HomeMy WebLinkAboutMISC LETTERST. LUCIE COUNTY
BOARD OF COUNTY
COMMISSIONERS
LINDA BARTZ
CHAIR
DISTRICT 3
CATHY TOWNSEND
VICE -CHAIR
DISTRICT 5
CHRIS DZADOVSKY
DISTRICT 1
SEAN MITCHELL
DISTRICT 2
FRANN15
HUTCHINSON
DISTRICT 4
w V.
HOWARD.OF T(. A1F5r@A7 Ig
COUNTY ADMINISTRATOR.,
DAN MCINTYRE
COUNTY ATTORNEY
MAILING ADDRESS
2300 VIRG{NIA AVENUE
FORT PIERCE, FL 34982
PHONE
(772) 462-2822
TDD
(772) 462-1428
FAX
(772) 462-1581
E-MAIL
OLSO NL@STLUCIECO.O RG
WEBSITE
W W W.STLUCIECO.GOV
October 30, 2019
Grande Construction of Florida Inc.
Attn. Greg Oldakowski
575 NW Mercantile Pl. # 113
Port St. Lucie, FL 34986
RE: Finished floor waiver
Dear Mr. Oldakowski:
PLANNIINU A141) L7hVhLU1'Mh1VJ
SERVICES DEPARTMENT
Planning Division
SCq
,t �U eyNFo
COUnty
Please accept this letter in response to your written request received October 30, 2019 to waive
the finished floor elevation of 18" above the crown of the road. The waiver regaest is for 9
proposed garages for Palmetto Village, located at 13400 Harbour Ridge Blvd., Palm City.
Pursuant to Section 7.04.01(C-3) ofthe St. Lucie County Land Development Code, the Planning
and Development Services Director has the authority to grant administrative relief, when
topographical conditions are such that compliance with this subsection would be impracticable
or cause grade level conditions detrimental to adjacent or nearby properties, consistent with the
intent of the Flood Protection regulations and any other applicable portion of this Code.
The Planning and Development Services Director has granted your request for administrative
relief of the finished floor elevation based on the following determinations:
1. The proposed garages are located in Flood Zone X.
2. The proposed finished floor elevation will be between 11.24' NAVD (lowest) and 11.80'
!� NAVD{highest) whichiwill be ON=1.16'. above the elevation of tbe.crown of thde road.
K':-t3. The elevation of the' center lute Wtthe, adjacent road ie k419iY a S ja; �0e eai)yiof
'R 2c. Palmetto Village. ^ ��M TRAZ
" 4. Raising the finished floor 18" above center line of the road would be impracticable due to
existing constraints that will not allow the finished floor elevation to meet or exceed 18'
above the center line of Harbour Ridge Blvd. The garage slabs will need to tie into varying
existing edge ofpavement locations.for transition and alleviation ofheight change hazards.
This approval does not in any way constitute authorization to begin construction. Prior to the , Dgy;; `,
co6ht-'% ement of any construction on this property, an application for a specific building permit k'tldi
must be obtained from this department.
Please feel free to contact me at (772) 462-2822 if you have any questions.
P
eOlson, AICP
Planning and Development Services. Director
cc: Monica Gmziani, Building and Code Compliance Manager
Jim McGuinness, Interim Building Official
Melissa Brubaker, Zoning Supervisor