Loading...
HomeMy WebLinkAboutSUBMITTED PHOTOSProperty Appraiser - St.Lucie Crntrlty, FL Page 1 of 1 Helen D Shaber Record: 1 of 2 Property Identification Site Address: 3335 Brocksmith Rd Sec/Town/Range: 29:35S:39E Map ID: 23/29N Zoning: AG-5 Ownership and Mailing Owner: Helen D Shaber Address: 3335 S Brocksmith Rd Fort Pierce FL 34945-4412 PROPERTY RECORD CARD «Prey Next» Spec.Assmnt Taxes Exemptions Permits Home Print �UCIE CpG2 Parcel) D: 2329-601-0002-000-5 \�k Account #. 139839 yP < Land Use: CRPLD SL CAP City/Cnty St Lucie County Legal Description BUFFALO CREEK LOT 2 (8.37 AC) (OR 1530-495) Sales Information Assessment 2010 Final Total Land and Building Date Price Code Deed Book/Page 2010 Final 223900 Land Value 117200 Acres 8.37 5/17/2002 68000 00 WD 1530 / 0495 Assessed: 171100 Building Value 106700 5/17/2002 100 02 WD 1530 / 0493 Ag.Credit 52800 Finished Area 2374 SgFt 6/2/1999 186800 02 WD 1227 / 2563 Exempt: 50000 Taxable: 121100 Taxes: 3556.19 BUILDING INFORMATION X Exterior Features View: RoofCover_ TN - Metal RoofStruct HP - Hip ExtType: HC - HC YearBlt: 2003 Frame: Grade: C - C EffYrBlt: 2003 PrimeWall: BS - CB Stucco StoryHght 0010 - 1 Story No.Units 1 SecWall: Interior Features BedRooms: 1 Electric: MX - MAXIMUM PrmintWall DW - Drywall FullBath 1 HeatType: FHA - FrcdHotAir AvgHUFI: 1/2Bath. 0 HeatFuel: ELEC - Electric Prm.Flors: WDLM - Wood Laminat %A/C: 100 %Heated: 100 %Sprinkled: 0 Special Features and Yard Items Land Information Type Y/S Qty. Units Qual. Cond. YrBlt No. Land Use Type Measure Depth 5100-CRPLD SL 520 -Market 1 4 CAP Acres 2 RC01-ROW 520 -Class Acres 4 CROP 3 0100-SF Res 520 -Acres 2.185 More... THIS INFORMATION IS BELIEVED TO BE CORRECT AT THIS TIME BUT IT IS SUBJECT TO CHANGE AND IS NOT WARRANTED http://www.paslc.org/prc.asp?prclid=232960100020005 5/ 19/2011 FILE COPY • The foundations as excavated correspond to the design drawings on Sheet S-1. • The foundations were excavated to the depth required in the plans (Page S-2) • The footing excavations generally complied with the shape of the foundation showed on the detail sheets. Excavation on a slant is difficult but the excavations appeared to meet or exceed those shown on the details (2, 2H, 3). • The 6 mil vapor barrier was properly placed below the pour • The rebars were #5 rebars • The rebars were tied together properly to form a continuous reinforcing system • The rebars were placed on spacers that were 3 inches above the base of the foundation. The conclusion is that based on the records of the contractor, photographs of the work and on -site inspection prior to the concrete pour, the foundations appear to comply with the requirements in the plan details. SCREEN PLAN The screened porch plans were created by American Ingenuity, Inc., the design engineers for the dome dated 12/10/04. The screen was installed subsequent to the completion of the dome. A review of the completed screen (see Figures 9-11) indicate that it is installed with the details required for the structural details. Figures 1 and 2 — Utility Room piping after to placement of 6 mil plastic and exterior foundation with 9 #5 rebar shown properly placed on top of 6 mil plastic for interior walls (Figure 1) and exterior foundation wall (Figure 2). Note 6 mil vapor barrier is under rebar. 4.? Figures 3 & 4 — measurements were made around the exterior and interior foundations to insure they were 18 inches deep, in accordance with the 12 x 12 foundation plus a 6 inch slab (see Sheet S-2 structural plan) Figures 5 — measurements were made around the exterior and interior foundations to insure they were 18 inches deep, in accordance with the 12 x 12 foundation plus a 6 inch slab (see Sheet S-2 structural plan) Figure 6 — Typical location of exterior wall. The form boards are 2 x 12's. It can be see that the foundation is 6 in or more below the 2 x 12. The rebar has not been placed and tied as yet in this photograph Figure 7 — Typical location of 2 45 rebars in foundation (see Sheet S-2 structural plan). To insure the rebar met the 3 inch above base design, rebar spaces were place under the rebar (shown circled). Vapor barrier is below rebar as per structural details. On -site inspection verified the foundations were 18 in deep, met the profile requirements of the structural details, and had 3 inch spacers under the #5 re -bars C()PY Figure 8 - Final Dome with pad shown for screen Figure 9 Installed porch on final slab from Figure 8 Figure 10 Installed porch Figure 11 Detail of connection showing correct screws