Loading...
HomeMy WebLinkAboutSUBMITTED PHOTOSFigures 1 and 2 — Utility Room piping after to placement of 6 mil plastic and exterior foundation with #5 rebar shown properly placed on top of 6 mil plastic for interior walls (Figure 1) and exterior foundation wall (Figure 2). Note 6 mil vapor barrier is under rebar. Figures 3 & 4 — measurements were made around the exterior and ini i.:rior foundations to insure they were 18 inches deep. in accordance with the l ? x 12 foundation plus a 6 inch slab (see Sheet S-2 structural plan) 7 Figures 5 — measurements were made around the exterior and interior foundations to insure they were 18 inches deep, in accordance with the 12 x 12 foundation plus a 6 inch slab (see Sheet S-2 structural plan) Figures 6 — measurements were made around the exterior und interior foundations to insure they were 18 inches deep, in accordance with the 12 x 12 foundation plus a 6 inch slab (see Sheet S-2 structural plan) Figure 7— Typical location of exterior wall. The form boards are 2 x 12's. It can be see that the foundation is 6 in or more below the 2 x 12. The rebar has not been placed and tied as yet in this photograph Figure 8— Typical location of 2 45 rebars in foundation (see Sheet S-2 structural plan). To insure the rebar met the 3 inch above base design, rebar spaces . re ,]ace under the rebar (shown circled). Vapor barrier is below rebar as per structural details. On -site inspection verified the foundations were 18 in deep, met the profile requirem�, &. of the structural details, and had 3 inch spacers under the #5 re -bars 0 Figure 9 — Dome anchor (from Detail S-2 2H — Rebar uncovered for verification Figure 10 and 11 — Dome anchor (from Detail S-2 2H -- Rebar uncovered for verification and cabling shown (not yet tensioned) 10 Figure 12 — photo showing the depth of bury for utilities. Figure 13 — Utility Room pipinf; rior to placement of 6 mil plastic. The 6 mil plastic can be seen in V background for In. room area 11 Figure 14 — Utility Room piping prior to placement of 6 mil plastic. Floor slab grade line can be seen in photo (orange string) Figure 15 —Utility Room pi!)Ing prior to placement of 6 mil plastic. The 6 mill plastic can be seen in the background for living room area. Utilities come in 12 inche ; below the proposed slab as shown below g, ade string (orange) 12 4 �N .Q- �� r I>.r Figure 21 — Cementing panel in place - cement covers the joints. Footer rebar tied to each Figure 22 — Cementing panel in place - cement covers the joints. Wood is for fonning architectural features. Cable within first row above riser panels with first layer of conci , -te (not yet tension cd ) 15 N N POP - Maw Y?.. r , Figure 22 — Cementing panel in place - cement covers the joints. Wood is for forming architectural features. Cable within first row above riser panels with first layer of concrete Figure 23 —Cementing panel in place -cement covers the joints. Wood is for forming, architectural features IM N N Figure 24 -Top of Dome — rebar extending through roof is shown. Cabling as per Sheet S-9 beneath the cement. End of cable after tension is shown (red arrow) Figure 25 - Kebar in joint section of cupola at all corners 17 Figure 26 - Rebar in joint section of cul,ola at all corners Figure 27 - Cable tie into cupola, all tlu•ead bolts/nuts/washer from top plate on cupola to frame Figure 28 - Galvanized hurricane clips on cupola connections. Figure 21) —Entry slab showhi�-, anchor bolts where cAry panels will be installed 19 Figure 30 — Entry slab showing anchor bolts where entry panels will be installed Figure 31 - Main support beam rebar at edge of main entryway with rebar shown. Typical for both entryways. Also note vertical rebar for link room. 20 � I 41 a - '� Vi 104 fr- z� d �5 t� Right M,a n Figure 35 - Exterior view of galvanized bolts with wire reinforcement. Galvanized all - thread bolts lock door framing to concrete beams of dome shell. 22 Figure 36 - construction of dome entryway. Figure 37 - 1! k, \ :ew of galvanized bolts with wire reinforcement. Galvanized all - thread bolts loci: door framing to concrete beams of dome hell. 23 Figure 38 - Exterior view of finished porch entryway. Galvanized all -thread bolts lock door framing to concrete beams of dome shell Figure 39 - shows construction of dome c itryway. Rebar was added to reinforce top of entry way/balcony 24 Figures 40 and 4 i sbo w the rebar incorporated into the entry panels and the connection of the entry to the dome panels. Footing rebar in joints connecting entry ways to dome shell. 25 ±�Ot n V.� � k m .Y�{ah i'f FM Figure 4 - Exterior view of galvanized bolts with cable reinforcement. Galvanized all - thread bolts lock door framing to concrete beams of dome shell. 26 Figure 43 - Interior view of porch entryway showing treated wood framing for interior wall leading to porch entry.. All interior vertical wood was comprised of 2 x 6 timbers Figure 44 - Rods on east side, view from top floor looking up to Cupola from interior. Rods to be tied to interior structure per detail 27 Figure 45 - Rods on east side, view from second floor looking up to Cupola from interior Figure 46 - Rods on north side, view from second floor. Tie rod go, s through to exterior AIM Figure 47 - Rods on either side of top floor door overlooking porch area from bedroom. Tie rods go through to exterior herinw.: Figures 48 to 51 - Interior and l , for view of galvan, d bolts. Galvanized all -thread bolts lock second floor to concrete beams of dome shell 29 Figures 52 to 53 - Interior and Exterior view of galvanized bolts. Galvanized all -thread bolts lock second floor to concrete beams of dome shell Figure 54 - Exterior view of galvanized bolt. i a 11,.-anized all -thread bolts lock second floor to concrete beams of dome shell 30 Figure 57 - Interior window frarning - typical Figure 58 - Upstairs bedroom wall naming showing electrical boxes in wall MA Figure 59 — close-up of bedroom wall and electrical box Figure 60 -- t aming for wing•,,,,Al iri upstairs bedroom showing electrical wiring 33 Figure 61 — close-up of framing for wingwall in upstairs bedroom showing electrical wiring Figure 62-- Electrical box along the framing at base of upstairs bedroom 34 Figure 63 -- close-up of electrical box Figure 64 — Framing in upstairs bedroom showing electrical wiring 35 Figure 65 — Close-up of electrical wiring in upstairs bedroom Figure 66 — Partially exposed framing for upstairs bedroom showing the light fixtures 910 Figure 67 — ceiling framing in upstairs bedroom with light fixtures Figure 68 — framing and electrical box in wall in upstairs closet 37 Figure 69 — framing and electrical boa (#2) in wall in upstairs closet Figure 70 - framing and electrical box (#3) in wall in upstairs closet 38 1,'igure 71 — framing for the interior closet/bedroom wall prior to application of drywall Figure 72 — training and electrical box in wall in upstairs closet 39 Figure 73 — framing and electrical box in well in upstairs closet Figure 74 — close-up of electrical box 40 Figure 75 — Hallway framing and electrical boxes upstairs Figure 76 Hallway light fixture uj,s(, irs 41 Figure 77 - Hallway framing and light boxes upstairs Figure 7;-1 - 1 iillway framing and electrical boxes upstairs 42 Figure 80 — Duct work and electrical box hebind drywall in upstairs bathroom 43 Figure 81 — Close-up of framing and first air conditioning ducts for upstairs bedroo,.n Figure 82 -- Partially exposed framing at base of walls where sheetrock will tie to existing roof tiles and floor. The framing shows the air conditioning ducts for upstai„ bedroom 44 Figure 83 — Close-up of second air conditioning ducts for upstairs bedroom Figure 84 — Partially exposed framing at rase of walls where sheetrock will tie to existing roof tiles and floor. The framing shows the air conditioning ducts for upstairs bedroom 45 Figure 85 — framing and plumbing in wall in upstairs bathroom Figure 86 — Close-up of base of frm-ning and plumbing in wall in upstairs bathroom 46 Figure 87 — shower connection on the 47 I Property Appraiser - St.Lucie C :y, FL Page 1 of 1 Helen D Shaber Record: 1 of 2 Property Identification Site Address: 3335 Brocksmith Rd Sec/Town/Range: 29 :35S :39E Map ID 23/29N Zoning. AG-5 Ownership and Mailing Owner: Helen D Shaber Address: 3335 S Brocksmith Rd Fort Pierce FL 34945-4412 Sales Information Date Price Code 5/17/2002 68000 00 5/17/2002 100 02 6/2/1999 186800 02 X PROPERTY RECORD CARD <<Prev Next» Spec.Assmnt Taxes Exemptions Permits Home Print ,�UCIECO ParcellD: 2329-601-0002-000-5 Account # 139839 Land Use. CRPLD SL CAP City/Cnty St Lucie County Legal Description BUFFALO CREEK LOT 2 (8.37 AC) (OR 1530-495) Assessment 2010 Final Total Land and Building Deed Book/Page 2010 Final 223900 Land Value: 117200 Acres 8.37 WD 1530 / 0495 Assessed: 171100 Building Value: 106700 WD 1530 / 0493 Ag.Credit: 52800 Finished Area: 2374 SgFt WD 1227 / 2563 Exempt 50000 Taxable 121100 Taxes 3556.19 BUILDING INFORMATION Exterior Features View: RoofCover. TN - Metal RoofStruct HP - Hip ExtType. HC - HC YearBlt: 2003 Frame - Grade: C - C EffYrBlt: 2003 PrimeWall: BS - CB Stucco StoryHght 0010 - 1 Story No Units 1 SecWall: Interior Features BedRooms: 1 Electric: MX - MAXIMUM PrmintWall: DW - Drywall FullBath 1 HeatType: FHA - FrcdHotAir AvgHt/FI: 1/26ath: 0 HeatFuel: ELEC - Electric Prm.Flors: WDLM - Wood Laminat %A/C: 100 %Heated: 100 %Sprinkled: 0 Special Features and Yard Items Land Information Type Y/S Qty Units Qual Cond. YrBlt. No. Land Use Type Measure Depth 1 5100-CRPLD SL 520 -Market 4 CAP Acres 2 RC01-ROW 520 -Class Acres 4 CROP 3 0100-SF Res 520 -Acres 2.185 More... THIS INFORMATION IS BELIEVED TO BE CORRECT AT THIS TIME BUT IT IS SUBJECT TO CHANGE AND IS NOT WARRANTED http://www.paslc.org/prc.asp?prcIid=232960100020005 5/ 19/2011