HomeMy WebLinkAboutRESDIENTIAL BUILDING PERMIT CHECKLISTCOUNTY_ -.
F L O R I `D • A�,
When you submit your building permit application for a new single-family residence or duplex, you should use the following
checklist to determine if your application submittal is complete. Only complete applications filled out with ink can be
dLGG LGLL 1Vi LVI.cJJua
HOW MANY
_ ,
r
r
ITEM s ,
yOMMENTS .ba:_ _>
Bui►ding Permit
1
A completely filled out building permit application must
Application
be submitted, including all required information. The
application must be signed by the applicant(s) and the
signatures must be notarized.
Notice of Commencement
I
A recorded Notice of Commencement for all construction
with a value exceeding $2,500 has to be submitted at time
of building permit application.
Construction Plans
2 sets
All proposed constnrction must be accurately shown on
the plans including but not limited to electrical wiring,
plumbing, heat/air-conditioning, gas piping, windows and
doors. The minimum plot size for these plans is 8 % by 11
SCANNED
inches - maximum size is 24 by 36 inches. Both sets of
BY
Sr.
plans need to be signed and sealed by a Florida registered
Lucie
Cie County
engineer and include truss plans. Both sets of plans must
be stamped by the Health Department, if a septic permit is
required.
Surveys
2
Surveys are required for all building permits involving a
primary structure or for accessory structure with a
construction value exceeding $10,000. All copies must be
stamped by the Health Department if a septic permit is
required. Please see our survey requirement sheet for
specific requirements,,The surveys must be signed
&/sealed by a registered Florida surveyor.
Lot Splits
Any parcel or pafcels riot,meeting the minimum
requirements of the lot sizeand dimensional requirements
Non Conforming Lots of
must be reviewed by foe Zoning Department. Any
Record (NCLOR)
division of property not subject to Site Plan review
through the Growth Management Department will require
review by the Zoning Department. Please contact 772-
462-1553.
Subcontractor Agreement
1 e
One subcontrc'tpr agreem"e`nt with original signature is
required for'eaeh subcontractor on the job. The building
permit cannot be issued until it has been determined that
11 subcontractors are properly licensed and registered.
The use of unlicensed contractors is strictly prohibited.
Energy Calculation Form
2
Both forms must bear the original signatures of both the
m Manual J's
2
creator and contractor.
Wind Load Calculation
2 Y
This form must be signed/sealed by a Florida registered
Form
I engineer.
MMENTS'e
Filled Land Affidavit
1
This form is required for all construction, except for
interior renovation. It must bear the original notarized
signature of the property owner. This affidavit serves to
notify the property owner of their responsibility not to
adversely impact their neighbor's properties with
stormwater drainage and runoff.
Product Review Affidavit
2
The Engineer of Record must certify all components listed
on the product affidavit per the submitted plans. To be
accepted for review this affidavit must be completely filled
out and signed and sealed. The actual design pressures
must be noted on the sealed drawings for each component
opening.
Recorded Warranty Deed
If the property has been purchased within the last six
months, the Property Appraiser records may not be to date.
this case we must see a recorded warranty deed in your
�n
name to verify ownership.
OwnerhBuilder Affidavit
1
When the application is applied for under the
owner/builder provisions of Chapter 489.103(7), F.S., the
applicant for this building permit must personally appear
to sign the appropriate affidavit.
Health Department Septic
2
If you are planning to use an existing or new septic
Approval
system, you must first obtain Health Department approval
for the system. Surveys and the construction plans must
bear the original Health Department approval stamp.
Vegetation Removal Permit
I
I
All residential properties of any size require a completed,
Application
signed, and notarizedvegetation removal application. A
set of construction plans, a survey, and a landscape plan (if
applicable per Land Development Code Sections 7.09.03
& 7.09.04.1) must accompany the application. A
vegetation removal plan is also required, including plans
for preservation, re -planting, and tree mitigation as
applicable. If you have any questions please contact the
Environment Resources Dept at 772-462-2526.
Driveway Permit
When you directly access a State or County road, you are
required to obtain a driveway permit from the Florida
Department of Transportation or the St. Lucie County
Road & Bridge Department.
Flood Elevation Certificate
2
If your property is located within a designated flood zone
you are required to file an original flood elevation
certificate signed/sealed by a Florida registered surveyor.
OTES:
Additional information beyond that contained in the checklist may be required in order to ensure a complete review of your
building permit application.
SLCPDSD Revised 08/10/2010