HomeMy WebLinkAboutTHRESHOLD INSPECTIONSThreshold Inspections
Special Inspection Plan
February 18, 2019
RECEIVED
MAR 0 4 2019
ST. Lucie 6euntps Perni tting
M L Engineering Inc.
2030 37ffi Ave
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
SDA/VNFD
St `UCBCOUn1V
Project: Paragon Condominiums — Exterior metal stud wall & balcony
repairs
Units: Lobby, 3S, 4S, 5N, 5S, 6N, 6S, 7N, 7S, 8N, 8S, 9N, 9S,
ION, IIN, 115, 12N, 12S, PHI-N & PH2-S
4400 North Highway AIA
Ft. Pierce, Florida 34949
Owner's Representative
Structural Engineer of Record
Keystone Property Management Group
Mr. Michael Barber
780 US Highway 1, Suite 300
Vero Beach, Florida 32962
M L Engineering, Inc
2030 37s' Ave
Vero Beach, Florida 32960
This Statement of Threshold Inspections is submitted as required for permit issuance and in accordance
with the requirements of the Florida Building Code (FBC). It includes a schedule of Special Inspection
Services applicable to this project as well as the name of the Special Inspector.
The Special Inspector shall keep records of all inspections and shall furnish inspection reports to the
Building Official, Owner, Engineer of Record and Contractor. All discrepancies shall be brought to the
Contractor's attention, and if such discrepancies are not corrected, these discrepancies shall be brought
to the attention of the Building Official and Structural Engineer of Record.
The Special Inspector shall submit a final report to the Building Official documenting completion of all
Special Inspections and corrections of any discrepancies prior to issuance of the Certificate of
Occupancy. Specia� dtls�o not relieve the Contractor of his or her responsibilities to carry out
quality control i� c�'f�s`A€g;®Job site safety means and methods are solely the responsibility
of the Contrmotlit.-
°LUo
Mic ael A. I%jr.4 F.
Flori a P.E.11q,�th L O
Special Inspector°�i96j�5; %ON s1514
Special Inspection Plan
Paragon Condominiums — Exterior metal stud wall & balcony repairs
Units: Lobby, 3S, 4S, SN, 5S, 6N, 6S, 7N, 7S, 8N, 8S, 9N, 9S, 10N, 11N, 115, 12N,12S, PHI-N & PH2-S
4400 N. Hwy Al
Ft. Pierce, Florida 34949
General Notes
1. The purpose of this Special Inspection as required by the FBC, is to report and record the repair
procedures highlighting those that are not in compliance with the Contract Documents.
2. The Special Inspector shall meet the requirements of the Board of Building Codes and
Standards. The Special Inspector shall be qualified as a Building Inspector under Part XII of
Chapter 468, Florida Statutes, or certified as a Special Inspector under Chapter 471 or 481,
Florida Statues.
3. The Special Inspector must solely dedicate his time to the Project and shall not be allowed to
provide other services or work, such as material or concrete testing on the same project.
4. The Contractor shall cooperate with and assist, however possible, the Special Inspector in
performing his inspections. The Contractor shall allow the Special Inspector access to the
project at all times when work is in progress. The Contractor shall review this plan and
coordinate the schedule of work such that a minimum of 24 hours notice is given to the Special
Inspector before the work that requires inspection is performed.
5. The Special Inspector shall be responsible to the Owner and Building Department having
jurisdiction for the project.
6. The Special Inspector shall perform site visits at regular intervals to ensure that the inspections
are being performed by his on -site representative in accordance with the Threshold Plan.
7. The Special Inspector shall cooperate with the Contractor and shall immediately notify the
Contractor of all discrepancies and deviations from the Contract Documents, and the Contractor
shall immediately make every effort to rectify said discrepancies or deviations.
8. Upon completion of the structuraf repairs, a signed and sealed statement by the Special
Inspector must be submitted to the Building Department stating that the portion of the project
under his inspection responsibilities and under the Threshold Plan was constructed in
substantial conformance with the Contract Documents.
9. This document is in addition to the requirements of the Standard Building Inspections as
required by the Florida Building Code and is not meant to specify all inspections required by
that Code.
M L Engineering, Inc. 2030 37w Ave. Vero Beach, FL 32960 ph (772) 569-1257 / fax (772) 569-4041 Page 2
rr 1
Special Inspection Plan
Paragon Condominiums — Exterior metal stud wall & balcony repairs
Units: Lobby, 3S, 4S, 5N, 5S, 6N, 6S, 7N, 7S, 8N, 8S, 9N, 9S, 10N, 11N, 11S, 12N,12S, PH1-N & PH2-S
4400 N. Hwy Al
Ft. Pierce, Florida 34949
Schedule of Special Inspection Services
Scope of Work
1. Repair of east elevation exterior metal infill wall with new EIFS system to match existing.
2. Remove & re -install sliding glass doors adjacent to wall repair.
3. Repair of concrete spalls at west facing balconies.
4. Repair of balcony slab edge at west facing balconies.
5. Repair of post tension cable ends at west facing balconies.
Inspection Services
Exterior metal infill wall repairs:
1. Assess damaged or deteriorated metal studs & track to be removed & replaced.
2. Verify size, gage & connections or all metal stud framing.
3. Verify door & window attachment.
4. Verify exterior wall sheathing attachment.
5. Verify placement of waterproofing membrane.
6. Verify installation of exterior insulation and finish wall system (EIFS).
Balcony repairs:
1. Verify location and quantity of repairs.
2. Verify reinforcement quantity, sizes, splices, dowels, placement and laps.
3. Verify the use of the correct approved concrete mix designs.
4. Observation of concrete placement for repair areas in accordance with the Contract Documents.
M L Engineering, Inc. 2030 370, Ave. Vero Beach, FL 32960 ph (772) 569-1257 / fax (772) 569-4041 Page 3
M L Engineering Inc.
2030 3711 Ave
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772)569-4041
Threshold Inspections
Special Inspection Plan
February 18, 2019
Project: Paragon Condominiums — Exterior metal stud wall & balcony
repairs
Units: Lobby, 3S, 4S, 5N, 5S, 6N, 6S, 7N, 7S, 8N, 8S, 9N, 9S,
10N,11N, ]IS, 12N, 12S, PHI-N&PH2-S
4400 North Highway AIA
Ft. Pierce, Florida 34949
Owner's Representative
Structural Engineer of Record
Keystone Property Management
Mr. Michael Barber
780 US Highway 1, Suite 300
Vero Beach, Florida 32962
M L Engineering, Inc
2030 37" Ave
Vero Beach, Florida 32960
MAR 04 20i9
ST. Lucie County, permitting
This Statement of Threshold Inspections is submitted as required for permit issuance and in accordance
with the requirements of the Florida Building Code (FBC). It includes a schedule of Special Inspection
Services applicable to this project as well as the name of the Special Inspector.
The Special Inspector shall keep records of all inspections and shall furnish inspection reports to the
Building Official, Owner, Engineer of Record and Contractor. All discrepancies shall be brought to the
Contractor's attention, and if such discrepancies are not corrected, these discrepancies shall be brought
to the attention of the Building Official and Structural Engineer of Record.
The Special Inspector shall submit a final report to the Building Official documenting completion of all
Special Inspections and corrections of any discrepancies prior to issuance of the Certificate of
Occupancy. Special ms& not relieve the Contractor of his or her responsibilities to carry out
quality control ip�rai( I�s}�Rag.; Job site safety means and methods are solely the responsibility
of the Con S •,Vv �i•�
<Ci • �N B of
•fit.
• `e
o • ED
• W .
Mic ael A. % ,�r$.
Flori a P.E. Nq. ' 0• ..... . •°:
FLO.P�°° Cr_
Special Inspector 9`rW °�%
Special Inspection Plan
Paragon Condominiums — Exterior metal stud wall & balcony repairs
Units: Lobby, 3S, 4S, 5N, 5S, 6N, 6S, 7N, 7S, 8N, 8S, 9N, 9S, ION, 1IN, 115, 12N,12S, PHI-N & PH2-S
4400 N. Hwy Al
Ft. Pierce, Florida 34949
General Notes
1. The purpose of this Special Inspection as required by the FBC, is to report and record the repair
procedures highlighting those that are not in compliance with the Contract Documents.
2. The Special Inspector shall meet the requirements of the Board of Building Codes and
Standards. The Special Inspector shall be qualified as a Building Inspector under Part XII of
Chapter 468, Florida Statutes, or certified as a Special Inspector under Chapter 471 or 481,
Florida Statues.
3. The Special Inspector must solely dedicate his time to the Project and shall not be allowed to
provide other services or work, such as material or concrete testing on the same project.
4. The Contractor shall cooperate with and assist, however possible, the Special Inspector in
performing his inspections. The Contractor shall allow the Special Inspector access to the
project at all times when work is in progress. The Contractor shall review this plan and
coordinate the schedule of work such that a minimum of 24 hours notice is given to the Special
Inspector before the work that requires inspection is performed.
5. The Special Inspector shall be responsible to the Owner and Building Department having
jurisdiction for the project.
6. The Special Inspector shall perform site visits at regular intervals to ensure that the inspections
are being performed by his on -site representative in accordance with the Threshold Plan.
7. The Special Inspector shall cooperate with the Contractor and shall immediately notify the
Contractor of all discrepancies and deviations from the Contract Documents, and the Contractor
shall immediately make every effort to rectify said discrepancies or deviations.
8. Upon completion of the structural repairs, a signed and seated statement by the Special
Inspector must be submitted to the Building Department stating that the portion of the project
under his inspection responsibilities and under the Threshold Plan was constructed in
substantial conformance with the Contract Documents.
9. This document is in addition to the requirements of the Standard Building Inspections as
required by the Florida Building Code and is not meant to specify all inspections required by
that Code.
M L Engineering, Inc. 2030 37th Ave. Vero Beach, FL 32960 ph (772) 569-1257 / fax (772) 569-4041 Page 2
Special Inspection Plan
Paragon Condominiums — Exterior metal stud wall & balcony repairs
Units: Lobby, 3S, 4S, 5N, 5S, 6N, 6S, 7N, 7S, 8N, 8S, 9N, 9S, 10N, 11N, 11S, 12N,12S, PH1-N & PI2-S
4400 N. Hwy Al A
Ft. Pierce, Florida 34949
Schedule of Special Inspection Services
Scope of Work
1. Repair of east elevation exterior metal infill wall with new EIFS system to match existing.
2. Remove & re -install sliding glass doors adjacent to wall repair.
3. Repair of concrete spalls at west facing balconies.
4. Repair of balcony slab edge at west facing balconies.
5. Repair of post tension cable ends at west facing balconies.
Inspection Services
Exterior metal infill wall repairs:
1. Assess damaged or deteriorated metal studs & track to be removed & replaced.
2. Verify size, gage & connections or all metal stud framing.
3. Verify door & window attachment.
4. Verify exterior wall sheathing attachment.
5. Verify placement of waterproofing membrane.
6. Verify installation of exterior insulation and finish wall system (EIFS).
Balcony repairs:
1. Verify location and quantity of repairs.
2. Verify reinforcement quantity, sizes, splices, dowels, placement and laps.
3. Verify the use of the correct approved concrete mix designs.
4. Observation of concrete placement for repair areas in accordance with the Contract Documents.
M L Engineering, Inc. 2030 37�b Ave. Vero Beach, FL 32960 ph (772) 569-1257 / fax (772) 569-4041 Page 3