Loading...
HomeMy WebLinkAboutSUBMITTED PAPERS_2DATE 09/21107 PAGE 1 Universal Forest Products !RE: X07-458 CENTEX HOMES MODEL 1702 A Site Information: Project Customer: CENTEX HOMES Project Name:MODEL 1702 A Lot/Block: Model: 1702 A Address: Subdivision: MORNINGSIDE City: State: General Truss Engineering Criteria & Design Loads (Individual Truss Design Drawings Show Special Loading Conditions Design Code: FBC2004ITP12002 Design Program: MiTek 20/20 6.3 Wind Speed: 130 mph Roof Load: 20.0,15.0,0.0,10.0 Floor Load: 40.0,10.0,0.0,5.0 No. I Job # Truss ID. Date No. I Job # I Truss ID. Date 1 X07.458 A01 09/21/07 26 X07-458 CJ5U 09/21/07 2 X07-458 A02 09/21/07 27 X07-458 E5 09/21/07 3 X07-458 A03 09/21/07 28 X07-458 E7 09/21/07 4 X07-458 A03A 09/21/07 29 X07-458 EG8 09/21/07 5 X07-458 A04 09/21/07 30 X07-458 EPA 09/21/07 6 X07-458 A04A 09/21/07 31 X07-458 EVU 09/21/07 7 X07-458 A05 09/21/07 32 X07-458 EJ8 09/21/07 8 X07-458 A06 09/21/07 33 X07-458 EJ8A 09/21/07 9 X07-458 B1 09/21/07 34 X07-458 HJ2 09/21/07 10 X07.-458 B2 09/21/07 35 X07-458 HPU 09/21/07 11 X07-458 B3 09/21/07 36 X07-458 K5 09/21/07 12 X07-458 B4 09/21/07 37 X07-458 K9 09/21/07 13 X07-458 B5 09/21/07 38 X07-458 V10 09/21/07 14 X07-458 B6 09/21/07 39 X07-458 V2 09/21/07 15 X07-458 B7 09/21/07 40 X07-458 V2A 09/21/07 16 X07-458 B8 09/21/07 41 X07-458 V4 09/21/07 17 XW-458 B9 09/21/07 42 X07-458 V6 09/21/07 18 X07-458 C1 09/21/07 43 X07-458 V8 09/21/07 1.9 X07-458 CIA 09/21/07 44 X07-458 F01 09/21/07 20 X07-458 C3 09/21/07 45 X07-458 F02 09/21/07 21 X07-458 C3A 09/21/07 46 X07-458 F03 09/21/07 22 X07-458 C5 99/21/07 47 X07-458 F04 09/21/07 23 X07-458 CJ1 09/21/07 48 X07-458 F05 09/21/07 24 X07-458 CJ1.0 NOW 49 X07-458 F06 ern+ n/, 09/21/07 25 X07-458 CJ3U 09/21/07 50 X07-4 F07 The truss drawing(s) refrenced above have been prepared by MiTek Industries, Inc. under my direct supervision based on the parameters provided by UFP-Ft.Pierce, FL. Truss Design Engineer's Name: Tan, Seng-Chaff p p D _No• " 67 My license renewal date for the state of Florida is February 28,2009. ppp� NOTE: The seal on these drawings indicate acceptance of STA :.� professional engineering responsibility solely for the truss Sen -c i n #46765 E OF components shown. y inge 33405 �'�.,�t�Si `� �p The suitability and use of this component for any particular lAffek to#6634 industries. inc' /�N '�'�,q���1� building is the responsibility of the building designer, per ANSI/TPI-1 Chapter 2 SEP 2 7 2007 This package includes 5 5 individual, dated truss design drawings and 0 Additional drawings. With my seal affixed to this sheet, I hereby certify that I am the Truss Design Engineer and this index sheet conforms to 61 G15-31.003, section 5 of Florida Board of Professional Engineers Rules. Site Information: Project Customer: CENTEX HOMES Project Name: MODEL 1702 A Lot/Block: Model: 1702 A Address: Subdivision:MORNINGSIDE City: State: No. I Job # I Truss ID. Date 51 X07-458 FG1 09/21/07 52 X07-458 FG2 09/21/07 53 X07-458 FG3 09/21/07 54 X07-458 FG4 09121107 55 X07-458 FG5 09/21/07 DATE 09/21/07 PAGE 2 Seng•Chai Tan, FL Lic #46765 345 Alhambra PL West Palm Beach, FL 33405 MiTek Industries, Inc. FL Cert.#6634 ```�`,,`,``tNntn n►rrgrr�,'f,''' = .� 6�. AN-o. pp AL rrr►►rir nntttl���� SEP 2 7 2007 I0b i Truss Truss Type Oty PlyJ Centex Homes, Model 1702 A I X07 458 I A01 COMMON 4 . _ ...-------- -- -- ---- -- -- Job Referenceloptional).- —_... _... - UniversallFEPO Product, Inc. E359, Vero Beach, FI. 32967 6.500 s Feb 5 2007 MITek Industries, Inc. Fri Sep 21 10:54:32 Tggg-o-age 1 1-0-0 6-9-3 14-0-0 21-2-13 28-0-0 29-0-Q 1-0-0 6-9-3 7-2-13 7-2-13 6-9-3 1-0-0 Scale = 1:50.0 = I 5.00 12 5x5 5 12 11 10 04 = 04 = 18-8-0 18-8-0 9-9-0 18-3-0 28-0-0 9-9-0 8-5-15 9-9-0 LOADING (psf) TCLL 20.0 TCDL 15.0 BCLL 10.0 BCDL 10.0 I SPACING 2-0-0 I Plates Increase 1.25 Lumber Increase 1.25 Rep Stress Incr YES Code FBC2004/TP12002 CSI TC 0.46 BC 0.68 WB 0.16 (Matrix) DEFL in Vert(LL) -0.19 Vert(TL) -0.60 Horz(TL) 0.10 (loc) I/deft L/d 8-10 >999 360 8-10 >558 180 8 n/a n/a PLATES GRIP MT20 244/190 Weight: 123 lb LUMBER BRACING TOP CHORD 2 X 4 SYP No.2 TOP CHORD Structural wood sheathing directly applied or 3-5-15 oc purlins. BOT CHORD 2 X 4 SYP No.2 BOT CHORD Rigid ceiling directly applied or 7-7-3 oc bracing: WEBS 2 X 4 SYP No.2 ! REACTIONS (lb/size) 2=1331/0-3-8, 8=1331/0-3-8 Max Horz 2=118(LC 5) Max Uplift2=-430(LC 5), 8=-430(LC 6) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=0/27, 2-3=-2529/714, 3-4=-2154/581, 4-5=-2056/603, 5-6=-2056/603, 6-7=-2154/581, 7-8=-2529/714, 8-9=0/27 BOT CHORD 2-12=-676/2271, 11-12=-322/1513, 10-11=-322/1513, 8-10=-559/2271 WEBS 3-12=-530/319, 5-12=-200/679, 5-10=-200/679, 7-10=-530/319 NOTES 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Category II; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 3) 'This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) All plates are 4x6 MT20 unless otherwise indicated. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 430 lb uplift at joint 2 and 430 lb uplift at joint 8. LOAD CASE(S) Standard Job r-uss Truss Type �X07-458 �A02 HIP UniversallF89If V Product, Inc. E359, Vero Beach, FI. 32967 i 170-0, 6-3-14 12-0-0 1-0-0 6-3-14 5-8-2 4x6 = 4 Qty Ply Centex Homes, Model 1702 A _---- 2_- 1_ Job Reference (optionalZ---._.....----------._...---.___ .... .. 6,500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54:3g_;6087 Page 1 —16-0-0 21-8-2 28-0-0 29-0-.9 4-0-0 5-8-2 6-3-14 1-0-0 Scale = 1:51.01 46 = 5 4x6 = 11 10 9 4x6 = 5x6 = 18-8-0 18-8-0 6-.10-1 14-0-0 21-1-15 28-0-0 6-10-1 7-1-15 7-1-15 6-10-1 Plate Offsets SX_YJ..,L0�-3-0,0-1-112 5:0-3-0 0-1-1?1,[10:0-3-0,0-3-01 _ LOADING _ PLATES GRIP (psf) SPACING 2-0-0 CSI DEFL in (loc) I/deft Ltd TOLL 20.0 Plates Increase 1.25 TC 0.35 Vert(LL) -0.10 10 >999 360 MT20 244/190 TCDL 15.0 Lumber Increase 1.25 BC 0.59 Vert(TL) -0.32 9-10 >999 180 BCLL 10.0 Rep Stress Incr YES WB 0.25 Horz(TL) 0.10 7 n/a n/a BCDL 10.0 Code FBC2004/TP12002 (Matrix) Weight: 133 lb LUMBER BRACING TOP CHORD'2=X 4.SYP N0.2 TOP CHORD Structural wood sheathing directly applied or 3-6'-9 oc purlins. BOT CHORD 2 X4 SYP No.2 BOT CHORD Rigid ceiling directly applied or 7-11-9 oc bracing. WEBS 2 X 4 SYP No.2 REACTIONS (Ib/size) 2=1331/0-3-8, 7=1331/0-3-8 Max Horz2=104(LC 5) Max Uplift2=-415(LC 5), 7=-415(LC 6) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=0/27, 2-3=-2607/661, 3-4=-2514/731, 4-5=-1720/486, 5-6=-2514/731, 6-7=-2607/662, 7-8=0/27 BOT CHORD 2-11=-616/2322, 10-1 1=-34511691, 9-10=-318/1691, 7-9=-51212322 WEBS 3-11=-3911256, 4-11=-306/775, 4-10=-50/206, 5-10=-50/206, 5-9=-306/775, 6-9=-391/256 NOTES 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Category II; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60, 3) Provide adequate drainage to prevent water ponding. 4) *This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) All plates are 44 MT20 unless otherwise indicated. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 415 lb uplift at joint 2 and 415 lb uplift at joint 7. LOAD CASE(S) Standard :Job I Truss I Truss Type Qry Ply Centex Homes, Model 1702 A X07-458 A03 IHIP 1 1 - TJob Reference OP tionaI UniversalAffbt Product, Inc. E359, Vero Beach, FI. 32967 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54:JJ_Y87 Page 1 5.7-2 10-0-0 18-0-0 22-4-14 I I 5x7 = 5x10 = 5.00 r_12 4 5 3 3 W2 1 W 2 B1 Scale = 7:51.Oi I j I I I 6 JJI w 7 8 5x5 = 11 10 9 5x5 = 5x8 = 4x6 = I I � i 18-8-0 18-8-0 F_ 10-0-0 18-0-0 _ 28-0-0 10.0-0 8-0-0 10-0-0 P�Offsets X Y):_[2!0_3-2,0-0-2j,17:0-3-2,0-0_ 21— — — —� LOADING (psf) SPACING 2-0-0 CSI DEFL in floc) I/deft L/d PLATES GRIP TCLL 20.0 Plates Increase 1.25 TC 0.57 Vert(LL) -0.23 7-9 >999 360 MT20 244/190 TCDL 15.0 Lumber Increase 1.25 BC 0.79 Vert(TL) -0.67 7-9 >494 180 BCLL 10.0 Rep Stress Incr YES WB 0.15 Horz(TL) 0.11 7 n/a n/a BCDL 10.0 Code FBC2004(TP12002 (Matrix) Weight: 128 lb LUMBER BRACING TOP CHORD 2 X 4 SYP No.2 TOP CHORD Structural wood sheathing directly applied or 3-4=8 oc purlins. BOT CHORD 2 X 4 SYP No.2 BOT CHORD Rigid ceiling directly applied or 8-2-6 oc bracing. WEBS 2 X 4 SYP No.2 WEBS 1 Row at midpt 5-11 REACTIONS (lb/size) 2=1331/0-3-8, 7=1331/0-3-8 Max Horz 2=90(LC 5) Max Uplift2=-398(LC 5), 7=-398(LC 6) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=0/27, 2-3=-2543/674, 3-4=-2177/604, 4-5=-1977/592, 5-6=-2176/604, 6-7=-2543/674, 7-8=0/27 BOT CHORD 2-11=-590/2286, 10-11=-443/1977, 9-10=-443/1977, 7-9=-558/2287 WEBS 3-11=-359/242, 4-11=-36/450, 5-11=-155/156, 5-9=-54/450, 6-9=-359/242 NOTES 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Category II; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 3) Provide adequate drainage to prevent water ponding. 4) "This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) All plates are 4x4 MT20 unless otherwise indicated. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 398 lb uplift at joint 2 and 398 lb uplift at joint 7. LOAD CASE(S) Standard Job I Truss - - -- Truss TypeCentex Homes, Model 1702 A i X07-458 A03A SPECIAL 1 1 - :- - -- J— - — ----- — -- -- — — Job Reference o tionalL-------_ — -- - I Umversalt§oast Product, Inc. E359, Vero Beach, FI. 32967 6.500 s Feb 5 2007 MTek Industries, Inc. Fri Sep 21 10:%-.yC2007 Page 1 18-0-0 21-3-0 28-0-0 9-0- j 1-0-0 5-7-2 4-4-14 B-0-0 3-3-0 6-9-0 1-0-0 Scale = 1:52.0i I ai 0 5x7 = 4x6 5.00 f12 4 5 6 T24--ER3 W3 7 3 B 1 0 W4-- 9 0 1 2 _-- 6x10 = B5 9 10 --- — [� frA 0 5x5 = 18 17 16 12 11 4x6 = 5x8 = 5x5 = 46 = I 18-8-0 18-8-0 10-0-0 17-11-8 21-3-0 28-0-0 10-0-0 7-11-8 3-3-8 6-9-0 Plate Offsets (X,Y): [2:0-3-2,0-0-2], [4:0-5-4,0-2-8], [6:0-3-4,0-1-12], [8:0-2-0,0-1-12], 19:0-1-6,0-0-2), [11:0-2-0,0-2-0], [13:0-3-0,Edge], [14:0-2-0,0-0-8], [15:0-2-8,0-3-0]. 16:Edge,0-3-81,[17:0-2-8 0-3-01 — LOADING (psf) SPACING 2-0-0 CSI DEFL in (loc) I/deft L/d PLATES GRIP TCLL 20.0 Plates Increase 1.25 TC 0.43 Vert(LL) -0.24 2-18 >999 360 MT20 244/190 TCDL 15.0 Lumber Increase 1.25 BC 0.74 Vert(TL) -0.72 2-18 >459 180 BCLL 10.0 I Rep Stress Incr YES WB 0.51 Horz(TL) 0.24 9 n/a n/a BCDL 10.0 Code FBC2004ITP12002 (Matrix) Weight: 153 lb ' LUMBER BRACING j TOP CHORD 2 X 4 SYP No.2 TOP CHORD Structural wood sheathing directly applied or 2-8-5 cc purlins. BOT CHORD 2 X 4-SYP No.2 BOT CHORD Rigid ceiling directly applied or 7-10-9 cc bracing. Except: WEBS 2 X 4 SYP No.2 6-0-0 cc bracing: 7-13 REACTIONS (lb/size) 2=1331/0-3-8, 9=1331/0-3-8 8-0-0 cc bracing: 14-15 Max Horz 2=90(LC 5) Max Uplift2=-398(LC 5), 9=-398(LC 6) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=0/27, 2-3=-2564/685, 3-4=-2148/588, 4-5=-2988/845, 5-6=-2999/845, 6-7=-4554/1142, 7-8=-4446/1103, 8-9=-2674/669, 9-10=0/27 BOT CHORD 2-18=-595/2309, 17-18=-11/57, 16-17=010, 14-15=-629/2744, 13-14=-629/2744, 12-13=-19/62, 7-13=-91/77, 11-12=-66/161, 9-11=-562/2392 WEBS 3-18=-437/259, 4-18=-269/112, 15-17=0/111, 5-15=-255/135, 6-15=-89/447, 6-13=-451/1892, 14-16=0/63, 8-11==l580/395, 11-13=-612/2748, 8-13=-374/1757, 15-18=-420/1956, 4-15=-348/1308 NOTES 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf, BCDL=3,Opsf; Category 11; Exp B; enclosed; MWFRS; cantilever left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60. 3) Provide adequate drainage to prevent water ponding. 4) 'This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) All plates are 4x4 MT20 unless otherwise indicated. 6) The following joint(s) require plate inspection per the Tooth Count Method when this truss is chosen for quality assurance inspection: 13. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 398 lb uplift at joint 2 and 398 lb uplift at joint 9. LOAD CASE(S) Standard Job TTruss - ----- - Truss Type ----- - ---- Qty -- P y --- Centex , jX07458 iA04 HIP 1 1 r.. -.. _ 118°��....------- ---- --- --- - Job Rel Universa F t Product, Inc. E359, Vero Beach, FI.32967 6.500 s Feb 5 2007 i .1-0-0 8:Q_ Q... 14-0-0 20-0-0 --r - -- - f -------- ----- - - I- --------- ----- } .. 1-0-0 8-0-0 6-0-0 6-0-0 5x10 MT18H = nes. Model 1702 A 5x10 MT18H= ustries, Inc. Fri Sep 21 10:54:�6 W87 Page 1 28-0-0 �9'Q'0 j 8-0-0 1-0-0 j Scale = 1:51.Oi 4x6 = 10 9 8 4x6 = 5x8 = 18-8-0 18-8-0 8-0-0 14-0-0 20-0-0 28-0-0 8-0-0 6-0-0 6-0-0 8-0-0 LOADING (psf) I SPACING 2-0-0 CSI DEFL in (loc) I/deft L/d PLATES GRIP TCLL 20.0 Plates Increase 1.25 TC 0.69 Vert(LL) -0.12 9 >999 360 MT20 2441190 TCDL 15.0 Lumber Increase 1.25 BC 0.70 Vert(TL) -0.41 6-8 >804 180 MT18H 244/190 BCLL 10.0 I Rep Stress Incr YES WB 0.11 Horz(TL) 0.11 6 n/a n/a BCDL 10.0 Code FBC2004ITP12002 (Matrix) Weight: 122 Ito LUMBER BRACING TOP CHORD 2 X 4 SYP No.2 TOP CHORD Structural wood sheathing directly applied or 3-1-2 oc purlins. BOT CHORD 2 X 4 S'YP No.2 BOT CHORD Rigid ceiling directly applied or 8-1-10 oc bracing. WEBS 2 X 4 SYP No.2 REACTIONS (lb/size) 2=1331/0-3-8, 6=1331/0-3-8 Max Horz 2=-77(LC 6) Max Uplift2=-389(LC 3), 6=-389(LC 4) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=0/27, 2-3=-2502/700, 3-4=-2576/821, 4-5=-2576/821, 5-6=-2502/700, 6-7=0/27 BOT CHORD 2-10=-558/2208, 9-10=-556/2216, 8-9=-566/2216, 6-8=-567/2208 WEBS 3-10=01329, 3-9=-1631577, 4-9=-374/194, 5-9=-1631577, 5-8=0/329 NOTES 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Category II; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 3) Provide adequate drainage to prevent water ponding. 4) *This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) All plates are MT20 plates unless otherwise indicated. 6) All plates are 4x4 MT20 unless otherwise indicated. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 389 lb uplift at joint 2 and 389 lb uplift at joint 6. LOAD CASE(S) Standard Job iTruss X07-458 A04A i Universall§gnt t , Product, Inc. E359, Vero I 1-0-0 8_0_0 1 ►o 5.00112 Truss Type Qty Ply Centex Homes, Model 1702 A j SPECIAL 1 1 Job ReferenceoptionalZ-----.--.- FI. 32967 '- — — — 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:15g:W007 Pagel 1 -12— --i--- -- 17-11-8 ---i 20-0-0 +21 _3-0� 24_3-10 4-11-12 4-11-12 2-0-8 1-3-0 3-0-10 3-8-6 1-0-0 Scale = 1,52,01 5x10 = 4x6 = 3 4 5 6 4x6 = 18 17 16 15 12 11 4x6 = 4x6 = 4x6 5x8 = 18-8-0 18-8-0 8-0-0 12A II-12 17-11-8 20-0-0?1-3� 24 3-10 28 0 0 , 8-0-0 4-11-12 4-11-12 2-0-8 1-3-0 3-0-10 3-8-6 LOADING (psf) SPACING 2-0-0 CSI DEFL in (loc) I/deft Ud PLATES GRIP TCLL 20.0 Plates Increase 1.25 TC 0.64 Vert(LL) -0.21 13-14 >999 360 MT20 244/190 TCDL 15.0 Lumber Increase 1.25 BC 0.74 Vert(TL) -0.60 13-14 >555 180 BCLL 10.0 Rep Stress Incr YES WB 0.45 Horz(TL) 0.23 9 n/a n/a BCDL 10.0 Code FBC2004/TP12002 (Matrix) Weight: 146 lb LUMBER BRACING TOP CHORD 2 XAZYP No.2 TOP CHORD Structural wood sheathing directly applied or 2-9-2 oc purlins. BOT CHORD 2 X 4`SYP No.2 BOT CHORD Rigid ceiling directly applied or 6-9-9 oc bracing. Except: WEBS 2 X'4 SYP No.2 6-0-0 oc bracing: 5-14, 7-13 REACTIONS (lb/size) 2=1331/0-3-8, 9=1331/0-3-8 Max Horz 2=77(LC 5) Max Uplift2=-389(LC 3), 9=-389(LC 4) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=0/27, 2-3=-2495/698, 3-4=-2553/811, 4-5=-3818/1142, 5-6=-3875/1144, 6-7=4464/1250, 7-8=-4424/1213, 8-9=-2701/729, 9-10=0/27 BOT CHORD 2-18=-555/2200, 17-18=-553/2208, 16-17=-553/2208, 15-16=-46/216, 14-15=0/116, 5-14=-241/130, 13-14=-865/3391, 12-13=-7/88, 7-13=-86/76, 11-12=-58/221, 9-11=-625/2425 WEBS 3-18=0/316, 3-16=-163/580, 4-16=-871/305, 14-16=-667/2423, 4-14=-359/1375, 11-13=-624/2425, 8-13=406/1615 8-11=-1008/297, 6-14=-220/726, 6-13=-321/1302 NOTES 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Category 11; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 3) Provide adequate drainage to prevent water ponding. 4) *This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) All plates are 4x4 MT20 unless otherwise indicated. 3) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 389 lb uplift at joint 2 and 389 lb uplift at joint 9. _OAD CASE(S) Standard Job TTruss t X07-458 !AO5 Trues Type HIP aty PIy 1 1 Centex Homes, Model 1702 A � UniversallF��t Product, Inc. E359, Vero Beach, FI. 32967 6.500 s Job Refere __lop ona�------- - ------ - Feb 5 2007 MiTek Industries, Inc. Fn Sep 21 10:54: ge 1 i 1-0- 6-0-0 11-4-0 16-8-0 22-0-0 28 t 1-0-0 6-0-0 5-4-0 5-4-0 5-4-0 6-0-0 1 -0-0 Scale = 1:51.Oj N 0 5x7 = 5.00 r12 5x7 = 4x14 = 11 10 9 4x14 = 18-8-0 5x10 MT18H= 18-8-0 6-0-0 14-0-0 22-0-0 - 28-0-0 6-0-0 8-0-0 8-0-0 6-0-0 Plate Offsets (X,Y): [2:0-0-9,Edge1 [3:0-3-4 0-2-8] [6:0-3-4,0-2-81, [7:0-0-9,Edge], [9:0-1-12,0-2-01, [10:0-5-0,0-3-4] [11:0-1-12,0-2-01 LOADING (psf) i SPACING 2-0-0 CSI DEFL in (loc) I/deft Ltd PLATES GRIP TCLL 20.0 I Plates Increase 1.25 TC 0.99 Vert(LL) 0.41 10 >816 360 MT20 244/190 TCDL 15,0 Lumber Increase 1.25 BC 0.76 Vert(TL) -1.03 10-11 >324 180 MT18H 2441190 BCLL 10.0 Rep Stress Incr NO WB 0.33 Horz(TL) 0.26 7 n/a n/a BCDL 10.0 Code FBC2004/TPI2002 (Matrix) Weight: 122 lb LUMBER TOP CHORD 2%4 SYP No.2 BOT CHORD 2:X 4 SYP SS WEBS 2.X 4 SYP No.2 REACTIONS (lb/size) 2=242210-3-8, 7=2422/0-3-8 Max Horz2=63(LC 5) Max Uplift2=-862(LC 3), 7=-862(LC 4) BRACING TOP CHORD Structural wood sheathing directly applied. BOT CHORD Rigid ceiling directly applied or 4-2-14 oc bracing. WEBS 1 Row at midpt 4-11, 5-9 FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=0/27, 2-3=-5283/1947, 3-4=-4850/1841, 4-5=-6793/2546, 5-6=-4850/1841, 6-7=-5283/1947, 7-8=0/27 BOT CHORD 2-11=-1717/4783, 10-11=-2499/6632, 9-10=-2502/6632, 7-9=-172914783 WEBS 3-11=-290/1195, 4-11=-2081/853, 4-10=0/342, 5-10=0/342, 5-9=-2081/853, 6-9=-290/1195 NOTES 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Category II; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 3) Provide adequate drainage to prevent water ponding. 4) 'This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) All plates are MT20 plates unless otherwise indicated. 6) All plates are 4x4 MT20 unless otherwise indicated. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 862 lb uplift at joint 2 and 862 lb uplift at joint 7. 8) Girder carries hip end with 6-0-0 end setback. 9) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 315 lb down and 199 lb up at 22-0-0, and 315 lb down and 199 lb up at 6-0-0 on top chord. The design/selection of such connection device(s) is the responsibility of others. 10) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). LOAD CASE(S) Standard 1) Regular: Lumber Increase=1.25, Plate Increase=1.25 Uniform Loads (plf) Vert: 1-3=-70, 3-6=-135(F=-65), 6-8=-70, 2-7=-39(F=-19) Concentrated Loads (lb) Vert: 3=-315(F) 6=-315(F) Job Truss Truss Type Oty Ply Centex Homes, Model 1702 A X07-458 A06 HIP 1 1 Job Reference_ (optional j Universal1F8Mst Product, Inc. E359, Vero Beach, FI. 32967^ - 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54: 7 Page 1. q N I0 0 16-8-0 22-0-0 28-0-0 9.0.0 ----.-..._..._- . ---t- ----- — --- - - - t-------- -- --- [-----------i ..__... - 1-0-0 6-0-0 5-4-0 5-4-0 5-4-0 6-0-0 1-0-0 Scale = 1:51.f 5x8 = 5.00 12 5x8 = 3 12 4 5 13 14 6 4x14 = it 15 16 17 18 10 19 20 21 22 9 4x14 = 18-8-0 5x5 = 7x10 MT18H= 5x5 = 18-8-0 6-0-0 14-0-0 22-0-0 28-0-0 6-0-0 8-0-0 8-0-0 6-0-0 Plate Offsets.(:,Y): [2:0-0-9,Edge],[7:0-0-9 Edgel [9:0-2-4 0-2-121 (10.0-5-0,0-5-0] [11:0-2-4,0-2-121 LOADING (psf) I SPACING 2-0-0 CSI DEFL in (loc) I/deft Ud PLATES GRIP TCLL 20.0 i Plates Increase 1.25 TC 0.80 Vert(LL) 0.48 10-11 >688 360 MT20 244/190 TCDL 15.0 1 Lumber Increase 1.25 BC 0.92 Vert(TL) -1.14 10-11 >293 180 MT18H 244/190 BCLL 10.0 I Rep Stress Incr NO WB 0.44 Horz(TL) 0.21 7 n/a n/a BCDL 10.0 Code FBC2004/TP12002 (Matrix) Weight: 145 lb LUMBER TOP CHORD �-2°X 4 SYP No.2 `Except' 72 2 X 4 SYP SS BOT CHORD :2 X 6 SYP SS WEBS 2 X 4 SYP No.2 REACTIONS (lb/size) 2=2893/0-3-8, 7=2815/0-3-8 Max Horz2=-66(LC 6) Max Uplift2=-1115(LC 3), 7=-1092(LC 4) BRACING TOP CHORD Structural wood sheathing directly applied or 1-10-7 oc purlins. BOT CHORD Rigid ceiling directly applied or 4-6-0 oc bracing. WEBS 1 Row at midpt 4-11, 5-9 FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=0/32, 2=3=-6828/2656, 3-12=-6334/2520, 4-12=-6334/2520, 4-5=-9211/3687, 5-13=-6035/2408, 13-14=-6035/2408, 6-14=-6036/2408, 6-7=-6509/2537, 7-8=0/32 BOT CHORD 2-11=-2378/6225, 11-15=-3346/8517, 15-16=-3346/8517, 16-17=-3346/8517, 17-18=-3346/8517, 10-18=-3346/8517,10-19=-3374/8504,19-20=-3374/8504,20-21=-3374/8504,21-22=-3374/8504, 9-22=-3374/8504, 7-9=-2283/5935 WEBS 3-11=-598/1860, 4-11=-2512/1033, 4-10=-348/977, 5-10=-306/983, 5-9=-2810/1183, 6-9=-521/1695 NOTES 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Category II; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 3) Provide adequate drainage to prevent water ponding. 4) 'This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) All plates are MT20 plates unless otherwise indicated. 6) All plates are 4x6 MT20 unless otherwise indicated. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 1115 lb uplift at joint 2 and 1092 lb uplift at joint 7. 8) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 280 lb down and 219 lb up at 6-0-0. 133 lb down and 110 lb up at 8-0-12, 133 lb down and 110 lb up at 17-11-4, and 124 lb down and 101 lb up at 19-11-4. and 320 lb down and 219 lb up at 22-0-0 on top chord, and 313lb down and 67 lb up at 6-0-0. 76 lb down at 8-0-12, 268 lb dowri and 115 lb up at 9-6-12, 274 lb down and 121 lb up at 10-9-0, 274 lb down and 121 lb up at 12-9-0, 274 lb down and 121 lb up at 14-9-0, 268 lb down and 115 lb up at 15-114, 76 lb down at 17-11-4, and 76 lb down at 19-11-4, and 313 lb down and 671b up at 21-11-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 9) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). LOAD CASE(S) Standard 1) Regular: Lumberincrease=1.25, Plate Increase=1.25 Uniform Loads (plf) Vert: 1-3=-70, 3-6=-70, 6-8=-70, 2-7=-20 Job I Truss - iTruss Type- - -- ----- -' —__. ___ Qry.. __. Ply - Centex Homes, Model 1702 A i X07-458 iA06 HIP 1 1 Job (Pt ob Reference o ionalj______,____.._._ __... ..__ .. Universal Forest Product, Inc. E359, Vero Beach, FI, 32967 6.500 s Feb 5 2007 MiTeh Industries, Inc. Fri Sep 21 10:54:36 2007 Page 2 LOAD CASE(S) Standard Concentrated Loads (lb) Vert: 3=-280(F) 6=-280(F) 11=-312(F) 9=-312(F) 12=-133(F) 13=-133(F) 14=-124(F) 15=-38(F) 16=-268(F) 17=-274(F) 18=-274(F) 19=-274(F) 20=-268(F) j 21=-38(F) 22=-38(F) !Job I Truss - - - -'- - — Truss Type -- --- Qty�Ply---TCentex Homes, Model 1702 A — -- - - - - ---- - X07-458 IB1 HIP 1__Job Reference o tional -- �--1— — --- -- --- jUniversal FmsttlProduct, Inc. E359, Vero Beach, FI. 32967 - 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54g3B �07 Pagel i I 1-0-0 3-6-8 6-0-0 10-8-8 15-5-0 17-10-8 21-5-0 22-5-0 1-0-0 3-6-8 2-5-8 4-8-8 4-8-8 2-5-8 3-6-8 1-0-0 Scale = 1:39.7 i I 3.00 12 4x4 II 3 11 12 4 13 14 5 10 15 16 9 17 18 8 4x4 II 5x10 MT18H= 44 II 9-0-0 9-0-0 1A O 1-6-8 6-0-0 10-8-8 15-5-0 17-10-8 21-5-0 3-6-8 2-5-8 4-8-8 4-8-8 2-5-8 3-6-8 — Plate Offsets (X Y): [2:0-4-9,Edge], [3:0-7-0 0-2-121 [5:0-7-0 0-2-12] [6:0-4-9 Edge] [9:0-5-0 0-3-01 LOADING (psf) SPACING 2-0-0 CSI DEFL in (loc) I/deft L/d PLATES GRIP I TCLL 20.0 Plates Increase 1.25 TC 0.83 Vert(LL) 0.41 9 >612 360 MT20 244/190 TCDL 15.0 Lumber Increase 1.25 BC 0.69 Vert(TL) -1.05 9 >238 180 MT18H 244/190 BCLL 10.0 Rep Stress Incr NO WB 0.27 Horz(TL) 0.20 6 n/a n/a BCDL 10.0 Code FBC2004/TPI2002 (Matrix) Weight: 86 lb LUMBER BRACING TOP CHORD 2wX'4 SYP No.2 *Except* TOP CHORD Structural wood sheathing directly applied or 1-1.0-4 oc purlins. T2 2 X 4 SYP No.1 BOT CHORD Rigid ceiling directly applied or 4-8-4 oc bracing. BOT CHORD 2'X 4 SYP SS WEBS 2 X 4 SYP No.2 REACTIONS (lb/size) 2=1906/0-7-8, 6=1906/0-7-8 Max Horz 2=37(LC 5) Max Uplift2=-732(LC 3), 6=-732(LC 4) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=0/16, 2-3=-6073/2159, 3-11=-7128/2601, 11-12=-7128/2601, 4-12=-7128/2601, 4-13=-7128/2601, 13-14=-7128/2601,5-14=-7128/2601,5-6=-607312160,6-7=0/16 BOT CHORD 2-10=-2060/5817, 10-15=-2064/5863, 15-16=-2064/5863, 9-16=-2064/5863, 9-17=-2033/5863, 17-18=-2033/5863, 8-18=-2033/5863, 6-8=-2029/5817 WEBS 3-10=-47/589, 3-9=-552/1455, 4-9=-658/352, 5-9=-553/1455, 5-8=-48/589 NOTES 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.0psf; Category II; Exp B; enclosed; MWFRS; cantilever left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60. 3),Provide adequate drainage to prevent water ponding. 4) 'This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) All plates are MT20 plates unless otherwise indicated. 6) All plates are 5xl0 MT20 unless otherwise indicated. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 732 lb uplift at joint 2 and 732 lb uplift at joint 6. 8) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 262 lb down and 159 lb up at 6-0-0, 116 lb down and 81 lb up at 8-0-12, 116 lb down and 81 lb up at 10-0-12, 116 lb down and 81 lb up at 11-4-4, and 116 lb down and 81 lb up at 13-4-4, and 262 lb down and 159 lb up at 15-5-0 on top chord, and 350 lb down and 82 lb up at 6-0-0, 73 lb down at 8-0-12, 73 lb down at 10-0-12, 73 lb down at 11-4-4, and 73 lb down at 13-4-4, and 350 lb down and 82 lb up at 15-4-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 9) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). LOAD CASE(S) Standard 1) Regular: Lumber Increase=1.25, Plate Increase=1.25 Uniform Loads (plf) Vert: 1-3=-70, 3-5=-70, 5-7=-70, 2-6=-20 Job Truss Truss Type Qty Ply Centex Homes, Model 1702 A X07458 B1 I HIP 1 1 - ......-..._..... -.... -------- ---- -- -_ Job_ Reference(gptional)— -- -_ .......... ... .. Universal Forest Product, Inc. E359, Vero Beach, FI.32967 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54:36 2007 Page 2 LOAD CASE(S) Standard Concentrated Loads (lb) Vert: 3=-222(F) 5=-222(F) 10=-350(F) 8=-350(F) 11=-116(F) 12=-116(F) 13=-116(F) 14=-116(F) 15=-36(F) 16=-36(F) 17=-36(F) 18=-36(F) Job Truss Truss Type I Oty Ply Centex Homes, Model 1702 X07-458 jB2 HIP 1 1 Reference ( Universal FQrBsaProduct, Inc. E359, Vero Beach, Ff. 32967 6.500 s Feb 5 2007 MiTek Industries, In i 13-5-0 1-0-0 8-0-0 5-5-0 8-0-0 3.00 F 12 5x10 = 3 5x6 = 4 A c. Fri Sep 21 10:5408_?OP07 Pagel f .22-5-0 1-0-0 Scale = 1:39.7 �iI 1 c; 1 6 9-0-0 8-0-0 9 8 7 4x4 11 4x4 = 5-5-0 LOADING (psf) SPACING 2-0-0 CSI DEFL in (loc) I/deft L/d TCLL 20.0 Plates Increase 1.25 TC 0.59 Vert(LL) 0.14 2-9 >999 360 TCDL 15.0 Lumber Increase 1.25 BC 0.74 Vert(TL) =0.47 2-9 >531 180 13CLL 10.0 Rep Stress Incr YES WB 0.11 Horz(TL) 0.09 5 n/a n/a BCDL 10.0 Code FBC2004ITP12002 (Matrix) LUMBER BRACING 8-0-0 9-0-0 PLATES GRIP MT20 2441190 Weight: 81 lb TOP CHORD 2 X.4 SYP No.2 TOP CHORD Structural wood sheathing directly applied or 3-T-9 oc purlins. BOT CHORD 2 X 4 SYP N0.2 BOT CHORD Rigid ceiling directly applied or 7-3-14 oc bracing. WEBS 2 X 4 SYP No.2 REACTIONS (lb/size) 2=1030/0-7-8, 5=1030/0-7-8 Max Horz2=45(LC 5) Max Uplift2=-382(LC 3), 5=-382(LC 4) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=0/16, 2-3=-2521/761, 3-4=-2386/768, 4-5=-2521/760, 5-6=0/16 BOT CHORD 2-9=-703/2374, 8-9=-701/2385, 7-8=-701/2385, 5-7=-665/2374 WEBS 3-9=0/274, 3-7=-252/253, 4-7=-4/274 NOTES 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Category 11; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 3) Provide adequate drainage to prevent water ponding. 4) 'This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) All plates are 4x6 MT20 unless otherwise indicated. 3) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 382 lb uplift at joint 2 and 382 lb uplift at joint 5. _OAD CASE(S) Standard i Truss - - -- --- --- __ --- -- -- - - • Truss Type X07-458 B3 ,HIP 1 Universal Fg[%Product, Inc. E359, Vero Beach, FI, 32967 5-4-14 10-0-0 11-5-0 1-0-0 5-4-14 4-7.2 1-5-0 3.00, 12 4x6 = 5x7 = 4 5 Ply Centex Homes, Model 1702 A 1 i Job Referencetiona.1)_—_ 6,500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54g3B 07 Page 1 i 16_0-2 21-5-0 22-5-0 4-7-2 5-4-14 1-0-0 Scale = 1:39.7i 4X6 = 10 9 4x6 == 5x10 = 9-0-0 9-0-0 10-0-0 11-5-0 21-5-0 10-0-0 1-5-0 10-0.0 Plate Offsets (X,Y): (5:0-5-4,0-2-121 (10:0 4_-12,0-3-0] - I LOADING (psf) SPACING 2-0-0 CSI DEFL in (loc) I/deft L/d PLATES GRIP TCLL 20.0 Plates Increase 1.25 TC 0.38 Vert(LL) -0.21 7-9 >999 360 MT20 244/190 TCDL 15.0 Lumber Increase 1.25 BC 0.83 Vert(TL) -0.63 7-9 >396 180 BCLL 10.0 Rep Stress Incr YES WB 0.25 Horz(TL) 0.10 7 n/a n/a BCDL 10.0 1 Code FBC2004/TP12002 (Matrix) Weight: 93 lb LUMBER BRACING TOP CHORD 2 X 4:SYP No.2 TOP CHORD Structural wood sheathing directly applied or 3-5-7 oc pudins. BOT CHORD 2 X 4 SYP No.2 WEBS 2 X BOT CHORD Rigid ceiling directly applied or 7-1-1 oc bracing. 4 SYP No,2 REACTIONS (lb/size) 2=1030/0-7-8, 7=1030/0-7-8 Max Horz 2=-54(LC 6) Max Uplift2=-371(LC 3), 7=-371(LC 4) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=0/16, 2-3=-2704/836, 3-4=-2088/569, 4-5=-1985/575, 5-6=-2073/565, 6-7=-2702/837, 7-8=0/16 30T CHORD 2-10=-798/2582, 9-10=-464/1986, 7-9=-754/2580 NEBS 3-10=-636/323, 4-10=-72/320, 5-10=-164/159, 5-9=-43/323, 6-9=-648/327 VOTES 1) Unbalanced roof live loads have been considered for this design. ?) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Category 11; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 3) Provide adequate drainage to prevent water ponding. t) 'This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. i) All plates are 4x4 MT20 unless otherwise indicated. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 371 lb uplift at joint 2 and 371 lb uplift at joint 7. -OAD CASE(S) Standard i Job '- i Truss Truss Type ------ ----'— ---- pty ---T y — Centex Homes, Model 1702 A : X07-458 I B4 COMMON 1 1 r- .n-V --- - L __ _ __ __ ---- Job ReferenceJpptional)_ ___ Uni�e�sal Forest Product, Inc E359, Vero Beach, FI. 32967 — 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54:37� Page 1 i 5.10-12 10-8-8 15-6-4 21-5-0 22-5-0 I 5-10-12 4-9-12 4-9-12 5-10-12 1-0-0 I Scale = 1:37.21 4x6 = 3 9-0-0 8 7 4x6= 4x6 = 6-3-15 8-9-2 LOADING (psf) SPACING 2-0-0 CSI DEFL in (loc) I/deft L/d TCLL 20.0 Plates Increase 1.25 TC 0,32 Vert(LL) -0.17 7-9 >999 360 TCDL 15.0 Lumber Increase 1.25 BC 0.74 Vert(TL) -0,58 7-9 >427 1110 BCLL 10.0 Rep Stress Incr YES WB 0,17 Horz(TL) 0.09 5 n/a n/a BCDL 10.0 Code FBC2004ITP12002 (Matrix) LUMBER TOP CHORD 2 X 4 SYP No.2 BOT CHORD 2 X 4 SYP No:2 WEBS 2 X 4 SYP No.2 REACTIONS (lb/size) 1=933/0-7-8, 5=1033/0-7-8 Max Horz 1=-61(LC 6) Max Upliftl=-279(LC 3), 5=-367(LC 4) 9-0-0 PLATES GRIP MT20 244/190 Weight: 85 lb BRACING TOP CHORD Structural wood sheathing directly applied or 3-5-8 oc purlins. BOT CHORD Rigid ceiling directly applied or 7-1-14 oc bracing. FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=-2803/797, 2-3=-2685/795, 34=-2658/763, 4-5=-2776/764, 5-6=0/16 BOT CHORD 1-9=-761/2661, 8-9=-466/1803, 7-8=-466/1803, 5-7=-682/2632 WEBS 2-9=-330/197, 3-9=-280/935, 3-7=-253/906, 4-7=-321/189 NOTES 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Category If; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 3) `This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) All plates are 4x4 MT20 unless otherwise indicated. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 279 lb uplift at joint 1 and 367 lb uplift at joint 5. LOAD CASE(S) Standard Job Truss TrussT a --- -----------o Model ------- -- -- - ..._ ... I Type Oty Ply Centex Homes, Model 1702 A ; j X07 458 : B5 COMMON 1 1 -- - ._ ........ Job Reference o tional) -- - - — I Uniiebsal Forest Product, Inc. E359, Vero Beach, FI. 32967 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54:37 07 Pagel 1 i 5-10-12 10-8-8 15-6-4 5-10-12 4-9-12 4-9-12 5-10-12 1-0-0 Scale = 1:3T21 3.00 12 4x6 = 3 4x6 7L 9 8 7 4x6 = 4x6 = 9-0-0 6-3-15 6-3-15 LOADING (psq SPACING 2-0-0 CSI DEFL in (loc) I/deft L/d TCLL 20.0 Plates Increase 1.25 TC 0.32 Vert(LL) -0.17 7-9 >999 360 TOOL 15.0 ! Lumber Increase 1.25 BC 0.74 Vert(TL) ' -0.58 7-9 >427 180 BCLL 10.0 Rep Stress Incr YES WB 0.17 Horz(TL) 0.09 5 n/a n/a BCDL 10.0 I Code FBC2004/TP12002 (Matrix) LUMBER BRACING TOP CHORD 2 X 4 SYP No.2 TOP CHORD BOT CHORD 2 X 4 SYP No.2 BOT CHORD WEBS 2 X 4 SYP No.2 REACTIONS (lb/size) 1=933/0-7-8, 5=1033/0-7-8 Max Horz 1=-61(LC 6) 'Max Upliftl=-279(LC 3). 5=-367(LC 4) FORCES (Ib) - Maximum Compression/Maximum Tension TOP CHORD 1-2=-2803/797, 2-3=-2685/795, 3-4=-2658/763, 4-5=-2776/764, 5-6=0/16 BOT CHORD 1-9=-761/2661, 8-9=-466/1803, 7-8=-466/1803, 5-7=-682/2632 WEBS 2-9=-330/197, 3-9=-280/935, 3-7=-253/906, 4-7=-321/189 9-0-0 6-3-15 PLATES GRIP MT20 244/190 Weight: 85 lb Structural wood sheathing directly applied or 3-5-8 oc purlins. Rigid ceiling directly applied or 7-1-14 oc bracing. NOTES 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.opsf; Category II; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 3) *This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) All plates are 4x4 MT20 unless otherwise indicated. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 279 lb uplift at joint 1 and 367 lb uplift at joint 5. LOAD CASE(S) Standard rJob Truss -- ----- YP Qty Ply Centex Homes, Model 1702 A i X07-458 ' B6 SPECIAL 1 1 ----- . ------ ...... _. --- —...... - ----- ---- -- --- --- Job UniverY-bFLgrest Product, Inc. E359, Vero Bead,(fb 32967 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54::7- Q{tp7 Page 1 - I 6 _--_,. -10-0 —_�-_ --___ 10�6_4 —_ 13-10-8 17-2-12 22-0-8 27-11-4 8-11- 3-11-4 3-11-4 2.10-12 3-8-4 3-4-4 34-4 4-9-12 5-10-12 1-0-0 Scale = 1:49* 3.00 F12 C 0 9-0-0 06 15 17 14 13 12 11 10 5x8 = 9-0-0 5x8 = 4x6 = 9-0-0 � 3-11=4 6-10-0 10-6-4 12-10-2 21-7-6 27-11-4 3-11-4 2-10-12 3-8-4 2-3-14 8-9-3 6-3-14 Plate Offset (X,YL11:0-0-0,0-0-11 [2:0-5-4 0-2-81,_[4:0-5-8 0-2-81 [8:0-5-1 2,0-0-21 LOADING (psf) SPACING 2-0-0 CSI DEFL in (loc) I/defl L/d PLATES GRIP TCLL 20.0 Plates Increase 1.25 TC 0.74 Vert(LL) -0.16 10-12 >999 350 MT20 244/190 TCDL 15.0 Lumber Increase 1.25 SC 0.64 Vert(TL) -0.50 10-12 >499 180 BCLL 10.0 I Rep Stress Incr NO WB 0.58 Horz(TL) 0.05 8 n/a n/a BCDL 10.0 Code FBC2004ITP12002 (Matrix) Weight: 120 lb LUMBER TOP CHORD 2 X 4 SYP No.2 BOT CHORD 2 X 4 SYP No.2 WEBS 2 X 4 SYP No.2 REACTIONS (lb/size) 1=38/0-6-12, 14=1824/0-7-8, 8=926/0-7-8 Max Horz 1=-61(LC 6) Max Upliftl=-37(LC 5), 14=-569(LC 3), 8=-340(LC 4) Max Grav1=90(LC 7), 14=1824(LC 1), 8=926(LC 1) BRACING TOP CHORD Structural wood sheathing directly applied or 3-9-1.5 oc purlins, BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing. FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=-64/454, 2-16=-516/1839, 3-16=-516/1839, 3-4=-516/1839, 4-5=-1640/448, 5-6=-1670/494, 6-7=-2252/662, 7-8=-2370/663, 8-9=0/16 BOT CHORD 1 -1 5=-402/80, 15-17=-392/84, 14-17=-392/84, 13-14=-254/836, 12-13=-258/850, 11-12=-345/1392, 10-11=-345/1392, 8-10=-584/2241 WEBS 2-15=0/191, 2-14=-1535/506, 3-14=-369/170, 4-14=-2777/816, 4-13=-101/28, 6-12=-86/374, 6-10=-256/921, 7-10=-330/191, 5-12=-275/150,4-12=-168/815 NOTES 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Category II; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 3) Provide adequate drainage to prevent water pbnding. 4) *This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) All plates are 4x4 MT20 unless otherwise indicated. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 37 lb uplift at joint 1, 569 lb uplift at joint 14 and 340 lb uplift at joint 8. 7) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 213 lb down and 106 lb up at 3-11-4, and 79 lb down and 36 lb up at 6-0-0 on top chord, and 90 lb down at 3-11-4, and 33 lb down at 6-0-0 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 8) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). LOAD CASE(S) Standard 1) Regular: Lumber Increase=1.25, Plate Increase=1.25 Uniform Loads (plf) Vert: 1-2=-70, 2-4=-70, 4-6=-70, 6-9=-70, 1-8=-20 Concentrated Loads (lb) Vert: 2=-133(F) 15=-43(F) 16=-39(F) 17=-16(F) Job TTruss'—-'---'-- � I X07-458 87 f Univer iJF Product. Inc. E359, Vero Beach, FI. 5-11-4 I 3.00 [12 5x10 = Truss Type Tty Ply Centex Homes, Model 1702 A SPECIAL 1 1 Job Referenced-- 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54:V3V7 Page 1 12-6-4 17-2-12 22-0-8 27-11-4 28_11_ --- 6-7-0 4-8-8 4-9-12 5-10-12 1-0-0 Scale = 1:50 0 4 iM l: 5x6 = 11 10 9 8 5x6 = 4x4 II 5x7 WB= 5x10 = 9-0-0 F 5-11-4 ; 12-6-4 21-7-6 L 27-11-4 5-11-4 6-7-0 9-1-2 6-3-14 LOADING (psf) SPACING 2-0-0 CSI DEFL in (loc) I/deft Ltd TCLL 20.0 1 Plates Increase 1.25 TC 0.91 Vert(LL) 0.44 8-9 >743 360 TCDL 15.0 Lumber Increase 1,25 BC 0.93 Vert(TL) -1.35 8-9 >242 180 BCLL 10.0 Rep Stress Incr YES WB 0,57 Horz(TL) 0.17 6 n/a n/a BCDL 10.0 Code FB02004ITP12002 (Matrix) LUMBER TOP CHORD 2 X 4 SYP N BRACING 9-0-0 PLATES GRIP MT20 244/190 Weight: 116 lb o-2 TOP CHORD Structural wood sheathing directly applied. BOT CHORD 2 X 4 SYP N0.2 BOT CHORD Rigid ceiling directly applied or 2-2-0 oc bracing. WEBS 2 X 4 SYP No.2 REACTIONS (lb/size) 1=1228/0-6-12, 6=1327/0-7-8 Max Horz 1=-61(LC 6) Max Upliftl=-388(LC 3), 6=-424(LC 4) =ORCES (lb) - Maximum Compression/Maximum Tension FOP CHORD 1-2=-3950/1234, 2-3=-5470/1645, 3-4=-5845/1790, 4-5=-3784/1008, 5-6=-3899/1004, 6-7=0/16 30T CHORD 1-11=-1185/3773, 10-11 =-1 18213785, 9-1 0=-1 182/3785, 8-9=-815/2930, 6-8=-934/3715 NEBS 2-11=0/235, 2-9=-436/1732, 3-9=-1764/634, 4-9=-975/3099, 4-8=-242/885, 5-8=-295/182 DOTES 1) Unbalanced roof live loads have been considered for this design. ?) Wind: ASCE 7-02: 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Category II; Exp B; enclosed; MWFRS; cantilever left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60. 1) Provide adequate drainage to prevent water ponding. "This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 1) All plates are 5x7 MT20 unless otherwise indicated. I) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 388 lb uplift at joint 1 and 424 Ito uplift at joint 6. .OAD CASE(S) Standard Job Truss — i i I Truss Type Qty Ply Centex Homes, Model 1702 A !X07-468 iB8 SPECIAL 1 1 - - - --- --1- - —------------- _ Job Reference o tional I Univervl�erest Product, Inc. E359, Vero Beach, FI. 32967 - -� p -- -- -- - - 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54:V aW7 Page 1 ' 27-11-4 2� .i 7-11-4 6-7-0 2-8-8 4-9.12 5-10-12 1-0-0 Scale = 1:50.01 3.00 f 12 5x10 = 4x6 = 4x6 = 4 v [C? 0 oxo - 11 10 9 8 5x6 = 5x8 = 4x6 = 9-0-0 9-0-0 f- 7-11-4 14-6-4 21-7-6 27-11-4 7-11-4 6-7-0 7-1-2 6-3-14 Plate Offsets (X TJ 0-3-13,Edgel [2:0-4-12 0-2-81 [3:0-2-8 0-2-41[4:0-2-8 0-2-01 [6:0-4-9 Edoel CSI DEFL in (loc) I/defl L/d PLATES GRIP — LOADING (psf�) TCLL 20.0 SPACING 2-0-0 I plates TCDL 15.0 Increase 1.25 Lumber Increase 1.25 TC 0.76 BC 0.94 Vert(LL) -0.30 Vert(TL) -0.90 10 8-10 >999 >365 360 180 MT20 244/190 BCLL 10.0 Rep Stress Incr YES WB 0.34 Horz(TL) 0.17 6 n/a n/a BCDL 10.0 Code FBC2004lfP12002 (Matrix) Weight: 115 lb LUMBER BRACING TOP CHORD 2 X 4 SYP N0.2 TOP CHORD Structural wood sheathing directly applied or 2-3-5 oc purlins. BOT CHORD 2 X 4 SYP N0.2 BOT CHORD Rigid ceiling directly applied or 2-2-0 oc bracing. WEBS 2 X 4 SYP No.2 REACTIONS (lb/size) 1=1228/0-6-12, 6=1327/0-7-8 Max Horz 1=-61(LC 6) Max Upliftl=-388(LC 3), 6=-423(LC 4) FORCES (Ib) - Maximum Compression/Maximum Tension TOP CHORD 1••2=-3732/1154, 2-3=-4172/1256, 3-4=-4418/1350, 4-5=-3756/1015, 5-6=-3872/1011, 6-7=0/16 BOT CHORD 1-11=-1094/3549, 10-11=-1092/3562, 9-10=-80012928, 8-9=-800/2928, 6-8=-942/3691 WEBS 2-11=0/309, 2-10=-190/640, 3-10=-1339/484, 4-10=-591/1845, 4-8=-257/836, 5-8=-306/185 NOTES 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Category II; Exp B; enclosed; MWFRS; cantilever left and right exposed Lumber DOL=1.60 plate grip DOL=1.60. 3) Provide adequate drainage to prevent water ponding. 4) 'This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) All plates are 4x4 MT20 unless otherwise indicated. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 388 lb uplift at joint 1 and 423 lb uplift at joint 6. LOAD CASE(S) Standard 'Truss '-----.-.....----- Truss Type---- ; X07-458 I B9 SPECIAL Univer -1 Ferest Product, Inc. E359, Vero Beach, FI. 32967 Qty Ply Centex Homes, Model 1702 A 1 1 Job ReferenceSopGona!L_____.___.___ 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54:V a_W7 Page 1 t- -- - -- -- - - - --- --' 9-� 1-4 -- -- -- 16-6-4 1 -2- 2 22-0-8 5-4-2 4-7-2 6-7-0 0-8-8 4-9-12 5-10-12 1-0-0 Scale = 1:50.01 = 3.00 4x6 12 5x6 = 5x8 = 3 4 5 — T2-- 2 6 W3 - - --- 81-- - �1�-- ------------ 7 6 Cl 5x6 = 12 11 10 9 5x6 = 5x8 = 4x6 = 9-0-0 9-0-0 9-11-4 16-6 4 21-7-5 27-11-4 9-11-4 6-7-0 5-1-1 6-3-15 Plate Offsets (X Y): (1:0-3-13,Edge], (3:0-3-0,0-2-121 (4:0-5.4,0-3-41, [5:0-3-0 0-1-121 [7:0-4-9 Edoel [10.0-1-12 0-2-01 LOADING (psf) TCLL 20.0 SPACING 2-0-0 Plates Increase CSI DEFL in (lec) I/deft L/d _ PLATES GRIP TCDL 15.0 i i 1.25 Lumber Increase 1.25 TC 0.50 BC 0.93 Vert(LL) -0.25 1-12 >999 360 MT20 2441190 BCLL 10.0 * Rep Stress Incr YES WB 0.24 Vert(TL) -0.83 Horz(TL) 0.17 1-12 >394 7 n/a 180 n/a BCDL 10.0 Code FBC2004ITP12002 (Matrix) Weight: 123 lb LUMBER BRACING TOP CHORD 2 X 4 SYP N0.2 TOP CHORD Structural wood sheathing directly applied or 2-8-11 oc purlins. BOT CHORD 2 X 4 SYP N0.2 BOT CHORD Rigid ceiling directly applied or 2-2-0 oc bracing. WEBS 2 X 4 SYP No.2 REACTIONS (lb/size) 1=1228/0-6-12, 7=1327/0-7-8 Max Horz 1=-61(LC 6) Max Upliftl=-388(LC 3), 7=-421(LC 4) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=-3795/1241, 2-3=-3286/1008, 3-4=-3175/1005, 4-5=-3454/1074, 5-6=-3728/1014, 6-7=-3844/1011, 7-8=0/16 BOT CHORD 1-12=-119113632, 11-12=-913/3277, 10-11=-913/3277, 9-10=-803/2969, 7-9=-941/3664 WEBS 2-12=-515/280, 3-12=-31/438, 4-12=-251/125, 4-10=-1133/464, 5-10=-458/1292, 5-9=-254/769, 6-9=-299/179 NOTES 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Category II; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60, 3) Provide adequate drainage to prevent water ponding. 4) *This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) All plates are 4x4 MT20 unless otherwise indicated. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 388 lb uplift at joint 1 and 421 lb uplift at joint 7. LOAD CASE(S) Standard Job j Truss �X07.08 ICI rTruss Type JACK L- ......-- - -- ...._..._.I ---- ---- i Universal Forest Prorlr�rf Inr Fzso vo... o����__-:,....ww------ Oty Ply Centex Homes, Model 1702 A 9-4-6 5 1 Job Reference (optional) Job (Truss 1'X07-458 iC1A Universal Forest Product, Inc. E359, Vero Bea I Fri Sep 21 10:54:39 2007 Page 1 1 Scale = 1: 1-5-4 4x4 = 1-5-4 LOADING (psf) TCLL i SPACING 2-0-0 CSI DEFL in (loc) I/deft L/d PLATES GRIP 20.0 TCDL 15.0 Plates Increase 1.25 Lumber Increase 1.25 TC 0.03 Vert(LL) -0.00 1 >999 360 MT20 244/190 BCLL 10.0 I Rep Stress Incr YES BC 0.02 WB 0.00 Vert(TL) Horz(TL) -0.00 -0.00 1 2 >999 n/a 180 n/a BCDL 10.0 _ Code FBC2004rrP12002 (Matrix) Weight: 4 lb LUMBER BRACING TOP CHORD 2 X 4 SYP N0.2 TOP CHORD Structural wood sheathing directly applied or 1-5-4 oc purlins. BOT CHORD 2 X 4 SYP Nc.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS (lb/size) 1=62/0-6-12, 3=14/Mechanical, 2=48/Mechanical Max Horz 1=18(LC 3) Max Uplift1=-18(LC 3), 2=-28(LC 3) Max Grav1=62(LC 1), 3=27(LC 2), 2=48(LC 1) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=-1Ill 1 BOT CHORD 1-3=0/0 NOTES 1) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Category II; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 2) *This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer -to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 18 lb uplift at joint 1 and 28 lb uplift at joint 2. LOAD CASES) Standard Job ;Truss- li, russType Qty Ply Centex Homes, Model 1702 A X07�58 ACKC35 1 9-8-14 I - - LL - -- -- - Job Reference o tional Universal Forest Product,lnc. E359, Vero Beach, I. 967 — -- _-Job ��--------- -- -- --- - - - �_0?� 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54:39 2007 Pad 3-0-0 i 1-0-0 3-0-0 I Scale = 1i:.71 2 3.00 r12 T1 B1 4 9-8-14 9-0-0 4x4 = LOADING (psf) SPACING 2-0-0 CSI TCLL 20.0 Plates Increase 1.25 TC 0.12 DEFL in (loc) I/deft Ltd Vert(LL) 0.00 2 4 >999 360 PLATES GRIP MT20 244/190 TCDL 15.0 Lumber Increase 1.25 BCLL BC 0.07 Vert(TL) -0.01 2-4 >999 180 10.0 Rep Stress Incr YES BCDL 10,0 Code FBC2004/TP12002 WB 0.00 Horz(TL) -0.00 3 n/a n/a (Matrix) Weight: 11 lb LUMBER BRACING TOP CHORD 2 X 4 SYP No.2 TOP CHORD Structural wood sheathing directly applied or 3-0-0 oc purlins. BOT CHORD 2 X 4 SYP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS (lb/size) 3=68/Mechanical, 2=237/0-7-8, 4=26/Mechanical Max Horz 2=51(LC 3) Max UpIM3=-30(LC 3), 2=-141(LC 3) Max Grav3=68(LC 1). 2=237(LC 1), 4=53(LC 2) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=0/16, 2-3=-32114 BOT CHORD 2-4=0/0 NOTES 1) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Category II; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 2) 'This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 30 lb uplift at joint 3 and 141 lb uplift at joint 2. LOAD CASE(S) Standard 1 - To T Pc�6 Truss -Qty Ply Centex Homes, Model X -458 9-8-14 07 MA JACK Forestuni"ersal-. Pr I o .-.- Job Reference V-5dric. Vero Beach, Fl. 32967 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21� 8-.b4:39 2007'Page Job Truss --- - YP Qty Ply Centex Homes, Model 1702 A X07458 I C5 JACK 4 1 - - - -- -- -- -1 - - ------ ----- Job Reference o t*Eal _.- 10-2-14 ( universal Foresl Product, Inc. E35 o Beach, FI. 32967 -- '- - -—"'-'-("P-"-) -'- - �j-�� 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54:39 2007 Pq!ed -1-0-0 4x4 = 10-2-14 9-0-0 9-0-0 1 5-0-0 LOADING (psf) I SPACING 2-0-0 CSI DEFL in (loc) I/deft L/d TCLL 20.0 1 'Plates Increase 1.25 TC 0.28 Vert(LL) -0.02 2-4 >999 360 TCDL 15.0 Lumber Increase 1.25 BC 0.20 Vert(TL) -0.06 2-4 >924 180 BCLL 10.0 Rep Stress Incr YES WS 0.00 Horz(TL) -0.00 3 n/a n/a BCDL 10.0 Code FBC2004/TP12002 (Matrix) LUMBER TOP CHORD 2 X 4 SYP No.2 BOT CHORD 2 X 4 SYP No.2 REACTIONS (lb/size) 3=148/Mechanical, 2=316/0-7-8, 4=46/Mechanical Max Horz 2=73(LC 3) Max Uplift3=49(1-C 3), 2=-159(LC 3) Max Grav3=148(LC 1), 2=316(LC 1), 4=93(LC 2) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=0/16, 2-3=-46/30 BOT CHORD 2-4=0/0 PLATES GRIP MT20 244/190 Weight: 17 lb BRACING TOP CHORD Structural wood sheathing directly applied or 5-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. NOTES 1) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Category II; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 2) 'This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 79 lb uplift at joint 3 and 159 lb uplift at joint 2. LOAD CASE(S) Standard - - - - - - -- YPe IJob � Truss Truss T - I X07-458 jCJ1 JACK .. ........ ........ _ ----- -- ---- Universal Forest Product, Inc. E359, Vero Beach. FI. 32967 TQty Ply Centex Homes, Model 1702 A 19-0-10 2 1 Job Referenggjo iionalZ._._. _— ... 6.500 s Feb 5 2007 MiTek Industries, 3 c. Frig1 10:54:40 2007 Page 1 Scale = 1:4. 18-8-0 1-0-0 1-0-0 DEFL in Vert(LL) -0.00 Vert(TL) -0.00 Horz(TL) 0.00 (loc) I/deft Ud 2 n/r 180 2 n/r 90 n/a n/a PLATES GRIP MT20 244/190 Weight: 5 lb LOADING (psf) TCLL 20.0 TCDL 15.0 BCLL . 10.0 BCDL 10.0 SPACING 2-0-0 Plates Increase 1.25 Lumber Increase 1.25 Rep Stress Incr YES Code FBC2004ITP12002 CSI TC 0.13 BC 0.05 WB 0.00 (Matrix) LUMBER TOP CHORD 2 X 4 SYP No.2 BOT CHORD 2 X 4 SYP No.2 BRACING TOP CHORD BOT CHORD Structural wood sheathing directly applied or 1-0-0 oc purlins. Rigid ceiling directly applied or 6-0-0 oc bracing. REACTIONS (Ib'/size) 4=10/Mechanical, 3=153/Mechanical Max Horz4=-351(LC 1), 3=351(LC 1) Max Uplift4=-14(LC 3), 3=-116(LC 5) Max Grav4=20(LC 2), 3=153(LC 1) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=0/27, 2-3=-324/380 BOT CHORD 2-4=-351/348 NOTES 1) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Category 11; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 2) 'This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 14 lb uplift at joint 4 and 116 lb uplift at joint 3. 5) Non Standard bearing condition. Review required. LOAD CASE(S) Standard :Job ;Truss Truss Type -- qty— ply Centex Homes, Model 1702 A ' 19-0-10 I X07.458 iCJ1IJ JACK g 1 _....._.. - - - --- ---- —=--- -- -- ----- --- --- Job Reference o Gonal Universal Forest Product, Inc. E359, Vero Beach, FI. 32967 (-�-�' -- - —"-' - -' - 18-8-0 6.500 s Feb 5 2007 MiTek Industries, Inc. FriAeg l 10:54:40 2007 Fage 1 I ' 1-0-0 nn __ ! Scale = 1: 1-0-0 4x4 = i_n_n LOADING (pOso i SPACING 2-0-0 TCLL CSI DEFL in (loc) I/deft L/d PLATES GRIP Plates Increase 1.25 TCDL 15.0 I TC 0.08 Vert(LL) -0.00 2 >999 360 MT20 244/190 Lumber Increase 1.25 BC 0.01 Vert(TL) -0.00 2 >999 180 BCLL 10.0 I Rep Stress Incr YES WB 0.00 Horz(TL) -0.00 3 n/a n/a BCDL 10.0 —�— Code FBC2004/TP12002 (Matrix) Weight: 5 lb LUMBER BRACING TOP CHORD '2 X 4 SYP No.2 TOP CHORD Structural wood sheathing directly applied or 1-0-0 oc purlins. BOT CHORD 2 XA SYP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS (lb/size) 2=162/0-3-8, 4=10/Mechanical, 3=-9/Mechanical Max Horz 2=49(LC 5) Max Uplift2=-122(LC 5), 3=-9(LC 1) Max Grav2=162(LC 1), 4=19(LC 2), 3=22(LC 5) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=0/27, 2-3=-32/9 BOT CHORD 2-4=0/0 NOTES 1) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Categc cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 2) "This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with a 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstandi at joint 3. LOAD CASE(S) Standard Job Truss Truss Type I I X07- 58 CJ3U JACK Universal Forest Product, Inc. E359, Vero Beach, FI. 329W8-0 -1-0-0 Qty Ply Centex Homes, Model 1702 A 8 1 Job Reference (optional) _ 6.500 s Feb 5 2007 MiTek Industries, Inc. ,A_n-n i 19-10-10 1 p 21 10i% n2007 Page 1 1 I i LOADING (psf) SPACING 2-0-0 CSI DEFL in (loc) I/defl L/d TCLL 20.0 Plates Increase 1.25 TC 0.10 Vert(LL) -0.00 2-4 >999 360 TCDL 15.0 Lumber Increase 1.25 BC 0.07 Vert(TL) -0.01 2-4 >999 180 BCLL 10.0 Rep Stress Incr YES WB 0.00 Horz(TL) -0.00 3 n/a n/a BCDL 10.0 Code FBC2004/TP12002 (Matrix) LUMBER TOP CHORD 2 X 4 SYP N0.2 BOT CHORD 2 X'4 SYP N0.2 REACTIONS (Ib/size) 3=80/Mechanical, 2=228/0-3-8, 4=28/Mechanical Max Horz 2=85(LC 5) Max Uplift3=-45(LC 5), 2=-123(LC 5) Max Grav3=80(LC 1), 2=228(LC 1), 4=56(LC 2) FORCES (Ib) - Maximum Compression/Maximum Tension TOP CHORD 1-2=0/27, 2-3=-48/25 BOT CHORD 2-4=0/0 le: 1.S'=1 PLATES GRIP MT20 244/190 Weight: 11 lb BRACING TOP CHORD Structural wood sheathing directly applied or 3-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. NOTES 1) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=,4.2psf; BCDL=3.opsf; Category II; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 2) 'This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 45 lb uplift at joint 3 and 123 lb uplift at joint 2. LOAD CASE(S) Standard Job ;Truss I Truss T e — - - — -- --- -- - -- , YP � Qty Ply Centex Homes, Model 1702 A jX07-458 iCJ51J JACK I8 1 j - _ L.... - - - -- -- -- — - - - - — - ---- - --- - - -.J--- — --- Job Reference.(optiona�- -- - - 20 .8.10 .._.. j Universal Forest Product, Inc. E359, Vero Be th F�. 32967 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 1%5�_80 2007 Page 1 j I L. _ __-1-0.0 I r_n_n Scale = 1:12.2 cv-v-iJ 18-8-0 4x4 = 18-8-0 j LOADING (psf) SPACING 2-0-0 CSI DEFL in (loc) I/deft L/d TCLL 20.0 Plates Increase 1.25 TC 0.32 Vert(LL) -0.03 2-4 >999 360 PLATES GRIP MT20 244/190 TCDL 15.0 Lumber Increase 1.25 BC 0.22 Vert(TL) -0.07 2-4 >831 180 BCLL 10.0 BCDL 10.0 Rep Stress Incr YES Code FBC2004ITP12002 WB 0.00 Horz(TL) -0.00 3 n/a n/a (Matrix) Weight: 171b L EBMU R BRACING TOP CHORD 2 X 4 SYP No.2 BOT CHORD 2 X 4 SYP No.2 TOP CHORD Structural wood sheathing directly applied or 5-0-0 oc purlins, BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS (lb/size) 3=157/Mechanical, 2=310/0-3-8, 4=48/Mechanical Max Horz 2=122(LC 5) Max Uplift3=-97(LC 5), 2=-138(LC 5) Max Grav3=157(LC 1), 2=31O(LC 1), 4=96(LC 2) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=0/27, 2-3=-71/49 BOT CHORD 2-4=0/0 NOTES 1) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Category II; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 2) 'This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 97 lb uplift at joint 3 and 138 lb uplift at joint 2. LOAD CASE(S) Standard ;Job ;Truss TrussT a -- ---------- - YP Oty Ply Centex Homess,,Model 1702 A i X07-458 E5 IJACK 2 1 9-11-14� _....__-._--_—_l___,_ _,__-_-_____ __ Job Reference o tional ; Universal Forest Product, Inc. E359, Ver h, FI. 32967 -—)-'-'- "- -'-pm_ - QJ e 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54:41 2007 Pm_61 j ; 1-0-0 9-0-0 4x4 = 3.00 12 T1 4-0-0 4-0-0 ScIle = 11 131 LOADING (psf) I SPACING 2-0-0 CSI DEFL in (loc) I/deft L/d PLATES GRIP TCLL 20.0 Plates Increase 1.25 TC 0.16 Vert(LL) -0.01 2-4 >999 360 MT20 2441190 TCDL 15.0 I Lumber Increase 1.25 BC 0.12 Vert(TL) -0.02 2-4 >999 180 BCLL 10.0 Rep Stress Incr YES WB 0.00 Horz(TL) -0.00 3 n/a n/a BCDL 10.0 Code FBC2004/TP12002 (Matrix) Weight: 14 lb LUMBER BRACING TOP CHORD 2 X 4 SYP No.2 TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins. BOT CHORD 2 X 4 SYP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS (lb/size) 3=109/Mechanical, 2=275/0-7-8, 4=36/Mechanical Max Horz 2=62(LC 3) Max Uplift3=-56(LC 3), 2=-149(LC 3) Max Grav3=109(LC 1), 2=275(LC 1), 4=73(LC 2) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=0/16, 2-3=-39/23 BOT CHORD 2-4=0/0 NOTES 1) Wind: ASCE 7=02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Category II; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 2) 'This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 56 lb uplift at joint 3 and 149 lb uplift at joint 2. LOAD CASE(S) Standard Job i Truss -Ply Centex Homes, Model 1702 A X075458 JE7 (JACK 8 1 - "- -- - _ __- Job Reference LpGona�_.__ 10-5-14 Universal Forest Product, Inc. Vero Beach, FI.32967 - 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 2i-10:54:41 2007 pm- -0- i- 10 i ........ — ... ------------- - --------- -- -._. 6-0-0 - ---- 6-0-0 ------ - -- ----- --- - c4�,1 a 2 9-0-0 4x4 = 3.00 F12 T1 B1 Scale3= 1: 4 10-5-1 9-0-0 LOADING (psf) SPACING 2-0-0 CSI DEFL in (loc) I/deft L/d PLATES GRIP T TOLL 20.0 I Plates Increase 1.25 TC 0.45 Vert(LL) -0,05 2-4 >999 360 MT20 244/190 TCDL 15.0 Lumber Increase 1.25 BC 0,30 Vert(TL) -0.13 2-4 >514 180 BCLL 10.0 Rep Stress Incr YES WB 0.00 Horz(TL) -b.00 3 n/a n/a BCDL 10.0 Code FBC2004ITP12002 (Matrix) Weight: 20 lb LUMBER BRACING TOP CHORD 2 X 4 SYP No.2 TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD 2 X 4 SYP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS (Ib/size) 3=186/Mechanical, 2=359/0-7-8, 4=56/Mechanical Max Horz2=84(LC 3) Max Uplift3=-101(LC 3), 2=-171(LC 3) Max Grav3=186(LC 1), 2=359(LC 1), 4=113(LC 2) FORCES (Ib) - Maximum Compression/Maximum Tension TOP CHORD 1-2=0/16, 2-3=-54/38 BOT CHORD 2-4=0/0 NOTES 1) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Category II; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 2) 'This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 101 lb uplift at joint 3 and 171 lb uplift at joint 2. LOAD CASE(S) Standard 2 Job I7russ Truss Type X07.458 I EGB SPECIAL i Universal Forest Product, Inc. E359, Vero Beach, Fj83g7 I -1-0-0 1-0-0 2-0-0 1-0-0 702 A goo Fieterence (opuona�--.------ -- -------_.18 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54:41 2007 Page 1 4-0-0 6 7 18-64 11 1-0-0 2-0-0 3-0-0 7-0-0 1-0-0 1-0-0 1-0-0 4-0-0 LOADING (psf) TCLL 20.0 i TCDL . 15.0 BCLL 10.0 BCDL 10.0 SPACING 2-0-0 Plates Increase 1.25 Lumber Increase 1.25 Rep Stress Incr NO Code FBC2004/TPI2002 CSI TC 0.37 BC 0.34 WB 0.02 (Matrix) DEFL in Vert(LL) 0.02 Vert(TL) -0.05 Horz(TL) 0.00 (loc) I/deft L/d 8 >999 360 7-8 >999 180 7 n/a n/a PLATES GRIP MT20 244/190 Weight: 34 lb it -UMBER BRACING TOP CHORD 2 X 4 SYP No.2 BOT CHORD 2 X 4 SYP No.2 TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, WEBS 2 X 4 SYP No.2 except end verticals. Except: WEDGE 6-0-0 oc bracing: 4-5 Left: 2 X 4 SYP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS (lb/size) 7=288/Mechanical, 2=37610-3-8 Max Horz 2=140(LC 5) Max Uplift7=-109(LC 5), 2=-149(LC 5) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=0/27, 2-3=-406/26, 3-4=-340/28, 4-5=-334/80, 4-6=-53/50, 5-7=-202/109, 5-6=-143/82 BOT CHORD 2-8=-111/342, 7-8=-99/339 WEBS 3-8=-16/98 NOTES 1) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Category II; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 2) Provide adequate drainage to prevent water ponding. 3) "This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) All plates are 4x4 MT20 unless otherwise indicated. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 109 lb uplift at joint 7 and 149 lb uplift at joint 2. 7) Design assumes 4x2 (flat orientation) purlins at oc spacing indicated, fastened to truss TC w/ 2-10d nails. 8) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 21 lb down and 24 lb up at 2-0-0 on top chord, and 0 lb up at 2-0-0 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 9) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). LOAD CASE(S) Standard 1) Regular: Lumber Increase=1.25, Plate Increase=1.25 Uniform Loads (plf) Vert: 1-3=-70, 3-4=-70, 4-6=-70, 2-7=-20 Concentrated Loads (lb) Vert: 3=24(B) 8=0(B) jJob iTruss - I XOT-458 I EJ7A i Universal Forest Product, Ing.9, Vero Bea FI. MONO TRUSS 6-0-0 2 I 1 6.500 s Feb --ex H---omes, M-_.-.-o- del --1702---A-- - ...._ .... . Cent Inc. Fri8S%pa1 10:54:41 2007 Page 1 I Scale = 1:13.9 I 18-8-0 4x4 = 21-1-10 18-8-0 I LOADING (psf) TCLL I SPACING 2-0-0 CSI DEFL in (loc) I/deft Ltd 20.0 1 TCDL 15.0 Plates Increase Lumber Increase 1.25 1.25 TC 0.53 Vert(LL) -0.06 1-3 >999 360 BCLL 10.0 Rep Stress Incr I YES BC 0,32 WB 0.00 Vert(TL) Horz(TL) -0.15 1-3 -0.00 2 >471 n/a 180 n/a BCDL 10.0 Code FBC2004ITP12002 (Matrix) LUMBER 1 TOP CHORD 2 X 4 SYP No 2 BRACING PLATES GRIP MT20 2441190 Weight: 19 lb TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD :2 X 4 SYP N0.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS (lb/size) 1=26110-3-8, 2=203/Mechanical, 3=58/Mechanical Max Horz 1=112(LC 5) Max Upliftl=-64(LC 5), 2=-130(LC 5) Max Grav1=261(LC 1), 2=203(LC 1), 3=116(LC 2) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=-69/64 BOT CHORD 1-3=0/0 NOTES 1) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Category II; Exp B; enclosed; MWFRS; cantilever left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60. 2) 'This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 64 lb uplift at joint 1 and 130 lb uplift at joint 2. LOAD CASE(S) Standard Job Truss Truss Type dty7 Ply Centex Homes, Model 1702 A X07 458 EJ7U I MONO TRUSS 12 1 I Job Reference (optional I Universal Forest Product, Inc. E359, Ver h, FI. 32967 6.500 s Feb 5 RO07 MiTek Industries, Inc. Fri Sep 21 10:l1-d,b2007 Page 1 j i i le = 1:13.9 L 1- 1-IU 18-8-0 4x4 = 18-8-0 6-0-0 I LOADING (psf) SPACING 2-0-0 CSI DEFL in (loc) I/deft L/d PLATES GRIP TCLL 20.0 Plates Increase 1.25 TC 0.49 Vert(LL) -0.06 2-4 >999 360 MT20 244/190 TCDL 15.0 Lumber Increase 1.25 BC 0.32 Vert(TL) -0.15 2-4 >471 180 BCLL 10.0 Rep Stress Incr YES WB 0.00 Horz(TL) -0.00 3 n/a n/a BCDL 10.0 I— Code FBC2004/TPI2002 (Matrix) Weight: 20 lb LUMBER —1 BRACING TOP CHORD 2 X 4 SYP No.2 TOP CHORD Structural wood sheathing directly applied or 6-0-0 cc purlins. BOT CHORD 2'X 4 SYP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 cc bracing. REACTIONS (lb/size) 3=194/Mechanical, 2=353/0-3-8, 4=58/Mechanical Max Horz 2=141(LC 5) Max Uplift3=-121(LC 5), 2=-147(LC 5) Max Grav3=194(LC 1), 2=353(LC 1), 4=116(LC 2) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=0/27, 2-3=-68/61 BOT CHORD 2-4=0/0 NOTES 1) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf, BCDL=3.Opsf, Category II; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 2) "This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 121 lb uplift at joint 3 and 147 lb uplift at joint 2. LOAD CASE(S) Standard Job Truss Truss Type X07;458 EJ8 SPECIAL Universal Forest Product, Inc. E359, Vero Beach, F�83j_7 I.- -._.._, 3-2-4 1-0-0 3-2-4 Qry Ply Centex Homes, Model 1702 A 2 1 __-- Job Reference toptionalL 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54:42 2007 Page 1� 1-0-0 2-9-12 6 14.1 18-8)(0 11 1r 1-0-0 111-12 3-2-4 4-2-4 7-0-0 1-0-0 0-1-12 2-0-8 1-0-0 2-9-12 LOADING (psf) I SPACING 2-0-0 TCLL 20.0 Plates Increase 1.25 TCDL 15.0 Lumber Increase 1.25 BCLL 10.0 Rep Stress Incr YES BCDL 10.0 Code FBC2004/TPI2002 LUMBER TOP CHORD 2 X 4 SYP N0.2 BOT CHORD 2 X 4 SYP N0.2 WEBS 2 X 4 SYP N0.2 WEDGE Left: 2 X 4 SYP No.2 REACTIONS (lb/size) 7=294/Mechanical, 2=394/0-3-8 Max Horz2=140(LC 5) Max Uplift7=-115(LC 5), 2=-164(LC 5) CSI DEFL in (loc) I/deft L/d PLATES GRIP TC 0.47 Vert(LL) 0.03 8 >999 360 MT20 244/190 BC 0.34 Vert(TL) -0.06 2-8 >999 180 WB 0.01 Horz(TL) 0.00 7 n/a n/a (Matrix) Weight: 33 lb BRACING TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. Except: 6-0-0 oc bracing: 4-5 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=0/27, 2-3=-355/40, 3-4=-275/51, 4-5=-365/124, 4-6 56/132, 5-7=-193/97, 5-6=-127/68 BOT CHORD 2-8=-107/277, 7-8=-100/274 WEBS 3-8=-27/70 NOTES 1) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.opsf; Category Il; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 2) Provide adequate drainage to prevent water ponding. 3) "This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) All plates are 4x4 MT20 unless otherwise indicated. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 115 lb uplift at joint 7 and 164 lb uplift at joint 2, 7) Design assumes 42 (flat orientation) purlins at oc spacing indicated, fastened to truss TC w/ 2-10d nails. LOAD CASE(S) Standard ;gob iTruss ----...... — -- --- — - — YP Qty Ply Centex Homes, Model 1702 A i �X071458 EJ8A SPECIAL 1 1 I Universal Forest Product, Inc. E359, Vero Beach, F�83�7 ---- — -- — Job Reference o Gonal 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54:42 2007 Page 1 1-0-0 5-2-4 1-0-0 0-9-1.9 14. D V 18-6)(0 II r,-ice o-z-4 7-0_0 1-0-0 0-1-12 4-0-8 1-9-1 2 LOADING (psf) TCLL 20.0 TCDL 15.0 BCLL 10.0 BCDL 10.0 -- SPACING 2-0-0 Plates Increase 1.25 Lumber Increase 1.25 Rep Stress Incr YES Code FBC2004ITP12002 CSI TC 0.36 BC 0.30 WB 0.05 (Matrix) DEFL in (loc) I/deft L/d Vert(LL) -0.02 2-7 >999 360 Vert(TL) -0.05 2-7 >999 180 Horz(TL) 0.00 6 nla n/a PLATES GRIP MT20 244/190 Weight: 37lb LUMBER BRACING TOP CHORD 2.X 4 SYP No.2 BOT CHORD 2 X 4 SYP No.2 TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, WEBS 2 X 4 SYP No.2 WEDGE BOT CHORD except end verticals. Rigid ceiling directly applied or 10-0-0 oc bracing. Left: 2 X 4 SYP No.2 REACTIONS (lb/size) 6=294/Mechanical, 2=39410-3-8 Max Horz2=140(LC 5) Max Uplift6=-115(LC 5), 2=-164(LC 5) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=0/27, 2-3=-275/10, 3-4=-176/42, 4-5=-7/7, 5-6=-23/15 BOT CHORD 2-7=-60/184, 6-7=-28/87 WEBS 3-7=-122/101, 4-7=-70/249, 4-6=-300/98 NOTES 1) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Category II; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 2) Provide adequate drainage to prevent water ponding. 3) 'This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) All plates are 4x4 MT20 unless otherwise indicated. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 115 lb uplift at joint 6 and 164 lb uplift at joint 2. LOAD CASE(S) Standard i Job Truss Truss Type F4] Ply Centex Homes, Model 1702 A X07-458 I F01 FLOOR 1 -"JobReference o tional Universal Forest Pro -ro eac-' I � duct, Inc. E359, Vero Beach, FL 32967 �-----' -�--L----------------- I 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54:42 2007 Fage 9 0-1-8 2x3 11 3x6 = 2x3 II 3x5 = 2x3 II 3x6 FP= 1 2 3 4 S a 7 o Sca -3-e: 1/4"=1 2x3 11 2x3 11 2x3 11 1 28 27 za 22 21 20 19 18 17 16 15 3x6 = 2x3 II 2x3 II 3x6 = 3x6 FP = 3x7 = 8-2-6 9-3-14 23-0-10 9-0-0 7-0-14 7-2-6 9 9-2-6 16-3-4 -0-0 21-0-10 22-0-11) 23r2-2 27-10-8 9-0-0 7-0-14 0-1-8 1-0-0 6-11-6 4-9-6 1-0-0 1-0-0 4-8-6 1-0-0 0.1-8 0-1-8 Plate Offsets (X,Y): [4:0-1-8,Edge], [5:0-1-8,Edge], [11:0-1-8,Edge], [12:0-1-8,0-0-0], (14:0-1-8,Edge), [16:0-1-8,Edge], [17:0-1-8,Edge], [18:0-2-4,Edge], [20:0-1-8,E _ L1�0-1-8,0-0-0],_[22:0-1-8 Edge] [23.0-2-8 Edge] [25:0-1-8,0-1-81. [26:0-1-8 0-1-81 [27:0-1-8 0-1-8] [28.0-1-8 0 1 81 LOADING (psf) SPACING 2-0-0FBC DEFL in (loc) I/deft L/d PLATES GRIP TCLL 40.0 Plates Increase 1.00.56 Vert(LL) -0.14 22-23 >999 480 MT20 244/190 TCDL 10.0 Lumber Increase 1.00.73 Vert(TL) -0.20 22-23 >959 240 BCLL 0.0 Rep Stress Incr YES.31 Horz(TL) 0.04 15 n/a n/a BCDL 5.0 Code FBC2004/TP12002 (Matrix) Weight: 145 lb LUMBER BRACING TOP CHORD 4'X 2 SYP No.2 TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, BOT CHORD 4 X'2 SYP No.2 except end verticals. WEBS 4 X 2 SYP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing, Except: REACTIONS (lb/size) 24=815/0-7-4, 15=531/0-6-12, 18=1679/0-8-0 8-0-0 oc bracing: 17-18. Max Grav24=846(LC 7), 15=583(LC 4), 18=1679(LC 1) FORCES (ib) - Maximum Compression/Maximum Tension TOP CHORD 24-25=-87/0, 25-26=-87/0, 1-26=-87/0, 15-27=-103/0, 27-28=-103/0, 14-28=-103/0, 1-2=0/0, 2-3=-1853/0, 3-4=-1853/0, 4-5=-2083/0, 5-6=-1771/0, 6-7=-1771/0, 7-8=-177110, 8-9=0/859, 9-10=0/859, 10-11=-985/0, 11-12=-985/0, 12-13=-985/0, 13-14=0/0 BOT CHORD 23-24=0/1070, 22-23=0/2083, 21-22=0/2083, 20-21=0/2083, 19-20=0/949, 18-19=0/949, 17-18=-215/595, 16-17=0/985, 15-16=01761 WEBS 4-22=-110/49, 5-21=-32/142, 11-17=-318/0, 12-16=-147/46, 9-18=-287/0, 2-24=-1301/0, 2-23=0/913, 3-23=-289/0, 4-23=-382/30, 13-15=-889/0, 13-16=-61/282, 10-18=-1129/0, 10-17=0/658, 8-1 8=-1 595/0, 8-20=0/1049, 6-20=-239/32, 5-20=-628/0 NOTES 1) Unbalanced floor live loads have been considered for this design. 2) All plates are 3x4 MT20 unless otherwise indicated. 3) The following joint(s) require plate inspection per the Tooth Count Method when this truss is chosen for quality assurance inspection: 19 and 7. 4) Recommend 2x6 strongbacks, on edge, spaced at 10-0-0 oc and fastened to each truss with 3-16d nails. Strongbacks to be attached to walls at their outer ends or restrained by other means. 5) CAUTION, Do not erect truss backwards. LOAD CASE(S) Standard Job I Truss Truss Type Qty Ply Centex Homes, Model 1702 A X07.458 i F02 FLOOR 2 1 _ _ _ Job Reference_(optiona� Universal Forest Product, Inc. E359, Vero Beach, FI. 32967 -�-- - _-- 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54:43 2007 Page 1 0-1-8 2-6-0 ..i 1-8-6 2-0-0 2-1-6 2x3 II 3x5 = 2x3 II 1 2 3 4 2x3 11 3x6 FP = 3x6 = 5 a 7 0 1-7-6 2-0-0 1-11-6 C- -8 I----1[ -- - -il-- -- I SC )a: 1/4"=1 2x3 11 2x3 11 2x3 11 1 28 27 ze ZZ 21 20 19 18 17 16 15 3x6 = 2x3 II 2x3 II 3x7 = 3x6 FP= 3x7 = B-2-6 9-3-14 23-0-10 9-0-0 F_ _- 7-0-14 7-2-6 9-2-6 16 8-4 9-0-0 21-0-10 22-0-1 23 2 27-10-8 9 0-0 7-0-14 0-1-8 1-0-0 7-4-6 4-4-6 1-0-0 1-0-0 4-8-6 1-0-0 0-1-8 0-1-8 Offsets (X;Y): [4:0-1-8,Edge], [5:0-1-S,Edge], [8:0-2-12,Edge], [11:0-1-8,Edge], [12:0-1-8,0-0-0], [14:0-1-8,Edge], [16:0-1-8,Edge], [17:0-1-8,Edge], [18:0-2-4,E __�__ 0= L-4,Edge],121:0-1-8,0-0-0][22:0-1-8 Edge], [25:0-1-8 0-1-8j,_ [26:0-1-8,0-1-81. [27:0-1-8.0=1-81. f28:0-1-a_0-1-ai LOADING (psf) ISPACING 2-0-0 CSI DEFL TCLL 40.0 TCDL Plates Increase 1.00 TC 0.66 Vert(ILL) in (loc) -0.14 22-23 I/deft >999 L/d 480 PLATES GRIP MT20 2441190 10.0 BCLL 0.0 Lumber Increase Rep Stress Incr 1.00 YES BC 0.72 Vert(TL) -0.22 15-16 >607 240 BCDL_ 5.0 I Code FBC2004/TP12002 WB 0.32 (Matrix) Horz(TL) 0.05 15 n/a n/a Weight: 145 lb LUMBER TOP CHORD 4•X 2 SYP N BRACING 0.2 TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, BOT CHORD 4 X 2 SYP N0.2 except end verticals. WEBS 4 X 2 SYP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing, Except: REACTIONS (lb/size) 24=841/0-6-12, 15=506/0-6-12, 18=167810-5-8 6-0-0 oc bracing: 17-18,16-17. Max Grav24=865(LC 7), 15=568(LC 3), 18=1678(LC 1) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 24-25=-102/0, 25-26=-102/0, 1-26=-102/0, 15-27=-102/0, 27-28=-102/0, 14-28=-102/0, 1-2=0/0, 2-3=-1975/0, 3-4=-1975/0, 4-5=-2183/0, 5-6=-1820/0, 6-7=-1820/0, 7-8=-1820/0, 8-9=0/853, 9-10=0/853, 10-11=-929/24, 11-12=-929/24, 12-13=-929/24, 13-14=0/0 BOT CHORD 23-24=0/1234, 22-23=0/2183, 21-22=0/2183, 20-21=0/2183, 19-20=0/943, 18-19=0/943, 17-18=-267/608, 16-17=-24/929, 15-16=01735 WEBS 4-22=-109/71, 5-21=-46/118, 11-17=-337/0, 12-16=-130/67, 9-18=-294/0, 2-24=-1441/0, 2-23=01864, 3-23=-264/6, 4-23=-413/42, 13-15=-858/0, 13-16=-104/244, 10-18=-1086/0, 10-17=0/618, 8-18=-1632/0, 8-20=0/1102, 6-20=-269/5, 5-20=-630/0 NOTES 1) Unbalanced floor live loads have been considered for this design. 2) All plates are 3x4 MT20 unless otherwise indicated. 3) The following joint(s) require plate inspection per the Tooth Count Method when this truss is chosen for quality assurance inspection: 19 and 7. 4) Recommend 2x6 strongbacks, on edge, spaced at 10-0-0 oc and fastened to each truss with 3-16d nails. Strongbacks to be attached to walls at their outer ends or restrained by other means. 5) CAUTION, Do not erect truss backwards. LOAD CASE(S) Standard - ... _. - J.. - - ----- - ob Truss- ------------ - - ---- ----- Truss Type --- Qry — Ply --- ---- — - —-...__....---- Centex Homes, Model 1702 A -- - X07+458 F03 FLOOR B 1 j 1 - - --- — ---- Universal -- - — ----- Job Reference optional) Forest Product, Inc. E359, Vero Beach, FI. 32967 _ -------- - -- - - 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54:43 2007 Page 1 0-1-8 H 2-6-0 Scale = 1:27.9; 2x3 1! 3x4 = 3x4 = 3x5 = 2x3 II 3x4 = 3x4 = 2x3 II 3x5 = 3x4 II 1 2 3 4 1— 5 6 7 8 6 1 W 3x4 = 2 1 Zw� 1 -81_ — 1 4 — V 1 W W2 13 19 3x6 = 2x3 II 2x3 II 3x6 = 3x5 = 9-0-0 9-3-14 9-0-0 1-- 7-0-14_ 7,2-68-2-6 9-2-6 1618 7-0-14 0-1-81-0-0 1-0-00-1-8 6-9-10 LOADING (psf) I SPACING 2-0-0 CSI DEFL in (loc) I/deft L/d PLATES GRIP TCLL 40.0 Plates Increase 1.00 TC 0.48 Vert(LL) -0.13 12-13 >999 480 MT20 244/190 TCDL 10.0 Lumber Increase 1.00 BC 0.69 Vert(TL) -0.18 12-13 >999 240 BOLL 0.0 Rep Stress Incr YES WB 0.29 Horz(TL) 0.04 9 n/a n/a BCDL 5.0 I Code FBC2004/TPI2002 (Matrix) Weight: 87 lb F — LUMBER BRACING TOP CHORD 4 X 2 SYP No.2 TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, BOT CHORD 4.X 2 SYP No.2 except end verticals. WEBS 4 X 2 SYP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS (Ib/size) 9=870/Mechanical, 14=870/0-6-12 FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 14-15=-102/0, 15-16=-102/0, 1-16=-102/0, 8-9=-104/0, 1-2=0/0, 2-3=-1990/0, 3-4=-1990/0, 4-5=-2204/0, 5-6=-1997/0, 6-7=-1997/0, 7-8=0/0 BOT CHORD 1.3-14=0/1242, 12-13-0/2204, 11-12=012204, 10-11=0/2204, 9-10=0/1268 WEBS 4-1,2=-100/97, 5-11=-98/115, 2-14=-1450/0, 2-13=0/873, 3-13=-259/20, 4-13=-508/17, 7-9=-1470/0, 7-10=0/852, 6-10=-243/42, 5-10=-523/25 NOTES 1) Unbalanced floor live loads have been considered for this design. 2) Refer to girder(s) for truss to truss connections. 3) Recommend 2x6 strongbacks, on edge, spaced at 10-0-0 oc and fastened to each truss with 3-16d nails. Strongbacks to be attached to walls at their outer ends or restrained by other means. 4) CAUTION, Do not erect truss backwards. LOAD CASE(S) Standard ;Job Truss Truss Type pty Ply — Centex Homes, Model 1702 A X07-458 I F04 FLOOR 8 1 - -Job Reference �o U. niversal Forest Product, Inc. E359, Vero Beach, FI. 32967 - — 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54:43 2007 Page 1 •0-1-8 2-6-0 1-11-6 Scale = 1.19. 2x3 I I 3x4 3x4 = 3x4 = 2x3 II 2x3 II 3x4 = 3x4 II 1 2 3 4 5 6 W2 3 I_ -- - ---- W wz -- --- Lh -61 9 8 3x4 = 3x4 = 3x4 = 3x5 9-0-0 9-0-0 4-8-6 4-9 14 5-9-14 i 6-9-14 6-1 1-6 11-4-8 4-8-6 0-1-8 1-0-0 1-0-0 0-1-8 4-5-2 LOADING (psf) I SPACING 2-0-0 CSI DEFL in (loc) I/deft L/d PLATES GRIP TCLL 40.0 Plates Increase 1:00 TC 0.41 Vert(LL) -0.09 9-10 >999 480 MT20 244/190 TCDL 10.0 i Lumber Increase 1.00 BC 0.39 Vert(TL) -0.15 9-10 >865 240 BCLL 0.0 II Rep Stress Incr. YES WB 0.18 Horz(TL) 0.02 7 n/a n/a BCDL 5.0 I — Code FBC2004/TPI2002 (Matrix) Weight: 60 lb LUMBER ---LLL BRACING TOP CHORD 4 X 2 SYP No.2 TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, BOT CHORD 4 X 2 SYP No.2 except end verticals. WEBS 4 X 2 SYP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS (lb/size) 7=608/Mechanical, 10=608/0-6-12 FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 10-11=-104/0, 11-12=-104/0, 1-12=-104/0, 6-7=-110/0, 1-2=0/0, 2-3=-1077/0, 3-4=-1077/0, 4-5=-107710, 5-6=0/0 BOT CHORD 9-10=0/803, 8-9=0/1077, 7-8=0/819 WEBS 3-9=-202/0, 4-8=-227/0, 2-10=-937/0, 2-9=0/439, 5-7=-950/0, 5-8=0/448 NOTES 1) Unbalanced floor live loads have been considered for this design. 2) Refer to girder(s) for truss to truss connections. 3) Recommend 2x6 strongbacks, on edge, spaced at 10-0-0 oc and fastened to each truss with 3-16d nails. Strongbacks to be attached to walls at their outer ends or restrained by other means. 4) CAUTION, Do not erect truss backwards. LOAD CASE(S) Standard 19ob Truss Truss Type - ---—�Job ----------- -------- - - _. Qty Plyentex Homes, Model 1702 A I X07-458 I F05 FLOOR 1 - •-- ------ -_ _ Reference o tionalUniversal Forest Product, Inc. E359, Vero Beach, FI. 32967 - _.-P —Z --- -- - 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 2110:54:44 2007 Page 1 2-6-0 - 0-7-12 ; Scale = 1:11.f 3x4 ]I 3x4 1 2x3 11 2 3 3x4 = 4 3x4 11 10 I I 9 I a-U-u 3X4 = 6-4-12 3x5 9--0-0 LOADING (psf) TCLL 40.0 I SPACING Plates Increase 2-0-0 CSI DEFL in (loc) I/deft L/d PLATES GRIP TCDL 10.0 Lumber Increase 1.00 1.00 TC 0.33 BC 0.21 Vert(LL) -0.02 5-6 >999 480 MT20 2441190 BCLL 0.0 Rep Stress Incr YES WB 0.08 Vert(TL) Horz(TL) -0.03 5-6 0,00 5 >999 240 BCDL 5.0 Code FBC20041TRI2002 (Matrix) n/a n/a Weight: 39 lb LUMBER BRACING TOP CHORD 4 X 2 SYP No 2 BOT CHORD 4 X 2 SYP No.2 TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, WEBS 4'X 2 SYP No.2 except end verticals. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS (lb/size) 5=335/Mechanical, 8=335/0-6-12 FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 8-9=-115/0, 9-10=-115/0, 1-10=-11510, 4-5=-118/0, 1-2=0/0, 2-3=-367/0, 3-4=0/0 BOT CHORD. 7-8=0/367, 6-7=0/367, 5-6=0/367 WEBS 2-8=-426/0, 3-5=-423/0, 2-7=-50/94, 3-6=-55/88 NOTES 1) Unbalanced floor live loads have been considered for this design. 2) Refer to girder(s) for truss to truss connections. 3) Recommend 2x6 strongbacks, on edge, spaced at 10-0-0 oc and fastened to each truss with 3-16d nails. Strongbacks to be attached to walls at their outer ends or restrained by other means. LOAD CASE(S) Standard Job ITruss ITruss Type Qty Ply — TCentex Homes, Model 1702 A X07-458 I F06 I FLOOR 1 ' J _...... ;..- - -- - L. ------- --- ----- - — - - --- Job Reference � Unwersal Forest Product, Inc...E.359,. Vero Beach, FI. 32967 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54:44 2007 Page 1 -........... --0-12------- I 4x4 i! 04 = 1 4x4 i I 2 I 8 � 34x4 == Scale = 1:13. 4x4 II 4 I i- I W3 W4 W3 -' 4x4 = 6 I 4x4 = 9-0-0 4x6 = 9-0-0 I--- 7-8-4 7-8-4 -� LOADING (psf) TCLL 40.0 SPACING 2-0-0 CSI DEFL in (loc) I/defl Ltd PLATES GRIP TCDL 10.0 Plates Increase 1.00 Lumber Increase 1.00 TC 0.29 BC Vert(LL) -0.01 6 >999 480 MT20 2441190 BCLL 0.0 Rep Stress Incr YES 0.20 WB 0.11 Vert(TL) Horz(TL) -0.07 0.01 5-6 5 >999 n/a 240 n/a BCDL 5.0 Code FBC2004ITP12002 (Matrix) Weight: 44 lb LUMBER BRACING TOP CHORD 4 X 2 SYP N 0.2 TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, BOT CHORD 4 X 2 SYP N0.2 except end verticals. WEBS 4 X 2 SYP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS (lb/size) 5=406/Mechanical, 7=406/0-6-12 FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 7-8=-109/0, 8-9=-109/0, 1-9=-109/0, 4-5=-109/0, 1-2=0/0, 2-3=-494/0, 3-4=0/0 BOT CHORD 6-7=0/494, 5-6=0/471 WEBS 2-7=-573/0, 3-5=-546/0, 2-6=0/31, 3-6=0/29 NOTES 1) Refer to girder(s) for truss to truss connections. 2) Recommend 2x6 strongbacks, on edge, spaced at 10-0-0 oc and fastened to each truss with 3-15d nails. Strongbacks to be attached to walls at their outer ends or restrained by other means. LOAD CASE(S) Standard ;Job Truss - -- -Tru--ss ---- type X07.458 F07 FLOOR lJniversal Forest Product, Inc. E359, Vero Beach, FI. 32967 0-1 -8 3x4 = 3x4 _ 3x4 = 3x4 = 3x4 = 3x6 FP = 1 2 3 4 5 6 7 a a 1nli 19 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 3x4 = 3x4 = 3x6 FP = 3x5 = 9-0-0 Plate Offsets (X,Y): [9:0-1-8, 27-10-8 27-10-8 [14:0-1-8,Edge], [23:0-1-8,Edge], [24:0-1 -8, Edge], Qty Ply Centex Homes, Model 1702 A 1 1 Job Referenceoptionalj__.__-_...._...__ -Pa . 6,500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54:44 2007 Pag_e 1 0-Il-8 Scale = 1:48.5 3x4 3x4 = 3x4 = 3x4 I 1d 1S Ia 47 9a +o on 0+ 22 23 iw 1 50 , 49 26 25 24 3x4 = 1-8,Edge], [4 LOADING (psf) SPACING 2-0-0 CSI DEFL in (loc) I/deft L/d PLATES GRIP TCLL 40.0 Plates Increase 1.00 TC 0.41 Vert(LL) n/a n/a 999 MT20 2441190 TCDL 10.0 Lumber Increase 1.00 BC 0,01 Vert(TL) n/a n/a 999 BCLL 0.0 Rep Stress Incr YES WB 0.07 Horz(TL) -0.00 24 n/a n/a BCDL 5.0 Code FBC2004/TP12002 (Matrix) _ Weight: 145 lb LUMBER BRACING TOP CHORD 4 X 2 SYP No.2 TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, BOT CHORD 4 X 2 SYP No.2 except end verticals. WEBS 4 X 2 SYP No.2 BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing. REACTIONS (lb/size) 46=220/27-10-8, 24=209/27-10-8, 45=581/27-10-8, 44=484/27-10-8, 43=512/27-10-8, 42=505/27-10-8, 41=507/27-10-8, 40=508/27-10-8, 39=501127-10-8, 38=455/27-10-8, 37=474/27-10-8, 25=565/27-10-8, 26=441/27-10-8, 27=522/27-10-8, 28=503/27-10-8, 29=508/27-10-8, 30=506/27-10-8, 3 1 =507/27-10-8, 32=507/27-10-8, 33=369127-10-8, 34=737127-10-8, 36=328121-10-8 FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 46-47=-215/0, 47-48=-215/0. 1-48=-215/0, 24-49=-203/0, 49-50=-203/0, 23-50=-203/0, 1-2=-8/0, 2-3=-8/0, 3-4=-8/0 4-5=-8/0, 5-6=-8/0, 6-7=-8/0; 7-8=-8/0, 8-9=-8/0, 9-10=0/55, 10-11=0/55, 11-12=0/55, 12-13=0/122, 13-14=0/122, 14-15=0/6, 15-16=0/6, 16-17=0/6, 17-18=0/6, 18-19=0/6, 19-20=0/6, 20-21=016, 21-22=0/6, 22-23=0/6 BOT CHORD 45-46=0/0, 44-45=0/8, 43-44=0/8, 42-43=018, 41-42=018, 4041=0/8, 39-40=0/8, 38-39=0/8, 37-38=0/8, 36-37=-55/0, 35-36=-55/0, 34-35=-55/0, 33-34=-6/0, 32-33=-6/0, 31-32=-6/0, 30-31=-6/0, 29-30=-6/0, 28-29=-6/0, 27-28=-6/0, 26-27=-6/0, 25-26=-6/0, 24-25=0/0 WEBS 2-45=-575/0, 3-44=472/0, 4-43=-499/0, 5-42=-492/0, 6-41=-493/0, 7-40=-495/0, 8-39=-488/0, 9-38=-441/0, 11-37=-391/0, 22-25=-543/0, 21-26=-430/0, 20-27=-508/0, 19-28=-490/0, 18-29=-494/0, 17-30=-493/0, 16-31=-494/0, 15-32=-493/0, 14-33=-356/0, 13-34=-510/0, 1-45=0112, 23-25=-9/0, 9-37=-96/0, 14-34=-177/0, 12-36=-318/0, 12-34=-103/0 NOTES 1) All plates are 2x3 MT20 unless otherwise indicated. 2) The following joint(s) require plate inspection per the Tooth Count Method when this truss is chosen for quality assurance inspection: 10 and 35. 3) Gable requires continuous bottom chord bearing. 4) Recommend 2x6 strongbacks, on edge, spaced at 10-0-0 oc and fastened to each truss with 3-16d nails. Strongbacks to be attached to walls at their outer ends or restrained by other means. 5) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). LOAD CASE(S) Standard 1) Floor: Lumber Increase=1.00, Plate Increase=1.00 Uniform Loads (plf) Vert: 24-46=-10, 1-23=-370(F=-270) ' Job I Truss - --- _-----------..---- ----- --- Truss Type Qty Ply Centex Homes, Model 1702 A 1 X07-458 FG1 FLOOR 1 {._.nl erJob Reference optional - -- - - Unwsal Forest Product, Inc. E359, Vero Beach, FI. 32967 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54:45 2007 Page 1 • 2-0-6 2-4-2 2-4-2 i Scale = 1:28.6! j -- - - -- - -- - - - ---- ------ --- 16-1-4 5x6 = 2x3 II '-- 3x4=-------- 3x7=----._....----5x16 =I= 1 5x16 2 3x7 t -__:- -- --�i-------- _ 1—----- 4 5 13 12 11 3-11-5 10 9 5x7 = 8 4 hs --- 4 1 7 = —3x7 = 3-11-5 8 = 3x7 4-1-5 � — 9-0-0 17-0-4 17-0-4 Plate Offsets (X,Y): III .0-1-7-92,0-2-8]; [20-9-81 ,0-1-8], [3:0-3-0,0-3-4], [6:0-1-12,0-1-8], [7:0-7-12,0-2-8], [9:0-1-12,0-2-8], [10:0-1-12,0-1-8], [11:0-4-0,0-4-12], [12 __— ,0-1-8 , 13:0-1-12 0-2-81 LOADING (psf) SPACING 2-0-0 CSI DEFL in (loc) I/deft L/d PLATES GRIP TCLL 40.0 Plates Increase 1.00 TC 0.75 Vert(LL) -0.31 11 >624 480 MT20 244/190 TCDL 10.0 Lumber Increase 1.00 BC 0.80 Vert(TL) -0.48 11 >400 240 BCLL 0.0 Rep Stress Incr NO WB 0.99 Horz(TL) 0.05 8 n/a n/a BCDL 5.0 Code FBC2004ITP12002 (Matrix) Weight: 307 lb LUMBER TOP CHORD 2 X 4 SYP No.1 BOT CHORD 2 X 6 SYP SS WEBS 2 X 4 SYP No.2 'Except' W1 2 X 6 SYP SS, W1 2 X 6 SYP SS, W1 2 X 6 SYP SS W12X6SYP SS REACTIONS (lb/size) B=6836/0-3-8, 14=6836/0-8-0 9-0-0 BRACING TOP CHORD Structural wood sheathing directly applied or 4-2-2 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. FORCES (lb) -Maximum Compression/Maximum Tension TOP CHORD 1=2=-11517/0, 2-3=-18376/0, 34=-20586/0, 4-5=-20586/0, 5-6=-18405/0, 6-7=-11515/0 BOT CHORD 13-14=-0/0, 12-13=0111517, 11-12=0/18504, 10-11=0/18405, 9-10=0/11515, 8-9=0/0 WEBS 1-14=-5813/0, 7-8=-5811/0, 4-11=-187/0, 2-13=-3604/0', 3-12=-1324/0, 5-10=-131510, 6-9=-3615/0, 2-12=0/7639, 3-11=0/2316, 5-11 =012404, 6-10=017674, 7-9=0/12823, 1-13=0/12825 NOTES 1) 3-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows: Top chords connected as follows: 2 X 4 - 1 row at 0-9-0 oc. Bottom chords connected as follows: 2 X 6 = 2 rows at 0-4-0 oc. Webs connected as follows: 2 X 6 - 2 rows at 0-9-0 oc, 2 X 4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply'to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Recommend 2x6 strongbacks, on edge, spaced at 10-0-0 oc and fastened to each truss with 3-16d nails. Strongbacks to be attached to walls at their outer ends or restrained by other means. LOAD CASE(S) Standard 1) Floor: Lumber Increase=1.00, Plate Increase=1.00 Uniform Loads (plf) Vert: 8-14=-749(F=-739), 1-7=-100 Job ; Truss Truss Type Qty Ply Centex Homes, Model 1702 A - jX07;458 IFG2 FLOOR 11 I - - --- -' ----....-.-._._ ._ 2 Job Reference o tionai Unrversai Forest Product, Inc. E359, Vero teach, FI. 32967 _--------1- - - - -- 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54:45 2007 Page 1 I 2-7-610- 2-11-12 2-4-8 2-4-8 2 11-12 10- 2-8-14 • --- -- i - - --- i ---� F - --- -1 F - --I f ---- Scale: 1 /4"=1'1 8-11-4 3x6 == 3x4 = 3x7 = 5x5 = 3x7 = ^� 39,t-;& 3x6 - �--- - - -- - 7-9-0 -- 24 25 5 F o ~-- - -- ,-T LJ zz 21 20 19 18 17 16 15 14 13 12 2x5 it 3x4 = 46 = 54 = 3x4 = 2x5 11 -- - -- -- 27-7-8 9-0-0 9-0-0 9-0-0 i 16-8-4 27-10-8 16-8-4 _ 11-2-4 Plate Offsets:(X_,Y): [3:0-2-4,0-1-8], [4:0-2 4,0-1-8J, [5:0-3-0,0-1-8), [6:0-2-8,0-3-0],-.0-3-0,0-1-8], [8:0-2-4,0-1-8], [9:0-2-4,0-1-8]. [13:0-1-12,0-1-81, [14:0-2-4,0-1-81, [15:0-2-4,0-1-8 , 1 6:0-2-4,0-1-81 rl7:0-4-0 0-2-41,[19:0-2-4,0-1-81,[20:0-2-4 0-1-81 [21:0-2-4 0-1-81 [22:0-1-12 0-1-8] :: LOADING s (P f) i SPACING 2-0-0 CSI DEFL in (loc) I/deft L/d PLATES GRIP TCLL 40.0 Plates Increase 1,00 TC 0.39 Vert(LL) -0.07 20 >999 480 MT20 244/190 1 TCDL 10:0 Lumber Increase 1.00 BC 0.21 Vert(TL) -0.11 20 >999 240 BCLL 0.0 Rep Stress Incr NO WB 0.41 Horz(TL) 0.01 12 n/a n/a BCDL 5.0 I Code FBC2004/TPI2002 (Matrix) Weight: 328lb LUMBER --L BRACING TOP CHORD 2.X 4 SYP SS TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD 2 X 6 SYP SS BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing. WEBS 2 X 4 SYP No.2 *Except* W1 2 X 6 SYP SS, W1 2 X 6 SYP SS, W1 2 X 6 SYP SS W1 2 X 6 SYP SS, W1 2 X 6 SYP SS, W1 2 X 6 SYP SS W1 2 X 6 SYP SS, W1 2 X 6 SYP SS REACTIONS (lb/size) 23=103210-6-12, 16=442310-5-8. 12=484/0-6-12 Max Grav23=1068(LC 2), 16=4423(LC 1), 12=695(LC 3) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=-2090/0, 2-3=-3290/0, 3-4=-3291/0, 4-24=-2496/0, 24-25=-2496/0, 5-25=-2496/0, 5-6=-421/709, 6-7=-421/709, 7-8=0/3049, 8-9=-1476/711, 9-10=-1664/260, 10-11=-1238/36 BOT CHORD 22-23=010, 21-22=0/2090, 20-21=0/3290, 19-20=013291, 18-19=012496, 17-18=0/2496, 16-17=-304910, 15-16=-711/1476, 14-15=-260/1664, 13-14=-36/1238,12-13=0/0 WEBS 3-21=-175/160, 9-14=0/390, 5-19=0/530, 7-16=-2563/0, 8-15=0/763, 4-20=0/310, 2-22=-857/0, 10-13=-539/25, 2-21=0/1299, 3-20=-427/113, 4-19=-125510, 10-14=-242/460, 9-15=-717/0, 8-16=-3494/0, 6-17=-806/0, 5-17=-2421/0, 7-17=0/3557, 1-23=-1026/0, 1-22=0/2277, 11-12=-655/0, 11-13=-39/1349 NOTES 1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2 X 4 - 1 row at 0.9-0 oc. Bottom chords connected as follows: 2 X 6 - 2 rows at 0-9-0 oc. Webs connected as follows: 2 X 6 - 2 rows at 0-9-0 oc, 2 X 4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated, 3) Unbalanced floor live loads have been considered for this design. 4) All plates are 3x5 MT20 unless otherwise indicated. 5) Recommend 2x6 strongbacks, on edge, spaced at 10-0-0 oc and fastened to each truss with 3-16d nails. Strongbacks to be attached to walls at their outer ends or restrained by other means. 6) CAUTION, Do not erect truss backwards. 7) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 406 lb down at 6-5-8, and 757 lb down at 20-1-8 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. LOAD CASE(S) Standard 1) Floor: Lumberincrease=1.00, Plate Increase=1.00 Uniform Loads (plf) Vert: 12-23=-10. 1-5=-100, 5-8=-300(F=-200), 8-11=-100 :ontinued cn page 2 ---.._._... _._..--- --- ---- Job l Truss Truss Type X07-458 I FG2 FLOOR Universal Forest Product, Inc. E359, Vero Beach, FI. 32967 LOAD CASE(S) Standard Concentrated Loads (lb) Vert: 21=-406(F) 15=-757(F) aty Ply Centex H6-me—s,—Nl-ojeT 1702 A 1 2 Job Reference optional 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54:45 2007 Page 2 I :Job Truss. ------------- .....----- --- --- Truss Type City -- Ply Centex Homes, Model 1702 A �X07;458 �FG3 FLOOR 1 1 ..._... - ------ _ — — — ----- -- — ----- — — --- _ Job Reference (op tional -- -----�.......---- Universal Forest Product, Inc. E359, Vero Beach, FI, 32967 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54:46 2007 Page 1 I , 1 4x6 -- 2-7-8 2 4x4 11 Scale = 1 3-4-8 LOADING (psf) I SPACING 2-0-0 I CSI DEFL in (loc) I/deft L/d PLATES GRIP TCLL 40.0 Plates Increase 1.00 TC 0.29 Vert(LL) -0.01 3-4 >999 480 MT20 244/190 TCDL 10.0 Lumber Increase 1.00 BC 0.16 Vert(TL) -0.01 3-4 >999 240 BCLL 0.0 Rep Stress Incr NO WB 0.00 Horz(TL) -0.00 3 n/a n/a BCDL 5.0 Code FBC2004ITP12002 (Matrix) Weight: 21 lb LUMBER BRACING TOP CHORD 2 X 4 SYP No.2 TOP CHORD Structural wood sheathing directly applied or 3-4-8 oc purlins, BOT CHORD 2 X-6 SYP SS except end verticals. WEBS 2 X 4 SYP No.2 *Except* BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. W12X6SYP SS REACTIONS (lb/size) 4=320/Mechanical, 3=334/Mechanical FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-4=-150/0, 2-3=-150/0, 1-2=0/0 BOT CHORD 4-5=-0/0, 3-5=-0/0 WEBS 1-3=0/0 NOTES 1) Refer to girder(s) for truss to truss connections. 2) Recommend 2x6 strongbacks, on edge, spaced at 10-0-0 oc and fastened to each truss with 3-16d nails. Strongbacks to be attached to walls at their outer ends or restrained by other means. 3) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 325 lb down at 1-9-8 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 4) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). LOAD CASE(S) Standard 1) Floor: Lumber Increase=1.00, Plate Increase=1.00 Uniform Loads (plf) Vert: 3-4=-10, 1-2=-100 Concentrated Loads (Ib) Vert: 5=-325(B) Job 'Truss 1Truss T e rO7.458 FG4 I FLOOR - -- -- -- — - - - - - -- ---- - — — Universal Forest Product, Inc. E358, Vero Beach, FI. 32967 1 4x6 LOADING (psf) I SPACING 2-0-0 TCLL 40.0 Plates Increase 1.00 TCDL 10.0 Lumber Increase 1.0o BCLL 0.0 Rep Stress Incr NO BCDL - 5.0 Code FBC2004ITP12002 LUMBER TOP CHORD 2 X 4 SYP N0.2 BOT CHORD 2 X 6 SYP SS WEBS 2 X 4•SYP No.2 'Except* W12X6SYPSS REACTIONS (lb/size) 4=35510-1-8, 3=37 1 /Mechanical FORCES (Ib) - Maximum Compression/Maximum Tension TOP CHORD 1-4=-150/0, 2-3=-150/0, 1-2=0/0 BOT CHORD 4-5=-0/0, 3-5=-0/0 WEBS 1-3=0/0 Qty Ply Centex Homes, Model 1702 A 1 1 i ----- - -- - _ Job Referenceoptiona- 6.500 s Feb 5 2007 MiTek Industries, Inc, Fri Sep 21 10:54:46 2007 Page 1 2.7-8 2 4x4 II Scale = 1 3-4-8 CSI DEFL in (loc) I/deft L/d PLATES GRIP TC 0.29 Vert(LL) -0.01 3-4 >999 480 MT20 244/190 BC 0.19 Vert(TL) -0.01 3-4 >999 240 WB 0.00 Horz(TL) -0.0o 3 n/a n/a (Matrix) Weight: 21 lb BRACING TOP CHORD Structural wood sheathing directly applied or 3-4-8 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. NOTES 1) Refer to girder(s) for truss to truss connections. 2) Provide mechanical connection (by others) of truss to bearing plate at joint(s) 4. 3) Recommend 2x6 strongbacks, on edge, spaced at 10-0-0 oc and fastened to each truss with 3-16d nails. Strongbacks to be attached to walls at their outer ends or restrained by other means. 4) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 396 lb down at 1-9-8 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 5) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). LOAD CASE(S) Standard 1) Floor: Lumber Increase=1.00, Plate Increase=1.00 Uniform Loads (plf) Vert: 3-4=-10, 1-2=-100 Concentrated Loads (lb) Vert: 5=-396(F) -Job __ _---------------rT�ss..-------- ----- _ _ Truss T e YP Qty Ply Centex Homes, Model 1702 A ; X07-458 FG5 FLOOR 1 2 Job ReferenceLopt onal _ Universal Forest Product, Inc. E359, Vero Beach, FI. 32967 ' -- - 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54:46 2007 Page 1 j 11_ 3_Q� 1-2-4 1-3-12 Scale: 1 /4"=1' 4x4 II 7x10 = 5x7 = 4x4 = 8x8 = 4x4 = 4x4 = 4x4 II 1 2 3 4 27 5 6 7 n o - d ---- --rj ----- --- --3--- - ---- 2 - 2-- 2- g- I �C -- __ _--- - -- $3 - --- 25 24 23 2622 21 20 19 18 17 29 16 15 14 8x8 _ 8x16 = 5x8 = 4x4 = 4x4 = 8x8 = 4x4 = 9-0-0 9-0-0 9-0-0 - 6-10-3 6-1A-8 27-7-8 6-10-3 0-0-5 20-9-0 late Offsets (X,Y): [5:0-4-12 0-5-01 f9.0-4-0,0-4-81 f17:0-4-0 0-5-41 120:0-2-8 0-2-01 f22:0-6-8 Edoel f25.0-4-0 0-5-01 LOADING (psf) i SPACING 2-0-0 CSI DEFL in (loc) I/deft L/d PLATES GRIP - I TCLL 40.0 Plates Increase 1.00 TC 0.90 Vert(LL) -0.28 17-18 >884 480 MT20 244/190 TCDL 10.0 Lumber Increase 1.00 BC 0.71 Vert(TL) -0.43 17-18 >571 240 BCLL 0.0 I Rep Stress Incr NO WB 0.66 Horz(TL) 0.04 14 n/a n/a BCDL 5.0 I Code FBC2004ITP12002 (Matrix) Weight: 360 lb L M R - TOP CHORD BRACING 2 X 6 SYP SS TOP CHORD Structural wood sheathing directly applied or 4-8-1 oc purlins, BOT CHORD 2 X26 SYP SS except end verticals. WEBS 2 X SYP No.2 'Except' BOT CHORD Rigid ceiling directly applied or 4-5-11 oc bracing. I W12X6SYP SS, W1 2X6SYP SS, W42X6SYP SS REACTIONS (lb/size) 14=3506/0-5-4, 25=-1481/0-5-4, 22=979710-3-8 Max Uplift25=-2280(LC 3) Max Grav 14=3521(LC 3), 25=325(LC 2). 22=9797(LC 1) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-25=-204/254, 13-14=-590/0, 1-2=-25/420, 2-3=0/5179, 3-4=0/10424, 4-27=0/12897, 5-27=0112897, 5-6=0/3189, 6-7=-4749/0, 7-8=-9819/0, 8-9=-12575/0, 9-28=-12979/0, 10-28=-1297910, 10-11=-1068110, 11-12=-6335/0, 12=13=-591/0 BOT CHORD 24-25=-2713/150, 23-24=-7865/0, 23-26=-12897/0, 22-26=-12897/0, 21-22=-7311/0, 20-21=011540, 19-20=0/7861. 18-19=0/11797, 17-18=0/13369, 17-29=0/12282, 16-29=0/12282, 15-16=0/8972, 14-15=0/3894 WEBS 2-25=-162/2961, 2-24=-3430/0, 3-24=0/3736, 3-23=-4331/0, 4-22=-4134/0, 4-23=013837, 12-14=-4266/0, 12-15=0/3395, 11-15=-3668/0, 11-16=0/2377, 10-16=-2227/0, 10-17=0/968, 9-17=-542/70, 9-18=-1124/0, 8-18=0/1103, 8-19=-2773/0, 7-19=0/2744, 7-20=-4346/0, 6-20=0/4488, 6-21=-6301/0, 5-21=015735, 5-22=-7239/0 NOTES 1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2 X 6 - 2 rows at 0-9-0 oc. Bottom chords connected as follows: 2 X 6 - 2 rows at 0-7-0 oc. Webs connected as follows: 2 X 4 - 1 row at 0-9-0 oc, 2 X 6 - 2 rows at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Unbalanced floor live loads have been considered for this design. 4) All plates are 4x6 MT20 unless otherwise indicated. 5) Bearing at.joint(s) 22 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 2280 lb uplift atjoint 25, 7) Uplift for first LC exceeds limits B) Recommend 2x6 strongbacks, on edge, spaced at 10-0-0 oc and fastened to each truss with 3-16d nails. Strongbacks to be attached to walls at their outer ends or restrained by other means. 3) CAUTION, Do not erect truss backwards. 10) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 310 lb down at 6-4-0, and 345 lb down at 20-0-0 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. -OAD CASE(S) Standard ,ontinued on page 2 Jo1 Truss Truss Type oty Ply Centex Homes, Model 1702 A X07 ;458 FG5 FLOOR 1 - --- - - _ ____ ____ _ 2 Job Reference joptional Universal Forest Product, Inc. E359, Vero Beach, FI. 32967 — 6.500 s Feb 5 2007 MiTek Industries, Inc, Fri Sep 21 10:54:46 2007 Page 2 I j LOAD CASE(S) Standard 1) Floor: Lumber Increase=1.00. Plate Increase=1.00 i Uniform Loads (pig Vert: 14-25=-10, 1-27=-340(F=-240), 27-28=-470(F=-370),13-28=-340(F=-240) Concentrated Loads (lb) Vert: 26=-310(B) 29=-345(B) ;Job Truss __... _ I Truss Type X07 458 I HJ2 MONO TRUSS Universal Forest Product, Inc. E359, Vero Beach, FI. 32967 I r.....---..._.._..._.__._-11-5-0 ------------ 1- I I I 2-9-15---- 18-8-0 4x6 11 'Sep 21 10:54:47 2007 Page 1 Plate Offset�X,Y): f2:0-3-10 Edoej j2:0-1-5,1-5-3] 1-10-11 0-11-4 LOADING (psf) i SPACING TCLL 20.0 2-0-0 Plates Increase 1,25 CSI TC DEFL in (loc) I/deft L/d PLATES GRIP TCDL 15.0 ' I Lumber Increase 1.25 0.22 BC 0.04 Vert(LL) -0.00 Vert(TL) -0.00 2-4 2-4 >999 >999 360 MT20 2441190 BOLL 10.0 BCDL I Rep Stress Incr !NO WB 0.00 Horz(TL) -0.00 3 n/a 180 n/a 10.0— I Code FBC2004ITP12002 (Matrix) Weight: 12 lb LUMBER TOP CHORD 2 X 4 SYP N0.2 BOT CHORD 2 X 4 SYP N0.2 WEDGE Left: 2 X 4 SYP No.2 REACTIONS (lb/size) 3=46/Mechanical, 2=269/0-6-7, 4=20/Mechanical Max Horz 2=66(LC 3) Max Uplift3=-15(LC 4), 2=-162(LC 3) Max Grav3=46(LC 1), 2=269(LC 1), 4=40(LC 2) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=0/28, 2-5=-41/0, 3-5=-6/9 BOT CHORD 2-6=0/0, 4-6=0/0 BRACING TOP CHORD Structural wood sheathing directly applied or 2-9-15 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. NOTES 1) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Category II; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 2) "This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 15 lb uplift at joint 3 and 162 lb uplift at joint 2. 5) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 32 lb down at 1-5-12 on top chord, and 21 lb up at 1-5-12 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 6) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). LOAD CASE(S) Standard 1) Regular: Lumber Increase=1.25, Plate Increase=1.25 Uniform Loads (plf) Vert: 1-3=-70, 2-4=-20 Concentrated Loads (lb) Vert: 6=10(F) i o Truss Truss _ _.� -- ------------ _ --- - ------ - _._..-.7 j �-fru'—ssTy-pe pty Ply Centex Homes, Model 102 A X07-.�58 HJ7U MONO TRUSS 4 1 .l.- - - -------- --- ----- - -- —- --- - --- Job Reference motional)- ---- _. _._ _ . - -- ._...2.1..t.11 1 Universal Forest Product, Inc 3 Vero Beach, FI. 32967 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54:47 2007 P�g�_a 1F8-✓3�� L ..___. -1. 5-0......... - I j 4-4.4 4-1-9 Scale = 1:16,5i 18-8-0 21-1-11 18-8-0 4-4-4 8-5-0 8 13 4-4-4 4-0-12 0-0-13 0 2-01 — -- LOADING (psf) SPACING 2-0-0 TCLL 20.0 Plates Increase 1.25 TCDL 15.0 Lumber Increase 1.25 BCLL 10.0 Rep Stress Incr NO BCDL 10.0 Code FBC2004/TP12002 LUMBER TOP CHORD 2 X 4 SYP No.2 BOT CHORD 2 X 4 SYP No.2 WEBS 2 X 4 SYP No.2 CSI DEFL in (loc) I/deft L/d PLATES GRIP TC 0.38 Vert(LL) -0.01 7 >999 360 MT20 244/190 BC 0.25 Vert(TL) -0.04 6-7 >999 180 WB 0.20 Horz(TL) 0.01 6 n/a n/a (Matrix) Weight: 36 Ito BRACING TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS (lb/size) 4=226/Mechanical, 2=400/0-5-11, 6=294/Mechanical Max Horz2=150(LC 3) Max Up1ift4=-138(LC 3), 2=-182(LC 3), 6=-61(LC 3) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=0/28, 2-3=-731/146, 3-4=-66/47 BOT CHORD 2.7=-244/681, 6-7=-244/681, 5-6=0/0 WEBS 3-7=0/198, 3-6=-716/256 NOTES 1) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Category II; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 2) 'This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) All plates are 4x4 MT20 unless otherwise indicated. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding J38 lb uplift at joint 4, 182 lb uplift at joint 2 and 61 lb uplift at joint 6. 6) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). LOAD CASE(S) Standard 1) Regular: Lumber Increase=1.25, Plate Increase=1.25 Uniform Loads (plf) Vert: 1-2=-70 Trapezoidal Loads (plf) Vert: 2=-4(F=33, B=33)-to-4=-148(F=-39, B=-39), 2=-0(F=10, B=10)-to-5=-42(F=-11, 8=-11) c Job FTruss iTruss Type I iX07458 IK5 IJACK Unigebs81 Forest Product, Inc. E359, Vero Beach, FI. 32967 9-i LOADING (psf) I SPACING 2-0-0 TCLL 20.0 Plates Increase 1.25 TCDL 15.0 I Lumber Increase 1,25 BCLL - 10.0 1 Rep Stress Incr NO BCDL 10.0 1 Code FBC2004/TP12002 LUMBER TOP CHORD 2 X 4 SYP No.2 BOT CHORD 2 X 4 SYP No.2 Qry Ply Centex Homes, Model 1702 A 1 1 9-11-14 Job Reference (op ional 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54:47 2007 F�j#01 I CSI DEFL in (loc) I/defl L/d PLATES GRIP TC 0.34 Vert(LL) -0.03 1-3 >999 360 MT20 244/190 BC 0.23 Vert(TL) -0.07 1-3 >868 180 WB 0.00 Horz(TL) -0.00 2 n/a n/a (Matrix) Weight: 16 Ib BRACING TOP CHORD Structural wood sheathing directly applied or 5-5-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS (lb/size) 1=115/0-8-8, 2=164/Mechanical, 3=47/Mechanical Max�Horz 1=32(LC 3) Max Upliftl=-33(LC 3), 2=-89(LC 3) Max Gravl=115(LC 1), 2=164(LC 1), 3=97(LC 2) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=-23/23 BOT CHORD 1-3=0/0 NOTES 1) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Category II; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 2) "This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 33 lb uplift at joint 1 and 89 lb uplift at joint 2. 5) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). LOAD CASE(S) Standard 1) Regular: Lumber Increase=1.25, Plate Increase=1.25 Trapezoidal Loads (plf) Vert: 1=-6(F=32, B=32)-to-2=-95(F=-12, B=-12), 1=-2(F=9, B=9)-to-3=-27(F=-4, B=-4) Job i Truss Truss Type - X07�58 K9 MONO TRUSS _ ... ..-- .... I Unwersal Forest Product,-. - . Vero Beach, FI. 32967 -I 5-9-....._ ........... 1-5-0 9-0-0 5-2-12 - --- -...- - - - - -entex- - Homes, M--..... o--.del..... -1702 - A- - ....... ..._ _. Qry Ply C, 2 1 —_- - Job Reference o tiona1--_ _ -.-- -- - - - -_ . ,10-5-15 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54:47 2007 Pp%e01 3-2-5 Scale = 1:16. 10-5-15 9-0-0 5-2-12 8-4-6 �_1 5-2-12 3-1-10 0-0-11 LOADING (psf) SPACING 2-0-0 CSI DEFL in (loc) I/deft L/d PLATES ^GRIP TCLL 20.0 Plates Increase 1.25 TC 0.23 Vert(LL) -0.02 2-7 >999 360 MT20 244/190 TCDL 15.0 Lumber Increase 1.25 BC 0,28 Vert(TL) -0.07 2-7 >999 180 BCLL 10.0 Rep Stress Incr NO WB 0.16 Horz(TL) 0.01 6 n/a n/a BCDL 10.0 I Code FBC2004/TP12002 (Matrix) Weight: 33 lb LUMBER —L- BRACING TOP' CHORD 2 X 4 SYP No.2 TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD 2,X 4 SYP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 2 X 4 SYP N6,2 REACTIONS (lb/size) 4=177/Mechanical, 2=386/0-10-10, 6=334/Mechanical 'Max Horz 2=87(LC 3) Max Uplift4=-98(LC 3), 2=-192(LC 3), 6=-76(LC 3) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-8=0/13, 2-8=0/13, 2-3=-908/226, 3-4=-35/23 BOT CHORD 2-7=-279/874, 6-7=-279/874, 5-6=0/0 WEBS 3-7=0/201, 3-6=-915/292 NOTES 1) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Category II; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 2) 'This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) All plates are 4x4 MT20 unless otherwise indicated. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 98 lb uplift at joint 4, 192 lb uplift at joint 2 and 76 Ib uplift at joint 6. 6) In the LOAD CASE(S) section, loads applied to the face ofthe truss are noted as front (F) or back (B). LOAD CASE(S) Standard 1) Regular: Lumber Increase=1.25, Plate Increase=1.25 Uniform Loads (plf) Vert: 1-8=-70 Trapezoidal Loads (p!f) Vert: 8=0(F=35, B=35)-to-4=-147(F=-39, B=-39), 2=-2(F=9; B=9)-to-5=-42(F=-11, 8=-11) Job lfruss ........ - ----TTruss Type — - ------------ ---- I I yp Qty Ply Centex Homes, Model 1702 A i X07-458 Iv10 GABLE 1 1 i Uni e I Forest Product, Inc E359 Vero Beach FI 32967T — — --- — —_ lob Reference {optional)___ _.-- 1 �� 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54:48 2007 Page 1 10-8-8 II Scale = 1:17.4 I I 4 3.00 12 3 2 — `�1 T1 W1 I ST2 ST1 1 X. ..�\ ; ;'� ;'� A::i •�': 'u ..% j/� - .,/ •,..<,.;1.� �� /\..0 �•. r, Y��/'•%�`.ili�C. ,.� /(i�;, 9-4-7 10-8-8 10-8-8 i Plate Offsets �_YL(S:Edge,0-3-8L LOADING (psf) SPACING 2-0-0 CSI DEFL in (loc) 1/defl L/d PLATES GRIP T TCLL 20.0 I Plates Increase 1.25 TC 0.33 Vert(LL) n/a n/a 999 MT20 2441190 j TCDL 15.0 I Lumber Increase 1.25 BG 0.22 Vert(TL) n/a Ma 999 ! BOLL 10.0 Rep Stress Incr YES WB 0.04 Horz(TL) 0.00 5 n/a n/a BCDL 10:0 Code FBC2004/TP12002 (Matrix) Weight: 38lb LUMBER BRACING TOP CHORD 2 X 4 SYP No.2 TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, BOT CHORD 2 X 4 SYP No.2 except end verticals. WEBS 2 X 4 SYP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. OTHERS 2 X 4 SYP No.2 REACTIONS (lb/size) 1=204/10-8-8, 5=115/10-8-8, 6=-12/10-8-8, 7=537/10-8-8 Max Horz 1=105(LC 3) Max Upliftl=-49(LC 3), 5=-44(LC 3), 6=-12(LC 1), 7=-199(LC 3) Max Gravl=204(LC 1), 5=115(LC 1), 6=7(LC 3), 7=537(LC 1) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=-77/37, 2-3=-55/0, 3-4=-22/6, 4-5=-81/45 BOT CHORD 1-7=-6/14, 6-7=-6/14, 5-6=-6/14 WEBS 3-6=-17/17, 2-7=-380/201 NOTES 1) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Category II; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 2) 'This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) All plates are 4x4 MT20 unless otherwise indicated. 4) Gable requires continuous bottom chord bearing. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 49 lb uplift at joint 1, 44 lb uplift at joint 5, 12 lb uplift at joint 6 and 199 lb uplift at joint 7. LOAD CASE(S) Standard -- I i X07-458 I V2 _'...-..._......_....._......--L — ----- Univei�a14F9rest Product, Inc. E359, Vero fil ]Truss Ty VALLEY 32967 Qty Ply Centex Homes, 1 1 Job Reference 6.500 s Feb 5 2007 MiTek I 2-8-8 Inc. Fri Sep 21 10:54:48 2007 Page 1 4�—---____-- i LOADING (psf) TCLL 20.0 I SPACING Plates Increase 2-0-0 1.25 CSI 2-8-8 4x4 PLATES GRIP DEFL in (loc) I/deft L/d TCDL 15.0 BCLL I Lumber Increase 1.25 TC 0.03 BC 0.02 Vert(LL) Vert(TL) n/a n/a 999 n/a n/a 999 MT20 244/190 10.0 i BCDL 10.o Rep Stress Incr YES Code FBC2004/TPI2002 WB mo (Matrix) Horz(TL) -0.00 2 n/a n/a -- _L— Weight: 6 lb i LUMBER TOP CHORD 2 X 4 SYP No 2 BRACING BOT CHORD 2 X 4 SYP No.2 TOP CHORD Structural wood sheathing directly applied or 2-8-8 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS (Ib/size) 1=61/2-8-8, 2=4712-8-8, 3=14/2-8-8 Max Horz1=17(LC 3) Max Upliftl =-1 8(LC 3). 2=-27(LC 3) Max Grav1=61(LC 1), 2=47(LC 1), 3=27(LC 2) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=-10/10 BOT CHORD 1-3=0/0 NOTES 1) Wind: ASCE 7-02: 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.opsf; Category II; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 2) 'This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Gable requires continuous bottom chord bearing. 4) Bearing.at joint(s) 2 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 18 lb uplift at joint 1 and 27 lb uplift at joint 2. LOAD CASE(S) Standard ;Truss Truss Type X07-458 I V2A VALLEY i - ,_..._. e --- uc Inc.E -.._--------- - --- --- Uni�er/sal Forest Product, nc. E359, Vero Beach, FI. 32967 9- Qty Ply Centex Homes, Model 1702 A I 1 1 I _ _ Job Reference (oeti _ 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54:48 200Z Page 1 I 2-1 1-8 LOADING (psf) — i SPACING 2-0-0 2-11-8 4x4 CSI DEFL in (loc) I/deft L/d TCLL 0 20. Plates Increase 1.25 TC 0.03 Vert(LL) n/a n/a 999 TCDL 15.0 Lumber Increase 1.25 BC 0.02 Vert(TL) n/a n/a 999 BCLL 10.0 I Rep Stress Incr YES WB 0.00 Horz(TL) -0.00 2 We n/a BCDL 10.0 Code FBC2004ITP12002 (Matrix) LUMBER TOP CHORD 2'X 4 SYP N0.2 BOT CHORD 2 X 4 SYP No.2 REACTIONS (lb/size) 1=67/2-11-8, 2=52/2-11-8, 3=15/2-11-8 Max Horz 1=20(LC 3) Max Upliftl=-20(LC 3), 2=-30(LC 3) Max Grav1=67(LC 1), 2=52(LC 1), 3=30(LC 2) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=-12/12 BOT CHORD 1-3=0/0 PLATES GRIP MT20 2441190 Weight: 7 lb BRACING TOP CHORD Structural wood sheathing directly applied or 2-11-8 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. NOTES 1) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf, BCDL=3.Opsf; Category II; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 2) "This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Gable requires continuous bottom chord bearing. 4) Bearing at joint(s) 2 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. - 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 20 lb uplift at joint 1 and 30 lb uplift at joint 2. LOAD CASE(S) Standard _....._....._..- -- -._ __ Job 'truss Truss Type Q-ty Ply Centex Homes, Model 1702 A X07-458 IV4 VALLEY 1 1 . - t Product, _.._.-- -- - - - - --- -- ---- — — ----- -- Job Referenc�optionalJ-- — — i Urji�eiL/Forest Product, Inc, E359, Vero Beach, FI. 32967 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep i 4-8-8 4-8-8 21 10:54:48 2007 Page 1 Sale = 1:7 LOADING (psf) SPACING 2-0-0 CSI DEFL in (loc) I/deft L/d PLATES GRIP TCLL 20.0 Plates Increase 1.25 TC 0.18 Vert(LL) n/a n/a 999 MT20 244/190 TCDL 15.0 Lumber Increase 1.25 BC 0.11 Vert(TL) n/a n/a 999 BCLL 10.0 Rep Stress Incr YES WB 0.00 Horz(TL) 0.00 n/a n/a BCDL 10.0 Code FBC2004/TPI2002 (Matrix) Weight: 13 lb LUMBER BRACING TOP CHORD 2 X 4 SYP No.2 TOP CHORD Structural wood sheathing directly applied or 4-8-8 oc purlins, BOT CHORD 2 X 4 SYP No.2 except end verticals. WEBS 2 X 4 SYP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS (lb/size) 1=152/4-8-8, 3=152/4-8-8 Max Horz 1=38(LC 3) Max Upliftl=-47(LC 3). 3=-56(LC 3) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=-23/23, 2-3=-118/66 BOT CHORD 1-3=0/0 NOTES 1) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL-4.2psf; BCDL=3.Opsf; Category II; Exp B; enclosed; MWFRS; cantilever left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60. 2) 'This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) All plates are 4x4 MT20 unless otherwise indicated. 4) Gable requires continuous bottom chord bearing. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 47 lb uplift at joint 1 and 56 lb uplift at joint 3. LOAD CASE(S) Standard 'Job Tfuas -- - ---- — Truss Ty X07 458 V6 VALLEY 1.-. — -- ---- -- Uni�yr�_4 Forest Product, Inc. E359, Vero Beach, FI. 32967 6-8-8 1 _,�_ 1 Job Re 6.500 s Feb 5 200 Homes702'Model 1A 7 3.00 F12 I I «`cyyygj T1 W 1 I 1 i ��\ •,il•:t1:' x .\^;a;Y;\�•;:ti �,..'' ; "+\:��,�x �. �.%\: X XT ;i %� �C� ;C y� ?� �,' '�:.X,�: ): r.�, Y, k.`<, ..\\; � ,I � x�'S.J �x \ " .�"%'i\'\Y `C r '\ k \ X \ � �• .� \ \C � X �c 7� s � Xx, \ \ 'X,4 `x �� i I 10-4-7 6-8-8 _ _- 6-8-8 Plate Offsets�X,Y : 3:Edye,0.3.8] ----- -- -- LOADING (psf) TCLL 20.0 SPACING 2-0-0 Plates Increase 1.25 CSI TC 0.46 DEFL in (loc) I/deft Ltd PLATES GRIP TCDL 15.0 Lumber Increase 1.25 BC 0.27 Vert(LL) n/a n/a 999 Vert(TL) n/a - n/a 999 MT20 244/190 BCLL 10.0 f Rep Stress Incr YES WB 0.00 Horz(TL) 0.00 n/a n/a BCDL 10.0 I Code FBC2004/TP12002 (Matrix) Weight: 20 lb LUMBER BRACING TOP CHORD 2 X 4 SYP No.2 TOP CHORD Structural wood sheathing directly applied or 6-8-8 oc purlins, BOT CHORD 2 X 4 SYP No.2 except end verticals. WEBS 2 X 4 SYP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS ,(Ib/size) 1=242/6-8-8, 3=242/6-8-8 Max Horz 1=60(LC 3) Max Upliftl=-74(LC 3), 3=-89(LC 3) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=-37/37, 2-3=-188/105 BOT CHORD 1-3=0/0 NOTES 1) Wind: ASCE 7-02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Category 11; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 2) 'This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) All plates are 4x4 MT20 unless otherwise indicated. 4) Gable requires continuous bottom chord bearing. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 74 lb uplift at joint 1 and 89 lb uplift at joint 3. LOAD CASE(S) Standard Job .. .. Truss - - ' �VALLEYpe - --- — ----- -- --- Qry - Ply 1 Centex Home' s, Model 1702 A X07-458 VS lL -^-- _1 - --- _ _ _ Job Reference(optlona_--..____._..............._....__._ .. -.. Ur9r�aj Forest Product, Inc. E359, Vero Beach, FI.32967 - 6.500 s Feb 5 2007 MiTek Industries, Inc. Fri Sep 21 10:54:49 2007 Page 1 8-8-8 I 8-8-8 i I Scale = 1:14.1! I I i 3.00 12 3 2 I� T W2 — I ry I I 61 X.K:,, ,< .� >� <'X �C >l . , ��� ' ;f `.' :� Vic. >. I 9-10-7 F- 8-8-8 8-8-8 i Ii Plate Offsets X,Y] f4:Edge 0-3-81 _ JJJ LOADING (psf) �- SPACING 2-0-0 CS1 DEFL in (loc) I/clef! L/d PLATES GRIP i TCLL 20.0 I Plates Increase 1.25 TC 0.23 Vert(LL) n/a n/a 999 MT20 2441190 TCDL 15.0 Lumber Increase 1.25 BC 0.14 Vert(TL) n/a n!a 999 i i BCLL 10.0 * Rep Stress Incr YES WB 0.03 Horz(TL) 0.00 I 'BCDL n/a n/a I 10.0 Code FBC2004ITP12002 (Matrix) Weight: 28 lb I LUMBER BRACINGI TOP.CHORD 2 X 4 SYP No.2 TO CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT•CHORD 2 X 4 SYP No.2 except end verticals. WEBS 2 X 4 SYP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS (Ib/size) 1=150/8-8-8, 4=93/8-8-8, 5=421/8-8-8 Max Horz 1=83(LC 3) Max Upliftl=-35(LC 3), 4=-34(LC 3), 5=-155(LC 3) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2=-69/43, 2-3=-37/12, 3-4=-73141 BOT CHORD 1-5=0/0, 4-5=0/0 WEBS 2-5=-327/183 NOTES 1) Wind: ASCE 7.02; 130mph (3-second gust); h=20ft; TCDL=4.2psf; BCDL=3.Opsf; Category 11; Exp B; enclosed; MWFRS; cantilever left and right exposed ; Lumber DOL=1.60 plate grip DOL=1.60. 2) *This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) All plates are 4x4 MT20 unless otherwise indicated. 4) Gable requires continuous bottom chord bearing. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 35 lb uplift at joint 1, 34 lb uplift at joint 4 and 155 Ib uplift at joint S. LOAD CASE(S) Standard