November 13, 2019 1 � V G/ - G (�-�
Mr. Grant Chambers, PE
St. Lucie County Water quality Division
2300 Virginia Ave., Rm. 229
Fort Pierce, FL 34982
RE: HSC Port St Lucie, LLC
Dollar General
Dear Mr. Chambers:
SCANNED
BY
St. Lucie County
RECEIVED
NOV 1 3 2019
Permitting Department
St. Lucie County
This letter is to inform you that the construction of the site work related improvement Items for this project
are substantially complete and in accordance with the project plans and specifications,
We respectfully request a final inspection of the site and access Improvements at your earliest
convenience.
Respectfully,
AVYPNY LTi
Perry C. Jinright, III,
Managing Member.
/sr
t)E
�• -.
No 61289 ;#
# ;r
:l
JEED AP E OF o
SSPS
L O Y' .X'o
POST OFFICE BOX 1929 • FAIRHOPE, ALABANIA 36533
TELEPHONE (251) 928-3443 9 FACSIMILE (251) 928-3665
A City for All Ages"
November 1, 2019
CITY OF PORT ST. LUCIE
UTILITY SYSTEMS DEPARTMENT
900 SE Ogden Lane
Port St. Lucie, FL 34986
(772) 873-6400 — TDD Accessible
(772) 871-7615 — FAX
Heather Burford
St. Lucie County
Via e-mail: burfordh(&stlucieco.oro
SUBJECT: Dollar General
7180 SE US 1 Hwy
PSLUSD File No. 11-242-00
Dear Mrs. Burford:
Brad Macek, Director
The above -referenced project has tied into the City of Port St. Lucie Utility Systems
Department (PSLUSD) water and we have performed the final inspection. PSLUSD does not
have wastewater service to this facility.
Should you have any questions or need further clarification, please do not hesitate at all to
contact me at (772) 871-7309.
Sincerely,
Colleen Ja o sen
Project Coordinator
c: Project File
Steve Harnage, Commercial Development Manager
Lila Gorman, Project Coordinator
1 of 1
i s
40680 Stat y 59
G.W. Stewart, Inc. Bay Minette, Alabama 36507
Stewart Engineering & Construction Office 251 937 6313
�t. Fax 251 937 1782
October 9, 2019
Adams Stewart Architecture
P.O. Box 529
22615 Hwy 59 North
Robertsdale, AL 36567
Re: Dollar General Port St. Lucie Plumbing Change
Dear Mr. Todd Stewart:
The purpose of this document is to approve the Contractors alternate pathway of the Domestic Water
Service into the building.
If you should have any questions orconcerns with regards to this document, please do not hesitate to
contact me at your convenience.
Sincerely,
Glen Wade Stewart, P.E.
President
j1111111
* ADE
\_tCENSF•�qP••i
�.` bN 6593 •••
w
•��p STATE OF rv�:
••;;,S O,A';,,,;��
(RC96 0q --?'z
G.W. Stewart, Inc.
Stewart Engineering & Construction
October 9, 2019
Adams Stewart Architecture
P.O. Box 529
22615 Hwy S9 North
Robertsdale, AL 36567
Re: Dollar General Port St. Lucie Plumbing Change
Dear Mr. Todd Stewart:
40680 State Hwy 59
Bay Minette, Alabama 36507
Office 251 937 6313
Fax 251 937 1782
The purpose of this document is to approve the Contractor's alternate pathway of the Domestic Water
Service into the building.
If you should have any questions or concerns with regards to this document, please do not hesitate to
contact me at your convenience.
Sincerely,
Glen Wade Stewart, P.E.
President
ADE
C E N SE-
�.� N0. 6593
�.� STATE OF ���
�I !qL)(, -oy-,2
G.W. Stewart,
:1-4� Stewart Engineering & Construction
October 11, 2019
Adams Stewart Architecture
P.O. Box 529
22615 Hwy 59 North
Robertsdale, AL 36567
Re: Dollar General Port St. Lucie Underground Electrical Service
Dear Mr. Todd Stewart:
40680 State Hwy 59
Bay Minefte, Alabama 36507
Office 251 937 6313
Fax 251 937 1782
The purpose of this document is to approve the underground electrical service consisting of (2) parallel
runs of 250KCMIL AL in 3" conduit.
If you should have any questions or concerns withregards to this document, please do not hesitate to
contact me at your convenience.
Sincerely,
Glen Wade Stewart, P.E.
President
STP� MIEN
BLDG:—�
DATE:
ELE/ q
DA 7
PLUMB:
DATE:—�
MECH:
DATE:---
1906 -(Z>q02-
Architecture, Planning P.O. Boa 529
Interiors, Construction Adminislmdon Robertsdale, Alabma 36567
ADAMS STEWART
ARCHITECTS,LLC
October 11, 2019
Lucie County Building Department
c/o Building Official
2300 Virginia Avenue
Ft. Pierce, Florida 34982
Re: Dollar General, Building Insulation
To whom it may concern,
Telephone 251.947.3864
Fax 251.947.3138
I have reviewed the insulation requirements for this project and offer the following;
The Insulation as installed meets or exceeds the design specifications and
minimum requirements for R Values as required for this building type.
Should you have any questions, please feel free to call,
Respectfully Submitted,
Todd F. Stewart
Florida Architect #AR92549
Ingram, Brian J
From: Laney Southerly <LSoutherly@cityofpsl.com>
Sent: Wednesday, May 15, 2019 2:36 PM
To: Paul Marcinko; Diana Spriggs; Sherry Ruth
Cc: Nathan Oaks; Project File; Scott Rheams; casey@hixsnedeker.com; Ladd Davis
(Idavis@ rushtonstakely.com)
Subject: RE: 11-242-00: HSC Port St. Lucie, LLC
Paul, we have reviewed the project and the statute and agree that your interpretation is correct that public sewer would
not be considered available for this project as a retail establishment at this time. I hope this e-mail will suffice in lieu of
a letter. Thanks.
Laney Southerly, PE
Utility Engineering Manager
City of Port St. Lucie, Utility Systems Dept.
Utility Engineering Division
900 SE Ogden Lane
Port St Lucie, FL 34983
772-873-6442
From: Paul Marcinko <pmarcinko@jadengineers.com>
Sent: Friday, May 10, 201910:43 AM
To: Laney Southerly <LSoutherly@cityofpsl.com>; Diana Spriggs <DSpriggs@cityofpsl.com>; Sherry Ruth
<sruth @jadengineers.com>
Cc: Nathan Oaks <noaks@jadengineers.com>; Project File <ProjectFile@cityofpsl.com>; Scott Rheams
<scott@hixsnedeker.com>; casey@hixsnedeker.com; Ladd Davis (Idavis@rushtonstakely.com)
<Idavis@ rushtonstakely.com>
Subject: RE: 11-242-00: HSC Port St. Lucie, LLC
Good morning — I just called and left you a voice mail; I apologize for the phone tag...
Based on my discussions with Diana, I believe the city has done the majority of the work. We had a contractor reach out
and offer to perform the pressure test but the city offered to locate the line and test it for us. We appreciate all the
time and effort the city has put forth to inspect this line. The list below is what I understand has been done to this point:
1. Located the end on our property.
a. Cannot locate the other end of the line near the existing lift station.
2. Put dye into the system and cannot find it coming out at the other end anywhere.
3. Probed the line and discovered a blockage.
4. Pressurized the line for the short distance to try and clear the blockage but was unsuccessful.
At this point, even if the existing line were a viable option (which it does not seem that it is), the existing easement for
the line does not benefit the city. Therefore a new line (or the existing line) would still require an easement across 5
different properties with 5 different property owners. It would be impossible for us to convince all these property
owners to allow this line to extend through their properties.
We have discassed'a septic design with the Health Department -and understand that they are willing and able to issue
a permit but needa;letter from the city statmgsewer is not available.
Based on my understanding of the word "available" defined from Chapter 381.0065 (2) (a) of the F.A.C. our property
does not have publicly owned sewer available.
Please let me know if you have any questions. Our project is very time sensitive and we appreciate all that can be done
to expedite this process.
Thank you,
Paul
Paul bfarcinko, P.E.
JADE Consulting
231.895.6063 (cell)
251.928.3443 (office)
From: Laney Southerly rmailto:LSoutherly(aDcityofpsl.coml
Sent: Friday, May 10, 2019 8:20 AM
To: Paul Marcinko; Diana Spriggs; Sherry Ruth
Cc: Nathan Oaks; Project File
Subject: 11-242-00: HSC Port St. Lucie, LLC
Paul, I just left a voice mail on your cell phone.
Can you please provide me a list or description of the work you or your client have done related to the private sewer
force main discharging from the lift station? I am only familiar with what the City has done.
Thanks
Laney Southerly, PE
Utility Engineering Manager
City of Port St. Lucie, Utility Systems Dept.
Utility Engineering Division
900 SE Ogden Lane
Port St Lucie, FL 34983
772-873-6442
CITY OF PORT ST. LUCIE
a�poersT
°c
UTILITY SYSTEMS DEPARTMENT
- m
900 SE Ogden Lane
Port St. Lucie, FL 34983
�Loaro�
(772) 873 6400 TDD Accessible
(772) 871-7615 - FAX Brad Macek, Director
A City furAllAges"
January 23, 2019
Via e-mail:
Re:
Dear -:
Regarding your e-mail request, this is to confirm that the referenced parcel is within the City of Port St.
Lucie Utility Systems Department service area. A public water main is adjacent to the property. There is
not a public sewer line adjacent to the property. \,
Page 1 of 2
Please be advised that water and sewer system extensions maybe required to serve
the property.
A data sheet with recent water and wastewater treatment plant capacity information is attached
for your use.
This should not be construed as a commitment to provide service until approvals by all
regulatory agencies have been obtained; construction plans are approved; a Service Agreement
has been fully executed; and all applicable fees have been paid to the City of Port St. Lucie
Utility Systems Department.
Should you have any questions or require additional information, please feel free to contact our
office.
Sincerely,
Laney Southerly, PE
Engineering Manager
Attachment: Permit Data Sheet
c: Brad Macek, Director
File 11-242-00
11-242-00_012319_2_Ava i lability.doc
Page 2 of 2
Architecture, Planning -
Interiors, Construction Administration
P.O. Box 529 - Telephone 251.947.3864
Robertsdale, Alabama 36567 Fax 251.947.3138
ADAMS STEWART
A R C HITE CT S, LLC
October 14, 2019
Lucie County Building Department
c/o Building Official
2300 Virginia Avenue
Ft. Pierce, Florida 34982
Re: Dollar General, Building Insulation
7180 US Highway!
Port St Lucie, Florida 34952
PERMIT # S r fiSb6 0 7
To whom it may concern,
I have reviewed this project for code compliance in regard to the required R-Values and
insulation requirements. My findings are as follows:
Code Requirements forthis project: 2017 Florida Building Code, Energy
Conservation, Sixth Edition Table (C402.1.3), St Lucie County, Climate Zone 2A
As Required
Roof. Requirements R19+R11 LS Total R30
Wall Requirements R13+R6.5 Cl Total R19.5
As Installed
Roof (1) Layer of R-21 and (1) Layer of R13 Liner System Total R34
Walls (1) Layer of R13 and (1) of R7 Cl Layer Total R20
The insulation as installed meets or exceeds the minimum requirements for this
project.
Should you have any questions, please feel free to call.
Respectfully Submitted,
/A&&l - wv�-
Todd F. Stewart
Florida Architect #AR92549
!k
Jim McGuinness
From: David Johnson
Sent: Thursday, December 5, 2019 8:36 AM
To: Jim McGuinness
Subject: FW: Dollar General Final Inspection o py
Attachments: Scanned from a Xerox Multifunction Printer.pdf
From: Grant M. Chambers <ChambersG@stlucieco.org>
Sent: Tuesday, November 19, 2019 8:59 AM
To: David Johnson <johnsond@stlucieco.org>; Jim McGuinness <mcguinnessj@stlucieco.org>
Cc: David Hays <haysd@stlucieco.org>; Patrick Dayan <DayanP@stlucieco.org>
Subject: FW: Dollar General Final Inspection
SCANNED
Good Morning David, St. LUC y County
Thank you,
!¢Giant--"Chain"Ee—is�fR:E;.q+C vi"iigineei4�,Wd efrQuality/L`and�DZvelopment Division
Ph: 772-462-1707 1 Direct: 772-462-2741 1 2300 Virginia Ave. Fort Pierce 34982
facebook.com/stlucie¢ov I twitter.com/stlucie¢ov I instaeram.com/stlucie¢ov I voutubexom/stlucieeov
3 2616= B;
o t� �a(ts;
FIB FY
From: Paul Marcinko[ma ilto:Pmarcinko Cc) wade ngineers.coml
Sent: Monday, November 18, 2019 12:39 PM
To: Grant M. Chambers <ChambersGC@stlucieco.ore>
Cc: David Hays <haysd@stlucieco.org>; Patrick Dayan <_DayanP@stlucieco.org>; Robert Krip <KripR@stlucieco.org>;
Bobby Laughlin <bobbv@fulcrumgroup.com>; Trey Jinright <tiinright(@ladengineers.com>; Sherry Ruth
<sruth @ iadengineers.com>
Subject: RE: Dollar General Final Inspection
Grant —Thanks for your time inspecting the site and our discussion this morning. Please see attached as we discussed.
I�
Please feelrfree to call me if you have av , .t:al comments. I look forward to your ap". al and the approval from water
quality division.
Paul Maxcinko, P.E.
JADE Consulting
251.895.6063 (cell)
251.928.3443 (office)
From: Grant M. Chambers <ChambersGCastlucieco.org>
Sent: Friday, November 15, 2019 1:15 PM
To: Paul Marcinko <pmarcinko@iadengineers.com>
Cc: David Hays <haysd@stlucieco.ora>; Patrick Dayan <DaVanP@stlucieco.ora>; Robert Krip <KfinR@stIucieco.Org>
Subject: Dollar General Final Inspection
Paul,
Please see attached letter regarding the final walk through that took place this morning. Please provide a response to
the items listed in the letter.
Thank you,
Grant Chambers, P.E. I Civil Engineer I Water Quality/Land Development Division
Ph: 772-462-1707 1 Direct: 772-462-2741 2300 Virginia Ave. Fort Pierce 34982
facebook.com/stlucieeov I twitter.com/stlucieeov I instaeram.com/stlucieeov I voutube.com/stluciezov
c'1 L10 f �lv s 01-f-P
�2616, MIS¢1� FILE COPY
n
Please Note: Florida has very broad public records laws. Most written communications to or from County officials regarding County business are public records
available to the public and media upon request. It is the policy of St. Lucie County that all County records shall be open for personal inspection, examination and /
or copying. Your e-mail communications will be subject to public disclosure unless an exemption applies to the communication. If you received this email in error,
please notify the sender by reply e-mail and delete all materials from all computers.
Please Note: Florida has very broad public records laws. Most written communications to or from County officials regarding County business are public records
available to the public and media upon request. It is the policy of St. Lucie County that all County records shall be open for personal inspection, examination and /
or copying. Your e-mail communications will be subject to public disclosure unless an exemption applies to the communication. If you received this email in error,
please notify the sender by reply e-mail and delete all materials from all computers.
Please Note: Florida has very broad public records laws. Most written communications to or from County officials regarding County business are public records
available to the public and media upon request. It is the policy of St. Lucie County that all County records shall be open for personal inspection, examination and 1
or copying. Your e-mail communications will be subject to public disclosure unless an exemption applies to the communication. If you received this email in error,
please notify the sender by reply e-mail and delete all materials from all computers.
I,
LJO
T.ING{L'L'C,
November 15, 2019
JINRIGHT & ASSOCIATES DEVELOPMENT ENGINEERS
CONSULTING, LLC
Mr. Grant Chambers, PE
St. Lucie County Water Quality Division
2300 Virginia Ave.,; Rm..229
Fort Pierce, FL 34982
RE: HSC Port St Lude,.LLC
Dollar General
Dear Mr. Chambers:
We respectfully submit on behalf of our client our response to comments dated November 15, 2019.
Listed below in bold italic are our responses to the review comments:
A. The retention pond has been holding water for an extended period of time and does not
appear to be recovering as designed. Please advise.
Response: The pond was designed to recover In approximately 2 days (50 hours)
and Is, expected to hold wafer during this time. ,The water table is approximately
one foot below the bottom of the pond and during the wet season with multiple
storms the pond may hold water longer than 2 days. The depth of this water Is
approximately 4".
2. Landscape Islands shall be curbed to protect landscaping and prevent sediment runoff
into the parking area and stormwater system. A landscape island on the south of the
building is not currently curbed.
-.Response:-We received this sameicomment from the planning:staff during a flnak
Respectfully,
JADE CONSLILT414GL LLC
P rry CFjlnri�ght.;111. P. ., LE AP
Managing Member
/pm
FILE COPY
POST OFFICE BOX 1929 • FAIRHOPE, ALABAMIA 36533
TELEPHONE (251) 928-3443 0 FACSIMILE (251) 928-3665
Architecture, Planning P.O. Box 529 --'telephone 251.947.3864
Interiors, Constmction Administration Robertsdale, Alabama 36567 Fax 251.947.3138
ADAMS STEWART
ARCHITECTS, LLC
ATTN: Port St. Lucie, Building & Code Regulation Division
Review Comments
DG Port St. Lucie FL
S'fl4c/eYNFO
Comment #1
1) PLEASE PROVIDE A ST LUCIE COUNTY PRODUCT REVIEW AFFIDAVIT. LIST ALL
COMPONENTS & CLADDING WITH METHODS OF ATTACHMENT INCLUDING.
A) WINDOWS & DOORS: Doors-Schlage FL12400. R9, Installed in Frame, Mechanical
Fasteners.
B) STONE VENEER/NICHIA: Nichiha-FL12098. R7, mechanically installed in
frames/tracks supplied by manufacturer.
C) EXTERIOR INSULATION PANELS: Product-FL2030.R1011 with supplement over PEMB
With Prescribed attachment by Dryvit's recommendation.
D) DRYVIT SYSTEM: Supplement to FL2030.Rl0 II, Mechanical Fasteners installed over
revers rib PEMB wall panel.
E) METAL WALL PANELS: FL7412.2 R5Bigbee, BigbeeLok-324 Rib II
F) METAL ROOF PANELS: FL7413.4 R5 Bigbee, BigbeeLok-324 Rib II
G) SOFFIT PANELS: N/A
* PRODUCT APPROVAL ATTACHED FOR REVIEW.
Comment #2
2) PLEASE PROVIDE THE ATTACHMENT OF THE PLYWOOD TO THE METAL
BUILDING- FASTENER SIZE & SPACING. Plywood has been removed — Not to be
installed on this project.
Comment #3
3) THE NOA FOR THE DRYVIT CALLS FOR INSTALLATION OVER GYPSUM
SHEATHING. THIS BUILDING DOES NOT HAVE GYPSUM SHEATHING, REVISE AS
NEEDED. The NOA is for the Dryvit Material and should be reviewed with the supplement
for Dryvit Installation over PEMB: This system is mechanically fastened and not
considered as part of the structural diaphragm. The structural integrity is completed at the
line of the PEMB wall panel. Attached is an updated A03 Sections and Details reflecting
the Manufacturers recommended installation.
Comment #4
4) PLEASE PROVIDE TWO ORIGINAL SETS OF THE GEO TECHNICAL REPORT.
Attached are two original sets of the Geotech Report as requested.
Comment #5
5) PROVIDE UP TO DATE PRODUCT APPROVALS, SOME OF THE EMAILED
DOCUMENTS ARE EXPIRED. The product approvals attached have been verified as
"APPROVED."
Comment #6
6) PLEASE PROVIDE A NOTE ON THE FOUNDATION PLANS STATING THE
FOUNDATION IS DESIGNED TO MEET THE REACTIONS OF THE METAL BUILDING.
PROVIDE THE METAL BUILDING JOB NUMBER. Please see Updated and Attached
S1.1 Foundation Plan with this note added as requested.
Comments #7
7) PLEASE PROVIDE ENERGY CALCULATIONS.
Energy calculations Have been provided as requested.
Comments #8
8) PLEASE PROVIDE A ST LUCIE COUNTY CERTIFICATION FOR DESIGN LOAD
COMPLIANCE FORM. This has been provided as requested.
Respectfully,