HomeMy WebLinkAboutPROPOSALSa"uthedst General
Contractors Grnop,Inc.
RECEIVED
JAN 91 2019
ST. Luele Gaunt MffilE I
PROPOSAL
10380 SW Village Center Drive - 232
Port St Lucie, Florida 34987
Office: (877) 407-3535
Fax: (877) 756-0007
www.southeastcontracting.com
CGC060247
CCC1330002
PROPOSAL SUBMITTED TO: Buddy's Holiday Truck and Van
Date: January 14, 2019
Job Name: Roofing / 24 Gauge Mill Finish
Job Location: 6144 South Us Highway 1, Fort Pierce, Florida 34982
Contact: Dale Bowes
Email: dale@buddysholiday.net
Phone: (772) 465-0360
Job Description: Roofing / 24 Gauge Mill Finish Panels (1112 slope)
Main Building:
a Provide roofing permit
Provide trash removal to a legal off -site facility
• Remove existing roofing
• Install 24 Gauge Mill Finish Panels (8,440 s/f)
• Install 24 Gauge 3"x 3" Drip -edge (Color Brown)
• Install 24 Gauge Mill Finish Panels at Parapet Walls (1321/f)
o Install 24 Gauge Mill Finish Ridge Cap
Install 24 Gauge Mill Finish Gable Rake
• Install'Coping Cap 24 Gauge (Color Brown)
• Install Clear Polycarbonate Panel kits (Skylights #16)
o Install Pipe Boots
a Install box gutter (156 I/f)
• Flash gutters at parapet walls
Attached Building:
SCANNED
BY
St. Lucie County
Provide trash removal to a legal off -site facility
Remove existing roofing
Install 24 Gauge Mill Finish Panels — Roof and 6 feet down on back and one side (Roof - 861 s/f)
S61,400.00 0
Notes:
• Remove and re -set existing ridge vents
• Engineering if required the Building Department will be billed as actual
Not included:
• Metal trim below drip edge
• Priming and painting
• Ridge vents
• Soffits
• Insulation
General Terms and Conditions
1. Change Orders, contractor may accept a "change order" to the plans, specifications or equipment. In
addition, the total price increased or decreased to reflect the change, and the same shall be in writing and
signed by the Owner and Contractor. Any increase to the contract price shall be paid by the Owner upon
ordering the work called for in such "change order" or upon execution of the change order as required
by the contractor.
2. The Owner is responsible for removing personal items from the work area.
3. Customer authorizes the contractor and the material supply companies access to the property. Customer
accepts full responsibility for any unforeseen damage to the walks, driveway, septic tank and drain field,
landscaping etc. to the property except for the following:
4. Labor Warranty 3 year on workmanship. Material Warranty 20-year limited warranty.
Southeast General Contractors Group, Inc shall not be held responsible for damage caused by hurricanes,
tropical storms, tornadoes, earthquakes, fires, floods or other causes beyond the reasonable control of the
Contractor. Contractor cannot be held responsible for interior damages. Southeast General Contractors
Group, Inc will not warranty the work if payment is not received within 5 business days after completion.
5. Quoted price is a cash price which includes all rebates and discounts, an additional 3.5% convenience
fee will be added to payments made by credit card.
6. Entire Agreement - This Contract, from the time it shall take effect, shall supersede any and all prior
Agreements whether claimed to be oral or in writing. The parties have incorporated in this Contract
their entire understanding. No oral statement or prior written matter extrinsic to this Contract shall have
any force or effect.
We hereby propose to furnish labor and materials complete in accordance with the above specifications, for the
sum of: $61,400.00 (Sixty -One Thousand Four Hundred and 00/100 Dollars)'
Schedule of Values:
Deposit: Is due upon executing this contract. $12,000.00
Draw #1: Is due when the material is delivered. S37,400,00
Draw 42: Is due upon the final inspection. S12,000.00
All material is guaranteed to be as specified. All work to be completed in a workman like manner according to
standard practices. All agreements are contingent upon strikes, accidents or delays beyond our control. This
proposal is subject to acceptance within 10 days and is void thereafter at the option of Southeast General
Contractors Group, Inc.
AUTHORIZED
Signature:
SOUTREAST GENERAL CONTRACTORS GROUP, INC.
Date: July 14, 2018
ACCEPTANCE OF PROPOSAL
The above prices, specifications and conditions are hereby accepted. You are authorized to do the work
as specified. Payment will be made as outlined above.
Accepted:
Signature: ' ' a Date: S' 2D 11j