Project No. 19-155 Report No.1
Building Official: Mr. Gary Stepalavich — SLC Building Official
Project Manager: Mr. Gene Ross — Elliott Merrill
Contractor: Mr. Bob Stark — Structure -Con
File
OBSERVATION REPORT
OCEAN HARBOR NORTH CONDOMINIUMS —BLDG. B PARAPET WALL
5159 N. HWY AIA, FT. PIERCE, FL 34949
SLC BUILDING DEPT. PERMIT NUMBER: 1906-0338
PROJECT NAME: Ocean Harbor N. Condos — Bldg B DATE: September 27, 2019
Parapet Wall
CLIENT: Elliott Merrill Community Management LOCATION: Vero Beach, Florida
CONTRACTOR: Structure -Con PROJECT MGR: Mr. Khris McConnell
INSPECTED BY: Mike Lue WEATHER: Sunny
WORK INSPECTED:
Repairs to the Building B Parapet wall joint at the roof slab line.
OBSERVATIONS: SCANNED
The horizontal joint was repaired and we observed the following: BY
• The width of the sealant extends too far above and below the actual joint. St. Lucie County
• A section of the joint in the middle close to the scupper was covered with stucco.
• The repaired joints stopped short of the adjacent walls to the north and south.
RECOMMENDATIONS:
• The width of the sealant should be the same width as the mortar joint.
• Remove the stucco and repair the sealant where the stucco is covering the joint near the scupper.
• Extend the repairs to the joint all the way to the north and south walls.
Verify that these repairs are
.1■
Page 1 of 2
M L Engineering Inc.
\' Consulting Engineers
Threshold Inspector
2030 37'" Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772)569-4041
www.mleneineerinainc.com
Project No.19-155 1Report No. 1
Building Official: Mr. Gary Stepalavich—SLC Building Official
Project Manager: Mr. Gene Ross — Elliott Merrill
Contractor: Mr. Bob Stark— Structure -Con
File
The width of the sealant is too wide and should
only be the width of the mortar joint.
Remove the excess stucco that is covering the
repaired joint and sealant.
Pic 3
The repaired joints stop short of the adjacent
walls.
The repaired joints are to extend all the way to
both the north and south walls.
Page 2 of 2
M L Engineering Inc. Project No. 19-155 Report No. 2
Consulting Engineers Building Official: SLC Building Official — SLC Building Dept.
Threshold Inspector Project Manager: Mr. Gene Ross —Elliott Merrill
2030 37 ° Avenue Contractor: Mr. Bob Stark — Structure -Con
Vero Beach, Florida 32960 File
Phone: (772)569-1257
Fax: (772) 569-4041
www.mlenaineerineinc.com
OBSERVATION REPORT
OCEAN HARBOR NORTH CONDOMINIUMS—BLDG. B PARAPET WALL
5159 N. HWY AIA, FT. PIERCE, FL 34949
SLC BUILDING DEPT. PERMIT NUMBER: 1906-0338
PROJECT NAME: Ocean Harbor N. Condos —Bldg B DATE: October 8, 2019
Parapet Wall
CLIENT: Elliott Merrill Community Management LOCATION: Vero Beach, Florida
CONTRACTOR: Structure -Con PROJECT MGR: Mr. Khris McConnell
INSPECTED BY: Mike Lue WEATHER: Sunny
FINAL INSPECTION:
Repairs to th6 Building B Parapet wall joint at the roof slab line.
OBSERVATIONS:
The deficiencies to the repaired joint noted in the previous report were corrected.
All repairs were found to be in substantial compliance with the design documents and structural work is complete.
Page 1 of 2
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37'^ Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772)569-4041
mvw.mleneineerin einc.com
Project No. 19-15
Building Official:
Project Manager:
Contractor:
File
5 Report No. 2
SLC Building Official — SLC Building Dept.
Mr. Gene Ross — Elliott Merrill
Mr. Bob Stark — Structure -Con
Pic 1
The width of the sealant was corrected and
reduced to the actual joint width.
Stucco was removed from across the joint near
the scupper midway along the joint
Pic 2
The repaired horizontal joint was extended to the
adjacent walls as plan.
Page 2 of 2
M L Engineering Inc. Project No. 19-155 Report No. 1
Consulting Engineers Building Official: Mr. Gary Stepalavich — SLC Building Official
Threshold Inspector Project Manager: Mr. GeneRoss— ElliottMerrill
2030 37th Avenue Contractor: Mr. Bob Stark — Structure -Con
Vero Beach, Florida 32960 File
Phone: (772)569-1257
Fax: (772)569-4041
www. mlengineerin ginc.com
OBSERVATION REPORT
OCEAN HARBOR NORTH CONDOMINIUMS — BLDG. B PARAPET WALL
5159 N. HWY AIA, FT. PIERCE, FL 34949
SLC BUILDING DEPT. PERMIT NUMBER: 1906-0338
PROJECT NAME: Ocean Harbor N. Condos — Bldg B DATE: September 27, 2019
Parapet Wall
CLIENT: Elliott Merrill Community Management LOCATION: Vero Beach, Florida
CONTRACTOR: Structure -Con PROJECT MGR: Mr. Khris McConnell
INSPECTED BY: Mike Lue WEATHER: Sunny
WORK INSPECTED:
Repairs to the Building B Parapet wall joint at the roof slab line.
OBSERVATIONS:
The horizontal joint was repaired and we observed the following:
• The width of the sealant extends too far above and below the actual joint.
• A section of the joint in the middle close to the scupper was covered with stucco.
• The repaired joints stopped short of the adjacent walls to the north and south.
RECOMMENDATIONS: I
• The width of the sealant should be the same width as the mortar joint.
• Remove the stucco and repair the sealant where the stucco is covering the joint near the scupper.
• Extend the repairs to the joint all the way to the north and south walls.
Verify that these repairs are
-.11
Pagel of 2
M L Engineering
Inc. Project No. 19-155 Report No. 1
Consulting Engineers
Threshold Inspector
2030 37 ° Avenue
Vero Beach, Florida 32960
Phone: (772)569-1257
Fax: (772)569-4041
www.mlengineeringinc.com
Building Official: Mr. Gary Stepalavich—SLC Building Official
Project Manager: _ Mr. Gene Ross — Elliott Merrill
Contractor: Mr. Bob Stark — Structure -Con
Fite
Pic 1
The width of the sealant is too wide and should
only be the width of the mortar joint.
Pic 2
Remove the excess stucco that is covering the
repaired joint and sealant.
Pic 3
The repaired joints stop short of the adjacent
walls.
The repaired joints are to extend all the way to
both the north and south walls.
Page 2 of 2
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 371h Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlengineeringinc.com
Project No.19-155 Report No. 2
Building Official: SLC Building Official —SLC Building Dept.
Project Manager: Mr. Gene Ross— Elliott Merrill
Contractor: Mr. Bob Stark — Structure -Con
File
OBSERVATION REPORT
OCEAN HARBOR NORTH CONDOMINIUMS—BLDG. B PARAPET WALL
5159 N. HWY Al A, FT. PIERCE, FL 34949
SLC BUILDING DEPT. PERMIT NUMBER: 1906-0338
PROJECT NAME: Ocean Harbor N. Condos — Bldg B DATE: October 8, 2019
Parapet Wall
CLIENT: Elliott Merrill Comm unity"Management LOCATION: Vero Beach, Florida
CONTRACTOR: Structure -Con PROJECT MGR: Mr. Khris McConnell
INSPECTED BY: Mike Lue WEATHER:
FINAL INSPECTION:
Repairs to the Building B Parapet wall joint at the roof slab line.
OBSERVATIONS:
The deficiencies to the repaired joint noted in the previous report were corrected.
All repairs were found to be in substantial compliance with the design documents and structural work is complete.
Page 1 of 2
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 3711 Avenue
Vero Beach, Florida 32960
Phone: (772)569-I257
Fax: (772) 569-4041
mvw.mleneineerineinc com
Project No.19-155 Report No. 2
Building Official: SLC Building Official — SLC Building Dept.
Project Manager: Mr. Gene Ross — Elliott Merrill
Contractor: Mr. Bob Stark — Structure -Con
File
Pic I
The width of the sealant was corrected and
reduced to the actual joint width.
Stucco was removed from across the joint near
the scupper midway along the joint
Pic 2
The repaired horizontal joint was extended to the
adjacent walls as plan.
Page 2 of 2
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 3711 Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
wmv. mlenei n eerin einc.com
Project No.19-155 Report No. 1
Building Official: Mr. Gary Stepalavich — SLC Building Official
Project Manager: Mr. Gene Ross — Elliott Merrill
Contractor: Mr. Bob Stark — Structure -Con
File
OBSERVATION REPORT
OCEAN HARBOR NORTH CONDOMINIUMS —BLDG. B PARAPET WALL
5159 N. H W Y A I A, FT. PIERCE, FL 34949
SLC BUILDING DEPT. PERMIT NUMBER 1906-0338
PROJECT NAME: Ocean Harbor N. Condos — Bldg B P
Parapet Wall DATE: September 27, 2019
CLIENT:
Elliott Merrill Community Management
LOCATION:
Vero Beach, Florida
CONTRACTOR:
Structure -Con
PROJECT MGR:
Mr. Khris McConnell
INSPECTED BY:
Mike Luc
WEATHER:
Sunnv
WORK INSPECTED:
Repairs to the Building B Parapet wall joint at the roof slab line.
OBSERVATIONS:
The horizontal joint was repaired and we observed the following:
e The width of the sealant extends too far above and below the actual joint.
. A section of the joint in the middle close to the scupper was covered with stucco.
o The repaired joints stopped short of the adjacent walls to the north and south.
RECOMMENDATIONS:
e The width of the sealant should be the same width as the mortar joint.
• Remove the stucco and repair the sealant where the stucco is covering the joint near the scupper.
o Extend the repairs to the joint all the way to the north and south walls.
Verify that these repairs are completed.
�%uu1n1♦
y PNTH ON f&
• F
�� s� vG `�520 . _•:.�
Page 1 of 2
J
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37a^ Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772)569-4041
www.mlengineerinizinc.com
Project No. 19-155 Report No. 1
Building Official: Mr. Gaiy Stepalavich —SLC Building Official
Project Manager: Mr. Gene Ross —Elliott Merrill
Contractor: Mr. Bob Stark — Structure -Con
File
Plc I
The width of the sealant is too wide and should
only be the width of the mortarjoint.
Pic 2
Remove the excess stucco that is covering the
repaired joint and sealant.
The repaired joints stop short of the adjacent
walls.
The repaired joints are to extend all the way to
both the north and south walls.
Page 2 of 2
M L Engineering Inc
Project No.19-155 Report No. 2
Consulting Engineers
Threshold Inspector
2030 371, Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772)569-4041
www.mleneineerin einc. corn
Building Official: SLC Building Official — SLC Building Dept
Project Manager: Mr. GeneRoss—ElliottMerrill
Contractor: Mr. Bob Stark —Structure -Con
File
OBSERVATION REPORT
OCEAN HARBOR NORTH CONDOMINIUMS —BLDG. B PARAPET WALL
5159 N. HWY AIA, FT. PIERCE, FL 34949
SLC BUILDING DEPT. PERMIT NUMBER: 1906-0338
PROJECT NAME: Ocean Harbor N. Condos --Bldg B Parapet Wall DATE: October 8, 2019
CLIENT: Elliott Merrill Community Management LOCATION: Vero Beach, Florida
CONTRACTOR: Structure -Con PROJECT MGR: Mr. Khris McConnell
INSPECTED BY: Mike Lue WEATHER: Sunnv
FINAL INSPECTION:
Repairs to the Building B Parapet wall joint at the roof slab line.
OBSERVATIONS:
The deficiencies to the repaired joint noted in the previous report were corrected.
All repairs were found to be in substantial compliance with the design documents and structural work is complete.
Page 1 of 2
M L Engineering Ii .
Consulting Engineers
Threshold Inspector
2030 37 ° Avenue
Vero Beach, Florida 32960
Phone: (772)569-1257
Fax: (772)569-4041
www.mlenginceringinc.com
Project No.19-155 Report No. 2
Building Official: SLC Building Official — SLC Building Dept.
Project Manager: Mr. Gene Ross — Elliott Merrill
Contractor: Mr. Bob Stark — Structure -Con
File
The width of the sealant was corrected and
reduced to the actual joint width.
Stucco was removed from across the joint near
the scupper midway along the joint
Pic 2
The repaired horizontal joint was extended to the
adjacent walls as plan.
Page 2 of 2
M L Engineering Inc.
Project No. 19-155 Report No. 2
Consulting Engineers
Building Official: SLC Building Official — SLC Building Dept.
Threshold Inspector
Project Manager: Mr. Gene Ross— Elliott Merrill
2030 37" Avenue
Contractor: Mr. Bob Stark— Structure -Con
Vero Beach, Florida 32960
File
Phone: (772) 569-1257
Fax: (772)569-4041
www.mlennineeringinc.com
OBSERVATION REPORT
OCEAN HARBOR NORTH CONDOMINIUMS — BLDG. B PARAPET WALL
5159 N. HWY AIA, FT. PIERCE, FL 34949
SLC BUILDING DEPT. PERMIT NUMBER: 1906-0338
PROJECT NAME: Ocean Harbor N. Condos —Bldg B DATE: October 8, 2019
Parapet Wall
CLIENT: Elliott Merrill Community Management LOCATION: Vero Beach, Florida
CONTRACTOR: Structure -Con PROJECT MGR: Mr. Khris McConnell
INSPECTED BY: Mike Luc WEATHER: Sunny
FINAL INSPECTION:
Repairs to the Building B Parapet wall joint at the roof slab line.
OBSERVATIONS:
The deficiencies to the repaired joint noted in the previous report were corrected.
All repairs were found to be in substantial compliance with the design documents and structural work is complete
Page 1 of 2
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37t1 Avenue
Vero Beach, Florida 32960
Phone: (772)569-1257
Fax: (772)569-4041
w .mleneineerineinc.com
Project No. 19-155 Report No. 2
Building Official SLC Building Official — SLC Building Dept.
Project Manager: Mr. Gene Ross — Elliott Merrill
Contractor: Mr. Bob Stark — Structure -Con
File
Pic I
The width of the sealant was corrected and
reduced to the actual joint width.
Stucco was removed from across the joint near
the scupper midway along the joint
Pic 2
The repaired horizontal joint was extended to the
adjacent walls as plan.
Page 2 of 2
Project No. 19-155 Report No. 1
M L Engineering Inu.
Consulting Engineers
Threshold Inspector
2030 3711 Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772)569-4041
www.mleneinceringinc.com
Building Official: Mr. Gary Stepalavich—SLC Building Official
Project Manager: Mr. Gene Ross —Elliott Merrill
Contractor: Mr. Bob Stark —Structure -Con
File
OBSERVATION REPORT
OCEAN HARBOR NORTH CONDOMINIUMS—BLDG. B PARAPET WALL
5159 N. HWY AlA, FT. PIERCE, FL 34949
SLC BUILDING DEPT. PERMIT NUMBER: 1906-0338
PROJECT NAME: Ocean Harbor N. Condos —Bldg B Parapet Wall DATE: September 27, 2019
CLIENT:
Elliott Merrill Community Management
LOCATION:
CONTRACTOR:
Structure -Con
PROJECT MGR:
INSPECTED BY:
Mike Lue
WEATHER:
WORK INSPECTED:
Repairs to the Building B Parapet wall joint at the roof slab line.
OBSERVATIONS:
The horizontal joint was repaired and we observed the following:
• The width of the sealant extends too far above and below the actual joint.
• A section of the joint in the middle close to the scupper was covered with stucco.
• The repaired joints stopped short of the adjacent walls to the north and south.
Vero Beach, Florida
Mr. Khris McConnell
RECOMMENDATIONS:
• The width of the sealant should be the same width as the mortar joint.
• Remove the stucco and repair the sealant where the stucco is covering the joint near the scupper.
• Extend the repairs to the joint all the way to the north and south walls.
Verify that these repairs are
e N G (�" • ' T
o
:,��Q'OFLOR�•l��O:
._ �_
Page 1 of 2
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 376 Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772)569-4041
www. mlengineerineinc.com
Project No. 19-155 Report No. 1
Building Official: Mr. Gary Stepalavich — SLC Building Official
Project Manager: Mr. Gene Ross — Elliott Merrill
Contractor: Mr. Bob Stark — Structure -Con
File
The width of the sealant is too wide and should
only be the width of the mortar joint.
Pic 2
Remove the excess stucco that is covering the
repaired joint and sealant.
The repaired joints stop short of the adjacent
walls.
The repairedjoints are to extend all the way to
both the north and south walls.
Page 2 of 2
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37o' Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772)5694041
www mlengineerineinc.com
Project No. 19-155 Report No.1
Building Official: Mr. Gary Stepalavich — SLC Building Official
Project Manager: Mr. Gene Ross —Elliott Merrill
Contractor: Mr. Bob Stark — Structure -Con
File
OBSERVATION REPORT
OCEAN HARBOR NORTH CONDOMINIUMS — BLDG. B PARAPET WALL
5159 N. HWY AIA, FT. PIERCE, FL 34949
SLC BUILDING DEPT. PERMIT NUMBER: 1906-0338
PROJECT NAME: Ocean Harbor N. Condos — Bldg B DATE: September 27, 2019
Parapet Wall
CLIENT: Elliott Merrill Community Management LOCATION: Vero Beach, Florida
CONTRACTOR: Structure -Con PROJECT MGR: Mr. Khris McConnell
INSPECTED BY: Mike Lue WEATHER: Sunny
WORK INSPECTED:
Repairs to the Building B Parapet wall joint at the roof slab line.
OBSERVATIONS:
The horizontal joint was repaired and we observed the following:
• The width of the sealant extends too far above and below the actual joint.
• A section of the joint in the middle close to the scupper was covered with stucco.
• The repaired joints stopped short of the adjacent walls to the north and south.
RECOMMENDATIONS:
• The width of the sealant should be the same width as the mortar joint.
• Remove the stucco and repair the sealant where the stucco is covering the joint near the scupper.
• Extend the repairs to the joint all the way to the north and south walls.
Verify that these repairs are c(
.•nu
G
v 520 • :*
,LORD
Page 1 of 2
Project No. 19-155 Report No.1
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37 Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772)569-4041
www. mleneineerin ainc.com
Building Official: Mr. Gary Stepalavich — SLC Building Official
Project Manager: Mr. Gene Ross —Elliott Merrill
Contractor: Mr. Bob Stark —Structure -Con
File
Pic 1
The width of the sealant is too wide and should
only be the width of the mortarjoint.
Pic 2
Remove the excess stucco that is covering the
repaired joint and sealant.
The repaired joints stop short of the adjacent
walls.
The repaired joints are to extend all the way to
both the north and south walls.
Page 2 of 2
M L Engineering Inc. Project No. 19-155 Report No. 1
Consulting Engineers Building Official: Mr. Gary Stepalavich — SLC Building Official
Threshold Inspector Project Manager: Mr. Gene Ross — Elliott Merrill
2030 37° Avenue Contractor: Mr. Bob Stark — Structure -Con
Vero Beach, Florida 32960 File
Phone: (772)569-1257
Fax: (772)569-4041
www.mleneineerin ginc.com
OBSERVATION REPORT
OCEAN HARBOR NORTH CONDOMINIUMS —BLDG. B PARAPET WALL
5159 N. HWY AIA, FT. PIERCE, FL 34949
SLC BUILDING DEPT. PERMIT NUMBE
PROJECT NAME: Ocean Harbor N. Condos —Bldg B DATE: September 27, 2019
Parapet Wall
CLIENT: Elliott Merrill Community Management LOCATION: Vero Beach, Florida
CONTRACTOR: Structure -Con PROJECT MGR: Mr. Khris McConnell
INSPECTED BY: Mike Lue WEATHER: Sunny
WORK INSPECTED:
Repairs to the Building B Parapet wall joint at the roof slab line.
OBSERVATIONS:
The horizontal joint was repaired and we observed the following:
• The width of the sealant extends too far above and below the actual joint.
• A section of the joint in the middle close to the scupper was covered with stucco.
• The repaired joints stopped short of the adjacent walls to the north and south.
RECOMMENDATIONS:
• The width of the sealant should be the same width as the mortarjoint.
• Remove the stucco and repair the sealant where the stucco is covering the joint near the scupper.
• Extend the repairs to the joint all the way to the north and south walls.
Verify that these repairs are completed.
.•` NZHON ••.
,,A,p• FLOE:,�IG��`
Pagel of 2
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37' Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlenginceringine.com
Project No. 19-155 Report No. 1
Building Official: Mr. Gary Stepalavich — SLC Building Official
Project Manager: Mr. Gene Ross —Elliott Merrill
Contractor: Mr. Bob Stark — Structure -Con
File
The width of the sealant is too wide and should
only be the width of the mortar joint.
Remove the excess stucco that is covering the
repaired joint and sealant.
Pic 3
The repaired joints stop short of the adjacent
walls.
The repaired joints are to extend all the way to
both the north and south walls.
Page 2 of 2