Loading...
HomeMy WebLinkAboutMISC LETTERJINRIGIIT & ASSOCIATES DEVELOPMENT ENGINEERS CONSULTING, LLC November 13, 2019 1 � V G/ - G (�-� Mr. Grant Chambers, PE St. Lucie County Water quality Division 2300 Virginia Ave., Rm. 229 Fort Pierce, FL 34982 RE: HSC Port St Lucie, LLC Dollar General Dear Mr. Chambers: SCANNED BY St. Lucie County RECEIVED NOV 1 3 2019 Permitting Department St. Lucie County This letter is to inform you that the construction of the site work related improvement Items for this project are substantially complete and in accordance with the project plans and specifications, We respectfully request a final inspection of the site and access Improvements at your earliest convenience. Respectfully, AVYPNY LTi Perry C. Jinright, III, Managing Member. /sr t)E �• -. No 61289 ;# # ;r :l JEED AP E OF o SSPS L O Y' .X'o POST OFFICE BOX 1929 • FAIRHOPE, ALABANIA 36533 TELEPHONE (251) 928-3443 9 FACSIMILE (251) 928-3665 A City for All Ages" November 1, 2019 CITY OF PORT ST. LUCIE UTILITY SYSTEMS DEPARTMENT 900 SE Ogden Lane Port St. Lucie, FL 34986 (772) 873-6400 — TDD Accessible (772) 871-7615 — FAX Heather Burford St. Lucie County Via e-mail: burfordh(&stlucieco.oro SUBJECT: Dollar General 7180 SE US 1 Hwy PSLUSD File No. 11-242-00 Dear Mrs. Burford: Brad Macek, Director The above -referenced project has tied into the City of Port St. Lucie Utility Systems Department (PSLUSD) water and we have performed the final inspection. PSLUSD does not have wastewater service to this facility. Should you have any questions or need further clarification, please do not hesitate at all to contact me at (772) 871-7309. Sincerely, Colleen Ja o sen Project Coordinator c: Project File Steve Harnage, Commercial Development Manager Lila Gorman, Project Coordinator 1 of 1 i s 40680 Stat y 59 G.W. Stewart, Inc. Bay Minette, Alabama 36507 Stewart Engineering & Construction Office 251 937 6313 �t. Fax 251 937 1782 October 9, 2019 Adams Stewart Architecture P.O. Box 529 22615 Hwy 59 North Robertsdale, AL 36567 Re: Dollar General Port St. Lucie Plumbing Change Dear Mr. Todd Stewart: The purpose of this document is to approve the Contractors alternate pathway of the Domestic Water Service into the building. If you should have any questions orconcerns with regards to this document, please do not hesitate to contact me at your convenience. Sincerely, Glen Wade Stewart, P.E. President j1111111 * ADE \_tCENSF•�qP••i �.` bN 6593 ••• w •��p STATE OF rv�: ••;;,S O,A';,,,;�� (RC96 0q --?'z G.W. Stewart, Inc. Stewart Engineering & Construction October 9, 2019 Adams Stewart Architecture P.O. Box 529 22615 Hwy S9 North Robertsdale, AL 36567 Re: Dollar General Port St. Lucie Plumbing Change Dear Mr. Todd Stewart: 40680 State Hwy 59 Bay Minette, Alabama 36507 Office 251 937 6313 Fax 251 937 1782 The purpose of this document is to approve the Contractor's alternate pathway of the Domestic Water Service into the building. If you should have any questions or concerns with regards to this document, please do not hesitate to contact me at your convenience. Sincerely, Glen Wade Stewart, P.E. President ADE C E N SE- �.� N0. 6593 �.� STATE OF ��� �I !qL)(, -oy-,2 G.W. Stewart, :1-4� Stewart Engineering & Construction October 11, 2019 Adams Stewart Architecture P.O. Box 529 22615 Hwy 59 North Robertsdale, AL 36567 Re: Dollar General Port St. Lucie Underground Electrical Service Dear Mr. Todd Stewart: 40680 State Hwy 59 Bay Minefte, Alabama 36507 Office 251 937 6313 Fax 251 937 1782 The purpose of this document is to approve the underground electrical service consisting of (2) parallel runs of 250KCMIL AL in 3" conduit. If you should have any questions or concerns withregards to this document, please do not hesitate to contact me at your convenience. Sincerely, Glen Wade Stewart, P.E. President STP� MIEN BLDG:—� DATE: ELE/ q DA 7 PLUMB: DATE:—� MECH: DATE:--- 1906 -(Z>q02- Architecture, Planning P.O. Boa 529 Interiors, Construction Adminislmdon Robertsdale, Alabma 36567 ADAMS STEWART ARCHITECTS,LLC October 11, 2019 Lucie County Building Department c/o Building Official 2300 Virginia Avenue Ft. Pierce, Florida 34982 Re: Dollar General, Building Insulation To whom it may concern, Telephone 251.947.3864 Fax 251.947.3138 I have reviewed the insulation requirements for this project and offer the following; The Insulation as installed meets or exceeds the design specifications and minimum requirements for R Values as required for this building type. Should you have any questions, please feel free to call, Respectfully Submitted, Todd F. Stewart Florida Architect #AR92549 Ingram, Brian J From: Laney Southerly <LSoutherly@cityofpsl.com> Sent: Wednesday, May 15, 2019 2:36 PM To: Paul Marcinko; Diana Spriggs; Sherry Ruth Cc: Nathan Oaks; Project File; Scott Rheams; casey@hixsnedeker.com; Ladd Davis (Idavis@ rushtonstakely.com) Subject: RE: 11-242-00: HSC Port St. Lucie, LLC Paul, we have reviewed the project and the statute and agree that your interpretation is correct that public sewer would not be considered available for this project as a retail establishment at this time. I hope this e-mail will suffice in lieu of a letter. Thanks. Laney Southerly, PE Utility Engineering Manager City of Port St. Lucie, Utility Systems Dept. Utility Engineering Division 900 SE Ogden Lane Port St Lucie, FL 34983 772-873-6442 From: Paul Marcinko <pmarcinko@jadengineers.com> Sent: Friday, May 10, 201910:43 AM To: Laney Southerly <LSoutherly@cityofpsl.com>; Diana Spriggs <DSpriggs@cityofpsl.com>; Sherry Ruth <sruth @jadengineers.com> Cc: Nathan Oaks <noaks@jadengineers.com>; Project File <ProjectFile@cityofpsl.com>; Scott Rheams <scott@hixsnedeker.com>; casey@hixsnedeker.com; Ladd Davis (Idavis@rushtonstakely.com) <Idavis@ rushtonstakely.com> Subject: RE: 11-242-00: HSC Port St. Lucie, LLC Good morning — I just called and left you a voice mail; I apologize for the phone tag... Based on my discussions with Diana, I believe the city has done the majority of the work. We had a contractor reach out and offer to perform the pressure test but the city offered to locate the line and test it for us. We appreciate all the time and effort the city has put forth to inspect this line. The list below is what I understand has been done to this point: 1. Located the end on our property. a. Cannot locate the other end of the line near the existing lift station. 2. Put dye into the system and cannot find it coming out at the other end anywhere. 3. Probed the line and discovered a blockage. 4. Pressurized the line for the short distance to try and clear the blockage but was unsuccessful. At this point, even if the existing line were a viable option (which it does not seem that it is), the existing easement for the line does not benefit the city. Therefore a new line (or the existing line) would still require an easement across 5 different properties with 5 different property owners. It would be impossible for us to convince all these property owners to allow this line to extend through their properties. We have discassed'a septic design with the Health Department -and understand that they are willing and able to issue a permit but needa;letter from the city statmgsewer is not available. Based on my understanding of the word "available" defined from Chapter 381.0065 (2) (a) of the F.A.C. our property does not have publicly owned sewer available. Please let me know if you have any questions. Our project is very time sensitive and we appreciate all that can be done to expedite this process. Thank you, Paul Paul bfarcinko, P.E. JADE Consulting 231.895.6063 (cell) 251.928.3443 (office) From: Laney Southerly rmailto:LSoutherly(aDcityofpsl.coml Sent: Friday, May 10, 2019 8:20 AM To: Paul Marcinko; Diana Spriggs; Sherry Ruth Cc: Nathan Oaks; Project File Subject: 11-242-00: HSC Port St. Lucie, LLC Paul, I just left a voice mail on your cell phone. Can you please provide me a list or description of the work you or your client have done related to the private sewer force main discharging from the lift station? I am only familiar with what the City has done. Thanks Laney Southerly, PE Utility Engineering Manager City of Port St. Lucie, Utility Systems Dept. Utility Engineering Division 900 SE Ogden Lane Port St Lucie, FL 34983 772-873-6442 CITY OF PORT ST. LUCIE a�poersT °c UTILITY SYSTEMS DEPARTMENT - m 900 SE Ogden Lane Port St. Lucie, FL 34983 �Loaro� (772) 873 6400 TDD Accessible (772) 871-7615 - FAX Brad Macek, Director A City furAllAges" January 23, 2019 Via e-mail: Re: Dear -: Regarding your e-mail request, this is to confirm that the referenced parcel is within the City of Port St. Lucie Utility Systems Department service area. A public water main is adjacent to the property. There is not a public sewer line adjacent to the property. \, Page 1 of 2 Please be advised that water and sewer system extensions maybe required to serve the property. A data sheet with recent water and wastewater treatment plant capacity information is attached for your use. This should not be construed as a commitment to provide service until approvals by all regulatory agencies have been obtained; construction plans are approved; a Service Agreement has been fully executed; and all applicable fees have been paid to the City of Port St. Lucie Utility Systems Department. Should you have any questions or require additional information, please feel free to contact our office. Sincerely, Laney Southerly, PE Engineering Manager Attachment: Permit Data Sheet c: Brad Macek, Director File 11-242-00 11-242-00_012319_2_Ava i lability.doc Page 2 of 2 Architecture, Planning - Interiors, Construction Administration P.O. Box 529 - Telephone 251.947.3864 Robertsdale, Alabama 36567 Fax 251.947.3138 ADAMS STEWART A R C HITE CT S, LLC October 14, 2019 Lucie County Building Department c/o Building Official 2300 Virginia Avenue Ft. Pierce, Florida 34982 Re: Dollar General, Building Insulation 7180 US Highway! Port St Lucie, Florida 34952 PERMIT # S r fiSb6 0 7 To whom it may concern, I have reviewed this project for code compliance in regard to the required R-Values and insulation requirements. My findings are as follows: Code Requirements forthis project: 2017 Florida Building Code, Energy Conservation, Sixth Edition Table (C402.1.3), St Lucie County, Climate Zone 2A As Required Roof. Requirements R19+R11 LS Total R30 Wall Requirements R13+R6.5 Cl Total R19.5 As Installed Roof (1) Layer of R-21 and (1) Layer of R13 Liner System Total R34 Walls (1) Layer of R13 and (1) of R7 Cl Layer Total R20 The insulation as installed meets or exceeds the minimum requirements for this project. Should you have any questions, please feel free to call. Respectfully Submitted, /A&&l - wv�- Todd F. Stewart Florida Architect #AR92549 !k Jim McGuinness From: David Johnson Sent: Thursday, December 5, 2019 8:36 AM To: Jim McGuinness Subject: FW: Dollar General Final Inspection o py Attachments: Scanned from a Xerox Multifunction Printer.pdf From: Grant M. Chambers <ChambersG@stlucieco.org> Sent: Tuesday, November 19, 2019 8:59 AM To: David Johnson <johnsond@stlucieco.org>; Jim McGuinness <mcguinnessj@stlucieco.org> Cc: David Hays <haysd@stlucieco.org>; Patrick Dayan <DayanP@stlucieco.org> Subject: FW: Dollar General Final Inspection SCANNED Good Morning David, St. LUC y County Thank you, !¢Giant--"Chain"Ee—is�fR:E;.q+C vi"iigineei4�,Wd efrQuality/L`and�DZvelopment Division Ph: 772-462-1707 1 Direct: 772-462-2741 1 2300 Virginia Ave. Fort Pierce 34982 facebook.com/stlucie¢ov I twitter.com/stlucie¢ov I instaeram.com/stlucie¢ov I voutubexom/stlucieeov 3 2616= B; o t� �a(ts; FIB FY From: Paul Marcinko[ma ilto:Pmarcinko Cc) wade ngineers.coml Sent: Monday, November 18, 2019 12:39 PM To: Grant M. Chambers <ChambersGC@stlucieco.ore> Cc: David Hays <haysd@stlucieco.org>; Patrick Dayan <_DayanP@stlucieco.org>; Robert Krip <KripR@stlucieco.org>; Bobby Laughlin <bobbv@fulcrumgroup.com>; Trey Jinright <tiinright(@ladengineers.com>; Sherry Ruth <sruth @ iadengineers.com> Subject: RE: Dollar General Final Inspection Grant —Thanks for your time inspecting the site and our discussion this morning. Please see attached as we discussed. I� Please feelrfree to call me if you have av , .t:al comments. I look forward to your ap". al and the approval from water quality division. Paul Maxcinko, P.E. JADE Consulting 251.895.6063 (cell) 251.928.3443 (office) From: Grant M. Chambers <ChambersGCastlucieco.org> Sent: Friday, November 15, 2019 1:15 PM To: Paul Marcinko <pmarcinko@iadengineers.com> Cc: David Hays <haysd@stlucieco.ora>; Patrick Dayan <DaVanP@stlucieco.ora>; Robert Krip <KfinR@stIucieco.Org> Subject: Dollar General Final Inspection Paul, Please see attached letter regarding the final walk through that took place this morning. Please provide a response to the items listed in the letter. Thank you, Grant Chambers, P.E. I Civil Engineer I Water Quality/Land Development Division Ph: 772-462-1707 1 Direct: 772-462-2741 2300 Virginia Ave. Fort Pierce 34982 facebook.com/stlucieeov I twitter.com/stlucieeov I instaeram.com/stlucieeov I voutube.com/stluciezov c'1 L10 f �lv s 01-f-P �2616, MIS¢1� FILE COPY n Please Note: Florida has very broad public records laws. Most written communications to or from County officials regarding County business are public records available to the public and media upon request. It is the policy of St. Lucie County that all County records shall be open for personal inspection, examination and / or copying. Your e-mail communications will be subject to public disclosure unless an exemption applies to the communication. If you received this email in error, please notify the sender by reply e-mail and delete all materials from all computers. Please Note: Florida has very broad public records laws. Most written communications to or from County officials regarding County business are public records available to the public and media upon request. It is the policy of St. Lucie County that all County records shall be open for personal inspection, examination and / or copying. Your e-mail communications will be subject to public disclosure unless an exemption applies to the communication. If you received this email in error, please notify the sender by reply e-mail and delete all materials from all computers. Please Note: Florida has very broad public records laws. Most written communications to or from County officials regarding County business are public records available to the public and media upon request. It is the policy of St. Lucie County that all County records shall be open for personal inspection, examination and 1 or copying. Your e-mail communications will be subject to public disclosure unless an exemption applies to the communication. If you received this email in error, please notify the sender by reply e-mail and delete all materials from all computers. I, LJO T.ING{L'L'C, November 15, 2019 JINRIGHT & ASSOCIATES DEVELOPMENT ENGINEERS CONSULTING, LLC Mr. Grant Chambers, PE St. Lucie County Water Quality Division 2300 Virginia Ave.,; Rm..229 Fort Pierce, FL 34982 RE: HSC Port St Lude,.LLC Dollar General Dear Mr. Chambers: We respectfully submit on behalf of our client our response to comments dated November 15, 2019. Listed below in bold italic are our responses to the review comments: A. The retention pond has been holding water for an extended period of time and does not appear to be recovering as designed. Please advise. Response: The pond was designed to recover In approximately 2 days (50 hours) and Is, expected to hold wafer during this time. ,The water table is approximately one foot below the bottom of the pond and during the wet season with multiple storms the pond may hold water longer than 2 days. The depth of this water Is approximately 4". 2. Landscape Islands shall be curbed to protect landscaping and prevent sediment runoff into the parking area and stormwater system. A landscape island on the south of the building is not currently curbed. -.Response:-We received this sameicomment from the planning:staff during a flnak Respectfully, JADE CONSLILT414GL LLC P rry CFjlnri�ght.;111. P. ., LE AP Managing Member /pm FILE COPY POST OFFICE BOX 1929 • FAIRHOPE, ALABAMIA 36533 TELEPHONE (251) 928-3443 0 FACSIMILE (251) 928-3665 Architecture, Planning P.O. Box 529 --'telephone 251.947.3864 Interiors, Constmction Administration Robertsdale, Alabama 36567 Fax 251.947.3138 ADAMS STEWART ARCHITECTS, LLC ATTN: Port St. Lucie, Building & Code Regulation Division Review Comments DG Port St. Lucie FL S'fl4c/eYNFO Comment #1 1) PLEASE PROVIDE A ST LUCIE COUNTY PRODUCT REVIEW AFFIDAVIT. LIST ALL COMPONENTS & CLADDING WITH METHODS OF ATTACHMENT INCLUDING. A) WINDOWS & DOORS: Doors-Schlage FL12400. R9, Installed in Frame, Mechanical Fasteners. B) STONE VENEER/NICHIA: Nichiha-FL12098. R7, mechanically installed in frames/tracks supplied by manufacturer. C) EXTERIOR INSULATION PANELS: Product-FL2030.R1011 with supplement over PEMB With Prescribed attachment by Dryvit's recommendation. D) DRYVIT SYSTEM: Supplement to FL2030.Rl0 II, Mechanical Fasteners installed over revers rib PEMB wall panel. E) METAL WALL PANELS: FL7412.2 R5Bigbee, BigbeeLok-324 Rib II F) METAL ROOF PANELS: FL7413.4 R5 Bigbee, BigbeeLok-324 Rib II G) SOFFIT PANELS: N/A * PRODUCT APPROVAL ATTACHED FOR REVIEW. Comment #2 2) PLEASE PROVIDE THE ATTACHMENT OF THE PLYWOOD TO THE METAL BUILDING- FASTENER SIZE & SPACING. Plywood has been removed — Not to be installed on this project. Comment #3 3) THE NOA FOR THE DRYVIT CALLS FOR INSTALLATION OVER GYPSUM SHEATHING. THIS BUILDING DOES NOT HAVE GYPSUM SHEATHING, REVISE AS NEEDED. The NOA is for the Dryvit Material and should be reviewed with the supplement for Dryvit Installation over PEMB: This system is mechanically fastened and not considered as part of the structural diaphragm. The structural integrity is completed at the line of the PEMB wall panel. Attached is an updated A03 Sections and Details reflecting the Manufacturers recommended installation. Comment #4 4) PLEASE PROVIDE TWO ORIGINAL SETS OF THE GEO TECHNICAL REPORT. Attached are two original sets of the Geotech Report as requested. Comment #5 5) PROVIDE UP TO DATE PRODUCT APPROVALS, SOME OF THE EMAILED DOCUMENTS ARE EXPIRED. The product approvals attached have been verified as "APPROVED." Comment #6 6) PLEASE PROVIDE A NOTE ON THE FOUNDATION PLANS STATING THE FOUNDATION IS DESIGNED TO MEET THE REACTIONS OF THE METAL BUILDING. PROVIDE THE METAL BUILDING JOB NUMBER. Please see Updated and Attached S1.1 Foundation Plan with this note added as requested. Comments #7 7) PLEASE PROVIDE ENERGY CALCULATIONS. Energy calculations Have been provided as requested. Comments #8 8) PLEASE PROVIDE A ST LUCIE COUNTY CERTIFICATION FOR DESIGN LOAD COMPLIANCE FORM. This has been provided as requested. Respectfully, Todd F. Stewart