Loading...
HomeMy WebLinkAbout06.20.2019Planning & Zoning Commission Meeting Thursday, June 20, 2019 6:00 PM 1 | P a g e PLANNING & ZONING COMMISSION ST. LUCIE COUNTY, FLORIDA Regular Meeting June 20, 2019 Convened: 6:00 PM Adjourned: 7:08 PM 1.CALL TO ORDER A.Pledge of Allegiance B.Roll Call Present Board Member Billy O'Dell, Board Member Bobby Hopkins, Chair Craig Mundt, Board Member Ed Lounds, Board Member James A. Taylor, Vice-Chair Bob Lowe, Board Member Lawrence "Beau" Slay, Board Member Charles Grande, Board Member Marty Sanders Vice -Chair William R. Smith C.Announcements No Announcements. D.Disclosure(s) No Disclosures. 2.MINUTES Mr. Lowe motioned to approve the St. Lucie County Planning & Zoning Commission minutes for the meeting of Thursday, April 18, 2019; Mr. O'Dell seconded. 3.PUBLIC COMMENT No public comment. 4.PUBLIC HEARINGS Excused Planning & Zoning Commission Meeting Thursday, June 20, 2019 6:00 PM 2 | P a g e A.FPL Pelican Solar Energy Center ‐ Conditional Use Permit Presented by Jodi Nentwick, Senior Planner. The applicant Florida Power & Light (FPL) is requesting a Conditional Use Permit for construction and operation of a solar generation center based upon the consistency with the Standards of Review identified in Section 11.07.03 and Section 7.10.28 of the Land Development Code and the goals, objectives and policies of the Comprehensive Plan. This solar generation center qualifies as a targeted industry and St. Lucie County conducted an expedited review. Public Notification signs were placed on the property, and mail notices sent to all property owners within 500 feet of the subject property, totaling 7 adjacent properties; one response was received, in favor. The subject property address is 6201 Minute Maid Road, Fort Pierce, FL. 955 acres, zoned AG-5 Agricultural; this subject property is located in a low impact use, low traffic area. The generation system will interconnect with FPL's transmission center (located in IRC County). The solar generation system, 300,000 structural supported panels will provide electricity to approximately 1500 homes. The applicant as also submitted a Major Site Plan application and two waivers pertaining to the lot coverage and perimeter landscape buffers to be voted on by the Board of County Commissioners. Staff recommends approval subject to the following Planning and Development conditions: 1.The conditional use improvements and operational areas be consistent with Resolution No. 19-XXX authorizing Major Site Plan approval in accordance to section 11.02.09 Standards for Site Plan of the St. Lucie County Development Code. 2.On-site construction activities and/or repairs to the solar energy facility be restricted to 7am-6pm on weekdays 8am-5pm on Saturday. 3.Footcandle readings for all exterior lighting associated with normal operation of the solar generation center shall be at zero (0) at adjacent properly lines. Repairs and maintenance of the solar generation center equipment shall be exempt from this provision. As well as additional conditions required to comply with Environment Resources Department. STAFF RECOMMENDATION: Forward the petition of the proposed Conditional Use Permit for a solar power generation to the Board of County Commissioners with a recommendation for approval, subject to conditions as set forth in the Resolution. Questions/ comments from Board Members regarding solar generation lighting, conditional use expiration date, 25 year contract conditions regarding Kings Hwy solar location and public notice response. Applicant/ agent presentation by: Bob Raynes, Gunster Law Firm, in response to the question of the Kings Hwy 25 year contract; the reason for condition is that the area was developed (TVC area); No road being created. Requested to change conditions on construction hours be lifted. Kate Cotner, with FP&L: FP&L recently launched a 30 by 30 program install thirty million additional solar panels by the year 2030; over a 100 new solar plant throughout Florida; each site will power 15,000 homes; currently have two sites in SLC. Planning & Zoning Commission Meeting Thursday, June 20, 2019 6:00 PM 3 | P a g e Scott, Senior Project Manager, with FP&L: Site is similar to the two other sites in SLC. 74.5 MW project, total area developed, private right of way access, no residential neighbors, the nearest home is 1.5 miles away, interconnecting to existing FPL infrastructure and start of construction as early as 11/1/19. Questions posed by Board Members regarding side set-back, unused land, location of northern boundary off Oslo/ Minute Maid Rd., environmental impact, service life of solar system (25-30 years), future location in SLC. Mr. Raynes requested amending motion to remove two conditions: working construction time, and lighting. Sending recommendation to the Board of County Commissioners with the two conditions removed. RESULT: Recommend the Board of County Commissioners approve the Conditional Use; removing two conditions: working construction time and lighting. 5.WORKSHOPS A.Electronic Signage Electronic Sign workshop presented by Leslie Olson, Director of Planning & Development Services. The purpose of the workshop to review the St. Lucie County sign code relating to electronic signage. The County's sign ordinance currently does not allow changeable signs. This item was presented to the Board of Commissioners Informal Meeting on October 8, 2018. There was a consensus that more information should be provided about other cities' requirements for changeable signs. The workshop objectives: Review St. Lucie County sign ordinance related to electronic signage; address pros and cons of electronic signage; and gather public input regarding current ordinances and possible changes. Electronic signs (Flashing, animated, fire-emitting, changeable-message, or noise-making signs) are prohibited, except for one (1) variable electronic message sign per parcel or group of parcels under a uniform site development plan, provided that the message sign does not exceed an overall area of thirty (30) square feet x ten (10) feet typical dimensions); the message displays shall not scroll, flash, or blink, and message display copy shall not change more frequently than once every five (5) seconds. Reference 9.03.00 Prohibited Signs. Visual examples of electronic signs were displayed. Explanation of Billboards 9.02.02, off premises signs. Discussed pros and cons of electronic signage: Planning & Zoning Commission Meeting Thursday, June 20, 2019 6:00 PM 4 | P a g e Pros Cons New technology Traffic safety concerns 1 sign= variety of options Visual clutter Ease of changing message Impair vision Messages can be changed and uploaded over the internet, enabling advertisers to target ads to specific days or certain times of the day Distract motorist Enforcement issues (timing of changes, flashing, brightness, blinking and scrolling) Signs are by zoning district. Changeable signs are allowed anywhere that ground signs are allowed. Currently regulations allow electronic signs, with restrictions, in the following zoning: Commercial General (CG), Hutchinson Island Residential District (HIRD), and Commercial Office (CO). Any billboard in St Lucie County is eligible to become an electronic billboard. Questions/ comments from the board regarding illumination, zoning, current changeable signs, mobile electronic signs, slot advertising, LED lighting vs back light, proliferation, driver distraction/ safety, code enforcement staffing, PDS plan to draft new code and structural integrity of signs. Further research and discussion will be conducted regarding this matter. 6.OTHER BUSINESS None. 7.ADJOURN There being no further business to be brought before the Board, the meeting was adjourned at 7:08 PM. Please Note: Final minutes are recorded in the official minute books that are filed with the Clerk of the Circuit Court and available for inspection upon request. Planning & Zoning Commission Meeting Thursday, June 20, 2019 6:00 PM 5 | P a g e