HomeMy WebLinkAboutMISC LETTERSOceanrise Condominium Association
10310 S. Ocean Dr. #105
Jensen Beach, FL 34957
St. Lucie County Building Department
2.1 SW Port St Lucie Blvd
Port St. Lucie, FL 34984
May 25, 2019 S, SC9iv
70YNFO
RE: Or-eanrise Condominium Association Inc. CO,61
Dear Sir or Madame:
Please allow this letter to serve as notice that Mathers Engineering is to perform the
threshold 'inspections for the concrete restoration project to be completed at Oceanrise
Condominium Association.
The Board of Directors understand that the Association is responsible for payment of the
Threshold Engineer for his services during this project.
Should you have any questions regarding this matter please contact me at 772-538-9639 or
�3tlYFr7.rA,C Div@inpi i���S2'f_$_l'f1P.n Lial.CQITi.
Sincer oly,
v
Katherine Cimpi LOAM
On Behalf of the Board of Directors
Oceanrise Condominiums Association Inc.
MATHERS ENGINEERING
CORPORATION
PRE -BUILDING PERMIT ADDENDUM
Date: January 30, 2019
To: St. Lucie County Building Department
2300 Virginia Avenue
Fort Pierce, FL 34982
2431 SE Dixie Highway
Stuart, FL 34996
Phone: (772) 287-0525
EB#004456
Referenced Project: Concrete Restoration for Common Walkways and Exterior Balconies
(decks, beams & columns)
For Units Numbers for Stack 8 (108, 208, 308, 408, 508, 608 and 708)
Unit Numbers for Stack 9 (109, 209, 309, 409, 509, 609 and 709)
for Oceanrise Condominium
Located at 10310 S. Ocean Drive, Jensen Beach, FL 34957
Contractor: DNff Construction
312 S. Old Dixie Hwy.
Jupiter, FL 33458
Enclosed is a copy of the structural threshold license for William J. Mathers, P.E. as the threshold
inspector for the project referenced above in accordance with Florida Statutes 553.79.
Approved, J. �MqT
NSF yF,p�ii
-19658 N =_
�E OF
i ! COR10?•'
William J.
Florida License 1'1Jllllllt���
Special Inspector FL License #SI-155
RECEIVED
FEB 2 7 2019
ST. Lucie County, FRUPItting
I Rb'�4-'5W
o (L/I G
CONSTI I,ACTION iq5'
October 12, 2019
St. Lude County Building Department
2300 Virginia Avenue
Fort Pierce, FL 34982
Re: OCEANRISE CONDOMINIUM, JENSEN BEACH, FL>PROJECT SUMMARY TOTAL
PERMIT #S1.09-62r05477
St. Lude County Buidling Department:
RFCEry fD
ocr2 4 p019
Pe
"'tt/n
St. dude 9 De
men[
ty
Please find attached "Project Summary Total" for the work accomplished and approved by the Engineer (Mathers
Engineering Corporation) at the above -referenced project site.
1 attest to the best of my knowledge, information and belief that the "Project Summary Total" is the total amount paid
($103,323.95) for work accomplished and approved by the Engineer (Mathers Engineering Corporation) in accordance
with the Contract Documents and all existing local, state and federal laws, ordinances and codes.
Respectfully submitted by,
*WM Date: r— —
Luciano Diaz, President
DMF Construction, Inc
,
Ol1RY PLB.i
State of Florida County of Palm Beac DIANA VELA = * . Notary Public -Staleto of of FloridaF
Subscribed and sworn to before In day of October, 2019 Commission # FF 929253
�„o"My Comm. Expires Nov 13, 2019
Notary Public
My Commission Expires: t S to
CC: Oceandse Condominium
Mathers Engineering Corporation
First Service Residential
312 5 Old Dixie Hwy Ste.109. Jupiter FL 334SS // 561-768-8988 // info@dmf-eonstruction.com
www.dmf-construction.com
PROJECT SUMMARY TOTAL
October 12, 2019
PROJECT SUMMARY TOTAL SUBMITTED TO:
OCEANRISE CONDOMINIUM ASSOCIATION
10310 S. Ocean Drive
Jensen Beach, FL 34957
Ph: 772-229-3375
Re: CONCRETE RESTORATION PROJECT 08 & 09 STACKS
Oceanrise Condominium:
Please accept this as the "Project Summary Total" for work completed and approved by the Engineer (Mathers Engineering
Corporation) for the "Concrete Restoration Project on the 08 & 09 Stacks" at your condominium.
SUMMARY TOTAL:
PERMIT
1.00
EA
@
S
2,500.00/EA =
$
2,500.00
MOBILIZATION
1.00
EA
@
S
5,000.00/EA =
S
5,000.00
DUMPSTER
1.00
EA
@
S
1,300.00/EA =
S
1,300.00
EDGE REPAIRS
128.37
LF
@
S
110.00/LF =
S
14,120.70
HALF DECK REPAIRS
412.94
SF
@
$
75.00/SF =
$
30,970.50
FULL DEPTH REPAIRS
111.67
SF
@
$
80.00/SF =
S
8,933.60
COLUMN REPAIRS
18.37
CF
@
$
260.00/CF =
$
4,776.20
OVERHEAD/CEILING REPAIRS
4.53
SF
@
$
85.00/SF =
$
385.05
STUCCO REPAIRS
840.24
SF
@
S
10.00/SF =
S
8,402.40
SHUTTER REMOVALS
163.84
LF
@
$
18.00/LF =
$
2,940.84
SHUTTER REINSTALLATIONS
58.35
LF
@
S
18.00/LF =
S
1,050.30
HANDRAIL REMOVALS
140.04
LF
@
S
10.00/1-F =
S
1,400.40
HANDRAIL REINSTALLATIONS
140.04
LF
@
$
10.00/LF =
$
1,400.40
TEMP WALL INSTALLS
105.83
LF
@
E
20.00/LF =
$
2,100.00
TEMP WALL REMOVALS
105.83
LF
@
S
20.00/1-F =
$
2,100.00
REBAR DOWELS
128.00
EA
@
$
50.00/EA =
S
6,400.00
NEW #4 MMFX REBAR
912.93
LF
@
$
1.25/LF =
$
1,141.16
HANDRAIL PAINTING
140.04
LF
@
$
18.00/1-F =
S
2,520.72
WATERPROOFING
980.28
SF
@
$
4.SO/SF =
S
4,411.26
PAINTING
980.28
SF
@
S
1.50/SF =
$
1,470.42
PROJECT SUMMARY TOTAL =
S
103,323.95
Respectfully submitted b
�3.� E `aexa
Luc�Diaz�President
DMF Construction, Inc
General Contractor License #CGC 1524718
CC: Mathers Engineering Corporation
First Service Residential
St. Lude County Building Department
312 S Old Dixie Hwy Ste.109. Jupiter FL 33458 // 561-768-8988 // info@dmf-construction.com
www.dmf-construction.com
D
GONSTRlJGT14N inc.
October 12, 2019
St. Lude County Building Department
2300 Virginia Avenue
Fort Pierce, FL 34982
Re: OCEANRISE CONDOMINIUM, JENSEN BEACH, FL>FINAL CONTRACT SUMMARY VALUE DIFFERENCE
PERMIT #SLC 1902-0547
St. Lucie County Buidling Department:
Please accept this as the "Final Contract Summary Value Difference" for the above -referenced project/permit.
CONTRACT SUMVIRY:
COMPLETED CONTRACT PROJECT AMOUNT
ORIGINAL CONTRACT AMOUNT
Respectfully submitted by,
= $ 103,393.95
= $ 82,168.00
DIFFERENCE = S 21.225.95
���i)r.FS rcf a 'v:fl ts'�r`A'".atelO�1'�.M1"'*> r
•. •Dia7_ President
DMF Construction, Inc.
State of Florida County of Palm B c
Subscribed and sworn to before thi 12th day of October, 2019
Notary Public
My Commission Expires: v U>
CC: Oceanrise Condominium
Mathers Engineering Corporation
First Service Residential
DIANA VELASUUEZ
Notary Public - State of Florida
Commission # FF 929253
'••'„eov noP:
My Comm. Expires Nov 13, 2019
(Seal)
312 S Old Dixie Hwy Ste. 109. Jupiter FL 33458 H 561-768-8988 H infoOdmf-construction.com
www.dmf-construction.com
RFc&vzo
oc z 4 1019
Perrnittin9 D
St. Gucie �ouent
October 12, 2019
St. Lude County Building Department
2300 Virginia Avenue
Fort Pierce, FL 34982
1:M
St. Lucie County Buidling Department:
Please find attached "Project Summary Total" for the work accomplished and approved by the Engineer (Mathers
Engineering Corporation) at the above -referenced project site.
1 attest to the best of my knowledge, information and belief that the "Project Summary Total" is the total amount paid
($103,323.95) for work accomplished and approved by the Engineer (blathers Engineering Corporation) in accordance
with the Contract Documents and all existing local, state and federal laws, ordinances and codes.
Respectfully submitted by,
W—y9mm" ��-`r `fir t5'
-w-
Date• w M
Luciano Diaz, President
DMF Construction, Inc
State of Florida County of Palm each EZ
oo.� • °°R'b DIALEXpires
of
Subscribed and sworn to befo this 12th day of October, 2019 `� Notary Puof Florida
�ffla Commi29253
',�t'orw°p`', My Commv 13, 2019
Notary Public
My Commission Expires: 13
CC: Oceanrise Condominium
Mathers Engineering Corporation
First Service Residential
312 S Old Dixie Hwy Ste. 109. Jupiter FL 33458 // 561-768-8999 // infoOdmf-construction.com
www.dmf-construcCon.com
C ,5TT®RMCITNOIN,
PROJECT SUMMARY TOTAL
October 12, 2019
PROJECT SUMMARY TOTAL SUBMITTED TO:
OCEANRISE CONDOMINIUM ASSOCIATION
10310 S. Ocean Drive
Jensen Beach, FL 34957
Ph: 772-229-3375
Re: CONCRETE RESTORATION PROJECT 08 & 09 STACKS
Oceanrise Condominium:
Please accept this as the "Project Summary Total" for work completed and approved by the Engineer (blathers Engineering
Corporation) for the "Concrete Restoration Project on the 08 & 09 Stacks" at your condominium.
SUMMARY 70TAL:
PERMIT
1.00
EA @
S
2,500.00/EA =
S
2,500.00
MOBILIZATION
1.00
EA
@
$
5,000.00/EA =
S
5,000.00
DUMPSTER
1.00
EA
@
S
1,300.00/EA =
S
1,300.00
EDGE REPAIRS
128.37
LF
@
$
110.00/LF =
$
14,120.70
HALF DECK REPAIRS
412.94
SF
@
$
75.00/SF =
$
30,970.50
FULL DEPTH REPAIRS
111.67
SF
@
S
80.00/SF =
S
8,933.60
COLUMN REPAIRS
18.37
CF
@
S
260.00/CF =
$
4,776.20
OVERHEAD/CEILING REPAIRS
4.53
SF
@
S
85.00/SF =
S
385.05
STUCCO REPAIRS
840.24
SF
@
S
10.00/SF =
S
8,402.40
SHUTTER REMOVALS
163.84
LF
@
S
18.00/LF =
S
2,940.84
SHUTTER REINSTALLATIONS
58.35
LF
@
S
18.00/LF =
S
1,050.30
HANDRAIL REMOVALS
140.04
LF
@
S
10.00/1-F =
S
1,400.40
HANDRAIL REINSTALLATIONS
140.04
LF
@
$
10.00/LF =
S
1,400.40
TEMP WALL INSTALLS
105.83
LF
@
$
20.00/LF =
$
2,100.00
TEMP WALL REMOVALS
105.83
LF
@
$
20.00/1-F =
$
2,100.00
REBAR DOWELS
128.00
EA
@
$
50.00/EA =
S
6,400.00
NEW #4 MMFX REBAR
912.93
LF
@
S
1.25/LF =
S
1,141.16
HANDRAIL PAINTING
140.04
LF
@
S
18.00/1-F =
S
2,520.72
WATERPROOFING
980.28
SF
@
S
4.SO/SF =
S
4,411.26
PAINTING
980.28
SF
@
S
1.50/SF =
S
1,470.42
PROJECT SUMMARY TOTAL =
10�3 323.95
Respectfully submitted by,
Luciano Diaz, President
DMF Construction, Inc
General Contractor License NCGC 1524718
CC: Mathers Engineering Corporation
First Service Residential
St. Lucia County Building Department
312 S Old Dixie Hwy Ste.109. Jupiter FL 33458 // 561-768-8988 // info@dmf-construction.com
www.dmf-construction.com
m
� CGTION ir1c.
October 12, 2019
St. Lucie County Building Department
2300 Virginia Avenue
Fort Pierce, FL 34982
Re: OCEANRISE CONDOMINIUM, JENSEN BEACH, FL>FINAL CONTRACT SUMMARY VALUE DIFFERENCE
PERMIT #SLC 1902-0547
St. Lucie County Buidling Department:
Please accept this as the "Final Contract Summary Value Difference" for the above -referenced projecVpermit.
CONTRACT SUAMRY.
COMPLETED CONTRACT PROJECT AMOUNT = E 103,393.95
ORIGINAL CONTRACT AMOUNT = $ 82,168.00
DIFFERENCE = f 21.225.95
Respectfully submitted by,
m
�- Date:
Luciano Diaz, President
DMF Construction, Inc.
State of Florida County of Pal Beach
Subscribed and sworn to bef, this 12th day of October, 2019
;`o ° e %,
�' . c
EZ
V- state f
PubliIANAc
- State of 253
Notary Commission
Commission # FF 929253
My Comm. Expires Nov 13. 2019
Notary Public
My Commission Expires: e l
CC: Oceanrise Condominium
Mathers Engineering Corporation
First Service Residential
312 S Old Dixie Hwy Ste. 109. Jupiter FL 33458 // 561-768-8988 // infoOdmf-construction.com
www.dmf-construction.com
Receva)
L?PISTF2i1CTIQN inc.
October 12, 2019
St. Lude County Building Department
2300 Virginia Avenue
Fort Pierce, FL 34982
Oi:r24 1019
Permitting Department
Lucie County
Re: OCEANRISE CONDOMINIUK JENSEN BEACH FL>PROJECT SUMMARY TOTAL
PERMIT #Sl:G(-cWk1547
St. Lude County Buidling Department:
Please find attached "Project Summary Total" for the work accomplished and approved by the Engineer (blathers
Engineering Corporation) at the above -referenced project site.
1 attest to the best of my knowledge, information and belief that the "Project Summary Total" Is the total amount paid
($103,323.95) for work accomplished and approved by the Engineer (Mathers Engineering Corporation) in accordance
with the Contract Documents and all existing local, state and federal laws, ordinances and codes.
Respectfully submitted by,
Luciano Diaz, President
DMF Construction, Inc -
State of Florida County of Palm Beac 1
Subscribed and sworn to before me isy�th day of October, 2019
Notary Public: \I
My Commission Expires:
CC: Oceandse Condominium
Mathers Engineering Corporation
First Service Residential
cio"JY POa'�
DIANA VELASDUEZ
®0.3
Notary Public - State of Florida
Commission # FF 929253
"�o«��;:•••
My Comm. Expires Nov 13, 2019
(Seal)
312 S Old Dixie Hwy Ste. 109. Jupiter FL 334SB // 561-768-8988 // info@dmf-construction.com
www.dmf-construction.com
CQI�ST'(�UCTION inc.
PROJECT SUMMARY TOTAL
October 12, 2019
PROJECT SUMMARY TOTAL SUBMITTED TO:
OCEANRISE CONDOMINIUM ASSOCIATION
10310 S. Ocean Drive
Jensen Beach, FL 34957
Ph: 772-229-3375
Re: CONCRETE RESTORATION PROJECT 08 & 09 STACKS
Oceanrise Condominium:
Please accept this as the "Project Summary Total" for work completed and approved by the Engineer (blathers Engineering
Corporation) for the "Concrete Restoration Project on the 08 & 09 Stacks" at your condominium.
SUMMARY TOTAL:
PERMIT
1.00
EA
@
$
2,500.00/EA =
$
2,500.00
MOBILIZATION
1.00
EA
@
S
5,000.00/EA =
$
5,000.00
DUMPSTER
1.00
EA
@
S
1,300.00/EA =
S
1,300.00
EDGE REPAIRS
128.37
LF
@
S
110.00/1-17 =
S
14,120.70
HALF DECK REPAIRS
412.94
SF
@
$
75.00/SF =
S
30,970.50
FULL DEPTH REPAIRS
111.67
SF
@
$
80.00/SF =
$
8,933.60
COLUMN REPAIRS
18.37
CF
@
S
260.00/CF =
$
4,776.20
OVERHEAD/CEILING REPAIRS
4.53
SF
@
$
85.00/SF =
$
385.05
STUCCO REPAIRS
840.24
SF
@
$
10.00/SF =
$
8,402.40
SHUTTER REMOVALS
163.84
LF
@
$
18.00/LF =
$
2,940.84
SHUTTER REINSTALLATIONS
58.35
LF
@
S
18.00/1-F =
S
1,050.30
HANDRAIL REMOVALS
140.04
LF
@
S
10.00/1-F =
S
1,400.40
HANDRAIL REINSTALLATIONS
140.04
LF
@
$
10.00/LF =
$
1,400.40
TEMP WALL INSTALLS
105.83
LF
@
$
20.00/LF =
$
2,100.00
TEMP WALL REMOVALS
105.83
LF
@
S
20.00/1-F =
S
2,100.00
REBAR DOWELS
128.00
EA
@
$
50.00/EA =
$
6,400.00
NEW #4 MMFX REBAR
912.93
LF
@
S
1.25/1-F =
S
1,141.16
HANDRAIL PAINTING
140.04
LF
@
S
18.00/1-17 =
S
2,520.72
WATERPROOFING
980.28
SF
@
$
4.50/SF =
$
4,411.26
PAINTING
980.28
SF
@
$
1.50/SF =
$
1,470.42
PROJECT SUMMARY TOTAL =
$
103.323.95
Respectfully submitted by,
! , y
Now!
Luciano Diaz, Aresident
DMF Construction, Inc
General Contractor License #CGC
1524718
CC: Mathers Engineering Corporation
First Service Residential
St. Lude County Building Department
312 S Old Dixie Hwy Ste. 109. Jupiter FL 33458 // 561-768-8988 // info@dmf-construction.com
www.dmf-construction.com
Ecoalilple,
October 12, 2019
St. Lude County Building Department
2300 Virginia Avenue
Fort Pierce, FL 34982
Re: OCEANRISE CONDOMINIUM, JENSEN BEACH, FL>FINAL CONTRACT SUMMARY VALUE DIFFERENCE
PERMIT #SLC 1902-0547
St. Lude County Buidling Department:
Please accept this as the "Final Contract Summary Value Difference" for the above -referenced project/permit.
CONTRACT SUMMARY:
COMPLETED CONTRACT PROJECT AMOUNT
ORIGINAL CONTRACT AMOUNT
Respectfully submitted by,
= S 103,393.95
= S 82,168.00
DIFFERENCE = S 21.225.95
Tudano Diaz. President Date:nw,
DMF Construction, Inc.
State of Florida County of Palm B
Subscribed and swom to beffire s h day of October, 2019
Notary Public
My Commission Expires: iJ
CC: Oceanrise Condominium
Mathers Engineering Corporation
First Service Residential
DIANA VELASOUEZ
Notary Public - State of Florida
Commission # FF 929253
o,
My Comm. Expires Nov 13, 2019
(Seal)
312 S Old Dixie Hwy Ste.109. Jupiter FL 33458 n 561-768-8988 n info@dmf-construction.com
www.dmf-construction.com
-w
MATHERS ENGINEERING_
CORPORATION
Memo
To:. Mr. Andrew Manero, Plan Reviewer From:
Co: St Lucie Co. Building Dept. Pages:
2300 Virginia Avenue
Fort Pierce, FL 34982
Fax:
2431 SE Dixie Hwy
Stuart, FL 34996
Phone: (772) 287-0525
Email: mathersengineers@bellsouth.net
Holly Mathers
SEE ATTACHED
Date: 04/02/2019
Re: Oceanrise Condominium Phone:
10310 S. Ocean Drive, Jensen Beach
Concrete Restoration
Permit #SLC 1902-0547
❑ Please Reply X Mailed ❑ Nand Delivered ❑ Faxed Only ❑ Faxed and Mailed
Enclosed is 1 signed and sealed correspondence from Mathers Engineering enclosing
the updated threshold license for the concrete restoration permit #SLC 1902-0547 for
Oceanrise Condonimium.
Thank you,
Holly
This message is intended only for use of the individual or entity to which it is addressed, and may contain
information that is privileged, confidential, and exempt from disclosure under applicable law. If the reader of the
message is not the intended recipient, or the employee or agent responsible for delivering the message, you are
hereby notified that any dissemination, distribution or copying of the communication is strictly prohibited. If you
have received this communication in error, please notify us immediately by telephone and return the original
message to us at the address above via the U.S. Postal Service.
MATHERS ENGINEERING
CORPORATION
PRE -BUILDING PERMIT ADDENDUM
Date: April 02, 2019
To: St. Lucie County Building Department
2300 Virginia Avenue
Fort Pierce, FL 34982
2431 SE Dixie Highway
Stuart, FL 34996
Phone: (772) 287-0525
EB#004456
Referenced Project: Concrete Restoration for Common Walkways and Exterior Balconies
(decks, beams & columns)
For Units Numbers for Stack 8 (108, 208, 308, 408, 508, 608 and 708)
Unit Numbers for Stack 9 (109, 209, 309, 409, 509, 609 and 709)
for Oceanrise Condominium
Located at 10310 S. Ocean Drive, Jensen Beach, FL 34957
Contractor: DMF Construction
312 S. Old Dixie Hwy.
Jupiter, FL 33458
Permit #SLC 1902-0547
Enclosed is a copy of the current threshold license for William J. Mathers, P.E. as the threshold
inspector for the project referenced above in accordance with Florida Statutes 553.79.
\\\\III I I I I//////
Approved, \\P/,
MC3. EM ET- '<',
_ \ tp'
19858
p ;
I tITTE OF ;
1p(�RLLCOD,. "
William J. Mathers, PE
Florida License #19658
Special Inspector FL License #SI-155
a
MATHERS ENGINEERING
CORPORATION
Memo
To: Plan Reviewer
Co: St Lucie Co. Building Dept.
2300 Virginia Avenue
Fort Pierce, FL 34982
Fax:
2431 SE Dixie Hwy
Stuart, FL 34996
Phone: (772) 287-0525
Email: mathersengineers@bellsouth.net
From: Holly Mathers
Pages: SEE ATTACHED
Date: 08/19/2019
Re: Oceandse Condominium Phone:
10310 S. Ocean Drive, Jensen Beach
Concrete Restoration
Permit #SLC 1902-0547
R�EiVED
AVM 2 0 2#19
Permittin9 D
St Lucie Coup ment
county
❑ Please Reply X Mailed ❑ Nand Delivered ❑ Faxed Only ❑ Faxed and Mailed
Enclosed is 1 signed and sealed engineer's field observation report #1 for the concrete
restoration permit #SLC 1902-0547 for Oceanrise Condonmium.
Thank you, '
Holly C'
� a
� a-
M
This message is intended only for use of the individual or entity to which it is addressed, and may contain
information that is privileged, confidential, and exempt from disclosure under applicable law. If the reader of the
message is not the intended recipient, or the employee or agent responsible for delivering the message, you are
hereby notified that any dissemination, distribution or copying of the communication is strictly prohibited. If you.
have received this communication in error, please notify us immediately by telephone and return the original
message to us at the address above via the U.S. Postal Service.
4A w1v
MATHERS ENGINEERING
CORPORATION
2431 SE Dixie Highway
Stuart, FL 34996 .
Phone: (772) 287-0525
EB#0004456
Post -Building Permit Addendum Engineer's Field Observations Report #1
Date: August 19, 2019
To: Plan Reviewer
St. Lucie County Building Department
2300 Virginia Avenue
Fort Pierce, FL 34982
Referenced Project: Concrete Restoration for Common Walkways and Exterior Balconies
(decks, beams & columns)
For Units Numbers for Stack 8 (108, 208, 308, 408, 508, 608 and 708) and
Unit Numbers for Stack 9 (109, 209, 309, 409, 509, 609 and 709)
for Oceanrise Condominium
Located at 10310 S. Ocean Drive, Jensen Beach, FL 34957
Contractor: DMF Construction
312 S. Old Dixie Hwy.
Jupiter, FL 33458
Permit #SLC 1902-0547
Mathers Engineering Corporation visited the job site and made the following observations of the on going
concrete restoration and repairs of exterior balconies:
Stack #8 Balconies:
• Unit 108: Concrete restoration has been completed guardrails have been re -installed. Shutters
have not yet been re -installed.
• Unit 208: Concrete restoration has been completed guardrails have been re -installed.
have not yet been re -installed.
• Unit 308: Concrete restoration has been completed guardrails have been re -installed.
have not yet been re -installed.
• Unit 408: Concrete restoration has been completed guardrails have been re -installed.
have not yet been re -installed.
Shutters
Shutters
Shutters
• Unit 508: Concrete restoration has been completed guardrails have been re -installed. Shutters
have not yet been re -installed.
• Unit 608: Concrete restoration has been completed guardrails have been re -installed. Shutters
have not yet been re -installed.
• Unit 708: Concrete restoration has been completed guardrails have been re -installed. Shutters
have not yet been re -installed.
Stack #9 Balconies:
• Unit 109: Concrete restoration has been completed guardrails have been re -installed. Shutters
have not yet been re -installed.
• Unit 209: Concrete restoration has been completed guardrails have been re -installed. Shutters
have not yet been re -installed.
w„
MATHERS ENGINEERING
CORPORATION
2431 SE Dixie Highway
Stuart, FL 34996
Phone: (772) 287-0525
EB#0004456
• Unit 309: Concrete restoration has been completed guardrails have been re -installed. Shutters
have not yet been re -installed.
• Unit 409: Concrete restoration has been completed guardrails have been re -installed.
Shutters
have not yet been re -installed.
• Unit 509: Concrete restoration has been completed guardrails have been re -installed.
Shutters
have not yet been re -installed.
• Unit 609: Concrete restoration has been completed guardrails have been re -installed.
Shutters
have not yet been re -installed.
• Unit 709: Concrete restoration has been completed guardrails have been re -installed.
Shutters
have not yet been re -installed.
Limitations:
Our professional services have been performed, our findings obtained and our opinions prepared in
accordance with general accepted engineering principles and practices. This company is not responsible
for the conclusions, opinions or recommendations made by others based on our findings.
Approved by,
William J. Math
Florida License
Special Inspectc
MATHERS ENGINEERING
CORPORATION
2431 SE Dixie Highway
R ciF viFO PhonStuart, FL 34996
e: (772) 287-0525
orr24101g EB#0004456
Pe'mItt. 0
FINAL CLOSE-OUT ON RESTORATION WOR'kit, Co �ty ent
Date: October 09, 2019
To St. Lucie County Building Department
2300 Virginia Avenue
Fort Pierce, FL 34982
Referenced Project: Concrete Restoration for Common Walkways and Exterior Balconies
(decks, beams & columns)
For Units Numbers for Stack 8 (108, 208, 308, 408, 508; 608 and 708) and
Unit Numbers for Stack 9 (109, 209, 309, 409, 509, 609 and 709)
for Oceanrise Condominium
Located at 10310 S. Ocean Drive, Jensen Beach, FL 34957
Contractor: DMF Construction
312 S. Old Dixie Hwy.
Jupiter, FL 33458
Permit #SLC 190 A7
The completed concrete restoration did not reduce the structural integrity of the remaining existing
structural systems and, therefore, a requirement to upgrade them by this permit was not warranted.
Existing building's components and elements outside the renovation area of this permit do not have their
current wind load resistant capacity or gravity load capacity compromised by the completed concrete
restoration.
Mathers Engineering Corporation performed onsite inspections as the job progressed. Repairs did not
require shoring.
As the demolition exposed areas of exterior concrete deterioration and steel corrosion of the exterior
balcony deck, we initiated and inspected restoration work such as concrete applications. The enclosed
Record Drawing (Sheets #1 and 2) shows the areas of repair for Stacks 8 and 9, and is made part of this
final close-out document approval under Permit Number SLC 1902-0547.
Materials used and work performed to date has been substantially completed in conformance with the
specifications outlined in the IRCI Guideline No. 03730, as well as the applicable 2017 Florida Building
Codes 6 h Edition (and upd QQ¢1Il ptjgf ndustry guidelines, or standard engineering practices.
IN
Approved by, \ \vv,•�ENSF • P
N�
STATE QF ;
WilliamJ.mamers,rn '�I/lllllllt�`'
Florida License #19658
Special Inspector FL License #SI-155
i
i�
III
MATHERS ENGINEERING
CORPORATION
PRE -BUILDING PERMIT ADDENDUM
Date: January 30, 2019 RECEIVED
To: St. Lucie County Building Departinc nt FEB 2 7 2019
2300 Virginia Avenue
Fort Pierce, FL 34982 ST. Luck county, Permitting
2431 SE Dixie Highway
Stuart, FL 34996
Phone: (772) 287-0525
EB#004456
Referenced Project: Concrete Restoration for Common Walkways and Exterior Balconies
(decks, beams & columns)
For Unit Numbers for Stack 8 (108, 208, 308, 408, 508, 608 and 708)
Unit Numbers for Stack 9 (109, 209, 309, 409, 509, 609 and 709)
for Oceanrise Condominium
Located at 10310 S. Ocean Drive, Jensen Beach, FL 34957
Contractor: DMF Construction
312 S. Old Dixie Hwy.
Jupiter, FL 33458
Background:
The removal and restoration of deteriorated concrete and steel within beams, columns, decks and
adjacent walls will comply with the IRCI Guideline No. 03730 (a copy of which is attached hereto)
or as modified by Engineer as work progresses.
The anticipated work involves the initial demolition, and then the removal, replacement and
restoration of concrete and reinforcement as required. The degree of restoration is currently
unknown, until such time as the initial demolition has begun.
The anticipated sequence of repairs is as follows:
• Shoring required for repairs of all columns, beams and decks (if required by engineer)
• Removal and restoration of concrete and reinforcement steel within beams, columns and
decks. (ICRI Guideline No. 03730)
• Minor chipping and patching of areas not requiring full depth repairs.
• Applied deck coating.
The following materials are approved for anticipated use in this restoration (see attached
manufacturers specifications): I
• Sikacrete 211 Concrete Mix.
• SikaQuilck 1000.
• Sika Armatec 110 EpoCem bonding agent and rebar coating.
• Sika FerroGard 903.
• Sikagard 701 W. THESE %2-60 AND ALL PROPOSED 1;dORf{
• SikaTop 123 Plus AE-E ;UyJFCT TO ANY CORRECTIONS
• TREMCO VulkenfOiWI R BY FIELD INSPECTORS TH T
INIAY BE CONCEALED FASTENERS ORAi7ACHMENTS CCLU)Lf V-11TW .• NECESSARY APPLICABLE CODE S.
ARE THE RESPONSIBILITY OF THE
CONTRACTOR OF RECORD
a2-o
2431 SE Dixie Highway
A �9 Stuart, FL 34996
Phone: (772) 287-0525
MATHERS ENGINEERING EB#004456
CORPORATION
The above sequence is general in nature and will be modified as restoration work progresses.
Observations of the initial demolition will determine any required modifications to the above
procedures and materials selected for the final restoration process.
Based on initial visual observations, repairs will not require shoring; however, in the event the
demolition work reveals that shoring will be required, the engineer will instruct the contractor to
shore the area as well as the number of levels required. The instructions given to the contractor will
be submitted to the Building Department with the final close-out documents.
We have been authorized by the Association to work with the contractor during the restoration and,
will inspect work partially completed as well as observe results of the new demolition prior to field
authorizing the repairs to be completed.
The proposed concrete restoration work, except as authorized by the engineer's modified
instructions, will comply with specifications outlined in the IRCI Guideline No. 03730, as well as
the applicable minimum building codes and the applicable fire safety standards as determined by
the local authority in accordance with Chapter 553 and Chapter 633 of the Florida Statutes where
applicable to concrete restoration.
Approved,
01111 I I I///////
J = A4,q
PE 19658 N
Fq�/ATE OF
William J. Mathers, ...... 'N�����
ONAL�G\���
Florida License #1965'�'//
Special Inspector FL LicenIL�#k t11��
2