Loading...
HomeMy WebLinkAboutPROJECT INFORMATIONSCANNED BY St. Lucie County HARBOUR RIDGE rACWA CBUM yCLUB 12600 H&bourt6teBa&vetd• P&n04 ti&3M • (772) 336-3000 • (7721 :1d AUG 0 q 2919 ST. Lucie County, Permitting REQUEST FOR REVIEW BY HARBOUR RIDGE ARCHITECTURAL REVIEW BOARD TO BE SUBMITTED BY APPLICANT TO HIS/HER VILLAGE BOARD OF DIRECTORS) Name: 111 bye y- L V` I12 GV s Phone #: Z S - 2 L L+' 4 tf Village: OSPAE y Address: (a N 1 S E Date: T ' ' -'� O-]/ l 19 Description of Proposed Change: (Attach Sketch and Site Plan. if applicable, plus copy of the attached Name of Contractor- -!3TE-U Address of Contractor. _I -a-. Permission given tonllallow contractor access to home: Yes Sd' No ❑ Phone #: 5(0 1- Z2 2 .c7 Signature CONDO VILLAGE BOARD RESPONSE: Date Received: The Board of Directors i�approves _ disapproves the above alteration by the tally of votes FOR and AGAINST. Response from neighbors attached, if applicable. Comments: - Date of Village Board Meeting: -1 1 "1 I t q Signature of Village ARCHITECTURAL REVIEW BOARD RESPONSE: Date received: 'TI 14 Date Reviewed: �� Decision: Approved: n— Disapproved: Comments: ��v i Tl1 is 4ry n+ door rv1 tA 5+ 1 r% a''A i S-ki V't Date returned to Applicant and Village President: 60 NI/YpLO" V"y' Signature of ARl Raised 1.5-I8 cc . -I-1. Vo%41 `�r> 't,tblul+om APPLICANT/ARB APPROVAL AGREEMENT I understand that in accordance with the requirements of the Harbour Ridge documents, the Architectural Review Board (ARB) will act on this request and provide me with a written response of their decision. I further understand and agree to the following provisions: I. No work or commitment of work will be made by me until I have received written approval from _the Association. 2. All work will be done expeditiously once commenced and will be done in a good workman -like manner by a contractor or myself. 3. Any work which disturbs irrigation lines and requires removal, repair, etc. notice must be given to the Landscape Department prior to the start of work, minimum two week notice. Homeowner assumes all costs associated with the turn off, relocation, repairs, etc. 4. All work will be performed at a time and in a manner to minimize interference and inconvenience to other unit owners. 5. I assume all liability and will be responsible for all damage and/or injury which may result from performance of this work. ARB approval does not signify that the proposed plan specs or work comply with local laws or regulations — It is applicant's responsibility to ensure compliance. 6. 1 will be responsible for the conduct of all persons, agents, contractors, and employees who are connected with this work Safety and Security will be notified as to the start up of construction. They will contact me regarding the construction and I agree to cooperate in providing any additional information required. I will be responsible for complying with, all ARB fee's if applicable, and will comply with, all applicable federal, state and local laws, codes, regulations and requirements in connection with this work, and I will obtain any necessary governmental permits and approvals for the work. I understand and agree that the Harbour Ridge Property Owners Association, its Board of Directors, its agent and the ARB have no responsibility with respect to such compliance and that the Board of Directors' or its designated ARB's approval of this request shall not be understood as the making of'any representation o r wananty that the plans, specifications or work comply with any law, code, regulation or governmental requirement. I understand that Harbour Ridge policy may be more stringent than St. Lucie County's codes, regulations and requirements. 8. If approved, the wor, wjpltild tart on or about Q \ and would be completed by J� 9. Change Order Form (Attached) must be completed prior to changing (modifying) an approved plan or request. - t/20 /Z0 ` Applicant Signature Rnised 1-5-18 Dabble Dave 12 ]hm-19 90S NW WintersLeek Palm FL 34990 281-804-4489 DESCRIPTION 7 Change Out: TraDe XL 18 Sees variable Capacity cooling 5 ton Air Conditioning system, 10 Kilowatt beat strip - Digital Temperature Control, Misr copper and electric, Evacoate and Charge System. Relocate ersting Air Handier to new .dose4Add.new _supply outlets to parch area modification to od5tlng dud system as req*W. . _ New Supply grills for home. RefriperatoL Darvasther, Washer, Dryer, Microwave, AppItarhcas � Supply and Install: Wtdhen, Master Bath, Guest Bath, and Guest Bath Riverside UNes otherwise noted, all plumbing, electrical, appliances, counter tops, flooring, etc. will be supplied and installed by others Cabinet Spedficadons for Ktchen, Master ", Guest Bath, and Guest Bath Riverside. Cabinet Manufacturer — Soutihem Stone Cabinetry Cabinet ConshuGion - Frarnetes Plywood w/ Solid Wood Drawers, 3/4" plywood box construction with a bid veneer Interior. Solid wood dovetailed drawer bodies with soft -dose .. under mount drawer slides. Door Style— CRP-10 3/4' thick mortise and tenon solid wood construction with either a raised or flat center. Panel. Drawer Style — Matrhthg S+kM Ccrstn>clon finBh —Painted Wood Specks - Paint Grade Maple Hinges; Shen EurP„ _ Concealed Soft.Dose Glass Insert - Not Applicable Cabinet Hardware - Allowance provided, $10.00 per pull or knob Details & Anodes— Features Include: Kitchen a0lnetry will finish at 90" high pis crown molditV • Appliance panels are not included • Vanity cabin will fin6h at 34-1 2" hi h 36' with toNOTE: Cell' :Fa7ns:: Homeavner Supplied, Contract to Install at 50.00 Der fan. add [anal cost will aanr If a fan box is needed. Cut Concrete for new kitchen island, ad concrete at new pass through at kitchen, at concrete to move roaster bathroom tub drain, shower drain, secondary bathroom 10 Mon Onuam shaver drain being moved Disconnect AC urd , an p1mbing, electrical and gas. Remove all the In entire home including patio, All Carpet, interior doors, Interior doors casings, baseboards, cabinets, olunWrmps, appliances, tDil&* bathroom vanities, closet shelving, tubs, sinks, faucets, Wbchen calling, fireplace, air handier box, All window beelims, All fight farhue% Patio ceiling, mirrors, shower enclosures, Master bedroom closets, Secondary Bedm= Demolition doses Secoridarir Bedroom Entrance IOITCHEN PENDENT LIGHT BOX WIRING 3 ISLAND GFI RECEPPICLE 1 UNDERCABWET LIGHT 1 DINNING LIGHT BOX WIRING 1 NOOK LIGHT BOX WIRING I MICROWAVE OR HOOD DISHWASHER 1 COOKTOP 1 DOUBLE OVEN 1 DISPOSAL L. _ REFRIGERATOR 1 4" LED RECESSED CAN 10 BASE PRICE DECORA SINGLE POLE SWITCH 6 WP GFI RECEP ICLE 10 BATH 3 VANITY LIGHT BOX WIRING 1 110 CFM BATH FAN 1 RELOCATE 6" LED READ CAN 1 RELOCATE WIRING IN WALLS TO BE MOVED 1 MASTER CLOSE IN BATH HALL 1 RELOCATE 2 SW X:KES AND 2 OUTLETS S GANG UP EXISTING SW I RELOCCTE 6" LED RECESSED CAN IN SOFFIT 1 110 CPM BATH FAN 1 RELOCATE GFI RECEPTICLE 1 6" LED RECESSED CAN 6 PORCH RELOCATE CEILING FAN WIRING 2 6" LED RECESSED CAN 2 RAISE FLOOR I . OFFICE"-' ' - - EXTEND HALL CLOSET INTO ROOM 1 RELOACTE 2 SW, FAN, OUTLETS 1 OFFICE BATH 110 CFM BATH FAN 1 HANG NEW LIGHT FIXTURE ON EXISTING LIGHT BOX WIRING 1 SHOWER 6" LED RECESSED CAN TRIM ONLY 1 LIVING REWIRE KITCHEN/ HALL 1 RAISE CEILING 1 THIS ESTIMATE MAY CHANGE IN PRICE DEPENDING ON PLANS BEING FINALIZED. There will be an additional large R,the electrician needs to realm to insb0 homeowner supplied futures that Eledricai Continued were not available when electrical work was done EDImR and "a To raise patio slab. Final Cleaning fl laca c ZFR Golf cart ct rated door and Motor. :C161ozec` New imerior gas lines Io new linear fl:eplace and le. Must tie in new gas line in at existing gas fine dace location. Connect gas to new fireplace and all countertop areas Including ktbhen, bathrooms To Reframe and drywall lanai ceiling, Reframe and drywall ld dm telling and walls, reframe and drywall �t master bathroom and secondary bathrooms, reframe and drywall new openi g at secondary bedroom, Refiame and drywall new fireplace, reframe and drywall secondary bedroom opening at living room, reframe and drywall master bedroom and secondary bedroom closets reframe and -drywall -new AC room.—Repairorywall due to windows and doors being replaced. Frame down headers at an Sliders. NOTE: CONTRACTORISNOT RESPONSIBLE TO REPAIR ANY EXISTING CRACKING OR DAMAGED CORNER BEADS UNLESSTHEY ARE WORKING ON THAT PARTICULAR WALL. DRYWALL REPAIRS DUE TO cKI%'II uG CRACKING OR CORNER BEADS ARE all new MDF interior Shaker Doors, A6 new 1 x 6 ands, All new I x 4 Door Casings, All New i x 4 Ste material for lank[ CUIUM , all new composite d for box beams at lanxl calling. All New EMTEK xdware included. all new MDF Intedor Shaker Doors, cards, AlAli new I x l new I x 4 Door Casings, All New i x 4 e material for larval columns, all new mmposle for box beams at lanai ce fin9• All New EMfEK pocket door framing there will be an at charge for material and labor. rr Bath: Furnish & Tmtall 60" X 82' X 3/6" ales Shower Door & Panel with a reban Panelon wall, dear tempered gW brushed I hinges, dips & C pull handle Furnish & Install (2) X 44" X 1/4" dear mirror, polished Punish & Install :44, X 1/4' dear mirror, polished x Bath 1: Furnish & Install 6D" X 82" X 3/8" eiess Shower Door & Panel, dear tempered glass/ ied nldrel hinges, dips & C pug Handle Furnish & 11 48'X 44' X 1/4" dear minor, polished Guest 17: Furnish & Install 59. X 7r X 3/8' Frameless ss Shower Doors, dear tempered gam/ brushed 9 framing Furnish & Install 72' X 44" X 1/4' dear Interior work not including Planation Shutters: Two Goats of nnlsh paint to baseboards, casings, odors and crnvn molding (only frying ioom) Property prepare, apply spot primer and two vats of finish paint to interior ceilings and walls. included painted lanai caBhg wood detail and columns. NOTE: Paint to be Sherwin William, Finishes: Ceiling to be flat, walls to be flat and trim to be satin. Pridng Includes up to 6 Samples. Additional samples are 75.00 each. Deep Base Colors Require an additional coat of paint and therefore wl0 be an additional Cost Pricing to be determined price final Pa *IrR*Jror`� paint colas are selected. Permits Billed directly to twmeowner MASTER BATH: DISCONNECT ALL FIXTURES. WALL BEHIND VANITY ARE GOING TO BE STRAIGHTENED OUT,1 SINK WATER AND DRAIN LINES TO BE MOVED WITH WALL. WMING TUB IS BEING REMOVED, MOVE DRAIN AND WATER LINES FOR NEW FREE STANDING TUB IN CORNER OF ROOM. SHOWER TO REMAIN IN SAME LOCATION]USTENIARGED, WILL MOVE PLUMBING AS NEEDED, INSTALL NEW VINYL SHOWER PAN AND DRAIN. BIDET TO BE MLEKINATED, TOILET TO BE CENTERED. INSTALL NEW FIXTURES AND TRIM. GUEST BATH: DISCONNECT ALL FIXTURES. TUB TO REMAIN, REPLACE SHOWER VALVE INSTALL NEW FIXTURES AND TRIM IN OOSTING LOCATION. GUEST BATH 2: DISCONNECT ALL FIGURES, SHOWER TO BE ENLARGED, INSTALL NEW VINYL SHOWER PAN AND DRAIN. REPLACE SHOWER VALVE INSTALL NEW FIXTURES AND TRIM IN EXISTNG LOCATION. LAUNDRY ROOM: REPLACE WASHER BOX IN SAME LOCATION. REPLACE EXISTING SO GAL WATER HEATER AND REPLACE WITH RO GAL HTP WATER HEATER KITCHEN: KITCHEN TO BE RECONFIGURED. KITCHEN SINK TO BE LOCATED IN ISLAND. ADD BAR SINK IN KITCHEN AREA. PLUMBING TO BE MOVED TO ISLAND LOCATION, PIPE IN BAR SINK FROM PIPES IN SLAB WHEN MOVING PLUMBING FOR KITCHEN SINK. REFRIGERATOR TO MOVE ABOUT V ICE MAKER NEEDS TO BE RANTO NEW LOCATION. INSTALL FIXTURES. For all sinks, faucets, toilets, hubs, shower trims. Plumbing b Fkft cos Material e el Porto let To Pour Concrete where conorete was cut for plumbing swim and electrical. Stucm'� To repair all Sturm due to windows and sliders. SGt9 i Make screen door for front entrY Supply Tievertlne Stone Chlsded edge Versailles for all areas of the home on the floor Includes enclosed patio. Includes Toe for One Master Bath wet floors and Walls, One Secondary Bath Walls Onk And Bath #3 for Wet krmlaerwr floor and wags. t ' IrMI: Travertine Some Qisded edge VersiaIlies for an areas of the home on the floor, Includes enclosed patio. Indudes Tile for Master Bath wet floors and Walls, One Semndary Bath Walk only, And Bath *3 for Wet floor and wads. NOTE: Ths quote Is based on Tile and labor being provided by the saw supplier. If the is purdhasal separately and not install by the same supplier the labor Tik - tabor cost ma be higher. IAFG?P ADl7SfRIES"At 11MINOMMAWWARD SIII:ATEO SF"�pAG-TLf;A,_;TEO V. �b"OOCRS:V3XITE ALUMINIkN FRAME ®. WRH. EP1EtEGYaS SEiDthX)('t.OVyE. AtiOr'ERATlNCi'VylP1DOWSfAND�OODRS COME Wff}i A N. ALL U..M DDORv f�If�TED�A'FSI ) RD'96 E„_STALL. __ — TOTAL OPENINGS 38 NOTE: toes not Include Aldmf Windgws:erA;FxteriocAaors Canted Reconnection. Must be done br Alarm CDhn nV Sub Total Allowances Total Builders manaaemant Fee 16% Total contract prke `..�....�.,...i..� 0 S�41____;JISIIJ IIIHfI$ IZ 135 11WH3d EO -. - - - - - - .- - - -- - - - - - - - - - -- � •= n i i Ig6 pi i rrrrrrFFrr ��,,1 Sc ,- �! i t 4�� I� I I� •I I I I:����� " I e t ; �T+�� �+�ffi M.A. COM ON 1 i ! DACUS RE IDER ♦acEnyzrm 906NWVM(nWC EEKl 11n=m eeow ev®racnsmxrwrnuna w..o..e I t'fa,ji f I(i�tlitj��jlti j'•1 �ilill�l ji,Ifli = ,gip I 111111HUN tilOURY PERMIT SET I��� '• �i�i I° ij idi �� EuIl�r Il1`Ili f i E , j i�y► iF jjiE{{i 4ii'1; !I ii; 7:l y rj iJi li f jlif�i i j1l(l E(5t� lr�ii'�irr pi"'T 4l' ;EE !! O ANIUMUORRERMAMNFORM 1 S E 906g RRS)®EFTCE3 .A. CORSON & ASSOCM ANCMUCNRE S,RUCNRAL PERMIT SET =O PERMIT SET DACUS RESIDE CE 906XWVAr?aWCPMXRD. ,Nancy Reily From: Tiffany0oley <receptionl rubincustomhomes@gmail.com> Sent: Wednesday, July 17, 2019 1:38 PM To: Nancy Reily Cc: Russell Reed Subject Re: Mr. & Mrs. David & Debbie Dacus, Osprey Village I will have to do a ARB Revison once a selection has been made. The windows and garage door are going back to the same size and color that they are now. Thank you, Tiffany Ooley Rubin Custom Homes reception I:rabincustomhomes(R)nmail.com Office# 772-283-0553 Ext #2 On Wed, Jul 17, 2019 at 1:35 PM Nancy Reily <-n reily anhrycc.org> wrote: Good afternoon Tiffany, Thanks for the ARB for Mr. & Mrs. Dacus. I will need the following information regarding this renovation for the ARB meeting: • Photo and specifications for entry door; • Photo and specifications of screen door including frame color; • Photo and specifications of golf cart garage door; • Photos and specifications for WinGuard windows including frame color. If you should have any questions or concerns please do not hesitate to contact me. Thank you. Sincerely, i Naricy i From: Tiffany Ooley<recentionl.rubincustomhomesraiemail.com> Sent: Wednesday, July 17, 201912:54 PM To: Nancy Redy <n.reily@hryccore> Cc: Russell Reed <r.reedt@hrvcc.ore> Subject: Re: Dacus Yes i need to have a gas tank installed Thank you, Tiffany Ooley f Rubin Custom Homes receotionl .rubincustomhomes(alemail.com Office# 772-283-0553 Ext 92 On Wed, Jul 17, 2019 at 12:27 PM Nancy Reily <n.reily(alhrvcc.org> wrote: Hi Tiffany, f 1 I do not have survey's for condominiums. Is there something particular you are looking for? Nancy 2 From: Tiffany Ooley <receotionl.rubincustomhomesCa smaii.com> }, Sent, Wednesday, July 17, 201912:21 PM i To: Nancy Rally <n.reiiyCdhrvcc.ore> �Subject: Dacus l Do you have a survey by chance on the dacus condo? t i I Thank you, Tiffany Ooley ! e Rubin Custom Homes reception 1.rubincustomhomesAgmail.com Office# 772-283-0553 Ext #2 Nance Reil From: Harrie Vo el <tarriet@harrietvogel.com> Sent Friday, July 19, 201910:40 AM To: Nancy Reily Subject Re: Request for Review by the Harbour Ridge Architectural Review Board by Mr. & Mrs. 11 a-va }?acus„OspreyMViBage Follow Up Flag: Follow up Flag Status Flagged ankank6� Sent from my iPhone On Jul 19, 2019, at 9:50 AM, Nancy Reily <n.rellv@hrvcc.ore> wrote: Mrs. Vogel, contacted Rubin Custom Homes regarding your questions and they provided ne with the following information. The ceiling heights will not be :hanging. They will be removing the soffits only. The estimated completion late for this project is currently January 20, 2020. If I may assist you further please do not hesitate to contact me. Sincerely, `From%HarriewV,' ef�<ha" ,,iet(aharrietvoeel.com> Sent W�edne+sday, July 17, 2019 2:38 PM To: Nancy Reily <n.reily@hrycc.oM> Cc: Mr. Hubbard Knox <hub1392aol.com>; Mr. Phillip Aquino <philaguino@aol.com>; Russell Reed <r.reedt&hrvcc.ore> Subject: Re: Request for Review by the Harbour Ridge Architectural Review Board by Mr. & Mrs. David Dacus, 0sprey�jag' = I have one question as it may affect me. What is meant by "raising the ceiling" in the living room? Once appr can Rubin Custom Homes give us an approximate time for this project? Thanks Harriet Vogel Sent_ __,fromlm00fone On Jul 17, 2019, at 1:20 PM, Nancy Reily <n.reily@hrvcc.org> wrote: Good afternoon all, Debbie Dacus 12-Iun-19 906 NW Winters Creek Palm City, FL 34990 281-804-4489 debdacus0com cast.net DESCRIPTION XEll) ALLOWA CE Specifications SCANNED BY St. Lucie County Change Out: Trane XL 18 Seer variable Capacity cooling 5 ton Air Conditioning system, 10 Kilowatt heat strip. Digital Temperature Control, Misc. copper and electric, Evacuate and Charge System. Relocate existing Air Handler to new closet, Add new supply outlets to porch area modification to existing duct system as required. Air Conditioning 16,275.00 New Supply -grills for home. Refrigerator, Dishwasher, Washer, Dryer, Microwave, Appliances 18 000.00 Range, Supply and Install: Kitchen, Master Bath, Guest Bath, and Guest Bath Riverside Unless otherwise noted, all plumbing, electrical, appliances, counter tops, flooring, etc. will be supplied and installed by others. Cabinet Specifications for Kitchen, Master Bath, Guest Bath, and Guest Bath Riverside : Cabinet Manufacturer — Southern Stone Cabinetry Cabinet Construction - Frameless Plywood w/ Solid Wood Drawers, 3/4" plywood box construction with a birch veneer interior. Solid wood dovetailed drawer bodies with soft -close under mount drawer slides. Door Style — CRP-10 3/4" thick mortise and tenon solid wood construction with either a raised or Flat center panel. Drawer Style — Matching 5-Piece Construction Finish — Painted Wood Species - Paint Grade Maple Hinges - Blum Euro Concealed Soft -Close Glass Insert - Not Applicable Cabinet Hardware - Allowance provided, $10.00 per pull or knob Details & Accessories — Features Include: Kitchen cabinetry will finish at 90" high plus crown molding • Appliance panels are not included • Vanity Cabinets 46 795.00 cabinebry will finish at 34-1/2" high 36" with tops NOTE: Homeowner Supplied, contract to install at 50.00 Ceiling Fans r fan, additional cost will occur if a fan box is needed. Cut Concrete for new kitchen island, cut concrete at new pass through at kitchen, cut concrete to move master bathroom tub drain, shower drain, secondary bathroom Concrete Cutting 2,800.00 1 shower drain being moved Disconnect AC unit, all plumbing, electrical and gas. Remove all tile in entire home including patio, All Carpet, interior doors, Interior doors casings, baseboards, cabinets, countertops, appliances, toilets, bathroom vanities, closet shelving, tubs, sinks, faucets, kitchen ceiling, fireplace, air handler box, All window treatments, All light fixtures, Patio ceiling, mirrors, shower enclosures, Master bedroom closets, Secondary Bedroom Demolition 9,000.00 closets, Secondary Bedroom Entrance, Dum sters 5,700.00 KITCHEN PENDENT LIGHT BOX WIRING 3 ISLAND GFI RECEPTICLE 1 UNDERCABINET LIGHT 1 DINNING LIGHT BOX WIRING 1 NOOK LIGHT BOX WIRING 1 MICROWAVE OR HOOD 1 DISHWASHER 1 COOKTOP 1 DOUBLE OVEN 1 DISPOSAL 1 REFRIGERATOR 4" LED RECESSED CAN 10 BASE PRICE DECORA SINGLE POLE SWITCH 6 WP GFI RECEPTICLE 10 BATH 3 VANITY LIGHT BOX WIRING 1 110 CFM BATH FAN 1 - RELOCATE 6" LED RECESSED CAN 1 RELOCATE WIRING IN WALLS TO BE MOVED 1 MASTER CLOSE IN BATH HALL 1 RELOCATE 2 SWITCHES AND 2 OUTLETS 1 Electrical GANG UP EXISTING SW 1 RELOACTE 6" LED RECESSED CAN IN SOFFIT 1 110 CFM BATH FAN 1 RELOCATE GFI RECEPTICLE 1 6" LED RECESSED CAN 6 PORCH RELOCATE CEILING FAN WIRING 2 6" LED RECESSED CAN 2 RAISE FLOOR 1 OFFICE EXTEND HALL CLOSET INTO ROOM 1 RELOACTE 2 SW, FAN, OUTLETS 1 OFFICE BATH 110 CFM BATH FAN 1 HANG NEW LIGHT FIXTURE ON EXISTING LIGHT BOX WIRING 1 SHOWER 6' LED RECESSED CAN TRIM ONLY 1 LIVING REWIRE KITCHEN/ HALL 1 RAISE CIELING 1 THIS ESTIMATE MAY CHANGE IN PRICE DEPENDING ON PLANS BEING FINALIZED. There will be an additional charge if the electrician needs to return to install homeowner supplied fixtures that Electrical Continued 13 250.00 were not available when electrical work was done. Entry Door 2,500.00 Epimre and pump 7,200.00 To raise patio slab. Final Cleaning 1400.00 Fireplace 4,000.00 Garage doors 2,000.00 Golf cart garage: impact rated door and motor. Install New interior gas lines to new linear fireplace and to range. Must tie in new gas line in at existing gas line at fireplace location. Connect gas to new fireplace and Gas piping and tank 2,100.00 Range. For all countertop areas including kitchen, bathrooms (Granite & Granite Installation 9,700.00 and Laundry. Insulation, interior walls 3,700.00 To Insulate Lanai Ceiling. To Reframe and drywall lanai ceiling, Reframe and drywall kitchen ceiling and walls, reframe and drywall master bathroom and secondary bathrooms, reframe and drywall new opening at secondary bedroom, Reframe and drywall new fireplace, refiame and drywall secondary bedroom opening at living room, reframe and drywall master bedroom and secondary bedroom closets, reframe and drywall new AC room. Repair Drywall due to windows and doors being replaced. Frame down headers at all sliders NOTE: CONTRACTOR ISNOT RESPONSIBLE TO REPAIR ANY EXISTING CRACKING OR DAMAGED CORNER BEADS UNLESS THEY ARE WORKING ON THAT PARTICULAR WALL. DRYWALL REPAIRS DUE TO EXISTING CRACKING OR CORNER BEADS ARE 'Interior frame and drywall 28 000.00 NOT PART OF THIS ESTIMATE. Install: all new MDF interior Shaker Doors, All new 1 x 6 baseboards, All new I x 4 Door Casings, All New 1 x 4 composite material for lanai columns, all new composite material for box beams at (anal ceiling. All New EMTEK door hardware included. Interior Trim Labor 22 000.00 Supply: all new MDF interior Shaker Doors, All new 1 x 6 baseboards, All new 1 x 4 Door Casings, All New 1 x 4 composite material for lanai columns, all new composite material for box beams at lanai ceiling. All New EMTEK door hardware included. Note: If Homeowner request pocket door framing there will be an additional charge for material and labor. Interior Trim Material 16 548.00 Master Bath: Furnish & Install 60" X 82" X 3/8" Frameless Shower Door & Panel with a return Panel on knee wall, clear tempered glass/ brushed nickel hinges, clips & C pull handle Furnish & Install (2) 144" X 44" X 1/4" clear mirror, polished Fumish & Install 42" X 44" X 1/4" clear mirror, polished Guest Bath 1: Furnish & Install 60" X 82" X 3/8" Frameless Shower Door & Panel, dear tempered glass/ brushed nickel hinges, clips & C pull Handle Furnish & Install 48" X 44" X 1/4" clear mirror, polished Guest Bath 2: Furnish & Install 59" X 72" X 3/8" Frameless Bypass Shower Doors, clear tempered glass/ brushed nickel framing Furnish & Install 72" X 44" X 1/4" clear Mirrors and shower enclosures 4,490.27 mirror, polished Interior work not including Planation Shutters: Two coats of finish paint to baseboards, casings, odors and crown molding (only living room) Properly prepare, apply spot primer and two coats of finish paint to Interior ceilings and walls. Included painted lanai ceiling wood detail and columns. NOTE: Paint to be Sherwin William, Finishes: Ceiling to be flat, walls to be flat and trim to be satin. Pricing includes up to 6 Samples. Additional samples are 75.00 each. Deep Base Colors Require an additional coat of paint and therefore will be an additional Cost Pricing to be determined once final Paint Interior 12 750.00 paint colors are selected. Permits Billed directly to homeowner MASTER BATH: DISCONNECT- ALL FIXTURES, WALL BEHIND VANITY ARE GOING TO BE STRAIGHTENED OUT, 1 SINK WATER AND DRAIN LINES TO BE MOVED WITH WALL. EXISTING TUB IS BEING REMOVED, MOVE DRAIN AND WATER LINES FOR NEW FREE STANDING - - - —TUB-IN-CORNER-OF ROOM:SHOWER TO -REMAIN -IN- - SAME LOCATION ]UST ENLARGED, WILL MOVE PLUMBING AS NEEDED, INSTALL NEW VINYL SHOWER PAN AND DRAIN. BIDET TO BE ELIMINATED, TOILET TO BE CENTERED. INSTALL NEW FIXTURES AND TRIM. GUEST BATH: DISCONNECT ALL FIXTURES. TUB TO REMAIN, REPLACE SHOWER VALVE. INSTALL NEW FIXTURES AND TRIM IN EXISTING LOCATION. GUEST BATH 2: DISCONNECT ALL FIXTURES. SHOWER TO BE ENLARGED, INSTALL NEW VINYL SHOWER PAN AND DRAIN. REPLACE SHOWER VALVE. INSTALL NEW FIXTURES AND TRIM IN EXISTING LOCATION. LAUNDRY ROOM: REPLACE WASHER BOX IN SAME LOCATION. REPLACE EXISTING 50 GAL WATER HEATER AND REPLACE WITH 80 GAL HTP WATER HEATER. KITCHEN: KITCHEN TO BE RECONFIGURED. KITCHEN SINK TO BE LOCATED IN ISLAND. ADD BAR SINK IN KITCHEN AREA. PLUMBING TO BE MOVED TO ISLAND LOCATION, PIPE IN BAR SINK FROM PIPES IN SLAB WHEN MOVING PLUMBING FOR KITCHEN SINK. REFRIGERATOR TO MOVE ABOUT 8' ICE MAKER NEEDS TO BE RAN TO NEW LOCATION. Plumbing - Labor 11 795.00 INSTALL FIXTURES. For all sinks, faucets, toilets, tubs, shower trims, Plumbing Fixtures / Material 10 000.00 garbage disposal. Porto let 500.00 To Pour Concrete where concrete was cut for plumbing Slab 1,100.00 and electrical. Stucco 1500.00 To repair all stucco due to windows and sliders. Screen Enclosure 700.00 Make screen door for front entry Supply Travertine Stone Chiseled edge Versailles for all areas of the home on the floor includes enclosed patio. Includes Tile for One Master Bath wet floors and Walls, One Secondary Bath Walls Only, And Bath #3 for Wet Tile - Material 31 159.72 Ifloor and walls. Install: Travertine Stone Chiseled edge Versailles for all areas of the home on the floor, includes enclosed patio. • Includes Tile for Master Bath wet floors and Walls, One Secondary Bath Walls Only, And Bath #3 for Wet floor and walls. NOTE: This quote is based on Tile and Labor being provided by the same supplier. If the is purchased separately and not install by the same supplier the labor Tile - Labor 22 500.00 cost maybe higher. MFG:PGiINDUSTRIES ALUMINUM WINDGUARD INSULATED IMPACT RATED WINDOWS AND DOORS.WHITE ALUMINUM FRAME WITH ENERGY SHIELD MAX LOW-E. ALL OPERATING WINDOWS AND DOORS COME WITH A SCREEN. ALL SLIDING DOORS QUOTED AT STANDARD 96 INCHES TALL. TOTAL OPENINGS 18 NOTE: Does not include Alarm Windows and Exterior Doors 65 557.72 Contact Reconnection. Must be done by Alarm Company Sub Total Allowances 177 152.72 Total 373 020.71 Builders management Fee 16% 59 683.31 Total contract price 432 704.02