Loading...
HomeMy WebLinkAboutMISC LETTERSOceanrise Condominium Association 10310 S. Ocean Dr. #105 Jensen Beach, FL 34957 St. Lucie County Building Department 2.1 SW Port St Lucie Blvd Port St. Lucie, FL 34984 May 25, 2019 S, SC9iv 70YNFO RE: Or-eanrise Condominium Association Inc. CO,61 Dear Sir or Madame: Please allow this letter to serve as notice that Mathers Engineering is to perform the threshold 'inspections for the concrete restoration project to be completed at Oceanrise Condominium Association. The Board of Directors understand that the Association is responsible for payment of the Threshold Engineer for his services during this project. Should you have any questions regarding this matter please contact me at 772-538-9639 or �3tlYFr7.rA,C Div@inpi i���S2'f_$_l'f1P.n Lial.CQITi. Sincer oly, v Katherine Cimpi LOAM On Behalf of the Board of Directors Oceanrise Condominiums Association Inc. MATHERS ENGINEERING CORPORATION PRE -BUILDING PERMIT ADDENDUM Date: January 30, 2019 To: St. Lucie County Building Department 2300 Virginia Avenue Fort Pierce, FL 34982 2431 SE Dixie Highway Stuart, FL 34996 Phone: (772) 287-0525 EB#004456 Referenced Project: Concrete Restoration for Common Walkways and Exterior Balconies (decks, beams & columns) For Units Numbers for Stack 8 (108, 208, 308, 408, 508, 608 and 708) Unit Numbers for Stack 9 (109, 209, 309, 409, 509, 609 and 709) for Oceanrise Condominium Located at 10310 S. Ocean Drive, Jensen Beach, FL 34957 Contractor: DNff Construction 312 S. Old Dixie Hwy. Jupiter, FL 33458 Enclosed is a copy of the structural threshold license for William J. Mathers, P.E. as the threshold inspector for the project referenced above in accordance with Florida Statutes 553.79. Approved, J. �MqT NSF yF,p�ii -19658 N =_ �E OF i ! COR10?•' William J. Florida License 1'1Jllllllt��� Special Inspector FL License #SI-155 RECEIVED FEB 2 7 2019 ST. Lucie County, FRUPItting I Rb'�4-'5W o (L/I G CONSTI I,ACTION iq5' October 12, 2019 St. Lude County Building Department 2300 Virginia Avenue Fort Pierce, FL 34982 Re: OCEANRISE CONDOMINIUM, JENSEN BEACH, FL>PROJECT SUMMARY TOTAL PERMIT #S1.09-62r05477 St. Lude County Buidling Department: RFCEry fD ocr2 4 p019 Pe "'tt/n St. dude 9 De men[ ty Please find attached "Project Summary Total" for the work accomplished and approved by the Engineer (Mathers Engineering Corporation) at the above -referenced project site. 1 attest to the best of my knowledge, information and belief that the "Project Summary Total" is the total amount paid ($103,323.95) for work accomplished and approved by the Engineer (Mathers Engineering Corporation) in accordance with the Contract Documents and all existing local, state and federal laws, ordinances and codes. Respectfully submitted by, *WM Date: r— — Luciano Diaz, President DMF Construction, Inc , Ol1RY PLB.i State of Florida County of Palm Beac DIANA VELA = * . Notary Public -Staleto of of FloridaF Subscribed and sworn to before In day of October, 2019 Commission # FF 929253 �„o"My Comm. Expires Nov 13, 2019 Notary Public My Commission Expires: t S to CC: Oceandse Condominium Mathers Engineering Corporation First Service Residential 312 5 Old Dixie Hwy Ste.109. Jupiter FL 334SS // 561-768-8988 // info@dmf-eonstruction.com www.dmf-construction.com PROJECT SUMMARY TOTAL October 12, 2019 PROJECT SUMMARY TOTAL SUBMITTED TO: OCEANRISE CONDOMINIUM ASSOCIATION 10310 S. Ocean Drive Jensen Beach, FL 34957 Ph: 772-229-3375 Re: CONCRETE RESTORATION PROJECT 08 & 09 STACKS Oceanrise Condominium: Please accept this as the "Project Summary Total" for work completed and approved by the Engineer (Mathers Engineering Corporation) for the "Concrete Restoration Project on the 08 & 09 Stacks" at your condominium. SUMMARY TOTAL: PERMIT 1.00 EA @ S 2,500.00/EA = $ 2,500.00 MOBILIZATION 1.00 EA @ S 5,000.00/EA = S 5,000.00 DUMPSTER 1.00 EA @ S 1,300.00/EA = S 1,300.00 EDGE REPAIRS 128.37 LF @ S 110.00/LF = S 14,120.70 HALF DECK REPAIRS 412.94 SF @ $ 75.00/SF = $ 30,970.50 FULL DEPTH REPAIRS 111.67 SF @ $ 80.00/SF = S 8,933.60 COLUMN REPAIRS 18.37 CF @ $ 260.00/CF = $ 4,776.20 OVERHEAD/CEILING REPAIRS 4.53 SF @ $ 85.00/SF = $ 385.05 STUCCO REPAIRS 840.24 SF @ S 10.00/SF = S 8,402.40 SHUTTER REMOVALS 163.84 LF @ $ 18.00/LF = $ 2,940.84 SHUTTER REINSTALLATIONS 58.35 LF @ S 18.00/LF = S 1,050.30 HANDRAIL REMOVALS 140.04 LF @ S 10.00/1-F = S 1,400.40 HANDRAIL REINSTALLATIONS 140.04 LF @ $ 10.00/LF = $ 1,400.40 TEMP WALL INSTALLS 105.83 LF @ E 20.00/LF = $ 2,100.00 TEMP WALL REMOVALS 105.83 LF @ S 20.00/1-F = $ 2,100.00 REBAR DOWELS 128.00 EA @ $ 50.00/EA = S 6,400.00 NEW #4 MMFX REBAR 912.93 LF @ $ 1.25/LF = $ 1,141.16 HANDRAIL PAINTING 140.04 LF @ $ 18.00/1-F = S 2,520.72 WATERPROOFING 980.28 SF @ $ 4.SO/SF = S 4,411.26 PAINTING 980.28 SF @ S 1.50/SF = $ 1,470.42 PROJECT SUMMARY TOTAL = S 103,323.95 Respectfully submitted b �3.� E `aexa Luc�Diaz�President DMF Construction, Inc General Contractor License #CGC 1524718 CC: Mathers Engineering Corporation First Service Residential St. Lude County Building Department 312 S Old Dixie Hwy Ste.109. Jupiter FL 33458 // 561-768-8988 // info@dmf-construction.com www.dmf-construction.com D GONSTRlJGT14N inc. October 12, 2019 St. Lude County Building Department 2300 Virginia Avenue Fort Pierce, FL 34982 Re: OCEANRISE CONDOMINIUM, JENSEN BEACH, FL>FINAL CONTRACT SUMMARY VALUE DIFFERENCE PERMIT #SLC 1902-0547 St. Lucie County Buidling Department: Please accept this as the "Final Contract Summary Value Difference" for the above -referenced project/permit. CONTRACT SUMVIRY: COMPLETED CONTRACT PROJECT AMOUNT ORIGINAL CONTRACT AMOUNT Respectfully submitted by, = $ 103,393.95 = $ 82,168.00 DIFFERENCE = S 21.225.95 ���i)r.FS rcf a 'v:fl ts'�r`A'".atelO�1'�.M1"'*> r •. •Dia7_ President DMF Construction, Inc. State of Florida County of Palm B c Subscribed and sworn to before thi 12th day of October, 2019 Notary Public My Commission Expires: v U> CC: Oceanrise Condominium Mathers Engineering Corporation First Service Residential DIANA VELASUUEZ Notary Public - State of Florida Commission # FF 929253 '••'„eov noP: My Comm. Expires Nov 13, 2019 (Seal) 312 S Old Dixie Hwy Ste. 109. Jupiter FL 33458 H 561-768-8988 H infoOdmf-construction.com www.dmf-construction.com RFc&vzo oc z 4 1019 Perrnittin9 D St. Gucie �ouent October 12, 2019 St. Lude County Building Department 2300 Virginia Avenue Fort Pierce, FL 34982 1:M St. Lucie County Buidling Department: Please find attached "Project Summary Total" for the work accomplished and approved by the Engineer (Mathers Engineering Corporation) at the above -referenced project site. 1 attest to the best of my knowledge, information and belief that the "Project Summary Total" is the total amount paid ($103,323.95) for work accomplished and approved by the Engineer (blathers Engineering Corporation) in accordance with the Contract Documents and all existing local, state and federal laws, ordinances and codes. Respectfully submitted by, W—y9mm" ��-`r `fir t5' -w- Date• w M Luciano Diaz, President DMF Construction, Inc State of Florida County of Palm each EZ oo.� • °°R'b DIALEXpires of Subscribed and sworn to befo this 12th day of October, 2019 `� Notary Puof Florida �ffla Commi29253 ',�t'orw°p`', My Commv 13, 2019 Notary Public My Commission Expires: 13 CC: Oceanrise Condominium Mathers Engineering Corporation First Service Residential 312 S Old Dixie Hwy Ste. 109. Jupiter FL 33458 // 561-768-8999 // infoOdmf-construction.com www.dmf-construcCon.com C ,5TT®RMCITNOIN, PROJECT SUMMARY TOTAL October 12, 2019 PROJECT SUMMARY TOTAL SUBMITTED TO: OCEANRISE CONDOMINIUM ASSOCIATION 10310 S. Ocean Drive Jensen Beach, FL 34957 Ph: 772-229-3375 Re: CONCRETE RESTORATION PROJECT 08 & 09 STACKS Oceanrise Condominium: Please accept this as the "Project Summary Total" for work completed and approved by the Engineer (blathers Engineering Corporation) for the "Concrete Restoration Project on the 08 & 09 Stacks" at your condominium. SUMMARY 70TAL: PERMIT 1.00 EA @ S 2,500.00/EA = S 2,500.00 MOBILIZATION 1.00 EA @ $ 5,000.00/EA = S 5,000.00 DUMPSTER 1.00 EA @ S 1,300.00/EA = S 1,300.00 EDGE REPAIRS 128.37 LF @ $ 110.00/LF = $ 14,120.70 HALF DECK REPAIRS 412.94 SF @ $ 75.00/SF = $ 30,970.50 FULL DEPTH REPAIRS 111.67 SF @ S 80.00/SF = S 8,933.60 COLUMN REPAIRS 18.37 CF @ S 260.00/CF = $ 4,776.20 OVERHEAD/CEILING REPAIRS 4.53 SF @ S 85.00/SF = S 385.05 STUCCO REPAIRS 840.24 SF @ S 10.00/SF = S 8,402.40 SHUTTER REMOVALS 163.84 LF @ S 18.00/LF = S 2,940.84 SHUTTER REINSTALLATIONS 58.35 LF @ S 18.00/LF = S 1,050.30 HANDRAIL REMOVALS 140.04 LF @ S 10.00/1-F = S 1,400.40 HANDRAIL REINSTALLATIONS 140.04 LF @ $ 10.00/LF = S 1,400.40 TEMP WALL INSTALLS 105.83 LF @ $ 20.00/LF = $ 2,100.00 TEMP WALL REMOVALS 105.83 LF @ $ 20.00/1-F = $ 2,100.00 REBAR DOWELS 128.00 EA @ $ 50.00/EA = S 6,400.00 NEW #4 MMFX REBAR 912.93 LF @ S 1.25/LF = S 1,141.16 HANDRAIL PAINTING 140.04 LF @ S 18.00/1-F = S 2,520.72 WATERPROOFING 980.28 SF @ S 4.SO/SF = S 4,411.26 PAINTING 980.28 SF @ S 1.50/SF = S 1,470.42 PROJECT SUMMARY TOTAL = 10�3 323.95 Respectfully submitted by, Luciano Diaz, President DMF Construction, Inc General Contractor License NCGC 1524718 CC: Mathers Engineering Corporation First Service Residential St. Lucia County Building Department 312 S Old Dixie Hwy Ste.109. Jupiter FL 33458 // 561-768-8988 // info@dmf-construction.com www.dmf-construction.com m � CGTION ir1c. October 12, 2019 St. Lucie County Building Department 2300 Virginia Avenue Fort Pierce, FL 34982 Re: OCEANRISE CONDOMINIUM, JENSEN BEACH, FL>FINAL CONTRACT SUMMARY VALUE DIFFERENCE PERMIT #SLC 1902-0547 St. Lucie County Buidling Department: Please accept this as the "Final Contract Summary Value Difference" for the above -referenced projecVpermit. CONTRACT SUAMRY. COMPLETED CONTRACT PROJECT AMOUNT = E 103,393.95 ORIGINAL CONTRACT AMOUNT = $ 82,168.00 DIFFERENCE = f 21.225.95 Respectfully submitted by, m �- Date: Luciano Diaz, President DMF Construction, Inc. State of Florida County of Pal Beach Subscribed and sworn to bef, this 12th day of October, 2019 ;`o ° e %, �' . c EZ V- state f PubliIANAc - State of 253 Notary Commission Commission # FF 929253 My Comm. Expires Nov 13. 2019 Notary Public My Commission Expires: e l CC: Oceanrise Condominium Mathers Engineering Corporation First Service Residential 312 S Old Dixie Hwy Ste. 109. Jupiter FL 33458 // 561-768-8988 // infoOdmf-construction.com www.dmf-construction.com Receva) L?PISTF2i1CTIQN inc. October 12, 2019 St. Lude County Building Department 2300 Virginia Avenue Fort Pierce, FL 34982 Oi:r24 1019 Permitting Department Lucie County Re: OCEANRISE CONDOMINIUK JENSEN BEACH FL>PROJECT SUMMARY TOTAL PERMIT #Sl:G(-cWk1547 St. Lude County Buidling Department: Please find attached "Project Summary Total" for the work accomplished and approved by the Engineer (blathers Engineering Corporation) at the above -referenced project site. 1 attest to the best of my knowledge, information and belief that the "Project Summary Total" Is the total amount paid ($103,323.95) for work accomplished and approved by the Engineer (Mathers Engineering Corporation) in accordance with the Contract Documents and all existing local, state and federal laws, ordinances and codes. Respectfully submitted by, Luciano Diaz, President DMF Construction, Inc - State of Florida County of Palm Beac 1 Subscribed and sworn to before me isy�th day of October, 2019 Notary Public: \I My Commission Expires: CC: Oceandse Condominium Mathers Engineering Corporation First Service Residential cio"JY POa'� DIANA VELASDUEZ ®0.3 Notary Public - State of Florida Commission # FF 929253 "�o«��;:••• My Comm. Expires Nov 13, 2019 (Seal) 312 S Old Dixie Hwy Ste. 109. Jupiter FL 334SB // 561-768-8988 // info@dmf-construction.com www.dmf-construction.com CQI�ST'(�UCTION inc. PROJECT SUMMARY TOTAL October 12, 2019 PROJECT SUMMARY TOTAL SUBMITTED TO: OCEANRISE CONDOMINIUM ASSOCIATION 10310 S. Ocean Drive Jensen Beach, FL 34957 Ph: 772-229-3375 Re: CONCRETE RESTORATION PROJECT 08 & 09 STACKS Oceanrise Condominium: Please accept this as the "Project Summary Total" for work completed and approved by the Engineer (blathers Engineering Corporation) for the "Concrete Restoration Project on the 08 & 09 Stacks" at your condominium. SUMMARY TOTAL: PERMIT 1.00 EA @ $ 2,500.00/EA = $ 2,500.00 MOBILIZATION 1.00 EA @ S 5,000.00/EA = $ 5,000.00 DUMPSTER 1.00 EA @ S 1,300.00/EA = S 1,300.00 EDGE REPAIRS 128.37 LF @ S 110.00/1-17 = S 14,120.70 HALF DECK REPAIRS 412.94 SF @ $ 75.00/SF = S 30,970.50 FULL DEPTH REPAIRS 111.67 SF @ $ 80.00/SF = $ 8,933.60 COLUMN REPAIRS 18.37 CF @ S 260.00/CF = $ 4,776.20 OVERHEAD/CEILING REPAIRS 4.53 SF @ $ 85.00/SF = $ 385.05 STUCCO REPAIRS 840.24 SF @ $ 10.00/SF = $ 8,402.40 SHUTTER REMOVALS 163.84 LF @ $ 18.00/LF = $ 2,940.84 SHUTTER REINSTALLATIONS 58.35 LF @ S 18.00/1-F = S 1,050.30 HANDRAIL REMOVALS 140.04 LF @ S 10.00/1-F = S 1,400.40 HANDRAIL REINSTALLATIONS 140.04 LF @ $ 10.00/LF = $ 1,400.40 TEMP WALL INSTALLS 105.83 LF @ $ 20.00/LF = $ 2,100.00 TEMP WALL REMOVALS 105.83 LF @ S 20.00/1-F = S 2,100.00 REBAR DOWELS 128.00 EA @ $ 50.00/EA = $ 6,400.00 NEW #4 MMFX REBAR 912.93 LF @ S 1.25/1-F = S 1,141.16 HANDRAIL PAINTING 140.04 LF @ S 18.00/1-17 = S 2,520.72 WATERPROOFING 980.28 SF @ $ 4.50/SF = $ 4,411.26 PAINTING 980.28 SF @ $ 1.50/SF = $ 1,470.42 PROJECT SUMMARY TOTAL = $ 103.323.95 Respectfully submitted by, ! , y Now! Luciano Diaz, Aresident DMF Construction, Inc General Contractor License #CGC 1524718 CC: Mathers Engineering Corporation First Service Residential St. Lude County Building Department 312 S Old Dixie Hwy Ste. 109. Jupiter FL 33458 // 561-768-8988 // info@dmf-construction.com www.dmf-construction.com Ecoalilple, October 12, 2019 St. Lude County Building Department 2300 Virginia Avenue Fort Pierce, FL 34982 Re: OCEANRISE CONDOMINIUM, JENSEN BEACH, FL>FINAL CONTRACT SUMMARY VALUE DIFFERENCE PERMIT #SLC 1902-0547 St. Lude County Buidling Department: Please accept this as the "Final Contract Summary Value Difference" for the above -referenced project/permit. CONTRACT SUMMARY: COMPLETED CONTRACT PROJECT AMOUNT ORIGINAL CONTRACT AMOUNT Respectfully submitted by, = S 103,393.95 = S 82,168.00 DIFFERENCE = S 21.225.95 Tudano Diaz. President Date:nw, DMF Construction, Inc. State of Florida County of Palm B Subscribed and swom to beffire s h day of October, 2019 Notary Public My Commission Expires: iJ CC: Oceanrise Condominium Mathers Engineering Corporation First Service Residential DIANA VELASOUEZ Notary Public - State of Florida Commission # FF 929253 o, My Comm. Expires Nov 13, 2019 (Seal) 312 S Old Dixie Hwy Ste.109. Jupiter FL 33458 n 561-768-8988 n info@dmf-construction.com www.dmf-construction.com -w MATHERS ENGINEERING_ CORPORATION Memo To:. Mr. Andrew Manero, Plan Reviewer From: Co: St Lucie Co. Building Dept. Pages: 2300 Virginia Avenue Fort Pierce, FL 34982 Fax: 2431 SE Dixie Hwy Stuart, FL 34996 Phone: (772) 287-0525 Email: mathersengineers@bellsouth.net Holly Mathers SEE ATTACHED Date: 04/02/2019 Re: Oceanrise Condominium Phone: 10310 S. Ocean Drive, Jensen Beach Concrete Restoration Permit #SLC 1902-0547 ❑ Please Reply X Mailed ❑ Nand Delivered ❑ Faxed Only ❑ Faxed and Mailed Enclosed is 1 signed and sealed correspondence from Mathers Engineering enclosing the updated threshold license for the concrete restoration permit #SLC 1902-0547 for Oceanrise Condonimium. Thank you, Holly This message is intended only for use of the individual or entity to which it is addressed, and may contain information that is privileged, confidential, and exempt from disclosure under applicable law. If the reader of the message is not the intended recipient, or the employee or agent responsible for delivering the message, you are hereby notified that any dissemination, distribution or copying of the communication is strictly prohibited. If you have received this communication in error, please notify us immediately by telephone and return the original message to us at the address above via the U.S. Postal Service. MATHERS ENGINEERING CORPORATION PRE -BUILDING PERMIT ADDENDUM Date: April 02, 2019 To: St. Lucie County Building Department 2300 Virginia Avenue Fort Pierce, FL 34982 2431 SE Dixie Highway Stuart, FL 34996 Phone: (772) 287-0525 EB#004456 Referenced Project: Concrete Restoration for Common Walkways and Exterior Balconies (decks, beams & columns) For Units Numbers for Stack 8 (108, 208, 308, 408, 508, 608 and 708) Unit Numbers for Stack 9 (109, 209, 309, 409, 509, 609 and 709) for Oceanrise Condominium Located at 10310 S. Ocean Drive, Jensen Beach, FL 34957 Contractor: DMF Construction 312 S. Old Dixie Hwy. Jupiter, FL 33458 Permit #SLC 1902-0547 Enclosed is a copy of the current threshold license for William J. Mathers, P.E. as the threshold inspector for the project referenced above in accordance with Florida Statutes 553.79. \\\\III I I I I////// Approved, \\P/, MC3. EM ET- '<', _ \ tp' 19858 p ; I tITTE OF ; 1p(�RLLCOD,. " William J. Mathers, PE Florida License #19658 Special Inspector FL License #SI-155 a MATHERS ENGINEERING CORPORATION Memo To: Plan Reviewer Co: St Lucie Co. Building Dept. 2300 Virginia Avenue Fort Pierce, FL 34982 Fax: 2431 SE Dixie Hwy Stuart, FL 34996 Phone: (772) 287-0525 Email: mathersengineers@bellsouth.net From: Holly Mathers Pages: SEE ATTACHED Date: 08/19/2019 Re: Oceandse Condominium Phone: 10310 S. Ocean Drive, Jensen Beach Concrete Restoration Permit #SLC 1902-0547 R�EiVED AVM 2 0 2#19 Permittin9 D St Lucie Coup ment county ❑ Please Reply X Mailed ❑ Nand Delivered ❑ Faxed Only ❑ Faxed and Mailed Enclosed is 1 signed and sealed engineer's field observation report #1 for the concrete restoration permit #SLC 1902-0547 for Oceanrise Condonmium. Thank you, ' Holly C' � a � a- M This message is intended only for use of the individual or entity to which it is addressed, and may contain information that is privileged, confidential, and exempt from disclosure under applicable law. If the reader of the message is not the intended recipient, or the employee or agent responsible for delivering the message, you are hereby notified that any dissemination, distribution or copying of the communication is strictly prohibited. If you. have received this communication in error, please notify us immediately by telephone and return the original message to us at the address above via the U.S. Postal Service. 4A w1v MATHERS ENGINEERING CORPORATION 2431 SE Dixie Highway Stuart, FL 34996 . Phone: (772) 287-0525 EB#0004456 Post -Building Permit Addendum Engineer's Field Observations Report #1 Date: August 19, 2019 To: Plan Reviewer St. Lucie County Building Department 2300 Virginia Avenue Fort Pierce, FL 34982 Referenced Project: Concrete Restoration for Common Walkways and Exterior Balconies (decks, beams & columns) For Units Numbers for Stack 8 (108, 208, 308, 408, 508, 608 and 708) and Unit Numbers for Stack 9 (109, 209, 309, 409, 509, 609 and 709) for Oceanrise Condominium Located at 10310 S. Ocean Drive, Jensen Beach, FL 34957 Contractor: DMF Construction 312 S. Old Dixie Hwy. Jupiter, FL 33458 Permit #SLC 1902-0547 Mathers Engineering Corporation visited the job site and made the following observations of the on going concrete restoration and repairs of exterior balconies: Stack #8 Balconies: • Unit 108: Concrete restoration has been completed guardrails have been re -installed. Shutters have not yet been re -installed. • Unit 208: Concrete restoration has been completed guardrails have been re -installed. have not yet been re -installed. • Unit 308: Concrete restoration has been completed guardrails have been re -installed. have not yet been re -installed. • Unit 408: Concrete restoration has been completed guardrails have been re -installed. have not yet been re -installed. Shutters Shutters Shutters • Unit 508: Concrete restoration has been completed guardrails have been re -installed. Shutters have not yet been re -installed. • Unit 608: Concrete restoration has been completed guardrails have been re -installed. Shutters have not yet been re -installed. • Unit 708: Concrete restoration has been completed guardrails have been re -installed. Shutters have not yet been re -installed. Stack #9 Balconies: • Unit 109: Concrete restoration has been completed guardrails have been re -installed. Shutters have not yet been re -installed. • Unit 209: Concrete restoration has been completed guardrails have been re -installed. Shutters have not yet been re -installed. w„ MATHERS ENGINEERING CORPORATION 2431 SE Dixie Highway Stuart, FL 34996 Phone: (772) 287-0525 EB#0004456 • Unit 309: Concrete restoration has been completed guardrails have been re -installed. Shutters have not yet been re -installed. • Unit 409: Concrete restoration has been completed guardrails have been re -installed. Shutters have not yet been re -installed. • Unit 509: Concrete restoration has been completed guardrails have been re -installed. Shutters have not yet been re -installed. • Unit 609: Concrete restoration has been completed guardrails have been re -installed. Shutters have not yet been re -installed. • Unit 709: Concrete restoration has been completed guardrails have been re -installed. Shutters have not yet been re -installed. Limitations: Our professional services have been performed, our findings obtained and our opinions prepared in accordance with general accepted engineering principles and practices. This company is not responsible for the conclusions, opinions or recommendations made by others based on our findings. Approved by, William J. Math Florida License Special Inspectc MATHERS ENGINEERING CORPORATION 2431 SE Dixie Highway R ciF viFO PhonStuart, FL 34996 e: (772) 287-0525 orr24101g EB#0004456 Pe'mItt. 0 FINAL CLOSE-OUT ON RESTORATION WOR'kit, Co �ty ent Date: October 09, 2019 To St. Lucie County Building Department 2300 Virginia Avenue Fort Pierce, FL 34982 Referenced Project: Concrete Restoration for Common Walkways and Exterior Balconies (decks, beams & columns) For Units Numbers for Stack 8 (108, 208, 308, 408, 508; 608 and 708) and Unit Numbers for Stack 9 (109, 209, 309, 409, 509, 609 and 709) for Oceanrise Condominium Located at 10310 S. Ocean Drive, Jensen Beach, FL 34957 Contractor: DMF Construction 312 S. Old Dixie Hwy. Jupiter, FL 33458 Permit #SLC 190 A7 The completed concrete restoration did not reduce the structural integrity of the remaining existing structural systems and, therefore, a requirement to upgrade them by this permit was not warranted. Existing building's components and elements outside the renovation area of this permit do not have their current wind load resistant capacity or gravity load capacity compromised by the completed concrete restoration. Mathers Engineering Corporation performed onsite inspections as the job progressed. Repairs did not require shoring. As the demolition exposed areas of exterior concrete deterioration and steel corrosion of the exterior balcony deck, we initiated and inspected restoration work such as concrete applications. The enclosed Record Drawing (Sheets #1 and 2) shows the areas of repair for Stacks 8 and 9, and is made part of this final close-out document approval under Permit Number SLC 1902-0547. Materials used and work performed to date has been substantially completed in conformance with the specifications outlined in the IRCI Guideline No. 03730, as well as the applicable 2017 Florida Building Codes 6 h Edition (and upd QQ¢1Il ptjgf ndustry guidelines, or standard engineering practices. IN Approved by, \ \vv,•�ENSF • P N� STATE QF ; WilliamJ.mamers,rn '�I/lllllllt�`' Florida License #19658 Special Inspector FL License #SI-155 i i� III MATHERS ENGINEERING CORPORATION PRE -BUILDING PERMIT ADDENDUM Date: January 30, 2019 RECEIVED To: St. Lucie County Building Departinc nt FEB 2 7 2019 2300 Virginia Avenue Fort Pierce, FL 34982 ST. Luck county, Permitting 2431 SE Dixie Highway Stuart, FL 34996 Phone: (772) 287-0525 EB#004456 Referenced Project: Concrete Restoration for Common Walkways and Exterior Balconies (decks, beams & columns) For Unit Numbers for Stack 8 (108, 208, 308, 408, 508, 608 and 708) Unit Numbers for Stack 9 (109, 209, 309, 409, 509, 609 and 709) for Oceanrise Condominium Located at 10310 S. Ocean Drive, Jensen Beach, FL 34957 Contractor: DMF Construction 312 S. Old Dixie Hwy. Jupiter, FL 33458 Background: The removal and restoration of deteriorated concrete and steel within beams, columns, decks and adjacent walls will comply with the IRCI Guideline No. 03730 (a copy of which is attached hereto) or as modified by Engineer as work progresses. The anticipated work involves the initial demolition, and then the removal, replacement and restoration of concrete and reinforcement as required. The degree of restoration is currently unknown, until such time as the initial demolition has begun. The anticipated sequence of repairs is as follows: • Shoring required for repairs of all columns, beams and decks (if required by engineer) • Removal and restoration of concrete and reinforcement steel within beams, columns and decks. (ICRI Guideline No. 03730) • Minor chipping and patching of areas not requiring full depth repairs. • Applied deck coating. The following materials are approved for anticipated use in this restoration (see attached manufacturers specifications): I • Sikacrete 211 Concrete Mix. • SikaQuilck 1000. • Sika Armatec 110 EpoCem bonding agent and rebar coating. • Sika FerroGard 903. • Sikagard 701 W. THESE %2-60 AND ALL PROPOSED 1;dORf{ • SikaTop 123 Plus AE-E ;UyJFCT TO ANY CORRECTIONS • TREMCO VulkenfOiWI R BY FIELD INSPECTORS TH T INIAY BE CONCEALED FASTENERS ORAi7ACHMENTS CCLU)Lf V-11TW .• NECESSARY APPLICABLE CODE S. ARE THE RESPONSIBILITY OF THE CONTRACTOR OF RECORD a2-o 2431 SE Dixie Highway A �9 Stuart, FL 34996 Phone: (772) 287-0525 MATHERS ENGINEERING EB#004456 CORPORATION The above sequence is general in nature and will be modified as restoration work progresses. Observations of the initial demolition will determine any required modifications to the above procedures and materials selected for the final restoration process. Based on initial visual observations, repairs will not require shoring; however, in the event the demolition work reveals that shoring will be required, the engineer will instruct the contractor to shore the area as well as the number of levels required. The instructions given to the contractor will be submitted to the Building Department with the final close-out documents. We have been authorized by the Association to work with the contractor during the restoration and, will inspect work partially completed as well as observe results of the new demolition prior to field authorizing the repairs to be completed. The proposed concrete restoration work, except as authorized by the engineer's modified instructions, will comply with specifications outlined in the IRCI Guideline No. 03730, as well as the applicable minimum building codes and the applicable fire safety standards as determined by the local authority in accordance with Chapter 553 and Chapter 633 of the Florida Statutes where applicable to concrete restoration. Approved, 01111 I I I/////// J = A4,q PE 19658 N Fq�/ATE OF William J. Mathers, ...... 'N����� ONAL�G\��� Florida License #1965'�'// Special Inspector FL LicenIL�#k t11�� 2