Loading...
HomeMy WebLinkAboutSOIL COMPACT TESTHeadquarters 11345 U.S. Highway 1 Sebastian, FL. 32958 Orlando 723 Progress Way Sanford, FL. 32771 DATE TESTED: PERMIT #: CONTRACTOR: JOB LOCATION V007 C 1 it ENGINEER711 " 17 A%% AND TESTING SOIL COMPACTION REPORT ASTM D 1557 and ASTM D 2922 January 22, 2020 1911-0029 Grande Construction 13400 Palmetto Village Bldg 7 Palm City, Florida Mailing PO Box 78-1377 Sebastian, FL. 32978 Phone:772-589-0712 C.A.# 5693 KSMengineering.net KSM JOB #: 200298-6d/MH/jc SCANNED St, LUCie CoUnty ITEM TESTED: Compacted Foundation Fill TEST LOCATION PEN DRY MAX. DRY PERCENT OF SAMPLE DEPTH READ DENSITY PROCTOR VALUE (P.C.F) COMPACTION 1. S.W. 0" -12" 50 108.9 113.9 95.6% 2. Center 110.9 97.4% 3. N.E. 112.2 98.5% Soil Description: Brown Sand with traces of Rock In Place Moisture: 7.6% Optimum Moisture: 11.0% Max. Dry Density: P.C.F. 113.9 @ Test Locations The Density & Penetrometer Readings Indicate the Degree of Compaction Meets Minimum Required for Staked Foundation 115.0 W I I 1 I I I I G 114.0 I—..—.i—..—.I _..—..—.. �..—.. ..—... H I I I I I T 113.0..—.i—..——.. i .—..1..—.:I ... P C I I I I I I 112.0 F I I I I I I I I G D 111.0 i..—.I—..—.I.—..—r.—..y..—..rt..—... R I I I I I Y I I I I I I 110.0..—.;—..—.;.—..—;.—..�..—..T..—.., 8 9 10 11 12 1314 Moisture - % of Dry Weight Disclaimer: Contractor is responsible to maintain the tested area in the condition that KSM completed the indicated passed compaction test. KSM is not responsible if the tested area has been altered from the approved inspected condition. Email to: greg@grandefl.com Proudly Serving Florida since 1990