PROJECT SUMMARY
Short Desc: ST LUCIE SURGERY Description: SURGERY CENTER OF
Owner:
Addressl: SECTION 15, TOWNSHIP 36S, RANGE 40E City:
Addressl: State: FL
Zip: 0
Type: Healthcare -Clinic Class: New Finished building
Jurisdiction: ST LUCIE COUNTY, ST LUCIE COUNTY, FL (661000)
Conditioned Area: 9047 SF Conditioned & UnConditioned Area: 9047 SF
No of Stories: 1 Area entered from Plans 0 SF
Permit No: 0 Max Tonnage 40.2
If different, write in:
SCANNED
BY
St. Lucie County
EnergyGauge SummitO Fla/Com-2008. Effective: March 1, 2009
2/25/2010
Page 1 of 8
Component
Gross Energy Cost (in $)
Compliance Summary
Design
8,411.0
LIGHTING CONTROLS
EXTERNAL LIGHTING
HVAC SYSTEM
PLANT
WATER HEATING SYSTEMS
PIPING SYSTEMS
Met all required compliance from Check List?
Criteria Result
9,979.0 PASSED
PASSES
PASSES
PASSES
None Entered
PASSES
PASSES
Yes/No/NA
IMPORTANT MESSAGE
Info 5009 -- — -- An input report of this design building must be submitted along with this
EnergyGauge Summit@ Fla/Com-2008. Effective: March 1, 2009
2/25/2010
Page 2 of 8
CERTIFICATIONS
I hereby certify that the plans and specifications covered by this calculation are in compliance with the
Florida Energy Code
Prepared By: DANIEL GUNTER Building Official:
Date: Date:
I certify that this building is in compliance i the FLorida Energy Efficiency Code
Owner Agent: Date:
If Required by Florida law, I hereby certify (`) that the system design is in compliance with the FLorida
Energy Efficiency Code
Architect: GORDON & ASSOCIATES
Electrical Designer: JAMES THOMS
Lighting Designer: JAMES THOMS
Mechanical Designer: BENNIE PANDORF
Reg No:
Reg No: 41236
Reg No: 41236
Reg No: 50061
Plumbing Designer: BENNIE PANDORF Reg No: 50061
(•) Signature is required where Florida Law requires design to be performed by registered design
professionals.
1t111010#000,,
pANOp''%
I • • V�
• N 0061 •'
,'dip • T
EnergyGauge Summit@ Fla/Com-2008. Effective: March 1, 2009
2/25/2010
Page 3 of 8
Project: ST LUCIE SURGERY
Title: SURGERY CENTER OF ST LUCIE
Type: Healthcare -Clinic
(WEA File: FL_ST_LUCIE_CO_INTL.tm3)
Building End Uses
1) Proposed
2) Baseline
Total
568.50
796.50
$8,411
$11,740
ELECTRICiTY(MBtulkWhl$)
568.50
79650
166554
233395
$8,411
$11,740
AREA LIGHTS
125.40
141.80
36743
41559
$1,856
$2,090
MISC EQUIPMT
135.70
135.70
39765
39765
$2,008
$2,000
PUMPS & MISC
0.10
0.10
24
25
$1
$1
SPACE COOL
154.20
245.30
45168
71874
$2,281
$3,615
SPACE HEAT
2.10
6.50
619
1901
$31
$96
VENT FANS
151.00
267.10
44235
78271
$2,234
$3,937
Passing requires Proposed Building cost to be at most 85%
PASSES
of Baseline cost. This Proposed Building is at 71.6%
EnergyGauge Summit@ FlatCom-2008. Effective: March 1, 2009
2/25/2010 Page 4 of 8
IProject: ST LUCIE SURGERY
Title: SURGERY CENTER OF ST LUCIE
pe: Healthcare -Clinic
Description Category Tradable? Allowance Area or Length ELPA CLP
(W/Unit) or No. of Units (W) (W)
(Sgft or ft)
Ext Light 1 Other (doors) than main entries Yes 20.00 6.0 120 104
Tradable Surfaces: 104 (W) Allowance for Tradable:120 (W) PASSES
All External Lighting: 104 M
Project: ST LUCIE SURGERY
Title: SURGERY CENTER OF ST LUCIE
Type: Healthcare -Clinic
(WEA File: FL_ST_LUCIE _CO INTL.tm3)
Lighting Controls Compliance
Acronym Ashrae Description Area Design Min Comp6-
ID (sq.ft) CP CP ance
Pr0Zo1Sp1 10,004 Exam/freatment(Hospital) 9,047 9 4 PASSES
PASSES
EnergyGauge Summit@ Fla/Com-2008. Effective: March 1, 2009
2/25/2010
Page 5 of 8
Project: ST LUCIE SURGERY
Title: SURGERY
CENTER OF ST LUCIE
Type: Healthcare -Clinic
(WEAFile: FL_ST_LUCIE CO_INTL.tm3)
System Report Compliance
AHU-1 System 1
Constant Volume Packaged No. of Units
System 1
Component
Category
Capacity Design
Eff Design IPLV Comp-
Eff
Criteria IPLV Criteria Hance
Cooling System
Air Conditioners Air Cooled
13.00
9.50 11.00 9.70 PASSES
240000 to 760000 Bta/b
Cooling Capacity
Heating System
Electric Furnace
1.00
1.00 PASSES
Air Handling
Air Handler (Supply) -
0.82
0.90 PASSES
System -Supply
Constant Volume
Air Distribution
ADS System
6.00
PASSES
System
AHU-2 System 2
Constant Volume Packaged No. of Units
System 1
Component
Category
Capacity Design
Eff Design IPLV Comp-
Eff
Criteria IPLV Criteria liance
Cooling System
Air Conditioners Air Cooled
13.00
9.50 11.00 9.70 PASSES
240000 to 760000 Btu/h
Cooling Capacity
Heating System
Electric Furnace
1.00
1.00 PASSES
Air Handling
Au Handler (Supply) -
0.82
0.90 PASSES
System -Supply
Constant Volume
Air Distribution
ADS System
6.00
PASSES
System
PASSES
Plant Compliance
Description
Installed Size Design
Min Design
Min Category Comp
No Eff
Eff IPLV
IPLV liance
None
EnergyGauge SummitO Fla/Com-2008. Effective: March 1, 2009
2/25/2010 Page 6 of 8
Project: ST LUCIE SURGERY
Title: SURGERY CENTER OF ST LUCIE
Type: Healthcare -Clinic
(WEAFile: FL ST LUCIE CO INTL.tm3)
Water Heater Compliance
Description Type Category Design Min
Design Max Comp
Eff Eff
Loss Loss liance
Water Heater 1 Electric water heater <=12 [kW] 0.92 0.86
PASSES
PASSES
Project: ST LUCIE SURGERY
Title: SURGERY CENTER OF ST LUCIE
Type: Healthcare -Clinic
(WEA File: FL_ST_LUCIE _CO_INTL.tm3)
Piping System Compliance
Category Pipe Din Is Operating Ins Coud
Ins Req Ins Compliance
[inches] Runoat? Temp [Btu-in/hr Thick
[in] Thick [in]
[F] SF.FJ
Domestic and Service Hot Water 1.00 False 105.00 0.28
1.00 0.50 PASSES
Systems
PASSES
EnergyGauge Summit® FIatCom-2008. Effective: March 1, 2009
2/25/2010 Page 7 of 8
Project: ST LUCIE SURGERY
Title: SURGERY CENTER OF ST LUCIE
Type: Healthcare -Clinic
(WEA File: FL—ST LUCIE_CO_INTL.tm3)
Other Required Compliance
Category
Section
Requirement (write N/A in box if not applicable)
Check
Report
13-101
Input Report Print -Out from EnergyGauge F1aCom attached
Operations Manual
13-102.1,
Operations manual provided to owner
13-410,13413
Windows & Doors
13406.AB.1.1
Glazed swinging entrance & revolving doors: max. 1.0 cfin/ft2; all
❑
other products: 0.4 cfin/ft'
Joints/Cracks
13-406.AB.I.2
To be caulked, gasketed, weather-stripped or otherwise scaled
El
Dropped Ceiling
13-406.AB.3
Vented: seal & insulated ceiling. Unvented seal & insulate roof &
El
Cavity
side walls
System
13-407
HVAC Load sizing has been performed
El
Reheat
134073
Electric resistance reheat prohibited
❑
HVAC Efficiency
13-407,13-408
Minimum efficiences: Cooling Tables 13407.AB.3.2.1A-D;
❑
Heating Tables 13-407.AB.3.2.1B, 13-407.AB.3.2.1D,
13408.AB.3.2.1E, 13-408.AB.3.2F
HVAC Controls
13-407.AB.2
Zone controls prevent reheat (exceptions); simultaneous heating
and cooling in each zone; combined HAC deadband of at least 5°F
(exceptions)
Ventilation Controls
13-409.AB.3
Motorized dampers reqd, except gravity dampers OK in: 1)
exhaust systems and 2) systems with design outside air intake or
exhaust capacity <300 efin
ADS
13410
Duct sizing and Design have been performed
HVAC Ducts
13410.AB
Air ducts, fittings, mechanical equipment & plenum chambers
shall be mechanically attached, sealed, insulated & installed per
Sec. 13-410 Air Distribution Systems
Balancing
13-410.AB.4
HVAC distribution system(s) tested & balanced. Report in
El
construction documents
Piping Insulation
13-41 LAB
In accordance with Table 1341 LAB.2
Water Heaters
13412.AB
Performance requirements in accordance with Table 13-412.AB.3.
El
Heat trap required
Swimming Pools
13412.AB.2.6
Cover on heated swimming pools: Time switch (exceptions);
Readily accessible on/off switch
Hot Water Pipe
1341 LAB.3 _
Table 1341 LAB.2 for circulating systems, first 8 feet of outlet
Insulation
pipe from storage tank and between inlet pipe and heat trap
Water Fixtures
13412.AB.2.5
Shower hot water flow restricted to 2.5 gpm at 80 psi. Public
lavatory fixture how water flow 0.5 gpm max; if self -closing valve
0.25 gallon recirculating, 0.5 gallon non recirculating
Motors
13414
Motor efficiency criteria have been met
Lighting Controls
13-415.AB
Automatic control required for interior lighting in buildings
>5,000 st..; Space control; Exterior photo sensor; Tandom wiring
with I or 3 linear fluuorescent lamps>30W
EnergyGauge Summit@ FlalCom-2008. Effective: March 1, 2009