HomeMy WebLinkAboutSOIL NUCLEAR GAUGE""""""'OtArdamanSoll Nuclear Gauge
& Associates, Inc. Report Date: 7/12/2019
Test Method: ASTM D 6938
Pon SL Lucia stench
F1.6da CA No. 5950
,160NW0onmumeP1ace.Umtj
Pod St. Ude. FL 34986
Phone: 772�878-0072
Client: Project: ORMT197,01M
Jacquin and Sons 113-19-64-5447
7348 Commercial Circle New Horizons
Fort Pierce, FL 34951 St. Lucie County AUG 2 8 201.q
Fort Pierre, FIL Permitting Departnnp-
St. Lucip
Test Results
Optimum
Maximum
In Place
In Place
Probe
Test#
Retest
Test
Sell
Moisture
Dry Density
Moisture
I
Depth
Percent
Min Comp.
Of
Date
ProctorlD
Method
Classification
(Pcf)
N
(in)
ompact
C [on
I%)
Remark
1
4/29119
19-071
A
-
10.0
109.0
7.1
108.6
12
100
95
Pass
2
4129119
19-071
A
-
10.0
109.0
4.3
110.1
12
101
95
Pass
3
4/29119
19-071
A
-
10.0
109.0
5.2
108.0
.12
99
95
Pass
4
4/29/19
19-071
A
-
10.0
109.0
5.2
108.7
12
100
95
Pass
5
4129/19
19-071
A
-
10.0
109.0
6.0
108.0
12
99
95
Pass
6
4129/19
19-071
F A
I -
1 10.0
109.0
1 5.7
108.5
12
100
95
Pass
Test Information
Test #
Test Location
Elevation
Reference
Gauge
Make Model / SN I Calibrated
FlelclTechniclan
I
Building Pad Fill: 10,000 sq. ft. New Horizons, new building, West side of existing
1.0
Bottom of Fill
Troxier / T-3430 121330 1
Tech, Port St. Lucie
Administration Building. South portion at center
2
Building Pad Fill: 10,000 sq. ft. New Horizons, new building, west side of existing
1.0
Bottom of Fill
Troxier / T-3430 / 21330 /
Tech, Port St. Lucie
Administration Building. At center
3
Building Pad Fill: 10,000 sq. ft * New Horizons, new building, west side of existing
1.0
Bottom of Fill
Troxler/ T-3430 / 21330 /
Tech, Port St. Lucie
Administration Building. North portion at center
4
Building Pad Fill: 10,000 sq. ft. Now Horizons, new building, west side of existing
2.0
Bottom of Fill
Troxier I T-3430 / 21330 1
Tech, Port St. Lucia
[Administration Building. South portion at center
5
Building Pad Fill7-0,000 sq ft. New Horizons, new building, west side of existing
2.0
i
Bottom of Fill
Troxier / T-3430 121330 1
Tech, Port St Lucle
Administration Building. At center
i
6
Building Pad Fill: 10,000 sq. ft. New Horizons, new building. west side of existing
I
2.0
Bottom of Fill
Troxier / T-3430 / 21330
Tech, Port St. Lu�ie-
Administration Building. North portion at center
I
I . Remarks
Comments
Pass: Density Pass
Tests are "Didect Tnansmission" (Method A) unless probe depth is noted as
I'Backscafter'.
Gauge calibration data on file vath the testing agency.
SCANNED
BY
St. Lucie County
AS A MUTUAL PROTECTION TO OUR CLIENT, THE PUBLIC AND OURSELVES, ALL REPORTS ARE SUBMI'l
THE CLIENT, AND AUTHORIZATION FOR PUBLICATION OF STATEMENTS, CONCLUSIONS OR EXTRACTS
PENDING OUR WRITTEN APPROVAL.
D A� -THE CON FIDENTIAL PROPERTY OF Page 1 of 1
OM OURRFPORTS,IS RESERVED