Loading...
HomeMy WebLinkAboutPROPOSAL-CONTRACTPROPOSAL/CONTRACT LS'cq WILCO CONSTRUCTION INC. ` ez 10751 ORANGE AVE C/@ FT. PIERCE, FL 34945 C0/4 PH 772-460-6928 FAX 772-460-6929. SCC #131151026 W W W.W ILCOMARINECONSTRUCITON.COM PROPOSAL SUBMITTED TO: DESCRIPTION OF JOB: WINDMILL VILLAGE BY THE SEA NEW BATTER PILE AND SLAB 10851 S OCEAN DR CONCRETE SEAWALL JENSEN BEACH, FL 34957 PH 772.229-7769 ATT: ROBERT FOSS WE HEREBY SUBMIT SPECIFICATIONS AND ESTIMATES FOR: 1. FURNISH AND INSTALL 224 L FT MIN OF BATTER PILE AND SLAB TYPE CONCRETE SEAWALI Z. EXISTING WALL AND COMPONENTS TO REMAIN - REMOVAL IF REQUIRED EXTRA 3. NEW PANELS TO BE UP TO 10' X 12' X 6" WITH #5 REBAR SET AT 1' +A ON CENTER EACH WAY (CAST ON SITE) 4. NEW TOP CAP TO BE 14" X 28" WITH 5 PCS #5 REBAR CONTINUOUS AND #3 TIES SET AT 2' +/- ON CENTER 5. PILINGS TO BE 12" X 12" PRESTRESSED CONCRETE X UP TO 13' LONG (ADDITIONAL AT PER L M AND DRIVEN VERTICAL AT EACH PANEL SEAM AND BATTERED (ANGLED 4 TO 1 +/-) AT MID PANEL (THIS WILL TIE WALL BACK LIEU OF UPLAND ANCHORS) 6. ALL PILINGS TO BE FINAL HAMMER DRIVEN TO A MINIMUM CAPACITY OF 5 TONS EACH 7. CONCRETE TO BE 5,000 PSI WITH CORROSION INHIBITOR ADDITIVE 6, GEOTEXTILE FILTER CLOTH ALONG BACKSIDE OF WALL INCLUDED 9. ROCK/HARD SUBSTRATE CUTTING, PUNCHING OR TRENCHING IF REQUIRED EXTRA 10. UP TO 36 CU YDS OF GENERAL FILL DIRT (PLACED BETWEEN WALLS) INCLUDED 11. PANELS TO BE POURED BEHIND BATHHOUSE (SAME AS PROJECT IN 2013) COST WALL-$S00.00 PER L FT (PRICE BASED ON 224 L FT) NOTES: 1. WILCO CONSTRUCTION CARRIES U.S.L. & H WORKERS COMPENSATION INSURANCE AS PER FEDERAL REGULATIONS FOR MARINE CONSTRUCTION 2. ACCESS FOR EQUIPMENT, MATERIALS, AND CREW REQUIRED S. PERMITS, PLANS, ENGINEERING AND ALL ASSOCIATED COSTS APPLIED OR OBTAINED BY WILCO CONSTRUCTION INC WILL BE PAID BY THE CUSTOMER AS AN EXTRA COST 4. EXCLUDED (UNLESS SPECIFIED ABOVE): ELECTRIC, PLUMBING, LANDSCAPE/SOD, ADDITIONAL FILL DIRT COSTS, ROCKAND/OR HARD SUBSTRATE CUTTING, TRENCHING OR PUNCHING COSTS (IF REQUIRED), IRRIGATION, DOCK WORK, DREDGING, AND/OR HANDRAILS 5. ROCK AND/OR HARD SUBSTRATE IF ENCOUNTERED REQUIRING REMOVAL THEN EXTRA CHARGES WILL APPLY 6. IN THE EVENTTHAN EXCESSIVE DEBRIS (WOOD, CONCRETE, TREES, ETC) ARE UNEARTHED REQUIRING DISPOSAL THEN ADDITIONAL FEES WILL APPLY (DISPOSAL COSTS) 7. WATER SUPPLY REQUIRED B. WILCO CONSTRUCTION INC TO BE HELD HARMLESS FOR CLAIMS OF VIBRATION, SETTLING, POLLUTION AND/OR NOISE DAMAGE TO ANY STRUCTURES ON OR ADJACENT TO JOB SITE. PAYMENTS AS FOLLOWS: 5 % OF CONTRACT UPON SIGNING, 25% OF CONTRACT 2 WKS +/- PRIOR TO COMMENCEMENT OF WORK 25%OF CONTRACT UPON PANELS CAST, 25%OF CONTRACT UPON PANELS IN PLACE AND BALANCE UPON TOP CAP IN PLACE AND CLEAN UP DATE: 4/4/2019 AU THIS PROPOSAL/CONTRACT AND UNDERSTAND ITS SIDE OF THIS FORM. WILCO IS AUTHORIZED TO DO THE ABOVE. LL INVOIICUES ARE DATE: �,��/ AUTHORIZED SIGNATURE: THIS IN THE 3vL=a%ll PAYMENT MADE AS STATED