LABOR
MATERIAL.
1
-pnong
varies and can not be determined until after all paperworkisfiled
'
f
fin eer Co
gm s[/Fees-Upon revlewof eperml[apphrotlon the building departinentmay require
that wesubmitnew planssjgRed offby an Eggineerbefore
TED
2
they can approve the permit, the
Er(gineerfeevariesbasedonehescopeoftheprofect
3
purchase all general rebuild material
TBD
4
Disconnect guest bathroom faucet sink and milet-Dispose
Remove exlstingguestbathroom comtertop and cabinetry - Dispose
{ ,
$250.00
5
6
Remove elastingguest bathroom shower doors -Dispose
7
Chip out guest bathroom dry Flobr
8
Remove all above material and dispose at dump
Inspect all exposed plumbing/elecnitalwjthfn the walls -Due to updated bWlddh{q codes ifyour
v
9
unit is not updated/carrentto code, IhB it required to bring it up to code -These costs are to be
covered by the homeowner.I
10
Install new shower system in bathroom shower
li
Mud, finish and prime all walls and ceilings
12
Mud guest shower pan
ImsWlguestdry floor t
tile 40 sgft
� Tile
$80.00
.
-Material= lW75De1MYSeSeries- Beige Linen .PDU.shed-24'x24"-PLRDELRLBP024@$4.50sgft
-Layout-Straight
13
- Groats CDlar-7BD
I
giuscsbower eapprox1085gR inch es 20%waste)
I Tile
$180.00
-Materldi-BappyF7oors-Glacier Wave GIRW-12"x36•- 6751-C @$405 persgft
- Layout- Vertical Stadmd
14.
-GmutColor-.TBD
Install decorative the
Tile
$437.00
-Materiel-ProPlooring-MontggeAbaro 2'x 6•Bridc Gloss Mosaic -18-100248293
15
-Layout-1'waterfaB down centerwall
Install b ose
Tile
$240.00
16
-Material-Schluter-Chrome m match the plumbingfixteres
Install baseboard approz lBLft
{ Tile
$150.00
17
-Material- WUI befabrimled outofthafloortile
Install niche
{ Tile
$144.00
16
-Location-Above theshower controls is walls allow
wets owerfioo1 I Iowerapproz 20 sq
1 Tile
$80.00
- Material - IW7'Atl=Series - Whice Br{ght3'x3•Mosaic-CATi1LAWBBR33
[20
-Layout-S&dght
-GreutColor- 7RD
Install
guest threshold -marble
i Tile
$300.00
ltile
$80.00
Initials - Island Kitchen and Bath
F I L E kC4 0 , Ppa Y'
i
I
I
0
C
I guest ineuy
-Material -Wellborn SelectSerlw-Bishop Pull Overlay in Dove -Soft-close features -Classic drawer
nts -Johnny waUon•mhinet
•Note'Cabineby pridg0 is based on the aryginal signed 2020 designs and any changes made may
21
affeathepricing ofthewhinete
bistau cabinetry hardware
i
$2,020.00
22
-Material- 7DaD a "mce
guestvanitycounmrtopw 4'ba maespmshes-appmm7sgR@ 7persgtLfor
+ $125.00
fabrication - One (1) vanity sink cutouts Ca $125 each.
- Material -White Galaxy- one (1) slab
23
Edge Eased
Instail guestvatdtysink-quantity one [i)
:$384.00
$1,524.00
24
-Material-One(1) undermountrectanglesinkin white
1 Plum
$125.00
Install gues[vanity faucet -quantity one [1)
25
-Material-One(1) Moen 90 Degreesingle handlefaucetin Chrome-S6700
Plum
26
lnsmll guestshowerpanwith slope kit
Install guestshower and diveroervalves
Plum
$380.00
$80.00
- Material -Moen Posi-temp valve -2520 -Moen diverts, valve -3372
27
-Location-TBD on during walk-thugh with the PrVect Manager.
ro
1 guestshowervalve anumvertervalvetrim
Plum
$275.00
28
-Material -Moen go degreeposl-temp valve trim in Chrome- 732711-Mom -go Degree diverter
valve trim in Chrome - 7S4172
I guest han owerw debar
I Plum
$280.00
-Material-Moen 90Degree singlefunctlon handshower w/slideborin Chrome-S3879EP-Requires
1
a wall -Mount supPlyelbow-A721
29
-Locotlon- Opposite the shower controls
InsWlguestrainhead
Plum
$315.00
-Material-Moen 90Degree singlefunction Raiwhowerin Chrome -S6340EP-Requuw ceiling
30
mount shower arm -K-7396-CP
ins guest bathroom mile[
Plum
$200.00
-Material - Kohlerlhghline ComfortReightElangatedl?"I in White - K-3658-00 - with
31
coordinating soJtteose lid-K4636-0
Install five (5) I.BD recessed lights -three (3) above the vanity and mile[ and two (2) in the
Plum
$375.00
32
shower-@$125 each
I
33
Install whisper quiet exhaust ran in the guest bathroom
Elea
$625.00
Install guest bath mirror
Elect
$225.00
34
-Material- Supplied by the homeowner
f
I
Install guest 6emeless shower doors (material, fabriotion, insWlatlon) :grzf
•
SBO
-Material-C7earGlass-One(1)faedpaneland one panel- Chrome hardware to match
35
she plumbingfixwres
Glass
$1.450.00
bor Ih
$2,400.00
bor (Tile)
$2;200.00
ing labor allowance(Plum)
ical ]aborallovrance (Elea)
W�dm
$1,185D.00
i
r gabor&materiaO -
$500.00
ngand true-Whitels-:TBD
aBowanceforone [I)colar$1
0.00ru.
Clean Up
$200.00
TOTAL LABOR / MATERIAL ALLOWANCE -
°57;984 00
$%940.00
$17,924.00
GRAND PROJECTALLOWANCE
Project Deposit: $5,615
Countertop Deposit $1,524
Draw #1 due once Rough inspections are completed: $5,395
Draw #2 due once the is completed: $2,700
Draw #3 due once counter is templated: $1,700
Final Payment due upon completion: Remaining balance
Initials - Island Kitchen and Bath
Pg. 2
' G
Commencement January start 2020 '
Completion
PAYMENT TERMSAND CONDITIONS
L3 DepwsitofabloetUpaldin full Plus 25%ofthe ro'
scheduled'
Credit Canis P IectAl not be cache,
d[e NOTaccepted. Deposit checks will not be ashedunta ��le m island Ifitchen and Bath, is required for a project to be
c2) Draws will be collected as needed m complete the ro' D1e PLOj� is about m commence.
coIlected P lect If the client refuses m ply draw, the Project will b halted until payment is
3•) RM PaymentofoPen halaoce within 3 days of completion ofthe project
TERMSAND CONDITIONS
— The prices represented an, based selections are made by client. on P ro jettand Product average costs Prices may vary once project and Product measurements, details, and
stl &D'nme spentby the owners Otte an work according m the Florida Building Code and is licensed in ffie IIII m of Florida and is in good
standin
contract. Project is not billable item AB work will be accordance with the scope of work detailed within the
—Dueto unforeseeable conditions inside walls behind cabinets,etc, additional cost may occur duringconstmcpol for issues suchazmold,
d°d�sti°gPlumbibg(electrical not being safe or code compliant These additional costs are NOTii dud in any contract Pricing 1
and will
as needed. as This n contract does NOT accuuntfor Product defects Orprodutt badcorden These
and w7Ilhe den@withazneeded. � P goad wiibe
—Atrychanges regttestedb issues may affect the project timeline
timeline and are an additional cost to the Orithe ginal original contract is signed, w' a result)na age order. Change orders will off project
addition m the total cost of the Chan r+gnal contract Pricing. A changeo affect r
pricing. Change Order Change Orders must be signed, and d humemasepaatefee wiy perchangeorder,tr
—AB selections must Paid immcdiatelyand separately] mthe on usC he made at the time of the contra gtadl contmr.
theris e is not a selection stated, TBD, orSBO then we mnaotNro"he pse s rice �r�ch as, To Be Decided (TBD) or Supplied by Owner (560). if
SBO matnial, srosWasIDBitym Provide all additional irectnformation thatma be needed for the project Sttch az,a If Banre
within the contraR
timethatmayoccm fromftetrgr��tion is provided by the client Island wtchen and Bath is NOT responsible for any ddmo�o�an
—'nsumnoeAged; 4 Corners insmanoe-
StudK—Liomse Holder. Justin Thhuy _ Lireaze Number LBC 1yS9508
THANK YOU FOR YOUR BUSINFSSI
Date / I gnature I-
' � Date t R gnatle
I
Initials -
Island Kitchen and Bath
P& 3