HomeMy WebLinkAboutPROPOSAL-CONTRACTPROPOSAL/CONTRACT LS'cq
WILCO CONSTRUCTION INC. ` ez
10751 ORANGE AVE C/@
FT. PIERCE, FL 34945 C0/4
PH 772-460-6928 FAX 772-460-6929.
SCC #131151026
W W W.W ILCOMARINECONSTRUCITON.COM
PROPOSAL SUBMITTED TO: DESCRIPTION OF JOB:
WINDMILL VILLAGE BY THE SEA NEW BATTER PILE AND SLAB
10851 S OCEAN DR CONCRETE SEAWALL
JENSEN BEACH, FL 34957
PH 772.229-7769
ATT: ROBERT FOSS
WE HEREBY SUBMIT SPECIFICATIONS AND ESTIMATES FOR:
1. FURNISH AND INSTALL 224 L FT MIN OF BATTER PILE AND SLAB TYPE CONCRETE SEAWALI
Z. EXISTING WALL AND COMPONENTS TO REMAIN - REMOVAL IF REQUIRED EXTRA
3. NEW PANELS TO BE UP TO 10' X 12' X 6" WITH #5 REBAR SET AT 1' +A ON CENTER EACH WAY
(CAST ON SITE)
4. NEW TOP CAP TO BE 14" X 28" WITH 5 PCS #5 REBAR CONTINUOUS AND #3 TIES SET AT 2' +/- ON CENTER
5. PILINGS TO BE 12" X 12" PRESTRESSED CONCRETE X UP TO 13' LONG (ADDITIONAL AT PER L M AND
DRIVEN VERTICAL AT EACH PANEL SEAM AND BATTERED (ANGLED 4 TO 1 +/-) AT MID PANEL (THIS WILL TIE WALL BACK
LIEU OF UPLAND ANCHORS)
6. ALL PILINGS TO BE FINAL HAMMER DRIVEN TO A MINIMUM CAPACITY OF 5 TONS EACH
7. CONCRETE TO BE 5,000 PSI WITH CORROSION INHIBITOR ADDITIVE
6, GEOTEXTILE FILTER CLOTH ALONG BACKSIDE OF WALL INCLUDED
9. ROCK/HARD SUBSTRATE CUTTING, PUNCHING OR TRENCHING IF REQUIRED EXTRA
10. UP TO 36 CU YDS OF GENERAL FILL DIRT (PLACED BETWEEN WALLS) INCLUDED
11. PANELS TO BE POURED BEHIND BATHHOUSE (SAME AS PROJECT IN 2013)
COST
WALL-$S00.00 PER L FT (PRICE BASED ON 224 L FT)
NOTES:
1. WILCO CONSTRUCTION CARRIES U.S.L. & H WORKERS COMPENSATION INSURANCE AS PER FEDERAL REGULATIONS FOR
MARINE CONSTRUCTION
2. ACCESS FOR EQUIPMENT, MATERIALS, AND CREW REQUIRED
S. PERMITS, PLANS, ENGINEERING AND ALL ASSOCIATED COSTS APPLIED OR OBTAINED BY WILCO CONSTRUCTION INC WILL BE
PAID BY THE CUSTOMER AS AN EXTRA COST
4. EXCLUDED (UNLESS SPECIFIED ABOVE): ELECTRIC, PLUMBING, LANDSCAPE/SOD, ADDITIONAL FILL DIRT COSTS, ROCKAND/OR
HARD SUBSTRATE CUTTING, TRENCHING OR PUNCHING COSTS (IF REQUIRED), IRRIGATION, DOCK WORK, DREDGING, AND/OR
HANDRAILS
5. ROCK AND/OR HARD SUBSTRATE IF ENCOUNTERED REQUIRING REMOVAL THEN EXTRA CHARGES WILL APPLY
6. IN THE EVENTTHAN EXCESSIVE DEBRIS (WOOD, CONCRETE, TREES, ETC) ARE UNEARTHED REQUIRING DISPOSAL THEN
ADDITIONAL FEES WILL APPLY (DISPOSAL COSTS)
7. WATER SUPPLY REQUIRED
B. WILCO CONSTRUCTION INC TO BE HELD HARMLESS FOR CLAIMS OF VIBRATION, SETTLING, POLLUTION AND/OR NOISE DAMAGE
TO ANY STRUCTURES ON OR ADJACENT TO JOB SITE.
PAYMENTS AS FOLLOWS: 5 % OF CONTRACT UPON SIGNING, 25% OF CONTRACT 2 WKS +/- PRIOR TO COMMENCEMENT OF WORK
25%OF CONTRACT UPON PANELS CAST, 25%OF CONTRACT UPON PANELS IN PLACE AND BALANCE UPON TOP CAP IN PLACE AND CLEAN UP
DATE:
4/4/2019
AU THIS PROPOSAL/CONTRACT AND UNDERSTAND ITS
SIDE OF THIS FORM. WILCO IS AUTHORIZED TO DO THE
ABOVE. LL INVOIICUES ARE
DATE: �,��/
AUTHORIZED SIGNATURE:
THIS
IN THE
3vL=a%ll
PAYMENT MADE AS STATED