HomeMy WebLinkAboutSUBMITTED PHOTOSProperty Appraiser - St.Lucie Crntrlty, FL
Page 1 of 1
Helen D Shaber Record: 1 of 2
Property Identification
Site Address:
3335 Brocksmith Rd
Sec/Town/Range:
29:35S:39E
Map ID:
23/29N
Zoning:
AG-5
Ownership and Mailing
Owner: Helen D Shaber
Address: 3335 S Brocksmith Rd
Fort Pierce FL 34945-4412
PROPERTY RECORD CARD
«Prey Next»
Spec.Assmnt Taxes
Exemptions Permits Home Print
�UCIE CpG2
Parcel) D:
2329-601-0002-000-5
\�k
Account #.
139839
yP <
Land Use:
CRPLD SL CAP
City/Cnty
St Lucie County
Legal Description
BUFFALO CREEK LOT 2 (8.37 AC) (OR 1530-495)
Sales Information
Assessment 2010 Final
Total Land and Building
Date Price
Code
Deed
Book/Page
2010 Final
223900
Land Value 117200 Acres 8.37
5/17/2002 68000
00
WD
1530 / 0495
Assessed:
171100
Building Value 106700
5/17/2002 100
02
WD
1530 / 0493
Ag.Credit
52800
Finished Area 2374 SgFt
6/2/1999 186800
02
WD
1227 / 2563
Exempt:
50000
Taxable:
121100
Taxes:
3556.19
BUILDING INFORMATION
X
Exterior Features
View:
RoofCover_
TN - Metal
RoofStruct
HP - Hip
ExtType:
HC - HC
YearBlt:
2003
Frame:
Grade:
C - C
EffYrBlt:
2003
PrimeWall:
BS - CB Stucco
StoryHght
0010 - 1 Story
No.Units
1
SecWall:
Interior Features
BedRooms:
1
Electric:
MX - MAXIMUM
PrmintWall
DW - Drywall
FullBath
1
HeatType:
FHA - FrcdHotAir
AvgHUFI:
1/2Bath.
0
HeatFuel:
ELEC - Electric
Prm.Flors:
WDLM - Wood Laminat
%A/C:
100
%Heated:
100
%Sprinkled:
0
Special Features and Yard Items
Land Information
Type Y/S
Qty. Units Qual.
Cond. YrBlt
No. Land Use
Type
Measure Depth
5100-CRPLD SL 520 -Market
1
4
CAP
Acres
2 RC01-ROW
520 -Class Acres 4
CROP
3 0100-SF Res
520 -Acres
2.185
More...
THIS INFORMATION IS BELIEVED TO BE CORRECT AT THIS TIME BUT IT IS SUBJECT TO CHANGE AND IS NOT WARRANTED
http://www.paslc.org/prc.asp?prclid=232960100020005 5/ 19/2011
FILE COPY
• The foundations as excavated correspond to the design drawings on Sheet S-1.
• The foundations were excavated to the depth required in the plans (Page S-2)
• The footing excavations generally complied with the shape of the foundation showed on
the detail sheets. Excavation on a slant is difficult but the excavations appeared to meet
or exceed those shown on the details (2, 2H, 3).
• The 6 mil vapor barrier was properly placed below the pour
• The rebars were #5 rebars
• The rebars were tied together properly to form a continuous reinforcing system
• The rebars were placed on spacers that were 3 inches above the base of the foundation.
The conclusion is that based on the records of the contractor, photographs of the work and on -site
inspection prior to the concrete pour, the foundations appear to comply with the requirements in
the plan details.
SCREEN PLAN
The screened porch plans were created by American Ingenuity, Inc., the design engineers for
the dome dated 12/10/04. The screen was installed subsequent to the completion of the dome. A
review of the completed screen (see Figures 9-11) indicate that it is installed with the details
required for the structural details.
Figures 1 and 2 — Utility Room piping after to placement of 6 mil plastic and exterior
foundation with 9 #5 rebar shown properly placed on top of 6 mil plastic for interior walls
(Figure 1) and exterior foundation wall (Figure 2). Note 6 mil vapor barrier is under rebar.
4.?
Figures 3 & 4 — measurements were made around the exterior and interior foundations to
insure they were 18 inches deep, in accordance with the 12 x 12 foundation plus a 6 inch
slab (see Sheet S-2 structural plan)
Figures 5 — measurements were made around the exterior and interior foundations to
insure they were 18 inches deep, in accordance with the 12 x 12 foundation plus a 6 inch
slab (see Sheet S-2 structural plan)
Figure 6 — Typical location of exterior wall. The form boards are 2 x 12's. It can be see
that the foundation is 6 in or more below the 2 x 12. The rebar has not been placed and
tied as yet in this photograph
Figure 7 — Typical location of 2 45 rebars in foundation (see Sheet S-2 structural plan).
To insure the rebar met the 3 inch above base design, rebar spaces were place under the
rebar (shown circled). Vapor barrier is below rebar as per structural details. On -site
inspection verified the foundations were 18 in deep, met the profile requirements of the
structural details, and had 3 inch spacers under the #5 re -bars
C()PY
Figure 8 - Final Dome with pad shown for screen
Figure 9 Installed porch on final slab from Figure 8
Figure 10 Installed porch
Figure 11 Detail of connection showing correct screws