HomeMy WebLinkAboutCHECK LISTI
-'F
,,,.,,Jo,rid6'Bu i Id i ng. Code Sixth Eqitioh (?Q;17),'En6rgyCohserv;tiitio
'EnergyGaug6 S�ummit@)Flii�C*72P,17, Effective Date: Dec 31, 2017
d" rm
IECC 2015'- Total Bull ing. Perfo' ance Compliance Option
Check List
Applications for compliance with the Florida Building Code, Energy Conservation shall
include:
M This Checklist
The full compliance report generated by the software that contains the project
summary, compliance summary, certifications and detailed component compliance
reports.
F1 The compliance report must include the full input report generated by the software as
contigous part of the compliance report.
0 Boxes appropriately checked in the Mandatory Section of the complaince report.
SCANNED
BY
St. Lucie county
REVIEWED FOR
CODE COMPLIANCE
ST. LUCIE COUNTY
BOCC
S.S
0. STATE 0
'Pet
EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option
11/21/2018 Page I of 24
f
PROJECT SUMMARY
Short Desc:
New Horizons Description:
New Horizons
Owner:
New Horizons
Addressl:
4500 West Midway Road City:
Fort Pierce
Address2:
State:
FL
Zip:
34981
Type:
Office Class:
New Finished building
Jurisdiction:
FORT PIERCE, ST LUCIE COUNTY, Fl, (661100)
Conditioned Area:
10449 SF Conditioned & UnConditioned Area:
10449 SF
No of Stories:
I Area entered from Plans
0 SF
Permit No:
0 Max Tonnage
7.5
If different, write in:
' V
EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option
11/21/2018 Page 2 of 24
Compliance Summary
Component Design
Gross Energy Cost (in $) 6,904.0
LIGHTING CONTROLS
EXTERNAL LIGHTING
HVAC SYSTEM
PLANT
WATER HEATING SYSTEMS
PIPING SYSTEMS
Met all required compliance from Check List?
Criteria Result
7,542.0 PASSED
PASSES
PASSES
PASSES
No Entry
PASSES
No Entry
Yes/No/NA
IMPORTANT MESSAGE
Info 5009 -- -- -- An input report of this design building must be submitted along with this
Compliance Report
EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
FloMa Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option
11/21/2018 Page 3 of 24
CERTIFICATIONS
I hereby certify that the plans and specifications covered by this calculation are in compliance with the
Florida Energy Code
Prepared By: Eric J. S,4boda, PE
Building Official:
Date: CT/ I - -&
Date:
I certify that this building is in compliance with the FLorida Energy Efficiency Code
Owner Agent:
Date:
If Required by Florida law, I hereby certify (*) that the system design is in compliance with the Florida
Energy Efficiency Code
Architect:
Reg No:
Electrical Designer:
Reg No:
Lighting Designer:
Reg No:
Mechanical Designer:
Reg No:
Plumbing Designer:
Reg No:
(*) Signature is required where Florida Law requires design to be performed by registered design
professionals. Typed names and registration numbers may be used where all relevant information is
contained on signed/sealed plans.
EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dee 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option
11/21/2018 Page 4 of 24
Project: New Horizons
Title: New Horizons
T�pe: office
Building End Uses
1) Proposed 2) Baseline
Total 443.70 569.30
$6,904 $8,873
ELECTRIClTY(MBtu1kWh1$)
443.70
569.30
130026
166793
$6,904
$8,873
AREA LIGHTS
63.00
121.20
18448
35522
$980
$1,890
MISC EQUIPIVIT
156.80
156.80
45932
45932
$2,439
$2,444
PUMPS & MISC
0.00
0.10
14
20
$1
$1
SPACE COOL
155.80
160.60
45663
47056
$2,425
$2,503
SPACE HEAT
0.70
2.40
215
709
$11
$38
VENTFANS
67.40
128.20
19754
37554
$1,049
$1,998
Credits Applied: None PASSES
Passing Criteria = 7542
Design (including any credits) = 6904
Passing requires Proposed Building cost to be at most 85% of
Baseline cost. This Proposed Building is at 77.8%
EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option
11/21/2018 Page 5 of 24
Project: New Horizons
Title: New Horizons
Type: Office
(WEA File: FL ST LUCIE CO ML.tm3)
External Lighting Compliance
Description Category Tradable? Allowance Area or Length ELPA CLP
(W[Unit) or No. of Units (W)
(Sqft or ft)
Ext Light I Building facades (by linear foot) No 3.75 460.0 1,725 300
Ext Light 2 Entry Canopies Yes 0.40 255.0 102 105
Ext Light 3 Other (doors) than main entries Yes 20.00 12.0 240 32
""radable Surfaces: 137 (W) Allowance for Tradable: 1092 (W) PASSES J
All External Lighting: 437 M
Complicance check includes a excess/Base allowance of 750.00(W)
Project: New Horizons
Title: New Horizons
Type: Office
(WEA File: FL ST LUCIE CO INTL.tm3)
Lighting Controls Compliance
Acronym Ashrae Description Area Design Min Compli-
ID (sq.ft) CP CP ance
PrOZo I Sp 1 17 Office - Enclosed 10,449 30 2 PASSES
PASSES
EnergyGauge Summit& Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option
11/21/2018 Page 6 of 24
Project: New Horizons
Title: New Horizons
Type: Office
(WEA File: FL ST LUCIE CO INTL.tm3)
System Report Compliance
Pr0SyI System I
Constant Volume Packaged No. of Units
System
I
Component
Category
Capacity
Design Eff Design IPLV
Comp-
Eff Criteria IPLV Criteria
liance
Cooling System
Air Conditioners Air Cooled
90000
11.20 11.20 12.90 12.90
PASSES
65000 to 135000 Btu/h
Cooling Capacity
Heating System
Electric Furnace
51000
1.00 1.00
PASSES
Air Handling
Air Handler (Supply) -
2600
0.57 0.82
PASSES
System -Supply
Constant Volume
Air Distribution
ADS System (Sup)
6.00 4.20
PASSES
System (Sup)
I
Air Distribution
ADS System (Ret)
6.00
PASSES
System (Ret)
PrOSy2 System 2
Constant Volume Packaged No. of Units
System
2
Component
Category
Capacity
Design Eff Design IPLV
Comp-
Eff Criteria IPLV Criteria
liance
Cooling System
Air Conditioners Air Cooled
72000
12.00 11.20 12.90 12.90
PASSES
65000 to 135000 Btu/h
Cooling Capacity
Heating System
Electric Furnace
51000
1.00 1.00
PASSES
Air Handling
Air Handler (Supply) -
2000
0.55 0.82
PASSES
System -Supply
Constant Volume
Air Distribution
ADS System (Sup)
6.00 4.20
PASSES
System (Sup)
Air Distribution
ADS System (Ret)
6.00
PASSES
System (Ret)
PrOSy3 System 3
Constant Volume Air Cooled No.
of Units
Split System < 65000 Btu/hr
Component
Category
Capacity
Design Eff Design IPLV
Comp-
Eff Criteria IPLV Criteria
liance
Cooling System
Air Conditioners Air Cooled
36000
16.00 13.00 8.00
PASSES
Split System < 65000 Btu/h
Cooling Capacity
Heating System
Electric Furnace
27000
1.00 1.00
PASSES
Air Handling
Air Handler (Supply) -
1100
0.33 0.82
PASSES
System -Supply
Constant Volume
Air Distribution
ADS System (Sup)
6.00 4.20
PASSES
System (Sup)
EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option
11/21/2018 Page 7 of 24
Air Distribution
ADS System (Ret)
6.00
PASSES
System (Ret)
PrOSy4 System 4
Constant Volume Air Cooled No. of Units
Split System < 65000 Btu/hr
Component
Category
Capacity
Design
Eff
Design IPLV Comp-
Eff
Criteria
IPLV Criteria liance
Cooling System
Air Conditioners Air Cooled
42000
15.50
13.00
8.00 PASSES
Split System < 65000 Btu/b
Cooling Capacity
Heating System
Electric Furnace
27000
1.00
1.00
PASSES
Air Handling
Air Handler (Supply) -
1400
0.53
0.82
PASSES
System -Supply
Constant Volume
Air Distribution
ADS System (Sup)
6.00
4.20
PASSES
System (SUP)
Air Distribution
ADS System (Ret)
6.00
PASSES
System (Ret)
PASSES
Plant Compliance
Description Installed Size Design Min Design Min Category Comp
No Eff Eff IPLV IPLV liance
Non=ij
EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation JECC 2015 - Total Building Performance Compliance Option
11/21/2018 Page 8 of 24
Project: New Horizons
Title: New Horizons
Type: Office
(WEA File: FL ST LUCIE CO INITL.tm3)
Water Heater Compliance
Description Type
Category Design Min
Eff Eff
Design Max Comp
Loss Loss liance
Water Heater I Electric water heater <-- 12 [kWJ 0.95 0.93
PASSES
PASSES
Piping System Compliance
Category
Pipe Dia Is Operating Ins Cond Ins Req Ins Compliance
[inches] Runout? Temp [Btu-in/hr Thick[inj Thicklin]
[F] SF.FJ
None
EnergyGauge Summit@) Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option
11/21/2018 Page 9 of 24
Mandatory Requirements (as applicable) Mandatory requirements compiled by US Department
of Energy and Pacific Northwest National Laboratory.
Adopted with permission
Topic Section Component Description Yes
NIA
Exempt
1. TQ,bG check d by Desi ner, oil� �ngineer
9
Insulation C303.2 Envelope
Below -grade wall insulation installed per
1:1
123
E]
manufacturer's instructions.
Insulation C303.2 Envelope
Slab edge insulation installed per manufacturer's
instructions.
Insulation C303.2 Envelope
Above -grade wall insulation installed per
M
1:1
11
manufacturer's instructions.
Insulation C402.3 Envelope
Hlgh�albedo roofs satisfy one of the following:
El
El
0
3-year-aged solar reflectance >= 0.55 and thermal
emittance >= 0.75 or 3-year-aged solar
reflectance index >= 64.0.
Fenestration C402.4.4 Envelope
U.factor of opaque doors associated with the
building thermal envelope meets requirements.
SYSTEK_SPECIFIC C403.2.12.1 Mechanical
HVAC fan systems at design conditions do not
El
0
1:1
exceed allowable fan system motor nameplate hp
or fan system bhp.
SYSTENLSPECIFIC C403.2.12.2 Mechanical
HVAC fan motors not oversized beyond allowable
ID
limits.
SYSTEM_SPECIFIG C403.2.3(8) Table Mechanical
Heat Rejection Equipment: Minimum Efficiency
0
ID
13
Requirement meet those listed in Table
C403.2.3(8)
HVAC C403.2.7 Mechanical
Exhaust air energy recovery on systems meeting
0
U-1-3
1:1
Table C403.2.7(l) and C403.2.7(2).
SYSTEM C403.3 Mechanical
Air economizers provided where required, meet
0
Ex 1
1:1
—SPECIFIC
the requirements for design capacity, control
signal, ventilation controls, high -limit shut-off,
integrated economizer control, and provide a
means to relieve excess outside air during
operation.
SYSTEM C403.3.2 Mechanical
Economizer operation will not increase heating
0
El
El
—SPECIFIC
energy use during normal operation.
SYSTEM C403.3.4, Mechanical
Water economizers provided where required,
1-1
El
0
—SPECIFIC
C403.3.4.1,
meet the requirements for design capacity,
C403.3.4.2.
maximum pressure drop and integrated
C403.3.1
economizer control.
SYSTEM C403.4.2.1 Mechanical
Three -pipe hydronic; systems using a common
—SPECIFIC
return for hot and chilled water are not used.
SYSTEM C403.4.2.3.1 Mechanical
Hydronic heat pump systems connected to a
E3
ID
13
—SPECIFIC
common water loop meet heat rejection and heat
addition requirements.
SYSTEM_SPECIFIC C403.4.3.4 Mechanical
Open -circuit cooling towers having water cooled
[3
El
[3
chiller systems and multiple or vairable speed
condenser pumps, are designed so that tower
cells can run in parallel with larger of flow crtleria.
SYSTEM C404.2 Mechanical
Service water heating equipment meets efficiency
—SPECIFIC
requirements.
Wattage C405.3 Interior Lighting
Exit signs do not exceed 5 watts per face.
3e checked by Plan eviewer
Plan Review C1 03.2 Envelope
Plans and/or specifications provide all information
with which compliance ran be determined for the
building envelope and document where
exceptions to the standard are claimed.
EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option
11/21/2018 Page 10 of 24
Plan Review C103.2' Mechanical
Plans, specifications, a;dtar-caicuiations provide
all information with which compliance can be
determined for the mechanical systems and
equipment and document where exceptions to the
standard are claimed. Load calculations per
acceptable engineering st
Plan Review C103.2 Mechanical
Plans, specifications, and/or calculations provide
all information with which compliance can be
determined for the service water heating systems
and equipment and document where exceptions
to the standard are claimed. Hot water system
sized per manufact
Plan Review C1 03.2 Interior Lighting
Plans, specifications, and/or calculations provide
0
11
11
all information with which compliance can be
determined for the interior fighting and electrical
systems and equipment and document where
exceptions to the standard are claimed.
Information provided shoul
Plan Review C103.2 Exterior Lighting
Plans, specifications, and/or calculations provide
El
El
1:1
all information with which compliance can be
determined for the exterior lighting and electrical
systems and equipment and document where
exceptions to the standard are claimed.
Information provided shoul
Insulation C402.2.5 Envelope
Slab edge insulation depth/length. Slab insulation
ri
extending away from building is covered by
pavement or >= 10 inches of soil.
Insulation C402.2.6 Project
Radiant heating systems panels insulated to
>=R-3.5 on face opposite space being heated.
HVAC C402.2.6 Mechanical
Thermally ineffective panel surfaces of sensible
heating panels have insulation >= R-3.5.
Insulation C402.2.6 Envelope
Radiant panels and associated components
11
1:1
0
designed for heat transfer from the panel su4aces
to the occupants or indoor space are insulated
with a minimum of R-3.5.
Air Leakage C402.5.7 Envelope
Vestibules are installed on all building entrances.
Doors have self -closing devices.
SYSTEM C403.2.12.3 Mechanical
Fans have efficiency grade (FEG) >= 67. The total
11
13
El
—SPECIFIC
efficiency of the fan at the design point of
operation <= 15% of maximum total efficiency of
the fan.
HVAC C403.2.13 Mechanical
Unenclosed spaces that are heated use only
11
1:1
El
radiant heat.
HVAC C403.2.4.2 Mechanical
Each zone equipped with setback controls using
automatic time clock or programmable control
system.
SYSTEM —SPECIFIC C403.2.4.4 Mechanical
Zone isolation devices and controls installed
1:1
11
El
where applicable.
SYSTEM C403.2.4.7 Mechanical
Fault detection and diagnostics installed with
1:1
0
—SPECIFIC
air-cooled unitary DX units having economizers.
SYSTEM C403.2.5 Mechanical
Hot water boilers supplying heat via one- or
1:1
El
—SPECIFIC
two -pipe systems include outdoor setback control.
HVAC C403.2.6.1 Mechanical
Demand control ventilation provided for spaces
1:1
El
El
>500 ft2 and >25 people11000 ft2 occupant
density and served by systems with air side
economizer, auto modulating outside air damper
control, or design airflow >3,000 dm.
SYSTEM C403.4.1.1 Mechanical
Hydronic; and multizone HVAC system controls
0
El
El
—SPECIFIC
areVAV fans driven by mechanical or electrical
variable speed drive per Table C403.4.1.1.
SYSTEM C403.4.1.3 Mechanical
Reset static pressure setpoint for DOG controlled
0
1:1
E]
—SPECIFIC
VAV boxes reporting to central controller based on
the zones requiring the most pressure.
SYSTEM C403.4.2 Mechanical
Temperature reset by representative building
1:1
11
0
—SPECIFIC
loads In pumping systems for chiller and boiler
systems >500,000 Btu/h.
EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation I.ECC 2015 - Total Building Performance Compliance Option
11/21/2018 Page I I of 24
SYSTEK-SPECIFIC C403.4.2.3.2.1
Mechanical Closed-circuit cooling tower writnin heat pump loop
have either automatic bypass valve or lower
leakage positive closure dampers. Open -circuit
tower within heat pump loop have automatic valve
to bypass all heat pump water flow around the
tower. Open- or cl
SYSTEM C403.4.2.4
Mechanical Hydronic systems greater than 500,000 Btu/h
—SPECIFIC
designed for variable fluid flow.
SYSTEM —SPECIFIC C403.4.2.5
Mechanical System turndown requirement met through
multiple single -input boilers, one or more
modulating boilers, or a combination of
single -input and modulating boilers.
Boiler input between 1.0 MBtu/h and 5 MBtu/h has
3:1 turndown ratio, boiler input between 5.0
SYSTEM C403.4.2.6
Mechanical Chilled water plants with multiple chillers have
—SPECIFIC
capability to reduce flow automatically through the
chiller plant when a chiller is shut down.
Boiler plants with multiple boilers have the
capability to reduce flow automatically through the
boiler plant
SYSTEM —SPECIFIC C403.4.3,
Mechanical Fan systems With motors >=7.5 hp associated
C403.4.3.2
with heat rejection equipment to have capability to
operate at 213 of full -speed and auto speed
controls to control the leaving fluid temperature or
condensing temp/pressure of heat rejection
device.
SYSTEM —SPECIFIC C403.4.4.5
Mechanical Multiple zone HVAC systems have supply air
temperature reset controls.
SYSTEM C403.4.4.6
Mechanical Multiple zone VAV systems with DDC of individual
El
11
13
—SPECIFIC
zone boxes have static pressure setpoint reset
cc ntrols.
SYSTEM G404.2.1
Mechanical Gas -fired water -heating equipment installed in
El
1:1
11
—SPECIFIC
new buildings: where a singular piece of
water -heating equipment >= 1,000 kBtuth serves
the entire building, thermal efficiency >= 90 Et.
Where multiple pieces of water -heating equipment
serve the building wi
SYSTEM —SPECIFIC C404.4
Mechanical All piping insulated in accordance with section
details and Table C403.2.1 0.
SYSTEM —SPECIFIC C404.5, C404.5.1.
Mechanical Heated water supply piping conforms to pipe
11
El
11
C404.5.2
length and volume requirements. Refer to section
details.
SYSTEM —SPECIFIC C404.6.3
Mechanical Pumps that circulate water between a heater and
storage tank have controls that limit operation
from startup to <= 5 minutes after end of heating
cycle.
SYSTEM C404.7
Mechanical Water distribution system that pumps water from a
—SPECIFIC
heated -water supply pipe back to the
heated -water source through a cold -water supply
pipe is
a demand recirculation water system. Pumps
within this system have controls that start the
pump upon receiving
Wattage C405.5.1
Exterior Lighting Exterior lighting power is consistent with what is
shown on the approved lighting plans,
demonstrating proposed wafts are less than or
equal to allowed watts.
Plan Review C405.6
Project Group R-2 dwelling units have separate electrical
meters.
Plan Review C406
Project Plans, specifications, and/or calculations provide
11
El
1:1
all information With which compliance can be
determined for the additional energy efficiency
package options.
SYSTEM —SPECIFIC C408.2.2.2
Mechanical HVAC hydronic heating and cooling coils have
11
El
11
means to balance and have pressure test
connections.
SYSTEM —SPECIFIC C408.2.2.2
Mechanical HVAC hydronic heating and cooling coils have
means to balance and have pressure test
connections.
3. To 1116 checked by Insp6ctor
EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option
11/21/2018 Page 12 of 24
Insulation C303.1 Envelope
Roof insulation installed-ii6r—r�anufacturmer&E-s
[j
11
instructions. Blown or poured loose -fill insulation
is installed only where the roof slope is <=3 in 12.
Insulation C303.1 Envelope
Building envelope insulation is labeled with
R.value or insulation certificate providing R-value
Fenestration C303.1.3 Envelope
and other relevant data.
Fenestration products rated in accordance with
NFRC.
Fenestration C303.1.3 Envelope
Fenestration products are certified as to
El
E]
1:1
performance labels or certificates provided.
Insulation C303.2, C402.2.4 Envelope
Floor insulation installed per manufacturer's
El
1:1
1:1
instructions. Cavity or structural slab insulation
installed in permanent contact with underside of
decking or structural slabs.
Insulation C303.2.1 Envelope
Exterior insulation protected against damage,
sunlight, moisture, wind, landscaping and
equipment maintenance activities.
Insulation C303.2.1 Envelope
Exterior insulation is protected from damage with
a protective material. Verification for exposed
foundation insulation may need to occur during
Foundation Inspection.
Insulation C402.1.3 Envelope
Non -swinging opaque doors have R-4.75
13
0
11
insulation.
Insulation C402.2.2 Envelope
Skylight curbs are insulated to the level of roofs
with insulation above deck or R-5.
Insulation C402.2.2 Envelope
Insulation intended to meet the roof insulation
requirements cannot be installed on top of a
suspended ceiling. Mark this requirement
compliant if insulation is installed accordingly.
Air Leakage C402.5 Envelope
Building envelope contains a continuous air
barrier that has been tested and deemed to limit
air leakage <= 0.40 cfrrVft2.
Air Leakage C402.5.1 Envelope
The building envelope contains a continuous air
El
El
1:1
barrier that is sealed in an approved manner and
either constructed or tested in an approved
manner. Air barrier penetrations are sealed in an
Air Leakage C402.5.1.1 Envelope
approved manner.
All sources of air leakage in the building thermal
0
0
envelope are sealed, caulked, gasketed, weather
stripped or wrapped with moisture
vapor -permeable wrapping material to minimize
air leakage.
Air Leakage C402.5.1.2.1 Envelope
The building envelope contains a continuous air
barrier that is sealed in an approved manner and
material permeability <= 0.004 cfm/ft2. Air barrier
penetrations are sealed in an approved manner.
Air Leakage C402.5.1.2.2 Envelope
The building envelope contains a continuous air
El
11
11
barrier that is sealed in an approved manner and
average assembly air leakage <= 0.04 dnVft2. Air
barrier penetrations are sealed in an approved
Air Leakage C402.5.2,-C402.5.4 Envelope
manner.
Factory -built fenestration and doors are labeled as
El
0
11
meeting air leakage requirements.
Air Leakage C402.5.3 Envelope
Where open combustion air ducts provide
combustion air to open combustion fuel burning
appliances, the appliances and combustion air
opening are located outside the building thermal
envelope or enclosed in a room, isolated from
inside the thermal envelope
Air Leakage C402.5.6, Envelope
Stair and elevator shaft vents have motorized
El
1:1
1:1
C403.2.4.3
dampers that automatically close.
Air Leakage C402.5.5. Envelope
Outdoor air and exhaust systems have motorized
C403.2.4.3
dampers that automatically shut when not in use
and meet maximum leakage rates. Check gravity
dampers where allowed.
Air Leakage C402.5.6 Envelope
Weatherseals installed on all loading dock cargo
doors.
Air Leakage C402.5.8 Envelope
Recessed luminaires in thermal envelope to limit
011
1:1
infiltration and be IC rated and labeled. Seal
between interior finish and luminaire housing.
EnergyGauge Summit(D Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Oprion
11/21/2018 1 Page 13 of 24
HVAC C403.2.1
Mechanical HVAC systems and equipmem: aesign loads
calculated in accordance with
ANSI/ASHRAE/ACCA Standard 183 or by an
approved equivalent computational procedure
SYSTEM C403.2.1,0
Mechanical HVAC piping insulation thickness. Where piping is
—SPECIFIC
installed in or under a slab, verification may need
to occur during Foundation Inspection.
HVAC C403.2.3
Mechanical HVAC equipment efficiency verified.
U
1:1
0
SYSTEM G403.2.3
Mechanical PTAC and PTHP with sleeves 16 in. by 42 in.
—SPECIFIC
labeled for replacement only as per Footnote b to
Table C403.2.3(3).
SYSTEM C403.2.4.1
Mechanical Heating and cooling to each zone is controlled by
El
1:1
11
—SPECIFIC
a thermostat control. Minimum one humidity
control device per installed
humidification/dehumidification system.
SYSTEM C403.2.4.1.1
Mechanical Heat pump controls prevent supplemental electric
—SPECIFIC
resistance heat from coming on when not needed.
HVAC C403.2.4.1.2
Mechanical Thermostatic controls have a 5 A'F deadband.
HVAC C403.2.4.1.2
Mechanical Thermostatic controls have a 5 A*F deadband.
11
13
HVAC C403.2.4.1.3
Mechanical Temperature controls have setpoint overlap
restrictions.
HVAC C403.2.4.2.1.
Mechanical Automatic Controls: Setback to 55*17 (heat) and
ri
C403.2.4.2.2
85*F (cool); 7-day clock, 2-hour occupant
override, 1 0-hour backup
SYSTEM —SPECIFIC C403.2.4.2.3
Mechanical Systems include optimum start controls.
HVAC G403.2.4.5,
Mechanical Snowlice melting system sensors for future
C403.2.4.6
connection to controls. Freeze protection systems
have automatic controls installed.
HVAC C403.2.6.2
Mechanical Enclosed parking garage ventilation has automatic
contaminant detection and capacity to stage or
modulate fans to 50% or less of design capacity.
HVAC C403.2.9
Mechanical HVAC ducts and plenums insulated. Where ducts
El
El
11
or plenums are installed in or under a slab,
verification may need to occur during Foundation
Inspection.
SYSTEM C403.2.9.1.3
Mechanical Ductwork operating >3 in. water column requires
—SPECIFIC
air leakage testing.
SYSTEM C403.4.1.2
Mechanical VAV fans have static pressure sensors located so
El
E]
11
—SPECIFIC
controller setpoint <=1.2 w.c..
SYSTEM C403.4.2.2
Mechanical Two -pipe hydronic systems using a common
—SPECIFIC
distribution system have controls to allow a
deadband >=150F, allow operation in one mode
for at least 4 hrs before changeover, and have
rest controls to limit heating and cooling supply
temperature to <=30 OF.
SYSTEM G403.4.2.3.3
Mechanical Two -position automatic valve interlocked t ? shut
—SPECIFIC
off water flow when hydronic heat pump with
pumping system >10 hp is off.
SYSTEM —SPECIFIC C403.4.4.5,
Mechanical Zone controls can limit simultaneous heating and
C403.4.4.5.1-4
cooling and sequence heating and cooling to each
SYSTEM C403.4.5
zone.
Mechanical Condenser heat recovery system that can heat
11
13
0
—SPECIFIC
water to 85OF or provide 60% of peak heat
rejection is installed for preheating of service hot
water.
SYSTEM C403.4.6
Mechanical Hot gas bypass limited to:
—SPECIFIC
<=240 kl3tulh - 60% capacity,
>240 kBtulh - 25% capacity
SYSTEM —SPECIFIC C404.3
Mechanical Heat traps installed on non -circulating storage
1:1
13
water tanks.
SYSTEK_SPECIFIC C404.3
Mechanical Heat traps installed on supply and discharge
11
11
piping of non -Circulating systems.
SYSTEM C404.3
Mechanical Heat traps installed on supply and discharge
11
13
—SPECIFIC
piping of non -circulating systems.
EnergyGauge Summit@) Fla/Com-2017. TAM 2017-1.0 Compliant Software. EffecIve Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option
11/21/2018 Page 14 of 24
SYSTEM C404.6.
Mechanical Controls are installed Mflifiria the operation of a
—SPECIFIC
recirculation pump installed to maintain
temperature of a storage tank. System return pipe
is a dedicated return pipe or a cold water supply
SYSTEM_SPECIFIC C404.6.1, C404.6.2
pipe.
Mechanical Automatic time switches installed to automatically
switch off the recirculating hot-water system or
SYSTEM_SPECIFIC C404.9.1
heat trace.
Mechanical Pool heaters are equipped with on/off switch and
no continuously burning pilot light.
SYSTEM —SPECIFIC C404.9.2
Mechanical Time switches are installed on all pool heaters and
pumps.
SYSTEULSPECIFIC C404.9.2
Mechanical Time switches are installed on all pool heaters and
El
0
11
pumps.
SYSTEM C404.9.3
Mechanical Vapor retardant pool covers are provided for
0
1:1
1:1
—SPECIFIC
heated pools and permanently installed spas.
Controls C405.2.1
Interior Lighting Lighting controls installed to uniformly reduce the
1:1
1:1
1:3
lighting load by at least 50%.
Controls C405.2.1
Interior Lighting Occupancy sensors installed in required spaces.
El
0
0
Controls C405.2.1,
Interior Lighting Independent lighting controls installed per
0
El
11
C405.2.2.3
approved lighting plans and all manual controls
readily accessible and visible to occupants.
Controls C405.2.2.1
Interior Lighting Automatic controls to shut off all building lighting
0
1:1
1:1
Installed in all buildings.
Controls C405.2.3
Interior Lighting Daylight zones.provided with individual controls
[3
11
1:1
that control the lights independent of general area
lighting.
Controls C405.2.3,
Interior Lighting Primary sidelighted areas are equipped with
C405.2.3.1,
required lighting controls.
C405.2.3.2
Controls C405.2.3.
Interior Lighting Enclosed spaces with daylight area under
0
11
1:1
C405.2.3.1,
skylights and rooftop monitors are equipped with
C405.2.3.3
required lighting controls.
Separate lighting devices for specific uses
Controls C405.2.4
Interior Lighting control
installed per approved lighting plans.
Wattage C405.2.4
Interior Lighting Additional interior lighting power allowed for
El
0
U
special functions per the approved lighting plans
and Is automatically controlled and separated from
general lighting.
Controls C405.2.6
Exterior Lighting Automatic lighting controls for exterior lighting
0
E]
El
installed. Controls will be daylight controlled, set
based on business operation time -of -day, or
reduce connected lighting > 30%.
Wattage C405.4.1
Interior Lighting Interior installed lamp and fixture lighting power is
[3
11
1:1
consistent with what is shown on the approved
lighting plans, demonstrating proposed watts are
less than or equal to allowed wafts.
Mandatory Additional C406.4
Project Enhanced digital lighting controls efficiency
0
0
11
package: Interior lighting has following enhanced
lighting controls in accordance with Section
C405.2.2:
Luminaires capable of continuous dimming and
being addressed individually, <= 8 luminaires
controlled in
Mandatory Additional C406.6
Project Dedicate outdoor air system efficiency package:
11
El
1:1
Buildings with hydronic and/or multiple -zone
HVAC systems are equipped with an independent
ventilation system designed to provide >=
1 00-percent outdoor air to each individual
occupied space, as specified by
Mandatory Additional C406.7, C406.7.1
Project Enhanced Service Water Heat System efficiency
0
0
package. One of the following SWH system
enhancements must satisfy 60 percent of hot
water requirements, or 100 percent if the building
otherwise complies with heat recovery per Section
C403.4.5: Waste heat re
HVAC C408.2.2.1
Mechanical Air outlets and zone terminal devices have means
for air balancing.
EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option
11/21/2018 Page 15 of 24
HVAC C408.2.2.1 Mechanical
Testing C408.2.3.2 Mechanical
Air outlets and zone terminaiuevices have means
for air balancing.
HVAC control systems have been tested to ensure
proper operation, calibration and adjustment of
controls.
11
El
A!J Pr I
00119n'a io,
:up nw'l'
Post Construction C303.3, C408.2.5.2 Interior Lighting
Furnished O&M instructions for systems and
equipment to the building owner or designated
representative.
Post Construction C303.3, C408.2.5.3 Mechanical
Furnished O&M manuals for HVAC systems within
11
El
90 days of system acceptance.
Fenestration C402.4.2.2 Envelope
Skylights in office, storage, automotive service,
manufacturing, non -refrigerated warehouse, retail
store, and distribution/sorting area have a
measured haze value > 90 percent unless
designed to exclude direct sunlight.
Post Construction C408.2.1 Mechanical
Commissioning plan developed by registered
design professional or approved agency.
Post Construction G408.2.3.1 Mechanical
HVAC equipment has been tested to ensure
1:1
E]
1:1
proper operation.
Post Construction C408.2.3.3 Mechanical
Economizers have been tested to ensure proper
operation.
Post Construction C408.2.4 Mechanical
Preliminary commissioning report completed and
1:1
El
certified by registered design professional or
approved agency.
Post Construction C408.2.5.1 Mechanical
Furnished HVAC as -built drawings submitted
11
El
1:1
within 90 days of system acceptance.
Post Construction C408.2.5.1 Interior Lighting
Furnished as -built drawings for electric power
D
El
systems within 90 days of system acceptance.
Post Construction C408.2.5.3 Mechanical
An air and/or hydronic system balancing report is
provided for HVAC systems.
Post Construction C408.2.5.4 Mechanical
Final commissioning report due to building owner
within 90 days of receipt of certificate of
occupancy.
Post Construction C408.3 Interior Lighting
Lighting systems have been tested to ensure
1:1
El
proper calibration, adjustment, programming, and
operation.
EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option
11/21/2018 Page 16 of 24
Input Data Report I
Proiect Information
Project Name: New Horizons
Address: 4500 West Midway Road
Owner: New Horizons
Building Type: Office
No.of Stories: I
Bldg. Rotation: None
ProjectTitle: NewHorizons
State: FL
Zip: 34981
Building Classification: New Finished building
GrossArea (SF): 10,449
Zones
No Acronym
Description
Type
Area Multi
Tsf1
Total Area
Istl
I PrOZol
Zone I
CONDITIONED
10449.5 1
10449.5
El
Spaces
No Acronym
Description
Type Depth
Ift]
Width HeightMult Total
[it] IN Area
IS11
Total
Vollcfl
In Zone: PrOZol
1 PrOZolSpl
ZOOSPI
Office - Enclosed 63.33
165.00 10.00 1
10449.5
104494.5E]
Lighting
No Type
Category No. of Watts per
Luminaires Luminaire
Power Control Type
[W]
No.of
Ctrl pts
In Zone: PrOZol
In Space: Pr0ZolSp1
I LED General Lighting 1 6024
6024 Occupancy sensor without
Daylighting
30
EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effectlive Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option
11/21/2018 Page 17 of 24
Walls (Walls will be rotated clockwise by buildi , ng rotation value)
No Description Type Width H (Effec) Multi Area Orient Cond- Heat Dens. R-Value
[it] plier [sfl ation uctance Capacity [lb/cfl [h.sLF/Btu]
[Btu/h.sf.Fl [Btu/sf.Fl
In Zone: PrOZol.
1
PrOZolWal
Metal
64.00
12.00
1 768.0
North
0.0957
0.757
16.80
10.5
E]
siding/RII]3att/0.5"
Gyp
-
2
PrOZo I Wa2
Metal
64.00
12.00
1 768.0
South
0.0957
0.757
16.80
10.5
El
siding/R I I Batt/0. 5"
Gyp
3
PrOZolWa3
Metal
164.00
12.00
1 1968.0
East
0.0957
0.757
16.80
10.5
siding/RllBatt/0.5"
Gyp
4
PrOZolWa4
Metal
164.00
12.00
1 1968.0
West
0.0957
0.757
16.80
10.5
El
siding/111113att/0.5"
Gyp
Windows (Windows will
be rotated clockwise by building rotation value)
No
Description
Orientation
Shaded
U
SHGC
Vis.Tra
W
H(Effec)
Multi
TotalArea
[Btu/hr sf F]
[ft]
Ift]
plier
[sfl
In Zone: PrOZol
In Wall: East
I
Pr0ZolWa3Wi1
East
No
1.2500
0.82
0.76
3.00
5.00
10
150.0
El
2
PrOZolWa3Wi2
East
No
1.2500
0.82
0.76
5.00
5.00
1
25.0
El
3
PrOZolWa3Wi3
East
No
1.2500
0.82
0.76
3.00
7.00
2
42.0
El
In Wall: North
I
PrOZolWalWil
North
No
1.2500
0.82
0.76
3.00
7.00
2
42.0
El
In Wall: South
1
PrOZol%2WH
South
No
1.2500
0.82
0.76
3.00
7.00
2
42.0
E-1
,2
PrOZolWa2Wi2
South
No
1.2500
0.82
0.76
3.00
5.00
2
30.0
El
In Wall: West
I
Pr0ZolWa4Wi1
West
No
1.2500
0.82
0.76
3.00
5.00
11
165.0
El
EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation ECC 2015 - Total Building Performance Compliance Option
11/21/2018 Page 18 of 24
Doors
No Description Type Shade? Width H(Effec) Multi Area Cond. Dens. Ht Cap. R
Ift] Ift] plier [sfl [Btu/h.sf.Fl [lb/cl] [Btu/sE [h.sLF/
IT] Btu]
Zone: PrOZol
In Wall: West
I PrOZolWa4Drl Solid core flush No 3.00 7.00 4 21.0 0.6061 0.00 0.00 1.65
(1.75")
Roofs
No Description
Type Width
H(Effec) Multi Area
Tilt
Cond. HeatCap Dens. R-Value
IN
IN plier lsfl
[deg)
[Btu/b.SL F] [Btu/sf. F] [lb/cfl lh.sff/Btu
In Zone: PrOZol
I Pr0ZolRf1
Mtl Bldg Roof/R-19 165.00
63.33 1 10449.5
0.00
0.0492 1.34 9.49 20.3 E]
Batt
Skylights
No Description
Type U
SHGC Vis.Trans W
H(Effec) Multi- Area TotalArea
[Btu/hr sf F]
Ift]
Ift]
plier IS11 IS11
In Zone:
In Roof -
EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option
11/21/2018 Page 19 of 24
a
Floors
No Description Type Width H(Effec) Multi Area Cond. HeatCap. Dens. R-Valuc
[ft] [ft] plier fsfl [Btu/b.sf.F J11tu/sE F] [lb/cfl jh.sLF/]Btu
In Zone: PrOZol
1 Pr0ZolF1l 1 ft. soil, concrete 165.00 63.33 1 10449.5 0.2681 34.00 113.33 3.73
floor, carpet and
rubber pad
EnergyGauge SummitV Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florlida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option
11/21/2018 Page 20 of 24
Systems
PrOSyl
System 1
Constant Volume Packaged
No. Of Units
System
Component
Category
Capacity Efficiency IPLV
I
Cooling System
90000.00 11.20 12.90
E]
2
Heating System
51000.00 1.00
E]
3
Air Handling System -Supply
2600.00 0.57
El
4
Air Distribution System (Sup)
6.00
Ej
5
Air Distribution System (Ret)
6.00
1:1
PrOSy2
System 2
Constant Volume Packaged
No. Of Units
System
2
Component
Category
Capacity Efflciency IPLV
I
Cooling System
72000.00 12.00 12.90
2
Heating System
51000.00 1.00
3
Air Handling System -Supply
2000.00 0.55
El
4
Air Distribution System (Sup)
6.00
13
5
Air Distribution System (Ret)
6.00
El
PrOSy3
System 3
Constant Volume Air Cooled
No. Of Units
Split System < 65000 Btu/hr
Component
Category
Capacity Efficiency IPLV
I
Cooling System
36000.00 16.00 8.00
El
2
Heating System
27000.00 1.00
0
3
Air Handling System -Supply
1100.00 0.33
El
4
Air Distribution System (Sup)
6.00
El
5
Air Distribution System (Ret)
6.00
El
PrOSy4
System 4
Constant Volume Air Cooled
No. Of Units
Split System < 65000 Btu/hr
Component
Category
Capacity Efficiency IPLV
I
Cooling System
42000.00 15.50 8.00
E3
2
Heating System
27000.00 1.00
3
Air Handling System -Supply
1400.00 0.53
4
Air Distribution System (Sup)
6.00
5
Air Distribution System (Ret)
6.00
EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Optlion
11/21/2018 Page 21 of 24
Plant
Equipment
Category Size
Inst.N(Eff. IPLV
Water Heaters
W-Heater Description
Capacity Cap.Unit I/P Rt.
Efficiency Loss
I Electric water heater
30 [Gal] 5 [kW]
0.9500 [Efl [Btu/hj
Ext-Lighting
Description
Category No.of Watts
Lumin- per
aires Lumin-
Area/Len/No Control Wattage
[sf/ft/Nol Type [W]
I Ext Light I
2 Ext Light 2
3 Ext Light 3
Building facades (by linear 10 30
foot)
Entry Canopies 7 15
Other (doors) than main 2 16
entries
460.00 Photo Sensor contr( V####:
255.00 Photo Sensor comn 9###-
12.00 Photo Sensor contrg 32.00
E]
El
Piping
No Type
Operating Insulation
Temp Conductivity
[F] I Btu-in/h.stfl
Nomonal pipe Insulation Is
Diameter Thickness Runout?
[in] [in]
EnergyGauge Surnmit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation JECC 2015 - Total Building Performance Compliance Opton
11/21/2018 Page 22 of 24
Fenestration Used
Name Glass Type No. of Glass SHGC VLT
Conductance
Panes [Btu/h.sEFI
ASHULSgICIrAI User Defined 1 1.2500 0.8200 0.7600
IFrrn
Materials Used
Mat No
Acronym
Description
Only
R-Value
Used
RValue
[h.sfF/Btuj
Thick
[it]
Cond-
uctivity
[Btu/h.ft.F
Density
jlb/cl]
Sp. Heat
[Btu/Ib.F
187
MatI187
GYP OR PLAS
No
0.4533
0.0417
0.0920
50.00
0.2000
[3
BOARD,1/2IN
178
lvIatll78
CARPET W/RUBBER PAD
Yes
1.2300
E]
265
Matl265
Soil, 1 ft
No
2.0000
1.0000
0.5000
100.00
0.2000
E3
48
Matl48
6 in. Heavyweight concrete
No
0.5000
0,5000
1.0000
140.00
0.2000
El
12
Matll2
3 in. Insulation
No
10.0000
0.2500
0.0250
2.00
0.2000
El
23
Mat123
6 in. Insulation
No
20.0000
0.5000
0.0250
5.70
0.2000
E-1
4
MatI4
Steel siding
No
0.0002
0.0050
26.0000
480.00
0.1000
E]
278
Matl278
Solid core flush (1.75")
Yes
1.6500
13
94
Matl94
BUILT-UP ROOFING,
No
0.3366
0.0313
0.0930
70.00
0.3500
E]
3/81N
EnergyGauge SummW Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option
11/21/2018 Page 23 of 24
Constructs Used
No
Name
Simple Massless
Conductance Heat Cap
Density
RValue
Construct Construct
[Btu/h.sfF] [Btu/sLF]
[lb/cf]
jh.sEF/Btuj.
1020
Metal siding/R I lBatt/0.5 "Gyp No No
0.10 0.76
16.80
10.5
E]
Layer
Material
Material
Thickness
Framing
No.
[ft]
Factor
1
4
Steel siding
0.0050
0.000
2
12
3 in. Insulation
0.2500
0.000
3
187
GYP OR PLAS BOARD, 1/21N
0.0417
0.000
El
No
Name
Simple Massless
Conductance Heat Cap
Density
RValue
Construct Construct
[Btu/h.sf.Fj [Btu/sEF]
[Ib1cf]
jh.sEF/Btuj
1027
Solid core flush (1.75")
No Yes
0.61
1.7
Layer
Material
Material
Thickness
Framing
No.
fft]
Factor
1
278
Solid core flush (1.75")
0.000
No
Name
Simple Massless
Conductance Heat Cap
Density
RValue
Construct Construct
[Btu/h.sf.Fl [Btu/sEF]
[lb/cfl
jh.sff/Btuj
1056
MtI Bldg Roof/R-19 Batt
No No
0.05 1.34
9.49
20.3
Layer
Material
Material
Thickness
Framing
No.
[ft]
Factor
1
94
BUILT-UP ROOFING, 3/81N
0.0313
0.000
El
2
23
6 in. Insulation
0.5000
0.000
El
No
Name
Simple Massless
Conductance Heat Cap
Density
RValue
Construct Construct
[Btulh.sEF] lBtu/sf.Fl
Ilb/cfl
[h.sf.F/Btul
1057
1 ft. soil:i concrete floor, carpet and No No
0.27 34.00
113.33
3.7
El
rubber pad
Layer
Material
Material
Thickness
Framing
No.
[ft]
Factor
1
265
Soil, 1 ft
1.0000
0.000
2
48
6 in. Heavyweight concrete
0.5000
0.000
3
178
CARPET W/RUBBER PAD
0.000
El
EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effectiive Date: Dec 31, 2017
Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option
11/21/2018 Page 24 of 24