Loading...
HomeMy WebLinkAboutDrawingPlanning & Developmental Building & Code Regulations Di) PROJECT REQUIREMENTS THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE ANALYSIS OF Department SYSTEM TO DETERMINE IF THIS IS A TENSIONED STRUCTURE. NO MODIFICATION TO THE SLAB OR DECK ABOVE (INCLUDING DRILLING, NOTCHING, CUTTING) IS PERMITTED UNDER THIS PERMIT. All work shall comply with the Florida Building Code Sixth Edition (2017), Fuel Gas, Mechanical, Plumbing, Accessibility. FLORIDA BUILDING CODE EXISTING 302.3 EXISTING MATERIALS. Materials already in use in a building in compliance w approvals in effect at the time of their erection or installation shall be permitted to determined by the building official to be unsafe. 702.6 MATERIALS AND METHODS. All new work shall comply with the materials ai requirements in the Florida building code, building; Florida building code, energy e building code, mechanical; and Florida building code, plumbing, as applicable, that standards, detail of installation and connection, joints, penetrations, an'd continuit component, or system in the building. 703.1 GENERAL. Alterations shall be done in a manner that maintains tlie level off provided. FLORIDA BUILDING CODE GYPSUM BOARD, GYPSUM PANEL PRODUCTS AND PLASTER 2506.2 STANDARDS. Gypsum board and gypsum panel products shall conform to standards listed in Table 2506.2 and Chapter 35 and, where required for fire Prot the provisions of Chapter 7. 2508.1 GENERAL. Gypsum board, gypsum panel products and gypsum plaster cc the materials listed in Tables 2506.2 and 2507.2. These materials shall be assem compliance with the appropriate standards listed in Tables 2508.1 and 2511.1.1 Contractor Name �� IJ 1 P r!l4 Contractor Signature --'— Existing Building, requirements or vain in use unless methods !rvation; Florida cify material any element, protection appropriate in, shall conform to action shall be of and installed in Chapter35. s Revised 1 /13/19 �tEC'N�n AN 09 2019 Fucie County, Permitting l n�k�vl �l L ma's vwry"v 11,911" AP ` �WCA- n