Loading...
HomeMy WebLinkAboutCONTRACT'r SCANNED BY St. Lucie County Master Bathroom Renovations Tom & Nina Brancato 917-969-9714 - tom13486@gmail.com - 917-744-9196 - mrsninab@gmail.com 9550 S. Ocean Drive, Unit 706, Jensen Beach, FL 34957 PI'OfeCt#: 19157 - ielnvdlo r _ rrnc _ n_..___._ Contract November 5, 2019 #001-R AfiiD w_,. zn{'w_`-7-7 ` ' 1_e vi Permit Cost/Fees - Notice of Commencement, building permit application fee, building permit review/approved fees, Termination of the Notice of Commencement and IKB time- Pricing varies C ' and is determined by the building department upon review of the permit application and cannot be .a 1 determined until after the permit been reviewed and approved b the buildin de artment js p g P _— ,__PP __ Y Engineer � �.j "`i'Bb ; Cost/Fees -Upon review ofthepermitapplicationthebuildingdepartmentmayrequire / --'----"--' that we submit new plans s{gnedojfbyanEngineer beorethe cana f Y approve the permit, the �`. �/;.•`i I 2 Engineer fee varies based on the scope of the project, -- 7,Bb 3 Disconnect vanity faucet &trap ' — --------� 4 Remove existing vanity cabinetry and countertop and dispose items . ----------1 5 Remove toilet- DISPOSE---J 6 Chip out existing tile floor ------ ------ i 7 Remove wall next to toilet ----- 8 -_------ Cut out shower plumbing pect all exposed plumbing/electrical within the walls -Due to updated building codes, ifyour R — ---1 t is not updated/current to code, !KB is required to bring ng it up to code - These costs are to be ered by the homeowner. ! J31nstall p cement floor and cut out remove old shower trap -move —4 all of the above materials and dispose at the dump chase all general rebuild material $350.001 two (21 pocketdoor 'Z/o$650.00ase $650 00 _ ceilings and have soffit over vanity and toilet $850.00 $250.00 15 Rough shower curb 16 Install new shower trap and drain -- - — -- --- ------- ! 17 Install liner back up on walls --- 18Install _ shower slop kitper code 19 Install shower pan -- — { 20 Install DensShield on shower walls and ceiling - _----------------- 21 --- Tape and finish bath and shower_ - --- � 22 Mud shower pan ----' -- - ——•� Prime and paint ceiling andentirebathruom---------- -Ceiling - YYhite 23 -Walls/ rone color TBD% �1) — $350.00 $75.00i Install bathroom dry floor tile —' `— — - approx.100sgk — -- - - Material -1WT: Delray Series - Moon - 24"x 24" @ $4.50 per sq%L -Layout-Straight j -Grout Color -MapekFrost #77 Tile' " Install shower curb threshold -White __$450.t10i $80.001 Tile; Initials - Island Kitchen and Bath Pg. 1 f Install shower wall file - approx 110sgk'----"---"' Material- MT.• Delray Series - Moon -24"x 24"@$4.50 per sgft -Layout-Straight 26 -Grout Color-Mapei:Frost#77 j' Install decorative file - — --- - Tile $495.pp s - Material -Akua: Nuur Mix Athens 2, -Layout- 1'waterfalldowncenterwall y/ Install shower wall bullnose - approx 22Lft Tile $200.00 28 - Material - Schluter in Brushed Nickel f / Install shower niche L Tile $176.00 29 -Location-Offsetfrointheslide bar. ' Install shower wet floor tile - approx. 30sgk ---- Tile $80.00 y` - Material -AkuaNuurMixAthens a -Layout-Straight -Grout Color -MapehFrost #77 '3�;. Instill floatin corner seat ---- - -Location->"-site during Tile $568.00 1 walk-through Install vanity cabinetry-0.0 $2501 _0.0 - Material - Wellborn Select - Bishop Full Overlay in Glacier with soft -close features and classic drower fronts - Drip trays - Rollouts in sink bases 32 "Note' Cabinet pricing is based on the original signed 2020 Design and any changes made may affect the pricing of the cabinetry Install cabinetry hardware ------ ' --__ $3,250_OO; 33 -Material - HR: Merrick- 4-3/16"Satin Nickel Pulls - 549-96SN nstallnewbathroommirrors L — $150_OO 3 -Material-Supplied by thehomeownner� J _ . SBQ - '. • Install bathroom vani counter to - t3' p -approx 17sgft w%4"back/side splashes @ $37 per sgft for fabrication and two (2) sink cutouts @ $125 each - �Material -White Ice Granite 3cm -supplied by Elite Custom Granite I 3 -Edge -HalfBullnose I "f; fir Install bathroom vanity sink- two (2) ---`------ $879.00 1 $675.00j Material - Two (2) undermount rectangles in White - Supplied by Elite Custom. Granite Install bathroom ---- Plum $250A0 vanity faucet -quantity two (2) ' -Material -Two (2) Moen Eva widespread faucets in Brushed Nickel - T6420BN -requires two (2) in - act valves -9000 Installshowerwayshowervalve -------- Plum $630.00i �8 - Material -M,oenPosi-Tempvalve -2520 - Location - n-site during the walk-through I I ------------------ Install shower valve trim Plum, —z---—'1 $250.00 j Material - Moen Kingsley Posi- Temp valve trim in Brushed F °-- Nickel - T2111BN Install hand shower with slidebar----------'--- Material -Moen single function hand shower with slidebar in Brushed Nickel-3868EPBN- Plum - $190.00 requires a drop elbow - A725BN - Location - oppositeofshowercontrols Plum Install master toilet --- $340.00' -.; - Material - Kohler Highline Comfort Height Elongated Bowl in White - K-3658-0 - w/Soft-close lid - rro K-4636-00 Install eight (8) LED recessed lights in the bath - three (3) over the vanity,--two(2) in closet area, _Plumy $350.00 42 two (2) in the shower and one (1) over toilet — Install ne,080.001 wwhisperquietexhaustfan Elect $1 install frameless shower doors - -' -_ --"-'---`- Elect $225.001 - Material - Clearglass - One (1) fixed panel and one (1) swing panel with Brushed Nickel hardware44 I to match the plumbingfixtures —___ — $1,450•�O 47 4 Install all new closet - -CAD _LPLS_ jf TSD _ 48 Labor allowance (`) .------------------}-----�---1 ---------- -------�---- Tile labor allowance (Tile) - — -- $4,900.00' . ._ $2,350.00 ----- _ 1 --------------------- Plumber labor allowance (Plum) — — - _- - Electrical labor ------ $2,450.00 ----� Initials - Island Kitchen and Bath pg. 2 'OTAL LABOR / MATERIAL ALLOW/uYc.ts;b " { GRAND PROJECT ALLOWANCE °..? Deposits Required: $12,500 Draw #1 due once tile is completed: $6,525 Draw #2 due once counter is templated: $5,525 Final Payment due upon completion: Remaining balance Commencement: 14/21ft9 11 *\Ok 5 Zls�- Completion: 2' ?'b`¢c- loot. PAYMENT TERMS AND CONDITIONS 1.) Deposit of cabinetry paid in full plus 25% of the project A deposit check payable to Island Kitchen and Bath, is required for a project to be scheduled. Credit Cards are NOT accepted. Deposit checks will not be cashed until the project is about to commence. 2.) Draws will be collected as needed to complete the project If the client refuses to pay a draw, the project will be halted until payment is collected. 3.) Full payment of open balance within 3 days of completion of the project TERMS AND CONDITIONS — This estimate Is valid for 30 calendar days starting on the date stated at the top of the estimate. — The prices represented are based on project and product average costs. Prices may vary once project and product measurements, details, and selections are made by client ^- ISLAND KITCHEN AND BATH will execute all work according to the Florida Building Code and is licensed in the state of Florida and is in good standig.n Time spent by the owners on the project is not a billable item. All work will be accordance with the scope of work detailed within the contract -- Due to unforeseeable conditions inside walls, behind cabinets, etc.., additional cost may occur during construction for issues such as mold, and existing plumbing/ electrical not being safe or code compliant These additional costs are NOT included in any contract pricing and will be dealt with as needed. This contract does NOT account for product defects or product backorder. These issues may affect the project timeline and will be dealt with as needed. — Any changes requested by the client after the original contract is signed, will result in a change order. Change orders will affect the project timeline and are an additional cost to the original contract pricing. A change order will result in a separate fee of $100 per change order, in addition to the total cost of the Change Order. Change Orders must be signed, and paid immediately and separately from the original contract pricing. All selections must be made at the time of the contract, unless otherwise stated, such as, To Be Decided (TBD) or Supplied by Owner (SBO). If there is not a selection stated, TBD, or SBO then we cannot promise the price written within the contract — It is the client's responsibility to provide all additional information that may be needed for the project Such as, appliance specifications, all SBO material, etc.. If any incorrect information is provided by the client Island Kitchen and Bath is NOT responsible for any additional cost or time that may occur from this error. — Insurance Agent.• 4 Comers Insurance -Smart --- License Holder: Justin Thiery---- License Number: CBC 1259508 YOU FOR YOUR BUSINESS! Date Client Signature {B Si e Date Initials - Island Kitchen and Bath pg. 3