HomeMy WebLinkAboutMISC LETTERSPLANNING AND DEVELOPMENT
SERVICES DEPARTMENT
Planning Division
ST. LUCIE COUNTY October 30, 2019
BOARD OF COUNTY SCANNED
COMMISSIONERS
Grande Construction of Florida Inc. StLUCBY
.
Aun. Greg Oldakowski County
LINDA BARTZ 575 NW Mercantile Pl. # 113
CHAIR Port St Lucie, FL 34986
DISTRICTS
RE: Finished floor waiver
CATHYTOWNSEND Dear Mr.Oldakowski:
Vice -CHAIR
DISTRICT 5 Please accept this letter in response to your written request received October 30, 2019 to waive
the finished floor elevation of 18" above the crown of the road. The waiver request is for 9
CHRIS DZADOVSKY proposed garages for Palmetto Village, located at 13400 Harbour Ridge Blvd., Palm City.
DISTRICT 1 Pursuant to Section 7.04.01(C-3) of the St. Lucie County Land Development Code, the Planning
and Development Services Director has the authority to grant administrative relief, when
topographical conditions are such that compliance with this subsection would be impracticable
SEAN MITCHELL or cause grade level conditions detrimental to adjacent or nearby properties, consistent with the
DISTRICT 2 intent of the Flood Protection regulations and any other applicable portion of this Code.
FRANNIE The Planning and Development Services Director has granted your request for administrative
relief of the finished floor elevation based on the following determinations:
HUTCHINSON
DISTRICT 4 1. The proposed garages are located in Flood Zone X.
•O2. The proposed finished floor elevation will be between 11.24' NAVD (lowest) and 11.80'
^" NAVD (highest) which will be 0.6' —1.16' above the elevation of the crown of the road:.
h3D1i 1 tD'N Tti P -1 �, 3' The elevation of the'denter line of the adjacent:road=is_10.90' 1QAVD at the entry o£_
COUNTY ADMINISTRATOR Palmetto Village.
il 4. Raising the finished floor 18" above center line of the road would be impracticable due to
DAN MCINTYRE existing constraints that will not allow the finished floor elevation to meet or exceed 18'
COUNTY ATTORNEY above the center line of Harbour Ridge Blvd. The garage slabs will need to tie into varying
existing edge ofpavement locations for transition and alleviation ofheight change hazards.
MAILING ADDRESS r I,or ` This approval does not in any way constitute authorization to begin construction. Prior to the
2300 VIRGt'NIA AVENUE IN` commencement of any construction on this property, an application for a specific building permit
FORT PIERCE, FL 34982 must be obtained from this department
PHONE Please feel free to contact me at (772) 462-2822 if you have any questions.
(772) 462-2822
Sin ly,
TDD
(772) 462-1428
slie Olson, AICP
FAX Planning and Development Services.Director
(772) 462-1581
EMAIL cc: Monica Graziani, Building and Code Compliance Manager
OLSONL@STLUCIECO.ORG Jim McGuinness, Interim Building Official
Melissa Brubaker, Zoning Supervisor
WESSITE
W W W.STLUCIECO.GOV