Loading...
HomeMy WebLinkAboutDRAWINGOJ7500E RMR �NONIA(I ICKPLLAIRNCICBE)WION RMI [CR1)A'] LATCH A (2 PLACES) AIR FILTER B AIR /NFL NEL O 0 0 RESTRICTION INDICATOR s11PPLY RETU B4 \ - -- 1 [1r] [Ow YnLTACE asiOMER CONNECTOR A NOT: D) 0 FUEL ALL PRIMARY CO CCNNELTI BO% OPENING FUEL LEVEL `A... mm, ____/ TOP VIEW FUEL VENTS ENGINE BLOCK HEATER INDIC 2) �437 % 90 (W % N) 800 430 % H) 2E TW TW 6T8 [N.5'] TYP BOTTOM Of 1166 [46'] FIG.] f0.66'1 TANK WOIN C0.YNECTOH fi0A [FN1ER OF M.WTY MOUNiTNO N81E5 1930 [TB'] (B PUCES) flEHfl VIEW TM'N LENGTHV. LEFT slDevlRv °°•" •""°, m'm"' mo.%•"•^ •••'°' m� INSTALLATION DRAWING 92 [16'] r [4.r] [' [35r) 00 [12'] SCANNED BY St. Lucie County RECONYENDED Fl£CTRICAL STUB -UPS (SEE DETAII£D MEw k TCP DEW) DESCRIPTION Asg HIGH VOLTAGE BTU&UPARFA 1) AC LO/A LEAD CMDNT AREA z) IBV2W VAC MGM UI (BY OTHERS) A (GLAND PLATE Ixcwom) LAW VOLTAGE STU&UP AREA 1) TRANSFER SMTM/ GCM.UNCATON CONDUITS. COMWWICOMMUNICATIONS AND z-WRE SFMT MUM NOT BE RUIN IN B WNWIT WN AC WRING. (GM NOR S) I..._... _.__. _..il (SNONN MN OWRS REMOVED) INSTALL SD030 DIESEL 2,4L G16 L2A Y02 SSM 210 GAL BASETANK ISSUE DATE, 05/21/14 NOTES, I. CONTROL PARR INCLUDES BATTERY CHARGER WN THREE PRONG CDRD. 2. 15DOW 120VAC ENGINE BLOCK HEATER WN THREE PRONG CORD. 3.12 VLTLT NEGATIVE GROUND SYSTEM. 4. GENERATOR MUST BE MOUNDED. 5. CENTER OF GRAVITY A: MIGHT MAY SHIFT SLIGHTLY DUE TO UNIT OPTIONS 6. STUB -UPS BASE TANK REQUIRES ALL STUD -UPS TO BE IN THE REAR TANK STLSI AREA 7. INCH VOLTAGE STUB -UP AREA INCLUDES THE AO LOAD LEAD CONNECTION TO ME MAIN UNE CIRCUIT BREAKER, THE NEUTRAL CONNECTION, AND AUXILIARY 120/24W CONNECTION. C B. CONNECTION POINTS FOR WTRM MRES BOTTOM OF LOW VOLTAGE CUSTOMER CONNECTION BOX HAS KNOCKOUTS FOR 1/2' AND 3/A'. CONDUIT FITTINGS. 9. MUST ALLOW FREE FLOW OF DISCHARGE AIR AND E%HADST. SR SPEC SHEET FOR MINIMUM FL OW OW AND MAXIMUM RESTRICTION REQUIREMENTS. 10. MUST ALLOW FREE ROW OF INTAKE AIR. SEE SPEC SHEET FOR MINIMUM AIR FLOW AND MAXIMUM RESTRICTION REQUIREMENTS. 11, GENERATOR MUST BE INSTALIED SUCH MAT MESH COOLING AIR IS AVAILABLE AND THAT DISCHARGE MR MOM THE RADIATOR IS NOT RECIRCULATED. 12. IT IS THE RESPWSIBWTY OF THE INSTALLATION TECHNICIAN TO ENSURE MAT THE GENERATOR INSTALLATION COMPLIES MM ALL APPLICABLE CODES, STANDARDS, AND REGULATIONS. 11 210 GALLON USEABLE CAPACITY BAMTANK IS INCLUDED WIN GENERATOR 14. UNIT Is SHIPPED WITH MnSUPPLY AND RETURN UN" DISCONNECTED AND PLUGGED BETWEEN ENGINE AND FUEL TANK. THIS HAS BEEN DONE TO FAClUTATE PRESSURE TESTING OF THE TANK IN THE FIELD. FOR INFORMATION REGARDING CONNECTING ME FUEL SUPPLY AND RETURN UNES PRIM TO START UP, SEE ME MEL TANK FIELD TESTING PROCEDURE (DEMO) SUPPLIED IN THE TANK LOOSE VENTS KIT, MACH IS SHIPPED WIN THIS GENERATOR. 15, ME DRAWING OC3850 FOR DISCHARGE DUCT REMOVAL REMOVAL OF DUCT WILL PRCWDE ACCESS TO MUFFLER FOR SERNONG. MIMI DATA INCOES EMPTY FUEL TANK) GENERATOR: 1 W2 AC (3157 LIM GENERATOR WIN WAGER SHIPPING MID: 1491 KC (32G7 LBS) UNI1S mm INCXF$ P.O. BOX B WAUKESHA, WIS. 53187 OJ7500E,DWG 532E 1 330 GT CO 1725150 1. REV OJ7500E A