Loading...
HomeMy WebLinkAboutFLORIDA ENERGY EFFIECIENCY CODEknit � i�' PROJECT SUMMARY Short Desc: ST LUCIE SURGERY Description: SURGERY CENTER OF Owner: Addressl: SECTION 15, TOWNSHIP 36S, RANGE 40E City: Addressl: State: FL Zip: 0 Type: Healthcare -Clinic Class: New Finished building Jurisdiction: ST LUCIE COUNTY, ST LUCIE COUNTY, FL (661000) Conditioned Area: 9047 SF Conditioned & UnConditioned Area: 9047 SF No of Stories: 1 Area entered from Plans 0 SF Permit No: 0 Max Tonnage 40.2 If different, write in: SCANNED BY St. Lucie County EnergyGauge SummitO Fla/Com-2008. Effective: March 1, 2009 2/25/2010 Page 1 of 8 Component Gross Energy Cost (in $) Compliance Summary Design 8,411.0 LIGHTING CONTROLS EXTERNAL LIGHTING HVAC SYSTEM PLANT WATER HEATING SYSTEMS PIPING SYSTEMS Met all required compliance from Check List? Criteria Result 9,979.0 PASSED PASSES PASSES PASSES None Entered PASSES PASSES Yes/No/NA IMPORTANT MESSAGE Info 5009 -- — -- An input report of this design building must be submitted along with this EnergyGauge Summit@ Fla/Com-2008. Effective: March 1, 2009 2/25/2010 Page 2 of 8 CERTIFICATIONS I hereby certify that the plans and specifications covered by this calculation are in compliance with the Florida Energy Code Prepared By: DANIEL GUNTER Building Official: Date: Date: I certify that this building is in compliance i the FLorida Energy Efficiency Code Owner Agent: Date: If Required by Florida law, I hereby certify (`) that the system design is in compliance with the FLorida Energy Efficiency Code Architect: GORDON & ASSOCIATES Electrical Designer: JAMES THOMS Lighting Designer: JAMES THOMS Mechanical Designer: BENNIE PANDORF Reg No: Reg No: 41236 Reg No: 41236 Reg No: 50061 Plumbing Designer: BENNIE PANDORF Reg No: 50061 (•) Signature is required where Florida Law requires design to be performed by registered design professionals. 1t111010#000,, pANOp''% I • • V� • N 0061 •' ,'dip • T EnergyGauge Summit@ Fla/Com-2008. Effective: March 1, 2009 2/25/2010 Page 3 of 8 Project: ST LUCIE SURGERY Title: SURGERY CENTER OF ST LUCIE Type: Healthcare -Clinic (WEA File: FL_ST_LUCIE_CO_INTL.tm3) Building End Uses 1) Proposed 2) Baseline Total 568.50 796.50 $8,411 $11,740 ELECTRICiTY(MBtulkWhl$) 568.50 79650 166554 233395 $8,411 $11,740 AREA LIGHTS 125.40 141.80 36743 41559 $1,856 $2,090 MISC EQUIPMT 135.70 135.70 39765 39765 $2,008 $2,000 PUMPS & MISC 0.10 0.10 24 25 $1 $1 SPACE COOL 154.20 245.30 45168 71874 $2,281 $3,615 SPACE HEAT 2.10 6.50 619 1901 $31 $96 VENT FANS 151.00 267.10 44235 78271 $2,234 $3,937 Passing requires Proposed Building cost to be at most 85% PASSES of Baseline cost. This Proposed Building is at 71.6% EnergyGauge Summit@ FlatCom-2008. Effective: March 1, 2009 2/25/2010 Page 4 of 8 IProject: ST LUCIE SURGERY Title: SURGERY CENTER OF ST LUCIE pe: Healthcare -Clinic Description Category Tradable? Allowance Area or Length ELPA CLP (W/Unit) or No. of Units (W) (W) (Sgft or ft) Ext Light 1 Other (doors) than main entries Yes 20.00 6.0 120 104 Tradable Surfaces: 104 (W) Allowance for Tradable:120 (W) PASSES All External Lighting: 104 M Project: ST LUCIE SURGERY Title: SURGERY CENTER OF ST LUCIE Type: Healthcare -Clinic (WEA File: FL_ST_LUCIE _CO INTL.tm3) Lighting Controls Compliance Acronym Ashrae Description Area Design Min Comp6- ID (sq.ft) CP CP ance Pr0Zo1Sp1 10,004 Exam/freatment(Hospital) 9,047 9 4 PASSES PASSES EnergyGauge Summit@ Fla/Com-2008. Effective: March 1, 2009 2/25/2010 Page 5 of 8 Project: ST LUCIE SURGERY Title: SURGERY CENTER OF ST LUCIE Type: Healthcare -Clinic (WEAFile: FL_ST_LUCIE CO_INTL.tm3) System Report Compliance AHU-1 System 1 Constant Volume Packaged No. of Units System 1 Component Category Capacity Design Eff Design IPLV Comp- Eff Criteria IPLV Criteria Hance Cooling System Air Conditioners Air Cooled 13.00 9.50 11.00 9.70 PASSES 240000 to 760000 Bta/b Cooling Capacity Heating System Electric Furnace 1.00 1.00 PASSES Air Handling Air Handler (Supply) - 0.82 0.90 PASSES System -Supply Constant Volume Air Distribution ADS System 6.00 PASSES System AHU-2 System 2 Constant Volume Packaged No. of Units System 1 Component Category Capacity Design Eff Design IPLV Comp- Eff Criteria IPLV Criteria liance Cooling System Air Conditioners Air Cooled 13.00 9.50 11.00 9.70 PASSES 240000 to 760000 Btu/h Cooling Capacity Heating System Electric Furnace 1.00 1.00 PASSES Air Handling Au Handler (Supply) - 0.82 0.90 PASSES System -Supply Constant Volume Air Distribution ADS System 6.00 PASSES System PASSES Plant Compliance Description Installed Size Design Min Design Min Category Comp No Eff Eff IPLV IPLV liance None EnergyGauge SummitO Fla/Com-2008. Effective: March 1, 2009 2/25/2010 Page 6 of 8 Project: ST LUCIE SURGERY Title: SURGERY CENTER OF ST LUCIE Type: Healthcare -Clinic (WEAFile: FL ST LUCIE CO INTL.tm3) Water Heater Compliance Description Type Category Design Min Design Max Comp Eff Eff Loss Loss liance Water Heater 1 Electric water heater <=12 [kW] 0.92 0.86 PASSES PASSES Project: ST LUCIE SURGERY Title: SURGERY CENTER OF ST LUCIE Type: Healthcare -Clinic (WEA File: FL_ST_LUCIE _CO_INTL.tm3) Piping System Compliance Category Pipe Din Is Operating Ins Coud Ins Req Ins Compliance [inches] Runoat? Temp [Btu-in/hr Thick [in] Thick [in] [F] SF.FJ Domestic and Service Hot Water 1.00 False 105.00 0.28 1.00 0.50 PASSES Systems PASSES EnergyGauge Summit® FIatCom-2008. Effective: March 1, 2009 2/25/2010 Page 7 of 8 Project: ST LUCIE SURGERY Title: SURGERY CENTER OF ST LUCIE Type: Healthcare -Clinic (WEA File: FL—ST LUCIE_CO_INTL.tm3) Other Required Compliance Category Section Requirement (write N/A in box if not applicable) Check Report 13-101 Input Report Print -Out from EnergyGauge F1aCom attached Operations Manual 13-102.1, Operations manual provided to owner 13-410,13413 Windows & Doors 13406.AB.1.1 Glazed swinging entrance & revolving doors: max. 1.0 cfin/ft2; all ❑ other products: 0.4 cfin/ft' Joints/Cracks 13-406.AB.I.2 To be caulked, gasketed, weather-stripped or otherwise scaled El Dropped Ceiling 13-406.AB.3 Vented: seal & insulated ceiling. Unvented seal & insulate roof & El Cavity side walls System 13-407 HVAC Load sizing has been performed El Reheat 134073 Electric resistance reheat prohibited ❑ HVAC Efficiency 13-407,13-408 Minimum efficiences: Cooling Tables 13407.AB.3.2.1A-D; ❑ Heating Tables 13-407.AB.3.2.1B, 13-407.AB.3.2.1D, 13408.AB.3.2.1E, 13-408.AB.3.2F HVAC Controls 13-407.AB.2 Zone controls prevent reheat (exceptions); simultaneous heating and cooling in each zone; combined HAC deadband of at least 5°F (exceptions) Ventilation Controls 13-409.AB.3 Motorized dampers reqd, except gravity dampers OK in: 1) exhaust systems and 2) systems with design outside air intake or exhaust capacity <300 efin ADS 13410 Duct sizing and Design have been performed HVAC Ducts 13410.AB Air ducts, fittings, mechanical equipment & plenum chambers shall be mechanically attached, sealed, insulated & installed per Sec. 13-410 Air Distribution Systems Balancing 13-410.AB.4 HVAC distribution system(s) tested & balanced. Report in El construction documents Piping Insulation 13-41 LAB In accordance with Table 1341 LAB.2 Water Heaters 13412.AB Performance requirements in accordance with Table 13-412.AB.3. El Heat trap required Swimming Pools 13412.AB.2.6 Cover on heated swimming pools: Time switch (exceptions); Readily accessible on/off switch Hot Water Pipe 1341 LAB.3 _ Table 1341 LAB.2 for circulating systems, first 8 feet of outlet Insulation pipe from storage tank and between inlet pipe and heat trap Water Fixtures 13412.AB.2.5 Shower hot water flow restricted to 2.5 gpm at 80 psi. Public lavatory fixture how water flow 0.5 gpm max; if self -closing valve 0.25 gallon recirculating, 0.5 gallon non recirculating Motors 13414 Motor efficiency criteria have been met Lighting Controls 13-415.AB Automatic control required for interior lighting in buildings >5,000 st..; Space control; Exterior photo sensor; Tandom wiring with I or 3 linear fluuorescent lamps>30W EnergyGauge Summit@ FlalCom-2008. Effective: March 1, 2009 2/25/2010 Page 8 of 8