Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ENERGY CONSERVATION - CHECKLIST
Florida Building Code, Sixth Edition (2017) - Energy Conservation EnergyGauge Summit® Fla/Com-2017, Effective Date: Dec 31, 2017 IECC 2015 -Total Building Performance Compliance Option Check List Applications for compliance with the Florida Building Code, Energy Conservation shall include: This Checklist [ The full compliance report generated by the software that contains the project summary, compliance summary, certifications and detailed component compliance reports. The compliance report must include the full input report generated by the software as contigous part of the compliance report. [ '' Boxes appropriately checked in the Mandatory Section of the complaince report. SCANNED BY St. Lucie County FILE COPY EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option 3/15/2019 Pagel of 25 PROJECT Short Desc: FRP MRO Hangar Description: FRP MRO Hangar Owner: Treasure Coast Intematiional Airport Addressl: Treasure Coast Internatiional Airport City: Ft Pierce Addressl: 3000 Curtins King Blvd. State: Florida Zip: 34946 Type: Warehouse Class: New Finished building Jurisdiction: FORT PIERCE, ST LUCIE COUNTY, FL (661100) Conditioned Area: 2710 SF Conditioned & UnConditioned Area: 31135 SF No of Stories: I Permit No: 0 Area entered from Plans Max Tonnage If different, write in: 31186 SF 7.3 EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option 3/15/2019 Page 2 of 25 Component Design Criteria Result Gross Energy Cost (in $) 7,754.0 9,891.0 PASSED LIGHTING CONTROLS EXTERNAL LIGHTING HVAC SYSTEM PLANT WATER HEATING SYSTEMS PIPING SYSTEMS Met all required compliance from Check List? PASSES No Entry PASSES No Entry PASSES No Entry Yes/No/NA IMPORTANT MESSAGE Info 5009 -- -- -- An input report of this design building must be submitted along with this Compliance Report EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 3/15/2019 Page 3 of 25 CERTIFICATIONS I hereby certify that the plans and specifications covered by this calculation are in compliance with the Florida Energy Code Prepared By: Zemp Pepper Building Official: Date: Date: I certify that this building is in compliance with the Florida Energy Efficiency Code Owner Agent: Treasure Coast Intematiional E Date: If Required by Florida law, I hereby certify (*) that the system design is in compliance with the Florida Energy Efficiency Code Architect: Miguel Martin Electrical Designer: Sean Day Lighting Designer: Sean Day Mechanical Designer: Zemp Pepper Plumbing Designer: Zemp Pepper Reg No: AR08255 Reg No: 80296 Reg No: 80296 Reg No: 41147 Reg No: 41147 (*) Signature is required where Florida Law requires design to be performed by registered design professionals. Typed names and registration numbers may be used where all relevant information is contained on signed/sealed plans. B.... 4*1 i V\CENS' °%I • No 47 V. A nWJAL i t ?I �e EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 3/15/2019 Page 4 of 25 Project: FRP MRO Hangar Title: FRP MRO Hangar Type: Warehouse (WEA File: FL ST LUCIE End Uses I)Proposed 2) Baseline Total 506.00 756.40 $7,754 $11,636 ELECTRICITY(MBtu/kWh/$) 506.00 756.40 148254 221640 $7,754 $11,636 AREA LIGHTS 283.50 500.00 83070 146508 $4,345 $7,692 MISC EQUIPMT 175.60 175.60 51459 51459 $2,691 $2,702 PUMPS & MISC 0.20 0.20 50 49 $3 $3 SPACE COOL 34.30 38.90 10044 11392 $525 $598 SPACE HEAT 0.50 2.30 143 686 $7 $36 VENT FANS 11.90 39.40 3488 11546 $182 $606 ,redits Applied: None PASSES 'assing Criteria = 9891 lesign (including any credits) = 7754 'assing requires Proposed Building cost to be at most 85% of laseline cost. This Proposed Building is at 66.6% EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 3/15/2019 Page 5 of 25 External Lighting Compliance Description Category Tradable? Allowance Area or Length ELPA CLP (W/Unit) or No. of Units (W) (W) (Sgft or ft) None Project: FRP MRO Hangar Title: FRP MRO Hangar Type: Warehouse (WEA File: FL ST LUCIE CO INTL.tm3) Lighting Controls Compliance Acronym Ashrae Description ID Area (sq.ft) Design CP Min CP Compli- ance PrOZo1Spl 31,001 Workshop 1,575 2 1 PASSES PrOZo1Sp2 31,001 Workshop 1,575 2 1 PASSES PrOZoISp3 31,001 Workshop 1,575 2 1 PASSES PrOZo1Sp4 31,001 Workshop 1,575 2 1 PASSES PrOZo1Sp5 31,001 Workshop 1,575 2 1 PASSES PrOZoISp6 31,001 Workshop 1,575 2 1 PASSES PrOZo1Sp7 31,001 Workshop 1,575 2 1 PASSES PrOZoISp8 31,001 Workshop 1,575 2 1 PASSES PrOZo1Sp9 31,001 Workshop 1,575 2 1 PASSES PtOZo2Spl 16 Office - Open Plan 2,160 1 1 PASSES PrOZo2Sp2 6 Toilet and Washroom 225 1 1 PASSES PrOZo2Sp3 I Electrical Mechanical Equipment 143 1 1 PASSES Room - General PrOZo2Sp4 I Electrical Mechanical Equipment 91 1 1 PASSES Room - General PrOZo3Spl 1 Electrical Mechanical Equipment 91 1 1 PASSES Room - General PrOZo1Spl 31,001 Workshop 14,250 2 2 PASSES PASSES EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 3/15/2019 Page 6 of 25 Project: FRPMRO Hangar Title: FRP MRO Hangar Type: Warehouse (WEA File: FL_ST_LUCIE_CO_INTL.tm3) System Report Compliance PrOSyl Split-dx heat pump serving Office area Constant Volume Packaged No. of Units System 1 Component Category Capacity Design Eff Design IPLV Comp- Eff Criteria IPLV Criteria liance Cooling System Air Conditioners Air Cooled 87200 12.80 11.00 13.00 12.20 PASSES 65000 to 135000 Btu/h Cooling Capacity Heating System Heat Pumps Air Cooled 60100 3.30 3.30 PASSES (Heating Mode) 65000 to 135000 Btu/h Clg Cap Air Handling Air Handler (Supply) - 3200 0.35 0.82 PASSES System -Supply Constant Volume PrOSy2 IDF room Split-dx unit Constant Volume Air Cooled No. of Units Split System < 65000 Btu/hr 1 Component Category Capacity Design Eff Design IPLV Comp- Eff Criteria IPLV Criteria liance Cooling System Air Conditioners Air Cooled 33600 16.00 13.00 8.00 PASSES Split System < 65000 Btu/h Cooling Capacity Air Handling Air Handler (Supply) - 1500 0.80 0.82 PASSES System -Supply Constant Volume PASSES Plant Compliance Description Installed Size Design Min Design No Eff Eff IPLV Min Category Comp IPLV liance None EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) -.Energy Conservation IECC 2015 - Total Building Performance Compliance Option 3/15/2019 Page 7 of 25 Project: FRP MRO Hangar Title: FRP MRO Hangar Type: Warehouse (WEA File: FL_ST_LUCIE_CO_INTL.tm3) Water Heater Compliance Description Type Category Design Min Eff Eff Design Max Comp Loss Loss liance Water Heater 1 Electric water heater <= 12 [kW] 86.00 0.94 Water Heater 2 Electric water heater <= 12 [kW] 86.00 0.90 PASSES PASSES PASSES Piping System Compliance Category Pipe Dia Is Operating Ins Cond Ins Req Ins Compliance [inches] Runout? Temp [Btu-in/hr Thick [in] Thick [in] [F] SF.F] None EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 3/15/2019 Page 8 of 25 Mandatory Requirements (as applicable) Mandatory requirements compiled by US Department of Energy and Pacific Northwest National Laboratory. Adopted with permission Topic Section Component Description Yes N/A Exempt 1. To be checked by Designer or Engineer Insulation C303.2 Envelope Below -grade wall insulation installed per manufacturer's instructions. Insulation C303.2 Envelope Slab edge insulation installed per manufacturer's ❑ d it instructions. Insulation C303.2 Envelope Above -grade wall insulation installed per d manufacturers instructions. Insulation C402.3 Envelope High-albedo roofs satisfy one of the following: 3-year-aged solar reflectance >= 0.55 and thermal emittance>=0.75 or 3-year-aged solar reflectance index >= 64.0. / Fenestration C402.4.4 Envelope U-factor of opaque doors associated with the 1L'J7' ❑ ❑ building thermal envelope meets requirements. SYSTEM —SPECIFIC C403.2.12.1 Mechanical HVAC fan systems at design conditions do not exceed allowable fan system motor nameplate hp or fan system bhp. SYSTEM —SPECIFIC C403.2.12.2 Mechanical HVAC fan motors not oversized beyond allowable limits. SYSTEM —SPECIFIC C403.2.3(8) Table Mechanical Heat Rejection Equipment: Minimum Efficiency d� Requirement meet those listed in Table HVAC C403.2.7 Mechanical Exhaust air energy recovery on systems meeting Table C403.2.7(1) and C403.2.7(2). SYSTEM —SPECIFIC C403.3 Mechanical Air economizers provided where required, meet d the requirements for design capacity, control signal, ventilation controls, high -limit shut-off, integrated economizer control, and provide a means to relieve excess outside air during .operation. / SYSTEM —SPECIFIC C403.3.2 Mechanical Economizer operation will not increase heating ❑ ❑ energy use during normal operation. SYSTEM —SPECIFIC C403.3.4, Mechanical Water economizers provided where required, 13 it C403.3.4.1, ' meet the requirements for design capacity, C403.3.4.2, maximum pressure drop and integrated C403.3.1 economizer control. SYSTEM —SPECIFIC C403.4.2.1 Mechanical Three -pipe hydronic systems using a common ❑ 0 return for hot and chilled water are not used. SYSTEM —SPECIFIC C403.4.2.3.1 Mechanical Hydronic heat pump systems connected to a 0Er ❑ common water loop meet heat rejection and heat addition requirements. SYSTEM —SPECIFIC C403.4.3.4 Mechanical Open -circuit cooling towers having water cooled �--�/ 1] Lb 11 chiller systems and multiple or vairable speed condenser pumps, are designed so that tower cells can run in parallel with larger of Flow crtieria. SYSTEM —SPECIFIC C404.2 Mechanical Service water heating equipment meets efficiency requirements. Wattage C405.3 Interior Lighting Exit signs do not exceed 5 watts per face. �y i 2. To be checked by Plan Reviewer Plan Review C103.2 Envelope Plans and/or specifications provide all information EJ it ❑ with which compliance can be determined for the building envelope and document where exceptions to the standard are claimed. EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 3/15/2019 Page 9 of 25 Plan Review C103.2 Mechanical Plans, specifications, and/or calculations provide ❑ El all information with which compliance can be determined for the mechanical systems and equipment and document where exceptions to the standard are claimed. Load calculations per acceptable engineering st Plan Review C103.2 Mechanical Plans, specifications, and/or calculations provide ❑ ❑ all information with which compliance can be determined for the service water heating systems and equipment and document where exceptions to the standard are claimed. Hot water system sized per manufact Plan Review C103.2 Interior Lighting Plans, specifications, and/or calculations provide ❑ El all information with which compliance can be determined for the interior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided shoul Plan Review C103.2 Exterior Lighting Plans, specifications, and/or calculations provide �. all information with which compliance can be determined for the exterior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided shoul Insulation C402.2.5 Envelope Slab edge insulation depth/length. Slab insulation 1:1 El extending away from building is covered by pavement or>= 10 inches of soil. Insulation C402.2.6 Project Radiant heating systems panels insulated to ❑ ❑ ❑ >=R-3.5 on face opposite space being heated. HVAC C402.2.6 Mechanical Thermally ineffective panel surfaces of sensible ❑ ❑ ❑ heating panels have insulation >= R-3.5. Insulation C402.2.6 Envelope Radiant panels and associated components, El ❑ ❑ designed for heat transfer from the panel surfaces to the occupants or indoor space are insulated with a minimum of R-3.5. Air Leakage C402.5.7 Envelope Vestibules are installed on all building entrances. Doors have self -closing devices. SYSTEM —SPECIFIC C4032.12.3 Mechanical Fans have efficiency grade (FEG) >= 67. The total El❑ efficiency of the fan at the design point of operation <= 15% of maximum total efficiency of the fan. HVAC C403.2.13 Mechanical Unenclosed spaces that are heated use only 13❑ El radiant heat. HVAC C403.2.4.2 Mechanical Each zone equipped with setback controls using 0❑ automatic time clock or programmable control system. SYSTEM —SPECIFIC C403.2.4.4 Mechanical Zone isolation devices and controls installed ❑ where applicable. SYSTEM —SPECIFIC C403.2.4.7 Mechanical Fault detection and diagnostics installed with ❑ ❑ air-cooled unitary DX units having economizers. . SYSTEM —SPECIFIC C403.2.5 Mechanical Hot water boilers supplying heat via one -or ❑ ❑ ❑ two -pipe systems include outdoor setback control. HVAC C403.2.6.1 Mechanical Demand control ventilation provided for spaces >500 ft2 and >25 people/1000 ft2 occupant density and served by systems with air side economizer, auto modulating outside air damper control, or design airflow>3,000 cfm. SYSTEM —SPECIFIC C403.4.1.1 Mechanical Hydronic and multizone HVAC system controls ❑ 13 areVAV fans driven by mechanical or electrical variable speed drive per Table C403.4.1.1. SYSTEM —SPECIFIC C403.4.1.3 Mechanical Reset static pressure setpoint for DDC controlled 1:1 El VAV boxes reporting to central controller based on the zones requiring the most pressure. SYSTEM —SPECIFIC C403.4.2 Mechanical Temperature reset by representative building loads in pumping systems for chiller and boiler systems >500,000 Btu/h. EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 -Total Building Performance Compliance Option 3/15/2019 Page 10 of25 SYSTEM —SPECIFIC C403.4.2.3.2.1 Mechanical Closed-circuit cooling tower within heat pump loop ❑ ❑ ❑ have either automatic bypass valve or lower leakage positive closure dampers. Open -circuit tower within heat pump loop have automatic valve to bypass all heat pump water flow around the tower. Open- or cl SYSTEM SPECIFIC C403.4.2.4 Mechanical Hydronic systems greater than 500,000 Btu/h designed for variable fluid flow. SYSTEM —SPECIFIC C403.4.2.5 Mechanical System turndown requirement met through multiple single -input boilers, one or more modulating boilers, or a combination of single -input and modulating boilers. Boiler input between 1.0 MBtu/h and 5 MBtu/h has 3:1 turndown ratio, boiler input between 5.0 SYSTEM SPECIFIC C403.4.2.6 Mechanical Chilled water plants with multiple chillers have capability to reduce flow automatically through the chiller plant when a chiller is shut down. Boiler plants with multiple boilers have the capability to reduce flow automatically through the boiler plant SYSTEM —SPECIFIC C403.4.3, Mechanical Fan systems with motors>=7.5 hp. associated C403.4.3.2 with heat rejection equipment to have capability to operate at 2/3 of full -speed and auto speed controls to control the leaving fluid temperature or condensing temp/pressure of heat rejection device. SYSTEM —SPECIFIC C403.4.4.5 Mechanical Multiple zone HVAC systems have supply air temperature reset controls. SYSTEM —SPECIFIC C403.4.4.6 Mechanical Multiple zone VAV systems with CDC of individual zone boxes have static pressure setpoint reset controls. SYSTEM —SPECIFIC C404.2.1 Mechanical Gas -fired water -heating equipment installed in ❑ 13 new buildings: where a singular piece of water -heating equipment>= 1,000 kBtu/h serves the entire building, thermal efficiency>= 90 Et. ' Where multiple pieces of water -heating equipment serve the building wi SYSTEM SPECIFIC C404.4 Mechanical All piping insulated in accordance with section details and Table C403.2.10. SYSTEM —SPECIFIC C404.5, C404.5.1, Mechanical Heated water supply piping conforms to pipe ❑ El C404.5.2 length and volume requirements. Refer to section details. SYSTEM —SPECIFIC C404.6.3 Mechanical Pumps that circulate water between a heater and ❑ ❑ storage tank have controls that limit operation from startup to <= 5 minutes after end of healing cycle. SYSTEM —SPECIFIC C404.7 Mechanical Water distribution system that pumps water from a heated -water supply pipe back to the heated -water source through a cold -water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving - Wattage C405.5.1 Exterior Lighting Exterior lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Plan Review C405.6 Project Group R-2 dwelling units have separate electrical meters. Plan Review C406 Project Plans, specifications, and/or calculations provide all information with which compliance can be determined for the additional energy efficiency - package options. SYSTEM —SPECIFIC C408.2.2.2 Mechanical HVAC hydronic heating and cooling coils have means to balance and have pressure test connections. SYSTEM —SPECIFIC C408.2.2.2 Mechanical HVAC hydronic heating and cooling coils have ❑ 11 ❑ means to balance and have pressure test connections. EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 3/15/2019 Page 11 of25 Insulation C303.1 Envelope Roof insulation installed per manufacturer§€TMs instructions. Blown or poured loose -fill insulation is installed only where the roof slope is <=3 in 12. Insulation C303.1 Envelope Building envelope insulation is labeled with ❑ R-value or insulation certificate providing R-value and other relevant data. Fenestration C303.1.3 Envelope Fenestration products rated in accordance with NFRC. Fenestration C303.1.3 Envelope Fenestration products are certified as to ❑ ❑ performance labels or certificates provided. Insulation C303.2, C402.2.4 Envelope Floor insulation installed per manufacturers ❑ ❑ ❑ instructions. Cavity or structural slab insulation installed in permanent contact with underside of decking or structural slabs. Insulation C303.2.1 Envelope Exterior insulation protected against damage, 0❑ sunlight, moisture, wind, landscaping and equipment maintenance activities. Insulation C303.2.1 Envelope Exterior insulation is protected from damage with a protective material. Verification for exposed foundation insulation may need to occur during Foundation Inspection. Insulation c402.1.3 Envelope Non -swinging opaque doors have R-4.75 insulation. Insulation C402.2.2 Envelope Skylight curbs are insulated to the level of roofs with insulation above deck or R-5. Insulation C402.2.2 Envelope Insulation intended to meet the roof insulation requirements cannot be installed on top of a suspended ceiling. Mark this requirement compliant if insulation is installed accordingly. Air Leakage C402.5 Envelope Building envelope contains a continuous air ❑ ❑ barrier that has been tested and deemed to limit air leakage <= 0.40 cfm/ft2. Air Leakage C402.5.1 Envelope The building envelope contains a continuous air ❑ ❑ ❑ barrier that is sealed in an approved manner and either constructed or tested in an approved manner. Air barrier penetrations are sealed in an approved manner. Air Leakage C402.5.1.1 Envelope All sources of air leakage in the building thermal envelope are sealed, caulked, gasketed, weather stripped or wrapped with moisture vapor -permeable wrapping material to minimize air leakage. Air Leakage C402.5.1.2.1 Envelope The building envelope contains a continuous air barrier that is sealed in an approved manner and material permeability <= 0.004 cfm/ft2. Air barrier penetrations are sealed in an approved manner. Air Leakage C402.5.1.2.2 Envelope The building envelope contains a continuous air - barrier that is sealed in an approved manner and average assembly air leakage <= 0.04 cfm/ft2. Air barrier penetrations are sealed in an approved manner. Air Leakage C402.5.2, C402.5.4 Envelope Factory -built fenestration and doors are labeled 11❑ as meeting air leakage requirements. Air Leakage C402.5.3 Envelope Where open combustion air ducts provide combustion air to open combustion fuel burning appliances, the appliances and combustion air opening are located outside the building thermal envelope or enclosed in a room, isolated from inside the thermal envelope Air Leakage C402.5.5, Envelope Stair and elevator shaft vents have motorized C403.2.4.3 dampers that automatically close. Air Leakage C402.5.5, Envelope Outdoor air and exhaust systems have motorized ❑ ❑ C403.2.4.3 dampers that automatically shut when not in use and meet maximum leakage rates. Check gravity dampers where allowed. Air Leakage C402.5.6 Envelope Weatherseals installed on all loading dock cargo ❑ doors. EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 3/15/2019 Page 12 of 25 Air Leakage C402.5.8 Envelope Recessed luminaires in thermal envelope to limit infiltration and be IC rated and labeled. Seal between interior finish and luminaire housing. HVAC C403.2.1 Mechanical HVAC systems and equipment design loads calculated in accordance with . ANSI/ASHRAE/ACCA Standard 183 or by an approved equivalent computational procedure SYSTEM —SPECIFIC C403.2.10 Mechanical HVAC piping insulation thickness. Where piping ❑ ❑ is installed in or under a slab, verification may need to occur during Foundation Inspection. HVAC C403.2.3 Mechanical HVAC equipment efficiency verified. ❑ ❑ ❑ SYSTEM —SPECIFIC C403.2.3 Mechanical PTAC and PTHP with sleeves 16 in. by 42 in. labeled for replacement only as per Footnote b to Table C403.2.3(3). SYSTEM —SPECIFIC C403.2.4.1 Mechanical Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. SYSTEM —SPECIFIC C403.2.4.1.1 Mechanical Heat pump controls prevent supplemental electric 11❑ ❑ resistance heat from coming on when not needed. HVAC C403.2.4.1.2 Mechanical Thermostatic controls have a 5 A'F deadband. HVAC C403.2.4.1.2 Mechanical Thermostatic controls have a 5 A°F deadband. ❑ ❑ HVAC C403.2.4.1.3 Mechanical Temperature controls have setpoint overlap restrictions. HVAC C403.2.4.2.1, Mechanical Automatic Controls: Setback to 55"F (heat) and 13❑ ❑ C403.2.4.2.2 85'F (cool); 7-day clock, 2-hour occupant override, 10-hour backup SYSTEM —SPECIFIC C403.2.4.2.3 Mechanical Systems include optimum start controls. ❑ 0 ❑ HVAC C403.2.4.5, Mechanical Snowfice melting system sensors for future C403.2.4.6 connection to controls. Freeze protection systems have automatic controls installed. HVAC C403.2.6.2 Mechanical Enclosed parking garage ventilation has automatic contaminant detection and capacity to stage or modulate fans to 60% or less of design capacity. HVAC C403.2.9 Mechanical HVAC ducts and plenums insulated. Where ducts El ❑ 11 or plenums are installed in or under a slab, verification may need to occur during Foundation Inspection. SYSTEM —SPECIFIC C403.2.9.1.3 Mechanical Ductwork operating>3 in. water column requires air leakage testing. SYSTEM —SPECIFIC C403.4.1.2 Mechanical VAV fans have static pressure sensors located so controller setpoint <=1.2 w.c.. SYSTEM —SPECIFIC C403.4.2.2 Mechanical Two -pipe hydronic systems using a common distribution system have controls to allow a deadband >=150F, allow operation in one mode for at least 4 his before changeover, and have • rest controls to limit heating and cooling supply temperature to <=30 -F. SYSTEM —SPECIFIC C403.4.2.3.3 Mechanical Two -position automatic valve interlocked to shut 11❑ off water flow when hydronic heat pump with pumping system >10 hp is off. SYSTEM —SPECIFIC C403.4.4.5, Mechanical Zone controls can limit simultaneous heating and C403.4.4.5.1-4 cooling and sequence heating and cooling to each zone. SYSTEM —SPECIFIC C403.4.5 Mechanical Condenser heat recovery system that can heat water to 85OF or provide 60% of peak heat rejection is installed for preheating of service hot " water. SYSTEM —SPECIFIC C403.4.6 Mechanical Hot gas "bypass limited to: El ❑ ❑ <=240 kBtu/h - 50% capacity, - >240 kBtu/h - 25% capacity SYSTEM —SPECIFIC C404.3 Mechanical Heat traps installed on non -circulating storage ❑ water tanks. EnergyGauge Summit© Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 3/15/2019 Page 13 of 25 I SYSTEM_SPECIFIC C404.3 Mechanical Heat traps installed on supply and discharge 11❑ ❑ piping of non -circulating systems. SYSTEM —SPECIFIC C404.3 Mechanical Heat traps installed on supply and discharge piping of non -circulating systems. SYSTEM —SPECIFIC C404.6.1 Mechanical Controls are installed that limit the operation of a recirculation pump installed to maintain temperature of a storage tank. System return pipe is a dedicated return pipe or a cold water supply pipe. SYSTEM —SPECIFIC C404.6.1, C404.6.2 Mechanical Automatic time switches installed to automatically ❑ El switch off the recirculating hot-water system or heat trace. SYSTEM —SPECIFIC C404.9.1 Mechanical Pool heaters are equipped with on/off switch and ❑ ❑ El no continuously burning pilot light. SYSTEM —SPECIFIC C404.9.2 Mechanical Time switches are installed on all pool heaters and pumps. SYSTEM —SPECIFIC C404.9.2 Mechanical Time switches are installed on all pool heaters and pumps. SYSTEM —SPECIFIC C404.9.3 Mechanical Vapor retardant pool covers are provided for heated pools and permanently installed spas. Controls C405.2.1 Interior Lighting Lighting controls installed to uniformly reduce the lighting load by at least 50%. Controls C405.2.1 Interior Lighting Occupancy sensors installed in required spaces. Controls C405.2.1, Interior Lighting Independent lighting controls installed per C405.2.2.3 approved lighting plans and all manual controls readily accessible and visible to occupants. Controls C405.2.2.1 Interior Lighting Automatic controls to shut off all building lighting installed in all buildings. Controls C405.2.3 Interior Lighting Daylight zones provided with individual controls 0 11❑ that control the lights independent of general area lighting. Controls C405.2.3, Interior Lighting Primary sidelighted areas are equipped with C405.2.3.1, required lighting controls. C405.2.3.2 Controls C405.2.3, Interior Lighting Enclosed spaces with daylight area under 0405.2.3.1, skylights and rooftop monitors are equipped with C405.2.3.3 required lighting controls. Controls C405.2.4 Interior Lighting Separate lighting control devices for specific uses ❑ ❑ installed per approved lighting plans. Wattage C405.2.4 Interior Lighting Additional interior lighting power allowed for special functions per the approved lighting plans and is automatically controlled and separated from general lighting. Controls C405.2.5 Exterior Lighting Automatic lighting controls for exterior lighting installed. Controls will be daylight controlled, set based on business operation time -of -day, or reduce connected lighting > 30%. Wattage C405.4.1 Interior Lighting Interior installed lamp and fixture lighting power is ❑ 11 El consistent with what isshown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Mandatory Additional C406.4 Project Enhanced digital lighting controls efficiency El 0 El package: Interior lighting has following enhanced lighting controls in accordance with Section C405.2.2: - Luminaires capable of continuous dimming and being addressed individually, <= 8 luminaires controlled in Mandatory Additional C406.6 Project Dedicate outdoor air system efficiency package: El ❑ Buildings with hydronic and/or multiple -zone HVAC systems are equipped with an independent ventilation system designed to provide >= 100-percent outdoor air to each individual occupied space, as specified by EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 3/15/2019 Page 14 of 25 Mandatory Additional C406.7, C406.7.1 Project - HVAC C408.2.2.1 Mechanical HVAC C408.2.2.1 Mechanical Testing C408.2.3.2 Mechanical - Enhanced Service Water Heat System efficiency package. One of the following SWH system enhancements must satisfy 60 percent of hot water requirements, or 100 percent if the building otherwise complies with heat recovery per Section C403.4.5: Waste heat re Air outlets and zone terminal devices have means for air balancing. Air outlets and zone terminal devices have means El for air balancing. HVAC control systems have been tested to El ensure proper operation, calibration and adjustment of controls. _ ❑ ❑ ❑ ❑ 4. To be checked by Inspector at Project Completion and Prior to Issuance of Certificate of Occupancy Post Construction C303.3, C408.2.5.2 Interior Lighting Furnished O&M instructions for systems and ❑���� equipment to the building owner or designated representative. Post Construction C303.3, 0408.2.6.3 Mechanical Furnished O&M manuals for HVAC systems ❑ ❑ within 90 days of system acceptance. Fenestration C402.4.2.2 Envelope Skylights in office, storage, automotive service, manufacturing, non -refrigerated warehouse, retail store, and distribution/sorting area have a measured haze value > 90 percent unless designed to exclude direct sunlight. Post Construction C408.2.1 Mechanical Commissioning plan developed by registered ❑ ❑ design professional or approved agency. Post Construction C408.2.3.1 Mechanical HVAC equipment has been tested to ensure ' proper operation. Post Construction C408.2.3.3 Mechanical Economizers have been tested to ensure proper operation. Post Construction C408.2.4 Mechanical Preliminary commissioning report completed and certified by registered design professional or approved agency. Post Construction C408.2.5.1 Mechanical Furnished HVAC as -built drawings submitted within 90 days of system acceptance. Post Construction C408.2.5.1 Interior Lighting Furnished as -built drawings for electric power 11❑ systems within 90 days of system acceptance. Post Construction C408.2.5.3 Mechanical An air and/or hydronic system balancing report is provided for HVAC systems. Post Construction C408.2.5.4 Mechanical Final commissioning report due to building owner ❑ within 90 days of receipt of certificate of occupancy. Post Construction C408.3 Interior Lighting Lighting systems have been tested to ensure proper calibration, adjustment, programming, and operation. EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 3/15/2019 Page 15 of25 Input Data Report Proiect Information Project Name: FRP MRO Hangar Project Title: FRP MRO Hangar Address: Treasure Coast Internatiional Airport State: Florida Owner: Treasure Coast Internatiional Ai Building Type: Warehouse No.of Stories: I Bldg. Rotation: None Zip: 34946 Building Classification: New Finished building GrossArea (SF): 31,135 Zones No Acronym Description Type Area Multi Total Area Isf] Isf] I PrOZol - 1 Hangar (North half) UNCONDITIONED 14175.0 1 14175.0 ❑ 2 PrOZo2 Office area CONDITIONED 2619.0 1 2619.0 ❑ 3 PrOZo3 IDF Room CONDITIONED 91.0 1 91.0 ❑ 4 PrOZol - 2 Hangar (South half) UNCONDITIONED 14250.0 1 14250.0 ❑ EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 3/15/2019 Page 16 of 25 Spaces No Acronym Description Type Depth Width Height Mult Total Total [ft] [ft] IN Area Vol[cf] [sf] In Zone: PrOZol - 1 1 PrOZo1Spl Hangar North half Workshop 25.00 63.00 50.00 1 1575.0 78750.0 2 PrOZo ISp2 Hangar South half Workshop 25.00 63.00 50.00 1 1575.0 78750.0 3 PrOZo ISp3 Hangar Workshop 25.00 63.00 50.00 1 1575.0 78750.0 4 PrOZolSp4 Hangar Workshop 25.00 63.00 50.00 1 1575.0 78750.0 5 PrOZolSp5 Hangar South half Workshop 25.00 63.00 50.00 I 1575.0 78750.0 6 PrOZo1Sp6 Hangar South half Workshop 25.00 63.00 50.00 1 1575.0 78750.0 ❑ 7 PrOZo ISp7 Hangar South half Workshop 25.00 63.00 50.00 1 1575.0 78750.0 ❑ 8 PrOZo1Sp8 Hangar Workshop 25.00 _ 63.00 50.00 1 1575.0 78750.0 9 PrOZolSp9 Hangar Workshop 25.00 63.00 50.00 1 1575.0 78750.0 In Zone: PrOZo2 1 Pr0Zo2Sp1 Open office Office - Open Plan 40.00 54.00 9.00 1 2160.0 19440.0 ❑ 2 PrOZo2Sp2 Restrooms Toilet and Washroom 15.00 15.00 9.00 1 225.0 2025.0 ❑ 3 PrOZo2Sp3 Mech room Electrical Mechanical - 13.00 11.00 12.00 1 143.0 1716.0 Equipment Room - General 4 PrOZo2Sp4 Electrical Room Electrical Mechanical 13.00 7.00 12.00 I 91.0 1092.0 Equipment Room - General In Zone: PrOZo3 l PrOZo3Spl IDF room Electrical Mechanical 7.00 13.00 9.00 1 91.0 819.0 Equipment Room - General In Zone: PrOZol - 2 1 PrOZolSpl Hangar South half Workshop 75.00 190.00 50.00 1 14250.0 712500.0E] EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 3/15/2019 Page 17 of 25 Lighting No Type Category No. of Watts per Power Control Type No.of Luminaires Luminaire 1W) Ctrl pts In Zone: Pr_OZol -1 In Space: Pr0Zo1Sp1 1 LED In Space: Pr0Zo1Sp2 1 LED In Space: Pr0Zo1Sp3 1 LED In Space: Pr0Zo1Sp4 1 LED In Space: PrOZo1Sp5 1 LED In Space: Pr0Zo1Sp6 1 LED In Space: Pr0Zo1Sp7 1 LED In Space: Pr0Zo1Sp8 1 LED In Space: Pr0Zo1Sp9 1 LED In Zone: PrOZo2 In Space: Pr0Zo2Sp1 1 LED In Space: PrOZo2Sp2 1 LED 2 . LED In Space: PrOZo2Sp3 1 LED In Space: PrOZo2Sp4 1 LED In Zone: PrOZo3 In Space: Pr0Zo3Sp1 1 LED In Zone: PrOZol - 2 In Space: Pr0Zo1Sp1 General Lighting General Lighting General Lighting General Lighting General Lighting General, Lighting General Lighting General Lighting General Lighting General Lighting Task Lighting General Lighting 2 800 1600 Occupancy sensor with 2 ❑ Daylighting On/Off 2 800 1600 Occupancy sensor with 2 ❑ Daylighting On/Off 2 800 1600 Occupancy sensor with 2 ❑ Daylighting On/Off 2 800 1600 Occupancy sensor with 2 ❑ Daylighting On/Off 2 800 1600 Occupancy sensor with 2 ❑ Daylighting On/Off 2 800 1600 Occupancy sensor with 2 ❑ Daylighting On/Off 2 800 1600 Occupancy sensor with 2 ❑ Daylighting On/Off 2 800 1600 Occupancy sensor with 2 ❑ Daylighting On/Off 2 800 1600 Occupancy sensor with 2 ❑ Daylighting On/Off 0 2 4 General Lighting 2 General Lighting 1 32 192 Occupancy sensor with Daylighting On/Off 40 80 Occupancy sensor with Daylighting On/Off 31 124 Occupancy sensor with Daylighting On/Off 75 150 Manual On/Off 90 90 Occupancy Sensor with Timer with Daylighting continuous General Lighting 1 90 90 Manual On/Off EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 3/15/2019 Page 18 of 25 1 1 ❑ I LED General Lighting 15 800 12000 Occupancy sensor with 2 Daylighting On/Off Walls (Walls will be rotated clockwise by building rotation value) No Description Type Width H (Effec) Multi Area Orient Cond- Heat Dens. R-Value IN [ftl plier [sf] ation uctance Capacity [lb/cfl [h.sUBtuj [Btu/h.sf.Fl [Btu/sf.Fl In Zone: PrOZol -1 1 PrOZol Wal Panel with 7/16" 190.00 50.00 1 9500.0 North 1.1057 0.9 ❑ panels 2 Hangar South wall Panel with 7/16" 190.00 50.00 1 9500.0 South 0.9981 1.0 ❑ panels 3 Hangar East wall Panel with 7/16" 150.00 50.00 1 7500.0 East 1.1057 0.9 ❑ panels 4 . Hangar West wall Panel with 7/16" 150.00 50.00 1 7500.0 West 1.1057 0.9 ❑ panels• In Zone: PrOZo2 1 Office area North wall T24R19a 75.00 12.00 1 900.0 North 0.0466 0.853 7.28 21.5 ❑ 2 Office area South wall T24R19a 75.00 12.00 1 900.0 South 0.0466 0.853 7.28 21.5 ❑ 3 Office area East wall T24R19a 40.00 12.00 1 480.0 East 0.0466 0.853 7.28 21.5 ❑ 4 Office area West wall T24R19a 40.00 12.00 1 480.0 West. 0.0466 0.853 7.28 21.5 ❑ In Zone: PrOZo3 1 ME Room North wall T24R19a 13.00 12.00 1 156.0 North 0.0466 0.853 7.28 21.5 ❑ 2 IDF room West wall T24R19a 7.00 12.00 1 84.0 West 0.0466 0.853 7.28 21.5 ❑ In Zone: Pr0Zol - 2 1 PrOZol Wal Panel with 7/16" 190.00 50.00 1 9500.0 North 1.1057 0.9 ❑ panels 2 Hangar South wall Panel with 7/16" 190.00 50.00 1 9500.0 South 0.998i 1.0 ❑ panels 3 Hangar East wall Panel with 7/16" 150.00 50.00 1 7500.0 East 1.1057 0.9 ❑ panels 4 Hangar West wall Panel with 7/16" 150.00 50.00 1 7500.0 West 1.1057 0.9 ❑ panels EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 3/15/2019 Page 19 of 25 Windows (Windows will be rotated clockwise by building rotation value) No Description Orientation Shaded U SHGC Vis.Tra W H (Effec) Multi Total Area [Btu/hr sf F] [ft] IN plier [sf] In Zone: PrOZo2 In Wall: Pr0Zo2Wa1 1 Pr0Zo2WalWi1 North No 0.2600 0.38 0.76 54.00 7.00 1 378.0 In Wall: PrOZo2Wa3 I Pr0Z02Wa3Wil East No 0.2600 0.38 0.76 39.00 7.00 1 273.0 Doors No Description Type Shade? Width H (Effec) Multi Area Cond. Dens. Ht Cap. R [ft] IN plier [sf] [Btu/h.sf.F] [lb/cf] [Btu/sf. [h.sEF/ F] Btu] Zone: In Wall: ❑� Roofs No Description Type Width H (Effec) Multi Area Tilt Cond. Heat Cap Dens. R-Value [ftl [ft] plier [sf] [deg] [Btu/h.Sf.F] [Btu/sf.F] [lb/cfl [h.sf.FBtu Zone: PrOZol -1 1 Hangar Roof Mtl Bldg Roof/R-11 190.00 150.00 1 28500.0 0.00 0.0967 0.87 9.57 10.3 Batt Zone: PrOZo2 1 PrOZo2Rfl Mtl Bldg Roof/R-19 75.00 40.00 1 3000.0 0.00 0.0492 1.34 9.49 20.3 Batt Zone: PrOZo3 1 PrOZo3Rfl Mtl Bldg Roof/R-19 13.00 7.00 l 91.0 0.00 0.0492 1.34 9.49 20.3 ❑ Batt Zone: Pr0Zo1 - 2 1 Hangar Roof Mtl Bldg Roof/R-19 190.00 150.00 1 28500.0 0.00 0.0492 1.34 9.49 20.3 Batt EnergyGauge Summi* Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dee 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option, 3/15/2019 Page 20 of 25 Skylights No Description Type U SHGC Vis.Trans W H (Effec) Multi- Area Total Area [Btu/hr sf F] Vt] [ft] plier [sf] [sf] In Zone: In Roof: Floors No Description Type Width H (Effec) Multi Area Cond. Heat Cap. Dens. R-Value [ft] [11] plier [sf] [Btu/h.sf.F [Btu/sf. F] [lb/cf] [h.sf.FBtu In Zone: PrOZol -1 1 Hangar floor 1 ft. soil, concrete 190.00 150.00 1 floor, carpet and rubber pad In Zone: PrOZo2 1 PrOZo2F11 1 R. soil, concrete 75.00 40.00 1 floor, carpet and rubber pad In Zone: PrOZo3 1 PrOZo3F11 1 ft. soil, concrete 13.00 7.00 1 floor, carpet and rubber pad In Zone: PrOZol - 2 1 Hangar floor 1 ft. soil, concrete 190.00 150.00 1 floor, carpet and rubber pad 28500.0 0.2681 34.00 113.33 3.73 ❑ I 3000.0 0.2681 34.00 113.33 3.73 ❑ 91.0 0.2681 34.00 113.33 3.73 ❑ I 28500.0 0.2681 34.00 113.33 3.73.. ❑ I EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 3/15/2019 Page 21 of 25 Systems PrOSyl Split-dx heat pump serving Office area Constant Volume Packaged No. Of Units System 1 Component Category Capacity Efficiency IPLV 1 Cooling System 87200.00 12.80 13.00 ❑ 2 Heating System 60100.00 3.30 ❑ 3 Air Handling System -Supply 3200.00 0.35 ❑ PrOSy2 IDF room Split-dx unit Constant Volume Air Cooled No. Of Units Split System < 65000 Btu/hr 1 Component Category Capacity Efficiency IPLV 1 Cooling System 33600.00 16.00 8.00 ❑ 2 Air Handling System -Supply 1500.00 0.80 ❑ Plant Equipment Category Size Inst.NtEff. IPLV Water Heaters W-Heater Description Capacity Cap.Unit I/P Rt. Efficiency Loss 1 Electric water heater 20 [Gal] 3 [kW] 86.0000 [Ef] iEim/h] ❑ 2 Electric water heater 50 [Gal] 6 [kW] 86.0000 [Ef] [Bm/h] ❑ Ext-Lighting Description Category No. of Watts per Area/Len/No Control Wattage Lumin- Lumin- [sf/ft/No) Type [Wj aires aire C EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 3/15/2019 Page 22 of 25 Piping No Type Operating Insulation Nomonal pipe Insulation Is Temp Conductivity Diameter Thickness Runout? [F] [ Btu-in/h.sf.F] [in] [in] . ❑. Fenestration Used Name Glass Type No. of Glass SHGC VLT Panes Conductance [Btu/h.sf.F] ApLbWndl3 User Defined 2 0.2600 0.3800 0.7600 Materials Used Mat No Acronym Description Only RValue Thick Cond- Density Sp. Heat R-Value [h.sf.F/Btu] [ft] uctivity [lb/cf] [Btu/Ib.F] Used [Btu/h.ft.F 187 Mat1187 GYP OR PLAS No 0.4533 0.0417 0.0920 50.00 0.2000 ❑ BOARD,1/2IN 178 Mat1178 CARPET W/RUBBER PAD Yes 1.2300 ❑ 265 Mat1265 Soil, 1 R No 2.0000 1.0000 0.5000 100.00 0.2000 ❑ 48 Mat148 6 in. Heavyweight concrete No 0.5000 0.5000 1.0000 140.00 0.2000 ❑ 12 Matl12 3 in. Insulation No 10.0000 0.2500 0.0250 2.00 0.2000 ❑ 23 Mat123 6 in. Insulation No 20.0000 0.5000 0.0250 5.70 0.2000 ❑ 272 Mat1272 Panel with 7/16" panels Yes 0.9044 ❑ 275 Mat1275 Panel with 7/16" panels Yes 1.0019 ❑ (1.375") 244 Mat1244 PLYWOOD, 1/21N No 0.6318 0.0417 0.0660 34.00 0.2900 ❑ 82 Mat182 ASPHALT -SHINGLE AND Yes 0.4400 ❑ SIDING 94 Mat194 BUILT-UP ROOFING, 3/81N No 0.3366 0.0313 0.0930 70.00 0.3500 ❑ 91 Matl91 BUILDING PAPER, Yes 0.0600 ❑ PERMEABLE FELT 407 Mat1407 R-19 Generic Insulation No 19.0000 0.4147 0.0218 0.30 0.2000 ❑ 77 Matl77 AIR LAYER, 314IN TO 4IN, Yes 0.8700 ❑ HORIZ. ROOFS EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 3/15/2019 Page 23 of25 Constructs Used No Name Simple Massless Conductance Heat Cap Density RValue Construct Construct [Btu/h.sf.F] [Btu/sf.F] [lb/cfJ [h.sf.FBtu] 1021 Panel with 7/16" panels No Yes 1.11 0.9 Layer Material Material Thickness Framing No. IN Factor 1 272 Panel with 7/16" panels 0.000 ❑ No Name Simple Massless Conductance Heat Cap Density RValue Construct Construct [Btu/h.sf.F] [Btu/sEF] [lb/cf] [h.sf.FBtu] 1024 Panel with 7/16" panels No Yes 1.00 1.0 Layer Material Material Thickness Framing No. [ft] Factor 1 275 Panel with 7/16" panels (1.375") 0.000 ❑ No Name Simple Massless Conductance Heat Cap Density RValue Construct Construct [Btu/h.sf.F] [Btu/sEF] []b/cfJ [h.sLFBtu] 1046 Mtl Bldg Roof/R-11 Batt No No 0.10 0.87 9.57 10.3 Layer Material Material Thickness Framing No. IN Factor 1 94 BUILT-UP ROOFING, 3/8IN 0.0313 0.000 ❑ 2 12 3 in. Insulation 0.2500 0.000 ❑ No Name Simple Massless Conductance Heat Cap Density RValue Construct Construct [Btu/h.sf.F] [Btu/sf.F] [lb/cf] [h.sLFBtu] 1047 Mtl Bldg Roof/R-19 Batt No No 0.05 1.34 9.49 20.3 Layer Material Material Thickness Framing No. IN Factor 1 94 BUILT-UP ROOFING, 3/81N 0.0313 0.000 ❑ 2 23 6 in. Insulation 0.5000 0.000 ❑ EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 3/15/2019 Page 24 of 25 No Name Simple Massless Conductance Heat Cap Density RValue Construct Construct [Btu/h.sf.F] [Btu/st:F] [Ib/cf] [h.sf.FBtu] 1052 T24R19a No No 0.05 0.85 7.28 21.5 ❑ Layer Material Material Thickness Framing No. IN Factor I 82 ASPHALT -SHINGLE AND SIDING 0.000 ❑ 2 91 BUILDING PAPER, PERMEABLE FELT 0.000 ❑ 3 244 PLYWOOD, 1/21N 0.0417 0.000 ❑ 4 77 AIR LAYER, 3/41N TO 41N, HORIZ. 0.000 ❑ ROOFS 5 407 R-19 Generic Insulation 0.4147 0.000 ❑ 6 187 GYP OR PLAS BOARD,1/2IN 0.0417 0.000 ❑ No Name Simple Massless Conductance Heat Cap Density RValue Construct Construct [Btu/hsf.F] [B[u/sf.F] [Ib/cf] [hsf.FBtu] 1056 Mtl Bldg Roof/R-19 Batt No No 0.05 1.34 9.49 20.3 ❑ Layer Material Material Thickness Framing No. [ft] Factor 1 94 BUILT-UP ROOFING, 3/8IN 0.0313 0.000 ❑ 2 23 6 in. Insulation 0.5000 0.000 ❑ No Name Simple Massless Conductance Heat Cap Density RValue Construct Construct [B[u/hsf.F] [Btu/sf.F] []b/cf] [hsf.FBtu] 1057 1 ft. soil, concrete floor, carpet and No No 0.27 34.00 113.33 3.7 ❑ rubber pad Layer Material Material Thickness Framing No. [ft] Factor 1 265 Soil, 1 ft 1.0000 0.000 ❑ 2 48 6 in. Heavyweight concrete 0.5000 0.000 ❑ 3 178 CARPET W/RUBBER PAD 0.000 ❑ EnergyGauge Summit@) Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 3/15/2019 Page 25 of 25