Loading...
HomeMy WebLinkAboutFIELD SURVEYSCANNED BY St. Lucie County Field Survey Date: 9-,23 -13 Customer: Phone: Owner: EiD91) UEL LC2 Jn TE Phone: gy y-3 -lk % Address: 39y0 Fax: 1AJ G .ra(-4, JCell: ' 3Hyw W x H MFG Model Zone I Exp. Design P.S.F Test P.S.F x t Sic aoco / C -As$" ' - f — , x Wall Construction Vertical Jambs Header Spring Pad CNfU / Wood / Other I & Required Anchors J# 2 Below Wood Jamb Attachment To Structure ( # 1 ) For attachment of iambs to cast in place concrete, Use 3/8" x 5". Install bolts a maximum of 6" from each end and at.12/6 center. Anchors must have a minimum of 2-1/2" embedment into concrete. ( # 2 ) For attachment to hollow block, use 1/4" diameter tapcon a a maximum of 6" from each end and a pair at 12" on center. The pair of anchors should be approximately 3" center to center. Anchors must have a minimum of 1-1/4" embedment into hollow block. ( # 3 ) Attach tracks to wood frame with " x " lags & additional track brackets (as required) to secure thru existing " x _"jamb with minimum of 1 1/2" embedment into existing stud wall. FLOOR PLAN . INTERIOR CMU Existing pzP ' ` Wall v