Loading...
HomeMy WebLinkAboutMISC LETTERROBERT W. MARSHALL, P.E. 672 LAWSON STREET SEBASTIAN, FLORIDA 32958 (772)581-8727 January 28 2020 SCANNED Sy Andrew Madero St. Lucie County St. Lucie County Planning and Development Services Building & Code Regulation Division 2300 Virginia Avenue Ft Pierce, Florida 34982 Phone: 772-462-1611 RECEIVED JAN 2 8 2020 ST. Lucie county, Permitting Re: Response to Comments on Permit # 1: Prestige Mobil Concrete, 3825 Selvitz Rd, Ft. Pierce, Florida Sir: This letter is in response to your review comment #2. The tank has emergency vents sized per NFPA 30 Section 22.7. These vents prevent the internal pressure of both the outer and inner from exceeding 2.5 P.S.I.G.. NFPA 30A Table 4.3.2.4 requires a minimum distance of 25 feet from a lot line that is or can be built upon and a protected tank (ul-2085). However the western property line shares a boarder with an FEC right-of-way. Based upon our research (see attached) we determined that a right-of-way is not a buildable property but rather land used for transportation purposes. Therefore the 25-foot restriction does not apply. We hope you agree. The tank will be outside the 20-foot utility easement and there is a concrete block wall between it and the property line. Please You Y. uMarsha] 1,;'. have any questions. ROBERT W. MARSHALL, P.E. 672 LAWSON STREET SEBASTIAN, FLORIDA 32958 (772)581-8727 January 9, 2020 St. Lucie County Planning and Development Services Building and Code Regulation Division 2300 Virginia Avenue Fort Pierce, Florida 34982 Re: Response to Review Comments for Prestige Mobile Concrete Permit Number: 1910-0413 Dear Sir or Madam: We are submitting the attached plan to address Plan Reviewer Comment 2. Please contact us if you have any other questions. Yours � truly,, Y l Robert W. Marshall, P.E. Planning & Developmental Services Department Building R Code Regulations Division, DEFERRED SUBMITTAL 1910-0413 DEFERRED SUBMITTAL OF DOCUMENTS REQUIRED BEFORE THE FIRST INSPECTION IS CALLED. 1) PROVIDE INFORMATION ON WHAT WILL BE USED TO ADHERE DOWELS INTO EXISTING SLAB. SHEET F2, TANK FOOTING DETAIL. 2) UPDATE THE GROUNDING SCHEMATIC, PROVIDE THE COMPLETE BONDING AND GROUNDING SYSTEM. 3) PROVIDE THE CALCULATION FOR THE VOLUME OF CONTAINMENT. Revised 12/13/19