Loading...
HomeMy WebLinkAboutTHRESHOLD REPORT SUMMARYD 96(9-063-D SCANNED D I AVCON, INC. St. Lucie County ENGINEERS & PLANNERS AVCON Project No. 2017.159.01 September 9, 2019 St. Lucie County 2300 Virginia Avenue Fort Pierce, FI 34982 Attention: Mr. Gary Stepalavich, Building Official Reference: MRO FPR Hangar Project No. 1907-0559) St. Lucie County, Florida THRESHOLD REPORT SUMMARY NO.1 Dear Mr. Stepalavich: 5555 E. Michigan St., Suite 200 Orlando, Florida 32822 Phone: (407) 599-1122 .� y , l•_� Fax: (407) 599-1133 5= 1 www.avconine.com As directed, representatives from AVCON, Inc. performed on -site, threshold inspection services for the MRO FPR Hangar project. This report summarizes our threshold inspection services performed during the inspection period of August 26, 2019 through August 28, 2019. Our inspections were performed in accordance with the structural documents, signed, and sealed by the Engineer of Record, Luca DelVerme PE (AVCON INC), and the project specifications. Our special inspector and his duly authorized representative(s) reported their observations as noted on the attached Daily Threshold Reports with all structural non-compliance items noted within the attached Special Inspection Log (SIL). All non-compliance Items, or SIL's, previously reported as non -compliant with regard to the plans or specifications, will be reevaluated by our Special Inspector after corrective action is taken by the General Contractor or the deficient conditions have been approved through written approval by the Engineer of Record. During the inspection period of August 26, 2019 through August 28, 2019, and to the best of our knowledge and belief, the construction of all structural load -bearing components described in the threshold inspection plan complies with permitted documents, with revisions as approved by the Engineer of Record, except as noted on the SIL. Should you have any questions or concerns regarding these reports, or desire any additional information, please contact us. Sincerely, AVCON, Inc. Certificate of Authorization No. 5057 RickV. Baldocchi, P.E. Vice President STATE OF FLORIDA Professional Engineer No. 38092 Registered Special Inspector No.1019 cc: Addressee, Gary Stepalavich SteoalavichG@stlucieco.org County Project Manager, Scotty Beaulieu beaulieus0stiucieco.org Chief Plans Examiner, William Durden DurdenW@stiucieco.org Construction Project Manager, Robert Hatton rhatton@ahrenscompanies.com 0 _qD 4,j1".jGEN.VF 'J a Na 39092' � e �* eT�IEOF "kG 14 sro uc ••4o,no,an• «aNf X PMvaV 9nrrlV vEmee Em Pvif1 old.. d vJe Cmmen m M wutlmJ vgnemm.am. m.ve�••mwmvnrea u,,.m<uWomw��.ou /.vmN. ev4 asssv,sru cperrs�aur suresoo CIVIL & STRUCTURAL • AIRPORT & AVIATION CONSULTING • TRANSPORTATION DESIGN & PLANNING • 6 --+� ►r�_ AVCON Project No. 2017.159.01 September 9, 2019 St. Lucie County 2300 Virginia Avenue Fort Pierce, FI 34982 Attention: Mr. Gary Stepalavich, Building Official Reference: MRO FPR Hangar Project No. 1907-0552 St. Lucie County, Florida THRESHOLD REPORT SUMMARY NO. 1 INSPECTOR(S): Jason Teliszczak (AVCON, Inc.) AVCON, INC. ENGINEERS & PLANNERS 5555 E. Michigan St., Suite 200 Orlando, Florida 32822 Phone: (407) 599-1122 Fax: (407) 599-1133 www.avconinc.com DAILY REPORT(S): Threshold Inspection Daily Report(s): 8/26/19 (1); 8/27/19 (1); 8/28/19 (1) [See attached report(s) for locations and observations.] SPECIAL INSPECTION LOG: Added this Summary Period: Resolved this Summary Period: Outstanding for the Project: ATTACHMENT(S): - None. Page 2 of 2 CIVIL & STRUCTURAL • AIRPORT & AVIATION CONSULTING 9 TRANSPORTATION DESIGN & PLANNING 9 s AVCON, INC. ENGINEERS &PLANNERS 5555 E. Michigan St., Suite 200 Orlando, Florida 32822 AVCON Project No. 2017.159.01 Phone: (407) 599-1122 Fax: (407) 599-1133 www.avconine.com St. Lucie County 2300 Virginia Avenue Fort Pierce, FI 34982 Reference: MRO FPR Hangar Project No. 700025 Orlando, Orange County, Florida DAILY THRESHOLD REPORT NO. 1 Date Inspected: Monday, August 26 Inspector(s): Jason Teliszczak (AVCON, Inc.) TOTAL NUMBER OF INSPECTION REPORTS =1 Civil & Structural Engineering • Airport & Aviation Consulting • Transportation Design & Planning 5555 East Michigan Street, Suite 200 • Orlando, FL 32822-2779 • Tel 407.599.1122 • Fax 407.599.1133 • www.avconlnc.com w IIVJr CI, I IVIV UMILT M=rUR I PROJECT: FPR MRO_Hangar LOCATION: Treasure Coast Intemationai Airport & Busingf PERMIT AGENCY: St. Lucie County CLIENT! FIELD CONTACT: Robert Hatton SCOPE OF WORK: Began installing helical piles. Contractor Is Cantsink Foundation Stability., Installed piles to approx. 38.6' which is deeper than planned. WA DATE- 08/27/19 Revision 9-4-19 WORK ORDER NO.: BUILDING PERMIT NO.: Permit No. 1907-0552 Decided to Install In the same general locations as soil borings. NE, SW, BE. NW could not be placed as pit was not completed. Four were completed with two crews, and one machine. The helical pile submittal used on site did not Include an acceptance stamp by the SEOR or the County Building Department. (SIL No. 1) INSPECTOR: Jason Tellszczak - w/Avcon FIELD COPIES TO: AVCON AVCON, INC. Ie.4LIN U.M& FkANNLRS i3i3 f: Alichiyan $I , Suile _`00 VW., 1407) ,Ploi i3, Fua: HU]1 S�n>-I U} AVCON Project No. 2017.159.01 St. Lucie County 2300 Virginia Avenue Fort Pierce, FI34982 Reference: MRO FPR Hangar Project No. 700025 Orlando, Orange County, Florida DAILY THRESHOLD REPORT NO. 2 Date Inspected: Tuesday, August 27 Inspector(s): Jason Teliszczak (AVCON, Inc.) TOTAL NUMBER OF INSPECTION REPORTS =1 AVCON, INC. ENGINEERS & PLANNERS 5555 E. Michigan St., Suite 200 Orlando, Florida 32822 Phone: (407) 599-1122 Fax: (407) 599-1133 www.aveoninc.com Civil & Structural Engineering • Airport & Aviation Consulting • Transportation Design & Planning 5555 East Michigan Street, Suite 200 • Orlando, FL 32822-2779 • Tel 407.599.1122 • Fax 407.599.1133 • www.avconinc.com INSF'EGI IVN DAILY KtF'VKI PROJECT: FPR MRO Hangar _- LOCATION: Treasure Coast International Airport & Businf., PERMIT AGENCY: St. Lucie County CLIENT: FIELD CONTACT: Robert Hatton SCOPE OF WORK: Continued installing helical piles. Contractor is Cantsink Foundation Stability. Installed piles averaged approx. 38.6' depth. -T4 DATE` 08/28/19 WORK ORDER NO.: BUILDING PERMIT NO.: Permit No. 1907-0552 Installed on the East side. Six of the seven were completed overall on the east side (three today), with two crews, and one machine. Second machine was dropped off late in the day. Contractor will provide updated log on 08/29/19 I INSPECTOR: Jason Teliszczak- w/Avcon AVCON,INC. - - WANLERS& PLANXLRS FIELD COPIES TO: AVCON SSSS E WO.ig.o St. slew 200 -, -. Ih InnAN, flmiJu }�gZ= 509-11 W07)_ Nix IJJ]13'10-I 111 \\IVPU\CUIIYLL'.fuUl AVCON Project No. 2017.159.01 St. Lucie County 2300 Virginia Avenue Fort Pierce, FI 34982 Reference: MRO FPR Hangar Project No. 700025 Orlando, Orange County, Florida DAILY THRESHOLD REPORT NO.3 Date Inspected: Wednesday, August 28 Inspector(s): Jason Teliszczak (AVCON, Inc.) TOTAL NUMBER OF INSPECTION REPORTS = 1 AVCON, INC. ENGINEERS & PLANNERS 5555 E. Michigan St., Suite 200 Orlando, Florida 32822 Phone: (407) 599-1122 Fax: (407) 599-1133 www.avconinc.com Civil & Structural Engineering • Airport & Aviation Consulting • Transportation Design & Planning 5555 East Michigan Street, Suite 200 • Orlando, Fl- 32822-2779 • Tel 407.599.1122 • Fax 407.599.1133 • www.avconinc.com IIVOML, I IUIV UAILT KCYUK I PROJECT: FPR MRO Hangar L`OCATIQN_ Treasure_Coast International Airport & Busing PERMITAGENGY St. Lucie County - CLIENT: FIELD'CQNTACT Robert Hatton SCOPE OF Continued installing helical piles. Contractor Is Cantsink Foundation Stability. Installed one location for piles averaged approx. 42-49' in depth. 003 8/29/19 Revision 9-4-19 f)ATE.. WORK ORDER NO.: BUILDING PERMIT NO.: Permit No. 1907-0552 Installed on the East side. The last of the seven (A/2) were completed overall on the east side according to drawing dated 07/26/19, with two crews, and one machine. Second machine was dropped off late In the day yesterday and was not utilized. The main machine went down after the A/2 location was completed. The crew waited for a part, and decided to close down the site mid afternoon as the part was not received and to prep for Hurricane Dorian. To date, the following locations have been installed (as per drawing 07/26/19 - that has not been approved by the EOR): A/1, A/2, AM A/4, A15, A16, All, La. An SIL will be issued, as A/7 and L/7 were not designed to be helical piles (per drawing S.3.0.3 date July 2019). Log was not provided by Cantsink. Ahrens provided a portion of the installation log data late in the afternoon to verify lengths. INSPECTOR: Jason Teliszczak-w/Avcon FIELD COPIES TO: AVCON AVCON, INC. LNGINLLRS&PI,ANNLRS 5555 G, Mwhiy .� St- S.a 200 00m dto Plo idu 52S22 Phone, 14071590,1121 Pux:1�0)15'1n.lIA �,,. no, oanincavm AVCON Project No. 2017.159.01 October 4, 2019 St. Lucie County 2300 Virginia Avenue Fort Pierce, FI 34982 Attention: Mr. Gary Stepalavich, Building Official Reference: MRO FPR Hangar Project No.1907-0552 St. Lucie County, Florida THRESHOLD REPORT SUMMARY NO.3 Dear Mr. Stepalavich: AVCON, INC. ENGINEERS & PLANNERS 5555 E. Michigan St., Suite 200 Orlando, Florida 32822 Phone: (407) 599-1122 Fax: (407) 599-1133 www.avconinc.com As directed, representatives from AVCON, Inc. performed on -site, threshold inspection services for the MRO FPR Hangar project. This report summarizes our threshold inspection services performed during the inspection period of September 30, 2019 through October 4, 2019. Inspections took place on October 2, as the helical piles were installed, and the rebar for the footings was inspected. Our inspections were performed in accordance with the structural documents, signed, and sealed by the Engineer of Record, Luca DelVerme PE (AVCON INC), and the project specifications. Our special inspector and his duly authorized representative(s) reported their observations as noted on the attached Daily Threshold Reports with all structural non-compliance items noted within the attached Special Inspection Log (SIL). All non-compliance items, or SIL's, previously reported as non -compliant with regard to the plans or specifications, will be reevaluated by our Special Inspector after corrective action is taken by the General Contractor or the deficient conditions have been approved through written approval by the Engineer of Record. During the inspection period of September 30, 2019 through October 4, 2019, and to the best of our knowledge and belief, the construction of all structural load -bearing components described in the threshold inspection plan complies with permitted documents, with revisions as approved by the Engineer of Record, except as noted on the SIL. Should you have any questions or concerns regarding these reports, or desire any additional information, please contact us. Sincerely, AVCON, Inc. Certificate of Authorization No. 5057 1/ gaZ�CCA�; P.(r RickV. Baldocchi, P.E. Vice President STATE OF FLORIDA Professional Engineer No. 38092 Registered Special Inspector No.1019 Nnsw • AKWK. gi �+� �P, ��NYJGNLEKl. r^u�F ovum.tisa cc: Addressee, Gary Stepalavich SteoalavichGrdstlucieco.org County Project Manager, Scotty Beaulieu beaulieusOstlucieco.org Chief Plans Examiner, William Durden DurdenW@stlucieco.org Construction Project Manager, Robert Hatton rhatton@ahrenscompanies.com CIVIL & STRUCTURAL 9 AIRPORT & AVIATION CONSULTING 9 TRANSPORTATION DESIGN & PLANNING AVCON Project No. 2017.159.01 October 4, 2019 St. Lucie County 2300 Virginia Avenue Fort Pierce, FI 34982 Attention: Mr. Gary Stepalavich, Building Official Reference: MRO FPR Hangar Project No.1907-0552 St. Lucie County, Florida THRESHOLD REPORT SUMMARY NO.3 INSPECTOR(S): Rick Baldocchi (AVCON, Inc.) DAILY REPORT(S): Threshold Inspection Daily Report(s): 10/02/19 [See attached report(s) for locations and observations.] SPECIAL INSPECTION LOG: Added this Summary Period: Resolved this Summary Period: Outstanding for the Project: ATTACHMENT(S): - None. 1 0 4 Page 2 of 2 AVCON, INC. ENGINEERS & PLANNERS 5555 E. Michigan St., Suite 200 Orlando, Florida 32822 Phone: (407) 599-1122 Fax: (407) 599-1133 www.avconine.com CIVIL & STRUCTURAL • AIRPORT & AVIATION CONSULTING • TRANSPORTATION DESIGN & PLANNING Project No. 2017.0259.01 Date Typed: October 4, 2019 SPECIAL INSPECTION LIST (SIL) ITEMS SUMMARY NO. 3 (Items Recorded from 09/30/19 to 10/04/19) Addressee: City of Port St. Lucie 121 SW Port St. Lucie Blvd Port St. Lucie, FL 34984 Project: FPR MRO Hangar Port St. Lucie, St. Lucie County, Florida—1812-0473 AVCON, INC. ENGINEERS & PLANNERS 5555 E. Michigan St., Suite 200 Orlando, Florida 32822 Phone: (407) 599-1122 Fax: (407) 599-1133 www.avconinc.com Note: This preliminary information does not comply with the project specifications and/or drawings. The report in its entirety will be forwarded with the Weekly Summary. If you have any questions regarding the information contained in this preliminary report, please feel free to contact either Rick Baldocchi or Jason Teliszczak with AVCON, Inc. SIL NO.4 (ADDED) — Inspector Rick Baldocchi (A VCON) observed on 10102119 Structural Element: Reinforcement Foundations Location: Foundation Gridlines - every Elevation: location Description: Reinforcement bars deviated from current plans/shop drawings. Attachments: Not included Page 1 of 1 CIVIL & STRUCTURAL • AIRPORT & AVIATION CONSULTING • TRANSPORTATION DESIGN & PLANNING "CON, INC. ENGINEERS & PLANNERS SPECIAL INSPECTION LOG Permitting Agency: Port St Lucie Project Name: FPR MRO Hangar Update Period: 09-30-19 to 10-04-19 1907-0552 Permit No.: Project No.: 2017.0259.01 Attention: Ahrens Construction/St. Lucie County Project Location: Port St. Lucie, St. Lucie County, Florida Threshold Agent Rick V. Baldocchi SIL No. Date Daily Report No. Structural Element Location e Description t S.I. Engineer of Record Response a S.I. Date Closed Daily Report No. 1 8-26-19 SIL Helical Piles N/A The helical pile submittal on RVB Summary Submittals site does not have SEOR or 1 County Building Department acceptance stamp. 2 8-30-19 SIL Helical Piles Footings A-7 & L-7 The Contract documents do RVB Summary not show helical piles within 2 the footings. 3 09/20/19 SIL Helical Piles Footings A-7—C-7, The Contract documents do RVB Summary 3 F7-1-7, G-8 8 L-8, not show helical plies within G9—L-9 the footings. 4 10/02/19 SIL Foundations All locations The rebar in the top mat RVB Summary 4 deviate from plans/shop drawings sThe Special Inspector, Rick V. Beldocchi, P.E., acknowledges this deficiency. a The Special Inspector, Rick V. Baldombi, P.E., acknowledges resolution to this deficiency. This is a brief summaryof tho SIL Refer to the daily report for a detailed description. Page 1 of 1 IIVJrCU 11UN UMILT RCrUM 1 PROJECT: FPR MRO Hangar LOCATION: Treasure Coast International Airport & Business PERMIT AGENCY: St. Lucie County CLIENT: FIELD CONTACT: Robert Hatton COMMENTS DATE:10/02/19 WORK ORDER NO.: BUILDING PERMIT NO.: Permit No. 1812-0473 SCOPE OF WORK: Foundations Helical piles and caps are in place. Inspected reinforcing steel for foundations in advance of concrete placement.. Reinforcing steel cages were installed at every footing location. Inspection was started and it was noted that the top bars were straight without hooks at the edges. The straight top bars deviate from the current plans/shop drawings. Contract drawings also have a note stating that all top bars will be hooked. According to the EOR, this is also an ACI code requirement. Reinforcing steel inspection was not completed and will need a re -inspection after deficiencies are corrected. SIL - Top Steel Missing Hooks - all foundations. INSPECTOR: Rick Baldocchi, P.E. AVCON, INC. FIELD COPIES TO: St. Lucie County, A �AYCON,INC..' ENGINEERS&PL 'NERS'., . 5555 E.Midiigwi 51., Suite 200 j Orlando, Plodda32822 Phone:(407)599-1122 1 Fa«(407)599-1133 'ui..A'MIINCmi 1- o SSS-d AVCON Project No. 2017.159.01 October 4, 2019 St. Lucie County 2300 Virginia Avenue Fort Pierce, FI 34982 Attention: Mr. Gary Stepalavich, Building Official Reference: MRO FPR Hangar Project No.1907-0552 St. Lucie County, Florida THRESHOLD REPORT SUMMARY NO.3 Dear Mr. Stepalavich: AVCON, INC. ENGINEERS & PLANNERS 5555 E. Michigan St., Suite 200 Orlando, Florida 32822 Phone: (407) 599-1122 Fax: (407) 599-1133 www.avconinc.com As directed, representatives from AVCON, Inc. performed on -site, threshold inspection services for the MRO FPR Hangar project. This report summarizes our threshold inspection services performed during the inspection period of September 30, 2029 through October 4, 2019. Inspections took place on October 2, as the helical piles were installed, and the rebar for the footings was inspected. Our inspections were performed in accordance with the structural documents, signed, and sealed by the Engineer of Record, Luca DelVerme PE (AVCON INC), and the project specifications. Our special inspector and his duly authorized representative(s) reported their observations as noted on the attached Daily Threshold Reports with all structural non-compliance items noted within the attached Special Inspection Log (SIL). All non-compliance items, or SIL's, previously reported as non -compliant with regard to the plans or specifications, will, be reevaluated by our Special Inspector after corrective action is taken by the General Contractor or the deficient conditions have been approved through written approval by the Engineer of Record. During the inspection period of September 30, 2019 through October 4, 2019, and to the best of our knowledge and belief, the construction of all structural load -bearing components described in the threshold inspection plan complies with permitted documents, with revisions as approved by the Engineer of Record, except as noted on the SIL. Should you have any questions or concerns regarding these reports, or desire any additional information, please contact us. Sincerely, AVCON, Inc. DCertificate of Authorization No. 5057 RickV. Baldocchi, P.E. Vice President STATE OF FLORIDA Professional Engineer No. 38092 Registered Special Inspector No. 1019 wwe a.w.ay.e+uww.,r. a+. Ts +q q�p *$ easrururgcw,smm 'gam EIOP � 6N2� o man w..v.,.ewinw'uw. cc: Addressee, Gary Stepalavich SteoalavichEi0stlucieco.ore County Project Manager, Scotty Beaulieu beaulieusna stlucieco.org Chief Plans Examiner, William Durden DurdenW@stlucieco.org Construction Project Manager, Robert Hatton rhatton@ahrenscompanies.com CIVIL & STRUCTURAL 9 AIRPORT & AVIATION CONSULTING+ TRANSPORTATION DESIGN & PLANNING AVCON Project No. 2017.159.01 October 4, 2019 St. Lucie County 2300 Virginia Avenue Fort Pierce, FI 34982 Attention: Mr. Gary Stepalavich, Building Official Reference: MRO FPR Hangar Project No. 1907-0552 St. Lucie County, Florida THRESHOLD REPORT SUMMARY NO.3 INSPECTOR(S): Rick Baldocchi (AVCON, Inc.) DAILY REPORT(S): Threshold Inspection Daily Report(s): 10/02/19 [See attached report(s) for locations and observations.] SPECIAL INSPECTION LOG: Added this Summary Period: Resolved this Summary Period: Outstanding for the Project: ATTACHMENT(S): - None. Page 2 of 2 AVCON, INC. ENGINEERS & PLANNERS 5555 E. Michigan St., Suite 200 Orlando, Florida 32922 Phone: (407) 599-1122 Fax: (407) 599-1133 www.avconinc.com CIVIL & STRUCTURAL • AIRPORT & AVIATION CONSULTING • TRANSPORTATION DESIGN & PLANNING Project No. 2017.0259.01 Date Typed: October 4, 2019 SPECIAL INSPECTION LIST (SIL) ITEMS SUMMARY NO. 3 (Items Recorded from 09/30/19 to 10/04/19) Addressee: City of Port St. Lucie 121 SW Port St. Lucie Blvd Port St. Lucie, FL 34984 Project: FPR MRO Hangar Port St. Lucie, St. Lucie County, Florida—1812-0473 AVCON, INC. ENGINEERS & PLANNERS 5555 E. Michigan St., Suite 200 Orlando, Florida 32822 Phone: (407) 599-1122 Fax: (407) 599-1133 www.avconinc.com Note: This preliminary information does not comply with the project specifications and/or drawings. The report in its entirety will be forwarded with the Weekly Summary. If you have any questions regarding the information contained in this preliminary report, please feel free to contact either Rick Baldocchi or Jason Teliszczak with AVCON, Inc. SIL NO.4 (ADDED I — Inspector Rick Baldocchi (AVCON) observed on 10102119 Structural Element: Reinforcement Foundations Location: Foundation Gridlines - every Elevation: location Description: Reinforcement bars deviated from current plans/shop drawings. Attachments: Not included Page 1 of 1 CIVIL & STRUCTURAL e AIRPORT & AVIATION CONSULTING • TRANSPORTATION DESIGN & PLANNING "CON, INC. ENGINEERS & PLANNERS SPECIAL INSPECTION LOG Permitting Agency: Pod SL Lucie Project Name: FPR MRO Hangar Update Period: 09-30-19 to 10-04-19 1907-0552 Permit No.: Project No.: 2017.0259.01 Attention: Ahrens Construction/St. Lucie County project Location: Pod St. Lucie, St. Lucie County, Florida Threshold Agent: Rick V. Baldocchi SIL Date Daily Structural Element LocationDeacrlption a r S.I. Engineer of Record 2 S.I. Data Daily Report No. Report No. Response Closed No. 1 8-26-19 SIL Helical Piles N/A The helical pile submittal on RVB Summary Submittals site does not have SEOR or 1 County Building Department acceptance stamp. 2 8-30-19 SIL Helical Piles Foogngs A-7 & L-7 The contract documents do RVB Summary not show helical piles within 2 the footings. 3 09/20/19 SIL Helical Piles Feelings A-7—C-7, The contract documents do RVB Summary 3 F7— L7, G-8 & L-S, not show helical piles within G-9—L-9 the footings. 4 10/02/19 SIL Foundations All locations The rebar in the top mat RVB Summary 4 deviate from plans/shop drawings z The Special Inspector, Rick V. Baldoechi, P.E„ acknowledges this defidenry. a The Special Inspector, Rick V. Baldacchi, P.E., acknowledges resolution to this deficiency. This is a beef summary of the SIL Refer to the daily report for a detailed description Page 1 of 1 IIYVr"l 11V1V UMILI RCrwmI PP1-1 PROJECT: FPR MRO Hangar DATE:10/02119 LOCATION: Treasure Coast International Airport & Business WORK ORDER NO.: PERMIT AGENCY: St. Lucie County BUILDING PERMIT NO.: Permit No. 1812-0473 CLIENT: FIELD CONTACT: Robert Hatton COMMENTS I SCOPE OF WORK: Foundations Helical piles and caps are in place. Inspected reinforcing steel for foundations in advance of concrete placement. Reinforcing steel cages were installed at every footing location. Inspection was started and it was noted that the top bars were straight without hooks at the edges. The straight top bars deviate from the current plans/shop drawings. Contract drawings also have a note stating that all top bars will be hooked. According to the EOR, this is also an ACI code requirement. Reinforcing steel inspection was not completed and will need a re -inspection after deficiencies are corrected. SIL - Top Steel Missing Hooks - all foundations. INSPECTOR: Rick Baldocchi, P.E. AVCON, INC. FIELD COPIES TO: St. Lucie County, A I AYCON,`INC., "E\GME[RS & PIANNFRS' t j 5555 E hi ciagan St, Suite 200 4 o11PMo� Florida 32922 Phw'(J07j,599•I S99.1133@b l l Fnz:,(40Y)! ttuw:8vcohuic.cumI AVCON Project No. 2017.159.01 November 1, 2019 St. Lucie County 2300 Virginia Avenue Fort Pierce, FI 34982 Attention: Mr. Gary Stepalavich, Building Official Reference: MRO FPR Hangar Project No. 1907-0552 St. Lucie County, Florida THRESHOLD REPORT SUMMARY NO.4 Dear Mr. Stepalavich: AVCON, INC. ENGINEERS & PLANNERS 5555 E. Michigan St., Suite 200 Orlando, Florida 32822 Phone: (407) 599-1122 Fax: (407) 599-1133 www.avconinc.com As directed, representatives from AVCON, Inc. performed on -site, threshold inspection services for the MRO FPR Hangar project. This report summarizes our threshold inspection services performed during the inspection period of October 5, 2019 through November 1, 2019. Inspections took place on November 1, as the helical piles were installed, and the rebar for the footings was re -inspected. Our inspections were performed in accordance with the structural documents, signed, and sealed by the Engineer of Record, Luca DelVerme PE (AVCON INC), and the project specifications. Our special inspector and his duly authorized representative(s) reported their observations as noted on the attached Daily Threshold Reports with all structural non-compliance items noted within the attached Special Inspection Log (SIL). All non-compliance items, or SIL's, previously reported as non -compliant with regard to the plans or specifications, will be reevaluated by our Special Inspector after corrective action is taken by the General Contractor or the deficient conditions have been approved through written approval by the Engineer of Record. During the inspection period of October 5, 2019 through November 1, 2019, and to the best of our knowledge and belief, the construction of all structural load -bearing components described in the threshold inspection plan complies with permitted documents, with revisions as approved by the Engineer of Record, except as noted on the SIL. Should you have any questions or concerns regarding these reports, or desire any additional information, please contact us. Sincerely, AVCON, Inc. Certificate of Authorization No. 5057 RickV. Baldocchi, P.E. Vice President STATE OF FLORIDA Professional Engineer No. 38092 Registered Special Inspector No. 1019 RXamMsma�,mwwea r> 1rL"8e mw.��a,.bv N: .mWbwM RppW o� aoumnu oo .u�meo ar.av ma�rtwxw' cc: Addressee, Gary Stepalavich SteoalavichGo stlucieco.org County Project Manager, Scotty Beaulieu beaulieusr@stiucieco.or¢ Chief Plans Examiner, William Durden DurdenW@stiucieco.org Construction Project Manager, Robert Hatton rhatton@ahrenscompanies.com CIVIL & STRUCTURAL • AIRPORT & AVIATION CONSULTING 9 TRANSPORTATION DESIGN & PLANNING N AVCON Project No. 2017.159.01 November 1, 2019 St. Lucie County 2300 Virginia Avenue Fort Pierce, FI 34982 Attention: Mr. Gary Stepalavich, Building Official Reference: MRO FPR Hangar Project No.1907-0552 St. Lucie County, Florida THRESHOLD REPORT SUMMARY NO.4 INSPECTOR(S): Rick Baldocchi (AVCON, Inc.). DAILY REPORT(S): Threshold Inspection Daily Report(s): 11/01/19 [See attached report(s) for locations and observations.] SPECIAL INSPECTION LOG: Added this Summary Period: Resolved this Summary Period: Outstanding for the Project: ATTACHMENT(S): - None. Page 2 of 2 AVCON, INC. ENGINEERS & PLANNERS 5555 E. Michigan St., Suite 200 Orlando, Florida 32822 Phone: (407) 599-1122 Fax: (407) 599-1133 www.avconinc.com CIVIL & STRUCTURAL • AIRPORT & AVIATION CONSULTING • TRANSPORTATION DESIGN & PLANNING AVCON, INC. ENGINEERS & PLANNERS SPECIAL INSPECTION LOG Permitting Agency: Port St Lucie Project Name: FPR MRO Hangar Update Period: 10-28-19 to 11-01-19 1907-0552 Permit No.: Project No.: 2017.0259.01 Attention: Ahrens Construction/St Lucie County Project Location: Port St. Lucie, St. Lucie County, Florida Threshold Agent Rick V. Baldocchi SIL No. No. Data Daily Report No. Structural Element Location s Deacdptton r 5.1. Engineer of Record Date Daily Report Response Closed Closed No. 1 e-25-19 SIL Helical Piles N/A The helical pile submittal on RVB FOR approved RVB 10/30/19 009 Summary Submittals site does not have SEOR or calculations and 1 County Building Department revised plans acceptance stamp. 2 5-30-19 SIL Helical Piles Footings A-7 & L-7 The contract documents do RVB FOR approved RVB 10/30/19 009 Summary not show helical piles within calculations and 2 the footings. revised plans 3 09/20/19 SIL Helical Piles Feelings A-7—C-7, The contact documents do RVB FOR approved RVB 10/30/19 009 Summary 3 F7— L7, G-e & L-S, not show helical piles within calculations and G-9—L-9 the footings. revised plans 4 10/02/19 SIL Foundations All locations The rebar In the top mat RVB Delegated engineer RVB 11/01/19 009 Summary 4 deviate from plans/shop submitted letter drawings regarding the removal of top mat hooks - FOR accepted zThe Special Inspector, Rick V. BaldomN, P.E., acknowledges this deficiency. a The Spacial Inspector, Rick V. Baldoochk, P.E., acknowledges resolution to this deficiency. This is a briefsummary of the SIL Refer to the daily report for a detailed desciption. Page 1 of 1 PPF. PROJECT: FPR MRO Hangar LOCATION: Treasure Coast International Airport & Business PERMIT AGENCY: St. Lucie County CLIENT: FIELD CONTACT: Robert Hatton COMMENTS I SCOPE OF WORK: DATE:11/01/19 WORK ORDER NO.: BUILDING PERMIT NO.: Permit No. 1812-0473 Observed rebar that was placed prior over the helical pile caps. Plans for that have been approved from FOR for helical piles. FOR approved plans/letter for footings. Final elevations for anchor bolts will be corrected prior to the concrete placement, as well as general housekeeping as per the contract to ensure that excess debris that has sluffed in will be removed. INSPECTOR: Jason Teliszczak - w/Avcon FIELD COPIES TO: AVCON - AVCON, INC.' I NGMURS & Pu,NNeRS 5555 C. Michigan St, Suite 200 I Orlando, Florida 32822 1 Phone: (407)599-1122 Fax: (407) 599-1133 j www.avconinc.com' CANTSINK PILE LOG SHEET 1 CONTRACTOR Ahrcns Com anies Installer. Clay Campo CONTRACT Treasure Coast Hangar pilings ADDRESS: 3191 Jet Center Terrace CITY: Ft. Pierce F134987 PILE LEAD: 27/8" diameter with a single 14" helix alvanized minimumembedmentl5'0" START DATE: Au st 27th-Se tember 19th 20I9 DRILLHEAD: ProM X7KC7000 FTLB drill hend PBeNI Pile#2 Pile#3 PileH4 Pile#5 Pile#6 Pile#7 Pile#8 Irn sI/ 10.5 1900 10.5 1800 10.5 1600 10.5 1900 10.5 2000 10.5 1900 10.5 2000 10.5 1800 len si/ 10.5 1300 10.5 1300 10.5 1200 10.5 1000 10.5 1600 10.5 I800 10.5 1800 10.5 1400 Ien si/ 10.5 1200 10.5 1200 10.5 1000 1 10.5 1000 10.5 1300 10.5 1400 10.5 1000 10.5 1000 length/psi/ 1 7.0 2500 7.0 2800 7.0 2900 7.0 2900 7.0 2900 7.0 2900 7.01301d 7.0 2600 final length/ki s 38'6" 291d 38'6" 30ld 38'6" 301d 38'6" 30ld 38'6" 301d 38'6" 38'6"38'6" Pile#9 Pile#10 Pile#11 Pile#12 Pile#13 Pile#15Pile#16 Ien si/ 10.5 1500 10.5 1500 10.5 1500 10.5 1300 10.5 1500 1800 10.5 10.5 1800 length/psi/ 10.5 1000 10.5 1000 10.5 1100 10.5 1400 10.5 1400 1400 10.5 10.5 1500 len sV 10.5 1200 10.5 1400 10.5 1400 10.5 1500 10.5 1500 1500 10.5 10.5 1200 length/psi/ 7.0 2900 7.0 2700 7.0 2700 7.0 2900 7.0 2700 2900 7.0 7.0 2900 final len /Id s 38'6" 30ld 38'6" 301d 38'6" 301d 38'6" 301d 38'6" 301d P38'61- 301d 38'6"38'6" 301d Pile417 Pilots Pile#19 Pile#20 Pile#21 Pile#23 Pile#34 Ien h/ si/ 10.5 1800 10.5 1600 10.5 1500 10.5 1500 10.5 1600 1800 10.5 1800 10.5 1600 len si/ 10.5 1300 10.5 1500 10.5 1500 10.5 1400 10.5 1500 1 1300 10.5 1 1600 10.5 1500 length/psi/ 10.5 1300 10.5 1400 1 10.5 1500 10.5 1300 10.5 1400 105 1400 10.5 1400 10.5 1400 length/psi/ 7.0 2900 7.0 1500 7.0 1300 7.0 1300 7.0 1200 7.0 1300 7.0 1100 7.0 1300 final lcn ' s 3816" 30ldM 7.0 2900 7.0 1300 7.0 2800 7.0 2900 7.0 2900 7.0 2900 7.0 2900 4516" 301dps 7.0 2900 45'6" 301fi 45'6" 30[dps 4516" 30ldW 45'6" 301cips 4516" 301dps 52W' 301dp Pile#25 Piie#26 Pile#27 Pile428 Pile#29 Pile#30 Pile#31 Pile#32 length1psu 10.5 1700 10.5 1700 10.5 1800 10.5 1800 10.5 1800 10.5 1800 10.5 1800 10.5 1800 len si/ 10.5 1300 10.5 1300 10.5 1400 10.5 1100 10.5 1200 10.5 1100 10.5 1500 10.5 1500 length/psi/ 10.5 1300 10.5 1400 10.5 1400 10.5 1300 10.5 1300 10.5 I100 10.5 1300 10.5 1500 length/psi/ 7.0 1000 7.0 1000 7.0 1000 7.0 2900 7.0 2900 7.0 2900 7.0 2900 7.0 2900 len ' s 7.0 2900 7.0 2900 7.0 2900 38'6" 301d s 38'6" 301d 38'6" 30ld 38'6" 301d 38'6" 30ldlis final lenmWps 45'6" 301dps 4516" 301d 45'6" 30]dps Pile433 Pile#34 Pile#35 P8e#36 Pile#37 Pile#38 Pile#39 Pile#40 Irn si/ 10.5 2000 10.5 1800 10.5 2000 10.5 1900 10.5 1800 10.5 1700 10.5 1700 10.5 1600 length/psi/ 10.5 1300 10.5 1300 10.5 1500 10.5 1000 10.5 1400 10.5 1300 10.5 1200 10.5 1200 Irn / si/ 10.5 1400 10.5 1500 10.5 1300 10.5 1400 10.5 1400 10.5 1200 10.5 1300 10.5 1300 len h/ si/ 7.0 2900 7.0 2900 7.0 1200 7.0 2400 7.0 2400 7.0 2900 7.0 2900 1 7.0 2900 final len ' s 38'6" 30ld 38'6" 301ti 7.0 2500 38'6" 281d s 38'6" 28td 38'6" 30ki 38'6" 301d 386"1 30hi 45'6" 291d Pile#41 Pi1e#42 Pile#43 Pile#44 Pile#45 Pile#46 Pile#47 P8e748 Ien sU 10.5 1500 10.5 1800 10.5 1500 10.5 1800 10.5 1800 10.5 1800 10.5 1800 10.5 1800 lengddpsU 10.5 1400 10.5 1300 10.5 1300 10.5 1800 10.5 1300 10.5 1400 10.5 1600 10.5 1200 length/psi/ 10.5 1300 10.5 1000 10.5 1300 10.5 1200 10.5 1500 10.5 1400 10.5 1400 10.5 1100 len si/ 7.0 2900 7.0 2900 7.0 2900 7.0 2900 7.0 1500 7.0 1200 7.0 1300 7.0 1100 final length/kips 3816" 30ld s 38'6" 301dps 38'6" 301dps 3816" 301cips 7.0 2900 7.0 2900 7.0 2900 7.0 2900 45'6" 30ki 45'6•' 301dm 4516" 30ldps 4516" 30ldps Pile#49 Pile#50 Pile#5I Pile#52 Pile#53 Pile#54 Pile#55 Pil056 len s1/ 10.5 1 2000 10.5 I800 10.5 2000 10.5 1800 10.5 1800 10.5 2000 10.5 1800 10.5 1800 I= si/ 10.5 1300 10.5 1200 10.5 1300 10.5 1500 10.5 1500 10.5 1500 10.5 1300 10.5 1400 length/psi/ 10.5 1100 10.5 IDDO 10.5 1100 10.5 1500 10.5 1500 10.5 1400 10.5 1400 10.5 1500 length/psi/ 7.0 1200 7.0 2500 7.0 2900 7.0 2900 7.0 2900 7.0 2900 7.0 1300 7.0 1000 Ien ' s 7.0 2900 38'6" 29ldps 3816" 30[dps 38'6" 301d 38'6" 301ti 38'6" 301dps 7.0 2900 7.0 2900 final lengtWps 45'6" 301fi 45'6" 301dps 45'6" 301ti ps Pik457 Pile#58 Pile#59 Pile#60 Pile#61 Pile#62 PH063 Pilc#64 length/psi/ 10.5 1800 10.5 1800 10.5 18DO 10.5 1800 10.5 1500 10.5 1500 10.5 1500 105 1500 length/psi/ 10.5 1800 1 10.5 1400 10.5 1300 10.5 1500 10.5 1600 10.5 1500 10.5 1500 10.5 1500 length/psi/ 1 10.5 1500 10.5 1100 10.5 1 1500 10.5 1500 10.5 1500 10.5 1000 10.5 1800 10.5 1800 length/psi/ 7.0 1100 10.5 15DO 10.5 1500 10.5 1500 7.0 1000 7.0 1000 7.0 1000 7.0 2900 length/kips 7.0 2900 7.0 2900 7.0 2900 7.0 2900 7.0 1200 7.0 2800 7.0 2800 38'6" 3010 ps final length/kips 4516" 30ldps 49'0" 3014 49'0•' 30ki s 49'0•' 30ld 7.0 2800 45'6" 30k1 s 45'6" 30ld ps 52'6" 301dps Pile#65 Pile#66 Pile467 Pile968 Pile#69 Pile470 Pile#71 P0e072 len Ih/ s'U 10.5 I800 10.5 1700 10.5 1500 10.5 I800 10.5 1800 10.5 1800 10.5 1600 10.5 1500 ten si/ 10.5 1800 10.5 1800 10.5 1700 10.5 1600 105 1600 10.5 1900 7.0 1300 7.0 1100 length/psi/ 10.5 1500 10.5 1500 10.5 1400 10.5 1400 M5 1300 10.5 1300 7.0 1000 7.0 1000 Iev si/ 10.5 1500 1 10.5 2900 10.5 2500 10.5 1500 00.5 1000 10.5 1200 7.0 1 1000 7.0 1000 len ' s 7.0 2900 42'0" 301ri 42'0" 291a 7.0 2700 7.0 2900 7.0 2800 7.0 2700 7.0 270D liZlen ' s 49'0•' 30ld s 49'0" 30ld 49'0•' 30ki 49'0" 30Id 38'6" 30ki 38'6" 30ld ps Pile#73 Pile#74 P0e#75 P8e#76 Pile#77 Pile#78 Pile#79 PROM len si/ 10.5 1800 10.5 1500 10.5 1600 10.5 1500 10.5 1800 10.5 1800 10.5 1800 10.5 1500 len si/ 7.0 1500 7.0 1100 7.0 1500 7.0 1500 10.5 1500 10.5 1400 10.5 1500 10.5 1500 length/psi/ 7.0 1100 7.0 1000 7.0 1500 7.0 1200 10.5 1000 10.5 1000 10.5 1000 10.5 1000 length/psi/ 7.0 1000 7.0 1000 7.0 1100 7.0 1000 7.0 2700 7.0 2900 7.0 1500 7.0 1500 len ' s 7.0 2700 7.0 2900 7.0 1300 7.0 1500 38'6" 30[i 38'6" 301u 7.0 2700 7.0 1500 final len h/ki s 38'6" 301d s 38'6" 301d 7.0 2900 7.0 2900 45'6" 30]. 7.0 1300 45'6" 301dps 4516" 30ld s 7.0 1800 59'6" 211ri P8e#81 Pile#82 Pile#83 Pile#84 Pile#85 Pile#86 Pile#87 Pile#88 len sU 10.5 1600 10.5 1600 10.5 1500 10.5 1500 10.5 1600 10.5 1500 10.5 1400 10.5 1500 length/psi/ 10.5 1300 10.5 1200 10.5 1400 10.5 1300 10.5 1400 10.5 1300 10.5 1300 10.5 1300 Ien si/ 10.5 1100 10.5 1100 10.5 1000 10.5 1100 10.5 1100 10.5 1000 10.5 1000 10.5 2900 length/psi/ 7.0 2500 7.0 2500 7.0 1200 7.0 1200 7.0 2600 7.0 2700 7.0 2900 31'6" 3010 ps final length/kips 38'6•' 291fi 38'6" 91dps 7.0 2000 7.0 2900 38'6" 301d 38'6" 301u 38'6" 301ti ps 45'6" 23.5[d s 45'6" 30ki Pile489 Pil690 Pile491 P0e#90.52 HODHODPile#94 Pile#95 P0e#96 In si/ 10.5 1500 10.5 I500 10.5 1500 1 1500 10.5 1700 M5 150D 10.5 1500 10.5 1500 ten si/ 10.5 1200 10.5 1000 10.5 1200 10.5 1200 105 1500 10.5 1 1500 1 10.5 1500 10.5 1500 length/psi/ 10.5 1200 10.5E301d 10.5 1100 10.5 1000 10.5 1200 10.5 1400 10.5 1200 10.5 1300 Ien / su 7.0 2600 7.0 7.0 2900 7.0 2900 7.0 2500 7.0 2900 7.0 2600 7.0 29DO final len ' s 38'6" 301u 38'6"38'6" 301d 38'6" 30Iri 38'6" 291ti 38'6" 30Iti 38'6" 301ti 386" 30ldps Pile497 Pile#98Pile#99 Pile#100 Pile#101 Pile#102 Pi10103 PROM length/psi/ 10.5 1500 10.5 10.5 1500 10.5 1500 10.5 1500 10.5 2000 10.5 2000 10.5 2000 length/psi/ 10.5 1100 10.5 10.5 1100 10.5 1200 10.5 1200 10.5 1800 10.5 1600 10.5 1800 length/psi/ 10.5 1200 10.5 10.5 1000 10.5 1300 10.5 1200 10.5 1500 10.5 1500 10.5 1200 length/psi/ 7.0 2900 7.0 7.0 2700 7.0 2800 7.0 2700 5.0 2900 7.0 2900 5.0 2900 final length/kips 38'6" 301u 38'6"38'6" 301d 38'6" 301ti 38'6" 301u 36'6" 3010 38-6" 301dw 3616" 301u PROM Pile#106 Pile#107 Pile4108 Pile#109 Pile#110 Pile#lll Pile#112 len si/ 10.5 2000 10.5 1800 10.5 1800 10.5 2000 10.5 1700 10.5 1800 10.5 1800 10.5 1800 length/psi/ 10.5 1800 10.5 1600 10.5 1500 10.5 1600 10.5 1500 10.5 1500 10.5 1600 10.5 1500 len si/ 10.5 2600 10.5 1400 10.5 1500 10.5 1400 10.5 1000 10.5 1000 10.5 1100 10.5 1300 len si/ 31'6" 301u 7.0 2900 7.0 29DO 7.0 2900 7.0 1000 7.0 1300 7.0 1200 7.0 2900 final len i s 38'6" 301d 38'6" 301ri 38'6" 30Id 7.0 2900 7.0 2900 7.0 2900 38'6" 30ldps 45'6" 301ti 45'6" 301u 45'6" 301dps Pile#113 Pi1d1114 Pile#115 Pile#116 Pile4117 Pile#118 Pile#119 Pilefi120 length/psi/ 1 10.5 1800 10.5 1800 10.5 18DO 10.5 1800 10.5 1800 10.5 1800 10.5 1800 10.5 1800 length/psi/ 1 10.5 1400 10.5 1500 10.5 1500 10.5 1600 10.5 1300 10.5 1200 10.5 1500 10.5 1500 Ien sI/ 10.5 1200 10.5 1300 10.5 1300 10.5 1200 10.5 1400 10.5 1500 10.5 1500 10.5 1500 lenWpsil 7.0 2900 7.0 2900 7.0 29DO 7.0 2900 7.0 2900 7.0 2900 7.0 1000 7.0 1000 final len ' s 38'6" 30ldps 38'6" 30Id 38'6" 301d 38'6" 30ldps 38'6" 30ldps 38'6" 3D[dps 7.0 2900 7.0 2900 45'6" 3016 45'6" 3015 Pile4121 Pile#122 Pile#123 Pile#124 Pile#125 Pile#126 Pile#127 Pile#128 len si/ 10.5 1500 10.5 1500 10.5 1000 10.5 1000 10.5 1500 10.5 1000 10.5 1500 10.5 1500 length/psi/ 10.5 1500 10.5 1200 10.5 1200 10.5 1000 10.5 1000 10.5 1200 10.5 1400 10.5 2000 length/psi/ 10.5 1500 10.5 1000 10.5 1200 10.5 3000 10.5 1500 10.5 1500 10.5 1500 21.0"E290uO len 1✓ si/ 7.0 1500 7.0 2900 7.0 2900 31'6" 301ti 7.0 2900 7.0 2900 7.0 2600 length/psi 7.0 2900 38'6" 301d 38'6" 301u 38'6" 3010 38'6" 301u 38'6" 301u s fmd len ' s 45'6" 30ldps Pile#129 Pile#130 P11e#131 Pile#132 Pile#133 Pile#134 Pile#135 Pile#136 len si/ 10.5 1500 10.5 1500 10.5 1500 10.5 1500 10.5 1500 10.5 1500 10.5 1500 10.5 Ien / si 10.5 1900 7.0 1800 7.0 25DO 7.0 1800 7.0 2400 7.0 2900 7.0 1800 7.0 final len ' s 21'0" 221d 17'6" 2110 17'6" 291u 17'6" 211u s 17'6" 281d 1716" 30Io 17'6" 211ti 10.5 10.5 38'6" 301u Pile#137 P0e#138 Pile#139 Pi OMO I Plle#141 I Pile#142 HOW Pile#144 length/psi/ 10.5 1500 10.5 1500 10.5 1500 10.5 1600 M5 1500 10.5 1500 10.5 1500 10.5 1500 len si/ 10.5 1200 7.0 1500 10.5 1500 10.5 1500 10.5 15DO 10.5 1500 10.5 1500 10.5 1100 length/psi/ 10.5 1200 10.5 1200 10.5 1500 10.5 1500 10.5 1100 10.5 1000 10.5 1500 10.5 1100 length/psi/ 7.0 2900 10.5 2900 7.0 2600 7.0 2700 7.0 1000 7.0 1000 7.0 1300 7.0 2800 final le.gdOdps 38'6" 301d 38'6" 301d 38'6" 30ldps 3816" 301dw 7.0 1000 7.0 2900 7.0 2900 38'6" 301dps 7.0 2900 45'6" 301dps 4516" 301u s 52'6" 30ldps Pile#145 Pile#147 Pile#148 Pile4149 Pile#I50 Pile#151 Pile#152 length/psi/ 10.5 1500 1 10.591 5500 10.5 1500 1 10.5 1500 10.5 1800 10.5 I500 10.5 IB00 10.5 IB00 len sV 10.5 1500 10.5 1000 10.5 1000 10.5 1000 10.5 1800 10.5 1800 10.5 1600 10.5 1600 Ien si/ 10.5 1000 10.5 1200 10.5 1100 10.5 900 10.5 1100 10.5 1100 10.5 I100 10.5 1000 lengthIpsil 7.0 2000 10.5 2900 10.5 2900 10.5 2900 7.0 2900 7.0 2900 7.0 2900 7.0 2900 final lengdOcips 38'6" 23.51fi s 4210" 301cips 42'0" 301dps 42'0" 301dps 3816" 301d 38'6" 301d 38'6" 301d 38'6" 301d PROM Pile#154 Pile4155 PileLl-I PileLl-2 PileLl-3 PileL14 PileLl-5 Ien sU 10.5 1200 10.5 1500 10.5 2200 10.5 1500 10.5 1500 10.5 1500 10.5 1500 10.5 1500 IcngdYpsU 10.5 1000 10.5 1200 10.5 1000 10.5 1400 10.5 1400 10.5 1400 10.5 1500 10.5 1500 Icn si/ 10.5 1100 10.5 1000 10.5 1000 10.5 1300 10.5 1300 10.5 1400 10.5 1500 10.5 1600 length/psi/ 10.5 2900 10.5 2900 10.5 2900 10.5 1000 10.5 1300 10.5 1000 10.5 2800 10.5 2800 final len ' s 42'0" 301dps 42'0" 301dps 4210" 301dps 1005 2700 7.0 1000 7 2900 42'0" 301u 42'0" 301dps 52'6" 301dw 7.0 2900 49'0" 301dps 56'0" 301d PileLl-6 PileLl-7R301d Pi1eLl-8 PileLl-9 PileL1-10 PileL2-1 PileL2-2 PileL2-3 length/psi/ 10.5 1500 10.5 10.5 1000 10.5 1000 10.5 1000 10.5 1500 10.5 1500 10.5 1500 length/psi/ 10.5 1300 10.5 10.5 1500 10.5 1500 10.5 1400 10.5 1800 10.5 1600 10.5 1500 Ien sU 10.5 1600 10.5 10.5 1000 10.5 1000 10.5 1000 10.5 1000 10.5 1200 10.5 1100 Ien si/ 10.5 2800 10.5 10.5 3000 10.5 1500 7.0 3000 7.0 1200 7.0 1000 7.0 1100 final Icn s 42'0" 301d 42'0"42'0" 301d 10.5 3000 38'6" 301d 10.5 3000 7.0 2000 7.0 1500 52'6" 301fi 49'0" 301d 7.0 2800 7.0 2800 52'6" 30ldps 52'6" 301d PileL24 PileL2-5 PileL2-6 PileL2-7 PileL2-8 PileL2-9 PileL2-10 PileL2-11 length/psi/ 1 10.5 1500 10.5 1500 10.5 1500 1500 10.5 1500 10.5 1500 10.5 1000 10.5 1000 length/psi/ 10.5 1400 10.5 1300 10.5 1500 1400 10.5 1500 10.5 1000 10.5 1000 10.5 1100 length/psi/ 10.5 1800 10.5 1100 10.5 1000 1800 10.5 1000 10.5 1200 10.5 1000 10.5 1000 len si/ 10.5 1200 10.5 2800 10.5 1000 1000 10.5 1000 10.5 1800 10.5 1500 10.5 1500 Icn sV 10.5 1200 42'0" 30ld 105 2800 2800 10.5 2800 10.5 2800 10.5 2800 10.5 2900 Ien si/ 10.5 2800 52'6" 30Id P52'6" 301d 52'6" 301d 52'6" 30ld 52'6" 301d 52'6" 301ufinal Icn ' s 63'0" 301dpsPileL2-12 POeL3-1 PileL3-2 PilcL34 P11eL3-5 Pil&3-6 PileL3-7 len si/ 10.5 1000 10.5 1000 10.5 1000 1000 10.5 1400 10.5 1500 10.5 1500 10.5 1500 Ien si/ 10.5 1100 10.5 1000 10.5 1000 1000 10.5 1400 10.5 1500 10.5 1500 10.5 1000 lengtlypsil 10.5 1000 10.5 1500 10.5 1800 10.5 1500 10.5 1000 1 10.5 1 1000 10.5 1000 10.5 1000 length/psi/ 10.5 1900 10.5 1500 10.5 1500 10.5 1500 10.5 2900 10.5 2900 10.5 2900 10.5 2900 length/psi/ 10.5 2900 10.5 2500 10.5 2500 10.5 2900 42'0" 30ldW 4210" 38ldps 4210" 30ldps 4210" 301dps final length4cips 5216" 301d 52'6" 291dps 52'6" 291dps 52'6" 301dps Pil 3-8 Pi1eL3-9 PileL3-10 Ien si/ 10.5 1500 10.5 1400 10.5 1400 length/psi/ 10.5 1200 10.5 1300 10.5 1300 length/psi/ 10.5 1700 10.5 1600 10.5 1400 length/psi/ 7.0 2900 7.0 1500 7.0 1500 final lrn ' s 38'6" 7.0 2900 7.0 2900 -301dps 45'6" 301d 45'6" 301u Ahrens Companies pile footage totals Treasure Coast Hangar Ft. Pierce FC Pile# Gross Length Estimated 1 38.5 2 38.5 3 38.5 4 38.5 5 38.5 6 38.5 7 38.5 8 38.5 9 38.5 10 38.5 11 38.5 12 38.5 13 38.5 14 38.5 15 38.5 16 38.5 17 38.5 18 45.5 19 52.5 20 45.5 21 45.5 22 45.5 23 45.5 24 45.5 25 45.5 26 45.5 27 45.5 28 38.5 29 38.5 30 38.5 31 38.5 32 38.5 33 38.5 34 38.5 35 45.5 36 38.5 37 38.5 38 38.5 39 38.5 40 38.5 41 38.5 42 38.5 43 38.5 44 38.5 45 45.5 46 45.5 47 45.5 48 45.5 19 45.5 0 38.5 51 38.5 52 38.5 53 38.5 54 38.5 55 45.5 56 45.5 57 45.5 58 49 59 1 49 60 49 61 52.5 62 45.5 63 45.5 64 38.5 65 49 66 42 67 42 68 49 69 49 70 49 71 38.5 72 38.5 73 38.5 74 38.5 75 45.5 76 45.5 77 38.5 78 38.5 79 45.5 80 59.5 81 38.5 82 38.5 83 45.5 84 45.5 85 38.5 86 38.5 87 38.5 88 31.5 89 38.5 90 38.5 91 38.5 92 38.5 93 38.5 94 38.5 95 38.5 96 38.5 97 38.5 98 38.5 99 38.5 100 38.5 101 38.5 102 36.5 103 38.5 104 36.5 105 31.5 106 38.5 V1 op m Vl DD m Vf Vl v Ill Ul v Vf Ul v V1 a0 m VI c0 m Vf W m YI o6 m Vf 00 m Li w m vl w m Vf N v N N v N m v Vf M m V1 W. m m m Vf M m vl M m Lq M m N N Vl n .+ Vl n .r Vl N .+ m n .+ Ul n .� Uf n rI Wf M m vl W m Ul M m N M m YI W m YI N m Ul m v Ui N v vl m m vl W m V V V L W m Ul M m Vf M m vl W m N a N N L N b m N N N n to ei .+ ei N e1 m ei v ei In ei {o ei n ei m M m e1 o N e1 .+ N ei ry NN I'1 m eel a N ei m eY Io eY n ei m ei m M o e1 .H ei ry ei m ei a ei In ei Io eel n e1 m ei m e1 o e1 .-I e1 N ei m eel a e1 m ei b ei n ei m e1 o1 el 0 e1 .+ 'i N M m ei v ei In e1 N J N J m J a J m J W0 J Ll-7 42 L1-8 42 U-9 52.5 L1-10 38.5 L2-1 49 L2-2 52.5 L2-3 52.5 L2-4 63 L2-5 42 L2.6 52.5 L2-7 52.5 L2-8 52.5 L2-9 52.5 L2-10 52.5 L2-11 52.5 L2-12 52.5 L3-1 52.5 L3-2 52.5 L3-3 52.5 L3-4 42 L3-5 42 L3-6 42 L3-7 42 L3-8 38.5 L3-9 45.5 L3-30 45.5 Totals 7717 gross feet 5880 lineal feet 1837 feet over estimate per bid dots r X7KC M:odEl� WiffBIG'd0i1 � Part Number X7KC Pressure 1 } - „ {' , Motor Mount SAE C 2 Bolt 100ccls 'r Min. Hydraulic Flow 4,GPM (15 Lpm) �. 6380!• ' ' - c ,� .0 Max. Hydraulic: Flow 25.GPM V5Lpm), , [162.05] - - t, Max. Continuous Pressure 3000 PSI (207 Bar) � `'^' -'. c2a Output Shaft 6Bolt Flange • t r 1,500,PIN. ,•; 64k f OUTPUTSPEED V) '�•:,c. G".4. o FLOW SPEED a� a'• i7 d l GPM'(LPM) RPM 1 J j; . 4(15.1) . 4. 1}F -' 8(30.2) 8 #; 10 (37.8).. 10... 12(45.4) 12 n. lability Under '' ,' ,� 14 (53) 15 0 0 " Pressure 2 1 r° p 5 ,P t� ! or n' 16 (60.4) 17 co ' a . M; r Yf .n , sV r x'� 18 (68.1).. 19 l� o �v ;ill ref° 20(75.6), 21 u. nm -- - �4:rfi .i.4{^>..¢ r"tx',•,y.,+o-'1a 22(83.3) 23: , m.�. " ,. i ,,,.. y 'rL':.+T.�-it Jr. 1 26(94.6). 26 rTORQUE �1,, OUTPUTT . x ri UE sd x. 1h �PRESSURE TORQUE PSI (BAR)' Fi/LBS.(Nm) 400(28) 943 (1279) 9 Y 600(41) 1415(1919) _'Y- �x"' 800(55) 1867 (2558) • F:i ° 'I . °� , aY ,� �+ Y x i �' 1000.(69); 2358 (3198) 1200.83 2830 ,. '; 1 u •A,. + r , 1400'(97) 3301,(4476) 403937 '� ✓ „1 = � 16001(110) 3773(5116) 1.260 [56100:00] r �p E+1 1, 1800 (124)' 4245 (5756) [32.00], J A^ i 3 , 2000 (138)4716 (6395) f, „ a r , r . '{• z„� ` . • � , � 22001(152) 5188 (7035)' , r- r.,. a .. 2400 (166) 5659 (7674) a 013.386; OUTPUT SHAFT 5'+' 26%(179) 6131,(8313) [¢340:00] �* ` t' 6x BOLT,PATTEFiN e, 2800(193) 6602(8953) ( ) 3000 (207)' 7074 (9592) Note. 1 FUb =1.356 Nm '.T `- IL Lill - ' �Jx 1 ♦J�y_1 f ut.{' J ,p.yr! °!('!q{�i^:• AVCON Project No. 2017.159.01 November 1, 2019 St. Lucie County 2300 Virginia Avenue Fort Pierce, FI 34982 Attention: Mr. Gary Stepalavich, Building Official Reference: MRO FPR Hangar Project No. 1907-0552 St. Lucie County, Florida THRESHOLD REPORT SUMMARY NO.4 Dear Mr. Stepalavich: AVCON, INC. ENGINEERS & PLANNERS 5555 E. Michigan St., Suite 200 Orlando, Florida 32822 Phone: (407) 599-1122 Fax: (407) 599-1133 www.avconinc.com As directed, representatives from AVCON, Inc. performed on -site, threshold inspection services for the MRO FPR Hangar project. This report summarizes our threshold inspection services performed during the inspection period of October 5, 2019 through November 1, 2019. Inspections took place on November 1, as the helical piles were installed, and the rebar for the footings was re -inspected. Our inspections were performed in accordance with the structural documents, signed, and sealed by the Engineer of Record, Luca DelVerme PE (AVCON INC), and the project specifications. Our special inspector and his duly authorized representative(s) reported their observations as noted on the attached Daily Threshold Reports with all structural non-compliance items noted within the attached Special Inspection Log (SIL). All non-compliance items, or SIL's, previously reported as non -compliant with regard to the plans or specifications, will be reevaluated by our Special Inspector after corrective action is taken by the General Contractor or the deficient conditions have been approved through written approval by the Engineer of Record. During the inspection period of October 5, 2019 through November 1, 2019, and to the best of our knowledge and belief, the construction of all structural load -bearing components described in the threshold inspection plan complies with permitted documents, with revisions as approved by the Engineer of Record, except as noted on the SIL. _ Should you have any questions or concerns regarding these reports, or desire any additional information, please contact us. Sincerely, AVCON, Inc. Certificate of Authorization No. 5057 q, .4�.awen. as+...•�wu..m ��ucexg. i'+ti u..vyore�u a xassax as .�.�� RickV. Baldocchi, P.E. Vice President STATE OF FLORIDA Professional Engineer No. 38092 Registered Special Inspector No. 1019 cc: Addressee, Gary Stepalavich StepalavichG@stlucieco.ore County Project Manager, Scotty Beaulieu beaulieus@stlucleco.ore Chief Plans Examiner, William Durden DurdenW@stlucleco.org Construction Project Manager, Robert Hatton rhatton@ahrenscompanies.com CIVIL & STRUCTURAL • AIRPORT & AVIATION CONSULTING 9 TRANSPORTATION DESIGN & PLANNING AVCON, INC. ENGINEERS & PLANNERS 5555 E. Michigan St., Suite 200 Orlando, Florida 32822 AVCON Project No.2017.159.01 Phone: (407) 599-1122 November 1, 2019 Fax: (407) 599-1133 www.avconinc.com St. Lucie County 2300 Virginia Avenue Fort Pierce, FI 34982 Attention: Mr. Gary Stepalavich, Building Official Reference: MRO FPR Hangar Project No. 1907-0552 St. Lucie County, Florida THRESHOLD REPORT SUMMARY NO.4 INSPECTOR(S): Rick Baldocchi (AVCON, Inc.) DAILY REPORT(S): Threshold Inspection Daily Report(s): 11/01/19 [See attached report(s) for locations and observations.] SPECIAL INSPECTION LOG: Added this Summary Period: Resolved this Summary Period: Outstanding for the Project: ATTACHMENT(S): - None. E 4 E Page 2 of 2 CIVIL & STRUCTURAL • AIRPORT & AVIATION CONSULTING • TRANSPORTATION DESIGN & PLANNING AVCON, INC. ENGINEERS & PLANNERS SPECIAL INSPECTION LOG Permitting Agency: Port St Lucie Project Name: FPR MRO Hangar Update Period: 10.28-19 to 11-01-19 1907-0552 Permit No.: Project No.: 2017.0259.01 Attention: Ahrens Construction/St Lucie County Project Location: Port St. Lucie, St. Lucie County, Florida Threshold Agent: Rick V. Baldocchi SIL Date Daily Structure) Element LeLocationDescriptionineer e 1 S.I. Engineer of Record �''I' Dato Daily Report No. Report No. Response Closed No. 1 8-26-19 SIL Helical Piles N/A The helical pile submittal on RVB FOR approved RVB 10/30/19 009 Summary Submittals site does not have SEOR or calculations and 1 County Building Department revised plans acceptance stamp. 2 8-30-19 SIL Helical Pies Footings A-7 & L-7 The contract documents do RVB FOR approved RVB 10/30/19 009 Summary not show helical piles within calculations and 2 the footings. revised plans 3 09/20M9 SIL Helical Pies Footings A-7— C-7, The contract documents do RVB FOR approved RVB 10130(11) 009 Summary 3 F7—L7, G-8 & L-6, not show helical piles within calculations and G-9—L-9 the footings. revised plans 4 10/02/19 SIL Foundations All locations The rebar in the top mat RVB Delegated engineer RVB 11/01/19 009 Summary4 deviate from plans/shop submitted letter drawings regarding the removal of top mat hooks - FOR accepted r The Special Inspector, aok V. Baldcochi, P.E., achnoWedges this deficiency. aThe Special Inspector, Rick V. Baldocctii, P.E., acknowledges resolution to this deficiency. This is a brief summary of the SIL Refer to the daily report for a detailed description. Page 1 of 1 ..�V. LV I'V.\ V/ .II 11Lr VI\1 UUJ PROJECT: FPR MRO Hangar LOCATION: Treasure Coast International Airport & Business PERMIT AGENCY: St. Lucie County CLIENT: FIELD CONTACT: Robert Hatton COMMENTS SCOPE OF WORK: DATE: 11/01/19 WORK ORDER NO.: BUILDING PERMIT NO.: Permit No. 1812-0473 Observed rebar that was placed prior over the helical pile caps. Plans for that have been approved from FOR for helical piles. FOR approved plans/letter for footings. Final elevations for anchor bolts will be corrected prior to the concrete placement, as well as general housekeeping as per the contract to ensure that excess debris that has sluffed in will be removed. INSPECTOR: Jason Teliszczak - w/Avcon FIELD COPIES TO: AVCON AVCON, INC. ENGINEERS&P"I EM 5355 G. Michigan St, San. 200 Orlando, Florida 32822 Phonc:(407)599-1122 F= (407) 599-1133 %" w.ovconinc.com AVCON, INC. ENGINEERS & PLANNERS 5555 E. Michigan St., Suite 200 Orlando, Florida 32822 AVCON Project No. 2017.159.01 Phone: (407) 599-1122 November 8, 2019 Fax: (407) 599-1133 www.avconinc.com St. Lucie County 2300 Virginia Avenue Fort Pierce, FI 34982 Attention: Mr. Jim McGuinness, Building Official Reference: MRO FPR Hangar Project No. 1907-0552 St. Lucie County, Florida THRESHOLD REPORT SUMMARY NO.5 Dear Mr. McGuinness: As directed, representatives from AVCON, Inc. performed on -site, threshold inspection services for the MRO FPR Hangar project. This report summarizes our threshold inspection services performed during the inspection period of November 4, 2029 through November 8, 2019. Inspections took place on November 6, as the rebar for the footings were re -inspected prior to the placement of concrete, as well as the concrete placement. Our inspections were performed in accordance with the structural documents, signed, and sealed by the Engineer of Record, Luca DelVerme PE (AVCON INC), and the project specifications. Our special inspector and his duly authorized representative(s) reported their observations as noted on the attached Daily Threshold Reports with all structural non-compliance items noted within the attached Special Inspection Log (SIL). All non-compliance items, or SIL's, previously reported as non -compliant with regard to the plans or specifications, will be reevaluated by our Special Inspector after corrective action is taken by the General Contractor or the deficient conditions have been approved through written approval by the Engineer of Record. During the inspection period of November 4, 2019 through November 8, 2019, and to the best of our knowledge and belief, the construction of all structural load -bearing components described in the threshold inspection plan complies with permitted documents, with revisions as approved by the Engineer of Record, except as noted on the SIL. Should you have any questions or concerns regarding these reports, or desire any additional information, please contact us. Sincerely, AVCON, Inc. Certificate of Authorization No. 5057 Rick V. Baldocchi, P.E. Vice President STATE OF FLORIDA Professional Engineer No. 38092 Registered Special Inspector No. 1019 M ba.saNM.� �I W'm. MgN[MV.Cwem{RmMlY ay vuon^"t'0, MYJg{M,pOwswrme..iu[m�!Intl Nv]WMt��' ♦vrox.w� • aurear � � ewrsrmcwoMerr�m 6�ijq���t= fFPMYrt0Yl11GEL cc: Addressee, Gary Stepalavich SteoalavichG@stlucieco.org County Project Manager, Scotty Beaulieu beaulieusPstlucleco.ore Chief Plans Examiner, William Durden DurdenW@stlucleco.org Construction Project Manager, Robert Hatton rhatton@ahrenscompanies.com CIVIL & STRUCTURAL 9 AIRPORT & AVIATION CONSULTING 9 TRANSPORTATION DESIGN & PLANNING M -- AVCON Project No. 2017.159.01 November 8, 2019 St. Lucie County 2300 Virginia Avenue Fort Pierce, FI 34982 Attention: Mr. Gary Stepalavich, Building Official Reference: MRO FPR Hangar Permit No.1907-0550 & 1812-0471 St. Lucie County, Florida THRESHOLD REPORT SUMMARY NO.5 INSPECTOR(S): Rick Baldocchi (AVCON, Inc.) DAILY REPORT(S): Threshold Inspection Daily Report(s): 11/06/19 [See attached report(s) for locations and observations.] SPECIAL INSPECTION LOG: Added this Summary Period: Resolved this Summary Period: Outstanding for the Project: ATTACHMENT(S): - None. n 0] 67 Page 2 of 2 AVCON, INC. ENGINEERS & PLANNERS 5555 E. Michigan St., Suite 200 Orlando, Florida 32822 Phone: (407) 599-1122 Fax: (407) 599-1133 www.avconine.com CIVIL & STRUCTURAL 9 AIRPORT & AVIATION CONSULTING • TRANSPORTATION DESIGN & PLANNING 4�J SPECIAL INSPECTION LOG "CON, INC. ENGINEERS & PLANNERS Permitting Agency: St Lucie County Project Name: FPR MRO Hangar Update Period: 11/04I79 to 11/08/19 Permit No,: 1907-0550 - Foundation & 1907-0550 Project No.: 2017.0259.01 e -g - Structure Attention: Ahrens Construction]St Lucie County Project Location: Port St. Lucie, St. Lucie County, Florida Threshold Agent Rick V. Baldocchi SIL Date Daily Structural Element Location s r Engineer of Record Date Daily Report No. NO. Report No. Response Closed Closed No. 1 8-26-19 SIL Helical Piles NIA The helical pile submittal on RVB FOR approved RVB 10/30/19 009 Summary Submittals site does not have SEOR or calculations and 1 County Building Department revised plans acceptance stamp. 2 8-30-19 SIL Helical Piles Footings A-7 & L-7 The contract documents do RVB FOR approved RVB 10/30/19 009 Summary not show helical piles within calculations and 2 the footings. revised plans 3 09/20/19 SIL Helical Piles Footings A-7—C-7, The contract documents do RVB FOR approved RVB 10/30/19 009 Summary 3 F7— 1-7, G-8 & L-8, not show helical piles within calculations and G-9—L-9 the footings. revised plans 4 10/02/19 SIL Foundations All locations The rebar in the top mat RVB Delegated engineer RVB 11/01/19 009 Summary 4 deviate from plans/shop submitted letter drawings regarding the removal of top mat hooks - FOR accepted zThe Special Inspector, Rick V. Baldocchi, P.E, acmowledges this deficiency. a The Special Inspector, Rids V. Baldocchi, P.E., acknowledges resolution to this deficiency. This is a brief summary oftho SIL Refer to the daily report for a detailed descnption. Page 1 of 1 II V OrC V I I V IN UMIL T MM-UM I mug PROJECT: FPR MRO Hangar LOCATION: Treasure Coast International Airport & Business PERMIT AGENCY: St. Lucie County CLIENT: FIELD CONTACT: Robert Hatton COMMENTS SCOPE OF WORK: DATE: 11/06/19 WORK ORDER NO.: BUILDING PERMIT NO.: Permit No. 1812-0471 Re -inspected rebar that was placed for foundations over the helical pile caps. Final elevations for anchor bolts were corrected prior to the concrete placement, as well as general housekeeping to ensure that vegetation growth was removed. Temperature avg. was 71-84 degrees, wind avg. was 0-9 mph. No significant rainfall occurred during the concrete placement. Concrete mix SW695R30 Spec W/C 0.50 #57 was used. The first truck arrived on -site at 7:10am with 11 CY out of 200 CY. Bolts were reset during the concrete placement. Final truck began to place concrete at L1 at 2:30pm, for a total of approx. 238 CY. INSPECTOR: Jason Teliszczak - w/Avcon FIELD COPIES TO: AVCON AVCON, INC. ENGINEERS h PLLNNEaS 5555 E. Michigan St, SUIm200 Orlando, Florida32822 Plwnc:(407)599-1122 Fax: (407)599-1173 '"Mavconinacora AVCON Project No. 2017.159.01 November 15, 2019 St. Lucie County 2300 Virginia Avenue Fort Pierce, FI 34982 Attention: Mr. Jim McGuinness, Building Official Reference: MRO FPR Hangar Project No. 1907-05S2 St. Lucie County, Florida THRESHOLD REPORT SUMMARY NO. 6 Dear Mr. McGuinness: AVCON, INC. ENGINEERS & PLANNERS 5555 E. Michigan St., Suite 200 Orlando, Florida 32822 Phone: (407) 599-1122 Fax: (407) 599-1133 www.avconinc.com As directed, representatives from AVCON, Inc. performed on -site, threshold inspection services for the MRO FPR Hangar project. This report summarizes our threshold inspection services performed during the inspection period of November 11, 2019 through November 15, 2019. Inspections took place on November 13, as the rebar for the slabs were inspected. Our inspections were performed in accordance with the structural documents, signed, and sealed by the Engineer of Record, Luca DelVerme PE (AVCON INC), and the project specifications. Our special inspector and his 'duly authorized representative(s) reported their observations as noted on the attached Daily Threshold Reports with all structural non-compliance items noted within the attached Special Inspection Log (SIL). All non-compliance items, or SlUs, previously reported as non -compliant with regard to the plans or specifications, will be reevaluated by our Special Inspector after corrective action is taken by the General Contractor or the deficient conditions have been approved through written approval by the Engineer of Record. During the inspection period of November 11, 2019 through November 15, 2019, and to the best of our knowledge and belief, the construction of all structural load -bearing components described in the threshold inspection plan complies with permitted documents, with revisions as approved by the Engineer of Record, except as noted on the SIL. Should you have any questions or concerns regarding these reports, or desire any additional information, please contact us. Sincerely, AWON, Inc. Certificate of Authorization No. 5057 1/ 8a"&aC4; A(r RickV. Baidacchi, P.E. Vice President STATE OF FLORIDA Professional Engineer No. 38092 Registered Special Inspector No. 1019 ww Wuawv.wnaenrcmwa.. .J-eV. aq�' prxpgWdmanm.mn�.mm�.uea A xi'J�BF y Wad �WM MW�WumYpvM 5'f � i�. 6511 E16}YiCNi4.x8iPEEf .ry�� p � F SVIIEA] wTaa eow*riov ''h0N"�,..x^� �uwveTwanteew awi ;em cc: Addressee, Gary Stepalavich SteoalavichGPstlucieco.ore County Project Manager, Scotty Beaulieu beaulieusrx7stlucieco.ore Chief Plans Examiner, William Durden DurdenW@stlucieco.org Construction Project Manager, Robert Hatton rhatton@ahrenscompanies.com CIVIL & STRUCTURAL 9 AIRPORT & AVIATION CONSULTING • TRANSPORTATION DESIGN & PLANNING AVCON, INC. ENGINEERS & PLANNERS 5555 E. Michigan St., Suite 200 Orlando, Florida 32822 AVCON Project No. 2017.159.01 Phone: (407) 599-1122 November 15, 2019 Fax: (407) 599-1133 www.avconinc.com St. Lucie County 2300 Virginia Avenue Fort Pierce, FI 34982 Attention: Mr. Jim McGuinness, Building Official Reference: MRO FPR Hangar Permit No.1907-0550 & 1812-0471 St. Lucie County, Florida THRESHOLD REPORT SUMMARY NO.6 INSPECTOR(S): Rick Baldocchi (AVCON, Inc.) DAILY REPORT(S): Threshold Inspection Daily Report(s): 11/13/19 (See attached report(s) for locations and observations.] SPECIAL INSPECTION LOG: Added this Summary Period: Resolved this Summary Period: Outstanding for the Project: ATTACHMENT(S): - None. E 17 E Page 2 of 2 CIVIL & STRUCTURAL 9 AIRPORT & AVIATION CONSULTING • TRANSPORTATION DESIGN & PLANNING t "CON, INC. ENGINEERS & PLANNERS SPECIAL INSPECTION LOG Permitting Agency: St Lucia County Project Name: FPR MRO Hangar Update Period: 11/11119 to 11/15/19 1907-0550 Permit No.: 1907-0550 - Foundation & Project No.: 2017.0259.01 812-0 -S u Attention: Ahrens Construction/St Lucie County Project Location: Port St. Lucie, St. Lucie County, Florida Threshold Agent: Rick V. Baldocchi SIL Date Daiy Structural Element Location 3 Description 1 S.I. Engineer of Record 'I' Date Daily Repoli No. Report No. Response Closed No. 1 8-26-19 SIL Helical Piles N/A The helical pile submittal on RVB FOR approved RVB 10/30/19 009 Summary Submittals site does not have SEOR or calculations and 1 County Building Department revised plans acceptance stamp. 2 8-30-19 SIL Helical Piles Footings A-7 & L-7 The Contract documents do RVB FOR approved RVB 10/30/19 call Summary not show helical piles within calculations and 2 the footings. revised plans 3 09/20/19 SIL Helical Piles Footings A-7—C-7, The Contract documents do RVB FOR approved RVB 10/30/19 009 Summary 3 F7—L7, G-8 & L-8, not show helical piles within calculations and G-9—L-9 the footings. revised plans 4 10/02/19 SIL Foundations All locations The rebar in the lop mat RVB Delegated engineer RVB 11/01/19 009 Summary 4 deviate from plans/shop submitted letter drawings regarding the removal of top mat hooks - FOR accepted sThe Special Inspector, Rick V. Beldocchl, P.E., acknowledges this deficiency. a The Special Inspector, Rick V. Baldocchi, P.E., ecimowledges resolution to this deficiency. This is a brief summaryof the SIL Refer to the daily report for a detailed description. Page 1 of 1 am PROJECT: FPR MRO Hangar LOCATION: Treasure Coast International Airport & Business PERMIT AGENCY: St. Lucie County CLIENT: FIELD CONTACT: Robert Hatton COMMENTS SCOPE OF WORK: 11/13/19 WORK ORDER NO.: BUILDING PERMIT NO.: Permit No. 1812-0471 Inspected rebar that was placed for slabs. 4", 6", and 12" slabs with column blockouts. Final elevations for anchor bolts were finalized within the column blockouts by installing high strength grout for the 10" steel plate. General housekeeping will need to take place prior to concrete placement. Concrete is tentatively scheduled for Monday, 11/18/19 at 7am. INSPECTOR: Jason Teliszczak- w/Avcon FIELD COPIES TO: AVCON AVCONa INC. ENGINEERS & PLANNERS 5553 C Michigan SL, Suite 200 Orlando, Florida 32822 Phone: (407) 599-1122 rm: (407) 599-1133 wmw twonimcona AVCON Project No. 2017.159.01 November 22, 2019 St. Lucie County 2300 Virginia Avenue Fort Pierce, FI 34982 Attention: Mr. Jim McGuinness, Building Official Reference: MRO FPR Hangar Project No.1907-0552 St. Lucie County, Florida THRESHOLD REPORT SUMMARY NO.7 Dear Mr. McGuinness: AVCON, INC. ENGINEERS & PLANNERS 5555 E. Michigan St., Suite 200 Orlando, Florida 32822 Phone: (407) 599-1122 Fax: (407) 599-1133 www.avconinc.com As directed, representatives from AVCON, Inc. performed on -site, threshold inspection services for the MRO FPR Hangar project. This report summarizes our threshold inspection services performed during the inspection period of November 18, 2019 through November 22, 2019. Inspections took place on November 18 and 20, as concrete for the office/bathroom slabs was placed. Our inspections were performed in accordance with the structural documents, signed, and sealed by the Engineer of Record, Luca DelVerme PE (AVCON INC), and the project specifications. Our special inspector and his duly authorized representative(s) reported their observations as noted on the attached Daily Threshold Reports with all structural non-compliance items noted within the attached Special Inspection Log (SIL). All non-compliance items, or SIL's, previously reported as non -compliant with regard to the plans or specifications, will be reevaluated by our Special Inspector after corrective action is taken by the General Contractor or the deficient conditions have been approved through written approval by the Engineer of Record. During the inspection period of November 28, 2019 through November 22, 2019, and to the best of our knowledge and belief, the construction of all structural load -bearing components described in the threshold inspection plan complies with permitted documents, with revisions as approved by the Engineer of Record, except as noted on the SIL. Should you have any questions or concerns regarding these reports, or desire any additional information, please contact us. Sincerely, AVCON, Inc. �'te Certificate of Authorization No. 5057 /" Y • ga"CIC-411 lor RickV. Bafdocchi, P.E. Vice President STATE OF FLORIDA Professional Engineer No. 38092 Registered Special Inspector No. 1019 ,waNw�v.emu�reeia.m, �'•p V.6q�44� nrvntMgnaaa�+w..mw�a.a 'C}y'' G ,b�W W�W�f�MywWW..mW brwM ±y5 N1 �C ,VW,.wG '� TAIFfI �� N0 ¢I.S,YICroNu61PEFt °ay 81RCEV w>r F uv.wwnvm � rem.nrzn.m�aw.raeon mmeo^•. v.e+mire cc: Addressee, Gary Stepalavich SteoalavichG()stlucieco.org County Project Manager, Scotty Beaulieu beaulieus(astlucieco.org Chief Plans Examiner, William Durden DurdenW@stlucieco.org Construction Project Manager, Robert Hatton rhatton@ahrenscompanies.com CIVIL & STRUCTURAL • AIRPORT & AVIATION CONSULTING • TRANSPORTATION DESIGN & PLANNING AVCON Project No. 2017.159.01 November 22, 2019 St. Lucie County 2300 Virginia Avenue Fort Pierce, FI 34982 Attention: Mr. Jim McGuinness, Building Official Reference: MRO FPR Hangar Permit No. 1907-0550 & 1812-0471 St. Lucie County, Florida THRESHOLD REPORTSUMMARY NO.7 INSPECTOR(S): Rick Baldocchi (AVCON, Inc.) AVCON, INC. ENGINEERS & PLANNERS 5555 E. Michigan St., Suite 200 Orlando, Florida 32822 Phone: (407) 599-1122 Fax: (407) 599-1133 www.avconinc.com DAILY REPORT(S): Threshold Inspection Daily Report(s): 11/18/19,11/20/19 [See attached report(s) for locations and observations.) SPECIAL INSPECTION LOG: Added this Summary Period: Resolved this Summary Period: Outstanding for the Project: ATTACHMENT(S): - None. If] I9 n Page 2 of 2 CIVIL & STRUCTURAL • AIRPORT & AVIATION CONSULTING • TRANSPORTATION DESIGN & PLANNING "CON, INC. ENGINEERS & PLANNERS SPECIAL INSPECTION LOG Permitting Agency: St Lucie County Project Name: FPR MRO Hangar Update Period: 11/18/19 to 11I22119 Permit No.: 1907-0550 - Foundation & 1907-0550 8 Structure Project No.: 2017.0259.01 Attention: Ahrens Construction/St. Lucie County Project Location: Fort Pierce, St. Lucie County, Florida Threshold Agent Rick V. Baldocchi SIL No. Date Daily Report No. Structural Element Location a Description t S.I. Engineer of Record Response 'S'I. Date Closed Daily Report No. 1 a-29-19 SIL Helical Piles NIA The helical pile submittal on RVB FOR approved RVB 10/30/19 009 Summary Submittals site does not have SEOR or calculations and 1 County Building Department revised plans acceptance stamp. 2 8-30-19 SIL Helical Piles Footings A-7 S L-7 The contract documents do RVB FOR approved RVB 10/30/19 009 Summary not show helical piles within calculations and 2 the footings. revised plans 3 09120/19 SIL Helical Piles Footings A-7—C-7, The contract documents do RVB FOR approved RVB 10/30/19 009 Summary 3 F7— L7, G-8 & L-8, not show helical piles within calculations and 1 G-9—L-9 the footings. revised plans 4 10/02/19 SIL Foundations All locators The rebar in the top mat RVB Delegated engineer RVB 11/01/19 009 Summary 4 deviate from plans/shop submitted letter drawings regarding the removal of top mat hooks - FOR accepted t The Special Inspector, Rick V. Saldocchi, P.E., adviowledges this deficiency. aThe Special Inspector, Rick V. Baldowhi, P.E., acknowledges resolution to this deficiency. This is a brief summary of the SIL Refer to the daily repon for a detailed description. Page 1 of t i_ INSPLG I IUN DAILY KLNUK I V IG PROJECT: FPR MRO Hangar LOCATION: Treasure Coast International Airport & Business PERMIT AGENCY: St. Lucie County CLIENT: FIELD CONTACT: Robert Hatton SCOPE OF WORK: DATE:11/18/19 WORK ORDER NO.: BUILDING PERMIT NO.: Permit No. 1812-0471 Re -inspected rebar prior to the concrete placement, as well as general housekeeping on the western office/bathroom slab up to the control joint. Temperature avg. was 71-84 degrees, wind avg. was 0-9 mph. No significant rainfall occurred during the concrete placement. Concrete mix SW695R30 Spec W/C 0.50 #57 was used. The first truck arrived on -site at approx. 7am with 11 CY out of 99 CY Final truck completed placing concrete at approx. 10am, for a total of approx. 99 CY. INSPECTOR: FIELD COPIES Jacob Cano - w/Avcon AVCON AVCON, INC.. e�clr+esas m r3.wNees 5555 & Michigan St, Suite 200 Orlando, Florida 32822. Plmne: (407) 599-1122 ' Fax: (407)599.1133 MWAVCuninc.com IIW7rM, I IUN Will-T Mr-t'URI u IJ PROJECT: FPR MRO Treasure Coast International Airport & Business PERMIT AGENCY: St. Lucie County CLIENT: FIELD CONTACT: Robert Hatton COMMENTS SCOPE OF WORK: DATE:11/20/19 WORK ORDER NO.: BUILDING PERMIT NO.: Permit No. 1812-0473 Re -inspected rebar prior to the concrete placement, as well as general housekeeping on the eastern office/bathroom slab up to the control joint of the prior western slab. Temperature avg. was 57-71 degrees, wind avg. was 7-9 mph. No significant rainfall occurred during the concrete placement. Concrete mix SW695R30 Spec W/C 0.50 #57 was used. The first truck arrived on -site at approx. lam with 11 CY out of 75 CY. Final truck completed placing concrete at approx. 10:30am, for a total of approx. 75 CY INSPECTOR: Jason Teliszczak - w/Avcon FIELD COPIES TO: AVCON AVCINC. ENGINEERS R &PL PL\NNERS 5555 E. Michigan St., suiie200 Orlando, Florida 32822 Phone; (407) 599-1122 Fax: (407) 599-1133 ' mm.aveonine.rnm I AVCON Project No. 2017.159.01 December 11, 2019 St. Lucie County 2300 Virginia Avenue Fort Pierce, FI 34982 Attention: Mr. Jim McGuinness, Building Official Reference: MRO FPR Hangar Project No. 2907-0552 St. Lucie County, Florida THRESHOLD REPORT SUMMARY NO.8 Dear Mr. McGuinness: AVCON, INC. ENGINEERS & PLANNERS 5555 E. Michigan St., Suite 200 Orlando, Florida 32822 Phone: (407) 599-1122 Fax: (407) 599-1133 www.avconinc.com As directed, representatives from AVCON, Inc. performed on -site, threshold inspection services for the MRO FPR Hangar project. This report summarizes our threshold inspection services performed during the inspection period of December 2, 2019 through December 2, 2019. Inspections took place on November 18 and 20, as concrete for the office/bathroom slabs was placed. Our inspections were performed in accordance with the structural documents, signed, and sealed by the Engineer of Record, Luca DelVerme PE (AVCON INC), and the project specifications. Our special inspector and his duly authorized representative(s) reported their observations as noted on the attached Daily Threshold Reports with all structural non-compliance items noted within the attached Special Inspection Log (SIL). All non-compliance items, or SIL's, previously reported as non -compliant with regard to the plans or specifications, will be reevaluated by our Special Inspector after corrective action is taken by the General Contractor or the deficient conditions have been approved through written approval by the Engineer of Record. During the inspection period of December 2, 2019 through December 2, 2019, and to the best of our knowledge and belief, the construction of all structural load -bearing components described in the threshold inspection plan complies with permitted documents, with revisions as approved by the Engineer of Record, except as noted on the SIL. Should you have any questions or concerns regarding these reports, or desire any additional information, please contact us. Sincerely, AVCON, Inc. Certificate of Authorization No. 5057 I/ aaz6ae4; Pam' Rick V. Boldocchi, P.E. Vice President STATE OF FLORIDA Professional Engineer No. 38092 Registered Special Inspector No. 1019 ,a, v��,4 wn.gx,Auaeam.vw�nmumm i W u�Nwk� miilwwM W ]A@T1 ,4tu.wG. ��� {2 Aif ewmwcwwn am[[} =�OPF' �� O�oVfN.M1.VYI F reawwcvne,._ver ea.ry aumMce cc: Addressee, Gary Stepalavich StepalavichGAstlucieco.orf; County Project Manager, Scotty Beaulieu beaulieus0stlucieco.ore Chief Plans Examiner, William Durden DurdenW@stlucieco.org Construction Project Manager, Robert Hatton rhatton@ahrenscompanies.com CIVIL & STRUCTURAL • AIRPORT & AVIATION CONSULTING 9 TRANSPORTATION DESIGN & PLANNING AVCON, INC. ENGINEERS & PLANNERS 5555 E. Michigan St., Suite 200 Orlando, Florida 32822 AVCON Project No. 2017.159.01 Phone: (407) 599-1122 December 11, 2019 Fax: (407) 599-1133 www.avconine.com St. Lucie County 2300 Virginia Avenue Fort Pierce, FI 34982 Attention: Mr. Jim McGuinness, Building Official Reference: MRO FPR Hangar Permit No. 1907-0550 & 1812-0471 St. Lucie County, Florida THRESHOLD REPORT SUMMARY NO.8 INSPECTOR(S): Rick Baldocchi (AVCON, Inc.) DAILY REPORT(S): Threshold Inspection Daily Report(s): 12/06/19 [See attached report(s) for locations and observations.] SPECIAL INSPECTION LOG: Added this Summary Period: Resolved this Summary Period: Outstanding for the Project: ATTACHMENT(S): - FOR Report 1 I7 1 Page 2 of 2 CIVIL & STRUCTURAL 9 AIRPORT & AVIATION CONSULTING • TRANSPORTATION DESIGN & PLANNING AVCON, INC. ENGINEERS & PLANNERS SPECIAL INSPECTION LOG Permitting Agency: St. Lucie County Project Name: FPR MRO Hangar Update Period: 12/02/19 to 12/06/19 1907-0552 Permit No.: 1907-0550 — Foundations & 1812-0471-Structure Project No.: 2017.0259.01 Attention: Ahrens ConstructiontSt Lucie County Project Location: St. Lucie County, Florida Threshold Agent Rick V. Baldocchi SIL No. Data Daily Report No. Structural Element Location r Description S.I. Engineer of Record Response 'I' Date Closed Daily Report No. 1 8-26-19 SIL Helical Piles N/A The helical pile submittal on RVB FOR approved RVB 10/30/19 009 Summary Submittals site does not have SEOR or calculations and 1 County Building Department revised plans acceptance stamp. 2 8-30-19 SIL Helical Piles Footings A-7 & L-7 The contract documents do RVB FOR approved RVB 10/30/19 009 Summary not show helical piles within calculations and 2 the footings• revised plans 3 09/20/19 SIL Helical Piles Footings A-7—C-7, The contract documents do RVB FOR approved RVB 10/3D/19 009 Summary 3 F7— L7, GA & L-B, not show helical piles within calculations and G-9—L-9 the footings. revised plans 4 10/02/19 SIL Foundations All locations The mbar in the top mat RVB FOR approved RVB 11/01/19 009 Summary 4 deviate from plans/shop calculations and drawings. revised plans 5 10/04/19 SIL Foundations Footings Column anchor bolts and RVB Summary 5 adjustment nuts were encased with high shrink grout prior to steel column placement. Columns that .The special Inspector, Rick V. Baldocchi, P.E., acknowledges this deficiency. a The Special Inspector, Rick V. Baldocchl, P.E., acknowledges resolution to this deficiency. This is a brief summery of the SIL. Refer to the daily report for a detailed desorption. Page 1 cf 2 "CON, INC. ENGINEERS & PLANNERS have been placed are not bearing evenly on the grout. iThe Special Inspector, Rick V. Baldocchi, P.E., acknoxledges this deficiency. a The Special Inspector, Rick V. Baldocchi, P.E., acknowledges resolution to this deficiency. This is a Met summary of the SIL. Refer to the daily report for a detailed desorption. Page 2 of 2 nVJr". Awry uMlLr r\crvnl ulY PROJECT: FPR MRO Hangar LOCATION: Treasure Coast International Airport & Business PERMIT AGENCY: St. Lucie County CLIENT: FIELD CONTACT: Robert Hatton COMMENTS SCOPE OF WORK: DATE:12/0619 WORK ORDER NO.: BUILDING PERMIT NO.: Permit No. 1812-0471 Inspected rebar prior to the concrete placement, as well as general housekeeping on the eastern column locations for 12" slab to be installed for grideline "A". Concete placement is scheduled for 12/06/19 at 7am. Inspected rebar prior to the concrete placement, as well as general housekeeping on the trench drain at approximately the middle of the hanger. The survey crew discovered that the layout was wrong, and the trench drain will have to be re- shot and moved to the appropriate location called out in the plans, further north. The columns that were placed in grideline 7, east to west from A7 to LZ were infilled with grout encapsulating the adjustment nut prior to placing the steel columns. The columns were set, and there were significant gaps between the north toe of the steel and the grout that was placed. See attached photo. INSPECTOR: Jason Teliszczak- w/Avcon FIELD COPIES TO: AVCON AVCON, INC., ENGINEERS & PLANNERS 5553 E. Michigan SL, S"iro 200 Orlando, Florida 32822 Pllone:(407) 599-1122 Fax: (407) 599-1133 www.avconinc.wm r- AVTON, INC. ENGINEERS & PLANNERS 5555 E. Michigan Street Suite 200 Orlando, FL 32822-2779 Phone: (407) 599-1122 Email: avcon@avconinc.com www.avconinc.com V.920170259. 01— FPR MRO Hangar CPS DATE: December 9, 2019 TO: File FROM: Luca DelVerme, PE REFERENCE: Notes from on -site observations FPR MRO Hangar CPS MRO — Treasure Coast International Airport An "CON, INC. (AVCON) representative visited the site on December 4, 2019 to observe the construction progress in regards to the footings, column placement, and overall progress. Field observations recorded the following: • Column anchor bolts and adjustment nuts were encased with high shrink grout prior to steel column placement. See Photos 1-3 • Column base plate is not bearing on grout uniformly (See Photo 2). CRITICAL PATH ACTION: GC shall secure the acceptance of the non -uniform condition found with the PEMB Manufacturer's Engineer via a signed and sealed letter prior to installing the beam sections onto the column sections. CIVIL & STRUCTURAL • AIRPORT & AVIATION CONSULTING • TRANSPORTATION DESIGN & PLANNING %l Photo 2 CIVIL & STRUCTURAL • AIRPORT & AVIATION CONSULTING • TRANSPORTATION DESIGN & PLANNING Photo 3 CIVIL & STRUCTURAL • AIRPORT & AVIATION CONSULTING • TRANSPORTATION DESIGN & PLANNING AVCON Project No. 2017.159.01 December 11, 2019 St. Lucie County 2300 Virginia Avenue Fort Pierce, FI 34982 Attention: Mr. Jim McGuinness, Building Official Reference: MRO FPR Hangar Project No. 1907-0559) St. Lucie County, Florida THRESHOLD REPORT SUMMARY NO.8 Dear Mr. McGuinness: AVCON, INC. ENGINEERS & PLANNERS 5555 E. Michigan St, Suite 200 Orlando, Florida 32822 Phone: (407) 599-1122 Fax: (407) 599-1133 www.avconine.com SCANNED BY St. Lucie County As directed, representatives from AVCON, Inc. performed on -site, threshold inspection services for the MRO FPR Hangar project. This report summarizes our threshold inspection services performed during the inspection period of December 2, 2019 through December 2, 2019. Inspections took place on November 18 and 20, as concrete for the office/bathroom slabs was placed. Our inspections were performed in accordance with the structural documents, signed, and sealed by the Engineer of Record, Luca DelVerme PE (AVCON INC), and the project specifications. Our special inspector and his duly authorized representative(s) reported their observations as noted on the attached Daily Threshold Reports with all structural non-compliance items noted within the attached Special Inspection Log (SIL). All non-compliance items, or SIL's, previously reported as non -compliant with regard to the plans or specifications, will be reevaluated by our Special Inspector after corrective action is taken by the General Contractor or the deficient conditions have been approved through written approval by the Engineer of Record. During the inspection period of December 2, 2019 through December 2, 2019, and to the best of our knowledge and belief, the construction of all structural load -bearing components described in the threshold inspection plan complies with permitted documents, with revisions as approved by the Engineer of Record, except as noted on the SIL. Should you have any questions or concerns regarding these reports, or desire any additional information, please contact us. Sincerely, AVCON, Inc. Certificate of Authorization No. 5057 � 1/ aa"C44; P.l�- Rick V. Baidacchi, P.E. Vice President STATE OF FLORIDA Professional Engineer No. 38092 Registered Special Inspector No.1019 M Canw,Im bn wNhr. W Y.. V ^� N up.a W,nau�aY.e.umwrew�am, ..����"pp00 xowmwa,n..evon. m.fawe.e IlkVicex�o auuoye..a. ' Roam�p Uxuwo nazm, F mviuttawmonv,.nox:xn 'n,u�nec^:.. vwtiaQeaov%r[wuwi .. cc: Addressee, Gary Stepalavich SteoalavlchGCdstlucieco.org County Project Manager, Scotty Beaulieu beaulleus(alstlucleco.org Chief Plans Examiner, William Durden DurdenW@stiucieco.org Construction Project Manager, Robert Hatton rhatton@ahrenscompanies.com CIVIL & STRUCTURAL • AIRPORT & AVIATION CONSULTING 9 TRANSPORTATION DESIGN & PLANNING AVCON Project No. 2017.159.01 December 11, 2019 St. Lucie County 2300 Virginia Avenue Fort Pierce, FI 34982 Attention: Mr. Jim McGuinness, Building Official Reference: MRO FPR Hangar Permit No. 19D7-OSSO & 2812-0471 St. Lucie County, Florida THRESHOLD REPORT SUMMARY NO.8 INSPECTOR(S): Rick Baldocchi (AVCON, Inc.) DAILY REPORT(S): Threshold Inspection Daily Report(s): 12/06/19 [See attached report(s) for locations and observations.] SPECIAL INSPECTION LOG: Added this Summary Period: Resolved this Summary Period: Outstanding for the Project: ATTACHMENT(S): - FOR Report 1 1 Page 2 of 2 AVCON, INC. ENGINEERS & PLANNERS 5555 E. Michigan St., Suite 200 Orlando, Florida 32822 Phone: (407) 599-1122 Fax: (407) 599-1133 www.avconinc.com CIVIL & STRUCTURAL • AIRPORT & AVIATION CONSULTING • TRANSPORTATION DESIGN & PLANNING AVCON, INC. ENGINEERS & PLANNERS SPECIAL INSPECTION LOG Permitting Agency: St. Lucie County Project Name: FPR MRO Hangar Update Period: 12/02/19 to 12/06/19 1907-0552 Permit No.: 1907-0550 — Foundations & 1812-0471 - Structure Project No.: 2017.0259.01 Attention: Ahrens Construction/St Lucie County Project Location: St. Lucie County, Florida Threshold Agent Rick V. Baldocchi SIL Date Daily Structural Element Location 3 Description t S.I. Engineer of Record Date Daily Report No. Report No. Response Closed No. 1 8-26-19 SIL Helical Piles N/A The helical pile submittal on RVB FOR approved RVB 10/30/19 009 Summary Submittals site does not have SEOR or calculations and 1 County Building Department revised plans acceptance stamp. 2 "a-19 SIL Helical Piles Footings A-7 & L-7 The contract documents do RVB FOR approved RVB 10/30/19 009 Summary not show helical piles within calculations and 2 the footings. revised plans 3 09/20/19 SIL Helical Piles Footings A-7—C-7, The contract documents do RVB FOR approved RVB 10/30/19 009 Summary 3 F7— L7, G-B & L-B, not show helical piles within calculations and G-9—L-9 the footings. revised plans 4 10/02/19 SIL Foundations All locations The rebar in the top mat RVB FOR approved RVB 11/01/19 009 Summary 4 deviate from plans/shop calculations and drawings. revised plans 5 10/04/19 SIL Foundations Footings Column anchor bolts and RVB Summary 5 adjustment nuts were encased with high shrink grout prior to steel column placement. Columns that 'The SPedal Inspedor, Rick V. Beldocchi, P.E., acknowledges this deficiency. 3 The Special Inspector, Rick V. Saldocchi, P.E., acknowledges resolution to this deficiency. This is a bdef summary of the SIL. Refer to the daily report for a detailed descipuon. Page 1 cf 2 AVCON, INC. ENGINEERS & PLANNERS have been placed are not bearing evenly on the grout. zThe Spacial Inspector, Rick V. Beldocchi, P.E., acknowledges He deficiency. The Spacial Inspector, Rick V. Baldocchi, P.E., acknowledges resolullon to the deficiency. s This is a brief summary of the SIL. Refer to the daily report for a detailed description. Page 2 of 2 IICt- J342INJALL'11A'�:A1�1:� 0� PROJECT: FPR MRO Hangar I nrerinnl. Treasure Coast International Airport & Business PERMIT AGENCY: St. Lucie County CLIENT: FIELD CONTACT: Robert Hatton COMMENTS SCOPE OF WORK: DATE:12/0619 WORK ORDER NO.: BUILDING PERMIT NO.: Permit No. 1812-0471 Inspected rebar prior to the concrete placement, as well as general housekeeping on the eastern column locations for 12" slab to be installed for grideline "A". Concete placement is scheduled for 12/06/19 at 7am. Inspected rebar prior to the concrete placement, as well as general housekeeping on the trench drain at approximately the middle of the hanger. The survey crew discovered that the layout was wrong, and the trench drain will have to be re- shot and moved to the appropriate location called out in the plans, further north. The columns that were placed in grideline 7, east to west from A7 to LZ were infilled with grout encapsulating the adjustment nut prior to placing the steel columns. The columns were set, and there were significant gaps between the north toe of the steel and the grout that was placed. See attached photo. INSPECTOR: Jason Teliszczak - w/Avcon FIELD COPIES TO: AVCON AVCON, 1NC. ENGINEERS & PLANNERS 5555 E. Michigon St., Suite 200 Orlando, Florida 32822 Phone: (407) 599-1122. Fax: (407) 599-1133 1 www.avconinacom s AVCON, INC. ENGINEERS & PLANNERS 5555 E. Michigan Street Suite 200 Orlando, FL 32822-2779 Phone: (407) 599-1122 Email: avcon@avconinc.com www.avconinc.com V.•120170259.01— FPR MRO Hangar CPS DATE: December 9, 2019 TO: File FROM: Luca DelVerme, PE REFERENCE: Notes from on -site observations FPR MRO Hangar CPS MRO — Treasure Coast International Airport An AVCON, INC. (AVCON) representative visited the site on December 4, 2019 to observe the construction progress in regards to the footings, column placement, and overall progress. Field observations recorded the following: • Column anchor bolts and adjustment nuts were encased with high shrink grout prior to steel column placement. See Photos 1-3 • Column base plate is not bearing on grout uniformly (See Photo 2). CRITICAL PATH ACTION: GC shall secure the acceptance of the non -uniform condition found with the PEMB Manufacturer's Engineer via a signed and sealed letter prior to installing the beam sections onto the column sections. CIVIL & STRUCTURAL • AIRPORT & AVIATION CONSULTING • TRANSPORTATION DESIGN & PLANNING Photo 2 CIVIL & STRUCTURAL • AIRPORT & AVIATION CONSULTING • TRANSPORTATION DESIGN & PLANNING Photo 3 CIVIL & STRUCTURAL a AIRPORT & AVIATION CONSULTING a TRANSPORTATION DESIGN & PLANNING AVCON Project No. 2017.159.01 December 23, 2019 St. Lucie County 2300 Virginia Avenue Fort Pierce, FI 34982 Attention: Mr. Douglas Harvey, Building Official Reference: MRO FPR Hangar St. Lucie County, Florida THRESHOLD REPORT SUMMARY NO.9 Dear Mr. McGuinness: AVCON, INC. ENGINEERS & PLANNERS 5555 E. Michigan St., Suite 200 Orlando, Florida 32822 Phone: (407) 599-1122 Fax: (407) 599-1133 www.avconinc.com As directed, representatives from AVCON, Inc. performed on -site, threshold inspection services for the MRO FPR Hangar project. This report summarizes our threshold inspection services performed during the inspection period of December 16, 2019 through December 20, 2019. Inspections took place on December 17, as concrete for the flatwork to the east was placed. Our inspections were performed in accordance with the structural documents, signed, and sealed by the Engineer of Record, Luca DelVerme PE (AVCON INC), and the project specifications. Our special inspector and his duly authorized representative(s) reported their observations as noted on the attached Daily Threshold Reports with all structural non-compliance items noted within the attached Special Inspection Log (SIL). All non-compliance items, or SIL's, previously reported as non -compliant with regard to the plans or specifications, will be reevaluated by our Special Inspector after corrective action is taken by the General Contractor or the deficient conditions have been approved through written approval by the Engineer of Record. During the inspection period of December 16, 2019 through December 20, 2019, and to the best of our knowledge and belief, the construction of all structural load -bearing components described in the threshold inspection plan complies with permitted documents, with revisions as approved by the Engineer of Record, except as noted on the SIL. Should you have any questions or concerns regarding these reports, or desire any additional information, please contact us. Sincerely, AVCON, Inc. Certificate of Authorization No. 5057 Rick V. Raldocchi, P.E. Vice President STATE OF FLORIDA Professional Engineer No. 38092 Registered Special Inspector No.1019 waMaawv: �ma 'm.�w•a po�'V�tiq<'°1 �m�.esw*.nm.aw,+n..K.wuunn y\ -a f _)�J9vcax.e cmiwws �m Yy �.spx umrnrznwmoawma v. e.wvmsewaw ;emr cc: Addressee, Gary Stepalavich SteoalavichG@stlucieco.org County Project Manager, Scotty Beaulieu beaulieus@stiucleco.ore Chief Plans Examiner, William Durden DurdenW@stlucieco.org Construction Project Manager, Robert Hatton rhatton@ahrenscompanies.com CIVIL & STRUCTURAL • AIRPORT & AVIATION CONSULTING • TRANSPORTATION DESIGN & PLANNING rr�, 771 0 AVCON Project No. 2017.159.01 December 23, 2019 St. Lucie County 2300 Virginia Avenue Fort Pierce, FI 34982 Attention: Mr. Douglas Harvey, Building Official Reference: MRO FPR Hangar Permit No.1907-0550 & 1812-0471 St. Lucie County, Florida THRESHOLD REPORT SUMMARY .NO. 9 INSPECTOR(S): Rick Baldocchi (AVCON, Inc.) DAILY REPORT(S): Threshold Inspection Daily Report(s): 12/17/19 [See attached report(s) for locations and observations.] SPECIAL INSPECTION LOG: Added this Summary Period: Resolved this Summary Period: Outstanding for the Project: ATTACHMENT(S): - None. N 0 1 Page 2 of 2 AVCON. INC. 5555 E. Michigan St., Suite 200 Orlando, Florida 32822 Phone: (407) 599-1122 Fax: (407) 599-1133 www.avconinc.com CIVIL & STRUCTURAL • AIRPORT & AVIATION CONSULTING • TRANSPORTATION DESIGN & PLANNING AVCON, INC. ENGINEERS & PLANNERS SPECIAL INSPECTION LOG Permitting Agency: St. Lucie County Project Name: FPR MRO Hangar Update Period: 12/16/19 to 1220/19 Permit No.: 1907-0550 — Foundations & 1812-0471- Structure Project No.: 2017.0259.01 Attention: Ahrens Construction/St. Lucie County Project Location: Port St. Lucie, St. Lucie County, Florida Threshold Agent: Rick V. Baldocchi SIL No. Date Daily Report No. Structural Element Location ] Description 1 S.I. Engineer of Record Response '1' Data Closed Daily Report No. 1 8-26-19 SIL Helical Piles N/A The helical pile submittal on RVB FOR approved RVB 10/30/19 009 Summary Submittals site does not have SEOR or calculations and 1 County Building Department revised plans acceptance stamp. 2 8-30-19 SIL Helical Piles Footings A-7 & L-7 The contract documents do RVB FOR approved RVB 10/30/19 009 Summary not show helical piles within calculations and 2 the footings. revised plans 3 0920/19 SIL Helical Piles Footings A-7— G-7, The Contract documents do RVB FOR approved RVB 10/30/19 009 Summary 3 F7—L7, G-8 & L-8, not show helical plies within calculations and G-9—L-9 the footings. revised plans 4 10/02/19 SIL Foundations All locations The rebar in the lop mat RVB FOR approved RVB 11/01/19 009 Summary 4 deviate from plans/shop calculations and drawings. revised plans 5 10/04/19 SIL Foundations Footings Column anchor bolts and RVB Summary 5 adjustment nuts were encased with high shrink grout prior to steel column placement. Columns that 1 The Special Inspector, Rick V. Baldocchi, P.E., acknoMedges this defidency. 3 The Special Inspector, Rick V. BaldocW, P.E., acknowledges resolution to this deficiency. This is a bdefsummary ofthe SIL. Refer to the dally report for a detailed description. Page l o42 AVCON, INC. ENGINEERS & PLANNERS have been placed are not bearing evenly on the grout. � The Special Inspector, Rick V. Beldocchl, P.E., acknowledges this defidency. ] The Special inspector, Rick V. Beldocchl, P.E., acknowledges resolution to this defidency. This Is a Edef summaryof tha SIL. Refer to the daily report for a detailed description. Page 2 of 2 INSPECTIUN UAILY KLF UK I MR PROJECT: FPR MRO Hangar LOCATION: Treasure Coast International Airport & Business PERMIT AGENCY: St. Lucie County CLIENT: FIELD CONTACT: Robert Hatton COMMENTS SCOPE OF WORK: 12/17/19 WORK ORDER NO.: BUILDING PERMIT NO.: Permit No. 1812-0471 Inspected rebar prior to the concrete placement, as well as general housekeeping. East side flat work, Mix SW695R30, 5" slump, approx. 43 CY. Approx. 73-80 degrees, 5-10 mph winds at the time of concrete placement. Trench drain has not been relocated, due to crane activity. At the main hanger, a steel beam running east to west, was placed on the southern most end. The three segments were placed in the order of the east, then the west, then the middle. One crane was utilized. Beams were supported north to south until the final middle section was placed. INSPECTOR: Jason Teliszczak - w/Avcon FIELD COPIES TO: AVCON AVCON, INC. ENGINEERS R PL NERS ' 5555 C. Michipo SL, Suite 200 Orlando, Florida 32822 Phone: (407) 599-1122 Fm:(407)599-II37 x MAW0ninc.com