HomeMy WebLinkAboutFIRE DOCSAINT LUCIECOUNTY FIRE DISTRICT
PLAN REVIEW FORM
S160 N.W. Milner Drive
Port Saint Lucie, FL 34983
Telephone: 772-621-3322
Fax: 772-621-3604
Web Address: www.slcfd.com
Building Dept.
SI-C
I
FMO Permit #
i,
ProjectName
lNew Horizon Record/ Storage Building
BLDG Permit #
Address 14500 West Midway Road
Contractor 1paul jacquin & Son Inc
city I Fort Pierce
IB-19-1 10
2-0362
Address 7348 Commercial Circle city I Fort Pierce
State F Zip 134951 Telephone (772) 465-2475
Architect/Engineer Architectonics Inc Telephone 1(772)460-7751
OccupancyType I Storage Construction Type 1 118 Square Feet 10,725
OccupantLoad 108 per plans' Number of Stories 1 Access Box Access Key Switch
F F
AFS Permit FAVermit F FFP Permit
General Notes
1. An electronic copy of the construction documents submitted on a CD is required. The file format shall be.pdf only.
2- All revisions, I ncluding the electronic copy must be received prior to permitting.
3. The F I re Marsha I requires 24 hou r notice on al I inspections.
4. The respective Building Department shall schedule all final Inspections through the Fire Marshal's Office.
S. Failed Inspections require payment of fee prior to rescheduling of further inspections.
6. Penetrations through rated assemblies shall be of the proper LIL design. Design criteria shall be submitted with the construction plans.
7. Fire alarm panels shall be located Indoors within air conditioned space.
8. Plans and construction are subject to corrections In the field to maintain code compliance.
9. Automatic fan shutdown Is required for HVAC systemls that exceed 2,000 chn design capacity.
10. The Installation or Alteration of Fire Sprinklers, Fire Alarms, and Fixed Fire Protection Systems requi re a separate review and permit.
THE IF LO RIDA F1 RE P REVENTION CODE, 2015 EDITI ON I S CU RRENTLY EN FORC ED.
BUILDINGSWITH LIGHT-FRAMETRUSS-TYPE CONSTRUCTION SHALL BE MARKED WITH APPROVED FIREFIGHTER SAFETY
WARNING SIGNS IN ACCORDANCE WITH FLORIDA ADMINISTRATIVE CODES 69A-3.012 AND 69A-60.0081 PRIOR TO RECEIVING
A CERTIFICATE OF OCCUPANCY.
General Notes Above and
Page F7 of 11 Reviewed by ITony.Jerger Date FO4--03-2019