Loading...
HomeMy WebLinkAboutDRAWINGN SCANNED BY q USUIII/£ aysd W3330 W1830�' LL DB15 b0i REVIEWED • CODE COMPLIANCE • " iFIL .'qv a =RECEIVED SSA iN I�It7f�— 9D C or drA-lv\5 dv'ti6 e kS4s vvj \\ c_vj-e_ will We ,k1 \ - S`.r& b Cl) Planning & Developmental Services Department Building R Code Regulations Division E PROJECT REQUIREMENTS 1905-0611 THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE ANALYSIS OF THE STRUCTURAL SYSTEM TO DETERMINE IF THIS IS A TENSIONED STRUCTURE. NO MODIFICATION TO THE SLAB OR DECK ABOVE (INCLUDING DRILLING, NOTCHING, CUTTING) IS PERMITTED UNDER THIS PERMIT. FLORIDA BUILDING CODE EXISTING 302.3 EXISTING MATERIALS. Materials already in use in a building in compliance with requirements or approvals in effect at the time of their erection or installation shall be permitted to remain in use unless determined by the building official to be unsafe. 702.6 MATERIALS AND METHODS. All new work shall comply with the materials and methods requirements in the Florida building code, building; Florida building code, energy conservation; Florida building code, mechanical; and Florida building code, plumbing, as applicable, that specify material standards, detail of installation and connection, joints, penetrations, and continuity of any element, component, or system in the building. 703.1 GENERAL. Alterations shall be done in a manner that maintains the level of fire protection provided. FLORIDA BUILDING CODE GYPSUM BOARD, GYPSUM PANEL PRODUCTS AND PLASTER 2506.2 STANDARDS. Gypsum board and gypsum panel products shall conform to the appropriate standards listed in Table 2506.2 and Chapter 35 and, where required for fire protection, shall conform to the provisions of Chapter 7. 2508.1 GENERAL. Gypsum board, gypsum panel products and gypsum plaster construction shall be of the materials listed in Tables 2506.2 and 2507.2. These materials shall be assembled and installed in compliance with the appropriate standards listed in Tables 2508.1 and 2511.1.1 and Chapter 35. Revised 21261M