M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 3711 Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlenginceringinc.com
Project Manager: Mr. Gene Ross —Elliott Merrill Community Mgmnt.
Building Official: St. Lucie County Bldg. Dept.
Contractor: Mr. Robert Stark — Structure -Con
Mr. Khris McConnell — Structure -Con
File
THRESHOLD INSPECTION REPORT
OCEAN HARBOR NORTH CONDOMINIUMS — BLDG. D CONCRETE REPArcT
S Mai' U 5 2020
5163 N. HWY. Al A, FT. PIERCE, FL 34949
SLC BUILDING PERMIT NUMBER: 2002-0526 i .rip county, Perr
PROJECT NAME:
CLIENT:
CONTRACTOR:
Ocean Harbor N. Condos — Bldg. D DATE: April 27, 2020
Concrete Repairs
Elliott Merrill Community Management
Structure -Con
LOCATION: Ft. Pierce, FL
PROJECT MGR: Mr. Khris McConnell
INSPECTED BY: Todd Rhoten WEATHER: Sunny & breezy
WORK INSPECTED: SCANNED
Units 316/416, 320/420, 520/620, 616/716 & 620/720 —Post pour
Unit 416/516 — North edge BY
OBSERVATIONS: St. Lucie County
Units 316/416, 320/420, 520/620, 616/716 & 620/720:
• The concrete was placed last week at the units listed above and the form boards are in the progress of being
removed.
The concrete manufacturer states that the compressive strength of the concrete mix used exceeds 4,000 psi as
required to re=tension'the post tension cables.
Cables are scheduled to'be tensioned Thursday April 30, 2020.
Stucco fmish has been applied to the underside of the slab & slab edges.
Unit416/516
• The existing bursting bars were found to be heavily corroded and not in serviceable condition.
• The corroded section of the bars has been removed and new bars have been epoxy doweled into the existing
slab.
• New post tension cable anchor plates are in place and are secured to the bursting bars using wire ties.
• Form boards & shoring are in progress for concrete pour.
• The total area of repair is (5) linear feet of edge and (2) PT cables required splicing.
All work to date complies with the design and permit documents. The concrete pour for Unit 416/516 is approved and
scheduled for Monday April 27, 2020.
\\\\\\\IIIIfIO
HONy�%.°
�' •' sF'••Gc�°'
i w•- n. _Q
Michael Lue, it""
Todd Rhoten
Page 1 of 2
x^,
Project No. 20-104 Report No. 10
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37a Avenue
Vero Beach, Florida 32960
Phone: (772)569-1257
Fax: (772)569-4041
www.mlengineeringinc.com
Project Manager: Mr. Gene Ross — Elliott Merrill Community Mgmnt.
Building Official: St. Lucie County Bldg. Dept.
Contractor: Mr. Robert Stark — Structure -Con
Mr. Khris McConnell — Structure -Con
File
Pic 1
Units 316-716
North elevation
Pic 2
Unit 316/416
New bursting bars epoxied & lapped with existing.
Unit 316/416
All reinforcing bars cleaned & coated.
Page 2 of 2