Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SUBMITTED PAPERS
ALL APPLICABLE I'N�CFFO, MUSIC BE COMPLETED FOR APPLICATION TO BE ACCEPTED Date: " 15 AjunOO alon-( •1S Permit Nun .l8 e J 02NNVOS Building Permit Applicatio Planning and Development Services Building and Code Regulation Division 2300 Virginia Avenue, Fort Pierce FL 34982 Phone: (772) 462-1553 Fax: (772) 462-1578 Commercial Residential ✓ PERMIT APPLICATION FOR: To Select from dropbox, click arrow at the end of line III I PROPOSED IMPROVEMENT LOCATION: —Al Address: Legal Description: 304 o r St.✓ Property Tax ID#: lqlEc—A13^ 0010-020-6 Lot No. Site Plan Name: •Project Name: (je4M,, 1) e-�- Setbacks Front Back: Right Side: Left Side: Block No. DETAILED DESCRIPTION OF WORK: III SW I I,,— tn� 1 N7 Poo f beC h CONSTRUCTION INFORMATION: orx to De Derrormeu unaer Ln❑'s Gas'Piping 1eLR a„ Shutters ❑ Windows/Doors HVAC Gas Tank Electric Plumbing ((�_ Sprinklers i Generator Ej L Roof i Total Sq. Ft of Construction: / f% 3 Sq. Ft. of First to r: Cost of Construction: $ 3,0. 7 2,3 Utilities: Sewer 4Septic Building Height: OWNER/LESSEE: CONTRA TOR:, Name F ric, 1,ilc Ville, Name: �r i jj Address: 4/9 /1 -rr'e J-6 p, h Company: S 0O E City: F r � P; e r C,- State: r, Zip Code: 3 `/ °/ S 1 Fax: Phone No. 696- Z 7 N Address: q6 VO A). S 7 City: _A& rn e.9 C Stater Zip Code: 0) 6 :z Fax: Phone No. 67 . 3067 E-Mail: Fill in fee simple Title Holder on next page ( if different from the Owner listed above) E-Mail: rg&VA14 (?' Q,Q�/STI}LfYST,EC State or County License: If value of construction is $2500 or more, a RECORDED Notice of commencemenz.is regwrea. SUPPLEMENTAL CONSTRUCTION LIEN LAW INFORMATION: DESIGNER/ENGINEER: _ Name: M13V �.� i Not Applicable trn/ MORTGAGE COMPANY: _ Not Applicable Name: Address: I `63 5 ad FL_ .S .-ee Address: . City: Veto 13 eAcl. Zip: 32-9(ot2 Phone: S&5- State: /-1. oo35- City: State: Zip: Phone: FEE SIMPLE TITLE HOLDER: Name: _ Not Applicable BONDING COMPANY: _Not Applicable Name: Address: Address: City: City: Zip: phone: Zip: Phone: I certify that no work or installation has commenced prior to the issuance of a permit. St. Lucie County makes no representation that is granting a permit will authorize the permit holder to build the subject structure which is in conflict with any applicable Home Owners Association rules, bylaws or and covenants that may restrict or prohibit such structure. Please consult with your Home Owners Association and review your deed for any restrictions which may apply. In consideration of the granting of this requested permit, I do hereby agree that I will, in all respects, perform the work in accordance with the approved plans, the Florida Building Codes and St. Lucie County Amendments. The following building permit applications are exempt from undergoing a full concurrency review: room additions, accessory structures, swimming pools, fences, walls, signs, screen rooms and accessory uses to another non-residential use WARNING TO OWNER: Your failure to Record a Notice of Commencement may result in your paying twice for improvements to your property. A Notice of Commencement must be recorded and posted on the jobsite before the first inspection. If you intend to obtain financing, consult with lender or an attorney before commencing work or recording vour Notice of Commencement. _ Sigddure of Owner/ Lessee/Agent STATE OF FLORIDA / COUNTYOF �Lh/ tr_r'r/� The forgoing instrument was acknowledged before me this L day of �..n e 20 /r'by s Signature of tractor/License Wol r STATE OF FLORIDA COUNTY OF Lnd 4 V The forgoing instrument was acknowledged before me this 4Lday of : v f< f 20 L by IF91C J0'4m,-ll gC1 r r�/ k/1s (Name of person acknowledging) (Name of person kno ledg(ng ) (Signatu f Notary Pub'c-State of Florida ) (Signature of Notary Personally Known i a 'o Personally Know Type of Identification P oql �Spj ,, I Type of Identifica 94 Notary Public State of Florida Commlolon 0 FF228285 Commission No. ` Co"l)on N FF 228285 Commission No. M Comm. Elfgd?Ap 4, 2019 _ My Comm. Expires Sep 4, 2019 11 to, 9Mdldfh M WmWNMWAun Revised 07/15/2014 REVIEWS FRONT ZONING SUPERVISOR PLANS VEGETATION SEATURTLE MANGROVE COUNTER RE VIE REVI REVIEW REVIEW REVIEW DATE r� COMPLETE / S INITIALS r PLANNING &'jjEVELOPMENT SERVICES DEPA t MENT Building and Code Regulations Division 2300 VIRGINIA AVE FORT PIERCE, FL 34982 (772) 462-1553 Fax (772) 462-1578 AFFIDAVIT OF REQUIREMENT COMPLIANCE Residential Swimming Pools, Spa, and Hot Tub Safety Act PERMIT # I (We) acknowledge that a new swimming pool, spa, or hot tub will be constructed or installed at 44rr I I Tr T! - and hereby affirm that one of the following methods (Please print street address) will be used to meet the requirements of Chapter 515, Florida Statutes: (Please initial the method used for pool.) The pool will be isolated from access to the home by an enclosure that meets the pool banner requrtemems of Florida Statute 515.29. The pool will be equipped with an approved safety pool cover that complies with ASTM F1246-91(Stmdard Performance Specifications for Safety Covers for Swimming Pools, Spas, and Hot Tubs). All doors and windows providing direct access from the home to the pool will be equipped with an exit alarm that has a minimum sound pressure rating of 85decibels at 10 feet. All doors providing direct access from the home to the pool will be equipped with self closing, self latching devices with release mechanisms placed no lower than 54 inches above the floor or deck. I understand that not having one of the above installed at the time of final inspection, or when the pool is completed for contract purposes, will constitute a violation of Chapter 515, F.S., and will be considered as committing a misdemeanor of the second degree, punishable by fines up to $500.00 and/or up to 60 days in jail as established in chapter 775, F.S. I understand that the St. Lucie County Building Inspections Department assumes no liability for the final inspection of one of the above protective devices, or the lack of maintenance, or the removal of such after the swimming pool has been finalized. 1, the contractor, agree to instruct the owner of the proper use and maintenance of such safety device. �0v yz� CONTR.POR SIGNATURE y- v SIGNATURE . STATE OF FL RIDA, COON OF / (`� !� 1 !/ `�� STATE OF FLORIDA, �Oy UUNNTY OF _ —AC/ lei �''`" Vh r Y I o NOT PUBLIC NOTARY PUBLIC The foregoing instrument was acknowledged before me this _Lday of --rl/r'e- , 201� by no Personally Known or Produced Identifirtion Type of Identification Produced: i`,,"'r'"3y..•• C 8 MILLS g ti Notary Public -Stale of Florida•; Commlaalon a FF 228285 s rA a �M�JJII �C�o�mm. Expires Sep 4. 20% 9E �dtididliif)tgtNtllaWNduyAua The foregoing instrument was acknowledged before me this _a day of l /V` (f , 20 S Personally Known 11 or Produced Identification Type of Identification produced: 22:�Y C 8MILLS Notary Piddle - Slate of Florida , Commission a FF 228285 M:` tr,awy COMM Expiras Sep 4, 2019 z PLANNING AND DEVELOPMENT SERVICES DEPARTMENT Building and Code Regulations Division 2300 Virginia Ave Fort Pierce, FL 34982 772-462-1553 Owner Builder Affidavit - Electrical Contracting DISCLOSURE STATEMENT F.S. 489.503 (6) EXEMPTIONS State law requires electrical contracting to be done by licensed electrical contractors. You have applied for a permit under an exemption to that law. The exemption allows you, as the owner of your property, to act as your own electrical contractor even though you do not have a license. You may install electrical wiring for a farm outbuilding or a single-family or duplex residence. You may install electrical wiring in a commercial building the aggregate construction costs of which are under $75,000. The home or building must be for your own use and occupancy. It may not be built for sale or lease. If you sell or lease more than one building you have wired yourself within 1 year after the construction is complete, the law will presume that you built it for sale or lease, which is a violation of this exemption. You may not hire an unlicensed person as your electrical contractor. Your construction shall be done according to building codes and zoning regulations. It is your responsibility to make sure that people employed by you have licenses required by state law and by county or municipal licensing ordinances. Failure to do so may result in a liability for you! To qualify for this exemption under this subsection, an owner must personally appear and sign the building permit application. I hereby acknowledge that I have read and understand the above disclosure statement and that I further understand that any violation of the terms of the owner/builder exemption shall be reported by the Community Development trector to the Florida State Department of Professional Regulation. Signed and acknowledged on this "2T k day of `fV i�42— 201 S . OWNER/BUILDER SIGNATURE STATE OF FLORIDA✓,CV'V,( COUNTY OF II JJ The foregoing insttr mpn, It was acknowledged before me this V day of e 20 by ft e— t,t�"' / t�� I.C7-i who is persona8y known ( tome or as identification. (SM) int name of Notary DERNADETTE CAMPDEIL ommissian Number OF �j SC9 Notary public • Slato of FIarIAa Ay CffVWao E1tres Dm-10, 2017 Commsslon e ff 77M SLCPDSD Revised SL Lurie County Owner Budder Affidavit -Electrical Contracting ti Planning 8 Development Services Building S: Code Regulation Division 2300 Virginia Avenue Fort Pierce, FL 349B2 Phone:(772)462-2172 Fax:(7721462.6443 PROPERTY INFORMATION Address: 4811 Tree Top Trl City / State I Zip: Fort Pierce, FI 34951 Parcel #: 1418-243-0010-00016 Zoning: AR-1 APPLICATION INFORMATION Permit Number: 1 UMM Permit Type: POOLISPA - RESIDENTIAL CONTRACTOR INFORMATION REVIEW COMMENTS L Owner(s): Eric Wetmiller Jurisdiction: SAINT LUCIE COUNTY Lot#: Stories: Contractor Name: Barry S Mills RECEIVED Business Name: Crystal Pools Of Indian River, Inc Business Addr. 4684 N. Us 1 JUL 2 2015 City / State I Zip: Vero Beach, FI 32967 REVIEWS AND COMMENTS Review Type DOCUMENTS MISSING 6/1212015 Comment: 6/19/2015 Comment: 6/2212015 Comment: ENVIRONMENTAL REVIEW Comment: FRONT COUNTER REVIEW Comment: PLANS EXAMINER REVIEW Comment: 7/912015 7/9/2015 Comment: 71912015 Comment: Comment: 7/9/2015 7/9/2016 Comment Block: Automatic Sprinkler System? No Fax Number: 772-770-5961 Email: Carenm@Crystalpoolsirc.Co m Status Reviewed By Date Started Date Completed Date Released PENDING Dawn Milone 611212015 • , NOTICE OF COMMENCEMENT VEG IN DRAWER UNDER W NO FEE , NEED SUBCONTRACTOR PERMITS COMPLETE ' Ben Balcer - 6/1912015 6119/2015 COMPLETE Dawn Milone 6/12/2015 6/1212015 :OMPLETE Joe Cicto 7l9/2015 i DESIGN PROFESSIONAL TO SHOW THE LOCATIONS OF THE POOL BARRIERS SURROUNDING THE POOL ON FLOOR PLANS • SUBMIT THE MANUFACTURERS SPECS FOR THE BARRIER SYSTEM' MUST CONFORM TO FBC 424.2:17' NOTE STATES SPA .THERE IS NO SPA DESIGNED ON PLANS 77 NO 2 IS AN INCORRECT CODE CITE' PRIVATE POOLS ARE 424.2.61N THE 2010 FBC SUBMIT THE MANUFACTURERS SPECIFICATIONS IN DUPLICATE FOR THE PUMP' MUST BE IN CONFORMANCE WITH FBC 424.2.7 AND 9.10.1 ANSIIAPSP SHOW A SIDE ELEVATION OF THE POOL IDENTIFYING ALL WATER DEPTHS AND FLOOR SLOPES IN CONFORMANCE WITH ANSI/APSP/ICC5-2011 ' ENGINEER TO NOTE THIS REFERENCE STANDARD ON PLANS AS A DESIGN GUIDE COMMENTS MAILED AND E-MAILED AS OF THIS DATE - Joe Cicio From: Joe Cicio Sent: Thursday, July 09, 2015 10:48 AM To: Icarenm@crysta[poolsirc.com' Cc: Joe Cicio Subject: Review Comments for Permit Number 1506-0228 Attachments: Report_FL_Review_Comments_Noncompliantjrf.pdf Please Note: Florida has very broad public records laws. Most written communications to or from County officials regarding County business are public records available to the public and media upon request. It is the policy of St. Lucie County that all County records shall be open for personal inspection, examination and / or copying. Your e-mail communications will be subject to public disclosure unless an exemption applies to the communication. If you received this email in error, please notify the sender by reply e-mail and delete all materials from all computers. Planning & Development Services Building & Code RegulationDivision 2300 Virginia Avenue FortPierce, FL. 34982 Phone:(772(462-2172 Fax:(772(462.6443 PROPERTY INFORMATION Address: 4811 Tree Top Trl City / State / Zip: Fort Pierce, FI 34951 Parcel 1418-243-0010-000/6 Zoning: AR-1 APPLICATION INFORMATION Permit Number: 1506-0228 Permit Type: POOUSPA- RESIDENTIAL CONTRACTOR INFORMATION Contractor Name: Barry S Mills Business Name: Crystal Pools Of Indian River, Inc Business Addr: 4684 N. Us 1 City / State / Zip: Vero Beach, FI 32967 REVIEWS AND COMMENTS Review Type DOCUMENTS MISSING 6/12/2015 Uommenr: 6/19/2015 Comment: 6/22/2015 Comment: ENVIRONMENTAL REVIEW Comment: FRONT COUNTER REVIEW Comment: PLANS EXAMINER REVIEW Comment: 7/9/2015 7/9/2015 Comment 7/9/2015 Comment: Comment: 7/9/2015 REVIEW COMMENTS 1 Owner(s): Eric Wetmiller Jurisdiction: SAINT LUCIE COUNTY Lot#: Block: Stories: Automatic Sprinkler System? No Fax Number: 772-770-5961 Email: Carenm@Crystalpoolsirc.Co In Status Reviewed By Date Started Date Completed Date Released PENDING Dawn Milone 6/12/2015 NOTICE OF COMMENCEMENT VEG IN DRAWER UNDER W NO FEE NEED SUBCONTRACTOR PERMITS COMPLETE Ben Balcer 6/19/2015 6119/2015 COMPLETE Dawn Milone 6/1212015 6112/2015 INCOMPLETE Joe Cicio 71912015 DESIGN PROFESSIONAL TO SHOW THE LOCATIONS OF THE POOL BARRIERS SURROUNDING THE POOL ON FLOOR PLANS' SUBMIT THE MANUFACTURERS SPECS FOR THE BARRIER SYSTEM' MUST CONFORM TO FBC 424.2.17' NOTE STATES SPA. THERE IS NO SPA DESIGNED ON PLANS ?? NOTE #17 ON SHEET 21S AN INCORRECT CODE CITE' PRIVATE POOLS ARE 424.2.6 IN THE 2010 FBC SUBMIT THE MANUFACTURERS SPECIFICATIONS IN DUPLICATE FOR THE PUMP • MUST BE IN CONFORMANCE WITH FBC 424.2.7 AND 9.10.1 ANSI/APSP SHOW A SIDE ELEVATION OF THE POOL IDENTIFYING ALL WATER DEPTHS AND FLOOR SLOPES IN CONFORMANCE WITH ANSI/APSP/ICC-5-2011 ' ENGINEER TO NOTE THIS REFERENCE STANDARD ON PLANS AS A DESIGN GUIDE 7/9/2015 Comment: COMMENTS MAILED AND E-MAILED AS OF THIS DATE Planning & Development Services Building & Code Regulation Division 2300 Virginia Avenue FortPierce, FL. 34982 Phone:(772)462.2172 Fax:(7721462.6443 REVIEW COMMENTS ZONING REVIEW COMPLETE Jeffrey Johnson 611612015 6/2212015 612212015 Comment: _ y r l � s _ Planning & Development Services - Building & Code Regulation Division • I 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT #: L 50k"�5 JOB ADDRESS: 2 �o BUILDER/CONTRACTOR: PEST CONTROL CONTRACTOR: e Z r 0 PEST CONTROL LICENSE #: I-1�S�2f We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: a 0 (irloc +—Chemicals used: �� C Percentage of solution: ;�LsL) 07— Total gallons used:gwl Date of Treatment: 0 Time of Treatment: U! 3 0 Footing 1st Treatment Re -Treat Driveway 1st Treatment Re -Treat Other 1st Treatment Re -Treat Slab 1st Treatment Re -Treat Pools 1st Treatment Re -Treat Perime � FinajInnsp�e�n r nature of Ext ina or Note: There must be'a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled Inspection will fail and a re -Inspection fee charged. FBC104.2.6CertlficateofProtectiveTreabnentforpreventionoftermites. AweatherresIstantjobsitepostingboard shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit is Issued to and another copy for the building permit files The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical bander method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. i'l Page 1 of 3 BUILDING &CODE SYSTEM You are logged s: sneaecota5n .,. �.. +,:.. as: very=n 15:: ROM -AS P y P 9 QI'jGp9rpefyRl(gtl0r ;B g Alert Edit Permit Search Permit Review Inspection Permit Fee/Pa Mlsc Fee Contractor Reports Malnt Fiscal i.Flood Log Fron CARRICK R BAILEY is ACTIVE. _ Submit Query LPdnt ADD OR -EDIT PERMIT 1( Add New Renewal Permltl rnotALLIP PermitConfirm# Status Enter Permit#:(Press ENTER) 1506.0 YB. 1506-021$ 334 Issuedylew,$panrn Enter ZC Proposed Bus Name(Press ENTER) _ Change Parcelld Edit Address I I Address: . 811. TREETOP TRL _ _ j FORT PIERCE j FQ 34951 No ' Historic: j { Jurisdiction: SAINT LUCIE COUNTYI OwneQs): JERICWETMILLER SI Parcel #: 1416-243-0010-000/6 I Block: F---j Lot #: F----i Zoning: AGRICULTURALRESIDEI FLU: RD _ I Flood Map: PANEL700F4ID I Flood Elevation: R/12I70' Flood Zone: 107998 Im CONTACT.INFORMATION IDARRICK R BAILEY is ACTIVE. V Contractor Company Status I Permit Type Reg Class Cnty Reg Expire arty Cet Expire St Reg Expire St CertExpire Liability Expire Workman&,re Temp Expire CARRICKR AGREAT Active FENCE- FENCE 9/30/2015 8/13/201S 9/15/2015 ! BAIIEY FENCE LLC RESIDENTIAL ` I • Pdtl Contact Type (Contradlor; OwnarBuildar, Tenant, ApplleanQ,BermltRumner). y 1. Click to Edit Property Owners and Then Return 2. to Update Property Owners Type Name Company Cei Phone Fax Cell Email Street Addres City state Zip Delete Contractor DiAGRFAT 23954 (T2)812- (772)40& INFO@AGREATFE 515 NW ENIERPRISE PORTST FL 34986 BAILEY FENCE LLC 0223 0272 DR LUCIE 2603 N Property ERIC (7n)696- INDIAN FORT FL 34946 Owner WEIMILLE3 2748 RIVER PIERCE DRIVE I EDIT Perrnitlnfonnation L_R II Perri 1151 Confirmation #:. W_"�'--•----�.--I. Valuation: 52,455.00 9 !Date Ong Expired: C E ACC: FENCE--! SUB TRADE PERMITS:INFOR iI `. Add Sub Permitl I Sub Pei Type Permit its Permit Permit Event: I Permit Category:IRESIDENTIAL _j Permit Status: Permit Type: I FEN —GE - Date Applied: 6/12/2015 Taken By: Dale Issued: fil122015 Issued By: Date Finaled: Posted By:. Date Voided: 0 Voided By: Date Expired: 12I[2/2015 Expired By: Data Renewed: 0 Renewed By: -I Max Expire Date: Status I Contract( Comoaml Cert# I'States I Chi Tenant I Phone No data to display Confirmation #: __4� Issuetl _ status M http://codel(S(eplmjnglwpoouu2gbc2f]afs))/Add EditPermit.aspx?Pennit_Id=223895 7/9/2015 4 x 4 2x3.5x72'�13) 1' Spacing 50. 41.49" 48" VIct®rian Ytan/ Oc t. l 1. 2012 12:38PM No.1656 P. 2/10 tyM- RAL irNT+Oiu17AxIO N'o:rR. Standard foaoe'sectkinh and gates are �desigated fOrlevel tertals, Wgiiiholud slopes In the tt:wn.will neoe&aitite modillcavons tQ panels, 90M and posts, a ltead this lnstrucN4n sheet completely before,slartine Work. • Ducing ppney gate assembly, work on a,soft, non.abrasive surface to avoid scretchlug. o WheneygingPVC•cowpgaeniswttlta p9wer•saw, use a Ime.toothed blade, othem'se you idust reverse a large tooth 61adato avoid chipping. • flan altead.when working with PVC'glue. It ddbs Very fast, requiring spited and prediaiorl, • l aylag dut the fence is tfic edtical 4rsl step toward ensmIng a quality Installation. •. HavdutilityobinpanYesidetiftunder ground lines. PiCD LA4' U t t& 1. Locate the boundary lines to your property. 3ien 2. Drive stakes into the ground along the propetty lines end stretch a string between each stake. go sure to extend the string about 24" beyond the property lido (fig. 1). it is recommended that all posts are set epprnximately6" inside the property line so that the concrete footings do not encroach onto the adjoining property. tiop�3. Mariithe location of esoh Gontor, end apd, gars ppost wlih a stake. b cew,Irvo Q jlrl � rlM reN nn 1111.9.umr � on.rn dal .e B lilt ,,,,ry t—a mkvx�<N ll c� 1M�i{ Mw1^�Wler ,QVNe£artN C.M.IreN Pill I RTTYN(; COR 14M, xND AND GATE POSTS Althou tpr depthand•holadismeterwltibe determined by freeze line and soil conditions, holes for cornier, dad, gate, and An; posts are typically dug 10" in diameter and 30" deep withsloped.sldw tS en 1. Dig all corner, and and gate post holes, 'Sat all•enrnar, ontl Ad gate posts in concrete, tS2bti 2. posilioli tho pstin the hole. The post sb9tild be centeraA In tlye.bole tied mpst-be square with the feace One .so that When the rails are Inserted into thepost,.they will parallel the string line. Check the post on two adjacent sides with a earperder's Wyal uud :adjust as necessary to make surd it is a plumb. Ue fonee height aboyc grade is determined at this time as wdl. Va recommend a 2" space from 0.9_ ttom of tho bottom rail to the ground. to 3, Porn c000rdte arodnd post, fill to,W' Below• ground level. Once tha Generate is completely dry, fill the behinco of the hole with dirt,. 0 AND SLF'TTINGLING POSTS Stan 1, After tt>c comer and end post footings have hardened enough for the posts to -remain &table, slake and stretch itsti'ingline laut across the tops of the posts.to Mork the desired height of theline posts t9g. 3). PIG.3 ?A&L 2oFL4 Oct. 11. 2012 12:40PM r , No. 1656 P• 4/10 Ston 3. If post spacing is less than 8' on center, you may need to out equal amounts off the ggrloved side df theplelret on one end of the panel hAd tho.tagueil side of tlia picket on the opposite end (fig. 9). . I . . F10.9 t6 en 4. Starting on the gnd, insert the first picket into tho.bottomrail and the Urobannel (it'you, hdvc oqt $,a fir# picket, the cgr•enit should:go into the u•abaunel), Proceeding down the panel,'insert piokets into the bottom rail, Interlocking the tongues and grooves:as you go, When you get toward the :rid of the pahel,bogia Working from the dpposite post book toward center (keep tongues and groves oriented in the same d'uection), so that the last picket to be inserted is 3 to 4 piekels in from the posts. Slide file laet picket in from the top (frg.10).. FIGAC W fiija If the rail' i going into a post, which will he filled withruxotete, seal this ends'of thti rail with the duct tape to prevent concreto from flowing into lts'?IgW vne end ofthe top rail into Ihspost end work your -way down the panel, inserting pickets into the top fail as you go (fig., 0. FIG.11 t6 en k, Once all the pickets are installed, slide the loss rail end into the post (fig.12). The notched end will lock into the post. Repeat these steps unlit all panels have been assembled, M011.2 ugte, comer anu one poses snoura oe. mica in wru 2" of thh top of the post with eprtorete and re -bar. Line posts should be filled halfway with concrete only. Make sure the gate hardware is installed before fiWnggato posts with concrete, of `I Oc t. 11. 2012 12:39PM No.1856 P. 3/10 Stoo 2. working eloog the string line, stake out-ltieposldolttl bf all.11oe Posts. . tS`ep 3. Utg all line posts holes, RTTING I, *POS PS AM RAILS MIL rfp0a spaoiag to less than 8An center,• cut a;piege from the and of the lop and bottom rails to aohlevo the desired length. Tke leagEh of the top -do bbliom tails should be tW less tHari iJte ceritei t6-cehtethreasuremetit of the posts, allowing for axpactidn and 6onttaction. Step Using a notpjdJ gtool, notFb b6th ends of the lie om rail with one or two notches on each aldc (fig, 4). H61d the xeil and the tool steady Wldle notohitirr to Woid-hvistina the tool. FIGL 4 to 3, Starting atthe comer, cad or gate pbat, slide the metal Insert into the bottom rail (fig. tiw.Ifthe rail is going Into a post thatwill,be filled ith concrete, seal the end of the rail With duct tape to prevent concrete &ooa ROwing into it (fig. 6). FIG. 6 tS en 4. Sli 6 the tail into the hottpin hole in tLa post (fig, 7). Prooeediag down the fence 1w, plage lho next roil Into the next hole aad Insert the bottom tall -into the post. FIG.7- to 5. Fill the post hole -Oh concrete. Clieck to make sure that the post is act at the co;redt 4elght, Is plumb and level and square to the fence line. Block and support as necessary to keep Ike posts stable as installation continues. Rbpcgt these steps Until oil posts are set wlth the bottom raUa ante inserts installed, tiTAI.LAVG PIC);{ETS Scab i. Center the ll-obannels on the post, between tho bottom rail and the hole t'ortho top rail Mill the flat side of the channels against ttte posts. grill pilot holes and seeurc the U- channels to the posts using the #11, 3/4" stainless steel sorows supplied (fig.8). Fro, a §Stj 2, Notch all remaining rails. &(DE y 0f q r ,2 Water Tower Road, Lake Park, FL 33403 ,ione(561)848-9112 Fax(561)844-7102 chme ercom www.mas y Remitto: Maschmeyer(t . eteCompanyofFlorlda Drawer #1887, P.O Box 5935 Troy, MI 48007.5935 CUSTOMER PHONE 772-567-3067 CUSTOMER'FAX 11946 772-770-5961 GENERAL PROJECT CONCRETE - VB CRYSTAL POOLS 4680 N. U.S. VERO BEACH FL 1 32967 DATE CUSTOMER NO PAGENUMBER q 10/06/15 1037 IORDER L INVOICE NO 339200 JOB NO NO 200 D'ELTVETCP ADDRESS PURCHASE ORDER HUMDER . • . - - 4811 Tree To Trail **FIBER** alex . DATE QUANTITY MATERIAL - DELCXe PLANT NUMBER '.UNIT PRICE TAXABLE NONTAXABLE EXTENSION EXTENSION SHIPPED 10/06 10.00 305 3000 PRPM 107 '2404455 $107.50 $1,075.00 10/06 10.00 FIBERR FIBERS - Res 107 2404455 $6.00 $60.00 10/06 1.00 ENVIRO ENVIRONMENTA 107 2404455 $15.00 $15.00 10/06 1.00 FUEL SURCHAR 107 2404455 $125.00 $25.00 10/06 8.00 305 3000 PRPM 107 2404464 $107.50 $860.00 10/06 8.00 FIBERA FIBERS - Res 101 .2404464 $6_00 $48.00, 10/06 1.00 ENVIRO ENVIRONMENTA 107 2404464 $15.00 $15,.00 10/06 1.00 FUEL SURCHAR 107 2404464 $25.00 $25.00 roud Su000 ter of Florida Concrete sonny Education Act! I RECEIVED OCZ 2 .1�15 Cash o� Ck Disc. I $21.23 CAN BE TAKEN IFS PAID tY11/10/t5. Pre''ax Subtotal;) $2,123.00 TOTAL SALES TAX TOTAL YARDS $Z38- SB.DO $2,261.00 SLC_Inspections Page 1 of 1 !V., St. Lucie Countyhm � - x ' 'gvnNPr nt PDOh I_ n15p6-0JStl' I Sletusanua4 Job Description: CONSTRUCT AN IN -GROUND NON -HEATED CONCREV.. SlSTAUHNO POOL AND DEM To Iny Arelmpmlloofee-pI.dick PnF link foremb feedun Ymmay use Yse,_Atnsertard,Discover Cstd• ormhouk tb pay Ills fee,ohis via Gi ntalJR gf lCMy. To schedule an impealion, please select Request for each inspection ywe dd ifketoschtdale Wpeadons rlusthe scheduled in thedaderof0e Mildly listed bell.. An iii'm en d a Ibnv Pdoday Approva0' GaasaM ALL renspeetion fxa haw been Rim. TD addaoozefor thee Tod noterauthe Inspector rforuheduleO lospettbny please , pl.,,,Im A selen Add Naa cote now in Impeclian Naulextiroiabeldw, and click Updae Rnk fp each IvspeNan you 11". would like to add a nab for. Ifyou art, unable to schedule an inaction or require any assistance, Illicit, mama the Building Divisional (772)462-2172. � rsea _1._s_.� Stma I.Pbmb TYRa Name WIWM PhaN F9v Ct8 Gnuman )J396 I.AW 'PWLJSaA. Na5[D[N2LL 04aAY9 N[US t,[¢ysTALPODl4Op SxvtAN aIYE0.1NC (T)SJ s6>-JOB) 6nbN6m it296 IAdtlw PItWOmO a15ID[Ni4l dUtM6M[l1S �OpSTALi001S OP [NDIAN RtVF0. [NC p))796)•J06) Qnlvl4Ntb rFJacaw)Na1zR fmJ69sn1e pastel Wives pwhe jiej code save Iaaa, Fammb impxlloilm I ]01 •tIg4KTlINi FaO Nee Day to i IFST-g0lalaL- /apn+eC 0 9122/IDl5 9/li/l015 Sfil TlptlbGpCiS]� ANJbe Pq fK 'lll-sl p _ yp �was _- _ 1 I 012y20IS tp26r2OIS A DdO aGm Pa/fx pf 11pwo1 1 0/!6irN15 M6ROtS` 33 )m ekR RN h'P 1e6•JlgN qpP! hn. /yporel � t I B/MJ1UI5 BRO.ROU fl cob lice Dry Fe IfM-gYlel TfSF 'I`yq.1 l !/M/IOtS PR6(tplS ]9 Additive Pr fee 1Nw may l 012wo15 wools AdUJkN RnY Fee yDWISiEFc\ -.... _4191 9l- D110L 5122c .. _._ _.._....._t-.. .-_ _._.._. .._ __'. ryrymv 1 Bf2yM1fi g�J4/IOU. A 101 COl¢pClifw AddtNN I Fite I 1FST QvoRak- TAwlwmanre POavIDPdd i 9J21/1015 I Rn1R01s 0 ' 10dinnN pm'Fa - ell DO0. 1@11JEPg0.CtAiD PPINO Awned 2 9D120U 9/3/2015 39 Nl Nae pollee 105.(0,1500M Hwy-aFl� Ai- 2 9A- . wM015 66 AY 1. say fee e13-PDE lF3T_ - - /ypebt_. }- J_ ~I" mmNN�L RW Cmb4 spra).6 aen sip/J1u)M1.y addtWc pollee 121•TFANIIEY9AT AapwW ) Ia5/JOIs lNS/2019 D lemevaCrepwlN ,onni, wea somsess � 1 SpdIOM) W. D)-nuu ♦dd xao "Fee SN[Le a0[eweb 1 ! 14N/ID25 s0J5/JOU 30 �aJLRF, IGd Nata l Day Feu 19J-i00L0ctll aRppM J l IQIS/ID15 10MOlz 9 Add Jwa ! Pa,, tan ._, ,as, lmemain I_ _. _ _- ._. _ nDamm 3 J tWSJ2nts torsnDls 30 _ )dd hate t Duy r« 12U•DOOL BOND .,.._ _ ._._.. Jpfrbled 2. � iW5J10tz 10/5/2015 3) -. _-._. .... . .. .....—�_� _.. 006 -fi,, J add}kee Par F¢ ��IN meemnand.ldhhlsaa a J 1G5/10tS IORROIz JA feoatlwduwWs.-Web ,ifGNaDZJ-TAUT Caaradupamc 10/2/mis ID93;611W. 9�.6lTH T6111; BODGt aditl dote vryfv hJ`S1A.N J it IlJt0OSy1Q . Anrm Par Fee WN. Dares AWN. i Pay Fe fIFCINC uaNmo � Day r: 'n)-EluewClmnD I s '-- ,PdoNW •. R/he 211-60C1P1e PA1GM s a31Nue Payfm 119•POOL RUMAOG. ....... - • ..a P ay� DSDErmFL W LlION a l I An01he PPermit p (2 - c�aa http://codeinspectionpublic.stlucieco.gov/ 10/29/2015 Tap Gi IL 9 RECEI`•-U SEP 221�1 _ '%�A�li y KELLER, SCHLEI ER & MacWILLIAM ENGINEERING AND TESTING, INC. MARTIN (772) 337-7755 P.O. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-Mail: KSMQKSMENGINEERING.NET ST. LUCIE (772) 229-9093 C.A.: 5693 FAX (772) 589-6469 SOIL COMPACTION REPORT ASTM D 1557 and ASTM D 2922 DATE TESTED September 14, 2015 PERMIT # 1506-0228 CONTRACTOR Crystal Pools JOB LOCATION 4811 Tree Top Trail Ft. Pierce, Florida ITEM TESTED . Pool Backfill KSM JOB # : 151978-1 pd/BV/ct P.O.# : Wetmiller TEST LOCATION DEPTH PEN DRY MAX. DRY PERCENT OF SAMPLE READ DENSITY PROCTOR VALUE COMPACTION South U-11.30 110.8 114.0 97.2 2 1' - 2' 40 95.0+ 3 2'- 3' 45 95.0+ 4 3' - 4' 45 " 95.0+ 5 N.E. 0' - 1' 35 110.2 114.0 96.7 6 1' - 2' 45 11 95.0+ 7 2'- 3' 45 " 95.0+ 8 3'- 4' 50 95.0+ 9 West 0' - 1' 35 112.0 114.0 98.3 10 1' - 2' 40 95.0+ 11 2' - 3' 45 95.0+ 12 3'-4- 45 95.0+ Soil Description: 115.0 - Dark Brown Sand w I I I I I I E I I I I I I In Place Moisture: 14.9 Percent G 114.0 �••_..j_.._.1_.._. _.f—..—,j._.._. H Optimum Moisture: T I I I I i 10.4 Percent P I I I I I 113.0..—..I—..—.)_..—.I_.._.I_.. _.._. Max. Dry Density: G 114.0 P.C.F. I I I I I @ Test Locations the Density & F 1120,._.I_.._.1_.._.I_.._.l_.._.I._.._. Penetrometer Readings Indicate j I I I I I the Degre oft0ompgction Meets o MinimlJtY?ttfre ee., R I I I I I I 0�®e ,�4 e000 Y 111.0--•••—•—••_• �_••—•i—••—•i—•'— I'—"—, P.&n. Raadin t� a e%faet iCal Grade. 7 8 9 10 11 12 13 ZV ra Moisture - % of Dry Weight RECEIVED SEP`22 20115 Fax arid9W,Ytr9 5&yft-llg3ggpB9.rNnteso / Julie E. Keller, P.E.: 68366 09/16/2015 08:45 7725896469 KSM ENGINEERING PAGE 01/51 Tr C1k t rtL,3ira KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC. MARTIN (772) 337-7755 P.O. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488 FAX (561) W-6576 E-Mail: KSM@I<SMENGINEERING.NET ST. LUCIE (772) 229-9093 G.A.: 5693 FAX (772) 589-6469 SOIL COMPACTION REPORT ASTM D 1557 and ASTM D 2922 DATE TESTED PERMIT # CONTRACTOR JOB LOCATION September 14, 2015 1506-0228 Crystal Pools 4811 Tree Top Trail Ft. Pierce, Florida KSM JOB # : 151978-1 pd/BV/ct P.O.* ; Wetmiller ITEM TESTED Pool Backfill TEST LOCATION DEPTH "PEN DRY MAX. DRY PERCENT OF SAMPLE READ DENSITY PROCTOR VALUE COMPACTION South 14. 2 1' - 2' 40 95.0+ 3 2'-3- 45 95.0+ 4 3' - 4' 45 95,0+ 5 N.E. 01. 1' 35 110.2 114.0 96.7 6 V - 2' 45 95.0+ 7 2'- 3' 45 95-0+ 8 T - 4' 50 95.0+ 9 West 0' -1' 35 112.0 114.0 98.3 10 1' - 2' 40 " 95,0+ 11 2'- $' 45 95.0+ 12 3'- 4' 45 95,0+ Soil Description: 115.0 Dark Brown Sand w I I I I I E In Place Moisture: 14.9 Percent c 114.0 �- — j— — j_.._,'—•�—.._.j._.._. H I I I I Optimum Moisture: T I 10.4 Percent I I I I I P Max. Dry Density: 113.01—••_ �.,_.t_.._.I_.._.I_.. _---- 114.0 P.C.F. c I I I I I Test Locations the Density& F j 1 I I I I @112.0-.._..L.._.J_.._.I_.._.l_.._.I._.._. Penetrometer Readings Indicate j I I I I I the Degrpaf0a;mpgt1on Meets p MinirviF, ��Ljve¢� 0*"j R Rddi �et r§ €q�tAel Grade. Y 111.0 7 _ a _ 9 � � E f ~ Moistu of Din� reiggt 6 2015 Pr�l I -� � '--fir 1 % Fax and« Ir II q BY: R141i7b(I!. 5934t5p�9.R�. t860 / Julie E. Keller. P.E.: 68366 6 PERMIT# I S010 — ©22'K' ISSUE DATE PLANNING & DEVELOPMENT SERVICES Building & Code Compliance Division BUILDING PERMIT SUB -CONTRACTOR AGREI St. Lucie County Contractor Certification Number: a State of Florida Certifi ation Nu�nmber (If applicable): oq s 0(-(Jt � PLIv 6N % Sub -contractor for _ (Type of Trade) �( For the project located at L o —FfPI° I— ®P / rd (Project Street Address or Property Tax ID have 7 ©< to be the It is understood that, if there is any change of status regarding our participation with the above mentioned project, I will immediately advise the Building and Zoning Department of St. Lucie County by filing a Change of Sub -contractor notice. (Form: SLCCDV (No. 004-00) BUSINESS QUALIFIER (Name of the Individual shown on the Contractor's License) NOTARIZED SIGNATURES ARE REQUIRED Business Name: Address: City/State/Zip: Phone: email: "04vo e &r„A,// SIGNAJURE PPRhINT NAME STATE OF FLORIDA, COUNTY OF / h,/ L // " _—)-.;�-7-ism DATE THE FOREGOING INSTRUMENT WAS SIGNED BEFORE ME THIS _ DAY OF l — 20� BY WHO IS PERSONALLY KNOWN /�//OR HAS PRODUCED AS IDENTIFICATION. (STAMP) SIGNA OF NOTARY PUBLIC PRINT NAME OF NOTARY PUBLIC SLCPDS: 08/06/2014 =Enyccro G B MILLS blic - State of Floridasion# FF 2'Sop2628519 uyt m. in plrNatbnalNatary 19 es Sep 4, 2BMut AFTER RECORDING -RETURN TO: ®� JOSERH E. WITH, CLERK OF THE CIRC! r CoUR7 SAINT LUCIE CO FILE # 4095421 0712W, 5 a1 11:52 AM OR BOOK 3771 PAGE 1771 - 1771 Doc Type- NC RECORDING: $10.00 PERstry NUMBER: NOTICE OF COND IENUE1 MN't— - The. undersigned hereby given notice. that improvement will be made to certain real property, and in accordance with Chapter 713, Florida statutes the following information is provided in the Notice of commencement. 1. DESCRIPTION OF PROPERTY (Legal description and street address) TAX FOLIO NUMBER: 1 `1� boor 2. GENERAL DESCRIPTION OF IMPROVEMENT: 3. b. a. L- 3NI Poo / Co n 3 -Fr Lx+j o w e i-t,, i H e y- interest in pmperty,{�W ✓I t r d. Name and address of fee simple titleholder (if other than owner)— 4. CONTRACTOR'S NAME, ADDRESS AND PHONE NUMBER: �1 0 01 S 141,9N fIfor+� U'S I , I/ero ACciC— , L 3a91,7. 5. SURETY'S NAME, ADDRESS AND PHONE NUMBER AND BOND AMOUNT: 6. LENDER'S NAME, ADDRESS AND PHONE NUMBER: 7. Persons within the State of Florida designated by Owner upon whom notices or other documents may be servedasprovided by Section 713.13 (1)(a)7., Florida Statutes: NAME, ADDRESS AND PHONE NUMBER: R. In addition to himself or herself, Owner designates the following to receive a copy of the Lienor's Notice as provided in Section 713.13 (1)(b),Florida Statutes: NAME, ADDRESS AND PHONE NUMBER: 9. Expiration date of notice of commencement (the expiration date is 1 year from the date of recording unless a different date is specified) ,,20_. Print Name Owner's Authorized Offrcer/Director/Pariner/Manager BEMApETTE CAMPSELL 3 WIN' Botuy Public • We of Flotilla State of Flo1�r,,J'//��,..))�,rry``��` j��,{��(ypppl.),r1e ''4C4mirirlmIFFTTEl19 Be fo a s7 en sac ol � gQedrbefore me this �J day of .20 _. (N,,��ggrree,,o persar�) j,, j (( (Type of authority y.... e.g. Owner, officer, trustee, attorney in fact) For U` e \ 7. ei`W V I I (Name of party on behalf of whom instrument was executed) Personally Known l/ or produced the following type of ID: (Printed Name of Notary Publ') (ignature of Notary Public) (Scr11 Under penalties of perjury, I declare that I have read the foregoing and that the facts in it are true to the best of my:knowledge and belief (section 92.525, Florida Statutes). Sigtrature(s) of Owner(s) or Owner(s)' Authorized OfficerMirector/Parl r/Maoager who signed above: By - ri By - R�..ou peso.umrl . T. r t ��\�//lam{� t ��} i is r, vo (� iiy },'.�.Ol-:l?iFx; ��}ciJ:..i i11'✓Vfi 4':.E.` .i Protect -A -Child Pool Fence Company June 13, 2012 Purchase Order No. Verbal QCM Job No. 12FM-611 INSPECTION RESULTS This report documents testing on 48" and 60" heights of fencing and self closing gates manufactured by Protect -A -Child Pool Fence Company. The samples inspected included fence sections in 48" and 60" heights with support posts attached to the mesh on 30" and 36" centers and self closing gates of sample heights. The fence and gates submitted were tested per the standards listed below including ASTM F 2286. • The mesh was tested per ASTM F2286-05_ o Vertical load test per ASTM F2286 Paragraph 5.1. A vertical load test was conducted A 1/8" steel wire was looped through the mesh 36" above ground. g of the mesh was noted. Upward force of 20 pounds was applied. No tearin • Impact Test per ASTM F 2286-05 Paragraph 5.2. A weight of 52 pounds was swung into the fence 36" above ground level. No deformation or tearing was noted. o The self closing gates tested were greater than 48" tall and included self closing hinges and a key lockable self latching mechanism. The release mechanism on the gate was above 54" minimum height requirement. • The mesh properties were certified by PHIFER Incorporated. CONCLUSION: The fence and gates submitted for testing meet or exceed the requirements of: ® ASTM F 2286 and ASTM F 1908 for tests performed. No testing on the mesh other than the impact and vertical tests. c ANSI IAF-8 Model Barrier Code for tests performed. u BOCA National Building Code Section 421.10.1 for tests performed. e *ICC - APSP International Swimming PooLand.Spa Code (ISPSC) Public Version 1.0 (*see note below) for tests performed. *Meets ICC-APSP ISPSC code when installed in such a manner that it is not temovabte without the aid of tools. P5, Frank Grate FC 0L �. 2870 Stiriirig ?:.ad F.oliYwocd, FL 33020-1199 ° t6.tti`1 g€1�l"0o i ` Fa ; (954I 241-5840 r maiJ: fcrate@a qc net.com ►� PENTAIR STA-RITE° SUPERMAX° VS VARIABLE SPEED PUMP INSTALLATION AND USER'S GUIDE IiPIi:417.YM IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS Select HfidmyCu¢c}v�m , i - CUSTOMER SERVICE / TECHNICAL SUPPORT If you have questions about ordering Pentair Aquatic Systems replacement parts, and pool products, please contact: Customer Service and Technical Support, USA (8 A.M. to 4:30 P.M. — Eastern/Pacific Times) Phone: (800) 831-7133 Fax: (800) 284-4151 Web site Visit www.pentairpool.com or www.staritepool.com for information about Pentair products.* TABLE OF CONTENTS Important Pump Warning and Safety Instructions ................................................ ii Pump Overview...................................................... 1 Pump Overview 1 General Features 1 Controller Features 1 Controller Overview 1 Control Panel Overview ......................................... 2 Keypad Navigation 2 Electrical Wiring Installation ................................. 3 Wiring Overview and Installation 3 Control with External Control/Inputs 4 Connecting to External Controls 4 Using the Supplied Low Voltage Signal for Digital Control 4 Using an External Low Voltage Signal for Digital Control 5 External Control Only Mode 5 Operatingthe Pump .............................................. 6 Setting the Clock 6 Using the Default Schedule 6 Custom Schedules 7 Speed Priorities (Non -External Control) 8 Operating the Pump While Running 8 Quick Clean 8 Priming 9 Quick Clean 10 Keypad Lockout 10 Factory Reset 11 Sanford, North Carolina (8 A.M. to 4:30 P.M. ET) Phone: (919) 566-8000 Fax: (919) 566-8920 Moorpark, California (8 A.M. to 4:30 P.M. PT) Phone: (805) 553-5000 (Ext.5591) Fax: (805) 553-5515 Maintenance.......................................................... 12 Pump Strainer Basket 12 Cleaning the Pump Strainer Basket 12 Winterizing 12 Servicing................. :................................ .............. 13 Electric Motor Care 13 Shaft Seal Replacement 13 Pump Disassembly 13 Pump Reassembly 14 Restart Instructions 14 Troubleshooting.................................................... 15 Errors and Alarms 16 Replacement Parts ................................................ 17 Illustrated Parts List 17 Pump Performance Curves 18 Pump Specifications 18 Pump Dimensions 18 ® ®w_ �MM n ri �N LL� V M W "Translated versions of this manual are available online at/La version en espanol de este manual del producto, se puede encontrar enlinea al Versions en trances de este manual esta disponible en linea an: http:/Avww.pentairpool.com/poof•owner/manuals/. P/N 353145 Rev. B 10/9/14 SUPERMAX® VSVariable Speed Pump Installation and User's Guide M• • IMPORTANT NOTICE This guide provides installation and operation instructions for the SuperMW VS Variable Speed Pump. Consult Pentair with any questions regarding this equipment. Attention Installer: This guide contains important information about the installation, operation and safe use of this product. This information should be given to the owner and/or operator of this equipment after installation or left on or near the pump. Attention User: This manual contains important information that will help you in operating and maintaining this product. Please retain it for future reference. Warnings and safety instructions for PentairAquatic Systems pumps and other related products are available at: http://www.pentairpool.com/pool-owner/safety-warnings/ or call (800) 831.7133 for additional free copies of these instructions. READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS © This is the safety alert symbol. When you see this symbol on your system or in this manual, look for one of the following signal words and be alert to the potential for personal injury. r Warns about hazards that can cause death, serious personal injury, or major property damage if ignored. 6tRIA NI serious personal injury, or major property damage G Warns about hazards that may cause death, if ignored. BCAUTION Warns about hazards that may or can cause minor personal injury or property damage if ignored. NOTE indicates special instructions not related to hazards. Carefully read and follow all safety instructions in this manual and on equipment. Keep safety labels in good condition; replace if missing or damaged. When installing and using this electrical equipment, basic safety precautions should always be followed, include the following: N N' .M Do not permit children to use this product. B A I RISK OF ELECTRICAL SHOCK. Connect only to a branch circuit protected by a ground -fault circuft- interrupter (GFCI). Contact a qualified electrician if you cannot verify that the circuit is protected by a GFCI. 8 AR I This unit must be connected only to a supply circuit that is protected by a ground -fault circuit -interrupter (GFCI). Such a GFCI should be provided by the installer and should be tested on a routine basis. To test the GFCI, push the test button. The GFCI should interrupt power. Push the reset button. Power should be restored. If the GFCI fails to operate in this manner, the GFCI is detect five. If the GFCI interrupts power to the pump without the test button being pushed, a ground current is flowing, indicating the possibility of an electric shock. Do not use this pump. Disconnect the pump and have the problem corrected by a qualified service representative before using. ®CAUTIQN This pump is for use with permanent swimming pools and may also be used with hot tubs and spas if so marked. Do not use with storable pools. A permanently -installed pool is constructed in or on the ground or in a building such that it cannot be readily disassembled for storage. A storable pool is constructed so that it is capable of being readily disassembled for storage and reassembled to its original integrity. General Warnings • Never open the inside of the drive motor enclosure. There is a capacitor bank that holds a 230 VAC charge even when there is no power to the unit. • The pump is not submersible. • The pump is capable of high flow rates; use caution when installing and programming to limit pumps performance potential with old or questionable equipment. • Code requirements for the electrical connection differ from state to state. Install equipment in accordance with the current National Electrical Code and all applicable local codes and ordinances. • Before servicing the pump; switch OFF power to the pump by disconnecting the main circuit to the pump. • This appliance is not intended for use by persons (including children) of reduced physical, sensory or mental capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction concerning the use of the appliance by a person responsible for their safety. ! FAILURE TO FOLLOW ALL INSTRUCTIONS AND WARNINGS CAN RESULT IN SERIOUS BODILY INJURY OR DEATH. THIS PUMP SHOULD BE INSTALLED AND SERVICED ONLY BYA QUALIFIED POOL SERVICE PROFESSIONAL. INSTALLERS, POOL OPERATORSAND OWNERS MUST READ THESE WARNINGS AND ALL INSTRUCTIONS IN THE OWNER'S MANUAL BEFORE USING THIS PUMP. THESE WARNINGS AND THE OWNER'S MANUAL MUST BE LEFT WITH THE POOL OWNER. SUCTION ENTRAPMENT HAZARD: STAY OFF THE MAIN DRAINANDAWAY FROMALLSUCTION OUTLETS! i + THIS PUMP PRODUCES HIGH LEVELS OF SUCTION AND CREATES A STRONG VACUUM AT THE MAIN DRAIN AT THE BOTTOM OF THE BODY OF WATER: THIS SUCTION IS SO STRONG THAT IT CAN TRAP ADULTS OR CHILDREN UNDER WATER IF THEY COME IN CLOSE PROXIMITY TO A DRAIN OR A LOOSE OR BROKEN DRAIN COVER OR GRATE. t RISK OF ELECTRICAL SHOCK OR ELECTRO- CUTION: PUMPS REQUIRE HIGH VOLTAGE WHICH CAN SHOCK, BURN, OR CAUSE DEATH. BEFORE WORKING ON PUMP circuit nose from power to the pool pump at the circuit breaker from the pump before servicing the pump. Failure to do so could result in death or serious injury to service person, pool users or others due to electric shock. THE USE OF UNAPPROVED COVERS OR ALLOWING USE OF THE POOLOR SPAWHEN COVERSARE MISSING, CRACKED OR BROKEN CAN RESULT IN BODY OR LIMB ENTRAPMENT, HAIR ENTANGLE- MENT BODY ENTRAPMENT, EVISCERATION AND/OR DEATH. The suction at a drain or outlet can cause: Limb Entrapment: When a limb is sucked or inserted into an opening resulting in a mechanical bind or swelling. This hazard is present when a drain cover is missing, broken, loose, cracked or not properly secured. Hair Entanglement: When the hair tangles or knots in the drain cover, trapping the swimmer underwater. This hazard is present when the flow rating of the cover is too small for the pump or pumps. SUPERMAX® VS Variable Speed Pump Installation and User's Guide Body Entrapment: When a portion of the body is held against the drain cover trapping the swimmer underwater. This hazard is present when the drain cover is missing, broken or the cover flow rating is not high enough for the pump or pumps. Evisceration/Disembowelment: When a person sits on an open pool (particularly a child wading pool) or spa outlet and suction is applied directly to the intestines, causing severe intestinal damage. This hazard is present when the drain cover is missing, loose, cracked, or not properly secured. Mechanical Entrapment: When jewelry, swimsuit, hair decorations, finger, toe or knuckle is caught in an opening of an'outlet or drain cover. This hazard is present when the drain cover is missing, broken, loose, cracked, or not properly secured. NOTE: ALL SUCTION PLUMBING MUST BE INSTALLED IN ACCORDANCE WITH THE LATEST NATIONALAND LOCAL CODES, STANDARDS AND GUIDELINES. ` N G TO MINIMIZE THE RISK OF INJURY DUE TO SUCTION ENTRAPMENT HAZARD: r • Aproperly installed and secured ANSI/ASMEAll 2.19.8approved anti -entrapment suction cover must be used for each drain. • Each suction cover must be installed at least three (T) feet apart, as measured from the nearest point to nearest point. • Regularly inspect all covers for cracks, damage and advanced weathering. • If a cover becomes loose, cracked, damaged, broken or is missing, replace with an appropriate certified cover. • Replace drain covers as necessary. Drain covers deteriorate over time due to exposure to sunlight and weather. • Avoid getting hair, limbs or body in close proximity to any suction cover, pool drain or outlet. • Disable suction outlets or reconfigure into return inlets. WMA014111 G A clearly labeled emergency shut-off switch for the pump must be in an easily accessible, obvious place. Make sure users know where it is and how to use it in case of emergency. The Virginia Graeme Baker (VGB) Pool and Spa Safety Act creates new requirements for owners and operators of commercial swimming pools and spas. Commercial pools or spas constructed on or after December 19, 2008, shall utilize: (A) A multiple main drain system without isolation capability with suction outlet covers that meet ASMEIANSI A112.19.8a Suction Fittings for Use in Shimming Pools, Wading Pools, Spas, and Hot Tubs and either: (1) A safety vacuum release system (SVRS) meeting ASME/ANSI At12.19.17 Manufactured Safety Vacuum Release systems (SVRS) for Residential and Commercial Swimming Pool, Spa, Hot Tub, and Wading Pool Suction Systems and/or ASTM F2387 Standard Specification for Manufactured Safety Vacuum Release Systems (SVRS) for Swimming pools, Spas and Hot Tubs or (ii) A properly designed and tested suction -limiting vent system or (iii) An automatic pump shut-off system. Commercial pools and spas constructed prior to December 19, 2008, with a single submerged suction outlet shall use a suction outlet cover that meetsASME/ANSI At12.19.8a and either: (A) ASVRS meetingASMFJANSI A112.19.17 and/orASTM F2387, or (B) A properly designed and tested suction -limiting vent system, or (C) An automatic pump shut-off system, or (D) Disabled submerged outlets, or (E) Suction outlets shall be reconfigured into return inlets. For Installation of Electrical Controls at Equipment Pad (OWOFF Switches, Timers and Automation Load Center) OGAIlIfAN Install all electrical controls at equipment pad, such as on/off switches, timers, and control systems, etc. to allow the operation (startup, shut -down, or servicing) of any pump or filter so the user does not place any portion of his/her body over or near the pump strainer lid, filter lid or valve closures. This installation should allow the user enough space to stand clear of the filter and pump during system start-up, shut down or servicing of the system' filter. l HAZARDOUS PRESSURE: STAND CLEAR OF PUMP AND FILTER DURING START UP Circulation systems operate under high pressure. When any part of the circulating system (i.e. locking ring, pump, filter, valves, etc.) is serviced, air can enter the system and become pressurized. Pressurized air can cause the pump housing cover, filter lid, and valves to violently separate which can result in severe personal injury or death. Filter tank lid and strainer cover must be properly secured to prevent violent separation. Stand clear of all circulation system equipment when turning on or starting up pump. Before servicing equipment, make note of the filter pressure. Be sure that all controls are set to ensure the system cannot inadvertently start during service.Turn off all powertothe pump. IMPORTANT: Place filter manual air relief valve in the open position and wait for all pressure in the system to be relieved. Before starting the system, fully open the manual air relief valve and place all system valves in the "open" position to allow waterto flowfreely from the tank and back to the tank. Stand clear of all equipment and start the pump. IMPORTANT: Do not close filter manual air relief valve until all pressure has been discharged from the valve and a steady stream of water appears. Observe filter pressure gauge and be sure it is not higher than the pre -service condition. General Installation Information • All work must be performed by a qualified service professional, and must conform to all national, state, and local codes. • Install to provide drainage of compartment for electrical components. • These instructions contain information for a variety of pump models and therefore some instructions may not apply to a specific model. All models are intended for use in swimming pool applications. The pump will function correctly only if it is properly sized to the specific application and properly installed. FA I ' Pumps improperly sized or installed or used in applications other than for which the pump was intended can result in severe personal injury or death. These risks may include but not be limited to electric shock, fire, flooding, suction entrapment or severe injury or property damage caused by a structural failure of the pump or other system component. ONJ (NG The pump can produce high levels of suction within the suction side of the plumbing system. These high levels of suction can pose a risk if a person comes within the close proximity of the suction openings. A person can be seriously injured by this high level of vacuum or may become trapped and drown. It is absolutely critical that the suction plumbing be installed in accordance with the latest national and local codes for swimming, pools. SAVE THESE INSTRUCTIONS SUPERMAX® VS Variable Speed Pump Installation and User's Guide Pump Overview The perfect choice for all types of pools, the SuperMax®VS Variable Speed Pump was specifically designed to be your best choice for a variety of in - ground pools. Thick walled body parts, a heavy duty TEFC motor, and highly engineered hydraulics make this rugged and tested design perfect for any pool, spa, water feature, or fountain. All pumps from Pentair Aquatic Systems incorporate innovative hydraulic engineering that has been refined for over 40 years. Compact, rugged, and easy to maintain, the SuperMax VS pump will deliver years of reliable service. SuperMax VS Pump General Features • Extremely quiet operation • Unionized fittings (1.5" and 2") for simple replacement • Cam and Ramp'"' Lid for easy cleaning and maintenance • Super -duty totally enclosed fan cooled (TEFL) motor for long life • Integral volute and pot reduce hydraulic noise • See -through lid permits easy inspection of strainer basket • Self -priming for quick, easy start-up • UUCUUNSF Listed Controller Features • Simple user interface • IPX6 certified UV and rain -proof enclosure • Onboard time of day schedule • Adjustable priming mode • Programmable quick clean mode PUMP OVERVIEW • Diagnostic alarm display and retention • Active power factor correction • Accepts 99-253V, 5O/6OHz input power • Auto power limiting protection circuit • 24hr. clock retention for power outages • Keypad lockout mode • Accepts low voltage digital inputs from external controls Controller Overview The SuperMax VS Variable Speed Pump uses a premium efficiency variable speed motor that provides tremendous program flexibility in terms of motor speed and duration settings. The pump is intended to run at the lowest speeds needed to maintain a sanitary environment, which in turn minimizes energy consumption. Pool size, the presence of additional water features, chemicals used to maintain sanitary conditions, and local environmental factors will impact optimal programming necessary to maximize energy conservation. q VWARN[142 This pump is for use with 115/208-230 Vrms nominal, and in pool pump applications ONLY. Connection to the wrong voltage, or use in other application may cause damage to equipment or personal injury. The integrated electronics interface controls the speed settings as well as the run durations. The pump can operate at speeds ranging between 300 and 3450 RPM and will operate within the voltage range of 99-253 Vrms at either 50 or 60Hz input frequency. Program customization may require some trial -and -error to determine the most satisfactory settings as dictated by the conditions. In most cases, setting the pump at the lowest speed for the longest duration is the best strategy to minimize energy consumption. However, conditions may require running the pump ate higher speed for some duration of time each day to maintain proper filtration to achieve satisfactory sanitation. Note: Optimize the pump to suit individual pool conditions. Specific conditions including pool size, other devices, features and environmental factors can all impact the optimal settings. SUPERMAX® VS Variable Speed Pump Installation and User's Guide CONTROL PANEL OVERVIEW (1) Speed Bu (2) Exterr Control OI LED IndicE (3) Start/Stop Button Display Mode =D Indicators 5) Display Button i) Quick Clean Button Power LED Indicator t I "+° and `- Arrows i ®CAUT191d If power is connected to the SuperMa)P VS Variable Speed Pump motor, pressing any of the following buttons referred to in this section could result in the motor starling. Failure to recognize this could result in personal injury or damage to equipment. Keypad Navigation 1. Speed Buttons - Used to select the run speed desired. The LED above the Speed Buttons will illuminate when that speed is selected or is currently running. A flashing LED indicates that an External Control is active on that speeds channel. 2. External'Control Only LED Indicator - Indicates that the pump is operating in External Control Only mode. When LED is illuminated the schedule is disabled and the only input is from the low voltage external controls: 3. Start/Stop Button - Used to Stan and Stop the pump. When the pump is stopped and the LED is not illuminated, the pump is unable to run from any type of input. 4. Display Mode LED Indicators - An illuminated LED indicates the information being displayed on the screen at any specific point. A flashing LED indicates that the parameter is currently being edited. 5. Display Button - Used to toggle between the different available display modes. This button is also used to set the 24-hour clock and screen resolution. 6. Quick Clean Button - Used to run a selected speed and duration programmed for Quick Clean. When the LED is illuminated the Quick Clean schedule is active. t 7. Power LED Indicator - An illuminated LED indicates that there is live power being supplied to the pump. 8. 'Y' and ` -" Arrows - Used to make on screen adjustments to the pump settings. The °+" arrow increases the value of a given setting, while `-" decreases the value of a given setting. Pressing and holding down either arrow button will increase or decrease the incremental changes faster. SUPERMAXOVS Variable Speed Pump Installation and User's Guide ELECTRICAL WIRING INSTALLATION ®WARNING RISK OF ELECTRICAL SHOCK OR ELECTROCUTION. The SupeTWO VS Variable Speed Pump must be installed by a licensed or certified electrician or a qualified service professional in accordance with the National Electrical Code and all applica- "F • ble local codes and ordinances. Improper installation will create an electrical hazard which could result in death or serious injury to users, installers, or others due to electrical shock, and may also cause damage to property. Always disconnect power to the pump at the circuit breaker before servicing the pump. Failure to do so could result in death or serious injury to service people, pool users or others due to electric shock and/or property damage. Read all servicing instructions before working on the pump. Wiring Overview and Installation The SuperMax VS Variable Speed Pump must be wired according to the local electrical codes and standards. Always refer to the National Electrical Code. This pump should be installed by a licensed electrician. The pump accepts 99-253V, 50 or 6OHz single phase input power. The terminal block connections are capable of handling up to 1 OAWG solid or stranded wire. There are also fast -on type quick connectors, however, check the local electrical codes for the desired connection method. The connections must be permanently made to the grounding terminal (see Figure 1) in the field wiring compartment according to the local electrical code. The motor controller will automatically regulate the pump's speed when running on lower voltage to keep the current below 13.2A. There is no wiring change required to run the pump on 11OV nominal power, the same terminals are used as with high voltage wiring. The drive will operate on 2-phase Line -Line -Ground electrical systems as well as Line -Neutral -Ground systems. This pump must be permanently connected by a circuit breaker as specified in the local electrical code. 1. Be sure all electrical breakers and switches are turned off before wiring motor. Always wait five (5) minutes after disconnecting the power from the pump before opening or servicing the drive. 2. Choose a wire siie for the pump in accordance with the current National Electrical Code and all applicable local codes and ordinances. When in doubt use a heavier gauge (larger diameter) wire. Be sure the wiring voltage is within the operating range. 3. Be sure all electrical connections are clean and tight. 4. Cut wires to the appropriate length so they do not overlap or touch when connected to the terminal board. 5. Permanently ground the motor using the ground screw located on the inside rear of the controller interface (see Figure 1). Use the correct wire size and type specified by the current National Electrical Code. Be sure the ground wire is connected to an electrical service ground. 6. Bond the motor to all metal parts of the pool structure and to all electrical equipment, metal conduit and metal pipping within 5 feet (1.5 M) of the inside walls of the swimming pool, spa or hot tub in accordance with the current National Electrical Code. UL requires use of a solid copper bonding conductor not smaller than 8 AWG. See Figure 1. Note: For Canada, a 6 AWG or larger solid copper bonding conductor is required. The pump should be permanently connected to either a circuit breaker, 2-pole timer or 2-pole relay. If AC power is supplied by a GFCI circuit breaker, use a dedicated circuit breaker that has no other electrical loads. 8. Connect the pump permanently to a circuit. Make sure no other lights or appliances are on the same circuit. A AR !NG Power should be turned off when installing, servicing, or repairing electrical components. Observe all warning notices posted on the existing equipment, pump, and in these installation instructions. The field wiring compartment has a 1/2" NPT threaded conduit port for the liquid tight fitting. The bonding lug should be used to bond the motor frame to the equipment pad. SUPERMAX® VS Variable Speed Pump Installation and User's Guide 4 Control with External Control and Digital Inputs The user can run the SuperMwO VS Variable Speed Pump with automation external controls, allowing all four programmed Speeds to be controlled remotely. The pump has a sealed connector that can be used with Pentair External Control Wiring Kit (Pentair P/N 353129Z) to run the Speeds using digital input signals. When there is an external low voltage signal present on the Speed Digital Input line, the pump will run the speed programmed for that Digital Input. The supplied +5V signal is the recommended input used for external control and Speed Digital Inputs. Connecting to External Controls Using the Supplied Low Voltage Signal for Digital Control The SuperMax VS pump provides a low voltage output signal that can be used to trigger its own Digital Inputs. This signal will need to be switched via the External Control system to engage the speed that it is connected to as in Figure 2. This could be an automation relay or switch in another piece of equipment. This feature could be useful for ensuring that the pump is running a certain program when a specific speed is needed to perform a task. The wire included with the External Control Wiring Kit (Pentair P/N 353129Z) will need to be cut to length for the installation. Do not leave excess wire around the installation, and the wire should be supported by something rigid if conduit is not used. At one end of the cable is a custom molded, watertight connection that plugs into the panel connection on the side of the drive. The opposite end has 6 wires that are defined by Table 1 below. When using the +5V signal supplied by the drive, the speeds should be wired as shown in Figure 2. When there is a low voltage signal present on the Speed Digital Input line the pump will run the speed that is programmed for the speed that is being triggered. The +5V signal supplied via the (red) wire is the suggested input for the Speed Digital Inputs. See Figure 2. Note: Any relay can be associated to any Digital Input. Figure 2 shows one of many potential wiring options available to the installer, allowing you to install External Controls in the way that best suits your needs. Note: This +5V Signal (red wire) is output from the drive only, and should never be wired to another power supply! When a Speed Digital Input is triggered, the LED above the Speed button will begin to blink and the display will toggle between the display parameter and "EC" indicating an External Control is running. The pump will run this speed as long as the Digital Input trigger is present. This will override the schedule or any user inputs for Speed selections via the keypad. The Display button is still functional along with the Start/Stop button. Once the Digital Input trigger is removed from all of the Speed Digital Input wires, the pump will resume the programmed schedule. RFIAYI RE YZ RE173 RSAY4 RFIgY Definition Signal Range Wire Color +5V Output for Digital Inputs 0 - 20mA Red Speed 1 Digital Input 0, 5 - 30V AC/DC Green Speed 2 Digital Input 0, 5 - 30V AC/DC Yellow Speed 3 Digital Input 0, 5 - 30V AC/DC Orange Quick Clean Digital Input 0, 5 - 30V AC/DC I Brown Common Ground I 0V I Black Table 1: Automation Control System Input Wiring Chart Figure 2: External Control Kit Wiring Diagram SUPERMAMS Variable Speed Pump Installation and User's Guide Using an Externally Supplied Low Voltage Signal for External Control When using an externally supplied low voltage signal as the Digital Input trigger, the wire should be connected as shown in Figure 3. The low voltage input needs to be within the range of 5-30V AC or DC. In this case the red +5V supply from the motor control will not be used. Note: This +5V signal (red wire) is output from the drive only and should never be wired to a voltage supply! The external low voltage signal can be regulated by switches or relays to activate the desired Digital Input. If more than one Digital Input is active at one time then they will be resolved by priority. E%IERNALLOW VOLTAGESUPPIY S3UVAC/DC GROUND RED fSV GUTPIRPOR D.I.TRIGGER GREEN SPEED IDIGRALINPUI' YELLOW SPEED 201GOALINPI? ORANGE SPEED 3 DIGITAL INPUT BROWN SPEEDO DIGITAL INPUT DIA[N GROUND Figure 3: Low Voltage Power Supply Wiring Diagram Note: If the pump has been stopped via the StartlStop button, the pump will not run until the pump is turned back on by pressing the Start/Stop button. If the Start/Stop LED is illuminated, that indicates the pump is on and will run via Digital Inputs. Note: If multiple low voltage triggers are present it will be resolved by this priority: Quick Clean, Speed 3, Speed 2, and then Speed 1. External Control Only Mode External Control Only mode will only allow the pump to run from external controls/inputs. When this mode is active the programmed pump schedule is deactivated, and user speed requests from the keypad will not be accepted. If the pump is stopped a user can still program the speeds for all four Speed buttons. To activate External Control Only mode: 1. Stop the pump by pressing the StartlStop button. 2. Activate External Control Only mode by pressing and holding the Start/Stop button for 3 seconds. 3. If successful the LED next to Ext. Control Only will illuminate. See Figure 4. 4. The Start/Stop button must be pressed again to allow the pump to run. To deactivate External Cdntrol Only mode: 1. Stop the pump by pressing the StartlStop button. 2. Deactivate External Control Only mode by pressing and holding the Start/Stop button for 3 seconds. 3. If successful the LED next to Ext. Control Only will turn off. See Figure 4. 4. The StartlStop button must be pressed again to allow the pump to run. Figure 4: Activating External ControlOnly SUPERMAX®VS Variable Speed Pump Installation and User's Guide OPERATING THE PUMP Setting the Clock When the pump is first plugged in, the clock will blink to indicate that is has not been set. Any daily schedule set by the user will be based on this clock setting, so it will be necessary to set the clock first. To Set the Clock: 1. Press and hold the Display button for 3 seconds. 2. Use the "+" and =' arrows to choose between a 12 or 24 hour time format. 3. Press Display to advance in the Clock Setup menu 4. Use the "+" and '=" arrows to change the time to the correct time of day. In the 12 hour time format AM/PM will display in the bottom right corner. 5. Press Display to advance. 6. Use the "+" and =' arrows to adjust the screen backlight brightness. 7. Press Display to exit the Clock Setup menu. The clock is now set. During a power outage, the drive will retain the clock setting in memory for as long as 24 hours. If the power is out longer than 24 hours the clock will have to be set again. If the drive has lost the user set time, the clock will continuously blink until the time is reset. Once the time is reset the clock will stop blinking. Note: When power is returned to the pump after a prolonged outage (24+ hours) the clock will automatically set itself to the Speed 1 start time, blink and advance. The pump will also run the associated schedule from that start time. Using the Default Schedule The default schedule is designed to provide enough daily turnover to service a typical pool. See Table 2 for default schedule. Duration (Hours) Speed (RPM) SPEED 1 2 3000 SPEED 2 10 1400 SPEED 3 2 2200 Table 2: Default Schedule. SPEED 1 is set to begin at 8:00am and run at 3000 RPM for a duration of 2 hours. When SPEED 1 is complete the pump immediately begins running the default SPEED 2. SPEED 2 is factory default to 1400 RPM and will last for 10 hours. When SPEED 2 has completed its run the pump will run SPEED 3 at 2200 RPM for a duration of two hours. After 14 hours of run time and completing its run of SPEED 3, the pump will enter a stationary/paused state for the next 10 hours. The pump will restart at 8:00am'the next morning and cycle through the default schedule again. The pump will continue to run in this in this manner until a custom schedule is programmed into the drive by the user. Note: The Start/Stop button must be pressed, and the LED lit, for the pump to run. SUPERMAX®VS Variable Speed Pump Installation and User's Guide Custom Schedules To customize the run schedule for your SuperMax® VS Variable Speed Pump, the pump must be stopped. Be sure that the Start/Stop button LED is not illuminated. Programming a Custom Schedule: Note: When programming, the LED light next to the parameter ("Speed", "Time" and "Duration") you are setting will blink. 1. Stop the pump if it is running by pressing the Start/Stop button. 2. Press the "1" button. The LED above the selected SPEED will begin to blink and the "Speed" parameter LED will blink while editing. See Figure 5. Figure 5: Setting Speed 3. Use the "+" and'-" arrows to adjust the speed in RPM for SPEED 1. Note: Speed is adjusted up or down by increments of 10 RPM, 4. Press the 1" button again and the display will change to SPEED 1 start time. The "Time" parameter LED will begin to blink. See Figure 6. Figure 6: Setting Start Time 5. Use the "+" and '-" arrows to adjust the daily start time for SPEED 1. 6. Press the 1" button again and the display will change to SPEED 1 duration. The "Duration" parameter LED will begin to blink. See Figure 7. Figure 7: Setting Duration 7. Use the "+" and "= arrows to adjust the duration for SPEED 1 in hours and minutes. Note: The duration parameter is adjusted in 15 minute increments. 8. Pressing the "1" button will continue to cycle through these parameters, but the changes are immediately saved as they are adjusted. 9. Press the '7 button. The LED above SPEED 2 will begin to flash and the corresponding parameter LED will flash while editing. 10. Use the "+" and-" arrows to adjust the speed in RPM for SPEED 2. 11. Press the '7 button again and the display will change to SPEED 2 duration. Note: SPEEDS 2 and 3 do not have a start time, as they begin their duration immediately after the previous SPEED finishes. 12. Use the "+" and '-" arrows to adjust the duration for SPEED 2 in hours and minutes. 13. Repeat steps 9-12 to program SPEED 3 and QUICK CLEAN. Note: Remember that the duration allowed for SPEED 3 will be limited to the remaining time in a 24 hour day. Any time in the 24 hour day not programmed into SPEEDs 1-3, the pump will remain in a stationary state. ( SPEED 1 + SPEED 2 + SPEED 3 5 24 Hours ] 14. Press the StarUStop button and ensure the LED is lit. The pump is now on and will run the custom user -programmed schedule. Note: If the pump has been stopped via the Start/ Stop button, the pump will not run until the pump is turned back on by the Start/Stop button. If the Start/Stop LED is illuminated then the pump is on and will run the programmed schedule. SUPERMAX® VS Variable Speed Pump Installation and User's Guide Note: If a user wants to have a period of time during the day when the pump is not running, any of the SPEEDs can be programmed to 0 RPM. This will cause the pump to remain stationary/paused throughout the duration of that SPEED. Speed Priorities (Non -External Control) For schedule duration settings, SPEEDs are prioritized as follows: SPEED 1 -> SPEED 2 SPEED 3. SPEED 1 is the highest priority, while SPEED 3 is the lowest. Operating the Pump While Running If power is connected to the pump motor, pressing any of the following buttons referred to in this section could result in the motor starting. Failure to recognize this could result in personal injury or damage to equipment. Pressing the Display button will cycle through the current parameters. The drive will not allow a user to program a schedule . Speed — current run speed of more than 24 hours. When the 24th hour of . Time — current time of day duration is programmed it will take time from the . Duration — amount of time remaining at the lower priority speeds in order to add them to the current run speed SPEED currently being adjusted. . Watts — amount of watts currently being Example: Startino Schedule (Before Adiustment) SPEED 1 duration = 20 hours SPEED 2 duration = 2 hours SPEED 3 duration = 2 hours If the user reprograms SPEED 1 to run for 23 hours, SPEED 2 (lower priority speed) will automatically adjust to a 1 hour duration and SPEED 3 (lowest priority speed) will adjust to a 0 hour duration. End Schedule (After Adjustment) SPEED 1 duration = 23 hours SPEED 2 duration = i hour SPEED 3 duration = 0 hours consumed Pressing any of the Speed Buttons ("1 ", "2", "3", "Quick Clean") while the pump is running will act as temporary override. It will run the speed and duration that is programmed for that button. Once completed it will default back to the appropriate point in the programmed schedule. Note: If you adjust the speeds of the schedule while the pump is running, it will run the adjusted speed for the rest of the current duration, but will not save the adjustments. Exception: Speed and Duration adjustments to QUICK CLEAN will always be immediately saved. Quick Clean If running Quick Clean, pressing the "+" or `-" arrows will change the speed accordingly. Pressing the Quick Clean button again within 10 seconds of pressing the "+" or '=" arrows will allow you to adjust the duration of Quick Clean via the "+" and =' arrows. These changes will be saved immediately and are the new defaults for Quick clean. Pressing the Quick Clean button again will cycle through the two Quick Clean settings. The pump will exit out of editing mode if no additional buttons are pressed within 10 seconds. If Quick Clean is running and you wish to stop the Quick Clean prior to the duration being completed you can press and hold the Quick Clean button for 3 seconds and the pump will return to the appropriate point in the programmed schedule. SUPERMAX®VS Variable Speed Pump Installation and User's Guide Priming BGAUTf This pump is shipped with Priming mode ENABLED. Unless the Priming settings are changed in the menu, be aware that the pump will speed up to the priming speed when the pump is powered on for the first time, and the startfstop button is pressed. Before turning the pump ON, be sure the following conditions are met: 1.Open filler air relief valve. 2.Open valves. 3. Pool return is completely open and clear of any blockages. 4. Water in the pump basket. 5. Stand clear of the filter or other pressurized vessels. DO NOT run the pump dry. If the pump is run dry, the mechanical seal will be damaged and the pump will start leaking. If this occurs, the damaged seal must be replaced. ALWAYS maintain proper water level in your pool (half way up skimmer opening). If the water level falls below the skimmer opening, the pump will draw air through the skimmer,' losing the prime and causing the pump to run dry, resulting in a damaged seal. Continued operation in this manner could cause a loss of pressure, resulting in damage to the pump case, impeller and seal and may cause property and personal injury. Priming will automatically run when the SuperMax® VS Variable Speed Pump is started from a stopped state, except when running in Quick Clean mode. Priming will run at 3450 RPM by default, and will last for 5 minutes. The drive's screen will display and cycle through the following things "Prl - Priming Speed, Prl --Remaining Time". Once priming has begun, the speed can be adjusted between 3450 and 1700 RPM using the 4" and %- arrows. if it is adjusted below 1700 RPM, Priming mode will be disabled and the pump will immediately begin to run the scheduled speed. When priming is disabled and the pump is started from a stopped state, the screen will display, "Prl - OFF" for 10 seconds while running the scheduled speed (See Figure 8). This allows the user time to enable priming mode by pressing the 4 arrow. If the user chooses to re -enable priming mode, the pump will then transition from the scheduled speed to 1700 RPM. The user can increase the priming speed from 1700 RPM by pressing the 4" arrow. The 5 minute priming countdown timer starts when priming is first engaged. The installer should set the priming speed to be sufficient for priming the pump from a fresh install, but not so fast that there is a substantial waste of energy during the 5 minute priming window. 'The time the pump needs to achieve prime can change based on local environmental conditions such as water temperature, atmospheric pressure,, and your pool's water level. All of these things should be taken into consideration when setting the priming speed, however in most cases the pump will not need to run at 3450 RPM to successfully prime itself. Please test and verify chosen priming speeds more than once, letting the water drain from the system in between each test. Note: The pump strainer basket should always remain full to the bottom of the inlet in order to prevent air from entering the system. Figure 8: Priming Deactivation SUPERMAX® VS Variable Speed Pump Installation and User's Guide 10 Quick Clean The SuperMax® VS Variable Speed Pump is equipped with a Quick Clean feature, which can be engaged to temporarily run at higher or lower speeds ranging between 300 to 3450 RPM. Once the Quick Clean duration has elapsed, the pump will automatically return to the programmed schedule. Programming Quick Clean: 1. Stop the pump if it is running by pressing the StarUStop button. 2. Press the Quick Clean button. The LED above the Quick Clean button and the "Speed" parameter LED will flash while editing. See Figure 9. Figure 9: Setting Speed for Quick Clean 3. Use the "+" and =" arrows to adjust the speed in RPM for Quick Clean. 4. Press the Quick Clean button again and the display will change to Quick Clean duration. The "Duration" parameter LED will flash while editing. See Figure 10. Note: The Quick Clean feature does not have a start time. Figure 10: Setting Duration for Quick Clean 5. Use the `+" and =" arrows to adjust the duration in hours and minutes for Quick Clean. 6. Press the Start/Stop button and ensure the LED is illuminated. The pump is now on and will run the speed and duration set for Quick Clean. Note: When the Quick Clean duration ends, the pump resumes the 24 hour schedule at the point where it normally would be running at that time. The Quick Clean duration will not affect the start or stop times of the 24 hour schedule. For example, if Quick Clean runs during a period overlapping with a later part of SPEED 1 and an early part of SPEED 2, the start time of SPEED 3 is not affected. Note: Pressing/Holding Quick Clean key for more than three (3) seconds will cancel Quick Clean mode. Note: During the Quick Clean mode, the pump will not start with the priming sequence. Note: It is recommended that you do not set the Quick Clean duration to 0 HRS. Setting the Quick Clean duration to 0 HRS will not allow you to change the duration setting while the motor is running. The motor will have t0be stopped in order to change the Quick Clean settings if the duration is set to 0 HRS. Keypad Lockout ACAMTON Key lockout will not prevent the motor from being stopped by pressing the Start/Stop button. It will then be unable to be restarted until the keypad has been unlocked. If the motor is operating in Keypad Lockout mode, and being controlled through external controls, it can only run when the Stad/Stop LED is illuminated. The SuperMax VS Variable Speed Pump user interface has a Keypad Lockout feature to prevent unwanted changes to the settings. When locked, the keypad will only accept input from pressing the Display button to cycle the displayed information on the screen and input to stop the motor from a press of Start/Stop button. The keypad can be locked by pressing andholding the "1" button and the Quick Clean button at the same time for at least three seconds. "Loc On" will be displayed if successful. To unlock the keypad press and hold the "1" button and the Quick Clean button at the same time for at least three seconds. "Loc OFF" will be displayed if successful. Note: While operating in Keypad Lockout mode the motor can still be stopped by pressing the Start/Stop button. However, the motor can not be started again until the user unlocks the keypad. SUPERMAX°VS Variable Speed Pump Installation and User's Guide Factory Reset The drive can be reset to factory settings if necessary. A Factory Reset will wipe out all of the saved user settings that have been programmed, except for the time of day. Be sure that it is necessary before performing a Factory Reset, as the results are immediate. To perform a Factory Reset: 1. Stop the pump if necessary by pressing the Start/Stop button. 2. Record all of the custom schedule settings using Table 3. You can find these setting by pressing the "t", "2", "3", and "Quick Clean" buttons and cycling through all the screens. Also write down the Priming Speed. 3. Press and hold the "1", "2", "3", and "Quick Clean" buttons for 3 seconds. 4. The screen will display "FACE r5E" if factory reset is successful. See Figure 11. 5. Be sure to reprogram the schedule and priming speed after the factory reset. The pump must be turned back on with the Start/Stop button before it will run again. The pump will run the programmed schedule upon initial start-up. Note: Factory Reset can not be performed from a Keypad Lockout state. Figure 11: Drive Factory Reset Speed I Duration I StartTime SPEED 2 SPEED 3. QUICK CLEAN Priming Speed Table 3: User Programmed Schedules SUPERMAX° VS Variable Speed Pump Installation and User's Guide 12 MAINTENANCE WARNING DO NOT open the strainer pot if SuperMax®VS Variable Speed Pump fails to prime or if pump has been operating without water in the strainer pot. Pumps operated in these circumstances may experience a build up of vapor pressure and may contain scalding hot water. Opening the pump may cause serious personal injury. In order to avoid the possibility of personal injury, make sure the /�:��� suction and discharge valves are open and strainer pot temperature is cool to touch, then open with extreme caution. if taAM To prevent damage to the pump and for proper operation of the system, clean pump strainer and skimmer baskets regularly. Pump Strainer Basket The pump strainer basket (or'strainer pot', 'hair and lint pot'), is located in front of the volute. Inside the chamber is the basket which must be kept clean of leaves and debris at all times. View basket through the'SeeThrough Lid' to inspect for leaves and debris. Regardless of the length of time between filter cleaning, it is most important to visually inspect the basket at least once a week. Cleaning the Pump Strainer Basket 1. Press the StartiStop button to stop the pump and turn off the pump at the circuit breaker. 2. Relieve pressure in the system by allowing the water to cool. 3. Gentlytapthe clamp in acounter-clockwise direction to remove the clamp and lid. 4. Remove debris and rinse out the basket. Replace the basket if it is cracked. 5. Putthe basket back into the housing. Be sureto align the notch in the bottom of the basket with the rib in the bottom of the volute. 6. Fill the pump pot and volute up to the inlet port with water. 7. Clean the cover, 0-ring, and sealing surface of the pump pot. Note: It is important to keep the lid O-ring clean and well lubricated. 8. Reinstall the lid by placing the lid on the pot. Be sure the lid O-ring is properly placed. Seat the clamp and lid on the pump then turn clockwise until the handles are horizontal. 9. Turn the power on at the house circuit breaker. Reset the pool time clock to the correct time, if applicable. 10. Open the manual, air relief valve on top of the filter. 11. Stand clear of the filter. Start the pump. 12. Bleed airfromthe filter until asteadystreamofwater comes out. Close the manual air relief valve. 01NARNINCa THIS SYSTEM OPERATES UNDER HIGH PRESSURE. When any part of the circulating system (e.g, Lock Ring, Pump, Filter, Valves, etc.) is serviced, air can enter the system and become pressurized. Pressurized air can cause the lid to separate which can result in serious injury, death, or property damage. To avoid this potential hazard, follow above instructions. Winterizing You are responsible for determining when freezing conditions may occur. If freezing conditions are expected, take the following steps to reduce the risk of freeze damage. Freeze damage is not covered under warranty, To prevent freeze damage, follow the procedures below: 1. Press the StarVStop button to stop the pump and shut off electrical power for the pump at the circuit breaker. 2. Drain the water out of the pump housing by removing the two thumb -twist drain plugs from the housing. Store the plugs in the pump basket. 3. Cover the motor to protect it from severe rain, snow and ice. Note: Do not wrap motor with plastic or other air tight materials during winter storage. The motor may be covered during a storm, winter storage, etc., but never when operating or expecting operation. Note: In mild climate areas, when temporary freezing conditions may occur, run your filtering equipment all night to prevent freezing. Strainer Pot Assembly VOLUTE SUPERMAX°VS Variable Speed Pump Installation and User's Guide 13 SERVICING ®W RNING Always disconnect power to the SuperMax° VS Variable Speed Pump at the circuit breaker and disconnect the communication cable before servicing the pump. Failure to do so could result in death or serious injury to service people, users or others due to electric shock. Read all servicing instructions before working on the pump. DO NOT open the strainer pot if pump fails to prime or if pump has been operating without water in the strainer pot. Pumps operated in these circumstances may experience a build up of vapor pressure and may contain scalding hot water. Opening the pump may cause serious personal injury. In order to avoid the possibility of personal injury, make sure the suction and discharge valves are open and strainer pot temperature is cool to touch, then open with extreme caution. Be sure not to scratch or mar the polished shaft seal faces; seal will leak if faces are damaged. The polished and lapped faces of the seal could be damaged if not handled with care. Electric Motor Care Protect from heat 1. Shade the motor from the sun. 2. Any enclosure must be well ventilated to prevent overheating. 3. Provide ample cross ventilation. Protect against dirt 1. Proteict from any foreign, matter. 2. Do not store (orspill) chemicals on or nearthe motor. 3. Avoid sweeping or stirring up dust near the motor while it is operating. 4. If a motor has been damaged by dirt it may void the motor warranty. 5. Clean the lid and clamp, 0-ring, and sealing surface of the pump pot. Protect against moisture 1. Protect from splashing or sprayed water. 2. Protect from extreme weather such as flooding. 3. If motor internals have become wet - let them dry before operating. Do not allow the pump to operate if it has been flooded. 4. If a motor has been damaged by water it may void the motor warranty. Shaft Seal Replacement The Shaft Seal consists primarily of two parts, a rotating member and a ceramic seal. The pump requires little or no service other than reasonable care, however, a Shaft Seal may occasionally become damaged and must be replaced. Note: The polished and lapped faces of the seal could be damaged if not handled with care. Pump Disassembly All moving parts are located in the rear sub -assembly of this pump. Tools required: • 1/4 inch socket or open end wrench. • 3/8 inch socket or open end wrench. • 9/16 inch open end wrench. • 1/4 inch Allen Key • Flat blade screwdriver. To remove and repairthe motor subassembly, follow the steps below: 1. Press the Start(Stop button to stop the pump and turn off the pump circuit breaker at the main panel. 2. Drain the pump by removing the drain plugs. 3. Remove the 4 bolts that hold the main pump body (strainer pot/volute) to the rear sub -assembly. 4. GENTLY pull the two pump halves apart, removing the rear sub -assembly. 5. Remove the three hex head screws holding the diffuser in position. 6. Hold the impeller securely in place and remove the impeller lock screw by using aflat blade screwdriver or wrench. The screw is a left-handed thread and loosens in a clockwise direction. 7. To unscrew the impeller from the shaft, insert a 1/4 inch Allen key into the center of the motor fan cover and twist the impeller counter -clockwise. 8. Remove the four bolts from.the seal plate to the motor using a 9/16 inch wrench. 9. Place the seal plate face down on a flat surface and tap out the ceramic seal. 10. Clean the seal plate, seal housing, and the motor shaft. SUPERMAX® VS Variable Speed Pump Installation and User's Guide 14 ®CL4UTI N DO NOT run the pump dry. If the pump is run dry, the mechanical seal Will be damaged and the pump will start leaking. Ifthisoccurs, the damaged seal must be replaced. ALWAYS maintain properwater level. If the water level falls below the suction port, the pump will draw air through the suction port, losing the prime and causing the pump to run dry, resulting in a damaged seal. Continued operation in this manner could cause a loss of pressure, resulting in damage to the pump case, impeller and seal and may cause property damage and personal injury. Pump Reassembly 1. When installing the replacement seal into the seal plate, use soapy water to wet the rubber boot before pressing it into the seal plate. 2. Remount the seal plate to the motor. 3. Before installing the rotating portion of the seal on the motor shaft, wet the motor shaft with soapy water and slide the seal onto the motor shaft. Ensure that the carbon face contacts the ceramic face of the stationary seat. Press the seal into the seal plate with your thumbs and wipe off the ceramic with a clean cloth. 4. Screw impeller onto the motor shaft (clockwise to tighten). 5. Screw in the impeller lock screw (counter -clockwise to tighten). Note: Insert a 1/4" hex Allen wrench into the motor shaft through the hole in the rear motor fan cover. This will prevent the motor shaft from rotating and you screw in the impeller lock screw. 6. Remount the diffuser onto the seal plate. Make sure the plastic pins and holding screw inserts are aligned. 7. Grease the diffuser quad ring and seal plate O-ring prior to reassembly. 8. Assemble the motor sub -assembly to the strainer pot -pump body. Tighten the bolts until all 4 bolts are in place and finger tightened. 9. Fill the pump with water. 10. Reinstall the pump lid and plastic clamp; see the next section, 'Restart Instructions'. 11, Re -prime the system. DIFFUSER 5EAL DIFFUSER DIFFUSER SCREWS (3X) Restart Instructions If SuperMax® VS Variable Speed Pump is installed below the water level of the pool, close return and suction lines prior to opening hair and lint pot on pump. Make sure to re -open valves prior to operating. Priming the Pump The pump strainer pot must be filled with water before the pump is initially started. Follow these steps to prime the pump: 1. Remove the pump lid plastic clamp. Remove the pump lid. 2. Fill the pump strainer pot with water. 3. Reassemble the pump cover and plastic clamp onto the strainer pot. The pump is now ready to prime. 4. Open the air release valve on the filter, and stand clear of the filter. 5. Turn on the power to the pump. 6. Press the StartlStop button on the drive keypad. If the pump is currently scheduled to run it will start. Note: If the pump is not schedule to start, press a Speed button to begin a manual override that will start the pump. 7. When water comes out of the air release valve, close the valve. The system should now be free of air and recirculating water to and from the pool. `DRIVE COVER DRIVE c o MOTOR B MOTOR TO SEALPLATE 0 HARDWARE (4X) MECHANICALSEAL SEAL PLATE SEAL PLATE O-RING ETSCREW IMPELLER rHREAD) Motor Assembly SUPERMAX°VS Variable Speed Pump Installation and User's Guide