Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Agenda Packet 07.21.2022
PLANNING & ZONING COMMISSION AGENDA ST. LUCIE COUNTY Regular Meeting Thursday, July 21, 2022 6:00 PM St. Lucie County Commission Chambers 2300 Virginia Avenue 3rd Floor of Roger Poitras Building Fort Pierce, FL 34982 BOARD MEMBERS CHAIRMAN JAMES TAYLOR VICE-CHAIRMAN ROBERT LOWE BOARD MEMBER CRAIG MUNDT BOARD MEMBER VALERIE SLACK BOARD MEMBER CRAIG BRIDGERS BOARD MEMBER ED LOUNDS AT-LARGE BOARD MEMBER LAWRENCE “BEAU” SLAY BOARD MEMBER WILLIAM O’DELL AT-LARGE BOARD MEMBER RYAN BINNER EX-OFFICIO BOARD MEMBER MARTY SANDERS Mission Statement St. Lucie Works to deliver superior service that enhances our quality of life Page 1 of 494 Regular Meeting Thursday, July 21, 2022 6:00 PM 2 | P a g e WELCOME Please turn off all cellular phones and pagers prior to entering the Commission Chambers. Please note that the Planning and Zoning Commission/Local Planning Agency serves in an advisory capacity to the St. Lucie County Board of County Commissioners and has the power to review and make recommendations to the Board, for approval or disapproval, on any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and comment at the public hearing. Please limit comments to three minutes if possible and be respectful of others’ opinions. For public convenience, all meetings are televised and are provided with wireless internet access. NOTICE: All Proceedings before this Board are electronically recorded. Any person who decides to appeal any action taken by the Board at these meetings will need a record of the proceedings and for such purpose may need to ensure that a verbatim record of the proceedings is made. Upon the request of any party to the proceedings, individuals testifying during a hearing will be sworn in. Any party to the proceedings will be granted the opportunity to cross-examine any individual testifying during a hearing upon request. Anyone with a disability requiring accommodation to attend this meeting should contact the Human Resources Department at (772) 462-1546, HumanResources@stlucieco.org or TDD (772) 462-1428 at least forty-eight (48) hours prior to the meeting. Page 2 of 494 Regular Meeting Thursday, July 21, 2022 6:00 PM 3 | P a g e 1. CALL TO ORDER 2. PLEDGE OF ALLEGIANCE 3. INVOCATION 4. ROLL CALL 5. ANNOUNCEMENTS 6. DISCLOSURE(S) 7. MINUTES A. St. Lucie County Planning & Zoning Commission minutes for the meeting of June 16, 2022 8. PUBLIC COMMENT 9. PUBLIC HEARINGS A. St. Lucie County Fire/EMS Impact Fee Study 2022 Update - Fire/EMS Impact Fees Ordinance B. Acting as the Local Planning Agency: A Future Land Use Map Amendment to change the land use categories from RU ((Residential, Urban - 5 du/ac), RM (Residential, Medium - 9du/ac) and COM (Commercial) to the MXD (Mixed-Use Development) category, submitted by Cotleur and Hearing, Inc., on behalf of Meritage Homes of Florida. C. A Zoning Atlas Amendment (Rezone) from RS-2 (Residential, Single-Family-2) and CG (Commercial, General) to PUD (Planned Unit Development), and Preliminary PUD Site Plan for a project to be known as the Tidewater PUD located at 6209 S. US Highway 1 in Fort Pierce, submitted by Cotleur and Hearing, Inc., on behalf of Meritage Homes of Florida Inc. D. Acting as the Local Planning Agency: Joseph Miller's Petition for a Comprehensive Plan Future Land Use Map Amendment to revise the Loop Road Mixed Use Activity Area Policy for the Low Intensity Sub-Area to replace specific required commercial, institutional and office thresholds with light industrial and warehouse land uses. Page 3 of 494 Regular Meeting Thursday, July 21, 2022 6:00 PM 4 | P a g e 10. WORKSHOPS 11. OTHER BUSINESS 12. ADJOURN Page 4 of 494 PLANNING & ZONING COMMISSION ST. LUCIE COUNTY, FLORIDA Regular Meeting June 16, 2022 Convened: 6:00pm Adjourned: 7:41pm 1. CALL TO ORDER The meeting was called to order at 6:00 PM by Chair Taylor. 2. PLEDGE OF ALLEGIANCE Pledge of Allegiance led by Chair Taylor. 3. INVOCATION Invocation led by Board Member O'Dell. 4. ROLL CALL Present Chair James A. Taylor, Board Member Billy O'Dell, Board Member Craig Mundt, Board Member Ed Lounds, Board Member Lawrence "Beau" Slay, Board Member Ryan Binner, Board Member Valerie Slack, Board Member Craig Bridgers Excused Vice-Chair Bob Lowe Absent Marty Sanders 5. ANNOUNCEMENTS Assistant County Administrator Mark Satterlee presented the ad-valorem sales tax abatement ballot initiative. A. Sales tax abatement. Deputy County Administrator Mark Satterlee made a presentation on ad-valorem tax abatement. St. Lucie County Board of County Commissioners has decided they will reach out to the voters in the upcoming Primary Election held in August to reauthorize the Economic development ad-valorem tax abatement incentive that the county has offered since 1992. The objective is to bring more high-paying jobs to St. Luce County. It has been a priority of the Page 5 of 494 Planning & Zoning Commission MeetingThursday, June 16, 2022 6:00 PM 2 | P a g e board for many, many years. Other incentive programs include the impact fee credit program, job growth investment grant and expedited permitting. A tax abatement is a tool to bring more jobs to the county. It' s performance-based for new and existing businesses. The Abatement applies only to the county's ad-valorem tax. 6.DISCLOSURE(S) 7.MINUTES A.St. Lucie County Planning & Zoning Commission minutes for the meeting of May 19, 2022 RESULT: APPROVE MOVER: Board Member Craig Mundt SECONDER: Board Member Ryan Binner AYES: James A. Taylor, Billy O'Dell, Craig Mundt, Ed Lounds, Lawrence "Beau" Slay, Ryan Binner, Valerie Slack, Craig Bridgers NAYS: None EXCUSED: None 8.PUBLIC COMMENT 9.PUBLIC HEARINGS A.Cabo Rio RV Resort Rezone & Planned Retail/Workplace Preliminary Site Plan - The applicant is seeking to rezone from the AR-1 (Agricultural, Residential-1) & CG (Commercial, General) Zoning Districts to the PRW (Planned Retail/Work Place) Zoning District and a Preliminary Planned Retail/Workplace Regulating Plan for a 146 lot Recreational Vehicle Park with associated site improvements and commercial outparcel along Kings Highway. STAFF PRESENTATION Kris McCrain, Planner, SLC Planning Department, made a presentation. The applicant is seeking a rezone from the AR-1 (Agricultural, Residential-1) & CG (Commercial, General) Zoning Districts to the PRW (Planned Retail/Work Place) Zoning District and a Preliminary Planned Retail/Workplace Regulating Plan for a 146 lot Recreational Vehicle Park with associated site improvements and commercial outparcel along Kings Highway. In accordance with the public notice requirements, advertisements for these Page 6 of 494 Planning & Zoning Commission MeetingThursday, June 16, 2022 6:00 PM 3 | P a g e public hearings were placed in the St. Lucie County Tribune on Wednesday, June 1, 2022. In addition, notices were mailed to adjacent property owners within 500 ft of the property. A sign was placed on the subject property. On May 30, 2006 the Board of County Commissioners adopted the TVC land development code regulations and comprehensive plan element. Prior to the adoption of the TVC overlay district the subject parcel had an underlying commercial future land use designation. The CG subject parcel includes split zoning designations with approximately 18 acres zoned commercial general and approximately 7 acres zoned AR-1 agricultural residential. The parcels situated to the east and south of the parcel are zoned AR 1 with the parcels to the north and west zoned commercial & general agricultural 1. The proposal seeks to create a recreational vehicle resort with 146 platted lots and a 2.64 acre future commercial outparcel fronting on Kings Highway. The preliminary plan identifies lot configuration, vehicular use areas, stormwater retention, landscaping, administration and maintenance buildings, clubhouse with associated parking, utility connections, amenities (pool, lazy river and "flowrider" wave pool), walking trails, and primary site access on Kings highway. A northbound right-in turn lane will be provided for the Kings Highway access, while access on Indrio Road is intended for pedestrian and emergency access only. The right of way improvements has been reviewed and approved by the Florida Department of Transportation. Fifteen notices were mailed to adjacent property owners within 500ft. As of June 16, 2022, the Planning Department has not received any responses. STAFF RECOMMENDATION Staff recommends the Planning and Zoning Commission forward a recommendation of approval to the Board of County Commissioners with the following conditions of approval. Recreational vehicles should be for recreational purposes only. The recreational vehicle resort shall only allow recreational vehicles and park models for temporary transient living quarters. No guests shall occupy the recreational vehicle park for more than 180 days in a calendar year. Pursuant to Florida Statues at all times, the recreational vehicle park operator shall maintain a guest registrar showing the dates of rental and the rates charged for the guest occupancy. This registrar shall be maintained in chronological order for a period of two years and made available to the public upon request. A northbound right turn lane is required and shall meet the minimum requirements in the Florida Design manual shall provide a buffered bicycle lane. The turn lane shall extend beyond the SR713 median nose and contain additional pavement to accommodate large vehicle southbound to northbound U-turns. BOARD DISCUSSION Mr. Lounds asks Mr. McCrain what is exhibit D? Mr. McCrain responds that exhibit D is a page in the resolution that identifies the individual permitted conditional accessory uses that are allowed within the future commercial outparcel. Mr. O'Dell asks Mr. Nolan from Lucido and Associates, representative what material will be used for the stabilized services? Mr. Nolan responds it could be mulch or a rubberized material. Mr. Lounds asks does this eastern exit extend to Taylor Dairy road? Mr. Nolan there is a parcel between them and Taylor Dairy Road, but he is not sure of the plans. Mr. Lounds suggest he speak with the county to research from Kings highway to US Highway 1 will be expanded to give easier access and relief off of Kings highway if they had a Indrio road entrance and exit. Mr. Slay is concerned about entry into the vehicle recreational RV park which will require u-turn to access into the park. Ms. Slay asks how the flow ways intended to connect to future flow ways. Mr. Nolan stated they Page 7 of 494 Planning & Zoning Commission MeetingThursday, June 16, 2022 6:00 PM 4 | P a g e located their flow way adjacent to the south property line. Mr. Binner asks is there a ego resort? Mr. Nolan states the intent is to maintain as much of the canopy as possible. Mr. Lounds asks Mr. Dobbins legal counsel for the applicant is it possible to expand Indrio Road exit so that it could be utilized as an entrance and exit? It would be safer than just being utilized as an emergency exit. Mr. Dobbins responds that it could not be used after speaking with Engineering. Mr. McCrain states that due to the restrictions on Indrio road, not wide enough to provide for the movement of in and out traffic. Mr. Lounds madea motion to forward a recommendation to the St. Lucie Board of County Commissioners to rezone from the AR-1 (Agricultural, Residential-1) & CG (Commercial, General) Zoning Districts to the PRW (Planned Retail/Work Place) Zoning District and a Preliminary Planned Retail/Workplace Regulating Plan for a 146 lot Recreational Vehicle Park with associated site improvements and commercial outparcel subject to conditions of the resolutions with hopes that the county and the developer can workout details with the FDOT and that they try to improve the eastern boundary between their property and the eastern edge of it and try to develop a Indrio road access. PUBLIC COMMENT Presenters that made presentations on behalf of Cabo Rio, Jim and Carrie Chalmers Lee Dobbins Legal Counsel Brian Nolan, Jr, AICP, ASLA Lucido & Associates Land Planner/Landscape Architect Wayne Bennett- 4555 Taylor Dairy Rd Fort Pierce, FL 34946 Mr. Bennett is concerned with the turn into the RV park, emergency exit with heavy traffic, reserved trees and the location of the RV park. Dennis Jurkiewicz and Janie Baugh- 6701 Indrio Rd Fort Pierce, FL 34951 They are concerned with number of lots, traffic flow, parties, possible flooding of the RV park. Robert Sinnott- 4595 Taylor Dairy Rd Fort Pierce, FL Mr. Sinnott is concerned with drainage for the RV Park. RESULT: APPROVE MOVER: Board Member Ed Lounds SECONDER: Board Member Valerie Slack AYES: James A. Taylor, Craig Mundt, Ed Lounds, Lawrence "Beau" Slay, Ryan Binner, Valerie Slack, Craig Bridgers NAYS: Billy O'Dell EXCUSED: None Page 8 of 494 Planning & Zoning Commission MeetingThursday, June 16, 2022 6:00 PM 5 | P a g e B.County Initiated Land Development Code Text Amendment for Solar Generation Stations. STAFF PRESENTATION Ben Balcer, Assistant Director, SLC Planning Department, made a presentation. This is a County initiated petition for land development code text amendment relating to solar generation stations. In accordance with the public notice requirements, advertisements for these public hearings were placed in the St. Lucie County Tribune on Friday June 3, 2022. The goal of this ordinance is to encourage clean energy operations by streamlining the approval process revising the land development code to comply with the Florida statue's solar facility approval process, which was amended to require solar generational facilities to be listed as permitted uses in all agricultural zoning districts within an unincorporated area. The county is currently one of the top producers of solar energy in the state. The definition of solar generation station was revised within Chapter 2 of the code to conform with industry standards. Current language in the land development code requires solar generation stations to obtain a conditional use permit approval to site solar generational facilities within agricultural zoning districts while the amended language eliminates this process and allows the facilities to be permitted use within all agricultural zoning districts in accordance with revised state statue. The amendment updates land development regulations to be consistent with the 2020 Florida building code which increases the distance rooftop solar panels require to be from the edge of the roof from 2ft to 3ft. STAFF RECOMMENDATION Staff recommends Planning and Zoning Commission forward this petition to the Board of County Commissioners with a recommendation of approval. BOARD DISCUSSION Mr. Lounds asked Mr.Balcer why are we going to try to turn the research and educational center into a solar park? Mr. Balcer responds to the board that the intention is not to turn the center into a solar park. Right now, it's listed as an option under conditional uses. It would be changed to allow it as a permitted statue within the research education overlay. Mr. Mundt asked, is this part of the Florida statue* change? Mr.Balcer responds yes. Mr. Binner asked what specifically did the county add that wasn't in the state statue? Mr. Balcer responds currently in our land development code solar generational facilities are listed as conditional uses within agricultural zoning districts and we are no longer able to require a conditional use permit approval since the Florida statue change. RESULT: APPROVE MOVER: Chair Craig Mundt SECONDER: Board Member Valerie Slack AYES: James A. Taylor, Billy O'Dell, Craig Mundt, Ed Lounds, Lawrence "Beau" Slay, Ryan Binner, Valerie Slack, Craig Bridgers NAYS: None EXCUSED: None Page 9 of 494 Planning & Zoning Commission MeetingThursday, June 16, 2022 6:00 PM 6 | P a g e C.Helseth Rezoning: Amendment to the Official Zoning Atlas for a change in zoning from the AG-1 (Agricultural - 1) Zoning District to the IL (Industrial, Light) Zoning District for +/- 18.22 acres located south of St. Lucie Boulevard, approximately one-quarter mile east of Kings Highway. STAFF PRESENTATION Tahir Curry, Planner, SLC Planning Department, made a presentation. The petitioners, Brian and Craig Helseth of Helseth Holdings LLC, are requesting a change in zoning from the AG-1 (Agricultural - 1) Zoning District to the IL (Industrial, Light) Zoning District for an +/- 18.22-acre parcel located south of St. Lucie Boulevard, approximately one- quarter mile east of Kings Highway. In accordance with the public notice requirements, advertisements for these public hearings were placed in the St. Lucie County Tribune on Thursday, June 2, 2022. In addition, notices were mailed to adjacent property owners within 500 ft of the property. The notices were mailed out to 8 property owners within 500ft of the subject site and the Planning Dept didn't receive any responses. The future land use designation is compatible to zoning districts to allow for a broad range of industrial uses. The proposed rezone to industrial light zoning district is consistent with the township villages and county size land use. The purpose of this rezone is to allow for an industrial subdivision consistent with industrial light zoning district. STAFF RECOMMENDATION The petition conforms to the standards of review as set forth in St. Lucie County Land Development Code Section 11.06.03 and is consistent with the St. Lucie County Comprehensive Plan goals, objectives and policies. Staff recommends that this petition be forwarded to the Board of County Commissioners with a recommendation of approval. BOARD DISCUSSION Mr. Lounds asked Mr. Chabab about the plan for Helseth. Mr. Chabab replies they have not settled on a site plan. PUBLIC COMMENT Abtraham Chabab agent for applicant Craig the Helseth development- 1391 NW St. Lucie Blvd #411 Fort Pierce, FL He is there to answer any questions the board may have. RESULT: APPROVE MOVER: Board Member Ed Lounds SECONDER: Board Member Craig Bridgers AYES: James A. Taylor, Billy O'Dell, Craig Mundt, Ed Lounds, Lawrence "Beau" Slay, Ryan Binner, Valerie Slack, Craig Bridgers NAYS: None EXCUSED: None D.Rock Road Farms: Amendment to the Official Zoning Atlas for a change in zoning from the AR-1 (Agricultural, Residential - 1) Zoning District to the AG-1 (Agricultural - 1) Zoning District for a Page 10 of 494 Planning & Zoning Commission MeetingThursday, June 16, 2022 6:00 PM 7 | P a g e +/- 7.82-acre parcel located at 2211 S Rock Road, Fort Pierce, FL. STAFF PRESENTATION Tahir Curry, Planner, SLC Planning Department, made a presentation. Amendment to the Official Zoning Atlas for a change in zoning from the AR-1 (Agricultural, Residential - 1) Zoning District to the AG-1 (Agricultural - 1) Zoning District for a +/- 7.82- acre parcel located at 2211 S Rock Road, Fort Pierce, FL. In accordance with the public notice requirements, advertisements for these public hearings were placed in the St. Lucie County Tribune on Friday, June 3, 2022. In addition, notices were mailed to adjacent property owners within 500 ft of the property. The notices were mailed out to 15 property owners within 500ft of the subject site and the Planning Dept didn't receive any responses. The future land use designation is residential estates which is compatible with zoning districts for agricultural uses. The proposed rezoning to AG-1 zoning district is consistent with the residential estate future land use designation category table 1-3 zoning use designation compatibility chart. STAFF RECOMMENDATION The petition conforms to the standards of review as set forth in St. Lucie County Land Development Code Section 11.06.03 and is consistent with the St. Lucie County Comprehensive Plan goals, objectives and policies. Staff recommends that this petition be forwarded to the Board of County Commissioners with a recommendation of approval. BOARD DISCUSSION No comments. RESULT: APPROVE MOVER: Board Member Ed Lounds SECONDER: Board Member Valerie Slack AYES: James A. Taylor, Billy O'Dell, Craig Mundt, Ed Lounds, Lawrence "Beau" Slay, Ryan Binner, Valerie Slack, Craig Bridgers NAYS: None EXCUSED: None E. County Initiated Land Development Code Text Amendment Pertaining to Floodplain Management STAFF PRESENTATION Mayte Santamaria, Director, SLC Planning Department, made a presentation. Ms. Santamaria presenting a land development code amendment related to our flood plan management provisions. As required by the land development code this notice was published in the newspaper on June 3, 2022. The purpose of this amendment is a County initiated Text Amendment to the Land Development Code to amend floodplain management related regulations, updating the elevation requirements for manufactured/mobile homes and providing criteria for non-elevated accessory structures. The overall purpose of this amendment is to reduce future flood damage and risks, to maintain the county's community rating system, flood insurance program regulations we get a discount on our flood insurance Page 11 of 494 Planning & Zoning Commission MeetingThursday, June 16, 2022 6:00 PM 8 | P a g e premiums for all the policyholders within the county. So the purpose of this is to comply with that and maintain that discount. Additionally, this complies with FEMA policy and state standards related to accessory structures. National Flood Insurance program is federally- subsidized damage insurance program administered by FEMA, available to communities that agree to adopt and enforce floodplain management ordinances to reduce flood damage. Regulations must meet or exceed the minimum requirements in the NFIP regulations. The Community Rating System is a voluntary incentive program that encourage floodplain management activities that exceed the minimum NFIP requirements. Communities can earn credits and discounts (up to 45% discounts) on federal flood insurance premiums. We are a Class 6 which equates to a 20% discount. BOARD DISCUSSION Ms. Slack asked if this is for new permits moving forward only or is it retroactive for existing structures? Ms. Santamaria responded this is only for new permits moving forward and with elevation requirements for the manufactured homes that would only get go in effect if you place a new home, replace a home, have substantial damages or substantial improvements modifying at 50% or more that is when it would go into effect. Ms. Slack asked how would this impact elevator machine rooms and shafts for elevated buildings on the barrier island? Ms. Santamaria responds that this particular amendment for the elevation only applies to manufactured homes. RESULT: APPROVE MOVER: Board Member Billy O'Dell SECONDER: Board Member Valerie Slack AYES: James A. Taylor, Billy O'Dell, Craig Mundt, Ed Lounds, Lawrence "Beau" Slay, Ryan Binner, Valerie Slack, Craig Bridgers NAYS: None EXCUSED: None 10. WORKSHOPS 11. OTHER BUSINESS 12. ADJOURN Chair Taylor motioned to adjourn at 7:41 pm. Page 12 of 494 ITEM NO. (ID # 2022-55359) DATE: 7/21/2022 AGENDA REQUEST TO: Planning and Zoning Commission PRESENTED BY: Joseph Sabater, Impact Fee Program Manager SUBMITTED BY: Administration SUBJECT: St. Lucie County Fire/EMS Impact Fee Study 2022 Update - Fire/EMS Impact Fees Ordinance BACKGROUND: Article III of Chapter 24 of the St. Lucie County Code of Ordinances (Fire/EMS Protection Impact Fee), specifically Section 24-51(c), establishes, "...the county fire district is the sole provider of fire/emergency medical services in the county." Additionally, Section 24-51(d) provides, "the county must collect fire/EMS protection impact fees in order to provide the fire district with funds to adequately provide fire/EMS services for all county residents, including residents of the cities. Development within the cities impacts the fire/EMS capital needs of the fire district. " In 2000, the County adopted a Fire/EMS Protection Impact Fee to address the impact of growth and demand on the Fire District to provide Fire/EMS protection services. The current Fire/EMS Protection impact fees are based on an October 2016 technical memorandum, “Update of the St. Lucie County Fire and Rescue Impact Fee,” prepared by Dr. James C. Nicholas, and were adopted by the County Board of Fire Commissioners (Fire Board) on October 19, 2016 and subsequently the Board of County Commissioners (BOCC) on April 18, 2017. St. Lucie Fire District engaged Dr. James C. Nicholas in 2021 to review and update the impact fees for Fire/EMS Protection Services, of which he prepared the attached Update of the St. Lucie County Fire and Rescue Impact Fee, dated May 10, 2022. Per Florida Statute 163.31801 Impact Fees, “impact fees are an important source of revenue for a local government to use in funding the infrastructure necessitated by new growth.” Central to the impact fee discussion is that existing taxpayers should not bear the costs of the impact of new development. The Fire Board approved the Draft Update of the St. Lucie County Fire and Rescue Impact Fee, dated February 5, 2022, at the Fire Board meeting held on February 16, 2022, and sent to the County for review. The impact fee report was reviewed by County staff and its legal consultant to provide comments. Initial comments were sent to the Fire District in March 2022 and additional comments were sent in early May 2022. All comments and questions were addressed in the Final Study Update dated May 10, 2022. County staff also sent the Study Update to the cities and local stakeholders for comments, but no comments were received. The Fire Board approved the Final Update of the St. Lucie County Fire and Rescue Impact Fee, dated May 10, 2022, at the Fire Board meeting held on July 20, 2022. Page 13 of 494 A local government may increase its impact fees once every four years by no more than 50%, unless the local government demonstrates extraordinary circumstances exist necessitating an increase beyond the maximum increase of 50%. Additionally, depending on the percent increase, a local government must phase-in the increase over a two (2) to four (4) year period in equal installments. Table VI-5 Changes in Fire/EMS Impact Fees (page 7, Update of the St. Lucie County Fire and Rescue Impact Fee, dated May 10, 2022) details the incremental phased increases over a two or four year period, with the exception of a few land use categories that are proposed to decrease upon adoption and implementation. PREVIOUS ACTION: The Fire/EMS Impact Fee Ordinance was last amended on April 18, 2017, Ordinance No. 17-003. FINANCIAL IMPACT: Financial impact cannot be calculated at this time, it is subject to the final impact fee schedule adopted by the Board of County Commissioners. RECOMMENDATION: Staff is recommending the Planning and Zoning Commission recommend the Board of County Commissioners approve the St.Lucie County Fire/EMS Impact Fee Study 2022 Update, and adopt the Ordinance enacting the proposed Fire/EMS Impact Fee Schedule. COMMISSION ACTION: RESULT: MOVER: SECONDER: None AYES: None NAYS: None EXCUSED: None Coordination/Signatures Date: July 13, 2022 John Titkanich, Innovation & Performance Division Director Date: July 14, 2022 Benjamin Balcer, Planning & Development Services Assistant Director Date: July 14, 2022 Page 14 of 494 Mayte Santamaria, Planning & Development Services Director Date: July 14, 2022 Daniel McIntyre, County Attorney Date: July 15, 2022 Mark Satterlee, Deputy County Administrator Page 15 of 494 1 ORDINANCE NO. 2022-______ AN ORDINANCE OF THE BOARD OF COUNTY COMMISSIONERS OF ST. LUCIE COUNTY, FLORIDA, REGARDING FIRE/EMS PROTECTION IMPACT FEES; AMENDING CHAPTER 24 OF THE ST. LUCIE COUNTY CODE RELATING TO FIRE/EMS PROTECTION IMPACT FEES; AMENDING SECTION 24-4 OF THE ST. LUCIE COUNTY CODE ADOPTION OF IMPACT FEE STUDY; AMENDING ARTICLE III OF CHAPTER 24 OF THE ST. LUCIE CODE OF ORDINANCES REGARDING FIRE/EMS PROTECTION IMPACT FEES, INCLUDING SECTION 24-52 INTENTS AND PURPOSES, SECTION 24-53 DEFINITIONS, SECTION 24-54 IMPOSITION OF FIRE/EMS PROTECTION IMPACT FEE, SECTION 24-55 COMPUTATION OF THE AMOUNT OF FIRE/EMS PROTECTION IMPACT FEE, SECTION 24-56 PAYMENT OF FEE, SECTION 24-57 CREDITS, SECTION 24-62 USE OF FUNDS, SECTION 24- 63 REFUND OF FEES PAID, SECTION 24-64 EXEMPTIONS, SECTION 24-65 APPEALS, SECTION 24-66 REVIEW AND AUTOMATIC ADJUSTMENT OF FEES; DIRECTING THE PROVISION OF NOTICE OF IMPACT FEE RATES; PROVIDING FOR SEVERABILITY, CODIFICATION, LIBERAL CONSTRUCTION, AND PROVIDING AN EFFECTIVE DATE. NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF COUNTY COMMISSIONERS OF ST. LUCIE COUNTY, FLORIDA: SECTION 1. AMENDMENT OF SECTION 2404 OF THE ST. LUCIE COUNTY CODE.Section 24-4 of the St. Lucie County Code, entitled Adoption of Impact Fee Study, is hereby amended as follows: Section 24-4. Adoption of Impact Fee Study. The Board hereby adopts and incorporates by reference the Impact Fee Studies entitled, “St. Lucie County Road Impact Fee Study,” March 2022 by Tindale Oliver/Benesch, and “St. Lucie County Impact Fee Study,” 2022 Update by PFM, and “Update of the St. Lucie County Fire and Rescue Impact Fee,” May 10, 2022, by James C. Nicholas, including the assumptions, conclusions, supporting data sources, and findings therein as to the determination of the anticipated costs of Infrastructure improvements and additions to Capital Facilities required to accommodate growth, which Page 16 of 494 2 Impact Fee Study is on file with the office of the County Administrator and available for public inspection. [underline indicates additions; strikethrough indicates deletions] SECTION 2. AMENDMENT OF SECTION 24-52 OF THE ST. LUCIE COUNTY CODE.Section 24-52 of the St. Lucie County Code, entitled Intents and Purposes, is hereby amended as follows: Sec. 24-52. Intents and purposes. (a) This article is intended to implement and be consistent with the goals, objectives and policies of the county comprehensive plan. (b) The purpose of this article is to regulate the use and development of land so as to ensure that new development bears a proportionate share of the cost of capital expenditures necessary to provide Fire/EMS protection and services in the county. (c) The state legislature, through the enactment of F.S. §§ 163.3202 and 163.31801 and 380.06(16), has sought to encourage local governments to enact impact fees as a part of their land development regulation program. (d) The St. Lucie County Fire District was created as an independent special taxing district pursuant to Chapter 2004-407, Laws of Florida, as amended, to provide fire prevention, fire suppression, emergency medical services, rescue, and other duties and responsibilities within St. Lucie County, including all incorporated and unincorporated areas. (e) The St. Lucie County Fire District Board of Commissioners procured the Fire/EMS Protection Impact Fee Study and, pursuant to Resolution No. 724-22, the St. Lucie County Fire District Board of Commissioners adopted and approved that study, as subsequently amended in April 2022, and requested that the St. Lucie County Board of County Commissioners amend the St. Lucie County Code to implement the study. (f) Development necessitated by the growth contemplated in the Comprehensive Plan and the Fire/EMS Protection Impact Fee Study will require Infrastructure improvements and additions to the Fire/EMS Protection System to accommodate the new development generated by such growth and maintain the standards of service provided by the Fire/EMS Protection System. (g) There is a rational nexus between future growth, as measured by new construction, and the need to expand the Fire/EMS Protection System through the acquisition and construction of new Buildings, apparatus, equipment, and other Infrastructure in order to maintain the standards of Page 17 of 494 3 service currently provided by the District’s Fire/EMS Protection System. The Fire/EMS Protection Impact Fees adopted herein for each Impact Fee Land Use Category are proportional to impact expected to be generated by new construction. (h) The District has determined and so advised the County that ad valorem tax revenue and other revenues will not be sufficient to provide the Infrastructure improvements to the Fire/EMS Protection System that are necessary to accommodate new construction within the County. (i) The District has a responsibility to provide Fire/EMS Protection services within both the unincorporated and incorporated areas of the County. The Fire/EMS Protection System benefits all new construction occurring within the County, and, therefore, the Fire/EMS Protection Impact Fees shall be imposed throughout the County, including within municipalities. (j) Future growth should contribute its fair share to the cost of the Infrastructure improvements to the Fire/EMS Protection System that are required to accommodate the impact generated by such growth. (k) The required Infrastructure improvements to the Fire/EMS Protection System needed to eliminate any deficiencies shall be financed by revenues other than Fire/EMS Protection Impact Fees. (l) Based on the input and information provided by the District, the Board expressly finds that the Infrastructure improvements to the Fire/EMS Protection System to be funded by the Fire/EMS Protection Impact Fee provide a benefit to all new construction within the County in excess of the Fire/EMS Protection Impact Fees. (m) Implementation of the Fire/EMS Protection Impact Fee to require new construction to contribute its fair share of the cost of required Infrastructure improvements is an integral and vital element of the regulatory plan of growth management of the County. (n) The purpose of this Article is to require payment of Fire/EMS Protection Impact Fees by those who engage in new construction and to provide for the cost of Infrastructure improvements to the Fire/EMS Protection System which are required to accommodate such growth. This Article shall not be construed to permit the collection of Fire/EMS Protection Impact Fees in excess of the amount reasonably anticipated to offset the demand on the Fire/EMS Protection System generated by such applicable new construction. (o) The imposition of a Fire/EMS Protection Impact Fee is to provide a source of revenue to fund the construction or improvement of the Fire/EMS Protection System necessitated by growth. [underline indicates additions; strikethrough indicates deletions] Page 18 of 494 4 SECTION 3. AMENDMENT OF SECTION 24-53 OF THE ST. LUCIE COUNTY CODE.Section 24-53 of the St. Lucie County Code, entitled Definitions, is hereby amended as follows: Sec. 24-53. Definitions. The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning: Capital improvement includes, but is not limited to, site planning, land acquisition, site improvements, buildings, motor vehicles, personal equipment and communications facilities with a useful life of two or more years, but excludes maintenance and operation. District or Fire District means the St. Lucie County Fire District, an independent special taxing district created by Chapter 2004-407, Laws of Florida, as amended, to provide fire prevention, fire suppression, emergency medical services, rescue, and other duties and responsibilities within St. Lucie County, including all incorporated and unincorporated areas. Feepayer or Applicant means a person commencing a land development activity by applying for the issuance of a building permit or electrical permit for a mobile home park or recreational vehicle park or for a type of land development activity specified in section 24-55. Fire/EMS Protection Impact Fee means the Impact Fee imposed to fund growth-necessitated Infrastructure for the Fire/EMS Protection System. Fire/EMS Protection Impact Fee Study means the study entitled “Update of the St. Lucie County Fire and Rescue Impact Fee,” May 10, 2022, by James C. Nicholas, which is adopted in Section 24-4. Fire/EMS Protection System means the Buildings, vehicles, apparatus, and capital equipment provided by the District that are used to provide fire prevention, fire suppression, emergency medical services, rescue, and other duties and responsibilities of the District within the County. [underline indicates additions; strikethrough indicates deletions] Page 19 of 494 5 SECTION 4. AMENDMENT OF SECTION 24-54 OF THE ST. LUCIE COUNTY CODE.Section 24-54 of the St. Lucie County Code, entitled Imposition of Fire/EMS Protection Impact Fee, is hereby amended as follows: Sec. 24-54. Imposition of Fire/EMS Protection impact fee. (a) Any person who, after the effective date of the ordinance from which this article is derived (October 1, 2000), seeks to develop land by applying for the issuance of a building permit for one of the land use types specified in section 24-55 any land development designed or intended to permit a use of land which will contain more Dwelling Units, Buildings or square footage than the existing use of land, or to otherwise change the use of the land in a manner that increases the impact upon the Fire/EMS Protection System or applies for an electrical permit for a mobile home park or recreational vehicle park, shall be required to pay a Fire/EMS Protection impact fee in the manner and amount set forth in this article. Nothing in this article shall be deemed to eliminate the requirements of Section 11.02.07 of the County Land Development Code. (b) The obligations herein for the payment of the Fire/EMS Protection Impact Fee shall apply to all new construction that applies for a Building Permit on or after the applicable implementation date set forth in Section 24-55. No building permit for any land use types specified in section 24-55 nor electrical permit for a mobile home park or recreational vehicle park shall be issued unless and until the Fire/EMS Protection impact fee hereby required has been paid as provided in section 24-56. [underline indicates additions; strikethrough indicates deletions] SECTION 5. AMENDMENT OF SECTION 24-55 OF THE ST. LUCIE COUNTY CODE.Section 24-55 of the St. Lucie County Code, entitled Computation of the Amount of Fire/EMS Protection Impact Fee, is hereby amended as follows: Sec. 24-55. Computation of the amount of Fire/EMS Protection impact fee. (a) At the option of the feepayer, the amount of the fee may be determined by the following fee schedule. All new construction occurring within the County shall pay the following Fire/EMS Protection Impact Fee as a condition of issuance of a Building Permit or Electrical Permit, as provided in Section 24-54, for such construction: Page 20 of 494 6 FIRE/EMS PROTECTION IMPACT FEE COUNTYWIDE ASSESSMENT Land Use Type Unit of Measure Impact Fee (as of 08/01/2017) RESIDENTIAL Single-family Per unit $617.00 Mobile home/RV (MHP/RV park only) Per unit 267.00 Multi-family 1 and 2 story Per unit 402.00 Multi-family 3+ stories Per unit 724.00 Hotel/motel Per room 639.00 Bed and breakfast (Does not include the primary residence. Single-family unit fee must also be assessed for the residential portion of use) Per room 639.00 All other residential Per unit 617.00 OFFICE AND FINANCIAL Medical office Per 1,000 feet2 618.00 Other office Per 1,000 feet2 618.00 RETAIL TRADE Under 100,000 feet2 Per 1,000 feet2 496.00 100,000—499,000 feet2 Per 1,000 feet2 496.00 500,000 feet2 and over Per 1,000 feet2 496.00 GASOLINE SERVICES Service station Per 1,000 feet2 319.00 INDUSTRIAL Warehouse Per 1,000 feet2 50.00 Truck terminal Per 1,000 feet2 70.00 General industrial Per 1,000 feet2 70.00 INSTITUTIONAL Page 21 of 494 7 School—Elementary Per 1,000 feet2 537.00 School—Middle/high Per 1,000 feet2 537.00 Day care center Per 1,000 feet2 537.00 Fraternal organization Per 1,000 feet2 537.00 Hospital Per 1,000 feet2 537.00 Nursing home Per bed 0.00 Library Per 1,000 feet2 537.00 RECREATIONAL Park public Per acre 510.00 Recreation facility—All types Per 1,000 feet2 510.00 Golf course Per acre 510.00 Movie theater Per 1,000 feet2 510.00 Note: The fee schedule shown in this table is subject to annual revision based upon the provisions of section 24-66 of this article. On September October 1, 2022, the Fire/EMS Protection Impact Fee, as specified below, for any Impact Fee Land Use Category that is decreasing shall go into effect. On January 1, 2023, the remaining Fire/EMS Protection Impact Fee rates, as specified below, shall go into effect: FIRE/EMS PROTECTION IMPACT FEES COUNTYWIDE ASSESSMENT LAND USE TYPE - (UNIT)January 1, 2023 Impact Fee Single Family – Per dwelling $650 Mobile Home/Rec. Vehicle – Per space $324 Multi-Family 1 & 2 Story - Per dwelling $469 Multi-Family 3 + Stories - Per dwelling $637 Hotel/Motel - Per Room $763 Bed & Breakfast - Per Room $763 All Other Residential - Per bed $650 Page 22 of 494 8 General Office – Per 1,000 FT²:$685 Medical Office - Per 1,000 FT²:$685 Retail Under 100,000 FT² - Per 1,000 FT²$578 Retail 100,000-499,999 FT² - Per 1,000 FT²$578 Retail 500,000 & Over - Per 1,000 FT²$578 Service Station - Per 1,000 FT² $388 Warehouse - Per 1,000 FT²$56 Truck Terminal - Per 1,000 FT²$58 General Industrial - Per 1,000 FT²$84 School - Elem. - Per 1,000 FT²$629 School - Middle/High - Per 1,000 FT²$629 Day Care - Per 1,000 FT²$629 Fraternal Org.- Per 1,000 FT²$629 Hospital - Per 1,000 FT²$629 Nursing Home - Per 1,000 FT² $1,513 Library - Per 1,000 FT²$629 Park (Public) - Per Acre $230 Recreation Facility - Per 1,000 FT²$230 Golf Course - Per Acre $230 Movie Theatres - Per 1,000 FT²$230 On January 1, 2024, the following Fire/EMS Protection Impact Fee rates shall go into effect: FIRE/EMS PROTECTION IMPACT FEES COUNTYWIDE ASSESSMENT LAND USE TYPE - (UNIT)January 1, 2024 Impact Fee Single Family - Per dwelling $650 Mobile Home/Rec. Vehicle - Per space $360 Multi-Family 1 & 2 Story - Per dwelling $502 Multi-Family 3 + Stories - Per dwelling $637 Hotel/Motel - Per Room $834 Page 23 of 494 9 Bed & Breakfast - Per Room $834 All Other Residential - Per bed $650 General Office – Per 1,000 FT²$702 Medical Office - Per 1,000 FT²$702 Retail Under 100,000 FT² - Per 1,000 FT²$621 Retail 100,000-499,999 FT² - Per 1,000 FT²$621 Retail 500,000 & Over - Per 1,000 FT²$621 Service Station - Per 1,000 FT² $431 Warehouse - Per 1,000 FT²$58 Truck Terminal - Per 1,000 FT²$58 General Industrial – Per 1,000 FT²$91 School - Elem. - Per 1,000 FT²$676 School - Middle/High - Per 1,000 FT²$676 Day Care - Per 1,000 FT²$676 Fraternal Org. - Per 1,000 FT²$676 Hospital - Per 1,000 FT²$676 Nursing Home - Per 1,000 FT² $3,026 Library - Per 1,000 FT²$676 Park (Public) - Per Acre $230 Recreation Facility - Per 1,000 FT²$230 Golf Course - Per Acre $230 Movie Theatres - Per 1,000 FT²$230 On January 1, 2025, the following Fire/EMS Protection Impact Fee rates shall go into effect: FIRE/EMS PROTECTION IMPACT FEES COUNTYWIDE ASSESSMENT LAND USE TYPE - (UNIT)January 1, 2025 Impact Fee Single Family - Per dwelling $650 Mobile Home/Rec. Vehicle - Per space $396 Multi-Family 1 & 2 Story - Per dwelling $502 Page 24 of 494 10 Multi-Family 3 + Stories - Per dwelling $637 Hotel/Motel - Per Room $905 Bed & Breakfast - Per Room $905 All Other Residential - Per bed $650 General Office – Per 1,000 FT²$702 Medical Office - Per 1,000 FT²$702 Retail Under 100,000 FT² - Per 1,000 FT²$621 Retail 100,000-499,999 FT² - Per 1,000 FT²$621 Retail 500,000 & Over - Per 1,000 FT²$621 Service Station - Per 1,000 FT² $474 Warehouse - Per 1,000 FT²$58 Truck Terminal - Per 1,000 FT²$58 General Industrial – Per 1,000 FT²$91 School - Elem. - Per 1,000 FT²$676 School - Middle/High - Per 1,000 FT²$676 Day Care - Per 1,000 FT²$676 Fraternal Org. - Per 1,000 FT²$676 Hospital - Per 1,000 FT²$676 Nursing Home - Per 1,000 FT² $3,026 Library - Per 1,000 FT²$676 Park (Public) - Per Acre $230 Recreation Facility - Per 1,000 FT²$230 Golf Course - Per Acre $230 Movie Theatres - Per 1,000 FT²$230 On January 1, 2026, the following Fire/EMS Protection Impact Fee rates shall go into effect: FIRE/EMS PROTECTION IMPACT FEES COUNTYWIDE ASSESSMENT LAND USE TYPE - (UNIT)January 1, 2026 Impact Fee Single Family - Per dwelling $650 Page 25 of 494 11 Mobile Home/Rec. Vehicle - Per space $432 Multi-Family 1 & 2 Story - Per dwelling $502 Multi-Family 3 + Stories - Per dwelling $637 Hotel/Motel - Per Room $976 Bed & Breakfast - Per Room $976 All Other Residential - Per bed $650 General Office – Per 1,000 FT²$702 Medical Office - Per 1,000 FT²$702 Retail Under 100,000 FT² - Per 1,000 FT²$621 Retail 100,000-499,999 FT² - Per 1,000 FT²$621 Retail 500,000 & Over - Per 1,000 FT²$621 Service Station - Per 1,000 FT² $518 Warehouse - Per 1,000 FT²$58 Truck Terminal - Per 1,000 FT²$58 General Industrial – Per 1,000 FT²$91 School - Elem. - Per 1,000 FT²$676 School - Middle/High - Per 1,000 FT²$676 Day Care - Per 1,000 FT²$676 Fraternal Org. - Per 1,000 FT²$676 Hospital - Per 1,000 FT²$676 Nursing Home - Per 1,000 FT² $3,026 Library - Per 1,000 FT²$676 Park (Public) - Per Acre $230 Recreation Facility - Per 1,000 FT²$230 Golf Course - Per Acre $230 Movie Theatres - Per 1,000 FT²$230 (b) If a building is requested for mixed uses, then the fee shall be determined through using the above schedule by apportioning the space committed to uses specified on the schedule. (cb) If the type of development activity for which a building permit or electrical permit for a mobile home park or recreational vehicle park is Page 26 of 494 12 applied is not specified on the above fee schedule, the county administrator shall use the fee applicable to the most nearly comparable type of land development on the above fee schedule. If the county administrator determines that there is no comparable type of land use on the above fee schedule, then the county administrator shall calculate the appropriate Impact Fees utilizing the methodology contained in the applicable Impact Fee Study. The County Administrator shall utilize as a standard in this determination the impact assumed in the most similar Impact Fee Land Use Category or any other generally accepted standard source of planning and cost impact analysis. (d) The county administrator shall determine the applicable land use type. (e) In the case of a change of use, redevelopment, or modification of an existing use which requires the issuance of a building permit, electrical permit for recreational vehicle parks or mobile home parks or zoning compliance certificate, the impact fee shall be based upon the net increase in the impact fee for the new use as compared to the previous use. If, however, the previous use has been either abandoned or otherwise inactive for a period of two consecutive years prior to the request for the issuance of a building permit, electrical permit for recreational vehicle parks or mobile home parks or zoning compliance certificate, then the impact fee calculated shall be based upon the new use with an adjustment for any impact fees paid for the previous use. (c) If the person applying for the issuance of a building permit or electrical permit for a mobile home park or recreational vehicle park may, at his option, submit evidence to the county administrator indicating that the fees set out in paragraph (a) above are not appropriate for his particular development. Based upon convincing and competent evidence, the county administrator may adjust the fee to that appropriate for the particular development. [underline indicates additions; strikethrough indicates deletions] SECTION 6. AMENDMENT OF SECTION 24-56 OF THE ST. LUCIE COUNTY CODE.Section 24-56 of the St. Lucie County Code, entitled Payment of Fee, is hereby amended as follows: Page 27 of 494 13 Sec. 24-56. Payment of fee. (a) The feepayer shall pay the fee to the county administrator as a condition of at any time prior to the issuance of a building permit or electrical permit for a recreational vehicle park or mobile home park. (b) In lieu of all or part of the Fire/EMS Protection impact fee, the county administrator may accept an alternative impact fee pursuant to Section 24- 6 or the board of county fire the district may accept the offer by a developer to construct, dedicate or acquire property or equipment for the purpose of meeting the capital public building needs of the fire district that is consistent with the county's comprehensive plan or the adopted comprehensive plan of Ft. Pierce, Port St. Lucie or St. Lucie Village. (c) In the event the developer proposes to dedicate or acquire unimproved property or equipment, the provisions of section 24-57(e)(3) shall apply. The portion of the fee represented by the property dedications or acquisitions shall be deemed paid only when the dedicated or acquired property is officially accepted by the fire district or other appropriate governmental entity. (d) If Fire/EMS Protection impact fees are owed, no development permits of any type may be issued for the building or structure in question while the fee remains unpaid. The county administrator may authorize the initiation of any action as permitted by law or equity to collect the unpaid fees. (e) The Fire/EMS Protection impact fee shall be calculated according to the rate in effect at the time of payment, unless otherwise provided herein. (f) In the event the Fire/EMS Protection impact fee is not paid at or prior to the issuance of a Building Permit, the Impact Fee shall be collected prior to the issuance of Certificate of Occupancy or by any other method which is authorized by law, unless, otherwise exempted pursuant to this chapter. (g) The payment of the Impact Fees shall be in addition to all other fees, charges or assessments due for the issuance of a Certificate of Occupancy or Building Permit. (h) The obligation for payment of the Impact Fees shall run with the land. [underline indicates additions; strikethrough indicates deletions] SECTION 7. AMENDMENT OF SECTION 24-57 OF THE ST. LUCIE COUNTY CODE.Section 24-57 of the St. Lucie County Code, entitled Credits, is hereby amended as follows: Page 28 of 494 14 Sec. 24-57. Credits. (a)Scope. Any person who shall commence any Fire/EMS Protection impact generating land development activity may apply for a credit against the required Fire/EMS Protection impact fee for any contribution, construction, or dedication of land or equipment made by such person or predecessor in interest that is accepted and received by the county fire district for Fire/EMS Protection purposes, pursuant to this section. Consistent with the standards of this section, an application may be made for credit for any contribution, construction or dedication made in the county as required by a development order issued by the county, the City of Fort Pierce, the City of Port St. Lucie, or St. Lucie Village pursuant to its local development regulations or F.S. § 380.06, or any additional development condition imposed by the state land and water adjudicatory commission on a development of regional impact to the extent the contribution, payment, construction or dedication meets the same needs as the Fire/EMS Protection impact fee. (b)General. Any person desiring a Fire/EMS Protection impact fee credit, who proposes to make any contribution, construction or dedication of a Fire/EMS Protection facility or equipment that is consistent with both the county's comprehensive plan and the fire district’s capital improvement program, shall first obtain from the board of county commissioners an approval that the proposed contribution, construction or dedication is considered to be eligible for a Fire/EMS Protection impact fee credit. The board of county commissioners shall consult with the county fire district prior to making any final determination that the proposed contribution, construction or dedication is considered to be eligible for a Fire/EMS Protection impact fee credit. Upon the determination by the board that the proposed contribution, construction or dedication is eligible for a Fire/EMS Protection impact fee credit, the final amount of the credit shall be determined upon the submission of a request for Fire/EMS Protection impact fee credit and the entering into of a formal Fire/EMS Protection impact fee credit agreement. (c)Relationship of Fire/EMS Protection impact fee to developments of regional impact. Pursuant to F.S. § 380.06(165), the value of Fire/EMS Protection facilities and/or other Fire/EMS Protection capital Infrastructure improvements required pursuant to a county or city-approved development order, except those deemed site-related, shall be credited against the Fire/EMS Protection impact fee. (d)General standards for issuing Fire/EMS Protection impact fee credits. Prior to the issuance of any credits against the Fire/EMS Protection impact fee, the person who made the contribution, payment, construction or dedication of Fire/EMS Protection facilities or equipment Infrastructure shall enter into an impact fee credit agreement with the board of county commissioners. The following provisions are the general rules for the award of credit, supplemented and provided in this section: Page 29 of 494 15 (1) Credit for contributions, payments, construction or dedications of the Fire/EMS Protection impact fee shall not be transferrable as a credit against other impact fees imposed for purposes other than Fire/EMS Protection. (2) If allowed by the credit agreement, cCredits may be assigned to successors in interest; provided the county receives a copy of the written agreement signed by both the assignor and the assignee that has been recorded in the public records of the county. (3) No credit shall exceed the amount due for the Fire/EMS Protection impact fee. 4) No credit shall be given for Fire/EMS Protection facilities and equipment dedicated or constructed before July 1, 2000. (e)Specific standards. Credits against Fire/EMS Protection impact fees otherwise payable shall be allowed only under the following conditions: (1)Fire district need. The contribution, payment, construction or dedication shall meet a Fire/EMS Protection capital need identified in the county's comprehensive plan, the fire district’s capital improvement program, or in the adopted comprehensive plan of Ft. Pierce, Port St. Lucie or St. Lucie Village. No credit shall be given for capital improvements Infrastructure that does not meet a Fire/EMS Protection capital need identified in the county's comprehensive plan, the fire district’s capital improvement program, or in the adopted comprehensive plan of Ft. Pierce, Port St. Lucie or St. Lucie Village. (2)Fire/EMS Protection property dedication. a. Credit for the dedication of property for Fire/EMS Protection purposes shall be valued at 120 percent of the most recent assessed value by the county property appraiser plus the reasonable cost, as determined by the county administrator, of any survey, closing costs or title information provided by the feepayer to the county at the request of the county. Credit for the dedication of property shall be provided when the property has been conveyed at no charge to, and accepted by the county fire district in a manner satisfactory to the county fire district. b. If the feepayer shall opt not to have the property dedication credit determined as set out above, then the amount of credit shall be determined by the board of county commissioners based on an independent property appraisal, as described in section 24-58, prepared by an individual both a member of the appraisal institute (MAI) and a state-certified general appraiser acceptable to the board of county commissioners, that is paid for by the feepayer. At the option of the board, the board may request a review appraisal, as described in section 24-59; provided that in the event the value established by the independent appraisal exceeds 120 percent of the Page 30 of 494 16 assessed value by more than 25 percent, the board shall request a review appraisal. c. In the event the board determines to request a review appraisal and the determination of the value is the same or greater than value determined by the independent appraiser, then the county shall bear the cost of the review appraisal. If the determination of the value by the review appraiser is less than the value determined by the independent appraiser, then the feepayer shall pay for the cost of the review appraisal. Any independent or review appraisal submitted pursuant to this subsection shall be subject to review of methodology and technical accuracy at the discretion of the county administrator. d. In the event a property owner determines to donate, and the county determines to accept, non-site related property for any planned nonexisting Fire/EMS Protection facility or expansion of an existing impact fee eligible public building or facility to the fire district in advance of any application for final development order approval, the board of county commissioners shall reserve the determination of value of the credit for the dedicated property until the property owner, or his assigns, seeks a final development order approval for the remainder of the property from which the dedicated property was provided. All property dedication credits shall be determined at the time contracts are let for the construction/expansion of the eligible facility or at the time a final development order approval is granted, whichever occurs first. No property dedication credit request may include the consideration of any enhancement to the value of property being dedicated as a result of the new or expanded public building construction. No property dedication credit request may include the consideration of any enhancement to the value of the property being dedicated as a result of the overall project development. (3)Application procedure. Applicants for credit for construction of non-site related Fire/EMS Protection building, facilities or equipment shall submit documentation of the actual engineering, construction or acquisition costs to the county administrator or his designee. The county administrator or his designee shall determine credit for Fire/EMS Protection construction based upon these costs or upon alternative engineering and construction cost estimates if the county administrator or his designee determines that such costs submitted are excessive or incomplete. (4)Acquisition by purchase or condemnation. a. In the event a developer is required as a condition of a final development order to acquire off-site Fire/EMS Protection property, the developer shall first obtain an independent property appraisal as described in section 24-58 and provide the county Page 31 of 494 17 administrator with a copy of the appraisal. The county administrator may obtain a review appraisal as described in section 24-59. b. Except as provided below, credits for Fire/EMS Protection property acquisition shall be based on the independent property appraisal, the review appraisal, or the purchase price, if lower, as determined by the county administrator. In the event the developer is unable to acquire the Fire/EMS Protection property for appraised value or lower, the board may: 1. Grant additional credits above the appraised value if it determines that the cost of acquisition is less than the cost of condemnation or that condemnation is not practical or desired; 2. Authorize the condemnation of the parcels; or 3. Deny the request for additional credits. (f)Time of claim; waiver. Any claim for credit must be made no later than the time of application for a building permit or an electrical permit. Any claim not so made shall be deemed waived. (g) The holder of any Impact Fee credits granted by the County shall be entitled to redeem such credits for the full benefit of the density or intensity represented by such credits as of the date of issuance, notwithstanding any subsequent increase in Impact Fee rates. The transferability of any Impact Fee credits granted by the County shall be in accordance with state law. [underline indicates additions; strikethrough indicates deletions] SECTION 8. AMENDMENT OF SECTION 24-62 OF THE ST. LUCIE COUNTY CODE.Section 24-62 of the St. Lucie County Code, entitled Use of Funds, is hereby amended as follows: Sec. 24-62. Use of funds. (a) Except for allowable Administrative Expenses, Aall funds collected by the county and municipalities located therein from Fire/EMS Protection impact fees shall be remitted at least monthly to the county fire district. The collecting governmental unit shall be entitled to up to but not more than four percent of the funds collected to compensate the entity for the administrative expense of collecting and administering this article. All remaining funds collected from fire/EMS protection impact fees used solely for the purpose of capital Infrastructure improvements to the Fire/EMS Protection System to the county’s Fire/EMS Protection facilities and Page 32 of 494 18 equipment identified within the technical memorandum titled "Update of the St. Lucie County Fire and Rescue Impact Fee" dated October 4, 2016 prepared by James C. Nicholas, Ph.D., which contains the most recent and localized data and which is incorporated by reference. as identified in the county's comprehensive plan, the fire district’s capital improvement program, or the comprehensive plans of the City of Fort Pierce, City of Port St. Lucie, St. Lucie Village. Fire/EMS Protection impact fees shall not be used for maintenance or operations. Land acquisition and Infrastructure improvements shall be of the type made necessary by the new development county's growth and development. (b) Funds shall be Encumbered and expended in the order in which they are collected. (c) Each January the county fire district shall present to the board of county commissioners a proposed capital improvement program for Fire/EMS Protection Infrastructure public building and facilities, assigning funds, including any accrued interest, from the several special revenue funds to specific Fire/EMS Protection projects and related expenses. Monies, including any accrued interest, not assigned in any fiscal period shall be retained in the same fire/EMS protection impact fee trust fund until the next fiscal period, except as provided by the refund provisions of this article. Funds shall be deemed expended in the order received. (cd) The board of county commissioners and the fire district will enter into appropriate interlocal agreements between or among themselves and the governing bodies of the municipalities in the county to provide for the collection of fees imposed and to ensure proper use of the funds collected pursuant to this article. [underline indicates additions; strikethrough indicates deletions] SECTION 9. AMENDMENT OF SECTION 24-63 OF THE ST. LUCIE COUNTY CODE.Section 24-63 of the St. Lucie County Code, entitled Refund of Fees Paid, is hereby amended as follows: Sec. 24-63. Refund of fees paid. (a) If a building or an electrical permit for a mobile home park or recreational vehicle park expires or is cancelled and no certificate of occupancy has been issued, then the feepayer, his heirs, successors or assigns, shall be entitled to a refund of the impact fee paid as a condition for its issuance, plus interest based on the local government surplus funds trust fund (Florida PRIME), except that the county and or collecting Page 33 of 494 19 government entity, if not the county, shall retain its Administrative Expenses four percent of the fee retained by the county and collecting government entity. In order to receive a refund from impact fees paid on or after the effective date of the ordinance from which this article is derived, the request must be made within three years of when the permit expired. ninety (90) days of the expiration of the Building Permit or other permit. Failure to timely apply for a refund of the Impact Fee shall waive any right to a refund. (1) The application for refund shall be filed with the County Administrator and contain the following: a. The name and address of the applicant; b. The location of the property which was the subject of the Building Permit; c. The date the Impact Fee was paid; d. A copy of the receipt of payment for the Impact Fee; and e. The date the Building Permit was issued and the date of expiration. (2) After verifying that the Building Permit has expired and that the Building has not received a Certificate of Occupancy, the County Administrator shall refund the Impact Fee paid for such Building from the Fire/EMS Protection Impact Fees collected and held by the County or, alternatively, the fire district shall be responsible for the amount of all refunds. (3) A Building Permit that is subsequently issued on the same property that was the subject of a refund shall pay the Impact Fee as required by this Chapter. (b) Any funds not expended or encumbered by the end of the calendar quarter immediately following ten years from the date the roads impact fee was paid shall, upon application of the feepayer, be returned to him with interest based on the local government surplus funds trust fund (Florida PRIME). Refunds shall be made only in accordance with the following procedure: (1) The then-current owner shall petition the County for the refund within ninety (90) days following the end of the calendar quarter immediately following the tenth anniversary of the date of payment of the Impact Fee. (2) The petition for refund shall be submitted to the County Administrator and shall contain: a. A notarized sworn statement that the petitioner is the present owner of the property on behalf of which the Impact Fee was paid; b. A copy of the dated receipt issued for payment of the Impact Fee or such other record as would evidence payment; and c. A certified copy of the latest recorded deed or a copy of the most recent ad valorem tax bill. Page 34 of 494 20 (3) The County Administrator shall immediately forward a copy of the application to the fire district for review and response. Within ninety (90) days from the date of receipt of a petition for refund, the fire district will advise the County Administrator, petitioner and the Board of the status of the Impact Fee requested for refund, and if such Impact Fee has not been expended or encumbered within the applicable time period, then it shall be returned to the petitioner. For the purposes of this Section, fees collected shall be deemed to be spent or encumbered on the basis of the first fee in shall be the first fee out. (4) In the event that a legal challenge is filed in connection with the payment of any Impact Fee, the ten-year period referenced in this Section shall not begin to run until completion of the associated litigation and appeals. [underline indicates additions; strikethrough indicates deletions] SECTION 10. AMENDMENT OF SECTION 24-64 OF THE ST. LUCIE COUNTY CODE.Section 24-64 of the St. Lucie County Code, entitled Exemptions, is hereby amended as follows: Sec. 24-64. Exemptions. The following shall be exempted wholly or in part from payment of the Fire/EMS Protection impact fee: (1) Alteration or expansion of an existing building where no additional residential dwelling units are created. (2) The construction of accessory buildings or structures which will not produce additional need for Fire/EMS Protection facilities over and above that produced by the principal building or use of the land. (3) The replacement of a destroyed or partially destroyed building or structure in existence on or after July 1, 2000, with a new building or structure of the same or a different use; provided that no additional need for Fire/EMS Protection facilities will be produced over and above those produced by the original use of the land. (4) Any claim of exemption must be made no later than the time of application for a building permit or electrical permit for a mobile home. Any claim not so made shall be deemed waived. (5) Government Property. [underline indicates additions; strikethrough indicates deletions] Page 35 of 494 21 SECTION 11. AMENDMENT OF SECTION 24-65 OF THE ST. LUCIE COUNTY CODE.Section 24-65 of the St. Lucie County Code, entitled Appeals, is hereby amended as follows: Sec. 24-65. Appeals. (a) Any decision made by the county administrator or the fire district in the course of administering the provisions of this article may be appealed to the board of county commissioners by filing a petition of appeal on a form approved by the County within 30 calendar days of the date of the rendition of the decision. (b) The board of county commissioners shall review the petition at a public meeting within 30 60 calendar days from the date of appeal of said decision. The petitioner shall be provided reasonable notice of the time, date, and place of the public meeting by certified mail, return receipt requested, and invited to attend. Testimony at the public meeting shall be limited to ten minutes per side, unless an extension of time is granted by the board. The board's decision shall be final for the purpose of administrative appeals. The hearing shall be before the Board and shall be conducted in a manner designed to obtain all information and evidence relevant to the requested hearing. Formal rules of civil procedure and evidence shall not be applicable; however, the hearing shall be conducted in a fair and impartial manner with each party having an opportunity to be heard and to present information and evidence. (c) The board's decision shall be final for the purpose of administrative appeals. The board of county commissioners shall revoke the decision of the county administrator or fire district only if there is competent, substantial evidence in the record that the decision fails to comply with this article. A determination shall be made in writing and issued within thirty (30) days of the hearing to the Applicant or owner. (d) Any Applicant who requests a hearing pursuant to this Section and desires the immediate issuance of a Building Permit, or if a Building Permit has been issued without the payment of the Impact Fee, shall pay the applicable Impact Fee prior to or at the time the request for hearing is filed. Said payment shall be deemed paid “under protest” and shall not be construed as a waiver of any review rights. An Applicant may request a hearing under this Section without paying the applicable Impact Fee, but no Building Permit shall be issued until such Impact Fee is paid in the amount initially calculated or the amount approved upon completion of the review provided in this Section. Page 36 of 494 22 [underline indicates additions; strikethrough indicates deletions] SECTION 12. AMENDMENT OF SECTION 24-66 OF THE ST. LUCIE COUNTY CODE.Section 24-66 of the St. Lucie County Code, entitled Review and Automatic Adjustment of Fees, is hereby amended as follows: Sec. 24-66. Review and automatic adjustment of fees.The Impact Fee Study for the Fire/EMS Protection impact fee shall be reviewed by the District and the Board at least every four (4) years. The initial review and each review thereafter shall consider new estimates of population and other socioeconomic data, changes in construction, land acquisition and related costs, and adjustments to the assumptions, conclusions or findings set forth in such Impact Fee Study. The purpose of this review is to evaluate and revise, if necessary, the Impact Fees to ensure that they do not exceed the reasonably anticipated costs associated with the Capital Facilities necessary to offset the demand generated by the new construction. In the event the review of this Chapter and the Impact Fee Study required by this Section alters or changes the assumptions, conclusions and findings of the Impact Fee Study adopted herein or alters or changes the amount or classification of the Impact Fees, such studies shall be amended and updated to reflect the assumptions, conclusions and findings of such reviews. (a) The fire/EMS protection impact fee shall be adjusted by the county administrator in April of each calendar year, beginning the first year after the adoption of the ordinance from which this article is derived. Unless otherwise directed by the board of county commissioners, any adjustments to the fire/EMS protection impact fee, made pursuant to this section, shall be effective the first Monday in October of each calendar year. All adjustments to the fire/EMS protection impact fee shall be based on the methodology described in subsection (b) of this section. (b) The base for computing any adjustment is the January Consumer Price Index—All Urban Consumers for the United States, published each year by the United States Department of Labor, Bureau of Labor Statistics. For the purpose of this section, the initial index to be referenced is January 2000. The fire/EMS protection impact fee shall be adjusted by the percentage change in the index. Page 37 of 494 23 (c) If the index is changed so that the base year is different, the index shall be converted in accordance with the conversion factor published by the United States Department of Labor, Bureau of Labor Statistics. If the index is discontinued or revised, such other government index or computation with which it is replaced shall be used in order to obtain substantially the same result as would be obtained if the index had not been discontinued or revised. (d) The board of county commissioners and the county fire district shall review the fire/EMS protection impact fee at least once every five years from the effective date of the ordinance from which this article is derived (October 1, 2000). [underline indicates additions; strikethrough indicates deletions] SECTION 13. NOTICE OF IMPACT FEES. (a) No later than October 3, 2022, the County Administrator is hereby directed to publish a notice once in a newspaper of general circulation within the County which notice shall include: (A) a brief and general description of the Impact Fees, (B) a description of the geographic area in which the Impact Fees will be collected; (C) the Impact Fee rates to be imposed for each Impact Fee Land Use Category; and (D) the date of implementation of the Impact Fee rates set forth in the notice, which date shall not be earlier than ninety (90) days after the date of publication of the notice. In the event, this notice is not published by October 3, 2022, then the initial January 1, 2023 implementation dates for the Impact Fees shall be adjusted to ensure that the increased Impact Fee rates are not implemented earlier than ninety (90) days after the date of publication of the notice, and the implementation dates for the phased-in Impact Fee rates in 2024, 2025, and 2026 shall be similarly adjusted to occur in one-year increments after the initial implementation date for such Impact Fees. Page 38 of 494 24 (b) In the event the Impact Fee rate for an Impact Fee Land Use Category is decreasing, then that rate shall go into effect for all new construction that applies for a Building Permit on or after September October 1, 2022 following the effective date of this Ordinance as provided in Section 14(d), notwithstanding the implementation dates specified in Section 24-55. (c) The obligations herein for the payment of the Impact Fees shall apply to all new construction that applies for a Building Permit on or after the applicable implementation date. SECTION 14. MISCELLANEOUS. (a) If any clause, section or provision of this Ordinance shall be declared unconstitutional or invalid for any reason or cause, the remaining portion of said chapter shall be in full force and effect and be valid as if such invalid portion thereof had not been incorporated herein. (b) It is the intention of the Board, and it is hereby ordained that the relevant provisions of this Ordinance shall become and be made a part of the St. Lucie County Code; that the sections of this Ordinance may be renumbered or relettered to accomplish such intentions; and that the word “Ordinance” shall be changed to “Section” or other appropriate word. (c) The terms and provisions of this Ordinance shall be liberally construed to affect the purpose for which it is adopted. (d) A certified copy of this Ordinance shall be filed with the Department of State within 10 days after its enactment by the Board and shall take effect as provided by law; Page 39 of 494 25 provided the revisions to the Impact Fee rates shall become effective as provided in Section 13 hereof. DULY ADOPTED this ____ day of _____________________, 2022. ST. LUCIE COUNTY BOARD OF COUNTY COMMISSIONERS _________________________________ Chair Attest: ____________________________ Clerk of the Circuit Court APPROVED AS TO FORM: _____________________________ County Attorney Page 40 of 494 Update of the St. Lucie County Fire and Rescue Impact Fee Prepared for the St. Lucie County Fire District By James C. Nicholas Revised Final Report May 10, 2022 Page 41 of 494 St Lucie County has been collecting fire & emergency medical impact fees since 2000. These fees were last updated in 2016. These fire and ems fees have been annually adjusted by the Consumers’ Price Index to keep them current. The growth of the County population and calls for service are shown in Table VI-1. The calls by 1,000 population has also increased, reflecting aging of the population in addition to the evolution of the public’s expectations. In St. Lucie County fire and rescue services are provided by a special district, the St. Lucie County Fire District. This taxing district provides service to both the unincorporated and incorporated areas of the County. TABLE VI-1 GROWTH OF CALLS FOR SERVICE ST LUCIE COUNTY YEAR POPULATION CALLS FOR SERVICE CALLS PER 1,000 POPULATION 1992 159,302 16,709 104.889 1993 163,831 18,259 111.450 1994 167,833 18,916 112.707 1995 172,212 20,394 118.424 1996 176,272 20,753 117.733 1997 180,338 21,877 121.311 1998 184,242 23,013 124.906 1999 188,327 23,965 127.252 2000 192,695 27,365 142.012 2001 198,253 27,844 140.447 2002 203,360 28,620 140.736 2003 211,898 30,423 143.574 2004 204,216 34,580 169.331 2005 240,039 34,115 142.123 2006 259,315 34,991 134.936 2007 271,961 36,116 132.798 2008 276,585 36,992 133.746 2009 272,864 38,192 139.967 2010 277,864 38,432 138.312 2011 279,696 38,652 138.193 2012 280,355 40,758 145.380 2013 281,151 43,458 154.572 2014 282,821 45,721 161.661 2015 287,749 48,042 166.958 2016 282,826 51,935 183.629 2017 297,634 52,996 178.058 Fire Impact Fee Update 2022 2 Page 42 of 494 TABLE VI-1 2018 302,432 53,046 175.398 2019 309,359 54,478 176.100 2020 322,265 54,616 169.475 2021 328,964 60,924 185.200 Office of Economic and Demographic Research, St Lucie County Fire District, 2021. Table IV-2 sets out the fire/rescue parameters used in establishing the nexus between growth and the need for additional fire and ems facilities. Table VI-3 3 shows the fire and ems needs and costs by land use type. The impact cost of fire/rescue protection is determined based upon the expected calls for service per unit per year. These call generation rates are based upon a statistical review of fire/rescue calls. TABLE VI-2 FIRE/RESCUE CALLS FOR SERVICE ST LUCIE COUNTY SOURCE OF FIRE/RESCUE CALLS: LAND USE CALLS PER UNIT Single Family Detached 0.2813 Multi-Family 1 & 2 Story 0.2171 Multi-Family 3 + Stories 0.2759 Mobile Home 0.2319 Hotel/Motel per 1,000 FT² 0.4224 Retail per 1,000 FT² 0.2687 Office per 1,000 FT² 0.3037 Storage per 1,000 FT² 0.0253 Industry per 1,000 FT² 0.0395 Service Station per 1,000 FT² 1.0855 Parks & Recreation per 1,000 FT² 0.0997 Instructional per 1,000 FT² 0.2927 Nursing Home/ACLF 2.6197 SOURCE: St Lucie County Fire District, Bureau of the Census, and St Lucie County Property Appraiser, 2021. Fire Impact Fee Update 2022 3 Page 43 of 494 TABLE VI-2A FIRE/RESCUE CLLS FOR SERVICE: DETAIL ST LUCIE COUNTY Total Calls 54,994 Calls to an Individual Land Use 46,298 Unallocated Total Allocated Calls Units or 1000 FT2 Calls per Unit Direct Calls % 8,696 Residential 31,425 67.9% 5,902 37,327 Single Family -Detached 24,929 29,612 105,282 DU 0.2813 Multi-Family 1-2 Stories 1,634 1,941 8,939 DU 0.2171 3+ Stories 3,892 4,623 16,754 DU 0.2759 Mobile Home 969 1,152 4,965 DU 0.2319 Hotel/Motel 733 1.6% 138 871 2,061,490 Per 1k FT² 0.4224 Retail 3,111 6.7% 584 3,695 13,752,697 Per 1k FT² 0.2687 Office 1,404 3.0% 264 1,668 5,490,604 Per 1k FT² 0.3037 Storage 188 0.4% 35 223 8,836,582 Per 1k FT² 0.0253 Industry 206 0.4% 39 245 6,196,356 Per 1k FT² 0.0395 Service Stn 696 1.5% 131 827 761,637 Per 1k FT² 1.0855 Parks & Rec 191 0.4% 36 227 2,274,663 Per 1k FT² 0.0997 Institutional 4,686 10.1% 880 5,566 19,016,439 Per 1k FT² 0.2927 Nursing Home 3,658 7.9% 687 4,345 1,658,605 Per 1k FT² 2.6197 TOTALS 46,298 100.0% 8,696 54,994 Page 44 of 494 Table VI-3 FIRE/RESCUE PARAMETERS ST LUCIE COUNTY FIRE DISTRICT INVENTORY OF FACILITIES: No. UNIT COST CAPITAL VALUE Administrative Building 1 $7,311,800 $7,311,800 Stations 17 $2,500,000 $57,819,465 Land -Reserve Commerce Park * $270,000 $367,200 Land -Rhode Island * $1,900,000 $2,584,000 Land -Other Stations * $1,085,000 $20,658,400 Training Fire Station $1,500,000 $2,040,000 Engines 18 $760,000 $13,680,000 Rescues 28 $401,000 $11,228,000 Quints 5 $1,180,000 $5,900,000 Ladders 1 $1,580,000 $1,580,000 Brush Trucks 16 $170,000 $2,720,000 Squad Trucks 2 $650,000 $1,300,000 Cascade Truck 1 $450,000 $450,000 ARFF Unit 1 $1,400,000 $1,400,000 Marine Unit 1 $40,000 $40,000 Command Bus 1 $400,000 $400,000 Battalion Trucks 5 $48,000 $240,000 FTO Trucks 4 $48,000 $192,000 Fire Prevention Truck 10 $45,000 $450,000 Training Trucks 6 $40,000 $240,000 Administration Vehicles 12 $40,000 $480,000 Logistics Van 1 $35,000 $35,000 Bucket Truck 1 $150,000 $150,000 IT/Shop/Maint 9 $45,000 $405,000 Tankers 4 $280,000 $1,120,000 Fire/Rescue Capital Investments $132,790,865 Population Served 322,265 Total Capital Cost Per Capita $412.05 Total Calls for Service 54,616 Total Capital Cost Per Call $2,431 Outstanding Debt (To be credited) $6,622,001 Citizen's Equity $126,168,864 Population Served 322,265 Net Capital Cost per Capita $391.51 Total Calls for Service 54,616 Net Capital Cost per Call $2,310.11 SOURCE: St. Lucie County Fire District, December 2021. *Estimated based on appraisals of other District land. NOTE: Capital cost per call is used to establish the Fire/Rescue impact fee. Page 45 of 494 TABLE VI-4 FIRE PROTECTION NEEDS AND COSTS BY LAND USE TYPE ST LUCIE COUNTY FIRE DISTRICT LAND USE TYPE (UNIT) CALLS FOR SERVICE COST PER UNIT CREDITS NET COST Single Family 0.2813 $683.85 $34.10 $649.75 Mobile Home/Rec. Vehicle 0.2319 $563.91 $28.12 $535.79 Multi-Family 1 & 2 Story 0.2171 $527.92 $26.33 $501.59 Multi-Family 3 + Stories 0.2759 $670.92 $33.46 $637.47 Hotel/Motel -Room 0.4224 $1,026.89 $51.21 $975.68 Bed & Breakfast -Room 0.4224 $1,026.89 $51.21 $975.68 All Other Residential 0.2813 $683.85 $34.10 $649.75 OFFICE AND FINANCIAL PER 1,000 FT²: General Office 0.3037 $738.50 $36.83 $701.67 Medical Office 0.3037 $738.50 $36.83 $701.67 RETAIL PER 1,000 FT²: Under 100,000 FT² 0.2687 $653.30 $32.58 $620.72 100,000-499,999 FT² 0.2687 $653.30 $32.58 $620.72 500,000 & Over 0.2687 $653.30 $32.58 $620.72 GASOLINE SERVICES: Service Station per 1,000 FT² 1.0855 $2,639.14 $131.61 $2,507.53 INDUSTRIAL PER 1,000 FT²: Warehouse 0.0253 $61.44 $3.06 $58.38 Truck Terminal 0.0253 $61.44 $3.06 $58.38 General Industrial 0.0395 $96.01 $4.79 $91.23 INSTITUTIONAL: School -Elem. Per 1,000 FT² 0.2927 $711.66 $35.49 $676.17 School -Middle/High Per 1,000 FT² 0.2927 $711.66 $35.49 $676.17 Day Care Per 1,000 FT² 0.2927 $711.66 $35.49 $676.17 Fraternal Org. Per 1,000 FT² 0.2927 $711.66 $35.49 $676.17 Hospital Per 1,000 FT² 0.2927 $711.66 $35.49 $676.17 Nursing Home Per 1,000 FT² * 2.6197 $6,369.45 $317.63 $6,051.82 Library Per 1,000 FT² 0.2927 $711.66 $35.49 $676.17 RECREATIONAL: Park (Public) Per Acre 0.0997 $242.50 $12.09 $230.41 Recreation Facility Per 1,000 FT² 0.0997 $242.50 $12.09 $230.41 Golf Course Per Acre 0.0997 $242.50 $12.09 $230.41 Movie Theatres Per 1,000 FT² 0.0997 $242.50 $12.09 $230.41 Fire Impact Fee Update 2022 6 Page 46 of 494 TABLE VI-5 CHANGES IN FIRE/EMS IMPACT FEES ST LUCIE COUNTY FIRE DISTRICT LAND USE TYPE (UNIT) Existing Fee Updated Cost % Change Updated Impact Fee Year 1 Year 2 Year 3 Year 4 Single Family $667 $650 -2.6% $650 $650 $650 $650 Mobile Home/Rec. Vehicle ** $288 $536 86.0% $324 $360 $396 $432 Multi-Family 1 & 2 Story $436 $502 15.0% $469 $502 $502 $502 Multi-Family 3 + Stories $784 $637 -18.7% $637 $637 $637 $637 Hotel/Motel -Room $692 $976 41.0% $763 $834 $905 $976 Bed & Breakfast -Room $692 $976 41.0% $763 $834 $905 $976 All Other Residential $667 $650 -2.6% $650 $650 $650 $650 OFFICE AND FINANCIAL PER 1,000 FT²: General Office $668 $702 5.0% $685 $702 $702 $702 Medical Office $668 $702 5.0% $685 $702 $702 $702 RETAIL PER 1,000 FT²: Under 100,000 FT² $536 $621 15.8% $578 $621 $621 $621 100,000-499,999 FT² $536 $621 15.8% $578 $621 $621 $621 500,000 & Over $536 $621 15.8% $578 $621 $621 $621 GASOLINE SERVICES: Service Station per 1,000 FT² ** $345 $2,508 626.8% $388 $431 $474 $518 INDUSTRIAL PER 1,000 FT²: Warehouse $54 $58 8.1% $56 $58 $58 $58 Truck Terminal $76 $58 -23.2% $58 $58 $58 $58 General Industrial $76 $91 20.0% $84 $91 $91 $91 INSTITUTIONAL: School -Elem. Per 1,000 FT² $581 $676 16.4% $629 $676 $676 $676 School -Middle/High Per 1,000 FT² $581 $676 16.4% $629 $676 $676 $676 Day Care Per 1,000 FT² $581 $676 16.4% $629 $676 $676 $676 Fraternal Org. Per 1,000 FT² $581 $676 16.4% $629 $676 $676 $676 Hospital Per 1,000 FT² $581 $676 16.4% $629 $676 $676 $676 Nursing Home Per 1,000 FT² ** $0 $6,052 100.0% $1,513 $3,026 $3,026 $3,026 Library Per 1,000 FT² $581 $676 16.4% $629 $676 $676 $676 RECREATIONAL: Park (Public) Per Acre $551 $230 -58.2% $230 $230 $230 $230 Recreation Facility Per 1,000 FT² $551 $230 -58.2% $230 $230 $230 $230 Golf Course Per Acre $551 $230 -58.2% $230 $230 $230 $230 Movie Theatres Per 1,000 FT² $551 $230 -58.2% $230 $230 $230 $230 ** Fee increase limited by statute Fire Impact Fee Update 2022 7 Page 47 of 494 Florida Statute Section 163.31801, the Florida Impact Fee Act, places limitations on the increases in impact fees. The relevant limitations are: • An increase of not more than 25% must be implemented in two equal annual installments; • An increase greater than 25% but not more than 50% must be implemented in four equal installments; • An impact fee increase may not exceed 50% of the current rate. Additionally, an impact fee increase may not be increased more than once every four years. In Table VI-5 all proposed decreases are implemental immediately. Proposed increases less than 25% are implemental over two years and all increases greater than 25% are implemental over four years. No fee is proposed to be increased greater than 50%. Fire Impact Fee Update 2022 8 Page 48 of 494 TABLE VI-5 OTHER FIRE/EMS IMPACT FEES Alachua County $152 Brevard County $93 Charlotte County $247 Citrus County $391 Collier County $1,257 Miami/Dade County $436 Hernando County $235 Hillsborough County $49 Indian River County $314 Lake County $390 Lee County $821 Levy County $53 Manatee County $289 Martin County $599 Orange County $325 Palm Beach County $528 Polk County $308 St Johns County $657 Sarasota County $452 Seminole County $172 Sumter County $397 Average $385 Median $355 St Lucie Revised $650 SOYRCE: Duncan & Associates, www.impactfees.com. Fire Impact Fee Update 2022 9 Page 49 of 494 RE: Proposed Changes to the St Lucie County Fire District Impact Fees County questions The County has posed three questions relating to the proposal: 1. Attach the call data analysis. 2. Explain where the cost data in Table VI-3 was derived, explain why an old population number was used in Table VI-3 to calculate the fees rather than the 2021 number displayed in table VI-1. 3. Outline the credit calculation (a credit just suddenly appears in Table VI-4 without explanation or documentation of what revenue sources were credited? Are there other revenues that were not? CALL DATA ANALYSIS A revised report should provide the requested data and information. USE OF 2020 POPULATION IN TABLE VI-3. Much of the data incorporated into Table VI-3 are 2020. CREDIT CALCULATION There is a credit or reduction given based on the outstanding debt of the Fire District. Table VI-3 shows Total Capital Investment of $132,790,865 and outstanding debt of $6,622,001 in outstanding debt. This outstanding debt is the basis for the credit. The Cost per Unit data shown in Table VI-4 are the total capital cost. This is reduced by the Credit for the outstanding debt to a net cost. James C. Nicholas 2736 NW 77th Blvd MGS 365 Gainesville, FL 32606 (352) 226-8799 E-mail jcnicholas@msn.com Page 50 of 494 Re: St Lucie Road Fees January 12, 2022 Page 2 Page 51 of 494 Re: St Lucie Road Fees January 12, 2022 Page 3 TABLE VI-2a FIRE/RESCUE CALLS FOR SERVICE: DETAILS ST LUCIE COUNTY Total Calls 54,994 Calls to an Individual Land Use Direct Calls % Unallocated Total Allocated Calls Units or 1000 FT2 Calls per Unit Direct Calls - Total 46,298 8,696 Residential 31,425 67.88% 5,902 37,327 Single Family - Detached 24,929 29,612 105,282 DU 0.2813 Multi-Family 1-2 Stories 1,634 1,941 8,939 DU 0.2171 3+ Stories 3,892 4,623 16,754 DU 0.2759 Mobile Home 969 1,152 4,965 DU 0.2319 Hotel/Motel 733 1.58% 138 871 2,061,490 1k FT2 0.4224 Retail 3,111 6.72% 584 3,695 13,752,697 1k FT2 0.2687 Office 1,404 3.03% 264 1,668 5,490,604 1k FT2 0.3037 Page 52 of 494 Re: St Lucie Road Fees January 12, 2022 Page 4 Storage 188 0.41% 35 223 8,836,582 1k FT2 0.0253 Industry 206 0.44% 39 245 6,196,356 1k FT2 0.0395 Service Stn 696 1.50% 131 827 761,637 1k FT2 1.0855 Parks & Rec 191 0.41% 36 227 2,274,663 1k FT2 0.0997 Institutional 4,686 10.12% 880 5,566 19,016,439 1k FT2 0.2927 Nursing Home 3,658 7.90% 687 4,345 1,658,605 1k FT2 2.6197 TOTALS 46,298 100.00 % 8,696 54,994 Page 53 of 494 Net Amount Tax Amount Total Amount Payment Method Payment Amount Amount Due ST LUCIE COUNTY ATTO 2300 VIRGINIA AVE FORT PIERCE FL 34982--563 $265.05 $0.00 $265.05 $0.00Invoice $265.050005304665 AD# 1313427 Account Sales Rep: RLewis Order Taker: RLewis 06/16/2022Order Created End DateStart Date# InsProduct Column Lines 07/03/2022 07/03/2022 1TCN-St Lucie News Tribune 1.00 155 * ALL TRANSACTIONS CONSIDERED PAID IN FULL UPON CLEARANCE OF FINANCIAL INSTITUTION Page 54 of 494 Text of Ad: 06/16/2022 Page 55 of 494 Page 56 of 494 Dept. / Anticipated Estimated FY 2022‐23 Prior Years FY 2022‐23 FY 2023‐24 FY 2024‐25 FY 2025‐26 FY 2026‐27 FY 2023 ‐ FY 2027 Beyond the Total Fund No. Project Title Completion Project Cost New Budget Carry Forward Total Budget Budget Budget Budget Budget CIP Subtotal 5‐Year Horizon Estimate IMPACT FEES FUND (371) New Station No. 18 Land Planning 12/31/2022 $500,000 $500,000 $0 $500,000 $0 $0 $0 $0 $500,000 $0 $500,000 New Station No. 18 Site Work 12/31/2022 $345,000 $345,000 $0 $345,000 $0 $0 $0 $0 $345,000 $0 $345,000 New Station No. 18 Building Construction 9/30/2023 $3,555,000 $2,000,000 $0 $2,000,000 $0 $0 $0 $0 $2,000,000 $0 $2,000,000 New Station No. 18 Architectural / Engineering / Civil Eng / Landscaping 9/30/2024 $600,000 $600,000 $0 $600,000 $584,725 $0 $0 $0 $1,184,725 $0 $1,184,725 New Station No. 19 Land Planning 9/30/2024 $500,000 $0 $0 $0 $500,000 $0 $0 $0 $500,000 $0 $500,000 New Station No. 19 Site Work 9/30/2024 $341,570 $0 $0 $0 $341,570 $0 $0 $0 $341,570 $0 $341,570 New Station No. 19 Architectural / Engineering / Civil Eng / Landscaping 9/30/2024 $584,725 $0 $0 $0 $584,725 $0 $0 $0 $584,725 $0 $584,725 New Station No. 19 Building Construction 9/30/2025 $3,685,000 $0 $0 $0 $1,800,000 $1,885,000 $0 $0 $3,685,000 $0 $3,685,000 Construction of the new Fire Station #7 9/30/2027 $3,000,000 $0 $0 $0 $0 $1,000,000 $1,000,000 $1,000,000 $3,000,000 $0 $3,000,000 IMPACT FEES FUND (371) TOTAL $13,111,295 $3,445,000 $0 $3,445,000 $3,811,020 $2,885,000 $1,000,000 $1,000,000 $12,141,020 $0 $12,141,020 TOTAL CAPITAL PROJECTS $13,111,295 $3,445,000 $0 $3,445,000 $3,811,020 $2,885,000 $1,000,000 $1,000,000 $12,141,020 $0 $12,141,020 ST. LUCIE COUNTY FIRE DISTRICT 5‐YEAR CAPITAL IMPROVEMENT PLAN FOR FY 2022‐23 THROUGH TO FY 2026‐27 Page 1 of 1 Page 57 of 494 Dept. / Anticipated Estimated FY 2022‐23 Prior Years FY 2022‐23 FY 2023‐24 FY 2024‐25 FY 2025‐26 FY 2026‐27 FY 2023 ‐ FY 2027 Beyond the Total Fund No. Project Title Completion Project Cost New Budget Carry Forward Total Budget Budget Budget Budget Budget Fleet Subtotal 5‐Year Horizon Estimate IMPACT FEES FUND (371) 2 Ford F‐150 4x2 SuperCrew Trucks 9/30/2023 $76,460 $0 $76,460 $76,460 $0 $0 $0 $0 $76,460 $0 $76,460 1 Ford F‐150 PR Crew Cab 4x4 9/30/2023 $52,049 $0 $52,049 $52,049 $0 $0 $0 $0 $52,049 $0 $52,049 3 Express Plus Type‐1 Ambulances 9/30/2023 $954,969 $0 $954,969 $954,969 $0 $0 $0 $0 $954,969 $0 $954,969 1 Express Plus Type‐1 Ambulances 9/30/2023 $255,915 $0 $255,915 $255,915 $0 $0 $0 $0 $255,915 $0 $255,915 2 Custom Brush Trucks 9/30/2024 $322,580 $0 $322,580 $322,580 $0 $0 $0 $0 $322,580 $0 $322,580 2 Extreme Duty Pumper Engines 9/30/2024 $1,246,000 $0 $1,246,000 $1,246,000 $1,246,000 $0 $0 $0 $2,492,000 $0 $2,492,000 1 EDC Aerial Ladder Engine 9/30/2024 $1,042,455 $0 $1,042,455 $1,042,455 $1,042,455 $0 $0 $0 $2,084,910 $0 $2,084,910 1 EDC Pumper Engine 9/30/2024 $567,600 $0 $567,600 $567,600 $567,600 $0 $0 $0 $1,135,200 $0 $1,135,200 1 Custom Brush Trucks 9/30/2024 $199,146 $0 $199,146 $199,146 $199,146 $0 $0 $0 $398,292 $0 $398,292 1 3,000 Gallon Water Tanker 9/30/2024 $381,257 $0 $381,257 $381,257 $381,257 $0 $0 $0 $762,514 $0 $762,514 IMPACT FEES FUND (371) TOTAL $5,098,431 $0 $5,098,431 $5,098,431 $3,436,458 $0 $0 $0 $8,534,889 $0 $8,534,889 TOTAL FLEET CAPITAL PROJECTS $5,098,431 $0 $5,098,431 $5,098,431 $3,436,458 $0 $0 $0 $8,534,889 $0 $8,534,889 ST. LUCIE COUNTY FIRE DISTRICT FLEET 5‐YEAR NEW AND REPLACEMENT CAPITAL PLAN FOR FY 2022‐23 THROUGH TO FY 2026‐27 Page 1 of 1Page 58 of 494 Dept. / Anticipated Estimated FY 2022‐23 Prior Years FY 2022‐23 FY 2023‐24 FY 2024‐25 FY 2025‐26 FY 2026‐27 FY 2023 ‐ FY 2027 Beyond the Total Fund No. Project Title Completion Project Cost New Budget Carry Forward Total Budget Budget Budget Budget Budget M&E Subtotal 5‐Year Horizon Estimate IMPACT FEES FUND (371) (6) Portable Radios for New Station No. 18 9/30/2023 $45,000 $45,000 $0 $45,000 $0 $0 $0 $0 $45,000 $0 $45,000 IMPACT FEES FUND (371) TOTAL $45,000 $45,000 $0 $45,000 $0 $0 $0 $0 $45,000 $0 $45,000 TOTAL MACHINERY & EQUIPMENT $45,000 $45,000 $0 $45,000 $0 $0 $0 $0 $45,000 $0 $45,000 ST. LUCIE COUNTY FIRE DISTRICT MACHINERY & EQUIPMENT 5‐YEAR NEW AND REPLACEMENT CAPITAL PLAN FOR FY 2022‐23 THROUGH TO FY 2026‐27 Page 1 of 1 Page 59 of 494 ITEM NO. (ID # 2022-55379) DATE: 7/21/2022 AGENDA REQUEST TO: Planning and Zoning Commission PRESENTED BY: Jodi Nentwick, Senior Planner SUBMITTED BY: Planning & Development Services SUBJECT: Acting as the Local Planning Agency: A Future Land Use Map Amendment to change the land use categories from RU ((Residential, Urban - 5 du/ac), RM (Residential, Medium - 9du/ac) and COM (Commercial) to the MXD (Mixed-Use Development) category, submitted by Cotleur and Hearing, Inc., on behalf of Meritage Homes of Florida. BACKGROUND: A petition for a Future Land Use Map Amendment to change the land use categories from RU (Residential, Urban - 5 du/ac), RM (Residential, Medium - 9du/ac) and COM (Commercial) to the MXD (Mixed-Use Development) category. The applicant has also submitted a concurrent Zoning Atlas Amendment (Rezone) from RS-2 (Residential, Single-Family-2) and CG (Commercial, General) to PUD (Planned Unit Development), and Preliminary PUD Site Plan for a project to be known as the Tidewater PUD located at 6209 S. US Highway 1 in Fort Pierce. The Preliminary PUD Site Plan encompasses a 16.37-acre subset of the subject sites to develop 160 multifamily residential (townhome) units associated with improvements to be known as Tidewater PUD. A proposed 2.50-acre outparcel, located at the northeastern corner of the subject site, is to retain a CG (Commercial, General) Zoning Designation. The applicant is proposing to extend approximately 5,200 linear feet of sanitary sewer force main within the US-1 right-of-way which connects to the existing Fort Pierce Utility Authority (FPUA) manhole. This new sanitary sewer force main will be able to serve undeveloped and underdeveloped parcels south of Midway Road, and FPUA's current system terminus. PREVIOUS ACTION: N/A FINANCIAL IMPACT: N/A RECOMMENDATION: Page 60 of 494 Staff has reviewed the proposed small-scale Comprehensive Plan Future Land Use Map Amendment and determined it is consistent with the Goals, Objectives, and Policies of the Comprehensive Plan, therefore, the staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commissioners. COMMISSION ACTION: RESULT: MOVER: SECONDER: None AYES: None NAYS: None EXCUSED: None Coordination/Signatures Date: July 15, 2022 Benjamin Balcer, Planning & Development Services Assistant Director Date: July 15, 2022 Mayte Santamaria, Planning & Development Services Director Date: July 15, 2022 Katherine Barbieri, Assistant County Attorney III Date: July 15, 2022 Mark Satterlee, Deputy County Administrator Page 61 of 494 Planning Division Agenda Item Summary Applicant: Meritage Homes of Florida Inc. Dante Fraiegari 1400 Centrepark Boulevard, Suite 10000 West Palm Beach, FL 33401 Agent: Cotleur & Hearing, Inc Dan Sorrow, PLA, AICP, LEED AP BD+C 1934 Commerce Centre Lane Jupiter, FL 33458 Project Location(s): 6209 S. Highway 1, Fort Pierce, FL Parcel ID(s)#: 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Future Land Use: RM (Residential, Medium) RU (Residential Urban) COM (Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Existing Zoning: RS-2 (Residential, Single-Family-2du/ac) CG (Commercial, General) Proposed Zoning: PUD (Planned Unit Development) & CG (Commercial, General) Staff Jodi Nentwick-Kugler Tel 772-462-1580 Email NentwickJ@stlucieco.org Mail 2300 Virginia Avenue, Tidewater PUD Amendment to the Future Land Use Map & Rezone to Planned Unit Development (PUD) and Preliminary Site Plan Project Description The applicant, Dan Sorrow, Cotleur & Hearing, on behalf Meritage Homes of Florida Inc, for a Future Land Use Map Amendment to change the land use cate- gory from RU (Residential, Urban-5 du/ ac), RM (Residential, Medium-9du/ac) and COM (Commercial) to MXD (Mixed- Use Development) category. The applicant has also submitted a con- current Zoning Atlas Amendment (Rezone) from RS-2 (Residential, Single-Family-2) and CG (Commercial, General) to PUD (Planned Unit Development), and Preliminary PUD Site Plan for a project to be known as the Tidewater PUD located at 6209 S. US Highway 1 in Fort Pierce. The applicant is proposing to extend ap- proximately 5,200 linear feet of sanitary sewer force main within the US-1 right-of- way which connects to the existing Fort Pierce Utility Authority (FPUA) manhole. This new sanitary sewer force main will be able to serve undeveloped and under- developed parcels south of Midway Road FPUA system limits. The St. Lucie County Planning and Zon- ing Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applica- tions within their area of responsibility. Notice Requirements Public hearing notice in accordance with Section 11.00.03 of the Land Develop- ment Code was placed in the St. Lucie News Tribune on Friday, July 8, 2022, Notices were sent to twenty-three (23) property owners within the 500 foot radi- us of the subject site, and a sign was posted on the property. The Planning Department received no responses to date. Staff’s Recommendation Staff recommends the Planning and Zoning Commission forward a recom-mendation of approval to the St. Lucie County Board of County Commission- ers. Hearing Date Thursday July 21, 2022 PLANNING AND ZONING COMMISSION Page 62 of 494 Planning and Development Services Department Planning Division M E M O R A N D U M GENERAL INFORMATION: Property Owner(s): Eguibebe, LLC 4855 Hunters Way Boca Raton, FL 33434 Nelmarta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc. Dante Fraiegari 1400 Centrepark Boulevard, Suite 10000 West Palm Beach, FL 33401 Agent/Agent of Record: Cotleur and Hearing, Inc. Dan Sorrow, PLA, AICP, LEED AP BD+C 1934 Commerce Centre Lane, Suite Jupiter, FL 33458 Location: 6209 S. US Highway 1, Fort Pierce, FL 34982 Tax ID(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Project Size: +/-18.873-Acres Existing Future Land Use: RM (Residential, Medium), RU (Residential Urban) & COM (Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Tidewater Mixed Use Activity Area Existing Zoning: RS-2 (Residential, Single-Family-2du/ac) & CG (Commercial, General) TO: Planning Commission and Zoning Commission THROUGH: Mayté Santamaria, Director Benjamin Balcer, AICP, Assistant Director FROM: Jodi Kugler, Senior Planner DATE: July 11, 2022 SUBJECT: Tidewater PUD Small-Scale Future Land Use Map Amendment (FLUMA-11202126232) Rezone to Planned Unit Development & Preliminary Development Plan (PUD-RZ-11202126231) Page 63 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 2 Proposed Zoning: PUD (Planned Unit Development) 16.37-acres CG (Commercial, General) 2.5-acres Existing Use: Vacant (undeveloped) Boundary (USB): The subject property is located inside the Urban Service Boundary Utility Service: Fort Pierce Utility Authority (FPUA) – Proposing a wastewater line extension Type of Concurrency Concurrency Deferral Affidavit Fire/EMS Protection: St. Lucie County Fire District Station #6, located at 350 E. Midway Road in Fort Pierce, approximately 1.75 miles northeast of the subject site. BACKGROUND & REQUEST OVERVIEW Cotleur and Hearing, Inc. submitted petitions, on behalf of Meritage Homes of Florida Inc., for a Future Land Use Map Amendment to change the land use categories from RU (Residential, Urban - 5 du/ac), RM (Residential, Medium - 9du/ac) and COM (Commercial) to the MXD (Mixed-Use Development) category. The applicant has also submitted a concurrent Zoning Atlas Amendment (Rezone) from RS-2 (Residential, Single-Family-2) and CG (Commercial, General) to PUD (Planned Unit Development), and Preliminary PUD Site Plan for a project to be known as the Tidewater PUD located at 6209 S. US Highway 1 in Fort Pierce. The Preliminary PUD Site Plan encompasses a 16.37-acre subset of the subject sites to develop 160 multifamily residential (townhome) units associated with improvements to be known as Tidewater PUD. A proposed 2.50- acre outparcel, located at the northeastern corner of the subject site, is to retain a CG (Commercial, General) Zoning Designation. The applicant is proposing to extend approximately 5,200 linear feet of sanitary sewer force main within the US-1 right-of-way which connects to the existing Fort Pierce Utility Authority (FPUA) manhole. This new sanitary sewer force main will be able to serve undeveloped and underdeveloped parcels south of Midway Road FPUA system limits. Aerial Page 64 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 3 ************************************************************************** SECTION 1: FUTURE LAND USE MAP AMENDMENT STANDARDS OF REVIEW AS OUTLINED IN THE ST. LUCIE COUNTY COMPREHENSIVE PLAN A. In reviewing petitions for amendments to the Future Land Use Map, the Planning and Zoning Commission should determine whether the proposed amendment is consistent with all elements of the St. Lucie County Comprehensive Plan and Florida Statutes. The proposed comprehensive plan amendment would change the Future Land Use Map designation for the collective 18.73 acres from RU (Residential, Urban-5 du/ac), RM (Residential, Medium-9du/ac), and COM (Commercial) to an MXD (Tidewater Mixed Use Activity Area) Category with Specific Use designations for COM/RES-10 by adding a new Mixed-Use area Figure to the Future Land Use Element. Specific Use areas within the Mixed-Use Activity Area are restricted to the following unless otherwise amended through the comprehensive plan amendment process. The Tidewater Mixed Use Activity Area will include the following sub-area policies: SU (Res-10) - Means that uses within this zone are restricted to those that would be equivalent to the RM land use designation as described in the future land use element of the comprehensive plan, allowing up to 10/du/ac through a PUD rezoning. SU (Com) – Means that the uses within this zone are restricted to those that would be equivalent to the COM as described in the future land use element of the comprehensive plan. The Development Review Committee (DRC) has reviewed this petition and determined it complies with the following Goals, Objectives, and Policies of the St. Lucie County Comprehensive Plan. Objective 1.1.2: Growth Management. St. Lucie County shall manage how and where growth occurs by using sustainable development and balanced planning practices. The County shall manage the land use patterns designated on the Future Land Use Map comprehensively, consistently, and effectively to enhance the quality of life for its citizens, promote economic vitality, and accommodate projected population growth and development in an environmentally acceptable manner. Policy 1.1.2.1: The adopted Future Land Use Map Series and any amendments shall promote responsible growth management practices. When considering any amendment to the Future Land Use Maps of the County’s Comprehensive Plan, the County Commission shall make the following findings, supported by the other elements of this Plan, before taking any approval actions granting an individual amendment to the Future Land Use Maps: 1. That the property under land use amendment application is adjunct to, or within no more than one-quarter mile of the same or greater type of land use classification. 2. That the property under land-use amendment consideration lies within the Five-Year Capital Improvement Program of the Water and Wastewater Master Plan for St. Lucie County (or can be reasonably accommodated with an amendment to the Master Plan) or otherwise meets the requirements of Policy 1.1.5.4. Page 65 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 4 Exhibit 1, Existing Future Land Use Map Exhibit 2, Proposed Future Land Use Map The subject parcel is situated along the west side of S. U.S Highway 1. The site is bordered by single-family residential, general commercial parcels, and an existing Arrigo Dodge automobile dealership to the north. To the west, the site is bordered by existing single-family homes and vacant single-family residential zoned parcels adjacent to the open space area. To the south of the subject parcels, is a vacant commercial area, small commercial out parcels to the southeast, and borders S. U.S. Highway 1 to the east. Page 66 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 5 Adjacent Land Uses: Policy 1.1.2.2 – By Florida Statutes, proposed future land use map amendments to the County’s Comprehensive Plan, shall be based upon the following analyses: 1. An analysis of anticipated growth; 2. An analysis of the availability of facilities and services; 3. An analysis of the suitability of the plan amendment for its proposed use considering the character of the undeveloped land, soils, topography, natural resources, and historic resources on-site; 4. An analysis of the compatibility of adjacent land uses; and 5. An analysis of the need for job creation, capital improvement, and economic development that will strengthen and diversify the community’s economy; and 6. A consultation with the Florida Department of Transportation when it is determined that a proposed amendment has the potential to affect facilities on the Strategic Intermodal System. The project site is currently located within the County’s Urban Service Boundary, making this a suitable location to further accommodate the County’s increasing population. By the Bureau of Economic and Business Research (BEBR), Florida Population Census 2020 report performed by the University of Florida, the population in St. Lucie County has increased by 18.5% from April 2010 to April 2020. The inclusion of utilizing infill mixed-use development for commercial and residential along US Highway 1 increases homeownership and job opportunities without additional transportation demands within St. Lucie County. Fire/EMS Services The nearest Fire Station, St. Lucie County Fire District Station #6, is located at 350 E. Midway Road in Fort Pierce, approximately 1.75 miles northeast of the subject site Water and Wastewater Water & Wastewater services will be provided by Fort Pierce Utility Authority, with the developer proposing an extension of lines to serve the project. Traffic The traffic analysis for the proposed Future Land Use MXD (Mixed-Use Development) to develop one hundred sixty 160 multifamily (townhome) units and retain a commercial outparcel was prepared by MacKenzie Engineering & Planning, Inc. dated March 2022. The daily and peak hour calculations anticipated to be a net increase in total trip generation by 8,954 daily, 731 AM peak hour (583in/147out), and 1,023 PM peak hour (336in/687out) net new trips. The analyses Location Zoning District Future Land Use Existing Land Use Subject Property CG (Commercial, General) RS-2 (Residential, Estates-2du/ac) COM (Commercial) Vacant/Undeveloped Adjacent Parcels North CG (Commercial, General) COM (Commercial) Arrigo Dodge Auto Dealership South CG (Commercial, General) COM (Commercial) Vacant/Undeveloped East CG (Commercial, General) COM (Commercial) Public Storage West RS-2 (Residential, Estates - 2du/ac) RU (Residential Urban) Single-Family Homes Page 67 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 6 demonstrated that the study area roadway has sufficient capacity to support the proposed future land use amendment. The Florida Department of Transportation (FDOT) issued a letter on April 7, 2022, approving the conceptual driveway location with conditions for the right-in/right-out driveway on the west side of US Highway 1 (approximately 380 feet south of the north property line) for the subject site. Environmental Assessment Background The Environmental Resources Department (ERD) receives April 20th, 2022, date-stamped submittal from Planning and Development Services. The applicant is requesting approval to change the future land use of the project site from Commercial (COM), Residential Medium (RM), & Residential Urban (RU) to Mixed-Use Development (MXD). The proposed future land-use change would accommodate the concurrent Planned Unit Development / Rezoning (PUD_RZ-11202126231) application that proposes 160 multifamily residential units with associated site improvements. A 2.58-acre outparcel located at the northeastern corner of the property is to retain Commercial General (CG) zoning for future commercial development. The project is located at 6209 S US Highway 1 in Ft. Pierce and currently consists of three (3) vacant parcels (Parcel IDs 3410-702-0055- 000-3, 3410-702-0054-000-6, & 3410-701-0001-000-7) collectively measuring 18.87-acres. Findings An Environmental Impact Report (EIR) prepared by Aquatic Research Monitoring, Equipment, & Deployment, LLC, dated April 2022, was provided and reviewed. The subject site is currently vacant and consists primarily of invasive vegetation with scattered native oaks and cabbage palms. No wetlands or native uplands were found on site, and no Federal or State-listed plant species or listed animal burrows, nests, dens, or roosting areas were observed on site. Topography and past aerials indicate the parcels were previously utilized for agricultural purposes. The proposed future land use text amendment application is being submitted concurrently with the Planned Unit Development / Rezoning (PUD_RZ-11202126231) application. Environmental impacts, specifically tree mitigation and landscaping, will be addressed through the site plan process. Recommendation ERD has no objection to the Future Land Use Map Amendment as outlined within the Ordinance. FUTURE LAND USE MAP AMENDMENT RECOMMENDATION: The staff has reviewed the proposed small-scale Comprehensive Plan Future Land Use Map Amendment and determined it is consistent with the Goals, Objectives, and Policies of the Comprehensive Plan; therefore, the staff recommends the Planning & Zoning Commission forward a recommendation of approval to the Board of County Commissioners. ************************************************************************** SECTION 2: REZONE TO THE OFFICIAL ZONING ATLAS STANDARDS OF REVIEW AS OUTLINED IN THE LAND DEVELOPMENT CODE SECTION 11.06.03 Section 11.06.03 of the St. Lucie County Land Development Code establishes the standards for reviewing Zoning Atlas Amendments. In reviewing an application for a Zoning Atlas Amendment, the Board of County Commissioners shall consider the following: Page 68 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 7 The proposed Zoning Atlas Amendment would change the Official Zoning Atlas Map designation to rezone the 16.37-acre subset of the subject site from RS-2 (Residential, Single-Family-2) and CG (Commercial, General) to PUD (Planned Unit Development), and Preliminary PUD Site Plan. A proposed 2.50-acre outparcel, located at the northeastern corner of the subject site, is to retain a CG (Commercial, General) Zoning Designation. Exhibit 3, Existing Zoning Map Exhibit 4, Proposed Zoning Map Page 69 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 8 A. Whether the proposed rezoning conflicts with any applicable portions of the St. Lucie County Land Development Code; The proposed amendment to the Official Zoning Atlas is not in conflict with the applicable provisions of the Land Development Code. The request seeks to amend the Official Zoning Atlas to reclassify the zoning from the RS-2 (Residential, Single-Family–2) and CG (Commercial, General) to the PUD (Planned Unit Development) Zoning District. Future Land Use: The proposed Future Land Use designation of the subject property is MXD (Mixed-Use Development). Policy 1.1.1.2.H: The MXD designation is to identify those areas where innovative land use concepts are encouraged. Application of this district should be with prudence and should be only to those areas where traditional land use classifications do not afford the desired flexibility and community input in land use planning necessary to address local concerns. Candidates for this district include all I-95 interchange areas, the Treasure Coast International Airport, Community Development Districts created pursuant to Chapter 190, Florida Statutes, and areas of special or unique environmental consideration that may not be appropriate for traditional land use designations. Uses within the areas classified as Mixed-Use should be segregated as intensity and indicated in the form of a concept master plan to be included as a part of the land use designation process. The following criteria, in addition to those as cited in Objective 1.1.7 (PUD, PNRD & PMUD), are to be used in the development of Mixed-Use areas: • Unless otherwise compliant with the identified intensity classification, any change in zoning shall be to the Planned Unit Development (PUD), Planned Non-Residential Development (PNRD), or Planned Mixed-Use Development (PMUD), as described in the St. Lucie County Land Development Code. Those properties with compatible existing zoning designations are encouraged to develop under the PUD, PNRD, or PMUD regulations. • Residential development shall be regulated by the intensity district in which it is to take place. In no case should gross residential density exceed 15 du/ac. • All uses shall be compatible with adjacent land uses. Current Zoning: The property is zoned RS-2 (Residential, Single-Family–2) and CG (Commercial, General): The RS-2 Zoning District – to provide and protect an environment suitable for single-family dwellings at a maximum density of two (2) dwelling units per gross acre, together with such other uses as may be necessary for and compatible with low-density residential surroundings. The CG Zoning District - to provide and protect an environment suitable for a wide variety of commercial uses intended to serve a population over a large market area, which does not impose desirable noise, vibration, odor, dust, or offensive effects on the surrounding area, together with such other uses as may be necessary to and compatible with general commercial surroundings. Proposed Zoning: The proposed rezoning is to the PUD (Planned Unit Development) Zoning District. The Planned Unit Development (PUD) District is intended to achieve residential land development of superior quality through the encouragement of flexibility and creativity in design options that: A. Permit creative approaches to the development of residential land reflecting changes in the technology of land development; B. Allow for the efficient use of land, which can result in smaller networks of utilities and streets and thereby lower development costs; Page 70 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 9 C. Allow design options that encourage an environment of stable character, compatible with surrounding land uses; and D. Permit the enhancement of neighborhoods through the preservation of natural features, the provision of underground utilities, and the provision of recreation areas and open space. A minimum of thirty-five percent (35%) of the gross area of land in a PUD must be for use as common open space, which may include, parks, recreation areas, bicycle, and pedestrian paths and facilities, marinas, swimming beaches, common open space, common landscaping and planting areas, stormwater retention areas, or other areas of public purpose or use. Common open space may not include street, road, or drainage rights-of-way, above-ground utilities, or parking areas. Additionally, a minimum of fifteen percent (15%) of any existing native upland habitat on the property must be preserved in its natural condition as part of the required thirty-five percent (35%) common open space. B. Whether the proposed amendment is consistent with all elements of the St. Lucie County Comprehensive Plan; The proposed rezoning to the PUD (Planned Unit Development) Zoning District, and retained CG (Commercial, General) Zoning District are consistent with the proposed MXD (Mixed-Use Development) Future Land Use designation as per Comprehensive Plan Table 1-3 - Land Use Designation / Zoning Compatibility Chart. Table 1-3 - Land Use Designation / Zoning Compatibility Chart Zoning Districts Future Land Use Categories AG -5 AG -2. 5 RE RS RU RM RH R/ C CP U CO M IN D P/ F MX D SD H T/ U TV C PUD X X X X X X X X X X X X X The proposed amendment is consistent with the Comprehensive Plan Future Land Use Element Goals, Objectives, and Policies: Objective 1.1.8: Planned Developments. The County shall continue to support and encourage innovative land use development patterns including planned developments through the adequate provision in the County's Land Development Code including Planned Unit Developments (PUD), Planned Non-Residential Development (PNRD), and the Planned Mixed-Use Development (PMUD) zoning designations. Policy 1.1.8.1 – The County shall continue to encourage the use of planned development techniques to conserve open space and environmentally sensitive areas, through the County's Land Development Code which shall include: a. Minimum acreage requirements necessary to support a viable mixed-use community providing sufficient design flexibility to allow innovation and creativity in all forms of planned unit developments; b. Minimum open space standards, consistent with the percentages identified in the Land Development Code for all planned developments and including assurances that such areas will remain as open space to protect existing native habitat, to provide for minimum setback needs from adjacent uses, and to provide active and passive recreational as well as visual amenities; c. Provisions ensuring the long-term preservation of remaining open spaces; d. A mixed-use district combining residential, commercial, recreational, educational, and other income-producing uses providing significant functional and physical integration among uses; e. Minimum standards for the provision of on-site shopping, job opportunities, and internal trip capture; and, f. Specific requirements to provide efficient, centralized infrastructure (potable water and Page 71 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 10 sanitary sewer). Include specific restrictions on the use of septic tanks, individual wells, and package plants in planned unit developments. g. Development consistent with the Towns, Villages, and Countryside Element and the Transfer of Development Rights Program outlined under Objective 11.1.7. Objective 1.1.9: Residential Areas. Property owners' investments, their quality of life, and the single-family neighborhood, as a defined residential area, shall be protected from the encroachment of commercial and/or other inappropriate land uses through the consistent and predictable application of the Land Development Code. Policy 1.1.9.1 - All new subdivisions, planned unit developments, and site development plans shall be designed to include an efficient system of internal traffic circulation that does not require internal trips or trips of short duration to be forced onto the major roadway network. Connections to new and existing subdivisions shall be encouraged. Policy 1.1.9.2 - All new subdivisions shall be designed so that all individual lots have direct access to the internal street system, and that any lot or property along the periphery of the development is to be buffered from any major roadway and incompatible land uses. Goal 3.1: To provide guidance, based on accepted planning principles, for the provision of housing resources for all citizens through public/private cooperative arrangements. Objective 3.1.1: The County shall ensure the creation and/or preservation of affordable housing for all current and anticipated future needs including rural and farmworker housing, workforce housing as well as adequate sites and distribution of housing for very-low-income, low-income, and moderate-income households. Policy 3.1.1.1 – To provide sufficient land to meet the future housing needs, the Future Land Use Map shall provide future land use designations that allow a variety of housing types, affordability, and densities. Policy 3.1.1.2 – The County shall continue to permit high-density residential development in Planned Mixed-Use Development projects. The Preliminary PUD Site Plan demonstrates the overall site plan depicting the one-hundred sixty (160) townhome lots within the Tidewater PUD subdivision. The applicant states that the proposed plan meets the intent of the Goals, Objectives, and Policies of the St. Lucie County Comprehensive Plan by the creation and/or preservation of “affordable” housing for all current and anticipated future residents, through the implementation of a 6-unit and 8-unit buildings made of (4) 2-bedroom, (2) 2-bedroom, and (4) 1-bedroom layouts allowing for a variety of housing. C. Whether and the extent to which the proposed zoning is inconsistent with the existing and proposed land uses; As stated above, the PUD (Planned Unit Development) Zoning District is compatible with the proposed MXD (Mixed-Use Development) Future Land Use designation as per the Land Development Code (LDC) and Comprehensive Plan. D. Whether there have been changed conditions that require an amendment; The applicant is pursuing a rezone from the current Zoning District to the PUD (Planned Unit Development) Zoning District, compatible with the surrounding area. Changing conditions include the proposed offsite improvements associated with Tidewater PUD will enable further development along the US Highway 1 corridor by approximately 800 feet south of Midway Road to Saeger Avenue, which is currently limited by the lack of availability of sanitary sewer service. The developer is proposing to install approximately 5,200 linear feet of sanitary sewer force main within the US Highway 1 right-of-way which connects to the existing FPUA manhole. Page 72 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 11 This new sanitary sewer force main will be able to serve undeveloped and underdeveloped parcels south of Midway Road FPUA service limits. Additionally, the proposed force main can potentially be extended south approximately 2,000 feet further to the southern limit of the FPUA service area, at Saeger Avenue. E. Whether and the extent to which the proposed amendment would result in demands on public facilities, and whether or to the extent to which the proposed amendment would exceed the capacity of such public facilities, including but not limited to transportation facilities, sewage facilities, water supply, parks, drainage, schools, solid waste, mass transit, and emergency medical facilities; The proposed change in zoning should not affect the acceptable level of service capacity of transportation facilities, parks, drainage, schools, solid waste, mass transit, or emergency medical facilities. Before the issuance of any Final Development Order, the developer must demonstrate that all public facilities are available to serve the parcel and obtain a Certificate of Capacity. The applicant has signed the required Concurrency Deferral Affidavit recognizing this provision. Drainage Following approval of the Preliminary PUD site plan, and Final site plan, the developer must receive a Site Development Permit from the Public Works Department to ensure the project does not adversely impact adjacent properties. Water/Wastewater Water & Wastewater services will be provided by the Fort Pierce Utilities Authority. Transportation Impacts Kimley-Horn, acting as the County’s traffic consultant, reviewed the traffic analysis prepared by MacKenzie Engineering & Planning, Inc., dated March 2022. The analysis demonstrates that the adjacent roadway segments have sufficient capacity, and no adverse impacts are anticipated to accommodate the proposed land-use change. F. Whether and the extent to which the proposed amendment would result in significant adverse impacts on the natural environment; The proposed amendment is not anticipated to create significant impacts on the natural environment. The applicant provided an environmental impact report that assesses existing environmental conditions on the subject property. The Environment Resources Department reviewed the submitted Environmental Impact Report and provided the following evaluation: Background The Environmental Resources Department (ERD) is in receipt of the June 13th, 2022, date-stamped submittal from Planning and Development Services. The applicant is seeking approval for a Planned Unit Development (PUD) that proposes 160 multifamily residential units with associated site improvements. ±16.29-acres of the subject site is to be rezoned from Residential, Single-Family – 2 (RS-2), and Commercial General (CG) to PUD. A 2.58-acre outparcel located at the northeastern corner of the property is to retain CG zoning for future commercial development. A concurrent Future Land Use Map Amendment (FLUMA) application is being reviewed. The project is located at 6209 S US Highway 1 in Ft. Pierce and currently consists of three (3) vacant parcels (Parcel IDs 3410-702-0055-000-3, 3410-702-0054-000-6, & 3410-701-0001-000-7) that collectively measure 18.87-acres. Findings An Environmental Impact Report prepared by Aquatic Research Monitoring, Equipment & Deployment, LLC, dated April 1st, 2022, was provided and reviewed. The site was historically utilized for citrus growing operations until at least 2006 according to available aerials and has since been abandoned. Neither native Page 73 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 12 upland habitat nor wetlands were determined to be present. The majority of the site is dominated by Brazilian pepper but does contain scattered mature laurel & live oaks, and cabbage palms. One potentially occupied gopher tortoise burrow was found on-site, but no other state-listed species were determined to be present. A 100% gopher tortoise survey per FWC guidelines and a gopher tortoise relocation permit (if applicable) will be required as a condition of approval. A landscape plan prepared by Cotleur & Hearing dated June 9th, 2022, was reviewed and found to be consistent with the land development code (LDC). An eight (8) ft. tall opaque fence with landscaping in excess of code requirements surrounds the northern, southern, and western perimeters of the proposed development, effectively buffering existing residences to the west and a parcel zoned residential to the north, consistent with LDC 7.09.04.E. The proposed lake’s littoral and upland buffer areas and associated plantings comply with LDC 3.01.03.EE.2.p.4. Additionally, 35% of the PUD’s total acreage is designated as open space, consistent with requirements outlined in LDC 7.01.03.I. The proposed project will impact a total of fifty-seven (57) cabbage palms and 1,290 inches diameter at breast height (DBH) of native canopy trees meeting minimum mitigation size thresholds outlined in LDC 6.00.05.D, resulting in a total of 2,580 inches of canopy trees and fifty-seven (57) palms requiring mitigation. Mitigation for these impacts has been provided via the onsite relocation of the fifty-seven (57) palms and the onsite planting of 970” of canopy trees, which are additional to the minimum canopy tree requirements utilized for landscaping in accordance with LDC 7.09.04. The remaining 1,610 inches of trees are to be mitigated via a fee-in-lieu of $322,000.00, which is calculated at the $200.00 per inch rate as outlined in LDC 6.00.05.D.3.a.4. Recommendation ERD has no objection to the preliminary PUD with the conditions outlined below. G. Whether and the extent to which the proposed amendment would result in an orderly and logical development pattern specifically identifying any negative effects of such patterns; The proposed change in zoning will result in an orderly and logical development pattern. The proposed parcel is located within the Urban Service Boundary (USB). The applicant justified that the proposed residential and commercial development near one another will promote a balance of land uses for the residential and nonresidential county needs. Apart from this, the proposed offsite improvements associated with Tidewater PUD will enable further development along the US Highway 1 corridor by approximately 800 feet south of Midway Road to Saeger Avenue, which is currently limited by the lack of availability of sanitary sewer service. The developer is proposing to install approximately 5,200 linear feet of sanitary sewer force main within the US Highway 1 right-of-way which connects to the existing FPUA manhole. This new sanitary sewer force main will be able to serve undeveloped and underdeveloped parcels south of Midway Road. Additionally, opportunities for active and passive recreation are created through the site’s design. The proposed project will promote easy accessibility from each unit and provide connectivity of sidewalks and open spaces nearby along with the synergy for the future residents and local businesses, with the inclusion of complete streets, which will promote walkability and safe traffic flow. In terms of environmental benefits, the Tidewater PUD project will be providing a stormwater management lake in the center of the development. This lake is designed to ensure proper drainage and runoff flows on the site to prevent flooding and any other potential issues that could arise with a change in drainage pattern. The lake will also have a 14,433-square-foot littoral zone with native vegetation, which will serve as a natural habitat for small native wildlife, as well as an upland transition zone to buffer the littoral zone from adjacent residences. A proposed eight (8) fences will be placed along the perimeter of the site with a fifteen (15) foot landscape buffer from adjacent properties. H. Whether the proposed amendment would be in conflict with the public interest, and is in harmony with the purpose and intent of this Code; Page 74 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 13 The proposed rezoning to a PUD (Planned Unit Development) Zoning District is not in conflict with the public interest and is in harmony with the purpose and intent of the Land Development Code. ************************************************************************** SECTION 3: PRELIMINARY SITE PLAN STANDARDS OF REVIEW AS OUTLINED IN THE LAND DEVELOPMENT CODE SECTION 11.02.07 Per LDC Section 11.02.05 A. 11, the Planning & Zoning Commission and Board of County Commissioners shall consider the Preliminary Development Plan at a scheduled public hearing by the requirements of Section 11.00.03. The public hearing held on the application shall be by Section 11.00.04. In deciding on the application, the Planning and Zoning Commission recommendations of the Planning and Development Services Director, and the standards specified in Sections 11.02.07 and 11.06.03. A. Consistency With Local Ordinances and Comprehensive Plan. The proposed plan is consistent with the general purpose, Goals, Objectives, and Standards of this Code, the St. Lucie County Comprehensive Plan, and the Code and compiled laws of St. Lucie County. As noted in the above analysis of the rezoning standards of review, the site plan and proposed use are consistent with Future Land Use Policy 1.1.8.1 in its use of planned development techniques. Future Land Use Element Goal 1.1: Ensure the highest quality living environment possible, through a mixture of land uses reflecting the needs and desires of the residents and how they want their community to develop. The goal shall be implemented by strictly enforced building, zoning, and development codes based on objectives and policies that will enhance St. Lucie County's natural and man-made resources while minimizing any damage or threat of degradation to the health, safety, and welfare of the country’s citizens, native wildlife and environment, through incompatible land uses. Objective 1.1.8: Planned Developments. The County shall continue to support and encourage innovative land use development patterns including planned developments through the adequate provision in the County's Land Development Code including Planned Unit Developments (PUD), Planned Non-Residential Development (PNRD), and the Planned Mixed-Use Development (PMUD) zoning designations. Policy 1.1.8.3: The County shall continue to support and implement the mixed-use activity areas as indicated in the Sub-area Mixed Use Activity Area Plans as depicted by name in this Element. Policy 1.1.10.2: Require effective visual and light diffusion barriers between residential and non-residential uses. Standards and requirements for such barriers are to be included in the landscaping and screening regulations of the St. Lucie County Land Development Code. Consistency with Land Development Code (LDC) Regulations The proposed development and proposed use are not in conflict with any applicable portions of the St. Lucie County Land Development Code (LDC) or Comprehensive Plan. The proposed PUD (Planned Unit Development) Site Plan demonstrates compliance with the St. Lucie County Land Development Code (LDC) and Comprehensive Plan requirements. Under LDC Section 7.01.00, the intent of the PUD (Planned Unit Development) Zoning designation is to achieve residential land development of superior quality through the encouragement of flexibility and creativity in design options that: A. Permit creative approaches to the development of residential land reflecting changes in the technology of land development; Page 75 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 14 B. Allow for the efficient use of land, which can result in smaller networks of utilities and streets and thereby lower development costs; C. Allow design options that encourage an environment of stable character, compatible with surrounding land uses; and D. Permit the enhancement of neighborhoods through the preservation of natural features, the provision of underground utilities, and the provision of recreation areas and open space. Intensity & Design All reasonable steps have been taken to minimize adverse effects on the immediate vicinity through landscaping, screening, and site design, and all buildings will be constructed, arranged, and operated so as not to interfere with adjacent properties. The project is designed to improve the project perimeter, creating strategic yet aesthetic buffering between the residential neighborhood and the adjacent S. U.S. Highway 1 right-of-way. This will promote active pedestrian transportation, such as walking and cycling, as well as recreational usage of the perimeter sidewalk. The internal sidewalk network will ensure residents within the PUD also have access to the exterior sidewalk system, ensuring the potential for people to walk to and from the future commercial parcel along the US1 corridor. By LDC Section 7.04.03, Building Spacing Formula applies to all multiple-family dwellings, hotels, and motels, and to all accessory structures with two (2) or more floors that are customarily associated with and subordinate to the principal uses as shown below in Figure 7-7. Per the applicant’s justification statement, by utilizing the formula detailed in this Code Section, the building spacing calculation equates to the following: D = LA + LB + 2(HA + HB)] / 4, the distance (D) between buildings would be [50 + 50 + 2(27.7 + 27.7)] / 4 = 52.7’ for adjacent buildings and approximately 117’ distance between perpendicular buildings. However, as shown on the site plan, townhomes are separated by a 15’ spacing setback between each adjacent building and approximately 90’ for buildings across the street. In some cases, these spaces between adjacent buildings include drainage easements. The applicant is requesting to deviate from this requirement. Per the site plan, the site design is very functional with these spacing measurements, and those proposed by Section 7.04.03 of the St. Lucie County Code spacing formula are excessive and would cause great hardship to the site development. The site is intended to be a multifamily buffer between the commercial uses along the main thoroughfare of US Highway 1 and the low- density single-family dwellings. In order to allow for this higher density transition between the two less Page 76 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 15 compatible uses, it is necessary to reduce this building spacing to fit the number of townhomes being proposed. The spacing shown on the site plan allows for adequate minimum distance between buildings; allowing for ventilation, lighting, drainage easements, and a 50’ right-of-way between buildings across the street from each other. Open Space The proposed project meets the required thirty-five (35%) percent of open space, which for this project would be the Tidewater PUD project will be providing a stormwater management lake in the center of the development. This lake is designed to ensure proper drainage and runoff flows on the site to prevent flooding and any other potential issues that could arise with a change in drainage pattern. The lake will also have a 14,433 square-foot littoral zone with native vegetation, which will serve as a natural habitat for small native wildlife, as well as an upland transition zone to buffer the littoral zone from adjacent residences. Exhibit 3: Preliminary PUD Site Plan Snapshot & Typical Lot Types: B. Effect on Nearby Properties. 1. The proposed building or use will not have an undue adverse effect upon nearby property, the character of the neighborhood, traffic conditions, parking, utility facilities, and other matters affecting public health, safety, and general welfare. 2. All reasonable steps have been taken to minimize any adverse effect of the proposed building or use on the immediate vicinity through building design, site design, landscaping, and screening. Page 77 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 16 3. The proposed building or use will be constructed, arranged, and operated so as not to interfere with the development and use of neighboring property, by applicable district regulations. By LDC Section 7.09.04.E. Landscaped Buffer Areas Between Non-Residential Structure(s) Housing Three (3) or More Dwelling Units and Single-Family or Two-Family Residential Uses. All side and rear yard perimeter buffer areas between non-residential or residential structure(s) housing three (3) or more dwelling units and single-family or two-family residential uses shall be landscaped with a masonry wall or opaque wood fence of at least eight (8) feet in height that forms a continuous screen between the uses. All masonry walls or opaque wood fences shall be landscaped with a continuous hedge along both the inside and outside base of the wall or fence. Any future expansion or major adjustment(s) to the abutting residential to the east will require the commercial outparcel to install a buffer between the residential use (Tidewater PUD) including a masonry wall or opaque wood fence and a continuous hedge on both sides and rear property line. This requirement can be waived by the Environmental Resources Department Director if a wall waiver is obtained from the proposed residential property to the south. C. Adequacy of Public Facilities Traffic Based on the Traffic Report prepared by MacKenzie Engineering & Planning, Inc. dated March 2022, the proposed project is expected to generate 1,101 daily, 72 AM peak hours (17in/55out), and 89 PM peak hours (56in/33out) net new external trips. Access Access to the site is proposed via one right-in/right-out driveway connection on US1. The proposed right-in/right-out driveway will be supported by a southbound right-turn lane, to support safety as egress left-turn movements will be offset north and south of the proposed right-in/right-out driveway southbound right-turn lane on US Highway 1, at Sunshine Boulevard and Easy Street, respectively, as drivers will be required to perform a U-turn movement. Drainage Following approval of the Preliminary Site Plan, and Final site plan, the developer must receive a Site Development Permit from the Public Works Department to ensure the project does not adversely impact adjacent properties. Water/Wastewater Water & Wastewater services will be provided by the Fort Pierce Utility Authority. D. Adequacy of Fire Protection St. Lucie County Fire District, Station #6, is located at 350 E. Midway Road in Fort Pierce approximately 1.75 miles northeast of the subject site, it will create additional demand, but no adverse impacts or exceptional demands. E. Adequacy of School Facilities. The proposed residential project is anticipated to create adverse impacts on school facilities. The Preliminary Site Plan depicts a school bus turnaround with benches and bike racks. F. Environmental Impact. The proposed amendment is not anticipated to create significant impacts on the natural environment. The applicant provided an environmental impact report that assesses existing environmental conditions on the subject property. Page 78 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 17 The Environment Resources Department reviewed the submitted Environmental Impact Report and provided the following evaluation: Background The Environmental Resources Department (ERD) is in receipt of the June 13th, 2022, date-stamped submittal from Planning and Development Services. The applicant is seeking approval for a Planned Unit Development (PUD) that proposes 160 multifamily residential units with associated site improvements. ±16.29-acres of the subject site is to be rezoned from Residential, Single-Family – 2 (RS-2), and Commercial General (CG) to PUD. A 2.58-acre outparcel located at the northeastern corner of the property is to retain CG zoning for future commercial development. A concurrent Future Land Use Map Amendment (FLUMA) application is being reviewed. The project is located at 6209 S US Highway 1 in Ft. Pierce and currently consists of three (3) vacant parcels (Parcel IDs 3410-702-0055-000-3, 3410-702-0054-000-6, & 3410-701-0001-000-7) that collectively measure 18.87-acres. Findings An Environmental Impact Report prepared by Aquatic Research Monitoring, Equipment & deployment, LLC, dated April 1st, 2022, was provided and reviewed. The site was historically utilized for citrus growing operations until at least 2006 according to available aerials and has since been abandoned. Neither native upland habitat nor wetlands were determined to be present. The majority of the site is dominated by Brazilian pepper but does contain scattered mature laurel & live oaks, and cabbage palms. One potentially occupied gopher tortoise burrow was found onsite, but no other state-listed species were determined to be present. A 100% gopher tortoise survey per FWC guidelines and a gopher tortoise relocation permit (if applicable) will be required as a condition of approval. A landscape plan prepared by Cotleur & Hearing dated June 9th, 2022, was reviewed and found to be consistent with the land development code (LDC). An eight (8) ft. tall opaque fence with landscaping in excess of code requirements surrounds the northern, southern, and western perimeters of the proposed development, effectively buffering existing residences to the west and a parcel zoned residential to the north, consistent with LDC 7.09.04.E. The proposed lake’s littoral and upland buffer areas and associated plantings comply with LDC 3.01.03.EE.2.p.4. Additionally, 35% of the PUD’s total acreage is designated as open space, consistent with requirements outlined in LDC 7.01.03.I. The proposed project will impact a total of fifty-seven (57) cabbage palms and 1,290 inches diameter at breast height (DBH) of native canopy trees meeting minimum mitigation size thresholds outlined in LDC 6.00.05.D, resulting in a total of 2,580 inches of canopy trees and fifty-seven (57) palms requiring mitigation. Mitigation for these impacts has been provided via the onsite relocation of the fifty-seven (57) palms and the onsite planting of 970” of canopy trees, which are additional to the minimum canopy tree requirements utilized towards landscaping in accordance with LDC 7.09.04. The remaining 1,610 inches of trees are to be mitigated via a fee-in-lieu of $322,000.00, which is calculated at the $200.00 per inch rate as outlined in LDC 6.00.05.D.3.a.4. Recommendation ERD has no objection to the Preliminary PUD with the conditions outlined below. NEIGHBORHOOD MEETING & PUBLIC NOTIFICATION: The applicant did not hold a neighborhood meeting; however, neighborhood meetings are not required but strongly encouraged. Staff provided notification letters to twenty-three (23) owners of the property, located within 500 feet of the petition site, detailing the proposals. A public notification sign detailing the Planning and Zoning Commission’s Public Hearing was posted on the premises, and an advertisement was displayed in the local newspaper on Friday, July 8, 2022. Page 79 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 18 CONCLUSION: The staff has reviewed these petitions and determined that it conforms to the Standards of Review as outlined in Section 11.06.03 of the St. Lucie County Land Development Code and are consistent with the St. Lucie County Comprehensive Plan Goals, Objectives, and Policies. PUD REZONING & PRELIMINARY SITE PLAN RECOMMENDATION: Staff recommends the approval with the following conditions: 1. Prior to the issuance of any building permit a final plat must be approved by the Board of County Commissioners. 2. The Community Clubhouse or similar use facilities shall be consistent with the Community architectural Standards of St. Lucie County Land Development Code, Section 3. All Residential driveways shall be a minimum of ten (10) feet wide. 4. Before issuance of Vegetation Removal Permit or Exemption, updated a survey to determine the current activity status of the onsite osprey nest shall be provided. Should the nest be deemed active, i.e., the nest has eggs or flightless young, then an Incidental Take Permit from the United States Fish and Wildlife Service (USFWS) is required. 5. Before issuance of Vegetation Removal Permit or Exemption, a 100% survey to determine the presence of the state-protected gopher tortoise and state-protected burrowing owl shall be required. If any gopher tortoise burrows are identified within 25 ft. of the proposed disturbance, all tortoises shall be relocated per the Florida Fish and Wildlife Conservation Commission (FWC) protocol. If any burrowing owls are identified, coordination with the FWC and/or United States Fish and Wildlife Service (USFWS) shall be required. 6. Before the issuance of a Certificate of Occupancy, all Category I invasive plant species shall be eradicated from the site. Page 80 of 494 ORDINANCE 22-XXX FILE NO.: FLUMA-11202126232 AN ORDINANCE OF THE BOARD OF COUNTY COMMISSIONERS OF ST. LUCIE COUNTY, FLORIDA, TO AMEND THE COMPREHENSIVE PLAN FUTURE LAND USE MAP FOR +/-18.73 ACRES OF LAND OWNED BY EQUIBEBE LLC AND NELMART ASSOCIATES LTD, FROM RM (RESIDENTIAL, MEDIUM), RU (RESIDENTIAL, URBAN), AND COM (COMMERCIAL) TO MXD (MIXED-USE DEVELOPMENT); PROVIDING FOR FINDINGS; PROVIDING FOR CONFLICTING PROVISIONS; PROVIDING FOR SEVERABILITY; PROVIDING FOR APPLICABILITY; PROVIDING FOR FILING WITH THE FLORIDA DEPARTMENT OF STATE; PROVIDING FOR FILING WITH THE FLORIDA DEPARTMENT OF ECONOMIC OPPORTUNITY; PROVIDING FOR AN EFFECTIVE DATE; AND PROVIDING FOR ADOPTION WHEREAS, the Board of County Commissioners of St. Lucie County, Florida, based on the testimony and evidence, including but not limited to the staff report, has made the following determinations: 1. A Petition submitted by Cotleur and Hearing on behalf of Eguibebe LLC and Nelmart Associates LTD, to amend the adopted Comprehensive Plan Future Land Use Map for an 18.73-acre parcel of land located at 6209 S. US Highway 1 in Fort Pierce, Florida, from RM (Residential, Medium – 9du/ac), RU (Residential, Urban – 5du/ac), and COM (Commercial) MXD (Mixed-Use Development) within St. Lucie County, Florida, in accordance with Chapter 163, Florida Statutes. 2. The Board of County Commissioners of St. Lucie County as the governing body of St. Lucie County having jurisdiction over this application pursuant to Chapter 163, Florida Statutes, is authorized and empowered to consider amendments to the adopted Comprehensive Plan of St. Lucie County; and 3. On July 21, 2022, the St. Lucie County Planning and Zoning Commission/Local Planning Agency held a public hearing, of which due notice was published in the St. Lucie News Tribune and notifying by mail all owners of property within 500 feet of the subject property, and forwarded a recommendation of approval/denial to the Board of County Commissioners for the petition for an Amendment to the Comprehensive Plan Future Land Use Map; and 4. On , 2022, the Board of County Commissioners of St. Lucie County, Florida held the final public hearing, of which due notice was placed in the St. Lucie News Tribune, and deemed adoption of the amendment to be in the best interests of the citizens and residents of the County; and 5. The proposed amendment to the Future Land Use Map is consistent with the Goals, Objectives, and Policies of the St. Lucie County Comprehensive Plan as outlined in the Planning and Zoning Commission staff report dated, July 13, 2022. NOW, THEREFORE, BE IT ORDAINED by the Board of County Commissioners of St. Lucie County, Florida: Page 81 of 494 Ordinance No. 2022-XXX File No.: FLUMA-8202025817 Page 2 A. AMENDMENDMENT TO FUTURE LAND USE DESIGNATION The Future Land Use Designation set forth in the St. Lucie County Comprehensive Plan for the property described in Exhibit “A,” attached hereto, containing 31.78-acre parcel of land owned by PGA at St. Lucie County, LLC, and located at 8563 Commerce Centre Drive in Port St. Lucie, from RS (Residential, Suburban – 2du/ac) and COM (Commercial) to RU (Residential, Urban-5du/ac), as depicted in the attached Exhibit. B. FINDING OF CONSISTENCY The Board of County Commissioners of St. Lucie County, Florida, specifically determines that the approval of this amendment to the adopted Comprehensive Plan Future Land Use Element is internally consistent with the Goals, Objectives, and Policies contained in the St. Lucie County Comprehensive Plan and provides for the recognition that impacts of this approval on the public facilities of St. Lucie County will not occur until such time as a Final Development Order for this property is issued. C. CHANGE TO FUTURE LAND USE MAP The St. Lucie County Planning and Development Services Director is hereby authorized and directed to cause this change to be made in the Future Land Use Map of the Future Land Use Element of the St. Lucie County Comprehensive Plan and to make notation of reference to the date of adoption of this Ordinance. D. CONFLICTING PROVISIONS Special acts of the Florida Legislature applicable only to unincorporated areas of St. Lucie County, County Ordinances, and County Resolutions, or parts thereof, in conflict with this Ordinance are hereby superseded by this Ordinance to the extent of such conflict. E. SEVERABILITY If any portion of this Ordinance is for any reason held or declared to be unconstitutional, inoperative, or void, such holding shall not affect the remaining portions of this Ordinance. If this Ordinance, or any provisions thereof shall be held to be inapplicable to any person, property, or circumstances, such holding shall not affect its applicability to any other person, property, or circumstance. F. APPLICABILITY OF ORDINANCE This Ordinance shall be applicable as stated in Paragraphs A, B, and C. G. FILING WITH THE DEPARTMENT OF STATE The Clerk is hereby directed forthwith to send a certified copy of this Ordinance to the Bureau of Laws, Department of State, The Capitol, Tallahassee, Florida, 32304. H. FILING WITH THE DEPARTMENT OF ECONOMIC OPPORTUNITY The Planning and Development Services Director shall send a certified copy of this Ordinance to the Department of Economic Opportunity Bureau of Community Planning Caldwell Building 107 East Madison Street, MSC 160 Tallahassee, FL 32399. Page 82 of 494 I. EFFECTIVE DATE This Ordinance shall take effect thirty-one (31) days after adoption. If the Ordinance is challenged within thirty (30) days after adoption, the Ordinance shall not be effective until the State Land Planning Agency or Administration Commission respectively issues a final order finding the adopted amendment in compliance in accordance with Section 163.3184(10), Florida Statutes. J. ADOPTION After motion and second, the vote on this Ordinance was as follows: Sean Mitchell, Chair XXX Frannie Hutchinson, Vice-Chair XXX Chris Dzadovsky, Commissioner XXX Linda Bartz, Commissioner XXX Cathy Townsend, Commissioner XXX PASSED AND DULY ADOPTED on this day of , 2022. BOARD OF COUNTY COMMISSIONERS ST. LUCIE COUNTY, FLORIDA BY Chair ATTEST APPROVED AS TO FORM AND CORRECTNESS Deputy Clerk County Attorney Page 83 of 494 Exhibit “A” Ordinance No. 2022-XXX File No.: FLUMA-8202025817 Page 4 LEGAL DESCRIPTION: Parcel 1: THE NORTH HALF OF THE SOUTHWEST QUARTER OF THE NORTHEAST QUARTER OF THE SOUTHWEST QUARTER OF SECTION 10, TOWNSHIP 36 SOUTH, RANGE 40 EAST, ST. LUCIE COUNTY, FLORIDA, LESS RIGHTS-OF-WAY FOR DRAINAGE CANALS AND PUBLIC ROADS, ALSO DESCRIBED AS THE NORTH 5 ACRES OF THE SOUTHWEST QUARTER OF THE NORTHEAST QUARTER OF THE SOUTHWEST QUARTER OF SECTION 10, TOWNSHIP 36 SOUTH, RANGE 40 EAST, LESS RIGHTS-OF-WAY FOR PUBLIC ROADS AND DRAINAGE CANALS. Parcel 2: THE SOUTHEAST QUARTER OF THE NORTHEAST QUARTER OF THE SOUTHWEST QUARTER OF SECTION 10, TOWNSHIP 36 SOUTH, RANGE 40 EAST, ST. LUCIE COUNTY, FLORIDA, LESS LOTS 1,3 AND 10, BLOCK A, AND LOTS 1 AND 2, BLOCK B, OF THE SUBDIVISION OF AETNA PARK, AS PER PLAT THEREOF, RECORDED IN PLAT BOOK 6, PAGE 13, OF THE PUBLIC RECORDS OF ST.LUCIE COUNTY, FLORIDA, LESS RIGHTS- OF-WAY FOR PUBLIC ROADS AND DRAINAGE CANALS, AND ALSO LESS THE FOLLOWING DESCRIBED PARCEL OF LAND, TO WIT: Parcel 3: LOTS 1 AND 3, BLOCK A, OF THE SUBDIVISION OF AETNA PARK, AS PER PLAT THEREOF, RECORDED IN PLAT BOOK 6, PAGE 13, AND AMENDED PLAT OF AETNA PARK, RECORDED IN PLAT BOOK 7, PAGE 41, OF THE PUBLIC RECORDS OF ST.LUCIE COUNTY, FLORIDA. Parcel 4: THE SOUTH HALF OF THE SOUTHWEST QUARTER OF THE NORTHEAST QUARTER OF THE SOUTHWEST QUARTER OF SECTION 10, TOWNSHIP 36 SOUTH, RANGE 40 EAST, ALSO DESCRIBED AS THE SOUTH 5 ACRES OF THE SOUTHWEST QUARTER OF THE NORTHEAST QUARTER OF THE SOUTHWEST QUARTER OF SAID SECTION 10, ST. LUCIE COUNTY, FLORIDA, LESS RIGHTS-OF-WAY OF PUBLIC ROADS AND DRAINAGE CANALS. CONTAINING 822,110 SQUARE FEET, 18.873 ACRES, MORE OR LESS. Page 84 of 494 FUTURE LAND USE MAP Page 85 of 494 Suggested motion to recommend approval/denial of this request: MOTION TO APPROVE: AFTER CONSIDERING THE TESTIMONY PRESENTED DURING THE PUBLIC HEARING, INCLUDING STAFF COMMENTS, I HEREBY MOVE THAT THE PLANNING AND ZONING COMMISSION OF ST. LUCIE COUNTY, ACTING AS THE LOCAL PLANNING AGENCY, RECOMMENDS THAT THE ST. LUCIE COUNTY BOARD OF COUNTY COMMISSIONERS APPROVE THE PROPOSED FUTURE LAND USE MAP AMENDMENT FROM RM (RESIDENTIAL MEDIUM), RU (RESIDENTIAL URBAN), AND COM (COMMERCIAL) TO MXD (MIXED-USE DEVELOPMENT) BECAUSE…. [CITE REASON(S) WHY – PLEASE BE SPECIFIC] MOTION TO DENY: AFTER CONSIDERING THE TESTIMONY PRESENTED DURING THE PUBLIC HEARING, INCLUDING STAFF COMMENTS, I HEREBY MOVE THAT THE PLANNING AND ZONING COMMISSION OF ST. LUCIE COUNTY, ACTING AS THE LOCAL PLANNING AGENCY, RECOMMENDS THAT THE ST. LUCIE COUNTY BOARD OF COUNTY COMMISSIONERS DENY APPROVAL OF THE PROPOSED FUTURE LAND USE MAP AMENDMENT FROM RM (RESIDENTIAL MEDIUM), RU (RESIDENTIAL URBAN), AND COM (COMMERCIAL) TO MXD (MIXED-USE DEVELOPMENT) BECAUSE…. [CITE REASON(S) WHY – PLEASE BE SPECIFIC] Page 86 of 494 Page 87 of 494 Page 88 of 494 Page 89 of 494 Page 90 of 494 Page 91 of 494 Page 92 of 494 Page 93 of 494 Page 94 of 494 Page 95 of 494 Page 96 of 494 St. Lucie County Planning and Development Services 2300 Virginia Avenue Fort Pierce, FL 34982 Tidewater Policy 1.1.10.4 Justification CH Project No: 21-0702 To Whom This May Concern, On behalf of the Applicant, Cotleur & Hearing is submitting this justification of how the Tidewater development will comply with Policy 1.1.10.4 - Restrict strip commercial development to those traffic corridors where such development patterns now exist. The depth of these commercial areas should average 600 feet, with the exceptions to be found at points of arterial intersection. The provided Commercial Depth Average Exhibit provides the parcels that are zoned Commercial General (CG) currently from Ulrich Rd and Saeger Ave. As per Policy 1.110.4, Parcels 3403-502-0313-000- 4 & 3403-502-0355-000-0 were not included in the minimum 600-foot depth for commercial development given that they are exempt for being located at points of arterial intersections. The fourteen properties’ approximate depths have been calculated within the table below to average +/-636.7214 feet. Given this calculation, the Tidewater Development meets the criteria established by Policy 1.110.4. PARCEL ID Estimated Commercial Depth 3410-244-0001-000-5 621.3 3410-244-0002-000-2 621.3 3410-244-0003-000-9 289.65 3410-244-0004-000-6 621.3 3410-244-0005-000-3 621.3 3410-311-0000-000-3 620 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 332 3410-701-0003-000-1 3410-701-0004-000-8 3410-702-0056-000-0 131 3410-702-0057-000-7 1283.9 3410-701-0006-000-2 620.1 3410-702-0063-000-2 295.20 3410-702-0064-000-9 620.20 3403-502-0350-010-8 952.35 3403-502-0350-000-5 1284.5 TOTAL AVERAGE +/-636.7214 *All numbers are estimated using the Saint Lucie County Property Appraiser (paslc.gov) Page 97 of 494 Commercial Depth Average St. Lucie County, Florida®Legend 600 FT Minimum Depth for CG Zoning Sunshine State Parkway Page 98 of 494 The proposed commercial development, as part of the Tidewater PUD, meets the requirements set in the St. Lucie County Comprehensive Plan necessary. It will also add lasting value to the area, as provided in the separate FLUMA narrative. Please let us know if you have any further questions or comments. Sincerely, Daniel T. Sorrow, PLA, AICP, LEED AP BD+C Cotleur & Hearing 1934 Commerce Lane, Suite 1 Jupiter, FL 33458 561.747.6336 Office Page 99 of 494 1 St. Lucie County Planning and Development Services 2300 Virginia Avenue Fort Pierce, FL 34982 Tidewater Comprehensive Plan Amendment Application Item: Narrative for Supplement 4 CH Project No: 21-0702 November 11th, 2021 Description: Parcel ID: 3410-702-0055-000-3, 3410-702-0054-000-6, 3410-701-0001-000-7 Site Address: 6209 S US HIGHWAY 1 Parcel Size: 18.873 Acres Current Land Use: COM, RM, RU Proposed Land Use: MIXED USE (MXD) Current Zoning: RS-2 & CG Proposed Zoning: PUD (Existing zoning on out parcel CG to remain) To Whom This May Concern, On behalf of the Applicant, Cotleur & Hearing is submitting this narrative to satisfy items 1, 2, 3, 5, 9, 12, 13, 14, 16, 17, 19, and 20 of the Required Documentation list of the Comprehensive Plan Amendments Application Supplement 4 form. Please accept this as our request to include 160 multifamily residential units and 2.58 acres of commercial space for parcels 3410-702-0055-000-3, 3410-702-0054-000-6, 3410-701-0001-000-7. The remainder of this narrative will provide necessary information focused on the Site located at 6209 S US Highway 1. The three parcels referenced above are approximately 18.873 acres in St. Lucie County. Per the St. Lucie County Future Land Use Map, the project site currently has a Commercial (COM), Residential Medium (RM), and a Residential Urban (RU) land use designations along with RS-2 and CG zoning classifications. The proposed rezoning to PUD is being done concurrent to a future land use (FLU) change to Mixed Use (MXD). The proposed future land use (FLU) designation of Mixed Use would allow for up to 15 dwelling units per acre for residential development as referenced in the table in Policy 1.1.1.1 of the St. Lucie County Comprehensive Plan, Future Land Use Element. A rezoning application from RS-2 & CG to Planned Unit Development (PUD) is to be submitted to ensure the FLU is compatible with the zoning and the site is in compliance with the County’s Comprehensive Plan to allow for an innovative mixed-use site. Page 100 of 494 2 Although the permitted density for the project site would be 0 du/ac, 9 du/ac, and 5 du/ac per the COM, RM, and RU land use, the developer aims having a max gross density of 10 du/ac. The new permitted density allowance would ensure flexibility to design higher density areas based on the housing type proposed. Therefore, the estimated number of dwelling units is approximately 160 in addition to the 2.58 acres of commercial in the northeast corner of the project. The project will provide recreational spaces for the community, meeting the demands for the area. Having a mix of uses and housing within Tidewater is consistent with Policy 1.1.5.6 of the County’s Comprehensive Plan’s Future Land Use Element, which emphasizes the need to “create a balance of land uses based upon demands of the residential population for the nonresidential needs of an area”. The mix of residential and commercial within Tidewater is compatible with the surrounding residential and commercial uses as well. Additionally, the development meets the requirements stated within Policy 1.1.10.4 which states “Restrict strip commercial development to those traffic corridors where such development patterns now exist. The depth of these commercial areas should average 600 feet, with the exceptions to be found at points of arterial intersection”. This is further explained in the additional Tidewater Policy 1.1.10.4 Justification. In addition to this Future Land Use Map Amendment application, the County will receive a PUD Rezoning Application, which will include a preliminary and final site plan for the site. The site’s main projected primary access point will be off South US Highway 1. Connectivity in the area will be enhanced and will ensure sufficient access is available for all future residents of the area as well as emergency personnel, per the St. Lucie County code and regulations. The potential enhancement of the South US Highway 1 median in front of our site through additional landscaping and possibly adding a bus shelter/bench easement location along US-1 also benefit the community’s needs. Per the St. Lucie County Comprehensive Plan’s Housing Element, Goal 3.2 states that the County aims “to provide an adequate mix of safe and sanitary housing that meets the needs of existing and future St. Lucie County residents”. Through the approval of this Comprehensive Plan Amendment to amend the Future Land Use Map, as well as the approval of the rezoning to PUD, the County would be providing the developer of this project the ability to accommodate for the growing population in St. Lucie County and the surrounding regions through the provided 160 units, adding to the low housing stock in the treasure coast. Additionally, the project site is located just west of the Grove Community PUD, general commercial, and residential development all located within the in the St. Lucie County jurisdiction. This shows that the envisioned development of Tidewater would be near similar adjacent uses. The area is currently underutilized giver its potential to provide for the residents. The project would also not interfere with the adjacent uses. A project of this magnitude within the County is a great opportunity as an infill development among similar uses. Page 101 of 494 3 Objective 1.1.8 of the Future Land Use Element is “to support and encourage innovative land use development patterns including planned developments” through adequate provisions to include PUDs, PNRDs, and PMUDs. Without this fundamental Future Land Use change from COM, RM, and RU to MXD, the subsequent rezoning to PUD would not be possible. More specifically, Tidewater would be aligned with Policy 1.1.8.1, which encourages “planned development techniques to conserve open space and environmentally sensitive areas” through the inclusion of open space, such as the center lake and walkways, that also serves as recreational space for the community. In accordance with Policy 1.1.5.3, The future land use designation of the surrounding areas within a quarter mile of the site are RM, RU, and COM as shown in Exhibit 1. This indicates the area’s upcoming potential to be a residential and mixed-use sector. The project site is currently located within the county’s current Urban Service Boundary as well, making this a great location to further accommodate for the County’s increasing population – which per the US Census has increased nearly 20% since between 2010 and 2019. The inclusion of townhomes and commercial development within this region would be beneficial to the county as a result. Exhibit 1: SLC Future Land Use ¼ Radius of Site Page 102 of 494 4 The Tidewater development would therefore provide an orderly and logical development pattern for the area, as it is an underutilized and vacant area of land that could instead be utilized to house the quickly growing population of St. Lucie County. The Applicant looks forward to working with Staff as the following applications are reviewed. Should you have any questions regarding the proposed Future Land Use Map amendment, please do not hesitate to contact me at dsorrow@cotleur-hearing.com or by calling 561-747-6336. Sincerely yours, Daniel T. Sorrow, AICP, RLA, LEED AP BD+C Cotleur & Hearing 1934 Commerce Lane, Suite 1 Jupiter, FL 33458 Page 103 of 494 MERITAGE TORRES - TIDEWATER ST. LUCIE COUNTY LAND USE AMENDMENT SUB AREA POLICY CH PROJECT NUMBER: 21-0702 NARRATIVE November 11th, 2021 On behalf of the applicant, Meritage Homes of Florida Inc., Cotleur & Hearing is submitting this narrative for a sub area policy regarding the proposed Future Land Use Map Amendment for the 18.873- acre project named above. The project, located at 6209 S US Highway 1 (Parcel IDs: 3410-702-0055-000- 3, 3410-702-0054-000-6, 3410-701-0001-000-7) is undergoing a land use change from the existing residential and commercial uses to an overall MXD use. This letter is intended to limit the intensity of the MXD Future Land Use designation for this specific project site so as to maintain consistency with the character in the area. The restrictions proposed are to limit the maximum allowable residential density to 10 dwelling units per acre, as opposed to the permitted 15 dwelling units per acre, as stated in the St. Lucie County Comprehensive Plan, Future Land Use Element, Policy 1.1.1.2 item H. Another constraint to the MXD land use in this sub area policy would be the use of industrial and institutional activities on the site. Although Policy 1.1.1.3 of the St. Lucie County Comprehensive Plan indicates that the MXD Future Land Use designation is compatible with Light, Heavy, Extraction Industrial zones, as well as institutional uses, the site would not be suitable for these developments, as it is surrounded by residential and commercial uses. Therefore, this sub area policy seeks to eliminate industrial uses within the subject site. The restrictions proposed to the MXD land use for this particular site would ensure that no unsuitable uses are located on this land without an amendment to this sub area policy. Please let us know if you have any further questions or comments. Sincerely, Daniel T. Sorrow, PLA, AICP, LEED AP BD+C Cotleur & Hearing 1934 Commerce Lane, Suite 1 Jupiter, FL 33458 561.747.6336 Office Page 104 of 494 Page 105 of 494 Page 106 of 494 Page 107 of 494 Page 108 of 494 Page 109 of 494 Page 110 of 494 Page 111 of 494 Page 112 of 494 Please reference the Comprehensive Plan Narrative provided. Page 113 of 494 The development is proposing to include 160 multifamily residential units and 2.58 acres of commercial space. This development is meant to provide more homeownership opportunities in the area for St. Lucie Co. Additionally, provide the opportunity for commercial growth within the site along the South US Highway 1 corridor. This mixed use concept will benefit the community as a whole and encourage sustainable growth that flows from one land use to another. Page 114 of 494 Page 115 of 494 Yes Page 116 of 494 Page 117 of 494 Page 118 of 494 Page 119 of 494 Page 120 of 494 Page 121 of 494 Page 122 of 494 Page 123 of 494 Page 124 of 494 MERITAGE TIDEWATER FUTURE LAND USE MAP SPECIAL USE OVERLAY Saint Lucie County, Florida PUD: 16.29 AC COMMERCIAL: 2.58 AC Page 125 of 494 MERITAGE TORRES - TIDEWATER ST. LUCIE COUNTY LAND USE AMENDMENT SUB AREA POLICY CH PROJECT NUMBER: 21-0702 NARRATIVE November 11th, 2021 On behalf of the applicant, Meritage Homes of Florida Inc., Cotleur & Hearing is submitting this narrative for a sub area policy regarding the proposed Future Land Use Map Amendment for the 18.873- acre project named above. The project, located at 6209 S US Highway 1 (Parcel IDs: 3410-702-0055-000- 3, 3410-702-0054-000-6, 3410-701-0001-000-7) is undergoing a land use change from the existing residential and commercial uses to an overall MXD use. This letter is intended to limit the intensity of the MXD Future Land Use designation for this specific project site so as to maintain consistency with the character in the area. The restrictions proposed are to limit the maximum allowable residential density to 10 dwelling units per acre, as opposed to the permitted 15 dwelling units per acre, as stated in the St. Lucie County Comprehensive Plan, Future Land Use Element, Policy 1.1.1.2 item H. Another constraint to the MXD land use in this sub area policy would be the use of industrial and institutional activities on the site. Although Policy 1.1.1.3 of the St. Lucie County Comprehensive Plan indicates that the MXD Future Land Use designation is compatible with Light, Heavy, Extraction Industrial zones, as well as institutional uses, the site would not be suitable for these developments, as it is surrounded by residential and commercial uses. Therefore, this sub area policy seeks to eliminate industrial uses within the subject site. The restrictions proposed to the MXD land use for this particular site would ensure that no unsuitable uses are located on this land without an amendment to this sub area policy. Please let us know if you have any further questions or comments. Sincerely, Daniel T. Sorrow, PLA, AICP, LEED AP BD+C Cotleur & Hearing 1934 Commerce Lane, Suite 1 Jupiter, FL 33458 561.747.6336 Office Page 126 of 494 Jodi Nentwick-Kugler St. Lucie County 2300 Virginia Avenue Fort Pierce, FL 34982 Tidewater (PUD_PZ-11202126231) Commercial Acreage Justification Letter July 11, 2022 Dear Jodi, As requested, please accept this as a formal justification from the change in commercial outparcel acreage from 2.58 acres to 2.5. The size was reduced in an earlier resubmittal due to staff comments requesting modifications to the entry way and turning radii. These changes cause the entry to require additional space, thus reducing the commercial parcel by 0.08 acres. If you have any questions or of you need additional information, please contact me directly at dsorrow@cotleur-hearing.com or 561.747.6336 ext. 120. Sincerely, Daniel T. Sorrow, PLA, AICP, LEED AP BD+C Cotleur & Hearing 1934 Commerce Lane, Suite 1 Jupiter, FL 33458 561.800.8426 | Cell 561.747.6336 | Office Page 127 of 494 Page 128 of 494 Page 129 of 494 Page 130 of 494 Page 131 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION All Inn Storage LLC, 1556 Keith RD Greenville, GA, 30222 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 132 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION Grove Community Assn Inc, 5890 S US Highway 1 Unit 1 Fort Pierce, FL, 34982 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 133 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION DNPJ LLC, PO Box 1578 Palm City, FL, 34991 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 134 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION Public Storage, 701 Western Ave Glendale, CA, 91201 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 135 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION TCLH1 LLC , 2020 Salzedo ST Ste 301 Coral Gables, FL, 33134 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 136 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION Total Success Concepts Llc, 10211 Hunt Club Ln Palm Beach Gardens, FL, 33418 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 137 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION Gator State Storage FP LLC, 3895 Westroads DR Riviera Beach, FL, 33407 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 138 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION Hayslip LLC, 940 NE Stokes TER Jensen Beach, FL, 34957 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 139 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION Arrigo Ft Pierce J RE Management LLC, 7301 Parkway DR Hanover, MD, 21076 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 140 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION Crawford, William P 702 Kearney Rd Fort Pierce, FL, 34982 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 141 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION Lippard, Tracy 6400 Oleander AVE Fort Pierce, FL, 34982 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 142 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION Holden, Steven 6404 Oleander AVE Fort Pierce, FL, 34982 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 143 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION Tracey (EST), Michael A 6406 Oleander AVE Fort Pierce, FL, 34982 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 144 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION McConnell, Jon 6410 Oleander Ave Fort Pierce, FL, 34982 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 145 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION Spence, Sydia Nichole 8001 NW 66th TER Tamarac, FL, 33321 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 146 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION EGUIBEBE LLC, 4855 Hunters WAY Boca Raton, FL, 33434 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 147 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION Petrie, Lisa A 5989 S US Highway 1 Fort Pierce, FL, 34982 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 148 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION BENTONWOOD MHP LLC, 49 SW Flagler AVE Ste 201 Stuart, FL, 34994 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 149 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION Gruwell, Melissa A 6360 Oleander Ave Fort Pierce, FL, 34982 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 150 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION EGUIBEBE LLC, 4855 Hunters WAY Boca Raton, FL, 33434 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 151 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION Petrie, Lisa A 5989 S Fed Hwy Fort Pierce, FL, 34982 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 152 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION Francris LLC, 19233 N Gardenia AVE Weston, FL, 33332 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 153 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION , , , Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 154 of 494 Page 155 of 494 Page 156 of 494 Page 157 of 494 Page 158 of 494 Page 159 of 494 Page 160 of 494 Page 161 of 494 Page 162 of 494 Page 163 of 494 Page 164 of 494 LA N D S C A P E A R C H I T E C T U R E - S U R V E Y I N G CA U L F I E L D & W H E E L E R , I N C . CI V I L E N G I N E E R I N G PH O N E ( 5 6 1 ) - 3 9 2 - 1 9 9 1 / F A X ( 5 6 1 ) - 7 5 0 - 1 4 5 2 79 0 0 G L A D E S R O A D - S U I T E 1 0 0 BO C A R A T O N , F L O R I D A 3 3 4 3 4 ” SITE US 1 OL E A N D E R A V E N U E MIDWAY ROAD SUNSHINE BLVD EASY STREET Page 165 of 494 LA N D S C A P E A R C H I T E C T U R E - S U R V E Y I N G CA U L F I E L D & W H E E L E R , I N C . CI V I L E N G I N E E R I N G PH O N E ( 5 6 1 ) - 3 9 2 - 1 9 9 1 / F A X ( 5 6 1 ) - 7 5 0 - 1 4 5 2 79 0 0 G L A D E S R O A D - S U I T E 1 0 0 BO C A R A T O N , F L O R I D A 3 3 4 3 4 Page 166 of 494 LA N D S C A P E A R C H I T E C T U R E - S U R V E Y I N G CA U L F I E L D & W H E E L E R , I N C . CI V I L E N G I N E E R I N G PH O N E ( 5 6 1 ) - 3 9 2 - 1 9 9 1 / F A X ( 5 6 1 ) - 7 5 0 - 1 4 5 2 79 0 0 G L A D E S R O A D - S U I T E 1 0 0 BO C A R A T O N , F L O R I D A 3 3 4 3 4 Page 167 of 494 LA N D S C A P E A R C H I T E C T U R E - S U R V E Y I N G CA U L F I E L D & W H E E L E R , I N C . CI V I L E N G I N E E R I N G PH O N E ( 5 6 1 ) - 3 9 2 - 1 9 9 1 / F A X ( 5 6 1 ) - 7 5 0 - 1 4 5 2 79 0 0 G L A D E S R O A D - S U I T E 1 0 0 BO C A R A T O N , F L O R I D A 3 3 4 3 4 Page 168 of 494 FUTURE LAND USE AMENDMENT ZONING AMENDMENT TRAFFIC ANALYSIS Tidewater (f.k.a. Equibebe) St. Lucie County, FL Prepared for: Meritage Homes of Florida, Inc. 17851 North 85th Street, Suite 300 Scottsdale, AZ 85225 Prepared by: 1172 SW 30th Street, Suite 500 Palm City, FL 34990 (772) 286-8030 220002 October 2021 Revised March 2022 © MacKenzie Engineering and Planning, Inc. CA 29013 Shaun G. MacKenzie P.E. PE Number 61751 THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY SHAUN G. MACKENZIE, P.E. ON THE DATE ADJACENT TO THE SEAL. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. MACKENZIE ENGINEERING AND PLANNING, INC.1172 SW30THSTREET, SUITE 500PALM CITY, FL34990CERTIFICATE OF AUTHORIZATION 29013SHAUN G. MACKENZIE, P.E.NO. 61751 Digitally signed by Shaun MacKenzie Date: 2022.04.15 13:32:27 -04'00' Page 169 of 494 220002 Page i EXECUTIVE SUMMARY MacKenzie Engineering and Planning, Inc. (MEP) was retained to evaluate the changes in the Future Land Use for the property located at the west side of US 1 north of Easy Street, St. Lucie County, FL (PCN: 3401-701-0001-000-7; 3410-702-0054-000-6; & 3410-702-0055-000-3). The future land use (FLU) amendment traffic analysis will examine the impacts of changing the existing future land use (FLU) from Commercial (COM), Residential Medium (RM) and Residential Urban (RU) to Commerical (COM) and Mixed Used Development (MXD). Future Land Use – Maximum Increase in External Trips The future land use amendment trip generation resulting change is as follows: • Future Land Use Change 8,954 daily, 731 AM peak hour, and 1,023 PM peak hour trips. All of the roadways surrounding and the property are projected to operate acceptably with the increase in traffic from the property. Page 170 of 494 220002 Page ii TABLE OF CONTENTS EXECUTIVE SUMMARY .......................................................................................................... i TABLE OF CONTENTS ............................................................................................................ ii LIST OF FIGURES .................................................................................................................... ii LIST OF TABLES ...................................................................................................................... ii INTRODUCTION ...................................................................................................................... 1 CURRENT DATA ...................................................................................................................... 2 FUTURE LAND USE CHANGE ANALYSIS ............................................................................ 3 TRIP GENERATION ................................................................................................................. 4 Existing Maximum Future Land Use (Commercial & Residential) ....................................... 4 Proposed Maximum Future Land Use (Commercial & Residential) ..................................... 4 Net Impact .......................................................................................................................... 5 ANALYSIS ................................................................................................................................ 7 Traffic Distribution ............................................................................................................. 7 Growth Rate ........................................................................................................................ 8 Study Area .......................................................................................................................... 8 Roadway Analysis ............................................................................................................... 8 CONCLUSION ........................................................................................................................ 10 APPENDICES .......................................................................................................................... 11 LIST OF FIGURES Figure 1. Property Location Map ................................................................................................ 2 Figure 2. Traffic Assignment...................................................................................................... 7 LIST OF TABLES Table 1. Future Land Use Change .............................................................................................. 1 Table 2. Future Land Use Trip Generation.................................................................................. 6 Table 3. Growth Rate Calculation .............................................................................................. 8 Table 4. Peak Hour One-Way Roadway Analysis ....................................................................... 9 Page 171 of 494 220002 Page 1 INTRODUCTION A future land use amendment is proposed on 18.87 acres located at the west side of US 1 north of Easy Street, St. Lucie County, FL (PCN: 3401-701-0001-000-7; 3410-702-0054-000-6; & 3410-702-0055- 000-3). The future land use (FLU) amendment traffic analysis will examine the impacts of changing the existing future land use (FLU) from Commercial (COM), Residential Medium (RM) and Residential Urban (RU) to Commerical (COM) and Mixed Used Development (MXD). The property details and proposed changes are shown below in Table 1. Figure 1 illustrates the property location. Table 1. Future Land Use Change Site Existing (acres) Proposed (acres) Commercial (COM) 8.82 2.58 Residential Medium (RM) 5.2 0 Residential Urban (RU) 4.85 0 Mixed Use Development (MXD) 0 16.29 Total 18.87 18.87 *Acres measured from survey Page 172 of 494 220002 Page 2 Figure 1. Property Location Map CURRENT DATA The information contained below was used to develop the foregoing future land use and rezoning traffic analysis. • Trip Generation, 11th Edition (ITE report) • St. Lucie County Comprehensive Plan • St Lucie County Future Land Use Element • FDOT Traffic Online Software • FDOT Quality Level of Service (QLOS) Handbook Parcel 2 3410-702-0054-000-6 13.41 Acres Parcel 3 3410-702-0055-000-3 5.20 Acres Parcel 1 3401-701-0001-000-7 0.26 Acres US 1 Ol e a n d e r A v e . Page 173 of 494 220002 Page 3 FUTURE LAND USE CHANGE ANALYSIS The proposed change is located on two separate properties. The larger property, Parcel 1, is 13.41 acres with 8.56 acres designated commercial (COM) future land use (FLU) and 4.85 acres designated residential urban (RU) FLU. The small property, Parcel 2, is 5.20 acres of residential medium (RM) FLU. RM has maximum density of five (5) units per acre and RU has maximum density of nine (9) units per acre in the Comprehensive Plan. The study used a 0.5 floor to area ratio for the commercial maximum buildable density based on the 50 percent building coverage in the Comprehensive Plan. The land is proposed for conversion to mixed use development (MXD) is proposed at fifteen (15) units per acre, 50 percent building coverage, a maximum height of 80 feet (5 floors), 1,500 SF per residential unit, and 1-floor commercial / 4-floors office for the remainder of the buildable area. The estimated maximum existing FLU of the property is as follows: • COM – 8.82 acres x 43,560 SF/acre x 50% lot coverage = 192,100 SF commercial use. • COM - 192,100 SF x 4 Floors = 768,400 SF office use. • RM – 4.85 acres x 5 dwelling units / acre = 24 dwelling units. • RU – 5.20 acres x 9 dwelling units / acre = 47 dwelling units. The existing maximum residential FLU is 71 dwelling units. The estimated maximum proposed FLU of the property is as follows: • MXD – 16.29 acres x 15 dwelling units / acre = 244 dwelling units. • MXD – (16.29 acres x 43,560 SF/acre x 50% lot coverage) – (244 dwelling units x 1500 SF /dwelling unit ÷ 5 floors) = 281,596 SF commercial use. • MXD – 281,596 SF x 4 floors = 1,126,384 SF office use. • COM – 2.58 acres x 43,560 SF/acre x 50% lot coverage = 56,192 SF commercial use. • COM – 56,192 SF x 4 floors = 224,768 SF office use. The maximum non-residential FLU is: • 337,788 SF of retail commercial use • 1,351,152 SF of office use Page 174 of 494 220002 Page 4 TRIP GENERATION The study used trip generation rates and equations from the Institute of Transportation Engineers (ITE)’s report, Trip Generation (11th Edition) for: • Shopping Center (>150k) - (ITE Code 820) • General Office Building - (ITE Code 710) • Multifamily Housing (Low-Rise) - (ITE Code 220) • Multifamily Housing (Mid-Rise) - (ITE Code 221) Existing Maximum Future Land Use (Commercial & Residential) • 192,100 SF Commercial (Shopping Center (>150k)) • 786,400 SF Office Use • 71 Residential Urban / Residential Medium Dwelling Units (Multifamily (Low-rise)) The study did not consider internal capture. A pass-by capture rate of 29 percent was applied to the commercial trip generation consistent with ITE Land Use 820 for shopping centers between 150k and 300k SF. The existing future land use generates the following net new external trips: • 15,233 daily, 1,206 AM peak hour (988 in/219 out), and 1,612 PM peak hour (495 in/1,117 out) trips. Proposed Maximum Future Land Use (Commercial & Residential) • 337,684 SF Commercial (Shopping Center (>150k)) • 1,351,152 SF Office Use • 244 Mixed Use Development (Multifamily Housing (Mid-rise)) The study did not consider internal capture. A pass-by capture rate of 19 percent was applied to the commercial trip generation consistent with ITE Land Use 820 for shopping centers between 300k and 900k SF. The proposed future land use generates the following net new external trips: • 24,187 daily, 1,937 AM peak hour (1,571 in/366 out), and 2,635 PM peak hour (831 in/1,804 out) trips. Page 175 of 494 220002 Page 5 Net Impact The difference between the trip generation potential of the existing future land use and the proposed future land use was examined to determine estimated impact to the existing and future roadway network. The proposed future land use change will generate the following net new external trips: • 8,954 daily, 731 AM peak hour (583 in/147 out), and 1,023 PM peak hour (336 in/687 out) trips. Table 2 displays the resulting trip generation. Page 176 of 494 220002 Page 6 Table 2. Future Land Use Trip Generation Land Use Intensity Daily AM Peak Hour PM Peak Hour Trips Total In Out Total In Out Existing FLU Traffic 192.100 1000 SF 10,879 247 153 94 903 433 470 General Office Building 786.400 1000 SF 6,979 986 868 118 920 156 764 Multi-family Housing (Low-rise)71 DU 530 45 11 34 51 32 19 Pass-By Traffic AM PM/Daily 29.0%29.0%3,155 72 44 27 262 126 136 NET EXISTING TRIPS 15,233 1,206 988 219 1,612 495 1,117 Total Existing Driveway Volumes 18,388 1,278 1,032 246 1,874 621 1,253 Proposed FLU Traffic 337.788 1000 SF 14,683 333 206 127 1,356 651 705 Multi-family Housing (Mid-rise)244 DU 1,117 96 22 74 96 59 37 General Office Building 1,351.152 1000 SF 11,177 1,571 1,382 189 1,441 245 1,196 Pass-By Traffic AM PM 19.0%19.0%2,790 63 39 24 258 124 134 NET PROPOSED TRIPS 24,187 1,937 1,571 366 2,635 831 1,804 Total Proposed Driveway Volumes 26,977 2,000 1,610 390 2,893 955 1,938 8,954 731 583 147 1,023 336 687 Note: Trip generation was calculated using the following data: Pass-by PM Peak Hour Land Use ITE Code Unit Daily Rate Rate in/out in/out Equation 820 1000 SF 19% / 29% *62/38 48/52 710 1000 SF 0%88/12 17/83 220 DU 0%24/76 63/37 221 DU 0%23/77 61/39 *See ITE Pass-by Justification in the Appendix Copyright © 2022, MacKenzie Engineering and Planning, Inc. Shopping Center (>150k) Shopping Center (>150k) Shopping Center (>150k) Shopping Center (>150k) NET CHANGE IN TRIPS (FOR THE PURPOSES OF FLU ANALYSIS) AM Peak Hour Multi-family Housing (Low-rise)T = 6.41(X) + 75.31 T = 0.31(X) + 22.85 T = 0.43(X) + 20.55 Multi-family Housing (Mid-rise)T = 4.77(X) - 46.46 T = 0.44(X) - 11.61 T = 0.39(X) + 0.34 Rate Shopping Center (>150k)T = 26.11(X) + 5863.73 T = 0.59(X) + 133.55 Ln(T) = 0.72 Ln(X) + 3.02 General Office Building Ln(T) = 0.87 Ln(X) + 3.05 Ln(T) = 0.86 Ln(X) + 1.16 Ln(T) = 0.83 Ln(X) + 1.29 Page 177 of 494 220002 Page 7 ANALYSIS Traffic Distribution Traffic distribution and assignment was determined using engineering judgment, trip lengths based on the uses and from a review of the roadway network. The overall distribution is summarized by general directions and is depicted below: NORTH - 40 percent SOUTH - 50 percent WEST - 10 percent The distributed net proposed trips for the project were assigned to the roadway network within the radius of influence. The project assignment is illustrated in Figure 2. Figure 2. Traffic Assignment Project Site Easy St. 50% 45% 50% 35% 10% Kitterman Road Page 178 of 494 220002 Page 8 Growth Rate In order to provide an accurate traffic analysis, the growth rate at each intersection was determined by a volume weighted averaging of the growth on each leg of the intersection as shown in Table 3. The historic annual growth rate on the surrounding facilities between 2015 and 2019 is -0.4%. A conservative growth rate of 2.0% was used for this analysis. Table 3. Growth Rate Calculation Study Area Based on section 11.02.09 of the St. Lucie County LDC, the study area for the project shall be 2 miles. Roadway Analysis Existing traffic volumes were obtained from turning movement counts performed at Midway Road and Sunshine Boulevard along US 1 and FDOT traffic count stations. The counts were adjusted to peak season conditions using FDOT’s peak season adjustment factors. The total volumes were developed by adding background traffic volume plus future land use (FLU) trips. The level of service capacity is based on Florida Department of Transportation’s Quality/Level of Service Handbook. The projected total traffic volumes were compared to the service volume on each respective roadway segment to determine if each roadway segment is projected to operate acceptably. Based on the analysis, all roadway segments are projected to operate acceptably in 2025 with the proposed development as shown in Table 4. Station Description 2015 2016 2017 2018 2019 945156 US1 (Midway to Easy St.)31,500 34,000 34,500 31,000 31,000 -400 -1.3% 940266 US1 (S. of Easy St.)33,000 34,500 33,500 32,000 35,000 150 0.4% 947005 Easy St. (E. of US 1)5,100 5,300 5,500 5,600 4,900 -10 -0.2% -0.4% 2.0%Growth Rate Used Annaual Absolute Growth Growth Rate Average Daily Traffic Weighted Average Page 179 of 494 220002 Page 9 Table 4. Peak Hour One-Way Roadway Analysis Roadway From To Direction Lanes Existing Volumes Year Count PSCF Growth Rate 2025 Pre Development Assignment (in/out) Project Traffic 2025 Post Development Roadway Capacity Accept able? US 1 Weatherbee Midway North 4 1,198 2020 FDOT (940020)1.00 2.00%1,323 35%240 1,563 2,000 YES US 1 Weatherbee Midway South 4 1,450 2020 FDOT (940020)1.00 2.00%1,601 35%118 1,719 2,000 YES US 1 Midway Sunshine North 6 1,387 2021 MEP 1.06 2.00%1,591 50%344 1,935 3,020 YES US 1 Midway Sunshine South 6 1,720 2021 MEP 1.06 2.00%1,973 50%168 2,141 3,020 YES US 1 Sunshine PROJECT SITE North 6 1,404 2021 MEP 1.06 2.00%1,611 50%344 1,955 3,020 YES US 1 Sunshine PROJECT SITE South 6 1,711 2021 MEP 1.06 2.00%1,963 50%168 2,131 3,020 YES US 1 PROJECT SITE Easy Street North 6 1,404 2021 MEP 1.06 2.00%1,611 50%168 1,779 3,020 YES US 1 PROJECT SITE Easy Street South 6 1,711 2021 MEP 1.06 2.00%1,963 50%344 2,307 3,020 YES US 1 Easy Street Kitterman North 6 1,404 2021 MEP 1.00 2.00%1,520 50%344 1,864 3,020 YES US 1 Easy Street Kitterman South 6 1,711 2021 MEP 1.00 2.00%1,852 50%168 2,020 3,020 YES US 1 Kitterman Prima Vista North 6 1,552 2020 FDOT (940264)1.05 2.00%1,799 45%151 1,950 3,020 YES US 1 Kitterman Prima Vista South 6 1,577 2020 FDOT (940264)1.05 2.00%1,828 45%309 2,137 3,020 YES Midway 25th Street US 1 East 4 845 2018 FDOT (948540)1.00 2.00%971 10%34 1,005 2,000 YES Midway 25th Street US 1 West 4 802 2018 FDOT (948540)1.00 2.00%921 10%69 990 2,000 YES Page 180 of 494 220002 Page 10 CONCLUSION MacKenzie Engineering and Planning, Inc. (MEP) was retained to evaluate the changes in the Future Land Use for the property located at the west side of US 1 north of Easy Street, St. Lucie County, FL (PCN: 3401-701-0001-000-7; 3410-702-0054-000-6; & 3410-702-0055-000-3). The future land use (FLU) amendment traffic analysis will examine the impacts of changing the existing future land use (FLU) from Commercial (COM), Residential Medium (RM) and Residential Urban (RU) to Commerical (COM) and Mixed Used Development (MXD). Future Land Use – Maximum Increase in External Trips The future land use amendment trip generation resulting change is as follows: • Future Land Use Change 8,954 daily, 731 AM peak hour, and 1,023 PM peak hour trips. All of the roadways surrounding and the property are projected to operate acceptably with the increase in traffic from the property. Page 181 of 494 APPENDICES Exhibit 1. FLU Trip Generation A. FDOT Peak Season Correction Factor – PSCF B. MEP Turning Movement Counts a. US 1 & Easy Street b. US 1 & Sunshine Boulevard c. Volume Summary C. FDOT Synopsis Report a. 940020 (US 1 from Weatherbee to Midway) b. 940264 (US 1 from Kitterman to Prima Vista) c. 948540 (Midway from 25th Street to US 1) D. FDOT QLOS Handbook – Service Capacities Table 7 E. St. Lucie County Future Land Use Element F. ITE Trip Generation Report a. Land Use 820 – Shopping Center (>150 K) • Pass-By Justification b. Land Use 710 – General Office Building c. Land Use 220 – Multifamily Housing (Low-Rise) d. Land Use 221 – Multifamily Housing (Mid-Rise) G. St. Lucie County Comprehensive – Future Land Use Map H. Site Survey I. Property ID Card Page 182 of 494 Tidewater - FLU Trip Generation Land Use Intensity Daily AM Peak Hour PM Peak Hour Trips Total In Out Total In Out Existing FLU Traffic 192.100 1000 SF 10,879 247 153 94 903 433 470 General Office Building 786.400 1000 SF 6,979 986 868 118 920 156 764 Multi-family Housing (Low-rise)71 DU 530 45 11 34 51 32 19 Pass-By Traffic AM PM/Daily 29.0% 29.0%3,155 72 44 27 262 126 136 NET EXISTING TRIPS 15,233 1,206 988 219 1,612 495 1,117 Total Existing Driveway Volumes 18,388 1,278 1,032 246 1,874 621 1,253 Proposed FLU Traffic 337.788 1000 SF 14,683 333 206 127 1,356 651 705 Multi-family Housing (Mid-rise)244 DU 1,117 96 22 74 96 59 37 General Office Building 1,351.152 1000 SF 11,177 1,571 1,382 189 1,441 245 1,196 Pass-By Traffic AM PM 19.0% 19.0%2,790 63 39 24 258 124 134 NET PROPOSED TRIPS 24,187 1,937 1,571 366 2,635 831 1,804 Total Proposed Driveway Volumes 26,977 2,000 1,610 390 2,893 955 1,938 8,954 731 583 147 1,023 336 687 Note: Trip generation was calculated using the following data: Pass-by PM Peak Hour Land Use ITE Code Unit Daily Rate Rate in/out in/out Equation 820 1000 SF 19% / 29% *62/38 48/52 710 1000 SF 0%88/12 17/83 220 DU 0%24/76 63/37 221 DU 0%23/77 61/39 *See ITE Pass-by Justification in the Appendix Copyright © 2022, MacKenzie Engineering and Planning, Inc. Shopping Center (>150k) Shopping Center (>150k) Shopping Center (>150k) Shopping Center (>150k) NET CHANGE IN TRIPS (FOR THE PURPOSES OF FLU ANALYSIS) AM Peak Hour Multi-family Housing (Low-rise)T = 6.41(X) + 75.31 T = 0.31(X) + 22.85 T = 0.43(X) + 20.55 Multi-family Housing (Mid-rise)T = 4.77(X) - 46.46 T = 0.44(X) - 11.61 T = 0.39(X) + 0.34 Exhibit 1 Rate Shopping Center (>150k)T = 26.11(X) + 5863.73 T = 0.59(X) + 133.55 Ln(T) = 0.72 Ln(X) + 3.02 General Office Building Ln(T) = 0.87 Ln(X) + 3.05 Ln(T) = 0.86 Ln(X) + 1.16 Ln(T) = 0.83 Ln(X) + 1.29 Page 183 of 494 2020 PEAK SEASON FACTOR CATEGORY REPORT - REPORT TYPE: ALL CATEGORY: 9401 CEN.-W OF US1 TO I95 MOCF: 0.93 WEEK DATES SF PSCF ================================================================================ * 1 01/01/2020 - 01/04/2020 0.96 1.03 * 2 01/05/2020 - 01/11/2020 0.92 0.99 * 3 01/12/2020 - 01/18/2020 0.88 0.95 * 4 01/19/2020 - 01/25/2020 0.88 0.95 * 5 01/26/2020 - 02/01/2020 0.87 0.94 * 6 02/02/2020 - 02/08/2020 0.87 0.94 * 7 02/09/2020 - 02/15/2020 0.86 0.92 * 8 02/16/2020 - 02/22/2020 0.89 0.96 * 9 02/23/2020 - 02/29/2020 0.92 0.99 *10 03/01/2020 - 03/07/2020 0.94 1.01 *11 03/08/2020 - 03/14/2020 0.97 1.04 *12 03/15/2020 - 03/21/2020 1.00 1.08 *13 03/22/2020 - 03/28/2020 1.08 1.16 14 03/29/2020 - 04/04/2020 1.16 1.25 15 04/05/2020 - 04/11/2020 1.24 1.33 16 04/12/2020 - 04/18/2020 1.32 1.42 17 04/19/2020 - 04/25/2020 1.26 1.35 18 04/26/2020 - 05/02/2020 1.20 1.29 19 05/03/2020 - 05/09/2020 1.13 1.22 20 05/10/2020 - 05/16/2020 1.07 1.15 21 05/17/2020 - 05/23/2020 1.06 1.14 22 05/24/2020 - 05/30/2020 1.04 1.12 23 05/31/2020 - 06/06/2020 1.03 1.11 24 06/07/2020 - 06/13/2020 1.01 1.09 25 06/14/2020 - 06/20/2020 1.00 1.08 26 06/21/2020 - 06/27/2020 1.01 1.09 27 06/28/2020 - 07/04/2020 1.02 1.10 28 07/05/2020 - 07/11/2020 1.03 1.11 29 07/12/2020 - 07/18/2020 1.04 1.12 30 07/19/2020 - 07/25/2020 1.04 1.12 31 07/26/2020 - 08/01/2020 1.04 1.12 32 08/02/2020 - 08/08/2020 1.03 1.11 33 08/09/2020 - 08/15/2020 1.03 1.11 34 08/16/2020 - 08/22/2020 1.03 1.11 35 08/23/2020 - 08/29/2020 1.02 1.10 36 08/30/2020 - 09/05/2020 1.02 1.10 37 09/06/2020 - 09/12/2020 1.01 1.09 38 09/13/2020 - 09/19/2020 1.01 1.09 39 09/20/2020 - 09/26/2020 1.00 1.08 40 09/27/2020 - 10/03/2020 1.00 1.08 41 10/04/2020 - 10/10/2020 0.99 1.06 42 10/11/2020 - 10/17/2020 0.98 1.05 43 10/18/2020 - 10/24/2020 0.98 1.05 44 10/25/2020 - 10/31/2020 0.99 1.06 45 11/01/2020 - 11/07/2020 0.99 1.06 46 11/08/2020 - 11/14/2020 1.00 1.08 47 11/15/2020 - 11/21/2020 1.00 1.08 48 11/22/2020 - 11/28/2020 0.99 1.06 49 11/29/2020 - 12/05/2020 0.98 1.05 50 12/06/2020 - 12/12/2020 0.97 1.04 51 12/13/2020 - 12/19/2020 0.96 1.03 52 12/20/2020 - 12/26/2020 0.92 0.99 53 12/27/2020 - 12/31/2020 0.88 0.95 * PEAK SEASON 27-FEB-2021 10:30:04 830UPD 4_9401_PKSEASON.TXT Page 184 of 494 File Name : US1EASY Site Code : MK2112 Start Date : 10/6/2021 Page No : 1 Manual Traffic Count - All Traffic US1 and Easy Street White City, FL Groups Printed- All Traffic US1 NB US1 SB Driveway EB Easy St WB Start Time UTurn Left Thru Right UTurn Left Thru Right Left Thru Right Left Thru Right Int. Total 07:00 AM 2 2 240 9 1 8 190 0 3 1 2 70 0 31 559 07:15 AM 1 4 342 10 2 7 269 0 3 0 0 49 0 15 702 07:30 AM 1 0 493 7 3 8 254 0 0 0 0 87 0 25 878 07:45 AM 3 1 417 25 2 10 308 0 2 0 0 41 0 14 823 Total 7 7 1492 51 8 33 1021 0 8 1 2 247 0 85 2962 08:00 AM 2 1 307 21 3 13 263 0 4 0 0 58 0 14 686 08:15 AM 0 0 287 14 5 6 310 0 1 0 1 30 0 17 671 08:30 AM 0 0 265 5 12 4 302 0 1 0 1 39 0 17 646 08:45 AM 0 0 262 0 8 8 266 0 1 0 1 31 0 20 597 Total 2 1 1121 40 28 31 1141 0 7 0 3 158 0 68 2600 *** BREAK *** 04:00 PM 4 0 316 47 9 23 357 0 0 0 0 32 0 10 798 04:15 PM 5 0 288 58 9 26 360 0 2 0 6 22 0 11 787 04:30 PM 10 0 341 64 4 16 363 0 7 1 8 23 0 16 853 04:45 PM 4 0 316 58 12 17 390 0 1 0 2 35 0 16 851 Total 23 0 1261 227 34 82 1470 0 10 1 16 112 0 53 3289 05:00 PM 9 0 340 70 8 14 401 0 1 0 0 23 0 25 891 05:15 PM 3 0 297 52 4 24 458 0 1 0 2 37 0 15 893 05:30 PM 6 0 286 66 11 24 409 0 0 0 0 31 0 7 840 05:45 PM 3 0 281 62 5 25 346 0 0 0 0 34 0 15 771 Total 21 0 1204 250 28 87 1614 0 2 0 2 125 0 62 3395 Grand Total 53 8 5078 568 98 233 5246 0 27 2 23 642 0 268 12246 Apprch %0.9 0.1 89 10 1.8 4.2 94.1 0 51.9 3.8 44.2 70.5 0 29.5 Total %0.4 0.1 41.5 4.6 0.8 1.9 42.8 0 0.2 0 0.2 5.2 0 2.2 KMF Traffic Group, LLC www.kmftraffic.net Mario Fiorillo (772) 924-6993 cell Page 185 of 494 Turn Count Summary Mackenzie Engineering and Planning 1172 SW 30TH St, STE 500 Palm City, FL, 34990 7722868030 Location: US1 at Sunshine Blvd, Ft. Pierce, FL GPS Coordinates: Lat=27.173802, Lon=-80.271152 Date: 2021-10-07 Day of week: Thursday Weather: Analyst: SGM Total vehicle traffic Interval starts SouthBound Westbound Northbound Eastbound TotalLeftThruRightLeftThruRightLeftThruRightLeftThruRight 07:00 1 0 2 0 0 12 6 0 0 0 0 0 21 07:15 0 0 2 0 0 4 7 0 4 0 0 1 18 07:30 1 0 6 1 0 9 9 0 4 0 0 1 31 07:45 2 0 11 0 0 9 9 0 5 0 0 3 39 08:00 5 0 7 0 0 10 5 0 3 0 0 7 37 08:15 2 0 8 0 0 20 11 0 7 0 0 4 52 08:30 7 0 5 0 0 4 10 0 1 0 0 5 32 08:45 8 0 7 0 0 9 10 0 6 0 0 3 43 09:00 0 0 0 0 0 1 0 0 0 0 0 0 1 Car traffic Interval starts SouthBound Westbound Northbound Eastbound TotalLeftThruRightLeftThruRightLeftThruRightLeftThruRight 07:00 1 0 2 0 0 12 6 0 0 0 0 0 21 07:15 0 0 2 0 0 4 7 0 4 0 0 1 18 07:30 1 0 6 1 0 9 9 0 4 0 0 1 31 07:45 2 0 11 0 0 9 9 0 5 0 0 3 39 08:00 5 0 7 0 0 10 5 0 3 0 0 7 37 08:15 2 0 8 0 0 20 11 0 7 0 0 4 52 08:30 7 0 5 0 0 4 10 0 1 0 0 5 32 08:45 8 0 7 0 0 9 10 0 6 0 0 3 43 09:00 0 0 0 0 0 1 0 0 0 0 0 0 1 Pedestrian volumes Interval starts NE NW SW SE TotalLeftRightTotalLeftRightTotalLeftRightTotalLeftRightTotal 07:00 0 0 0 0 0 0 0 0 0 0 0 0 0 07:15 0 0 0 0 0 0 0 0 0 0 0 0 0 07:30 0 0 0 0 0 0 0 0 0 0 0 0 0 07:45 0 0 0 0 0 0 0 0 0 0 0 0 0 08:00 0 0 0 0 0 0 0 0 0 0 0 0 0 08:15 0 0 0 0 0 0 0 0 0 0 0 0 0 08:30 0 0 0 0 0 0 0 0 0 0 0 0 0 08:45 0 0 0 0 0 0 0 0 0 0 0 0 0 09:00 0 0 0 0 0 0 0 0 0 0 0 0 0 Page 186 of 494 Turn Count Summary Mackenzie Engineering and Planning 1172 SW 30TH St, STE 500 Palm City, FL, 34990 7722868030 Location: US1 at Sunshine Blvd, Ft. Pierce, FL GPS Coordinates: Lat=27.357884, Lon=-80.325456 Date: 2021-10-07 Day of week: Thursday Weather: Analyst: SGM Total vehicle traffic Interval starts SouthBound Westbound Northbound Eastbound TotalLeftThruRightLeftThruRightLeftThruRightLeftThruRight 16:00 8 0 6 0 0 15 6 0 10 0 0 19 64 16:15 8 0 2 0 0 13 10 0 10 0 0 8 51 16:30 7 0 6 0 0 7 8 0 12 0 0 11 51 16:45 9 0 5 0 0 10 9 0 9 0 0 4 46 17:00 6 0 2 0 0 14 11 0 3 0 0 20 56 17:15 11 0 4 0 0 12 5 0 3 0 0 6 41 17:30 10 0 5 0 0 8 10 0 6 0 0 11 50 17:45 9 0 3 0 0 6 6 0 4 0 0 20 48 Car traffic Interval starts SouthBound Westbound Northbound Eastbound TotalLeftThruRightLeftThruRightLeftThruRightLeftThruRight 16:00 8 0 6 0 0 15 6 0 10 0 0 19 64 16:15 8 0 2 0 0 13 10 0 10 0 0 8 51 16:30 7 0 6 0 0 7 8 0 12 0 0 11 51 16:45 9 0 5 0 0 10 9 0 9 0 0 4 46 17:00 6 0 2 0 0 14 11 0 3 0 0 20 56 17:15 11 0 4 0 0 12 5 0 3 0 0 6 41 17:30 10 0 5 0 0 8 10 0 6 0 0 11 50 17:45 9 0 3 0 0 6 6 0 4 0 0 20 48 Pedestrian volumes Interval starts NE NW SW SE TotalLeftRightTotalLeftRightTotalLeftRightTotalLeftRightTotal 16:00 0 0 0 0 0 0 0 0 0 0 0 0 0 16:15 0 0 0 0 0 0 0 0 0 0 0 0 0 16:30 0 0 0 0 0 0 0 0 0 0 0 0 0 16:45 0 0 0 0 0 0 0 0 0 0 0 0 0 17:00 0 0 0 0 0 0 0 0 0 0 0 0 0 17:15 0 0 0 0 0 0 0 0 0 0 0 0 0 17:30 0 0 0 0 0 0 0 0 0 0 0 0 0 17:45 0 0 0 0 0 0 0 0 0 0 0 0 0 Page 187 of 494 1164 1632 1720 1387 Sunshine Blvd 56 32 Sunshine Blvd50 43 12 24 41 60 1142 1646 1711 1404 US 1 US 1 1142 1646 1711 1404 DW 1 0 0 DW 1 0 0 0 0 0 0 1142 1646 1711 1404 1142 1646 1711 1404 Easy St.6 303 Easy St.0 190 9 101 23 316 1336 1635 1768 1564 AM 2021 Existing Volumes PM 2021 Existing Volumes EGUIBEBE Tidewater - 2021 Existing Volume Summary Page 188 of 494 file:///C/Users/Asus/OneDrive%20-%20Florida%20Department%20of%20Transportation/Traffic/SynopsisReports_2020/940020.txt[5/19/2021 3:27:17 PM] County: 94Station: 0020Description: SR 5 / US 1 - N OF CR 712/MIDWAY RD (COUNTY 20) Start Date: 02/11/2020Start Time: 0000--------------------------------------------------------------------------------------- Direction: N Direction: S CombinedTime 1st 2nd 3rd 4th Total 1st 2nd 3rd 4th Total Total---------------------------------------------------------------------------------------0000 31 18 42 25 116 | 30 23 15 16 84 | 2000100 24 17 9 12 62 | 17 13 16 11 57 | 1190200 15 13 10 9 47 | 10 7 11 15 43 | 900300 9 11 9 16 45 | 7 8 16 19 50 | 950400 19 27 34 32 112 | 17 19 32 24 92 | 2040500 51 59 69 99 278 | 43 63 60 59 225 | 5030600 105 170 260 271 806 | 110 182 187 188 667 | 14730700 276 381 352 329 1338 | 203 253 218 247 921 | 22590800 293 275 302 298 1168 | 294 257 270 254 1075 | 22430900 237 272 222 253 984 | 260 315 285 310 1170 | 21541000 273 244 260 255 1032 | 233 255 240 282 1010 | 20421100 266 249 270 289 1074 | 261 277 253 310 1101 | 21751200 256 281 276 292 1105 | 318 290 271 288 1167 | 22721300 246 276 285 283 1090 | 275 245 244 243 1007 | 20971400 280 240 269 281 1070 | 319 307 317 290 1233 | 23031500 254 303 311 292 1160 | 291 359 296 351 1297 | 24571600 255 327 280 272 1134 | 354 357 369 343 1423 | 25571700 319 335 276 282 1212 | 381 341 315 300 1337 | 25491800 212 256 249 229 946 | 251 223 262 210 946 | 18921900 179 177 161 154 671 | 203 187 154 168 712 | 13832000 117 138 135 103 493 | 139 129 113 105 486 | 9792100 120 109 92 93 414 | 106 103 70 82 361 | 7752200 70 61 59 49 239 | 51 57 43 34 185 | 4242300 41 47 50 39 177 | 41 27 28 25 121 | 298---------------------------------------------------------------------------------------24-Hour Totals: 16773 16770 33543--------------------------------------------------------------------------------------- Peak Volume Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour VolumeA.M. 715 1355 845 1114 715 2367P.M. 1700 1212 1615 1450 1615 2648Daily 715 1355 1615 1450 1615 2648 Page 189 of 494 file:///C/Users/Asus/OneDrive%20-%20Florida%20Department%20of%20Transportation/Traffic/SynopsisReports_2020/940264.txt[5/19/2021 3:27:19 PM] County: 94Station: 0264Description: SR 5/US 1 - N OF PRIMA VISTA BLVD (COUNTY 0264) Start Date: 10/14/2020Start Time: 0000--------------------------------------------------------------------------------------- Direction: N Direction: S CombinedTime 1st 2nd 3rd 4th Total 1st 2nd 3rd 4th Total Total---------------------------------------------------------------------------------------0000 49 34 17 26 126 | 28 34 25 20 107 | 2330100 23 24 16 15 78 | 24 16 19 18 77 | 1550200 16 23 9 14 62 | 21 19 11 14 65 | 1270300 12 19 9 15 55 | 7 16 17 20 60 | 1150400 17 27 37 38 119 | 12 25 41 37 115 | 2340500 41 61 80 84 266 | 31 65 72 100 268 | 5340600 87 156 240 198 681 | 114 168 220 227 729 | 14100700 243 311 367 354 1275 | 241 262 314 337 1154 | 24290800 345 304 315 307 1271 | 323 273 271 248 1115 | 23860900 248 263 266 296 1073 | 263 255 262 265 1045 | 21181000 268 259 278 339 1144 | 257 279 294 296 1126 | 22701100 268 311 320 302 1201 | 267 290 268 314 1139 | 23401200 310 341 354 358 1363 | 287 310 289 297 1183 | 25461300 329 323 342 333 1327 | 285 294 345 343 1267 | 25941400 355 357 363 297 1372 | 324 280 317 321 1242 | 26141500 331 348 394 418 1491 | 310 325 325 350 1310 | 28011600 399 397 387 379 1562 | 382 378 382 377 1519 | 30811700 389 397 349 391 1526 | 394 424 373 289 1480 | 30061800 339 282 311 253 1185 | 281 281 235 193 990 | 21751900 238 238 202 195 873 | 257 237 201 177 872 | 17452000 166 173 157 140 636 | 139 166 154 135 594 | 12302100 109 131 100 96 436 | 123 116 97 73 409 | 8452200 82 73 67 56 278 | 76 76 70 48 270 | 5482300 47 57 48 42 194 | 47 35 47 34 163 | 357---------------------------------------------------------------------------------------24-Hour Totals: 19594 18299 37893--------------------------------------------------------------------------------------- Peak Volume Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour VolumeA.M. 715 1377 730 1247 730 2617P.M. 1530 1608 1630 1577 1630 3129Daily 1530 1608 1630 1577 1630 3129 Truck Percentage 4.82 9.22 6.94---------------------------------------------------------------------------------------------------------- Classification Summary Database Dir 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 TotTrk TotVol N 115 15784 2751 91 452 90 94 119 56 38 0 0 4 0 0 944 19594 S 93 13791 2728 126 836 237 51 338 58 35 0 0 6 0 0 1687 18299 ---------------------------------------------------------------------------------------------------------- Page 190 of 494 QUALITY/LEVEL OF SERVICE HANDBOOK 79 INTERRUPTED FLOW FACILITIES UNINTERRUPTED FLOW FACILITIES STATE SIGNALIZED ARTERIALS FREEWAYS Class I (40 mph or higher posted speed limit) Core Urbanized Lanes Median B C D E Lanes B C D E 1 Undivided * 830 880 ** 2 2,230 3,100 3,740 4,080 2 Divided * 1,910 2,000 ** 3 3,280 4,570 5,620 6,130 3 Divided * 2,940 3,020 ** 4 4,310 6,030 7,490 8,170 4 Divided * 3,970 4,040 ** 5 5,390 7,430 9,370 10,220 Class II (35 mph or slower posted speed limit) 6 6,380 8,990 11,510 12,760 Lanes Median B C D E Urbanized 1 Undivided * 370 750 800 Lanes B C D E 2 Divided * 730 1,630 1,700 2 2,270 3,100 3,890 4,230 3 Divided * 1,170 2,520 2,560 3 3,410 4,650 5,780 6,340 4 Divided * 1,610 3,390 3,420 4 4,550 6,200 7,680 8,460 5 5,690 7,760 9,520 10,570 Non-State Signalized Roadway Adjustments (Alter corresponding state volumes by the indicated percent.) Non-State Signalized Roadways - 10% Freeway Adjustments Auxiliary Ramp Lane Metering + 1,000 + 5% Median & Turn Lane Adjustments UNINTERRUPTED FLOW HIGHWAYS Lanes Median B C D E 1 Undivided 580 890 1,200 1,610 2 Divided 1,800 2,600 3,280 3,730 3 Divided 2,700 3,900 4,920 5,600 Uninterrupted Flow Highway Adjustments Lanes Median Exclusive left lanes Adjustment factors 1 Divided Yes +5% Multi Undivided Yes -5% Multi Undivided No -25% Exclusive Exclusive Adjustment Lanes Median Left Lanes Right Lanes Factors 1 Divided Yes No +5% 1 Undivided No No -20% Multi Undivided Yes No -5% Multi Undivided No No -25% – – – Yes + 5% One-Way Facility Adjustment Multiply the corresponding directional volumes in this table by 1.2 BICYCLE MODE2 1Values shown are presented as peak hour directional volumes for levels of service and are for the automobile/truck modes unless specifically stated. This table does not constitute a standard and should be used only for general planning applications. The computer models from which this table is derived should be used for more specific planning applications. The table and deriving computer models should not be used for corridor or intersection design, where more refined techniques exist. Calculations are based on planning applications of the HCM and the Transit Capacity and Quality of Service Manual. 2 Level of service for the bicycle and pedestrian modes in this table is based on number of vehicles, not number of bicyclists or pedestrians using the facility. 3 Buses per hour shown are only for the peak hour in the single direction of the higher traffic flow. * Cannot be achieved using table input value defaults. ** Not applicable for that level of service letter grade. For the automobile mode, volumes greater than level of service D become F because intersection capacities have been reached. For the bicycle mode, the level of service letter grade (including F) is not achievable because there is no maximum vehicle volume threshold using table input value defaults. Source: Florida Department of Transportation Systems Implementation Office https://www.fdot.gov/planning/systems/ (Multiply vehicle volumes shown below by number of directional roadway lanes to determine two-way maximum service volumes.) Paved Shoulder/Bicycle Lane Coverage B C D E 0-49% * 150 390 1,000 50-84% 110 340 1,000 >1,000 85-100% 470 1,000 >1,000 ** PEDESTRIAN MODE2 (Multiply vehicle volumes shown below by number of directional roadway lanes to determine two-way maximum service volumes.) Sidewalk Coverage B C D E 0-49% * * 140 480 50-84% * 80 440 800 85-100% 200 540 880 >1,000 BUS MODE (Scheduled Fixed Route)3 (Buses in peak hour in peak direction) Sidewalk Coverage B C D E 0-84% > 5 ≥ 4 ≥ 3 ≥ 2 85-100% > 4 ≥ 3 ≥ 2 ≥ 1 TABLE 7 January 2020 Generalized Peak Hour Directional Volumes for Florida’s Urbanized Areas Page 191 of 494 FUTURE LAND USE ELEMENT GOALS, OBJECTIVES AND POLICIES Goal 1.1: Ensure the highest quality living environment possible, through a mixture of land uses reflecting the needs and desires of the local residents and how they want their community to develop. The goal shall be implemented by strictly enforced building, zoning and development codes based on objectives and policies that will enhance St. Lucie County's natural and man-made resources while minimizing any damage or threat of degradation to the health, safety and welfare of the county's citizens, native wildlife and environment, through incompatible land uses. Objective 1.1.1: Land Use. Maintain the Future Land Use Map land with the following use designations to portray the future development patterns of St. Lucie County. Policy 1.1.1.1 - The following land use designations/intensities, as indicated on the Future Land Use Maps are provided as the pattern for the future development of the area within unincorporated St. Lucie County. Future Land Use Designation Residential Density Max Height4 (For Buildings) Max Lot Coverage (For Buildings) AG-5 Agriculture-5 1 du/5 acres (0.2 du/1 acre) - - AG-2.5 Agriculture-2.5 1 du/2.5 acres (0.4 du/1 acre) - - RE Residential Estate 1 du/a acre - - RS Residential Suburban 2 du/1 acre - - RU Residential Urban 5 du/1 acre - - RM Residential Medium 9 du/ 1 acre - - RH Residential High 15 du/ 1 acre - - R/C Residential/Conservation 1 du/5 acres (0.2 du/1 acre) - - Cpub Conservation-Public 0 du1 20 ft 5-10% COM Commercial 0 du1.5 60 ft3 40—50% IND Industrial 0 du1 80 ft 40—50% P/F Public Facilities 0 du1 80 ft 40—50% T/U Transportation/Utilities 0 du1 40 ft6 40—50% MXD Mixed Use Development 0.2-15 du/acre2.5 80 ft 40—50% H Historic 0 du1 40 ft 40—50% SD Special District 0.2-15 du/acre 80 ft 40—50% TVC Towns, Villages, & Countryside Variable pursuant to special areas plan. See TVC Element Goals, Objectives, and Policies. 1-9 du/acre - - Notes: 1 Residential uses permitted under specific conditions only. Refer to Zoning/Land Development Code for special restrictions in individual zoning districts. 2 Maximum Densities subject to compliance with intensity with intensity plans for each mixed use area, as set forth in Policy 1.1.87.4 3 For motel or hotel uses, the building spacing formula as identified in the Land Development Code shall be used to establish maximum building height, unless otherwise stipulated in the Hutchinson Island Building Height Overlay Zone section of the Land Development Code, or unless otherwise restricted by Code or Ordinance of the County. 4 Unless otherwise stipulated in the Hutchinson Island Height Overlay Zone section in the Land Development Code 5 Motels/hotels shall be allowed up to 36 units/acre. 6 The height of the Treasure Coast Airport shall be regulated by the Airport Zone Height Limitations established in Section 4.00.03, of the Land Development Code, as reviewed and approved by the Federal Aviation Administration (FAA). Page 192 of 494 175 Land Use: 820 Shopping Center (>150k) Description A shopping center is an integrated group of commercial establishments that is planned, developed, owned, and managed as a unit. Each study site in this land use has at least 150,000 square feet of gross leasable area (GLA). It often has more than one anchor store. Various names can be assigned to a shopping center within this size range, depending on its specific size and tenants, such as community center, regional center, superregional center, fashion center, and power center. A shopping center of this size typically contains more than retail merchandising facilities. Office space, a movie theater, restaurants, a post office, banks, a health club, and recreational facilities are common tenants. A shopping center of this size can be enclosed or open-air. The vehicle trips generated at a shopping center are based upon the total GLA of the center. In the case of a smaller center without an enclosed mall or peripheral buildings, the GLA is the same as the gross floor area of the building. The 150,000 square feet GLA threshold value between community/regional shopping center and shopping plaza (Land Use 821) is based on an examination of trip generation data. For a shopping plaza that is smaller than the threshold value, the presence or absence of a supermarket within the plaza has a measurable effect on site trip generation. For a shopping center that is larger than the threshold value, the trips generated by its other major tenants mask any effects of the presence or absence of an on-site supermarket. Shopping plaza (40-150k) (Land Use 821), strip retail plaza (<40k) (Land Use 822), and factory outlet center (Land Use 823) are related uses. Additional Data Many shopping centers—in addition to the integrated unit of shops in one building or enclosed around a mall—include outparcels (peripheral buildings or pads located on the perimeter of the center adjacent to the streets and major access points). These buildings are typically drive-in banks, retail stores, restaurants, or small offices. Although the data herein do not indicate which of the centers studied include peripheral buildings, it can be assumed that some of the data show their effect. The technical appendices provide supporting information on time-of-day distributions for this land use. The appendices can be accessed through either the ITETripGen web app or the trip generation resource page on the ITE website (https://www.ite.org/technical-resources/topics/trip- and-parking-generation/). The sites were surveyed in the 1980s, the 1990s, the 2000s, and the 2010s in Alberta (CAN), California, Colorado, Connecticut, Delaware, Florida, Georgia, Illinois, Indiana, Iowa, Kentucky, General Urban/Suburban and Rural (Land Uses 800–999) Page 193 of 494 Maryland, Massachusetts, Michigan, Minnesota, New Jersey, New York, North Carolina, Ohio, Oklahoma, Pennsylvania, Tennessee, Texas, Vermont, Virginia, Washington, West Virginia, and Wisconsin. Source Numbers 77, 110, 154, 156, 159, 190, 199, 202, 204, 213, 251, 269, 294, 295, 299, 304, 305, 307, 308, 309, 311, 314, 315, 316, 317, 319, 365, 385, 404, 414, 423, 442, 446, 562, 629, 702, 715, 728, 868, 871, 880, 899, 912, 926, 946, 962, 973, 974, 978, 1034, 1040, 1067 176 Trip Generation Manual 11th Edition • Volume 5 Page 194 of 494 Shopping Center (>150k)(820) Vehicle Trip Ends vs:1000 Sq.Ft.GLA On a:Weekday Setting/Location:General Urban/Suburban Number of Studies:108 Avg.1000 Sq.Ft.GLA:538 Directional Distribution:50%entering,50%exiting Vehicle Trip Generation per 1000 Sq.Ft.GLA Average Rate Range of Rates Standard Deviation 37.01 17.27 -81.53 12.79 Data Plot and Equation 0 1000 20000 20000 40000 60000 Average RateStudySiteFittedCurve Fitted Curve Equation:T =26.11(X)+5863.73 R²=0.60 X =1000 Sq.Ft.GLA T = T r i p s E n d s 177General Urban/Suburban and Rural (Land Uses 800–999) Page 195 of 494 Shopping Center (>150k)(820) Vehicle Trip Ends vs:1000 Sq.Ft.GLA On a:Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Setting/Location:General Urban/Suburban Number of Studies:44 Avg.1000 Sq.Ft.GLA:546 Directional Distribution:62%entering,38%exiting Vehicle Trip Generation per 1000 Sq.Ft.GLA Average Rate Range of Rates Standard Deviation 0.84 0.30 -3.11 0.42 Data Plot and Equation 0 1000 20000 1000 2000 Average RateStudySiteFittedCurve Fitted Curve Equation:T =0.59(X)+133.55 R²=0.56 X =1000 Sq.Ft.GLA T = T r i p s E n d s 178 Trip Generation Manual 11th Edition • Volume 5 Page 196 of 494 Shopping Center (>150k)(820) Vehicle Trip Ends vs:1000 Sq.Ft.GLA On a:Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Setting/Location:General Urban/Suburban Number of Studies:126 Avg.1000 Sq.Ft.GLA:581 Directional Distribution:48%entering,52%exiting Vehicle Trip Generation per 1000 Sq.Ft.GLA Average Rate Range of Rates Standard Deviation 3.40 1.57 -7.58 1.26 Data Plot and Equation 0 1000 2000 30000 2000 4000 6000 8000 Average RateStudySiteFittedCurve Fitted Curve Equation:Ln(T)=0.72 Ln(X)+3.02 R²=0.70 X =1000 Sq.Ft.GLA T = T r i p s E n d s 179General Urban/Suburban and Rural (Land Uses 800–999) Page 197 of 494 Land Use Code Land Use Setting Time Period # Data Sites Average Pass-By Rate GLA (000)Primary (%)Diverted (%)Total (%)Source 213 Florida 1990 312 28 31 41 72 —33 225 Illinois 1994 264 35 32 33 65 1970 24 227.9 Kentucky 1993 —34 35 31 66 —34 235 Kentucky 1993 211 35 29 36 65 2593 2 255 Iowa 1994 222 23 38 39 77 3706 24 256 Connecticut 1994 208 27 51 22 73 3422 24 293 Illinois 1994 282 24 70 6 76 4606 13 294 Pennsylvania 1994 213 24 48 18 76 4055 24 350 Massachusetts 1994 224 18 45 37 82 2112 24 361 Virginia 1994 315 17 54 29 83 2034 24 375 North Carolina 1994 214 29 48 23 71 2053 24 413 Texas 1994 228 28 51 21 72 589 24 418 Maryland 1994 281 20 50 30 80 5610 24 450 California 1994 321 23 49 28 77 2787 24 476 Washington 1994 234 25 53 22 75 3427 24 488 Texas 1994 257 12 75 13 88 1094 13 560 Virginia 1994 437 19 49 32 81 3051 24 581 Colorado 1994 296 18 53 29 82 2939 24 598 Colorado 1994 205 17 55 28 83 3840 24 633 Texas 1994 257 10 64 26 90 —24 667 Illinois 1994 200 16 53 31 84 2770 24 738 New Jersey 1994 283 13 75 12 87 8059 24 800 California 1994 205 21 51 28 79 7474 24 808 California 1994 240 13 73 14 87 4035 24 Weekday PM Peak Period Pass-By Characteristics for Individual Sites State or Province Survey Year # Interviews Pass-By Trip (%) Non-Pass-By Trips Adj Street Peak Hour Volume 8 Sites with GLA between 150 and 300k 29% for Sites with GLA between 150 and 300k 16 Sites with GLA between 300 and 900k 19% for Sites with GLA between 300 and 900k General Urban/Suburban Vehicle Pass-By Rates by Land Use Source: ITE Trip Generation Manual, 11th Edition 820 Shopping Center (> 150k) Page 198 of 494 707 Land Use: 710 General Office Building Description A general office building is a location where affairs of businesses, commercial or industrial organizations, or professional persons or firms are conducted. An office building houses multiple tenants that can include, as examples, professional services, insurance companies, investment brokers, a banking institution, a restaurant, or other service retailers. A general office building with a gross floor area of 10,000 square feet or less is classified as a small office building (Land Use 712). Corporate headquarters building (Land Use 714), single tenant office building (Land Use 715), medical-dental office building (Land Use 720), office park (Land Use 750), research and development center (Land Use 760), and business park (Land Use 770) are additional related uses. Additional Data If two or more general office buildings are in close physical proximity (within a close walk) and function as a unit (perhaps with a shared parking facility and common or complementary tenants), the total gross floor area or employment of the paired office buildings can be used for calculating the site trip generation. If the individual buildings are isolated or not functionally related to one another, trip generation should be calculated for each building separately. For study sites with reported gross floor area and employees, an average employee density of 3.3 employees per 1,000 square feet GFA (or roughly 300 square feet per employee) has been consistent through the 1980s, 1990s, and 2000s. No sites counted in the 2010s reported both GFA and employees. The average building occupancy varies considerably within the studies for which occupancy data were provided. The reported occupied gross floor area was 88 percent for general urban/suburban sites and 96 percent for the center city core and dense multi-use urban sites. The technical appendices provide supporting information on time-of-day distributions for this land use. The appendices can be accessed through either the ITETripGen web app or the trip generation resource page on the ITE website (https://www.ite.org/technical-resources/topics/trip- and-parking-generation/). The average numbers of person trips per vehicle trip at the eight center city core sites at which both person trip and vehicle trip data were collected are as follows: • 2.8 during Weekday, Peak Hour of Adjacent Street Traffic, one hour between 7 and 9 a.m. • 2.9 during Weekday, AM Peak Hour of Generator • 2.9 during Weekday, Peak Hour of Adjacent Street Traffic, one hour between 4 and 6 p.m. • 3.0 during Weekday, PM Peak Hour of Generator General Urban/Suburban and Rural (Land Uses 400–799) Page 199 of 494 The average numbers of person trips per vehicle trip at the 18 dense multi-use urban sites at which both person trip and vehicle trip data were collected are as follows: • 1.5 during Weekday, Peak Hour of Adjacent Street Traffic, one hour between 7 and 9 a.m. • 1.5 during Weekday, AM Peak Hour of Generator • 1.5 during Weekday, Peak Hour of Adjacent Street Traffic, one hour between 4 and 6 p.m. • 1.5 during Weekday, PM Peak Hour of Generator The average numbers of person trips per vehicle trip at the 23 general urban/suburban sites at which both person trip and vehicle trip data were collected are as follows: • 1.3 during Weekday, Peak Hour of Adjacent Street Traffic, one hour between 7 and 9 a.m. • 1.3 during Weekday, AM Peak Hour of Generator • 1.3 during Weekday, Peak Hour of Adjacent Street Traffic, one hour between 4 and 6 p.m. • 1.4 during Weekday, PM Peak Hour of Generator The sites were surveyed in the 1980s, the 1990s, the 2000s, the 2010s, and the 2020s in Alberta (CAN), California, Colorado, Connecticut, Georgia, Illinois, Indiana, Kansas, Kentucky, Maine, Maryland, Michigan, Minnesota, Missouri, Montana, New Hampshire, New Jersey, New York, Ontario (CAN)Pennsylvania, Texas, Utah, Virginia, and Washington. Source Numbers 161, 175, 183, 184, 185, 207, 212, 217, 247, 253, 257, 260, 262, 273, 279, 297, 298, 300, 301, 302, 303, 304, 321, 322, 323, 324, 327, 404, 407, 408, 419, 423, 562, 734, 850, 859, 862, 867, 869, 883, 884, 890, 891, 904, 940, 944, 946, 964, 965, 972, 1009, 1030, 1058, 1061 708 Trip Generation Manual 11th Edition • Volume 4 Page 200 of 494 General Office Building(710) Vehicle Trip Ends vs:1000 Sq.Ft.GFA On a:Weekday Setting/Location:General Urban/Suburban Number of Studies:59 Avg.1000 Sq.Ft.GFA:163 Directional Distribution:50%entering,50%exiting Vehicle Trip Generation per 1000 Sq.Ft.GFA Average Rate Range of Rates Standard Deviation 10.84 3.27 -27.56 4.76 Data Plot and Equation 0 200 400 600 8000 2000 4000 6000 Average RateStudySiteFittedCurve Fitted Curve Equation:Ln(T)=0.87 Ln(X)+3.05 R²=0.78 X =1000 Sq.Ft.GFA T = T r i p s E n d s 709General Urban/Suburban and Rural (Land Uses 400–799) Page 201 of 494 General Office Building(710) Vehicle Trip Ends vs:1000 Sq.Ft.GFA On a:Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Setting/Location:General Urban/Suburban Number of Studies:221 Avg.1000 Sq.Ft.GFA:201 Directional Distribution:88%entering,12%exiting Vehicle Trip Generation per 1000 Sq.Ft.GFA Average Rate Range of Rates Standard Deviation 1.52 0.32 -4.93 0.58 Data Plot and Equation 0 1000 20000 1000 2000 Average RateStudySiteFittedCurve Fitted Curve Equation:Ln(T)=0.86 Ln(X)+1.16 R²=0.78 X =1000 Sq.Ft.GFA T = T r i p s E n d s 710 Trip Generation Manual 11th Edition • Volume 4 Page 202 of 494 General Office Building(710) Vehicle Trip Ends vs:1000 Sq.Ft.GFA On a:Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Setting/Location:General Urban/Suburban Number of Studies:232 Avg.1000 Sq.Ft.GFA:199 Directional Distribution:17%entering,83%exiting Vehicle Trip Generation per 1000 Sq.Ft.GFA Average Rate Range of Rates Standard Deviation 1.44 0.26 -6.20 0.60 Data Plot and Equation 0 1000 20000 1000 2000 Average RateStudySiteFittedCurve Fitted Curve Equation:Ln(T)=0.83 Ln(X)+1.29 R²=0.77 X =1000 Sq.Ft.GFA T = T r i p s E n d s 711General Urban/Suburban and Rural (Land Uses 400–799) Page 203 of 494 Page 204 of 494 Page 205 of 494 Page 206 of 494 Page 207 of 494 Page 208 of 494 273 Land Use: 221 Multifamily Housing (Mid-Rise) Description Mid-rise multifamily housing includes apartments and condominiums located in a building that has between four and 10 floors of living space. Access to individual dwelling units is through an outside building entrance, a lobby, elevator, and a set of hallways. Multifamily housing (low-rise) (Land Use 220), multifamily housing (high-rise) (Land Use 222), off- campus student apartment (mid-rise) (Land Use 226), and mid-rise residential with ground-floor commercial (Land Use 231) are related land uses. Land Use Subcategory Data are presented for two subcategories for this land use: (1) not close to rail transit and (2) close to rail transit. A site is considered close to rail transit if the walking distance between the residential site entrance and the closest rail transit station entrance is ½ mile or less. Additional Data For the six sites for which both the number of residents and the number of occupied dwelling units were available, there were an average of 2.5 residents per occupied dwelling unit. For the five sites for which the numbers of both total dwelling units and occupied dwelling units were available, an average of 96 percent of the total dwelling units were occupied. The technical appendices provide supporting information on time-of-day distributions for this land use. The appendices can be accessed through either the ITETripGen web app or the trip generation resource page on the ITE website (https://www.ite.org/technical-resources/topics/trip- and-parking-generation/). It is expected that the number of bedrooms and number of residents are likely correlated to the trips generated by a residential site. To assist in future analysis, trip generation studies of all multifamily housing should attempt to obtain information on occupancy rate and on the mix of residential unit sizes (i.e., number of units by number of bedrooms at the site complex). The sites were surveyed in the 1990s, the 2000s, the 2010s, and the 2020s in Alberta (CAN), California, District of Columbia, Florida, Georgia, Illinois, Maryland, Massachusetts, Minnesota, Montana, New Jersey, New York, Ontario (CAN), Oregon, Utah, and Virginia. Source Numbers 168, 188, 204, 305, 306, 321, 818, 857, 862, 866, 901, 904, 910, 949, 951, 959, 963, 964, 966, 967, 969, 970, 1004, 1014, 1022, 1023, 1025, 1031, 1032, 1035, 1047, 1056, 1057, 1058, 1071, 1076 General Urban/Suburban and Rural (Land Uses 000–399) Page 209 of 494 Multifamily Housing (Mid-Rise)Not Close to Rail Transit (221) Vehicle Trip Ends vs:Dwelling Units On a:Weekday Setting/Location:General Urban/Suburban Number of Studies:11 Avg.Num.of Dwelling Units:201 Directional Distribution:50%entering,50%exiting Vehicle Trip Generation per Dwelling Unit Average Rate Range of Rates Standard Deviation 4.54 3.76 -5.40 0.51 Data Plot and Equation 0 100 200 300 4000 1000 2000 Average RateStudySiteFittedCurve Fitted Curve Equation:T =4.77(X)-46.46 R²=0.93 X =Number of Dwelling Units T = T r i p s E n d s 274 Trip Generation Manual 11th Edition • Volume 3 Page 210 of 494 Multifamily Housing (Mid-Rise)Not Close to Rail Transit (221) Vehicle Trip Ends vs:Dwelling Units On a:Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Setting/Location:General Urban/Suburban Number of Studies:30 Avg.Num.of Dwelling Units:173 Directional Distribution:23%entering,77%exiting Vehicle Trip Generation per Dwelling Unit Average Rate Range of Rates Standard Deviation 0.37 0.15 -0.53 0.09 Data Plot and Equation 0 100 200 300 400 5000 100 200 300 Average RateStudySiteFittedCurve Fitted Curve Equation:T =0.44(X)-11.61 R²=0.91 X =Number of Dwelling Units T = T r i p s E n d s 275General Urban/Suburban and Rural (Land Uses 000–399) Page 211 of 494 Multifamily Housing (Mid-Rise)Not Close to Rail Transit (221) Vehicle Trip Ends vs:Dwelling Units On a:Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Setting/Location:General Urban/Suburban Number of Studies:31 Avg.Num.of Dwelling Units:169 Directional Distribution:61%entering,39%exiting Vehicle Trip Generation per Dwelling Unit Average Rate Range of Rates Standard Deviation 0.39 0.19 -0.57 0.08 Data Plot and Equation 0 100 200 300 400 5000 100 200 Average RateStudySiteFittedCurve Fitted Curve Equation:T =0.39(X)+0.34 R²=0.91 X =Number of Dwelling Units T = T r i p s E n d s 276 Trip Generation Manual 11th Edition • Volume 3 Page 212 of 494 U S 1 ST LUCIE BLVDFLORIDA TPK ST JAMES BLVD ORANGE AVE GLADES CUT OFF RD S O C E A N D R S IN DIA N RIV E R D R W MIDWAY RD A 1 A INDRIO RD O K EE C H O B E E R D I-9 5 N KINGS HWY N CA USE W AY D R S E A W A Y D R S 25TH ST N O L D DIXIE H WY PORT ST. LUCIE BLVD ST. LUCIE WEST BLVD/PRIMA VISTA BLVD US HIGHWAY 1 Port St. Lucie St. Lucie Village Fort Pierce St. Lucie County2018 Comprehensive PlanFuture Land Use 2040 Map Print Date: 7/23/2018 Source:St Lucie County ² 0 4.52.25 Miles Indian River County Martin County A tl a n ti c O c e a n I n d i a n R i v e r L a g o o n §¨¦I-95 Map: FLU-1 Legend Urban Service Boundary County Boundary Municipalities Future Land UseAG-5, Agriculture-5 AG-2.5, Agriculture-2.5 RE, Residential Estate RS, Residential Suburban RU, Residential Urban RM, Residential Medium RH, Residential High R/C, Residential/Conservation CPUB, Conservation-Public COM, Commercial IND, Industrial P/F, Public Facilities T/U, Transportation/Utilities MXD, Mixed Use Development H, Historic SD, Special District TVC, Towns, Villages & Countryside ROW, Right of Way SUBM, Submerged Lands SPIS, Spoil Islands Page 213 of 494 LA N D S C A P E A R C H I T E C T U R E - S U R V E Y I N G CA U L F I E L D & W H E E L E R , I N C . CI V I L E N G I N E E R I N G PH O N E ( 5 6 1 ) - 3 9 2 - 1 9 9 1 / F A X ( 5 6 1 ) - 7 5 0 - 1 4 5 2 79 0 0 G L A D E S R O A D - S U I T E 1 0 0 BO C A R A T O N , F L O R I D A 3 3 4 3 4 ” SITE US 1 OL E A N D E R A V E N U E MIDWAY ROAD SUNSHINE BLVD EASY STREET Page 214 of 494 LA N D S C A P E A R C H I T E C T U R E - S U R V E Y I N G CA U L F I E L D & W H E E L E R , I N C . CI V I L E N G I N E E R I N G PH O N E ( 5 6 1 ) - 3 9 2 - 1 9 9 1 / F A X ( 5 6 1 ) - 7 5 0 - 1 4 5 2 79 0 0 G L A D E S R O A D - S U I T E 1 0 0 BO C A R A T O N , F L O R I D A 3 3 4 3 4 Page 215 of 494 LA N D S C A P E A R C H I T E C T U R E - S U R V E Y I N G CA U L F I E L D & W H E E L E R , I N C . CI V I L E N G I N E E R I N G PH O N E ( 5 6 1 ) - 3 9 2 - 1 9 9 1 / F A X ( 5 6 1 ) - 7 5 0 - 1 4 5 2 79 0 0 G L A D E S R O A D - S U I T E 1 0 0 BO C A R A T O N , F L O R I D A 3 3 4 3 4 Page 216 of 494 Michelle Franklin, CFA -- Saint Lucie County Property Appraiser -- All rights reserved. All information is believed to be correct at this time, but is subject to change and is provided without any warranty. © Copyright 2021 Saint Lucie County Property Appraiser. All rights reserved. Property Identi cation Site Address: TBD Use Type: 0000 Sec/Town/Range: 10/36S/40E Account #: 40600 Parcel ID: 3410-702-0055-000-3 Map ID: 34/10S Jurisdiction: Saint Lucie County Zoning: RS-2 - Cou Ownership EGUIBEBE LLCNelmarta associates LTD 4855 Hunters WAY Boca Raton, FL 33434 Legal Description AMENDED PLAT OF AETNA PARK 10 3640 S 1/2 OF SW 1/4 OF NE 1/4OF SW 1/4 (5.00 AC) (OR 2017-743) Current Values Just/Market Value:$156,200 Assessed Value:$133,540 Exemptions:$0 Taxable Value:$133,540 Property taxes are subject to change upon change of ownership. Past taxes are not a reliable projection of future taxes.The sale of a property will prompt the removal of allexemptions, assessment caps, and special classifications. Taxes for this parcel: SLC Tax Collector's Office Download TRIM for this parcel: Download PDF Total Areas Finished/Under Air (SF):0 Gross Sketched Area (SF):0 Land Size (acres):5 Land Size (SF):217,800 Building Design Wind Speed Occupancy Category I II III & IV Speed 140 160 160 Sources/links: Page 217 of 494 Michelle Franklin, CFA -- Saint Lucie County Property Appraiser -- All rights reserved. All information is believed to be correct at this time, but is subject to change and is provided without any warranty. © Copyright 2021 Saint Lucie County Property Appraiser. All rights reserved. Property Identi cation Site Address: 6209 S US HIGHWAY 1 Use Type: 1000 Sec/Town/Range: 10/36S/40E Account #: 40599 Parcel ID: 3410-702-0054-000-6 Map ID: 34/10S Jurisdiction: Saint Lucie County Zoning: RS-2 - Cou Ownership EGUIBEBE LLCNelmarta associates LTD 4855 Hunters WAY Boca Raton, FL 33434 Legal Description AMENDED PLAT OF AETNA PARK 10 3640 N 1/2 OF SW 1/4 OF NE 1/4OF SW 1/4 AND SE 1/4 OF NE 1/4 OF SW 1/4-LESS S 40 FT OF E 131 FTAND LESS LOTS 1, 3 AND 10 BLK A AND LOTS 1 AND 2, BLK B OFORIGINAL PLAT OF AETNA PARK AND LESS RD R/W- (13.46AC) (OR2017-743) Current Values Just/Market Value:$1,546,300 Assessed Value:$1,272,799 Exemptions:$0 Taxable Value:$1,272,799 Property taxes are subject to change upon change of ownership. Past taxes are not a reliable projection of future taxes.The sale of a property will prompt the removal of allexemptions, assessment caps, and special classifications. Taxes for this parcel: SLC Tax Collector's Office Download TRIM for this parcel: Download PDF Total Areas Finished/Under Air (SF):0 Gross Sketched Area (SF):0 Land Size (acres):13.46 Land Size (SF):586,317.6 Building Design Wind Speed Occupancy Category I II III & IV Speed 140 160 170 Sources/links: Page 218 of 494 Michelle Franklin, CFA -- Saint Lucie County Property Appraiser -- All rights reserved. All information is believed to be correct at this time, but is subject to change and is provided without any warranty. © Copyright 2021 Saint Lucie County Property Appraiser. All rights reserved. Property Identi cation Site Address: S US HIGHWAY 1 Use Type: 1000 Sec/Town/Range: 10/36S/40E Account #: 40592 Parcel ID: 3410-701-0001-000-7 Map ID: 34/10S Jurisdiction: Saint Lucie County Zoning: Comm Genra Ownership EGUIBEBE LLCNelmarta associates LTD 4855 Hunters WAY Boca Raton, FL 33434 Legal Description AETNA PARK S/D BLK A LOTS 1 AND 3 (0.26 AC) (OR 2017-743) Current Values Just/Market Value:$44,000 Assessed Value:$44,000 Exemptions:$0 Taxable Value:$44,000 Property taxes are subject to change upon change of ownership. Past taxes are not a reliable projection of future taxes.The sale of a property will prompt the removal of allexemptions, assessment caps, and special classifications. Taxes for this parcel: SLC Tax Collector's Office Download TRIM for this parcel: Download PDF Total Areas Finished/Under Air (SF):0 Gross Sketched Area (SF):0 Land Size (acres):0.25 Land Size (SF):11,000 Building Design Wind Speed Occupancy Category I II III & IV Speed 140 160 170 Sources/links: Page 219 of 494 Environmental resources FINAL REPORT TO: Jodi Kugler, Planning & Development Services Department THROUGH: Aimee L. Cooper, Environmental Regulations Manager Amy E. Griffin, Environmental Resources Director FROM: Brian Arbeiter, Sr. Environmental Planner DATE: May 27th, 2022 SUBJECT: Tidewater Future Land Use Map Amendment FLUMA-11202126232 Background The Environmental Resources Department (ERD) is in receipt of the April 20th, 2022 date-stamped submittal from Planning and Development Services. The applicant is requesting approval to change the future land use of the project site from Commercial (COM), Residential Medium (RM), & Residential Urban (RU) to Mixed Use Development (MXD). The proposed future land use change would accommodate the concurrent Planned Unit Development / Rezoning (PUD_RZ-11202126231) application that proposes 160 multifamily residential units with associated site improvements. A 2.58-acre outparcel located at the northeastern corner of the property is to retain Commercial General (CG) zoning for future commercial development. The project is located at 6209 S US Highway 1 in Ft. Pierce and currently consists of three (3) vacant parcels (Parcel IDs 3410-702-0055-000-3, 3410-702-0054- 000-6, & 3410-701-0001-000-7) collectively measuring 18.87-acres. Findings An Environmental Impact Report (EIR) prepared by Aquatic Research Monitoring, Equipment, & Deployment, LLC, dated April 2022, was provided, and reviewed. The subject site is currently vacant and consists primarily of invasive vegetation with scattered native oaks and cabbage palms. No wetlands or native uplands were found onsite, and no Federal or State listed plant species or listed animal burrows, nests, dens, or roosting areas were observed onsite. Topography and past aerials indicate the parcels were previously utilized for agricultural purposes. The proposed future land use text amendment application is being submitted concurrently with the Planned Unit Development / Rezoning (PUD_RZ-11202126231) application. Environmental impacts, specifically tree mitigation and landscaping, will be addressed through the site plan process. Recommendation ERD has no objection to the proposed future land use text amendment request. Please contact Brian Arbeiter at 772-462-2866 if you have any questions. Page 220 of 494 ITEM NO. (ID # 2022-55380) DATE: 7/21/2022 AGENDA REQUEST TO: Planning and Zoning Commission PRESENTED BY: Jodi Nentwick, Senior Planner SUBMITTED BY: Planning & Development Services SUBJECT: A Zoning Atlas Amendment (Rezone) from RS-2 (Residential, Single-Family-2) and CG (Commercial, General) to PUD (Planned Unit Development), and Preliminary PUD Site Plan for a project to be known as the Tidewater PUD located at 6209 S. US Highway 1 in Fort Pierce, submitted by Cotleur and Hearing, Inc., on behalf of Meritage Homes of Florida Inc. BACKGROUND: Cotleur and Hearing, Inc. submitted petitions, on behalf of Meritage Homes of Florida Inc., for a Future Land Use Map Amendment to change the land use categories from RU (Residential, Urban - 5 du/ac), RM (Residential, Medium - 9du/ac) and COM (Commercial) to the MXD (Mixed-Use Development) category. The applicant has also submitted a concurrent Zoning Atlas Amendment (Rezone) from RS-2 (Residential, Single- Family-2) and CG (Commercial, General) to PUD (Planned Unit Development), and Preliminary PUD Site Plan for a project to be known as the Tidewater PUD located at 6209 S. US Highway 1 in Fort Pierce. The Preliminary PUD Site Plan encompasses a 16.37-acre subset of the subject sites to develop 160 multifamily residential (townhome) units associated with improvements to be known as Tidewater PUD. A proposed 2.50-acre outparcel, located at the northeastern corner of the subject site, is to retain a CG (Commercial, General) Zoning Designation. The applicant is proposing to extend approximately 5,200 linear feet of sanitary sewer force main within the US-1 right-of-way which connects to the existing Fort Pierce Utility Authority (FPUA) manhole. This new sanitary sewer force main will be able to serve undeveloped and underdeveloped parcels south of Midway Road, and FPUA's current system terminus.. PREVIOUS ACTION: No previous action for the subject site FINANCIAL IMPACT: N/A RECOMMENDATION: Page 221 of 494 Staff has reviewed these petitions and determined that it conforms to the Standards of Review as outlined in Section 11.06.03 of the St. Lucie County Land Development Code and are consistent with the St. Lucie County Comprehensive Plan Goals, Objectives, and Policies. Staff recommends to the Planning and Zoning Commissioner forward a recommendation of approval to the St. Lucie County Board of Commissioners with conditions outlined in the Draft Resolution. COMMISSION ACTION: RESULT: MOVER: SECONDER: None AYES: None NAYS: None EXCUSED: None Coordination/Signatures Date: July 15, 2022 Benjamin Balcer, Planning & Development Services Assistant Director Date: July 15, 2022 Mayte Santamaria, Planning & Development Services Director Date: July 15, 2022 Katherine Barbieri, Assistant County Attorney III Date: July 15, 2022 Mark Satterlee, Deputy County Administrator Page 222 of 494 Planning Division Agenda Item Summary Applicant: Meritage Homes of Florida Inc. Dante Fraiegari 1400 Centrepark Boulevard, Suite 10000 West Palm Beach, FL 33401 Agent: Cotleur & Hearing, Inc Dan Sorrow, PLA, AICP, LEED AP BD+C 1934 Commerce Centre Lane Jupiter, FL 33458 Project Location(s): 6209 S. Highway 1, Fort Pierce, FL Parcel ID(s)#: 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Future Land Use: RM (Residential, Medium) RU (Residential Urban) COM (Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Existing Zoning: RS-2 (Residential, Single-Family-2du/ac) CG (Commercial, General) Proposed Zoning: PUD (Planned Unit Development) & CG (Commercial, General) Staff Jodi Nentwick-Kugler Tel 772-462-1580 Email NentwickJ@stlucieco.org Mail 2300 Virginia Avenue, Tidewater PUD Amendment to the Future Land Use Map & Rezone to Planned Unit Development (PUD) and Preliminary Site Plan Project Description The applicant, Dan Sorrow, Cotleur & Hearing, on behalf Meritage Homes of Florida Inc, for a Future Land Use Map Amendment to change the land use cate- gory from RU (Residential, Urban-5 du/ ac), RM (Residential, Medium-9du/ac) and COM (Commercial) to MXD (Mixed- Use Development) category. The applicant has also submitted a con- current Zoning Atlas Amendment (Rezone) from RS-2 (Residential, Single-Family-2) and CG (Commercial, General) to PUD (Planned Unit Development), and Preliminary PUD Site Plan for a project to be known as the Tidewater PUD located at 6209 S. US Highway 1 in Fort Pierce. The applicant is proposing to extend ap- proximately 5,200 linear feet of sanitary sewer force main within the US-1 right-of- way which connects to the existing Fort Pierce Utility Authority (FPUA) manhole. This new sanitary sewer force main will be able to serve undeveloped and under- developed parcels south of Midway Road FPUA system limits. The St. Lucie County Planning and Zon- ing Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applica- tions within their area of responsibility. Notice Requirements Public hearing notice in accordance with Section 11.00.03 of the Land Develop- ment Code was placed in the St. Lucie News Tribune on Friday, July 8, 2022, Notices were sent to twenty-three (23) property owners within the 500 foot radi- us of the subject site, and a sign was posted on the property. The Planning Department received no responses to date. Staff’s Recommendation Staff recommends the Planning and Zoning Commission forward a recom-mendation of approval to the St. Lucie County Board of County Commission- ers. Hearing Date Thursday July 21, 2022 PLANNING AND ZONING COMMISSION Page 223 of 494 Planning and Development Services Department Planning Division M E M O R A N D U M GENERAL INFORMATION: Property Owner(s): Eguibebe, LLC 4855 Hunters Way Boca Raton, FL 33434 Nelmarta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc. Dante Fraiegari 1400 Centrepark Boulevard, Suite 10000 West Palm Beach, FL 33401 Agent/Agent of Record: Cotleur and Hearing, Inc. Dan Sorrow, PLA, AICP, LEED AP BD+C 1934 Commerce Centre Lane, Suite Jupiter, FL 33458 Location: 6209 S. US Highway 1, Fort Pierce, FL 34982 Tax ID(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Project Size: +/-18.873-Acres Existing Future Land Use: RM (Residential, Medium), RU (Residential Urban) & COM (Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Tidewater Mixed Use Activity Area Existing Zoning: RS-2 (Residential, Single-Family-2du/ac) & CG (Commercial, General) TO: Planning Commission and Zoning Commission THROUGH: Mayté Santamaria, Director Benjamin Balcer, AICP, Assistant Director FROM: Jodi Kugler, Senior Planner DATE: July 11, 2022 SUBJECT: Tidewater PUD Small-Scale Future Land Use Map Amendment (FLUMA-11202126232) Rezone to Planned Unit Development & Preliminary Development Plan (PUD-RZ-11202126231) Page 224 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 2 Proposed Zoning: PUD (Planned Unit Development) 16.37-acres CG (Commercial, General) 2.5-acres Existing Use: Vacant (undeveloped) Boundary (USB): The subject property is located inside the Urban Service Boundary Utility Service: Fort Pierce Utility Authority (FPUA) – Proposing a wastewater line extension Type of Concurrency Concurrency Deferral Affidavit Fire/EMS Protection: St. Lucie County Fire District Station #6, located at 350 E. Midway Road in Fort Pierce, approximately 1.75 miles northeast of the subject site. BACKGROUND & REQUEST OVERVIEW Cotleur and Hearing, Inc. submitted petitions, on behalf of Meritage Homes of Florida Inc., for a Future Land Use Map Amendment to change the land use categories from RU (Residential, Urban - 5 du/ac), RM (Residential, Medium - 9du/ac) and COM (Commercial) to the MXD (Mixed-Use Development) category. The applicant has also submitted a concurrent Zoning Atlas Amendment (Rezone) from RS-2 (Residential, Single-Family-2) and CG (Commercial, General) to PUD (Planned Unit Development), and Preliminary PUD Site Plan for a project to be known as the Tidewater PUD located at 6209 S. US Highway 1 in Fort Pierce. The Preliminary PUD Site Plan encompasses a 16.37-acre subset of the subject sites to develop 160 multifamily residential (townhome) units associated with improvements to be known as Tidewater PUD. A proposed 2.50- acre outparcel, located at the northeastern corner of the subject site, is to retain a CG (Commercial, General) Zoning Designation. The applicant is proposing to extend approximately 5,200 linear feet of sanitary sewer force main within the US-1 right-of-way which connects to the existing Fort Pierce Utility Authority (FPUA) manhole. This new sanitary sewer force main will be able to serve undeveloped and underdeveloped parcels south of Midway Road FPUA system limits. Aerial Page 225 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 3 ************************************************************************** SECTION 1: FUTURE LAND USE MAP AMENDMENT STANDARDS OF REVIEW AS OUTLINED IN THE ST. LUCIE COUNTY COMPREHENSIVE PLAN A. In reviewing petitions for amendments to the Future Land Use Map, the Planning and Zoning Commission should determine whether the proposed amendment is consistent with all elements of the St. Lucie County Comprehensive Plan and Florida Statutes. The proposed comprehensive plan amendment would change the Future Land Use Map designation for the collective 18.73 acres from RU (Residential, Urban-5 du/ac), RM (Residential, Medium-9du/ac), and COM (Commercial) to an MXD (Tidewater Mixed Use Activity Area) Category with Specific Use designations for COM/RES-10 by adding a new Mixed-Use area Figure to the Future Land Use Element. Specific Use areas within the Mixed-Use Activity Area are restricted to the following unless otherwise amended through the comprehensive plan amendment process. The Tidewater Mixed Use Activity Area will include the following sub-area policies: SU (Res-10) - Means that uses within this zone are restricted to those that would be equivalent to the RM land use designation as described in the future land use element of the comprehensive plan, allowing up to 10/du/ac through a PUD rezoning. SU (Com) – Means that the uses within this zone are restricted to those that would be equivalent to the COM as described in the future land use element of the comprehensive plan. The Development Review Committee (DRC) has reviewed this petition and determined it complies with the following Goals, Objectives, and Policies of the St. Lucie County Comprehensive Plan. Objective 1.1.2: Growth Management. St. Lucie County shall manage how and where growth occurs by using sustainable development and balanced planning practices. The County shall manage the land use patterns designated on the Future Land Use Map comprehensively, consistently, and effectively to enhance the quality of life for its citizens, promote economic vitality, and accommodate projected population growth and development in an environmentally acceptable manner. Policy 1.1.2.1: The adopted Future Land Use Map Series and any amendments shall promote responsible growth management practices. When considering any amendment to the Future Land Use Maps of the County’s Comprehensive Plan, the County Commission shall make the following findings, supported by the other elements of this Plan, before taking any approval actions granting an individual amendment to the Future Land Use Maps: 1. That the property under land use amendment application is adjunct to, or within no more than one-quarter mile of the same or greater type of land use classification. 2. That the property under land-use amendment consideration lies within the Five-Year Capital Improvement Program of the Water and Wastewater Master Plan for St. Lucie County (or can be reasonably accommodated with an amendment to the Master Plan) or otherwise meets the requirements of Policy 1.1.5.4. Page 226 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 4 Exhibit 1, Existing Future Land Use Map Exhibit 2, Proposed Future Land Use Map The subject parcel is situated along the west side of S. U.S Highway 1. The site is bordered by single-family residential, general commercial parcels, and an existing Arrigo Dodge automobile dealership to the north. To the west, the site is bordered by existing single-family homes and vacant single-family residential zoned parcels adjacent to the open space area. To the south of the subject parcels, is a vacant commercial area, small commercial out parcels to the southeast, and borders S. U.S. Highway 1 to the east. Page 227 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 5 Adjacent Land Uses: Policy 1.1.2.2 – By Florida Statutes, proposed future land use map amendments to the County’s Comprehensive Plan, shall be based upon the following analyses: 1. An analysis of anticipated growth; 2. An analysis of the availability of facilities and services; 3. An analysis of the suitability of the plan amendment for its proposed use considering the character of the undeveloped land, soils, topography, natural resources, and historic resources on-site; 4. An analysis of the compatibility of adjacent land uses; and 5. An analysis of the need for job creation, capital improvement, and economic development that will strengthen and diversify the community’s economy; and 6. A consultation with the Florida Department of Transportation when it is determined that a proposed amendment has the potential to affect facilities on the Strategic Intermodal System. The project site is currently located within the County’s Urban Service Boundary, making this a suitable location to further accommodate the County’s increasing population. By the Bureau of Economic and Business Research (BEBR), Florida Population Census 2020 report performed by the University of Florida, the population in St. Lucie County has increased by 18.5% from April 2010 to April 2020. The inclusion of utilizing infill mixed-use development for commercial and residential along US Highway 1 increases homeownership and job opportunities without additional transportation demands within St. Lucie County. Fire/EMS Services The nearest Fire Station, St. Lucie County Fire District Station #6, is located at 350 E. Midway Road in Fort Pierce, approximately 1.75 miles northeast of the subject site Water and Wastewater Water & Wastewater services will be provided by Fort Pierce Utility Authority, with the developer proposing an extension of lines to serve the project. Traffic The traffic analysis for the proposed Future Land Use MXD (Mixed-Use Development) to develop one hundred sixty 160 multifamily (townhome) units and retain a commercial outparcel was prepared by MacKenzie Engineering & Planning, Inc. dated March 2022. The daily and peak hour calculations anticipated to be a net increase in total trip generation by 8,954 daily, 731 AM peak hour (583in/147out), and 1,023 PM peak hour (336in/687out) net new trips. The analyses Location Zoning District Future Land Use Existing Land Use Subject Property CG (Commercial, General) RS-2 (Residential, Estates-2du/ac) COM (Commercial) Vacant/Undeveloped Adjacent Parcels North CG (Commercial, General) COM (Commercial) Arrigo Dodge Auto Dealership South CG (Commercial, General) COM (Commercial) Vacant/Undeveloped East CG (Commercial, General) COM (Commercial) Public Storage West RS-2 (Residential, Estates - 2du/ac) RU (Residential Urban) Single-Family Homes Page 228 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 6 demonstrated that the study area roadway has sufficient capacity to support the proposed future land use amendment. The Florida Department of Transportation (FDOT) issued a letter on April 7, 2022, approving the conceptual driveway location with conditions for the right-in/right-out driveway on the west side of US Highway 1 (approximately 380 feet south of the north property line) for the subject site. Environmental Assessment Background The Environmental Resources Department (ERD) receives April 20th, 2022, date-stamped submittal from Planning and Development Services. The applicant is requesting approval to change the future land use of the project site from Commercial (COM), Residential Medium (RM), & Residential Urban (RU) to Mixed-Use Development (MXD). The proposed future land-use change would accommodate the concurrent Planned Unit Development / Rezoning (PUD_RZ-11202126231) application that proposes 160 multifamily residential units with associated site improvements. A 2.58-acre outparcel located at the northeastern corner of the property is to retain Commercial General (CG) zoning for future commercial development. The project is located at 6209 S US Highway 1 in Ft. Pierce and currently consists of three (3) vacant parcels (Parcel IDs 3410-702-0055- 000-3, 3410-702-0054-000-6, & 3410-701-0001-000-7) collectively measuring 18.87-acres. Findings An Environmental Impact Report (EIR) prepared by Aquatic Research Monitoring, Equipment, & Deployment, LLC, dated April 2022, was provided and reviewed. The subject site is currently vacant and consists primarily of invasive vegetation with scattered native oaks and cabbage palms. No wetlands or native uplands were found on site, and no Federal or State-listed plant species or listed animal burrows, nests, dens, or roosting areas were observed on site. Topography and past aerials indicate the parcels were previously utilized for agricultural purposes. The proposed future land use text amendment application is being submitted concurrently with the Planned Unit Development / Rezoning (PUD_RZ-11202126231) application. Environmental impacts, specifically tree mitigation and landscaping, will be addressed through the site plan process. Recommendation ERD has no objection to the Future Land Use Map Amendment as outlined within the Ordinance. FUTURE LAND USE MAP AMENDMENT RECOMMENDATION: The staff has reviewed the proposed small-scale Comprehensive Plan Future Land Use Map Amendment and determined it is consistent with the Goals, Objectives, and Policies of the Comprehensive Plan; therefore, the staff recommends the Planning & Zoning Commission forward a recommendation of approval to the Board of County Commissioners. ************************************************************************** SECTION 2: REZONE TO THE OFFICIAL ZONING ATLAS STANDARDS OF REVIEW AS OUTLINED IN THE LAND DEVELOPMENT CODE SECTION 11.06.03 Section 11.06.03 of the St. Lucie County Land Development Code establishes the standards for reviewing Zoning Atlas Amendments. In reviewing an application for a Zoning Atlas Amendment, the Board of County Commissioners shall consider the following: Page 229 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 7 The proposed Zoning Atlas Amendment would change the Official Zoning Atlas Map designation to rezone the 16.37-acre subset of the subject site from RS-2 (Residential, Single-Family-2) and CG (Commercial, General) to PUD (Planned Unit Development), and Preliminary PUD Site Plan. A proposed 2.50-acre outparcel, located at the northeastern corner of the subject site, is to retain a CG (Commercial, General) Zoning Designation. Exhibit 3, Existing Zoning Map Exhibit 4, Proposed Zoning Map Page 230 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 8 A. Whether the proposed rezoning conflicts with any applicable portions of the St. Lucie County Land Development Code; The proposed amendment to the Official Zoning Atlas is not in conflict with the applicable provisions of the Land Development Code. The request seeks to amend the Official Zoning Atlas to reclassify the zoning from the RS-2 (Residential, Single-Family–2) and CG (Commercial, General) to the PUD (Planned Unit Development) Zoning District. Future Land Use: The proposed Future Land Use designation of the subject property is MXD (Mixed-Use Development). Policy 1.1.1.2.H: The MXD designation is to identify those areas where innovative land use concepts are encouraged. Application of this district should be with prudence and should be only to those areas where traditional land use classifications do not afford the desired flexibility and community input in land use planning necessary to address local concerns. Candidates for this district include all I-95 interchange areas, the Treasure Coast International Airport, Community Development Districts created pursuant to Chapter 190, Florida Statutes, and areas of special or unique environmental consideration that may not be appropriate for traditional land use designations. Uses within the areas classified as Mixed-Use should be segregated as intensity and indicated in the form of a concept master plan to be included as a part of the land use designation process. The following criteria, in addition to those as cited in Objective 1.1.7 (PUD, PNRD & PMUD), are to be used in the development of Mixed-Use areas: • Unless otherwise compliant with the identified intensity classification, any change in zoning shall be to the Planned Unit Development (PUD), Planned Non-Residential Development (PNRD), or Planned Mixed-Use Development (PMUD), as described in the St. Lucie County Land Development Code. Those properties with compatible existing zoning designations are encouraged to develop under the PUD, PNRD, or PMUD regulations. • Residential development shall be regulated by the intensity district in which it is to take place. In no case should gross residential density exceed 15 du/ac. • All uses shall be compatible with adjacent land uses. Current Zoning: The property is zoned RS-2 (Residential, Single-Family–2) and CG (Commercial, General): The RS-2 Zoning District – to provide and protect an environment suitable for single-family dwellings at a maximum density of two (2) dwelling units per gross acre, together with such other uses as may be necessary for and compatible with low-density residential surroundings. The CG Zoning District - to provide and protect an environment suitable for a wide variety of commercial uses intended to serve a population over a large market area, which does not impose desirable noise, vibration, odor, dust, or offensive effects on the surrounding area, together with such other uses as may be necessary to and compatible with general commercial surroundings. Proposed Zoning: The proposed rezoning is to the PUD (Planned Unit Development) Zoning District. The Planned Unit Development (PUD) District is intended to achieve residential land development of superior quality through the encouragement of flexibility and creativity in design options that: A. Permit creative approaches to the development of residential land reflecting changes in the technology of land development; B. Allow for the efficient use of land, which can result in smaller networks of utilities and streets and thereby lower development costs; Page 231 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 9 C. Allow design options that encourage an environment of stable character, compatible with surrounding land uses; and D. Permit the enhancement of neighborhoods through the preservation of natural features, the provision of underground utilities, and the provision of recreation areas and open space. A minimum of thirty-five percent (35%) of the gross area of land in a PUD must be for use as common open space, which may include, parks, recreation areas, bicycle, and pedestrian paths and facilities, marinas, swimming beaches, common open space, common landscaping and planting areas, stormwater retention areas, or other areas of public purpose or use. Common open space may not include street, road, or drainage rights-of-way, above-ground utilities, or parking areas. Additionally, a minimum of fifteen percent (15%) of any existing native upland habitat on the property must be preserved in its natural condition as part of the required thirty-five percent (35%) common open space. B. Whether the proposed amendment is consistent with all elements of the St. Lucie County Comprehensive Plan; The proposed rezoning to the PUD (Planned Unit Development) Zoning District, and retained CG (Commercial, General) Zoning District are consistent with the proposed MXD (Mixed-Use Development) Future Land Use designation as per Comprehensive Plan Table 1-3 - Land Use Designation / Zoning Compatibility Chart. Table 1-3 - Land Use Designation / Zoning Compatibility Chart Zoning Districts Future Land Use Categories AG -5 AG -2. 5 RE RS RU RM RH R/ C CP U CO M IN D P/ F MX D SD H T/ U TV C PUD X X X X X X X X X X X X X The proposed amendment is consistent with the Comprehensive Plan Future Land Use Element Goals, Objectives, and Policies: Objective 1.1.8: Planned Developments. The County shall continue to support and encourage innovative land use development patterns including planned developments through the adequate provision in the County's Land Development Code including Planned Unit Developments (PUD), Planned Non-Residential Development (PNRD), and the Planned Mixed-Use Development (PMUD) zoning designations. Policy 1.1.8.1 – The County shall continue to encourage the use of planned development techniques to conserve open space and environmentally sensitive areas, through the County's Land Development Code which shall include: a. Minimum acreage requirements necessary to support a viable mixed-use community providing sufficient design flexibility to allow innovation and creativity in all forms of planned unit developments; b. Minimum open space standards, consistent with the percentages identified in the Land Development Code for all planned developments and including assurances that such areas will remain as open space to protect existing native habitat, to provide for minimum setback needs from adjacent uses, and to provide active and passive recreational as well as visual amenities; c. Provisions ensuring the long-term preservation of remaining open spaces; d. A mixed-use district combining residential, commercial, recreational, educational, and other income-producing uses providing significant functional and physical integration among uses; e. Minimum standards for the provision of on-site shopping, job opportunities, and internal trip capture; and, f. Specific requirements to provide efficient, centralized infrastructure (potable water and Page 232 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 10 sanitary sewer). Include specific restrictions on the use of septic tanks, individual wells, and package plants in planned unit developments. g. Development consistent with the Towns, Villages, and Countryside Element and the Transfer of Development Rights Program outlined under Objective 11.1.7. Objective 1.1.9: Residential Areas. Property owners' investments, their quality of life, and the single-family neighborhood, as a defined residential area, shall be protected from the encroachment of commercial and/or other inappropriate land uses through the consistent and predictable application of the Land Development Code. Policy 1.1.9.1 - All new subdivisions, planned unit developments, and site development plans shall be designed to include an efficient system of internal traffic circulation that does not require internal trips or trips of short duration to be forced onto the major roadway network. Connections to new and existing subdivisions shall be encouraged. Policy 1.1.9.2 - All new subdivisions shall be designed so that all individual lots have direct access to the internal street system, and that any lot or property along the periphery of the development is to be buffered from any major roadway and incompatible land uses. Goal 3.1: To provide guidance, based on accepted planning principles, for the provision of housing resources for all citizens through public/private cooperative arrangements. Objective 3.1.1: The County shall ensure the creation and/or preservation of affordable housing for all current and anticipated future needs including rural and farmworker housing, workforce housing as well as adequate sites and distribution of housing for very-low-income, low-income, and moderate-income households. Policy 3.1.1.1 – To provide sufficient land to meet the future housing needs, the Future Land Use Map shall provide future land use designations that allow a variety of housing types, affordability, and densities. Policy 3.1.1.2 – The County shall continue to permit high-density residential development in Planned Mixed-Use Development projects. The Preliminary PUD Site Plan demonstrates the overall site plan depicting the one-hundred sixty (160) townhome lots within the Tidewater PUD subdivision. The applicant states that the proposed plan meets the intent of the Goals, Objectives, and Policies of the St. Lucie County Comprehensive Plan by the creation and/or preservation of “affordable” housing for all current and anticipated future residents, through the implementation of a 6-unit and 8-unit buildings made of (4) 2-bedroom, (2) 2-bedroom, and (4) 1-bedroom layouts allowing for a variety of housing. C. Whether and the extent to which the proposed zoning is inconsistent with the existing and proposed land uses; As stated above, the PUD (Planned Unit Development) Zoning District is compatible with the proposed MXD (Mixed-Use Development) Future Land Use designation as per the Land Development Code (LDC) and Comprehensive Plan. D. Whether there have been changed conditions that require an amendment; The applicant is pursuing a rezone from the current Zoning District to the PUD (Planned Unit Development) Zoning District, compatible with the surrounding area. Changing conditions include the proposed offsite improvements associated with Tidewater PUD will enable further development along the US Highway 1 corridor by approximately 800 feet south of Midway Road to Saeger Avenue, which is currently limited by the lack of availability of sanitary sewer service. The developer is proposing to install approximately 5,200 linear feet of sanitary sewer force main within the US Highway 1 right-of-way which connects to the existing FPUA manhole. Page 233 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 11 This new sanitary sewer force main will be able to serve undeveloped and underdeveloped parcels south of Midway Road FPUA service limits. Additionally, the proposed force main can potentially be extended south approximately 2,000 feet further to the southern limit of the FPUA service area, at Saeger Avenue. E. Whether and the extent to which the proposed amendment would result in demands on public facilities, and whether or to the extent to which the proposed amendment would exceed the capacity of such public facilities, including but not limited to transportation facilities, sewage facilities, water supply, parks, drainage, schools, solid waste, mass transit, and emergency medical facilities; The proposed change in zoning should not affect the acceptable level of service capacity of transportation facilities, parks, drainage, schools, solid waste, mass transit, or emergency medical facilities. Before the issuance of any Final Development Order, the developer must demonstrate that all public facilities are available to serve the parcel and obtain a Certificate of Capacity. The applicant has signed the required Concurrency Deferral Affidavit recognizing this provision. Drainage Following approval of the Preliminary PUD site plan, and Final site plan, the developer must receive a Site Development Permit from the Public Works Department to ensure the project does not adversely impact adjacent properties. Water/Wastewater Water & Wastewater services will be provided by the Fort Pierce Utilities Authority. Transportation Impacts Kimley-Horn, acting as the County’s traffic consultant, reviewed the traffic analysis prepared by MacKenzie Engineering & Planning, Inc., dated March 2022. The analysis demonstrates that the adjacent roadway segments have sufficient capacity, and no adverse impacts are anticipated to accommodate the proposed land-use change. F. Whether and the extent to which the proposed amendment would result in significant adverse impacts on the natural environment; The proposed amendment is not anticipated to create significant impacts on the natural environment. The applicant provided an environmental impact report that assesses existing environmental conditions on the subject property. The Environment Resources Department reviewed the submitted Environmental Impact Report and provided the following evaluation: Background The Environmental Resources Department (ERD) is in receipt of the June 13th, 2022, date-stamped submittal from Planning and Development Services. The applicant is seeking approval for a Planned Unit Development (PUD) that proposes 160 multifamily residential units with associated site improvements. ±16.29-acres of the subject site is to be rezoned from Residential, Single-Family – 2 (RS-2), and Commercial General (CG) to PUD. A 2.58-acre outparcel located at the northeastern corner of the property is to retain CG zoning for future commercial development. A concurrent Future Land Use Map Amendment (FLUMA) application is being reviewed. The project is located at 6209 S US Highway 1 in Ft. Pierce and currently consists of three (3) vacant parcels (Parcel IDs 3410-702-0055-000-3, 3410-702-0054-000-6, & 3410-701-0001-000-7) that collectively measure 18.87-acres. Findings An Environmental Impact Report prepared by Aquatic Research Monitoring, Equipment & Deployment, LLC, dated April 1st, 2022, was provided and reviewed. The site was historically utilized for citrus growing operations until at least 2006 according to available aerials and has since been abandoned. Neither native Page 234 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 12 upland habitat nor wetlands were determined to be present. The majority of the site is dominated by Brazilian pepper but does contain scattered mature laurel & live oaks, and cabbage palms. One potentially occupied gopher tortoise burrow was found on-site, but no other state-listed species were determined to be present. A 100% gopher tortoise survey per FWC guidelines and a gopher tortoise relocation permit (if applicable) will be required as a condition of approval. A landscape plan prepared by Cotleur & Hearing dated June 9th, 2022, was reviewed and found to be consistent with the land development code (LDC). An eight (8) ft. tall opaque fence with landscaping in excess of code requirements surrounds the northern, southern, and western perimeters of the proposed development, effectively buffering existing residences to the west and a parcel zoned residential to the north, consistent with LDC 7.09.04.E. The proposed lake’s littoral and upland buffer areas and associated plantings comply with LDC 3.01.03.EE.2.p.4. Additionally, 35% of the PUD’s total acreage is designated as open space, consistent with requirements outlined in LDC 7.01.03.I. The proposed project will impact a total of fifty-seven (57) cabbage palms and 1,290 inches diameter at breast height (DBH) of native canopy trees meeting minimum mitigation size thresholds outlined in LDC 6.00.05.D, resulting in a total of 2,580 inches of canopy trees and fifty-seven (57) palms requiring mitigation. Mitigation for these impacts has been provided via the onsite relocation of the fifty-seven (57) palms and the onsite planting of 970” of canopy trees, which are additional to the minimum canopy tree requirements utilized for landscaping in accordance with LDC 7.09.04. The remaining 1,610 inches of trees are to be mitigated via a fee-in-lieu of $322,000.00, which is calculated at the $200.00 per inch rate as outlined in LDC 6.00.05.D.3.a.4. Recommendation ERD has no objection to the preliminary PUD with the conditions outlined below. G. Whether and the extent to which the proposed amendment would result in an orderly and logical development pattern specifically identifying any negative effects of such patterns; The proposed change in zoning will result in an orderly and logical development pattern. The proposed parcel is located within the Urban Service Boundary (USB). The applicant justified that the proposed residential and commercial development near one another will promote a balance of land uses for the residential and nonresidential county needs. Apart from this, the proposed offsite improvements associated with Tidewater PUD will enable further development along the US Highway 1 corridor by approximately 800 feet south of Midway Road to Saeger Avenue, which is currently limited by the lack of availability of sanitary sewer service. The developer is proposing to install approximately 5,200 linear feet of sanitary sewer force main within the US Highway 1 right-of-way which connects to the existing FPUA manhole. This new sanitary sewer force main will be able to serve undeveloped and underdeveloped parcels south of Midway Road. Additionally, opportunities for active and passive recreation are created through the site’s design. The proposed project will promote easy accessibility from each unit and provide connectivity of sidewalks and open spaces nearby along with the synergy for the future residents and local businesses, with the inclusion of complete streets, which will promote walkability and safe traffic flow. In terms of environmental benefits, the Tidewater PUD project will be providing a stormwater management lake in the center of the development. This lake is designed to ensure proper drainage and runoff flows on the site to prevent flooding and any other potential issues that could arise with a change in drainage pattern. The lake will also have a 14,433-square-foot littoral zone with native vegetation, which will serve as a natural habitat for small native wildlife, as well as an upland transition zone to buffer the littoral zone from adjacent residences. A proposed eight (8) fences will be placed along the perimeter of the site with a fifteen (15) foot landscape buffer from adjacent properties. H. Whether the proposed amendment would be in conflict with the public interest, and is in harmony with the purpose and intent of this Code; Page 235 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 13 The proposed rezoning to a PUD (Planned Unit Development) Zoning District is not in conflict with the public interest and is in harmony with the purpose and intent of the Land Development Code. ************************************************************************** SECTION 3: PRELIMINARY SITE PLAN STANDARDS OF REVIEW AS OUTLINED IN THE LAND DEVELOPMENT CODE SECTION 11.02.07 Per LDC Section 11.02.05 A. 11, the Planning & Zoning Commission and Board of County Commissioners shall consider the Preliminary Development Plan at a scheduled public hearing by the requirements of Section 11.00.03. The public hearing held on the application shall be by Section 11.00.04. In deciding on the application, the Planning and Zoning Commission recommendations of the Planning and Development Services Director, and the standards specified in Sections 11.02.07 and 11.06.03. A. Consistency With Local Ordinances and Comprehensive Plan. The proposed plan is consistent with the general purpose, Goals, Objectives, and Standards of this Code, the St. Lucie County Comprehensive Plan, and the Code and compiled laws of St. Lucie County. As noted in the above analysis of the rezoning standards of review, the site plan and proposed use are consistent with Future Land Use Policy 1.1.8.1 in its use of planned development techniques. Future Land Use Element Goal 1.1: Ensure the highest quality living environment possible, through a mixture of land uses reflecting the needs and desires of the residents and how they want their community to develop. The goal shall be implemented by strictly enforced building, zoning, and development codes based on objectives and policies that will enhance St. Lucie County's natural and man-made resources while minimizing any damage or threat of degradation to the health, safety, and welfare of the country’s citizens, native wildlife and environment, through incompatible land uses. Objective 1.1.8: Planned Developments. The County shall continue to support and encourage innovative land use development patterns including planned developments through the adequate provision in the County's Land Development Code including Planned Unit Developments (PUD), Planned Non-Residential Development (PNRD), and the Planned Mixed-Use Development (PMUD) zoning designations. Policy 1.1.8.3: The County shall continue to support and implement the mixed-use activity areas as indicated in the Sub-area Mixed Use Activity Area Plans as depicted by name in this Element. Policy 1.1.10.2: Require effective visual and light diffusion barriers between residential and non-residential uses. Standards and requirements for such barriers are to be included in the landscaping and screening regulations of the St. Lucie County Land Development Code. Consistency with Land Development Code (LDC) Regulations The proposed development and proposed use are not in conflict with any applicable portions of the St. Lucie County Land Development Code (LDC) or Comprehensive Plan. The proposed PUD (Planned Unit Development) Site Plan demonstrates compliance with the St. Lucie County Land Development Code (LDC) and Comprehensive Plan requirements. Under LDC Section 7.01.00, the intent of the PUD (Planned Unit Development) Zoning designation is to achieve residential land development of superior quality through the encouragement of flexibility and creativity in design options that: A. Permit creative approaches to the development of residential land reflecting changes in the technology of land development; Page 236 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 14 B. Allow for the efficient use of land, which can result in smaller networks of utilities and streets and thereby lower development costs; C. Allow design options that encourage an environment of stable character, compatible with surrounding land uses; and D. Permit the enhancement of neighborhoods through the preservation of natural features, the provision of underground utilities, and the provision of recreation areas and open space. Intensity & Design All reasonable steps have been taken to minimize adverse effects on the immediate vicinity through landscaping, screening, and site design, and all buildings will be constructed, arranged, and operated so as not to interfere with adjacent properties. The project is designed to improve the project perimeter, creating strategic yet aesthetic buffering between the residential neighborhood and the adjacent S. U.S. Highway 1 right-of-way. This will promote active pedestrian transportation, such as walking and cycling, as well as recreational usage of the perimeter sidewalk. The internal sidewalk network will ensure residents within the PUD also have access to the exterior sidewalk system, ensuring the potential for people to walk to and from the future commercial parcel along the US1 corridor. By LDC Section 7.04.03, Building Spacing Formula applies to all multiple-family dwellings, hotels, and motels, and to all accessory structures with two (2) or more floors that are customarily associated with and subordinate to the principal uses as shown below in Figure 7-7. Per the applicant’s justification statement, by utilizing the formula detailed in this Code Section, the building spacing calculation equates to the following: D = LA + LB + 2(HA + HB)] / 4, the distance (D) between buildings would be [50 + 50 + 2(27.7 + 27.7)] / 4 = 52.7’ for adjacent buildings and approximately 117’ distance between perpendicular buildings. However, as shown on the site plan, townhomes are separated by a 15’ spacing setback between each adjacent building and approximately 90’ for buildings across the street. In some cases, these spaces between adjacent buildings include drainage easements. The applicant is requesting to deviate from this requirement. Per the site plan, the site design is very functional with these spacing measurements, and those proposed by Section 7.04.03 of the St. Lucie County Code spacing formula are excessive and would cause great hardship to the site development. The site is intended to be a multifamily buffer between the commercial uses along the main thoroughfare of US Highway 1 and the low- density single-family dwellings. In order to allow for this higher density transition between the two less Page 237 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 15 compatible uses, it is necessary to reduce this building spacing to fit the number of townhomes being proposed. The spacing shown on the site plan allows for adequate minimum distance between buildings; allowing for ventilation, lighting, drainage easements, and a 50’ right-of-way between buildings across the street from each other. Open Space The proposed project meets the required thirty-five (35%) percent of open space, which for this project would be the Tidewater PUD project will be providing a stormwater management lake in the center of the development. This lake is designed to ensure proper drainage and runoff flows on the site to prevent flooding and any other potential issues that could arise with a change in drainage pattern. The lake will also have a 14,433 square-foot littoral zone with native vegetation, which will serve as a natural habitat for small native wildlife, as well as an upland transition zone to buffer the littoral zone from adjacent residences. Exhibit 3: Preliminary PUD Site Plan Snapshot & Typical Lot Types: B. Effect on Nearby Properties. 1. The proposed building or use will not have an undue adverse effect upon nearby property, the character of the neighborhood, traffic conditions, parking, utility facilities, and other matters affecting public health, safety, and general welfare. 2. All reasonable steps have been taken to minimize any adverse effect of the proposed building or use on the immediate vicinity through building design, site design, landscaping, and screening. Page 238 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 16 3. The proposed building or use will be constructed, arranged, and operated so as not to interfere with the development and use of neighboring property, by applicable district regulations. By LDC Section 7.09.04.E. Landscaped Buffer Areas Between Non-Residential Structure(s) Housing Three (3) or More Dwelling Units and Single-Family or Two-Family Residential Uses. All side and rear yard perimeter buffer areas between non-residential or residential structure(s) housing three (3) or more dwelling units and single-family or two-family residential uses shall be landscaped with a masonry wall or opaque wood fence of at least eight (8) feet in height that forms a continuous screen between the uses. All masonry walls or opaque wood fences shall be landscaped with a continuous hedge along both the inside and outside base of the wall or fence. Any future expansion or major adjustment(s) to the abutting residential to the east will require the commercial outparcel to install a buffer between the residential use (Tidewater PUD) including a masonry wall or opaque wood fence and a continuous hedge on both sides and rear property line. This requirement can be waived by the Environmental Resources Department Director if a wall waiver is obtained from the proposed residential property to the south. C. Adequacy of Public Facilities Traffic Based on the Traffic Report prepared by MacKenzie Engineering & Planning, Inc. dated March 2022, the proposed project is expected to generate 1,101 daily, 72 AM peak hours (17in/55out), and 89 PM peak hours (56in/33out) net new external trips. Access Access to the site is proposed via one right-in/right-out driveway connection on US1. The proposed right-in/right-out driveway will be supported by a southbound right-turn lane, to support safety as egress left-turn movements will be offset north and south of the proposed right-in/right-out driveway southbound right-turn lane on US Highway 1, at Sunshine Boulevard and Easy Street, respectively, as drivers will be required to perform a U-turn movement. Drainage Following approval of the Preliminary Site Plan, and Final site plan, the developer must receive a Site Development Permit from the Public Works Department to ensure the project does not adversely impact adjacent properties. Water/Wastewater Water & Wastewater services will be provided by the Fort Pierce Utility Authority. D. Adequacy of Fire Protection St. Lucie County Fire District, Station #6, is located at 350 E. Midway Road in Fort Pierce approximately 1.75 miles northeast of the subject site, it will create additional demand, but no adverse impacts or exceptional demands. E. Adequacy of School Facilities. The proposed residential project is anticipated to create adverse impacts on school facilities. The Preliminary Site Plan depicts a school bus turnaround with benches and bike racks. F. Environmental Impact. The proposed amendment is not anticipated to create significant impacts on the natural environment. The applicant provided an environmental impact report that assesses existing environmental conditions on the subject property. Page 239 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 17 The Environment Resources Department reviewed the submitted Environmental Impact Report and provided the following evaluation: Background The Environmental Resources Department (ERD) is in receipt of the June 13th, 2022, date-stamped submittal from Planning and Development Services. The applicant is seeking approval for a Planned Unit Development (PUD) that proposes 160 multifamily residential units with associated site improvements. ±16.29-acres of the subject site is to be rezoned from Residential, Single-Family – 2 (RS-2), and Commercial General (CG) to PUD. A 2.58-acre outparcel located at the northeastern corner of the property is to retain CG zoning for future commercial development. A concurrent Future Land Use Map Amendment (FLUMA) application is being reviewed. The project is located at 6209 S US Highway 1 in Ft. Pierce and currently consists of three (3) vacant parcels (Parcel IDs 3410-702-0055-000-3, 3410-702-0054-000-6, & 3410-701-0001-000-7) that collectively measure 18.87-acres. Findings An Environmental Impact Report prepared by Aquatic Research Monitoring, Equipment & deployment, LLC, dated April 1st, 2022, was provided and reviewed. The site was historically utilized for citrus growing operations until at least 2006 according to available aerials and has since been abandoned. Neither native upland habitat nor wetlands were determined to be present. The majority of the site is dominated by Brazilian pepper but does contain scattered mature laurel & live oaks, and cabbage palms. One potentially occupied gopher tortoise burrow was found onsite, but no other state-listed species were determined to be present. A 100% gopher tortoise survey per FWC guidelines and a gopher tortoise relocation permit (if applicable) will be required as a condition of approval. A landscape plan prepared by Cotleur & Hearing dated June 9th, 2022, was reviewed and found to be consistent with the land development code (LDC). An eight (8) ft. tall opaque fence with landscaping in excess of code requirements surrounds the northern, southern, and western perimeters of the proposed development, effectively buffering existing residences to the west and a parcel zoned residential to the north, consistent with LDC 7.09.04.E. The proposed lake’s littoral and upland buffer areas and associated plantings comply with LDC 3.01.03.EE.2.p.4. Additionally, 35% of the PUD’s total acreage is designated as open space, consistent with requirements outlined in LDC 7.01.03.I. The proposed project will impact a total of fifty-seven (57) cabbage palms and 1,290 inches diameter at breast height (DBH) of native canopy trees meeting minimum mitigation size thresholds outlined in LDC 6.00.05.D, resulting in a total of 2,580 inches of canopy trees and fifty-seven (57) palms requiring mitigation. Mitigation for these impacts has been provided via the onsite relocation of the fifty-seven (57) palms and the onsite planting of 970” of canopy trees, which are additional to the minimum canopy tree requirements utilized towards landscaping in accordance with LDC 7.09.04. The remaining 1,610 inches of trees are to be mitigated via a fee-in-lieu of $322,000.00, which is calculated at the $200.00 per inch rate as outlined in LDC 6.00.05.D.3.a.4. Recommendation ERD has no objection to the Preliminary PUD with the conditions outlined below. NEIGHBORHOOD MEETING & PUBLIC NOTIFICATION: The applicant did not hold a neighborhood meeting; however, neighborhood meetings are not required but strongly encouraged. Staff provided notification letters to twenty-three (23) owners of the property, located within 500 feet of the petition site, detailing the proposals. A public notification sign detailing the Planning and Zoning Commission’s Public Hearing was posted on the premises, and an advertisement was displayed in the local newspaper on Friday, July 8, 2022. Page 240 of 494 Project Name: Tidewater PUD File No.: FLUMA-11202126232 & PUD_RZ-11202126231 18 CONCLUSION: The staff has reviewed these petitions and determined that it conforms to the Standards of Review as outlined in Section 11.06.03 of the St. Lucie County Land Development Code and are consistent with the St. Lucie County Comprehensive Plan Goals, Objectives, and Policies. PUD REZONING & PRELIMINARY SITE PLAN RECOMMENDATION: Staff recommends the approval with the following conditions: 1. Prior to the issuance of any building permit a final plat must be approved by the Board of County Commissioners. 2. The Community Clubhouse or similar use facilities shall be consistent with the Community architectural Standards of St. Lucie County Land Development Code, Section 3. All Residential driveways shall be a minimum of ten (10) feet wide. 4. Before issuance of Vegetation Removal Permit or Exemption, updated a survey to determine the current activity status of the onsite osprey nest shall be provided. Should the nest be deemed active, i.e., the nest has eggs or flightless young, then an Incidental Take Permit from the United States Fish and Wildlife Service (USFWS) is required. 5. Before issuance of Vegetation Removal Permit or Exemption, a 100% survey to determine the presence of the state-protected gopher tortoise and state-protected burrowing owl shall be required. If any gopher tortoise burrows are identified within 25 ft. of the proposed disturbance, all tortoises shall be relocated per the Florida Fish and Wildlife Conservation Commission (FWC) protocol. If any burrowing owls are identified, coordination with the FWC and/or United States Fish and Wildlife Service (USFWS) shall be required. 6. Before the issuance of a Certificate of Occupancy, all Category I invasive plant species shall be eradicated from the site. Page 241 of 494 Resolution No. 2022-XXX Page 1 File No: PUD_RZ-11202126231 RESOLUTION 2022-XXX File Numbers: PUD_RZ-5202126043 A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF ST. LUCIE COUNTY FOR A PLANNED UNIT DEVELOPMENT (PUD) REZONING FROM THE CG (COMMERCIAL, GENERAL) AND RS-2 (RESIDENTIAL, SINGLE-FAMILY – 2DU/AC) ZONING DISTRICTS TO THE PLANNED UNIT DEVELOPMENT (PUD) ZONING DISTRICT AND PRELIMINARY PUD SITE PLAN KNOWN AS THE TIDEWATER PUD LOCATED WITHIN IN ST. LUCIE COUNTY, FLORIDA. WHEREAS, the Board of County Commissioners of St. Lucie County, Florida, based upon acceptable evidence, including but not limited to the staff report, has made the following determinations: ZONING ATLAS AMENDMENT 1) Cotleur and Hearing, Inc on behalf of Meritage Homes of Florida, LLC, presented a petition for an Amendment to the Official Zoning Atlas from RS- 2 (Residential, Single-Family – 2du/ac) and CG (Commercial, General) Zoning Districts to the PUD (Planned Unit Development) Zoning District, for property located at 6209 S. US Highway 1, in Fort Pierce, Florida, as depicted on the attached map as Exhibit “A” and described in Part “A” below. 2) On July 21, 2022, the St. Lucie County Planning and Zoning Commission held a public hearing on this petition, after installing a sign on the property and notifying by mail all owners of property within 500 feet of the subject property, at which all interested persons were given an opportunity to be heard and recommended that the Board of County Commissioners approve/deny the request for the property described in Part “A”. 3) On ____________, 2022, the Board of County Commissioners held a public hearing on this petition after publishing a notice in the St. Lucie News Tribune at least 10 days prior to the hearing, installing a sign on the property and notifying by mail all owners of property within 500 feet of the subject property, at which all interested persons were given an opportunity to be heard. 4) The St. Lucie County Development Review Committee has reviewed the Rezone Petition and found it to meet the technical requirements and to be consistent with the St. Lucie County Comprehensive Plan, subject to the conditions set forth in Part “C” of this Resolution. Page 242 of 494 Resolution No. 2022-XXX Page 2 File No: PUD_RZ-11202126231 5) The proposed zoning change is consistent with the St. Lucie County Comprehensive Plan and has satisfied the requirements of Section 11.06.03 of the St. Lucie County Land Development Code. PRELIMINARY PNRD SITE PLAN 6) Cotleur and Hearing, Inc on behalf of Meritage Homes of Florida, LLC, submitted a Preliminary PUD (Planned Unit Development) Site Plan to develop a one hundred sixty (160) multifamily townhome subdivision to be known as the Tidewater PUD, for the property depicted in the attached map as Exhibit “A” and described in Part “A” below. 7) On July 21, 2022, the St. Lucie County Planning and Zoning Commission held a public hearing on this petition, after installing a sign on the property and notifying by mail all owners of property within 500 feet of the subject property, at which all interested persons were given an opportunity to be heard and recommended that the Board of County Commissioners approve/deny the request for the property described in Part “A”. 8) On ____________, 2022, the Board of County Commissioners held a public hearing on this petition after publishing a notice in the St. Lucie News Tribune at least 10 days prior to the hearing, installing a sign on the property and notifying by mail all owners of property within 500 feet of the subject property, at which all interested persons were given an opportunity to be heard. 9) The St. Lucie County Development Review Committee has reviewed the Preliminary PUD Site Plan for the project and found it to meet the technical requirements and to be consistent with the St. Lucie County Comprehensive Plan, subject to the conditions set forth in Part “C” of this Resolution. 10) The proposed project, with conditions of approval, will not have an undue adverse effect on adjacent property, the character of the neighborhood, traffic conditions, parking, utility facilities, or other matters affecting the public health, safety, and general welfare. 11) All reasonable steps have been taken to minimize any adverse effect of the proposed project on the immediate vicinity through building design, site design, landscaping, and screening. 12) The proposed project will be constructed, arranged, and operated so as not to interfere with the development and use of neighboring property, in accordance with applicable district regulations. Page 243 of 494 Resolution No. 2022-XXX Page 3 File No: PUD_RZ-11202126231 13) The proposed project will be served by the Reserve Utility District for water and wastewater services. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of St. Lucie County, Florida: ZONING ATLAS AMENDMENT A. The property on which the Zoning Atlas Amendment, or change in zoning, from CG (Commercial, General) and RS-2 (Residential, Single-Family – 2du/ac) Zoning Districts to Tidewater PUD (Planned Unit Development) is being granted is described as follows: Legal Description: A PORTION OF THE SOUTH HALF OF THE SOUTHWEST QUARTER OF THE NORTHEAST QUARTER OF THE SOUTHWEST QUARTER OF SECTION 10, TOWNSHIP 36 SOUTH, RANGE 40 EAST BEGINNING AT THE SOUTHWEST CORNER OF THE SOUTH HALF OF THE SOUTHWEST QUARTER OF THE NORTHEAST QUARTER OF THE SOUTHWEST QUARTER OF SECTION 10, TOWNSHIP 36 SOUTH, RANGE 40 EAST; THENCE ALONG THE WEST LINE OF THE NORTHEAST QUARTER OF THE SOUTHWEST QUARTER, NORTH 00°15'32" WEST, A DISTANCE OF 663.77 FEET; THENCE ALONG THE NORTH LINE OF THE NORTH HALF OF THE NORTHEAST QUARTER OF THE SOUTHWEST QUARTER, NORTH 89°46'16" EAST, A DISTANCE OF 955.09 FEET; THENCE DEPARTING SAID NORTH LINE, SOUTH 00°01'20" WEST, A DISTANCE OF 320.22 FEET TO THE BEGINNING OF A CURVE TO THE LEFT THROUGH A CENTRAL ANGLE OF 90° 21' 54", HAVING A RADIUS OF 20.00 FEET, HAVING AN ARC DISTANCE OF 31.54 FEET; THENCE, NORTH 89°39'26" EAST, A DISTANCE OF 29.71 FEET TO THE BEGINNING OF A CURVE TO THE LEFT THROUGH A CENTRAL ANGLE OF 43° 06' 54", HAVING A RADIUS OF 17.00 FEET, HAVING AN ARC DISTANCE OF 12.79 FEET; THENCE, NORTH 46°32'32" EAST, A DISTANCE OF 3.49 FEET TO THE BEGINNING OF A CURVE TO THE RIGHT THROUGH A CENTRAL ANGLE OF 43° 22' 50", HAVING A RADIUS OF 53.00 FEET, HAVING AN ARC DISTANCE OF 40.13 FEET; THENCE, NORTH 89°55'21" EAST, A DISTANCE OF 80.32 FEET TO THE BEGINNING OF A CURVE TO THE RIGHT THROUGH A CENTRAL ANGLE OF 51° 38' 37", HAVING A RADIUS OF 35.00 FEET, HAVING AN ARC DISTANCE OF 31.55 FEET; THENCE, SOUTH 38°26'02" EAST, A DISTANCE OF 9.43 FEET TO THE BEGINNING OF A CURVE TO THE LEFT THROUGH A CENTRAL ANGLE OF 51° 49' 18", HAVING A RADIUS OF 35.00 FEET, HAVING AN ARC DISTANCE OF 31.66 FEET; THENCE, NORTH 89°44'40" EAST, A DISTANCE OF 91.04 FEET; THENCE, SOUTH 00°18'04" EAST TO A POINT ON THE NORTH LINE OF LOT 10, BLOCK A, AETNA PARK AS RECORDED IN PLAT BOOK 6, PAGE 13 OF THE PUBLIC RECORDS OF ST. LUCIE COUNTY, FLORIDA, A DISTANCE OF 70.57 FEET; Page 244 of 494 Resolution No. 2022-XXX Page 4 File No: PUD_RZ-11202126231 THENCE ALONG SAID NORTH LINE, SOUTH 89°46'08" WEST, TO THE NORTHWEST CORNER OF SAID LOT 10, A DISTANCE OF 131.00 FEET; THENCE, SOUTH 00°18'04" EAST TO A POINT ON THE SOUTH LINE OF THE NORTHEAST QUARTER OF THE SOUTHWEST QUARTER OF SAID SECTION 10, A DISTANCE OF 240.00 FEET; THENCE ALONG SAID SOUTH LINE, SOUTH 89°46'08" WEST, A DISTANCE OF 1155.20 FEET TO THE POINT OF BEGINNING. SAID LANDS LYING SECTION 10, TOWNSHIP 36 SOUTH, RANGE 40 EAST, ST. LUCIE COUNTY, FLORIDA. CONTAINING 16.318 ACRES, MORE OR LESS. Parcel ID Numbers: 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 B. The St. Lucie County Planning and Development Services Director shall/shall not be authorized to amend the Official Zoning Map to change the zoning of the property herein described, from CG (Commercial, General) and RS-2 (Residential, Single-Family – 2du/ac) Zoning Districts to PUD (Planned Unit Development) and to make a notation of the reference to the date of adoption of this Resolution. PRELIMINARY PUD SITE PLAN C. Pursuant to 11.02.05(B) of the St. Lucie County Land Development Code, the PUD (Planned Unit Development) Preliminary Site Plan for the project known as the Tidewater PUD is hereby approved/denied, for the subject property described in Part “A” above, as shown on the preliminary site plan drawings for the project, prepared by Cotleur and Hearing, Inc on June 9, 2022, and date stamped received by the St. Lucie County Planning & Development Services Department on June 9, 2022, as attached and incorporated herein as Exhibit “C”, and subject to the following conditions: 1. Prior to the issuance of any building permit a final plat must be approved by the Board of County Commissioners. 2. The Community Clubhouse or similar use facilities shall be consistent with the Community Architecture Standards of St. Lucie County Land Development Code in Section 7.10.24. 3. All Residential driveways shall be a minimum of ten (10) feet in wide. Page 245 of 494 Resolution No. 2022-XXX Page 5 File No: PUD_RZ-11202126231 4. Before issuance of Vegetation Removal Permit or Exemption, updated a survey to determine the current activity status of the onsite osprey nest shall be provided. Should the nest be deemed active, i.e., the nest has eggs or flightless young, then an Incidental Take Permit from the United States Fish and Wildlife Service (USFWS) is required. 5. Before issuance of Vegetation Removal Permit or Exemption, a 100% survey to determine the presence of the state-protected gopher tortoise and state-protected burrowing owl shall be required. If any gopher tortoise burrows are identified within 25 ft. of the proposed disturbance, all tortoises shall be relocated per the Florida Fish and Wildlife Conservation Commission (FWC) protocol. If any burrowing owls are identified, coordination with the FWC and/or United States Fish and Wildlife Service (USFWS) shall be required. 6. Before the issuance of a Certificate of Occupancy, all Category I invasive plant species shall be eradicated from the site. D. The Preliminary PUD Site Plan approvals granted by this Resolution shall expire on ____________, 2022 unless a Building Permit is obtained, or an extension is granted in accordance with Section 11.02.06(B)(3) of the Land Development Code. E. The developer is advised as part of this approval that the property owner(s), developer, etc., including any successors in interest, shall obtain all applicable development permits and construction authorizations from the appropriate State and Federal and local regulatory agencies including, but not limited to, the United States Army Corps of Engineers, the Florida Department of Environmental Protection, Florida Department of Transportation, South Florida Water Management District, and the St. Lucie County Environmental Resources, Public Works, and Building Departments prior to the commencement of any development activities on the property described in Part “A”. Issuance of this authorization or permit by the County does not in any way create any rights on the part of the developer to obtain a permit from a State or Federal agency and does not create any liability on the part of the County for issuance of this permit if the developer fails to obtain requisite approvals or fulfill the obligations imposed by a State or Federal agency or undertake actions that may result in a violation of State or Federal law. F. The conditions set forth in Part “C” are an integral non-severable part of the preliminary PUD site plan approval granted by this Resolution. If any condition set forth in Part “C” is determined to be invalid or unenforceable for any reason and the developer declines to comply voluntarily with that condition, the site plan approval granted by this Resolution shall become null and void. Page 246 of 494 Resolution No. 2022-XXX Page 6 File No: PUD_RZ-11202126231 G. A Concurrency Deferral Affidavit, a copy which is attached to this Resolution as Exhibit “B” was signed by the applicant on May 5, 2021. H. A copy of this Resolution shall be mailed to the owner the of record as identified on the application. I. This Resolution shall be recorded in the Public Records. J. ADOPTION After motion and second, the vote on this Resolution was as follows: Sean Mitchell, Chair XXX Frannie Hutchinson, Vice-Chair XXX Chris Dzadovsky, Commissioner XXX Linda Bartz, Commissioner XXX Cathy Townsend, Commissioner XXX PASSED AND DULY ADOPTED this _____ day of _____________, 2022. BOARD OF COUNTY COMMISSIONERS ST. LUCIE COUNTY, FLORIDA BY: ______________________________ CHAIR ATTEST: APPROVED AS TO FORM AND CORRECTNESS: ___________________ BY: ______________________________ DEPUTY CLERK COUNTY ATTORNEY Page 247 of 494 Resolution No. 2022-XXX Page 7 File No: PUD_RZ-11202126231 EXHIBIT “A” (LOCATION MAP) Page 248 of 494 Resolution No. 2022-XXX Page 8 File No: PUD_RZ-11202126231 EXHIBIT “B” (CERTIFICATE OF CONCURRENCY DEFERRAL) Page 249 of 494 Resolution No. 2022-XXX Page 9 File No: PUD_RZ-11202126231 EXHIBIT “C” (PRELIMINARY PUD SITE PLAN) Page 250 of 494 SUGGESTED MOTIONS: TIDEWATER REZONE TO PUD AND PRELIMINARY SITE PLAN MOTION TO APPROVE After considering the testimony presented during the public hearing, including staff comments, and the standards of review as set forth in the St. Lucie County land development code, I hereby move that the Planning and Zoning commission forward a recommendation of approval to the St. Lucie County Board of County Commissioners for an Amendment to the Official Zoning Atlas for Planned Unit Development (PUD) Rezoning from CG (Commercial, General) and RS-2 (Residential, Estates – 2) Zoning Districts to the PUD Zoning District and Preliminary Site Plan for the development of 160 multifamily townhome subdivision within the Tidewater PUD, subject to the conditions of the resolution because...(cite reasons why - please be specific) MOTION TO DENY AFTER CONSIDERING THE TESTIMONY PRESENTED DURING THE PUBLIC HEARING, INCLUDING STAFF COMMENTS, AND THE STANDARDS OF REVIEW AS SET FORTH IN THE ST. LUCIE COUNTY LAND DEVELOPMENT CODE, I HEREBY MOVE THAT THE PLANNING AND ZONING COMMISSION FORWARD A RECOMMENDATION OF DENIAL TO ST. LUCIE COUNTY BOARD OF COUNTY COMMISSIONERS FOR AN TO THE OFFICIAL ZONING ATLAS FOR A PLANNED UNIT DEVELOPMENT (PUD) REZONING FROM CG (COMMERCIAL, GENERAL) AND RS-2 (RESIDENTIAL, ESTATES -2) ZONING DISTRICTS TO THE PUD ZONING AND PRELIMINARY SITE PLAN FOR THE DEVELOPMENT OF 160 MULTIFAMILY TOWNHOME SUBDIVISION WITHIN THE TIDEWATER PUD, SUBJECT TO THE CONDITIONS OF THE RESOLUTION BECAUSE… (CITE REASONS WHY - PLEASE BE SPECIFIC) Page 251 of 494 Page 252 of 494 Page 253 of 494 Page 254 of 494 Page 255 of 494 Page 256 of 494 Page 257 of 494 Page 258 of 494 Page 259 of 494 Page 260 of 494 Page 261 of 494 St. Lucie County Planning and Development Services 2300 Virginia Avenue Fort Pierce, FL 34982 Tidewater Policy 1.1.10.4 Justification CH Project No: 21-0702 To Whom This May Concern, On behalf of the Applicant, Cotleur & Hearing is submitting this justification of how the Tidewater development will comply with Policy 1.1.10.4 - Restrict strip commercial development to those traffic corridors where such development patterns now exist. The depth of these commercial areas should average 600 feet, with the exceptions to be found at points of arterial intersection. The provided Commercial Depth Average Exhibit provides the parcels that are zoned Commercial General (CG) currently from Ulrich Rd and Saeger Ave. As per Policy 1.110.4, Parcels 3403-502-0313-000- 4 & 3403-502-0355-000-0 were not included in the minimum 600-foot depth for commercial development given that they are exempt for being located at points of arterial intersections. The fourteen properties’ approximate depths have been calculated within the table below to average +/-636.7214 feet. Given this calculation, the Tidewater Development meets the criteria established by Policy 1.110.4. PARCEL ID Estimated Commercial Depth 3410-244-0001-000-5 621.3 3410-244-0002-000-2 621.3 3410-244-0003-000-9 289.65 3410-244-0004-000-6 621.3 3410-244-0005-000-3 621.3 3410-311-0000-000-3 620 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 332 3410-701-0003-000-1 3410-701-0004-000-8 3410-702-0056-000-0 131 3410-702-0057-000-7 1283.9 3410-701-0006-000-2 620.1 3410-702-0063-000-2 295.20 3410-702-0064-000-9 620.20 3403-502-0350-010-8 952.35 3403-502-0350-000-5 1284.5 TOTAL AVERAGE +/-636.7214 *All numbers are estimated using the Saint Lucie County Property Appraiser (paslc.gov) Page 262 of 494 Commercial Depth Average St. Lucie County, Florida®Legend 600 FT Minimum Depth for CG Zoning Sunshine State Parkway Page 263 of 494 The proposed commercial development, as part of the Tidewater PUD, meets the requirements set in the St. Lucie County Comprehensive Plan necessary. It will also add lasting value to the area, as provided in the separate FLUMA narrative. Please let us know if you have any further questions or comments. Sincerely, Daniel T. Sorrow, PLA, AICP, LEED AP BD+C Cotleur & Hearing 1934 Commerce Lane, Suite 1 Jupiter, FL 33458 561.747.6336 Office Page 264 of 494 1 St. Lucie County Planning and Development Services 2300 Virginia Avenue Fort Pierce, FL 34982 Tidewater Comprehensive Plan Amendment Application Item: Narrative for Supplement 4 CH Project No: 21-0702 November 11th, 2021 Description: Parcel ID: 3410-702-0055-000-3, 3410-702-0054-000-6, 3410-701-0001-000-7 Site Address: 6209 S US HIGHWAY 1 Parcel Size: 18.873 Acres Current Land Use: COM, RM, RU Proposed Land Use: MIXED USE (MXD) Current Zoning: RS-2 & CG Proposed Zoning: PUD (Existing zoning on out parcel CG to remain) To Whom This May Concern, On behalf of the Applicant, Cotleur & Hearing is submitting this narrative to satisfy items 1, 2, 3, 5, 9, 12, 13, 14, 16, 17, 19, and 20 of the Required Documentation list of the Comprehensive Plan Amendments Application Supplement 4 form. Please accept this as our request to include 160 multifamily residential units and 2.58 acres of commercial space for parcels 3410-702-0055-000-3, 3410-702-0054-000-6, 3410-701-0001-000-7. The remainder of this narrative will provide necessary information focused on the Site located at 6209 S US Highway 1. The three parcels referenced above are approximately 18.873 acres in St. Lucie County. Per the St. Lucie County Future Land Use Map, the project site currently has a Commercial (COM), Residential Medium (RM), and a Residential Urban (RU) land use designations along with RS-2 and CG zoning classifications. The proposed rezoning to PUD is being done concurrent to a future land use (FLU) change to Mixed Use (MXD). The proposed future land use (FLU) designation of Mixed Use would allow for up to 15 dwelling units per acre for residential development as referenced in the table in Policy 1.1.1.1 of the St. Lucie County Comprehensive Plan, Future Land Use Element. A rezoning application from RS-2 & CG to Planned Unit Development (PUD) is to be submitted to ensure the FLU is compatible with the zoning and the site is in compliance with the County’s Comprehensive Plan to allow for an innovative mixed-use site. Page 265 of 494 2 Although the permitted density for the project site would be 0 du/ac, 9 du/ac, and 5 du/ac per the COM, RM, and RU land use, the developer aims having a max gross density of 10 du/ac. The new permitted density allowance would ensure flexibility to design higher density areas based on the housing type proposed. Therefore, the estimated number of dwelling units is approximately 160 in addition to the 2.58 acres of commercial in the northeast corner of the project. The project will provide recreational spaces for the community, meeting the demands for the area. Having a mix of uses and housing within Tidewater is consistent with Policy 1.1.5.6 of the County’s Comprehensive Plan’s Future Land Use Element, which emphasizes the need to “create a balance of land uses based upon demands of the residential population for the nonresidential needs of an area”. The mix of residential and commercial within Tidewater is compatible with the surrounding residential and commercial uses as well. Additionally, the development meets the requirements stated within Policy 1.1.10.4 which states “Restrict strip commercial development to those traffic corridors where such development patterns now exist. The depth of these commercial areas should average 600 feet, with the exceptions to be found at points of arterial intersection”. This is further explained in the additional Tidewater Policy 1.1.10.4 Justification. In addition to this Future Land Use Map Amendment application, the County will receive a PUD Rezoning Application, which will include a preliminary and final site plan for the site. The site’s main projected primary access point will be off South US Highway 1. Connectivity in the area will be enhanced and will ensure sufficient access is available for all future residents of the area as well as emergency personnel, per the St. Lucie County code and regulations. The potential enhancement of the South US Highway 1 median in front of our site through additional landscaping and possibly adding a bus shelter/bench easement location along US-1 also benefit the community’s needs. Per the St. Lucie County Comprehensive Plan’s Housing Element, Goal 3.2 states that the County aims “to provide an adequate mix of safe and sanitary housing that meets the needs of existing and future St. Lucie County residents”. Through the approval of this Comprehensive Plan Amendment to amend the Future Land Use Map, as well as the approval of the rezoning to PUD, the County would be providing the developer of this project the ability to accommodate for the growing population in St. Lucie County and the surrounding regions through the provided 160 units, adding to the low housing stock in the treasure coast. Additionally, the project site is located just west of the Grove Community PUD, general commercial, and residential development all located within the in the St. Lucie County jurisdiction. This shows that the envisioned development of Tidewater would be near similar adjacent uses. The area is currently underutilized giver its potential to provide for the residents. The project would also not interfere with the adjacent uses. A project of this magnitude within the County is a great opportunity as an infill development among similar uses. Page 266 of 494 3 Objective 1.1.8 of the Future Land Use Element is “to support and encourage innovative land use development patterns including planned developments” through adequate provisions to include PUDs, PNRDs, and PMUDs. Without this fundamental Future Land Use change from COM, RM, and RU to MXD, the subsequent rezoning to PUD would not be possible. More specifically, Tidewater would be aligned with Policy 1.1.8.1, which encourages “planned development techniques to conserve open space and environmentally sensitive areas” through the inclusion of open space, such as the center lake and walkways, that also serves as recreational space for the community. In accordance with Policy 1.1.5.3, The future land use designation of the surrounding areas within a quarter mile of the site are RM, RU, and COM as shown in Exhibit 1. This indicates the area’s upcoming potential to be a residential and mixed-use sector. The project site is currently located within the county’s current Urban Service Boundary as well, making this a great location to further accommodate for the County’s increasing population – which per the US Census has increased nearly 20% since between 2010 and 2019. The inclusion of townhomes and commercial development within this region would be beneficial to the county as a result. Exhibit 1: SLC Future Land Use ¼ Radius of Site Page 267 of 494 4 The Tidewater development would therefore provide an orderly and logical development pattern for the area, as it is an underutilized and vacant area of land that could instead be utilized to house the quickly growing population of St. Lucie County. The Applicant looks forward to working with Staff as the following applications are reviewed. Should you have any questions regarding the proposed Future Land Use Map amendment, please do not hesitate to contact me at dsorrow@cotleur-hearing.com or by calling 561-747-6336. Sincerely yours, Daniel T. Sorrow, AICP, RLA, LEED AP BD+C Cotleur & Hearing 1934 Commerce Lane, Suite 1 Jupiter, FL 33458 Page 268 of 494 MERITAGE TORRES - TIDEWATER ST. LUCIE COUNTY LAND USE AMENDMENT SUB AREA POLICY CH PROJECT NUMBER: 21-0702 NARRATIVE November 11th, 2021 On behalf of the applicant, Meritage Homes of Florida Inc., Cotleur & Hearing is submitting this narrative for a sub area policy regarding the proposed Future Land Use Map Amendment for the 18.873- acre project named above. The project, located at 6209 S US Highway 1 (Parcel IDs: 3410-702-0055-000- 3, 3410-702-0054-000-6, 3410-701-0001-000-7) is undergoing a land use change from the existing residential and commercial uses to an overall MXD use. This letter is intended to limit the intensity of the MXD Future Land Use designation for this specific project site so as to maintain consistency with the character in the area. The restrictions proposed are to limit the maximum allowable residential density to 10 dwelling units per acre, as opposed to the permitted 15 dwelling units per acre, as stated in the St. Lucie County Comprehensive Plan, Future Land Use Element, Policy 1.1.1.2 item H. Another constraint to the MXD land use in this sub area policy would be the use of industrial and institutional activities on the site. Although Policy 1.1.1.3 of the St. Lucie County Comprehensive Plan indicates that the MXD Future Land Use designation is compatible with Light, Heavy, Extraction Industrial zones, as well as institutional uses, the site would not be suitable for these developments, as it is surrounded by residential and commercial uses. Therefore, this sub area policy seeks to eliminate industrial uses within the subject site. The restrictions proposed to the MXD land use for this particular site would ensure that no unsuitable uses are located on this land without an amendment to this sub area policy. Please let us know if you have any further questions or comments. Sincerely, Daniel T. Sorrow, PLA, AICP, LEED AP BD+C Cotleur & Hearing 1934 Commerce Lane, Suite 1 Jupiter, FL 33458 561.747.6336 Office Page 269 of 494 Page 270 of 494 Page 271 of 494 Page 272 of 494 Page 273 of 494 Page 274 of 494 Page 275 of 494 Page 276 of 494 Page 277 of 494 Please reference the Comprehensive Plan Narrative provided. Page 278 of 494 The development is proposing to include 160 multifamily residential units and 2.58 acres of commercial space. This development is meant to provide more homeownership opportunities in the area for St. Lucie Co. Additionally, provide the opportunity for commercial growth within the site along the South US Highway 1 corridor. This mixed use concept will benefit the community as a whole and encourage sustainable growth that flows from one land use to another. Page 279 of 494 Page 280 of 494 Yes Page 281 of 494 Page 282 of 494 Page 283 of 494 Page 284 of 494 Page 285 of 494 Page 286 of 494 Page 287 of 494 Page 288 of 494 Page 289 of 494 Supplement 3 Page 1 of 2 Revised: May 27, 2010 Rezoning/Amendment to the Official Zoning Atlas Application Supplement Refer to St Lucie County Land Development Code (LDC) Section 11.06.00 for details Current Zoning: Current Future Land Use: Proposed Zoning: Acreage of the area to be rezoned: 1.If you are requesting an amendment to the Official Zoning Atlas of St. Lucie County, 2.Please give a statement describing any changed conditions that would justify a 3. Please state why there is a need for the proposed rezoning: 4. Please state whether and how the proposed rezoning is consistent with the St. Lucie 5.Please give a statement outlining the extent to which the proposed amendment: A)Is compatible with existing land uses; state whether the proposed amendment is in conflict with any portions of the LDC. Please review the attached justification. rezoning: Please review the attached justification. Please review the attached justification. County Comprehensive Plan: Please review the attached justification. A concurrent Future Land Use change is being processed for compatibility. Page 290 of 494 Page 291 of 494 MERITAGE TIDEWATER FUTURE LAND USE MAP SPECIAL USE OVERLAY Saint Lucie County, Florida PUD: 16.29 AC COMMERCIAL: 2.58 AC Page 292 of 494 MERITAGE TORRES - TIDEWATER ST. LUCIE COUNTY LAND USE AMENDMENT SUB AREA POLICY CH PROJECT NUMBER: 21-0702 NARRATIVE November 11th, 2021 On behalf of the applicant, Meritage Homes of Florida Inc., Cotleur & Hearing is submitting this narrative for a sub area policy regarding the proposed Future Land Use Map Amendment for the 18.873- acre project named above. The project, located at 6209 S US Highway 1 (Parcel IDs: 3410-702-0055-000- 3, 3410-702-0054-000-6, 3410-701-0001-000-7) is undergoing a land use change from the existing residential and commercial uses to an overall MXD use. This letter is intended to limit the intensity of the MXD Future Land Use designation for this specific project site so as to maintain consistency with the character in the area. The restrictions proposed are to limit the maximum allowable residential density to 10 dwelling units per acre, as opposed to the permitted 15 dwelling units per acre, as stated in the St. Lucie County Comprehensive Plan, Future Land Use Element, Policy 1.1.1.2 item H. Another constraint to the MXD land use in this sub area policy would be the use of industrial and institutional activities on the site. Although Policy 1.1.1.3 of the St. Lucie County Comprehensive Plan indicates that the MXD Future Land Use designation is compatible with Light, Heavy, Extraction Industrial zones, as well as institutional uses, the site would not be suitable for these developments, as it is surrounded by residential and commercial uses. Therefore, this sub area policy seeks to eliminate industrial uses within the subject site. The restrictions proposed to the MXD land use for this particular site would ensure that no unsuitable uses are located on this land without an amendment to this sub area policy. Please let us know if you have any further questions or comments. Sincerely, Daniel T. Sorrow, PLA, AICP, LEED AP BD+C Cotleur & Hearing 1934 Commerce Lane, Suite 1 Jupiter, FL 33458 561.747.6336 Office Page 293 of 494 Jodi Nentwick-Kugler St. Lucie County 2300 Virginia Avenue Fort Pierce, FL 34982 Tidewater (PUD_PZ-11202126231) Commercial Acreage Justification Letter July 11, 2022 Dear Jodi, As requested, please accept this as a formal justification from the change in commercial outparcel acreage from 2.58 acres to 2.5. The size was reduced in an earlier resubmittal due to staff comments requesting modifications to the entry way and turning radii. These changes cause the entry to require additional space, thus reducing the commercial parcel by 0.08 acres. If you have any questions or of you need additional information, please contact me directly at dsorrow@cotleur-hearing.com or 561.747.6336 ext. 120. Sincerely, Daniel T. Sorrow, PLA, AICP, LEED AP BD+C Cotleur & Hearing 1934 Commerce Lane, Suite 1 Jupiter, FL 33458 561.800.8426 | Cell 561.747.6336 | Office Page 294 of 494 Page 295 of 494 Page 296 of 494 Page 297 of 494 Page 298 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION All Inn Storage LLC, 1556 Keith RD Greenville, GA, 30222 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 299 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION Grove Community Assn Inc, 5890 S US Highway 1 Unit 1 Fort Pierce, FL, 34982 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 300 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION DNPJ LLC, PO Box 1578 Palm City, FL, 34991 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 301 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION Public Storage, 701 Western Ave Glendale, CA, 91201 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 302 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION TCLH1 LLC , 2020 Salzedo ST Ste 301 Coral Gables, FL, 33134 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 303 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION Total Success Concepts Llc, 10211 Hunt Club Ln Palm Beach Gardens, FL, 33418 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 304 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION Gator State Storage FP LLC, 3895 Westroads DR Riviera Beach, FL, 33407 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 305 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION Hayslip LLC, 940 NE Stokes TER Jensen Beach, FL, 34957 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 306 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION Arrigo Ft Pierce J RE Management LLC, 7301 Parkway DR Hanover, MD, 21076 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 307 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION Crawford, William P 702 Kearney Rd Fort Pierce, FL, 34982 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 308 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION Lippard, Tracy 6400 Oleander AVE Fort Pierce, FL, 34982 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 309 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION Holden, Steven 6404 Oleander AVE Fort Pierce, FL, 34982 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 310 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION Tracey (EST), Michael A 6406 Oleander AVE Fort Pierce, FL, 34982 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 311 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION McConnell, Jon 6410 Oleander Ave Fort Pierce, FL, 34982 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 312 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION Spence, Sydia Nichole 8001 NW 66th TER Tamarac, FL, 33321 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 313 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION EGUIBEBE LLC, 4855 Hunters WAY Boca Raton, FL, 33434 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 314 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION Petrie, Lisa A 5989 S US Highway 1 Fort Pierce, FL, 34982 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 315 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION BENTONWOOD MHP LLC, 49 SW Flagler AVE Ste 201 Stuart, FL, 34994 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 316 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION Gruwell, Melissa A 6360 Oleander Ave Fort Pierce, FL, 34982 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 317 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION EGUIBEBE LLC, 4855 Hunters WAY Boca Raton, FL, 33434 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 318 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION Petrie, Lisa A 5989 S Fed Hwy Fort Pierce, FL, 34982 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 319 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION Francris LLC, 19233 N Gardenia AVE Weston, FL, 33332 Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 320 of 494 Date Mailed: July 11, 2022 Planning and Development Services Department (772) 462-2822 Owner(s): Nelmerta Associates, LTD 4855 Hunters Way Boca Raton, FL 33434 Equibebe, Inc 4855 Hunters Way Boca Raton, FL 33434 Applicant: Meritage Homes of Florida Inc 1400 Centrepark Blvd., Ste 1000 West Palm Beach, FL 33401 Agent of Record: Dan Sorrow, AICP, ASLA Cotleur & Hearing 1934 Commerce Lane, Ste 1 Jupiter, FL 33458 Project Location: 6209 S. US Highway 1 Fort Pierce, FL 34982 Project File Number(s): FLUMA-5202126042 PUD_RZ-11202126231 Parcel ID Number(s): 3410-702-0055-000-3 3410-702-0054-000-6 3410-701-0001-000-7 Existing Zoning Districts: RS-2 (Residential, Single-family - 2) CG, (Commercial General) Proposed Zoning Districts: PUD (Planned Unit Development) & CG, (Commercial, General) (Partially Retained) Existing Future Land Use: RM (Residential, Medium), RU (Residential, Urban) and COM(Commercial) Proposed Future Land Use: MXD (Mixed-Use Development) Public Hearing Notice Thursday, July 21, 2022 Notice of Proposed Future Land Use Map Amendment and PUD Rezoning with a Preliminary Development Plan PLANNING AND ZONING COMMISSION , , , Meeting Time: 6:00 PM (or soon thereafter) Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 You are receiving this notice because you are a property owner within 500-feet of the pro-posed petition. Parcel outlined in blue to retain CG Zoning Outparcel. Project Description Dan Sorrow of Cotleur & Hearing, on behalf of Meritage Homes of Florida, Inc, petitioned an Amendment to the Compre- hensive Plan Future Land Use Map, to change the subject +/-18.73 acre sites from the RM (Residential, Medium 9du/ac), RU (Residential, Urban 5du/ac) and COM (Commercial) categories to the MXD (Mixed-Use Development) category. The applicant has submitted a concurrent Zoning Atlas Amendment (Rezone) appli- cation requesting a PUD (Planned Unit Development) Rezoning & Preliminary Site Plan for a 16.37 acre subset of the subject sites to develop 160 multifamily residential (townhome) units with associat-ed improvements to be known as the Tide-water PUD. A proposed 2.50-acre outpar-cel, located at the northeastern corner of the property, is to retain a CG (Commercial, General) zoning designation. Staff Recommendation: Staff recommends the Planning & Zoning Commission, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commis- sioners. Planning & Zoning Commission: The St. Lucie County Planning and Zoning Commission has the power to review and recommend to the St. Lucie County Board of County Commissioners, for approval or disapproval, any applications within their area of responsibility. The Planning and Zoning Commission strongly encourages your input and com- ment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zon- ing Commission should be received by the Planning and Development Services De- partment-Planning Division at least three (3) days prior to the scheduled public hear- ing. Anyone with a disability requiring accom- modations to attend this meeting may con- tact the SLC Community Risk Manager at least 48 hours in advance at (772) 462- 1546 or TDD (772) 462-1428 Further details are available in the Plan-ning & Development Services Depart-ment- Planning Division please contact: Staff Jodi Kugler, Senior Planner Tel (772) 462-1580 Email NentwickJ@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 Page 321 of 494 Page 322 of 494 Page 323 of 494 Page 324 of 494 Page 325 of 494 Page 326 of 494 Page 327 of 494 Page 328 of 494 Page 329 of 494 Page 330 of 494 Page 331 of 494 LA N D S C A P E A R C H I T E C T U R E - S U R V E Y I N G CA U L F I E L D & W H E E L E R , I N C . CI V I L E N G I N E E R I N G PH O N E ( 5 6 1 ) - 3 9 2 - 1 9 9 1 / F A X ( 5 6 1 ) - 7 5 0 - 1 4 5 2 79 0 0 G L A D E S R O A D - S U I T E 1 0 0 BO C A R A T O N , F L O R I D A 3 3 4 3 4 ” SITE US 1 OL E A N D E R A V E N U E MIDWAY ROAD SUNSHINE BLVD EASY STREET Page 332 of 494 LA N D S C A P E A R C H I T E C T U R E - S U R V E Y I N G CA U L F I E L D & W H E E L E R , I N C . CI V I L E N G I N E E R I N G PH O N E ( 5 6 1 ) - 3 9 2 - 1 9 9 1 / F A X ( 5 6 1 ) - 7 5 0 - 1 4 5 2 79 0 0 G L A D E S R O A D - S U I T E 1 0 0 BO C A R A T O N , F L O R I D A 3 3 4 3 4 Page 333 of 494 LA N D S C A P E A R C H I T E C T U R E - S U R V E Y I N G CA U L F I E L D & W H E E L E R , I N C . CI V I L E N G I N E E R I N G PH O N E ( 5 6 1 ) - 3 9 2 - 1 9 9 1 / F A X ( 5 6 1 ) - 7 5 0 - 1 4 5 2 79 0 0 G L A D E S R O A D - S U I T E 1 0 0 BO C A R A T O N , F L O R I D A 3 3 4 3 4 Page 334 of 494 LA N D S C A P E A R C H I T E C T U R E - S U R V E Y I N G CA U L F I E L D & W H E E L E R , I N C . CI V I L E N G I N E E R I N G PH O N E ( 5 6 1 ) - 3 9 2 - 1 9 9 1 / F A X ( 5 6 1 ) - 7 5 0 - 1 4 5 2 79 0 0 G L A D E S R O A D - S U I T E 1 0 0 BO C A R A T O N , F L O R I D A 3 3 4 3 4 Page 335 of 494 S. U S H I G H W A Y 1 LAKE 1283.4' 66 2 . 4 ' 1152.4' 42 2 . 4 ' 24 0 ' 131' 2.50 AC COMMERCIAL 8 6 7 9 9 10 DRY DETENTION LAND USE: MIXED ZONING: GENERAL COMMERCIAL LAND USE: MIXED ZONING: PUD LAND USE: COMMERCIAL & RESIDENTIAL MEDIUM (9 DU/AC) ZONING: RS-2 (RESIDENTIAL, SINGLE FAMILY 2 DU/AC) & CG (GENERAL COMMERCIAL) LAND USE: HIGHWAY (OTHER SIDE OF HWY IS COMMERCIAL) ZONING: HIGHWAY (OTHER SIDE HWY IS CG (GENERAL COMMERCIAL) LAND USE: COMMERCIAL ZONING: CG (GENERAL COMMERCIAL) LAND USE: RESIDENTIAL URBAN (5 DU/AC) ZONING: RS-2 (RESIDENTIAL, SINGLE FAMILY 2 DU/AC) 4 2' VG 2' VG 2' VG 2' VG 2' VG 2' VG ACCESS GATE CABANA BLDG A, 6 UNIT BLDG B, 8 UNIT BLDG C, 8 UNIT BLDG D, 8 UNIT BLDG E, 8 UNIT BLDG F, 8 UNIT BLDG G, 8 UNIT BLDG H, 6 UNIT 20' 10' 5' 20' 10'5'20' 10'5' 20' 10' 5' 20' 10' 12' 5' 15'15'15' 15'15'15' 15'15'15' 15'15'15' BLDG I, 6 UNIT BLDG J, 6 UNIT BLDG K, 8 UNIT BLDG L, 6 UNIT BLDG M, 6 UNIT BLDG N, 8 UNIT BLDG O, 8 UNIT BLDG P, 8 UNIT BLDG Q, 6 UNIT BLDG R, 8 UNIT BLDG S, 6 UNITBLDG T, 8 UNIT BLDG U, 8 UNITBLDG V, 8 UNIT LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6LOT 7 LOT 8 LOT 9 LOT 10 LOT 11 LOT 12 LOT 13 LOT 14 LOT 15 LOT 16 LOT 17 LOT 18 LOT 19 LOT 20 LOT 21 LOT 22 LOT 23 LOT 24 LOT 25 LOT 26 LOT 27 LOT 28 LOT 29 LOT 30 LOT 38 LOT 37 LOT 36 LOT 35 LOT 34 LOT 33 LOT 32 LOT 31 LOT 46 LOT 45 LOT 44 LOT 43 LOT 42 LOT 41LOT 40 LOT 39 LOT 54 LOT 53 LOT 52 LOT 51 LOT 50 LOT 49 LOT 48 LOT 47 LOT 60 LOT 59 LOT 58 LOT 57 LOT 56 LOT 55 LOT 61 LOT 62 LOT 63 LOT 64 LOT 65 LOT 66 LOT 67 LOT 68 LOT 69 LOT 70 LOT 71 LOT 72 LOT 73 LOT 74 LOT 75 LOT 76 LOT 77 LOT 78 LOT 79 LOT 80 LOT 81 LOT 82 LOT 83 LOT 84 LOT 85 LOT 86 LOT 87 LOT 88 LOT 89 LOT 90 LOT 91 LOT 92 LOT 100 LOT 99 LOT 98 LOT 97 LOT 96 LOT 95 LOT 94 LOT 93 LOT 108 LOT 107 LOT 106 LOT 105 LOT 104 LOT 103 LOT 102 LOT 101 LOT 116 LOT 115 LOT 114 LOT 113 LOT 112 LOT 111 LOT 110 LOT 109 LOT 131 LOT 132 LOT 133 LOT 134 LOT 135 LOT 136 LOT 123 LOT 124 LOT 125 LOT 126 LOT 127 LOT 128 LOT 129 LOT 130 LOT 122 LOT 121 LOT 120 LOT 119 LOT 118 LOT 117 LOT 137 LOT 138 LOT 139 LOT 140 LOT 141 LOT 142 LOT 143 LOT 144 LOT 145 LOT 146 LOT 147 LOT 148 LOT 149 LOT 150 LOT 151 LOT 152LOT 153 LOT 154 LOT 155 LOT 156 LOT 157 LOT 158 LOT 159 LOT 160 2' VG 20' 20' 24' 2' VG 24' 44' 44' 6.3' 6.3'6.3' R23' R20.6' R23'R23' R23' 20' 20' 50' 50' 50' 225.4' 308.4' FUTURE DEVELOPMENT NOT PART OF SITE PLAN 150' 26' R30' POOL 15' BUFFER 15' BUFFER 50' ROW 79.7' 20' LME 20' LME 15' BUFFER 15' BUFFER 50' ROW 24'10' 20' 92.7' 132.4' 5' SW 79.7' 20'24' 20' LME 22' FRONT SB 22' FRONT SB 15'79'15' BUFFER10' DE10' DE 15' DE 10' DE 10' DE 15' DE 15' DE 15' DE 10' DE 15' DE 20'12' 12' 6' SW 60' ROW 22' 22' 60' ROW 60' ROW 10' DE 60' ROW 20' 5' SW 20'12' 2' VG 20' 5' SW 11' 2' VG 11' 10' 2' VG 20' 5' SW 11' 2' VG 20' 5' SW 11' 10' 2' VG 20' 5' SW 79.7' 10'10' 20' 5' SW 22' 15' DE TURN-AROUND TURN-AROUND TURN-AROUND POOL EQUIP. BIKE RACK FENCE 19.3' 25.5' 20' 2' VG 20' 5' SW 15' 15' 15' 6' PVC FENCE TYP. 8' AC UNIT TYP. 6' PVC FENCE TYP. 8' AC UNIT TYP. 5' 22'12' 8'8' 6' PVC FENCE TYP. AC UNIT TYP. 6' PVC FENCE TYP. AC UNIT TYP. 8' 6' PVC FENCE TYP. AC UNIT TYP. 7'12' 8' UE 8' UE 8' UE 8' UE 8' UE 8' UE 8' UE 8' UE 8' UE 8' UE 8' UE 14433 SF LITTORAL SHELF 7' 8' UE 8' UE STUB FOR COMMERCIAL PARCEL TYP. SANITARY FORCE MAIN DRAINAGE PIPE TYP. SEWER MAIN WATER MAIN SEWER MAIN WATER MAIN 79.7' 79.7' 20'24' 24' 79.7' 24' 79.7' 79.7' 20'24' 20'24' MAIL KIOSK 48' 72' 22.5' 15' 17.4' 44' 45' 22' 16' 6.3' 8' 22' 16'8' 22' 16'8'22' 16'8' EMS ACCESS LIFT STATION SEWER MAIN WATER MAIN 6' PVC FENCE TYP. 22'16' 8' 22' 16' 8' 16' 8'16' 8' 16' 8' 7.7' 8' 7.7' 13'7.7' 7.7' 7.7' 7.7' 7.7' 20' LME 20' 5' SW CONNECT TO EXISTING 12" WATER MAIN (FPUA SYSTEM) 176' 79.7' 128' 79.7' 24' 24' 176' 79.7' 128'20'24' 176'128'20'24' EXISTING BILLBOARD BILLBOARD EASEMENT CONTINUES ~5,200 LF FOR CONNECTION TO GRAVITY MANHOLE (FPUA SYSTEM) LIGHT TYP. LIGHT TYP. LIGHT TYP. LIGHT TYP. FOUNTAIN FOUNTAIN 8' PVC FENCE TYP. 8' PVC FENCE TYP. 8' PVC FENCE TYP. 8' PVC FENCE TYP. 176' 79.7' PROPOSED MONUMENT SIGN PROPOSED SCHOOL BUS DROP-OFF LOCATION CALL BOX 50' ROW 50' ROW 60' ROW SEWER MAINWATER MAINDRAIN PIPE SEWER MAINWATER MAINDRAIN PIPE 5' SW CONNECTION TO COMMERCIAL PARCEL, ACCESS POINTS TBD 20' 7.7' R35' 46' 79.7' 90.0' 20' 8' 8' UE 5' SW 7.7'7.7' 8' 22' FRONT SB AC UNIT TYP. 50' 79.7' 90.0' 8' UE 24'AC UNIT TYP. 5' SW 7.7'7.7' 8' 22' FRONT SB 16' 1 PRELIMINARY SITE PLAN Scale: 1" = 50'-0" 25'0'100'50'150' North 200' by agreement in writing with the architect. Immediately report any discrepancies to the architect. SHEET COTLEUR & HEARING, INC. These drawings are the property of the architect and are not to be used for extensions or on other projects except OF 2 ME R I T A G E H O M E S T I D E W A T E R Me r i t a g e H o m e s St . L u c i e C o u n t y , F l o r i d a 21-0604 DTS ACE/CTB ACE/CTBDESIGNED DRAWN REVISIONS JOB NUMBER APPROVED DATE Landscape Architects Land Planners Environmental Consultants www.cotleurhearing.com 1934 Commerce Lane Suite 1 Jupiter, Florida 33458 561.747.6336 · Fax 747.1377 Lic# LC-C000239 11-11-21 04-15-22 05-12-22 06-09-22 07-11-22 LEGAL DESCRIPTION TRAFFIC STATEMENT DRAINAGE STATEMENT NOTE: AS PER SECTION 11.02.10 (E & F), THERE WILL BE A UTILITY AND DRAINAGE PLAN SUBMITTED WITH THE SITE PLAN APPLICATION. MACKENZIE ENGINEERING AND PLANNING, INC. (MEP) WAS RETAINED TO EVALUATE THE CHANGES IN THE FUTURE LAND USE FOR THE PROPERTY LOCATED AT THE WEST SIDE OF THE US 1 NORTH OF EASY STREET, ST. LUCIE COUNTY, FL (3401-701-0001-000-7; 3410-702-0054-000-6; 3410-702-0055-000-3). THE APPLICANT PROPOSES 160 MULTIFAMILY DWELLING UNITS. THE PROPOSED PROJECT IS EXPECTED TO GENERATE THE FOLLOWING NET NEW EXTERNAL AND CUMULATIVE DRIVEWAY TRIPS: *1,101 DAILY, 72 AM PEAK HOUR (17 IN/55 OUT), AND 89 PM PEAK HOUR (56 IN/33 OUT) TRIPS. THE ANALYSIS SHOWS THAT THE ROADWAYS ARE PROJECTED TO OPERATE ACCEPTABLY WITH THE ADDITION OF THE PROPOSED DEVELOPMENT AND THE PROJECT MEETS ST. LUCIE COUNTY'S CONCURRENCY REQUIREMENTS. Parcel 1: THE NORTH HALF OF THE SOUTHWEST QUARTER OF THE NORTHEAST QUARTER OF THE SOUTHWEST QUARTER OF SECTION 10, TOWNSHIP 36 SOUTH, RANGE 40 EAST, ST. LUCIE COUNTY, FLORIDA, LESS RIGHTS-OF-WAY FOR DRAINAGE CANALS AND PUBLIC ROADS, ALSO DESCRIBED AS THE NORTH 5 ACRES OF THE SOUTHWEST QUARTER OF THE NORTHEAST QUARTER OF THE SOUTHWEST QUARTER OF SECTION 10, TOWNSHIP 36 SOUTH, RANGE 40 EAST, LESS RIGHTS-OF-WAY FOR PUBLIC ROADS AND DRAINAGE CANALS. PARCEL 2: THE SOUTHEAST QUARTER OF THE NORTHEAST QUARTER OF THE SOUTHWEST QUARTER OF SECTION 10, TOWNSHIP 36 SOUTH, RANGE 40 EAST, ST. LUCIE COUNTY, FLORIDA, LESS LOTS 1, 3 AND 10, BLOCK A, AND LOTS 1 AND 2, BLOCK B, OF THE SUBDIVISION OF AETNA PARK, AS PER PLAT THEREOF, RECORDED IN PLAT BOOK 6, PAGE 13, OF THE PUBLIC RECORDS OF ST. LUCIE COUNTY, FLORIDA, LESS RIGHTS-OF-WAY FOR PUBLIC ROADS AND DRAINAGE CANALS, AND ALSO LESS THE FOLLOWING DESCRIBED PARCEL OF LAND, TO WIT: BEGINNING AT THE INTERSECTION OF THE WEST RIGHT OF WAY OF U.S. NO. 1 AND THE SOUTH LINE OF LOT 2, BLOCK B, AETNA PARK RECORDED IN PLAT BOOK 6, PAGE 13 AND AMENDED PLAT OF AETNA PARK RECORDED IN PLAT BOOK 7, PAGE 41; RUN WEST ON THE SOUTH LINE OF LOT 2, 131 FEET TO THE SOUTHWEST CORNER OF SAID LOT 2; THENCE SOUTH 40 FEET; THENCE EAST 131 FEET TO THE U.S. NO. 1 RIGHT OF WAY; THENCE NORTH 40 FEET TO THE POINT OF BEGINNING. PARCEL 3: LOTS 1 AND 3, BLOCK A, OF THE SUBDIVISION OF AETNA PARK, AS PER PLAT THEREOF, RECORDED IN PLAT BOOK 6, PAGE 13, AND AMENDED PLAT OF AETNA PARK, RECORDED IN PLAT BOOK 7, PAGE 41, OF THE PUBLIC RECORDS OF ST. LUCIE COUNTY, FLORIDA. PARCEL 4: THE SOUTH HALF OF THE SOUTHWEST QUARTER OF THE NORTHEAST QUARTER OF THE SOUTHWEST QUARTER OF SECTION 10, TOWNSHIP 36 SOUTH, RANGE 40 EAST, ALSO DESCRIBED AS THE SOUTH 5 ACRES OF THE SOUTHWEST QUARTER OF THE NORTHEAST QUARTER OF THE SOUTHWEST QUARTER OF SAID SECTION 10, ST LUCIE COUNTY, FLORIDA, LESS RIGHTS-OF-WAY OF PUBLIC ROADS AND DRAINAGE CANALS. CONTAINING 822,110 SQUARE FEET, 18.873 ACRES, MORE OR LESS. LDC WAIVER TABLE SECTION 7.04.03 - BUILDING SPACING FORMULA SHALL APPLY TO ALL MULTIPLE-FAMILY DWELLINGS, HOTELS, AND MOTELS, AND TO ALL ACCESSORY USES WITH TWO (2) OR MORE FLOORS THAT ARE CUSTOMARILY ASSOCIATED WITH AND SUBORDINATE TO THE PRINCIPLE USES. THE BUILDING SPACING FORMULA WOULD CALL FOR 50' OF SEPARATION BETWEEN ADJACENT UNITS AND 117' OF SEPARATION BETWEEN FRONT FACING UNITS. THESE MEASUREMENTS ARE EXCESSIVE FOR THE SITE GIVEN ITS USEAGE AND CONTEXT. SEE PROVIDED JUSTIFICATION STATEMENT FOR CLARIFICATION. REQUIRED PROPOSED LEGEND SW VG LME UE ROW SIDEWALK VALLEY GUTTER LAKE MAINTENANCE EASEMENT UTILITY EASEMENT RIGHT-OF-WAY 20' LOT TYP. 24' LOT TYP. MODEL CENTER UNITS: LOTS 123 & 124 Page 336 of 494 2 by agreement in writing with the architect. Immediately report any discrepancies to the architect. SHEET COTLEUR & HEARING, INC. These drawings are the property of the architect and are not to be used for extensions or on other projects except OF 2 ME R I T A G E H O M E S T I D E W A T E R Me r i t a g e H o m e s St . L u c i e C o u n t y , F l o r i d a 21-0604 DTS ACE/CTB ACE/CTBDESIGNED DRAWN REVISIONS JOB NUMBER APPROVED DATE Landscape Architects Land Planners Environmental Consultants www.cotleurhearing.com 1934 Commerce Lane Suite 1 Jupiter, Florida 33458 561.747.6336 · Fax 747.1377 Lic# LC-C000239 11-11-21 04-15-22 05-12-22 06-09-22 07-11-22 NTS HANDICAP SIGN DETAIL 36" 2 1/2" 1" 12" R1'-8" R5'' NOTE: SYMBOL TO BE 4" WIDE WHITE TRAFFIC PAINT ON PAVEMENT OR COLORED PAVERS . TYPICAL @ ALL HANDICAP STALLS HANDICAP SYMBOL DETAIL NTS F.S. 318.14 $250 FINE PARKING BY DISABLED PERMIT ONLY 18" 6" 12" COLORS: TOP SYMBOL & BORDER = WHITE BOTTOM TEXT & BORDER = BLACK TOP BACKGROUND = BLUE BOTTOM BACKGROUND = WHITE COLORS: TEXT & BORDER = BLACK BACKGROUND = WHITE 1" - 1.5" SETTING BED 4" AGGREGATE BASE EXISTING STABILIZED SUBGRADE TRANSFORMER DETAIL PEDESTRIAN PAVER DETAIL NTS D CURB DETAIL NTS ELEVATION VIEW PLAN VIEW TRANSFORMER HEDGE MATERIAL (COCOPLUM, WAX MYRTLE OR SANDANKWA VIBURNUM) OPEN FOR ACCESS TRANSFORMER OPEN FOR ACCESS HEDGE MATERIAL (COCOPLUM, WAX MYRTLE OR SANDANKWA VIBURNUM) 8" 6" 6" BASE 18" 2" RAD. PAVEMENT VEHICULAR PAVER DETAIL NTS 2.5" THICK PAVERS 3" THICK PAVERS IN LENGTHWISE RUNNING BOND PATTERN PAVEMENT PAVEMENT #4 REBAR ALONG CENTER 2" CL MIN. CLASS I CONCRETE STRIP ON EACH SIDE (12" X 12" DEEP) SIDEWALK DETAIL NTS 1" - 1.5" SETTING BED 10" AGGREGATE BASE EXISTING STABILIZED SUBGRADE 3,000 PSI CONCRETE SUBGRADE COMPACTED TO 98% MAX. DRY DENSITY PER AASHTO T-99 METHOD PRIMECOAT SEALANT TO BE APPLIED ON TOP OF BASE COURSE STABILIZED SUBGRADE MIN. DEPTH OF 12", COMPACTED TO 98% MAX. DRY DENSITY PER AASHTO T-180 METHOD, MIN. LBR40, MIXED AND HOMOGENEOUS MATERIAL 1.5" TYPE SP 9.5 FINE ASPHALTIC CONCRETE TRAFFIC LEVEL B 6" 12" 8"6" NOTE: PAVEMENT SHALL HAVE MARSHALL STABILITY OF 1,000 LBS. CONSTRUCT 6" LIMEROCK OR COQUINA BASE COMPACTED TO 98% MAX. DRY DENSITY PER AASHTO T-180 METHOD, LBR 100 VEHICULAR PAVEMENT DETAIL NTS TYPE: COLOR: FINISH: LANDSCAPE FORMS FPG BIKE RACK DARK GREY/SILVER POWDER COAT ALUMINUM CASTING ALUMINUM CASTING 2' - 7" 6" 2' - 6" 3-1/2" 1-1/4" BIKE RACK DETAIL NTS 4" SITE DETAILS F CURB DETAIL NTS 1/4" MAX. 6" 12"6" R2" R3" 8"16"24"3000 PSI CONCRETE ASPHALT 6" M I N . NOTE: WHEN USED ON HIGH SIDE OF ROADWAYS, THE CROSS SLOPE OF THE GUTTER SHALL MATCH THE SLOPE OF ADJACENT PAVEMENT AND THICKNESS OF THE LIP SHALL BE 6 INCHES. 7 12" BENCH DETAIL NTS TYPICAL 60' ROW NTS TYPICAL 50' ROW NTS PVC FENCE DETAIL NTS PRIVACY FENCE: WHITE PVC FENCE, 6' TALL, 8' LENGTH PERIMETER FENCE: WHITE PVC FENCE, 8' TALL TYPICAL GUEST AND HANDICAP PARKING DETAIL NTS HANDICAP RAMP DETAIL NTS 12'-0" 1:12 MA X . D O W N 1:12 MA X . D O W N 6-8' CLEARANCE MA X I M U M 2 % GRA D E U P 5'-0" 12'-0" NOTE: IN THIS APPLICATION RAMPS CAN BE SEPARATED AND SIDEWALK CAN BE FLUSH ACROSS ALL HC SPACES NOTE: HCR#3-MOD MEANS ONLY 1 RAMP BUILT TO REQUIRED SIDE OF SIDEWALK. OR RAMPS SEP. TO ENDS OF HC SPACES MAX I M U M 2 % GRA D E U P 5'-0" 20'-0" 10-0" STANDARD PARKING SPACE 12'-0" 6"6" 6" PAINTED (BLUE) STRIPES HANDICAP MARKINGS AS PER CODE 5'-0" SIDEWALK HANDICAP PARKING SIGN PER ADA REQUIREMENTS EDGE OF PAVEMENT D CURB CURB RAMP 4" DIAGONAL BLUE STRIPES PER FDOT INDEX 6" SURFACE MOUNT OPTION: (4) 1/4" THICK ANCHOR TABS WITH Ø1/2"HOLE FOR ANCHORING. NON-CORROSIVE ANCHORING HARDWARE SUPPLIED BY OTHERS. EMBEDDED OPTION: INCLUDES (4) 10mm x 120mm THREADED RODS CONFIDENTIAL DRAWING INFORMATION CONTAINED HEREIN IS THE PROPERTY OF LANDSCAPE FORMS, INC.INTENDED USE IS LIMITED TO DESIGN PROFESSIONALS SPECIFYING LANDSCAPE FORMS, INC. PRODUCTS ANDTHEIR DIRECT CLIENTS. DRAWING IS NOT TO BE COPIED OR DISCLOSED TO OTHERS WITHOUT THE CONSENTOF LANDSCAPE FORMS, INC. © 2014 LANDSCAPE FORMS, INC. ALL RIGHTS RESERVED. SURFACE MOUNT DETAIL EMBEDDED DETAIL 30 29/32 [785] 24 53/64 [630] 17 49/64 [451] 13 13/16 [351] 18 7/64 [460] 68 57/64 [1750] 22 25/32 [579] 14 3/16 [361]2 3/4 [70] 1 3/16 [30] NARROW WOOD SLATS FREESTANDING GLIDE FPUA TRADITIONAL POST TOP FIXTURE G.E. TC-100R LUMINARY WITH HIGH PRESSURE SODIUM LAMP ROUND, FIBERGLASS POLE, 12' HEIGHT (BURY 5' IN DEPTH). COACH LAMP (STREETLIGHTS) N.T.S. 60' R/W 10'10'12' 2%2% APPROXIMATE FINISHED GRADE VALLEY GUTTER (TYP.) VALLEY GUTTER (TYP.) ASPHALT PAVEMENT 6" COQUINA BASE 24'37' 2% 12" SUBGRADE CL 2'2' 5' SIDEWALK 2% 20' PARKING SPACES 60' RIGHT-OF-WAY TYPICAL SECTION 1' OUTSIDE R.O.W. 50' R/W 10'10'5'10' SIDEWALK 2%2% APPROXIMATE FINISHED GRADE VALLEY GUTTER (TYP.) VALLEY GUTTER (TYP.) ASPHALT PAVEMENT 6" COQUINA BASE 27'23' 2% 12" SUBGRADE CL 2'2' 11' 2% 50' RIGHT-OF-WAY TYPICAL SECTION Page 337 of 494 Meritage Tidewater PUD_PZ-11202126231 Building Spacing Formula Justification Per comment number 3 under section D. Determination of Compliance with Land Development Code and Comprehensive Plan Requirements of the final DRC report dated March 11, please accept this justification for the deviation regarding the Building Spacing Formula per St. Lucie County Code Section 7.04.03. Using the formula detailed in this Code section, D = [LA + LB + 2(HA + HB)] / 4, the distance (D) between buildings would be [50 + 50 + 2(27.7 + 27.7)] / 4 = 52.7’ for adjacent buildings and approximately 117’ distance between perpendicular buildings. However, as shown on the site plan, townhomes are separated by a 15’ spacing setback between each adjacent building and approximately 90’ for buildings across the street. In some cases, these spaces between adjacent buildings include drainage easements. Per the site plan, the site design is very functional with these spacing measurements, and those proposed by Section 7.04.03 of the St. Lucie County Code spacing formula are excessive and would cause great hardship to the site development. The site is intended to be a multifamily buffer between the commercial uses along the main thoroughfare of US Highway 1 and the low-density single-family dwellings. In order to allow for this higher density transition between the two less compatible uses, it is necessary to reduce this building spacing to fit the number of townhomes being proposed. The spacing shown on the site plan allows for adequate minimum distance between buildings; allowing for ventilation, lighting, drainage easements, and a 50’ right-of-way between buildings across the street from each other. Therefore, we respectfully ask that the County accepts these dimensions, as those required by code would prove to be excessive and would render this project unfeasible. If you have any questions regarding the appropriateness of the building spacing being proposed, please do not hesitate to contact us at 561-747-6336. Sincerely, Daniel T. Sorrow, PLA, AICP, LEED AP BD+C Cotleur & Hearing 1934 Commerce Lane, Suite 1 Jupiter, FL 33458 Page 338 of 494 Environmental Impact Report (EIR) Tidewater Aetna Park (Amended)– Subdivision 6209 S US Highway 1 Unincorporated, St. Lucie County, Florida PIN’s: 3410-702-0054-000-6, 3410-702-0055-000-3, & 3410-701-0001-000-7 Section 10, Township 36 S, Range 40 E Prepared For: St Lucie County Environmental Resource Department Meritage Home of FL Prepared By: ©Aquatic Research Monitoring, Equipment, and Deployment, LLC REVISED April 2022 Page 339 of 494 PIN’s: 3410-702-0054-000-6, 3410-702-0055-000-3, Tidewater St. Lucie County (21-188) & 3410-701-0001-000-7 January 2022 Page 2 of 11 TABLE OF CONTENT INTRODUCTION .............................................................................................................. 3 1. A vegetation and substrate survey ............................................................................ 4 2. A statement of jurisdictional control over the environmental area. .......................... 5 3. A statement on when the jurisdictional boundaries .................................................. 5 4. Indicate the required elevation .................................................................................. 5 5. The identification of any area that has experienced overwash ................................. 5 6. The identification of any area subject to breach during storm conditions. ............... 5 7. An assessment of the impacts upon onsite vegetation and wildlife. ......................... 5 8. An assessment of the impacts upon onsite and off-site natural resources. ............... 6 9. A detailed description of the planned approach to minimize impacts. ..................... 6 10. A detailed description of the proposed alterations or disturbances being proposed. ................................................................................................................................. 8 11. A detailed description of the proposed mitigation plan to off set impacts. ............ 9 12. A plant and animal survey for onsite federal and state protected species. ........... 10 13. A surface water management plan ........................................................................ 10 14. A sea turtle protection plan. .................................................................................. 10 15. A shoreline stabilization plan................................................................................ 10 16. A gopher turtle protection plan. ............................................................................ 11 Figure 1: Location Map Figure 2: Site Map Figure 3: Historic Aerial (1999) Figure 4: Agency Reported Land Use/FLUCCS Figure 5: Existing Habitat Map Figure 6: Gopher Tortoise, Listed Flora & Fauna with General Wildlife Survey Transect Figure 7: Soils(s) Map Page 340 of 494 PIN’s: 3410-702-0054-000-6, 3410-702-0055-000-3, Tidewater St. Lucie County (21-188) & 3410-701-0001-000-7 January 2022 Page 3 of 11 INTRODUCTION The following environmental impact report has been prepared in accordance with Section 11.02.09(A) (5) of the St. Lucie County Land Development Code (LDC). The environmental impact report is required when the thresholds depicted in Section 11.02.09(A) (5) (a) are met. The Tidewater project totals ±18.87 acres and is located on the west side of Highway US 1, ~6,400 ft south of Midway Road, and ~350 ft north of Saeger Avenue, within St. Lucie County, Florida. The property consists of three (3) parcels that are further identified by the St. Lucie County Property Appraiser as Parcel ID’s 3410-702-0054-000-6, 3410-702-0055-000-3 & 3410-701-0001-000-7, located within Section 10 Township 36 South and Range 40 East. The parcel is further generally located at Latitude 27°21'25.22"N and Longitude 80°19'40.80"W. See Figures 1 and 2 for location and site maps. The Tidewater project is situated on a historic agriculture (citrus) property. See Figure 3 for 1999 aerial indicating the previous agricultural use. The onsite vegetation consists almost solely of (±90%) exotic Brazilian pepper trees with scattered oaks and cabbage palms. This is consistent with a former citrus/row crop operation as oak and palms were commonly installed to provide windbreaks for crops. Habitat is best classified as Brazilian pepper. Furthermore, the site’s historic topography of beds and furrows remain visible on the site. See Figure 4 for Agency Reported Land Use Map and Figure 5 for FLUCCS/Existing Habitat Map. The property is bordered by Highway US 1 to the east, the north is bordered by a car dealership, and abandoned agriculture areas border the west and south. The immediate surrounding area consists of commercial, residential, and remnant agriculture lands. The property is currently vacant land. As described above the majority of the property consists of Brazilian pepper with scattered oaks and cabbage palms remaining from the sites previous use in citrus. The proposed project is to construct 160 multifamily residential units and associated infrastructure such as parking and a stormwater treatment area. Additionally, 2.58 acres of commercial space is proposed. The proposed project requires an Environmental Impact Report (EIR) as part of the County approval process. See site plan submitted under separate cover. Based on section 11.02.09(A) (5) of the St. Lucie County Land Development Code, the environmental impact report shall completely depict the following: Page 341 of 494 PIN’s: 3410-702-0054-000-6, 3410-702-0055-000-3, Tidewater St. Lucie County (21-188) & 3410-701-0001-000-7 January 2022 Page 4 of 11 1. A vegetation and substrate survey including: a) Extent and acreage of any areas in which vegetation typical of the primary dune extends landward of the Coastal Construction Control Line; The property is not located along the coast or near a waterway and therefore has no dune areas or CCCL line. b) Extent and acreage of all marsh and mangrove forest areas, including substrate conditions: No wetlands or other surface waters are present on the property. c) Extent and acreage of all upland hammock forests; and, No native upland habitat is located on the subject property. Upland areas consist almost solely of Brazilian pepper trees (±90%), with scattered oaks and cabbage palms likely planted as wind breaks from the sites previous use in agriculture (citrus). Understory consists of various non-descript and exotic grasses along with areas of heavy coverage of muscadine grape vine. Habitat is best classified as Brazilian pepper. For depiction of upland areas See Figure 4 for Agency Reported Land Use Map and Figure 5 for Existing FLUCCS/Habitat Map. Upland habitats and representative vegetation include the following: Representative vegetation within each wetland includes the following: Brazilian Pepper (± 18.87 acres) FLUCCS Category – 4220 Brazilian pepper (Schinus terebinthifolia) Non-descript grasses Cogon grass Oaks (Quercus spp.) Muscadine grape vine (Vitis rotundifolia) d) Extent and acreage of all wetlands. No wetlands or other surface waters are located on the subject property. Page 342 of 494 PIN’s: 3410-702-0054-000-6, 3410-702-0055-000-3, Tidewater St. Lucie County (21-188) & 3410-701-0001-000-7 January 2022 Page 5 of 11 2. A statement of jurisdictional control over the environmental area. The proposed project site does not include any native upland areas. Therefore, no county native upland preserve is required. The site also does not include any jurisdictional wetlands or other surface waters. St. Lucie County maintains jurisdiction over onsite trees qualifying for protection under the Land Development Code (LDC). 3. A statement on when the jurisdictional boundaries were delineated and who delineated the boundaries. Not applicable. No jurisdictional wetlands on site as verified during a site visit conducted in June 2021 by the qualified biologists with Aquatic Research FL. 4. Indicate the required first floor elevation, and whether all floor elevations will be above this level. See site plan as prepared by Cotleur and Hearing, submitted under separate cover. 5. The identification of any area that has experienced overwash of the primary dune. No dune is present. Property is located inland. 6. The identification of any area subject to breach during storm conditions. Not applicable. 7. An assessment of the impacts upon onsite vegetation and wildlife. Development of the site will include impacts to native trees. A mitigation plan has been prepared by Cotleur & Hearing and is enclosed as part of the project resubmittal packet. Further details regarding tree mitigation specifics can be found in questions 9-11 of this EIR. A listed flora and fauna survey was conducted by Aquatic Research FL in June 2021 and was again updated in March 2022. This survey also included the completion of a state compliant (FFWCC) 15% minimum habitat survey for gopher tortoise burrows. One (1) potentially occupied gopher tortoise burrow was observed during the updated listed species Page 343 of 494 PIN’s: 3410-702-0054-000-6, 3410-702-0055-000-3, Tidewater St. Lucie County (21-188) & 3410-701-0001-000-7 January 2022 Page 6 of 11 survey conducted in March 2022. No further listed flora species or fauna dens, nests, burrows, or roosting areas were located on site. A gopher tortoise relocation permit for offsite relocation will be obtained from the FFWCC prior to site clearing in accordance with the Florida Fish and Wildlife Conservation Commission Gopher Tortoise Permitting Guidelines, April 2008, Revised July 2020. No further impacts are anticipated to occur to listed species. 8. An assessment of the impacts upon onsite and off-site natural resources. The property is bordered by Highway US 1 to the east, the north is bordered by a car dealership, and abandoned agriculture areas border the west and south. The immediate surrounding area consists of commercial, residential, and remnant agriculture lands. The property is currently vacant land. Proposed onsite impacts include impacts to non-native upland habitat (Brazilian pepper). Impacts to the Brazilian pepper habitat will specifically include impacts to native trees (oaks, cabbage palms, and slash pine), non-descript grasses, and exotic vegetation such as cogon grass and Brazilian pepper. Impacts to native trees will be mitigated for in accordance with county standards. See the tree mitigation plan as prepared by Cotleur & Hearing. County protected trees proposed to be removed consist of 1379 DBH inches of oaks (67 oaks) and 26 DBH inches of Pine (1 pine). All onsite cabbage palms (62) will also be impacted; however, they will not be removed. Rather all 62 onsite cabbage palms shall be relocated on site at a 1:1 ratio. Oak and pine inches are to be mitigated via a combination of onsite mitigation at a 2:1 ratio in concert with payment into the County Tree Mitigation Fund. No further mitigation or preservation is required on the site. No native upland areas are present on the site. No jurisdictional wetlands or other surface waters are present on site. No impacts to offsite resources are proposed. Stormwater system also has been designed in accordance with state and federal required nutrient and discharge standards. 9. A detailed description of the planned approach to minimize impacts. Page 344 of 494 PIN’s: 3410-702-0054-000-6, 3410-702-0055-000-3, Tidewater St. Lucie County (21-188) & 3410-701-0001-000-7 January 2022 Page 7 of 11 No native upland habitat exists on the subject property. Upland areas are best classified as Brazilian pepper based on dominance of ±90%. Remaining onsite vegetation consists of a mixture of oaks, and cabbage palms, along with one (1) pine tree, and an understory of non-descript grasses, exotic cogon grass, and muscadine grape vine. Impacts from development solely consist of disruption to non-native upland areas. Regulated impacts within this area of non-native uplands consists of tree removal via 1405 diameter at breast height (DBH) inches of protected trees impacts (oaks and 1 pine). The 62 onsite cabbage palms 10’ or greater clear trunk (CT) will be impacted but not removed from the site. Impacts will be mitigated in accordance with county standards. Overall, the site specifically includes 1379 DBH inches of protected oak trees (67 oaks), 26 DBH inches of protected slash pine (1 pine), and 62 cabbage palms meeting protection criteria. Based on the proposed site plan tree mitigation will require mitigation for the 1379 DBH inches of oaks, 26 DBH inches of slash pine, and 62 cabbage palms. This will thereby require mitigation for 2758 DBH inches of oak, 52 DBH inches of pines, and 62 cabbage palms. To minimize the extent of the protected tree impacts the applicant proposes permanent impacts to the onsite 67 oaks and 1 pine only. As previously mentioned all onsite cabbage palms will be impacted however, impacts will be essentially temporary in nature. All 62 palms are proposed for onsite relocation into areas more favorable for long term survival and that function to provide greater ecological and aesthetic value than leaving these trees in place. This thereby offers a form of “onsite” protection of all resident cabbage palms, via relocation. Oak and pine mitigation will be accomplished via a combination of replanting/upsizing of landscape vegetation in concert with payment into the County Tree Mitigation Fund. Specifically, 1004.25 inches of oak tree credits will be replanted or mitigated via replanting/upsized landscape trees (equivalency plantings) on site with the remaining inches to be accounted for via payment into the County Tree Mitigation Fund. Pine tree mitigation of 52 inches will be done via onsite replanting. Payment into the Tree Fund will total $350,750.00. This will account for the remaining 1753.75 DBH inches of oak mitigation at $200.00 per inch. This will result in a final DBH of oak mitigation of 2758 inches and pine tree mitigation for 52 DBH inches. Page 345 of 494 PIN’s: 3410-702-0054-000-6, 3410-702-0055-000-3, Tidewater St. Lucie County (21-188) & 3410-701-0001-000-7 January 2022 Page 8 of 11 To provide an added onsite and offsite long term benefit the site plan further proposes an enhanced native buffer along the western border of the site. As this western perimeter is adjacent to a land use of a lower density than what the project proposes the perimeter buffer has been landscaped with upsized oak trees and native shrubs that go beyond the county buffer standards required between these properties. Impacts to protected trees were difficult to avoid while creating a site plan meeting all county and state requirements such as emergency access, waste removal, necessary grading, impervious drives, and onsite stormwater treatment. These various items require utilization of land for storm water treatment, as well as general disruption of the vegetative substrate as a whole to provide necessary sloping and elevations across the site. Furthermore, avoidance of oaks and pines during site clearing and construction without causing root damage leading to future tree death is difficult on a small development site. Additionally, relocation of these tree species is also difficult and generally unsuccessful long term. As cabbage palm are more tolerant to relocation, all existing onsite cabbage palms will be relocated into locations more favorable for long term survival and that function to provide greater ecological and aesthetic value than leaving these trees in place. Lastly, the site itself was specifically chosen for development of this project as no environmentally significant/sensitive areas are present on the site, no native uplands, wetland or other surface waters are present, along with minimal native vegetation and trees meeting the standard for county protection. 10. A detailed description of the proposed alterations or disturbances being proposed. The proposed project is to construct 160 multifamily residential units and associated infrastructure such as parking and a stormwater treatment system. Additionally, 2.58 acres of commercial space is proposed. As the site contains no native upland or wetland habitat impacts to natural resources will encompass individual tree impacts only. This will result in impacts to 1405 DBH inches of trees qualifying for protection under county regulations along with 62 cabbage palms 10’ CT or greater. As impacts to oaks and pines are mitigated at a 2:1 ratio and palms 1:1, 2758 inches of oak mitigation, 52 inches of pine mitigation and 62 individual cabbage palms are required to be accounted for. As discussed in item Page 346 of 494 PIN’s: 3410-702-0054-000-6, 3410-702-0055-000-3, Tidewater St. Lucie County (21-188) & 3410-701-0001-000-7 January 2022 Page 9 of 11 #9 above, to offset these impacts the applicant proposes relocation onsite for all 62 cabbage palms, replanting of the 52 required mitigation inches of pine trees, replanting/landscape equivalency plantings of 1004.25 DBH inches of oak and payment of $350,750 into the County Tree Mitigation Fund for the remaining 1753.75 inches of oak. 11. A detailed description of the proposed mitigation plan to off set impacts. As the site contains no native uplands or wetlands development of the site solely includes impacts to county protected trees. The site in total includes 1379 DBH inches of protected oak trees, 26 DBH inches of protected slash pines, and 62 protected cabbage palms. Proposed impacts will result in a requirement for 2758 DBH inches of oaks, 52 DBH inches of slash pines, and relocation or replacement of 62 cabbage palms. Mitigation will be accomplished via relocation on site of all 62 cabbage palms, thereby offering a form of “onsite” protection. Slash pine mitigation will be done via onsite replanting resulting in 52 DBH inches of slash pine mitigation, replanting/landscape equivalency planting of 1004.25 DBH inches of oaks, and payment of $350,750 into the County Tree Mitigation Fund for the remaining 1753.75 inches of required oak mitigation. To provide an added onsite and offsite long term benefit the site plan further proposes an enhanced native buffer along the western border of the site. As this western perimeter is adjacent to a land use of a lower density than what the project proposes the perimeter buffer has been landscaped with upsized oak trees and native shrubs that go beyond the county buffer standards required between these properties. Site contains 67 oaks, 62 cabbage palms, and 1 pine tree meeting county protection standards DBH protected oak trees = 1379 inches Proposed impacts to 1379 DBH inches of oaks Required mitigation = 2758 DBH inches Oak mitigation to be provided via replanting/landscape equivalency plantings = 1004.25 DBH inches 2758 DBH inches of oak mitigation required – 1004.25 DBH inches of mitigation provided via replanting/landscape equivalency plantings = 1753.75 DBH inches of oak mitigation remaining. 1753.75 DBH inches of oak mitigation to be provided for via Payment into the County Tree Fund @$200 per inch Page 347 of 494 PIN’s: 3410-702-0054-000-6, 3410-702-0055-000-3, Tidewater St. Lucie County (21-188) & 3410-701-0001-000-7 January 2022 Page 10 of 11 1753.75 X $200 = $350,750 to be paid into the County Tree Mitigation Fund DBH protected pine trees = 26 inches Proposed impacts to 26 DBH inches of pine Required mitigation = 52 DBH inches Mitigation to be provided via onsite replanting of pines = 52 DBH inches Number of native palm trees 10 ‘CT or greater = 62 Proposed impacts to 62 cabbage palm trees Required mitigation = relocation or replanting of 62 cabbage palm trees Mitigation to be provided = onsite relocation of 62 cabbage palms (100% onsite relocation) 12. A plant and animal survey for onsite federal and state protected species. In March 2022, Aquatic Research conducted updated pedestrian surveys throughout the property to investigate for the presence of any state or Federal listed plant or animal species. This included a 15% minimum habitat survey for gopher tortoise burrows. One (1) potentially occupied gopher tortoise burrow was observed during the updated listed species survey conducted in March 2022. No further listed flora species or fauna dens, nests, burrows, or roosting areas were located on site. A gopher tortoise relocation permit for offsite relocation will be obtained from the FFWCC prior to site clearing in accordance with the Florida Fish and Wildlife Conservation Commission Gopher Tortoise Permitting Guidelines, April 2008, Revised July 2020. No further impacts are anticipated to occur to listed species. Please see Wildlife Transect Map (Figure 6). 13. A surface water management plan and written assessment including a description of techniques to be used to prevent both the potential degradation of surface water resources and an increase in flood hazard damage. To be submitted under separate cover as part of engineering documents as applicable. 14. A sea turtle protection plan. Not applicable. 15. A shoreline stabilization plan. Page 348 of 494 PIN’s: 3410-702-0054-000-6, 3410-702-0055-000-3, Tidewater St. Lucie County (21-188) & 3410-701-0001-000-7 January 2022 Page 11 of 11 Not applicable. 16. A gopher turtle protection plan. In March 2022, Aquatic Research conducted updated pedestrian surveys throughout the property to investigate for the presence of any state or Federal listed plant or animal species. This included a 15% minimum habitat survey for gopher tortoise burrows. One (1) potentially occupied gopher tortoise burrow was observed during the updated listed species survey conducted in March 2022. A gopher tortoise relocation permit for offsite relocation will be obtained from the FFWCC prior to site clearing in accordance with the Florida Fish and Wildlife Conservation Commission Gopher Tortoise Permitting Guidelines, April 2008, Revised July 2020. In accordance with these guidelines no gopher tortoises will be removed from the subject property until St. Lucie County approval is obtained to clear and develop the site. As part of the process for obtaining a relocation permit when 10 or fewer burrows are located on a property, a 100% habitat survey will be conducted prior to submittal of the permit application. The offsite relocation will be conducted in accordance with FFWCC permit conditions. Please see Wildlife Transect/Burrow Location Map (Figure 6). Page 349 of 494 Pg. 1 of 8 Location Map Environmental Consulting Department Figure 1 Image: Google Earth Date 01/03/2018 Aetna Park (Amended)–Subdivision 6209 S US Highway 1 Unincorporated, St. Lucie County, Florida PIN’s: 3410-702-0054-000-6, 3410-702-0055-000-3, & 3410-701-0001-000-7 Page 350 of 494 Pg. 2 of 8 Site Map Environmental Consulting Department Figure 2 Image: Google Earth –Date 01/21/2021 Data: St. Lucie County Property Appraisers LEGEND Property Boundary (±18.87 acres) Aetna Park (Amended)–Subdivision 6209 S US Highway 1 Unincorporated, St. Lucie County, Florida PIN’s: 3410-702-0054-000-6, 3410-702-0055-000-3 & 3410-701-0001-000-7 Not Included In Site Plan Page 351 of 494 Pg. 3 of 8 1999 Historic Aerial Environmental Consulting Department Figure 3 Image: Google Earth –Date 01/21/2021 Data: St. Lucie County Property Appraisers LEGEND Property Boundary (±18.87 acres) Aetna Park (Amended)–Subdivision 6209 S US Highway 1 Unincorporated, St. Lucie County, Florida PIN’s: 3410-702-0054-000-6, 3410-702-0055-000-3 & 3410-701-0001-000-7 Page 352 of 494 Pg. 4 of 8 Agency Reported Land Use Map Environmental Consulting Department Figure 4 Image: Florida Department of Environmental ProtectionData: Florida Land Cover Classification System Definitions for the CooperativeLand Cover Map v2.3 LEGEND Property Boundary (±18.87 acres) 4220: Brazilian Pepper 2240: AbandonedGroves 4300: Upland MixedForest 1180: Rural Residential 1400:Commercial & Services 1900: Open Land 1130: Mixed Units, Fixed and Mobile Home 8140: Roads and Highways 3300: Mixed Rangeland 3200: Upland Shrub and Brushland 1310: Fixed Single Family Units 4220 Aetna Park (Amended)–Subdivision 6209 S US Highway 1 Unincorporated, St. Lucie County, Florida PIN’s: 3410-702-0054-000-6, 3410-702-0055-000-3 & 3410-701-0001-000-7 1900 1130 8140 1400 1400 4220 4300 1180 2240 3300 3200 1310 Page 353 of 494 Pg. 5 of 8 Existing Habitat/FLUCCS Map Environmental Consulting Department Figure 5 Image: Google Earth –Date 01/21/2021 Data: Aquatic Research Monitoring, Equipment, & Deployment LLC LEGEND Property Boundary (±18.87 acres) 4220: Brazilian Pepper(±18.87 acres) Aetna Park (Amended)–Subdivision 6209 S US Highway 1 Unincorporated, St. Lucie County, Florida PIN’s: 3410-702-0054-000-6, 3410-702-0055-000-3 & 3410-701-0001-000-7 4220 Page 354 of 494 Pg. 6 of 8 General Wildlife Survey including Listed Flora and Fauna Transect Map Environmental Consulting Department Figure 6 Image: Google Earth –Date 01/21/2021 Data: Aquatic Research Monitoring, Equipment, & Deployment LLC LEGEND Property Boundary (±18.87 acres) Wildlife Survey Transects Gopher Tortoise Burrow (1) Tr a n s e c t 1 Tr a n s e c t 8 Transect 6 Tr a n s e c t 2 ±66 0 ’ ±1,150’ Aetna Park (Amended)–Subdivision 6209 S US Highway 1 Unincorporated, St. Lucie County, Florida PIN’s: 3410-702-0054-000-6, 3410-702-0055-000-3 & 3410-701-0001-000-7 Tr a n s e c t 1 0 Tr a n s e c t 1 1 Transect 12Transect 13 Tr a n s e c t 1 4 Tr a n s e c t 1 5 Tr a n s e c t 1 6 Tr a n s e c t 1 9 Tr a n s e c t 2 0 Transect 21 Transect 24 Tr a n s e c t 3 0 Tr a n s e c t 3 1 Tr a n s e c t 3 2 Tr a n s e c t 3 3 Tr a n s e c t 3 4 Transect 35 Transect 36 Transect 37 Transect ID# Width of Transects (ft) Length of Transects (ft) Transect Acreage 1 25'350'0.20 2 25'300'0.17325'300'0.17425'300'0.17525'300'1.17 6 25'300'0.17 7 25'300'0.17 8 25'350'0.20925'350'0.201025'300'0.17 11 25'300'0.17 12 25'350'0.20 13 25'500'0.30 14 25'300'0.171525'350'0.201625'200'0.12 17 25'200'0.12 18 25'200'0.12 19 25'300'0.172025'300'0.172125'350'0.202225'300'0.17 23 25'300'0.17 24 25'550'0.32 25 25'350'0.202625'300'0.172725'610'0.35 28 25'550'0.32 29 25'550'0.32 30 25'610'0.35 31 25'300'0.173225'300'0.173325'300'0.17 34 25'200'0.12 35 25'550'0.32 36 25'550'0.323625'550'0.32 Degrees Minutes Seconds (DMS) Latitude 27°21'25.50"N Longitude 80°19'42.07"W Total Property Acreage 18.87 Total Acreage Surveyed 8.69 Total Percent of Acreage Surveyed 46% Page 355 of 494 Pg. 7 of 8 Gopher Tortoise/Burrow Transect Survey Environmental Consulting Department Figure 7 Image: Google Earth –Date 01/21/2021 Data: Aquatic Research Monitoring, Equipment, & Deployment LLC Tr a n s e c t 1 Transect 9 Tr a n s e c t 3 Tr a n s e c t 8 Tr a n s e c t 7 Tr a n s e c t 2 ±1,150’ Aetna Park (Amended)–Subdivision 6209 S US Highway 1 Unincorporated, St. Lucie County, Florida PIN’s: 3410-702-0054-000-6, 3410-702-0055-000-3 & 3410-701-0001-000-7 Transect 10 Tr a n s e c t 1 1 Transect 13 Tr a n s e c t 1 5 Degrees Minutes Seconds (DMS)Latitude 27°21'25.50"N Longitude 80°19'42.07"W Transect 12 Tr a n s e c t 1 6 Tr a n s e c t 1 8 Tr a n s e c t 1 9 Tr a n s e c t 2 2 Tr a n s e c t 2 3 ±66 0 ’ LEGEND Property Boundary (±18.87 acres) Gopher Tortoise/Burrow Survey Transects Gopher Tortoise Burrow (1) Transect ID# Width of Transects (ft) Length of Transects (ft) Transect Acreage 1 25'350'0.20 2 25'300'0.17 3 25'300'0.17 4 25'300'1.17 5 25'200'0.11 6 25'200'0.11 7 25'300'0.17 8 25'300'0.17 9 25'350'0.20 10 25'550'0.32 11 25'610'0.35 12 25'550'0.32 13 25'550'0.32 14 25'200'0.12 15 25'300'0.17 16 25'300'0.17 17 25'475'0.27 18 25'300'0.17 19 25'300'0.17 20 25'475'0.27 21 25'200'0.12 22 25'350'0.20 23 25'350'0.20 Total Acreage of Suitable/Not Preferred Habitat 7.37 Total Acreage Surved 5.64 Total Percent Surveyed 76% Page 356 of 494 Pg. 8 of 8 Soil(s) Map Environmental Consulting Department Figure 8 Image: Florida Department of Environmental ProtectionData: WSS USDA/Soil Survey Staff, Natural Resources Conservation Service LEGEND Property Boundary (±18.87 acres) 48 Aetna Park (Amended)–Subdivision 6209 S US Highway 1 Unincorporated, St. Lucie County, Florida PIN’s: 3410-702-0054-000-6, 3410-702-0055-000-3 & 3410-701-0001-000-7 38 hydric non-hydric Page 357 of 494 8 6 7 9 9 10 4 CABANA POOL LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6LOT 7 LOT 8 LOT 9 LOT 10 LOT 11 LOT 12 LOT 13 LOT 14 LOT 15 LOT 16 LOT 17 LOT 18 LOT 19 LOT 20 LOT 21 LOT 22 LOT 23 LOT 24 LOT 25 LOT 26 LOT 27 LOT 28 LOT 29 LOT 30 LOT 38 LOT 37 LOT 36 LOT 35 LOT 34 LOT 33 LOT 32 LOT 31 LOT 46 LOT 45 LOT 44 LOT 43 LOT 42 LOT 41LOT 40 LOT 39 LOT 54 LOT 53 LOT 52 LOT 51 LOT 50 LOT 49 LOT 48 LOT 47 LOT 60 LOT 59 LOT 58 LOT 57 LOT 56 LOT 55 LOT 61 LOT 62 LOT 63 LOT 64 LOT 65 LOT 66 LOT 67 LOT 68 LOT 69 LOT 70 LOT 71 LOT 72 LOT 73 LOT 74 LOT 75 LOT 76 LOT 77 LOT 78 LOT 79 LOT 80 LOT 81 LOT 82 LOT 83 LOT 84 LOT 85 LOT 86 LOT 87 LOT 88 LOT 89 LOT 90 LOT 91 LOT 92 LOT 100 LOT 99 LOT 98 LOT 97 LOT 96 LOT 95 LOT 94 LOT 93 LOT 108 LOT 107 LOT 106 LOT 105 LOT 104 LOT 103 LOT 102 LOT 101 LOT 116 LOT 115 LOT 114 LOT 113 LOT 112 LOT 111 LOT 110 LOT 109 LOT 131 LOT 132 LOT 133 LOT 134 LOT 135 LOT 136 LOT 123 LOT 124 LOT 125 LOT 126 LOT 127 LOT 128 LOT 129 LOT 130 LOT 122 LOT 121 LOT 120 LOT 119 LOT 118 LOT 117 LOT 137 LOT 138 LOT 139 LOT 140 LOT 141 LOT 142 LOT 143 LOT 144 LOT 145 LOT 146 LOT 147 LOT 148 LOT 149 LOT 150 LOT 151 LOT 152LOT 153 LOT 154 LOT 155 LOT 156 LOT 157 LOT 158 LOT 159 LOT 160 *SEE LP 3 FOR POOL LANDSCAPE LAKE 831 L-2 361 L-1 L-3 529 L-1 738 651 L-2 332 L-3 2.50 AC COMMERCIAL DRY DETENTION LAND USE: MIXED ZONING: GENERAL COMMERCIAL 20' LME 15' BUFFER 15' BUFFER10' DE 15' DE 10' DE 10' DE 15' DE 15' DE 10' DE 15' DE 15' DE 8' UE 8' UE 8' UE 8' UE 8' UE 8' UE 8' UE 8' UE SANITARY FORCE MAIN DRAINAGE PIPE TYP. SEWER MAIN WATER MAIN SEWER MAIN WATER MAIN BLDG A, 6 UNIT BLDG B, 8 UNITBLDG C, 8 UNIT BLDG D, 8 UNIT BLDG E, 8 UNIT BLDG F, 8 UNIT BLDG G, 8 UNIT BLDG H, 6 UNIT BLDG I, 6 UNIT BLDG J, 6 UNIT BLDG K, 8 UNIT BLDG L, 6 UNIT BLDG M, 6 UNIT BLDG N, 8 UNIT BLDG O, 8 UNIT BLDG P, 8 UNIT BLDG Q, 6 UNIT BLDG R, 8 UNIT BLDG S, 6 UNITBLDG T, 8 UNIT BLDG U, 8 UNITBLDG V, 8 UNIT 15' BUFFER 15' BUFFER 15' BUFFER BILLBOARD AG 1 BGS 112 RE 12 LJ2 VM1 2 FG 14 FG 48 BGS 4 FG 20 9 CG 4 PHM ED 2 2 AG AC 3 CG 47 CAT 33 16 PEN BGS 1 AG 2 4 AC 1 TAB CAT 34 TAB 1 CG 63 16 PEN BGS 1 2 AG 4 AC QV 8 QV 7 27 SB 40 SB SB 79 SSC 36 MYR 2 SB 69 TA 3TA 3SP* 5 TA 5 SB 64 TA 3SB 140 MYR 5 SP* 5 SSC 64 TA 1 764 CI3 QV 39 QV 3 22 QV 435 CI3 32 QV 607 CI3 28 IVS 43 PX 13 CLU QV 10 2 QV 5 QV 5 QV QV 3 2 QV 17 QV2 17 QV2 QV 2 QV 2 1 QV 15 QV2 QV 1 QV2 2 QV 2 QV 2 QV 2 1 QV QV2 17 TA 2QV2 3 QV2 17 SB 52 SSC 38 SSC 96 SB 151 SSC 76 SB 119 18 SSC SB 41 PIT 153 PEN 19 FG 307 6 RE LJ2 6 6 RE FG 141 PIT 116 5 LJ2 CAT 24 BGS 2 AG 1 FG 158 60 PIT 234 CI3 WATER MAIN 8' TALL FENCE ON BERM 8' TALL FENCE ON BERM 8' TALL FENCE ON BERM 8' TALL FENCE ON BERM 8' TALL FENCE ON BERM 8' TALL FENCE ON BERM 8' TALL FENCE ON BERM START OF 8' FENCE NO FENCE NO FENCE 15' BUFFER 15' BUFFER 15' BUFFER MONUMENT SIGN CG 62 18 CATBR 989 L-2 418 L-3 314 L-1 469 BR 439 77 SB SP* 45 MYR 27 TA 29 CI3 158 549 BR CI3 86 CI3 78 2 QV PE2 3 PE 4 CES2 2 24 PX PE2 4 PE 4 CI3 30 MAIL KIOSK 1 LANDSCAPE PLAN Scale: 1" = 50'-0" 25'0'100'50'150' North 200' E\DJUHHPHQWLQZULWLQJZLWKWKHDUFKLWHFWIPPHGLDWHO\ UHSRUWDQ\GLVFUHSDQFLHVWRWKHDUFKLWHFW SHEET C2TLEUR HEARINGINC TKHVHGUDZLQJVDUHWKHSURSHUW\RIWKHDUFKLWHFWDQGDUH QRWWREHXVHGIRUH[WHQVLRQVRURQRWKHUSURMHFWVH[FHSW 2F 4 ME R I T A G E H O M E S T I D E W A T E R Me r i t a g e H o m e s St . L u c i e C o u n t y , F l o r i d a 21-0604 DTS ACE/CTB ACE/CTBDESIGNED DRA:N REVISI2NS J2BNUMBER APPR2VED DATE LDQGVFDSHAUFKLWHFWV LDQGPODQQHUV EQYLURQPHQWDOCRQVXOWDQWV ZZZFRWOHXUKHDULQJFRP 1934CRPPHUFHLDQH SXLWH1 JXSLWHUFORULGD33458 5617476336āFD[7471377 LLFLC-C000239 11-11-21 04-15-21 05-12-22 06-09-22 LANDSCAPE DATA BUFFER PLANTINGS: 1 NATIVE SHADE TREE PER 30 LF, NATIVE HEDGE * REQUIRED: 3,683 LF REQUIRING A 15' BUFFER, 123 TREES, HEDGE * PROVIDED: 3,683 LF WITH 15' BUFFER, 124 OAK TREES, RED TIP COCOPLUM HEDGE LANDSCAPE VUA CALCULATIONS: 1SF OF LANDSCAPE AREA PER 18 SF OF VUA * REQUIRED: 94,853/18= 5,269 SF * PROVIDED: 9,250 SF SHADE TREE VUA CALCULATIONS: 1 SHADE TREE PER 180 SF OF LANDSCAPE VUA * REQURIED: 5,269/180 = 29 TREES * PROVIDED: 29 OAK TREES LITTORAL/UPLAND PLANTINGS: 10 SF OF LITTORAL FOR EVERY 1 SF OF LAKE SHORELINE & UPLAND TRANSITION BUFFER ALONG 50% OF LITTORAL SHELF * REQUIRED: 1,304 * 10 = 13,040 SF OF LITTORAL SHELF WITH UPLAND TRANSITION BUFFER * PROVIDED: 14,433 SF OF LITTORAL SHELF WITH UPLAND TRANSITION BUFFER OPEN SPACE CALCULATIONS * REQUIRED: 249,616.85 SF OR 5.7 AC (35% OF SITE) * PROVIDED: 249,919 SF OR 5.7 AC (35% OF SITE) - AREA 1: 136325 SF OR 3.1 AC - AREA 2: 113594 OR 2.6 AC Page 358 of 494 3 ED 3 JT 20 PX 4 VM2 6 SR JT 3 PX 20 ED 3 25 CAR 2 AC 5 PIT CV 24 8 IX AC 3 4 CV 11 PIT 8 IX CAR 11 IX 8 PIT 11 CV 4 8 PM 3 AC IX 8 CAR 26 AC 2 PIT 5 PM 56 3 LJ 3 JT 20 TF 6 CA 4 CV LJ 3 TF 20 4 AM2 7 PX 2 AC 16 JM CV 24 8 PM 8 IXY 16 PX AC 3 8 IXY 7 JM 8 IXY PX 16 3 AC IXY 8 JM 17 AC 2 PX 8 4 CV JT 3 CI2 38 TREES QTY COMMON NAME BOTANICAL NAME CONT CAL SIZE NATIVE REMARKS ED 6 JAPANESE BLUEBERRY TREE ELAEOCARPUS DECIPIENS 30 GAL 2" CAL 8`-10` OA N CONICAL, FULL TO BASE, MATCHED JT 6 JATROPHA JATROPHA INTEGERIMMA 25 GAL.2" CAL 5` STD N SPECIMEN, 2.5` C.T. TIGHT HEADS PALMS QTY COMMON NAME BOTANICAL NAME CONT CAL SIZE NATIVE REMARKS VM2 4 MONTGOMERY PALM VEITCHIA MONTGOMERYANA 45 GAL.N.A.12` OA FULL CANOPY, 2 TRUNK SHRUBS QTY COMMON NAME BOTANICAL NAME CONT SIZE SPACE NATIVE REMARKS AC 10 PINOT NOIR BROMELIAD AECHMEA X 'PINOT NOIR'7 GAL CV 32 MRS. ICETON CROTON CODIAEUM VARIEGATUM `MRS. ICETON`3 GAL 2.5` X 2.5`2.5` OC PM 56 DWARF PODOCARPUS PODOCARPUS `PRINGLES`3 GAL 2` X 2`2` OC N FULL & THICK. SR 6 ORANGE BIRD OF PARADISE STRELITZIA REGINAE 7 GAL 2.5` X 2`AS N FULL & THICK, FLORIDA FANCY GROUND COVERS QTY COMMON NAME BOTANICAL NAME CONT SIZE SPACE NATIVE SPACING REMARKS CAR 62 DWARF NATAL PLUM CARISSA MACROCARPA 'NANA'3 GAL 1.5` x 1.5`24" O.C.24" o.c. IX 32 YELLOW MAUI IXORA IXORA X `MAUI YELLOW`3 GAL 2` x 2`2.5` OC N 30" o.c.FULL & THICK PX 40 XANADU PHILODENDRON PHILODENDRON X XANADU 3 GAL 3` X 2`2.5` OC 30" o.c.FULL & THICK PIT 32 VARIEGATED PITTOSPORUM PITTOSPORUM TOBIRA 'VARIEGATA'7 GAL 3X3 3` O.C.N 36" o.c.FULL & THICK TREES QTY COMMON NAME BOTANICAL NAME CONT CAL SIZE NATIVE REMARKS JT 6 JATROPHA JATROPHA INTEGERIMMA 25 GAL.2" CAL 5` STD N SPECIMEN, 2.5` C.T. TIGHT HEADS LJ 6 JAPANESE PRIVET LIGUSTRUM JAPONICUM 30 GAL 1.5" DBH 6` OA Y FULL CANOPY, 4` CT. MULIT-TRUNK PALMS QTY COMMON NAME BOTANICAL NAME CONT CAL SIZE NATIVE REMARKS AM2 4 DOUBLE CHRISTMAS PALM ADONIDIA MERILLII 45 GAL NA 12`-14` O.A.N 2 TRUNK MIN. SHRUBS QTY COMMON NAME BOTANICAL NAME CONT SIZE SPACE NATIVE REMARKS AC 10 PINOT NOIR BROMELIAD AECHMEA X 'PINOT NOIR'7 GAL CI2 38 REDTIP COCO PLUM CHRYSOBALANUS ICACO `RED TIP`3 GAL 3` X 2`2.5` OC Y FULL & THICK CV 32 MRS. ICETON CROTON CODIAEUM VARIEGATUM `MRS. ICETON`3 GAL 2.5` X 2.5`2.5` OC PM 8 DWARF PODOCARPUS PODOCARPUS `PRINGLES`3 GAL 2` X 2`2` OC N FULL & THICK. CA 6 CRINUM AUGUSTUM 'QUEEN EMMA'QUEEN EMMA CRINUM LILY 7 GAL 2.5` X 2`AS N FULL & THICK, FLORIDA FANCY GROUND COVERS QTY COMMON NAME BOTANICAL NAME CONT SIZE SPACE NATIVE SPACING REMARKS IXY 32 IXORA `NORA GRANT`IXORA X `NORA GRANT`3 GAL 2` x 2`2.5` OC N 30" o.c.FULL & THICK PX 47 XANADU PHILODENDRON PHILODENDRON X XANADU 3 GAL 3` X 2`2.5` OC 30" o.c.FULL & THICK JM 40 STAR JASMINE TRACHELOSPERMUM JASMINOIDES 3 GAL 12 X 12 30" OC 30" o.c.FULL & THICK, MULTIPLE RUNNERS TF 40 DWARF FAKAHATCHEE GRASS TRIPSACUM FLORIDANA 3 GAL 2` x 2`2.5` O.C.Y 30" o.c.FULL & THICK TREES QTY BOTANICAL NAME COMMON NAME CONT CAL SIZE NATIVE REMARKS MYR 5 MYRICANTHES FRAGRANS SIMPSON'S STOPPER 25 GAL.2"Cal 6`-8` O.A. TA 3 TAXODIUM DISTICHUM BALD CYPRESS 100 GAL 4" DBH 12` - 14` O.A.Y FULL CANOPY PALMS QTY BOTANICAL NAME COMMON NAME CONT CAL SIZE NATIVE REMARKS SS 8 SABAL PALMETTO CURVED CABBAGE PALM B & B NA 18`, 24`, 30` OA, STGG.Y STRONG, UNIQUE CURVES, SLICK TRUNKS GROUND COVERS QTY BOTANICAL NAME COMMON NAME CONT SIZE SPACE NATIVE SPACING REMARKS SSC 38 SERENOA REPENS 'CINERA'SILVER SAW PALMETTO 3 GAL 2` x 2`3` O.C.Y 36" o.c.FULL & THICK SB 46 SPARTINA BAKERI SAND CORD GRASS 3 GAL 2` x 2`2.5` OC Y 30" o.c.FULL & THICK LITTORAL PLANTINGS QTY BOTANICAL NAME COMMON NAME CONT SIZE SPACE NATIVE SPACING REMARKS BR 191 BR LITORAL PLANTINGS BULLRUSH 3 GAL 18" O.C.Y 18" o.c.SCRIPUS VALIDUS L-1 408 L-1 LITORAL PLANTINGS MULTIPLE SPIKERUSH, PICKEREL WEED, ARROWHEAD 3 GAL 18" OC Y 18" o.c.ELEOCHARIS CELLULOSA, PONTEDERIA CORDATA, SAGITARIA LATIFOLIA L-2 195 L-2 LITORAL PLANTINGS MULTIPLE ALLIGATOR FLAG 3 GAL 18" OC Y 18" o.c.THALIA GENICULATA L-3 228 L-3 LITORAL PLANTINGS MULTIPLE WATER LILY, MAIDENCANE 3 GAL 18" OC Y 18" o.c.NYMPHIA ODORATA, PANICUM HEMITOMON 191 BR 195 L-2 L-1 215 L-1 193 L-3 228 SB 46 SSC 383 TA8 SS 5 MYR 2 LANDSCAPE PLAN Scale: 1" = 20'-0" 10'0'40'20'60' North 80' E\DJUHHPHQWLQZULWLQJZLWKWKHDUFKLWHFWIPPHGLDWHO\ UHSRUWDQ\GLVFUHSDQFLHVWRWKHDUFKLWHFW SHEET C2TLEUR HEARINGINC TKHVHGUDZLQJVDUHWKHSURSHUW\RIWKHDUFKLWHFWDQGDUH QRWWREHXVHGIRUH[WHQVLRQVRURQRWKHUSURMHFWVH[FHSW 2F 4 ME R I T A G E H O M E S T I D E W A T E R Me r i t a g e H o m e s St . L u c i e C o u n t y , F l o r i d a 21-0604 DTS ACE/CTB ACE/CTBDESIGNED DRA:N REVISI2NS J2BNUMBER APPR2VED DATE LDQGVFDSHAUFKLWHFWV LDQGPODQQHUV EQYLURQPHQWDOCRQVXOWDQWV ZZZFRWOHXUKHDULQJFRP 1934CRPPHUFHLDQH SXLWH1 JXSLWHUFORULGD33458 5617476336āFD[7471377 LLFLC-C000239 11-11-21 04-15-21 05-12-22 06-09-22 8 UNIT BUILDING LANDSCAPE TYPICAL: 1 8 UNIT BUILDING LANDSCAPE TYPICAL: 2 *BUILDING SIDE ADJACENT TO DE *NOTE: IF LOCATED NEXT TO D.E., PLANTING SCHEME ALONG SIDE OF BUILDING TO BE REPLACED WITH A SINGLE ROW OF SHRUBS AS SHOWN LEFT LITTORAL AND UPLAND PLANTINGS TYPICAL 100' Page 359 of 494 CABANA POOL 4 LJ 8 ALP 5 SS 1 TAB 26 PM 2 CC RE 2 SR 6 CAR 76 ALP 6 AM2 3 CLD 24 1 LJ 4 PM 1 QV LJ 2 1 RE JT 2 23 CG 33 AP HK 1 8 FG RE 2 SS 5 2 QV 12 CG CLD 25 TF 49 34 CG CG 26 34 MUH PX 48 PM 13 ALP 8 CLD 9 17 PX 33 SB 8 SS 4 VM2 20 PX 4 CV PX 20 3 CES2 2 MYR 1 HK 25 CAR 2 AC 5 PIT CV 16 8 IX 8 PM 3 AC 11 PIT 5 SR 10 CAR 2 AC 5 IX 4 CV 11 PIT 3 AC 8 IX HK 1 AC 2 CAR 26 PIT 5 MYR 2 CES2 3 PM 55 TREES QTY COMMON NAME BOTANICAL NAME CONT CAL SIZE NATIVE REMARKS CES2 6 SILVER BUTTONWOOD CONOCARPUS ERECTUS `SERICEUS`30 GAL 2" CAL 8`-10` HT X 6` SPRD Y FULL CANOPY, STANDARD, SINGLE TRUNK MYR 4 SIMPSON'S STOPPER MYRICANTHES FRAGRANS 25 GAL.2"Cal 6`-8` O.A. PALMS QTY COMMON NAME BOTANICAL NAME CONT CAL SIZE NATIVE REMARKS VM2 4 MONTGOMERY PALM VEITCHIA MONTGOMERYANA 45 GAL.N.A.12` OA FULL CANOPY, 2 TRUNK SHRUBS QTY COMMON NAME BOTANICAL NAME CONT SIZE SPACE NATIVE REMARKS AC 12 PINOT NOIR BROMELIAD AECHMEA X 'PINOT NOIR'7 GAL CV 24 MRS. ICETON CROTON CODIAEUM VARIEGATUM `MRS. ICETON`3 GAL 2.5` X 2.5`2.5` OC HK 2 KONA HIBISCUS HIBISCUS ROSA-SINENSIS 'KONA'15 GAL 6` O.A.SINGLE TRUNK PM 55 DWARF PODOCARPUS PODOCARPUS `PRINGLES`3 GAL 2` X 2`2` OC N FULL & THICK. SR 5 ORANGE BIRD OF PARADISE STRELITZIA REGINAE 7 GAL 2.5` X 2`AS N FULL & THICK, FLORIDA FANCY GROUND COVERS QTY COMMON NAME BOTANICAL NAME CONT SIZE SPACE NATIVE SPACING REMARKS CAR 61 DWARF NATAL PLUM CARISSA MACROCARPA 'NANA'3 GAL 1.5` x 1.5`24" O.C.24" o.c. IX 26 YELLOW MAUI IXORA IXORA X `MAUI YELLOW`3 GAL 2` x 2`2.5` OC N 30" o.c.FULL & THICK PX 40 XANADU PHILODENDRON PHILODENDRON X XANADU 3 GAL 3` X 2`2.5` OC 30" o.c.FULL & THICK PIT 32 VARIEGATED PITTOSPORUM PITTOSPORUM TOBIRA 'VARIEGATA'7 GAL 3X3 3` O.C.N 36" o.c.FULL & THICK TREES QTY COMMON NAME BOTANICAL NAME CONT CAL SIZE NATIVE REMARKS JT 2 JATROPHA JATROPHA INTEGERIMMA 25 GAL.2" CAL 5` STD N SPECIMEN, 2.5` C.T. TIGHT HEADS LJ 7 JAPANESE PRIVET LIGUSTRUM JAPONICUM 30 GAL 1.5" DBH 6` OA Y FULL CANOPY, 4` CT. MULIT-TRUNK QV 4 LIVE OAK QUERCUS VIRGINIANA 200 GAL.6" DBH 18`-20` O.A.Y FULL CANOPY, SPECIMEN TAB 1 PINK TRUMPET TREE TABEBUIA HETEROPHYLLA 65 GAL MIN 3" Cal.14` HT., 6` SPD.N FULL CANOPY PALMS QTY COMMON NAME BOTANICAL NAME CONT CAL SIZE NATIVE REMARKS AM2 3 DOUBLE CHRISTMAS PALM ADONIDIA MERILLII 45 GAL NA 12`-14` O.A.N 2 TRUNK MIN. CC 2 OLD MAN PALM COCOTHRINAX CRINITA 15 GAL 2" CAL 3`-4` CT RE 5 ROYAL PALM ROYSTONEA ELEGATA FIELD GROWN NA 12` CT Y FULL CANOPY, FLORIDA FANCY SS 18 CURVED CABBAGE PALM SABAL PALMETTO B & B NA 18`, 24`, 30` OA, STGG.Y STRONG, UNIQUE CURVES, SLICK TRUNKS SHRUBS QTY COMMON NAME BOTANICAL NAME CONT SIZE SPACE NATIVE REMARKS ALP 22 DWARF RED GINGER ALPINIA PURPURATA 'DWARF RED'7 GAL 3` - 4` HT AS SHOWN CLD 58 SMALL-LEAF CLUSIA CLUSIA GUTTIFERA 15 gal 4`-5` OA 3` O.C.N FULL & THICK, FLORIDA FANCY HK 1 KONA HIBISCUS HIBISCUS ROSA-SINENSIS 'KONA'15 GAL 6` O.A.SINGLE TRUNK PM 43 DWARF PODOCARPUS PODOCARPUS `PRINGLES`3 GAL 2` X 2`2` OC N FULL & THICK. SR 6 ORANGE BIRD OF PARADISE STRELITZIA REGINAE 7 GAL 2.5` X 2`AS N FULL & THICK, FLORIDA FANCY GROUND COVERS QTY COMMON NAME BOTANICAL NAME CONT SIZE SPACE NATIVE SPACING REMARKS AP 33 DWARF VARIEGATED GINGER ALPINIA ZERUMBET 'VARIEGATA DWARF'3 GAL 1.5` x 1.5`24" O.C.24" o.c. CAR 76 DWARF NATAL PLUM CARISSA MACROCARPA 'NANA'3 GAL 1.5` x 1.5`24" O.C.24" o.c. CG 95 COCOPLUM CHRYSOBALANUS ICACO `GREEN TIP`3 GAL 2` x 2`3` O.C.Y 36" o.c.FULL & THICK FG 8 GREEN ISLAND FICUS FICUS MACROPHYLLA `GREEN ISLAND`3 GAL 2` X 2`2.5` OC Y 30" o.c.FULL & THICK, FLORIDA FANCY MUH 34 PINK CLOUD MUHLY GRASS MUHLENBERGIA CAPILLARIS 'PINK CLOUD'3 GAL 3` X 2`2.5` OC Y 30" o.c. PX 65 XANADU PHILODENDRON PHILODENDRON X XANADU 3 GAL 3` X 2`2.5` OC 30" o.c.FULL & THICK SB 33 SAND CORD GRASS SPARTINA BAKERI 3 GAL 2` x 2`2.5` OC Y 30" o.c.FULL & THICK TF 49 DWARF FAKAHATCHEE GRASS TRIPSACUM FLORIDANA 3 GAL 2` x 2`2.5` O.C.Y 30" o.c.FULL & THICK TREES QTY COMMON NAME BOTANICAL NAME CONT CAL SIZE NATIVE REMARKS LJ 6 JAPANESE PRIVET LIGUSTRUM JAPONICUM 30 GAL 1.5" DBH 6` OA Y FULL CANOPY, 4` CT. MULIT-TRUNK MYR 4 SIMPSON'S STOPPER MYRICANTHES FRAGRANS 25 GAL.2"Cal 6`-8` O.A. PALMS QTY COMMON NAME BOTANICAL NAME CONT CAL SIZE NATIVE REMARKS AM2 4 DOUBLE CHRISTMAS PALM ADONIDIA MERILLII 45 GAL NA 12`-14` O.A.N 2 TRUNK MIN. SHRUBS QTY COMMON NAME BOTANICAL NAME CONT SIZE SPACE NATIVE REMARKS AC 12 PINOT NOIR BROMELIAD AECHMEA X 'PINOT NOIR'7 GAL CI2 38 REDTIP COCO PLUM CHRYSOBALANUS ICACO `RED TIP`3 GAL 3` X 2`2.5` OC Y FULL & THICK CV 24 MRS. ICETON CROTON CODIAEUM VARIEGATUM `MRS. ICETON`3 GAL 2.5` X 2.5`2.5` OC HK 2 KONA HIBISCUS HIBISCUS ROSA-SINENSIS 'KONA'15 GAL 6` O.A.SINGLE TRUNK PM 8 DWARF PODOCARPUS PODOCARPUS `PRINGLES`3 GAL 2` X 2`2` OC N FULL & THICK. CA 5 CRINUM AUGUSTUM 'QUEEN EMMA'QUEEN EMMA CRINUM LILY 7 GAL 2.5` X 2`AS N FULL & THICK, FLORIDA FANCY GROUND COVERS QTY COMMON NAME BOTANICAL NAME CONT SIZE SPACE NATIVE SPACING REMARKS IXY 21 IXORA `NORA GRANT`IXORA X `NORA GRANT`3 GAL 2` x 2`2.5` OC N 30" o.c.FULL & THICK PX 47 XANADU PHILODENDRON PHILODENDRON X XANADU 3 GAL 3` X 2`2.5` OC 30" o.c.FULL & THICK JM 40 STAR JASMINE TRACHELOSPERMUM JASMINOIDES 3 GAL 12 X 12 30" OC 30" o.c.FULL & THICK, MULTIPLE RUNNERS TF 40 DWARF FAKAHATCHEE GRASS TRIPSACUM FLORIDANA 3 GAL 2` x 2`2.5` O.C.Y 30" o.c.FULL & THICK 4 AM2 TF 20 4 CV 20 TF 3 LJ 2 MYR 1 HK 16 JM 2 AC 7 PX 8 IXY 8 PM 3 AC 5 CA 16 PX 7 JM 2 AC 5 IXY 4 CV 16 PX 3 AC 8 IXY 17 JM HK 1 AC 2 PX 8 MYR 2 LJ 3 CV 16 CI2 38 3 LANDSCAPE PLAN Scale: 1" = 20'-0" 10'0'40'20'60' North 80' E\DJUHHPHQWLQZULWLQJZLWKWKHDUFKLWHFWIPPHGLDWHO\ UHSRUWDQ\GLVFUHSDQFLHVWRWKHDUFKLWHFW SHEET C2TLEUR HEARINGINC TKHVHGUDZLQJVDUHWKHSURSHUW\RIWKHDUFKLWHFWDQGDUH QRWWREHXVHGIRUH[WHQVLRQVRURQRWKHUSURMHFWVH[FHSW 2F 4 ME R I T A G E H O M E S T I D E W A T E R Me r i t a g e H o m e s St . L u c i e C o u n t y , F l o r i d a 21-0604 DTS ACE/CTB ACE/CTBDESIGNED DRA:N REVISI2NS J2BNUMBER APPR2VED DATE LDQGVFDSHAUFKLWHFWV LDQGPODQQHUV EQYLURQPHQWDOCRQVXOWDQWV ZZZFRWOHXUKHDULQJFRP 1934CRPPHUFHLDQH SXLWH1 JXSLWHUFORULGD33458 5617476336āFD[7471377 LLFLC-C000239 11-11-21 04-15-21 05-12-22 06-09-22 6 UNIT BUILDING LANDSCAPE TYPICAL: 1 6 UNIT BUILDING LANDSCAPE TYPICAL: 2 POOL LANDSCAPE Page 360 of 494 TREES QTY COMMON NAME BOTANICAL NAME CONT CAL SIZE NATIVE REMARKS BGS 9 PINK BOUGAINVILLEA BOUGAINVILLEA `MIAMI PINK'30 GAL 2" DBH 6` O.A., STANDARD N SINGLE, STRAIGHT TRUNK. FULL CANOPY CLU 13 AUTOGRAPH TREE CLUSIA ROSEA 45 GAL 2.5 DBH 12`-14` O.A.Y CES2 2 SILVER BUTTONWOOD CONOCARPUS ERECTUS `SERICEUS`30 GAL 2" CAL 8`-10` HT X 6` SPRD Y FULL CANOPY, STANDARD, SINGLE TRUNK ED 2 JAPANESE BLUEBERRY TREE ELAEOCARPUS DECIPIENS 30 GAL 2" CAL 8`-10` OA N CONICAL, FULL TO BASE, MATCHED LJ2 23 JAPANESE PRIVET LIGUSTRUM JAPONICUM 45 GAL 2"Cal 8` OA HT Y FULL CANOPY, 4` CT. MULIT-TRUNK MYR 34 SIMPSON'S STOPPER MYRICANTHES FRAGRANS 25 GAL.2"Cal 6`-8` O.A. PE 8 SLASH PINE PINUS ELLIOTTII 45 GAL 3" DBH 5`- 6` O.A. HT.Y FULL CANOPY PE2 7 SLASH PINE PINUS ELLIOTTII 65 GAL.4" DBH 10`-12` OA Y FULL CANOPY; PLANTED IN PRESERVE QV 151 LIVE OAK QUERCUS VIRGINIANA 200 GAL.6" DBH 18`-20` O.A.Y FULL CANOPY, SPECIMEN QV2 88 LIVE OAK QUERCUS VIRGINIANA 45 GAL 2.5" DBH 12`-14` O.A.Y FULL CANOPY, SPECIMEN TAB 2 PINK TRUMPET TREE TABEBUIA HETEROPHYLLA 65 GAL MIN 3" Cal.14` HT., 6` SPD.N FULL CANOPY TA 46 BALD CYPRESS TAXODIUM DISTICHUM 100 GAL 4" DBH 12` - 14` O.A.Y FULL CANOPY PALMS QTY COMMON NAME BOTANICAL NAME CONT CAL SIZE NATIVE REMARKS PHM 4 MEDJOOL DATE PALM PHOENIX DACTYLIFERA 'MEDJOOL'FIELD GROWN NA 12` CT N MATCHED,THICK TRUNK, FANCY CUT TRUNK SP*55 RELOCATED SABAL PALMETTO RELOCATED SABAL PALMETTO N.A.NA EXISTING Y RELOCATED RE 24 ROYAL PALM ROYSTONEA ELEGATA FIELD GROWN NA 12` CT Y FULL CANOPY, FLORIDA FANCY VM1 2 MONTGOMERY PALM VEITCHIA MONTGOMERYANA FIELD GROWN N.A.18`-20` O.A.N SINGLE, STRAIGHT TRUNK SHRUBS QTY COMMON NAME BOTANICAL NAME CONT SIZE SPACE NATIVE REMARKS AC 11 PINOT NOIR BROMELIAD AECHMEA X 'PINOT NOIR'7 GAL AG 8 BLUE AGAVE AGAVE AMERICANA GAINSVILLE BLUE 15 GAL 3` X 3`AS SHOWN CI3 2,384 REDTIP COCO PLUM CHRYSOBALANUS ICACO `RED TIP`7 GAL 3` X 2`3` O.C.Y FULL & THICK GROUND COVERS QTY COMMON NAME BOTANICAL NAME CONT SIZE SPACE NATIVE SPACING REMARKS CAT 109 TOMILSON NATAL PLUM CARISSA MACROCARPA 'TOMILSON'3 GAL 1.5` x 1.5`30" O.C.30" o.c. CG 181 COCOPLUM CHRYSOBALANUS ICACO `GREEN TIP`3 GAL 2` x 2`3` O.C.Y 36" o.c.FULL & THICK FG 688 GREEN ISLAND FICUS FICUS MACROPHYLLA `GREEN ISLAND`3 GAL 2` X 2`2.5` OC Y 30" o.c.FULL & THICK, FLORIDA FANCY IVS 28 DWARF YAUPON HOLLY ILEX VOMITORIA 'SCHILLINGS DWARF'3 GAL 1` HT. X 1.5` SPRD.2.5` O.C.Y 30" o.c. PEN 51 WHITE GRAFFITI PENTAS PENTAS LANCEOLATA 'GRAFFITI WHITE'3 GAL 1.5` x 1.5`18" O.C.18" o.c. PX 67 XANADU PHILODENDRON PHILODENDRON X XANADU 3 GAL 3` X 2`2.5` OC 30" o.c.FULL & THICK PIT 329 VARIEGATED PITTOSPORUM PITTOSPORUM TOBIRA 'VARIEGATA'7 GAL 3X3 3` O.C.N 36" o.c.FULL & THICK SSC 328 SILVER SAW PALMETTO SERENOA REPENS 'CINERA'3 GAL 2` x 2`3` O.C.Y 36" o.c.FULL & THICK SB 859 SAND CORD GRASS SPARTINA BAKERI 3 GAL 2` x 2`2.5` OC Y 30" o.c.FULL & THICK LITTORAL PLANTINGS QTY COMMON NAME BOTANICAL NAME CONT SIZE SPACE NATIVE SPACING REMARKS BR 1,977 BULLRUSH BR LITORAL PLANTINGS 3 GAL 18" O.C.Y 18" o.c.SCRIPUS VALIDUS L-1 1,568 SPIKERUSH, PICKEREL WEED, ARROWHEAD L-1 LITORAL PLANTINGS MULTIPLE 3 GAL 18" OC Y 18" o.c.ELEOCHARIS CELLULOSA, PONTEDERIA CORDATA, SAGITARIA LATIFOLIA L-2 1,900 ALLIGATOR FLAG L-2 LITORAL PLANTINGS MULTIPLE 3 GAL 18" OC Y 18" o.c.THALIA GENICULATA L-3 1,175 WATER LILY, MAIDENCANE L-3 LITORAL PLANTINGS MULTIPLE 3 GAL 18" OC Y 18" o.c.NYMPHIA ODORATA, PANICUM HEMITOMON 4 LANDSCAPE DETAILS E\DJUHHPHQWLQZULWLQJZLWKWKHDUFKLWHFWIPPHGLDWHO\ UHSRUWDQ\GLVFUHSDQFLHVWRWKHDUFKLWHFW SHEET C2TLEUR HEARINGINC TKHVHGUDZLQJVDUHWKHSURSHUW\RIWKHDUFKLWHFWDQGDUH QRWWREHXVHGIRUH[WHQVLRQVRURQRWKHUSURMHFWVH[FHSW 2F 4 ME R I T A G E H O M E S T I D E W A T E R Me r i t a g e H o m e s St . L u c i e C o u n t y , F l o r i d a 21-0604 DTS ACE/CTB ACE/CTBDESIGNED DRA:N REVISI2NS J2BNUMBER APPR2VED DATE LDQGVFDSHAUFKLWHFWV LDQGPODQQHUV EQYLURQPHQWDOCRQVXOWDQWV ZZZFRWOHXUKHDULQJFRP 1934CRPPHUFHLDQH SXLWH1 JXSLWHUFORULGD33458 5617476336āFD[7471377 LLFLC-C000239 11-11-21 04-15-21 05-12-22 06-09-22 LANDSCAPE NOTES LANDSCAPE SPECIFICATIONS PLANTING DETAILS ORANGE PLASTIC CONSTRUCTION FENCING STEEL BAR TO DRIP LINE NTS TREE PROTECTION DETAIL PLAN VIEW NTS TREE PROTECTION DETAIL SECTION VIEW ORANGE PLASTIC CONSTRUCTION FENCING STEEL BAR FINISHED GRADE FENCE LOCATIONS TO BE APPROVED IN FIELDTO DRIP LINE 4'-0" ALL PLANT MATERIAL SHALL BE FLORIDA NUMBER 1 OR BETTER AS DEFINED BY THE DIVISION OF PLANT INDUSTRY 'FLORIDA GRADES AND STANDARDS' LATEST EDITION. ALL LANDSCAPE SHALL CONFORM TO THE REQUIREMENTS OF ST. LUCIE COUNTY LAND DEVELOPMENT REGULATIONS. ST. LUCIE COUNTY LANDSCAPE CODE (LDRs) SHALL GOVERN IN THE EVENT OF A CONFLICT. VEGETATION REMOVAL PERMITS ARE REQUIRED PRIOR TO REMOVING, CLEARING OR STRIPPING ANY VEGETATION FROM THE PROPERTY. AT THE TIME OF BUILDING PERMIT, THE APPLICANT SHALL EXECUTE HOLD HARMLESS AGREEMENTS WITH ALL APPLICABLE UTILITIES FOR LANDSCAPING WITHIN UTILITY EASEMENTS. THE LANDSCAPE CONTRACTOR SHALL NOT MAKE ANY SUBSTITUTIONS AND/ OR CHANGES WITHOUT THE AUTHORIZATION OF ST. LUCIE COUNTY, THE OWNER AND THE LANDSCAPE ARCHITECT. THE LANDSCAPE CONTRACTOR SHALL REVIEW THE PROJECT DRAINAGE AND UTILITY PLANS PRIOR TO CONSTRUCTIONAND AVOID ALL CONFLICTS. THE LANDSCAPE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TO COMMENCING WORK. THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITS. THE CONTRACTOR SHALL COORDINATE THE PLANTING AND TRIMMING OF STREET TREES TO ENSURE FULL VISIBILITY TO TRAFFIC CONTROL AND SAFETY SIGNAGE TREES SHALL BE POSITIONED TO AVOID CONFLICTS WITH SIGNAGE AND SITE LIGHTING. LARGER TREES WILL BE PROVIDED AT INTERSECTIONS WHERE DEEMED NECESSARY. ALL VEGETATION SHALL BE SELECTED AND POSITIONED SO THAT IT DOES NOT PRESENT OBSTRUCTIONS TO THE LINE OFSIGHT AT INTERSECTIONS PURSUANT TO SECTION 27-1262(a)(9)(c) OF ST. LUCIE COUNTY CODE. ALL ABOVE GROUND UTILITIES I.E. TRANSFORMERS, SWITCH BOXES, AC CONDENSERS AND ALIKE SHALL BE FULLY SCREENED FROM VIEW ON THREE SIDES WITH LANDSCAPING. THE LANDSCAPING SHALL TO THE TALLEST POINT OF SAIDEQUIPMENT AT TIME OF PLANTING. ALL TREES SHALL BE LOCATED WITHIN A MULCH PLANTING BED WITH A MINIMUM OF TWO (2) FEET OF CLEARANCE TO THE EDGE OF THE BED. SOD AND IRRIGATION SHALL BE INSTALLED IN ANY ADJACENT RIGHT OF WAY BETWEEN THE SIDEWALK AND THE CURB. ALL SOD SHALL BE STENOTAPHRUM SECONDATUS FLORITAM-PALMETTO (ST. AUGUSTINE SOD). TREES WITHIN PLANTING ISLANDS LESS THAN FIVE (5) FEET IN WIDTH SHALL BE LOCATED TO AVOID CONFLICTS WITH THE OVERHANG OF VEHICLES. TYPE D RAISED CONCRETE CURBING SHALL BE PROVIDED AROUND ALL PLANTING ISLANDS WITHIN VEHICULAR USEAREAS. TREES AT ENTRANCE WAYS AND WITHIN SIGHT TRIANGLES SHALL BE TRIMMED IN SUCH A FASHION TO MINIMIZE SITE VISIBILITY CONFLICTS. CLEAR VISIBILITY SHALL BE MAINTAINED BETWEEN 30 INCHES AND 7 FEET. TEN FOOT BY THIRTYFOOT SIGHT VISIBILITY TRIANGLES SHALL BE PROVIDED AT THE INTERSECTIONS WITH THE PUBLIC RIGHT OF WAY. INADDITION ALL LANDSCAPING SHALL CONFORM TO THE REQUIREMENTS OF FDOT INDEX 546. EARTH BERMS SHALL NOT EXCEED A 3:1 SLOPE 4:1 SLOPES OR GREATER ARE PREFERABLE. ALL TREES PLANTED UNDER OR ADJACENT TO FPL POWER LINES WILL COMPLY WITH THE FPL RIGHT TREE IN THE RIGHT PLACE GUIDELINES (REV 5/95) PERIMETER TREES AT THE TIME OF PLANTING SHALL BE SPACED IN A WAY THAT COMPLEMENTS THE SPACING OF ANYEXISTING TREES ON ADJACENT DEVELOPED AREAS. ALL LANDSCAPE ISLANDS AND BEDS SHALL BE FREE FROM SHELL ROCK AND CONSTRUCTION DEBRIS, EXCAVATED TO A DEPTH OF 30 INCHES OR TO CLEAN NATIVE SOILS AND FILLED WITH THE SPECIFIED BACKFILL MIXTURE. ALL LANDSCAPE ISLANDS SHALL INCORPORATE THE INSTALLATION OF MOUNDING OF NATIVE SOILS A MINIMUM OF SIX INCHES (6") ABOVE THE TOP OF CURB. 19.5" 'BIO BARRIER' ROOT BARRIER SHALL BE PROVIDED FOR SHADE TREES PLANTED WITHIN SIX (6') FEET OF PUBLICCURBS, SIDEWALKS OR PUBLIC RIGHT OF WAYS. ALL ROOT BARRIER SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURES RECOMMENDATIONS. THE TOTAL LENGTH OF THE ROOT BARRIERS SHALL BE 20' ADJACENT TO THE SIDEWALK AND 20' ADJACENT TO THE CURB. ALL AREAS SHALL BE FULLY IRRIGATED BY AUTOMATIC MEANS IN ACCORDANCE WITH THE REQUIREMENTS OF ST. LUCIE COUNTY . THE IRRIGATION WATER SOURCE SHALL BE WELL WATER FOR COMMON AREAS AND POTABLE WATER AROUND THE BUILDING FOUNDATION. CATCH BASINS AND DRAINAGE SHALL NOT BE LOCATED WITH IN REQUIRED PERIMETER BUFFERS OR PRESERVE AREAS. THE IRRIGATION SYSTEM SHALL BE DESIGNED TO PROVIDE 100% OVERLAP COVERAGE TO ALL LANDSCAPE AND SODAREAS. THE IRRIGATION SYSTEM SHALL BE EQUIPPED WITH A RAIN SENSOR/CUT OFF SWITCH IN ACCORDANCE WITH STATE AND LOCAL REQUIREMENTS. EXISTING TREES AND VEGETATION TO REMAIN SHALL BE STAKED AND BARRICADED PRIOR TO ANY LAND CLEARING. TREES TO BE RELOCATED SHALL BE ROOT PRUNED AND PROTECTED DURING CONSTRUCTION. ALL TREES PROPOSED TO BE PRESERVED ON SITE SHALL BE PROTECTED IN ACCORDANCE WITH THE PROCEDURESOUTLINED IN DIVISION IV., VEGETATION REMOVAL REQUIREMENTS IN THE ST. LUCIE COUNTY CODE PRIOR TO THE ISSUANCE OF A C.O. ANY AREA DESIGNATED WITH EXISTING VEGETATION TO REMAIN THAT IS DISTURBED DURING CONSTRUCTION WILL BERESTORED WITH NATIVE PLANTINGS. EXISTING TREES PRESERVED OR RELOCATED ON SITE SHALL BE PRUNED ACCORDING TO ANSI A300 STANDARDS OR BY AN ISA CERTIFIED ARBORIST. ALL EXISTING LANDSCAPING AND TREES TO REMAIN SHALL BE BARRICADED WITH ORANGE CONSTRUCTION BARRICADE. THE BARRICADE SHALL BE INSTALLED AT THE DRIP LINE OF THE TREE/PALM OR AT THE EDGE OF THE SHRUB MASS. BARRICADES SHALL REMAIN IN PLACE THROUGHOUT THE DURATION OF CONSTRUCTION. EXISTING, SUITABLE NATIVE VEGETATION LOCATED WITHIN THE PROPOSED DEVELOPMENT AREAS SHALL BE RELOCATED TO SUPPLEMENT THE LANDSCAPING. NATIVE VEGETATION SHALL BE RELOCATED BY TREE SPADE OR CRANE. PRIOR TO THE CLEARING OF THE SITE THE APPLICANT SHALL IDENTIFY ALL NATIVE VEGETATION TO BE RELOCATED. RELOCATION METHODOLOGY: EXISTING NATIVE VEGETATION DETERMINED TO BE SUITABLE FOR RELOCATION SHALL BE RELOCATED TO TARGET AREAS USING HYDROLOGIC TREE SPADES. THE SIZE OF SPADE SHALL VARY FROM 90" TO 45" DEPENDING ON THE SIZE AND TYPE OF VEGETATION TO BE MOVED. THE APPLICANT SHALL IDENTIFY PRIOR TO THE CLEARING OF THE SITE ALL EXISTING NATIVE VEGETATION TO BE RELOCATED. FOLLOWING RELOCATION, VEGETATIONSHALL BE WATERED DAILY. 1. GENERAL LANDSCAPE REQUIREMENTS LANDSCAPE CONTRACT WORK INCLUDES, BUT IS NOT LIMITED TO, SOIL PREPARATION, FINE OR FINISHGRADING, FURNISHING AND INSTALLING PLANT MATERIAL, WATERING, STAKING, GUYING AND MULCHING. PLANT SIZE AND QUALITY TREES, PALMS, SHRUBS, GROUNDCOVERS: PLANT SPECIES AND SIZES SHALL CONFORM TO THOSE INDICATED ON THE DRAWINGS, NOMENCLATURE SHALL CONFORM TO STANDARD PLANT NAMES, 1942 EDITION. ALL NURSERY STOCKSHALL BE IN ACCORDANCE WITH GRADES AND STANDARDS FOR NURSERY PLANTS PARTS I & II, LATESTEDITION PUBLISHED BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES, UNLESS SPECIFIED OTHERWISE. ALL PLANTS SHALL BE FLORIDA GRADE NUMBER 1 OR BETTER AS DETERMINED BY THE FLORIDA DIVISION OF PLANT INDUSTRY. ALL CONTAINER GROWN MATERIAL SHALL BE HEALTHY, VIGOROUS, WELL-ROOTED PLANTS AND ESTABLISHED IN THE CONTAINER IN WHICH THEY ARE SOLD. THE PLANTS SHALL HAVE TOPS OF GOOD QUALITY AND BE IN A HEALTHY GROWING CONDITION. AN ESTABLISHED CONTAINER GROWN PLANT SHALL BE TRANSPLANTED INTO A CONTAINER AND GROWN IN THAT CONTAINER SUFFICIENTLY LONG ENOUGH FOR THE NEW FIBROUS ROOTS TO HAVE DEVELOPED SO THAT THE ROOT MASS WILL RETAIN ITS SHAPE AND HOLD TOGETHER WHEN REMOVED FROM THE CONTAINER. STANDARD PLANTING MIXTURE SHALL BE ONE (1) PART RECYCLED ORGANIC MATERIAL ADDED TO THREE (3) PARTS EXISTING NATIVE SOIL. REPLACEMENT SOIL SHALL BE USED AS SPECIFIED TO REPLACE EXISTING SOILS THAT ARE DETERMINEDBY THE LANDSCAPE ARCHITEC TO BE UNSUITABLE FOR PLANTING, IE. ROAD BASE, PAVEMENT, ETC. REPLACMENT SOIL MIX SHALL CONTAIN 60% SAND AND 40% MUCK. SAND SHALL BE 100% CLEAN NATIVE SAND SCREENED TO 1/4" AND MUCK SHALL BE 100% CLEAN ORGANIC NATIVE MUCK SCREENED TO 1/2". ALL SOIL SHALL BE MIXED PRIOR TO DELIVERY ON SITE. MULCH SHALL BE SHREDDED MELALEUCA, EUCALYPTUS OR GRADE "A" RECYCLED. ALL MULCH IS TO BE APPLIED TO A DEPTH OF 3", EXCEPT AS OTHERWISE NOTED. FERTILIZER IN BACKFILL MIXTURE FOR ALL PLANTS SHALL CONSIST OF MILORGANITE ACTIVATEDSLUDGE MIXED WITH THE BACKFILL AT A RATE OF NOT LESS THAN 50 LBS. PER CUBIC YARD. FERTILIZER FOR TREES AND SHRUBS MAY BE TABLET FORM OR GRANULAR. GRANULAR FERTILIZER SHALL BE UNIFORM IN COMPOSITION, DRY AND FREE-FLOWING. THIS FERTILIZER SHALL BEDELIVERED TO THE SITE IN THE ORIGINAL UNOPENED BAGS, EACH BEARING THE MANUFACTURER'S STATEMENT OF ANALYSIS, AND SHALL MEET THE FOLLOWING REQUIREMENTS: 16% NITROGEN, 7% PHOSPHORUS, 12% POTASSIUM, PLUS IRON. TABLET FERTILIZER (AGRIFORM OR EQUAL) IN 21 GRAM SIZE SHALL MEET THE FOLLOWING REQUIREMENTS: 20% NITROGEN, 10% PHOSPHORUS AND 5% POTASSIUM. FERTILIZER WILL BE APPLIED AT THE FOLLOWING RATES: PLANT SIZE 16-7-12 AGRIFORM TABLETS (21 GRAM) 1 GAL. 1/4 LB. 1 3 GAL. 1/3 LB. 3 7-15 GAL. 1/2 LB. 6 1"-6" CALIPER 2 LBS./1" CALIPER 2 PER 1" CALIPER 6" AND LARGER 3 LBS./1" CALIPER 2 PER 1" CALIPER "FLORIDA EAST COAST PALM SPECIAL" SHALL BE APPLIED TO ALL PALMS AT INSTALLATION AT A RATE OF ½ LB. PER INCH OF TRUNK UNLESS OTHERWISE SPECIFIED. FIELD GROWN TREES AND PALMS PREVIOUSLY ROOT PRUNED SHALL OBTAIN A ROOT BALL WITH SUFFICIENT ROOTS FOR CONTINUED GROWTH WITHOUT RESULTING SHOCK. CONTRACTOR SHALL NOT MARK OR SCAR TRUNK IN ANY FASHION. PLANTS SHALL BE WATERED AS NECESSARY OR WITHIN 24 HOURS AFTER NOTIFICATION BY THE LANDSCAPE ARCHITECT. THE LOCATIONS OF PLANTS, AS SHOWN IN THESE PLANS, ARE APPROXIMATE. THE FINAL LOCATIONS MAY BE ADJUSTED TO ACCOMMODATE UNFORESEEN FIELD CONDITIONS. MAJOR ADJUSTMENTS TO THE LAYOUT ARE TO BE APPROVED BY THE LANDSCAPE ARCHITECT. ALL PLASTIC FABRIC SHALL BE REMOVED FROM PLANT MATERIAL AT TIME OF INSTALLATION. ALL TREES MUST BE STAKED AS SHOWN ON THE PLANTING DETAILS WITHIN 24 HOURS OF PLANTING. STAKES TO REMAIN FOR A MINIMUM OF 9 MONTHS, BUT NO LONGER THAN 18 MONTHS. CONTRACTORIS RESPONSIBLE FOR MAINTENANCE AND REMOVAL OF THE STAKES. ALL TREES MUST BE PRUNED AS PER LANDSCAPE ARCHITECT'S DIRECTION. SABAL PALMS MAY BE HURRICANE CUT. ALL SHRUBS, TREES AND GROUND COVER WILL HAVE IMPROVED SOIL AS PER PLANTING SOIL NOTES. THE SOILS SHALL BE PLACED IN THE HOLE DURING PLANTING. TOP DRESSING ONLY IS NOT ACCEPTABLE. DO NOT ALLOW AIR POCKETS TO FORM WHEN BACKFILLING. ALL TREES SHALL BE SPIKED IN UTILIZING WATER AND A TREE BAR. THE LANDSCAPE CONTRACTOR SHALL WATER, MULCH, WEED, PRUNE, AND OTHERWISE MAINTAIN ALL PLANTS, INCLUDING SOD, UNTIL COMPLETION OF CONTRACT OR ACCEPTANCE BY LANDSCAPE ARCHITECT. SETTLED PLANTS SHALL BE RESET TO PROPER GRADE, PLANTING SAUCERS RESTORED, AND DEFECTIVE WORK CORRECTED. THE LANDSCAPE CONTRACTOR SHALL AT ALL TIMES KEEP THE PREMISES FREE FROM ACCUMULATION OF WASTE MATERIALS OR DEBRIS CAUSED BY HIS CREWS DURING THE PERFORMANCE OF THE WORK. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL PROMPTLY REMOVE ALL WASTEMATERIALS, DEBRIS, UNUSED PLANT MATERIAL, EMPTY PLANT CONTAINERS AND ALL EQUIPMENT FROM THE PROJECT SITE. UPON COMPLETION OF THE WORK, THE LANDSCAPE CONTRACTOR SHALL NOTIFY THE LANDSCAPEARCHITECT AND REQUEST A FINAL INSPECTION. ANY ITEMS THAT ARE JUDGED INCOMPLETE OR UNACCEPTABLE BY THE LANDSCAPE ARCHITECT OR OWNER'S REPRESENTATIVE SHALL BE CORRECTED BY THE LANDSCAPE CONTRACTOR WITHIN 14 DAYS. ALL LABOR AND MATERIAL FOR SOIL AMENDMENTS AND FERTILIZER THAT IS REQUIRED TO INSURE THE SUCCESSFUL ESTABLISHMENT AND SURVIVAL OF THE PROPOSED VEGETATION, AS WELL AS ALL THE COST FOR THE REMOVAL OF UNSUITABLE OR EXCESS BACKFILL MATERIAL, SHALL BE INCLUDED IN THE CONTRACTOR'S BID TO PERFORM THE WORK REPRESENTED IN THIS PLAN SET. 2. PLANTING TREES EXCAVATE PIT AS PER PLANTING DETAILS. BACKFILL AROUND BALL WITH STANDARD PLANTING MIXTURE AND SLIGHTLY COMPACT, WATER THOROUGHLY AS LAYERS ARE PLACED TO ELIMINATE VOIDS AND AIR POCKETS. BUILD A 6" HIGH BERM OF STANDARD PLANTING MIXTURE BEYOND EDGE OF EXCAVATION. APPLY 3" (AFTER SETTLEMENT) OF MULCH EXCEPT WITHIN 6" OF TRUNK. PRUNE TREE TO REMOVE DAMAGED BRANCHES, IMPROVE NATURAL SHAPE AND THIN OUT STRUCTURE. DO NOT REMOVE MORE THAN 15% OF BRANCHES. DO NOT PRUNE BACK TERMINAL LEADER. GUY AND STAKE TREE IN ACCORDANCE WIT THE STAKING DETAILS IMMEDIATELY AFTER PLANTING. 3. PLANTING SHRUBS LAYOUT SHRUBS TO CREATE A CONTINUOUS SMOOTH FRONT LINE AND FILL IN BEHIND. EXCAVATE PIT OR TRENCH TO 1-1/2 TIMES THE DIAMETER OF THE BALLS OR CONTAINERS OR 1'-0"WIDER THAN THE SPREAD OF ROOTS FOR POSITIONING AT PROPER HEIGHT. BACKFILL AROUNDPLANTS WITH STANDARD PLANTING MIXTURE, COMPACTED TO ELIMINATE VOIDS AND AIR POCKETS. FORM GRADE SLIGHTLY DISHED AND BERMED AT EDGES OF EXCAVATION. APPLY 3" OF MULCH EXCEPT WITHIN 3" OF STEMS. PRUNE SHRUBS TO REMOVE DAMAGED BRANCHES, IMPROVE NATURAL SHAPE AND THIN OUT STRUCTURE. DO NOT REMOVE MORE THAN 15% OF BRANCHES. 4. PLANTING GROUND COVER LOOSEN SUBGRADE TO DEPTH OF 4" IN AREAS WHERE TOPSOIL HAS BEEN STRIPPED AND SPREAD SMOOTH. SPACE PLANTS AS OTHERWISE INDICATED. DIG HOLES LARGE ENOUGH TO ALLOW SPREADING OF ROOTS. COMPACT BACKFILLTO ELIMINATE VOIDS AND LEAVE GRADE SLIGHTLY DISHED AT EACH PLANT. WATER THOROUGHLY. APPLY 3" OF MULCH OVER ENTIRE PLANTING BED, LIFTING PLANT FOLIAGE ABOVE MULCH. DURING PERIODS OF HOT SUN AND/OR WIND AT TIME OF PLANTING, PROVIDE PROTECTIVE COVER FOR SEVERAL DAYS OR AS NEEDED. 5. PLANTING LAWNS SODDING: SOD TYPE SPECIFIED ON PLANT LIST SHALL BE MACHINE STRIPPED NOT MORE THAN 24 HOURS PRIOR TO LAYING. LOOSEN SUBGRADE TO DEPTH OF 4" AND GRADE WITH TOPSOIL EITHER PROVIDED ON SITE OR IMPORTED STANDARD PLANTING MIX TO FINISH DESIGN ELEVATIONS. ROLL PREPARED LAWN SURFACE. WATER THOROUGHLY, BUT DO NOT CREATE MUDDY SOIL CONDITION. FERTILIZE SOIL AT THE RATE OF APPROXIMATELY 10 LBS. PER 1,000 S.F. SPREAD FERTILIZER OVER THE AREA TO RECEIVE GRASS BY USING AN APPROVED DISTRIBUTION DEVICE CALIBRATED TO DISTRIBUTE THE APPROPRIATE QUANTITY. DO NOT FERTILIZE WHEN WIND VELOCITY EXCEEDS 15M.P.H. THOROUGHLY MIX FERTILIZER INTO THE TOP 2" OF TOPSOIL. LAY SOD STRIPS WITH TIGHT JOINTS, DO NOT OVERLAP, STAGGER STRIPS TO OFFSET JOINTS IN ADJACENT COURSES. WORK SIFTED STANDARD PLANTING MIXTURE INTO MINOR CRACKS BETWEENPIECES OF SOD AND REMOVE EXCESS SOIL DEPOSITS FROM SODDED AREAS. SOD ON SLOPES GREATERTHAN 3:1 SHALL BE STAKED IN PLACE. ROLL OR STAMP LIGHTLY AND WATER THOROUGHLY WITH A FINE SPRAY IMMEDIATELY AFTER PLANTING. 6. MISCELLANEOUS LANDSCAPE WORK LANDSCAPE MAINTENANCE MAINTAIN LANDSCAPE WORK UNTIL FINAL ACCEPTANCE IS ISSUED BY THE OWNER'S REPRESENTATIVE. INCLUDE WATERING, WEEDING, CULTIVATING, RESTORATION OF GRADE, MOWING AND TRIMMING GRASS, PRUNING TREES AND SHRUBS, PROTECTION FROM INSECTS AND DISEASES, FERTILIZING AND SIMILAR OPERATIONS AS NEEDED TO INSURE NORMAL GROWTH AND GOOD HEALTH FOR LIVE PLANTMATERIAL. PLANT MATERIAL SUBSTITUTION NO SUBSTITUTION OF PLANT MATERIAL, TYPE OR SIZES WILL BE PERMITTED WITHOUT AUTHORIZATION FROM THE LANDSCAPE ARCHITECT. PLANTING BED PREPARATION ALL PLANTING BEDS SHALL BE PROPERLY PREPARED PRIOR TO THE COMMENCEMENT OF ANY PLANTING. PLANTING AREAS, INCLUDING LAWNS SHALL BE FREE OF ALL WEEDS AND NUISANCE VEGETATION. IF TORPEDO GRASS (PANICUM REPENS) IS PRESENT OR ENCOUNTERED DURING PLANTING, THELANDSCAPE CONTRACTOR SHALL STOP ALL PLANTING UNTIL IT CAN BE DEMONSTRATED THAT IT HASBEEN COMPLETELY REMOVED OR ERADICATED. THERE SHALL BE NO EXCEPTIONS TO THIS PROVISION. ALL LANDSCAPE ISLANDS AND BEDS WILL BE FREE OF SHELL ROCK AND CONSTRUCTION DEBRIS ANDWILL BE EXCAVATED TO A DEPTH OF 30 INCHES OR TO CLEAN, NATIVE SOIL AND FILLED WITH THESPECIFIED REPLACMENT SOIL. LANDSCAPE WARRENTY THE LANDSCAPE CONTRACTOR SHALL GUARANTEE ALL PLANT MATERIAL FOR A PERIOD OF SIX (6) MONTHS FROM THE DATE OF CONDITIONAL ACCEPTANCE IN WRITING FROM THE LANDSCAPE ARCHITECT. AT THE TIME OF CONDITIONAL ACCEPTANCE, THE SIX (6) MONTH PERIOD SHALL COMMENCE. ANY MATERIALS WHICH HAVE DIED OR DECLINED TO THE POINT WHERE THEY NOLONGER MEET FLORIDA #1 CONDTION DURING THIS PERIOD SHALL BE PROMPTLY REPLACED WITHSPECIMENS THAT MEET THE MINIMUM REQUIREMENTS CALLED FOR ON THE DRAWINGS. THE LANDSCAPE CONTRACTOR SHALL NOT BE HELD RESPONSIBLE FOR THE DEATH OR DAMAGE RESULTING FROM ACTS OF GOD SUCH AS LIGHTNING, VANDALISM, AND AUTOMOBILES OR FROM NEGLIGENCE BY THE OWNER. CONTRACTOR SHALL BE RESPONSIBLE FOR WATERING AND OTHERWISE MAINTAININGPLANTS UP TO THE CONDITIONAL ACCEPTANCE PERIOD, UNLESS A WRITTEN AGREEMENT WITH THE LANDSCAPE ARCHITECT PROVIDES FOR A DIFFERENT ARRANGEMENT. LARGE TREE PLANTING DETAIL NTS PLACE RUBBER HOSE ON WIRE AT ALLPOINTS OF CONTACT WITH TREE PLACE 3 (DOUBLE STRANDS) 12 GAUGE GALVANIZED GUY WIRE, SPACED EQUAL DISTANCE AROUND TREE ABOVE FIRST LATERAL BRANCH PLACE SAFETY FLAGS ON GUY WIRES TWIST WIRES TO ADJUST TENSION ON GUY WIRE REMOVE BURLAP FROM TOP 1/3 OF ROOTBALL IFAPPLICABLE 3" MULCH FORM SAUCER WITH 4"-6" CONTINUOUS EARTHEN RIM AROUND PLANTING HOLE 2"x4"x24" WOOD STAKE DRIVEN 3" BELOW GRADE PLANTING PIT DEPTH SHALL EQUAL DEPTH OF ROOT BALL PLUS 6" FOR SETTING LAYER OF COMPACTED STANDARD PLANTING MIXTURE. PLANTING PIT WIDTHSHALL BE TWICE THE DIAMETER OF ROOT BALL BACK FILL AROUND ROOT BALL WITH STANDARDPLANTING MIXTURE. ELIMINATE AIR POCKETS. PLANT TOP OF ROOT BALL SLIGHTLY HIGHER THAN FINISHED GRADE PLACE ROOT BALL AT BOTTOM OF PLANTING PIT SHRUB/GROUNDCOVER PLANTING DETAIL NTS 3MULCH F2RMSAUCER:ITH3C2NTINU2USEARTHEN RIMAR2UNDPLANTINGH2LE PLANTINGPITDEPTHSHALLBE4-6GREATER THANR22TBALLPLANTINGPIT:IDTHSHALLBET:ICETHEDIAMETERF2RR22TBALLS2 ANDUNDER2R2 LARGERINDIAMETERF2R R22TBALLS2VER2 BACKFILLAR2UNDR22TBALL:ITHSTANDARDPLANTINGMIXELIMINATEAIR P2CKETS PLACET2P2FR22TBALL2AB2VEFINISHED GRADE PLACER22TBALLATB2TT2M2FPLANTINGPIT NTS ROOT BARRIER DETAIL PLAN VIEW 20 LF OF 19.5 INCH DEEP "BIO BARRIER" ROOT BARRIER INSTALLED IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. ROOT BARRIERTO BE INSTALLED FLUSH WITH CURB OR SIDEWALK. SIDEWALK CURB 10'10' 20' ROOT BARRIER 10'10' 20'ROOT BARRIER NTS ROOT BARRIER DETAIL SECTION VIEW FINISHED GRADE CURB OR SIDEWALK TOP OF ROOT BARRIER TO BE INSTALL 1/4" BELOW TOP OF CURB/SIDEWALK. CURB OR SIDEWALK 20 LF OF 19.5 INCH DEEP "BIO BARRIER" ROOT BARRIER INSTALLED IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. ROOT BARRIER TO BE INSTALLED FLUSH WITH CURB OR SIDEWALK. 19.5" 2"x4" WOOD BRACE 2"x4" WOOD STAKE WITH BOARDS POSITIONED FACETO FACE, NAIL BRACE SECURELYTO WOOD STAKE BELOW FINISHEDGRADE NTS EXISTING SOIL WOOD STAKING DETAIL SABAL PALM PLANTING DETAIL CLEAR TRUNK (CT) HEIGHT VARIES FINISHED GRADE NTS NO ABRUPT TRUNK CONSTRICTIONS SABAL PALMS TO BE SLICK TRUNK (UNLESSOTHERWISE NOTED) 5 - 2"x4"x18" WOOD BATTENS OVER 5 LAYERSOF BURLAP. DO NOT NAIL BATTENS TO PALM.HEIGHT OF BATTENS SHALL BE LOCATED INRELATION TO THE HEIGHT OF THE PALM FORADEQUATE BRACING 2 STEEL BANDS MINIMUM 3 - 2"x4" WOOD BRACES SHALL BETOE NAILED TO WOOD BATTENS PLANT ROOT BALL SLIGHTLY ABOVE FINISHEDGRADE 3" MULCH FORM SAUCER WITH 4"-6" CONTINUOUSEARTHEN RIM AROUND PLANTING HOLE 2"x4"x24" WOOD STAKE REMAINING 3"ABOVE GRADE PLACE ROOT BALL AT BOTTOM OF PLANTING PIT ONUNDISTURBED SUBGRADE TO PREVENT SETTLING MINIMUM ROOT BALL SIZE AS PER GRADES & STANDARDS. BACK FILL AROUND ROOT BALL WITH STANDARDPLANTING MIXTURE. JET IN WITH WATER HOSE TOELIMINATE AIR POCKETS. EXISTING SUBGRADE SAFETY FLAG DIAMETER OF THE HOLE SHALL BE TWICE THE BALLDIAMETER. FOR ROOT BALLS 2' AND GREATER, THEHOLE SHALL BE 2' LARGER THAN THE BALL DIAMETER. FOR REGENERATEDPALMS, ROOTPRUNE MINIMUM 8WEEKS, MAXIMUM12 WEEKS SKIRT SHALL BE NEAT AND MATCHED ON ALL PALMS LANDSCAPE NOTES SOD: ST. AUGUSTINE MULCH: EUCALYPTUS MULCH *NOTE:SITE SHALL BE KEPT FREE OF INVASIVE SPECIES FINISHEDGRADE TRUNK IN GROUND DIRECTION OF CURVED TRUNK PALM CANOPY HEAD MAX. 6'-7' PALM HEADS SHALL BESET STRAIGHT, NOT AT ANANGLE TO THE GROUND MAX. 6'-7' EITHER 'C' OR 'S' CURVESARE ACCEPTABLE UNLESSOTHERWISE NOTED GENTLE CURVE BETWEEN3' AND 5'. EXTREME CURVESWILL NOT BE ACCEPTEDUNLESS OTHERWISE NOTED PLAN VIEW CURVED PALM TRUNK DETAIL NTS 'C''S' Page 361 of 494 8 6 7 9 9 10 4 CABANA POOL LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6LOT 7 LOT 8 LOT 9 LOT 10 LOT 11 LOT 12 LOT 13 LOT 14 LOT 15 LOT 16 LOT 17 LOT 18 LOT 19 LOT 20 LOT 21 LOT 22 LOT 23 LOT 24 LOT 25 LOT 26 LOT 27 LOT 28 LOT 29 LOT 30 LOT 38 LOT 37 LOT 36 LOT 35 LOT 34 LOT 33 LOT 32 LOT 31 LOT 46 LOT 45 LOT 44 LOT 43 LOT 42 LOT 41LOT 40 LOT 39 LOT 54 LOT 53 LOT 52 LOT 51 LOT 50 LOT 49 LOT 48 LOT 47 LOT 60 LOT 59 LOT 58 LOT 57 LOT 56 LOT 55 LOT 61 LOT 62 LOT 63 LOT 64 LOT 65 LOT 66 LOT 67 LOT 68 LOT 69 LOT 70 LOT 71 LOT 72 LOT 73 LOT 74 LOT 75 LOT 76 LOT 77 LOT 78 LOT 79 LOT 80 LOT 81 LOT 82 LOT 83 LOT 84 LOT 85 LOT 86 LOT 87 LOT 88 LOT 89 LOT 90 LOT 91 LOT 92 LOT 100 LOT 99 LOT 98 LOT 97 LOT 96 LOT 95 LOT 94 LOT 93 LOT 108 LOT 107 LOT 106 LOT 105 LOT 104 LOT 103 LOT 102 LOT 101 LOT 116 LOT 115 LOT 114 LOT 113 LOT 112 LOT 111 LOT 110 LOT 109 LOT 131 LOT 132 LOT 133 LOT 134 LOT 135 LOT 136 LOT 123 LOT 124 LOT 125 LOT 126 LOT 127 LOT 128 LOT 129 LOT 130 LOT 122 LOT 121 LOT 120 LOT 119 LOT 118 LOT 117 LOT 137 LOT 138 LOT 139 LOT 140 LOT 141 LOT 142 LOT 143 LOT 144 LOT 145 LOT 146 LOT 147 LOT 148 LOT 149 LOT 150 LOT 151 LOT 152LOT 153 LOT 154 LOT 155 LOT 156 LOT 157 LOT 158 LOT 159 LOT 160 6045 6081 6080 6085 6093 6094 6097 6096 1096 1092 1093 1094 6019 6018 6028 BLDG A, 6 UNIT BLDG B, 8 UNITBLDG C, 8 UNIT BLDG D, 8 UNIT BLDG E, 8 UNIT BLDG F, 8 UNIT BLDG G, 8 UNIT BLDG H, 6 UNIT BLDG I, 6 UNIT BLDG J, 6 UNIT BLDG K, 8 UNIT BLDG L, 6 UNIT BLDG M, 6 UNIT BLDG N, 8 UNIT BLDG O, 8 UNIT BLDG P, 8 UNIT BLDG Q, 6 UNIT BLDG R, 8 UNIT BLDG S, 6 UNITBLDG T, 8 UNIT BLDG U, 8 UNITBLDG V, 8 UNIT 1148 1147 1144 1152 1146 1145 1143 1141 1138 1140 113911371136 1133 1132 1134 113011291126 1125 1127 6014 1150 6245 1098 1068 6215 6219 6170 6165 6164 1061 10551057 1052 1028 1015 6000 6003 6001 6007 6005 6004 6248 6033 6032 6037 602960306100 6104 6107 6110 6108 6109 6106 6105 1114 1123 1121 1122 1120 1110 6161 61606159 6157 6158 6156 6155 6154 6141 6134 6132 6131 6130 6129 6118 6116 6115 6114 6113 6126 6123 61116112 1064 1054 1067 1020 1021 1099 1109 1107 1115 11161119 6048 6117 6125 6128 6127 6133 62226231 NL04 1 TREE MITIGATION Scale: 1" = 50'-0" 25'0'100'50'150' North 200' by agreement in writing with the architect. Immediately report any discrepancies to the architect. SHEET COTLEUR & HEARING, INC. These drawings are the property of the architect and are not to be used for extensions or on other projects except OF 1 ME R I T A G E H O M E S T I D E W A T E R Me r i t a g e H o m e s St . L u c i e C o u n t y , F l o r i d a 21-0604 DTS ACE/CTB ACE/CTBDESIGNED DRAWN REVISIONS JOB NUMBER APPROVED DATE Landscape Architects Land Planners Environmental Consultants www.cotleurhearing.com 1934 Commerce Lane Suite 1 Jupiter, Florida 33458 561.747.6336 · Fax 747.1377 Lic# LC-C000239 11-11-21 TREE MITIGATION TABLE PINE DBH" PLANTED: 52" *PLANTED TREES AT 1:1 RATIO 7 PE2 AT 4": 28" 8 PE AT 3": 24" RELOCATED SABALS: 55 *RELOCATED PALMS AT 1:1 RATIO UPLAND PLANTINGS: 55 SP* OAK PLANTED INCHES: 849" *(5"-10" DBH PLANTED TREES CREDITED AT 1:1.5 RATIO) 136 QV2 UPSIZED FROM 2.5" DBH TO 6" DBH - 1.5 * (6-2.5) = 5.25 - (136 * 5.25) = 714" DBH 15 QV2 ADDITIONAL OAKS AT ENTRY, POOL, UPLAND - 1.5* 15 * 6 = 135" DBH SUBSTITUTED CANOPY TREE PLANTINGS: 51" DBH ENHANCED LITTORAL & UPLAND TRANSITION TREES: - 34 TA UPSIZED FROM 2.5" DBH TO 4" DBH - 34* (4 - 2.5) = 51" DBH REQUIRED SABALS: 62 TOTAL RELOCATED SABALS: 62 REQUIRED PINE" DBH: 52" TOTAL PINE " DBH REPLANTED: 52" REQUIRED OAK" DBH: 2,528" TOTAL OAK " DBH OR EQUIVALENT REPLANTED: 849+51= 900" TOTAL OAK" DBH REMAINING: 2,528-900 = 1628" REMAINING FEE-IN-LIEU: $325,600 *$200 PER INCH 1628* 200 = 325,600 LEGEND EXISTING OAK TO BE REMOVED EXISTING SABAL TO BE RELOCATED MITIGATION STRATEGY EXISTING PINE TO BE REMOVED TOTAL OAK DBH" REQUIRED TO BE REPLANTED: 2,528" TOTAL SABAL PALMS REQUIRED TO BE RELOCATED: 55 TOTAL PINE DBH" REQUIRED TO BE REPLANTED: 52" 04-13-22 05-12-22 06-09-22 Page 362 of 494 EnvironmEntal rEsourcEs Final rEport TO: Jodi Kugler, Planning & Development Services THROUGH: Aimee L. Cooper, Environmental Regulations Manager Amy E. Griffin, Environmental Resources Director FROM: Brian Arbeiter, Senior Environmental Planner DATE: July 12th, 2022 SUBJECT: Tidewater Planned Unit Development Rezoning/Preliminary Plan PUD_RZ-11202126231 Background The Environmental Resources Department (ERD) is in receipt of the June 13th, 2022, date-stamped submittal from Planning and Development Services. The applicant is seeking approval of a Planned Unit Development (PUD) that proposes 160 multifamily residential units with associated site improvements. ±16.29-acres of the subject site is to be rezoned from Residential, Single-Family – 2 (RS-2) and Commercial General (CG) to PUD. A 2.58-acre outparcel located at the northeastern corner of the property is to retain CG zoning for future commercial development. A concurrent Future Land Use Map Amendment (FLUMA) application is being reviewed. The project is located at 6209 S US Highway 1 in Ft. Pierce and currently consists of three (3) vacant parcels (Parcel IDs 3410-702-0055-000-3, 3410-702- 0054-000-6, & 3410-701-0001-000-7) that collectively measure 18.87-acres. Findings An Environmental Impact Report prepared by Aquatic Research Monitoring, Equipment & Deployment, LLC, dated April 1st, 2022, was provided and reviewed. The site was historically utilized for citrus growing operations until at least 2006 according to available aerials, and has since been abandoned. Neither native upland habitat nor wetlands were determined to be present. The majority of the site is dominated by Brazilian pepper, but does contain scattered mature laurel & live oaks, and cabbage palms. One potentially occupied gopher tortoise burrow was found onsite, but no other state listed species were determined to be present. A 100% gopher tortoise survey per FWC guidelines and a gopher tortoise relocation permit (if applicable) will be required as a condition of approval. A landscape plan prepared by Cotleur & Hearing dated June 9th, 2022, was reviewed, and found to be consistent with the land development code (LDC). An eight (8) ft. tall opaque fence with landscaping in excess of code requirements surrounds the northern, southern, and western perimeters of the proposed development, effectively buffering existing residences to the west and a parcel zoned residential to the north, consistent with LDC 7.09.04.E. The proposed lake’s littoral and upland buffer areas and associated plantings comply with LDC 3.01.03.EE.2.p.4. Additionally, 35% of the PUD’s total acreage is designated as open space, consistent with requirements outlined in LDC 7.01.03.I. The proposed project will impact a total of fifty-seven (57) cabbage palms and 1,290 inches diameter at breast height (DBH) of native canopy trees meeting minimum mitigation size thresholds outlined in LDC 6.00.05.D, resulting in a total of 2,580 Page 363 of 494 inches of canopy trees and fifty-seven (57) palms requiring mitigation. Mitigation for these impacts has been provided via the onsite relocation of the fifty-seven (57) palms and the onsite planting of 970” of canopy trees, which are additional to the minimum canopy tree requirements utilized towards landscaping in accordance with LDC 7.09.04. The remaining 1,610 inches of trees is to be mitigated via a fee-in-lieu of $322,000.00, which is calculated at the $200.00 per inch rate as outlined in LDC 6.00.05.D.3.a.4. Recommendation ERD has no objection to the proposed Planned Unit Development Rezoning/Preliminary Plan. Please contact Brian Arbeiter at 772-462-2866 if you have any questions. Page 364 of 494 TRAFFIC IMPACT ANALYSIS Tidewater (f.k.a. Equibebe) St. Lucie County, FL Prepared for: Meritage Homes of Florida, Inc. 17851 North 85th Street, Suite 300 Scottsdale, AZ 85225 Prepared by: 1172 SW 30th Street, Suite 500 Palm City, FL 34990 (772) 286-8030 220002 November 2021 Revised March 2022 © MacKenzie Engineering and Planning, Inc. CA 29013 Shaun G. MacKenzie P.E. Florida License # 61751 THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY SHAUN G. MACKENZIE, P.E. ON THE DATE ADJACENT TO THE SEAL. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. MACKENZIE ENGINEERING AND PLANNING, INC.1172 SW30THSTREET, SUITE 500PALM CITY, FL34990CERTIFICATE OF AUTHORIZATION 29013SHAUN G. MACKENZIE, P.E.NO. 61751 Digitally signed by Shaun MacKenzie Date: 2022.04.15 13:33:18 -04'00' Page 365 of 494 220002 Page i EXECUTIVE SUMMARY MacKenzie Engineering and Planning, Inc. performed an analysis of the traffic impacts resulting from the proposed project located on US 1 north of Easy Street, St. Lucie County, FL (PCN: 3401-701-0001- 000-7; 3410-702-0054-000-6; & 3410-702-0055-000-3). The applicant proposes 160 multifamily dwelling units. The proposed project is expected to generate the following net new external and cumulative driveway trips: • 1,101 daily, 72 AM peak hour (17 in/55 out), and 89 PM peak hour (56 in/33 out) trips. The analysis shows that the roadways are projected to operate acceptably with the addition of the proposed development and the project meets Saint Lucie County’s concurrency requirements. No turn lanes are required or recommended. Page 366 of 494 220002 Page ii TABLE OF CONTENTS EXECUTIVE SUMMARY .......................................................................................................... i TABLE OF CONTENTS ............................................................................................................ ii LIST OF TABLES ..................................................................................................................... iii LIST OF FIGURES ................................................................................................................... iii INTRODUCTION ...................................................................................................................... 1 INVENTORY AND PLANNING DATA.................................................................................... 2 PROJECT TRAFFIC .................................................................................................................. 2 Traffic Generation....................................................................................................................... 2 Internal Capture .......................................................................................................................... 2 Pass-by Trip Capture ................................................................................................................... 2 TRAFFIC DISTRIBUTION ........................................................................................................ 3 TRAFFIC ASSIGNMENT .......................................................................................................... 4 ASSURED AND PROGRAMMED IMPROVEMENTS ............................................................. 5 STUDY AREA ........................................................................................................................... 5 ANALYSIS ................................................................................................................................ 6 Growth Rate ............................................................................................................................... 6 Roadway Analysis ...................................................................................................................... 7 Roadway Capacity .............................................................................................................. 7 Volume Development Analysis ........................................................................................... 7 Intersection Analysis ................................................................................................................... 8 US 1 & Sunshine Boulevard ................................................................................................ 8 US 1 & Easy Street ............................................................................................................. 8 DRIVEWAYS ............................................................................................................................ 9 CONCLUSION ........................................................................................................................ 11 APPENDICES .......................................................................................................................... 12 Page 367 of 494 220002 Page iii LIST OF TABLES Table 1. Trip Generation ............................................................................................................ 3 Table 2. Growth Rate Calculation .............................................................................................. 6 Table 3. PM Peak Hour Roadway Significant Analysis............................................................... 7 Table 4. US 1 & Sunshine Boulevard 95th Percentile Queue ...................................................... 8 Table 5. US 1 & Easy Street Southbound Left-Turn Queue ........................................................ 8 LIST OF FIGURES Figure 1. Site Location Map ....................................................................................................... 1 Figure 2. Traffic Assignment...................................................................................................... 4 Figure 3. Map of the Study Area ................................................................................................ 5 Figure 4. Proposed Driveway Volumes .................................................................................... 10 Page 368 of 494 220002 Page 1 INTRODUCTION MacKenzie Engineering and Planning, Inc. performed an analysis of the traffic impacts resulting from the proposed project located on US 1 north of Easy Street, St. Lucie County, FL (PCN: 3401-701-0001- 000-7; 3410-702-0054-000-6; & 3410-702-0055-000-3). The applicant proposes 160 multifamily dwelling units. The site is proposed for a buildout of 2025. Figure 1 illustrates the site location. Figure 1. Site Location Map Project Site Sunshine Blvd. Easy St. Easy St. US 1 US 1 Page 369 of 494 220002 Page 2 INVENTORY AND PLANNING DATA Data was acquired relative to the most current information available from the following sources: • Saint Lucie County’s Comprehensive Plan • Florida Department of Transportation Peak Season Correction Factor • FDOT’s Q/LOS Manual • Trip Generation, 11th Edition, an ITE Manual • Mackenzie Engineering & Planning, Inc. Count Data Coulter & Hearing, Inc. provided site information. PROJECT TRAFFIC Traffic Generation The study uses trip generation rates for Multifamily Dwelling Units (Low-Rise) (ITE Land Use 220) published in the Institute of Transportation Engineers’ (ITE) report, Trip Generation (11th Edition). Table 1 presents the project’s trip generation. The proposed project is expected to generate the following net external and cumulative driveway trips: • 1,101 daily, 72 AM peak hour (17 in/55 out), and 89 PM peak hour (56 in/33 out) trips. Internal Capture The site contains no internal capture. Pass-by Trip Capture The pass-by trip capture rate is 0. Page 370 of 494 220002 Page 3 Table 1. Trip Generation TRAFFIC DISTRIBUTION Traffic distribution and assignment was determined using engineering judgment, trip lengths based on the uses and from a review of the roadway network. The overall distribution is summarized by general directions and is depicted below: NORTH - 40 percent SOUTH - 50 percent WEST - 10 percent Land Use Intensity Daily AM Peak Hour PM Peak Hour Trips Total In Out Total In Out Proposed Site Traffic 160 DU 1,101 72 17 55 89 56 33 1,101 72 17 55 89 56 33 1,101 72 17 55 89 56 33 Note: Trip generation was calculated using the following data: Pass-by PM Peak Hour Land Use ITE Code Unit Daily Rate Rate in/out in/out Equation 220 DU 0%24/76 63/37 Copyright © 2021, MacKenzie Engineering and Planning, Inc. NET CHANGE IN DRIVEWAY VOLUMES AM Peak Hour Rate Multi-family Housing (Low-rise)T = 6.41(X) + 75.31 T = 0.31(X) + 22.85 T = 0.43(X) + 20.55 Multi-family Housing (Low-rise) NET CHANGE IN TRIPS (FOR THE PURPOSES OF CONCURRENCY) Page 371 of 494 220002 Page 4 TRAFFIC ASSIGNMENT The distributed net proposed trips for the project were assigned to the roadway network within the radius of influence. The project assignment is illustrated in Figure 2. Figure 2. Traffic Assignment Project Site Easy St. 100% 1 50% 45% 50% 35% 10% 100% 1 50%/50% LEGEND: NORTH SOUTH BOTH 50% 50% 50% Kitterman Road Page 372 of 494 220002 Page 5 ASSURED AND PROGRAMMED IMPROVEMENTS Improvements contained with the 5-year capital improvement project of the local government, or FDOT's 5-year work program are considered in place for the purposes of traffic concurrency analysis. FDOT's 5-year program shows the following roadway improvements within the study area: • On-Going – Widen Midway Road to 4-Lanes from 25th Street to US 1 STUDY AREA The study area is 2 miles based on Section 11.02.09.4 (b) of St. Lucie County Code. Figure 3. Map of the Study Area 2 miles Page 373 of 494 220002 Page 6 ANALYSIS Growth Rate In order to provide an accurate traffic analysis, the growth rate at each intersection was determined by a volume weighted averaging of the growth on each leg of the intersection as shown in Table 2. The historic annual growth rate on the surrounding facilities between 2015 and 2019 is -0.4%. A conservative growth rate of 2.0% was used for this analysis. Table 2. Growth Rate Calculation Station Description 2015 2016 2017 2018 2019 945156 US1 (Midway to Easy St.)31,500 34,000 34,500 31,000 31,000 -400 -1.3% 940266 US1 (S. of Easy St.)33,000 34,500 33,500 32,000 35,000 150 0.4% 947005 Easy St. (E. of US 1)5,100 5,300 5,500 5,600 4,900 -10 -0.2% -0.4% 2.0%Growth Rate Used Annaual Absolute Growth Growth Rate Average Daily Traffic Weighted Average Page 374 of 494 220002 Page 7 Roadway Analysis Roadway Capacity Roadway classification follows the St. Lucie County Comprehensive Plan outlining the roadway functional classification. The St. Lucie County Transportation Element outlines the minimum Level of Service (LOS) for each roadway functional classification. Roadway Capacity is based on St. Lucie county’s minimum LOS and Table 7 from FDOT’s 2020 Quality/LOS Handbook. Volume Development Analysis The 2021 peak hour traffic volumes were increased based St. Lucie County’s peak season correction factors and the annual compound growth rate to develop the projected year 2025 pre-development growth traffic volumes. Project traffic volumes on each road segment were developed based on the project's trip generation times the project assignment as shown in Table 3. Table 3 identifies the project impact on each road segment. Pre-development traffic volumes were developed by adding the existing traffic volumes and traffic growth trips. The post development 2025 traffic volumes were developed by adding pre-development traffic volume plus project traffic. The post development 2025 traffic volumes were compared to the service volumes for each respective roadway segment to determine if the road is projected to operate acceptably as shown in Table 4. Table 3. PM Peak Hour Roadway Significant Analysis Table 4. Post-development 2025 PM Peak Hour Roadway Analysis All roadways within the study area are expected to operate acceptably as shown in Table 4. Roadway From To E + C Lanes Capacity Assign Peak Hour Peak Direction Impact Significant Impact? (Y/N) US 1 Weatherbee Midway 4 2,000 35%20 0.98%NO US 1 Midway Sunshine 6 3,020 50%28 0.93%NO US 1 Sunshine PROJECT SITE 6 3,020 100%56 1.85%YES US 1 PROJECT SITE Easy Street 6 3,020 100%56 1.85%YES US 1 Easy Street Kitterman 6 3,020 50%28 0.93%NO US 1 Kitterman Prima Vista 6 3,020 45%25 0.83%NO Midway 25th Street US 1 4 2,000 10%6 0.28%NO Roadway From To Direction Lanes 2021 Volumes PSCF Growth Rate 2025 Pre Development Assignment (in/out) Project Traffic 2025 Post Development Roadway Capacity Accept able? US 1 Sunshine PROJECT SITE North 6 1,404 1.06 2.00%1,611 50%/50%45 1,656 3,020 YES US 1 Sunshine PROJECT SITE South 6 1,711 1.06 2.00%1,963 100%56 2,019 3,020 YES US 1 PROJECT SITE Easy Street North 6 1,404 1.06 2.00%1,611 50%/50%45 1,656 3,020 YES US 1 PROJECT SITE Easy Street South 6 1,711 1.06 2.00%1,963 100%33 1,996 3,020 YES Page 375 of 494 220002 Page 8 Intersection Analysis The intersections within the study area were evaluated in 2025 post development (pre-development traffic plus project) traffic conditions. This study analyzes the impacts to the following intersections for the AM and PM peak hours: • US 1 & Sunshine Boulevard • US 1 & Easy Street Data from the existing facilities within the study area were collected based on aerial photography and site observations. US 1 & Sunshine Boulevard MEP evaluated the existing turn lanes at the US 1 & Sunshine Boulevard intersection using HCS 7 software. With project traffic, all turn lanes are expected to operate acceptably in 2025 with the proposed development. Table 4 shows the 95th percentile queue for each approach. Table 4. US 1 & Sunshine Boulevard 95th Percentile Queue Approach AM 95th Queue PM 95th Queue Existing Storage (veh) Acceptable NBL 1 3 9 YES US 1 & Easy Street MEP evaluated the US 1 & Street intersection. With project traffic, the intersection is projected to be under capacity with all movements operating under capacity (v/c ratio less than 1.0). Table 5 evaluates the southbound left-turn movement queue because that is the only turn lane affect by project traffic. As shown is Table 5, existing southbound left-turn storage is acceptable. Table 5. US 1 & Easy Street Southbound Left-Turn Queue Approach AM 95th Queue PM 95th Queue Existing Storage (veh) Acceptable SBL 3 2 9 YES Page 376 of 494 220002 Page 9 DRIVEWAYS The project site has the following proposed access at US 1: • DW 1 - Right-in/Right-out The projected peak hour inbound right-turn volume is 56 vehicles. FDOT's standard for requiring a right-turn lane is 80-125 vehicles per hour. Therefore a right-turn lane is not recommended. Figure 4 illustrates the proposed driveway. Page 377 of 494 220002 Page 10 Figure 4. Proposed Driveway Volumes (in) 50% Sunshine Blvd 50%50% (in)(out) (in) 100% (56) 17 FI G U R E 2 0%0 0 (out)100%(33)55 50% 0 (in/out) 0 0% In Out In Out 17 55 56 33 US 1 (out)(out) 50%50% 0% Easy Street 50% (in) Total daily driveway trips PM peak hour driveway trips AM peak hour directional driveway trips Tidewater 1,101 (89) PROPOSED DRIVEWAY TRAFFIC 72 1,101 72 89 Daily AM Peak Hour PM Peak Hour Total Total PROJECT DRIVEWAY TRIPS DW 1 1,101 (89) 72Project Site Page 378 of 494 220002 Page 11 CONCLUSION MacKenzie Engineering and Planning, Inc. performed an analysis of the traffic impacts resulting from the proposed project located on US 1 north of Easy Street, St. Lucie County, FL (PCN: 3401-701-0001- 000-7; 3410-702-0054-000-6; & 3410-702-0055-000-3). The applicant proposes 160 multifamily dwelling units. The proposed project is expected to generate the following net new external and cumulative driveway trips: • 1,101 daily, 72 AM peak hour (17 in/55 out), and 89 PM peak hour (56 in/33 out) trips. The analysis shows that the roadways are projected to operate acceptably with the addition of the proposed development and the project meets Saint Lucie County’s concurrency requirements. No turn lanes are required or recommended. Page 379 of 494 APPENDICES Exhibit 1. Trip Generation Exhibit 2. Intersection Volume Development Worksheets Exhibit 3. HCS 7 – Intersection Analysis and Queuing Analysis 1. US 1 & Sunshine Boulevard 2. US 1 & Driveway 1 3. US 1 & Easy Street A. FDOT Peak Season Correction Factors B. Institute of Transportation Engineers’ (ITE) report, Trip Generation (11th Edition) a. Multifamily Dwelling Units (Low-Rise) (ITE Land Use 220) C. Signal Timing a. US 1 & Easy Street D. Site Plan E. Site Survey Page 380 of 494 Eguibebe Land Use Intensity Daily AM Peak Hour PM Peak Hour Trips Total In Out Total In Out Proposed Site Traffic 160 DU 1,101 72 17 55 89 56 33 1,101 72 17 55 89 56 33 1,101 72 17 55 89 56 33 Note: Trip generation was calculated using the following data: Pass-by PM Peak Hour Land Use ITE Code Unit Daily Rate Rate in/out in/out Equation 220 DU 0%24/76 63/37 Copyright © 2021, MacKenzie Engineering and Planning, Inc. Exhibit 1 Multi-family Housing (Low-rise) NET CHANGE IN TRIPS (FOR THE PURPOSES OF CONCURRENCY) NET CHANGE IN DRIVEWAY VOLUMES AM Peak Hour Rate Multi-family Housing (Low-rise)T = 6.41(X) + 75.31 T = 0.31(X) + 22.85 T = 0.43(X) + 20.55 Page 381 of 494 AM PEAK HOUR TURNING MOVEMENTS & ebu ebl ebt ebr wbu wbl wbt wbr nbu nbl nbt nbr sbu sbl sbt sbr totals 7:00 AM 7:15 AM 0 0 0 0 0 0 0 12 0 6 269 0 0 1 199 2 747 7:15 AM 7:30 AM 0 0 0 1 0 0 0 4 0 7 351 4 0 0 277 2 909 7:30 AM 7:45 AM 0 0 0 1 0 0 0 9 0 9 508 4 0 1 264 6 1011 7:45 AM 8:00 AM 0 0 0 3 0 0 0 9 0 9 421 5 0 2 317 11 1034 8:00 AM 8:15 AM 0 0 0 7 0 0 0 10 0 5 320 3 0 5 272 7 930 8:15 AM 8:30 AM 0 0 0 4 0 0 0 20 0 11 292 7 0 2 317 8 1024 8:30 AM 8:45 AM 0 0 0 5 0 0 0 4 0 10 284 1 0 7 313 5 963 8:45 AM 9:00 AM 0 0 0 3 0 0 0 9 0 10 275 6 0 8 279 7 959 0 0 0 24 0 0 0 77 0 67 2720 30 0 26 2238 48 7577 7:15 AM 8:15 AM 0 0 0 12 0 0 0 32 0 30 1600 16 0 8 1130 26 3884 Count Taken: 10/7/2021 Buildout year:2025 Growth Rate:2.0% Seasonal Factor:1.06 ebu ebl ebt ebr wbu wbl wbt wbr nbu nbl nbt nbr sbu sbl sbt sbr 10/7/2021 Existing Volumes 0 0 0 12 0 0 0 32 0 30 1600 16 0 8 1130 26 Seasonal Factor 0 0 0 1 0 0 0 2 0 2 96 1 0 0 68 2 Adjusted Volumes 0 0 0 13 0 0 0 34 0 32 1696 17 0 8 1198 28 Growth Rate 2.0% 2.0% 2.0%2.0% 2.0% 2.0%2.0% 2.0% 2.0%2.0% 2.0% 2.0% Growth Volume 0 0 1 0 0 3 3 140 1 1 99 2 2025 Volumes 0 0 14 0 0 37 35 1836 18 9 1297 30 Pre Development Volumes 0 0 0 14 0 0 0 37 0 35 1836 18 0 9 1297 30 Project Traffic 0 0 0 0 0 0 0 0 9 0 28 0 0 0 9 0 Post Development Volumes 0 0 14 0 0 37 44 1864 18 9 1306 30 Out In 0.0% 0.0% 0.0%0.0% 0.0% 0.0%0.0% 50.0% 0.0%0.0% 50.0% 0.0% EXHIBIT 2 Eguibebe US Hwy 1 Sunshine Blvd Peak Hour Traffic Volume Project Traffic Assignment Page 382 of 494 PM PEAK HOUR TURNING MOVEMENTS & ebu ebl ebt ebr wbu wbl wbt wbr nbu nbl nbt nbr sbu sbl sbt sbr totals 4:00 PM 4:15 PM 0 0 0 19 0 0 0 15 0 6 319 10 0 8 370 6 1032 4:15 PM 4:30 PM 0 0 0 8 0 0 0 13 0 10 290 10 0 8 387 2 1108 4:30 PM 4:45 PM 0 0 0 11 0 0 0 7 0 8 348 12 0 7 372 6 1213 4:45 PM 5:00 PM 0 0 0 4 0 0 0 10 0 9 327 9 0 9 415 5 1167 5:00 PM 5:15 PM 0 0 0 20 0 0 0 14 0 11 360 3 0 6 403 2 1275 5:15 PM 5:30 PM 0 0 0 6 0 0 0 12 0 5 309 3 0 11 480 4 1214 5:30 PM 5:45 PM 0 0 0 11 0 0 0 8 0 10 288 6 0 10 433 5 1188 5:45 PM 6:00 PM 0 0 0 20 0 0 0 6 0 6 291 4 0 9 356 3 1088 0 0 0 99 0 0 0 85 0 65 2532 57 0 68 3216 33 9285 4:30 PM 5:30 PM 0 0 0 41 0 0 0 43 0 33 1344 27 0 33 1670 17 4869 Count Taken:10/7/2021 Buildout year:2025 Growth Rate:2.0% Seasonal Factor:1.06 ebu ebl ebt ebr wbu wbl wbt wbr nbu nbl nbt nbr sbu sbl sbt sbr 10/7/2021 Existing Volumes 0 0 0 41 0 0 0 43 0 33 1344 27 0 33 1670 17 Seasonal Factor 0 0 0 2 0 0 0 3 0 2 81 2 0 2 100 1 Adjusted Volumes 0 0 0 43 0 0 0 46 0 35 1425 29 0 35 1770 18 Growth Rate 2.0% 2.0% 2.0%2.0% 2.0% 2.0%2.0% 2.0% 2.0%2.0% 2.0% 2.0% Growth Volume 0 0 4 0 0 4 3 117 2 3 146 1 2025 Volumes 0 0 47 0 0 50 38 1542 31 38 1916 19 Pre Development Volumes 0 0 0 47 0 0 0 50 0 38 1542 31 0 38 1916 19 Project Traffic 0 0 0 0 0 0 0 0 28 0 17 0 0 0 28 0 Post Development Volumes 0 0 47 0 0 50 66 1559 31 38 1944 19 Out In 0.0% 0.0% 0.0%0.0% 0.0% 0.0%0.0% 50.0% 0.0%0.0% 50.0% 0.0% EXHIBIT 2 Eguibebe US Hwy 1 Sunshine Blvd Peak Hour Traffic Volume Project Traffic Assignment Page 383 of 494 AM PEAK HOUR TURNING MOVEMENTS & Count Taken: 10/7/2021 Buildout year:2025 Growth Rate:2.0% Seasonal Factor:1.06 ebu ebl ebt ebr wbu wbl wbt wbr nbu nbl nbt nbr sbu sbl sbt sbr 10/7/2021 Existing Volumes 0 0 0 0 0 0 0 0 0 0 1646 0 0 0 1142 0 Seasonal Factor 0 0 0 0 0 0 0 0 0 0 99 0 0 0 69 0 Adjusted Volumes 0 0 0 0 0 0 0 0 0 0 1745 0 0 0 1211 0 Growth Rate 2.0% 2.0% 2.0%2.0% 2.0% 2.0%2.0% 2.0% 2.0%2.0% 2.0% 2.0% Growth Volume 0 0 0 0 0 0 0 144 0 0 100 0 2025 Volumes 0 0 0 0 0 0 0 1889 0 0 1311 0 Pre Development Volumes 0 0 0 0 0 0 0 0 0 0 1889 0 0 0 1311 0 Project Traffic 0 0 0 55 0 0 0 0 0 0 37 0 0 0 0 17 Post Development Volumes 0 0 55 0 0 0 0 1926 0 0 1311 17 Out Both In 0.0% 0.0% 100.0%0.0% 0.0% 0.0%0.0%50%/50%0.0%0.0% 0.0% 100.0% Project Traffic Assignment US Hwy 1 DW 1 EXHIBIT 2 Eguibebe Page 384 of 494 PM PEAK HOUR TURNING MOVEMENTS & Count Taken:10/7/2021 Buildout year:2025 Growth Rate:2.0% Seasonal Factor:1.06 ebu ebl ebt ebr wbu wbl wbt wbr nbu nbl nbt nbr sbu sbl sbt sbr 10/7/2021 Existing Volumes 0 0 0 0 0 0 0 0 0 0 1404 0 0 0 1711 0 Seasonal Factor 0 0 0 0 0 0 0 0 0 0 84 0 0 0 103 0 Adjusted Volumes 0 0 0 0 0 0 0 0 0 0 1488 0 0 0 1814 0 Growth Rate 2.0% 2.0% 2.0%2.0% 2.0% 2.0%2.0% 2.0% 2.0%2.0% 2.0% 2.0% Growth Volume 0 0 0 0 0 0 0 188 0 0 229 0 2025 Volumes 0 0 0 0 0 0 0 1676 0 0 2043 0 Pre Development Volumes 0 0 0 0 0 0 0 0 0 0 1676 0 0 0 2043 0 Project Traffic 0 0 0 33 0 0 0 0 0 0 45 0 0 0 0 56 Post Development Volumes 0 0 33 0 0 0 0 1721 0 0 2043 56 Out Both In 0.0% 0.0% 100.0%0.0% 0.0% 0.0%0.0%50%/50%0.0%0.0% 0.0% 100.0% Project Traffic Assignment US Hwy 1 DW 1 EXHIBIT 2 Eguibebe Page 385 of 494 AM PEAK HOUR TURNING MOVEMENTS & ebu ebl ebt ebr wbu wbl wbt wbr nbu nbl nbt nbr sbu sbl sbt sbr totals 7:00 AM 7:15 AM 0 3 1 2 0 70 0 31 2 2 240 9 1 8 190 0 559 7:15 AM 7:30 AM 0 3 0 0 0 49 0 15 1 4 342 10 2 7 269 0 702 7:30 AM 7:45 AM 0 0 0 0 0 87 0 25 1 0 493 7 3 8 254 0 878 7:45 AM 8:00 AM 0 2 0 0 0 41 0 14 3 1 417 25 2 10 308 0 823 8:00 AM 8:15 AM 0 4 0 0 0 58 0 14 2 1 307 21 3 13 263 0 686 8:15 AM 8:30 AM 0 1 0 1 0 30 0 17 0 0 287 14 5 6 310 0 671 8:30 AM 8:45 AM 0 1 0 1 0 39 0 17 0 0 265 5 12 4 302 0 646 8:45 AM 9:00 AM 0 1 0 1 0 31 0 20 0 0 262 0 8 8 266 0 597 0 15 1 5 0 405 0 153 9 8 2613 91 36 64 2162 0 5562 7:15 AM 8:15 AM 0 9 0 0 0 235 0 68 7 6 1559 63 10 38 1094 0 3089 Count Taken: 10/7/2021 Buildout year:2025 Growth Rate:2.0% Seasonal Factor:1.06 ebu ebl ebt ebr wbu wbl wbt wbr nbu nbl nbt nbr sbu sbl sbt sbr 10/7/2021 Existing Volumes 0 9 0 0 0 235 0 68 7 6 1559 63 10 38 1094 0 Seasonal Factor 0 1 0 0 0 14 0 4 0 0 94 4 1 2 66 0 Adjusted Volumes 0 10 0 0 0 249 0 72 7 13 1653 67 11 51 1160 0 Growth Rate 2.0% 2.0% 2.0%2.0% 2.0% 2.0%2.0% 2.0% 2.0%2.0% 2.0% 2.0% Growth Volume 1 0 0 21 0 6 1 136 6 4 96 0 2025 Volumes 11 0 0 270 0 78 14 1789 73 55 1256 0 Pre Development Volumes 0 11 0 0 0 270 0 78 0 14 1789 73 0 55 1256 0 Project Traffic 0 0 0 0 0 0 0 0 0 0 9 0 28 0 28 0 Post Development Volumes 11 0 0 270 0 78 14 1798 73 83 1284 0 In Out 0.0% 0.0% 0.0%0.0% 0.0% 0.0%0.0% 50.0% 0.0%0.0% 50.0% 0.0% EXHIBIT 2 Eguibebe US Hwy 1 Easy Street Peak Hour Traffic Volume Project Traffic Assignment Page 386 of 494 PM PEAK HOUR TURNING MOVEMENTS & ebu ebl ebt ebr wbu wbl wbt wbr nbu nbl nbt nbr sbu sbl sbt sbr totals 4:00 PM 4:15 PM 0 0 0 0 0 32 0 10 4 0 316 47 9 23 357 0 798 4:15 PM 4:30 PM 0 2 0 6 0 22 0 11 5 0 288 58 9 26 360 0 787 4:30 PM 4:45 PM 0 7 1 8 0 23 0 16 10 0 341 64 4 16 363 0 853 4:45 PM 5:00 PM 0 1 0 2 0 35 0 16 4 0 316 58 12 17 390 0 851 5:00 PM 5:15 PM 0 1 0 0 0 23 0 25 9 0 340 70 8 14 401 0 891 5:15 PM 5:30 PM 0 1 0 2 0 37 0 15 3 0 297 52 4 24 458 0 893 5:30 PM 5:45 PM 0 0 0 0 0 31 0 7 6 0 286 66 11 24 409 0 840 5:45 PM 6:00 PM 0 0 0 0 0 34 0 15 3 0 281 62 5 25 346 0 771 0 12 1 18 0 237 0 115 44 0 2465 477 62 169 3084 0 6684 4:30 PM 5:30 PM 0 10 1 12 0 118 0 72 26 0 1294 244 28 71 1612 0 3488 Count Taken:10/7/2021 Buildout year:2025 Growth Rate:2.0% Seasonal Factor:1.06 ebu ebl ebt ebr wbu wbl wbt wbr nbu nbl nbt nbr sbu sbl sbt sbr 10/7/2021 Existing Volumes 0 10 1 12 0 118 0 72 26 0 1294 244 28 71 1612 0 Seasonal Factor 0 1 0 1 0 7 0 4 2 0 78 15 2 4 97 0 Adjusted Volumes 0 11 1 13 0 125 0 76 28 28 1372 259 30 105 1709 0 Growth Rate 2.0% 2.0% 2.0%2.0% 2.0% 2.0%2.0% 2.0% 2.0%2.0% 2.0% 2.0% Growth Volume 1 0 2 16 0 10 4 173 33 13 216 0 2025 Volumes 12 1 15 141 0 86 32 1545 292 118 1925 0 Pre Development Volumes 0 12 1 15 0 141 0 86 0 32 1545 292 0 118 1925 0 Project Traffic 0 0 0 0 0 0 0 0 0 0 28 0 17 0 17 0 Post Development Volumes 12 1 15 141 0 86 32 1573 292 135 1942 0 In Out 0.0% 0.0% 0.0%0.0% 0.0% 0.0%0.0% 50.0% 0.0%0.0% 50.0% 0.0% EXHIBIT 2 Eguibebe US Hwy 1 Easy Street Peak Hour Traffic Volume Project Traffic Assignment Page 387 of 494 1164 1632 1720 1387 Sunshine Blvd 56 32 Sunshine Blvd50 43 12 24 41 60 1142 1646 1711 1404 US 1 US 1 1142 1646 1711 1404 DW 1 0 0 DW 1 0 0 0 0 0 0 1142 1646 1711 1404 1142 1646 1711 1404 Easy St.6 303 Easy St.0 190 9 101 23 316 1336 1635 1768 1564 AM 2021 Existing Volumes PM 2021 Existing Volumes EGUIBEBE EXHIBIT 2 Page 388 of 494 HCS7 Two-Way Stop-Control Report General Information Site Information Analyst MEP Intersection US 1 & Sunshine Blvd Agency/Co.Jurisdiction St. Lucie County Date Performed 10/08/2021 East/West Street Sunshine Blvd Analysis Year 2025 North/South Street US 1 Time Analyzed 2025 AM Post-Development Peak Hour Factor 0.95 Intersection Orientation North-South Analysis Time Period (hrs)0.25 Project Description Eguibebe Lanes Major Street: North-South Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 10 11 12 7 8 9 1U 1 2 3 4U 4 5 6 Number of Lanes 0 0 1 0 0 1 0 1 3 1 0 1 3 0 Configuration R R L T R L T TR Volume (veh/h)14 37 0 44 1864 18 0 9 1306 30 Percent Heavy Vehicles (%)2 2 2 2 2 2 Proportion Time Blocked Percent Grade (%)0 0 Right Turn Channelized No No No Median Type | Storage Left Only 1 Critical and Follow-up Headways Base Critical Headway (sec)7.1 7.1 5.3 5.3 Critical Headway (sec)7.14 7.14 5.34 5.34 Base Follow-Up Headway (sec)3.9 3.9 3.1 3.1 Follow-Up Headway (sec)3.92 3.92 3.12 3.12 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)15 39 46 9 Capacity, c (veh/h)326 214 248 128 v/c Ratio 0.05 0.18 0.19 0.07 95% Queue Length, Q₉₅ (veh)0.1 0.6 0.7 0.2 Control Delay (s/veh)16.6 25.6 22.8 35.4 Level of Service (LOS)C D C E Approach Delay (s/veh)16.6 25.6 0.5 0.2 Approach LOS C D Copyright © 2021 University of Florida. All Rights Reserved. HCS™ TWSC Version 7.9 Generated: 11/11/2021 1:47:19 PM Sunshine AM Post.xtw Page 389 of 494 HCS7 Two-Way Stop-Control Report General Information Site Information Analyst MEP Intersection US 1 & Sunshine Blvd Agency/Co.Jurisdiction St. Lucie County Date Performed 10/08/2021 East/West Street Sunshine Blvd Analysis Year 2025 North/South Street US 1 Time Analyzed 2025 PM Post-Development Peak Hour Factor 0.95 Intersection Orientation North-South Analysis Time Period (hrs)0.25 Project Description Eguibebe Lanes Major Street: North-South Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 10 11 12 7 8 9 1U 1 2 3 4U 4 5 6 Number of Lanes 0 0 1 0 0 1 0 1 3 1 0 1 3 0 Configuration R R L T R L T TR Volume (veh/h)47 50 0 66 1559 31 0 38 1944 19 Percent Heavy Vehicles (%)2 2 2 2 2 2 Proportion Time Blocked Percent Grade (%)0 0 Right Turn Channelized No No No Median Type | Storage Left Only 1 Critical and Follow-up Headways Base Critical Headway (sec)7.1 7.1 5.3 5.3 Critical Headway (sec)7.14 7.14 5.34 5.34 Base Follow-Up Headway (sec)3.9 3.9 3.1 3.1 Follow-Up Headway (sec)3.92 3.92 3.12 3.12 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)49 53 69 40 Capacity, c (veh/h)197 273 116 183 v/c Ratio 0.25 0.19 0.60 0.22 95% Queue Length, Q₉₅ (veh)1.0 0.7 3.0 0.8 Control Delay (s/veh)29.3 21.3 74.6 30.2 Level of Service (LOS)D C F D Approach Delay (s/veh)29.3 21.3 3.0 0.6 Approach LOS D C Copyright © 2021 University of Florida. All Rights Reserved.HCS™TWSC Version 7.8 Generated: 10/12/2021 3:02:06 PMSunshine PM Post.xtw Page 390 of 494 HCS7 Two-Way Stop-Control Report General Information Site Information Analyst MEP Intersection US 1 & DW 1 Agency/Co.Jurisdiction St. Lucie County Date Performed 10/08/2021 East/West Street DW 1 Analysis Year 2025 North/South Street US 1 Time Analyzed 2025 AM Post-Development Peak Hour Factor 0.95 Intersection Orientation North-South Analysis Time Period (hrs)0.25 Project Description Eguibebe Lanes Major Street: North-South Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 10 11 12 7 8 9 1U 1 2 3 4U 4 5 6 Number of Lanes 0 0 1 0 0 0 0 0 3 0 0 0 3 1 Configuration R T T R Volume (veh/h)55 1926 1311 17 Percent Heavy Vehicles (%)2 Proportion Time Blocked Percent Grade (%)0 Right Turn Channelized No No Median Type | Storage Left Only 1 Critical and Follow-up Headways Base Critical Headway (sec)7.1 Critical Headway (sec)7.14 Base Follow-Up Headway (sec)3.9 Follow-Up Headway (sec)3.92 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)58 Capacity, c (veh/h)332 v/c Ratio 0.17 95% Queue Length, Q₉₅ (veh)0.6 Control Delay (s/veh)18.1 Level of Service (LOS)C Approach Delay (s/veh)18.1 Approach LOS C Copyright © 2021 University of Florida. All Rights Reserved.HCS™TWSC Version 7.8 Generated: 10/12/2021 2:59:53 PMDW 1 AM Post.xtw Page 391 of 494 HCS7 Two-Way Stop-Control Report General Information Site Information Analyst MEP Intersection US 1 & DW 1 Agency/Co.Jurisdiction St. Lucie County Date Performed 10/08/2021 East/West Street DW 1 Analysis Year 2025 North/South Street US 1 Time Analyzed 2025 PM Post-Development Peak Hour Factor 0.95 Intersection Orientation North-South Analysis Time Period (hrs)0.25 Project Description Eguibebe Lanes Major Street: North-South Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 10 11 12 7 8 9 1U 1 2 3 4U 4 5 6 Number of Lanes 0 0 1 0 0 0 0 0 3 0 0 0 3 1 Configuration R T T R Volume (veh/h)33 1721 2043 56 Percent Heavy Vehicles (%)2 Proportion Time Blocked Percent Grade (%)0 Right Turn Channelized No No Median Type | Storage Left Only 1 Critical and Follow-up Headways Base Critical Headway (sec)7.1 Critical Headway (sec)7.14 Base Follow-Up Headway (sec)3.9 Follow-Up Headway (sec)3.92 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)35 Capacity, c (veh/h)185 v/c Ratio 0.19 95% Queue Length, Q₉₅ (veh)0.7 Control Delay (s/veh)28.9 Level of Service (LOS)D Approach Delay (s/veh)28.9 Approach LOS D Copyright © 2021 University of Florida. All Rights Reserved.HCS™TWSC Version 7.8 Generated: 10/12/2021 2:58:23 PMDW 1 PM Post.xtw Page 392 of 494 HCS7 Signalized Intersection Input Data General Information Intersection Information Agency Duration, h 0.25 Analyst Analysis Date Oct 7, 2021 Area Type Other Jurisdiction Time Period PHF 0.88 Urban Street Eguibebe -Tidewater Analysis Year 2025 Analysis Period 1> 7:00 Intersection US 1 & Easy Street File Name Easy Street AM Post.xus Project Description 2025 AM Post Development Demand Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 11 0 0 270 0 78 14 1798 73 83 1284 0 Signal Information Green Yellow Red 2.4 2.5 95.5 28.2 0.0 0.0 4.8 0.0 4.8 4.8 0.0 0.0 2.0 0.0 2.0 3.0 0.0 0.0 1 2 3 4 5 6 7 8 Cycle, s 150.0 Reference Phase 2 Offset, s 0 Reference Point End Uncoordinated No Simult. Gap E/W On Force Mode Fixed Simult. Gap N/S On Traffic Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand (v), veh/h 11 0 0 270 0 78 14 1798 73 83 1284 0 Initial Queue (Qb), veh/h 0 0 0 0 0 0 0 0 0 0 0 0 Base Saturation Flow Rate (so), veh/h 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Parking (Nm), man/h None None None None Heavy Vehicles (PHV), %2 2 2 2 2 2 2 2 Ped / Bike / RTOR, /h 0 0 0 0 0 0 0 0 0 0 Buses (Nb), buses/h 0 0 0 0 0 0 0 0 0 0 0 0 Arrival Type (AT)3 3 3 3 3 3 3 3 3 3 3 3 Upstream Filtering (I)1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Width (W), ft 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Turn Bay Length, ft 0 0 0 0 0 0 0 0 Grade (Pg), %0 0 0 0 Speed Limit, mi/h 45 45 45 45 45 45 45 45 45 45 45 45 Phase Information EBL EBT WBL WBT NBL NBT SBL SBT Maximum Green (Gmax) or Phase Split, s 36.0 36.0 20.0 94.0 20.0 94.0 Yellow Change Interval (Y), s 4.8 4.8 4.8 4.8 4.8 4.8 Red Clearance Interval ( Rc), s 3.0 3.0 2.0 2.0 2.0 2.0 Minimum Green ( Gmin), s 5 5 5 5 5 5 Start-Up Lost Time ( lt), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of Effective Green (e), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Passage (PT), s 2.0 2.0 2.0 2.0 2.0 2.0 Recall Mode Off Off Off Min Off Min Dual Entry Yes Yes No Yes No Yes Walk (Walk), s 0.0 0.0 0.0 0.0 Pedestrian Clearance Time (PC), s 0.0 0.0 0.0 0.0 Multimodal Information EB WB NB SB 85th % Speed / Rest in Walk / Corner Radius 0 No 25 0 No 25 0 No 25 0 No 25 Walkway / Crosswalk Width / Length, ft 9.0 12 0 9.0 12 0 9.0 12 0 9.0 12 0 Street Width / Island / Curb 0 0 No 0 0 No 0 0 No 0 0 No Width Outside / Bike Lane / Shoulder, ft 12 5.0 2.0 12 5.0 2.0 12 5.0 2.0 12 5.0 2.0 Pedestrian Signal / Occupied Parking No 0.50 No 0.50 No 0.50 No 0.50 Copyright © 2022 University of Florida, All Rights Reserved.HCS™ Streets Version 7.8 Generated: 3/22/2022 5:02:28 PM Page 393 of 494 HCS7 Signalized Intersection Results Summary General Information Intersection Information Agency Duration, h 0.25 Analyst Analysis Date Oct 7, 2021 Area Type Other Jurisdiction Time Period PHF 0.88 Urban Street Eguibebe -Tidewater Analysis Year 2025 Analysis Period 1> 7:00 Intersection US 1 & Easy Street File Name Easy Street AM Post.xus Project Description 2025 AM Post Development Demand Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 11 0 0 270 0 78 14 1798 73 83 1284 0 Signal Information Green Yellow Red 2.4 2.5 95.5 28.2 0.0 0.0 4.8 0.0 4.8 4.8 0.0 0.0 2.0 0.0 2.0 3.0 0.0 0.0 1 2 3 4 5 6 7 8 Cycle, s 150.0 Reference Phase 2 Offset, s 0 Reference Point End Uncoordinated No Simult. Gap E/W On Force Mode Fixed Simult. Gap N/S On Timer Results EBL EBT WBL WBT NBL NBT SBL SBT Assigned Phase 4 8 5 2 1 6 Case Number 8.0 6.0 1.1 3.0 1.1 4.0 Phase Duration, s 36.0 36.0 9.2 102.3 11.7 104.8 Change Period, ( Y+R c ), s 7.8 7.8 6.8 6.8 6.8 6.8 Max Allow Headway ( MAH ), s 3.0 3.0 3.0 0.0 3.0 0.0 Queue Clearance Time ( g s ), s 10.5 30.2 2.5 4.8 Green Extension Time ( g e ), s 0.7 0.0 0.0 0.0 0.1 0.0 Phase Call Probability 1.00 1.00 0.48 0.98 Max Out Probability 0.00 1.00 0.00 0.00 Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Assigned Movement 7 4 14 3 8 18 5 2 12 1 6 16 Adjusted Flow Rate ( v ), veh/h 13 307 89 16 2043 83 94 1459 0 Adjusted Saturation Flow Rate ( s ), veh/h/ln 974 1781 1585 1781 1698 1585 1781 1870 0 Queue Service Time ( g s ), s 1.2 19.7 7.2 0.5 36.5 3.0 2.8 18.3 0.0 Cycle Queue Clearance Time ( g c ), s 8.5 28.2 7.2 0.5 36.5 3.0 2.8 18.3 0.0 Green Ratio ( g/C )0.19 0.19 0.19 0.65 0.64 0.64 0.67 0.65 Capacity ( c ), veh/h 231 282 298 265 3244 1009 187 3665 Volume-to-Capacity Ratio ( X )0.054 1.086 0.297 0.060 0.630 0.082 0.503 0.398 0.000 Back of Queue ( Q ), ft/ln ( 95 th percentile)18.7 627.3 130.6 8.1 494.4 48.4 54 297.4 0 Back of Queue ( Q ), veh/ln ( 95 th percentile)0.7 24.7 5.1 0.3 19.5 1.9 2.1 11.7 0.0 Queue Storage Ratio ( RQ ) ( 95 th percentile)0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Uniform Delay ( d 1 ), s/veh 56.0 66.8 52.4 10.2 16.5 10.4 16.8 12.2 Incremental Delay ( d 2 ), s/veh 0.0 78.5 0.2 0.0 0.9 0.2 0.8 0.3 0.0 Initial Queue Delay ( d 3 ), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay ( d ), s/veh 56.1 145.3 52.6 10.3 17.5 10.6 17.6 12.5 Level of Service (LOS)E F D B B B B B Approach Delay, s/veh / LOS 56.1 E 124.5 F 17.2 B 12.8 B Intersection Delay, s/veh / LOS 26.0 C Multimodal Results EB WB NB SB Pedestrian LOS Score / LOS 2.74 C 2.61 C 1.89 B 1.66 B Bicycle LOS Score / LOS 0.51 A 1.14 A 1.67 B 1.34 A Copyright © 2022 University of Florida, All Rights Reserved.HCS™ Streets Version 7.8 Generated: 3/22/2022 5:02:28 PM Page 394 of 494 HCS7 Signalized Intersection Intermediate Values General Information Intersection Information Agency Duration, h 0.25 Analyst Analysis Date Oct 7, 2021 Area Type Other Jurisdiction Time Period PHF 0.88 Urban Street Eguibebe -Tidewater Analysis Year 2025 Analysis Period 1> 7:00 Intersection US 1 & Easy Street File Name Easy Street AM Post.xus Project Description 2025 AM Post Development Demand Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 11 0 0 270 0 78 14 1798 73 83 1284 0 Signal Information Green Yellow Red 2.4 2.5 95.5 28.2 0.0 0.0 4.8 0.0 4.8 4.8 0.0 0.0 2.0 0.0 2.0 3.0 0.0 0.0 1 2 3 4 5 6 7 8 Cycle, s 150.0 Reference Phase 2 Offset, s 0 Reference Point End Uncoordinated No Simult. Gap E/W On Force Mode Fixed Simult. Gap N/S On Saturation Flow / Delay L T R L T R L T R L T R Lane Width Adjustment Factor (fw)1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Heavy Vehicles and Grade Factor (fHVg)1.000 0.984 1.000 0.984 0.984 1.000 0.984 0.984 0.984 0.984 0.984 1.000 Parking Activity Adjustment Factor (fp)1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Bus Blockage Adjustment Factor (fbb)1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Area Type Adjustment Factor (fa)1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Lane Utilization Adjustment Factor (fLU)1.000 1.000 1.000 1.000 1.000 1.000 1.000 0.908 1.000 1.000 1.000 1.000 Left-Turn Adjustment Factor (fLT)0.521 0.521 0.952 0.000 0.952 0.000 0.952 0.000 Right-Turn Adjustment Factor (fRT)0.000 0.521 0.847 0.847 0.000 0.847 1.000 1.000 Left-Turn Pedestrian Adjustment Factor (fLpb)1.000 1.000 1.000 1.000 Right-Turn Ped-Bike Adjustment Factor (fRpb)1.000 1.000 1.000 1.000 Work Zone Adjustment Factor (fwz)1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 DDI Factor (fDDI)1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Movement Saturation Flow Rate (s), veh/h 974 0 0 1781 0 1585 1781 5095 1585 1781 5611 0 Proportion of Vehicles Arriving on Green (P)0.19 0.00 0.00 0.19 0.00 0.19 0.02 0.64 0.64 0.03 0.65 0.00 Incremental Delay Factor (k)0.04 0.50 0.04 0.04 0.50 0.50 0.04 0.50 Signal Timing / Movement Groups EBL EBT/R WBL WBT/R NBL NBT/R SBL SBT/R Lost Time (tL)7.8 7.8 6.8 6.8 6.8 6.8 Green Ratio (g/C)0.19 0.19 0.65 0.64 0.67 0.65 Permitted Saturation Flow Rate (sp), veh/h/ln 1329 1781 364 0 206 0 Shared Saturation Flow Rate (ssh), veh/h/ln 0 Permitted Effective Green Time (gp), s 28.2 28.2 95.5 0.0 95.5 0.0 Permitted Service Time (gu), s 21.0 19.7 77.7 0.0 59.0 0.0 Permitted Queue Service Time (gps), s 1.2 19.7 0.8 30.7 Time to First Blockage (gf), s 0.0 0.0 0.0 0.0 0.0 0.0 Queue Service Time Before Blockage (gfs), s 0.0 Protected Right Saturation Flow (sR), veh/h/ln 0 Protected Right Effective Green Time (gR), s 0.0 Multimodal EB WB NB SB Pedestrian Fw / Fv 1.983 0.000 1.852 0.000 1.198 0.000 0.972 0.000 Pedestrian Fs / Fdelay 0.000 0.156 0.000 0.156 0.000 0.092 0.000 0.088 Pedestrian Mcorner / Mcw Bicycle cb / db 376.00 49.45 376.00 49.45 1273.31 9.90 1306.35 9.02 Bicycle Fw / Fv -3.64 0.02 -3.64 0.65 -3.64 1.18 -3.64 0.85 Copyright © 2022 University of Florida, All Rights Reserved.HCS™ Streets Version 7.8 Generated: 3/22/2022 5:02:28 PM Page 395 of 494 HCS7 Signalized Intersection Results Graphical Summary General Information Intersection Information Agency Duration, h 0.25 Analyst Analysis Date Oct 7, 2021 Area Type Other Jurisdiction Time Period PHF 0.88 Urban Street Eguibebe -Tidewater Analysis Year 2025 Analysis Period 1> 7:00 Intersection US 1 & Easy Street File Name Easy Street AM Post.xus Project Description 2025 AM Post Development Demand Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 11 0 0 270 0 78 14 1798 73 83 1284 0 Signal Information Green Yellow Red 2.4 2.5 95.5 28.2 0.0 0.0 4.8 0.0 4.8 4.8 0.0 0.0 2.0 0.0 2.0 3.0 0.0 0.0 1 2 3 4 5 6 7 8 Cycle, s 150.0 Reference Phase 2 Offset, s 0 Reference Point End Uncoordinated No Simult. Gap E/W On Force Mode Fixed Simult. Gap N/S On Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Back of Queue ( Q ), ft/ln ( 95 th percentile)18.7 627.3 130.6 8.1 494.4 48.4 54 297.4 0 Back of Queue ( Q ), veh/ln ( 95 th percentile)0.7 24.7 5.1 0.3 19.5 1.9 2.1 11.7 0.0 Queue Storage Ratio ( RQ ) ( 95 th percentile)0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Control Delay ( d ), s/veh 56.1 145.3 52.6 10.3 17.5 10.6 17.6 12.5 Level of Service (LOS)E F D B B B B B Approach Delay, s/veh / LOS 56.1 E 124.5 F 17.2 B 12.8 B Intersection Delay, s/veh / LOS 26.0 C 56.1 145.3 52.6 10.3 17.5 10.6 17.612.5 0.7 24.7 5.1 0.3 19.5 1.9 2.1 11.7 0 Queue Delay LOS A LOS B LOS C LOS D LOS E LOS F Copyright © 2022 University of Florida, All Rights Reserved.HCS™ Streets Version 7.8 Generated: 3/22/2022 5:02:28 PMPage 396 of 494 HCS7 Signalized Intersection Input Data General Information Intersection Information Agency Duration, h 0.25 Analyst Analysis Date Oct 7, 2021 Area Type Other Jurisdiction Time Period PHF 0.88 Urban Street Eguibebe -Tidewater Analysis Year 2025 Analysis Period 1> 16:00 Intersection US 1 & Easy Street File Name Easy Street PM Post.xus Project Description 2025 PM Post Development Demand Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 12 1 15 141 0 86 32 1573 292 135 1942 0 Signal Information Green Yellow Red 3.0 1.9 53.5 11.0 0.0 0.0 4.8 0.0 4.8 4.0 0.0 0.0 2.0 0.0 2.0 3.0 0.0 0.0 1 2 3 4 5 6 7 8 Cycle, s 90.0 Reference Phase 2 Offset, s 0 Reference Point Begin Uncoordinated No Simult. Gap E/W On Force Mode Fixed Simult. Gap N/S On Traffic Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand (v), veh/h 12 1 15 141 0 86 32 1573 292 135 1942 0 Initial Queue (Qb), veh/h 0 0 0 0 0 0 0 0 0 0 0 0 Base Saturation Flow Rate (so), veh/h 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Parking (Nm), man/h None None None None Heavy Vehicles (PHV), %0 0 0 0 0 0 0 0 Ped / Bike / RTOR, /h 0 0 0 0 0 0 0 0 0 0 0 Buses (Nb), buses/h 0 0 0 0 0 0 0 0 0 0 0 0 Arrival Type (AT)3 3 3 3 3 3 3 3 3 3 3 3 Upstream Filtering (I)1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Width (W), ft 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Turn Bay Length, ft 0 0 0 0 0 0 0 0 Grade (Pg), %0 0 0 0 Speed Limit, mi/h 45 45 45 45 45 45 45 45 45 45 45 45 Phase Information EBL EBT WBL WBT NBL NBT SBL SBT Maximum Green (Gmax) or Phase Split, s 18.0 18.0 15.0 57.0 15.0 57.0 Yellow Change Interval (Y), s 4.0 4.0 4.8 4.8 4.8 4.8 Red Clearance Interval ( Rc), s 3.0 3.0 2.0 2.0 2.0 2.0 Minimum Green ( Gmin), s 5 5 5 5 5 5 Start-Up Lost Time ( lt), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of Effective Green (e), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Passage (PT), s 2.0 2.0 2.0 2.0 2.0 2.0 Recall Mode Off Off Off Off Off Off Dual Entry Yes Yes No Yes No Yes Walk (Walk), s 0.0 0.0 0.0 0.0 Pedestrian Clearance Time (PC), s 0.0 0.0 0.0 0.0 Multimodal Information EB WB NB SB 85th % Speed / Rest in Walk / Corner Radius 0 No 25 0 No 25 0 No 25 0 No 25 Walkway / Crosswalk Width / Length, ft 9.0 12 0 9.0 12 0 9.0 12 0 9.0 12 0 Street Width / Island / Curb 0 0 No 0 0 No 0 0 No 0 0 No Width Outside / Bike Lane / Shoulder, ft 12 5.0 2.0 12 5.0 2.0 12 5.0 2.0 12 5.0 2.0 Pedestrian Signal / Occupied Parking No 0.50 No 0.50 No 0.50 No 0.50 Copyright © 2022 University of Florida, All Rights Reserved.HCS™ Streets Version 7.8 Generated: 3/22/2022 4:51:30 PM Page 397 of 494 HCS7 Signalized Intersection Results Summary General Information Intersection Information Agency Duration, h 0.25 Analyst Analysis Date Oct 7, 2021 Area Type Other Jurisdiction Time Period PHF 0.88 Urban Street Eguibebe -Tidewater Analysis Year 2025 Analysis Period 1> 16:00 Intersection US 1 & Easy Street File Name Easy Street PM Post.xus Project Description 2025 PM Post Development Demand Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 12 1 15 141 0 86 32 1573 292 135 1942 0 Signal Information Green Yellow Red 3.0 1.9 53.5 11.0 0.0 0.0 4.8 0.0 4.8 4.0 0.0 0.0 2.0 0.0 2.0 3.0 0.0 0.0 1 2 3 4 5 6 7 8 Cycle, s 90.0 Reference Phase 2 Offset, s 0 Reference Point Begin Uncoordinated No Simult. Gap E/W On Force Mode Fixed Simult. Gap N/S On Timer Results EBL EBT WBL WBT NBL NBT SBL SBT Assigned Phase 4 8 5 2 1 6 Case Number 8.0 6.0 1.1 3.0 1.1 4.0 Phase Duration, s 18.0 18.0 9.8 60.3 11.7 62.2 Change Period, ( Y+R c ), s 7.0 7.0 6.8 6.8 6.8 6.8 Max Allow Headway ( MAH ), s 3.1 3.1 3.0 0.0 3.0 0.0 Queue Clearance Time ( g s ), s 7.2 13.0 2.7 4.9 Green Extension Time ( g e ), s 0.2 0.0 0.0 0.0 0.1 0.0 Phase Call Probability 1.00 1.00 0.60 0.98 Max Out Probability 0.53 1.00 0.01 0.74 Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Assigned Movement 7 4 14 3 8 18 5 2 12 1 6 16 Adjusted Flow Rate ( v ), veh/h 32 160 98 36 1788 332 153 2207 0 Adjusted Saturation Flow Rate ( s ), veh/h/ln 1193 1417 1610 1810 1725 1610 1810 1900 0 Queue Service Time ( g s ), s 0.1 5.8 5.1 0.7 19.3 9.5 2.9 21.8 0.0 Cycle Queue Clearance Time ( g c ), s 5.2 11.0 5.1 0.7 19.3 9.5 2.9 21.8 0.0 Green Ratio ( g/C )0.12 0.12 0.12 0.63 0.59 0.59 0.65 0.62 Capacity ( c ), veh/h 203 172 197 203 3077 957 281 3510 Volume-to-Capacity Ratio ( X )0.157 0.932 0.497 0.179 0.581 0.347 0.546 0.629 0.000 Back of Queue ( Q ), ft/ln ( 95 th percentile)27.1 241.9 87.7 9.9 257.8 135.1 41.3 300.9 0 Back of Queue ( Q ), veh/ln ( 95 th percentile)1.1 9.7 3.5 0.4 10.3 5.4 1.7 12.0 0.0 Queue Storage Ratio ( RQ ) ( 95 th percentile)0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Uniform Delay ( d 1 ), s/veh 35.4 43.3 36.9 9.7 11.3 9.3 10.9 10.8 Incremental Delay ( d 2 ), s/veh 0.1 48.6 0.7 0.2 0.8 1.0 0.6 0.9 0.0 Initial Queue Delay ( d 3 ), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay ( d ), s/veh 35.5 91.9 37.6 9.9 12.1 10.3 11.5 11.7 Level of Service (LOS)D F D A B B B B Approach Delay, s/veh / LOS 35.5 D 71.3 E 11.8 B 11.7 B Intersection Delay, s/veh / LOS 15.1 B Multimodal Results EB WB NB SB Pedestrian LOS Score / LOS 2.72 C 2.59 C 1.88 B 1.65 B Bicycle LOS Score / LOS 0.54 A 0.91 A 1.67 B 1.79 B Copyright © 2022 University of Florida, All Rights Reserved.HCS™ Streets Version 7.8 Generated: 3/22/2022 4:51:31 PM Page 398 of 494 HCS7 Signalized Intersection Intermediate Values General Information Intersection Information Agency Duration, h 0.25 Analyst Analysis Date Oct 7, 2021 Area Type Other Jurisdiction Time Period PHF 0.88 Urban Street Eguibebe -Tidewater Analysis Year 2025 Analysis Period 1> 16:00 Intersection US 1 & Easy Street File Name Easy Street PM Post.xus Project Description 2025 PM Post Development Demand Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 12 1 15 141 0 86 32 1573 292 135 1942 0 Signal Information Green Yellow Red 3.0 1.9 53.5 11.0 0.0 0.0 4.8 0.0 4.8 4.0 0.0 0.0 2.0 0.0 2.0 3.0 0.0 0.0 1 2 3 4 5 6 7 8 Cycle, s 90.0 Reference Phase 2 Offset, s 0 Reference Point Begin Uncoordinated No Simult. Gap E/W On Force Mode Fixed Simult. Gap N/S On Saturation Flow / Delay L T R L T R L T R L T R Lane Width Adjustment Factor (fw)1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Heavy Vehicles and Grade Factor (fHVg)1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Parking Activity Adjustment Factor (fp)1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Bus Blockage Adjustment Factor (fbb)1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Area Type Adjustment Factor (fa)1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Lane Utilization Adjustment Factor (fLU)1.000 1.000 1.000 1.000 1.000 1.000 1.000 0.908 1.000 1.000 1.000 1.000 Left-Turn Adjustment Factor (fLT)0.682 0.628 0.746 0.000 0.952 0.000 0.952 0.000 Right-Turn Adjustment Factor (fRT)0.000 0.628 0.847 0.847 0.000 0.847 1.000 1.000 Left-Turn Pedestrian Adjustment Factor (fLpb)1.000 1.000 1.000 1.000 Right-Turn Ped-Bike Adjustment Factor (fRpb)1.000 1.000 1.000 1.000 Work Zone Adjustment Factor (fwz)1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 DDI Factor (fDDI)1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Movement Saturation Flow Rate (s), veh/h 511 43 639 1417 0 1610 1810 5176 1610 1810 5700 0 Proportion of Vehicles Arriving on Green (P)0.12 0.12 0.12 0.12 0.00 0.12 0.03 0.59 0.59 0.05 0.62 0.00 Incremental Delay Factor (k)0.04 0.44 0.04 0.04 0.50 0.50 0.04 0.50 Signal Timing / Movement Groups EBL EBT/R WBL WBT/R NBL NBT/R SBL SBT/R Lost Time (tL)7.0 7.0 6.8 6.8 6.8 6.8 Green Ratio (g/C)0.12 0.12 0.63 0.59 0.65 0.62 Permitted Saturation Flow Rate (sp), veh/h/ln 1318 1417 178 0 269 0 Shared Saturation Flow Rate (ssh), veh/h/ln 0 Permitted Effective Green Time (gp), s 11.0 11.0 53.5 0.0 53.5 0.0 Permitted Service Time (gu), s 5.9 5.8 31.6 0.0 34.3 0.0 Permitted Queue Service Time (gps), s 0.1 5.8 5.6 25.5 Time to First Blockage (gf), s 2.5 0.0 0.0 0.0 0.0 0.0 Queue Service Time Before Blockage (gfs), s 0.5 Protected Right Saturation Flow (sR), veh/h/ln 0 Protected Right Effective Green Time (gR), s 0.0 Multimodal EB WB NB SB Pedestrian Fw / Fv 1.983 0.000 1.852 0.000 1.198 0.000 0.972 0.000 Pedestrian Fs / Fdelay 0.000 0.142 0.000 0.142 0.000 0.080 0.000 0.076 Pedestrian Mcorner / Mcw Bicycle cb / db 244.44 34.67 244.44 34.67 1189.06 7.40 1231.43 6.65 Bicycle Fw / Fv -3.64 0.05 -3.64 0.43 -3.64 1.19 -3.64 1.30 Copyright © 2022 University of Florida, All Rights Reserved.HCS™ Streets Version 7.8 Generated: 3/22/2022 4:51:31 PM Page 399 of 494 HCS7 Signalized Intersection Results Graphical Summary General Information Intersection Information Agency Duration, h 0.25 Analyst Analysis Date Oct 7, 2021 Area Type Other Jurisdiction Time Period PHF 0.88 Urban Street Eguibebe -Tidewater Analysis Year 2025 Analysis Period 1> 16:00 Intersection US 1 & Easy Street File Name Easy Street PM Post.xus Project Description 2025 PM Post Development Demand Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 12 1 15 141 0 86 32 1573 292 135 1942 0 Signal Information Green Yellow Red 3.0 1.9 53.5 11.0 0.0 0.0 4.8 0.0 4.8 4.0 0.0 0.0 2.0 0.0 2.0 3.0 0.0 0.0 1 2 3 4 5 6 7 8 Cycle, s 90.0 Reference Phase 2 Offset, s 0 Reference Point Begin Uncoordinated No Simult. Gap E/W On Force Mode Fixed Simult. Gap N/S On Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Back of Queue ( Q ), ft/ln ( 95 th percentile)27.1 241.9 87.7 9.9 257.8 135.1 41.3 300.9 0 Back of Queue ( Q ), veh/ln ( 95 th percentile)1.1 9.7 3.5 0.4 10.3 5.4 1.7 12.0 0.0 Queue Storage Ratio ( RQ ) ( 95 th percentile)0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Control Delay ( d ), s/veh 35.5 91.9 37.6 9.9 12.1 10.3 11.5 11.7 Level of Service (LOS)D F D A B B B B Approach Delay, s/veh / LOS 35.5 D 71.3 E 11.8 B 11.7 B Intersection Delay, s/veh / LOS 15.1 B 35.5 91.9 37.6 9.9 12.1 10.3 11.511.7 1.1 9.7 3.5 0.4 10.3 5.4 1.7 12 0 Queue Delay LOS A LOS B LOS C LOS D LOS E LOS F Copyright © 2022 University of Florida, All Rights Reserved.HCS™ Streets Version 7.8 Generated: 3/22/2022 4:51:31 PMPage 400 of 494 2020 PEAK SEASON FACTOR CATEGORY REPORT - REPORT TYPE: ALL CATEGORY: 9401 CEN.-W OF US1 TO I95 MOCF: 0.93 WEEK DATES SF PSCF ================================================================================ * 1 01/01/2020 - 01/04/2020 0.96 1.03 * 2 01/05/2020 - 01/11/2020 0.92 0.99 * 3 01/12/2020 - 01/18/2020 0.88 0.95 * 4 01/19/2020 - 01/25/2020 0.88 0.95 * 5 01/26/2020 - 02/01/2020 0.87 0.94 * 6 02/02/2020 - 02/08/2020 0.87 0.94 * 7 02/09/2020 - 02/15/2020 0.86 0.92 * 8 02/16/2020 - 02/22/2020 0.89 0.96 * 9 02/23/2020 - 02/29/2020 0.92 0.99 *10 03/01/2020 - 03/07/2020 0.94 1.01 *11 03/08/2020 - 03/14/2020 0.97 1.04 *12 03/15/2020 - 03/21/2020 1.00 1.08 *13 03/22/2020 - 03/28/2020 1.08 1.16 14 03/29/2020 - 04/04/2020 1.16 1.25 15 04/05/2020 - 04/11/2020 1.24 1.33 16 04/12/2020 - 04/18/2020 1.32 1.42 17 04/19/2020 - 04/25/2020 1.26 1.35 18 04/26/2020 - 05/02/2020 1.20 1.29 19 05/03/2020 - 05/09/2020 1.13 1.22 20 05/10/2020 - 05/16/2020 1.07 1.15 21 05/17/2020 - 05/23/2020 1.06 1.14 22 05/24/2020 - 05/30/2020 1.04 1.12 23 05/31/2020 - 06/06/2020 1.03 1.11 24 06/07/2020 - 06/13/2020 1.01 1.09 25 06/14/2020 - 06/20/2020 1.00 1.08 26 06/21/2020 - 06/27/2020 1.01 1.09 27 06/28/2020 - 07/04/2020 1.02 1.10 28 07/05/2020 - 07/11/2020 1.03 1.11 29 07/12/2020 - 07/18/2020 1.04 1.12 30 07/19/2020 - 07/25/2020 1.04 1.12 31 07/26/2020 - 08/01/2020 1.04 1.12 32 08/02/2020 - 08/08/2020 1.03 1.11 33 08/09/2020 - 08/15/2020 1.03 1.11 34 08/16/2020 - 08/22/2020 1.03 1.11 35 08/23/2020 - 08/29/2020 1.02 1.10 36 08/30/2020 - 09/05/2020 1.02 1.10 37 09/06/2020 - 09/12/2020 1.01 1.09 38 09/13/2020 - 09/19/2020 1.01 1.09 39 09/20/2020 - 09/26/2020 1.00 1.08 40 09/27/2020 - 10/03/2020 1.00 1.08 41 10/04/2020 - 10/10/2020 0.99 1.06 42 10/11/2020 - 10/17/2020 0.98 1.05 43 10/18/2020 - 10/24/2020 0.98 1.05 44 10/25/2020 - 10/31/2020 0.99 1.06 45 11/01/2020 - 11/07/2020 0.99 1.06 46 11/08/2020 - 11/14/2020 1.00 1.08 47 11/15/2020 - 11/21/2020 1.00 1.08 48 11/22/2020 - 11/28/2020 0.99 1.06 49 11/29/2020 - 12/05/2020 0.98 1.05 50 12/06/2020 - 12/12/2020 0.97 1.04 51 12/13/2020 - 12/19/2020 0.96 1.03 52 12/20/2020 - 12/26/2020 0.92 0.99 53 12/27/2020 - 12/31/2020 0.88 0.95 * PEAK SEASON 27-FEB-2021 10:30:04 830UPD 4_9401_PKSEASON.TXT Page 401 of 494 Page 402 of 494 Page 403 of 494 Page 404 of 494 Page 405 of 494 Page 406 of 494 St.Lucie County ECCNCLITE MOVING TRAFFIC FORWARD 00039 -US1 @ EASY ST - -Econolite Type -Cobalt Controller Timing Plan (MM)2-1 Plan 1 III'- Phase 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Direction N-L SoT E-L W-T Sol N-T W-L E-T N N N N N N N N Min Green 5 5 a 5 5 5 a 5 5 5 5 5 5 5 5 5 Bk Min Green a 0 a a a 0 a a a a 0 a a a a a CS Min a 0 a a a 0 a a a a 0 a a a a aGreen Delay Green a a a a a 0 a a a a 0 a a a a a Walk a a a 7 a 7 a 7 a 10 0 10 a 10 a 10 Walk2 a a a a a 0 a a a a 0 a a a a a Walk Max a a a a a 0 a a a a a a a a a a Ped Clear a a a 30 a 24 a 35 a 16 a 16 a 16 a 16 Ped Clear 2 a a a a a a a a a a a a a a a a Ped Clear a a a a a a a a a a a a a a a aMax Ped CO a a a a a a a a a a a a a a a a Vehicle Ext 3.0 3.0 00 3.0 30 30 00 3.0 5.0 5.0 5.0 5.0 5.0 50 50 5.0 Vehicle Ext 2 0.0 00 00 0.0 0.0 00 00 0.0 0.0 0.0 0.0 0.0 0.0 00 00 0.0 Max1 20 60 a 30 20 60 a 30 35 35 35 35 35 35 35 35 Max2 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 Max3 a a a a a a a a a a a a a a a a DYM Max a a a a a a a a a a a a a a a a Dym Step 0.0 0.0 0.0 0.0 0.0 00 00 0.0 00 00 00 0.0 0.0 0.0 0.0 00 Yellow 4.8 4.8 0.0 4.0 4.8 4.8 00 4.0 3.0 30 30 3.0 3.0 3.0 3.0 30 Red Clear 2.0 20 00 3.0 2.0 2.0 0.0 3.0 1.0 1.0 10 10 10 1.0 1.0 1.0 Red Max 00 00 00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 00 00 00 0.0 0.0 00 Red Revert 2.0 2.0 20 2.0 2.0 2.0 2.0 2.0 2.0 2.0 20 2.0 2.0 2.0 2.0 2.0 ActB4 a a a a a a a a a a a a a a a a Sec/Act 0.0 00 00 0.0 00 00 0.0 0.0 0.0 0.0 0.0 00 00 00 0.0 0.0 Max Int a a a a a a a a a a a a a a a a Time B4 a a a a a a a a a a a a a a a a Cars Wt a a a a a a a a a a a a 0 0 0 0 STPTDuc 0.0 0.0 0.0 0.0 0.0 0.0 00 0.0 00 0.0 00 00 0.0 0.0 0.0 00 TTReduc a a a a a a 0 a a 0 0 0 0 0 a 0 Min Gap 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 00 0.0 00 0.0 0.0 0.0 0.0 00 file:///e:/U sers/S patm"oAiAppData/Roaming/Econolite/Prints/1OOO/Pri ntAl1.html 3/17/2022 Page 407 of 494 St.Lucie County ECCNCLITE MOVING TnllFFIC FonWllno 00039 -US1 @ EASY ST - -Econolite Type -Cobalt Time Base Day Plan/Schedule Day Plan (MM)5-3 Day Plan #1 -"1" Event Action Start Plan Time 1 100 00:00 2 11 06:30 3 1 07:30 4 2 09:00 5 3 13:30 6 4 15:30 7 5 18:30 8 100 20:00 Day Plan #2 -"2" Event Action Start Plan Time 1 100 00:00 2 2 10:00 3 100 19:00 Ii le:///C:/Users/S pataroA/AppData/Roaming/Econolile/Prinls/I OOO/Pri nlA II.htm I 3117/2022 Page 408 of 494 St.Lucie County ECONOL/TE MOVING T/lAFFIC FO/lWARO 00039 -US1 @ EASY ST - -Econolite Type -Cobalt Coordination Pattern Data Coordinator Pattern Data (MM)3-2 Coordinator Pattern #1 Split Pattern 1 Cycle 150 Offset Value 94s Actuated Coord Yes Actuated Walk Rest No Phase Reservice No Max Select None TS2 (Pat-Off) Std (COS) Dwell/Add Time Timing Plan Sequence Action Plan Force Off 0-1 9 o 1 1 1 None Splits In Offsets In Seconds Seconds Split Preference Phases Phase 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Description N-L SoT E-L W-T Sol N-T W-L E-T N N N N N N N N Splits (Split Pat 1)20 94 0 36 20 94 0 36 0 0 0 0 0 0 0 0 Prel1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Prel2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Ring 1 2 3 4 Ring Split Ext 0 0 0 0 Ring -0 0 0Displacement Split Sum 150s 150s Os Os Misc.Data Veh Perm 1 0 Split Demand Pat 0 1 Veh Perm 2 0 Split Demand Pat 0 2 Veh Perm 2 Disp 0 Crossing Arterial Pat 0 SrlPtt,PII a ern Phase 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Coord Phase X X Vehicle Recall Pedestrian Recall Recall to Max.Time Omit Phase X X X X X X X X Special Funciton Outputs fi le:llie:/U sers/SpataroAIAppData/Roaming/Econolite/Printsl1OOO/PrintAII.html 3/1712022 AM 7:30 - 9:00 Page 409 of 494 Coordinator Pattern #2 Split Pattern 2 Cycle 130 Offset Value 27s Actuated Coord Yes Actuated Walk Rest No Phase Reservice No Max Select None TS2 (Pat-Off) Std (COS) Dwell/Add Time Timing Plan Sequence Action Plan Force Off 0-2 17 o 1 1 2 None Splits In Offsets In Seconds Seconds Split Preference Phases Phase 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Description N-L S-T E-L W-T S-L N-T W-L E-T N N N N N N N N Splits (Split Pat 2)20 74 0 36 20 74 0 36 0 0 0 0 0 0 0 0 Pref 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Pref 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Ring 1 2 3 4 Ring Split Ext 0 0 0 0 Ring -0 0 0Displacement Split Sum 130s 130s Os Os Misc.Data Veh Perm 1 0 Split Demand Pat 0 1 Veh Perm 2 0 Split Demand Pat 0 2 Veh Perm 2 Disp 0 Crossing Arterial Pat 0 ;Pllt attern Phase 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Coord Phase X X Vehicle Recall Pedestrian Recall Recall to Max.Time Omit Phase X X X X X X X X Special Funciton Outputs S r P Coordinator Pattern #3 Split Pattern 3 Cycle 80 Offset Value 36s Actuated Coord Yes Actuated Walk Rest No Phase Reservice No Max Select None TS2 (Pat-Off) Std (COS) Dwell/Add Time Timing Plan Sequence Action Plan Force Off 0-3 25 o 1 1 3 None Splits In Offsets In Seconds Seconds Split Preference Phases Phase 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Description N-L S-T E-L W-T S-L N-T W-L E-T N N N N N N N N Splits (Split Pat 3)16 44 0 20 16 44 0 20 0 0 0 0 0 0 0 0 Pref 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Pref 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Ring 1 2 3 4 Ring Split Ext 0 0 0 0 Ring -0 0 0Displacement Split Sum 80s 80s Os Os Misc.Data Veh Perm 1 0 Split Demand Pat 0 1 Veh Perm 2 0 Split Demand Pat 0 2 Veh Perm 2 Disp 0 Crossing Arterial Pat 0 file:///C:/Users/SpataroA/AppData/Roaming/Econolite/Prints/1OOO/PrintAII.html 3/17/2022 Page 410 of 494 Split Pattern Phase 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Coord Phase X X Vehicle Recall Pedestrian Recall Recall to Max.Time Omit Phase X X X X X X X X Special Functton Outputs fi Ie :IIIC:/Users/SpataroAIAppData/Roaming/Econol ite/Prints/]OOO/PrintAII.htm!3117/2022 Page 411 of 494 Coordinator Pattern #4 Split Pattern 4 Cycle 90 Offset Value 63s Actuated Coord Yes Actuated Walk Rest No Phase Reservice No Max Select None TS2 (Pat-Off) Std (COS) Dwell/Add Time Timing Plan Sequence Action Plan Force Off 1-1 33 o 1 1 4 None Splits In Offsets In Seconds Seconds Split Preference Phases Phase 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Description N-L S-T E-L W-T S-L N-T W-L E-T N N N N N N N N Splits (Split Pat 4)15 57 0 18 15 57 0 18 0 0 0 0 0 0 0 0 Pref 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Pref 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Ring 1 2 3 4 Ring Split Ext 0 0 0 0 Ring -0 0 0Displacement Split Sum 90s 90s Os Os Misc.Data Veh Perm 1 0 Split Demand Pat 0 1 Veh Perm 2 0 Split Demand Pat 0 2 Veh Perm 2 Disp 0 Crossing Arterial Pat 0 SPilt attern Phase 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Coord Phase X X Vehicle Recall Pedestrian Recall Recall to Max.Time Omit Phase X X X X X X X X Special Funciton Outputs S r P Coordinator Pattern #5 Split Pattern 5 Cycle 130 Offset Value 64s Actuated Coord Yes Actuated Walk Rest No Phase Reservice No Max Select None TS2 (Pat-OlD Std (COS) Dwell/Add Time Timing Plan Sequence Action Plan Force Off 1-2 41 o 1 1 5 None Splits In Offsets In Seconds Seconds Split Preference Phases Phase 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Description N-L S-T E-L W-T S-L N-T W-L E-T N N N N N N N N Splits (Split Pat 5)22 77 0 31 22 77 0 31 0 0 0 0 0 0 0 0 Pref 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Pref 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Ring 1 2 3 4 Ring Split Ext 0 0 0 0 Ring -0 0 0Displacement Split Sum 130s 130s Os Os Misc.Data Veh Perm 1 0 Split Demand Pat 0 1 Veh Perm 2 0 Split Demand Pat 0 2 Veh Perm 2 Disp 0 Crossing Arterial Pat 0 file:///C:/Users/SpataroA!AppData/Roaming/Econolite/Prints/1OOO/PrintAII.html 3/17/2022 PM 4:30 - 6:30 Page 412 of 494 Split Pattern Phase 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Coord Phase X X Vehicle Recall Pedestrian Recall Recall to Max.Time Omit Phase X X X X X X X X Special Funciton Outputs file:1Ile:/users/SpataroAIAppData/Roaming/Econolite/Pri ntsl IOOO/PrintAll.html 3/17/2022 Page 413 of 494 S. U S H I G H W A Y 1 LAKE 330' 953.4' 1283.4' 66 2 . 4 ' 953.4' 1152.4' 34 6 . 4 ' 42 2 . 4 ' 24 0 ' 131' 24 0 ' 2.62 AC COMMERCIAL 8 6 7 9 10 10 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX POOL 26' DRY DETENTION LAND USE: MIXED ZONING: GENERAL COMMERCIAL LAND USE: MIXED ZONING: PUD LAND USE: COMMERCIAL & RESIDENTIAL MEDIUM (9 DU/AC) ZONING: RS-2 (RESIDENTIAL, SINGLE FAMILY 2 DU/AC) & CG (GENERAL COMMERCIAL) LAND USE: HIGHWAY (OTHER SIDE OF HWY IS COMMERCIAL) ZONING: HIGHWAY (OTHER SIDE HWY IS CG (GENERAL COMMERCIAL) LAND USE: COMMERCIAL ZONING: CG (GENERAL COMMERCIAL) LAND USE: RESIDENTIAL URBAN (5 DU/AC) ZONING: RS-2 (RESIDENTIAL, SINGLE FAMILY 2 DU/AC) 3 15' BUFFER 15' BUFFER 50' ROW 90' 20' LME 20' LME 15' BUFFER 15' BUFFER 50' 24'10' 20' 90' 132.4' 5' SW 90' 20'24' 20' LME 20' LME 20' FRONT SB 20' FRONT SB 15'79'15' BUFFER 44.7' 10' DE10' DE 15' DE 10' DE 10' DE 15' DE 15' DE 15' DE 10' DE 15' DE 19'12' 12' 6' SW 60' ROW 20' 20' 60' ROW 60' ROW 10' DE 60' ROW 20' 20' 2' OH 5' SW 19'12' 2' OH 20' 2' OH 5' SW 11' 2' OH 11' 10' 2' OH 20' 2' OH 5' SW 11' 2' OH 20' 5' SW 11' 10' 2' OH 20' 2' OH 5' SW 89' 61' 90' 10' 2' OH 10' 20' 2' OH 5' SW ACCESS GATE LIFTSTATION EMS ACCESS 20' 15' DE TURN-AROUND TURN-AROUND TURN-AROUND MAIL XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX POOL EQUIP. BIKE RACK FENCE CABANA 48' 75' 45' 20' 19.3' 25.5' BLDG A, 6 UNIT BLDG B, 8 UNIT BLDG C, 8 UNIT BLDG D, 8 UNIT BLDG E, 8 UNIT BLDG F, 8 UNIT BLDG G, 8 UNIT BLDG H, 8 UNIT 12'19' 2' OH 20' 2' OH 5' 19' 9.5'5' 19' 9.5'5'19' 9.5'5' 19' 9.5'5' 19' 9.5' 12' 5' 15'15'15' 15'15'15' 89' 61' 15'15'15' 15'15'15' 15' 15' 15' 8' PVC FENCE TYP. 8' 8' AC UNIT TYP. 8' PVC FENCE TYP. 8' 8' AC UNIT TYP. 5' 20'12' 8' 8'8' 8' 8' PVC FENCE TYP. AC UNIT TYP. 8' PVC FENCE TYP. AC UNIT TYP. 8' 8' 8' PVC FENCE TYP. AC UNIT TYP. BLDG I, 6 UNIT BLDG J, 6 UNIT BLDG K, 8 UNIT BLDG L, 6 UNIT BLDG M, 6 UNIT BLDG N, 8 UNIT BLDG O, 8 UNIT BLDG P, 8 UNIT BLDG Q, 6 UNIT BLDG R, 8 UNIT BLDG S, 6 UNIT BLDG T, 8 UNIT BLDG U, 8 UNIT BLDG V, 8 UNIT LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 9 LOT 10 LOT 11 LOT 12 LOT 13 LOT 14 LOT 15 LOT 16 LOT 17 LOT 18 LOT 19 LOT 20 LOT 21 LOT 22 LOT 23 LOT 24 LOT 25 LOT 26 LOT 27 LOT 28 LOT 29 LOT 30 LOT 38 LOT 37 LOT 36 LOT 35 LOT 34 LOT 33 LOT 32 LOT 31 LOT 46 LOT 45 LOT 44 LOT 43 LOT 42 LOT 41 LOT 40 LOT 39 LOT 54 LOT 53 LOT 52 LOT 51 LOT 50 LOT 49 LOT 48 LOT 47 LOT 60 LOT 59 LOT 58 LOT 57 LOT 56 LOT 55 LOT 61 LOT 62 LOT 63 LOT 64 LOT 65 LOT 66 LOT 67 LOT 68 LOT 69LOT 70 LOT 71 LOT 72 LOT 73 LOT 74 LOT 75 LOT 76 LOT 77 LOT 78 LOT 79 LOT 80 LOT 81 LOT 82 LOT 83 LOT 84 LOT 85 LOT 86 LOT 87 LOT 88 LOT 89 LOT 90 LOT 91 LOT 92 LOT 100 LOT 99 LOT 98 LOT 97 LOT 96 LOT 95 LOT 94 LOT 93 LOT 108 LOT 107 LOT 106 LOT 105 LOT 104 LOT 103 LOT 102 LOT 101 LOT 116 LOT 115 LOT 114 LOT 113 LOT 112 LOT 111 LOT 110 LOT 109 LOT 131 LOT 132 LOT 133 LOT 134 LOT 135 LOT 136 LOT 123 LOT 124 LOT 125 LOT 126 LOT 127 LOT 128 LOT 129 LOT 130 LOT 122 LOT 121 LOT 120 LOT 119 LOT 118 LOT 117 LOT 137 LOT 138 LOT 139 LOT 140 LOT 141 LOT 142 LOT 143 LOT 144 LOT 145 LOT 146 LOT 147 LOT 148 LOT 149 LOT 150 LOT 151 LOT 152LOT 153 LOT 154 LOT 155 LOT 156 LOT 157 LOT 158 LOT 159 LOT 160 1 PRELIMINARY & FINAL SITE PLAN Scale: 1" = 50'-0" 25'0'100'50'150' North 200' by agreement in writing with the architect. Immediately report any discrepancies to the architect. SHEET COTLEUR & HEARING, INC. These drawings are the property of the architect and are not to be used for extensions or on other projects except OF 2 62 0 9 S U S H I G H W A Y 1 Me r i t a g e H o m e s St . L u c i e C o u n t y , F l o r i d a 21-0604 DTS ACE/CTB ACE/CTBDESIGNED DRAWN REVISIONS JOB NUMBER APPROVED DATE Landscape Architects Land Planners Environmental Consultants www.cotleurhearing.com 1934 Commerce Lane Suite 1 Jupiter, Florida 33458 561.747.6336 · Fax 747.1377 Lic# LC-C000239 10-06-21 LEGAL DESCRIPTION TRAFFIC STATEMENT DRAINAGE STATEMENT Page 414 of 494 LA N D S C A P E A R C H I T E C T U R E - S U R V E Y I N G CA U L F I E L D & W H E E L E R , I N C . CI V I L E N G I N E E R I N G PH O N E ( 5 6 1 ) - 3 9 2 - 1 9 9 1 / F A X ( 5 6 1 ) - 7 5 0 - 1 4 5 2 79 0 0 G L A D E S R O A D - S U I T E 1 0 0 BO C A R A T O N , F L O R I D A 3 3 4 3 4 ” SITE US 1 OL E A N D E R A V E N U E MIDWAY ROAD SUNSHINE BLVD EASY STREET Page 415 of 494 LA N D S C A P E A R C H I T E C T U R E - S U R V E Y I N G CA U L F I E L D & W H E E L E R , I N C . CI V I L E N G I N E E R I N G PH O N E ( 5 6 1 ) - 3 9 2 - 1 9 9 1 / F A X ( 5 6 1 ) - 7 5 0 - 1 4 5 2 79 0 0 G L A D E S R O A D - S U I T E 1 0 0 BO C A R A T O N , F L O R I D A 3 3 4 3 4 Page 416 of 494 LA N D S C A P E A R C H I T E C T U R E - S U R V E Y I N G CA U L F I E L D & W H E E L E R , I N C . CI V I L E N G I N E E R I N G PH O N E ( 5 6 1 ) - 3 9 2 - 1 9 9 1 / F A X ( 5 6 1 ) - 7 5 0 - 1 4 5 2 79 0 0 G L A D E S R O A D - S U I T E 1 0 0 BO C A R A T O N , F L O R I D A 3 3 4 3 4 Page 417 of 494 kimley-horn.com 101 East Silver Springs Boulevard, Suite 400, Ocala, Florida 34470 352 438 3000 To:Jodi Kugler Senior Planner St. Lucie County Planning and Development Services From: Alex Memering, P.E. Alex Campano, E.I. Kimley-Horn and Associates, Inc. Kimley-Horn and Associates, Inc. Date: June 8, 2022 Re:Tidewater Final Review of Traffic Analyses Kimley-Horn has reviewed the Future Land Use Amendment Traffic Analysis (revised March 2022) and site- specific Traffic Impact Analysis (revised March 2022) prepared by MacKenzie Engineering & Planning, Inc. related to the above-mentioned project. The subject parcels and proposed project are located west of US 1, south of Sunshine Boulevard in St. Lucie County. The future land use amendment includes changing the existing future land uses of Commercial (COM), Residential Medium (RM), and Residential Urban (RU) to the proposed future land uses of COM and Mixed- Use Development (MXD). This results in a net increase in total trip generation potential by 8,954 daily, 731 AM peak hour (583 in / 147 out), and 1,023 PM peak hour (336 in / 687 out) net new trips. The analyses demonstrate that the study area roadway has sufficient capacity available to support the proposed future land use amendment. The proposed site-specific development consists of approximately 160 multifamily (low-rise) dwelling units. The total trip generation potential for the proposed development is 1,101 daily, 72 AM peak hour trips (17 in / 55 out), and 89 PM peak hour trips (56 in / 33 out). The analyses demonstrate that study area roadways and intersections have sufficient capacity to support the site-specific development upon buildout. Access to the site is proposed via one right-in/right-out driveway connection on US 1. The proposed right- in/right-out driveway will provide additional safety as egress left-turn movements are disallowed which reduces conflict points and crashes. Therefore, ingress and egress left-turn movements will be offset north and south of the proposed right-in/right-out driveway on US 1 at Sunshine Boulevard and Easy Street, respectively, as drivers will be required to perform a U-turn movement. We have no further comments for the applicant at this time. Thank you for the opportunity to assist St. Lucie County in reviewing this project. Please contact us if you have any questions or need additional information. Page 418 of 494 Florida Department of Transportation RON DESANTIS GOVERNOR 3400 West Commercial Boulevard Fort Lauderdale, FL 33309 KEVIN J. THIBAULT SECRETARY Page 1 of 2 April 7, 2022 Shaun MacKenzie MacKenzie Engineering and Planning, Inc. 1172 SW 30th Street, Palm City FL, 34990 Dear Shaun MacKenzie, RE: Variance Committee Review to allow for Category D Driveway Applicant/Property Owner: Eguibebe LLC St. Lucie County City of Port St. Lucie State Road: 5 Section: 94010000 MP: 7.09 Access Class: 3 Posted Speed: 45 mph SIS: No Site Acreage: 18.87 Acres Development Size: 160 DU Low-Rise Multi-family Residential, 25,000 SF Retil/Shopping Center Project Name & Address: Tidewater - 6209 S US Highway 1 AMRC Meeting Date: April 7, 2022 Request: Right-in/right-out driveway on the west side of US 1 approximately 380 feet south of the north property line. This request is: Approved with Conditions Conditions / Comments: A minimum driveway length of 150 feet, as measured from the ultimate right-of-way line of the State Road to the first conflict point, is required. A minimum driveway return radius of 35 feet is required. A right turn lane is required and shall meet the minimum requirements in the Florida Design Manual (FDM) and shall provide a buffered bicycle lane. If the right turn lane does not meet the minimum requirements in the Florida Design Manual, a design variation will be required. • All existing driveways not approved in this letter must be fully removed and the area restored. • Drainage mitigation is required for any impacts within FDOT right-of-way (i.e. increased runoff or reduction of existing storage. • A Storm Water Pollution Prevention Plan must be submitted with the application if there will be more than one acre of “disturbed area” (as defined by the Florida Department of Environmental Protection (FDEP) • If additional right-of-way is required to implement the proposed improvements, the applicant shall donate the right-of-way to the Department. DocuSign Envelope ID: 0D8DBD8A-C850-4F75-A661-63754386F435 Page 419 of 494 Shaun MacKenzie – Tidewater Access Management Review Committee Letter cc: Nesa Y. Harden, Jonathan Overton P.E. File S:\Transportation Operations\Traffic Operations\Access Management\1. Pre-Apps and Variance\2022-04-07 & AMRC\AMRC - 1. 94010000 MP 7.1 SR 5_Tidewater\94010 MP 7.1 SR 5_Tidewater.docx Page 2 of 2 Comments: Please note that the dimensions between driveways are measured from the near edge of pavement to near edge of pavement and dimensions between median openings are measured from centerline to centerline unless otherwise indicated. The purpose of this letter is to document the conceptual review of the approximate location of driveway(s) to the State Highway system and to note any required improvements. Earlier Department decisions on this request shall be voided unless expressly approved herein. If the above concept is approved, the applicant may submit engineering plans to the Department for permitting. The Department’s personnel shall review these plans for compliance with this letter as well as current Department standards and/or specifications. Final design must consider the existing roadway profile and any impacts to the existing drainage system. Please note that this letter does not guarantee permit approval. The permit may be denied based on the review of the submitted engineering plans. Be aware that any approved median openings may be modified (or closed) in the future, at the sole discretion of the Department. Committee approvals and conditions which are at variance with Department rules or standards are not binding in the permitting process for more than 12 months. Please contact the Access Management Manager - Tel. # 954-777-4363 or e-mail: D4AccessManagement@dot.state.fl.us with any questions regarding the Pre-Approval Letter and Permits Office - Tel. # 954-777-4383 with any questions regarding permits. For right-of-way dedication requirements go to: https://osp.fdot.gov: Click on Statewide Permit News. Scroll down to District 4. Scroll down to Additional Information and Examples and choose Right-of-way Donations/Dedications. THE DISTRICT ACCESS MANAGEMENT REVIEW COMMITTEE With the above ruling I Agree Disagree John Olson, P.E. _______________________________ _____ _____ April 7, 2022 District Design Engineer Mark Plass, P.E.___________________________________ _____ _____ April 7, 2022 District Traffic Operations Engineer Jonathan Overton, P.E. for: Antonio Castro, P.E.________________________________ _____ _____ April 7, 2022 District Maintenance Engineer DocuSign Envelope ID: 0D8DBD8A-C850-4F75-A661-63754386F435 X X X Page 420 of 494 ITEM NO. (ID # 2022-55400) DATE: 7/21/2022 AGENDA REQUEST TO: Planning and Zoning Commission PRESENTED BY: Kori Benton, Planning Manager Irene Szedlmeyer SUBMITTED BY: Planning & Development Services SUBJECT: Acting as the Local Planning Agency: Joseph Miller's Petition for a Comprehensive Plan Future Land Use Map Amendment to revise the Loop Road Mixed Use Activity Area Policy for the Low Intensity Sub-Area to replace specific required commercial, institutional and office thresholds with light industrial and warehouse land uses. BACKGROUND: The property owner, Joseph Miller (TR), applicant, Tambone Companies, and representative, Brad Currie, AICP, of EDC, Inc. are proposing a Comprehensive Plan Future Land Use Map Amendment to revise the Loop Road Mixed Use Activity Area affecting the subject +/-34.01 acres would retain the MXD, Mixed Use District, Low Intensity category. However, the modified Sub Area Policies would alter the permissible land use scope centered on industrial uses. The proposal retains a vegetated buffer zone requirement, to properly buffer the adjacent residences and other less intense uses. Staff proposes a provision requiring rezoning to the Planned Non-residential Development District (PNRD), for future development proposals requiring rezoning and associated evaluation criteria. The Loop Road MXD Activity Area Map was adopted within the Comprehensive Plan in 2007, via Ordinance 07- 025. The area affected,within the Low Intensity Area, is guided by a Sub Area Policy to include 50% commercial at the northeast corner with a combination of 25% Office and 25% Institutional, and includes a vegetated buffer zone to properly buffer the adjacent residences from future development. The proposal seeks to replace the intended use scope with light industrial and warehouse land uses, while retaining provisions related to buffering and affirming future development proposals via a Planned Development process. PREVIOUS ACTION: In 2007, the Board of County Commissioners Adopted Ordinance 07-025 enacting the Loop Road MXD Activity Area Map adopted within the Comprehensive Plan. On June 5, 2018, the Board of County Commissioners adopted Resolution 18-102, authorizing a Zoning Atlas Amendment (Rezoning) for the eastern +/- 16. 21 acres included in the current proposal. FINANCIAL IMPACT: N/A RECOMMENDATION: Page 421 of 494 Staff has reviewed the proposed small-scale Comprehensive Plan Future Land Use Map Amendment and determined it is consistent with the Goals, Objectives, and Policies of the Comprehensive Plan; therefore, staff recommends the Planning & Zoning Commission acting as the Local Planning Agency forward a recommendation of approval to the Board of County Commissioners with the provisions incorporated by Staff. COMMISSION ACTION: RESULT: MOVER: SECONDER: None AYES: None NAYS: None EXCUSED: None Coordination/Signatures Date: July 15, 2022 Mayte Santamaria, Planning & Development Services Director Date: July 15, 2022 Mark Satterlee, Deputy County Administrator Date: July 15, 2022 Katherine Barbieri, Assistant County Attorney III Page 422 of 494 Planning and Development Services Department Planning Division M E M O R A N D U M TO: Planning and Zoning Commission THROUGH: Mayté Santamaria, Director Benjamin Balcer, AICP, Assistant Director FROM: Kori Benton, AICP, Planning Manager Irene Szedlmayer, AICP, Senior Planner DATE: July 13, 2022 SUBJECT: Orange 95 Commerce Center - Comprehensive Plan Future Land Use Map Amendment FLUMA-2205-000012: Loop Road Mixed-Use Development (MXD) Activity Area OWNER: Joseph G Miller (TR) 5500 Orange Ave Fort Pierce, FL 3494 AGENT: Bradley J. Currie, AICP Engineering Design & Construction, Inc. 10250 SW Village Parkway, Suite 201 Port St. Lucie, FL 34987 APPLICANT: PROPOSAL: Tambone Companies, LLC Lori & Richard Tambone 3710 Buckeye Street Suite 100 Palm Beach Gardens, FL 33418 A Comprehensive Plan Future Land Use Map Amendment to amend the Loop Road Mixed Use Activity Area Policy for the Low Intensity Sub-Area to replace the specific commercial, institutional and office thresholds to permit light industrial and warehouse land uses. LOCATION: The property is located 2,000 feet north of Orange Avenue, abutting the canal that runs parallel to and south of Floyd Johnson Road. PARCEL ID NO.(S): 2312-111-0001-000-2 and 2312-121-0000-000-6 PARCEL SIZE(S): +/-34.01 acres EXISTING USE(S): Agriculture FUTURE LAND USE: MXD (Mixed Use Development – Loop Road Mixed Use Activity Area) CURRENT ZONING: AR-1 (Agricultural Residential–1 du/acre) & CG (Commercial General). The property is also located within the Jenkins Road Area Plan Special District and partly within the Airport Overlay District. Page 423 of 494 July 13, 2022 Page 2 of 13 Request Overview: A Comprehensive Plan Future Land Use Map Amendment to amend the Loop Road Mixed Use Activity Area Policy for the Low Intensity Sub Area to replace the specific commercial, institutional and office thresholds to permit light industrial and warehouse land uses including flex space buildings. The subject +/-34.01 acres will retain the MXD, Mixed Use District, Low Intensity category, however the modified Sub Area policies will alter the permissible land uses. The modified policy strengthens the requirement that a vegetated buffer zone be provided to properly buffer the adjacent residences and other less intense uses by specifying that the landscape buffer shall be a minimum of 50 feet wide. A Future Land Use Map amendment is often accompanied by a concurrent request to amend the Zoning Atlas (Rezoning), however; in this case, a future rezoning is anticipated to the Planned Non-Residential Development District (PNRD) which requires a Preliminary Site Plan application. The rezoning of the subject parcel will be addressed in a separate proceeding. Staff proposes a provision requiring rezoning to the Planned Non-Residential Development District (PNRD) with future rezoning proposals in the retained Low Intensity District. Figure 1. Location Map The Applicant is preparing a development plan for the petition sites, anticipated as a PNRD Rezoning and Preliminary Plan set. The Applicant has a parallel project, a Minor Site Plan, active for the 26.84 acres abutting to the southeast. The adjacent proposal, of similar use scope, is within the Loop Road MXD Activity Area - Medium Intensity category and the IL Zoning District (identified as “M” on Figure 5 and Table 2 below). Page 424 of 494 July 13, 2022 Page 3 of 13 Figure 2. Subject Property Background The Loop Road MXD Activity Area Map adopted within the Comprehensive Plan in 2007, via Ordinance 07-025, is presented in Figure 3. The area affected by the subject petition is highlighted, displaying the corresponding areas within the Low and Medium Intensity sections of this Mixed-Use Activity Area. Future Land Use: The Future Land Use designation is MXD (Mixed Use Development – Loop Road Mixed Use Activity Area), which is intended to allow for a variety of uses based upon Sub-Area Policies for Medium and Low Intensity districts, as follows: “1. The MXD Low Intensity district will include 50% commercial at the northeast corner with a combination of 25% Office and 25% Institutional on the remainder of the MXD Low Intensity district, which shall include a vegetated buffer zone to properly buffer the adjacent residences from future development: and 2. The MXD Medium Intensity district will be Light Industrial/Warehouse land uses, including flex space buildings.” The proposal seeks to modify the Low Intensity Sub-Area Policy to eliminate the requirements that development at the northeast corner contain 50% commercial uses and that the remainder of the site contain 25% Office and 25% Institutional uses and to instead permit Light Industrial /warehouse land uses, including flex space buildings, for the entirety of the Low Intensity Area. The requirement for transitional buffering to adjacent residential properties is retained. The protection of nearby residential and other lower intensity uses is strengthened by providing that the landscape buffer shall be at least 50 feet wide. In coordination with the applicant, staff is proposing that future rezoning proposals are limited to the Planned Non-Residential Development (PNRD) zoning district, to ensure a Preliminary Site Plan, specific light industrial uses, and buffering plan are coupled with the rezoning request. Page 425 of 494 July 13, 2022 Page 4 of 13 Figure 3. Loop Road Mixed Use Activity Area Map with Petition Area Overlaid (Existing) The proposed text showing the changes with strike-through for deletions and underlining for additions is as follows: 1. The MXD Low Intensity district will include 50% commercial at the north-east corner with a combination of 25% Office and 25% Institutional on the remainder of the MXD Low Intensity district Light Industrial/Warehouse land uses, including flex space buildings. Industrial development shall be approved through the PNRD (Planned Non-Residential Development) process and shall provide which shall have a minimum 50 foot wide vegetated buffer zone to properly buffer the adjacent residences from future development non-industrial uses, and shall preserve environmental resources; and 2. The MXD Medium Intensity district will be Light Industrial/Warehouse land uses, including flex space buildings. The proposed final text, if the recommended revisions are adopted, will be as follows: 1. The MXD Low Intensity district will include Light Industrial/Warehouse land uses, including flex space buildings. Industrial development shall be approved through the PNRD (Planned Non-Residential 16.21 +/- acres 17.80 +/- acres Page 426 of 494 July 13, 2022 Page 5 of 13 Development) Zoning District process and shall provide a minimum 50 feet wide vegetated buffer to properly buffer the adjacent non-industrial uses and shall preserve environmental resources; and 2. The MXD Medium Intensity district will be Light Industrial/Warehouse land uses, including flex space buildings. FUTURE LAND USE MAP AMENDMENT STANDARDS OF REVIEW AS SET FORTH IN THE ST. LUCIE COUNTY COMPREHENSIVE PLAN AND FLORIDA STATUTES In reviewing petitions for amendments to the Future Land Use Map, the Planning and Zoning Commission should consider whether the proposed amendment is consistent with all elements of the St. Lucie County Comprehensive Plan and Florida Statutes. The Development Review Committee (DRC) has reviewed this petition and determined it complies with the St. Lucie County Comprehensive Plan. Objective 1.1.2: Growth Management. St. Lucie County shall manage how and where growth occurs by using sustainable development and balanced planning practices. The County shall manage the land use patterns designated on the Future Land Use Map comprehensively, consistently, and effectively to enhance the quality of life for its citizens, promote economic vitality, and accommodate projected population growth and development in an environmentally acceptable manner. Policy 1.1.2.1: The adopted Future Land Use Map Series and any amendments shall promote responsible growth management practices. When considering any amendment to the Future Land Use Maps of the County’s Comprehensive Plan, the County Commission shall make the following findings, supported by the other elements of this Plan, prior to taking any approval actions granting an individual amendment to the Future Land Use Maps: 1. That the property under land use amendment application is adjunct to, or within no more than one-quarter mile of the same or greater type of land use classification. 2. That the property under land use amendment consideration lies within the Five-Year Capital Improvement Program of the Water and Wastewater Master Plan for St. Lucie County (or can be reasonably accommodated with an amendment to the Master Plan) or otherwise meets the requirements of Policy 1.1.5.4 [formerly Policy 1.1.5.3]. Policy 1.1.2.2: In accordance with Florida Statutes, proposed future land use map amendments to the County’s Comprehensive Plan, shall be based upon the following analyses: 1. An analysis of anticipated growth; 2. An analysis of the availability of facilities and services; 3. An analysis of the suitability of the plan amendment for its proposed use considering the character of the undeveloped land, soils, topography, natural resources, and historic resources on-site; 4. An analysis of the compatibility of adjacent land uses; and 5. An analysis of the need for job creation, capital improvement, and economic development that will strengthen and diversify the community’s economy; and 6. A consultation with the Florida Department of Transportation when it is determined that a proposed amendment has the potential to affect facilities on the Strategic Intermodal System. Staff Analysis The proposed amendment is consistent with Policy 1.1.2.1. The subject parcel borders land with an MXD future land use designation and is adjacent to land with the same or higher intensity future land use classifications. The Page 427 of 494 July 13, 2022 Page 6 of 13 subject property is within the Urban Service Boundary and adequate water and wastewater facilities are nearby and can be extended by the property owner to meet the needs of the development. The proposed Amendment is consistent with the overall intent of the Comprehensive Plan which encourages the integration of development opportunities in a manner that is based upon the general principals of smart growth energy-efficient land use patterns, discouraging urban sprawl, and supporting sustainable industrial growth in appropriate areas. The Loop Road Mixed Use Activity Area was integrated into the Comprehensive Plan during the 2007-2 Amendment Cycle via Ordinance 07-025, after review and analysis of an applicant-initiated (Sanford Gibson, Joseph Miller and Jim Turner) request to provide for compatible enterprise opportunities contiguous to the Orange Avenue/I-95 Mixed Use Activity Area while utilizing the improved Loop Road infrastructure. This plan amendment directed Medium Intensity mixed land uses adjacent to existing industrial land uses along Orange Avenue and established the subject Low Intensity sub-area as a transition between light industrial activities and the residential land uses further to the north. The amendment also established the policy that requires vegetated buffer areas to assimilate the low intensity sub-area with the less intense uses to the north. Previous rezoning actions, at the request of property owners, have been ratified within the Loop Road Mixed Use Activity Area as the area plan is gradually implemented. Future Land Use Element The subject property has the MXD future land use designation. As stated in Policy 1.1.1.2.H., the intent of the Mixed-Use Development (MXD) designation is to: “identify those areas where innovative land use concepts are encouraged. Application of this district should be with prudence and should be only to those areas where traditional land use classifications do not afford the desired flexibility and community input in land use planning necessary to address local concerns. Candidates for this district include all I-95 interchange areas, the Treasure Coast International Airport, Community Development Districts created pursuant to Chapter 190, Florida Statutes and areas of special or unique environmental consideration that may not be appropriate for traditional land use designations. Uses within the areas classified as Mixed Use should be segregated as to intensity and indicated in the form of a concept master plan which is to be included as a part of the land use designation process. The following criteria, in addition to those as cited in Objective 1.1.7 (PUD, PNRD and PMUD), are to be used in the development of Mixed-Use areas: • Unless otherwise compliant with the identified intensity classification, any change in zoning shall be to the Planned Unit Development (PUD), Planned Non-Residential Development (PNRD) or Planned Mixed Use Development (PMUD), as described in the St. Lucie County Land Development Code. Those properties with compatible existing zoning designations are encouraged to develop under the PUD, PNRD or PMUD regulations. • All uses shall be compatible with adjacent land uses. Objective 1.1.8: Planned Developments. The County shall continue to support and encourage innovative land use development patterns including planned developments through the adequate provision in the County's Land Development Code including Planned Unit Developments (PUD), Planned Non-Residential Development (PNRD) and the Planned Mixed-Use Development (PMUD) zoning designations. Policy 1.1.8.3: The County shall continue to support and implement the mixed-use activity areas as indicated in the Sub-area Mixed Use Activity Area Plans as depicted by name in this Element. The proposed amendment, by requiring development within the Loop Road Special Activity Area to proceed pursuant to the PNRD (Planned Non-Residential Zoning District) advances Objective 1.1.8. Page 428 of 494 July 13, 2022 Page 7 of 13 The proposed amendment is consistent with Policy 1.1.8.3. The intent of mixed-use activity areas can be realized through a mix of uses within proximity that evolve over time because of independent investment decisions and development approvals as well as through mixed-use projects that include a mix of commercial, office and light industrial uses planned, approved and developed as a single project. It is not essential that each individual project include a mix of uses. Policy 1.1.10.2: Require effective visual and light diffusion barriers between residential and non-residential uses. Standards and requirements for such barriers are to be included in the landscaping and screening regulations of the St. Lucie County Land Development Code. The proposed amendment is consistent with Policy 1.1.10.2. The proposed amendment specifies a 50-foot minimum width of the required landscape buffer along the northern property line. The LDC provides lighting standards that prohibit outdoor lighting from being a visible nuisance to any adjoining residential property. The development review process requires a photometric plan to demonstrate that commercial, industrial or other non-residential development causes no light trespass onto adjacent properties. The wider minimum landscape buffer that this amendment will require will allow trees to grow to their full mature height and will provide an improved buffer for nearby residential properties. Pursuant to Comprehensive Plan Policy 1.1.8.4, Industrial and Professional Service/Office uses may receive an intensity bonus of up to 100% of the floor area ratio (FAR), within specific use areas served by Strategic Intermodal System (SIS) facilities operating at or above the adopted level of service (LOS) and with available water service and wastewater service. The PNRD review process, recommended with this Amendment, is a more appropriate channel to pursue such bonus opportunities through analysis of available facilities, project design and compatibility. The proposed Amendment, with coupled policies, seeks to ensure an implementing zoning and development plan that provides opportunity for infill and mixed-use development in the Urban Service Area consistent with Objective 1.1.6. of the Future Land Use Element: “Urban Service Area Boundary. In coordination with the other elements of this plan, future development within the Urban Service Area shall be directed to areas where urban and community services/facilities can be provided in the most efficient and compact manner so as to discourage the proliferation of urban sprawl.” The proposed Amendment also advances policies designed to achieve Objective 1.1.5, which provides: “Urban Sprawl. Consider changes to the future land use plan based upon smart growth, energy-efficient land use patterns and discouraging the proliferation of urban sprawl.” Additionally, this proposed amendment is consistent with Policy 1.1.5.9: “The County shall continue to support dense, compact development in the Jenkins Special Area Plan corridor which creates a viable road system and supporting multi-modal facilities, and to create an innovative, mixed use neighborhood that increases the internal capture of trips and to include walkable scale and bicycle facilities that increase the variety of modes of transportation used to make internal trips built with adequate open space and recreational resources, and to protect natural resources.” As set-forth previously, the intent of mixed-use activity areas can be realized through a mix of uses within proximity that evolve over time as a result of independent investment decisions and development approvals as well as through mixed-use projects that include a mix of commercial, office and light industrial uses planned, approved and developed as a single project. It is not essential that each individual project include a mix of uses. As evidenced by the pending development proposals identified on Figure 5 and Table 2, a mix of industrial, commercial, and residential uses are being proposed for the Jenkins Special Area Plan. Page 429 of 494 July 13, 2022 Page 8 of 13 Furthermore, these proposed sub-area policy changes will facilitate future development of the subject sites with industrial uses, advancing the Economic Sustainability provisions of the Future Land Use Element and the Economic Development Element, specifically the following policies: Objective 1.1.13: Economic Sustainability. To enhance the quality of life of St. Lucie County and promote a sound and resilient local economy, St. Lucie County shall continue to work with the interested groups and agencies to increase and broaden the County's economic base while expanding existing business and industrial opportunities. Policy 1.1.13.1: St. Lucie County shall actively assist to the maximum extent practical in the recruitment of clean high growth industrial activities and maintain an expedited permitting process for bona fide economic development projects, especially those within the Targeted Industry List, and for development projects located within the Foreign Trade Zone. Policy 1.1.13.4: The County shall maintain procedures and incentive tools to encourage business development and assist economic development in St. Lucie County, especially for business within the Targeted Industry List. This goal shall be further implemented by developing innovative land use codes to provide an enhanced the quality of life for St. Lucie County and promote a sound, diverse and resilient local economy. Policy 10.1.1.1 - Attract investors to help diversify the industrial base, broaden the economic tax base and strengthen the job market. Policy 10.1.1.2 - Encourage redevelopment projects and business expansions that will promote economic development opportunities. Policy 10.1.1.4 - Place a high priority on infill projects that are consistent with the smart growth policies of St. Lucie County. Compatibility with Adjacent Land Uses Current Zoning: The subject properties are currently zoned CG (Commercial, General) and AR-1 (Agricultural Residential – 1 du/acre). The purpose of the CG (Commercial, General) zoning district, which encompasses the eastern +/- 16.21-acres is “to provide and protect an environment suitable for a wide variety of commercial uses intended to serve a population over a large market area, which do not impose undesirable noise, vibration, odor, dust, or offensive effects on the surrounding area, together with such other uses as may be necessary to and compatible with general commercial surroundings.” The purpose of the AR-1 zoning district, which designates the western +/-17.8-acres, is “to provide and protect an environment suitable for single-family dwellings at a maximum density of one (1) dwelling unit per gross acre, together with such other uses as may be necessary for and compatible with very low density rural residential surroundings.” The subject parcel and all adjacent parcels are located within the Jenkins Road Area Plan Special District (hereinafter, Jenkins Road Special District). The Jenkins Road Special District encompasses the land in unincorporated St. Lucie County in the area lying south and west of Angle Road, North of Orange Avenue, and east of Kings Highway, near the western boundary of the City of Ft. Pierce. According to LDC Section 4.12.01, the primary intent of the Jenkins Road Special District is to “create a viable road system and supporting multi-modal facilities built within the constraints of existing development, with adequate open space and recreational resources, and to protect natural resources.” LDC Sections 4.12.00 through 4.12.11, establish specific desired street sections, including provisions for pedestrian and cyclist facilities and landscaping. Page 430 of 494 July 13, 2022 Page 9 of 13 Figure 4. Jenkins Road Area Plan Road System (Current) Table 1. Surrounding Property: Location Future Land Use designation Zoning District Existing Land Use Subject Property MXD (Mixed Use Development – Loop Road Mixed Use Activity Area – Low Intensity) AR-1 (Agricultural Residential – 1 du/acre) and CG (Commercial General) Agriculture Ad j a c e n t Pa r c e l s North RU (Residential, Urban) AR-1 (Agricultural Residential – 1 du/acre) Drainage Canal, Single-family Homes, & Agriculture South MXD (Mixed Use Development – Loop Road Mixed Use Activity Area – Medium Intensity) IL (Industrial, Light) Light Industrial Facilities (on Orange Ave. and Jenkins Road) & Agriculture and residential East RU (Residential, Urban) RS-2 (Residential, Single-family – 2 dua) Agriculture (pending petition to annex to City of Fort Pierce) West RU (Residential, Urban) AR-1 (Agricultural Residential – 1 du/acre) Undeveloped Page 431 of 494 July 13, 2022 Page 10 of 13 The proposed amendment to the policy governing permitted uses in the Low Intensity Sub-Area is also consistent with the proposed and pending development in the surrounding area. Figure 5 and Table 2 identify proposed developments currently under review. Figure 5. Jenkins Road Special District and pending development applications Table 2. Pending Developments Currently Under Review – Unincorporated St. Lucie County Project Name Application Type Proposed Development A Pineapple Grove PUD Rezoning and Preliminary Site Plan 405 single-family lots B SLC Evidence Warehouse Conditional Use 27,000 sf warehouse C American Concrete Industries Site Plan Adjustment 10,000 sf addition to existing manufacturing facility D South Florida Logistics Center Major Site Plan Two warehouse distribution buildings: 1,102,950 sf and 202,400 sf E First Source Commerce Park Condo Association Minor Adjustment to Major Site Plan Pave stabilized parking F Kings Highway Warehouse Minor Adjustment to Major Site Plan and wetland waiver Reduction in number of trailer parking spaces to meet storm water requirements for 658,000 sf warehouse/distribution facility G Florida Coast Equipment Major Adjustment to Minor Site Plan Add equipment staging area and a 12ft wide unpaved forklift access to rear parking area H Miller 193 North Minor Re-Plat Reconfiguration of two Industrial lots I Orange Avenue RV Major Adjustment to Minor Site Plan 608 covered, open air Recreational vehicle/Boat storage spaces B A C D E F H I J K G Subject Property N M L Bent Creek Celebration Pointe Whispering Oaks Page 432 of 494 July 13, 2022 Page 11 of 13 J Kings Angle Retail Site Plan and Plat 2 Commercial lots K KRE Development Future Land Use Map Amendment Industrial, Commercial and High-Density Residential Land Use Categories L Eagle Bend PUD Rezoning and Preliminary Site Plan +/- 1235 dwelling units including single-family and multi-family and rental units M Orange 95 Commerce Center Minor Site Plan Two industrial buildings totaling 363,567 sf The MXD, Low Intensity, Future Land Use Category supports a mix of land uses as presented in Table 3, below. The current Loop Road Mixed-Use Activity Area pinpoints specific categories including Institutional, Professional Service/Office and Commercial. The Amendment seeks to narrow the scope further by replacing this use mix with Light Industrial allowances. The floor area ratio (FAR) for industrial development in the Low Intensity Mixed Use development area is limited to 0.5. [Policy 1.1.8.4]. Policy 1.1.8.4 further provides that Industrial and Professional Service/Office uses may receive an intensity bonus of up to 100% of the FAR, within the specific use areas served by the Strategic Intermodal System (SIS) facilities operating at or above the adopted level of service (LOS) and with available water service and wastewater service. Table 3. Permitted Use Groups and Floor Area Ratios permitted in Low Intensity Mixed Use Activity Areas. Zoning Consistency The current zoning designations, and anticipated PNRD District guided by the Sub Area policies, are compatible with the MXD Future Land Use category. Table 3 presents an excerpt from Comprehensive Plan Policy 1.1.1.3. identifying which zoning districts are compatible with which future land use categories. Table 4. Excerpt from Comp Plan Policy 1.1.1.3 ZONING DISTRICTS FUTURE LAND USE CATEGORIES AG-5 AG-2.5 RE RS RU RM RH R/C Cpub COM IND P/F MXD SD H T/U TVC AR-1 Agricultural Residential-1 X X X X X CG Commercial General X X X X PNRD Planned Non-Residential Development X X X X X X X X X X X X X X Low Intensity development areas may include the following types of uses Residential Not to exceed 5 du/acres Institutional 0.5 FAR (Floor Area Ratio) Professional Service/Office 0.5 FAR General Commercial 0.5 FAR Public Service/Utility 0.25 FAR Industrial 0.5 FAR Page 433 of 494 July 13, 2022 Page 12 of 13 The future development is anticipated to be planned, reviewed, and approved via the PNRD Planned Development process to further transition use and design from Orange Avenue north to the canal south of Floyd Johnson Road. Replacing the Agricultural Residential – 1 du/acre district with compatible industrial light activities will support interstate side industrial and distribution facilities in this segment of the Orange Avenue corridor and business hubs adjacent to the Interstate 95 interchange. The proposal maintains consistency with the Comprehensive Plan Table 1-3, Land Use Designation / Zoning Compatibility Chart and the Loop Road Mixed Use Activity Area adopted into the Comprehensive Plan and articulated in Policy 1.1.7.4. Public Facilities As development activity expands in the vicinity of the interchange of Interstate 95 and Orange Avenue (SR 68), transitioning from existing agricultural districts to zoning designations that permit greater intensity of development, the area will continue to benefit from access to transportation and utility infrastructure. The applicant suggests greater demand for the proposed industrial uses in St. Lucie County, and limited land area with as much access to needed public facilities. Utilities The subject properties are in the Fort Pierce Utilities Authority (FPUA) service area with existing water and sanitary sewer force mains located on Orange Avenue and North Jenkins Road to the southeast of the subject sites. Utilities may be extended across the eastern parcel to serve the entire holdings or extend through the planned right-of-way network in the Jenkins Road Special Area Plan. Florida Power and Light (FP&L) is the electric provider for the area. The anticipated public facility demands are consistent with industrial and non-residential development envisioned in this planning area and within the Urban Service Boundary. Further, the Fort Pierce Utilities Authority (FPUA) continues to plan for expanded demand and services to this evolving employment hub. Roadways This area has been identified as suitable for Light Industrial development since the MXD Future Land Use designation was applied in 2007, consistent with an industrial and commercial development trend applied over the past few decades on the Orange Avenue corridor. The Jenkins Road Area Plan Special District further provides strategies to create a more viable road system and supporting multi-modal facilities within this area. I-95 is operating at a Level of Service (LOS) B between Okeechobee Road and Indrio Road. Orange Avenue between Hartman Road and Kings Highway is operating at a LOS C. The Jenkins Road Area Plan Special District establishes specific desired road sections for Jenkins Road between Orange Avenue and Angle Road. The Road Plan provides for a 130-foot wide right-of-way, with two, 12-foot wide travel lanes both northbound and southbound, sidewalks and bike lanes both northbound and southbound, and a landscaped median and landscaped buffers between the sidewalks and the travel lanes. The St. Lucie County 2022-2023 Capital Improvement Plan identifies “future anticipated needs” of $49,000,000 for Jenkins Road from Orange Avenue to St. Lucie Blvd. The various development proposals highlighted in Figure 5 may contribute directly and indirectly to this future infrastructure. Other public facilities The amendment of the Future Land Use Map to allow more Light Industrial and Warehouse uses does not create demand for public school facilities, parks and recreation facilities. Page 434 of 494 July 13, 2022 Page 13 of 13 Public Notice Consistent with the requirements of Sections 163.3174(4)(a), 163.3164(40), and 125.66(2), Florida Statutes, notice of the public hearing before the Planning and Zoning Commission on this proposed amendment was published in the St. Lucie News Tribune on July 10, 2022. Courtesy mailed notice was also provided to owners of property located within 500 feet of the affected area. Staff Recommendation: Staff recommends that the Planning and Zoning Commission of St. Lucie County, acting as the Local Planning Agency, forward a recommendation of approval to the Board of County Commissioners based upon consistency with the St. Lucie County Comprehensive Plan Goals, Objectives and Policies and Florida Statutes. Page 435 of 494 Ordinance No. 2022-XXX Page 1 . ORDINANCE No. 2022-XXX FILE NO.: FLUMA-2205-000012 AN ORDINANCE OF THE BOARD OF COUNTY COMMISSIONERS OF ST. LUCIE COUNTY, FLORIDA, AMENDING THE ADOPTED COMPREHENSIVE PLAN FUTURE LAND USE MAP AND FUTURE LAND USE ELEMENT, LOOP ROAD MIXED USE ACTIVITY AREA SUB AREA POLICY (1.) FOR THE MXD LOW INTENSITY DISTRICT WHICH CONTAINS 34.01 ACRES (M.O.L) OF LAND TO ELIMINATE THE SPECIFIC COMMERCIAL, INSTITUTIONAL AND OFFICE USE THRESHOLDS, AND ALLOW LIGHT INDUSTRIAL AND WAREHOUSE LAND USES INCLUDING FLEX SPACE BUILDINGS; PROVIDING FOR FINDINGS; PROVIDING FOR CONFLICTING PROVISIONS; PROVIDING FOR SEVERABILITY; PROVIDING FOR APPLICABILITY; PROVIDING FOR FILING WITH THE FLORIDA DEPARTMENT OF STATE; PROVIDING FOR FILING WITH THE FLORIDA DEPARTMENT OF ECONOMIC OPPORTUNITY; PROVIDING FOR AN EFFECTIVE DATE; AND PROVIDING FOR ADOPTION WHEREAS, the Board of County Commissioners of St. Lucie County, Florida, based on the testimony and evidence, including but not limited to the staff report, has made the following determinations: 1. On January 9, 1990, the Board of County Commissioners of St. Lucie County, Florida, adopted the St. Lucie County Comprehensive Plan. 2. The Board of County Commissioners of St. Lucie as the governing body of St. Lucie County having jurisdiction over this application pursuant to Chapter 163, Florida Statues, is authorized and empowered to consider amendment to the adopted Comprehensive Plan of St. Lucie County. 3. On July 21, 2022, the St. Lucie County Planning and Zoning Commission acting as the Local Planning Agency held a public hearing, of which due notice was published in the St. Lucie News Tribune, and recommended approval/denial of the proposed amendment to the Board of County Commissioners. 4. On , the Board of County Commissioners of St. Lucie County, Florida held the required public hearing, of which due notice was placed in the St. Lucie News Tribune and voted to approve/deny adopt. Page 436 of 494 Ordinance No. 2022-XXX Page 2 . NOW, THEREFORE, BE IT ORDAINED by the Board of County Commissioners of St. Lucie County, Florida: A. ADOPTION OF THE AMENDMENTS The Board of County Commissioners does hereby adopt the amendment to the St. Lucie County Comprehensive Plan, attached herein as Exhibit A. B. CHANGES TO THE COMPREHENSIVE PLAN The Board of County Commissioners does hereby state its intention to amend the St. Lucie County Comprehensive Plan Future Land Use Map to revise the Loop Road Mixed Use Activity Area Policy for the Low Intensity Sub-Area to replace specific required commercial, institutional and office thresholds with light industrial and warehouse land uses. C. CONFLICTING PROVISIONS Special acts of the Florida Legislature applicable only to unincorporated areas of St. Lucie County, County Ordinances and County Resolutions, or parts thereof, in conflict with the Ordinance are hereby superseded by this Ordinance to the extent of such conflict. D. SEVERABILITY If any portion of this Ordinance is for any reason held or declared to be unconstitutional, inoperative or void, such holding shall not affect the remaining portions of this Ordinance. If this Ordinance or any provisions thereof shall be held to be inapplicable for any person, property, or circumstances, such holding shall not affect its applicability to any other person, property or circumstances. E. APPLICABILITY OF ORDINANCE This Ordinance shall be applicable as stated in Paragraph A and B. Page 437 of 494 Ordinance No. 2022-XXX Page 3 . F. FILING WITH THE DEPARTMENT OF STATE The Clerk is hereby directed forthwith to send a certified copy of the Ordinance to the Bureau of Laws, Department of State, The Capitol, Tallahassee, Florida, 32304. G. FILING WITH THE STATE LAND PLANNING AGENCY The Planning and Development Services Director shall send a certified copy of the Ordinance to the Department of Economic Opportunity, Community Planning and Development Programs, 107 East Madison Street, Caldwell Building, Tallahassee, Florida 32399-4120. H. EFFECTIVE DATE This Ordinance shall take effect thirty-one (31) days after the adoption. If the Ordinance is challenged within thirty (30) days after adoption, the Ordinance shall not be effective until the State Land Planning Agency or Administration Commission respectively issues a final order finding the adopted amendment in compliance in accordance with Section 163.3184(10), Florida Statues. I. CODIFICATION This Ordinance, upon its effective date, shall be codified by incorporating any contained changes into the St. Lucie County Comprehensive Plan. J. ADOPTION. After motion and second, the vote on this ordinance was as follows: Sean Mitchell, Chair XXX Frannie Hutchinson, Vice-Chair XXX Chris Dzadovsky, Commissioner XXX Linda Bartz, Commissioner XXX Cathy Townsend, Commissioner XXX PASSED AND DULY ENACTED this day of _, 2022. Page 438 of 494 Ordinance No. 2022-XXX Page 4 . Attest: Board of County Commissioners St. Lucie County, Florida By: Deputy Clerk Chair Approved As To Form and Correctness: By: County Attorney Page 439 of 494 Ordinance No. 2022-XXX Page 5 . Exhibit “A” UPDATED COMPREHENSIVE PLAN FUTURE LAND USE MAP – LOOP ROAD MIXED USE ACTIVITY AREA Page 440 of 494 Suggested motion to recommend approval/denial of this request: MOTION TO APPROVE: AFTER CONSIDERING THE TESTIMONY PRESENTED DURING THE PUBLIC HEARING, INCLUDING STAFF COMMENTS, I HEREBY MOVE THAT THE PLANNING AND ZONING COMMISSION OF ST. LUCIE COUNTY, ACTING AS THE LOCAL PLANNING AGENCY, RECOMMENDS THAT THE ST. LUCIE COUNTY BOARD OF COUNTY COMMISSIONERS APPROVE THE PROPOSED FUTURE LAND USE MAP AMENDMENT TO REVISE THE LOOP ROAD MIXED USE ACTIVITY AREA POLICY FOR THE LOW INTENSITY SUB-AREA TO REPLACE SPECIFIC REQUIRED COMMERCIAL, INSTITUTIONAL AND OFFICE THRESHOLDS WITH LIGHT INDUSTRIAL AND WAREHOUSE LAND USES. BECAUSE…. [CITE REASON(S) WHY – PLEASE BE SPECIFIC] MOTION TO DENY: AFTER CONSIDERING THE TESTIMONY PRESENTED DURING THE PUBLIC HEARING, INCLUDING STAFF COMMENTS, I HEREBY MOVE THAT THE PLANNING AND ZONING COMMISSION OF ST. LUCIE COUNTY, ACTING AS THE LOCAL PLANNING AGENCY, RECOMMENDS THAT THE ST. LUCIE COUNTY BOARD OF COUNTY COMMISSIONERS DENY APPROVAL OF THE PROPOSED FUTURE LAND USE MAP AMENDMENT TO REVISE THE LOOP ROAD MIXED USE ACTIVITY AREA POLICY FOR THE LOW INTENSITY SUB-AREA TO REPLACE SPECIFIC REQUIRED COMMERCIAL, INSTITUTIONAL AND OFFICE THRESHOLDS WITH LIGHT INDUSTRIAL AND WAREHOUSE LAND USES. BECAUSE…. [CITE REASON(S) WHY – PLEASE BE SPECIFIC]Page 441 of 494 ST. LUCIE COUNTY Planning & Development Services Department Planning Division 2300 Virginia Avenue, Ft. Pierce, FL 34982 Office: 772-462-2822 – Fax: 772-462-1581 stlucieco.gov/planningdivision DEVELOPMENT APPLICATION Submission email:planningapplication@stlucieco.org A pre-application conference is recommended prior to main application submittal. Please contact the Planning Division to schedule an appointment. Submittal Type [check each that applies] Site Plan □Major Site Plan □Minor Site Plan □Major Adjustment to Major Site Plan □Major Adjustment to Minor Site Plan □Major Adjustment to PUD/PNRD/PMUD □Minor Adjustment to Major Site Plan □Minor Adjustment to Minor Site Plan □Minor Adjustment to PUD/PNRD/PMUD Planned Development □Planned Town or Village (PTV) □Planned Country Subdivision (PCS) □Planned Retail Workplace (PRW) □Prelim. Planned Unit Develop. (PUD) □Prelim. Planned Mixed Use Develop. (PMUD) □Prelim. Planned Non-Res. Develop. (PNRD) □Final Planned Unit Develop. (PUD) □Final Planned Mixed Use Develop. (PMUD) □Final Planned Non-Res. Develop. (PNRD) Conditional Use 1 □Conditional Use □Major Adjustment to a Conditional Use □Minor Adjustment to a Conditional Use Variance 2 □Administrative Variance □Variance □Variance to Coastal Setback Line Rezoning 3 □Rezoning (straight rezoning) □Rezoning (includes PUD/PNRD/PMUD) □Rezoning with Plan Amendment Comprehensive Plan Amendment 4 □Future Land Use Map Change □Comprehensive Plan Text Amendment Other □Administrative Relief □Class A Mobile Home 5 □Developer Agreement (Submit per LDC 11.08.03) □Power Generation Plants □Extension to Development Order □Historical Designation/Change 6 □Land Development Code Text Amendment 7 □Plat □Post Development Order Change 8□Re-Submittal # □Shoreline Variance □Stewardships – Sending/Receiving □Telecom Tower (Submit per LDC 7.10.23) □Transfer of Development Rights □Waiver to LDC/Comp. Plan Requirements 9 □Appeal of Decision by Administrative Official10 □Eminent Domain Waiver11 1.Conditional Use 2.Variance 3.Rezoning / Zoning Atlas Amend. 4.Comp. Plan Amendments 5.Class A Mobile Home Application Supplement Packages 6.Historical Designation/Change 10.Appeal of Decision by 7.LDC Text Amendment Administrative Official 8.Re- Submittal 11.Eminent Domain Waiver 9.Waiver to LDC/Comp. Plan Requirements Refer to Fee Schedule for applicable fees. All required materials must be included at the time of submittal along with the appropriate non-refundable fee(s). Additional fees will be due if a 3rd party traffic study review is needed. These services will be invoiced to applicant upon receipt of quote of services from 3rd party. -Please note: For all projects requiring public notice, you will be invoiced by St. Lucie County Planning Division. Refer to“Public Procedures”. -Other fees may be applicable by other external reviewing agencies; i.e. Fire District and proof of payment will be required prior to project approval. Page 1 of 5 Revised September 2021 n Page 442 of 494 Page 443 of 494 Submittal Requirements The following checklist is provided as a reminder. Please see applicable code sections for more detailed submittal requirements. All Submittals MUST be in complete folded and collated sets. All applications must include the following: □Application, completed in black ink, with property owner signature(s) and notary seal (1 original and 11 copies) □Aerial Photograph – property outlined (available from Property Appraiser’s office □Property Deed □Legal description, in MS Word format, of subject property * □Property Tax Map – property outlined (electronic copy not required) □Survey (24x36) □2 USB's of all documents submitted (in lieu of email submission to planningapplication@stlucieco.org - □with files named according to the Required Naming List. (attached) □Concurrency Deferral Affidavit; or □Description and analysis of the impact of the development on public facilities in accordance with the methodologies acceptable to the County (LDC Section 5.08.02). This will require a Transportation Assessment or a full Traffic Impact Report, if applicable.Site Plan and Planned Development Applications must also include: □Site Plan 24”x36” at a scale of 1”=50’ (5 copies- folded, not rolled) □Boundary Survey (24x36) – Signed and Sealed (5 originals) □Topographic Survey (24x36) – Signed and Sealed (5 originals) □Landscape Plan – Signed and Sealed (5 originals) □Traffic Impact Report (TIR) (4 copies) if: o 50+ residential units o Development on N. or S. Hutchinson Island o Non-residential (see LDC Section 11.02.09(4)) □Environmental Impact Report (4 copies) if:(See LDC Section 11.02.09(5)) o The property is ten acres or greater o The property, regardless of size, contains a wetland; o The property is identified on the “Native Habitat Inventory for SLC”; o The proposed development is located in whole, or part, within the One Hundred Year Flood Plain; o Development on N. or S. Hutchinson Island Development Order Extension Applications only require the following: □Letter of justification – submitted at least 2 weeks prior to expiration. (LDC 11.02.06) □Updated Traffic Analysis if applicable (4 copies) □Approved Resolution or GM Order Final Plats only require 2 USBs (follow specifications above) & 4 copies of the following: □Main Application and back up material □Approved Site Plan and copy of approved Development Order □Plat - Include extra copies of Plat for applicable conditions of approval (3 Original Mylars Needed for Recording) *Please note: Only a surveyor, attorney, or title agent is authorized to provide a legal description. The legal description provided on the property appraiser’s website is not valid for our purposes. The legal description you provide us will be used in all future documentation. If it is incorrect, it may invalidate the results of any hearing(s). Page 3 of 5 Revised September 2021 n nnnnn n Page 444 of 494 Project Information Project Name: Site address: Parcel ID Number(s): Legal Description: (Attach additional sheets if necessary – also must be provided in MS Word format on USB) Property location – Section/Township/Range: Property size – acres: Square footage: Future Land Use Designation: Zoning District: Description of project: (Attach additional sheets if necessary) Type of construction (check all applicable boxes): Commercial Total Square Footage: Existing Industrial Total Square Footage: Existing Residential Existing No. of residential units: No. of subdivided lots: Existing Proposed: Proposed: Proposed: Proposed: Other Please specify: Number and size of out parcels (if applicable): Page 4 of 5 Revised September 2021 TBD - Jenkins Road Orange 95 Commerce Center Parcels D & E 2312-111-0001-0002 and 2312-121-0000-000-6 BEING A PARCEL OF LAND LYING IN THE NORTHEAST ¼ OF SECTION 12, TOWNSHIP 35 SOUTH, RANGE 39 EAST, ST. LUCIE COUNTY, FLORIDA; BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: COMMENCE NORTHEAST ¼ CORNER OF SAID SECTION 12; THENCE SOUTH 89°45'46” WEST, ALONG THE NORTH LINE OF SAID SECTION 12, A DISTANCE OF 163.27 FEET; THENCE SOUTH 00°06'24” WEST, DEPARTING SAID NORTH LINE, A DISTANCE OF 64.50 FEET TO A POINT ON THE WEST RIGHT-OF-WAY LINE OF JENKINS ROAD AS SHOWN ON THE ST. LUCIE RIGHT-OF-WAY MAP, DRAWING NO. 324, SHEET 3 OF 5, SAID POINT ALSO BEING THE POINT OF BEGINNING; THENCE CONTINUE SOUTH 00°06'24” WEST, ALONG SAID WEST LINE, A DISTANCE OF 607.24 FEET TO THE SOUTH LINE OF THE NORTH ¼ OF THE [NORTHEAST] ¼ OF SAID SECTION 12; THENCE SOUTH 89°44'22” WEST, DEPARTING SAID WEST LINE AND ALONG SAID SOUTH LINE, A DISTANCE OF 1,162.81 FEET TO THE WEST LINE OF THE EAST ½ OF THE NORTHEAST ¼ OF SAID SECTION 12; THENCE NORTH 00°04'21” EAST, DEPARTING SAID SOUTH LINE AND ALONG SAID WEST LINE, A DISTANCE OF 607.53 FEET TO THE SOUTH RIGHT-OF-WAY LINE OF THE NORTH ST. LUCIE RIVER WATER CONTROL DISTRICT CANAL NO. 31; THENCE NORTH 89°45'46” EAST, DEPARTING SAID EAST LINE AND ALONG SAID SOUTH LINE, A DISTANCE OF 1,163.17 FEET TO THE POINT OF BEGINNING. PARCEL E: THE NORTH 1/2 OF THE NORTHWEST 1/4 OF THE NORTHEAST 1/4 OF SECTION 12, TOWNSHIP 35 SOUTH, RANGE 39 EAST, EXCEPTING THEREFROM RIGHTS OF WAY FOR DRAINAGE CANALS AND ROADS. CONTAINING 34.01 ACRES, MORE OR LESS. 12 / 35 / 39 MXD 34.01 1,481,475.60 sf AR-1 and CG Applicant is requesting approval of a comprehensive plan text amendment for revisions to the current intensity as outlined in the mixed use exhibit within the future land use element. Currently the MXD activity area depicts these parcels as "Low Intensity". The applicant is requesting approval of a change to "Medium Intensity" to match the properties to the south. Concurrently with the above request, the applicant is requesting a Zoning change from AR-1 (western parcel) and CG (eastern parcel) to Industrial, Light (IL). n/a Approx 272,524 sfn Page 445 of 494 Required Document Naming List * All electronically submitted documents must be formatted and named according to the list below. If your submittal includes a document not on the list, the document name shall clearly reflect the content of the submitted document. * Document Document Format Required Name on USB Aerial Photograph PDF Aerial.pdf Application PDF Application.pdf Approval Order PDF ApprovalOrder.pdf Architectural Elevations PDF ArchElev.pdf Boundary / Topographic Survey PDF BoundaryTopo.pdf Drainage / Stormwater Plan PDF DrainagePln.pdf Easements PDF Easements.pdf Environmental Impact Report PDF or Word EIR.pdf or EIR.doc Existing Condition Plan PDF ExistingCond.pdf Flood Plain PDF or Word Flood.pdf or Flood. Doc Landscape Plan PDF Landscape.pdf Legal Description Word Legal.doc Lighting Plan PDF Lighting.pdf Mitigation Plan PDF Mitigation.pdf Mobile Home Plans PDF or Word MobileHome.pdf or MobileHome.doc Paving Plan PDF Paving.pdf Permit (External) PDF Permit.pdf Plat PDF Plat.pdf or Plat.doc Property Deed PDF Deed.pdf Site Plan PDF SitePlan.pdf Traffic Impact Report PDF or Word TIR.pdf or TIR.doc Tree Survey PDF Tree.pdf Turtle Protection PDF or Word Turtle.pdf or Turtle.doc Utility Plan PDF Utiliity.pdf Vegetation Removal Application PDF Vegetation.pdf Page 5 of 5 Revised September 2021 Page 446 of 494 Engineering Design & Construction, Inc. 10250 SW Village Parkway, Suite 201, Port Saint Lucie, FL 34987 772-462-2455 www.EDC-Inc.com PROJECT NARRATIVE & COVER LETTER Orange 95 Commerce Center – Parcels D & E Development Application – Future Land Use Map Change May 10, 2022 REQUEST On behalf of the Petitioner, Engineering Design & Construction, Inc. is requesting approval of a Future Land Use Map Change along with associated text revisions to the Loop Road Mixed Use Activity Area Sub Area Policies within the Jenkins Road Special Area Plan for a proposed industrial development on 34.01 acres. The property is located west of N. Jenkins Road and south of Floyd Johnson Road in St. Lucie County, Florida. The subject parcels are noted below: SITE CHARACTERISTICS & PROJECT HISTORY The subject parcel can be identified in the below table: Parcel ID: Address: Acreage: FLU: Zoning: 2312-111-0001-000-2 TBD 16.17 MXD CG 2312-121-0000-000-6 Lamont Rd. 17.85 MXD AR-1 TOTAL: 34.01 The subject parcels total 34.01 acres and is located west of N. Jenkins Road and south of Floyd Johnson Road in St. Lucie County. The parcels have a Future Land Use Designation of Mixed-Use Development (MXD). The eastern parcel has a Zoning designation of Commercial, General (CG). The western parcel has a Zoning designation of Agricultural, Residential – 1 (AR-1). The petitioner is proposing the development of two (2) industrial buildings with associated site improvements. The applicant is proposing a Future Land Use Map Change along with associated text revisions to the Loop Road Mixed Use Activity Area Sub Area Policies within the Jenkins Road Special Area Plan North of the subject parcels lies a NSLRWCD canal (ROW) followed by the right-of-way for Floyd Johnson Road. North of the roadway lies a number of developed and undeveloped residential parcels. These parcels have Residential Urban (RU) and an underlying Zoning designation of Agricultural, Residential – 1 (AR-1). South of the subject parcel lies an industrial parcel to the southeast and an agricultural parcel to the southwest. The parcel to the southeast has a Future Land Use designation of Mixed-Use Development (MXD) and an underlying Zoning designation of Industrial, Light (IL). The parcel to the southwest has a Future Land Use designation of Mixed-Use Development (MXD) and an underlying Zoning designation of Agricultural, Residential – 1 (AR-1). Page 447 of 494 Orange 95 Commerce Center D&E – FLU Map Change Page 2 of 2 May 11, 2021 East of the subject parcel is the right-of-way of North Jenkins Road followed by a large undeveloped parcel. This parcel has a Future Land Use designation of Residential, Urban (RU) and an underlying Zoning designation of Residential, Single-Family – 2 (RS- 2) West of the is a large lake tract owned by The Lake House LLC. This parcel has a Future Land Use designation of Residential, Urban (RU) and an underlying Zoning designation of Agricultural, Residential – 1 (AR-1). This parcel lies within the jurisdiction of FPUA for water and sewer service and FPL for power service. Included with this submittal, please find the required development review application along with the required submittal material as outlined on page 3 of the application. All required items are included as part of this submittal. Based on the above and attached information, the applicant respectfully requests approval of this application. Z:\EDC-2021\21-550 - Tambone - O95CC - Parcels D & E\ENGINEERING\Documents\Submittal Documents\Justification Statement\2022-05-10_REVISED_O95CC_D&E_FLU_Justification_Statement_21-550.docx Page 448 of 494 Page 449 of 494 Page 450 of 494 Page 451 of 494 Page 452 of 494 Page 453 of 494 Page 454 of 494 Page 455 of 494 Page 456 of 494 Page 457 of 494 Page 458 of 494 Date Mailed 07/12/2022 Planning and Development Services Department 772.462.2822 Applicant Joseph G. Miller (TR) 5500 Orange Avenue Fort Pierce, FL 34947 Agent Bradley J. Currie, AICP bradcurrie@edc.inc.com (772) 462-2455 File Number FLUMA-2205-000012 Future Land Use MXD (Mixed Use Development – Loop Road Activity Area) - Low In- tensity with Office, Commercial, & Institutional Uses Proposed Future Land Use MXD (Mixed Use Development – Loop Road Activity Area) - Low In- tensity with Light Industrial / Ware- house Uses Existing Zoning AR-1 (Agricultural Residential – 1 du/acre) /CG (Commercial General) Staff Recommendation Approval with additional Sub Area Policy Provisions Public Hearing Notice Thursday, July 21, 2022 Project Description A Comprehensive Plan Future Land Use Map Amendment to amend the Loop Road Mixed Use Activity Area Sub Area Policy (1.) for the Low Intensity district to replace the specific commercial, institu- tional and office thresholds for light in- dustrial and warehouse land uses includ- ing flex space buildings. The subject +/-34.01 acres would retain the MXD, Mixed Use District, Low Inten- sity category, however the modified Sub Area Policies would alter the permissible land use scope. The proposal retains vegetated buffer zone requirement, to properly buffer the adjacent residences and other less intense uses. Staff pro- poses a provision requiring rezoning to the Planned Non-residential Develop-ment District (PNRD) for future develop- ment proposals requiring rezoning. For further details on this application please contact: Staff Kori Benton, AICP or Irene Szedlmeyer, AICP Tel 772.462.2518 / 772-462-1562 Email bentonk@stlucieco.org Mail Planning and Development Services Department 2300 Virginia Avenue Fort Pierce, FL 34982 The St. Lucie County Planning and Zon- ing Commission, acting as the Local Planning Agency, has the power to re- view and recommend to the St. Lucie County Board of County Commission-ers, for approval or disapproval, any applications within their area of respon- sibility. The Planning and Zoning Commission strongly encourages your input and comment at the public hearing. You may also mail or email written comments regarding this proceeding in advance of the public hearing for inclusion in the official record. Written comments to the Planning and Zoning Commission should be received by the Planning and Development Services Department— Planning Division at least 3 days prior to the scheduled hearing. Anyone with a disability requiring ac- commodations to attend this meeting may contact the SLC Community Risk Manager at least 48 hours in advance at 772.462.1546 or TDD 772.462.1428 Location: BOCC Chambers SLC Administration Annex, 2300 Virginia Avenue, Fort Pierce, FL 34982 Meeting Time: 6:00 PM (or soon thereafter ) PLANNING AND ZONING COMMISSION Project Location: N Jenkins Road—West Side «Owner» «Mailing Address 1» «Mailing Address 2» «Mailing City State Zip» Page 459 of 494 Owner Acres Owner1 Cypress Knee LLC 31.75998622589 Cypress Knee LLC Damien Russell Baringer and Julie Beth Baring1.73298898071 Damien Russell Baringer David S Schindette 5 David S Schindette Edward A Ritsick and Maria E Ritsick 2.8109963269 Edward A Ritsick George Ritsick and Susan Ritsick 2.8109963269 George Ritsick Howard N Haskell and Barbara A Haskell 2.8109963269 Howard N Haskell Joseph G Miller (TR)16.21359044995 Joseph G Miller (TR) Leroy J Hoeffner and Susan C Hoeffner and Jo 39.57 Leroy J Hoeffner Mary Jeanne Wilson and Caroline Ann Frankl 21.82 Mary Jeanne Wilson Michael R Johnson 1.22 Michael R Johnson Michael R Johnson and Debora M Johnson 1.6 Michael R Johnson NSLRWCD 6.588 NSLRWCD Philip Anton Hoeffner III 2.62286501377 Philip Anton Hoeffner III Priscilla Speicher and Dennis Fesperman 2.8109963269 Priscilla Speicher St Lucie County 0.60700183654 St Lucie County The Lake House LLC 20.7 The Lake House LLC WHALOU PROPERTIES LLC 46.76 WHALOU PROPERTIES LLC Page 460 of 494 Owner2 Owner3 Mailing Ad M Mailing City State Zip 5500 Orang Fort Pierce; FL 34947-1309 Julie Beth B 5960 Floyd Fort Pierce; FL 34947-1560 6300 Floyd Fort Pierce; FL 34947-1568 Maria E Rit 6320 Floyd Fort Pierce; FL 34947-1568 Susan Ritsic 6340 Floyd Fort Pierce; FL 34947-1568 Barbara A H 6400 Floyd Fort Pierce; FL 34947-1573 5500 Orang Fort Pierce; FL 34947-1309 Susan C Ho John A Wes 11 Sussex L Stony Brook; NY 11790-3333 Caroline An 280 Lamon Fort Pierce; FL 34947-1538 6080 Floyd Fort Pierce; FL 34947-1558 Debora M J 6080 Floyd Fort Pierce; FL 34947-1558 14666 Oran Fort Pierce; FL 34945-4511 300 N Jenk Fort Pierce; FL 34947-1513 Dennis Fesp 611 SE Flam Stuart; FL 34996-3248 2300 Virgin Fort Pierce; FL 34982-5632 24300 State Vero Beach; FL 32966-4001 c/o Maria V3 Palm Beach Gardens; FL 33410 Page 461 of 494 Site Address N JENKINS RD 5960 FLOYD JOHNSON RD 6300 FLOYD JOHNSON RD 6320 FLOYD JOHNSON RD 6340 FLOYD JOHNSON RD 6400 FLOYD JOHNSON RD N JENKINS RD N JENKINS RD 280 LAMONT RD 6020 FLOYD JOHNSON RD 6080 FLOYD JOHNSON RD Drainage 300 N JENKINS RD 6450 W JOHNSON PIERCE RD TBD 351 LAMONT RD 670 W JOHNSON PIERCE RD Page 462 of 494 Environmental resources Development Review Letter TO:Kori Benton, Planning & Development Services Department THROUGH:Amy E. Griffin, Environmental Resources Director Aimee L. Cooper, Environmental Regulations Manager FROM:Brian Arbeiter, Senior Environmental Planner DATE:July 14, 2022 SUBJECT:Orange 95 Commerce Center Parcels D & E Future Land Use Map Amendment FLUMA-2205-000012 Background The Environmental Resources Department (ERD) is in receipt of the May 10th, 2022, date-stamped submittal from Planning and Development Services. The applicant is requesting approval of a Future Land Use Map Amendment (FLUMA) to change the development activity description of two (2) parcels from ‘low intensity’, with specific use categories of Institutional, Office and Commercial, to ‘low intensity’ with light industrial use allowances which is more aligned with properties to the south. Additionally, the applicant wishes to pursue Industrial development. A concurrent minor site plan (MNSP-2202226286) is under review for the parcel to the south (Parcel ID 2312-112- 0000-000-8). The subject site is located at TBD Jenkins Road and consists of two (2) parcels respectively measuring 17.8-acres and 16.21-acres. Please contact Brian Arbeiter at 772-462-2866 if you have any questions. Page 463 of 494 Page 464 of 494 Page 465 of 494 Page 466 of 494 Page 467 of 494 Page 468 of 494 Page 469 of 494 Page 470 of 494 Page 471 of 494 Page 472 of 494 Page 473 of 494 FUTURE LAND USE ELEMENT GOALS, OBJECTIVES AND POLICIES Goal 1.1: Ensure the highest quality living environment possible, through a mixture of land uses reflecting the needs and desires of the local residents and how they want their community to develop. The goal shall be implemented by strictly enforced building, zoning and development codes based on objectives and policies that will enhance St. Lucie County's natural and man- made resources while minimizing any damage or threat of degradation to the health, safety and welfare of the county's citizens, native wildlife and environment, through incompatible land uses. Objective 1.1.1: Land Use. Maintain the Future Land Use Map land with the following use designations to portray the future development patterns of St. Lucie County. Policy 1.1.1.1 - The following land use designations/intensities, as indicated on the Future Land Use Maps are provided as the pattern for the future development of the area within unincorporated St. Lucie County. Future Land Use Designation Residential Density Max Height4 (For Buildings) Max Lot Coverage (For Buildings) AG-5 Agriculture-5 1 du/5 acres (0.2 du/1 acre) - - AG-2.5 Agriculture-2.5 1 du/2.5 acres (0.4 du/1 acre) - - RE Residential Estate 1 du/a acre - - RS Residential Suburban 2 du/1 acre - - RU Residential Urban 5 du/1 acre - - RM Residential Medium 9 du/ 1 acre - - RH Residential High 15 du/ 1 acre - - R/C Residential/Conservation 1 du/5 acres (0.2 du/1 acre) - - Cpub Conservation-Public 0 du1 20 ft 5-10% COM Commercial 0 du1.5 60 ft3 40—50% IND Industrial 0 du1 80 ft 40—50% P/F Public Facilities 0 du1 80 ft 40—50% T/U Transportation/Utilities 0 du1 40 ft6 40—50% MXD Mixed Use Development 0.2-15 du/acre2.5 80 ft 40—50% H Historic 0 du1 40 ft 40—50% SD Special District 0.2-15 du/acre 80 ft 40—50% TVC Towns, Villages, & Countryside Variable pursuant to special areas plan. See TVC Element Goals, Objectives, and Policies. 1-9 du/acre - - Notes: 1 Residential uses permitted under specific conditions only. Refer to Zoning/Land Development Code for special restrictions in individual zoning districts. 2 Maximum Densities subject to compliance with intensity with intensity plans for each mixed use area, as set forth in Policy 1.1.87.4 3 For motel or hotel uses, the building spacing formula as identified in the Land Development Code shall be used to establish maximum building height, unless otherwise stipulated in the Hutchinson Island Building Height Overlay Zone section of the Land Development Code, or unless otherwise restricted by Code or Ordinance of the County. 4 Unless otherwise stipulated in the Hutchinson Island Height Overlay Zone section in the Land Development Code 5 Motels/hotels shall be allowed up to 36 units/acre. 6 The height of the Treasure Coast Airport shall be regulated by the Airport Zone Height Limitations established in Section 4.00.03, of the Land Development Code, as reviewed and approved by the Federal Aviation Administration (FAA). Page 474 of 494 St. Lucie County 1-1 Adopted 4.2.2019 Comprehensive Plan Future Land Use Element GOPs Policy 1.1.1.2 - The County’s land use categories shall be described as follows: A. Agricultural-5 (AG-5) The AG-5 land use designation is intended for those areas of the County outside of the planned urban service area which are associated with agricultural and agricultural-related activities. These areas are recognized for first being appropriate for the production of citrus, cash crops, or ranching activities. These areas are acknowledged as potentially suitable for limited residential and nonresidential development under the following criteria: All residential and nonresidential development must be in accordance with applicable standards and restrictions as set forth in the Land Development Code; All residential development proposals in excess of forty-five (45) units must be approved through the Planned Development (PD) process as provided for in the Land Development Code; Any activity other than crop or food product related production, including combinations of properties/uses, in excess of 200 acres should identify appropriate mechanisms for funding the operation and maintenance of necessary infrastructure. Any utility infrastructure shall be consistent with the Infrastructure Element. Residential densities are set at a maximum of 0.20 units per gross acre (one unit per 5 gross acres). B. Agricultural-2.5 (AG-2.5) The AG-2.5 land use designation is intended for those areas of the County outside of the planned urban service area which are associated with agricultural and agricultural-related activities. These areas are recognized for first being appropriate for the production of citrus, cash crops, or ranching activities. These areas are acknowledged as potentially suitable for limited residential and nonresidential development under the following criteria: All residential and nonresidential development must be in accordance with applicable standards and restrictions as set forth in the Land Development Code; All residential development proposals in excess of forty-five (45) units must be approved through the Planned Development (PD) process as provided for in the Land Development Code; Any activity other than crop or food product related production, including combinations of properties/uses, in excess of 200 acres should identify appropriate mechanisms for funding the operation and maintenance of necessary infrastructure. Any utility infrastructure shall be consistent with the Infrastructure Element. Residential densities are set at a maximum of 0.40 units per gross acre (one unit per 2.5 gross acres). C. Residential Estate (RE) The Residential Estate (RE) land use category is intended to act as a transitional area between the agricultural areas and the more intense residential areas in the eastern portion of the County. This category is found predominantly along the western edge of the urban form, but is also appropriate for areas of special environmental concern such as along the North Fork of the St. Lucie River and the Indian River Lagoon. Page 475 of 494 St. Lucie County 1-2 Adopted 4.2.2019 Comprehensive Plan Future Land Use Element GOPs The RE designation is intended for large lot, single-family detached residential dwellings, at a density of one unit per gross acre. These areas are not required to be served with central utilities, however when at all practical, service connections should be provided. The RE designation is acknowledged as potentially suitable for limited residential and nonresidential development under the following criteria: All residential and nonresidential development must be in accordance with applicable standards and restrictions as set forth in the Land Development Code; All residential development proposals in excess of eight units must be approved through the Planned Development (PD) process as provided for in the Land Development Code; Residential densities are set at a maximum of one (1) unit per one gross acre. D. Residential Suburban (RS) The Residential Suburban (RS) land use category is intended to act as a transitional area between the agricultural areas and the more intense residential areas in the eastern portion of the County. This category is found predominantly along the western edge of the urban form, but is also appropriate for areas of special environmental concern such as along the North Fork of the St. Lucie River and the Indian River Lagoon. The RS designation is intended for large lot, single-family detached residential dwellings, at a density of one (1) to two (2) units per gross acre. These areas are not required to be served with central utilities; however when at all practical, service connections should be required. Limited nonresidential uses may be appropriate, in accordance with applicable standards and restrictions as set forth in the Land Development Code. E. Residential Urban (RU) The Residential Urban (RU) classification is the predominant residential land use category in the County. This residential land use category provides for a maximum density of five (5) dwelling units per gross acre. The RU designation is generally found between the identified urban service areas and the transitional RS areas. These properties need to be serviced with central water and wastewater services. These services may be provided by either a public utility or through private on-site facilities, as would be permitted in accordance with all applicable regulations. New development in the RU areas can occur using traditional single-family or multifamily zoning designations or through the planned unit development process. Limited nonresidential uses may be appropriate, in accordance with applicable standards and restrictions as set forth in the Land Development Code. F. Residential Medium (RM) The Residential Medium (RM) land use category is to be applied to those areas that are within, or planned to be within, areas of central community services. A maximum residential density of nine (9) dwelling units per gross acre is permitted under this land use designation. If required, the actual density is subject to the satisfactory completion of the rezoning process, which would include complete review of the physical suitability of the property for development at the proposed intensity. Limited nonresidential uses may be appropriate, in accordance with applicable standards Page 476 of 494 St. Lucie County 1-3 Adopted 4.2.2019 Comprehensive Plan Future Land Use Element GOPs and restrictions as set forth in the Land Development Code. Medium density residential land uses can act as a transition between the lower intensity RU areas and the more intense land use designations. Zoning applications within the RM land use area include single-family, multifamily, or PD zoning. G. Residential High (RH) Areas designated Residential High (RH) are intended to accommodate high density development, not to exceed 15 dwelling units per gross acre. In order to develop at this intensity, it must be possible to connect into a central water and wastewater service facility, and the subject property must be located in an area of the County which has available all urban services and facilities including fire protection, police, recreation, roadways, and schools. Limited nonresidential uses may be appropriate, in accordance with applicable standards and restrictions as set forth in the Land Development Code. H. Mixed Use Development (MXD) The intent of the Mixed Use Development (MXD) designation is to identify those areas where innovative land use concepts are encouraged. Application of this district should be with prudence, and should be only to those areas where traditional land use classifications do not afford the desired flexibility and community input in land use planning necessary to address local concerns. Candidates for this district include all I-95 interchange areas, the Treasure Coast International Airport, Community Development Districts created pursuant to Chapter 190, Florida Statutes and areas of special or unique environmental consideration that may not be appropriate for traditional land use designations. Uses within the areas classified as Mixed Use should be segregated as to intensity and indicated in the form of a concept master plan which is to be included as a part of the land use designation process. The following criteria, in addition to those as cited in Objective 1.1.7 (PUD, PNRD & PMUD), are to be used in the development of Mixed Use areas: Unless otherwise compliant with the identified intensity classification, any change in zoning shall be to the Planned Unit Development (PUD), Planned Non- Residential Development (PNRD) or Planned Mixed Use Development (PMUD), as described in the St. Lucie County Land Development Code. Those properties with compatible existing zoning designations are encouraged to develop under the PUD, PNRD or PMUD regulations. Residential development shall be regulated by the intensity district in which it is to take place. In no case should gross residential density exceed 15 du/ac. All uses shall be compatible with adjacent land uses. I. Special District (SD) The intent of the Special District (SD) designation is to identify those areas where specific uses or combinations of uses are anticipated. SD designated areas include previously approved Community Development Districts, areas for which a site specific development plan or concept has been granted, or areas which by their location have specific issues and concerns for their development. Residential densities within an area designated as a Special District are limited to what the current land use designation authorizes. Any increase over the present designation may be considered only through the Plan Amendment process. Page 477 of 494 St. Lucie County 1-4 Adopted 4.2.2019 Comprehensive Plan Future Land Use Element GOPs J. Commercial (COM) The Commercial (COM) land use designation is applicable to areas of future commercial development, in addition to those existing developed commercial areas. Future commercial areas should be located at points of high transportation access, with specific action taken to prevent the development of new linear commercial strips. Although this plan supports the location of higher intensity commercial uses at the intersection of arterial roadways, it should not be interpreted to mean that every intersection should be designated for commercial activities. Unless otherwise designated on the future land use maps, applications for commercial use should be done in conjunction with a detailed review of the impacts of such development on adjacent property, specifically noting what, if any, negative neighborhood impacts could result from a map amendment. The Commercial (COM) designation is intended to accommodate all commercial zoning districts as identified under St. Lucie County's Land Development Code. Office and general retail uses are considered the principal uses within the COM designated areas. K. Industrial (IND) This land use designation is applied to specific areas of the County identified as suitable for industrial use. This land use designation is intended to be implemented through both the heavy and light industrial zoning districts, with the specific criteria for zoning application as provided for under the policies of the Future Land Use Element. Areas designated for Industrial activities must have available all necessary services and facilities prior to development, supplied by either public or private sources as permitted. In addition, developments proposing to incorporate heavy industrial uses will be required to be adequately buffered from any adjacent use that would be incompatible. Limited nonresidential uses may be appropriate, in accordance with applicable standards and restrictions as set forth in the Land Development Code. L. Public Facilities (P/F) The Public Facilities (P/F) land use designation is applied to properties used for such activities as education and places of worship. This designation may also be applied to other public uses such as jails and administrative buildings. M. Transportation/Utilities (T/U) The purpose of this district is to recognize the Transportation or Utility use of property. This designation may be applied as appropriate subject to review of the specific application and intended use of the property. The Transportation/Utilities (T/U) land use designation has been applied principally to four areas: 1) Treasure Coast International Airport; 2) The St. Lucie County Landfill; 3) The St. Lucie Power Plant site located on South Hutchinson Island; and, 4) The Florida Power and Light-Midway switching station along West Midway Road. N. Historic (H) The Historic (H) land use designation is applied to properties of historic significance as identified by the national historic register, the State of Florida or local designation. Page 478 of 494 St. Lucie County 1-5 Adopted 4.2.2019 Comprehensive Plan Future Land Use Element GOPs O. Conservation The Conservation land use designation has been divided into two future land use categories: Residential/Conservation (R/C) and Conservation-Public (Cpub). These designations are intended to identify areas of the County which exhibit unique or special environmental characteristics, and may be either publicly or privately held. The designations are described in more detail below. 1. Residential/Conservation (R/C): The Residential/Conservation category is intended to identify those privately controlled lands that contain unique vegetation or have characteristics which warrant special attention prior to their being developed. The Residential/Conservation designation is not intended to prevent development activities. Instead, its purpose is to identify those areas that, due to special environmental or other unique constraints, location, property configuration, or topography should be more closely examined before final development approvals are authorized. Areas designated Residential/Conservation carry a development potential of 0.20 dwelling units per gross acre (one dwelling unit per five gross acres). Areas within the R/C designation should be developed using the following criteria: The development is supplied with central water and sewer service; unless otherwise permitted by the appropriate authority. Any development within an area designated R/C should, as a requirement for building permit approval, demonstrate compliance with all applicable environmental protection regulations as set forth in the Land Development Code for St. Lucie County. Any residential development proposal in excess of ten (10) acres, or involving more than eight (8) units, should be reviewed under the Planned Development regulations as set forth in the Land Development Code for St. Lucie County. 2. Conservation-Public (Cpub): Areas designated Conservation-Public are those lands which exhibit unique environmental characteristics and are owned by federal, state, regional, or local public agencies. They are intended solely for preservation and/or recreational use. No residential or commercial development may occur other than that typically related to park service and security functions. P. Towns Villages and Countryside (TVC). Areas designated TVC must follow the policies of the TVC Element in this Comprehensive Plan and the TVC Overlay Zone requirements in the Land Development Code. The purpose of the TVC land use designation is to accommodate future growth within the Special Area Plan for North St. Lucie County in the existing, undeveloped rural areas with a planning strategy that will ensure a settlement pattern that is sustainable, predictable, protects and enhances the rural environment and improves the citizens’ quality of life. The TVC requires a sustainable settlement pattern characterized by a mix of uses, building types and income levels within a compact pedestrian friendly environment that accommodates multiple modes of transportation and preserves open space. This land use category is appropriate for areas that have been analyzed in a Special Area Plan, created with a high degree of citizen participation. Page 479 of 494 St. Lucie County 1-6 Adopted 4.2.2019 Comprehensive Plan Future Land Use Element GOPs Policy 1.1.1.3 – The Future Land Use Map establishes the proposed long-range distribution and general use of property within the county. The following table shall be used to determine consistency of future land use designations and zoning districts to identify compatible zoning districts. Any zoning district that is not consistent with the Future Land Use designation according to the Consistency Matrix, shall not be applied for, permitted, or approved; without a corresponding proposed future land use map amendment request. Zoning Districts FUTURE LAND USE CATEGORIES AG-5 AG- 2.5 RE RS RU RM RH R/C Cpub COM IND P/F MXD SD H T/U TVC AG-5 Agriculture-5 X X X X X X X AG-2.5 Agriculture-2.5 X X X X X AG-1 Agricultural - 1 X X X X X R/C Residential/ Conservation X X X X X X X X AR-1 Agricultural, Residential - 1 X X X X X RE-1 Residential, Estate - 1 X X X X X RE-2 Residential, Estate - 2 X X X X X RS-2 Residential, Single-Family - 2 X X X X X RS-3 Residential, Single-Family - 3 X X X X RS-4 Residential, Single-Family - 4 X X X X RM-5 Residential, Multi-Family - 5 X X X X RMH-5 Residential, Mobile home - 5 X X X X RM-7 Residential, Multi-Family - 7 X X X RM-9 Residential, Multi-Family - 9 X x X RM-11 Residential, Multi-Family - 11 X X RM-15 Residential, Multi- Family - 15 X X CN Commercial, Neighborhood X X X X X X X X X X CO Commercial, Office X X X X X X X X X X CG Commercial, General X X X X CR Commercial, Resort X X IL Industrial, Light X X X IH Industrial, Heavy X X X Page 480 of 494 St. Lucie County 1-7 Adopted 4.2.2019 Comprehensive Plan Future Land Use Element GOPs IX Industrial, Extraction X X X X X X X X X X X X U Utilities X X X X X X X X X X X X X X X X X I Institutional X X X X X X X X X X X X X X X X RF Religious Facilities X X X X X X X X X X X X PCS Planned Country Subdivision X PUD Planned Unit Development X X X X X X X X X X X X X PNRD Planned Non-Residential Development X X X X X X X X X X X X X X PMUD Planned Mixed Use Development X X X X X X X X X X X X X X PRW Planned Retail/Workplace X X PTV Planned Town or Village X X HIRD Hutchinson Island Residential District X X X X X X X X X X RVP Recreational Vehicle Park X X CPUB Conservation Public X X X X X X X X X X X X X X X X X Policy 1.1.1.4 – Notwithstanding the density limitations set forth in Policies 1.1.1.1 and 1.1.1.2 land upon which a lawfully established residential dwelling unit exists (single family residence or mobile home) shall be entitled to a density of one dwelling unit per each recognized lawfully established unit. Such lawfully-established dwelling unit(s) shall not be considered as nonconforming as to the density provisions of Policies 1.1.1.1 and 1.1.1.2 and the St. Lucie County Land Development Code. Policy 1.1.1.5 – St. Lucie County shall review land use designations, zoning districts and consider the creation of appropriate standards for the permitting of accessory dwelling units in single-family residential or agricultural zoning districts, while maintaining the single-family character of the primary single-family dwelling unit and the neighborhood. An “accessory dwelling unit” shall mean an ancillary or secondary living unit, that has a separate kitchen, bathroom, and sleeping area, existing either within the same structure, or on the same lot, as the primary dwelling unit. Objective 1.1.2: Growth Management. St. Lucie County shall manage how and where growth occurs by using sustainable development and balanced planning practices. The County shall manage the land use patterns designated on the Future Land Use Map comprehensively, consistently, and effectively to enhance the quality of life for its citizens, promote economic vitality, and accommodate projected population growth and development in an environmentally acceptable manner. Policy 1.1.2.1 – The adopted Future Land Use Map Series and any amendments shall promote responsible growth management practices. When considering any amendment to the Future Land Use Maps of the County’s Comprehensive Plan, the County Page 481 of 494 St. Lucie County 1-8 Adopted 4.2.2019 Comprehensive Plan Future Land Use Element GOPs Commission shall make the following findings, supported by the other elements of this Plan, prior to taking any approval actions granting an individual amendment to the Future Land Use Maps: 1. That the property under land use amendment application is adjunct to, or within no more than one-quarter mile of the same or greater type of land use classification. 2. That the property under land use amendment consideration lies within the Five Year Capital Improvement Program of the Water and Wastewater Master Plan for St. Lucie County (or can be reasonably accommodated with an amendment to the Master Plan) or otherwise meets the requirements of Policy 1.1.5.4 [formerly Policy 1.1.5.3]. Policy 1.1.2.2 – In accordance with Florida Statutes, proposed future land use map amendments to the County’s Comprehensive Plan, shall be based upon the following analyses: 1. An analysis of anticipated growth; 2. An analysis of the availability of facilities and services; 3. An analysis of the suitability of the plan amendment for its proposed use considering the character of the undeveloped land, soils, topography, natural resources, and historic resources on site; 4. An analysis of compatibility of adjacent land uses; and 5. An analysis of the need for job creation, capital improvement, and economic development that will strengthen and diversify the community’s economy; and 6. A consultation with the Florida Department of Transportation when it is determined that a proposed amendment has the potential to affect facilities on the Strategic Intermodal System. Objective 1.1.3: Agricultural Sustainability. Provide in the Land Development Code provisions for a compatible and coordinated land use pattern which establishes agriculture as the primary use outside of the urban service boundary and promotes retention of agricultural activities, preserves natural resources and maintains native vegetative habitats and allows new development in accordance with the Towns, Villages and Countryside Goals, Objectives and Policies for settlement outside of the urban service boundary within the Special Area Plan for North St. Lucie County. Policy 1.1.3.1 - Require that new developments within the AG-5 and AG-2.5 future land use categories not exceed the gross densities provided in Policy 1.1.1.1, to maintain a distinct and sustainable urban – rural interface. Policy 1.1.3.2 - Any application or petition to divide a lot or parcel of record as of January 9, 1990, in the AG-2.5 or AG-5 future land use categories, into more than forty-five (45) lots, parcels or tracts, shall be approved only through the planned development process consistent with the other Goals, Objectives and Polices of this Plan. If two or more lots, parcels or tracts or combinations of lots parcels or tracts and portions of lots parcels or tracts which are contiguous to other lots parcels or tracts under single or common ownership interest and were of record on January 1, 1990, the lands involved shall be considered to be an undivided parcel for the purposes of this Policy, provided however, that lots, parcels or tracts separated by an ingress/egress, access or roadway easement that was of record on January 1, 1990, but specifically excluding any easement Page 482 of 494 St. Lucie County 1-9 Adopted 4.2.2019 Comprehensive Plan Future Land Use Element GOPs limited to utilities, drainage or other non-access purpose, shall not be considered an undivided parcel for the purpose of this Policy. Policy 1.1.3.3 – For any planned development project within the AG-5 and AG-2.5 future land use categories, the PUD may encompass one or more non-contiguous properties. All of the properties that are included within the PUD shall be considered together for the purpose of calculating the maximum allowable density and shall be governed by a single authorizing resolution. Any planned development project developed within the AG-5 and AG-2.5 future land use categories in excess of 400 units shall be required to employ proven innovative planning techniques to reduce the cost of providing public services to the proposed development. Such techniques may include, but are not limited to, providing for a mix of uses consistent with the scope and scale of the development and paying appropriate impact fees or assessments to offset the cost of providing public services. Policy 1.1.3.4 - Provide the means to manage growth within the agricultural land use categories through the orderly delivery of services concurrent with the impacts of development. It is anticipated that over time portions of the agricultural land use categories will be converted to urban uses as services are provided; however, , the physical extension of County provided central sewer and water services shall only occur consistent with the other provisions of this Plan. Policy 1.1.3.5 - The County shall maintain a site assessment process to evaluate the potential conversion of existing or designated agricultural land uses to non-agricultural land uses in a rational and orderly manner. The site assessment process for a conversion shall require as a condition to such conversion that the Board of County Commissioners affirmatively find that the proposed non-agricultural use: a. is compatible with adjacent land uses; b. maintains the viability of continued agricultural uses on adjacent lands; c. contains soils suitable for urban use as defined by the St. Lucie County soil survey; d. is suitable with existing site-specific land characteristics; e. is consistent with comprehensive development plans; f. will have available the necessary infrastructure concurrent with the anticipated demands for development; g. will avoid the extension of the urban services boundary to create any enclaves, pockets, or finger areas; and, h. Could not be feasibly located on non-agricultural land. Policy 1.1.3.6 - Provide adequate buffering and/or setbacks between agriculture and non- agricultural uses to protect such agricultural uses from adverse impacts associated with encroachment of non-agricultural development or creation of nuisances by agricultural operations, with the use of Agricultural Best Management Practices. Policy 1.1.3.7 - The County shall consider and allow for compatible agri-tourism and eco- tourism uses within the Agricultural area. The proposed use shall not negatively impact the agricultural area or natural resources of the site and the proposed facility shall utilize design standards which consider the carrying capacity of the environmental resources, and the intensity and compatibility of the proposed use. No residential or intense commercial development may occur other than that typically related to park service and security functions. Any agri-tourism or eco-tourism facility must be consistent with the Page 483 of 494 St. Lucie County 1-10 Adopted 4.2.2019 Comprehensive Plan Future Land Use Element GOPs provisions of the Coastal and Conservation Elements of this Plan. Objective 1.1.4: Implementing Land Development Code. Review and amend, as required, the County's Land Development Code which support the implementation of the Future Land Use Element, and the other components of the St. Lucie County Comprehensive Plan. Policy 1.1.4.1 - The Land Development Code shall maintain the specific and detailed provisions necessary to implement the adopted Comprehensive Plan, and which at as a minimum include the following: a. Regulate the subdivision of land; b. Regulate the use of land, air, and water consistent with all elements of the St. Lucie County Comprehensive Plan, to ensure the compatibility of adjacent land uses and provide for adequate open space; c. Protect those areas designated for conservation purposes or that contain other special environmental habitat as identified in the Future Land Use and other elements of the St. Lucie County Comprehensive Plan; d. Regulate areas subject to seasonal and periodic flooding and provide for drainage and stormwater management; e. Protect potable water wellfields and aquifer recharge areas; f. Regulate signage; g. Provide minimum landscaping standards for all development that encourages the use and protection of native and drought tolerant species in lieu of exotic and water consumptive plants; h. Ensure safe and convenient on-site traffic flow and vehicle parking needs; i. Provide that development orders and development permits shall not be issued which result in a reduction of the levels of service for the affected public facilities below the level of service standards adopted in this and other elements of the St. Lucie County Comprehensive Plan; j. Provide for procedures and time schedules for acceptance of amendments to the St. Lucie County Comprehensive Plan in accordance with the provisions of Section 163.3187, F.S.; and k. Minimize noise and light pollution. Objective 1.1.5: Urban Sprawl. Consider changes to the future land use plan based upon smart growth, energy-efficient land use patterns and discouraging the proliferation of urban sprawl. Policy 1.1.5.1 - Consistent with other policies, encourage the location of urban land use intensities, within the defined urban service boundary and authorize density bonuses or other incentives for developments inside the urban service boundary that conform to the Settlement Principles outlined in Policy 11.1.4.2 (TVC) and provide affordable/workforce housing and/or mixed-use development. Discourage the conversion of property in the suburban areas to higher intensity urban uses except where such conversions conform to the Settlement Principles outlined in Policy 11.1.4.2. Prohibit the conversion of property in the agricultural areas to high intensity urban uses except as specifically permitted or required in the Towns, Villages and Countryside (TVC) Element or other programs designed to preserve agricultural lands as approved by the Board of County Commissioners. Policy 1.1.5.2 - Require that new development be designed and planned in a manner which does not place an economic burden upon the services and facilities of St. Lucie Page 484 of 494 St. Lucie County 1-11 Adopted 4.2.2019 Comprehensive Plan Future Land Use Element GOPs County. Policy 1.1.5.3 - Retain an urban service area boundary to restrict the negative impacts of a sprawling low density development pattern and the fiscal burden that pattern of development has on the ability of the community to meet its service needs. Policy 1.1.5.4 - Retain Towns, Villages, and Countryside (TVC) Element to develop North County areas along an urban-to-rural transect with a grid transportation network, interconnected greenway network, and low impact development standards. Policy 1.1.5.5 – St. Lucie County shall follow state standards for brownfields to provide for future brownfield site identification and redevelopment as urban infill projects. The reduction of environmental hazards on existing commercial and industrial sites is vital to the reuse of these areas as sources of employment, housing, recreation, and open space areas. The reuse of industrial land is an important component of sound land use policy for productive urban purposes which help prevent the premature development of agricultural areas, open space areas, and natural areas, and reduce public costs for installing new water, sewer and highway infrastructure. Policy 1.1.5.6 - Future land use map amendment applications that increase the number of potential dwelling units within the unincorporated county, should create a balance of land uses based upon demands of the residential population for the nonresidential needs of an area and allow the operation of real estate markets to provide adequate choices for permanent and seasonal residents and business. Policy 1.1.5.7 – St. Lucie County shall work with FDOT, the Transportation Planning Organization, and adjacent jurisdictions to review coordinated guidelines for Transit Oriented Development (TOD), multimodal systems and design standards for compact, walkable developments. Policy 1.1.5.8 - St. Lucie County shall continue to implement the greenway and trail conceptual plans, in coordination with the federal, state and the adjacent jurisdictions, to provide connectivity between land uses, provide for recreational uses, provide for alternative modes of transportation, and encourage energy efficiency and greenhouse gas reduction. Policy 1.1.5.9 - The County shall continue to support dense, compact development in the Jenkins Special Area Plan corridor which creates a viable road system and supporting multi-modal facilities, and to create an innovative, mixed use neighborhood that increases the internal capture of trips and to include walkable scale and bicycle facilities that increase the variety of modes of transportation used to make internal trips built with adequate open space and recreational resources, and to protect natural resources. Policy 1.1.5.10 – St. Lucie County shall develop, as needed, Land Development Code amendments to implement recommendations of a Green Jobs and Innovation Corridor Charrette which may include green collar job creation, green energy, energy conservation, building standards, landscaping, public meeting places and guidelines to develop the Research Park so that it will encompass the most current green technology available. Policy 1.1.5.11 - Calculate gross residential density on lands that lie above the mean high water elevation and provide for the ability to transfer residential density from wetland and Page 485 of 494 St. Lucie County 1-12 Adopted 4.2.2019 Comprehensive Plan Future Land Use Element GOPs other sensitive or unique environmental habitats to upland areas on contiguous property or non-contiguous property. The transfer of density from a portion of a parcel of land to another parcel of land, the density transferred away shall be documented via a restrictive covenant or similar legal instrument which shall not allow density to be reused by transferring density from the same parcel of land again. Objective 1.1.6: Urban Service Area Boundary. In coordination with the other elements of this plan, future development within the Urban Service Area shall be directed to areas where urban and community services/facilities can be provided in the most efficient and compact manner so as to discourage the proliferation of urban sprawl. Policy 1.1.6.1 - Urban development activities shall be restricted to that area identified as the Urban Service Area in the Future Land Use Map series or to special area plans adopted within the Towns, Villages and Countryside Element. Urban development activities are defined, for the purpose of this Policy, as any residential development activity in excess of two units to the gross acre, any non-agricultural commercial activity or any non- extractive/non-agriculturally related industrial activity. The Urban Service Area is not intended to be a static line of development. Using the 1990 urban service boundary line as a base, an individual segment of this line may be extended or contracted only once for a distance up to 1,500 feet from that which is indicated in the Future Land Use Map series without necessitating an amendment to the Comprehensive Plan provided that the urban service area lies contiguous to an existing residential commercial or industrial land use classification; the owner of the contiguous property can ensure the provision of appropriate infrastructure and services, and the resulting change does not detrimentally impact the established character of the area surrounding the area to be included in the urban service boundary. St. Lucie County shall be responsible for maintaining an updated map indicating the location of the 1990 Urban Service Boundary, including any alterations to it and once every two years include as a part of a Comprehensive Plan Amendment process, the latest Urban Service Area Map. Any modification of the Planned Urban Service Area Boundary beyond 1,500 feet will require a formal amendment through the Comprehensive Plan amendment process. Policy 1.1.6.2 - Prior to the issuance of any final development order within the Urban Service Area and special area plans adopted within the Towns, Villages and Countryside Element, the County shall consider the proximity of the proposed development activity to the availability of urban and community services and facilities. Development which requires extending any of these services over or through significant distances of undeveloped land or land not already subject to the issuance of a final development order shall be discouraged until other lands that are more proximate to the existing services have been developed. Policy 1.1.6.3 – St. Lucie County shall ensure that all development and redevelopment taking place within the unincorporated area of the County does not result in a reduction of the level-of-service requirements established and adopted by this comprehensive plan. Facilities for potable water, sanitary sewer, solid waste, drainage and transportation facilities shall be in place and available to serve new development no later than the issuance of the certificate of occupancy or its functional equivalent. If facility improvements are needed to ensure that the adopted level-of-service standards are achieved and maintained, prior to commencement of construction, a developer is required to enter into Page 486 of 494 St. Lucie County 1-13 Adopted 4.2.2019 Comprehensive Plan Future Land Use Element GOPs a binding and legally enforceable commitment with the County to assure construction or improvement of the facility. [163.3180, F.S] Policy 1.1.6.4 - All new subdivision and site plan development projects that are proposed to take place within the unincorporated area of the County for which water/sanitary sewer service can be provided to the project as identified in the Infrastructure Element, the project shall be required to provide a dry-line water/sanitary sewer distribution/collection system, and provide for connection to such available water/sanitary sewer service as such service becomes available. The standard for construction of these systems shall be included as a part of the County's Land Development Code or Utility Extension Policy Regulations. Policy 1.1.6.5 - Within the Urban Service Area and special area plans adopted within the Towns, Villages and Countryside Element, where regional water and wastewater utility service is not currently available or planned to be made available within the Five Year Schedule of Capital Improvements, the County shall not allow for non-residential development, or residential development in excess of two (2) dwelling units per acre unless the following factors are met: a) The proposed development bears the entire fiscal impact of providing its own on- site water and wastewater services; and, b) The developer agrees to connect to a regional water and wastewater system when such system becomes available to the site with none of the cost for connecting to the regional system being passed on to the regional system. c) At the election of the duty authorized water/wastewater utility in St. Lucie County in whose service territory the proposed development is located, providing on-site water and wastewater service facilities for ownership and operation of the utility service. Policy 1.1.6.6 - The County shall not at public expense construct any new roadways which will extend public facilities to areas not presently served within the Urban Service Area unless such areas are immediately contiguous to existing non-residential or residential urban developments (those areas having density in excess of two (2) dwelling units per acre) or which have been identified by the Transportation Planning Organization as part of its area roadway network to meet area-wide transportation needs. Policy 1.1.6.7 - No non-agricultural development shall be permitted outside of the Urban Service Area that does not address all of its community infrastructure impacts, both on- site and off-site. All development outside the Urban Service Area shall pay the entire cost of its fiscal impacts on public facilities and services. Policy 1.1.6.8 - As provided for under Policy 1.1.6.2, construction of new residential development at densities greater than two (2) units per acre shall only be permitted when central or on-site water and central or on-site wastewater systems are available or will be provided concurrent with the impacts of development, consistent with the adopted levels of service found in the plan. Policy 1.1.6.9 - Existing development will be required to connect to central water and sewer systems when such facilities are made available in accordance with applicable Rules and Regulations and payment of utility fees. Policy 1.1.6.10 - All new subdivision and site plan development projects that are proposed Page 487 of 494 St. Lucie County 1-14 Adopted 4.2.2019 Comprehensive Plan Future Land Use Element GOPs to take place within the approved service area of any duly authorized water/wastewater utility in St. Lucie County, shall be required to provide a "dry-line" central water and wastewater distribution/collection system, and provide for the connection to centralized systems as they become available in accordance with applicable Rules and Regulations and payment of utility fees. The standards for construction of these systems shall be included as a part of the County's Land Development Code, or the Rules and Regulations of the duly authorized water/wastewater utility. Policy 1.1.6.11- Local utility services (i.e., electric substations, wastewater lift stations, telecommunication sites and other small scale utility service operations) necessary to provide for the utility service needs of the neighborhood area, may be approved without the need to amend the Future Land Use Element so long as the property on which the activity is to take place is less than ten (10) acres in total area. Zoning compliance and review procedures for the local utility services are to be as described in the County's Land Development Code. Policy 1.1.6.12 - Require that new development be designed and planned in a manner which does not shift the economic impact of new development to existing taxpayers, services and facilities of St. Lucie County. Economic impact shall be determined based upon the goals, objectives, and policies of this Comprehensive Plan and applicable county regulations. Objective 1.1.7: Historic Resources. St. Lucie County shall require, through the County's Land Development Code, the protection of historically significant structures, facilities and locations within the unincorporated areas of the County, as identified by the State of Florida or the National Register of Historic Places. Policy 1.1.7.1 - St. Lucie County shall continue, with the assistance of the State of Florida and the St. Lucie County Historical Commission, to identify significant historic resources within the unincorporated areas which are in need of protection and develop management and restoration plans as appropriate. Policy 1.1.7.2 - Historic resources shall be protected through designation as historic sites by the State or the County. Policy 1.1.7.3 - St. Lucie County shall maintain specific actions as prescribed by the Division of Historic Resources of the Florida Department of State, which are to be followed in the event historically significant facilities are discovered through or threatened by the land development process. The County shall evaluate alterations to locally designated historic structures to ensure consistency with the U.S. Department of the Interior’s “Standards for Rehabilitation.” Policy 1.1.7.4 - Adaptive reuse of historic structures shall be given priority over activities that would harm or otherwise destroy the historic value of such resources. Policy 1.1.7.5 - St. Lucie County shall continue to protect historic structures by enforcing the St. Lucie County Land Development Code. Policy 1.1.7.6 - St. Lucie County shall maintain and update, as necessary an inventory and map of all archaeological and historical resources within the County. Page 488 of 494 St. Lucie County 1-15 Adopted 4.2.2019 Comprehensive Plan Future Land Use Element GOPs Objective 1.1.8: Planned Developments. The County shall cContinue to support and encourage innovative land use development patterns including planned developments through the adequate provision in the County's Land Development Code including Planned Unit Developments (PUD), Planned Non-Residential Development (PNRD) and the Planned Mixed Use Development (PMUD) zoning designations. Policy 1.1.8.1 – The County shall continue to encourage the use of planned development techniques to conserve open space and environmentally sensitive areas, through the County's Land Development Code which shall include: a. Minimum acreage requirements necessary to support a viable mixed use community providing sufficient design flexibility to allow innovation and creativity in all forms of planned unit developments; b. Minimum open space ratios of 35 percent in all planned developments and including assurances that such areas will remain as open space to protect existing native habitat, to provide for minimum setback needs from adjacent uses, and to provide active and passive recreational as well as visual amenities; c. Provisions ensuring the long term preservation of remaining open spaces; d. A mixed use district combining residential, commercial, recreational, educational, and other income producing uses providing significant functional and physical integration among uses; e. Minimum standards for the provision of on-site shopping, job opportunities and internal trip capture; and, f. Specific requirements to provide efficient, centralized infrastructure (potable water and sanitary sewer). Include specific restrictions on the use of septic tanks, individual wells, and package plants in planned unit developments. g. Development consistent with the Towns, Villages and Countryside Element and the Transfer of Development Rights Program outlined under Objective 11.1.7. Policy 1.1.8.2 – The County shall eEncourage the use of the Planned Mixed Use Development (PMUD) zoning designation which permits both residential and non- residential development within a single planned development. Policy 1.1.8.3 – The County shall cContinue to support and implement the mixed use activity areas as indicated in the Sub-area Mixed Use Activity Area Plans as depicted by name in this Element. Remainder of page is left blank intentionally Page 489 of 494 St. Lucie County 1-16 Adopted 4.2.2019 Comprehensive Plan Future Land Use Element GOPs Policy 1.1.8.4 - The following use density and intensity standards shall be used for the purpose of this plan for the Mixed Use activity areas: 1. High Intensity development areas may include the following types of land uses: Residential 5 to 15 du/acres Institutional 1.5 FAR * Professional Service/Office 1.5 FAR * General Commercial 1.0 FAR * Public Service/Utility 0.5 FAR * Industrial 0.75 FAR * * FAR = Floor Area Ratio 2. Medium Intensity development areas may include the following types of land uses: Residential 5 to 9 du/acres Institutional 1.0 FAR * Professional Service/Office 1.0 FAR * General Commercial 0.75 FAR * Public Service/Utility 0.25 FAR * Industrial 0.5 FAR * * FAR = Floor Area Ratio 3. Low Intensity development areas may include the following types of uses: Residential not to exceed 5 du/acres Institutional 0.5 FAR * Professional Service/Office 0.5 FAR * General Commercial 0.5 FAR * Public Service/Utility 0.25 FAR * Industrial 0.5 FAR * FAR = Floor Area Ratio 4. Specific Use Areas: Areas with special or unique local character may be included within the Mixed Use Designation. These areas, because of conditions unique or peculiar to them alone, have been limited to specific activities and zoning options as set forth in the activity area plans described in Policy 1.1.8.3. Any zoning application not consistent with this policy must be accompanied by a corresponding Comprehensive Plan Amendment indicating the change in intensity classification. Application of the Specific Use Area designation is to be made to those areas recognized by the County as suitable for alternative land use as the full spectrum of community services become available. This designation would serve to prevent the unplanned or premature development of such areas until all services were provided for and are consistent with the Future Land Use development philosophy of St. Lucie County. The terminology used in the Specific Use designation identifies the type of permitted activity, maximum zoning density or maximum zoning intensity. Each Mixed Use Activity area will identify the type of Special Use areas in the legends of each area. Industrial and Professional Service/Office uses may receive an intensity bonus of up to 100% of the FAR, within specific use areas served by Strategic Intermodal System (SIS) facilities operating at or above the adopted level of service (LOS) and with available water service and wastewater service. Objective 1.1.9: Residential Areas. Property owners' investments, their quality of life and the single-family neighborhood, as a defined residential area, shall be protected from the encroachment of commercial and/or other inappropriate land uses through consistent and predictable application of the Land Development Code. Policy 1.1.9.1 - All new subdivisions, planned unit developments and site development plans shall be designed to include an efficient system of internal traffic circulation that Page 490 of 494 St. Lucie County 1-17 Adopted 4.2.2019 Comprehensive Plan Future Land Use Element GOPs does not require internal trips or trips of short duration to be forced onto the major roadway network. Connections to new and existing subdivisions shall be encouraged. Policy 1.1.9.2 - All new subdivisions shall be designed so that all individual lots have direct access to the internal street system, and that any lot or property along the periphery of the development is to be buffered from any major roadway and incompatible land uses. Policy 1.1.9.3 - Continue to implement the county-wide right-of-way protection regulation and Right-of-Way Dedication Ordinance. Policy 1.1.9.4 - Limited development of commercial/non-residential uses, that are not located within a special area plan adopted within the Towns, Villages and Countryside Element, will be allowed within areas classified for residential use, provided that these activities are compatible with the adjacent land uses and meet the following standards: a) Intent of the commercial use is to provide easily accessible, convenience-type uses to immediately surrounding residents; b) Conversion of the petitioned property would not promote any strip commercial use of land; c) Use is compatible with surrounding land uses and is provided with adequate screening and buffering of any adjacent residential property; d) The property for which the commercial designation is sought does not exceed 10 acres. Objective 1.1.10: Commercial Areas. St. Lucie County shall provide for the establishment of commercial zoning districts where various types of commercial retail, including commercial uses for retail trade, office and service activities and general commercial uses for highway- oriented sales and services; light industrial service uses; and hotel uses may be permitted at intensities which are consistent and compatible with the surrounding community and the natural environment. Policy 1.1.10.1 - The implementation of the County's Land Development Code the Commercial General (CG) zoning district shall include: a) New Commercial General (CG) property shall have available to it at the time of any zoning change central water services, or have an executed service agreement for the provision of central water services necessary for both domestic and fire protection purposes. b) New Commercial General (CG) property shall not be located within 300 feet of any Aquatic Preserve or other specially designated aquatic habitat or a Category I Wetland as described in the Conservation Element of this Plan. c) New Commercial General (CG) areas shall have immediate access to the regional transportation network. d) New Commercial General (CG) property shall have a minimum lot size of one (1) acre, unless the property is being added to another existing commercially (general) zoned property. Policy 1.1.10.2 - Require effective visual and light diffusion barriers between residential and non-residential uses. Standards and requirements for such barriers are to be included in the landscaping and screening regulations of the St. Lucie County Land Development Code. Policy 1.1.10.3 – Eliminate future scattered and highway strip commercial development Page 491 of 494 St. Lucie County 1-18 Adopted 4.2.2019 Comprehensive Plan Future Land Use Element GOPs (linear pattern of commercial retail uses along road corridors) by providing for the consolidation of access points, installation of landscaping, incorporation of pedestrian access, adherence to the community architectural standards and encouraging the development of commercial centers or nodes consistent with the Future Land Use Map. The County may require a market study to validate land use requests for additional highway strip commercial development. Policy 1.1.10.4 - Restrict strip commercial development to those traffic corridors where such development patterns now exist. The depth of these commercial areas should average 600 feet, with the exceptions to be found at points of arterial intersection. Policy 1.1.10.5 - Interchange development activities should not include commercial activities that are designed to service a small geographic market area. Local service activities should be located near or within the neighborhoods they serve where a mix of uses is appropriate and where pedestrian and bicycle traffic can be encouraged and promoted. Policy 1.1.10.6 - Encourage the use of existing commercial and industrial designated lands within the urban service area, through requiring a strict demonstration of service availability, before authorizing Land Use and Zoning amendments in areas not presently indicated as having such a designation. Objective 1.1.11: Natural Resources. Through enforcement of the County's Land Development Code, the County shall support criteria and standards for the protection/creation of native plant communities within the County. For the purpose of this plan, Native Plant Communities shall be preserved as defined in the Treasure Coast Regional Planning Council's Regional Policy Plan, Regional Policy 10.1.2.2., "...preserved in viable condition with intact ground cover, understory and canopy." Policy 1.1.11.1 - St. Lucie County shall protect and preserve both wetland and upland habitat by evaluating the following for Land Use and Zoning amendments and development proposals: a) Size of the property on which the development activity is to take place; b) The type quality and sensitivity of the native habitat including nesting and foraging locations found on site; c) Methodologies to be employed in protecting and preserving native habitat; d) The presence or occurrence of endangered or threatened species on site and methodologies to be employed to ensure their continuing presence on site or mitigation; e) The amount of similar habitat in a state of functional preserve within the same area; and, f) Requirements that all necessary environmental assessments be prepared by personnel having the appropriate expertise to make the necessary determinations which shall be submitted in writing to the Board of County Commissioners for review prior to their making a determination regarding any proposed development. Policy 1.1.119.2 - In conjunction with the implementation of Policy 1.1.11.1, the County shall allow fees in lieu of on-site preservation for the purpose of habitat acquisition/preservation. The Land Development Code criteria and standards drafted for the protection and preservation of both wetland and upland habitat shall specify criteria when fees in lieu of on-site preservation shall be allowed. The criteria shall consider Page 492 of 494 Page 493 of 494 Page 494 of 494