HomeMy WebLinkAboutSUBMITTED PHOTOSFigures 1 and 2 — Utility Room piping after to placement of 6 mil plastic and exterior
foundation with #5 rebar shown properly placed on top of 6 mil plastic for interior walls
(Figure 1) and exterior foundation wall (Figure 2). Note 6 mil vapor barrier is under rebar.
Figures 3 & 4 — measurements were made around the exterior and ini i.:rior foundations to
insure they were 18 inches deep. in accordance with the l ? x 12 foundation plus a 6 inch
slab (see Sheet S-2 structural plan)
7
Figures 5 — measurements were made around the exterior and interior foundations to
insure they were 18 inches deep, in accordance with the 12 x 12 foundation plus a 6 inch
slab (see Sheet S-2 structural plan)
Figures 6 — measurements were made around the exterior und interior foundations to
insure they were 18 inches deep, in accordance with the 12 x 12 foundation plus a 6 inch
slab (see Sheet S-2 structural plan)
Figure 7— Typical location of exterior wall. The form boards are 2 x 12's. It can be see
that the foundation is 6 in or more below the 2 x 12. The rebar has not been placed and
tied as yet in this photograph
Figure 8— Typical location of 2 45 rebars in foundation (see Sheet S-2 structural plan).
To insure the rebar met the 3 inch above base design, rebar spaces . re ,]ace under the
rebar (shown circled). Vapor barrier is below rebar as per structural details. On -site
inspection verified the foundations were 18 in deep, met the profile requirem�, &. of the
structural details, and had 3 inch spacers under the #5 re -bars
0
Figure 9 — Dome anchor (from Detail S-2 2H — Rebar uncovered for verification
Figure 10 and 11 — Dome anchor (from Detail S-2 2H -- Rebar uncovered for verification
and cabling shown (not yet tensioned)
10
Figure 12 — photo showing the depth of bury for utilities.
Figure 13 — Utility Room pipinf; rior to placement of 6 mil plastic. The 6 mil plastic can
be seen in V background for In. room area
11
Figure 14 — Utility Room piping prior to placement of 6 mil plastic. Floor slab grade line
can be seen in photo (orange string)
Figure 15 —Utility Room pi!)Ing prior to placement of 6 mil plastic. The 6 mill plastic
can be seen in the background for living room area. Utilities come in 12 inche ; below the
proposed slab as shown below g, ade string (orange)
12
4 �N
.Q-
�� r
I>.r
Figure 21 — Cementing panel in place - cement covers the joints. Footer rebar tied to each
Figure 22 — Cementing panel in place - cement covers the joints. Wood is for fonning
architectural features. Cable within first row above riser panels with first layer of
conci , -te (not yet tension cd )
15
N N
POP
- Maw
Y?..
r ,
Figure 22 — Cementing panel in place - cement covers the joints. Wood is for forming
architectural features. Cable within first row above riser panels with first layer of
concrete
Figure 23 —Cementing panel in place -cement covers the joints. Wood is for forming,
architectural features
IM
N N
Figure 24 -Top of Dome — rebar extending through roof is shown. Cabling as per Sheet
S-9 beneath the cement. End of cable after tension is shown (red arrow)
Figure 25 - Kebar in joint section of cupola at all corners
17
Figure 26 - Rebar in joint section of cul,ola at all corners
Figure 27 - Cable tie into cupola, all tlu•ead bolts/nuts/washer from top plate on cupola to
frame
Figure 28 - Galvanized hurricane clips on cupola connections.
Figure 21) —Entry slab showhi�-, anchor bolts where cAry panels will be installed
19
Figure 30 — Entry slab showing anchor bolts where entry panels will be installed
Figure 31 - Main support beam rebar at edge of main entryway with rebar shown. Typical
for both entryways. Also note vertical rebar for link room.
20
�
I
41
a
-
'�
Vi
104
fr-
z�
d
�5 t�
Right M,a n
Figure 35 - Exterior view of galvanized bolts with wire reinforcement. Galvanized all -
thread bolts lock door framing to concrete beams of dome shell.
22
Figure 36 - construction of dome entryway.
Figure 37 - 1! k, \ :ew of galvanized bolts with wire reinforcement. Galvanized all -
thread bolts loci: door framing to concrete beams of dome hell.
23
Figure 38 - Exterior view of finished porch entryway. Galvanized all -thread bolts lock
door framing to concrete beams of dome shell
Figure 39 - shows construction of dome c itryway. Rebar was added to reinforce top of
entry way/balcony
24
Figures 40 and 4 i sbo w the rebar incorporated into the entry panels and the connection of
the entry to the dome panels. Footing rebar in joints connecting entry ways to dome
shell.
25
±�Ot
n
V.�
� k m
.Y�{ah i'f FM
Figure 4 - Exterior view of galvanized bolts with cable reinforcement. Galvanized all -
thread bolts lock door framing to concrete beams of dome shell.
26
Figure 43 - Interior view of porch entryway showing treated wood framing for interior
wall leading to porch entry.. All interior vertical wood was comprised of 2 x 6 timbers
Figure 44 - Rods on east side, view from top floor looking up to Cupola from interior.
Rods to be tied to interior structure per detail
27
Figure 45 - Rods on east side, view from second floor looking up to Cupola from interior
Figure 46 - Rods on north side, view from second floor. Tie rod go, s through to exterior
AIM
Figure 47 - Rods on either side of top floor door overlooking porch area from bedroom.
Tie rods go through to exterior
herinw.:
Figures 48 to 51 - Interior and l , for view of galvan, d bolts. Galvanized all -thread
bolts lock second floor to concrete beams of dome shell
29
Figures 52 to 53 - Interior and Exterior view of galvanized bolts. Galvanized all -thread
bolts lock second floor to concrete beams of dome shell
Figure 54 - Exterior view of galvanized bolt. i a 11,.-anized all -thread bolts lock second
floor to concrete beams of dome shell
30
Figure 57 - Interior window frarning - typical
Figure 58 - Upstairs bedroom wall naming showing electrical boxes in wall
MA
Figure 59 — close-up of bedroom wall and electrical box
Figure 60 -- t aming for wing•,,,,Al iri upstairs bedroom showing electrical wiring
33
Figure 61 — close-up of framing for wingwall in upstairs bedroom showing electrical
wiring
Figure 62-- Electrical box along the framing at base of upstairs bedroom
34
Figure 63 -- close-up of electrical box
Figure 64 — Framing in upstairs bedroom showing electrical wiring
35
Figure 65 — Close-up of electrical wiring in upstairs bedroom
Figure 66 — Partially exposed framing for upstairs bedroom showing the light fixtures
910
Figure 67 — ceiling framing in upstairs bedroom with light fixtures
Figure 68 — framing and electrical box in wall in upstairs closet
37
Figure 69 — framing and electrical boa (#2) in wall in upstairs closet
Figure 70 - framing and electrical box (#3) in wall in upstairs closet
38
1,'igure 71 — framing for the interior closet/bedroom wall prior to application of drywall
Figure 72 — training and electrical box in wall in upstairs closet
39
Figure 73 — framing and electrical box in well in upstairs closet
Figure 74 — close-up of electrical box
40
Figure 75 — Hallway framing and electrical boxes upstairs
Figure 76 Hallway light fixture uj,s(, irs
41
Figure 77 - Hallway framing and light boxes upstairs
Figure 7;-1 - 1 iillway framing and electrical boxes upstairs
42
Figure 80 — Duct work and electrical box hebind drywall in upstairs bathroom
43
Figure 81 — Close-up of framing and first air conditioning ducts for upstairs bedroo,.n
Figure 82 -- Partially exposed framing at base of walls where sheetrock will tie to existing
roof tiles and floor. The framing shows the air conditioning ducts for upstai„ bedroom
44
Figure 83 — Close-up of second air conditioning ducts for upstairs bedroom
Figure 84 — Partially exposed framing at rase of walls where sheetrock will tie to existing
roof tiles and floor. The framing shows the air conditioning ducts for upstairs bedroom
45
Figure 85 — framing and plumbing in wall in upstairs bathroom
Figure 86 — Close-up of base of frm-ning and plumbing in wall in upstairs bathroom
46
Figure 87 — shower connection on the
47
I
Property Appraiser - St.Lucie C :y, FL
Page 1 of 1
Helen D Shaber Record: 1 of 2
Property Identification
Site Address:
3335 Brocksmith Rd
Sec/Town/Range:
29 :35S :39E
Map ID
23/29N
Zoning.
AG-5
Ownership and Mailing
Owner:
Helen D Shaber
Address:
3335 S Brocksmith Rd
Fort Pierce FL 34945-4412
Sales Information
Date Price
Code
5/17/2002 68000
00
5/17/2002 100
02
6/2/1999 186800
02
X
PROPERTY RECORD CARD
<<Prev Next» Spec.Assmnt
Taxes Exemptions Permits Home Print
,�UCIECO
ParcellD: 2329-601-0002-000-5
Account # 139839
Land Use. CRPLD SL CAP
City/Cnty St Lucie County
Legal Description
BUFFALO CREEK LOT 2 (8.37 AC) (OR 1530-495)
Assessment 2010 Final
Total Land and Building
Deed
Book/Page
2010 Final
223900
Land Value: 117200 Acres 8.37
WD
1530 / 0495
Assessed:
171100
Building Value: 106700
WD
1530 / 0493
Ag.Credit:
52800
Finished Area: 2374 SgFt
WD
1227 / 2563
Exempt
50000
Taxable
121100
Taxes
3556.19
BUILDING INFORMATION
Exterior Features
View:
RoofCover.
TN - Metal
RoofStruct
HP - Hip
ExtType.
HC - HC
YearBlt:
2003
Frame
-
Grade:
C - C
EffYrBlt:
2003
PrimeWall:
BS - CB Stucco
StoryHght
0010 - 1 Story
No Units
1
SecWall:
Interior Features
BedRooms:
1
Electric:
MX - MAXIMUM
PrmintWall:
DW - Drywall
FullBath
1
HeatType:
FHA - FrcdHotAir
AvgHt/FI:
1/26ath:
0
HeatFuel:
ELEC - Electric
Prm.Flors:
WDLM - Wood Laminat
%A/C:
100
%Heated:
100
%Sprinkled:
0
Special Features and Yard Items
Land Information
Type Y/S
Qty Units Qual
Cond. YrBlt.
No. Land Use
Type
Measure Depth
1 5100-CRPLD SL 520 -Market
4
CAP
Acres
2 RC01-ROW
520 -Class Acres 4
CROP
3 0100-SF Res
520 -Acres
2.185
More...
THIS INFORMATION IS BELIEVED TO BE CORRECT AT THIS TIME BUT IT IS SUBJECT TO CHANGE AND IS NOT WARRANTED
http://www.paslc.org/prc.asp?prcIid=232960100020005 5/ 19/2011