panwdde
ue ul paleas we suopwlaued laweq AV 'iauuew
panwdde ue ui palsal to papwlsuoo jay1!a
pue jauuew panwdde ue ul paleas sl legl lalueq
❑
❑
❑
lle snonupum a sulelum adolanua 6ulppnq eyl
9d0l0nu3 L'97043
a6exeaj -0V
'ZU/wlo Ob'0 => e6eyeal ne
llwp of pawaap pue palsal uaaq sey legl lalueq
❑
❑
❑
1!e snonupum a sulelum adolanua Bulpl!ne
ad0l0nu3 97043
e6eyea-1 -0V
'Al6ulp 000e palpsul sl uopelnsul )l luepdwm
luawwmbei slyl 1peyy'6uplm papuedsns
e to dol uo pallelsul aq iouum sluawallnbw
❑
❑
❑
uopelnsul low eyl leave of popuslui uopelnsul
ad0l8nu3 ZZ'Z06o
uopelnsul
'S-m to Hoope uopelnsul 4l!n+
❑
❑
❑
slow to lanai ayl of palelnsui ul Ole sgim igBgAxg
edolanu3 Z"Z'Z063
uopelnsul
-uopelnsul
ElEl
SL'b-m eney woop anbedo 6ul6uuns-u0N
edolanu3 eTZ043
uopelnsul
•uolpadsul uopepuno3
Buunp mmo of paau hew uopelnsul uopepunol
pasodxe lol uopmpuaq •leualew an!palwd e
❑
❑
❑
yl!m e6ewep woq papalwd sl uopelnsul joualx3
ed0l8nu3 l"Z'EOEo
uopelnsul
'selunlpa aoueualulew luawdlnba
PUB 6uldmspuel'pupx'wnls!ow'ly6lluns
'a6ewep lsule60 papalwd uopelnsul louapc3
ad0lanu3 L'Z'EOEo
uopelnsul
'sgels lempMs l0 6uppap
to oplslapun yl!m popoo luaueuuad ui papelsul
uopelnsul gels lempms jo Allneo'suolpngsu!
ri
spwnpelnuew lad papelsul uopelnsul Joold
edolanu3 b'Z'Z043'Z'E0E3
uopelnsul
'papinwd salmgipm to slagel muewjoyad
of Be padwm we spinpwd uopwlsaued
ed019nu3 E'LT=
uopwlsaued
'OWN
yllm muepimoe ul pales spnpwd uopwlsaued
adolanu3 ETC=
uopwlsaued
'elep luenalw laglo pue
anlen-m 6upinwd olmpym uopelnsul jo amen-m
[I
El
❑
4MM palagel sl uopelnsui adolanua bUtpllne
adolanu3 L'EOE3
uopelnsul
•ZL ul E=> sl adols low agl waym AM papelsul sl
uopelnsu! IIJNsool pwnod to umole 'suolpngsul
❑
s„ 3Vwnpelnuew lad pallelsul uopelnsul loom
8d0l9nu3 L'EOE3
uopelnsul
bl3o ZI aged HIMPI/0I
uopdp amegdwoo a0ueuuopad 6uiplme Ielol- 9IOZ 0031 u00e/ua£u0D A61au3 - (806 u011ip3 q)xIS'opop 6uiplmg epuol j
80Z'I600p:a)epan008.43'alemyoS)uepdw030'I-LIOZWVj'LI0Z-wo0/ejj®)lwwnSa6neDA13 u3
Belem
❑
El
❑s11u21
a6elols 6u0e!nona-uou uo pallelsw scion leaH
leo!uegoaW
E"1,0173
31d133dS W31SAS
N!oedeo %9Z - g/n18A ObZ<
El
El
:ol pal!w!I ssedAq seB loH
In!ueyoalnl
9'1"EOb3
0Id133dS W31SAS
ualem
loq oaiNos )o eupeagald loy pallelsul sl uolpalal
leag dead Jo / 09 apinoid jo j.99 of jelem
El
❑
❑
yeaq um 1e41 walsAs Aanooaj leag jasuapuo3
IMIUB439W
9'1'E043
31d133dS W31SAS
auoz
goes of Bull000 pue Bugeaq nuonbas pue Bullom
17-l'9'b'b'£Ob0
❑
❑
❑
pue Buneag snoauelinwls llwp um sloqum auoZ
180!uegoON
'S'b'b'EOb3
0Id133dS W31SAS
•)Io s! dq Ol< walsAs Bu!dwnd
LAM dwnd IU04 oluoipA4 uagm moU Jalem go
❑
❑
❑
ings of PwPOPaluj amen opewolne uoplsodoml
Im!uegoaW
E'E71"E043
OIdl03d1 W31SAS
'do OE=> of ainpuedwal
Alddns 6upom pue 6u!leaq 1!wp of sloqum lsw
aneq pue haAmBUego eio}aq sjq b lseel le ioy
epow ouo ui uopelado molle'deSl=< puegpeap
e mope of sloqum aneq welsAs uopnquls!p
El
❑
❑
gowwm a Bulsn swalsAs oluapAq adldoml
lmlumpayy
Z'Z'b'£043
3Id133dS W31SAS
"o'm Z' L=> lulodlas japmlum
❑
❑
❑
os palmol slosuas ounssaid ollelS aneq sue) AVA
Ieoluegoapy
ZVVeo43
0Id103dSW31SAS
'Bupsol 05"eal qe
❑
❑
❑
sannbai uwnlm lalem'ul £< Buggiado Hiompn0
Im!umpayy
E'l'6'Z'£043
OId133dS W31SAS
vo!padsul
uo!lepunoj Buunp mmo of paau Aew uo!lmpuaA
a lapun io ul Pallwsu! we swnuald io
El
El
El
spnp eiagM •palelnsul swnuald pue spnp OVAH
spnp
IMIU8409W
BZ'£043
OVAH
'N!oedn
u6!sap jo ssal jo %09 0l suel alelnpow io eBels
of Nlaedeo pue uo!palap lueu!weyum opewolne
El
El
❑
seq uopel!luan oBeleB BupPed posolou3
leo!uegoaW
Z'9'Z'E040
OVAH
•
-pallelsul slollum opewolne aneq
swalsAs uolpalwd ezow j 'sloilum of uopoouum
9'117'E043
❑
❑
❑
aminl iol slosuas walsAs Bulllaw n!/mouS
POWWOW
S'b'Z'E063
3VAH
❑
❑
❑
-slollum Pals wnw!ldo apnlou! swelsAS
Im!uegoaW
E'Z117'£043
0Id133dS W31SAS
dngoeq moq-0y'apwano
luedn000 moq-Z'lloolo Aep-L:(I�)j.99
Z'Z'4'Z'EObO
El
❑
❑
Pue(leaq) j.9S of goeq!aS:sloquoO opewolnV
InluegoaW
'I'Z'4Z"E063
3VAH
El
El
Elsuopo!gsw
delmo lulodlas aneq sloqum amleladwal
Im!ue4oaW
E'l'b'Z'E0b3
OVAH
❑
❑
❑
'puegpeap I.y S e aneg slollum apelsouuagj
Im!umpayy
Z'l'b'Z'£063
OVAH
❑
❑
❑
puegpeap j.y S e aneq slwlum opelsouuagl
InNeyoapy
Z'l'b'Z'E0b0
OVAH
'popaau loll uagm uo Bu!wm wmy leaq eouelslsw
El
El
❑
oupala leluawalddns luaAwd slwlum dwnd IBOH
Iso!ue43M
I'I'b'Z'MCI
31d133d5 W31SAS
wwsAs uopmU!Plwngap/uopmUlp!wnq
pa:Iwsui jad m!Aep loqum
N!plwnq auo wnwlulW 'loqum lelsouuagl e
El
El
❑
Aq papoqum sI auoz Woo of Bupom PUB 6upeaH
1nluelpaW
VVZ'E043
0IdI03dS W31SAS
'(E)E'Z'£043 algal
of q elouloo j led se Nuo luawmeldw iol polagel
El
El
El
'uI Zb Aq •u! 91. s9na919 gl!m Mid PUB OVld
IeolumpaW
E'Z'E043
31d109dS W31SAS
❑
❑
paguaA Aoua!owa luawdlnba 3VAH
ImluegoaW
E7"E043
OVAH
'uolloodsul uopepunoj Buunp mmo of paau
Aew uopmppaA'gels a ,spun io ul pallelsul sl
❑
❑
❑
6u!d!d watIM •ssawlo!gl uo!lelnsu! Bu!d!d 3VAH
Im!ueyoaW
OVZ'E040
31j133dS W31SAS
wnpeawd leuopolndwm lualenmba panadde
us Aq Ja E91, P ENUIS V33V/3V-dHSV/ISNV
411m muepiome u! palelmlm
❑
❑
❑
spool u6!sop luawdlnba pue swalsAs OVAH
Ieo!uegoaW
Vz'£O4O
OVAH
'6u!snoq aneu!wnl pue gs!ug joualu! uaamlaq
IesS'palagel pue paleu 31 eq PUB uopeglUul
❑
❑
❑
11w!l of adolanue lemagl ui sageulwm nl passaa
odOIOAU3
9'S'ZOb3
a8mleal nV
SYSTEM
C404.3
Mechanical
Heat traps installed on supply and discharge
—SPECIFIC
piping of noncirculating systems.
SYSTEM
C404.3
Mechanical
Heat traps installed on supply and discharge
—SPECIFIC
piping of non -circulating systems.
SYSTEM
C404.6.1
Mechanical
Controls are installed that limit the operation of a
—SPECIFIC
recirculation pump installed to maintain
temperature of a storage tank. System return pipe
Is a dedicated return pipe or a cold water supply
pipe.
SYSTEM
C404.6.1, C404.6.2
Mechanical
Automatic time switches installed to automatically
—SPECIFIC
switch off the recirculating hot-water system or
heat trace.
SYSTEM
C404.9.1
Mechanical
Pool heaters are equipped with on/off switch and
—SPECIFIC
no continuously burning pilot light.
SYSTEM —SPECIFIC
C404.9.2
Mechanical
Time switches are installed on all pool heaters
and pumps.
SYSTEM —SPECIFIC
C404.9.2
Mechanical
Time switches are installed on all pool heaters
and pumps.
SYSTEM
C404.9.3
Mechanical
Vapor retardant pool covers are provided for
—SPECIFIC
heated pools and permanently Installed spas.
Controls
C405.2.1
Interior Lighting
Lighting controls Installed to uniformly reduce the
lighting load by at least 50%.
Controls
C405.2.1
Interior Lighting
Ocoupancy sensors installed In required spaces.
Controls C405.2.1,
Interior Lighting
Independent lighting controls installed per
C405.2.2.3
approved lighting plans and all manual controls
readily accessible and visible to occupants.
Controls C405.2.2.1
Interior Lighting
Automatic controls to shut off all building lighting
installed in all buildings.
Controls C405.2.3
Interior Lighting
Daylight zones provided with individual controls
that control the lights independent of general area
lighting.
Controls C405.2.3,
Interior Lighting
Primary sidelighted areas are equipped with
C405.2.3.1,
required lighting controls.
C405.2.3.2
Controls C405.2.3,
Interior Lighting
Enclosed spaces with daylight area under
C405.2.3.1,
skylights and rooftop monitors are equipped with
C405.2.3.3
required lighting controls.
Controls C405.2.4
Interior Lighting
Separate lighting control devices for specific uses
installed per approved lighting plans.
Wattage C405.2.4
Interior Lighting
Additional Interior lighting power allowed for
special functions per the approved lighting plans
and is automatically controlled and separated
from general lighting.
Controls C405.2.5
Exterior Lighting
Automatic lighting controls for exterior lighting
installed. Controls will be daylight controlled, set
based on business operation time -of -day, or
reduce connected lighting > 30%.
Wattage C405.4.1
Interior Lighting
Interior installed lamp and fixture lighting power is
consistent with what is shown on the approved
lighting plans, demonstrating proposed watts are
less than or equal to allowed wafts.
MandatoryAdditional Eff C406.4
Project
Enhanced digital lighting controls efficiency
package: Interior lighting has following enhanced
lighting controls in accordance with Section
C405.2.2:
Luminaires capable of continuous dimming and
being addressed individually, <= 8uuminaires
controlled in
Mandatory Additional Eff C406.6
Project
Dedicate outdoor air system efficiency package:
Buildings with hydronic and/or multiple -zone
HVAC systems are equipped with an Independent
ventilation system designed to provide>=
100-percent outdoor air to each individual
occupied space, as specified by
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
011"01
EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option
10/14/2018 Page 13 of 14
Mandatory Additional Eff C406.7, C406.7.1
HVAC C408.2.2.1
HVAC C408.2.2.1
Testing C408.2.3.2
Project
Mechanical
Mechanical
Mechanical
Enhanced Service Water Heat System efficiency
package. One of the following SWH system
enhancements must satisfy 60 percent of hot
water requirements, or 100 percent if the building
otherwise complies with heat recovery per Section
C403.4.5: Waste heat re
Air outlets and zone terminal devices have means
for air balancing.
Air outlets and zone terminal devices have means
for air balancing.
HVAC control systems have been tested to
ensure proper operation, calibration and
adjustment of controls.
❑
❑
❑
❑
El
❑
❑
❑
i 4. To be by Inspector
at Project Completion and Prior to Issuance of
checked
P
Certificate of Occupancy
Post Construction C303.3, C408.2.5.2
Interior Lighting
Furnished 08M instructions for systems and
equipment to the building owner or designated
Post Construction C303.3, C408.2.5.3
Mechanical
representative.
Furnished 08M manuals for HVAC systems
within 90 days of system acceptance.
Fenestration C402.4.2.2
Envelope
Skylights in office, storage, automotive service,
❑
❑
ri
manufacturing, non-refdgerated warehouse, retail
store, and distdbudon/sorting area have a
measured haze value > 90 percent unless
designed to exclude direct sunlight
Post Construction C408.2.1
Mechanical
Commissioning plan developed by registered
El
1:1
❑
design professional or approved agency.
Post Construction C408.2.3.1
Mechanical
HVAC equipment has been tested to ensure
proper operation.
Post Construction C408.2.3.3
Mechanical
Economizers have been tested to ensure proper
El
❑
operation.
Post Construction C408.2.4
Mechanical
Preliminary commissioning report completed and
❑
❑
certified by registered design professional or
Post Construction C408.2.5.1
Mechanical
approved agency.
Famished HVAC es -built drawings submitted
❑
❑
❑
within 90 days of system acceptance.
Post Construction C408.2.5.1
Interior Lighting
Furnished as-bulit drawings for electric power
El
11
systems within 90 days of system acceptance.
Post Construction C408.2.5.3
Mechanical
An air and/or hydronic system balancing report is
❑
provided for HVAC systems.
Post Construction C408.2.5.4
Mechanical
Final commissioning report due to building owner
❑
❑
within 90 days of receipt of certificate of
Post Construction C408.3
Interior Lighting
occupancy.
Lighting systems have been tested to ensure
proper calibration, adjustment, programming, and
operation.
EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Dale: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option
10/14/2018 Page 14 of 14
EnergyGauge Summit® v6.00
INPUT DATA REPORT
Project Name:
Project Title:
Address:
State:
Zip:
Owner:
Proiect Information
MissionaryFl - GC Orientation:
Missionary Flights - Garage Closet Building Type:
Hammond Rd & Steel Blvd Building Classification:
FL No.of Stories:
34946 GrossArea:
Enter Owner's name here
0 Deg Clockwise. Walls & Windows will
be rotated accordingly
Warehouse
New Finished building
I
161 SF
Zones
No Acronym Description
Type
Area
[all
Multiplier
Total Area
Istl
1 Garage Closet warehouse
CONDITIONED
161.0
1
161.0 ❑
Spaces
No Acronym Description
Type _ Depth
lftl
Width Height Multi
lftl lftl plier
Total Area
lst]
Total Volume
let]
10/14/2018 EnergyGauge Summit® v6.00
In Zone: Garage Closet
1 Closet closet
Fine Material Storage
1.00 161.00
9.00 1 161.0
1449.0
❑
Lighting
No Type
Category
No. of Watts per
Power Control Type
No.of
Luminaires Luminaire
[W]
Ctrl pis
In Zone: Garage Closet
In Space: Closet
l LED
General Lighting
1 72
72 Occupancy sensor without
I
Daylighting
Walls (Walls will be rotated clockwise by building rotation value)
No Description
Type Width H(Efcc) Multi Area Orientation Conductance Heat
Dens. R-Value
[ft]
[ft] plier ]sf]
[Btu/hr. A. F] Capacity
[Ib/cf] [h.sLFBtu]
[Bm1sf.F]
In Zone: Garage Closet
1 wall
.75" stucco, 6" hvc, 8.50
9.00 1 76.5 North
0.1637 14.624
102.50 6.1
❑
R5 ins, 1/2" gypsum
2 wall
.75" stucco, 6" hvc, 19.00
9.00 1 171.0 East
0.1637 14.624
102.50 6.1
❑
R5 ins, 1/2" gypsum
3 wall
.75" stucco, 6" hvc, 8.00
9.00 1 72.0 South
0.1637 14.624
102.50 6.1
❑
R5 ins, 1/2" gypsum
4 wall
0.75 in. stucco, 19.00
9.00 1 171.0 West
0.1118 1.183
14.94 8.9
❑
2x4xl6' cc,
R1lBatt, 0.5 in. gyp
Windows (Windows will be rotated clockwise by building rotation value)
No Description
Orientation Shaded
U SHGC Vis.Tra
W H(Effec) Multi
Total Area
[Btu/hr sf F]
IN [ft] plier
[sf]
In Zone: Garage Closet
In Wall: East
1 window
East Yes
1.2500 0.82 0.76
3.00 5.00 1
15.0
❑
10/14/2018 EnergyGauge Summit® v6.00
Doors
No Description
Type
Shaded?
Width H (Effec)
Multi
Area
Cond.
Dens. Heat Cap.
R-Value
[ft] [R]
plier
[sQ
[Btuthr. st: F]
[lb/cQ ]Btu/sf. FI
[h.sEFBtu]
In Zone: Garage Closet
In Wall: South
1 Door
Solid core flush
No
3.00 7.00
1
21.0
0.3504
0.00
0.00
2.85
❑
(2.25)
Roofs
No Description
Type
Width
H (Effec) Multi
Area
Tilt
Cond.
Heat Cap
Dens.
R-Value
[ft]
[ft] plier
[sQ
[deg]
[Btu/hr. SE F]
[Btu/sf. F]
[lb/cQ
[h.sLFBtu]
In Zone: Garage Closet
I Roof
ShngU1/2"WD
161.00
1.00 1
161.0
0.00
0.0471
1.40
10.89
21.2
❑
DeCIdWD
Truss/6Batt/Gyp Brd
Skylights
No Description Type
U SHGC Vis.Trans
W
H (Effec)
Multiplier
Area
Total Area
[Btu/hr sfF1
Ift]
Ift]
[Sf]
ISf]
In Zone:
In Roof.
El
Floors
No Description
Type
Width
H (Effec) Multi
Area
Cond. Heat Cap. Dens.
R-Value
[ft]
[ft] plier
Ist]
[Btu/hr. sf. F] [Btu/sf. F] [lb/cQ
[h.sEFBtu]
In Zone: Garage Closet
10/14/2018 EnergyGauge Summit® v6.00
1 Floor 1 0. soil, concrete 161.00 1.00 1 161.0 0.2681 34.00 113.33 3.73 Q
floor, carpet and
rubber pad
Systems
System 1 System
Constant Volume Air Cooled Split
System <65000 Btu/hr
No. Of Units 1
Component Category
Capacity Efficiency IPLV
1 Cooling System
2 Heating System
3 Air Handling System -Supply
9000.00 23.20 8.00
10900.00 11.00
300.00 0.10
ID
Plant
Equipment
Category
Size Inst.No Ell.
IPLV
Water Heaters
W-Heater Description
Capacity Cap.Unit
I/P lit. Efficiency
Loss
I Electric water heater
1 [Gal]
5 [kW] 0.9900 [Ef]
[Btu/h] ❑
Ext-Lighting
Description Category No. of Watts per Area/Len/No. of units Control Type Wattage
Luminaires Luminaire [sfIlt/No] [W]
1 Ext Light 1 Main entries 3 10 16.00 Astronomical Timer Conte 30.00 ❑
10/14/2018 EnergyGauge Summit® v6.00 4
Piping
Operating
Insulation
Nomonal pipe
Insulation Is Runout?
No Type
Temperature
Conductivity
Diameter
Thickness
[F]
[ Btu-in/h.sLF]
[in]
[in]
1 Heating System (Steam, Steam Condensate, &
105.00
0.28
0.75
1.00 No ❑
Hot Water)
2 Cooling Systems (Chilled Water, Brine and
45.00
0.28
0.50
0.50 No ❑
Refrigerant)
Fenestration Used
Glass
Name Glass Type
No. of SHGC VLT
Conductance
Panes
[Btu/h.sf.F]
ASH ULSgIC1rAl1 User Defined
1 1.2500 0.8200 0.7600 El
Materials Used
Only R-Value RValue
Thickness
Conductivity
Density
SpecscHeat
Mat No
Acronym
Description
Used
[h.sf.FBtu]
[ft]
IBtu/h.ft.F]
[lb/cf]
[Btu/Ib.F]
187
Mat1187
GYP OR PLAS
No
0.4533
0.0417
0.0920
50.00
0.2000
Li
BOARD,1/2IN
178
Mat1178
CARPET W/RUBBER PAD
Yes
1.2300
❑
265
Mat1265
Soil, 1 R
No
2.0000
1.0000
0.5000
100.00
0.2000
1:1
48
Matl48
6 in. Heavyweight concrete
No
0.5000
0.5000
1.0000
140.00
0.2000
❑
267
Matl267
0.75" stucco
No
0.1563
0.0625
0.4000
16.00
0.2000
❑
266
Mat1266
2x4@I6"oc+Rll Batt
No
8.3343
0.2917
0.0350
9.70
0.2000
❑
23
Mat123
6 in. Insulation
No
20.0000
0.5000
0.0250
5.70
0.2000
❑
279
Mat1279
Solid core flush (2.25")
Yes
2.8537
❑
10/14/2018 EnergyGauge Summit® v6.00 5
81
Matl8l
ASPHALT -ROOFING, Yes
0.1500
❑
ROLL
244
Mm1244
PLYWOOD, 1/21N No
0.6318 0.0417
0.0660
34.00
0.2900
❑
1011
ApLbMat1011
R-5 Generic Insulation No
5.0000 0.1091
0.0218
0.30
0.2000
❑
Constructs Used
No
Name
Simple
Massless Conductance
Heat Capacity
Density
RValue
Construct
Construct [Btu/h.sLF]
[Btu/sf.F]
]Ib/ct]
[h.sLFBtu]
1009
0.75 in. stucco, 2x4xl6" oc, RllBatt, 0.5 in. No
No 0.11
1.18
14.94
8.9
❑
gyp
Layer
Material Material
Thickness
Framing
No.
[ft]
Factor
1
267 0.75" stucco
0.0625
0.000
❑
2
266 2x4@16" oc+R11 Batt
0.2917
0.000
❑
3
187 GYP OR PLAS BOARD,1/2IN
0.0417
0.000
❑
No
Name
Simple
Massless Conductance
Heat Capacity
Density
RValue
Construct
Construct [Btu/h.sf.F]
[Btu/sf.F]
[lb/ct]
]h.sf.FBtu]
1039
ShngU1/2"WD Deck/WD Truss/6Batt/Gyp No
No 0.05
1.40
10.89
21.2
❑
Brd
Layer
Material Material
Thickness
Framing
No.
[ft]
Factor
1
81 ASPHALT -ROOFING, ROLL
0.000
❑
2
244 PLYWOOD, 1/2IN
0.0417
0.000
❑
3
23 6 in. Insulation
0.5000
0.000
❑
4
187 GYP OR PLAS BOARD, 1/2IN
0.0417
0.000
❑
10/1412018 EnergyGauge Summit® v6.00
Simple
Massless
Conductance
Heat Capacity
Density
RValue
No
Name
Construct
Construct
[Btu/h.sf.F]
[Btu/sEF]
[lb/cf]
[h.sEFBru]
1057
1 ft. soil, concrete floor, carpet and rubber pad No
No
0.27
34.00
113.33
3.7
❑
Layer
Material
Material
Thickness
Framing
No.
IN
Factor
1
265
Soil, 1 ft
1.0000
0.000
❑
2
48
6 in. Heavyweight concrete
0.5000
0.000
❑
3
178
CARPET W/RUBBER PAD
0.000
❑
Simple
Massless
Conductance
Heat Capacity
Density
RValue
No
Name
Construct
Construct
[Btu/h.sf.F]
[Btu/sEF]
[Ib/cf]
(h.sf.FBtu]
1058
Solid core flush (2.25)
No
Yes
0.35
2.9
❑
Layer
Material
Material
Thickness
Framing
No.
[ft]
Factor
1
279
Solid core flush (2.25")
0.000
❑
Simple
Massless
Conductance
Heat Capacity
Density
RValue
No
Name
Construct
Construct
[Btu/h.sEF]
]Btu/sEF]
[lb/cf]
[h.sEFBtu]
1069
.75" stucco, 6"
hvc,R5 ins, 1/2" gypsum No
No
0.16
14.62
102.50
6.1
❑
Layer
Material
Material
Thickness
Framing
No.
[ft]
Factor
1
267
0.75" stucco
0.0625
0.000
❑
2
48
6 in. Heavyweight concrete
0.5000
0.000
❑
3
1011
R-5 Generic Insulation
0.1091
0.000
❑
4
187
GYP OR PLAS BOARD,1/21N
0.0417
0.000
❑
10/14/2018 EnergyGauge Summit® v6.00
PER ACCA MANUAL N
SUMMER OA11A. - 91 DEG. D.B: 79 DEG. W.Bl75 DEG. D.B: 64 DEG. W.B., INDOOR DESIGN R.H. - 559/6I GR. WATER DIFF. - 60
WINTER O.A.AA. - 47 DEG. D.BJ70 DEG. D.B.
Pmj Missionary Flights Phase II Garage
DATE 13-Ocb18
COOLING CALCULATIONS
SYSTEM 1
TIME MONTH
LATITUDE
Wheat
16 JULY
24
SENS
gain
OA
ROOF
ROOF
WALL WIND
WIND
WIND
WIND
WIND MISC
LIGHTS
PPL
ROOM
ROOM CFM
RM
ROOM
SENS
SENS
SENS SENS
SENS
SENS
SENS
SENS BTUH
SENS
BTUH
BTUH
CFM RM
PPL
HEAT
TRAN-KW
1 Garage Closet
483
1485 637
879
0
0 0 1500
341
0
5857
285
0
0 1.09
60 0.00
0
0 0
0
0
0 0 0
0
0
0
0
0
0 0.00
TOT
483
1485 637
879
0
0 0 1500
341
0
5857
285
0
0 1.09
OA TOT
EST
SYS
SYS RM
TOT
OA
TOT.
ROOM OA
ery ON
ery
std ON
std
KW HT -KW
TONS
TOT
SHR SHR
SENS
SENS
LAT
LAT LAT
sensible latent
oa
as oa
on
BTUH
ratio ratio
temp
tam latent
latent
0.00 1.09
0.51
5857 1.00 1.00
5857
0
0
0
0
1.00 1.00
16.00
16.00 60.00
60.00
Jones 6 Conde, LLC
4440 PDA Boulevard
Palm Beach Gardens, FL 33410
Certificate of Authorization 029783
Tel (561) 309.9017
Engineer David R Jones, PE 041042
/0 -2-CP
EnE
u • P
IECC 2015-Total Building Performance Compliance Option
Check List
Applications for compliance with the Florida Building Code, Energy Conservation shall
include:
1111�This Checklist
The full compliance report generated by the software that contains the project
summary, compliance summary, certifications and detailed component compliance
reports.
The compliance report must include the full input report generated by the software as
comigous part of the compliance report.
Boxes appropriately checked in the Mandatory Section of the complaince report.
WARNING: INPUT REPORT NOT GENERATED.
To include input report in final submission, go to the Project Form, Settings Tab and check
the box - "Append Input Report to Compliance Output Report"
Then rerun your calculation
SCANNED
BY
St. Lucie County
RECgIVED
DEC 042018
ST. Lucie county, Permitting
.�c Na!
EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option W
8/23/2018 Pa e I of 16
1 �t2-or�}2
PROJECT SUMMARY
Short Dear:
Missionary Flights
Description:
Missionary Flights
Owner:
Enter Owner's name here
Addressl:
Hammond Rd & Steel Blvd
City:
Fort Pierce
Address2:
State:
FL
Zip: 34946
Type: Dormitory Class:
Jurisdiction: FORT PIERCE, ST LUCIE COUNTY, FL (661100)
Conditioned Area: 6587 SF Conditioned & UnConditioned Area: 6587 SF
No of Stories: 1 Area entered from Plans 6587 SF
Permit No: 0 Max Tonnage 4
If different, write in:
EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option
8/23/2018 Page 2 of 16
Component Design Criteria Result
Gross Energy Cost (in $) 2,801.0 4,164.0 PASSED
LIGHTING CONTROLS
EXTERNAL LIGHTING
HVAC SYSTEM
PLANT
WATER HEATING SYSTEMS
PIPING SYSTEMS
Met all required compliance from Check List?
PASSES
PASSES
PASSES
No Entry
PASSES
PASSES
Yes/No/NA
IMPORTANT MESSAGE
Info 5009 -- -- -- An input report of this design building must be submitted along with this
EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option
8/23/2018 Page 3 of 16
8/23/2018
CERTIFICATIONS
I hereby certify that the plans and specifications covered by this calculation are in compliance with the
Florida Energy Code
Prepared By:
David R. Jones
Building Official:
Date:
10 . //(e( -
lb
Date:
I certify that this building is in compliance with the FLorida Energy Efficiency Code
Owner Agent: Date:
If Required by Florida law, 1 hereby certify (`) that the system design is in compliance with the Florida Energy
Efficiency Code
Architect: Reg No:
Electrical Designer: David R. Jones Reg No: 41042
Lighting Designer: David R. Jones Reg No: 41042
Mechanical Designer: David R. Jones Reg No: 41042
Plumbing Designer: David R. Jones Reg No: 41042
(') Signature is required where Florida Law requires design to be performed by registered design
professionals. Typed names and registration numbers may be used where all relevant information is
contained on signed/sealed plans.
IL
EnergyGauge Summit® FlalCom-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 �' tt �
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option' `
Page 4 of 16
- Project: Missionary Flights
Title: Missionary Flights
Type: Dormitory
(WEA File: FL ST LUCIE CO INTLAW)
Building End Uses
1) Proposed
2) Baseline
Total
180.70
316.00
$2,801
$4,899
ELECTRICITY(MBtu/kWh)$)
180.70
316.00
52954
92608
$2,801
$4,899
AREA LIGHTS
19.20
61.20
5613
17931
$297
$949
MISC EQUIPMT
53.40
53.40
15659
15659
$828
$828
PUMPS & MISC
0.50
0.10
137
43
$7
$2
SPACE COOL
73.30
105.40
21476
30884
$1,136
$1,634
SPACE HEAT
7.90
13.30
2325
3900
$123
$206
VENT FANS
26.40
82.60
7744
24191
$410
$1,280
Credits Applied: None
PASSES
Passing Criteria = 4164
Design (including any credits) = 2801
Passing requires Proposed Building cost to be at most 85% of
Baseline cost. This Proposed Building is at 57.2%
EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option
8/2312018 Page 5 of 16
8/23/2018
Project: Missionary Flights
Title: Missionary Flights
Type: Dormitory
(WEA File: FL ST LUCIE CO_INTL.tm3)
External Lighting Compliance
Description Category Tradable?
Allowance
Area or Length
ELPA CLP
(W/Unit)
or No.of Units
(W). (W)
(Sgft or it)
Ext Light 1 Main entries Yes
30.00
6.0
180 33
Ext Light 2 Main entries Yes
30.00
6.0
180 20
Tradable Surfaces: 53 (W) Allowance for Tradable: 1110 (W)
PASSES
All External Lighting: 53 (W)
Complicance check includes a excess/Base allowance of 750.00(W)
Project: Missionary Flights
Title: Missionary Flights
Type: Dormitory
(WEA File: FL_ST_LUCIE_CO_INTL.tm3)
Lighting Controls Compliance
Acronym Ashrae Description
Area
Design
Min Compli-
ID
(sq.ft)
CP
CP ance
Laundry 17 Office - Enclosed
218
1
1 PASSES
Pwdr 6 Toilet and Washroom
67
1
1 PASSES
Storage/Bedroom 30,002 Medium/Bulky Material Storage
117
1
1 PASSES
Office 17 Office - Enclosed
119
1
1 PASSES
Corridor 5 Corridor
878
2
1 PASSES
Women's Bunk 7,001 Dormotory Living Quarters
431
1
1 PASSES
Showers 6 Toilet and Washroom
442
2
1 PASSES
Apartment 16,001 Private Living Space
744
6
1 PASSES
Game Room 9,001 Playing Area
325
1
1 PASSES
Men's Bunk 7,001 Dormotory Living Quarters
440
1
1 PASSES
Showers 6 Toilet and Washroom
528
2
1 PASSES
Kitchen/Pantry 7 Food Service - Kitchen
435
1
1 PASSES
Meeting Room 15 Conference/meeting (Multiple
1,843
2
1 PASSES
Functions)
PASSES
EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2615 -Total Building Performance Compliance Option
Page 6 of 16
Project: Missionary Flights
Title: Missionary
Flights
Type: Dormitory
(WEA File: FL ST LUCIE CO INTL.tm3)
System Report Compliance
System I
System
Constant Volume Air Cooled
No. of Units
Split System < 65000 Btu/hr
1
Component
Category
Capacity
Design Eff Design
IPLV
Comp -
Elf Criteria IPLV
Criteria
liance
Cooling System
Air Conditioners Air Cooled
48000
14.50 13.00 8.00
PASSES
Split System < 65000 Btu/h
Cooling Capacity
Heating System
.Electric Furnace
27000
1.00 1.00
PASSES
Air Handling
Air Handler (Supply) -
1600
0.30 0.82
PASSES
System -Supply
Constant Volume
System 2
System
Constant Volume Air Cooled
No. of Units
Split System < 65000 Btu/hr
1
Component
Category
Capacity
Design Eff Design
IPLV
Comp -
Elf Criteria IPLV
Criteria
liance
Cooling System
Air Conditioners Air Cooled
24000
16.00 13.00 8.00
PASSES
Split System < 65000 Btu/h
Cooling Capacity
Heating System
Electric Furnace
17000
1.00 1.00
PASSES
Air Handling
Air Handler (Supply) -
800
0.30 0.82
PASSES
System -Supply
Constant Volume
System 3
System
Constant Volume Air Cooled
No. of Units
Split System <65000 Btu/hr
1
Component
Category
Capacity
Design Elf Design
IPLV
Comp -
Elf Criteria IPLV
Criteria
liance
Cooling System
Air Conditioners Air Cooled
42000
14.50 13.00 8.00
PASSES
Split System < 65000 Btu/h
Cooling Capacity
Heating System
Electric Furnace
27000
1.00 1.00
PASSES
Air Handling
Air Handler (Supply) -
1400
0.30 0.82
PASSES
System -Supply
Constant Volume
System 4
System
Constant Volume Air Cooled
No. of Units
Split System < 65000 Btu/hr
I
Component
Category
Capacity
Design Elf Design
IPLV
Comp -
Eli Criteria IPLV
Criteria
liance
EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option
8/23/2018 •Page 7 of 16
8/23/2018
Cooling System
Air Conditioners Air Cooled
48000
14.50
13.00 8.00
PASSES
Split System < 65000 Btu/h
Cooling Capacity
Heating System
Electric Furnace
14000
1.00
1.00
PASSES
Air Handling
Air Handler (Supply) -
1600
0.30
0.82
PASSES
System -Supply
Constant Volume
System 5-6
System
Constant Volume Air Cooled
No. of Units
Split System < 65000 Btu/hr
2
Component
Category
Capacity
Design
Eff Design
IPLV Comp-
Eff
Criteria IPLV
Criteria liance
Cooling System
Air Conditioners Air Cooled
48000
14.50
13.00 8.00
PASSES
Split System < 65000 Btu/h
Cooling Capacity
Heating System
Electric Furnace
27000
1.00
1.00
PASSES
Air Handling
Air Handler(Supply)-
1600
0.30
0.82
PASSES
System -Supply
Constant Volume
PASSES
Plant Compliance
Description Installed Size Design Min Design Min Category Comp
No Eff Eff IPLV IPLV liance
None
EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option
Page 8 of 16
8/23/2018
Project: Missionary Flights
Title: Missionary Flights
Type: Dormitory
(WEA File: FL ST LUCIE CO INTL.tm3)
Water Heater Compliance
D
Description Type
Category
Design Min
Eft FIT
Design Max Comp
Loss Loss liance
Water Heater 1 Electric water heater
<= 12 [kW]
0.85 0.81
PASSES
Water Heater 2 Electric water heater
<= 12 [kW]
0.95 0.92
PASSES
Water Heater 3 Electric water heater
<= 12 [kW]
0.95 0.92
PASSES
PASSES
Project: Missionary Flights
Title: Missionary Flights
Type: Dormitory
(WEA File: FL ST LUCIE CO_INTL.tm3)
Piping System Compliance
Category Pipe Dia Is
Operating Ins Cond
Ins
Req Ins Compliance
[inches] Runout?
Temp [Btu-in/hr
Thick [in]
Thick ]in]
IF] SF.F]
Domestic and Service Hot Water
0.75 False
110.00 0.28
1.00
0.50 PASSES
Systems
Cooling Systems (Chilled Water, Brine
1.00 False
45.00 0.28
0.75
0.50 PASSES
and Refrigerant)
Cooling Systems (Chilled Water, Brine
0.75 False
45.00 0.28
0.75
0.50 PASSES
and Refrigerant)
Cooling Systems (Chilled Water, Brine
1.00 False
45.00 0.28
0.75
0.50 PASSES
and Refrigerant)
Cooling Systems (Chilled Water, Brine
1.00 False
45.00 0.28
0.75
0.50 PASSES
and Refrigerant)
Cooling Systems (Chilled Water, Brine
1.00 False
45.00 0.28
0.75
0.50 PASSES
and Refrigerant)
Cooling Systems (Chilled Water, Brine
1.00 False
45.00 0.28
0.75
0.50 PASSES
and Refrigerant)
PASSES
EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option
Page 9 of 16
Mandatory Requirements (as applicable) Mandatory requirements compiled by US Department
of Energy and Pacific Northwest National Laboratory.
Adopted with permission
Topic Section Component Description Yes NIA Exempt
Insulation
C303.2
Envelope
Below -grade wall Insulation installed per
manufacturer's instructions.
Insulation
C303.2
Envelope
Slab edge insulation installed per manufacturer's
�❑
Instructions.
Insulation
C303.2
Envelope
Above -grade wall insulation installed per
E
manufacturer's Instructions.
Insulation
C402.3
Envelope
High-albedo roofs satisfy one of the following:
�❑
3-year-aged solar reflectance>= 0.55 and thermal
emlttance>=0.75 or 3-year-aged solar
reflectance Indexed
Fenestration
C402.4.4
Envelope
U-factor off opaque doors associated with the
�❑ ❑
building thermal envelope meets requirements.
SYSTEM —SPECIFIC
C403.2.12.1
Mechanical
HVAC fan systems at design conditions do not
exceed allowable fan system motor nameplate hp
or fan system bhp.
SYSTEM —SPECIFIC
C403.2.12.2
Mechanical
HVAC fan motors not oversized beyond allowable
_ El ❑
ffLLJAJA
limits.
SYSTEM —SPECIFIC
C403.2.3(8) Table
Mechanical
Heat Rejection Equipment: Minimum Efficiency
El fEl
Requirement meet those listed in Table
HVAC
C403.2.7
Mechanical
Exhaust air energy recovery on systems meeting
Ei EGJf
Table C403.2.7(1) and C403.2.7(2).
SYSTEM —SPECIFIC
C403.3
Mechanical
Air economizers provided where required, meet
the requirements for design capacity, control
signal, ventilation controls, high -limit shut -of,
integrated economizer control, and provide a
means to relieve excess outside air during
operation.
/❑
SYSTEM —SPECIFIC
C403.3.2
Mechanical
Economizer operation will not increase heating
❑ _
ILTJY
energy use during normal operation.
SYSTEM —SPECIFIC
C403.3.4,
Mechanical
Water economizers provided where required,
❑ 011�0
C403.3.4.1,
meet the requirements for design capacity,
C403.3.4.2,
maximum pressure drop and integrated
C403.3.1
economizer control.
SYSTEM —SPECIFIC
C403.4.2:1
Mechanical
Three -pipe hydroniydronic systems using a common
❑ I�Jy/❑
return for hot and chilled water are not used.
SYSTEM —SPECIFIC
C403.4.2.3.1
Mechanical
Hydronic heat pump systems connected to a
common water loop meet heat rejection and heat
addition requirements.
SYSTEM —SPECIFIC
C403.4.3.4
Mechanical
Open -circuit cooling towers having water cooled
❑ fLJA'b
chiller systems and multiple or vairable speed
condenser pumps, are designed so that tower
cells can run in parallel with larger of flow crtieria.
/❑
C404.2
Mechanical
Service water heating equipment meets efficiency
jL'��J{
El
requirements.
Wattage
C405.3
Interior Lighting
Exit signs do not exceed 5 watts per face.
Plan Review C103.2 Envelope Plans and/or specifications provide all information
with which compliance can be determined for the
building envelope and document where
exceptions to the standard are claimed.
EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option
8/23/2018 Page 10 of 16
Plan Review C103.2 Mechanical
Plans, specifications, and/or calculations provide
❑
all information with which compliance can be
determined for the mechanical systems and
equipment and document where exceptions to the
standard are claimed. Load calculations per
acceptable engineering st
Plan Review C103.2 Mechanical
Plans, specifications, and/or calculations provide
El
❑
❑
all information with which compliance can be
determined for the service water heating systems
and equipment and document where exceptions
to the standard are claimed. Hot water system
sized per manufact
Plan Review C103.2 Interior Lighting
Plans, specifications, and/or calculations provide
all information with which compliance can be
determined for the Interior lighting and electrical
systems and equipment and document where
exceptions to the standard are claimed.
Information provided shout
Plan Review C103.2 Exterior Lighting
Plans, specifications, and/or calculations provide
❑
all information with which compliance can be
determined for the exterior lighting and electrical
systems and equipment and document where
exceptions to the standard are claimed.
Information provided shoul
Insulation C402.2.5 Envelope
Slab edge insulation depth/length. Slab insulation
❑
extending away from building is covered by
pavement or>= 10 inches of soil.
Insulation C402.2.6 Project
Radiant heating systems panels insulated to
❑
❑
❑
>=R-3.5 on face opposite space being heated.
HVAC C402.2.6 Mechanical
Thermally ineffective panel surfaces of sensible
11
1-3
heating panels have insulation>= R-3.5.
Insulation C402.2.6 Envelope
Radiant panels and associated components,
El
❑
designed for heat transfer from the panel surfaces
to the occupants or indoor space are Insulated
with a minimum of R-3.5.
Air Leakage C402.5.7 Envelope
Vestibules are Installed on all building entrances.
❑
❑
❑
Doors have self -dosing devices.
SYSTEM —SPECIFIC C403.2.12.3 Mechanical
Fans have efficiency grade (FEG)>= 67. The total
efficiency of the fan at the design point of
operation -=15% of maximum total efficiency of
the fan.
HVAC C403.2.13 Mechanical
Unenclosed spaces that are heated use only
radiant heat.
HVAC C403.2.4.2 Mechanical
Each zone equipped with setback controls using
❑
❑
El
automatic time clack or programmable control
system.
SYSTEM -SPECIFIC C403.2.4.4 Mechanical
Zone Isolation devices and controls Installed
where applicable.
SYSTEM —SPECIFIC C403.2.4.7 Mechanical
Fault detection and diagnostics installed with
air-cooled unitary DX units having economizers.
SYSTEM —SPECIFIC C403.2.5 Mechanical
Hot water boilers supplying heat via one -or
two -pipe systems Include outdoor setback control.
HVAC C403.2.6.1 Mechanical
Demand control ventilation provided for spaces
❑
❑
❑
>500 ft2 and>25 people/1000 112 occupant
density and served by systems with air side
economizer, auto modulating outside air damper
Control, or design airflow>3,000 dim.
SYSTEM —SPECIFIC C403.4.1.1 Mechanical
Hydronic and multizone HVAC system controls
areVAV fans driven by mechanical or electrical
variable speed drive per Table C403.4.1.1.
SYSTEM —SPECIFIC C403.4.1.3 Mechanical
Reset static pressure setpoint for DDC controlled
VAV boxes reporting to central controller based on
the zones requiring the most pressure.
SYSTEM_SPECIFIC C403.4.2 Mechanical
Temperature reset by representative building
loads in pumping systems for chiller and boiler
systems >500,000 Btu/h.
EnergyGauge Summit®Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option
8/23/2018 Page 11 of 16
SYSTEM —SPECIFIC C403.4.2.3.2.1
Mechanical Closed.circuit cooling tower within heat pump loop
u
u
u
have either automatic bypass valve or lower
leakage positive closure dampers. Open -circuit
tower within heat pump loop have automatic valve
to bypass all heat pump water flow around the
tower. Open- or cl
SYSTEM —SPECIFIC C403.4.2.4
Mechanical Hydronic systems greater than 500,000 Btu/h
designed for variable fluid flow.
SYSTEM —SPECIFIC C403.4.2.5
Mechanical System turndown requirement met through
multiple single -Input boilers, one or more
modulating boilers, or a combination of
single -input and modulating boilers.
Boiler input between 1.0 MBtu/h and 5 MBtu/h
has 3:1 turndown ratio, boiler Input between 5.0
SYSTEM —SPECIFIC C403.4.2.6
Mechanical Chilled water plants with multiple chillers have
capability to reduce flow automatically through the
chiller plant when a chiller is shut down.
Boiler plants with multiple boilers have the
capability to reduce flow automatically through the
boiler plant
SYSTEM SPECIFIC C403.4.3,
Mechanical Fan systems with motors >=7.5 hp associated
1:1
El
C403.4.3.2
with heal rejection equipment to have capability to
operate at 2/3 of full -speed and auto speed
controls to control the leaving fluid temperature or
condensing temp/pressure of heat rejection
device.
SYSTEM —SPECIFIC C403.4.4.5
Mechanical Multiple zone HVAC systems have supply air
temperature reset controls.
SYSTEM —SPECIFIC C403.4.4.6
Mechanical Multiple zone VAV systems with DDC of individual
zone boxes have static pressure setpoint reset
controls.
SYSTEM SPECIFIC C404.2.1
Mechanical Gas -fired water -heating equipment installed in
new buildings: where a singular piece of
water-heafing equipment>= 1,000 kBtu/h serves
the entire building, thermal efficiency >= 90 Et.
Where multiple pieces of water -heating
equipment serve the building wi
SYSTEM SPECIFIC C404.4
Mechanical All piping insulated in accordance with section
1:1
El
details and Table C403.2.10.
SYSTEM SPECIFIC C404.5, C404.5.1,
Mechanical Healed water supply piping conforms to pipe
C404.5.2
length and volume requirements. Refer to section
details.
SYSTEM —SPECIFIC C404.6.3
Mechanical Pumps that circulate water between a heater and
ri
storage tank have controls that limit operation
from startup to <= 5 minutes after end of heating
cycle.
SYSTEM —SPECIFIC C404.7
Mechanical Water distribution system that pumps water from
a heated -water supply pipe back to the
heated -water source through a cold -water supply
pipe is
a demand recirculation water system. Pumps
within this system have controls that start the
pump upon receiving
Wattage C405.5.1
Exterior Lighting Exterior lighting power is consistent with what is
❑
❑
❑
shown on the approved lighting plans,
demonstrating proposed watts are less than or
equal to allowed watts.
Plan Review C405.6
Project Group R-2 dwelling units have separate electrical
meters.
Plan Review C408
Project Plans, specifications, and/or calculations provide
all information with which compliance can be
determined for the additional energy efficiency
package options.
SYSTEM —SPECIFIC C408.2.2.2
Mechanical HVAC hydronic heating and cooling coils have
❑
❑
means to balance and have pressure test
connections.
SYSTEM SPECIFIC C408.2.2.2
Mechanical HVAC hydronic heating and cooling coils have
❑
❑
❑
means to balance and have pressure test
connections.
EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option
8/23/2018 Page 12 of 16
Insulation
C303.1 Envelope
Roof insulation installed per manufacturer3E' s
instmctions. Blown or poured loose -fill Insulation
is Installed only where the roof slope is <=3 in 12.
Insulation
C303.1 Envelope
Building envelope insulation Is labeled with
R-value or insulation certificate providing R-value
and other relevant data.
Fenestration
C303.1.3 Envelope
Fenestration products rated in accordance with
❑
NFRC.
Fenestration
C303.1.3 Envelope
Fenestration products are certified as to
performance labels or certificates provided.
Insulation
C303.2, C402.2.4 Envelope
Floor insulation Installed per manufacturers
El
❑
instructions. Cavity or structural slab insulation
installed in permanent contact with underside of
decking or structural slabs.
Insulation
C303.2.1 Envelope
Exterior insulation protected against damage,
❑
❑
❑
sunlight, moisture, wind, landscaping and
equipment maintenance activities.
Insulation
C303.2.1 Envelope
Exterior Insulation is protected from damage with
a protective material. Verifcation for exposed
foundation insulation may need to occur during
Foundation Inspection.
Insulation
C402.1.3 Envelope
Non -swinging opaque doors have R-4.75
❑
❑
insulation.
Insulation
C402.2.2 Envelope
Skylight curbs are insulated to the level of roofs
❑
El
❑
with insulation above deck or R-5.
Insulation
C402.2.2 Envelope
Insulation intended to meet the roof insulation
❑
requirements cannot be installed on top of a
suspended ceiling. Mark this requirement
compliant if insulation is installed accordingly.
Air Leakage
C402.5 Envelope
Building envelope contains a continuous air
❑
El
❑
barrier that has been tested and deemed to limit
air leakage <= 0.40 cfm/112.
Air Leakage
C402.5.1 Envelope
The building envelope contains a continuous air
❑
❑
❑
barrier that is sealed in an approved manner and
either constructed or tested in an approved
manner. Air barrier penetrations are sealed in an
approved manner.
Air Leakage
C402.5.1.1 Envelope
All sources of air leakage in the building thermal
❑
❑
❑
envelope are sealed, caulked, gasketed, weather
stripped or wrapped with moisture
vapor -permeable wrapping material to minimize
air leakage.
Air Leakage
C402.5.1.2.1 Envelope
The building envelope contains a continuous air
barrier that Is sealed in an approved manner and
material permeability <= 0.004 cfMft2. Air barrier
penetrations are sealed in an approved manner.
Air Leakage
C402.5.1.2.2 Envelope
The building envelope contains a continuous airEl
El
❑
barrier that is sealed in an approved manner and
average assembly air leakage <= 0.04 cfm/ft2.
Air barrier penetrations are sealed in an approved
Air Leakage
C402.5.2, C402.5.4 Envelope
manner.
Factory -built fenestration and doors are labeled
❑
❑
as meeting air leakage requirements.
Air Leakage
C402.5.3 Envelope
Where open combustion air ducts provide
combustion air to open combustion fuel burning
appliances, the appliances and combustion air
opening are located outside the building thermal
envelope or enclosed in a room, isolated from
inside the thermal envelope
Air Leakage
C402.5.5, Envelope
Stair and elevator shaft vents have motorized
❑
El
❑
C403.2.4.3
dampers that automatically close.
Air Leakage
C402.5.5, Envelope
Outdoor air and exhaust systems have motorized
C403.2.4.3
dampers that automatically shut when not in use
and meet maximum leakage rates. Check gravity
dampers where allowed.
Air Leakage
C402.5.6 Envelope
Weatherseals installed on all loading dock cargo
doors.
EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option
8/23/2018 Page 13 of 16
Air Leakage C402.5.8
Envelope
Recessed luminaires in thermal envelope to limit
❑
❑
Li
infiltration and be IC rated and labeled. Seal
between interior finish and luminaire housing.
HVAC C403.2.1
Mechanical
HVAC systems and equipment design loads
❑El
❑
calculated in accordance with
ANSI/ASHRAE/ACCA Standard 183 or by an
approved equivalent computational procedure
SYSTEM_SPECIFIC C403.2.10
Mechanical
HVAC piping Insulation thickness. Where piping
Is Installed in or under a slab, verification may
need to occur during Foundation Inspection.
HVAC C403.2.3
Mechanical
HVAC equipment efficiency verified.
SYSTEM_SPECIFIC C403.2.3
Mechanical
PTAC and PTHP with sleeves 16 in. by 42 in.
labeled for replacement only as per Footnote b to
Table C403.2.3(3).
SYSTEM_SPECIFIC C403.2.4.1
Mechanical
Heating and cooling to each zone is controlled by
a thermostat control. Minimum one humidity
control device per installed
humidification/dehumidification system.
SYSTEM_SPECIFIC C403.2.4.1.1
Mechanical
Heat pump controls prevent supplemental electric
EI
❑
El
resistance heat from coming on when not needed.
HVAC C403.2.4.1.2
Mechanical
Thermostatic controls have a 5 A-F deadband.
❑1:1
❑
HVAC C403.2.4.1.2
Mechanical
Thermostatic controls have a 5 A-F deadband.
❑
El
❑
HVAC C403.2.4.1.3
Mechanical
Temperature controls have setpoint overlap
restrictions.
HVAC C403.2.4.2.1,
Mechanical
Automatic Controls: Setback to 55'F (heat) and
El
El
El
C403.2.4.22
85'F (cool); 7-day clock, 2-hour occupant
override, 10-hour backup
SYSTEM_SPECIFIC C403.2.4.2.3
Mechanical
Systems include optimum start controls.
El
11
❑
HVAC C403.2.4.5,
Mechanical
Snowlce melting system sensors for future
❑
❑
C403.2.4.6
connection to controls. Freeze protection systems
have automatic controls installed.
HVAC C403.2.6.2
Mechanical
Enclosed parking garage ventilation has
automatic contaminant detection and capacity to
stage or modulate fans to 50% or less of design
HVAC C403.2.9
Mechanical
capacity.
HVAC duds and plenums insulated. Where ducts
El
❑
11
or plenums are Installed In or under a slab,
verification may need to occur during Foundation
SYSTEM_SPECIFIC C403.2.9.1.3
Mechanical
Inspeclion.
Ductwork operating>3 in. water column requires
El
❑
11
air leakage testing.
SYSTEM_SPECIFIC C403.4.1.2
Mechanical
VAV fans have static pressure sensors located so
El
❑
controller setpoint <=1.2 w.c..
SYSTEM_SPECIFIC C403.4.2.2
Mechanical
Two -pipe hydronic systems using a common
El
❑
11
distribution system have controls to allow a
deadband >=15°17, allow operation in one mode
for at least 4 hrs before changeover, and have
rest controls to limit heating and cooling supply
SYSTEM_SPECIFIC C403.4.2.3.3
Mechanical
temperature to <=30 OF.
Two-posifion automatic valve interlocked to shut
off water flow when hydronic heat pump with
pumping system>10 hp is off.
SYSTEM_SPECIFIC C403.4.4.5,
Mechanical
Zone controls can limit simultaneous heating and
F-1
El
El
C403.4A.5.14
cooling and sequence heating and cooling to each
SYSTEM_SPECIFIC C403.4.5
Mechanical
zone.
Condenser heat recovery system that can heat
❑
❑
water to 85°F or provide 60 % of peak heat
rejection is installed for preheating of service hot
water.
SYSTEM_SPECIFIC C403.4.6
Mechanical
Hot gas bypass limited to:
<=240 kBtu/h - 50 % capacity,
>240 kBtu/h -25% capacity
SYSTEM_SPECIFIC C404.3
Mechanical
Heat traps installed on non -circulating storage
watertanks.
EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option
8/23/2018 Page 14 of 16
9130 SI a8ed SIOZ/£Z/S
uo!fdo 9ouepdwo0 a3uew0pad Bu!ppng lalol- SLOZ 0031 uolleruasuo0 A6iau3 - (UOZ) uopip3 p!S'apo0 Bu!ppq epuol j
LIOZ'lCOad:sledaA!pag3'eiemyoSluelldwo00'l-LlOZWV1'L 0Z-w00/elj(pllwwnSa6negA618u3
Aq payloads se'aoeds paldn=o
lenplA!pu! pea o111e ioopino lueoied-00L
x ep!Aad of pau6lsop walsAs uollelquan
luapuadapu) ue yllm paddlnbe we swelsh OVAH
auoz-a!dll!nw jo1pue o!umpA44l!m sbu!ppq
❑
❑
❑
:aBeyoed Aaua!o4a walsAs ne loopino aleolpao
pafwd
9'9040 B31eu0111PPVAIolepueW
u! papwluoo
salleulwnl 9=>'Allenp!n!pu! passappe Buloq
pue Bulwwlp snonu!{u=lo algedm saneulwnl
Z'Z'SObO
uolpas 41!m mueplo=e u! sloquoo Bup46ll
paaueyua Bu!mollol se4 Bup46!l loua{ul :aBelped
❑
❑
❑
Aouap!49 sloilum Bu!74B!I Ie11Blp pmue4u3
pelwd
b'9040 831euo!11PPV AlolepueW
's4em pamolle of lenbe jo uegl ssal
we s1lem pasodad Bulleilsuowep'sueld 6u4g6!1
panoidde eql uo umogs sl leym 411m luals!suoo
❑
❑
❑
sl lamod 6u114611 wnlxg pue dwel pallelsul jouolul
Bu046!1 �oValul
l'b'SO40 aBePepA
' % OE < 6u.14611 papauum aonpal
io'Aep-p-aw!l uo0wado ssou!snq uo paseq
las'pallalum 14611AEP aq Il!m slw{u00-pallelsul
❑
❑
❑
6u1146I loi alxa lot sloqu= bug46p ogewolnV
Bug4611 loualx3
SZ'9040 slaluoo
'6up4611 IwauaB wal
palwedas pue pallwlum Alleollewolne sl pue
sueld Bull4Bll panoldde eyl lad suolpunl lepads
❑
❑
❑
iol pamolle jamod Bu114611 loualul IeuoplppV
Bu04611 iopalul
b'Z'S000 e6epem
Sueld Bupg611 Panadde iad pape{su1
El
El
❑
sasn o9loads jol saolnap I011u00Bw14611 alwedaS
Bu9gB!1 ioualul
4'Z'SObO slaluoo
,slaluoo Bug4Bp pannbw
E'E'Z'SObO
yllm padd!nbe we slolluow dollow pue s{4611AYs
'L'E'noto
El
El
El
lapun ewe 146pAep 4l!m smeds pasolou3
6u1J46ll iouelul
'E'no40 sloquao
Z'E'Z'SO40
'slwlum BueyBll pwmbw
L'E'Z'SOvo
❑
❑
❑
411m paddmbe we seam pal4Bpepls Aew j
BuI14Bll Jopelul
'E'Z'SO40 sloquoo
Bul1y6!1
ewe lwaua6lo luapuadaput sl4B1l a4l lwlum le41
❑
❑
❑
sloqum IenpIAIPUI 411m papinad sauoz 146!IAeo
6up4611 Joualul
E'Z'SO40 slaluoo
,s6ulPllnq Ile ul pallelsul
❑
❑
❑
6u0yBll Bu!pl!nq Ile go 1n4s of slalu=opewolnV
6u6g611 joualul
CZ'Z'9O4o slaluoo
•sluednoao of alglslA pue alglssame AI!Pew
slollum lemma Ile pue sueld Bu11y611 panwdde
E'Z'Z'5040
❑
❑
❑
iad pallelsw slwlum BuiWil luepuadopul
6u946111opalul
'L'not-3 slaluoo
❑
❑
❑
—eds palnbw ul pallelsu! wosuas Aouedn=0
6ug4611 lopalul
1.7'5040 slaluoo
'%OS iseal le Aq peol BullgB!l
❑
❑
❑
a41 mnpw Almollun of pallelsu! slonu= Bw14611
Bu!148!1 lopalol
L'Z'SO4o slmluo0
'seds pallelsul gluauewad pue stood palea4
❑
❑
❑
101 papinad we wanm load luepielai lodeA
l=lueLpaW
E'8'000 01d103dS W31SdS
sdwnd pue
❑
❑
❑
waleay Imd Ile uo pallelsu! we s94o1!ms awl
ImNm4oaW
Z'6'00bO 01d103dS W31SAS
sdwnd pue
❑
❑
❑
waleay lord Ile uo pallelsul we sa4ollms awl
I=lumpoll
Z'6'0040 01dI03dS W31SAS
'146!l loud Bulwnq Alsnonupoo ou
El
El
❑
pue 4ol!ms Maluo 41!m padd!nba we walea4 load
IM!ue40aW
V6'4040 01d103dS W31SAS
.men 1894
jo walsAs lalem-loq Bu0elnomai a418o 4allms
❑
❑
❑
Alleo4ewolne of pallelsul s9go1!ms aw11 opewolnV
ImIumpaW
Z'e'40b0'l'9'4040 01d103dS W31SAS
•edld
Alddns la{em plm a to adld wnlw poleopop a sl
adld wnlw ujwsAS'8uel a6wols a Io wnlwadwal
ulelulew of pallelsul dwnd uollelnwpa
El
El
El
e 10 uo!lwedo ayl l!w!11e41 pallelsul we slaluoo
leo!ueyoalry
l'e'4040 01d103dS W31SAS
'swalsAs Bullelmjrwou to Buldld
❑
❑
❑
e6le4oslp pue Aiddns uo pallelsul sden leaH
IeolueyoaW
E'4040 01d103dS W31SAS
swalsAs Bupelnap-uou to Buldld
❑
❑
❑
eBleyoslp pue Nddns uo pallelsul sdwl leaH
IeolueyoaW
E'4040 01d103dS W318AS
Mandatory Additional Eff C406.7, C406.7.1 Project
HVAC C408.2.2.1 Mechanical
HVAC C408.2.2.1 Mechanical
Testing C408.2.3.2 Mechanical
Enhanced Service Water Heat System efficiency
package. One of the following SWH system
enhancements must satisfy 60 percent of hot
water requirements, or 100 percent if the building
otherwise complies with heat recovery per Section
C403.4.5: Waste heat re
Air outlets and zone terminal devices have means
for air balancing.
Air outlets and zone terminal devices have means
for air balancing.
HVAC control systems have been tested to
ensure proper operation, calibration and
adjustment of controls.
Post Construction
C303.3, C408.2.5.2 Interior Lighting
Furnished O&M instructions for systems and
equipment to the building owner or designated
representative.
Post Construction
C303.3, C408.2.5.3 Mechanical
Furnished O&M manuals for HVAC systems
within 90 days of system acceptance.
Fenestration
C402.4.2.2 Envelope
Skylights in office, storage, automotive service,
manufacturing, non -refrigerated warehouse, retail
store, and distribution/sorting area have a
measured haze value > 90 percent unless
designed to exclude direct sunlight.
Post Construction
C408.2.1 Mechanical
Commissioning plan developed by registered
design professional or approved agency.
Post Construction
C408.2.3.1 Mechanical
HVAC equipment has been tested to ensure
proper operation.
Post Construction
C408.2.3.3 Mechanical
Economizers have been tested to ensure proper
operation.
Post Construction
C408.2.4 Mechanical
Preliminary commissioning report completed and
certified by registered design professional or
approved agency.
Post Construction
C408.2.5.1 Mechanical
Furnished HVAC as -built drawings submitted
within 90 days of system acceptance.
Post Construction
C408.2.5.1 Interior Lighting
Furnished as -built drawings for electric power
systems within 90 days of system acceptance.
Post Construction
C408.2.5.3 Mechanical
An air and/or hydronic system balancing report is
provided for HVAC systems.
Post Construction
C408.2.5.4 Mechanical
Final commissioning report due to building owner
within 90 days of receipt of certificate of
occupancy.
Post Construction
C408.3 Interior Lighting
Lighting systems have been tested to ensure
proper calibration, adjustment, programming, and
operation.
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software.. Effective Dale: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option
8/23/2018 Page 16 of 16
EnergyGauge Summit® v6.00
INPUT DATA REPORT
Project Name:
ProjectTitle:
J
Address:
State:
Zip:
Owner:
Missionary Flights
Missionary Flights
Hammond Rd & Steel Blvd
FL
34946
Enter Owner's name here
Pro*ect Information
Orientation:
Building Type:
Building Classification:
No.of Stories:
GrossArea:
0 Deg Clockwise. Walls & Windows will
be rotated accordingly
Dormitory
]
6587 SF
Zones
No
Acronym
Description
Type
Area
Multiplier
TotalArea
fstl
lsfl
1
Womens
Dormitory
CONDITIONED
2272.0
1
2272.0
❑
2
Apt
Living Quarters
CONDITIONED
744.0
1
744.0
❑
3
Men's
Dormitory
CONDITIONED
1293.0
1
1293.0
❑
4
Kitchen/Pantr
Kitchen/Pantry
CONDITIONED
435.0
1
435.0
❑
y
5
Meeting
Conference
CONDITIONED
1843.0
1
1843.0
❑
8/23/2018 EnergyGauge Summit® v6.00 1
Spaces
No
Acronym Description
Type
Depth
Width
Height
Multi
Total Area
Total Volume
Ift]
Ift]
Ift]
plier
Ist]
Icf]
In Zone:
Women's
I
Laundry Laundry
Office - Enclosed
1.00
218.00
10.00
1
218.0
2180.0
❑
2
Pwdr Restroom
Toilet and Washroom
1.00
67.00
10.00
1
67.0
670.0
3
StorageBedroonStorage
Medium/Bulky Material
1.00
117.00
10.00
1
117.0
1170.0
Storage
4
Office Office
Office - Enclosed
1.00
119.00
10.00
1
119.0
1190.0.
El
5
Corridor Corridor
Corridor
1.00
878.00
10.00
1
878.0
8780.0
El
6
Women's Bunk Dormitory
Dornrotory Living Quarters
1.00
431.00
10.00
1
431.0
4310.0
❑
7
Showers Restroom
Toilet and Washroom
1.00
442.00
10.00
1
442.0
4420.0
❑
In Zone:
Apt
1
Apartment Apt
Private Living Space
1.00
744.00
10.00
1
744.0
7440.0
In Zone:
Men's
1
Game Room Play
Playing Area
1.00
325.00
10.00
1
325.0
3250.0
❑
2
Men's Bunk Dormitory
Dormotory Living Quarters
1.00
440.00
10.00
1
440.0
4400.0
❑
3
Showers Restroom
Toilet and Washroom
1.00
528.00
10.00
1
528.0
5.280.0
❑
In Zone:
Kitchen/Pantry
1
Kitchen/Pantry Kitchen
Food Service - Kitchen
1.00
435.00
10.00
1
435.0
4350.0
El
In Zone:
Meeting
1
Meeting Room Conference
Conferencelmeeting
100.00
18.43
10.00
1
1843.0
- 18430.0
❑
(Multiple Functions)
Lighting
No Type
Category
No. of
Watts per
Power
Control Type
No.of
Luminaires
Luminaire
]W]
Ctrl pts
In Zone:
Women's
8/23/2018 EnergyGauge Summit® v6.00
In Space:
Laundry
1 LED
General Lighting
2
35
70
Occupancy sensor without
1
El
Daylighting
In Space:
Pwdr
1 LED
General Lighting
1
25
25
Occupancy sensor without
I
Daylighting
In Space:
StorageBedroom
1 LED
General Lighting
4
20
80
Occupancy sensor without
1
❑
Daylighting
In Space:
Offlce
I LED
General Lighting
4
20
80
Occupancy sensor without
1
El
Daylighting
In Space:
Corridor
1 LED
General Lighting
2
22
44
Occupancy sensor without
1
Daylighting
2 LED
General Lighting
12
10
120
Occupancy sensor without
1
❑
Daylighting
In Space:
Women's Bunk
1 LED
General Lighting
6
20
120
Manual On/Of
1
In Space:
Showers
1 LED
General Lighting
2
36
72
Occupancy sensor without
1
❑
Daylighting
2 LED
General Lighting
6
10
60
Occupancy sensor without
1
Daylighting
In Zone: Apt
In Space:
Apartment
1 LED
General Lighting
19
10
190
Manual On/Off
6
❑
In Zone: Men's
In Space:
Game Room
I LED
General Lighting
8
20
160
Occupancy sensor without
1
❑
Daylighting
In Space:
Men's Bunk
1 LED
General Lighting
6
20
120
Manual On/Off
I
In Space:
Showers
I LED
General Lighting
3
36
108
Occupancy sensor without
1
❑
Daylighting
2 LED
General Lighting
9
10
90
Occupancy sensor without
1
Daylighting
In Zone: Kitchen/Pantry
In Space:
Kitchen/Pantry
8/23/2018 EnergyGauge Summit® v6.00 3
I LED
General Lighting
5
36
180 Occupancy sensor without
1
❑
Daylighting
In Zone: Meeting
In Space:
Meeting Room
1 LED
General
Lighting
12
20
240 Occupancy
sensor without
I
Daylighting
2 LED
General Lighting
2
30
60 Manual On/Off
1
❑
Walls (Walls will be rotated clockwise by building rotation value)
No Description
Type
Width
H(Effec)
Multi
Area
Orientation
Conductance
Heat
Dens.
R-Value
[ft]
[R]
plier
[stj
[Btulhr. A. Fj
Capacity
[Ib/cfj
[h.sf.FBtu]
[Btu/sf.F]
In Zone:
Women's
I wall
.75" stucco, 6" hvc,
70.00
10.00
1
700.0
North
0.1637
14.624
102.50
6.1
❑
R5 ins, 1/2" gypsum
2 wall
.75" stucco, 6" hvc,
2.00
10.00
1
20.0
East
0.1637
14.624
102.50
6.1
❑
R5 ins, 1/2" gypsum
3 wall
.75" stucco, 6" hvc,
6.50
10.00
1
65.0
South
0.1637
14.624
102.50
6.1
❑
R5 ins, 1/2" gypsum
4 wall
.75" stucco, 6" hvc,
37.50
10.00
1
375.0
West
0.1637
14.624
102.50
6.1
❑
R5 ins, 1/2" gypsum
In Zone:
Apt
1 wall
.75" stucco, 6" hvc,
15.00
10.00
1
150.0
East
0.1637
14.624
102.50
6.1
❑
R5 ins, 1/2" gypsum
2 wall
.75" stucco, 6" hvc,
26.00
10.00
1
260.0
South
0.1637
14.624
102.50
6.1
❑
R5 ins, 1/2" gypsum
3 wall
.75" stucco, 6" hvc,
26.50
10.00
1
265.0
West
0.1637
14.624
102.50
6.1
❑
R5 ins, 1/2" gypsum
In Zone:
Men's
1 wall
.75" stucco, 6" hvc,
54.00
10.00
1
540.0
South
0.1637
14.624
102.50
6.1
❑
R5 ins, 1/2" gypsum
2 wall
.75" stucco, 6" hvc,
4.50
10.00
1
45.0
West
0.1637
14.624
102.50
6.1
❑
R5 ins, 1/2" gypsum
In Zone:
Kitchen/Pantry
I wall
.75" stucco, 6" hvc,
23.00
10.00
1
230.0
North
0.1637
14.624
102.50
6.1
❑
R5 ins, 1/2" gypsum
In Zone:
Meeting
1 wall
.75" stucco, 6" hvc,
34.00
10.00
1
340.0
North
0.1637
14.624
102.50
6.1
❑
R5 ins, 1/2" gypsum
8/23/2018 EnergyGauge Summit® v6.00
2 wall .75" stucco, 6" hvc, 50.50 10.00 1 505.0 East 0.1637 14.624 102.50 6.1 ❑
R5 ins, 1/2" gypsum
3 wall .75" stucco, 6" hve, 40.00 10.00 1 400.0 South 0.1637 14.624 102.50 6.1 ❑
R5 ins, 1/2" gypsum
Windows (Windows will be rotated clockwise by building rotation value)
No
Description
Orientation
Shaded
U
SHGC
Vis.Tra
W
H(Effec)
Multi
Total Area
[Btu/hr sfF1
[it]
[ft]
plier
[sf]
In Zone: Apt
In Wall: East
1
window
East
Yes
1.2500
0.82
0.76
3.00
7.00
1
21.0
In Wall: South
1
window
South
Yes
1.2500
0.82
0.76
6.00
5.00
1
30.0
In Wall: West
1
window
West
Yes
1.2500
0.82
0.76
6.00
5.00
2
60.0
In Zone: Kitchen/Pantry
In Wall: North
2
window
North
Yes
1.2500
0.82
0.76
3.00
5.00
1
15.0
In Zone: Meeting
In Wall: East
1
window
East
Yes
1.2500
0.82
0.76
3.00
5.00
4
60.0
In Wall: North
1
window
North
Yes
1.2500
0.82
0.76
3.00
7.00
1
21.0
2
window
North
Yes
1.2500
0.82
0.76
6.00
7.00
1
42.0
In Wall: South
I
window
South
Yes
1.2500
0.82
0.76
6.00
7.00
1
42.0
2
window
South
Yes
1.2500
0.82
0.76
3.00
5.00
2
30.0
In Zone: Men's
In Wall: South
I
window
South
Yes
1.2500
0.82
0.76
3.00
5.00
1
15.0
2
window
South
Yes
1.2500
0.82
0.76
6.00
5.00
1
30.0
8123/2018 EnergyGauge Summit® v6.00 5
In Zone: Women's
In Wall: North
2 window
North
Yes
1.2500
0.82
0.76
3.00
7.00
1
21.0
3 window
North
Yes
1.2500
0.82
0.76
3.00
5.00
2
30.0
e
In Wall: South
4 window
South
Yes
1.2500
0.82
0.76
3.00
7.00
1
21.0
In Wall: West
4 window
West
Yes
1.2500
0.82
0.76
3.00
5.00
1
15.0
El
Doors
No Description
Type
Shaded?
Width
H (Effec)
Multi
Area
Cond.
Dens.
Heat Cap.
R-Value
[ft]
[ft]
plier
]sf] jBtu/hr. A. F]
[lb/cq
IBtu/sf. F]
[h.sf.FBtu]
In Zone: Women's
In Wall: West
1 Door
Solid core flush
No
3.00
7.00
1
21.0
0.3504
0.00
0.00
2.85
❑
(2.25)
Roofs
No Description
Type
Width
H (Effec)
Multi
Area
Tilt
Cond.
Hcat Cap Dens.
R-Value
IN
IN
plier
[st]
[deg] jBW/hr. SL F]
[Btu/sf. F] [lb/cq
[h.sf.FBtu]
In Zone: Women's
1 Roof
Shngl/l/2"WD
22.72
100.00
1
2272.0
0.00
0.0471
1.40
10.89
21.2
❑
Deck/WD
Truss/6"Batt/Gyp Brd
In Zone: Apt
1 Roof
ShngVI/2"WD
7.44
100.00
1
744.0
0.00
0.0471
1.40
10.89
21.2
❑
Deck/WD
Tmss/6"Batt/Gyp Brd
In Zone: Men's
I Roof
Shngl/l/2"WD
12.93
100.00
1
1293.0
0.00
0.0471
1.40
10.89
21.2
❑
Deck/WD
Truss/6"Batt/Gyp Brd
In Zone: Kitchen/Pantry
8/23/2018 EncrgyGauge Summit® v6.00
I
Roof
Shngl/1/2"WD
4.35
100.00 1
435.0
0.00
0.0471
1.40
10.89 21.2
❑
Deck/WD
Truss/6"Batt/Gyp Brd
In Zone:
Meeting
1
Roof
Shngl/l/2"WD
18.43
100.00 1
1843.0
0.00
0.0471
1.40
10.89 21.2
❑
Deck/WD
Tmss/6"Batt/Gyp Brd
Skylights
No Description Type
U
SHGC
Vis.Trans
W
H(Effec) Multiplier
Area Total Ana
[Btu/hr
sf F]
[ft[
Vt[
[Sf] [sf]
In Zone:
In Roof:
Floors
No Description
Type
Width
H (Effec)
Multi
Area
Cond.
Heat Cap.
Dens.
R-Value
[ft]
[ft]
plier
[sf] [Btulhr. sf. F] [Btu/sf. F]
[Ib/cf]
[h.sf.FBtu]
In Zone:
Women's
I
Floor
1 ft. soil, concrete
22.72
100.00
1
2272.0
0.2681
34.00
113.33
3.73
❑
floor, carpet and
-
rubber pad
In Zone:
Apt
1
Floor
1 ft. soil, concrete
7.44
100.00
1
744.0
0.2681
34.00
113.33
3.73
❑
floor, carpet and
rubber pad
In Zone:
Men's
1
Floor
1 ft. soil, concrete
12.93
100.00
1
1293.0
0.2681
34.00
113.33
3.73
❑
floor, carpet and
rubber pad
In Zone:
Kitchen/Pantry
I
Floor
I ft. soil, concrete
4.35
100.00
1
435.0
0.2681
34.00
113.33
3.73
❑
floor, carpet and
rubber pad
In Zone:
Meeting
8/23/2018 EnergyGauge Summit® v6.00
1 Floor 1 0. soil, concrete 18.43 100.00 1 1843.0 0.2681 34.00 113.33 3.73 0
floor, carpet and
rubber pad
Systems
System 1
System
Constant Volume Air Cooled Split
No. Of Units 1
System < 65000 Btu/hr
Component
Category
Capacity ERciency
IPLV
I
Cooling System
48000.00 14.50
8.00
2
Heating System
27000.00 I.00
ID
3
Air Handling System -Supply
1600.00 0.30
ID
System 2
System
Constant Volume Air Cooled Split
No. Of Units I
System < 65000 Btu/hr
Component
Category
Capacity Efficiency
IPLV
1
Cooling System
24000.00 16.00
8.00
2
Heating System
17000.00 1.00
3
Air Handling System -Supply
800.00 0.30
System 3
System
Constant Volume Air Cooled Split
No. Of Units 1
System < 65000 Btu/hr
Component
Category
Capacity Efficiency
IPLV
1
Cooling System
42000.00 14.50
8.00
2
Heating System
27000.00 1.00
❑
3
Air Handling System -Supply
1400.00 0.30
ID
System 4
System
Constant Volume Air Cooled Split
No. Of Units 1
System < 65000 Btu/hr
Component
Category
Capacity Efficiency
IPLV
1
Cooling System
48000.00 14.50
8.00
2
Heating System
14000.00 1.00
❑
3
Air Handling System -Supply
1600.00 0.30
❑
8/23/2018 EnergyGauge Summit® v6.00
System 5-6 System
Constant Volume Air Cooled Split
System < 65000 Btu/hr
No. Of Units 2
Component Category
Capacity Efficiency IPLV
1 Cooling System
2 Heating System
3 Air Handling System -Supply
48000.00 14.50 8.00
27000.00 1.00
1600.00 0.30
❑
❑
❑
Plant
Equipment
Category
Size Inst.No ER.
IPLV
El
Water Heaters
W-Heater Description
Capacity Cap.Unit
UP Rt. Efficiency
Loss
I Electric water heater
2 Electric water heater
3 Electric water heater
120 [Gal]
40 [Gal]
40 [Gal]
11 [kW] 0.8500 [Et]
5 [kW] 0.9500 [Ef]
5 [kW] 0.9500 [Et]
[Btu/h]
[Btu/h]
[Btu/h]
❑
❑
❑
Ext-Lighting
Description
Category No. of
Watts per
Area/Len/No. of units Control Type
Wattage
Luminaires
Luminaire
[sf/ft/No]
IW]
1 Ext Light 1
Main entries 3
11
6.00 Astronomical Timer Conn
33.00
❑
2 Ext Light 2
Main entries 2
10
6.00 Astronomical Timer Contra
20.00
❑
Piping
Operating
Insulation
Nomonal pipe Insulation Is Runout?
No Type
Temperature
Conductivity
Diameter Thickness
IF]
] Btu-in/h.sLF]
[in] [in]
8/23/2018 EnergyGauge Summit® v6.00
I
Domestic and Service Hot Water Systems
110.00
0.28
0.75
1.00
No
❑
2
Cooling Systems (Chilled Water, Brine and
45.00
0.28
1.00
0.75
No
❑
Refrigerant)
3
Cooling Systems (Chilled Water, Brine and
45.00
0.28
0.75
0.75
No
❑
Refrigerant)
4
Cooling Systems (Chilled Water, Brine and
45.00
0.28
1.00
0.75
No
❑
Refrigerant)
5
Cooling Systems (Chilled Water, Brine and
45.00
0.28
1.00
0.75
No
❑
Refrigerant)
6
Cooling Systems (Chilled Water, Brine and
45.00
0.28
1.00
0.75
No
❑
Refrigerant)
7
Cooling Systems (Chilled Water, Brine and
45.00
0.28
1.00
0.75
No
❑
Refrigerant)
Fenestration Used
Glass
Name Glass Type
No. of SHGC VLT
Conductance
Panes
[Btu/h.sEF]
ASHULSgICIrAII User Defined
1 1.2500 0.8200 0.7600 ❑
Front
Materials Used
Only R-Value RValue
Thickness
Conductivity
Density
Spec�eHeat
Mat No
Acronym
Description
Used
1h.sf.FBtu]
[ft]
[Btu/h.ft.F]
[lb/cf]
[Btu/Ib.F]
187
Mat1187
GYP OR PLAS
No
0.4533
0.0417
0.0920
50.00
0.2000
Li
BOARD,1/21N
178
Mat1178
CARPET W/RUBBER PAD
Yes
1.2300
❑
265
Mat1265
Soil, 1 ft
No
2.0000
I.0000
0.5000
100.00
0.2000
1:1
48
Mat148
6 in. Heavyweight concrete
No
0.5000
0.5000
1.0000
140.00
0.2000
❑
267
Mat1267
0.75" stucco
No
0.1563
0.0625
0.4000
16.00
0.2000
❑
23
Mat123
6 in. Insulation
No
20.0000
0.5000
0.0250
5.70
0.2000
❑
279
Mat1279
Solid core flush (2.25")
Yes
2.8537
❑
8/2312018 EnergyGauge Summit® v6.00 10
81
Matl81
ASPHALT -ROOFING, Yes
0.1500
❑
ROLL
244
Mat1244
PLYWOOD, 1/21N No
0.6318 0.0417
0.0660
34.00
0.2900
❑
1011
ApLbMat1011
R-5 Generic Insulation No
5.0000 0.1091
0.0218
0.30
0.2000
❑
Constructs Used
Simple
Massless Conductance
Heat Capacity
Density
RValue
No
Name
Construct
Construct [Bto/h.sLF]
[Btu/sf.F]
[Ib/ct]
[h.sLFBtul
1039
ShngVI/2"WDDeck/WDTruss/6'Batt/Gyp No
No 0.05
1.40
10.89
21.2
❑
Brd
Layer
Material Material
Thickness
Framing
No.
[ft]
Factor
1
81 ASPHALT -ROOFING, ROLL
0.000
❑
2
244 PLYWOOD, 112IN
0.0417
0.000
❑
3
23 6 in. Insulation
0.5000
0.000
❑
4
187 GYP OR PLAS BOARD,I/2IN
0.0417
0.000
❑
Simple
Massless Conductance
Heat Capacity
Density
RValue
No
Name
Construct
Construct [Btu/h.sLF]
[Btu/sLF]
[Ib/cf]
]h.sf.FBtu]
1057
1 ft. soil, concrete floor, carpet and rubber pad No
No 0.27
34.00
113.33
3.7
❑
Layer
Material Material
Thickness
Framing
No.
[ft]
Factor
1
265 Soil, 1 ft
1.0000
0.000
2
48 6 in. Heavyweight concrete
0.5000
0.000
❑
3
178 CARPET W/RUBBER PAD
0.000
❑
8/23/2018 EnergyGauge Summit® v6.00 11
Simple
Massless
Conductance
Heat Capacity
Density
RValue
No
Name
Construct
Construct
[Btu/h.sfF]
[Btu/sfF]
[Ib/cf[
jh.sfFBtuj
1058
Solid core flush (2.25)
No
Yes
0.35
2.9
❑
Layer Material
Material
Thickness
Framing
No.
IN
Factor
1 279
Solid core flush (2.25")
0.000
❑
Simple
Massless
Conductance
Heat Capacity
Density
RValue
No
Name
Construct
Construct
[Btu/h.sfFI
[Btu/sfF]
[Ib/cf]
[h.sfFBtul
1069
.75" stucco, 6" hvc, R5 ins, 1/2"
gypsum No
No
0.16
14.62
102.50
6.1
❑
Layer Material
Material
Thickness
Framing
No.
[ft]
Factor
1 267
0.75" stucco
0.0625
0.000
❑
2 48
6 in. Heavyweight concrete
0.5000
0.000
❑
3 1011
R-5 Generic Insulation
0.1091
0.000
❑
4 187
GYP OR PLAS BOARD, WIN
0.0417
0,000
❑
8/23/2018 EnergyGauge Summit® v6.00 12
PERACCA MANUALN
SUMMER OAJIA.-91 DEG.D.B:79 DEG. W3175 DEG. D.B.-64 DEG. W.B., INDOOR DESIGN R.H.-55No/GR. WATER DIFF.-60
WINTER OAAA.-47 DEG. D.B170 DEG. D.B.
Pmj Missionary Flights
DATE 13-Oct-18
COOLING CALCULATIONS
SYSTEM 1-2
TIME MONTH
LATITUDE
Wheat
16 JULY
24
SENS
gain
OA
ROOF
ROOF
WALL WIND
WIND
WIND
WIND
WIND MISC
LIGHTS
PPL
ROOM
ROOM CFM
RM
SENS
SENS
SENS SENS
SENS
SENS
SENS
SENS BTUH
SENS
BTUH
BTUH
CFM RM
PPL
16 Meeting Room
5529
3735 878
1756 3515
1202
1683 1600
6461
20250
50169
2445
360
60
0.00 0
0 0
0 0
0
0 0
0
0
0
0
0
60
0.00 0
0 0
0 0
0
0 0
0
0
0
0
0
TOT
5529
3735 878
1756 3515
1202
1683 1600
5461
20250
50169
2445
360
OA TOT
EST
SYS
SYS RM
TOT
OA
TOT.
ROOM OA
KW HT -KW
TONS
TOT
SHR SHR
SENS
SENS
LAT
LAT LAT
BTUH
3.54 7.62
7.91
90922
0.62 0.71
56398
6229
34524
20260 14274
SYSTEM 3
TIME MONTH
LATITUDE
wheat
16 JULY
24
SENS
gain
OA
ROOF
ROOF
WALL WIND
WIND
WIND
WIND
WIND MISC
LIGHTS
PPL
ROOM
ROOM CFM
RM
SENS
SENS
SENS SENS
SENS
SENS
SENS
SENS BTUH
SENS
BTUH
BTUH
CFM RM
PPL
13 Pantry
405
195 0
0 0
0
0 1500
683
250
3336
163
12
14 Mchen
900
510 627
0 0
0
0 25700
1365
1760
33938
1654
138
28
0.00 0
0 0
0 0
0
0 0
0
0
0
0
0
20
0.00 0
0 0
0 0
0
0 0
0
0
0
0
0
25
0.00 0
0 0
0 0
0
0 0
0
0
0
0
0
TOT
1305
705 627
0 0
0
0 27200
2048
2000
37273
1816
150
OA TOT
EST
SYS
SYS RM
TOT
OA
TOT.
ROOM OA
KW HT -KW
TONS
TOT
SHR SHR
SENS
SENS
LAT
LAT LAT
BTUH
1.47 2.11
4.16
47800
0.83 0.95
39864
2590
7936
2000 5936
Jones S Conde, LLC
4440 PGA Boulevard
Palm Beach Gardens, FL 33410
Certificate of Author&at/on #29793
Tel (561) 309.9017
Engineer. Bawd R Jones, PE 041042
ROOM
HEAT
TRAM -KW
81 4.08
0 0.00
0 0.00
81 4.08
ON
eN
ON Std
am
Old
sensible
latent
as as
ca
oa
ratio
ratio
temp tam
latent
latent
1.00
1.00
16.00 16.00
60.00
60.00
ROOM
HEAT
TRAN-KW
1 0.15
7 0.49
0 0.00
0 0.00
0 0.00
8 0.64
a" am ery Old ery std
sensible latent as os oa as
ratio ratio temp tom latent latent
1.00 1.00 16.00 16.00 60.00 60.00
0
mm��OR mq mYo�a3D
m rmOOW oonlmmAON+ m o+ofn+o 'm mZ pp0
1 `-gym aef a �� and WxiC 35SN nmm moC a'3n C y00
tj0m�oO O 333 �' A� 20� O O 3>> ZOO O %i SbD
sfppa m mmm n WT and fe WT o 5 b 5Z
D
am 3x s M, �mZ
Pao a z
O r W N O O
m mw mVm
b0 m 16
+ V W m m
oo a 00o R Op
00 00 0 0 00 0 +m m
p ZO S ZO S N
q (Tu fO mfWil o{mn mT w mtmnW NT O A
N O O A N W V O+ P A m 1J0 O O O U P O A m
JJ$$ O
inD u m+mN +m ZD 2D m mm� Z> m
m o ooNooOobN Wr m 000NNN Wr-
o N m� No mm
N~ V m W WW (ZAD W~ m N m y0 Cp
V N 0 0 0 O V O O N V V W O O O N O S
ZZ ZZ m
m m WO NO Z
m oomoo0oo0 0 000000 0
czz
N~ N~ O towWo m
+yy o 000000000 o 00000o W
A C OyW ZZ wCU ZZ Z
W 2 00 m i WO m
+ 0 000000000 C � o 000000
m ZZ o xN ZZ N
of 0 0000moboo WO o 00000o WO �
Wv m3_ Wm ym 3_ �
ma o CW O A� n a fn cW
n o 000000000 20 o m00000 SO D
(� mo WE:mo m, X
A N~ J N N+ mm N NN Z~ N + w+ N O
Om W O O O w A W O+ W W N O coo.. A m W T
(� m y m-I 9 m m °D + -1' m W
L Z V NJVN N '1Z V Z fall OVV CrZ 'O
P W N O N U U O S W m W O O N N = W
b O O O O O O O O O O N O O O O O O O
s0 w +m o m m+m +mom �0& m sfWi omfJil mm3 0 03
=312
Xm N N b N O N W m V A W N N
W W O O W V N •C O V N m O O O O O W V
w SO + TO a sy0 p TO
N O N N N b m Nw KO O 0 4f L N N i 0
o a ooag' oNN o w 000Nwm 3
V 5D 3D W 50
XD
0 o AmN+ W tll +
W O O O N m N N O O
Tm 9m
N O O N w V+ O O N m O O O m w V
amZ ti=O �wz DSO
o f'n ��O o a go
R w 00000.000 + + 0000003
O m OOdNOIOOP01� O m N 00041 N.P�
O + O O O m P P N O P P O O m O O O b+ b
+UM um
0ff� +m FS
O ^ O ^
O O
\, 9 m3 Z Wd Z
o'
o 0
m m
Saw
mFEE
m= ma
o^ e
o e
Missionary Flights 2 Apartmerit
FORT PIERCE, FL
MANUAL V/ASHRAE CALCULATION RESULTS
SUMMER O.A./I.A. - 91 DEG. D.B./75 DEG. D.B.
WINTER O.A./I.A. - 47 DEG. D.B./70 DEG. D.B.
system room room
6.00 num name
1 Bedroom 1
2 Bedroom 2
3 Bath
4 Living/Dining/Kitchen
60 -
60 -
SUB TOTALS
TOTALS
Jones & Conde, LLC
4440 PGA Boulevard
Palm Beach Gardens, FL 33410
Certificate of Authorization #29783
Tel (561) 309-9017
Engineer. David R Jones, PE #41042
approx
kw calc
total cfm
heat tons
4900.70
180
0.45
5270.20
193
0.52
541.65
20
0.10
12472.73
457
1.76
0.00
0
0.00
0.00
0
0.00
23185.28
850
2.82
23185.28
2.0