HomeMy WebLinkAboutPROJECT INFORMATIONs
91o. U, a u
�-I .>
1904-0310
Planning & Developmental Services Department
Building & Code Regulations Division
THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE ANALYSIS OF THE STRUCTURAL SYSTEM TO
DETERMINE IF THIS IS A TENSIONED STRUCTURE. NO MODIFICATION TO THE SLAB OR DECK ABOVE
(INCLUDING DRILLING, NOTCHING, CUTTING) IS PERMITTED UNDER THIS PERMIT.
302.3 EXISTING MATERIALS. Materials already in use in a building in compliance with requirements or
approvals in effect at the time of their erection or installation shall be permitted to remain in use unless
determined by the building official to be unsafe.
702.6 MATERIALS AND METHODS. All new work shall comply with the materials and methods
requirements in the Florida building code, building; Florida building code, energy conservation; Florida
building code, mechanical; and Florida building code, plumbing, as applicable, that specify material
standards, detail of installation and connection, joints, penetrations, and continuity of any element,
component, or system in the building.
703.1 GENERAL. Alterations shall be done in a manner that maintains the level of fire protection
provided.
Revised 2,12E/19
I R041 o310