Loading...
HomeMy WebLinkAboutIN-PLACE DENSITY TEST REPORTUNIVERSAL ENGINEERING SCIENCES Consultants In: Geotechnical Engineering - Environmental Sciences Geophysical Services - Materials Testing - Threshold Inspection Building Code Administration, Compliance Inspection &Plan Review $20 Brevard Avenue, Rockledge, Fli. 32955 -P:321.638.0808 -F:321.638.0978 Client - Project: Area Tested: Type of Test: Technician: Requirements: ga*7L UES Project No: 0310.190017&0000 UES DOCS No: LIES Report No: 117055-2 DT 102519 In -Place Density Test Report Ahrens Companies 1461 Kinetic Road Lake Park, FL 33403 MRO Hangar at Treasure Coast IA 3191 Jet Center Terrace, Ft. Pierce, County, FL Dumpster pad Field: ASTM D-6938 Nuclear Gauge Method Lab: ASTM D1557 Modified Proctor Russell Brause WE I SCANNED BY St. Lucie County Date of Test: 10/25/2019 95% of Proctor maximum dry density. These tests apply to the flit and/or surficial soil conditions onlV and do not address the condition of the undedyinq soils below the tested depths. FLeld Dry Field Test Depth Proctor nsity, I Moisture Comments No. Location of Test Range (inch) (2) (PCF) % Compaction (3) 2 Ctr of pad. Oto-Ift 12.00 24384 1 109.6 4.4 98 A (1) Ref. Datum: 0 = Top of Final Grade (2) Maximum Optimum Proctor Dry Moisture # Density Content 24384 111.6 10.0 This test was performed without deviation from ASTMprocedures. (3) Comments Key A. Compaction meets,min. requirements B. Compaction does not meet min. requirements C. Moisture does not meet requirements D. Recompaction required E. Recompacted, Retested, Meets Requirements This report shall not be reproduced, except In full, without the wtiffen approval of Universal Engineering Sclences.