Loading...
HomeMy WebLinkAboutBUILDING PERMIT REVISIONSSCANNED BY St. Lucie Countv D O N A D I O & Associates, Architects, P.A. November 15, 2019 Mr. Gary Stepalavich, MCP/CFM Building Code Administrator 2300 Virginia Avenue Ft. Pierce, Florida 34982-5652 RE: Pursuit Boats New. Facility °PermttdVo�1907-0579'> `� Building Permit Revisions Architect's Project No. 2018.42.7 Dear Mr. Stepalavich, NOV 2 2 2019 Permitting Department St. Lucie County, FL Attached please find 4 sets of signed and sealed drawings showing the. revision made to the building permitted drawings based on the Owners requested Value Engineering changes. A brief Summary of the Value Engineering changes are as follows: 1. Deleted exterior Rolling Doors. 2. Reduced the size of the Loading Dock. 3. Deleted the Compressor Room. 4. Deleted the Movable Partition in the Breakroom. 5. Electrical Room, Upholstery Room and Mill Shop revisions. 6. Addition of Winch Pits. 7. Deleted Jib Cranes. S. Addition of exterior Resin Tank. 9. MEP revisions based on the above items and other miscellaneous MEP revisions such as: a. Revised Lighting layout and fixture type. b. Service conductors changed to Aluminum. c. Changed Water Beater from gas to electric. d. Deleted AHU #9. e. Removed Natural Gas Piping. f. Condensing units revised from ground mounted to roof mounted on west low 10 ft. roof overhang. g. Revised ductwork layout in Electrical Shop. _ 609 17" Street Vero Beach, Florida 32960 Phone 772 794 2929 Fax 772 562 8600 �f� a License No. AA0002238 0H Tt Pursuit Boats New Facility Pennit No. 1907-0579 Building Permit Revisions Page 2 Below are the revised drawing sheets per each discipline and a narrative of the Value Engineering changes made to each sheet. A. Architectural: 1. Cover New date "OCTOBER 14, 2019" and "VE REVISIONS SET" 2. AO.20 None 3. A1.10 Revise overhead & sliding doors, Loading Dock changes, delete Compressor Room, Electrical Room, Upholstery Room and Mill Shop revisions, delete operable partition and move "P" line wall. 4. A 1.11 None 5. A1.12 None 6. A2.10 Revise overhead &'sliding doors, Loading Dock changes, delete Compressor Room, Electrical Room, Upholstery Room and Mill Shop revisions, delete operable partition and move" P" line wall. 7. A2.11 Revise overhead & sliding doors, Loading Dock changes, delete Compressor Room, Electrical Room and Upholstery Room revisions, delete operable partition and move "P" line.wall. 8. A2.12 Revise overhead & sliding doors, loading dock changes, delete Compressor Room, Electrical Room. and Upholstery Room revisions, delete operable partition, move "P" line wall and revised partition type legend. 9. A2.20 None 10. A2.30 Delete operable partition, move "P" line wall and adjust walls and dimensions accordingly and thicken Janitor's Closet wall. 11. A2.31 Move Door 03-1 in Electric. Room #03 12. A2.32 Delete enlarged plan of Compressor Room 404 13. A2.40 Delete operable partition 14. A3.10 Revise overhead & sliding doors. 15. A4.10 None 16. A5.10 None 17. A6.I OA Revise overhead & sliding doors and delete Compressor Room. 18. A6.1 OB Revised hardware groups due to door changes 19. M.I I Revised overhead door details 20. A6.12 Delete operable partition and revise header detail for same. 21. A6.13 Revised interior overhead door details to delete door in lieu of trimmed opening. B. Structural: 1. S-1. Revised Loading Dock size, deleted exterior adjusted column line "P", deleted exterior rolling doors, eliminated the Compressor Room, added compressor slab south of column line 15. 2. S-2. Same as revisions on Sheet S-1, added Winch Pits and deleted Jib Crane foundations. 3. S-3. Deleted exterior rolling doors and Compressor Room, adjusted Pool dimension off of column line "23", revised footing at column line "15-W". 4. S-5. Deleted recessed jamb -detail and rolling door detail, Jib Crane foundations and added Winch Pit details. 5. "S-6. Modified Footing Schedule for MF-4, MF-5 and F-10. Pursuit Boats New Facility Permit No. 1907-0579 Building Permit Revisions Page 3 B. Structural: (Continued) 6. S-7. Deleted rolling door framing, deleted Jib Cranes, deleted overhead structure for deleted Movable Partition, deleted west exterior 10-foot overhang structure. 7. S-8. Deleted rolling doors, Compressor Room and Jib Crane. 8. S-9. Deleted Compressor Room ceiling detail, deleted Movable Partition details. C. Electrical: 1. E-OA Electrical Sheet Index updated. 2. E-OB Inverters removed; Resin Tank details added. 3. E-01 Primary conduit routing updated per coordination with FPUA. 4. E-02 Primary conduit routing updated, 5 light poles near storage area (SW of bldg.) removed. 5. E-03 Resin Tank added, air compressors moved. 6. E-04 Resin Tank added. Some general-purpose outlets removed. 7. E-05 Electrical Room layout updated per switchgear submittals. 8. E-06 Upholstery Room and Electrical Shop flipped, some general-purpose outlets removed, HVAC updated. 9. E-07 Electrical Room layout updated per switchgear submittals. 10. E-08 Revised Air Compressor pad details added, vacuum pumps removed, PAF-1 moved, air breather controller circuits added. 11. E-09 HVAC unit locations revised. 12. E-10 PAF fans shifted to coordinate with revised lighting layout. Air Compressor Room deleted. 13. E-12 Mill Shop layout revised. 14. E-13 Mill Shop layout revised. 15. E-16 Lighting layout and fixture types revised. 16. E-17 Lighting layout and fixture types revised. 17. E-18 Lighting layout revised. 18. E-18A Booth lighting sheet added. 19. E-19 Lighting layout revised. 20. E-20 Lighting fixture types revised. 21. E-21 Lighting control diagram updated per Value Engineering lighting package. 22. E-22 Panelboard schedules updated per Value Engineering revisions. 23. E-23 Panelboard schedules updated per Value Engineering revisions. 24. E-24 Panelboard schedules updated per Value Engineering revisions. Service conductors changed to aluminum. D. Plumbing: 1. P-OA Revised General Notes to dwv pvc, revised Fixture Schedule with missing fixtures and change to Model No., removed gas piping from Legend. 2. P-OB Revised water heater from gas to electric. 3. P-OC Revised domestic water spec to cpvc in Warehouse, removed Natural Gas Piping Specification. 4. P-01 Removed Unit Alm-9, revised sanitary sewer main from 5" to 4". 5. P-02 Removed natural gas piping. 6. P-03 Removed Compressor Room rotated north arrow. Pursuit Boats Ne%v Facility Permit No. 1907-0579 Building Pcrmit Revisions Page 4 D. Plumbing: (Continued) 7. P-04 Removed Compressor Room rotated north arrow. 8. P-05 Changed Water Heater to electric, modified 3-compartment sink -grease trap -millwork to fit within space. 9. P-06 Changed Water Heater to electric. 10. P-07 Riser reflected changes. 11. P-08 Riser reflected changes. E. HVAC: 1. M-OA Revised Drawing List. 2. .M-OB Revised Fan Schedule, 100% DOAS Unit Schedule, Split Ac Equipment Schedule (combined systems 3 & 4 with 5 & 6 systems, removed system 9 from scope). 3. M-OC Revised OA Schedule to reflect system zone changes on Sheet M-OB. 4. M-OD Detail added for to Roof Mounted Equipment. 5. M-01 Condensing Units relocated from ground level to low roof. 6. M-02 Condensing Units relocated from ground level to low roof 7. M-03 Removed Gas Water Heater flue ductwork, revised Value Engineering Equipment and Value Engineering duct layout for Value Engineering alternate equipment. 8. M-04 Removed System #9 fi-om Upholstery Room to be added in future, Electrical Shop expanded, reselect unit with Value Engineering duct layout. 9. M-05 Revised location of Condensing Units on low roof 10. M-06 Compressor Room removed from scope (this sheet is now blank). � 11. M-07 Revised ductwork\equipment sections and elevations to match floor plans. me if you have any questions. b SCANNED BY St. Lucie Countv D O N A D I O & Associates, Architects, P.A. November 15, 2019 Mr. Gary Stepalavich, MCP/CFM Building Code Administrator 2300 Virginia Avenue Ft. Pierce, Florida 34982-5652 RE: Pursuit Boats New Facility cr-mit No. 9020579 wilding Permit Revisions Architect's Project No. 2018.42.7 Dear Mr. Stepalavich, EC1F°tED NOV 2 2 2019 Permitting Department St. Lucie County, FL Attached please find 4 sets of signed and sealed drawings showing the revision made to the building permitted drawings based on the Owners requested Value Engineering changes. A brief Summary of the Value Engineering changes are as follows: 1. Deleted exterior Rolling Doors. 2. Reduced the size of the Loading Dock. 3. Deleted the Compressor Room. 4. Deleted the Movable Partition in the Breakroom. 5. Electrical Room, Upholstery Room and Mill Shop revisions. 6. Addition of Winch Pits. 7. Deleted Jib Cranes. S. Addition of exterior Resin Tank. 9. MEP revisions based on the above items and other miscellaneous MEP revisions such as: a. Revised Lighting layout and fixture type. b. Service conductors changed to Aluminum. c. Changed Water Heater from gas to electric. d. Deleted AHU #9. e. Removed Natural Gas Piping. f. Condensing units revised from ground mounted to roof mounted on west low 10 ft. roof overhang. g. Revised ductwork layout in Electrical Shop. �1�T� 609 IT" street Vero Beach, Florida 32960 Phone 772 794 2929 Fax 772 562 8600 \ I License No. AA0002238 CONS 'MOTOR CUPY Pursuit Boats New Facility Permit No. 1907-0579 Building Permit Revisions Page 2 Below are the revised drawing sheets per each discipline and a narrative of the Value Engineering changes made to each sheet. A. Architectural: 1. Cover New date "OCTOBER 14, 2019" and "VE REVISIONS SET" 2. AO.20 None 3. ALIO Revise overhead & sliding doors, Loading Dock changes, delete Compressor Room, Electrical Room, Upholstery Room and Mill Shop revisions, delete operable partition and move "P" line wall. 4. A1.11 None 5. A1.12 None 6. A2.10 7. A2.11 8. A2.12 9. A2.20 10. A2.30 I1. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. A2.31 A2.32 A2.40 A3.10 Revise overhead & sliding doors, Loading Dock changes, delete Compressor Room, Electrical Room, Upholstery Room and Mill Shop revisions, delete operable partition and move" P" line wall. Revise overhead & sliding doors, Loading Dock changes, delete Compressor Room, Electrical Room and Upholstery Room revisions, delete operable partition and move "P" line wall. Revise overhead & sliding doors, loading dock changes, delete Compressor Room, Electrical Room and Upholstery Room revisions, delete operable partition, move "P" line wall and revised partition type legend. None Delete operable partition, move "P" line wall and adjust walls and dimensions accordingly and thicken Janitor's Closet wall. Move Door 03-1 in Electric. Room #03 Delete enlarged plan of Compressor Room #04 Delete operable partition Revise overhead & sliding doors. A4.10 None A5.10 None A6. I OA Revise overhead & sliding doors and delete Compressor Room. A6.1 OB Revised hardware groups due to door changes A6.11 Revised overhead door details A6.12 Delete operable partition and revise header detail for same. A6.13 Revised interior overhead door details to delete door in lieu of trimmed opening. B. Structural: I. S-1. Revised Loading Dock size, deleted exterior adjusted column line "P", deleted exterior rolling doors, eliminated the Compressor Room, added compressor slab south of column line 15. 2. S-2. Same as revisions on Sheet S-1, added Winch Pits and deleted Jib Crane foundations. 3. S-3. Deleted exterior rolling doors and Compressor Room, adjusted Pool dimension off of column line "23", revised footing at column line "15-W". 4. S-5. Deleted recessed jamb detail and rolling door detail, Jib Crane foundations and added Winch Pit details. 5. S-6. Modified Footing Schedule for MF-4, MF-5 and F-10. Pursuit Boats New Facility Permit No. 1907-0579 Building Pcrmit Revisions Page 3 B. Structural: (Continued) 6. S-7. Deleted tolling door framing, deleted Jib Cranes, deleted overhead structure for deleted Movable Partition, deleted west exterior 10-foot overhang structure. 7. S-8. Deleted rolling doors, Compressor Room and Jib Crane. 8. S-9. Deleted Compressor Room ceiling detail, deleted Movable Partition details. C. Electrical: 1. E-OA Electrical Sheet Index updated. 2. E-OB Inverters removed; Resin Tank details added. 3. E-01 Primary conduit routing updated per coordination with FPUA. 4. E-02 Primary conduit routing updated, 5 light poles near storage area (SW of bldg.) removed. 5. E-03 Resin Tank added, air compressors moved. 6. E-04 Resin Tank added. Some general-purpose outlets removed. 7. E-05 Electrical Room layout updated per switchgear submittals. 8. E-06 Upholstery Room and Electrical Shop flipped, some general-purpose outlets removed, HVAC updated. 9. E-07 Electrical Room layout updated per switchgear submittals. 10. E-08 Revised Air Compressor pad details added, vacuum pumps removed, PAY-1 moved, air breather controller circuits added. 11. E-09 HVAC unit locations revised. 12. E-10 PAY, fans shifted to coordinate with revised lighting layout. Air Compressor Room deleted. 13. E-12 Mill Shop layout revised. 14. E-13 Mill Shop layout revised. 15. E-16 Lighting layout and fixture types revised. 16. E-17 Lighting layout and fixture types revised. 17. E-I 8 Lighting layout revised. 18. E-1 BA Booth lighting sheet added. 19. E-19 Lighting layout revised. 20. E-20 Lighting fixture types revised. 21. E-21 Lighting control diagram updated per Value Engineering lighting package. 22. E-22 Panelboard schedules updated per Value Engineering revisions. 23. E-23 Panelboard schedules updated per Value Engineering revisions. 24. E-24 Panelboard schedules updated per Value Engineering revisions. Service conductors changed to aluminum. D. Plumbing: 1. P-OA Revised General Notes to dwv pvc, revised Fixture Schedule with missing fixtures and change to Model No., removed gas piping from Legend. 2. P-013 Revised water heater from gas to electric. 3. P-OC Revised domestic water spec to cpvc in Warehouse, removed Natural Gas Piping Specification. 4. P-0I Removed Unit Ahu-9, revised sanitary sewer main from 5" to 4". 5. P-02 Removed natural gas piping. 6. P-03 Removed Compressor Room rotated north arrow. Pursuit Boals New Facility Permit No. 1907-0579 Building Permit Revisions Page 4 D. Plumbing: (Continued) 7. P-04 Removed Compressor Room rotated north arrow. 8. P-05 Changed Water Heater to electric, modified 3-compartment sink -grease trap -millwork to fit within space. 9. P-06 Changed Water Heater to electric. 10. P-07 Riser reflected changes. 11. P-08 Riser reflected changes. E. HVAC: 1. M-OA Revised Drawing List. 2. M-0E Revised Fan Schedule, 100% DOAS Unit Schedule, Split Ac Equipment Schedule (combined systems 3 & 4 with 5 & 6 systems, removed system 9 from scope). 3. M-OC Revised OA Schedule to reflect system zone changes on Sheet M-013. 4. M-OD Detail added for to Roof Mounted Equipment. 5. M-01 Condensing Units relocated from ground level to low roof. 6. M-02 Condensing Units relocated from ground level to low roof 7. M-03 Removed Gas Water Heater flue ductwork, revised Value Engineering Equipment and Value Engineering duct layout for Value Engineering alternate equipment. 8. M-04 Removed System #9 from Upholstery Room to be added in future, Electrical Shop expanded, reselect unit with Value Engineering duct layout. 9. M-05 Revised location of Condensing Units on low roof 10. M-06 Compressor Room removed from scope (this sheet is now blank). 1. M-07 Revised ductwork\equipment sections and elevations to match floor plans. .i * me if you have any questions. NCARB