Loading...
HomeMy WebLinkAboutCONTRACTSCANNED BY St. Lucie Countv Renovation David & Vim Greehan`• 704-578-9911- djgreehan@bellsoutILnet - 704-607-6778- jwgreehan 8600 S. Ocean Drive, Unit 602, Jensen Beach, FL 34957 prniect a. 1 Q12R - V...e....., Contract September 18, 2019 #001-R. Permit Cost-noticeo commencementbuildi - -x -• - f building permiK NOC termination and /RB time • All., r �°� 1 pricing varies and can not be determined until after all paperwork is filed — EngineerCoa Fees-Upanreview of the permitapplicaKonthe building department may`^ require that we submit new plans signed off by an Engineer before they can approve the'(�.� r 2 permit, the E ineer P 49 fee varies based on the scope of the project; �..' 3 Purchase all required general rebuild material $350.00 4 _ Remove all cabinet and counter -tops in the kitchen - DLspose $350.00 Raise cei ing to hold ten in the kitchen area - Lnyout/Location of the LED's will be finalized during the walk-through with the Project 5 Manager. u $500.00 $350.00 Install kitchen cabinetry _T_ - - Material - Wellborn Premier Series - Saybrook Full Overlay in Glacier- Soft -close features Classic drawerfronts - Deep drawer divider kit& organizer- Cudery/Utensil insert - Drip tray - Dbl waste basket- Pantry w/rollouts- Matching end panels - Low -profile crown and under cabinet molding. • Note • Cabinet pricing is based on the original design, any changes made may affect the 7 price of the cabinetry(+/-)- $2,500.00 $22,500.00 lastail kitchen cabin�etry�/hh�azdware 8 - Material -1L73i riltfid"In.. / .. 1 Yf insaut tawnen countertop -12" overhang at the peninsula - approx 89sgft @ $39 per ?t sqR for fabrication -One (1) sink cutout and one (1) cooktop cutout @ $150 each y/ - Material -Fantasy Brown Leather Marble 3cm -two (2) slabs 13,dy1-Material - Chefseries single bowl undermountstainless sink -Chef-Z205 plmn �h Install kitchen faucet $375.00 4 , . -Material - Moen Notch high -arc single handle pulldown faucet in Brushed Nickel - 1 ; 9124SRS ' Plum $375.00 Instal kitchen disposal with push-button to the left of the faucet z -Material-Disposal-73134A-Push-button-STS-SO - Plum $325.00 I Install ldtchen acksplash - approx 44sgft w/waste 1 -Material .. allowance -GroutColorrv;B$ $800.00 $954.00 _ Install ten (10) LED recessed lights in the kitchen_@ $125 each __ Elect $1,250.00 Install under cabinet plug -strips - Wblte/White $550.00 $850.00 Install under cabinet lights - White cc c Initials - Island Kitchen and Bath Page 1 of 3 j a i nm $3,900.00 Electrical - Range and double oven $1,500.00 Plumber $1,450.00 _ Kitchen Total Labor/Material Allowance ="$36 , I flq $33;SZ9s0 Kitchen Project Allowance- ti" st ,� Ns? x Addaorilts�H5 a cs aea, '�5. ,�.- ..c, -3e Rd,t �TEItIAI $250.00 21 IPurchase all required general rebuild material 22 _ lRemove baseboard throughout the unit $350.00 23 _ Insra1I 20OLft of 5-1/4" baseboard @ $9 per Leftfinished __ $1,000.00__ _ $800.00 1,350sgft of flooring throughout the condo (excludes the master and guest 24lRemove bedrooms) @ $1.95 per sgft - cork underlayment $2,632.00 _ Paint the Idtchreen�ttand living room 25 - Color -C,C"2vlowancefor two (2)colors $1,950.00 $450.00 'Install _ 1,350sgft of 90mm underlayment throughout the condo (excludes the master and 2H guest bedrooms) @ $1.99 per sgft $2,686.00_ r4 _ _ Install 1,485sgft (1,350sgft+ 10%waste) of file throughout the condo (excludes the FF master and guest bedrooms) @$6.50persgftfor installation 41 pr� - Material - IWT -Aequa Series - Nix -12"x 48"plank the @ $8.35 persgft - Layout- Staggered 33 27 -Grout Color -TEC-Birch 903 $8,775.00 $12,399.00 _ Add -on Total labor/Material Allowance Add -on Project Allowance M{;#$31,292:00�tY; _ hxx r..,., . -.Faf sc `y as=s , ¢^g'�' rf. rry r < , t, .r^�'*z . vr.�., ;+ f :,. ^v -,.N ^til ...«�i��ii'�'SE r ;a. t_?isy+�u".{9`i'�3r ,r , :w ,r rs , z�,>ti,. �'rs ,!*rt7utu h"sr 4. '.'Ri 41, TOTAL LABOR / MATERIAL ALLOWANCE 4ry 3;S d ifl }$4'i, 00„n GRAND PROJECT ALLOWANCE � x� *aYN$81.242'OO+r..''•'�"�,'rhr3 Deposit required: Counter -top Deposit $4,000 - Project Deposit: $40,845 - Total Deposits: $44,845 Draw Payment #1 due once tile is installed: $12,135 Draw Payment #2 due once cabinets are delivered: $12,135 Draw Payment #3 due once tops are templated: $10,630 Final Payment due upon completion: Remaining balance Commencement: October 11, 2019 Completion: January 1, 2020 PAYMENT TERMS AND CONDITIONS 1.) Deposit of counter -top material & cabinetry paid in full plus 25% of the project. A deposit check, payable to Island Kitchen and Bath, is required for a project to be scheduled. Credit Cards are NOT accepted. Deposit checks will not be cashed until the project is about to commence. 2.) Draws will be collected as needed to complete the project If the client refuses to pay a draw, the project will be halted until payment is collected. 3.) Full payment of open balance within 3 days of completion of the project TERMS AND CONDITIONS — This estimate is valid for 30 calendar days starting on the date stated at the top of the estimate. — The prices represented are based on project and product average costs. Prices may vary once project and product measurements, details, and selections are made by client — ISLAND KITCHEN ARD BATH will execute all work according to the Florida Building Code and is licensed in the state of Florida and is in good standing. Time spent by the _owners on the project is not a billable item. All work will be accordance with the scope of work detailed within the contract — Due to unforeseeable conditions inside walls, behind cabinets, etc., additional cost may occur during construction for issues such as mold, and f isting plumbing/ electrical not being safe or code compliant These additional costs are NOT included in any contract pricing and will be dealt tth as needed. This contract does NOT account for product defects or product backorder. These issues may affect the project timeline and will be dealt with as needed. Initials - Island Kitchen and Bath Page 2 of 3