Loading...
HomeMy WebLinkAboutMISCI— . N Ultra Large Capacity Stearnl)ryer� wif NFC �iag On ALWAYS STAY EFFICIENT Efficiency can mean a lot nowadays, and this dryer knows it. Its ultra large capacity will handle extra -large loads, so you finish your laundry faster. The Intelligent Electronic Controls with Dual LED Display make it easier to get the settings right, so you can just "set it and go' Plus, the Sensor Dry System will detect the level of moisture in the fabric and automatically adjust drying time and temperature. If you appreciate efficiency, so does this dryer. SPECIFICATIONS INNOVATIONS * 7.4 cv. ft. Ultra Capacity Wth TrueSbeaml- Technology Alcosta Steel Drum SteamFmShT. Cycle * 12 Drying Programs SteamSanitary� Cycle * 5 Temperature Settings ReduceStabc� Option EasylmrP Option Sensor Dry System STYLISH DESIGN Precise Temperature Control • Upfront Electronic Control Panel Mth with Variable Heat Souce Dual LED Display and Dial-A-Cycle� LoDecibell- Quiet Operation • Large Chrome Rimmed Glass NFC Tag On Door Wth Dark Blue Tinted Cover SmartDiaqnosW- Reversible Door 3 Minute Installation Check Stackable with Matching Washer FlowSenseni Duct Clogging Indicator (Stacking l(it sold separately) Wrinkle Cam option Optional Matching,Drawer Pedestal Anti -Bacterial Cycle Damp Dry Signal SCANNED BY St. Lucie County SMART DLAGNOSIS� TRO n No I,)& �P. 7* /00� � 4� :q CAPACITY APPEARANCE lWre1i(g'o'Bectmr1C Controls with Dual LED Display DRYING PROGRAMS am, nsorDry) CotomrNomal'psrm'Pres%F-;LtDekiq Pr.g.ots(m.romary) SpeedDyArD, Optmms W, MoraTime. LessTims, Custom program Damp DrySuiral W -Cold Lott, iiodv�oStapC-, E6yllmi-.-Rack Dry End . ;f LhkloCanc, I 4 yingLeuds ve ss D "�;mw FABRIC CARE FEATURES do 'a .s;p'se:'Ptum pne'is'T�;ol-wrt Cbmin-l-nd Variable H,.ttr af . . . . .. LIS Electronics U.S.A., Inc. 1000 Sylvan Avenue Englewood Ofiffs, NJ 07632 Customer Service end Technical Support. (800) 243-0000 Mcom MATERIALS AND FINISHES, T I Plate aD --o AvaJ POWER SOURCE .1n Elear,.l Peru rements ET 12OX 15 Amps (Gas) I 240V� 30 Amps (Eleamd 11Z.L M OPTIONS p 27"X133Wx28215' El TE 7-27 A"jFq LP Conversion Kit it d; r 383EEL30020 DIMENSIONS VrxI 'jJ N.- � I M , Car= (vin,H.D) 29 1n'x421/4-x3ll/4- LIMITED WARRANTY OT� ElW= n"L lgg( UPCCODES OPn..l —�urs pod.�Wt'.Id om.f, (D2014LGEt��n,.USA,I..AUdght,,.,�d.�GLil�.G���l,i�ed�d�.�.fLGC�,N[ other praductand brand morres.r. mdenowni.rneisterd Uaderveris, aftheirrespettive co-parent.4110114 18 INSTALLATION Venting the Dryer 7AWARNING To reduce the risk of fire or explosion, electric shock, property damage, injury to persons or death when using this appliance, follow basic safety Precautions, includl ' ng the following: • Do not crush or collapse ductwork. • Do not allow ductwork to rest on or contact sharp objects. • If connecting to existing ductwork, make sure it is suitable and clean before installing the dryer. • Venting must conform.to local, building -codes. • Gas dryers MUST exhaust to the outdoors. I 4, Use only 4-inch (10.2 cm) rigid, semi -rigid o flexib le metal ductwork inside the dryer cabinet /Y and for venting outside. To reduce the risk of fire, combustion, or accumulation of combustible gases, DO NOT exhaust dryer air into an enclosed and unventilated area, such as an attic, wall, ceili�g crawl space, chimney, gas vent, or concealed space of a building. -To reduce the risk of fire, DO NOT exhaust tf dryer with plastic or thin foil ducting, • The exhaust duct must be 4-inch (10.2 cm) in diameter with no obstructions. The exhaust duc t should be kept as short as possible. Make sure � to clean any old ducts before Installing your new\ dryer. • Rigid, semi -rigid or flexible metal ducting is recommended for use between the dryer and the wall. All non -rigid metal transition duct must be UL-listed. Use of other materials for transition duct Could affect drying time. • DO NOT use sheet metal screws or other fasteners which extend into the duct that could catch lint and reduce the efficiency of the exhaust system. Secure all joints with duct tape. • Do not exceed the recommended duct length limitations noted in the chart. Failure to follow these instructions may result in extended dr times, fire or death. AWARNING Ductwork is not Provided with the dryer. You shoufd obtain the necessary ductwork locally. The vent hood should have hingei!tdempers to prevent backdEaftwhei7-th4--drvP.r.i.q nnt',In im. *The totaIJ'e7n-gtrof flexible metal exre4d' 811 (2.4 m). X WR i mmax n'tol nomg, y, ff e Nil Recommended 0 b5 ft.(19.8 M) C 55 ft.(16.8 m) 2 R.(14.3 m) 3 t47 36 ft.(11.0 m) a: 4" (10.2 cm) 4 28 ft.(8.5 m) '5 m) Use only for short 0 - 6.8 rn) 55 ft.(11_ 1 - 47 ft.(14.3 m run installations C 2 ft. (1 \Z�b: 2.5" 3 30 ft.(d /M) " '�l (6.35 crn) 4 ----"22ftg(6.7 m) NOTE Deduct 6 ft. (1�8 M) for each additional elbow. Do not use more than four 90' elbows. *In 2nada, only those foil -type flexible ducts, if any, specifica IY identified for use with the appliance by the manufacturer should be used. In the United States, only those foil -type flexible ducts, if any, specifically identified for use with the appliance by the manufacturer and that comply with the Outline for Clothes Dryer Transition Duct, Subject 2158A, should be used. mix ov� A�� SCANNED BY St. Lucie County CHANGE ORDER Full Condo Renovations October 4, 2019 Joann & Robert Caputo, ­,'#00t i.com - ro 203-650-6413 - j6caputS122@gnia I ber�caputo@rne.�dni 4500S Ocean Dr�v e, nit 1006, j6n�eh Beach;FL 34957 .4 -Proiect#:,1909�0-rlslanA!all-1006-Canift�- 0­ n R�' nbract.#00,1- I I lftfe7i I left;,84- IfistantliotWater Heater _QQLM- heaterdub to not'meeimb the electrical load cidcula water tioni- keeping the Ce?-h&dter'- a- —1 rt _16 , 4 A TOTAL CHANGE ORDER C_ TERMS AND CONDITIONS -Change Orden are to be paid in full within ten (10) days of initial request, failure to do so may result in all work coming to a halt until payment is received. - Change Order amounts are transferred to the initial invoice, this is for documentation purposes. - The above Change Order shall be performed under the same conditions as specified in the existing contract. Change orders may affect the project timeline and are an additional cost to the original contract pricing. Your signature below signifies your agreement and approval of this change order. M-ake.all checks 0ayable to Island Kitchen and Biiih --- THANK YOU FOR YOUR 9US1_N'9­S§i' 1 BY V�Lj k'all Condo Renovations Jairdary 29,2018 Joann & Robert Caputo #001 'S t. LU Cie CO U 19tWO S. Ocean Drive, Unit 1006, Jensen Beach, Fl. 349 5 7 203-650-6413 I 2 3 Permit Cost - notice Of commencement, building permit NOC termination and IKB time pricingvaries and --n-­ I until after all Paperwork is filed Purchase an general rebuild material Disconnect any remaining window mtments throughout condo and DISPOSE Disconnect all idchen appliances - rairl gerator, dishwasher, range, crowave� etc DISPOSE raj * Homeowner has supplied the showroom with all ofthe appliance spec -a Bisconneci; wasner and dryer - DlSP6S_E *11onzeowner hassuppiled the showroom with all of the appliance spec,& Disconnect emsting latchen ceilings lights _ DISPOSE - TBD $2.500.00 4 5 6 k2__ Disconnect all electrical Plugs/switches throughout condo Disconnect all bedroomoi!qm room ceilings hans - DISPOSE k9 �DL coZ ister bathroom faucet, s and toilet - DISPOSE - _'scon= guest bathroom faucet, sink and toilet - DISPOSE - 11 Remove edsting chen countertop and cabinetry - DISPOSj 12 13 Remove ceiling to max keight in master bath and master closet Remove eidsting master bathroom coUntertop and cabinetry - DISPOSE si,�500.0 14 Remove e3risting guest bathroom countertop and cabinetry - DISPOSE 15 16 17 ;::ove =bar countertop and cabinetry - DISPOSE �ve mirrors throughout entire condo including master and guest bathrooms - DISPOSE Remove base molding throughout entire condo - Door casing is stLDdnq Re Mtchen ceiling panels, drywall, and soffit finuning (1fapplicable depending an sprinklers) - $400.00 18 19 20 Remove Idtchen vmll- an area drywall Chip out Idtchen a-, 119 21 Remove gma�tpr sbower doors -DISPOSE R emove tudsting guest bathroom shower doors - DISPOSE Chip out master bath- Ristingtub Removee door at bath Chip out guest bathroom dry floor and existing shower Removealldoors DISPOSE 22 23 24 25 26 27 Remove wdsting r oset Contract Island Kitchen and Bath pg. 1 28 Remove FRENCH DOORS 29 Remove existing guest closer 30 Remove all above material and dispose �t__p Inspect all exposed plu;nbing electrical wit the walls - Due to upiated building codes, if Your unit is not updated/current to code, IXB is required to bring it up to code - 31 These costs are to be covered by the homeowner. 32 Reframe Idtchen Wall to counter height - 34 1/2 33 Reframe Iritchen walls and ceilings 34 Replace dry'wall where existing mirrors were 35 Install soffit into front omfbrA/C 36 install ductwork in Idtchen ceiling soffit 37 Build soffit in master bedroom (LED's will be installed) - even with crown $650.00 38 Raise ceiling in master bathroom 39 Install DenseShield in master bathroom show� 40 Install DenseShield in guest b Voin shower 41 Mud, finish and prime all walls and ceilings 42 Install 5 1/4 - base molding throughout entire condo approx. 270UL Inma 5 1/4; crown molding througliout entire �condo_approx22OLfftt crown to sttI t $750.00 43 A/C vents 44 $6SO.00 install four (4) large sliders intwo b"ackk bbedroom - 2 panel doors 45 Install one (1) Louver door for Ac closet $2,250.00 46 $450.00 Insual four (4) IouveI throughout entire condo @ $185 each $740.00 guest suite master bath and one (1) for the 47 48 $1,600.00 est bathroom one (1) for the back 0.00 705.00 $ )5.00 up waterline and hook up fridge 50 *FY*e has a separate ice maker that wig need to be histalled1hooked-up 51 !�!:Ij ;Ieratiir, �:: !!I washer, range, microwave, etc. *AppYance spec's have been provided to the Project Manager* 52 Install new front door and necessary hardware Install und -IRE I �� � i � � i II: : I 1 1 1 1! 11: : I 1 .11 nitenti re xi� Ic 1 1!:11:1: 1 ;:11: l�11:1 II: I I I: Oms) approx 1600 sqft �$550.00 53 @ $1.70 per sqfL 1:1:!i i � � � �: I :: � � � :1 13:11:1 :i 1 11 11 11: 1111 !1 tout I o approx. 1760sqfL (includes 10 % waste) Til $2,720.00 (actual 1600 sqfL). - Material - 24x24 @ $3.55 persqft - Layout - straight - Grout Color - Laticrete - Silver Shadow - 86 54 * Groutselections must befinalizedprior to signing the contract !:: I I I : I 1 1: 1 : I 'I � I 11 11 le approx 110 sqft (includes 10% waste) - To firchide to Tfle $6,248.60 front of bench seat - Material - @ $3.50 per sigt -Layout-Subway - Grout Color - Laticrete - Sfiver Shadow - 88 55 * Grout selection in ust befinalized prior to sign Lng the contract Tile in $385.00 B Install master baseboard approx. 18Lft 56 To 0 Is - Material - If a Promade baseb a= notojered we willfabricate out of thefloor tile. Tile �­­�Wdtieand 0(2) ers es $ $63.00 57 , -Location- rBD on site during the waflc-thrbugh Tile $2 0 00.00 Contract . Island Kitchen and Bath pg. 2 Insiall listello, approx 8sqft - Material - @ $22.50 per s* - Layout - 1'strip down the center wall 58 Tile $180.00 Install master wet shower floor in shower approx. 20 sqfL (includes comer seat) - Material - 4:x4 tumbled @ $1 ZSO per s* - Layout - Straight - Grout Color - Laticrete - Silver Shadow - 86 59 *Groutselections; must beflnalized prior to signing the contract, Tile $350.00 6 .0 Install master threshold - marble Tile $80.00 Install guest shower wall tile approx. 90sqft ��-d wainscoting �approy- 40sqfL wainscoting = 143sqfL (includes 10% waste) - - Material - Padron Floor - Brilliant White - 12x24 @ a5o persqft - Layout - SubwW - Grout Color - Laticrete - Silver Shadow - 33 61 * Groutselections must befinalized prior to signing the coruract Tile $442.00 Install guestbaseboard approx 121,ft 62 - Material - if a premade baseboard is not offered we willfabricate out of thefloor tile 71le $42.00 Install guest wet shower floor in shower approx. 17 sqfL - Ma terial - @ $1 Z 50 per sq#- -Liyout-S&a1ght - Grout color - Laticrew - Silver Shadow - 86 63 *.Groutselections must be final&ed prior to signing the contract 64 Install guest threshold - marble Tile $297.00 Install If go approx asq-ft F - - - - - - - Tile $80.00 - Material - lWT - Glass-Stime-Stainless Series - #45 Fassil Rock 65 - Layout - 1'strfP down the cen ter wall . Install Idtchen back­sp-1a-sh­appmx----� Tile $160.00 66 - Magerial - 8 !I 1 1!1 VIE I I I 15;1� 1111 1:1:!i I �:�: : : : � � � ::; �dardlmrel2adjustldil Tile $550.00 67 Ving -Layout-TBD onsitebetween the Project Manager and homeowner -�� bkiU1EU1rU lever L non-adjustable wood shelving in ballwiy —le ailing to the master $250.00 $850.00 above the washer and dryer. 68 -Layout- 7ND on site between the PM and the homeowner 69 Install standard level 2 adjustable wood shelvinjin linen —doset -g -tc -;�;ble -;TJusta;ie�ooEhelving $300.00 t-,e s 10 s e t 1, n -th 'sia n —da r —dI e v-e IT n-o n --a� wood shelving $200.00 70 -Layout- 7BD on site between the Project Manager and homeowner $150.00 $550.00 Install Idtchen cabinetry and side cabinets - Material - Wellborn Premier Series -36" uppers, simple riserfor crown and under cab molding, trash can Pullout wood tiered sihwware tray and cudery divider. * Note * Cabineby pricing Is based on the original signed 2020 designs and any changes 71 that are e may affect the pricing e ld:d n caomerrY nardware $1,450.00 $18,700.00 - Material --- 40pc.&, 72 * Hardware sizes to be confirmed before ordering. ii�A� master Camnetry $400.00 Material - Wellborn Premier Ser7es - Note * Cabineby pricing is based on the original signed 2020 designs and any changes 73 m ade in ay affect th e pricing of th e cabinem Install master cabinetry hardware $2;850.00 - Material - Hardware Resources - 8pcs 74 *Note*. -N $200.00 Contract I Island Kitchen and Bath pg- 3 76 77 Install guest cabluetry - Material - Milan MaPle Full Overlay in Cloud *Note * Cabinetry design has beenfinahzed Install guest cabmetry hardware -Material- -2pcs * Note * CabinetrY Pricing is based on the original signed 2020 designs and any changes made may affect the pricing of the cabinem $1,850.00 $50.00 counte r 112 ba Mt4 tL 'rial _ th 79 -Edye-!/4 E L Install eM $4,350.00 $4,900.00 80' - aterial-ChiefZ-105 Tnstallidtchenfauce Plum $350�00 . Monadal - 81 — — — — Install ten garbag—e _dispo­sa_1vA_th —pu—sh button to the right of �thefaucet Plum $370.00 82 - 73134A Install two (2) uride—rm—o—im—t v—abity Tsin—ks inm—aster �bath Plum $205.00 83 - Material- TWo (2) undermount rectangle sinks - Mite R� �ma�ur ba0"om vanity �fa uc, two (2) Plum $200.00 84 -Material- 85 Install waster shower Pan with slope Idt Plum 86 Install shower drain in master shower Plum &t all �maste r s ho �wer valve an �dd ive rt�er���� Plum $3S.00 - Material - 87 �jcat, on site during the walk-thro ugh Wr varve, diverter trim and Rainhead Plum $220.00 88 - Material- - Itstall master slideb Plum $350.00 89 -Material- Install Plum $255.06 - Material - Kohler Highline Comfort Hejght Elongated Bowl in White - 3658-0, withsoft- close lid-4636-0 90 Install one (1) undermount vanity sink in s bath �O Plum $325.00 91 _Matedal-One(l) undermOuntrectanglesink- White ng k 7faucet Plum $100.00 Eguest gu r guest bathroom vamty - quantity one (J.) 9 2 _M . Mateernial- te . dHEE 9 it 3 �11 Install guest shower Pan with slope Idt Plum $300.00 94 Install linear shower drain in guest shower Plum Install st Shower valve and diverter Plum $7S.00 - Material - Moen Posi-temp valve - 2520 - Moen diverter valve - 3372 95 - Location - 7RD On site during the walk-through Insta-, gu�� srLower VaLve, diverter trim and Rainhead Plum $220.00 - Material - Moen Pasi-temp valve trim - M711 - Moen diverter trim - TS4172 - Moen singlefunction Rainhead - S6340EP _L6_ Install guest slidebar wit—h h­a_nd­wand_- Plum $350.00 97 -Material- Install guest bathroom Plum $255.00 Material- Kohler Highline Comfort HeightElongated Bowl in White � 3658-0, with soft- close lid - 4636-0 1 98 Install washer and dryer - change valve box Pluml $325.00 99 -Location -In hallwa leadina into the master bedroom __n1_umF $250.00 Contract Island Vdtchen and Bath pg- 4 100 Install instant hot water heater W��switches and plugs �throughout condo * Outlet covers in bathrooms are to be mirror covers to blend in with the mirrors walls 101 around the vanity's 102 histall under cabinet ligh in kitchen - White 103 Install under cabinet plug strips - White/White Install four !Ij Ifili:11III:!, I !1�,Ijj ;ij �: I Z le chall, 11111 , . 111 1 l�: � ! ii-(2)mthemaster- (one (1) for the soffit to be located by the bed for soffit dinning room lighting) and one (1) in the 104 *Add a sivitch by the bed in the master lbr the soffit lighting. [10I ten (10) LED recessed lights throughout the kitchen @ $125 each - three (3) 105 above the sink one (1) in the front hall and six (6) throughout kitchen Insts.11 five (5) LED recessed lights in the soffit in the master bedroom @ $125 each 106 * To b e ivired to dim In er switch installed n ext to bed Install two (2) LED recessed If 108 109 II �Unmm, ywiu M ,50 6 124 md two (23 in the showe aust fan in master bathr rT4) LED 'recessed lightt, nd two (2) in the showe aust fan in guest bathroc ter frameless clear glass - One (I)ftxed Panel and st frarn Bless �shower doo - one(I)Ibredpaneland as when the Unit Is enrn, master - two C& $129 each n - existing a, guest - one (: @ $125 each one doors (material, fabrication, Installation) $6-800 Plank StYle. MasUr shower wall $1,800, Guest shower wall $1,750, r ,nn (labor & materia) - trim and ceiling is white, one (1) color TBD throughout ,.a. TOTAL LABOR / MATERIAL ALLOWANCE GRAND PROJECT ALLOWANCE Deposit $46,165 Draw #1 due once drywall is completed: $22,755 Draw #2 due once tile is completed: $22,755 Draw #3 due Once counter is templated: $22,755 ectl $750.001 $625.00 Contract Island Vitchen and Bath Pg. 5 Final Payment due upon completion: Remaining balance Commencement: Completion: TBD PAYMENT TERMS AND CONDMONS I.) Depositof cabinetry paid in fidl-plus 25% of the project A deposit checic� payable to Island Kitchen and Bath, is required for a project to be scheduled. Credit Cards are NOT accepted. Deposit checlss will notbe cashed until the project is about to commence. 1) Draws will be collected as needed to complete the project. If the client refuses to pay a draw, the projectwill be halted until payment is collected. 3.) Full payment of open balance within 3 days of completion of the projecL TERMS AND CONDMONS — The prices represented are based on project and product average costs. Prices my vary once project and product measureauents, details, and selections are made by client — ISLAND KITCHEN AND RATH will execute all work according to the Florida Building Code and is licensed in the state of Florida and is in good stOndhiga Time spent by the owners on the project is not a billable item. All work will be accordance with the scope of work detailed within the contract _ Due to unforeseeable conditions inside walls, behind cabinets, etc- additional cost may occur during mnstruction for issues such as mold, and existing plumbingt electrical not being safe or code compliant These additional costs we NOT included in my contract pricing and will be dealt With W needed. This contract does NOT account for product defects or product backorder. These issues may affect the project timeline, and wJII he dealtwith as needed. — Any changes requested by the client after the original contract is signed, will result in a change order. Change orders will affect the project timelme and are an additional cost to the original contract pricing A change order will result in a separate fee of $100 per change order, in addition to the total cost of the Change order. Change Orders must be signed, and paid immediately and separately from the original contract pricin& — All selections must be made at the time of the contract unless otherwise stated, such as. To Be Decided (TBD) or Supplied by Owner (SRO). If there is not a selection staW, TBD, or SBO then we cannot promise the prim written within the contram . — It is the clienes responsibility to provide all additional information that may be needed for the project. Such as� appliance specificatlow, all SBO material, et, if my inmMct Information is provided by the client Island Kitchen and Bath is NOT responsible for my additional cost or time that may occor from this error. — Insurance Agent 4 Corners Insumvice-Stuart — License Holder. Justin Thiery — License Number. CBC 1259508 Date_ Date IK13 Contract Island Kitchen and Bath pg. 6