HomeMy WebLinkAboutHVAC LOAD CALCULATIONSFile Copy
SCANNED
BY
St. Lucie County
Harbour Ridge REM-ENC 13468 SEP 2 4 "un19
HVAC Load Calculations I ST. Lucie County, Permitting
for
Harbour Ridge POA
13468 HARBOUR RIDGE BLVD 2A
PALM CITY, FLORIDA 34990
SHGC WARNING:
The window performance values consist of the u•factor for the frame,
and Solar Heat Gain Coefficient (SHGC) for the glass. These values have
a huge Impact on the building thermal envelop and may have a significant
impact on the following:
• the size of the HVAC system(s), $$$
• the duct work layout and design, $$
• delays with permitting, $$$$
• Inspector comments or failed Inspections $$
It is important to us that your project stay on schedule and if there are
any changes to the design base it may impact any of the bullet points
above. KO Enemy Design must be contacted Immediately at
Info(dkoenemydesign.com or (5611327-7272 to help support any
changes to your pmject information.
Prepared By:
Karen Oliver
KO Energy Design
1470 N Congress Ave, Ste 106A
West Palm Beach, FL
561-327-7272
Wednesday, September4, 2019
Rhvac is an ACCA approved Manual J, D and S computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
Rhvac - Residential &Light Commercial HVAC Loads - Elite Software Development, Inc..
KO Enerciv Design LLC ' Harbour Rldge: REM-ENC 13468'
Pro'ect Report
'GeneralPro'ectlnfoRnahon
Project Title: Harbour Ridge REM-ENC 13468
Designed By: Karen Oliver
Project Date: Wednesday, July 3, 2019
Client Name: Harbour Ridge PDA
Client Address: 13468 HARBOUR RIDGE BLVD 2A
Client City: PALM CITY, FLORIDA 34990
Company Name: KO Energy Design
Company Representative: Karen Oliver
Company Address: 1470 N Congress Ave, Ste 106A
Company City: West Palm Beach, FL
Company Phone: 561-327-7272
Company E-Mail Address: info@koenergydesign.com
Company Website: www.koenergydesign.com
�'D inData
Reference City: Fort Pierce, Florida
Building Orientation: Front door faces East
Daily Temperature Range: Medium
Latitude: 27 Degrees
Elevation: 25 ft.
Altitude Factor: 0.999
Outdoor Outdoor Outdoor Indoor Indoor Grains
Dry Bulb Wat Bulb RAI. ium Rel-Hurn Dry Bulb Difference
Winter: 42 39.4 n/a n/a 70 n/a
Summer: 90 78 59% 50% 75 61
Chea . i ur
Total Building Supply CFM: 1,554 CFM Per Square ft.: 0.889
Square ft. of Room Area: 1,749 Square ft. Per Ton: 533
Volume (ft'): 14,551
. -
Buildin toads �, "4� � ,. rs'� � �' *�,: .:�:,° nri�',ti, Aty,
Total Heating Required Including Ventilation Air: 27,293 Btuh 27.293 MBH
Total Sensible Gain: 34,163 Btuh 87 %
Total Latent Gain: 5,203 Btuh 13 %
Total Cooling Required Including Ventilation Air: 39,366 Btuh 3.28 Tons (Based On Sensible + Latent)
c Notes .V. �,�*.�.,:.i,..',Wtw�i:'t=4'''1:.'O.,r': v7-7
Rhvac is an ACCA approved Manual J, D and S computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
your design conditions.
CA ... \13468 Harbour Ridge Blvd-MJ.rh9 Wednesday, September 4, 2019, 3:35 PM
Rhvac Reeidential 8 Light Commercial HVAC Loads r i 1 ''4 x * Elite Software Development' Inc.;
'KO ;.,arbour,Ridge R,EMrrENC 13468!
Enerr'gVADesiQl,
.. ..
z sne
Load Preview Report
Ne
ft.
Be
La
Ne
Sen
H g
Clg
A
Duc
Scope
To
/To
Are
Gai
Gal
GaI
Loss
CFM
CFM
CFM
Siz
Build! 3.28 533
1,749 34,163
5,203
27,293 355 1,554 1,554
-no
Svstem 1 3.28 533
1,749 34,163
_39,366
6,203 39,366
27,293 355SM 1,554 0'
Supply Duct Latent
1,282 1,282
Zane 1
1,749 34,163
3,921 38,084
27,293 355 1,554
1-Existing
1,559 21,205
3,004 24,209
15,931 _ 207M 965 4-0
2-Back Enclosure
122 91015
474 9,489
6,400 83 M 410 _2-0
_
3-Front Enclosure
6S 3,942
_
443 4.385
4,962 65M, 179 1-0
CA ... \13468 Harbour Ridge Blvd-MJ.rh9 Wednesday, September 4, 2019, 3:35 PM
.�._
�Rhvac Residential'& LightCom-m-ercial HVAC Loads'
KO`
�
_ -- r3 -
Elite�Software Devetopmlin;llnc ,,
Harbour Ridge REMtEN13i468,�
Enemv Design LLG11F
,.
Duct Size Preview
Room or
Source
Minimu
Maxim
Rough
Desig
SIR
Du
Duc
H(q
Clg
Act
Duct
Duct Name
Vela
Veloci
Faclo
LI10
Loss
Velod
Lengsize
System 1
Supply Runouts
`
Zone 1
1-Existing
Built -In 0
0 0.003
0.1
0
207� 965
2-Back Enclosure
Built -In 0
0 0.003
0.1
0
83® 410. 2
_
3-Front Enclosure
Built -In 0'
0 0.003
0.1
0
65 17 0 179. '1—
Other Ducts in System 1
Supply Main Trunk
Built -In 0,
0 0.003
0.12
0
3551IM5 1,554 0
Summary
SVSteM 1
Heatinq Flow: 355
Coolina Flow: 1554
CA ... \13468 Harbour Ridge Blvd-MJ.rh9 Wednesday, September 4, 2019, 3:35 PM
Rhvac - Residential B.Light Commercial HVAC Loads - -
Elite .Software Development Inc.
KO Enemv Design LLC
�.
,Harbour Ridge: REM-ENC: 13468Wesf
Palm Beach, FL 33411
Page 51
Total Building Summaty Loads
ComponentW ti a Y"-' axle ` " ` 'Area
rl�F
Sen
Lya�t^ $enz Total;
Descn lion P-3ts c<<.t . �,.
P
r , .. uan
oss,
. Gain
G _inzr.Galnl
STT1: Glazing single tint, U value 0 99, SHGC 0.51
81.3
2,254
0
4,590 4,590
1A-hw-o: Glazing -Single pane, operable window, heat-
70.2
1,770
0
1,657 1,657
absorbing, wood frame, U-value 0.9, SHGC 0.48
NSISGD770: Glazing-NSI Windows & Doors SDG770
113.7
3,533
0
5,878 5,878
Gray Tint, U-value 1.11, SHGC 0.43
sgd770-55: GlazingSGD - Bronze, U-value 1.11, SHGC
80
2,486
0
2,090 2,090
0.45
11 D: Door -Wood - Solid Core, U-value 0.39
20
219
0
203 203
13A-5ocs: Wall -Block, board insulation only, R-5 board
991.6
3,472
0
1,896 1,896
Insulation, open core, siding finish, U-value 0.125
12E-Osw: Wall -Frame, R-19 insulation in 2 x 6 stud
30.3
58
0
36 36
cavity, no board insulation, siding finish, wood studs,
U-value 0.068
16E-30: Roof/Ceiling-Under Attic with Insulation on Attic
1582.6
1,418
0
1,266 1,266
Floor (also use for Knee Walls and Partition
Ceilings), Vented Attic, No Radiant Barrier, Light Tile,
Slate or Concrete, R-30 insulation, U-value 0.032
1613-19: Roof/Ceiling-Under Attic with Insulation on Attic
190
260
0
466 466
Floor (also use for Knee Walls and Partition
Ceilings), Vented Attic, No Radiant Barrier, Dark
Asphalt Shingles or Dark Metal, Tar and Gravel or
Membrane R-19 insulation U-value 0.049
Subtotals for structure:
15,470
0
18,082 18,082
People:
4
800
920 1,720
Equipment:
0
4,500 4,500
Lighting:
0
0 0
Ductwork:
7,420
1,282
4,560 5,843
Infiltration: Winter CFM: 143, Summer CFM: 75
4,403
3,121
1,239 4,360
Ventilation: Winter CFM: 0, Summer CFM: 0
0
0
0 0
AED Excursion:
0
0
4.861 4 861
Total Building Load Totals:
27,293
5,203
34,163 39,366
Check,Fi tires ";::, tu,
t..i,, aS1 a.
4f". %�kNuk�`„fir
w.
:h v„+
Total Building Supply CFM: 1,554
CFM Per Square ft.:
0.889
Square ft. of Room Area: 1,749
Square ft. Per Ton:
533
Volume (W): 14,551
Buildin-Loads'-:ruf`. pie' �'Hc r,1aiti",.''fi,'.r
.',':
Total Heating Required Including Ventilation Air:
27,293 Btuh
27.293
MBH
Total Sensible Gain:
34,163 Btuh
87
%
Total Latent Gain:
6,203 Btuh
13
%
Total Cooling Required Including Ventilation Air:
39,366 Btuh
3.28
Tons (Based On
Sensible + Latent)
I'Not 5.. .'_ .`..; �tU w ,7l �;,;},� ,�, ,,:-:,
f-yxL ._ '
•., _ ,..,.:_
:,...y.�+`33y,J
Rhvac is an ACCA approved Manual J, D and S computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent
loads according to the manufacturer's performance data at
your design conditions.
C:\ ... \13468 Harbour Ridge Blvd-MJ.rh9 Wednesday, September 4, 2019, 3:35 PM
Wall 13%
Glass 37%
Glass 36%
Roof 6%
oof 4%
Wall
Infiltration 16%
Ductwork 27%
Door 1 %
AED Excursion 12%
Infiltration 11 %
Ductwork 15%
Door 1 % Equipment 11 %
People 4%
CA ...%13468 Harbour Ridge Blvd-MJ.rh9 Wednesday, September 4, 2019, 3:35 PM
Rhvac - Residential $Light Commercial HVAC Loads �pp
"KO Enerav'Deslpn LLO 7�54, .
Elite. Software Development, Inc.
Harbour Ridpe REM-ENC' 13468
System 1 System #1 Summa Loads
Comporiont,,w. �� }u"Area "-
escri t'on " `" * • ' ad, „, �- a' u n
Seng' Lot '
oss SGain M
Se,n� ` wTotaf
Gai4n . ain
STT1: Glazing -single tint, U-value 0.99, SHGC 0.51 81.3
2,254
0
4,590
4,590
1A-hw-o: Glazing -Single pane, operable window, heat- 70.2
1,770
0
1,657
1,657
absorbing, wood frame, U-value 0.9, SHGC 0.48
NSISGD770: Glazing-NSI Windows i£ Doors SDG770 113.7
3,533
0
5,878
5,878
Gray Tint, U-value 1.11, SHGC 0.43
sgd770-55: Glazing-SGD - Bronze, U-value 1.11, SHGC 80
2,486
0
2,090
2,090
0.45
11 D: Door -Wood - Solid Core, U-value 0.39 20
219
0
203
203
13A-5ors: Wall -Block, board insulation only, R-5 board 991.6
3,472
0
1,896
1,896
Insulation, open core, siding finish, U-value 0.125
12E-Osw: Wall -Frame, R-19 insulation in 2 x 6 stud 30.3
58
0
36
36
cavity, no board insulation, siding finish, wood studs,
U-value 0.068
16E-30: Roof/Ceiling-Under Attic with Insulation on Attic 1582.6
1,418
0
1,266
1,266
Floor (also use for Knee Walls and Partition
Ceilings), Vented Attic, No Radiant Barrier, Light Tile,
Slate or Concrete, R-30 insulation, U-value 0.032
16B-19: Roof/Ceiling-Under Attic with Insulation on Attic 190
260
0
466
466
Floor (also use for Knee Walls and Partition
Ceilings), Vented Attic, No Radiant Barrier, Dark
Asphalt Shingles or Dark Metal, Tar and Gravel or
Membrane R-19 insulation U-value 0.049
Subtotals for structure:
15,470
0
18,082
18,082
People: 4
800
920
1,720
Equipment:
0
4,500
4,500
Lighting: 0
0
0
Ductwork:
7,420
1,282
4,560
5,843
Infiltration: Winter CFM: 143, Summer CFM: 75
4,403
3,121
1,239
4,360
Ventilation: Winter CFM: 0, Summer CFM: 0
0
0
0
0
AED Excursion:
0
0
4,861
4,861
System 1 System #1 Load Totals:
27,293
5,203
34,163
39,366
„-
Check, Figures. ,, ,. p,-_, -�, ,, �; M cz ,..�Mrr ,�*� �;�-ai4; , ,, !o- .:^+:, `�6:. , Avr �' ,?ri> e'kns�.lw -: #" ti , ....
,;,
Supply CFM: 1,554 CFM Per Square ft.:
0.889
Square ft. of Room Area: 1,749 Square ft. Per Ton:
533
Volume (ft3): 14,551
System Loads . ,',, ., c . , " ';.h' A. t
Total Heating Required Including Ventilation Air.' 27,293 Btuh
27.293
MBH
Total Sensible Gain: 34,163 Btuh
87
%
Total Latent Gain: 5,203 Btuh
13
%
Total Cooling Required Including Ventilation Air: 39,366 Btuh
3.28
Tons (Based On Sensible + Latent)
•-Notes'.;, s .x�>. 3F ,F1 tfa
.!
T, Nv... ,...,;:
Rhvac is an ACCA approved Manual J, D and S computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according
to the manufacturer's performance data at
your design conditions.
CA ...\13468 Harbour Ridge Blvd-MJ.rh9 Wednesday, September 4, 2019, 3:35 PM
Rhvac - Residential & Light Commercial HVAC Loads
KO EnergyDesign LLC
-
AINUM
- Elite Software Development, Inc.
Harbour Ridqe REM-ENC 13468
WesfPalrn.Bgarh... 33411-
System 1 Room Load Summaty
Room
No ,Name
Area
SF
Htg
Sens
Btuh
Min
Htg
C M '
Run
Duct F'
Size' �
Run
. Duct
` 7 Vet "
Clgi Cig
;Sens! ` ' -''Let
Btuh ' Btuh '
Min
Clg '
; '° CF.M
Act
Sys
CFM
--Zone I—
1 Existing
1,559
15,931
207
4-0
0
21,205
3,004
965
965
2 Back Enclosure
122
6,400
83
2-0
0
9,015
474
410
410
3 Front Enclosure
68
4,962
65
1-0
0
3,942
443
179
179
Duct Latent
1,282
System 1 total
1,749
27,293
355
34,163
5,203
1,554
1,554
Cooling System Summary
,
Coolmg
Tons_
' ` Sensible/Latent
_ S lit
�y �^Sen'sible ter,
Btuh ` `'"
Lretent� "" ?
Bu"
Total
Btuh
Net Required:
3.28
87% / 13%
34,163
5,203
39,366
C:\ ... \13468 Harbour Ridge Blvd-MJ.rh9 Wednesday, September 4, 2019, 3:35 PM
KO Energy Design
561 327-7272
Field Verification Requirement
Project Information
Designed by:
Karen Oliver
Project date:
Wednesday, July 3, 2019
Client name:
Harbour Ridge POA
Client address:
13468 HARBOUR RIDGE BLVD 2A
Client city:
PALM CITY, FLORIDA 34990
Company name:
KO Energy Design
Company phone:
561-327-7272
Field Verification Requirement
All inputs/defaults/building characteristics used for the ACCA Manual J Version 8
calculations must be verified by the Homeowner and/or must be verified by the builder/owner/contractor verifying that what
is built is consistent with the builder's/owners project components used in this report. All data used for Manual J sizing
report is based on RFI received via customer.. K.O. Energy Design must be notified in writing of any said changes to RFI.
Equipment Selection
Equipment selected below was carefully chosen to meet or exceed the FL Energy Efficiency Code. Alternate equivalent
equipment selection shall also meet the attached Energy Code Requirements. Any change in SEER or size of equipment will
require approval and plan revision. K.O. Energy Design must be notified in writing of any said changes.
Manual D Duct Sizing
Duct sizing has been carefully engineered at the stated s.p. Any deviance in duct sizing could impact the performance and
efficiency of selected equipment. Any change or alteration in duct sizing will require approval and possible plan revision.
K.O. Energy Design must be notified in writing of any said changes. Duct sealing Air Distribution System Test to be
performed and made available for Rough Duct Inspection, if required.