Loading...
HomeMy WebLinkAboutSOIL COMPACT TESTHeadquarters 11345 U.S. Highway 1 C� 1 t ENGINEER''',G Sebastian, FL. 32958 QUYL AND TESTING Orlando 723 Progress Way Sanford, FL. 32771 SOIL COMPACTION REPORT ASTM D 1557 and ASTM D 2922 DATE TESTED: January 22, 2020 KSM JOB # Mailing PO Box 78-1377 Sebastian, FL. 32978 Phone:772-589-0712 C.A.# 5693 KSMengineering.net 200298-1d/M H/jo PERMIT #: 1911-0038 SCANNED CONTRACTOR: Grande Construction BY St. Lucie County JOB LOCATION: 13400 Palmetto Village Bldg 1 Palm City, Florida ITEM TESTED: Compacted Foundation Fill TEST LOCATION PEN DRY MAX. DRY PERCENT OF SAMPLE DEPTH READ DENSITY PROCTOR VALUE (P.C.F) COMPACTION 1. S.E. W -12" 50 113.8 113.9 99.9% 2. Center 111.9 98.2% 3. N.W. 110.7 97.2% Soil Description: Brown Sand with traces of Rock In Place Moisture: 5.8% Optimum Moisture: 11.0% Max. Dry Density: P.C.F. 113.9 @ Test Locations The Density & Penetrometer Readings Indicate the Degree of Compaction Meets Minimum Required for Staked Foundation 115.0 W I E I I I I I G 114.0 •I- ••_.i_.._ ._.._�._...._.. i .._... H I T113.0 I I I I I I P I I I I I C I I I I I 112.0—.._.j_ ._.I._.._E._..�.._ �.._..: F F I I • I I I I I I R I I I I I Y110.0 I I I I I 8 9 10 11 12 13 14 Moisture - % of Dry Weight Disclaimer: Contractor is responsible to maintain the tested area in the condition that KSM completed the indicated passed compaction test. KSM is not responsible if the tested area has been altered from the approved inspected condition. Email to: greg@grandefl.com Proudly Serving.Florida since 1990