HomeMy WebLinkAboutMISCI— . N
Ultra Large Capacity Stearnl)ryer� wif NFC �iag On
ALWAYS STAY EFFICIENT
Efficiency can mean a lot nowadays, and this dryer knows it.
Its ultra large capacity will handle extra -large loads, so you
finish your laundry faster. The Intelligent Electronic Controls
with Dual LED Display make it easier to get the settings right,
so you can just "set it and go' Plus, the Sensor Dry System
will detect the level of moisture in the fabric and automatically
adjust drying time and temperature. If you appreciate efficiency,
so does this dryer.
SPECIFICATIONS
INNOVATIONS
* 7.4 cv. ft. Ultra Capacity Wth
TrueSbeaml- Technology
Alcosta Steel Drum
SteamFmShT. Cycle
* 12 Drying Programs
SteamSanitary� Cycle
* 5 Temperature Settings
ReduceStabc� Option
EasylmrP Option
Sensor Dry System
STYLISH DESIGN
Precise Temperature Control
• Upfront Electronic Control Panel Mth
with Variable Heat Souce
Dual LED Display and Dial-A-Cycle�
LoDecibell- Quiet Operation
• Large Chrome Rimmed Glass
NFC Tag On
Door Wth Dark Blue Tinted Cover
SmartDiaqnosW-
Reversible Door
3 Minute Installation Check
Stackable with Matching Washer
FlowSenseni Duct Clogging Indicator
(Stacking l(it sold separately)
Wrinkle Cam option
Optional Matching,Drawer Pedestal
Anti -Bacterial Cycle
Damp Dry Signal
SCANNED
BY
St. Lucie County
SMART
DLAGNOSIS�
TRO n
No I,)& �P. 7* /00�
� 4� :q
CAPACITY
APPEARANCE
lWre1i(g'o'Bectmr1C Controls with Dual LED Display
DRYING PROGRAMS
am,
nsorDry) CotomrNomal'psrm'Pres%F-;LtDekiq
Pr.g.ots(m.romary) SpeedDyArD,
Optmms W,
MoraTime. LessTims, Custom program Damp DrySuiral W
-Cold Lott, iiodv�oStapC-, E6yllmi-.-Rack Dry End . ;f LhkloCanc,
I
4
yingLeuds ve ss D
"�;mw
FABRIC CARE FEATURES
do
'a
.s;p'se:'Ptum
pne'is'T�;ol-wrt Cbmin-l-nd Variable H,.ttr
af . . . . ..
LIS Electronics U.S.A., Inc.
1000 Sylvan Avenue Englewood Ofiffs, NJ 07632
Customer Service end Technical Support. (800) 243-0000
Mcom
MATERIALS AND FINISHES,
T I Plate
aD --o
AvaJ
POWER SOURCE
.1n
Elear,.l Peru rements
ET 12OX 15 Amps (Gas) I 240V� 30 Amps (Eleamd
11Z.L M
OPTIONS
p 27"X133Wx28215'
El TE 7-27 A"jFq
LP Conversion Kit
it
d;
r 383EEL30020
DIMENSIONS
VrxI
'jJ
N.-
� I M ,
Car= (vin,H.D) 29 1n'x421/4-x3ll/4-
LIMITED WARRANTY
OT�
ElW= n"L
lgg(
UPCCODES
OPn..l —�urs pod.�Wt'.Id om.f,
(D2014LGEt��n,.USA,I..AUdght,,.,�d.�GLil�.G���l,i�ed�d�.�.fLGC�,N[
other praductand brand morres.r. mdenowni.rneisterd Uaderveris, aftheirrespettive co-parent.4110114
18 INSTALLATION
Venting the Dryer
7AWARNING
To reduce the risk of fire or explosion, electric
shock, property damage, injury to persons or
death when using this appliance, follow basic
safety Precautions, includl ' ng the following:
• Do not crush or collapse ductwork.
• Do not allow ductwork to rest on or contact sharp
objects.
• If connecting to existing ductwork, make sure it is
suitable and clean before installing the dryer.
• Venting must conform.to local, building -codes.
• Gas dryers MUST exhaust to the outdoors. I
4, Use only 4-inch (10.2 cm) rigid, semi -rigid o
flexib le metal ductwork inside the dryer cabinet /Y
and for venting outside.
To reduce the risk of fire, combustion, or
accumulation of combustible gases, DO
NOT exhaust dryer air into an enclosed and
unventilated area, such as an attic, wall, ceili�g
crawl space, chimney, gas vent, or concealed
space of a building.
-To reduce the risk of fire, DO NOT exhaust tf
dryer with plastic or thin foil ducting,
• The exhaust duct must be 4-inch (10.2 cm) in
diameter with no obstructions. The exhaust duc t
should be kept as short as possible. Make sure �
to clean any old ducts before Installing your new\
dryer.
• Rigid, semi -rigid or flexible metal ducting is
recommended for use between the dryer and
the wall. All non -rigid metal transition duct must
be UL-listed. Use of other materials for transition
duct Could affect drying time.
• DO NOT use sheet metal screws or other
fasteners which extend into the duct that could
catch lint and reduce the efficiency of the
exhaust system. Secure all joints with duct tape.
• Do not exceed the recommended duct length
limitations noted in the chart. Failure to follow
these instructions may result in extended dr
times, fire or death.
AWARNING
Ductwork is not Provided with the dryer. You
shoufd obtain the necessary ductwork locally.
The vent hood should have hingei!tdempers to
prevent backdEaftwhei7-th4--drvP.r.i.q nnt',In im.
*The totaIJ'e7n-gtrof flexible metal
exre4d' 811 (2.4 m).
X
WR
i mmax n'tol
nomg,
y, ff
e Nil
Recommended
0
b5 ft.(19.8 M)
C
55 ft.(16.8 m)
2
R.(14.3 m)
3
t47
36 ft.(11.0 m)
a: 4" (10.2 cm)
4
28 ft.(8.5 m)
'5 m)
Use only for short
0
-
6.8 rn)
55 ft.(11_
1
-
47 ft.(14.3 m
run installations
C
2
ft. (1
\Z�b: 2.5"
3
30 ft.(d /M)
" '�l
(6.35 crn)
4
----"22ftg(6.7 m)
NOTE
Deduct 6 ft. (1�8 M) for each additional elbow. Do
not use more than four 90' elbows.
*In 2nada, only those foil -type flexible ducts, if any,
specifica IY identified for use with the appliance by
the manufacturer should be used. In the United
States, only those foil -type flexible ducts, if any,
specifically identified for use with the appliance by
the manufacturer and that comply with the Outline
for Clothes Dryer Transition Duct, Subject 2158A,
should be used.
mix ov� A��
SCANNED
BY
St. Lucie County
CHANGE ORDER
Full Condo Renovations October 4, 2019
Joann & Robert Caputo, ,'#00t
i.com - ro
203-650-6413 - j6caputS122@gnia I ber�caputo@rne.�dni
4500S Ocean Dr�v
e, nit 1006, j6n�eh Beach;FL 34957
.4
-Proiect#:,1909�0-rlslanA!all-1006-Canift�-
0
n R�'
nbract.#00,1- I I lftfe7i I left;,84- IfistantliotWater Heater
_QQLM- heaterdub to not'meeimb the electrical load cidcula
water tioni- keeping the
Ce?-h&dter'-
a- —1
rt
_16
, 4
A
TOTAL CHANGE ORDER C_
TERMS AND CONDITIONS
-Change Orden are to be paid in full within ten (10) days of initial request, failure to do so may result in all work coming to a halt until payment
is received.
- Change Order amounts are transferred to the initial invoice, this is for documentation purposes.
- The above Change Order shall be performed under the same conditions as specified in the existing contract. Change orders may affect the
project timeline and are an additional cost to the original contract pricing. Your signature below signifies your agreement and approval of this
change order.
M-ake.all checks 0ayable to Island Kitchen and Biiih --- THANK YOU FOR YOUR 9US1_N'9S§i'
1
BY V�Lj k'all Condo Renovations Jairdary 29,2018
Joann & Robert Caputo #001
'S t. LU Cie CO U 19tWO S. Ocean Drive, Unit 1006, Jensen Beach, Fl. 349 5 7
203-650-6413
I
2
3
Permit Cost - notice Of commencement, building permit NOC termination and IKB time
pricingvaries and --n- I until after all Paperwork is filed
Purchase an general rebuild material
Disconnect any remaining window mtments throughout condo and DISPOSE
Disconnect all idchen appliances - rairl gerator, dishwasher, range, crowave� etc
DISPOSE raj
* Homeowner has supplied the showroom with all ofthe appliance spec -a
Bisconneci; wasner and dryer - DlSP6S_E
*11onzeowner hassuppiled the showroom with all of the appliance spec,&
Disconnect emsting latchen ceilings lights _ DISPOSE
-
TBD
$2.500.00
4
5
6
k2__
Disconnect all electrical Plugs/switches throughout condo
Disconnect all bedroomoi!qm room ceilings hans - DISPOSE
k9
�DL coZ ister bathroom faucet, s and toilet - DISPOSE
- _'scon= guest bathroom faucet, sink and toilet - DISPOSE
-
11
Remove edsting chen countertop and cabinetry - DISPOSj
12
13
Remove ceiling to max keight in master bath and master closet
Remove eidsting master bathroom coUntertop and cabinetry - DISPOSE
si,�500.0
14
Remove e3risting guest bathroom countertop and cabinetry - DISPOSE
15
16
17
;::ove =bar countertop and cabinetry - DISPOSE
�ve mirrors throughout entire condo including master and guest
bathrooms - DISPOSE
Remove base molding throughout entire condo - Door casing is stLDdnq
Re Mtchen ceiling panels, drywall, and soffit finuning (1fapplicable depending an
sprinklers)
-
$400.00
18
19
20
Remove Idtchen vmll- an area drywall
Chip out Idtchen a-, 119
21
Remove gma�tpr sbower doors -DISPOSE
R emove tudsting guest bathroom shower doors - DISPOSE
Chip out master bath- Ristingtub
Removee door at bath
Chip out guest bathroom dry floor and existing shower
Removealldoors DISPOSE
22
23
24
25
26
27
Remove wdsting r oset
Contract Island Kitchen and Bath pg. 1
28
Remove FRENCH DOORS
29
Remove existing guest closer
30
Remove all above material and dispose �t__p
Inspect all exposed plu;nbing electrical wit the walls - Due to upiated building
codes, if Your unit is not updated/current to code, IXB is required to bring it up to code
-
31
These costs are to be covered by the homeowner.
32
Reframe Idtchen Wall to counter height - 34 1/2
33
Reframe Iritchen walls and ceilings
34
Replace dry'wall where existing mirrors were
35
Install soffit into front omfbrA/C
36
install ductwork in Idtchen ceiling soffit
37
Build soffit in master bedroom (LED's will be installed) - even with crown
$650.00
38
Raise ceiling in master bathroom
39
Install DenseShield in master bathroom show�
40
Install DenseShield in guest b Voin shower
41
Mud, finish and prime all walls and ceilings
42
Install 5 1/4 - base molding throughout entire condo approx. 270UL
Inma 5 1/4; crown molding througliout entire �condo_approx22OLfftt crown to sttI t $750.00
43
A/C vents
44
$6SO.00
install four (4) large sliders intwo b"ackk bbedroom - 2 panel doors
45
Install one (1) Louver door for Ac closet $2,250.00
46
$450.00
Insual four (4) IouveI throughout entire condo @ $185 each
$740.00
guest suite
master bath and one (1) for the
47
48
$1,600.00
est bathroom one (1) for the back 0.00
705.00
$ )5.00
up waterline and hook up fridge
50
*FY*e has a separate ice maker that wig need to be histalled1hooked-up
51
!�!:Ij ;Ieratiir, �:: !!I washer, range, microwave, etc.
*AppYance spec's have been provided to the Project Manager*
52
Install new front door and necessary hardware
Install und -IRE I �� � i � � i II: : I
1 1 1 1! 11: : I 1 .11 nitenti re xi� Ic 1 1!:11:1: 1 ;:11: l�11:1 II: I I I: Oms) approx 1600 sqft
�$550.00
53
@ $1.70 per sqfL
1:1:!i i � � � �: I :: � � �
:1 13:11:1 :i 1 11 11 11: 1111 !1 tout I o approx. 1760sqfL (includes 10 % waste)
Til
$2,720.00
(actual 1600 sqfL).
- Material - 24x24 @ $3.55 persqft
- Layout - straight
- Grout Color - Laticrete - Silver Shadow - 86
54
* Groutselections must befinalizedprior to signing the contract
!:: I I I : I 1 1: 1 : I 'I � I 11 11 le approx 110 sqft (includes 10% waste) - To firchide to
Tfle
$6,248.60
front of bench seat
- Material - @ $3.50 per sigt
-Layout-Subway
- Grout Color - Laticrete - Sfiver Shadow - 88
55
* Grout selection in ust befinalized prior to sign Lng the contract
Tile
in
$385.00
B
Install
master baseboard approx. 18Lft
56
To
0 Is
- Material - If a Promade baseb a= notojered we willfabricate out of thefloor tile.
Tile
��Wdtieand 0(2) ers es
$
$63.00
57 ,
-Location- rBD on site during the waflc-thrbugh
Tile
$2 0
00.00
Contract . Island Kitchen and Bath pg. 2
Insiall listello, approx 8sqft
- Material - @ $22.50 per s*
- Layout - 1'strip down the center wall
58
Tile
$180.00
Install master wet shower floor in shower approx. 20 sqfL (includes comer seat)
- Material - 4:x4 tumbled @ $1 ZSO per s*
- Layout - Straight
- Grout Color - Laticrete - Silver Shadow - 86
59
*Groutselections; must beflnalized prior to signing the contract,
Tile
$350.00
6 .0
Install master threshold - marble
Tile
$80.00
Install guest shower wall tile approx. 90sqft ��-d wainscoting �approy- 40sqfL
wainscoting = 143sqfL (includes 10% waste) -
- Material - Padron Floor - Brilliant White - 12x24 @ a5o persqft
- Layout - SubwW
- Grout Color - Laticrete - Silver Shadow - 33
61
* Groutselections must befinalized prior to signing the coruract
Tile
$442.00
Install guestbaseboard approx 121,ft
62
- Material - if a premade baseboard is not offered we willfabricate out of thefloor tile
71le
$42.00
Install guest wet shower floor in shower approx. 17 sqfL
- Ma terial - @ $1 Z 50 per sq#-
-Liyout-S&a1ght
- Grout color - Laticrew - Silver Shadow - 86
63
*.Groutselections must be final&ed prior to signing the contract
64
Install guest threshold - marble
Tile
$297.00
Install If go approx asq-ft F - - - - - - -
Tile
$80.00
- Material - lWT - Glass-Stime-Stainless Series - #45 Fassil Rock
65
- Layout - 1'strfP down the cen ter wall
.
Install Idtchen backsp-1a-shappmx----�
Tile
$160.00
66
- Magerial - 8
!I 1 1!1 VIE I I I 15;1� 1111
1:1:!i I �:�: : : : � � � ::; �dardlmrel2adjustldil
Tile
$550.00
67
Ving
-Layout-TBD onsitebetween the Project Manager and homeowner
-�� bkiU1EU1rU lever L non-adjustable wood shelving in ballwiy —le
ailing to the master
$250.00
$850.00
above the washer and dryer.
68
-Layout- 7ND on site between the PM and the homeowner
69
Install standard level 2 adjustable wood shelvinjin linen —doset
-g -tc -;�;ble
-;TJusta;ie�ooEhelving
$300.00
t-,e s 10 s e t 1, n -th 'sia n —da r —dI e v-e IT n-o n --a�
wood shelving
$200.00
70
-Layout- 7BD on site between the Project Manager and homeowner
$150.00
$550.00
Install Idtchen cabinetry and side cabinets
- Material - Wellborn Premier Series -36" uppers, simple riserfor crown and under cab
molding, trash can Pullout wood tiered sihwware tray and cudery divider.
* Note * Cabineby pricing Is based on the original signed 2020 designs and any changes
71
that are e may affect the pricing
e
ld:d n caomerrY nardware
$1,450.00
$18,700.00
- Material --- 40pc.&,
72
* Hardware sizes to be confirmed before ordering.
ii�A� master Camnetry
$400.00
Material - Wellborn Premier Ser7es -
Note * Cabineby pricing is based on the original signed 2020 designs and any changes
73
m ade in ay affect th e pricing of th e cabinem
Install master cabinetry hardware
$2;850.00
- Material - Hardware Resources - 8pcs
74
*Note*.
-N
$200.00
Contract I Island Kitchen and Bath pg- 3
76
77
Install guest cabluetry
- Material - Milan MaPle Full Overlay in Cloud
*Note * Cabinetry design has beenfinahzed
Install guest cabmetry hardware
-Material- -2pcs
* Note * CabinetrY Pricing is based on the original signed 2020 designs and any changes
made may affect the pricing of the cabinem
$1,850.00
$50.00
counte r
112 ba
Mt4
tL
'rial _ th
79
-Edye-!/4 E L
Install eM
$4,350.00
$4,900.00
80'
- aterial-ChiefZ-105
Tnstallidtchenfauce
Plum
$350�00
. Monadal -
81
— — — —
Install ten garbag—e _disposa_1vA_th —pu—sh button to the right of �thefaucet
Plum
$370.00
82
- 73134A
Install two (2) uride—rm—o—im—t v—abity Tsin—ks inm—aster �bath
Plum
$205.00
83
- Material- TWo (2) undermount rectangle sinks - Mite
R� �ma�ur ba0"om vanity �fa
uc, two (2)
Plum
$200.00
84
-Material-
85
Install waster shower Pan with slope Idt
Plum
86
Install shower drain in master shower
Plum
&t all �maste r s ho �wer valve an �dd ive rt�er����
Plum
$3S.00
- Material -
87
�jcat, on site during the walk-thro ugh
Wr varve, diverter trim and Rainhead
Plum
$220.00
88
- Material-
-
Itstall master slideb
Plum
$350.00
89
-Material-
Install
Plum
$255.06
- Material - Kohler Highline Comfort Hejght Elongated Bowl in White - 3658-0, withsoft-
close lid-4636-0
90
Install one (1) undermount vanity sink in
s bath
�O
Plum
$325.00
91
_Matedal-One(l) undermOuntrectanglesink- White
ng k
7faucet
Plum
$100.00
Eguest
gu r
guest bathroom vamty - quantity one (J.)
9 2
_M
. Mateernial-
te . dHEE
9 it
3
�11
Install guest shower Pan with slope Idt
Plum
$300.00
94
Install linear shower drain in guest shower
Plum
Install st Shower valve and diverter
Plum
$7S.00
- Material - Moen Posi-temp valve - 2520 - Moen diverter valve - 3372
95
- Location - 7RD On site during the walk-through
Insta-, gu�� srLower VaLve, diverter trim and Rainhead
Plum
$220.00
- Material - Moen Pasi-temp valve trim - M711 - Moen diverter trim - TS4172 - Moen
singlefunction Rainhead - S6340EP
_L6_
Install guest slidebar wit—h ha_ndwand_-
Plum
$350.00
97
-Material-
Install guest bathroom
Plum
$255.00
Material- Kohler Highline Comfort HeightElongated Bowl in White � 3658-0, with soft-
close lid - 4636-0
1
98
Install
washer and dryer - change valve box
Pluml
$325.00
99
-Location -In hallwa leadina into the master bedroom
__n1_umF
$250.00
Contract Island Vdtchen and Bath pg- 4
100 Install instant hot water heater
W��switches and plugs �throughout condo
* Outlet covers in bathrooms are to be mirror covers to blend in with the mirrors walls
101 around the vanity's
102 histall under cabinet ligh in kitchen - White
103 Install under cabinet plug strips - White/White
Install four !Ij Ifili:11III:!, I !1�,Ijj ;ij �: I Z
le chall, 11111
, . 111 1 l�: � ! ii-(2)mthemaster-
(one (1) for the soffit to be located by the bed for soffit
dinning room lighting) and one (1) in the
104 *Add a sivitch by the bed in the master lbr the soffit lighting.
[10I ten (10) LED recessed lights throughout the kitchen @ $125 each - three (3)
105 above the sink one (1) in the front hall and six (6) throughout kitchen
Insts.11 five (5) LED recessed lights in the soffit in the master bedroom @ $125 each
106 * To b e ivired to dim In er switch installed n ext to bed
Install two (2) LED recessed If
108
109
II
�Unmm,
ywiu M
,50 6
124
md two (23 in the showe
aust fan in master bathr
rT4) LED 'recessed lightt,
nd two (2) in the showe
aust fan in guest bathroc
ter frameless clear glass
- One (I)ftxed Panel and
st frarn Bless �shower doo
- one(I)Ibredpaneland
as when the Unit Is enrn,
master - two
C& $129 each
n - existing a,
guest - one (:
@ $125 each
one
doors (material, fabrication, Installation)
$6-800 Plank StYle. MasUr shower wall $1,800, Guest shower wall $1,750,
r
,nn
(labor & materia) - trim and ceiling is white, one (1) color TBD throughout
,.a.
TOTAL LABOR / MATERIAL ALLOWANCE
GRAND PROJECT ALLOWANCE
Deposit $46,165
Draw #1 due once drywall is completed: $22,755
Draw #2 due once tile is completed: $22,755
Draw #3 due Once counter is templated: $22,755
ectl $750.001
$625.00
Contract Island Vitchen and Bath Pg. 5
Final Payment due upon completion: Remaining balance
Commencement:
Completion: TBD
PAYMENT TERMS AND CONDMONS
I.) Depositof cabinetry paid in fidl-plus 25% of the project A deposit checic� payable to Island Kitchen and Bath, is required for a project to be
scheduled. Credit Cards are NOT accepted. Deposit checlss will notbe cashed until the project is about to commence.
1) Draws will be collected as needed to complete the project. If the client refuses to pay a draw, the projectwill be halted until payment is
collected.
3.) Full payment of open balance within 3 days of completion of the projecL
TERMS AND CONDMONS
— The prices represented are based on project and product average costs. Prices my vary once project and product measureauents, details, and
selections are made by client
— ISLAND KITCHEN AND RATH will execute all work according to the Florida Building Code and is licensed in the state of Florida and is in good
stOndhiga Time spent by the owners on the project is not a billable item. All work will be accordance with the scope of work detailed within the
contract
_ Due to unforeseeable conditions inside walls, behind cabinets, etc- additional cost may occur during mnstruction for issues such as mold, and
existing plumbingt electrical not being safe or code compliant These additional costs we NOT included in my contract pricing and will be dealt
With W needed. This contract does NOT account for product defects or product backorder. These issues may affect the project timeline, and wJII
he dealtwith as needed.
— Any changes requested by the client after the original contract is signed, will result in a change order. Change orders will affect the project
timelme and are an additional cost to the original contract pricing A change order will result in a separate fee of $100 per change order, in
addition to the total cost of the Change order. Change Orders must be signed, and paid immediately and separately from the original contract
pricin&
— All selections must be made at the time of the contract unless otherwise stated, such as. To Be Decided (TBD) or Supplied by Owner (SRO). If
there is not a selection staW, TBD, or SBO then we cannot promise the prim written within the contram .
— It is the clienes responsibility to provide all additional information that may be needed for the project. Such as� appliance specificatlow, all
SBO material, et, if my inmMct Information is provided by the client Island Kitchen and Bath is NOT responsible for my additional cost or
time that may occor from this error.
— Insurance Agent 4 Corners Insumvice-Stuart — License Holder. Justin Thiery — License Number. CBC 1259508
Date_ Date
IK13
Contract Island Kitchen and Bath
pg. 6