HomeMy WebLinkAboutcost of constructionf
11/6/2019
Franco Construction Inc
1011 NE Jensen Beach Blvd
John and Colette Drtadul
Jensen Beach, FL 34957
!
Off7ce 772-334-9118
Demo
Demo All Including Ceiling Fans
Demo Removal and DumpTrsRer
Remove all Popcorn In Closets Only
,
Demo Flooring
Ram Board Floor Protection
I
$41AG .75
CarpentryRough
Frame Niche
Rework Walls In Witcher,
[recall Blocking for Shower Dcor,Gmb Bars
I
Frame down Callings in 2 Bedrooms
$1,898.00
Plumbing Rough
Install NmAcyrUeShower Base Cast of Base not included
Install Nev, Water Shut off valves
P
Instill New Shower Vain
i 51,)96.OD
Electrical Rough
Hide CableN Wire
l
Install and Prmdde IargerToggle Wnhesffnoperable Rear Balcony Outlet
Under cabinet Lighting
Install New Ceiling Farts
Remove Fluorescent light -Install and Provide 6 Can Ughtsatitchen
Remove Old and Install New Light Fbmrrs.Guest Bath and Master Bath
Install New Can Ughts averpassthruarea(2)
$4,199.00
Drywall/Cement Board
Install New Drywall as Needed
Install New Cement Board
Tape and Finish all new Drywall(ready for paint)
r
' $2.B66.50
Tile
install Tile or High on Bathroom Walls in Master bath
Install New Tiles on Shower Walls
I
Install Bull Nose Tile
Install Sound Proofing for Flooring whole house
I
Install Flooring -Guest Bedroom, Kl rhen, Living Room, Master Bath and Master Bedroom
Install Tile Guest Bathroom
l
Install Tile Baclsplash
$35,795J07
Plumbing Flnlsh
i
Install Trim In Shower
Install Toilet
I
Install Sink
Install Faucet
1
$1,287A0
Electrical Finish
Install New Vanity Lights
I
Install New Switches/Outlets(Swap Old)
Install Fan/UghtTrim
I
[ $83200
t
I(
p
t
I
Y
REVIEWED OR
PLIANCE
r�ODE
STe WOE COUNTY
ADD
Page 1 of 2
Franco Construction Inc
;
11/612019
1011 NE Jensen Beach Blvd
'` .- • �$%
John and Colette D9adu1
Jensen Beach, FL 34957
D379Y U&T-1D'
�
Office 772-334-9118
i
i
T-W
Carpentry Finish
Install and
Provide larger S' Baseboard- Guest Bathroom, Guest Bedroom, Kitchen, living and Master Bedroom
Install New Prehung Door
1
Install Siding Ram Door Master Bath
Install New Door Casing on Existing door
Install 1 New Bifold Doors
Install Shiplap on one Side of Passthur by kitchen I
r
$3,1BSA0
Custom Shower Door
Install and Provide Master Bath Glass Shower Enclosure
1
$2,3aDA0
Paint
Pabst All Rooms
f
$ZA7D.00
Material
I
No Material included except asated above as Supply and Install or Provide and Install
Permit
i
Permit Fees
1 $1,200.00
lotd
1
$42,49125
I
EWIE® FOR
M MPL.IANCE
CIE COUNTY
B[�`CC
r
I
Page 2 of '
r
i I
I