HomeMy WebLinkAboutSOIL COMPACT TESTHeadquarters
11345 US. Highway 1 C01 t ENGINEEF
Sebastian, FL. 32958 Orlando L%% AND TESUM
723 Progress Way
Sanford, FL. 32771 SOIL COMPACTION REPORT
ASTM D 1557 and ASTM D 2922
DATE TESTED: January 22, 2020 KSM JOB #
PERMIT #. 1910-0067
CONTRACTOR: Grande Construction
JOB LOCATION: 13400 Palmetto Village SCANNED
Bldg 3 BY
Palm City, Florida St. Lucie County
Mailing
PO Box 78-1377
Sebastian, FL. 32978
Phone:772-589-0712
C.A.# 5693
KSMengineer ng.net
200298-3d/M H/jo
ITEM TESTED:
Compacted Foundation Fill
TEST LOCATION
PEN
DRY
MAX. DRY
PERCENT
DEPTH
OF SAMPLE
READ
DENSITY
PROCTOR VALUE (P.C.F)
COMPACTION
1. S.E.
0" -12" 50
113.6
113.9
99.7%
2. Center
it "
110.3
96.8%
3. N.W.
It11
111.6
98.0%
Soil Description:
Brown Sand with traces
of Rock
In Place Moisture:
7.9%
Optimum Moisture:
11.0%
Max. Dry Density: P.C.F.
113.9
@ Test Locations The
Density & Penetrometer
Readings Indicatethe
Degree of Compaction Meets
Minimum Required
for Staked Foundation
Moisture - % of Dry Weight
Disclaimer: Contractor is responsible to maintain
the tested area in the condition that KSM
completed the indicated passed compaction test.
KSM is not responsible if the tested area has been
altered from the approved inspected condition.
Email to: greg@grandefl.com
Proudly Serving Florida since 1990