Loading...
HomeMy WebLinkAboutCHECK LISTI -'F ,,,.,,Jo,rid6'Bu i Id i ng. Code Sixth Eqitioh (?Q;17),'En6rgyCohserv;tiitio 'EnergyGaug6 S�ummit@)Flii�C*72P,17, Effective Date: Dec 31, 2017 d" rm IECC 2015'- Total Bull ing. Perfo' ance Compliance Option Check List Applications for compliance with the Florida Building Code, Energy Conservation shall include: M This Checklist The full compliance report generated by the software that contains the project summary, compliance summary, certifications and detailed component compliance reports. F1 The compliance report must include the full input report generated by the software as contigous part of the compliance report. 0 Boxes appropriately checked in the Mandatory Section of the complaince report. SCANNED BY St. Lucie county REVIEWED FOR CODE COMPLIANCE ST. LUCIE COUNTY BOCC S.S 0. STATE 0 'Pet EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/21/2018 Page I of 24 f PROJECT SUMMARY Short Desc: New Horizons Description: New Horizons Owner: New Horizons Addressl: 4500 West Midway Road City: Fort Pierce Address2: State: FL Zip: 34981 Type: Office Class: New Finished building Jurisdiction: FORT PIERCE, ST LUCIE COUNTY, Fl, (661100) Conditioned Area: 10449 SF Conditioned & UnConditioned Area: 10449 SF No of Stories: I Area entered from Plans 0 SF Permit No: 0 Max Tonnage 7.5 If different, write in: ' V EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/21/2018 Page 2 of 24 Compliance Summary Component Design Gross Energy Cost (in $) 6,904.0 LIGHTING CONTROLS EXTERNAL LIGHTING HVAC SYSTEM PLANT WATER HEATING SYSTEMS PIPING SYSTEMS Met all required compliance from Check List? Criteria Result 7,542.0 PASSED PASSES PASSES PASSES No Entry PASSES No Entry Yes/No/NA IMPORTANT MESSAGE Info 5009 -- -- -- An input report of this design building must be submitted along with this Compliance Report EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 FloMa Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/21/2018 Page 3 of 24 CERTIFICATIONS I hereby certify that the plans and specifications covered by this calculation are in compliance with the Florida Energy Code Prepared By: Eric J. S,4boda, PE Building Official: Date: CT/ I - -& Date: I certify that this building is in compliance with the FLorida Energy Efficiency Code Owner Agent: Date: If Required by Florida law, I hereby certify (*) that the system design is in compliance with the Florida Energy Efficiency Code Architect: Reg No: Electrical Designer: Reg No: Lighting Designer: Reg No: Mechanical Designer: Reg No: Plumbing Designer: Reg No: (*) Signature is required where Florida Law requires design to be performed by registered design professionals. Typed names and registration numbers may be used where all relevant information is contained on signed/sealed plans. EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dee 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/21/2018 Page 4 of 24 Project: New Horizons Title: New Horizons T�pe: office Building End Uses 1) Proposed 2) Baseline Total 443.70 569.30 $6,904 $8,873 ELECTRIClTY(MBtu1kWh1$) 443.70 569.30 130026 166793 $6,904 $8,873 AREA LIGHTS 63.00 121.20 18448 35522 $980 $1,890 MISC EQUIPIVIT 156.80 156.80 45932 45932 $2,439 $2,444 PUMPS & MISC 0.00 0.10 14 20 $1 $1 SPACE COOL 155.80 160.60 45663 47056 $2,425 $2,503 SPACE HEAT 0.70 2.40 215 709 $11 $38 VENTFANS 67.40 128.20 19754 37554 $1,049 $1,998 Credits Applied: None PASSES Passing Criteria = 7542 Design (including any credits) = 6904 Passing requires Proposed Building cost to be at most 85% of Baseline cost. This Proposed Building is at 77.8% EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/21/2018 Page 5 of 24 Project: New Horizons Title: New Horizons Type: Office (WEA File: FL ST LUCIE CO ML.tm3) External Lighting Compliance Description Category Tradable? Allowance Area or Length ELPA CLP (W[Unit) or No. of Units (W) (Sqft or ft) Ext Light I Building facades (by linear foot) No 3.75 460.0 1,725 300 Ext Light 2 Entry Canopies Yes 0.40 255.0 102 105 Ext Light 3 Other (doors) than main entries Yes 20.00 12.0 240 32 ""radable Surfaces: 137 (W) Allowance for Tradable: 1092 (W) PASSES J All External Lighting: 437 M Complicance check includes a excess/Base allowance of 750.00(W) Project: New Horizons Title: New Horizons Type: Office (WEA File: FL ST LUCIE CO INTL.tm3) Lighting Controls Compliance Acronym Ashrae Description Area Design Min Compli- ID (sq.ft) CP CP ance PrOZo I Sp 1 17 Office - Enclosed 10,449 30 2 PASSES PASSES EnergyGauge Summit& Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/21/2018 Page 6 of 24 Project: New Horizons Title: New Horizons Type: Office (WEA File: FL ST LUCIE CO INTL.tm3) System Report Compliance Pr0SyI System I Constant Volume Packaged No. of Units System I Component Category Capacity Design Eff Design IPLV Comp- Eff Criteria IPLV Criteria liance Cooling System Air Conditioners Air Cooled 90000 11.20 11.20 12.90 12.90 PASSES 65000 to 135000 Btu/h Cooling Capacity Heating System Electric Furnace 51000 1.00 1.00 PASSES Air Handling Air Handler (Supply) - 2600 0.57 0.82 PASSES System -Supply Constant Volume Air Distribution ADS System (Sup) 6.00 4.20 PASSES System (Sup) I Air Distribution ADS System (Ret) 6.00 PASSES System (Ret) PrOSy2 System 2 Constant Volume Packaged No. of Units System 2 Component Category Capacity Design Eff Design IPLV Comp- Eff Criteria IPLV Criteria liance Cooling System Air Conditioners Air Cooled 72000 12.00 11.20 12.90 12.90 PASSES 65000 to 135000 Btu/h Cooling Capacity Heating System Electric Furnace 51000 1.00 1.00 PASSES Air Handling Air Handler (Supply) - 2000 0.55 0.82 PASSES System -Supply Constant Volume Air Distribution ADS System (Sup) 6.00 4.20 PASSES System (Sup) Air Distribution ADS System (Ret) 6.00 PASSES System (Ret) PrOSy3 System 3 Constant Volume Air Cooled No. of Units Split System < 65000 Btu/hr Component Category Capacity Design Eff Design IPLV Comp- Eff Criteria IPLV Criteria liance Cooling System Air Conditioners Air Cooled 36000 16.00 13.00 8.00 PASSES Split System < 65000 Btu/h Cooling Capacity Heating System Electric Furnace 27000 1.00 1.00 PASSES Air Handling Air Handler (Supply) - 1100 0.33 0.82 PASSES System -Supply Constant Volume Air Distribution ADS System (Sup) 6.00 4.20 PASSES System (Sup) EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/21/2018 Page 7 of 24 Air Distribution ADS System (Ret) 6.00 PASSES System (Ret) PrOSy4 System 4 Constant Volume Air Cooled No. of Units Split System < 65000 Btu/hr Component Category Capacity Design Eff Design IPLV Comp- Eff Criteria IPLV Criteria liance Cooling System Air Conditioners Air Cooled 42000 15.50 13.00 8.00 PASSES Split System < 65000 Btu/b Cooling Capacity Heating System Electric Furnace 27000 1.00 1.00 PASSES Air Handling Air Handler (Supply) - 1400 0.53 0.82 PASSES System -Supply Constant Volume Air Distribution ADS System (Sup) 6.00 4.20 PASSES System (SUP) Air Distribution ADS System (Ret) 6.00 PASSES System (Ret) PASSES Plant Compliance Description Installed Size Design Min Design Min Category Comp No Eff Eff IPLV IPLV liance Non=ij EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation JECC 2015 - Total Building Performance Compliance Option 11/21/2018 Page 8 of 24 Project: New Horizons Title: New Horizons Type: Office (WEA File: FL ST LUCIE CO INITL.tm3) Water Heater Compliance Description Type Category Design Min Eff Eff Design Max Comp Loss Loss liance Water Heater I Electric water heater <-- 12 [kWJ 0.95 0.93 PASSES PASSES Piping System Compliance Category Pipe Dia Is Operating Ins Cond Ins Req Ins Compliance [inches] Runout? Temp [Btu-in/hr Thick[inj Thicklin] [F] SF.FJ None EnergyGauge Summit@) Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/21/2018 Page 9 of 24 Mandatory Requirements (as applicable) Mandatory requirements compiled by US Department of Energy and Pacific Northwest National Laboratory. Adopted with permission Topic Section Component Description Yes NIA Exempt 1. TQ,bG check d by Desi ner, oil� �ngineer 9 Insulation C303.2 Envelope Below -grade wall insulation installed per 1:1 123 E] manufacturer's instructions. Insulation C303.2 Envelope Slab edge insulation installed per manufacturer's instructions. Insulation C303.2 Envelope Above -grade wall insulation installed per M 1:1 11 manufacturer's instructions. Insulation C402.3 Envelope Hlgh�albedo roofs satisfy one of the following: El El 0 3-year-aged solar reflectance >= 0.55 and thermal emittance >= 0.75 or 3-year-aged solar reflectance index >= 64.0. Fenestration C402.4.4 Envelope U.factor of opaque doors associated with the building thermal envelope meets requirements. SYSTEK_SPECIFIC C403.2.12.1 Mechanical HVAC fan systems at design conditions do not El 0 1:1 exceed allowable fan system motor nameplate hp or fan system bhp. SYSTENLSPECIFIC C403.2.12.2 Mechanical HVAC fan motors not oversized beyond allowable ID limits. SYSTEM_SPECIFIG C403.2.3(8) Table Mechanical Heat Rejection Equipment: Minimum Efficiency 0 ID 13 Requirement meet those listed in Table C403.2.3(8) HVAC C403.2.7 Mechanical Exhaust air energy recovery on systems meeting 0 U-1-3 1:1 Table C403.2.7(l) and C403.2.7(2). SYSTEM C403.3 Mechanical Air economizers provided where required, meet 0 Ex 1 1:1 —SPECIFIC the requirements for design capacity, control signal, ventilation controls, high -limit shut-off, integrated economizer control, and provide a means to relieve excess outside air during operation. SYSTEM C403.3.2 Mechanical Economizer operation will not increase heating 0 El El —SPECIFIC energy use during normal operation. SYSTEM C403.3.4, Mechanical Water economizers provided where required, 1-1 El 0 —SPECIFIC C403.3.4.1, meet the requirements for design capacity, C403.3.4.2. maximum pressure drop and integrated C403.3.1 economizer control. SYSTEM C403.4.2.1 Mechanical Three -pipe hydronic; systems using a common —SPECIFIC return for hot and chilled water are not used. SYSTEM C403.4.2.3.1 Mechanical Hydronic heat pump systems connected to a E3 ID 13 —SPECIFIC common water loop meet heat rejection and heat addition requirements. SYSTEM_SPECIFIC C403.4.3.4 Mechanical Open -circuit cooling towers having water cooled [3 El [3 chiller systems and multiple or vairable speed condenser pumps, are designed so that tower cells can run in parallel with larger of flow crtleria. SYSTEM C404.2 Mechanical Service water heating equipment meets efficiency —SPECIFIC requirements. Wattage C405.3 Interior Lighting Exit signs do not exceed 5 watts per face. 3e checked by Plan eviewer Plan Review C1 03.2 Envelope Plans and/or specifications provide all information with which compliance ran be determined for the building envelope and document where exceptions to the standard are claimed. EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/21/2018 Page 10 of 24 Plan Review C103.2' Mechanical Plans, specifications, a;dtar-caicuiations provide all information with which compliance can be determined for the mechanical systems and equipment and document where exceptions to the standard are claimed. Load calculations per acceptable engineering st Plan Review C103.2 Mechanical Plans, specifications, and/or calculations provide all information with which compliance can be determined for the service water heating systems and equipment and document where exceptions to the standard are claimed. Hot water system sized per manufact Plan Review C1 03.2 Interior Lighting Plans, specifications, and/or calculations provide 0 11 11 all information with which compliance can be determined for the interior fighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided shoul Plan Review C103.2 Exterior Lighting Plans, specifications, and/or calculations provide El El 1:1 all information with which compliance can be determined for the exterior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided shoul Insulation C402.2.5 Envelope Slab edge insulation depth/length. Slab insulation ri extending away from building is covered by pavement or >= 10 inches of soil. Insulation C402.2.6 Project Radiant heating systems panels insulated to >=R-3.5 on face opposite space being heated. HVAC C402.2.6 Mechanical Thermally ineffective panel surfaces of sensible heating panels have insulation >= R-3.5. Insulation C402.2.6 Envelope Radiant panels and associated components 11 1:1 0 designed for heat transfer from the panel su4aces to the occupants or indoor space are insulated with a minimum of R-3.5. Air Leakage C402.5.7 Envelope Vestibules are installed on all building entrances. Doors have self -closing devices. SYSTEM C403.2.12.3 Mechanical Fans have efficiency grade (FEG) >= 67. The total 11 13 El —SPECIFIC efficiency of the fan at the design point of operation <= 15% of maximum total efficiency of the fan. HVAC C403.2.13 Mechanical Unenclosed spaces that are heated use only 11 1:1 El radiant heat. HVAC C403.2.4.2 Mechanical Each zone equipped with setback controls using automatic time clock or programmable control system. SYSTEM —SPECIFIC C403.2.4.4 Mechanical Zone isolation devices and controls installed 1:1 11 El where applicable. SYSTEM C403.2.4.7 Mechanical Fault detection and diagnostics installed with 1:1 0 —SPECIFIC air-cooled unitary DX units having economizers. SYSTEM C403.2.5 Mechanical Hot water boilers supplying heat via one- or 1:1 El —SPECIFIC two -pipe systems include outdoor setback control. HVAC C403.2.6.1 Mechanical Demand control ventilation provided for spaces 1:1 El El >500 ft2 and >25 people11000 ft2 occupant density and served by systems with air side economizer, auto modulating outside air damper control, or design airflow >3,000 dm. SYSTEM C403.4.1.1 Mechanical Hydronic; and multizone HVAC system controls 0 El El —SPECIFIC areVAV fans driven by mechanical or electrical variable speed drive per Table C403.4.1.1. SYSTEM C403.4.1.3 Mechanical Reset static pressure setpoint for DOG controlled 0 1:1 E] —SPECIFIC VAV boxes reporting to central controller based on the zones requiring the most pressure. SYSTEM C403.4.2 Mechanical Temperature reset by representative building 1:1 11 0 —SPECIFIC loads In pumping systems for chiller and boiler systems >500,000 Btu/h. EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation I.ECC 2015 - Total Building Performance Compliance Option 11/21/2018 Page I I of 24 SYSTEK-SPECIFIC C403.4.2.3.2.1 Mechanical Closed-circuit cooling tower writnin heat pump loop have either automatic bypass valve or lower leakage positive closure dampers. Open -circuit tower within heat pump loop have automatic valve to bypass all heat pump water flow around the tower. Open- or cl SYSTEM C403.4.2.4 Mechanical Hydronic systems greater than 500,000 Btu/h —SPECIFIC designed for variable fluid flow. SYSTEM —SPECIFIC C403.4.2.5 Mechanical System turndown requirement met through multiple single -input boilers, one or more modulating boilers, or a combination of single -input and modulating boilers. Boiler input between 1.0 MBtu/h and 5 MBtu/h has 3:1 turndown ratio, boiler input between 5.0 SYSTEM C403.4.2.6 Mechanical Chilled water plants with multiple chillers have —SPECIFIC capability to reduce flow automatically through the chiller plant when a chiller is shut down. Boiler plants with multiple boilers have the capability to reduce flow automatically through the boiler plant SYSTEM —SPECIFIC C403.4.3, Mechanical Fan systems With motors >=7.5 hp associated C403.4.3.2 with heat rejection equipment to have capability to operate at 213 of full -speed and auto speed controls to control the leaving fluid temperature or condensing temp/pressure of heat rejection device. SYSTEM —SPECIFIC C403.4.4.5 Mechanical Multiple zone HVAC systems have supply air temperature reset controls. SYSTEM C403.4.4.6 Mechanical Multiple zone VAV systems with DDC of individual El 11 13 —SPECIFIC zone boxes have static pressure setpoint reset cc ntrols. SYSTEM G404.2.1 Mechanical Gas -fired water -heating equipment installed in El 1:1 11 —SPECIFIC new buildings: where a singular piece of water -heating equipment >= 1,000 kBtuth serves the entire building, thermal efficiency >= 90 Et. Where multiple pieces of water -heating equipment serve the building wi SYSTEM —SPECIFIC C404.4 Mechanical All piping insulated in accordance with section details and Table C403.2.1 0. SYSTEM —SPECIFIC C404.5, C404.5.1. Mechanical Heated water supply piping conforms to pipe 11 El 11 C404.5.2 length and volume requirements. Refer to section details. SYSTEM —SPECIFIC C404.6.3 Mechanical Pumps that circulate water between a heater and storage tank have controls that limit operation from startup to <= 5 minutes after end of heating cycle. SYSTEM C404.7 Mechanical Water distribution system that pumps water from a —SPECIFIC heated -water supply pipe back to the heated -water source through a cold -water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving Wattage C405.5.1 Exterior Lighting Exterior lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed wafts are less than or equal to allowed watts. Plan Review C405.6 Project Group R-2 dwelling units have separate electrical meters. Plan Review C406 Project Plans, specifications, and/or calculations provide 11 El 1:1 all information With which compliance can be determined for the additional energy efficiency package options. SYSTEM —SPECIFIC C408.2.2.2 Mechanical HVAC hydronic heating and cooling coils have 11 El 11 means to balance and have pressure test connections. SYSTEM —SPECIFIC C408.2.2.2 Mechanical HVAC hydronic heating and cooling coils have means to balance and have pressure test connections. 3. To 1116 checked by Insp6ctor EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/21/2018 Page 12 of 24 Insulation C303.1 Envelope Roof insulation installed-ii6r—r�anufacturmer&E-s [j 11 instructions. Blown or poured loose -fill insulation is installed only where the roof slope is <=3 in 12. Insulation C303.1 Envelope Building envelope insulation is labeled with R.value or insulation certificate providing R-value Fenestration C303.1.3 Envelope and other relevant data. Fenestration products rated in accordance with NFRC. Fenestration C303.1.3 Envelope Fenestration products are certified as to El E] 1:1 performance labels or certificates provided. Insulation C303.2, C402.2.4 Envelope Floor insulation installed per manufacturer's El 1:1 1:1 instructions. Cavity or structural slab insulation installed in permanent contact with underside of decking or structural slabs. Insulation C303.2.1 Envelope Exterior insulation protected against damage, sunlight, moisture, wind, landscaping and equipment maintenance activities. Insulation C303.2.1 Envelope Exterior insulation is protected from damage with a protective material. Verification for exposed foundation insulation may need to occur during Foundation Inspection. Insulation C402.1.3 Envelope Non -swinging opaque doors have R-4.75 13 0 11 insulation. Insulation C402.2.2 Envelope Skylight curbs are insulated to the level of roofs with insulation above deck or R-5. Insulation C402.2.2 Envelope Insulation intended to meet the roof insulation requirements cannot be installed on top of a suspended ceiling. Mark this requirement compliant if insulation is installed accordingly. Air Leakage C402.5 Envelope Building envelope contains a continuous air barrier that has been tested and deemed to limit air leakage <= 0.40 cfrrVft2. Air Leakage C402.5.1 Envelope The building envelope contains a continuous air El El 1:1 barrier that is sealed in an approved manner and either constructed or tested in an approved manner. Air barrier penetrations are sealed in an Air Leakage C402.5.1.1 Envelope approved manner. All sources of air leakage in the building thermal 0 0 envelope are sealed, caulked, gasketed, weather stripped or wrapped with moisture vapor -permeable wrapping material to minimize air leakage. Air Leakage C402.5.1.2.1 Envelope The building envelope contains a continuous air barrier that is sealed in an approved manner and material permeability <= 0.004 cfm/ft2. Air barrier penetrations are sealed in an approved manner. Air Leakage C402.5.1.2.2 Envelope The building envelope contains a continuous air El 11 11 barrier that is sealed in an approved manner and average assembly air leakage <= 0.04 dnVft2. Air barrier penetrations are sealed in an approved Air Leakage C402.5.2,-C402.5.4 Envelope manner. Factory -built fenestration and doors are labeled as El 0 11 meeting air leakage requirements. Air Leakage C402.5.3 Envelope Where open combustion air ducts provide combustion air to open combustion fuel burning appliances, the appliances and combustion air opening are located outside the building thermal envelope or enclosed in a room, isolated from inside the thermal envelope Air Leakage C402.5.6, Envelope Stair and elevator shaft vents have motorized El 1:1 1:1 C403.2.4.3 dampers that automatically close. Air Leakage C402.5.5. Envelope Outdoor air and exhaust systems have motorized C403.2.4.3 dampers that automatically shut when not in use and meet maximum leakage rates. Check gravity dampers where allowed. Air Leakage C402.5.6 Envelope Weatherseals installed on all loading dock cargo doors. Air Leakage C402.5.8 Envelope Recessed luminaires in thermal envelope to limit 011 1:1 infiltration and be IC rated and labeled. Seal between interior finish and luminaire housing. EnergyGauge Summit(D Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Oprion 11/21/2018 1 Page 13 of 24 HVAC C403.2.1 Mechanical HVAC systems and equipmem: aesign loads calculated in accordance with ANSI/ASHRAE/ACCA Standard 183 or by an approved equivalent computational procedure SYSTEM C403.2.1,0 Mechanical HVAC piping insulation thickness. Where piping is —SPECIFIC installed in or under a slab, verification may need to occur during Foundation Inspection. HVAC C403.2.3 Mechanical HVAC equipment efficiency verified. U 1:1 0 SYSTEM G403.2.3 Mechanical PTAC and PTHP with sleeves 16 in. by 42 in. —SPECIFIC labeled for replacement only as per Footnote b to Table C403.2.3(3). SYSTEM C403.2.4.1 Mechanical Heating and cooling to each zone is controlled by El 1:1 11 —SPECIFIC a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. SYSTEM C403.2.4.1.1 Mechanical Heat pump controls prevent supplemental electric —SPECIFIC resistance heat from coming on when not needed. HVAC C403.2.4.1.2 Mechanical Thermostatic controls have a 5 A'F deadband. HVAC C403.2.4.1.2 Mechanical Thermostatic controls have a 5 A*F deadband. 11 13 HVAC C403.2.4.1.3 Mechanical Temperature controls have setpoint overlap restrictions. HVAC C403.2.4.2.1. Mechanical Automatic Controls: Setback to 55*17 (heat) and ri C403.2.4.2.2 85*F (cool); 7-day clock, 2-hour occupant override, 1 0-hour backup SYSTEM —SPECIFIC C403.2.4.2.3 Mechanical Systems include optimum start controls. HVAC G403.2.4.5, Mechanical Snowlice melting system sensors for future C403.2.4.6 connection to controls. Freeze protection systems have automatic controls installed. HVAC C403.2.6.2 Mechanical Enclosed parking garage ventilation has automatic contaminant detection and capacity to stage or modulate fans to 50% or less of design capacity. HVAC C403.2.9 Mechanical HVAC ducts and plenums insulated. Where ducts El El 11 or plenums are installed in or under a slab, verification may need to occur during Foundation Inspection. SYSTEM C403.2.9.1.3 Mechanical Ductwork operating >3 in. water column requires —SPECIFIC air leakage testing. SYSTEM C403.4.1.2 Mechanical VAV fans have static pressure sensors located so El E] 11 —SPECIFIC controller setpoint <=1.2 w.c.. SYSTEM C403.4.2.2 Mechanical Two -pipe hydronic systems using a common —SPECIFIC distribution system have controls to allow a deadband >=150F, allow operation in one mode for at least 4 hrs before changeover, and have rest controls to limit heating and cooling supply temperature to <=30 OF. SYSTEM G403.4.2.3.3 Mechanical Two -position automatic valve interlocked t ? shut —SPECIFIC off water flow when hydronic heat pump with pumping system >10 hp is off. SYSTEM —SPECIFIC C403.4.4.5, Mechanical Zone controls can limit simultaneous heating and C403.4.4.5.1-4 cooling and sequence heating and cooling to each SYSTEM C403.4.5 zone. Mechanical Condenser heat recovery system that can heat 11 13 0 —SPECIFIC water to 85OF or provide 60% of peak heat rejection is installed for preheating of service hot water. SYSTEM C403.4.6 Mechanical Hot gas bypass limited to: —SPECIFIC <=240 kl3tulh - 60% capacity, >240 kBtulh - 25% capacity SYSTEM —SPECIFIC C404.3 Mechanical Heat traps installed on non -circulating storage 1:1 13 water tanks. SYSTEK_SPECIFIC C404.3 Mechanical Heat traps installed on supply and discharge 11 11 piping of non -Circulating systems. SYSTEM C404.3 Mechanical Heat traps installed on supply and discharge 11 13 —SPECIFIC piping of non -circulating systems. EnergyGauge Summit@) Fla/Com-2017. TAM 2017-1.0 Compliant Software. EffecIve Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/21/2018 Page 14 of 24 SYSTEM C404.6. Mechanical Controls are installed Mflifiria the operation of a —SPECIFIC recirculation pump installed to maintain temperature of a storage tank. System return pipe is a dedicated return pipe or a cold water supply SYSTEM_SPECIFIC C404.6.1, C404.6.2 pipe. Mechanical Automatic time switches installed to automatically switch off the recirculating hot-water system or SYSTEM_SPECIFIC C404.9.1 heat trace. Mechanical Pool heaters are equipped with on/off switch and no continuously burning pilot light. SYSTEM —SPECIFIC C404.9.2 Mechanical Time switches are installed on all pool heaters and pumps. SYSTEULSPECIFIC C404.9.2 Mechanical Time switches are installed on all pool heaters and El 0 11 pumps. SYSTEM C404.9.3 Mechanical Vapor retardant pool covers are provided for 0 1:1 1:1 —SPECIFIC heated pools and permanently installed spas. Controls C405.2.1 Interior Lighting Lighting controls installed to uniformly reduce the 1:1 1:1 1:3 lighting load by at least 50%. Controls C405.2.1 Interior Lighting Occupancy sensors installed in required spaces. El 0 0 Controls C405.2.1, Interior Lighting Independent lighting controls installed per 0 El 11 C405.2.2.3 approved lighting plans and all manual controls readily accessible and visible to occupants. Controls C405.2.2.1 Interior Lighting Automatic controls to shut off all building lighting 0 1:1 1:1 Installed in all buildings. Controls C405.2.3 Interior Lighting Daylight zones.provided with individual controls [3 11 1:1 that control the lights independent of general area lighting. Controls C405.2.3, Interior Lighting Primary sidelighted areas are equipped with C405.2.3.1, required lighting controls. C405.2.3.2 Controls C405.2.3. Interior Lighting Enclosed spaces with daylight area under 0 11 1:1 C405.2.3.1, skylights and rooftop monitors are equipped with C405.2.3.3 required lighting controls. Separate lighting devices for specific uses Controls C405.2.4 Interior Lighting control installed per approved lighting plans. Wattage C405.2.4 Interior Lighting Additional interior lighting power allowed for El 0 U special functions per the approved lighting plans and Is automatically controlled and separated from general lighting. Controls C405.2.6 Exterior Lighting Automatic lighting controls for exterior lighting 0 E] El installed. Controls will be daylight controlled, set based on business operation time -of -day, or reduce connected lighting > 30%. Wattage C405.4.1 Interior Lighting Interior installed lamp and fixture lighting power is [3 11 1:1 consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed wafts. Mandatory Additional C406.4 Project Enhanced digital lighting controls efficiency 0 0 11 package: Interior lighting has following enhanced lighting controls in accordance with Section C405.2.2: Luminaires capable of continuous dimming and being addressed individually, <= 8 luminaires controlled in Mandatory Additional C406.6 Project Dedicate outdoor air system efficiency package: 11 El 1:1 Buildings with hydronic and/or multiple -zone HVAC systems are equipped with an independent ventilation system designed to provide >= 1 00-percent outdoor air to each individual occupied space, as specified by Mandatory Additional C406.7, C406.7.1 Project Enhanced Service Water Heat System efficiency 0 0 package. One of the following SWH system enhancements must satisfy 60 percent of hot water requirements, or 100 percent if the building otherwise complies with heat recovery per Section C403.4.5: Waste heat re HVAC C408.2.2.1 Mechanical Air outlets and zone terminal devices have means for air balancing. EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/21/2018 Page 15 of 24 HVAC C408.2.2.1 Mechanical Testing C408.2.3.2 Mechanical Air outlets and zone terminaiuevices have means for air balancing. HVAC control systems have been tested to ensure proper operation, calibration and adjustment of controls. 11 El A!J Pr I 00119n'a io, :up nw'l' Post Construction C303.3, C408.2.5.2 Interior Lighting Furnished O&M instructions for systems and equipment to the building owner or designated representative. Post Construction C303.3, C408.2.5.3 Mechanical Furnished O&M manuals for HVAC systems within 11 El 90 days of system acceptance. Fenestration C402.4.2.2 Envelope Skylights in office, storage, automotive service, manufacturing, non -refrigerated warehouse, retail store, and distribution/sorting area have a measured haze value > 90 percent unless designed to exclude direct sunlight. Post Construction C408.2.1 Mechanical Commissioning plan developed by registered design professional or approved agency. Post Construction G408.2.3.1 Mechanical HVAC equipment has been tested to ensure 1:1 E] 1:1 proper operation. Post Construction C408.2.3.3 Mechanical Economizers have been tested to ensure proper operation. Post Construction C408.2.4 Mechanical Preliminary commissioning report completed and 1:1 El certified by registered design professional or approved agency. Post Construction C408.2.5.1 Mechanical Furnished HVAC as -built drawings submitted 11 El 1:1 within 90 days of system acceptance. Post Construction C408.2.5.1 Interior Lighting Furnished as -built drawings for electric power D El systems within 90 days of system acceptance. Post Construction C408.2.5.3 Mechanical An air and/or hydronic system balancing report is provided for HVAC systems. Post Construction C408.2.5.4 Mechanical Final commissioning report due to building owner within 90 days of receipt of certificate of occupancy. Post Construction C408.3 Interior Lighting Lighting systems have been tested to ensure 1:1 El proper calibration, adjustment, programming, and operation. EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/21/2018 Page 16 of 24 Input Data Report I Proiect Information Project Name: New Horizons Address: 4500 West Midway Road Owner: New Horizons Building Type: Office No.of Stories: I Bldg. Rotation: None ProjectTitle: NewHorizons State: FL Zip: 34981 Building Classification: New Finished building GrossArea (SF): 10,449 Zones No Acronym Description Type Area Multi Tsf1 Total Area Istl I PrOZol Zone I CONDITIONED 10449.5 1 10449.5 El Spaces No Acronym Description Type Depth Ift] Width HeightMult Total [it] IN Area IS11 Total Vollcfl In Zone: PrOZol 1 PrOZolSpl ZOOSPI Office - Enclosed 63.33 165.00 10.00 1 10449.5 104494.5E] Lighting No Type Category No. of Watts per Luminaires Luminaire Power Control Type [W] No.of Ctrl pts In Zone: PrOZol In Space: Pr0ZolSp1 I LED General Lighting 1 6024 6024 Occupancy sensor without Daylighting 30 EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effectlive Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/21/2018 Page 17 of 24 Walls (Walls will be rotated clockwise by buildi , ng rotation value) No Description Type Width H (Effec) Multi Area Orient Cond- Heat Dens. R-Value [it] plier [sfl ation uctance Capacity [lb/cfl [h.sLF/Btu] [Btu/h.sf.Fl [Btu/sf.Fl In Zone: PrOZol. 1 PrOZolWal Metal 64.00 12.00 1 768.0 North 0.0957 0.757 16.80 10.5 E] siding/RII]3att/0.5" Gyp - 2 PrOZo I Wa2 Metal 64.00 12.00 1 768.0 South 0.0957 0.757 16.80 10.5 El siding/R I I Batt/0. 5" Gyp 3 PrOZolWa3 Metal 164.00 12.00 1 1968.0 East 0.0957 0.757 16.80 10.5 siding/RllBatt/0.5" Gyp 4 PrOZolWa4 Metal 164.00 12.00 1 1968.0 West 0.0957 0.757 16.80 10.5 El siding/111113att/0.5" Gyp Windows (Windows will be rotated clockwise by building rotation value) No Description Orientation Shaded U SHGC Vis.Tra W H(Effec) Multi TotalArea [Btu/hr sf F] [ft] Ift] plier [sfl In Zone: PrOZol In Wall: East I Pr0ZolWa3Wi1 East No 1.2500 0.82 0.76 3.00 5.00 10 150.0 El 2 PrOZolWa3Wi2 East No 1.2500 0.82 0.76 5.00 5.00 1 25.0 El 3 PrOZolWa3Wi3 East No 1.2500 0.82 0.76 3.00 7.00 2 42.0 El In Wall: North I PrOZolWalWil North No 1.2500 0.82 0.76 3.00 7.00 2 42.0 El In Wall: South 1 PrOZol%2WH South No 1.2500 0.82 0.76 3.00 7.00 2 42.0 E-1 ,2 PrOZolWa2Wi2 South No 1.2500 0.82 0.76 3.00 5.00 2 30.0 El In Wall: West I Pr0ZolWa4Wi1 West No 1.2500 0.82 0.76 3.00 5.00 11 165.0 El EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation ECC 2015 - Total Building Performance Compliance Option 11/21/2018 Page 18 of 24 Doors No Description Type Shade? Width H(Effec) Multi Area Cond. Dens. Ht Cap. R Ift] Ift] plier [sfl [Btu/h.sf.Fl [lb/cl] [Btu/sE [h.sLF/ IT] Btu] Zone: PrOZol In Wall: West I PrOZolWa4Drl Solid core flush No 3.00 7.00 4 21.0 0.6061 0.00 0.00 1.65 (1.75") Roofs No Description Type Width H(Effec) Multi Area Tilt Cond. HeatCap Dens. R-Value IN IN plier lsfl [deg) [Btu/b.SL F] [Btu/sf. F] [lb/cfl lh.sff/Btu In Zone: PrOZol I Pr0ZolRf1 Mtl Bldg Roof/R-19 165.00 63.33 1 10449.5 0.00 0.0492 1.34 9.49 20.3 E] Batt Skylights No Description Type U SHGC Vis.Trans W H(Effec) Multi- Area TotalArea [Btu/hr sf F] Ift] Ift] plier IS11 IS11 In Zone: In Roof - EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/21/2018 Page 19 of 24 a Floors No Description Type Width H(Effec) Multi Area Cond. HeatCap. Dens. R-Valuc [ft] [ft] plier fsfl [Btu/b.sf.F J11tu/sE F] [lb/cfl jh.sLF/]Btu In Zone: PrOZol 1 Pr0ZolF1l 1 ft. soil, concrete 165.00 63.33 1 10449.5 0.2681 34.00 113.33 3.73 floor, carpet and rubber pad EnergyGauge SummitV Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florlida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/21/2018 Page 20 of 24 Systems PrOSyl System 1 Constant Volume Packaged No. Of Units System Component Category Capacity Efficiency IPLV I Cooling System 90000.00 11.20 12.90 E] 2 Heating System 51000.00 1.00 E] 3 Air Handling System -Supply 2600.00 0.57 El 4 Air Distribution System (Sup) 6.00 Ej 5 Air Distribution System (Ret) 6.00 1:1 PrOSy2 System 2 Constant Volume Packaged No. Of Units System 2 Component Category Capacity Efflciency IPLV I Cooling System 72000.00 12.00 12.90 2 Heating System 51000.00 1.00 3 Air Handling System -Supply 2000.00 0.55 El 4 Air Distribution System (Sup) 6.00 13 5 Air Distribution System (Ret) 6.00 El PrOSy3 System 3 Constant Volume Air Cooled No. Of Units Split System < 65000 Btu/hr Component Category Capacity Efficiency IPLV I Cooling System 36000.00 16.00 8.00 El 2 Heating System 27000.00 1.00 0 3 Air Handling System -Supply 1100.00 0.33 El 4 Air Distribution System (Sup) 6.00 El 5 Air Distribution System (Ret) 6.00 El PrOSy4 System 4 Constant Volume Air Cooled No. Of Units Split System < 65000 Btu/hr Component Category Capacity Efficiency IPLV I Cooling System 42000.00 15.50 8.00 E3 2 Heating System 27000.00 1.00 3 Air Handling System -Supply 1400.00 0.53 4 Air Distribution System (Sup) 6.00 5 Air Distribution System (Ret) 6.00 EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Optlion 11/21/2018 Page 21 of 24 Plant Equipment Category Size Inst.N(Eff. IPLV Water Heaters W-Heater Description Capacity Cap.Unit I/P Rt. Efficiency Loss I Electric water heater 30 [Gal] 5 [kW] 0.9500 [Efl [Btu/hj Ext-Lighting Description Category No.of Watts Lumin- per aires Lumin- Area/Len/No Control Wattage [sf/ft/Nol Type [W] I Ext Light I 2 Ext Light 2 3 Ext Light 3 Building facades (by linear 10 30 foot) Entry Canopies 7 15 Other (doors) than main 2 16 entries 460.00 Photo Sensor contr( V####: 255.00 Photo Sensor comn 9###- 12.00 Photo Sensor contrg 32.00 E] El Piping No Type Operating Insulation Temp Conductivity [F] I Btu-in/h.stfl Nomonal pipe Insulation Is Diameter Thickness Runout? [in] [in] EnergyGauge Surnmit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation JECC 2015 - Total Building Performance Compliance Opton 11/21/2018 Page 22 of 24 Fenestration Used Name Glass Type No. of Glass SHGC VLT Conductance Panes [Btu/h.sEFI ASHULSgICIrAI User Defined 1 1.2500 0.8200 0.7600 IFrrn Materials Used Mat No Acronym Description Only R-Value Used RValue [h.sfF/Btuj Thick [it] Cond- uctivity [Btu/h.ft.F Density jlb/cl] Sp. Heat [Btu/Ib.F 187 MatI187 GYP OR PLAS No 0.4533 0.0417 0.0920 50.00 0.2000 [3 BOARD,1/2IN 178 lvIatll78 CARPET W/RUBBER PAD Yes 1.2300 E] 265 Matl265 Soil, 1 ft No 2.0000 1.0000 0.5000 100.00 0.2000 E3 48 Matl48 6 in. Heavyweight concrete No 0.5000 0,5000 1.0000 140.00 0.2000 El 12 Matll2 3 in. Insulation No 10.0000 0.2500 0.0250 2.00 0.2000 El 23 Mat123 6 in. Insulation No 20.0000 0.5000 0.0250 5.70 0.2000 E-1 4 MatI4 Steel siding No 0.0002 0.0050 26.0000 480.00 0.1000 E] 278 Matl278 Solid core flush (1.75") Yes 1.6500 13 94 Matl94 BUILT-UP ROOFING, No 0.3366 0.0313 0.0930 70.00 0.3500 E] 3/81N EnergyGauge SummW Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/21/2018 Page 23 of 24 Constructs Used No Name Simple Massless Conductance Heat Cap Density RValue Construct Construct [Btu/h.sfF] [Btu/sLF] [lb/cf] jh.sEF/Btuj. 1020 Metal siding/R I lBatt/0.5 "Gyp No No 0.10 0.76 16.80 10.5 E] Layer Material Material Thickness Framing No. [ft] Factor 1 4 Steel siding 0.0050 0.000 2 12 3 in. Insulation 0.2500 0.000 3 187 GYP OR PLAS BOARD, 1/21N 0.0417 0.000 El No Name Simple Massless Conductance Heat Cap Density RValue Construct Construct [Btu/h.sf.Fj [Btu/sEF] [Ib1cf] jh.sEF/Btuj 1027 Solid core flush (1.75") No Yes 0.61 1.7 Layer Material Material Thickness Framing No. fft] Factor 1 278 Solid core flush (1.75") 0.000 No Name Simple Massless Conductance Heat Cap Density RValue Construct Construct [Btu/h.sf.Fl [Btu/sEF] [lb/cfl jh.sff/Btuj 1056 MtI Bldg Roof/R-19 Batt No No 0.05 1.34 9.49 20.3 Layer Material Material Thickness Framing No. [ft] Factor 1 94 BUILT-UP ROOFING, 3/81N 0.0313 0.000 El 2 23 6 in. Insulation 0.5000 0.000 El No Name Simple Massless Conductance Heat Cap Density RValue Construct Construct [Btulh.sEF] lBtu/sf.Fl Ilb/cfl [h.sf.F/Btul 1057 1 ft. soil:i concrete floor, carpet and No No 0.27 34.00 113.33 3.7 El rubber pad Layer Material Material Thickness Framing No. [ft] Factor 1 265 Soil, 1 ft 1.0000 0.000 2 48 6 in. Heavyweight concrete 0.5000 0.000 3 178 CARPET W/RUBBER PAD 0.000 El EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effectiive Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/21/2018 Page 24 of 24