HomeMy WebLinkAboutTHRESHOLD INSPECTION REPORTProject No. 20-104 Report No. 10 M L Engineering Inc. Consulting Engineers Threshold Inspector 2030 3711 Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 569-4041 www.mlenginceringinc.com Project Manager: Mr. Gene Ross —Elliott Merrill Community Mgmnt. Building Official: St. Lucie County Bldg. Dept. Contractor: Mr. Robert Stark — Structure -Con Mr. Khris McConnell — Structure -Con File THRESHOLD INSPECTION REPORT OCEAN HARBOR NORTH CONDOMINIUMS — BLDG. D CONCRETE REPArcT S Mai' U 5 2020 5163 N. HWY. Al A, FT. PIERCE, FL 34949 SLC BUILDING PERMIT NUMBER: 2002-0526 i .rip county, Perr PROJECT NAME: CLIENT: CONTRACTOR: Ocean Harbor N. Condos — Bldg. D DATE: April 27, 2020 Concrete Repairs Elliott Merrill Community Management Structure -Con LOCATION: Ft. Pierce, FL PROJECT MGR: Mr. Khris McConnell INSPECTED BY: Todd Rhoten WEATHER: Sunny & breezy WORK INSPECTED: SCANNED Units 316/416, 320/420, 520/620, 616/716 & 620/720 —Post pour Unit 416/516 — North edge BY OBSERVATIONS: St. Lucie County Units 316/416, 320/420, 520/620, 616/716 & 620/720: • The concrete was placed last week at the units listed above and the form boards are in the progress of being removed. The concrete manufacturer states that the compressive strength of the concrete mix used exceeds 4,000 psi as required to re=tension'the post tension cables. Cables are scheduled to'be tensioned Thursday April 30, 2020. Stucco fmish has been applied to the underside of the slab & slab edges. Unit416/516 • The existing bursting bars were found to be heavily corroded and not in serviceable condition. • The corroded section of the bars has been removed and new bars have been epoxy doweled into the existing slab. • New post tension cable anchor plates are in place and are secured to the bursting bars using wire ties. • Form boards & shoring are in progress for concrete pour. • The total area of repair is (5) linear feet of edge and (2) PT cables required splicing. All work to date complies with the design and permit documents. The concrete pour for Unit 416/516 is approved and scheduled for Monday April 27, 2020. \\\\\\\IIIIfIO HONy�%.° �' •' sF'••Gc�°' i w•- n. _Q Michael Lue, it"" Todd Rhoten Page 1 of 2 x^, Project No. 20-104 Report No. 10 M L Engineering Inc. Consulting Engineers Threshold Inspector 2030 37a Avenue Vero Beach, Florida 32960 Phone: (772)569-1257 Fax: (772)569-4041 www.mlengineeringinc.com Project Manager: Mr. Gene Ross — Elliott Merrill Community Mgmnt. Building Official: St. Lucie County Bldg. Dept. Contractor: Mr. Robert Stark — Structure -Con Mr. Khris McConnell — Structure -Con File Pic 1 Units 316-716 North elevation Pic 2 Unit 316/416 New bursting bars epoxied & lapped with existing. Unit 316/416 All reinforcing bars cleaned & coated. Page 2 of 2