Loading...
HomeMy WebLinkAboutMISC LETTER - EMAIL1 • CONSTRUCRON CORPOR1mOA CGC0130I CCCO53553 August 20, 2019 We do more than building buildings, we're building Sb UtIOm Internet: www.rl<davis.com Mr. William Durden Chief Plans Examiner St. Lucie County Building Department 2300 Virginia Avenue Fort Pierce., Florida 34gR7 RE: Foundation Permit 1906-0042 Pursuit Boats Plant Expansion Dear Mr. Durden: SDgVN�D St. Lucie County Please accept this request to cancel the current Foundation Permit # 1906-0042 and apply its approval to the main building permit 1907-0579 currently under review. . Should you have any questions regarding this matter please feel free to contact me. LV Sincerely, Douglas Davis President Richard K. Davis Construction Corp. CGC013084 July 16, 2019 Mr. Gary Stepalavich, MCP/CFM Building Code Administrator 2300 Virginia Avenue Ft. Pierce, Florida 34982-5652 RE: Pursuit Boats New Facility Plumbing Fixture Calculation Reduction Letter Architect's Project No. 2018.42.7 Dear Mr. Stepalavich, As per Florida Plumbing Code, Section 403.1.1, Exception, Pursuit Boats is requesting a redistribution of the. sexes for the calculation of plumbing fixtures from.500A men and 50% women to 80% men and 20% women, based on statistical data from our existing Boat ManufacturingPlant. The existing Boat Manufacturing Plant has an employee count of 400 people, 80% men and 20% women. This has been the norm for our Plant for over the. past years of operating this Facility. For this reason our employee count of 400 people will be the same for the New Facility, 320 men/80% and 80 women/20%. As per the;plumbing fixture calculation shown cry sheet Al.11, see attach copy, the total occupant load for. the new facility is calculated at 1818 persons, 909 men and 909 women. Per the plumbing design of the New.;Facility, we have only reduced the Women's required plumbing fixture count from 10 to 7, while the Men's has actually been increased from 10 to 12 fixtures. The New Occupant'Load, based on the Plumbing Fixture Count Schedule, will actually support 1200 men and'700 women, 1900 persons total, with the redistribution of the sexes. This is actually an increase in the total occupant load as calculated by Section 403. I hope this letterhas helped to. justify our requested redistribution of sexes per the Florida Plumbing Code; Section 403.1.1, Exception. Please feel free to contact me if you have any questions. Sincerely, Bruce Thompson President [Pursuit Boats 0 Lydia Galbraith From: Monica Graziani Sent: Friday, August 16, 2019 4:11 PM To: Lydia Galbraith; Gary Stepalavich; William Durden Subject: FW: Pursuit Site Development Permit Attachments: Site Development Permit PH 1A.pdf FYI. File accordingly Lydia. igQj — 0519 From: David Hays Sent: Friday, August 16, 2019 4:08 PM To: Stef Matthes <smatthes@ct-eng.com>; bthompson@pursuitboats.com Cc: Patrick Dayan <DayanP@stlucieco.org>; Kori Benton <bentonk@stlucieco.org>; Benjamin Balcer <BalcerB@stlucieco.org>; Robert Krip <KripR@stlucieco.org>; Monica Graziani <GrazianiM@stlucieco.org> Subject: Pursuit Site Development Permit The attached Permit provides for site development, driveway adjustment and St. Lucie Blvd modifications. A separate permit has been issued to FPUA for the installation of utility services within the right-of-way. If you have any questions, do not hesitate to contact me. Sincerely, David Hays, P.E., CFM Senior Project Engineer St. Lucie County Water Quality Division 2300 Virginia Avenue Ft. pierce, FL 34982 772-462-1491 (direct) 772-462-1707 haysd@stlucieco.ora 2D16-201$ 1. ` l:e"'•I.V S ti� � .+rt`�.� 5T. LUCIE COUNTY "Teamwork gives you the best opportunity to turn vision into reality" John C. Maxwell Please Note: Florida has very broad public records lays. Most written communications to or from Ceunty officials regarding County business are public records available to the public and media upon request. It is the policy of St. Lucie County that all County records shall be open for personal inspection, examination and / or copying, Your e-mail communications will be subject to public disclosure unless an exemption applies to the communication. If you received this email in error, please notify the sender by reply e-mail and delete all materials from all computers. Please Note: Florida has very broad public records laws. Most written communications to or from County officials regarding County business are public records available to the public and media upon request. It is the policy of St. Lucie County that all County records shall be open for personal inspection, examination and / August 14, 2019 ST. LUCIE COUNTY BOARD OF COUNTY COMMISSIONERS PB Holdco, LLC LINDA BARTZ 3901 St. Lucie Blvd. CHAIR Ft. Pierce, FL 34946 DISTRICT 3 Attention: Mr. Bruce Thompson CATHY TOWNSEND Subject: Site Development Permit VICE-CHAIRMAN DISTRICT 5 Pursuit Boats Phase 1A Ref: BLDG Permit #1907-0579 CHRIS DZADOVSKY DISTRICT 1 The Construction Plans signed and sealed August 14, 2019, are accepted for construction of the site improvements as proposed. SEAN MITCHELL DISTRICT 2 Construction of site improvements is conditioned on the following: 1. Prior to commencement of any construction of site improvements or access, the FOR shall coordinate a pre -construction meeting including the FRANNIE HUTCHINSON St. Lucie County Public Works representatives, Robert Krip, 772-519-0440, DISTRICT 4 KripR@stlucieco.org and Nick Linehan, 772-408-7595, LinehanN@stlucieco.org. HOWARD TIPTON 2. A set of plans stamped as accepted by the County, together with all other COUNTY ADMINISTRATOR applicable permits shall be on site at all times during construction. 3. Prior to commencement of work, all other agency permits must be obtained and followed. The more stringent condition of common or conflicting DAN MCINTYRE conditions shall be met. Discrepancies within the plans shall be COUNTY ATTORNEY appropriately addressed and does not relieve the contractor of his obligation to construct according to local, state and federal rules and MAILING ADDRESS regulations. 2300 VIRGINIA AVENUE 4. Site inspections shall be coordinated as established at the Pre -Construction FORT PIERCE, FL 34982 meeting. Inspections shall be performed at a minimum for the following stages: PHONE A. Delivery of pipe and structures prior to installation (772) 462-1707 B. SW structure installations and backfill C. Subgrade compaction testing and stringline TDD D. Base compaction and stringline (772) 462-1428 E. Asphalt/paving F. Final after FOR Certification FAX 5. Any proposed changes to the permitted stamped plans must be approved (772) 462-2362 by the County prior to initiating any change in construction. This includes material changes such as pavement type, type of drainage pipe, etc. E-MAIL 6. Any structure shown or not shown on the plans (such as walls, gates, signs, HAYSD@STLUCIECO.ORG columns, etc.) requiring a building permit, such permit shall be obtained prior to initiating construction on such structures. This permit does not WESSITE authorize the construction of above ground structures. www.STLUCIECO.GOV ST LUCE WCIH Sl' ft August 14, 2019 Mr. Stefan K. Matthes, P.E. Pursuit Boats Phase 1A 7. The Developer/Contractor shall provide a copy of an active FDEP NOI at the pre -construction meeting. 8. The permittee is responsible for administering the construction contract in accordance with this permit. If the permittee fails to comply with any part of this permit or any other permit issued for this project by any regulatory authority, the County may at its sole discretion, cause to cease construction activities on the site until said permit condition is complied with. A Cease and Desist Orderwill be issued by the County Administrator or his designee, and served in an appropriate manner to the permittee or the permittee's agent. Under no circumstances shall work proceed when a Cease and Desist Order has been issued until said Order has been withdrawn in writing by the County. If a Cease and Desist Order is issued, the County, at its sole discretion, may take other action against the permittee and the permittee's agent(s) for the project. 9. Activities approved by this permit shall be conducted in a manner which does not cause pollution or allow pollution to exit the site. The permittee is solely responsible for preventing pollution caused by dewatering water and/or stormwater runoff from the construction site or work area. In addition to taking its own actions and remedies against the permittee for a permit violation, the County may report each violation to the South Florida Water Management District, Florida Department of Environmental Protection, Water Control District (or other Florida Statute Chapter 298 Drainage District, as appropriate), County Code Enforcement, and other pertinent regulatory or enforcement agencies. No construction work shall begin until the pollution control and treatment system have been constructed in accordance with approved permits and plans. 10. A copy of the Stormwater Pollution Prevention Plan (SWPPP) must be available on site during construction. Any necessary change to the SWPPP shall be agreed upon with the County prior to implementing such change. 11. An'lllicit Discharge Sign' shall be obtained, installed and remain posted continuously during construction activities. The sign may be obtained from the County Public Works Department at the pre - construction meeting or by separate arrangement's. 12. An As -Built survey is required along the EOR's certification upon request for a final inspection of the site and access improvements. A published benchmark utilized for site elevations shall be referenced for use by other parties, including but not limited to the County. This permit shall expire as conditioned by the Development Order. Please do not hesitate to contact me at (772) 462-1491 if you have any questions. Sincerely, X/)lp David Hays, PE, CFM Sr. Project Engineer cc: Patrick Dayan, PE Kori Benton, AICP Benjamin Balcer Robert Krip Monica Graziani Stefan K. Matthes, P.E., C & T \V3T. [`'ocoftss00l�\_sle_2$\EN group\EN03 CONiMn7EES\3B COUNTY DRC\Pmjects\Ptmn1 t Boats ExpansionTemtit0ite Development permit • f It IA.docx �`�`pp QQ P!/RSU/T. July 16, 2019 Mr. Gary Stepalavich, MCP/CFM Building Code Administrator 2300 Virginia Avenue Ft. Pierce, Florida 34982-5652 SC qN St 40cie�.NFO CoUn fy RE: Pursuit Boats New Facility Plumbing Fixture Calculation Reduction Letter Architect's Project No. 2018.42.7 Dear Mr. Stepalavich, JUL 2 5 2019 Sf. Lucie County, As per Florida Plumbing Code, Section 403.1.1, Exception, Pursuit Boats is requesting a redistribution of the sexes for the calculation of plumbing fixtures from 50% men and 50% women to 80% men and 20% women, based on statistical data from our existing Boat Manufacturing Plant. The existing Boat Manufacturing Plant has an employee count of 400 people, 80% men and 20% women. This has been the norm for our Plant for over the past years of operating this Facility. For this reason our employee count of 400 people will be the same for the New Facility, 320 men/80% and 80 women/20%. As per the plumbing fixture calculation shown on sheet Al.11, see attach copy, the total occupant load for the new facility is calculated at 1818 persons, 909 men and 909 women. Per the plumbing design of the New Facility, we have only reduced the Women's required plumbing fixture count from 10 to 7, while the Men's has actually been increased from 10 to 12 fixtures. The New Occupant Load, based on the Plumbing Fixture Count Schedule, will,actually support 1200 men and 700 women, 1900 persons total, with the redistribution of the sexes. This is actually an increase in the total occupant load as calculated by Section 403. I hope this letter has helped to justify our requested redistribution of sexes per the Florida Plumbing Code, Section 403.1.1, Exception. Please feel free to contact me if you have any questions. Sincerely, .e Bruce Thompson President I Pursuit Boats Q paRsair. July 16, 2019 Mr. Gary Stepalavich, MCP/CFM Building Code Administrator 2300 Virginia Avenue Ft. Pierce, Florida 34982-5652 RE: Pursuit Boats New Facility Plumbing Fixture Calculation Reduction Letter Architect's Project No. 2018A2.7 Dear Mr. Stepalavich, As per Florida Plumbing Code, Section 403.1.1, Exception, Pursuit Boats is requesting a redistribution of the sexes for the calculation of plumbing fixtures from 50% men and 50% women to 80% men and 20% women, based on statistical data from our existing Boat Manufacturing Plant. The existing Boat Manufacturing Plant has an employee count of 400 people, 80% men and 20% women. This has been the norm for our Plant for over the past years of operating this Facility. For this reason our employee count of 400 people will be the same for the New Facility, 320 men/80% and 80 Women/20%. As per the plumbing fixture calculation shown on sheet Al.11, see attach copy, the total occupant load for the new facility is calculated at 1818 persons, 909 men and 909 women. Per the plumbing design of the New Facility, we have only reduced the Women's required plumbing fixture count from 10 to 7, while the Men's has actually been increased from 10 to 12 fixtures. The New Occupant Load, based on the Plumbing Fixture Count Schedule, will.actually support 1200 men and 700 women, 1900 persons total, with the redistribution of the sexes. This is actually an increase in the total occupant load as calculated by Section 403. I hope this letter has helped to justify our requested redistribution of sexes per the Florida Plumbing Code, Section 403.1.1, Exception. Please feel free to contact me if you have any questions. Sincerely, 41.V. 0 Bruce Thompson President I Pursuit Boats � puRs�ir. July 16, 2019 Mr. Gary Stepalavich, MCP/CFM Building Code Administrator 2300 Virginia Avenue Ft. Pierce, Florida 34982-5652 RE: Pursuit Boats New Facility Plumbing, Fixture Calculation Reduction Letter Architect's Project No. 2018.42.7 Dear Mr. Stepalavich, As per Florida Plumbing Code, Section 403.1.1, Exception, Pursuit Boats is requesting a redistribution of the sexes for the calculation of plumbing fixtures from 50% men and 50% women to 80% men and 20% women, based on statistical data from our existing Boat Manufacturing Plant. The existing Boat Manufacturing Plant has an employee count of 400 people, 80% men and 20% women. This has been the norm for our Plant for over the past years of operating this Facility. For this reason our employee count of 400 people will be the same for the New Facility, 320 men/80% and 80 women/20%. As per the plumbing fixture calculation shown on sheet Al.11, see attach copy, the total occupant load for the new facility is calculated at 1818 persons, 909 men and 909 women. Per the plumbing design of the New Facility, we have only reduced the Women's required plumbing fixture count from 10 to 7, while the Men's has actually been increased from 10 to 12 fixtures. The New Occupant Load, based on the Plumbing Fixture Count Schedule, will.actually support 1200 men and 700 women, 1900 persons total, with the redistribution of the sexes. This is actually an increase in the total occupant load as calculated by Section 403. I hope this letter has helped to justify our requested redistribution of sexes per the Florida Plumbing Code, Section 403,1.1, Exception. Please feel free to contact me if you have any questions. Sincerely, Bruce Thompson President I Pursuit Boats Q paRszvr. July 16, 2019 Mr. Gary Stepalavich, MCP/CFM Building Code Administrator 2300 Virginia Avenue Ft. Pierce, Florida 34982-5652 RE: Pursuit Boats New Facility Plumbing Fixture Calculation Reduction Letter Architect's Project No. 2018A2.7 Dear Mr. Stepaiavich, As per Florida Plumbing Code, Section 403.1.1, Exception, Pursuit Boats is requesting a' redistribution of the sexes for the calculation of plumbing fixtures from 50% men and 50% women to 80% men and 20% women, based on statistical data from our existing Boat Manufacturing Plant. The existing Boat Manufacturing Plant has an employee count of 400 people, 80% men and 20% women: This has been the norm for our Plant for over the past years of operating this Facility. For this reason our employee count of 400 people will be the same for the New Facility, 320 men/80% and 80 women/20%. As per the plumbing fixture calculation shown on sheet Al.11,, see attach copy, the total occupant load for the new facility is calculated at 1818 persons, 909 men and 909 women. Per the plumbing design of the New Facility, we have only reduced the Women's required plumbing fixture count from 10 to 7, while the Men's has actually been increased from 10 to 12 fixtures. The New Occupant Load, based on the Plumbing Fixture Count Schedule, will.actually support 1200 men and 700 women, 1900 persons total, with the redistribution of the sexes. This is actually an increase in the total occupant load as calculated by Section 403. I hope this letter has helped to justify our requested redistribution of sexes per the Florida Plumbing Code, Section 403.1.1, Exception. Please feel free to contact me if you have any questions. Sincerely, 41- 0 Bruce Thompson President I Pursuit Boats r Lydia Galbraith From: Thondra Lanese Sent: Wednesday, August 21, 2019 7:32 PM To: Lydia Galbraith; Monica Graziani; Angela Huff; Edwin Blaine; William Durden Subject: FW: Pursuit, 1907-0579 Tommy has indicated Pursuit will use a separate address for the new building Thank you, Thondra THONDRA LANESE ( Business Navigator ( Economic Development Division ( Planning & Development Services Ph: 772-462-2548 12300 Virginia Avenue, Fort Pierce, FL 34982 IanesetCo)stlucieco.org I www.stlucieco.gov From: Thomas Lawson <TLawson@pursuitboats.com> Sent: Wednesday, August 21, 2019 7:24 PM To: Thondra Lanese <laneset@stlucieco.org> Cc: Roger Priest (rpriest@rkdavis.com) <rpriest@rkdavis.com> Subject: Re: Pursuit, 1907-0579 Sorry for the delay. Please use the separate address for the new building. Sent from my Verizon, Samsung Galaxy smattphone -------- Original message -------- From: Thondra Lanese <laneset(a�stlucieco.org> Date: 8/21/19 7:20 PM (GMT-05:00) To: Thomas Lawson <TLawson2pursuitboats.com> Cc: "Roger Priest (rpriest@rkdavis.com)" <mriest@rkdavis.com> Subject: FW: Pursuit, 1907-0579 Good evening gentlemen, The building permit for your new building is almost ready to be issued. However, we still need to resolve the address for the new building. If you want to use the 3901 St. Lucie Boulevard address for the new building, we can treat it as a campus -style address for all of your buildings at this location. To do that, you need to request a campus address and tell us how you want to identify the individual structures for safety purposes (i.e. Building A, Building B, Building C). You will also need to apply for Unity of Title for both properties from the Property Appraiser's office, and.provide a copy of an application to us. Alternately, we can issue the building permit using the new address (3891 St. Lucie Boulevard) for the new property. That will provide a unique address where the Fire District can respond. Other than to provide a location for emergency services, it will be up to you whether you want to receive mail at that address or publicize it in any way.