March 31, 2014
Ms. Iasha Pryor
Frontline Homeowners Insurance
7131 Business Park Lane, Suite 300
Lake Mary, Florida 32746
SCAN
St Zoe Cot
Y
S>�-1 ` 0 Z-- ®26�
Subject: Completion Report of Underpinning Remediation
Lyshon Residence
2601 Gray Twig Lane in Fort Pierce, Florida
Claim No.009-20290
Remediation Contractor: Certified Foundations, Inc.
Remediation Contractor Permit No. SLC1402-0264
SDII Project No. 8058005D
i " Dear Ms. Pryor:
SDII Global Corporation (SDII) is pleased to present this report"summarizing
the underpinning remediation performed at the Lyshon residence located at
2601 Gray Twig Lane in Fort Pierce, Florida. Figure 1 illustrates the project
location.
BACKGROUND INFORMATION
SDII was retained to monitor and confirm that foundation repairs were made
in substantial compliance with the recommendations made in our Foundation
Stabilization Recommendations, dated October 31, 2013, SDII Project
Number 8058005C.
The purpose of the underpinning program was to stabilize the foundation of
j the structure. SDII monitored the contractor's operations during the
underpinning to verify compliance with the .intent of , SDII's
recommendations.
Although SDII monitored the contractor's operations, SDII did not have
control over, charge of, or responsibility for the construction means,
methods, techniques, sequences or procedures or for the safety precautions
and programs performed in connection with the work, since these are solely
the contractor's responsibilities.
t
Completion Report of UnderpinningRemeaiaron -- Marrh31,2014
Lyshon residence - Fort Pierce, Florida
Claim No. 069-20290
SD77 Project No 80580OSD
SUMMARY OF MONITORING SERVICES
The following summarizes the activities SDII observed and documented at the site:
• Between March 10 and March 21, 2014, Certified Foundations, Inc. installed 46 steel
helical pipe piles along the exterior of the residence which comprised of 1,216 linear feet
of steel piling advanced into the subsurface.
• The installed helical piles had 1-1/2 inch square shafts (Chance SS150) with lead sections
consisting of a 10-inch diameter helix followed by an 8-inch diameter helix (Chance
C150-0490).
• Installation torque ranged from 5,130 to 6;398 foot-pounds and installed tip depths
ranged from 20 to 38 feet.
4! Following installation, the .piles and foundation brackets were initially seated at 1,500 _
pounds per square inch sr Final lift pressures ranged from 1200 to. 2 200 PSI. _ Y
• The contractor used the installed helical underpinning piles and hydraulic tams to support
the foundation and close any cracks on the exterior of the home. The perimeter, of the
residence was lifted between 3/8 and 2 inches.
Based on our observations, the underpinning pile installations were documented as' substantially.,
complying with SDII's recommendations. Table 1 in, the Appendix summarizes the ,pin pile
installation. Figure 2 illustrates the location and numbering of the -pin pile locations.
It is SDII's understanding that cosmetic repairs, will be done following the pin pile*installation..'
Accordingly, any existing damage and/or collateral damage associated with the .pin pile t` "
installation program and the previously performed compaction grouting operations should be" '
repaired at that time by a qualified restoration contractor.
f
F Im L E
OPY
Completion Report of Underpinning Ret', ,ion March 3I, 2014
Lyshon residence - Fort Pierce, Florida
Claim No. 009-20290
SDII Project No 8058005D
CLOSING
SDII appreciates the opportunity to have assisted you on this project. If you should have any
questions concerning the contents of this report, or if we may be of further assistance, please
contact us.
Sincerely,
SDII GLOBAL CORPORATION
4509 George Road, Tampa, Florida 33634
FBPE Certificate of Authorization 8778
'b 'x, y/51q
Ruben Sosa, Jr., P.E., M.S.C.E.
Geotechnical Engineer of Record
Florida License Number 61847
Mark S. Densmore, P.Et,,8ke_". '
Structural Engineer ofc�ord
Florida License Number 54625
ATTACHMENTS: Table I — Pin Pile Installation Summary
Figure 1— Project Site Location Map
Figure 2 — Site Plan Showing'As-Installed Pin Pile Locations
Selected Site Photographs-, r
DISTRIBUTION: Addressee — 1 Digitally Signed Copy
Certified Foundations, Inc.— 2 r
File — 1 ;
Completion Report ofUnderpinningRemeamion
Lyshon residence - Fort Pierce, Florida
Claim No. 009-20290
SDI7Projecl No 8058005D
Table 1. Pin Pile Installation Summary
March 31, 2014
Pile
Number
Installation
Depth
(feet)
Installation
Torque
(ft-lb)
Ultimate Vertical
Capacity
(kips)*
Final Lift
Pressure
(psi)**
Final Lift
(inches)
1
23
5 810
58
1400
1/16
2
28
5 942
59
1500
1/32
3
38
6 371
64
1400
1/32
4
23
6145
61
1500
1/32
5
27
6,361
64
1800
1
6
24
6,390
64
2,200
11/2
7
22
6 366
64
2,200
2
8
22
5,720
57
2,200
2
9
27
6,180
62
2,000
11/4
10
24
6,014
60
1400
1/32
11
24
5,881
59
1500
1/16
12
30
5,358
54
1500
1/32
13
31
6,398
64
1400
1/32
14
32
6123
61
1500
1/32
15
30
5,566
56
1500
1/32
16
31
6,313
63
1500
1/32
17
28
5,873
59
1500
1/32
18
24
5,945
59
1500
1/32.
19
28
5 878
59
1200
3/8
20
27
6120
61
1700
3/4
21
23
6 370
64
1700
3/4
22
26
8 510
55
1200
3/8
23
26
5 450
55
1400
1/16
24
29
6 050
61
1400
1/32
25
29
6,342
63
1500
1/32
26
24
6198
62
1400
1/32
27
25 _
5 620
56
1500
1/32
28
31
5,921
59
1500
1/32
29
26
5,550
56
1600
1/32
30
27
5,710
57
1500
1/16
31
25
5,830
58
1,M0.
1/16
32 _ _
27
5 230
52
1500
1/32
33
29
6,210
62
1500
1/32
34
26
5 540
55
1500
1/16
35
26
6 010
60
1700
1/16
36
24
6 385
64
1500
1/32
37
20
5 395
54 1
1500
1/32
Completion Report of Underpinning Remeami on
Lyshon residence -Fort Pierce, Florida
Claim No. 009-20290
SD11 Project No 8058005D
March 31, 2014
Pile
Number
Installation
Depth
(feet)
Installation
Torque
(ft-lb
Ultimate Vertical
Capacity*
(kips)
Final Lift
Pressure
(psi)**
Final Lift
(inches)
38
21
6 366
64
1500
1/32
39
24
6 361
64
1500
1/32
40
25
6,262
63
1,500
1/32
41
23
6 297
63
1500
1/32
42
28
5,939
59
1500
1 1/32
43
32
5,900
59
1600
1/16
44
24
5,830
58
1500
1/32
45
29
5130
51
1500
1/32
46
24
5,590
56
1500
1/32
TOTAL
1216
---
-
---
---
*Ultimate Capacity (kips) =10 x Installation Torque/1000 (ft-lb)
**Area of Lifting Hydraulic Ram = 8.29 in
•
s it w 1 1
�ti`
y.r< � � ��� fI
• it
�
7 -
iWu IL
•r
-
•
�• -� �W 4 r-w .n.
�l
NOTICE OF WOOD - DESTROYING
ORGANISM INSPECTION
43 AND/OR TREATMENT
THIS NOTICE POSTED PURSUANT To
CHAPTER 482, FLORIDASTATUTES.
e
Dates Of IftspecfMId]I on (if �adO�
7 ti rl Date Of Tf=nt (it Made)
pe,sticicl Used (If Applied)
Woad -Destroying oeganism
Treatment Performed For
Z9412-8 LiCL11500t, NAftle And AdTaSs
TERMITE SERVICE REPORT
;ustomer Name CFI INC (FOR GLORIA LYSHON) phone # (772) 201-5781
iervice Address 2601 GRAY TWIG .LN FORT PIERCE, FL
lccountNumber 12097801 Infestation Type SUBTERRANEAN TERMITE S
i 410..i
nitial Treatment + 00 Amount Due 141000 � Amount Received
>ervice Covered Thru: 0� O O J 0 O Completion Date 0 0 O/ O O Renewal Amount
Tme Onsite: l/ ❑ AM /❑ PM
, Service
k) Performed on (Date):
�) Retreatment Scheduled Date (if needed):
r
Date: 3 / 1 9/ 14
(863) 272-6300
212.00 Grid # MP
Time Offsite: ❑ AM / ❑ PM Next Scheduled Service Date:
❑ Retreatmenl ❑ Service Call (No Treatment) ❑ Reinspection ❑ Bait Monitoring ❑ Annual Bait keinspection
This report is not intended for a property transaction.
B) Activity Found: OYe_. 2nNo---
❑Yes ❑ No
Orkin Representative
No ❑ In Station ❑ On Structure
# oiStafion onitoring Baiteatm�Materials
Us d), Consumer post application precautionary statements on hack.
ityFound: ❑ Yea �•t�oTarget Pest: CL1- -cq t2c_ 7eT� ;_4Utiliee'Key
on back for completion of this section
Application Rates
1181itActivity:
Produc # Amount Applied Dilution % Equipment Used
❑ 1 gallon/ 10 SOFT
❑ Void Foaming
❑ 2gallons/10 LF
❑ Other
�4gallons/1VLF/FTofdepth
❑ 3 gallons liquid & 1 gallon foam/10 LF
)
States where applicable:
'
Wind Direction Wind Velocity
V. Conditions Conducive
Temperature Humidity
It is important foryou to know that certain conditions in and around your home can contribute
to Wood Infesting Organisms, and can therefore compromise the effectiveness of Orkin's
, TVof -,� �'t CpAj Qom, MQ-1 of
treatment. It is very important that you remedy the Conditions Conducive noted below. If you
fall 'to,do so, it may, in some cases; jeopardize your agreement; moreover, it is probable that
11
k 11
/our home will experience future termite activity and damage, and treatment by Orkin may
P`rS_q C �X P 115 r V
t'
lot solve the termite problem. This report DOES NOT INCLUDE MOLD or any mold -like
:onditions. Mold is generally not a wdbd destroying organism and is outside the scope of
,
:his report. If you wish your properlyto be inspected for mold or mold -like conditions, please
mittact the appropriate mold professional. Please notify us in writing when you have corrected
he Conditions Conducive. We identified the following Condition(s) Conducive:
&Sell Above Sill ❑ Cellulose Material in Contact with Ground
D Roof Leaks ❑ Excessive Exterior Moisture
7 Cellulose Material Stored in Crawl Area ❑ Excessive Interior Moisture /
7Improper Ventilation ❑Siding/Stucco in Contact with Groul! . l
7 Excessive Moisture in Crawl ❑ Treatment Disturbed
Exterior Insulation Finished System (EIFS) ❑ Other
Information
C
CO -COMMERCIAL APPLICATORS ARE LICENSED BY THE COLORADO DEPARTMENPOF
Ar-mm a Ti me
I. Acknowledgement Thank you for choosing Orkin �
I understand that additions, or modifications to or around the structure can disturb the teNrlYmcide treatment, and rray`require aQ,�il1
Thelocation of these areas are: , At
Pesticide Product Labels are Available Upon Request.
For additional information, a copy of the Label and/or MSDS may be requested Itoi
Y i
This work has been performed'to my satisfaction r ,A
Customer Signature }�
JF3N
�• f11' � Representative - Full Name '/ CA # / Bus. License # (if appli�
Orkin street Address: 3231 S US HIGHWAY 1
2002'Rev 10/12 r City/State/Zip: FORT P T F pr.F 1 F I •R 9
5 - fJ !t IMAr:p rinpv
L E
nalol
spaand realm t.
your local branch.
70
222-122,
Phone #:079) 1, R1,-101 R'
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Product
Premise 75
Premise 0.5 SC
Premise 2
Premise Granules
Premise Pre -
Construction
Termidor SC
Termidor 80.WG
Bora-Care
Tim-bor
Recruit IV
Recruit AG
Recruit' IV AG
Firstline GT Plus
Firstline AG
ValueLine
Bifenthrin TC
Talstar
Phantom
Labyrinth
Cy -kick
Optigard ZT
Zyrox
Advance
Termidor HE
ETDS - Popup Monitor
Product Information Page
• o a+.
Manufacturer
EPA Reg #
Active Ingredient
Bayer
3125-456
i
Imidacloprid
75.00%
Bayer
3125-497
Imidacloprid I'
5.65%
Bayer
3125-4521
Imidacloprid..
21.4%
Bayer
432-1385
Imidacloprid
0.5%
Bayer
432-1331
Imidacloprid
21.4%
BASF
7969-210
Fipronil
9.10%
BASF
7969-209
Fipronil
80.00%
Nisus
64405-1
Disodium Octaborate Tetrahydrate
40.00%
Nisus
64405-08
Disodium Octaborate Tetrahydrate
98.00%
Dow AgroSciences
62719-453
Noviflumuron
0.5%
Dow AgroSciences
62749-270
Hexaflumuron
0.50% '
Dow AgroSciences
62719-454
Noviflumuron
0.5%
FMC
279-3196
Sulfuramid
0.01 %
FMC
279-3153
Sulfluramid
0.01%
FMC
279-3266-7374B
Bifenthrin
7.9%
FMC
279-3206
Bifenthrin
7.90%
BASF
241-392
Chlorfenapyr
21.44%
Exterra
68850-2
Diflubenzuron
0.25%
Whitmire Micro -Gen
499-470
Cyfluthrin
0.1%
Syngenta
100-1170
Thiamethoxam
21.6%
Syngenta
100-1174
Lufenuron
0.15%
Whitmire Mirco-Gen
499-488
Diflubenzuron
0.25%
BASF
499-552-7969
Fipronil
9.1%
Pest Stop, Inc.
Z1
monitor stauons
28
Bait Stations
EQUIPMENT
29
Vents
E1 Injectomatic E6 Power Sprayer
30
Bathtraps
E2 Tank & Pump Unit E7
31
Polyethylene
E3 Compressed Air Sprayer E8
E4 Foam Machine E9
E5 Aerosal Can E10
CONSUMER POST APPLICATION PRECAUTIONARY STATEMENTS
1
Contact Treated Area(s) — Do not allow unprotected persons, children, or pets to touch, enter, or replace items or bedding,
to contactor enter treated area(s) until dry.
2
Ventilation / Reoccupying — Vacate and keep area(s) closed up to 30 minutes after treatment, then ventilate area(s) for up to
2 hours before reoccupying.
3
Equipment / Processing / Food — Thoroughly wash dishes, utensils, food preparation / processing equipment and surfaces
with an effective cleaning compound and rinse with clean water, if not removed or covered during a treatment. The area
should be odor free before food products are placed in the area.
4
Exterior Applications (Baits) — Do not allow grazing of feed, lawn, or sod clippings to livestock after bait applications.
February 14, 2014
Ms. Iasha Pryor
Frontline Homeowners Insurance
7131 Business Park Lane Ste. 300
Lake Mary, Florida 32746
ST. LUCIE COUNTY
BUILDING DIVISION
REVIEWED
FOR CO CE
REVIEWED BY
DATE
PLANS AND PERMIT
MUST BE KEPT ON JOB OR
NO INSPECTION WILL BE MADE
Re: Letter Report
Lyshon Residence — Fort Pierce, Florida
Claim No.: 009-20290
SDII Project No.: 8058005D
Dear Ms. Pryor:
I, Mark S. Densmore, PE, SI, have reviewed the file for the subject project
Knoxville„TN 379I and have rethought and recreated the structural evaluation portion of the
Dallas, Tx 76104 subsidence investigation for SDII Global Corporation. As such, I am now
Houston, TX 77042 serving as the successor professional structural engineer of record.
SDII Global Corporation appreciates this opportunity to be of service to you.
If we can be of further assistance in this or other matters, please do not
hesitate to contact us.
Sincerely,
SDII GLOBAL CORPORATION
4509 George Road, Tampa, Florida 33634
FBPE Certificate of Authorization #8778
Mark S. Densmore, P.E., S.I.
Structural Engineer of Record
Florida License Number 54625
THF,SF, PLANS AND All. PROPOSED WORK
ARE SUBJECT TO ANY CORRECTIOM
REQUIRED BY RELD,IWKCTORS THAT
MAY BE NECESSARY IN ORDER TO
COMPLY WITH ALL AP&GABLE CODES.
rt
Still Global Corporation
4509 G=9e Road
Tampa, Mrlda'33634
,813A96.9634
Fax 813.496,9864
J.�
Sc
q
St 4Uc/6yNFO
coUnry
October 31, 2013
Ms. Iasha Pryor
Frontline Homeowners Insurance
7131 Business Park Lane, Suite 300
Lake Mary, Florida 32746
Subject: Foundation Stabilization Recommendations
Lyshon Residence — Fort Pierce, Florida
Claim No. 009-20290
SDII Project No. 8058005C
Dear Ms. Pryor:
As requested, provided below are foundation stabilization
recommendations by SDII Global Corporation (SDII) for the Lyshon
residence (subject residence) located at 2601 Gray Twig Lane in Fort
Pierce, Florida. Figure 1 illustrates the project location. It is noted that
SDII completed a subsidence investigation at the subject residence and
was detailed in our Final Report — Subsidence Investigation dated August
21, 2013. In our report, it was SDII's opinion, within a reasonable
professional probability, that sinkhole activity, as defined by Chapter (§)
627.706(2)(i) Florida Statutes (F.S.), did not exist at the Lyshon residence
and that the observed damage to the structure is most consistent with
either the direct result, or the collateral effect, of differential foundation
movement. The observed conditions were structurally significant in that
they compromise the load capacity of primary structural members or
systems.
The differential movement of the foundation was primarily attributed to
the shallow organic -rich soils that were encountered onsite and evident in
SPT B-1. These soils are susceptible to compression as a consequence of
organic decomposition, resulting in settlement. Also contributing to the
differential foundation movement are the encountered near -surface sandy
soils are also susceptible to consolidation and/or settlement. These
conditions are a result of various factors including variations in applied
structural loads through the foundation, variable soil relative densities,
seasonal fluctuations in groundwater levels, surface soil erosion, and
stormwater runoff and percolation. These factors can occur at varying
points during a structure's lifetime and need not be contemporaneous.
These factors can contribute to long-term settle der tial
movement of the foundation. SDII has been d p 0V'OPY
recommendations for stabilizing the foundation of a fff��� sif
Foundation Stabilization Recommendations
Lyshon Residence —Fort Pierce, Florida
Claim No. 009-20290
SDI/Project No. 86k05C
Paget of 3
Based on the slope of the floor slab and the damage observed, SDII recommends that the
foundation of the structure be stabilized and releveled through the installation of helical piles
around the perimeter of the structure. The intent of the helical piles is to resupport the
foundation/slab such that the helical flights will bear on the medium dense sands encountered
between 20 and 35 feet bls. The installation of the underpinning piles will lift, support, and
relevel the structure, closing the relatively wide cracks that have opened. The underpinning
helical pile assembly, including mounting bracket, is to have a minimum load capacity of 30
kips. The contractor is to submit the proposed helical pile system to SDII for approval.
The underpinning helical piles should be installed around the perimeter of the structure as shown
on Figure 2. These piles should be advanced to bear on the medium dense sands between 20 and
35 feet bls (estimated average of 30 feet). The lead section flights (likely 3 flights will be
necessary) shall be capable of bearing a 30-kip load. The final bearing capacity will be
determined in the field based on the final achieved torque as per the manufactures specifications
of the equipment utilized. Helical bearing capacities shall be confirmed by the overseeing
geotechnical engineer. Flight configuration and pile installation methods must be submitted to
SDII for approval.
Helical pile spacing should be approximately 6 feet on center and should not be located more
than 3 feet from any corner unless a spreader beam is utilized and should not be located under
any window or ,opening unless approved by the overseeing engineer. An estimated 46 piles will
be required at the approximate locations shown on Figure 2. These locations may require
adjustment by the contractor based on site conditions but the overseeing engineer must approve
any adjustment.
It is important to note that the optimum level to which the structure can be lifted as a result of the
underpinning process is a function of the structural configuration as well as the amount of long-
term and irreversible stresses that have accumulated. It may not be practical to attempt to
completely relevel the structure, as excessive collateral damage may result. Following the
underpinning, any remaining releveling that is needed should be accomplished through cosmetic
repair techniques. It is our recommendation that the structure be carefully monitored during the
lifting process. It should be noted that the contractor is responsible for the means and methods of
construction.
A list of estimated costs for repair and engineering supervision is provided below. It does not
include estimates for cosmetic repairs, which should be estimated by a qualified insurance
adjustor or contractor. Cosmetic repairs should be postponed for 30 days after the installation of
the helical piles to allow for any subsequent structure movement to occur.
A. Install underpin helical piles: 46 piles @ $1,250 (average cost) each .......... $57,500
B. Monitoring and Certification....................................................................... $9,040
Total.........................$66,540
This cost estimate should be considered an "order of magnitude" estimate of actual construction
costs, and therefore should not be construed as a bid for performing th al
only be determined through solicitation of bids from qualified contractors l COPY
Foundation Stabilization Recommendations Page 3. of 3
Lyshon Residence —Fort Pierce, Florida
Claim No. 009-20290
SDII Project No. 8058005C
Continuous monitoring by SDII personnel during foundation stabilization is suggested to verify
compliance with these recommendations and to make necessary adjustments to the stabilization
program due to unforeseen site conditions. This will also allow the engineer who created the
foundation stabilization design to certify that the stabilization met design specifications. It should
be noted that the contractor is responsible for the means and methods of construction.
SDII appreciates the opportunity to have assisted Frontline Homeowners Insurance on this
project. Should you have any questions concerning this or any other matter, please do not
hesitate to contact us.
Sincerely,
SDII Global Corporation
4509 George Road, Tampa, Florida 33634
FBPE Certificate of Authorization #8778
/450
/ Ruben Sosa, Jr., P.E. l Thomas H. Fi E.
Principal Geotechnical Engineer Senior Princ' Engineer (Civil/Structural)
State of Florida License 61847 State of rida icense 58027
Attachments: Figure 1— Project Site Location Map
Figure 2 — Site Plan Showing Approximate Location of Helical Piles
Distribution: Addressee —1 Electronic (Digitally Signed Copy)
File —1
A digital signature(s) has been used to sign and seal this document in accordance with applicable state statutes. If not signed and sealed by the
licensed professional named and shown as its authors, the findings, conclusions, and opinions cannot be relied upon by anyone for any reason;,
as such, the document has been provided for informational purposes only.
FILE COPY
N
NOT TO SCALE
FRONTLINE
HOMEOWNERS
INSURANCE
LAKE MARY, FLORIDA
v�I�.ivnt+,lL:h#wA'z�.:�
APPROXII�QATE�'
FPROJEGTySITE;J � `,� �4 T�rMs�„r_..
•. �� wmr�wrF7t.'E". ..,ti5;r.�iY 'Y,o +CS ,. .
> c"
n�Y U
w'
.i
STAUCIE;
COUNTY'"'
r �2� C3P1C_
PROJECT SITE LOCATION MAP
PROJECC NO.: 8058W5C
CHECKED BY: RS
DRAWING NO.: 8005C 1
DRAWN BY: L4R
DATE: 10/25/13
Ll
B-,
a
------------
J
wmmSo n,Pa (DaWIL
FbHa Lb =MINT
Soil GL Capmw
45D9Gan.R=J
Twq%FA,4a33536
P�ynemap r»�Gwesna
d3Ucetsek56525 `-
Gb0elCmrp B n� ._.
Geom—aFoad
pe Fhhla 3383a —
omrIrg BVahem C.A aene
B-2
S
IY:I
TR
EE
TYP
T) 41W3JUY HEUCJ. RLE SPACING IS 6'-0' O.C.
2) D0. NOT RACE HELICAL PILES UNDER'. WALL OPENINGS WGNOUT SPREADER BEAM
3) HELICAL PEE ASSEMBLY TO MVE A LONINUY SERVICE LOAD CAPACITY OP 30 NIP
a) CONTRACTOR TO SUBMIT PROPOSED HELCAL PILE SYSTEM TO SD9 FOR APPROVAL
B_) ® APPROXIMATE LOCATION OF SPT BORING WITH DESIGNATION
0 APPROXIMATE LOCATION OF AREA PARTIALLY OR TOTALLY INACCESSIBLE TO GPR SURVEY
INDICATES LOCATION OF HELICAL PILE WITH SPREADER BEAM
O INDICATES LOCATION OF HELICAL PILE
SITE PLANOM
FRONTLINE
HOMEOWNERS
INSURANCE
LAKE MARY, FLORIDA
A/C
PVC
PIPE
N
0 20'
SCALE
4Lysflolq fumw
W W
FORT PIERCE; FL
DESIGNED BY: RSFDRAWWGNO.:
ECT NO.: BOSBOOSC FIGUI
CHECKED 8005C•2 2
CREATED DATnE,.
10/25/13
L'GlobarmF' C4��eC F� August21,2013
,poration , °gory
George Road Ms. Iasha Pryor
oa, Florida 33634 754-SDII Frontline Homeowners Insurance
'
377-576-5921 t 7131 Business Park Lane, Suite 300
_. ----- Lake Mary, Florida 32746
Miami, FL 33176 Subject: Final Report - Subsidence Investigation
Pensacola; FL 32505 '. Lyshon Residence — Fort Pierce, Florida
Sunrise, FL 33351 ` f
Atlanta, GA'30152 ' Claim Number: 009-20290
Metairie,ILA`76bo2 ` SDII Project Number: 8058005B
Newton ;MA 02132 ,i
Knoxville TN 37923 Dear Ms. Pryor:
Dallas, TX i5104'
Houston, TX 77042 - r
j. SDII Global Corporation (SDII) is pleased to submit this final report of our
i subsidence investigation, including our structural damage evaluation, for the
above referenced project. When conducting a subsidence investigation, SDII
follows the general sinkhole -investigation and structural damage evaluation
protocols included in Chapter 627 of the Florida Statutes and described in
j "Geological and Geotechnical Investigation Procedures for Evaluation of the
Causes of Subsidence Damage in Florida" (Florida Geological Survey,
Special Publication No. 57, 2005).
Presented herein are the findings and conclusions of our investigation,
li including: (1) identification of the observed and reported damage; (2)
- . evaluations of the cause(s) of the damage; (3) determinations as to whether
the damage is structural in nature; and (4) determinations as to whether or not
sinkhole activity exists at the site. These evaluations are based on an
1 extensive data collection and interpretation effort by our technical staff with
supervision and review by the professionals who have signed and sealed this
report.
SDII appreciates the opportunity to have assisted. Frontline Homeowners
Insurance on this project. The senior professionals who developed the
opinions contained herein, are always available to help. If you have any
questions or comments concerning this report, please do not hesitate to
contact us.
Sincerely, FILE
SDII GLOBAL CORPORATION COPY
,f
Subsidence Investigation SDIi'rioject Number: 8058005B
Lyshon Residence — Fort Pierce, Florida
EXECUTIVESTTWUAPY
Frontline Homeowners Insurance retained SDII Global Corporation (SDII) on July 30, 2013 to
conduct a subsidence investigation, including a structural damage evaluation at the Lyshon
residence in Fort Pierce, Florida. The purpose of the. investigation was to determine if sinkhole
activity and structural damage exist at the property and, to the extent possible, the probable
causes contributing to the observed damage, especially structural damage, at the property.
SDII previously completed a Structural Damage Evaluation (SDE) and a Residential Damage
Assessment (RDA) at the Lyshon residence to determine if structural damage exists at the
property and, to the extent possible, determine the probable causes contributing to the damage,
especially structural damage, at the property. SDII issued the RDA and SDE reports to Frontline
Homeowners _Insurance dated May 16, 2013 and August 19, 2013, respectively. The conclusions
of the SDE evaluation are incorporated into this report. Please refer to the RDA and SDE reports
for the observed and reported damages, and an evaluation of said observations and structural
damage to the residence.
The following methods were utilized in our investigation:
• A site inspection and an owner interview were completed to identify local conditions,
record specific concerns, establish a history of the structure, determine a timeline of
observed damages, and obtain details of the construction of the structure.
• Damage to the structure was documented, photographed, and mapped (Figure 2).
• A Ground Penetrating Radar (GPR) survey was conducted around the perimeter and
inside of the structure to identify anomalous subsurface areas within the zone of influence
of the foundation and in other areas of interest (Figure 3). Wall scans were also
conducted along the exterior walls of the structure where applicable.
• Test pits were excavated to directly observe foundation construction and geometry
(Figure 4).
• Hand auger (HA) borings and push penetrometer soundings were advanced to determine
the composition and strength of subsurface materials near the foundation and the upper
zone of influence of the structure (Figure 4).
• Standard Penetration Test (SPT) borings were advanced adjacent to the foundation in
order to characterize the relative stability of soils within the zone of influence of the
structure and to investigate deeper geologic conditions for the presence of evidence of
sinkhole activity (Figure 4).
• Laboratory testing of soils was performed to identify deleterious soil types and for quality
control of soil and geologic materials classification.
• Relative floor elevation contour mapping was completed to identify anomalous floor
elevation trends and establish a baseline contour map of the existing floor elevation
(Figure5). FILE COPY
iii
Subsidence Investigation
Lyshon Residence — Fort Pierce, Florida
SDIi r`roject Number: 8058005B
• A limited visual, non-destructive structural assessment was completed by an engineer in
the field to identify construction methods and structural deficiencies related to the
potential causes of observed damage.
• Specific structural observations and measurements were made to allow for determination
of the conditions considered to reflect structural damage.
• ASTM International (ASTM) standard methods, where available, were generally utilized
in this scope of work. Otherwise, industry standard methods were employed. Methods of
data collection are explained and cited in Appendix A.
This final report was prepared to summarize the results of the subsidence investigation and
reiterate the results of SDII's Structural Damage Evaluation. If sinkhole activity is identified, this
report also includes SDII's recommendations for remediation. This report provides conclusions
concerning whether sinkhole activity and structural damage exist.
It is SDII's opinion, within a reasonable professional probability, that sinkhole activity, as
defined by Chapter (§) 627.706(2)(i) Florida Statutes (F.S.), does not exist at the Lyshon
residence. The SPT boring data do not indicate the presence of sinkhole activity at the site. The
N value patterns observed in the SPT borings are consistent with normal compaction of
sediments, changes in stratigraphy, an increase in the clay content, and/or depositional features
related to the geology of the Eastern Valley Physiographic province of St. Lucie County. There
were no indicators of settlement or systematic weakening of the earth supporting the residence
resulting from contemporaneous movement or raveling of soils, sediments, or rock materials into
subterranean voids created by the effect of water on a limestone or similar rock formation. The
generally lateral continuity of the stratigraphy, as well at the relatively similar N value patterns
observed in the SPT borings, indicates that the sediments have not been disturbed by sinkhole
activity.
It is SDII's opinion, within a reasonable professional probability, that structural damage,
§627.706(2)(k) F.S., exists at the Lyshon residence. The observed damage to the main structure
qualifies as excessive foundation displacement or deflections.
As structural damage, as defined in §627.706(2)(k) F.S., has been identified and the
presence of sinkhole activity, as defined in §627.706(2)(i) F.S., has been eliminated, SDII
certifies that this investigation was of sufficient scope to determine the absence of sinkhole
loss, as defined in §627.706(2)0) F.S., and the presence of other cause(s) of damage within a
degree of reasonable professional probability as specified in §627.7072 F.S. and §627.7073
F.S.
The observed damage to the main structure is most consistent with either the direct result, or the
collateral effect, of differential foundation movement. The observed conditions are structurally
significant in that they compromise the load capacity of primary structural members or systems.
The differential movement of the foundation is primarily attributed to the shallow organic -rich
soils that were encountered onsite and evident in SPT B-1. These soils are susceptible to
compression as a consequence of organic decomposition, resulting in settlement. Also
iv
FILE COPY
Subsidence Investigation
Lyshon Residence — Fort Pierce, Florida
SDH rroject Number: 8058005B
contributing to the differential foundation movement are the encountered near -surface sandy,
soils are also susceptible toconsolidation and/or settlement.. These conditions are a result of
various factors including variations in applied structural loads. through'the foundation, variable
soil relative densities, seasonal fluctuations in groundwater levels, surface soil erosion, and
stormwafer runoff and percolation. These factors can occur at varying points during a structure's
lifetime and need not be contemporaneous. These factors can contribute to long-term settlement
and differential movement of the foundation.
The following report details the basis of these findings. A list and definitions of terms utilized in
this report are provided in the Glossary.
Subsidence Investigation SDII'rr'-ject Number: 805800513
Lyshon Residence — Fort Pierce, Florida
2.5 Geologic and Geotechnical Evaluation Summary
The SPT data indicate that sinkhole activity, as defined by §627.706(2)(i) F.S., does not
exist at the site.
The SPT boring data do not indicate the presence of sinkhole activity at the site. The N value
patterns observed in the SPT borings are consistent with normal compaction of sediments,
changes in stratigraphy, an increase in the clay content, and/or depositional features related to the
geology of the Eastern 'Valley Physiographic province of St. Lucie County. There were no
indicators of settlement or systematic weakening of the earth supporting the residence resulting
from contemporaneous movement or raveling of soils, sediments, or rock materials into
subterranean voids created by the effect of water on a limestone or similar rock formation. The
generally lateral continuity of the stratigraphy, as well at the relatively similar N value patterns
observed in the SPT borings, indicates that the sediments have not been disturbed by sinkhole
activity.
The differential movement of the foundation described below is primarily attributed to the
shallow organic -rich soils that were encountered onsite and evident in SPT B-1. These soils are
susceptible to compression as a consequence of organic decomposition, resulting in settlement.
Also contributing to the differential foundation movement are the encountered near -surface
sandy soils are also susceptible to consolidation and/or settlement. These conditions are a result
of various factors including variations in applied structural loads through the foundation, variable
soil relative densities, seasonal fluctuations in groundwater levels, surface soil erosion, and
stormwater runoff and percolation. These factors can occur at varying points during a structure's
lifetime and need not be contemporaneous. These factors can contribute to long-term settlement
and differential movement of the foundation.
2-4
Subsidence Investigation SDii Project Number: 8058005B
Lyshon Residence — Fort Pierce, Florida
4.0 CONCLUSIONS
It is SDII's opinion, within a reasonable professional probability, that sinkhole activity, as
defined by §627.706(2)(i) F.S., does not exist at the Lyshon residence. The SPT boring data
do not indicate the presence of sinkhole activity at the site. The N value patterns observed in the
SPT borings are consistent with normal compaction of sediments, changes in stratigraphy, an
increase in the clay content, and/or depositional features related to the geology of the Eastern
Valley Physiographic province of St. Lucie County. There were no indicators of settlement or
systematic weakening of the earth supporting the residence resulting from contemporaneous
movement or raveling of soils, sediments, or rock materials into subterranean voids created by
the effect of water on a limestone or similar rock formation. The generally lateral continuity of
the stratigraphy, as well at the relatively similar N value patterns observed in the SPT borings,
indicates that the sediments have not been disturbed by sinkhole activity.
It is SDII's opinion, within a reasonable professional probability, that structural damage,
§627.706(2)(k) F.S., exists at the Lyshon residence. The observed damage to the main structure
qualifies as excessive foundation displacement or deflections.
As structural damage, as defined in §627.706(2)(k) F.S., has been identified and the
presence of sinkhole activity, as defined in §627.706(2)(i) F.S., has been eliminated, SDII
certifies that this investigation was of sufficient scope to determine the absence of sinkhole
loss, as defined in §627.706(2)0) F.S., and the presence of other cause(s) of damage within a
degree of reasonable professional probability as specified in §627.7072 F.S. and §627.7073
F.S.
The observed damage to the main structure is most consistent with either the direct result, or the
collateral effect, of differential foundation movement. The observed conditions are structurally
significant in that they compromise the load capacity of primary structural members or systems.
The differential movement of the foundation described below is primarily attributed to the
shallow organic -rich soils that were encountered onsite and evident in SPT B-1. These soils are
susceptible to compression as a consequence of organic decomposition, resulting in settlement.
Also contributing to the differential foundation movement are the encountered near -surface
sandy soils are also susceptible to consolidation and/or settlement. These conditions are a result
of various factors including variations in applied structural loads through the foundation, variable
soil relative densities, seasonal fluctuations in groundwater levels, surface soil erosion, and
stormwater runoff and percolation. These factors can occur at varying points during a structure's
lifetime and need not be contemporaneous. These factors can contribute to long-term settlement
and differential movement of the foundation.
These conclusions are based upon the following:
• The SPT borings indicated typical N values for the soils throughout the extent of the
SPT borings performed at the site. Voids or raveling soils indicative of sinkhole
activity were not observed during the completion of the borings.
FILE COP4-1 Y
Subsidence Investigation
Lyshon Residence — Fort Pierce, Florida
SDII rroject Number: 8058005B
The hand auger and SPT borings indicate the near -surface soils consist of very loose
to medium dense sands. Very loose and loose sandy soils are susceptible to long-term
settlement from variations in applied structural loads through the foundation, variable
and/or inadequate soil compaction, seasonal fluctuations in the groundwater table
level, surface soil erosion, surface -water runoff, and groundwater percolation.
• Laboratory testing of soil samples from 6 to 8 feet bls in SPT boring B-1 returned an
organic content of 12.3 percent by weight. Soils with organic contents greater than 5
percent by weight are generally considered unsuitable for foundation support due to
compression as a consequence of organic decomposition, resulting in settlement.
FILE COPY
4-2
Subsidence Investigation SDii`t•roject Number: 8058005B
Lyshon Residence — Fort Pierce, Florida
5.0 LIMITATIONS
5.1 Ground Penetrating Radar
According to ASTM D6429, GPR is the preferred method for investigating "voids and
sinkholes". This method provides high -resolution data with a minimum of interferences. GPR
has been used in similar investigations to help identify shallow subsurface conditions frequently
associated with karst features. In many cases, a GPR investigation has resulted in the
identification and mapping of the boundaries of karst features and has helped characterize their
size and geometry. This method, however, is limited to the ability of the GPR unit to collect
interpretable data. There is a possibility that karst features may exist at the project site and not be
detected by the GPR technique due to small size, subsurface soil conditions, or the occurrence of
such karst features below the depth of penetration of the GPR signal. Note that many GPR
anomalies are not sinkhole or karst features. The presence of an anomaly should not be construed
to reflect sinkhole activity simply because of its existence.
5.2 Standard Penetration Test and Hand Auger Borings
The determination of soil type and conditions was only done from the ground surface to the
maximum depth of the borings. Any changes in subsurface conditions that occur between or
below the borings would not have been detected or reflected in this report. Soil classifications are
based upon identifiable textural changes, color changes, changes in composition, or changes in
resistance to penetration at the intervals from which such samples were collected. Abrupt
changes in soil type, as reflected in boring logs and/or cross sections, may actually represent
gradual transitions.
Depth to the water table is based upon observations made while advancing hand augers and SPT
borings. The maximum depth of hand auger borings is 10 feet bls unless otherwise noted. Water
table depth is an estimate and does not reflect annual or extreme variations that occur due to
fluctuations in rainfall, pumpage, and rates of evapotranspiration. Low permeability soils or
sediments may not allow water to freely enter the borehole and, therefore, the water table may
not be evident or it may only represent a transient condition. The depths are estimated from the
immediate land surface, which is not surveyed or tied to a known reference elevation.
5.3 Site Figures and Conditions Described in this Report
The measurements used for the preparation of figures in this report were made with a fiberglass
measuring tape or measuring wheel. Such measurements are usually accurate to within ±5
percent. Right angles were estimated from existing exterior walls at the structure; such angles are
usually accurate to within 5 degrees. Figures in this report were not prepared by a licensed land
surveyor and should not be interpreted as such.
The construction and damage to the structure(s) investigated by SDII are subject to change. The
conditions described in this report are, to the best of our knowledge, c LEr
the time of the
investigation, but they may not reflect historical or post -investigation cor i
5.4 Use of This Report The conclusions, anal sis, and o inions ex ressed herein have been prepared within aeasono��
Y P P
degree of professional certainty. They are based on the results and interpretations of the testing
and/or data collection activities performed at the site, the information available to SDII at the
5.1
Subsidence Investigation SDII r-roject Number: 8058005B
Lyshon Residence — Fort Pierce, Florida
time the report was issued, and the education, training, knowledge, skill, and experience of the
author and/or licensed professional engineer noted.
The contents of this report are confidential and intended for the use of Frontline Homeowners
Insurance and its representatives or clients. Contents of this report may also be copyrighted,
privileged, or otherwise protected by work product immunity or other legal rules.
SDII assumes no liability for the misuse of this information by others and reserves the right to
update this report should additional information become available.
A digital signature(s) has been used to sign and seal this document in accordance with applicable
state statutes. If not signed and sealed by the professionals named and shown as its authors, the
findings, conclusions, and opinions cannot be relied upon by anyone for any reason; as such, the
document has been provided for informational purposes only.
SDII Global Corporation appreciates this opportunity to be of service to you with this
investigation. If we can be of further assistance, please do not hesitate to contact us.
5-2
Subsidence Investigation SIiu rroject Number: 8058005B
Lyshon Residence — Fort Pierce, Florida
6.0 ENDORSEMENTS
6.1 Compliance with Florida Statute Title XXXVII §627.7072 F.S. and §627.7073 F.S.
This report followed the statutory requirements that it be prepared by individual(s) qualified to
determine the following: (1) the existence of sinkhole activity and that the tests performed be of
sufficient scope to eliminate sinkhole activity as the cause of damage; and (2) the existence of
structural damage and that the tests performed be of sufficient scope to determine whether or not
structural damage exists. As structural damage, as defined in §627.706(2)(k) F.S., had been
identified and the presence of sinkhole activity, as defined in §627.706(2)(i) F.S., had been
eliminated, SDII certifies that this investigation was of sufficient scope to determine the absence
of sinkhole loss, as defined in §627.706(2)0) F.S., and the presence , of other cause(s) of damage
within a degree of reasonable professional probability as specified in §627.7072 F.S. and
§627.7073 F.S.
6.2 Certifications
In accordance with Florida Statutes, the following individuals, who are licensed to practice in the
State of Florida and are Principals of SDII, have supervised this investigation and report.
This report shall not be considered official unless it bears original signatures and seals.
SDII GLOBAL CORPORATION
4509 George Road, Tampa, FL 33634
FBPE Certificate of Authorization 8778
FBPG Geology Business GB91
Michael C. Alfieri, P.G., P.Hg., CGWP
Geologist of Record
Florida License Number PG2476
(Geological Interpretation)
Ruben Sosa, Jr., P.E.
Geotechnical Engineer of Record
Florida License Number 61847
(Geotechnical Evaluation)
Mark S. Densmore, P.E., SST:
Structural-Engineet•-of,Rcord
Florida Li6ehse'Number:54625
(Structural Evaluation)
6-1
m el ell 8 _ 4
m
ja e, Lt
9 gg P l
..-:
i
Rd
Cl
vP
!, n w�, arl flr ers u't, p -
f _1
i'
PROJECPMSIM
I.00�ATION
6• .�, r rEL` .
r rf.
4 t
N
NOT TO SCALE
ST{"LLJCTE�x :r 1'+ a�`•+F�,° `t' �tZa�e.k: <-,�,a%`�'r,;ri':
COLRVTgY
in, mill
PROJ A
FRONTLINE LYSHON RESIDENCE
HOMEOWNERS FORT PIERCE, FLORIDA
INSURANCE
LAKE MARY, FLORIDA CHECKED BY: MCA PRoIEcr NG.: 8058005B FIGURE
,
DRAWING.NO.: 8005B-1
DRAWN BY: LAR
DATE: OB/12/13
APPROXIMATE LOCATION OF CRACKING IN CEILING SCALE
FRONTLINE
HOMEOWNERS
INSURANCE.
LAKE MARY, FLORIDA
SITE PLAN SHOWING APPROXIMATE LOCATION
AND EXAMPLES OF OBSERVED DAMAGE
LYSHON RESIDENCE
CHECKED BY: MCA PROJECT NO.: 8058005B FIGII
DRAWING NO.: 8005B -2[
CREATED BY: SMS 2
I I DATE: 08/12/13.
7
12
10
H
9
C.
8 W
7
J
6
U
5
4
3
2
1
0
A B G. D E F G H d. J
APPROXIMATE LOCATION OF GPR TRANSECT LINE
APPROXIMATE LOCATION OF GPR TR . A NSECT LINE (STRUCTURAL) FILE Gyp
APPROXIMATE LOCATION OF SUBSURFACE ANOMALY WITH DESIGNATION
0 APPROXIMATE LOCATION OF AREA PARTIALLY OR TOTALLY INACCESSIBLE TO GPR SURVEY
APPROXIMATE LOCATION OF CRACKING/SEPARATION ON WALLS O 20,
APPROXIMATE LOCATION OF CRACKING/SEPARATION IN CONCRETE SLAB
APPROXIMATE LOCATION OF CRACKING IN CEILING SCALE
SITE PLAN SHOWING APPROXIMATE LOCATION
OF GPR SURVEY AND RESULTS
FRONTLINE LYSHON RESIDENCE
HOMEOWNERS INSURANCE FORT PIERCE, FLORIDA
LAKE MARY, FLORIDA CHECKED BY: MCA PROJECTNO.: 8658605B FIGURE -
DRAWING NO.: 8005B -3
CREATED BY: SMS 3
DATE: 0S/1y13
HA-7 -P
TP-1 ®
APPROXIMATE LOCATION OF TEST PIT EXCAVATION WITH DESIGNATIOI
HA-1 ®
APPROXIMATE LOCATION OF HAND AUGER BORING WITH DESIGNAT101
g-1 19
APPROXIMATE LOCATION OF SPT BORING WITH DESIGNATION
®
APPROXIMATE LOCATION OF SUBSURFACE ANOMALY WITH DESIGNATK
APPROXIMATE LOCATION OF AREA PARTIALLY OR TOTALLY INACCESSI
0
APPROXIMATE LOCATION OF CRACKING/SEPARATION ON WALLS
APPROXIMATE LOCATION OF CRACKING/SEPARATION IN CONCRETE S
_
APPROXIMATE LOCATION OF CRACKING IN CEILING
FRONTLINE
HOMEOWNERS
INSURANCE
LAKE MARY, FLORIDA
I
...:
................
B-3
PVC
in PIPE
TR
EE HA-4
TYP
N
IMA
TO GPR SUF I LE O
0 20,
SCALE .
SITE PLAN SHOWING APPROXIMATE
LOCATION OF FIELD TESTS _
LYSHON RESIDENCE
FORT PIERCE, FLORIDA
PRO]ECCNO.: 8058005B FIGURE
BY: MCA
I BY: SMS I
DRAWING NO.:. 8005B -4 4
ti
NOTE: COLOR SCALES DENOTE
RELATIVE ELEVATION IN INCHES
2.8 2.1
2A - 1:8
60:^.,.-
2 1.5
55 / ��1A 1.6 1.2
+� + 1f� , 1.2 0.9
+ ti"- + h + s 0.8 0.6
R ' 0.4 0.3
40 7.e + 1 10
+ +
z
w 30 t
Q +
vVi 25
O R
20
15 A L.
OW FEE
10 _.. 1.8
5 7(3
0 \
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70
SCALE IN FEET
N
+ INDICATES POINT OF MANOMETER DATA COLLECTION ♦ APPROXIMATE LOCATION OF MANOMETER FILE COP
FFE FINISHED FLOOR ELEVATION OF MAIN LIVING AREA
RELATIVE FLOOR ELEVATION
CONTOUR MAP
FRONTLINE LYSHON RESIDENCE
HOMEOWNERS FORT PIERCE, FLORIDA
INSURANCE
LAKE MARY, FLORIDA FIELD DATA: KA PROJECTNO.: 111110111 FIGURE
CHECKED BY: THE DRAWING NO.: 8005B-5 G
DRAWN BY: IAR DATE: 08112113 J
2
4
6
a
10
I
' HA-1 HA-2 HA-3 HA-4
20
25
25
SILTY SAND (SM): Dark -
brown (10YR3/3).silty fine
to medium quartz sand
with roots (approximately
2.7%organics)
WINNOW
07D .
orehole caved n @
caved i
LLTtQBf@
w
2
4
6
8
10
15
20
20
SILTY SAND (SM): Dark -
brown (10YR 3/3) silty fine
to medium quartz sand
(approximately 2.4%
organics)
TOB @ 2.5-ft. bile.
Borehole caved in@
water tattle
2
4
6
8
10
.
20
27
30
=
POORLY GRADED SAND
WITH SILT (SP-SM):
Dark -brown (10YR 3/3)
fine to medium quartz
.sand with silt
TOB @ :3.0 ft. bls.
Borehole caved in @
.water table
APPROX WAT�BLE - APPROX SEASONAL HIGH WATER TABLE 9D APPROX ANALYZED SOIL HORIZON TOB TERMINATION OF BORING
NOTE:
Frontline Homeowners
HAND AUGER BORING LOGS
SITE NAME: Lyshon Residence
SECOND COLUMN FROM LEFT
Insurance
SITE LOCATION: Fort Pierce, Florida
INDICATES APPROXIMATE PUSH
Lake Mary, Florida
DESIGNED BY: JMW
PROJECT NO.: 8058005A
HAND'
PENETRATION VALUES IN kg1cm2
(WHERE APPLICABLE)
CHECKED BY: JMW
BORING DATE: 07/19/13
AUGERS
DRAWN BY: MVK
PAGE NO.: 1 of-1
1 thru 4
I
_J
J
COMMENTS
PENETRATION
BLOW 4
O
in
Water Table
= uJ
IL m
DESCRIPTION
blows per foot
COUNTS >
Drilling Fluid Losses
w
G
Z
W
ft. = ft. bls (typical)
0
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
. POORLY GRADED SAND WITH.
I
I
!
Hand auger boring from 0-4 ft.
SILT (SP-SM): Very loose
ppt resistances @ 1,2,3,4 R:
Greyish -brown (10YR 5/2) fine to
I
15/22115112 kg/sq cm
medium quartz sand with silt
;
412n12
3/41877
4
12
NoEV from 4ft. to end of, boring
EFR @,8 ft. @15 gpm
`
SILTY SAND WITH ORGANICS
(SM-PT): Medium dense
8/12/1219
,24
Black (10YR 211) fine to medium
quartz sand with silt (appro)(imately
12.3%organic)
0 120
40
60
801I
514/6
10
POORLY GRADED SAND WITH
SILT (SP-SM): Loose to medium
dense
Light -brownish -grey (10YR 6/2) fine
7110/12
22
to medium quartz sand with silt
i
I
POORLY GRADED SAND WITH
SILT (SP-SM): Medium dense
!
7/8/8
16
Very -dark -greyish -brown (10YR 3/2)
to medium quartz sand with silt
fifine nd t
0--20
j 40T60'
8071
1 OG
8110/12
22
POORLY GRADED SAND WITH
SILT (SP-SM): Medium dense
!
Light -brownish -grey (10YR 6/2) fine
!
!
615/9
14
to medium quartz sand with sill
j
'
POORLY GRADED SAND WITH
i
I
313/3
6
SILT (SP-SM): loose to medium
i
dense
Very -dark -grey (10YR 3/1) fine to
medium quartz sand with silt
020
40
60
8010
3/6/13
19
POORLY GRADED SAND WITH
SILT (SP-SM): Medium dense
`
Grey (10YR 5/1) fine to medium
1216/6
12
_ 4
quartz sand with silt and shell
!
4/4f7
11
dense
CLAYEY SAND (SC): M�ah�elll
Grey (10YR 5/1) clayey
j
medium quartz sand with
i-�
NO RECOVERY
0 20
40
8010
517/18
25
1607
SHELL: Light -grey (10YR 7/1) shell
with clay
"
J
20/15J18
33
POORLY GRADED SAND WITH
•
CLAY (SP-SC): Dense to very dense
(
j
•
�,
Grey (10YR 6/1) fine to medium
i
20I20/18
38
quartz sand with clay and shell
I
.y
24/22/40
62
0 20
40
60,4
80
100
•
j
23/41I
0+
s of penetration
50 ybI
T
ut I re
Frontline Homeowners
SPT BORING LOG
SITE NAME: Lyshon Residence
Insurance
SITE LOCATION: Fort Pierce, Florida
Lake Mary, Florida
DESIGNED BY: MVK
CHECKED BY: JMW
DRAWN BY: DEF
PROJECT NO: 8058005B
BORING DATE: 8112113
PAGE NO: 1 of
BORING
B��
COMMENTS
PENETRATION
BLOW �.
m
Water Table
= to
DESCRIPTION
>
Drilling Fluid Losses
a
blows per foot
COUNTS
r
z
rn
ft. = fi. bls (typical)
0-
5
10-
15-
20 -
25-
30 -
35 -
40 -
45-
50 -
55 -
60-
65-
70 -
75 -
80-
85-
POORLY GRADED SAND WITH
I
_
Hand auger boring from
SILT (SP-SM): Medium dense
I
I.
ppt resistances @ 1;2,3,4 ft.:
Dark -brownish -grey (10YR 4/2) fine
35/44/50160kglsq cm
to medium quartz sand with silt
i
7/7/8/12
15
NoEV from 4 ft. to end of boring
POORLY GRADED SAND WITH
j
10/10/10/12
20
T
EFR @ 8 ft. @ 15 gpm
SILT (SP-SM): Medium dense
j
8l8110/10
18.
Greyish -brown (10YR 512) fine to
I
medium quartz sand with silt
j
i
0 20
40 60
6010
I
5/5/5
10
POORLY GRADED SAND WITHCLAY
: Loose
"J
Grey shsbro n) (10YR 5/2) fine to
medium quartz sand with Gay
10/10/13
23
POORLY GRADED SAND WITH
11
SILT (SP-SM): Medium dense
,
Light -brownish -grey (10YR 612) fine
to medium quartz sand with silt
j
'
8/13/13
26
' .
I
OT20
I
i
40T60
I
i
_
80
I
I
. 100
I
8110/13
51818
23
16
POORLY GRADED SAND WITH
SILT (SP-SM): Loose to medium
dense
j
Dark -grey (10YR 4/1)fine to medium
j
quartz sand with silt
'
6/5l5
10
0 2
j
40T60
8010
I
5/8f7
15
POORLY GRADED SAND WITH
.
CLAY (SP-SC): Very dense
Grey (10YR 511) fine to medium
40/38/50
88
quartz sand with clay and shell
i.
j
I
617/10
17
SHELL: Light -grey (10YR 7/1) shell
with clay
07 20
40 660
80
1 OC
4/5110
15
16l15/18
33
•
'`.
POORLY GRADED SAND WITH
•
'�
CLAY (SP-SC): Dense to very dense
SGrey
(10YR 6/1) fine to medium
i
quartz sand with clay and shell
9/12/28
40
'
25/35/30
65
0
20
40I
60
8010
I
Drilled hard from 76 ft. to end of
. •.
J,
j
I
boring
J
i
26130/30
60
TOB @80 ft. bls.
i
I
Grouted borehole
Frontline Homeowners
SPT BORING LOG
SITE NAME: Lyshon Residence
Insurance
SITE LOCATION: Fort Pierce, Florida
Lake Mary, Florida
DESIGNED BY: MVK
CHECKED BY: JMW
DRAWN BY: DEF
PROJECT NO: 80580058.
BORING DATE: 8112/13
PAGE NO: 1 of 1
BORING
8�.1
-
i.�
COMMENTS
PENETRATION
BLOW _
m
Water Table
w
DESCRIPTION
j
Drilling Fluid Losses
IL m
blows per foot
COUNTS
Lu
z
w
ft. = ft. bls (typical)
G
0
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
C
POORLY GRADED SAND WITH,
i
(
Hand auger boring from 0-4 ft.
SILT (SP-SM): Brown (10YR�5/3)fine
ppt resistances@ 1.2.3.4 ft.:
to medium quartz sand with silt
22/15/12/17 kglsgcm
I
4/415/10
9
NoEV from 4 ft. to end of boring
POORLY GRADED SAND WITH
Illyyy
SILT (SP-SM): Loose
I
7/8110/9
18
EFR @ 8 ft. @ 15 gpm
Very-darkyreyish-brown (10YR 3/2)
616/7/8
13,
Ij
fine to medium quartz sand with silt
POORLY GRADED SAND (SP):
I
i
Medium dense
0 20
1
40 '
60
8010
5/4l5
9
Light -grey (10YR 712) fine to medium
quartz sand
!
POORLY GRADED SAND WITH
816/6
12
SILT (SP-SM): Medium dense
Dark -brownish -grey (10YR 4/2) fine
to medium quartz sand with silt
10/817
15
POORLY GRADED SAND WITH
SILT (SP-SM): Loose to medium
dense
0 20T
O
60
80,10C
8/10/1'1
21
Light -brownish -grey (10YR 6/2) fine
i
to medium quartz sand with silt
POORLY GRADED: SAND WITH
!
7/10/10
20
SILT (SP-SM): Medium dense
Very -dark -grey (10YR 311) fine to
medium quartz sand with. silt
81615
11
POORLY GRADED SAND WITH
CLAY (SP-SC): Dense
•
—20+40
J
Grey (10YR 6/1). fine to medium
07
60
8010
8/19/27
46
ry
quartz sand with clay and shell
i
!
32120/10
30
CLAY (CLICH): Very stiff
Grey (10YR 5/1) clay with shell
I
i
4/4I6
10
SHELL: Light -grey (10YR 7/1) shell
^.
with clay
0 20
40
601
8010
5/5113
18
�.
15/16/16
32
POORLY_GRADED SAND WITH
•
CLAY (SPSC): Dense to.very dense
Grey (10YR 6/1) fine to medium
•
quartz sand with clay and shell
•
16135/32
67
'
•'
21/27/28
55
' ad f 6 I d f
0 201
40
60
8010
J
I
26/40/50+
1
10 f nc a trafion
9.5�/
roe.@ 80 ft. bls.
Grouted borehole
Frontline Homeowners
SPT BORING LOG
SITE NAME: Lyshon Residence
Insurance
SITE LOCATION: Fort Pierce, Florida
Lake Mary, Florida
DESIGNED BY: MVK
CHECKED BY: JMW
DRAWN BY: DEF
PROJECT NO: 8058005B
BORING DATE: 8112113
PAGE NO: 1 of 1
BORING
B'3