Loading...
HomeMy WebLinkAboutcost of constructionf 11/6/2019 Franco Construction Inc 1011 NE Jensen Beach Blvd John and Colette Drtadul Jensen Beach, FL 34957 ! Off7ce 772-334-9118 Demo Demo All Including Ceiling Fans Demo Removal and DumpTrsRer Remove all Popcorn In Closets Only , Demo Flooring Ram Board Floor Protection I $41AG .75 CarpentryRough Frame Niche Rework Walls In Witcher, [recall Blocking for Shower Dcor,Gmb Bars I Frame down Callings in 2 Bedrooms $1,898.00 Plumbing Rough Install NmAcyrUeShower Base Cast of Base not included Install Nev, Water Shut off valves P Instill New Shower Vain i 51,)96.OD Electrical Rough Hide CableN Wire l Install and Prmdde IargerToggle Wnhesffnoperable Rear Balcony Outlet Under cabinet Lighting Install New Ceiling Farts Remove Fluorescent light -Install and Provide 6 Can Ughtsatitchen Remove Old and Install New Light Fbmrrs.Guest Bath and Master Bath Install New Can Ughts averpassthruarea(2) $4,199.00 Drywall/Cement Board Install New Drywall as Needed Install New Cement Board Tape and Finish all new Drywall(ready for paint) r ' $2.B66.50 Tile install Tile or High on Bathroom Walls in Master bath Install New Tiles on Shower Walls I Install Bull Nose Tile Install Sound Proofing for Flooring whole house I Install Flooring -Guest Bedroom, Kl rhen, Living Room, Master Bath and Master Bedroom Install Tile Guest Bathroom l Install Tile Baclsplash $35,795J07 Plumbing Flnlsh i Install Trim In Shower Install Toilet I Install Sink Install Faucet 1 $1,287A0 Electrical Finish Install New Vanity Lights I Install New Switches/Outlets(Swap Old) Install Fan/UghtTrim I [ $83200 t I( p t I Y REVIEWED OR PLIANCE r�ODE STe WOE COUNTY ADD Page 1 of 2 Franco Construction Inc ; 11/612019 1011 NE Jensen Beach Blvd '` .- • �$% John and Colette D9adu1 Jensen Beach, FL 34957 D379Y U&T-1D' � Office 772-334-9118 i i T-W Carpentry Finish Install and Provide larger S' Baseboard- Guest Bathroom, Guest Bedroom, Kitchen, living and Master Bedroom Install New Prehung Door 1 Install Siding Ram Door Master Bath Install New Door Casing on Existing door Install 1 New Bifold Doors Install Shiplap on one Side of Passthur by kitchen I r $3,1BSA0 Custom Shower Door Install and Provide Master Bath Glass Shower Enclosure 1 $2,3aDA0 Paint Pabst All Rooms f $ZA7D.00 Material I No Material included except asated above as Supply and Install or Provide and Install Permit i Permit Fees 1 $1,200.00 lotd 1 $42,49125 I EWIE® FOR M MPL.IANCE CIE COUNTY B[�`CC r I Page 2 of ' r i I I