HomeMy WebLinkAboutDRAWINGOJ7500E
RMR
�NONIA(I ICKPLLAIRNCICBE)WION RMI [CR1)A']
LATCH
A
(2 PLACES)
AIR FILTER B AIR /NFL NEL O 0 0
RESTRICTION INDICATOR s11PPLY RETU B4
\ - -- 1 [1r] [Ow YnLTACE asiOMER
CONNECTOR A
NOT: D)
0 FUEL ALL PRIMARY CO CCNNELTI
BO% OPENING
FUEL LEVEL `A... mm, ____/
TOP VIEW FUEL VENTS
ENGINE BLOCK HEATER
INDIC 2)
�437 % 90 (W % N) 800
430
% H)
2E
TW TW 6T8 [N.5'] TYP BOTTOM Of
1166 [46'] FIG.] f0.66'1 TANK WOIN C0.YNECTOH fi0A
[FN1ER OF M.WTY MOUNiTNO N81E5
1930 [TB'] (B PUCES) flEHfl VIEW
TM'N LENGTHV.
LEFT slDevlRv °°•" •""°, m'm"' mo.%•"•^ •••'°'
m�
INSTALLATION DRAWING
92 [16']
r [4.r] [' [35r)
00 [12']
SCANNED
BY
St. Lucie County
RECONYENDED Fl£CTRICAL STUB -UPS
(SEE DETAII£D MEw k TCP DEW)
DESCRIPTION
Asg
HIGH VOLTAGE BTU&UPARFA
1) AC LO/A LEAD CMDNT AREA
z) IBV2W VAC MGM UI
(BY OTHERS)
A
(GLAND PLATE Ixcwom)
LAW VOLTAGE STU&UP AREA
1) TRANSFER SMTM/
GCM.UNCATON CONDUITS.
COMWWICOMMUNICATIONS AND z-WRE
SFMT MUM NOT BE RUIN IN
B
WNWIT WN AC WRING.
(GM NOR S)
I..._... _.__. _..il
(SNONN MN OWRS REMOVED)
INSTALL SD030
DIESEL 2,4L G16
L2A Y02 SSM
210 GAL BASETANK
ISSUE DATE, 05/21/14
NOTES,
I. CONTROL PARR INCLUDES BATTERY CHARGER WN THREE PRONG CDRD.
2. 15DOW 120VAC ENGINE BLOCK HEATER WN THREE PRONG CORD.
3.12 VLTLT NEGATIVE GROUND SYSTEM.
4. GENERATOR MUST BE MOUNDED.
5. CENTER OF GRAVITY A: MIGHT MAY SHIFT SLIGHTLY DUE TO
UNIT OPTIONS
6. STUB -UPS BASE TANK REQUIRES ALL STUD -UPS TO BE IN THE REAR
TANK STLSI AREA
7. INCH VOLTAGE STUB -UP AREA INCLUDES THE AO LOAD LEAD CONNECTION
TO ME MAIN UNE CIRCUIT BREAKER, THE NEUTRAL CONNECTION,
AND AUXILIARY 120/24W CONNECTION.
C B. CONNECTION POINTS FOR WTRM MRES BOTTOM OF LOW VOLTAGE
CUSTOMER CONNECTION BOX HAS KNOCKOUTS FOR 1/2' AND
3/A'. CONDUIT FITTINGS.
9. MUST ALLOW FREE FLOW OF DISCHARGE AIR AND E%HADST. SR SPEC
SHEET FOR MINIMUM FL
OW OW AND MAXIMUM RESTRICTION REQUIREMENTS.
10. MUST ALLOW FREE ROW OF INTAKE AIR. SEE SPEC SHEET FOR MINIMUM
AIR FLOW AND MAXIMUM RESTRICTION REQUIREMENTS.
11, GENERATOR MUST BE INSTALIED SUCH MAT MESH COOLING AIR
IS AVAILABLE AND THAT DISCHARGE MR MOM THE RADIATOR
IS NOT RECIRCULATED.
12. IT IS THE RESPWSIBWTY OF THE INSTALLATION TECHNICIAN TO ENSURE
MAT THE GENERATOR INSTALLATION COMPLIES MM ALL APPLICABLE
CODES, STANDARDS, AND REGULATIONS.
11 210 GALLON USEABLE CAPACITY BAMTANK IS INCLUDED WIN GENERATOR
14. UNIT Is SHIPPED WITH MnSUPPLY AND RETURN UN" DISCONNECTED
AND PLUGGED BETWEEN ENGINE AND FUEL TANK. THIS HAS BEEN DONE
TO FAClUTATE PRESSURE TESTING OF THE TANK IN THE FIELD.
FOR INFORMATION REGARDING CONNECTING ME FUEL SUPPLY AND
RETURN UNES PRIM TO START UP, SEE ME MEL TANK FIELD TESTING
PROCEDURE (DEMO) SUPPLIED IN THE TANK LOOSE VENTS KIT, MACH IS
SHIPPED WIN THIS GENERATOR.
15, ME DRAWING OC3850 FOR DISCHARGE DUCT REMOVAL REMOVAL OF
DUCT WILL PRCWDE ACCESS TO MUFFLER FOR SERNONG.
MIMI DATA INCOES EMPTY FUEL TANK)
GENERATOR: 1 W2 AC (3157 LIM
GENERATOR WIN WAGER SHIPPING MID: 1491 KC (32G7 LBS)
UNI1S mm INCXF$
P.O. BOX B
WAUKESHA, WIS. 53187
OJ7500E,DWG 532E
1 330 GT CO 1725150
1. REV
OJ7500E A