HomeMy WebLinkAboutFIELD SURVEYSCANNED
BY
St. Lucie County
Field Survey
Date: 9-,23 -13
Customer:
Phone:
Owner: EiD91) UEL LC2 Jn TE
Phone: gy y-3 -lk %
Address: 39y0
Fax:
1AJ G .ra(-4,
JCell:
' 3Hyw
W x H
MFG
Model
Zone
I Exp.
Design P.S.F
Test P.S.F
x
t Sic
aoco
/
C
-As$" ' -
f — ,
x
Wall Construction
Vertical Jambs
Header
Spring Pad
CNfU / Wood / Other
I &
Required Anchors
J# 2 Below
Wood Jamb Attachment To Structure
( # 1 ) For attachment of iambs to cast in place concrete, Use 3/8" x 5". Install bolts a maximum
of 6" from each end and at.12/6 center. Anchors must have a minimum of 2-1/2" embedment into concrete.
( # 2 ) For attachment to hollow block, use 1/4" diameter tapcon
a
a
maximum of 6" from each end and a pair at 12" on center. The pair of anchors should be approximately
3" center to center. Anchors must have a minimum of 1-1/4" embedment into hollow block.
( # 3 ) Attach tracks to wood frame with " x " lags & additional track brackets (as required)
to secure thru existing " x _"jamb with minimum of 1 1/2" embedment into existing stud wall.
FLOOR PLAN
. INTERIOR
CMU
Existing
pzP
' ` Wall
v