Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SUBMITTED PAPERS
DATE FILED: PLAN REVIEW FEE: RECEIPT NO.: CONCURRENCY FEE: a�- ir-,0 - RECEIPT NO.: PERMIT NUMBER: CERT. CAP. NO.: ALL INFO MUST BE COMPLETE & FILLED IN TO, Oe SCANNEq. Lucie County Building and Zo ng Fn BY 2300 Virginia Avenue 5t. Lucie County Ft: Pierce, _FL 34982-5652 010 772-462-1553 i 072f/% '?�CCEP'I'ED ',pub s�rnM lkwagy,0 APPLICATION for BUILDING PERM CERTIFICATE of CAPACITY/ZONING COMPLIANCE PROJECT INFORMATION SCANNED BY �, t. Lucie County 1. LOCATION/SITE ADDRESS:�uo S. '1+` S+re.eJ 4+-JTi e rce—jk Wir�c� So ++V1AAR1iP Lo� 6p 2. S/D NAME: M VI, I� l G+�i�P,nS S p SITE PLAN NAME: W nL'IS onA NADU1 P_� f 1 Z� 3. PROPERTY TAX ID #: 4. LEGAL DESCRIPTION (attach extra sheets if necessary); P41 lwxiwylr,,4 '6 K,U� 0�.�.ar5 /877CY-/113.z;;IV4 _Dr4,�'� F6�d�.�� �o9Aai /1,TXV/���e 5. PLAT 6. PAGE 7. BLOCK BOOK 1D NO. � NO. 9. PARCEL SIZE: ACRES/SQ FT. 8., LOT NO. LOT DEVIENSIONS 3-7 X-7-7 11& ) 10. DESCRIPTION OF CONSTRUCTION PROJECTOR WORK ACTIVITY:/r/G41LL d✓/l �P.rYYII�' EX,ISkiI�D► PUAD U ni+. 11. SETBACKS (ACTUAL) FRONT, BACK: �,/ RIGHT: � �� . (s�0 I SIDE SIDE < < Iq 12. TYPE OF CONSTRUCTION (Check all appropriate boxes) [ ] NEW CONSTRUCTION [ ] EXPANSION/ADDITION [ ] INTERIOR RENOVATION [ ] RESIDENTIAL r (] COMMERCIAL [ ] INDUSTRIAL [ jc] OTHER (SPECIFY) �—✓Lj }�! [ . �c�/'L' �? l'�l �i 13. DESCRIPTION OF PROPOSED USE: 0?E5AVE/v7'E 1 — 14. Sq. Ft./CONSTRUCTION: oe XK 15. Sq. Ft. 1st Floor: I! D0 16. VALUE OF CONSTRUCTION: $ T61) The value of construction is used to determine the amount of permit fees to be assessed. St. Lucie County reserves the right to question and/or modify the indicated value of construction if it is demonstrated that the submitted figures are not consistent with similar types of construction activities. If the value is $2500 or more, a RECORDED Notice of Commencement must be submitted with ttus applicah\ SLCCDV Form No.: 001-02 1 OWNER INFORMATION .. s .;. NAME: . W vIf/21v LZ- ADDRE 7 52 CITY: o"Odio STATE: ZIP ,�j�n `� • �,� email::. . PHONE (DAYTIlVIE): IF THE FEE SRaLE TITLEHOLDER (PROPERTY OWNER) IS DIFFERENT FROM THE OWNER LISTED ABOVE, PLEASE FILL IN NAIVIE-AND ADDRESS BELOW. FEE SIMPLE TITLEHOLDER::.. .:' . • •. ADDRESS: STATE: ZIP PHONE (DAYTIlVIE):. (--) CONTRACTOR INFORMATION ' ('UC7y % `I ST. LUCIE COUNTY CERT #: Zy7y 3 ST. of FL REG./CERT #: -L BUSINESS NAME: &Z QUALIFIERS NAME:, ADDRESS: CITY: STATE: ZIP PHONE (DAYTIME): ( C—/ 6a5^7 FAX NO. email: t ARCHIT/ENGINEER: ADDRESS: CITY: STATE: ZIP PHONE (DAYTEVIE): (_) BONDING COMPANY: ADDRESS: CITY: STATE: ZIP MORTGAGE LENDER: ADDRESS: CITY: STATE: ZIP IMPORTANT NOTICE: When a permit is issued and it is not picked up within 60 days after notification it will be voided and returned to you by mail. CERTIFICATION: This application is hereby made to obtain a permit to do the work and installations as indicated, and to obtain a certificate of capacity, if applicable, for the permitted work. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. I understand that separate permits may be required for ELECTRICAL, PLUMBING, SIGNS, WELLS, POOLS, FURNACES, BOILERS, HEATERS, TANKS, AND AIR CONDITIONERS, ETC., not otherwise included with this building permit application. The following building permit applications are exempt from undergoing a full concurrency review: room additions, accessory structures (all types), swimming pools, fences, walls, signs, screen rooms, utility substations & accessory uses to another non- residential use. NOTICE TO OWNER: FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. NOTICE TO APPLICANT: AS THE APPLICANT FOR THIS BUILDING PERMIT, IF IT IS NOT YOUR RIGHT, TITLE, AND INTEREST THAT IS SUBJECT TO ATTACHMENT; AS A CONDITION OF THIS PERMIT YOU PROMISE IN GOOD FAITH TO DELIVER A COPY OF THE ATTACHED CONSTRUCTION LIEN LAW NOTICE TO THE PERSON WHOSE PROPERTY IS SUBJECT TO ATTACHMENT. OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. OWNER/CONTRACTOR SIGNATURE CONTRACTOR SIGN. URE STATE OF FLORIDA STATE OF FLOR P o COUNTY OF X1,yelf• , .. COUNTY OF The foregoing instrument was acknowledged before me this, day of .Qil , 200-Z by /,l4.rds �!• �%ri�✓Tist , who is personally known to me or who has produced as identification. 3 ` gnature of Notar Type or Ptrini` '.,of Notary CompiisI8 on No. (Seal) f , T e foregoing i eVwaowlled is, a y n�rpersonally �d iJ o 5 I a idehtfication. Signature of Notary �I fa,ta.)"le If Type or Print Name of Notary V'� MVCn,,;RIF NO L+': ''I` O' (2)'SIGNATURES ARE REQUIRED. EACH SIGNATURE MUS g 4� L G FOR TiIIS;B`UILING PERMIT AS AN OWNER/BUILDER THE OWNER MUST P r E �L A O SIGN �'I'IUIS APPbCATION IN THE OFFICE LISTED ON THE FRONT OF THE APPLICATI "tle"�"'B� For specific instructions see appropriate permit checklist. OFFICE USA :ONLY SECTION 27 TOWNSHIP 253 RANGE C)e MAP NO. . ZONING CG� LAND USE ft LOT CVG % TAZ NO. �. I � � N FLOOD ZONE FIRM MAP # ' $Gl 1ST FLR ELV MAX HGT CONST TYPE OCCUP TYPE MAX OCCUP # OF FLRS WATER SEWER SPRINKLERS STORMWATER LOT OF REC LOT OF REC (after LOT SPLIT LOT SPLIT APPROVED (before 1/90) 1/90) REQUIRED • " is 'i Nt LIBRARY A PARKS A PERMIT ADMINST VARIANCE IMPACT FEE IMPACT FEE FEE REPORT PUBLIC BLD HABITABLE RADON FEE CODE 1 IMPACT FEE AREA (RADON) 72-7 N SCHOOL Man GROSS ROAD CREDIT Y N TOTAL ROAD IMPACT FEE I3y1(3 'IMPACT FEE IMPACT FEE DUE SCHOOL CREDIT Y N TOTAL ' IMPACT FEE' SCHOOL IMPACT FEE S POLICE FEE FIRE FEE MISC FEE TOTAL _ POLICEIFIRE MISC FEES ADDITIONAL Y N SPECIFY Q� TOTAL PERMITS - of ALL REQUIRED FEES REVIEWS ZONING ZONING PLANS MISC. VEGETATION SEA TURTLE MANGROVE REVIEWED BY EXAMING DATE�� COMPLETE _ O , INITIALS 1• ^` �:>' :•,� r 4 - .1. . i i Code Compliance Division Ft Pierce, Virginia Avenue 349 2 INSPECTION CARD Ft Pierce, FL 34982 Phone: (772) 462-1553 Fax: (772) 462-1148 http://stlucleco.gov/ce Permit #: SLC- 0709-0178 Conf #: 531 Type: Mobile Home Issued 11/13/2007 Status: FIN Double Fee: No Job Location 3200 s 7TH ST 64 City: FORT PIERCE Jurisdiction: St. Lucie County Lot: 47 ' Block: Parcel: 2427-601-0060-000/0 Subdiv: Maravilla Gardens S/D Unit 3 Flood: Elev: Flood Map: Job Description: INSTALLATION OF A MOBILE HOME TIE -DOWN FOR USED MOBILE HOME 2005 LIBERTY / SINGLE WIDE FEMA UNIT SERIAL# 16LO9742 HANDICAP RAMP BP# 0711-0015 Setbacks Left: 5.00 Right 15.00 Front 10.00 Rear, 19.00 Inspection Notes: HANDICAP RAMP PERMIT# 0711-0015 Contractor THOMAS N. HUNTER NEVER QUIT ENTERPRISES, INC (904) 213-0013 331 PARKRIDGE AVE SUITE 3 ORANGE PARK, FL 32065 Property Owner WINDSONG MOBILE VILL LTD PTNS (772) 879-0987 1750 S TELEGRAPH RD #301A BLOOMFIELD, MI 48302 Tenant KATHY DOURNEY (772) 465-9476 3200 S 7TH ST LOT #64 FORT PIERCE, FL 34982 SUB -PERMITS Permit # Status PT Cert # DBA 0709-0178-01 FIN EP 23811 SCOTT HAMMOND 0709-0178-02 FIN PP 24703 NEVER QUIT ENTERPRISES, 0709-0178-03 FIN ME 8887 ADVANTAGE A/C OF THE TRI Permit # Code Description 0709-017E 107 Penetrometer Owner / Builder Job Description INSPECTIONS - For Requests, Call: (772) 462-1261 Priority Date Sched. Res Description 1 92 Accepted As Noted 0709-017E 156 Manufacturer ID null Resulted: Fri Dec 28 13:09:21 EST 2007 0709-017E 175 Tie Down null Resulted: Fri Dec 28 13:08:56 EST 2007 0709-017f? 185 Piers null Resulted: Fri Dec 28 13:11:12 EST 2007 0709-017E 280 Electric Final 1 90 Approved 1 90 Approved 1 90 Approved 1 90 Approved CHANGE OF SUB FROM WILLIAM SANDERS #23153 TO SAMUELDURHAM-PER LETTER CONTRACTOR -A HUMPHREY 12-20-2007 Inspector Date Insp. Kathy Cicio Van Whitaker 09/27/2007 12/28/2007 Van Whitaker 12/28/2007 Van Whitaker 12/28/2007 Van Whitaker 12/28/2007 Permit Nun 0709-0178 null W "• Resulted: Fri Dec 28 13:08:37 EST 2007 0709-017E 380 Mechanical Final 1 90 Approved Van Whitaker 12/28/2007 null Resulted: Fri Dec 28 13:10:06 EST 2007 0709-017E 425 Sewer Connect 1 90 Approved Van Whitaker 12/28/2007 null Resulted: Fri Dec 28 13:09:43 EST 2007 0709-017E 480 Plumbing Final 1 90 Approved Van Whitaker 12/28/2007 null Resulted: Fri Dec 28 13:10:28 EST 2007 0709-017E 800 Address Final 1 90 Approved Van Whitaker 12/28/2007 null Resulted: Fri Dec 28 13:10:51 EST 2007 0709-017E 888 Pre -Manufactured Steps 1 90 Approved Van Whitaker 12/28/2007 null Resulted: Fri Dec 28 13:08:11 EST 2007 0709-017E 900 Plan Revision 1 92 Accepted As Noted Kathy Cicio 12/18/2007 PLAN REVISION TO CORRECT INSTALLATION DECAL # ON PERMIT WORKSHEETS - CORRECT # IS 278117 0709-017E 999 Final Inspection 1 12/12/2007 82 Disapproved-Reinspec Scott Attey 12/12/2007 12/11/07 incall schedule with petra/ contr. bac Re -inspection 1 Scheduled: Tue Dec 11 09:44:11 EST 2007 with value: null INSTALLATION DECAL DOES NOT MATCH THE PLANS AND THE SERIAL # DOES NOT MATCH, PLEASE CORRECT.- THE SKIRTING HAS BEEN REMOVED ON PARTS OF ONE SIDE, PLEASE REMOVE AS MUCH AS POSSIBLE. 0709-017E 999 Final Inspection 1 12/14/2007 81 Disapproved Dave Johnson 12/14/2007 Re -inspection 2 INSTALATION DECAL AND SERISL # DON'T MATCH PAPERWORK. IF NOT USING STANDARD BLOCK PEIRS AT DOORWAYS SUPPLY DETAILS. WHEN SKIRTING IS REPLACED BE SURE TO LEAVE WATEWR SHUTOFF ACCESSIBLE. MASTIC AC DUCTS AT CONNECTIONS 0709-017E 999 Final Inspection 1 12/28/2007 99 Final Approval Van Whitaker 12/28/2007 Re -inspection 3 Scheduled: Wed Dec 19 10:24:36 EST 2007 with value: null Scheduled: Thu Dec 20 16:55:35 EST 2007 with value: null Scheduled: Thu Dec 27 14:24:03 EST 2007 with value: Fri Dec 28 00:00:00 EST 2007 Resulted: Fri Dec 28 13:11:37 EST 2007 0709-017E 999 Final Inspection 1 12/03/2007 81 Disapproved Dave Johnson 12/03/2007 null REMOVE SKIRTING FOR INSPECTION. MAIN WATER SHUTOFF VALVE MUST BE OUTSIDE HOME. MAIN DISCONNECT NEEDS BLANK OFF COVER. ADDRESS MUST BE ON BUILDING. EXPOSE SEWER CONECT AND CLEANOUT. Scheduled: Fri Nov 30 15:01:54 EST 2007 with value: Mon Dec 3 00:00:00 EST 2007 Resulted: Mon Dec 3 14:36:28 EST 2007 Permit Nun 0709-0178 UtL-19-dUU(kWtU) ld:29 Ntvtm I tNItKNKl:)t r.uujiuua a .,, St Lucie County Building & Zoning 2300 Virginia Avc fort rierte, IRL 34M BUILDING PERMIT SUB -CONTRACTOR SUMMARY 4V1G�S Iy- _t-1�, n��' will be using the following sub -contractors for the (CompanyAndividual Name) � I ` project located at �5 p-00 ,5• ^1 # h J ► LOT 10 (Strcd address or Property Tax ID #) It is undersloodthat if -there is any change of status regarding the participation of ony of the sub-eontratturs listed below, I will immediately advise the Building and Zoning Department of St. Lucie County. Taade Name of CompanyJContractor St. Lucie County/ State of (Florida LiccaseNnmbcr Electrical Plumbing HYAC/ Mechanical �Ai%A 1Y COYWC' + i out 4 C R C.©-3166 Roofing Gas OFFICE USE ONLY: PFRM3T ISSUE DATE: NUMBER: UtL-11-CUUi MU1 IC:ty NtvtK#1 M tKYK15t5 ,lrHAIJU4C13U M ST. LUCIE COUNTY PUBLIC WORKS • '' BUILDING -& ZONING DEPARTMENT BUILDING FERMIT SUQCONTRACTOR AGREEMENT St. Lucie County Contactor Ccrtittation Number: f C� 3 co State of Florida Certification Number (tfapplicable): nA UG. r1 + G G,e- Air have agreed to bathe (Company N ndividual Name) COnd :t� ,w70M, sub -contractor for (Type of'rmdc) V (Primary Contll ew) for -the project, located at �0106 h �� _ (5147 (Project Strict Address or Pmpctty Tax ID #!) It is understood that, if there is any ehangc of status rck arding our participation with the above mentioned project,l will immediately advise the Building and Zoning Department of St. Lucie County by personally filing a Change of Contractor notice. (Form: slxaw No. otvwu) BUSTK ESS QUALIFIER (Name of the Individual shown on the Contractor's Liccnvc) ORIGINAL SIGNATURES ARE REQUIRED -T, buo, ,n., labok0i ti tGNA'f'URIr PRINT NAM iE DA l;ttsim%%Numir 1-lC�yC n kct g e- Pt I G Addr= 001 ,(�- GArI(e,k At-rtv-e 'CitylStaterlip: yby k 'V-L. 3 `I V A _ Phone: a- q (.5- j (o o(p email: OFFICE USE ONLY: r. UUC/UUR UtL-ly-tUU(IWtU) Iiff;t`! NtVtHf I tNitNFMI 5t5 (rMX)'JU4elJU15U N.UUA/UUU r 19 DEC 07 From: TbomasN, IluoW To: St Lucie County Public Works Deparlmcm Subject: CHANGE OF MECHANICAL CONTRACTOR l . I am ehang'ting mechanical contractor William Sanders Air Conditioning to Advantage Air Conditioning of the Treasure Coast effective today. 2. Thank you. Thomas N. Hunter 070 q. 0 (7 S? ADVANTAGE AIR CONDITIONING OF THE TREASURE COAST, INC. 601 S. MARKET AVENUE - FT. PIERCE, FL 34982 r 465-1606 - STATE CERTIFICATION #CAC039664.335-3339 FAX No. (561) 465-4945 December 20, 2007 Advantage Air Conditioning has agreed to pull the following Air Conditioning Sub -Contractor Permit for Never Quit Enterprises, Incorporated for a total of $250 for the following residence: 3200 South 7 h Street Lot # 64 Fort Pierce, FL Advantage Air Conditioning has agreed to pull the permit only and accepts no financial and/or work responsibility. Never Quit Enterprises, Incorporated understands they are responsible for the Air Conditioning inspection and bringing it up to code with St. Lucie County. '14 Thomas Hunter, Representative Samuel T. Durham, Owner - Never Quit Enterprises Advantage Air Conditioning 0 27 N- Code Compliance Division 2300 Virginia Avenue Ft. Pierce, FL 34982 Phone: (772) 462-1553 Fax: (772) 462-2522 http://stiucieco.gov/ce Date: 20 December 2007 Job Address: 3200 s 7TH ST 64 Received By: humphreya Paid With: CA Paid By: NEVER QUIT ENTERPRISES INC Building Receipt Sign: Receipt #: 0000059638 ermit Number: SLC- 0709-0178 Amount: $50.00 �redit Card Number: Check Number: S.z"_-� Building Code Compliance Division Receipt 2300 Virginia Avenue Ft. Pierce, FL 34982 Phone: (772) 462-1553 Fax: (772) 462-2522 hftp://stiucieco.gov/ce Date: 13 November 2007 Job Address: 3200 s 7TH ST 64 Received By: dpelton Paid With: VS Paid By: NEVER QUIT ENTERPRISES INC Sign: Receipt M 0000058746 'ermit Number: SLC- 0709-0178 Amount: $391.40 �redit Card Number: Check Number: Ec - - - St. Lucie County Building -& Zoning 2300 Virginia Ave . �oR► Fort Pierce, FL 34982 BUILDING PERMIT SUB -CONTRACTOR SUMMARY. will. be using the following sub -contractors for'the (Company/Individual Name) project located at CEO 5 7-la ,5 (Street address or Property Tax ID #) It is understood that if there is any change of status regarding the participation of any of the sub -contractors listed below, I will immediately advise'the Building and Zoning Department of St. Lucie County. Trade -. Name of Company/Contractor St. Lucie County/ State of Florida License Number' Electrical C, 002 / Plumbing HVAC/ Mechanical A0gOL1100 Roofing Gas II PERMIT I ISSUE DATE: NUMBER: I - I J ST. LUCIE COUNTY PUBLIC WORKS ov. BUILDING & ZONING DEPARTMENT OR1�� BUILDING PERMIT SUB -CONTRACTOR AGREEMENT St. Lucie County Contractor Certification Number: (?�� State of Florida Certification Number (If applicable): _ I f ' 0 CaDC2 $ 7 % O/ZiJ /f vv�% Name/Individual Name) have agreed to be the Ail,sub-contractor for low (Type of Trade) (Primary Contractor) for the project located at 5 /.o% (� y (Project Street Address or Property Tax ID #) It is understood that, if there is any change of status regarding our participation with the above mentioned project, I will immediately advise the Building and Zoning Department of St. Lucie County by personally filing a Change of Contractor notice. (Form: SLCCDV No. 004-00) BUSINESS QUALIFIER (Name of the Individual shown on the Contractor's License) ORIGINAL SIGNATURES ARE I EQUIRED O17 ILILIA1--A% 1 /-13-0 7 SIGNATURE y PRINT NAME DATE Business Name: Address: City/State/Zip: .Phone: OFFICE USE ONLY: email: 1. — -.a_' -u ST- LUCN COUNFff—PVDUCW4DRfM n. .may & ZQG IDEPARTIEWr VM-M) BUILDENGPEMT SCT&COWMACTMACIREZMENT hwvFz'amOd=- be tile :7 ± .54 16- CrToica Sind or f 'R -Ab the dm-- bcamp- Cb-, wwragm g; tba Rw.-Aabg A zmaems awmtmenl -by vas` n'--6�-' E&ga Chm-4c Iffi-ow- slxenv QUALOTHR PIMMIAME. CH IL o10q - -D m RECEIVED 09/18/2007 09:22 7725953492 WILLIAMSANDERSAC 5EP-18-2007(TUE) 09.26 NE"-", QUIT ENTERPRISES VRK)9`" 1'30150 P.003/003 ST. LUCIE COUNW PUBLIC WORKS BUILDING & ZONING DEPARTMENT BUILDING PERMIT SUB -CONTRACTOR AGREEMENT St. Lucle-County-Contramr Certification Number: 7) c� — have agreed to be the (Comp any NameAndividualName) Prc�sub-contractor for I C) (Y) (Typc of Trudc) (Pritmtuy Contractor) for the prcject located at (Project Street Address or Property Tax ID 4) It is understood that, if there is any change of status regarding our participation with the above mentioned project, I will immediately advise the Building and Zoning Department of St. Lucie County by personally filing a Change of Contractor notice. (Form: SLCCDV No. 004-00) BUSINESS QUALIFIER (Name of the Individual shown on the Contractor's License) ORIGINAL SIGNAT11RE, , I�FQUIRF.,I] ( ) �t/i�a/N�.H.�cT.:ry/L_J_4uQE,eS aI D 5IGNA PRINTNAME ATC•,' Business Name: Address- city/state/zip: Phone: email- OFFICE USE ONLY: PERMIT a 156UE DATE Aug 24 07 10:25a p.2 ST. LUCIE COUNTY BUILDING & ZONING 2300 VIRGINIA AVENUE FORT PIERCE, FL 34982-5652 772-462-1553 FILLED LANDS AFFIDAVIT for which I have applied to St. Lucie County for a Final Development Permit. In accepting this Final Development Permit, BP Number MCA- 011% acknowledge that as owner of the above described property, and in accordance with Section 7.04.01(D), St. Lucie County Land Development Code, I shall be responsible for assuring adequate drainage so that the immediate community WILL NOT be adversely affected. I further acknowledge that in granting this permit for the development of this property, St. Lucie County is neither oblige( nor liable to provide for, or maintain in any form, adequate drainage off my property whicl will not adversely affect the immediate community. (0"A1�v � rd Property Owner Name Prop KronVoere gnature rem STATE OF-2LNCY OF ACKN ED B O RAM .. THIS DAY OF 20� BY WHO IS PERSON OWN'TO ME OR WHO HAS PRODUCED A1 AS IDETtFFCATION. Ili �We�-�K SIGNATURE OF NOTARY TYPE OR PRINT NAME OF NOTARY NOTARY PUBLIC TITLE COMAISSION NUMBER' (SEAT.) j ()q C/ '&e Greta 11l Haselbeck Notary Public State oflVIichigan _My Co1e County of Bay Actin ►ssion Expires Oct gin the County of ber 13, 2 12 Property Appraiser - St.Lucie County, FL, Page 1 of 1 PROPERTY RECORD CARD Windsong Mobile Vill Ltd Ptnsp Record: 1 of 1 <<Prev Next» Spec.Assmnt Taxes Exemptions Permits Home Print Property Identification �, CIE C Site Address: 3200 S 7 ST ParcellD: 2427-601-0060-000-0 �Gy Sec/Town/Range: 27 :35S :40E Account #: 31640 y -, Map ID: 24/27N Land Use: PRKG/MOBILE Zoning: CG City/Cnty: ST. LUCIE COUNTY Ownership and Mailing Legal Description Owner: Windsong Mobile Vill Ltd Ptnsp MARAVILLA GARDENS S/D-UNIT THREE- PART OF LOTS 180 AND Address: 1750 S Telegraph Rd #301A 183 INC MPDAF: FROM NW COR LOT 183 RUN E ALG Bloomfield MI 48302 More... Sales Information Assessment TRIM Total Land and Building Date Price Code Deed Book/Page 2007 TRIM: 3460700 Land Value: 3040000 Acres: 20.12 12/9/1996 2200000 00 WD 1051 / 1073 Assessed: 3460700 Building Value: 420700 6/1/1984 1525000 00 CV 0436 / 2245 Ag.Credit: 0 Finished Area: 1 SgFt 10/1/1979 935800 00 CV 0318 / 1773 Exempt: 0 Taxable: 3460700 Proposed Tax: 65361.88 BUILDING INFORMATION No Image Available Exterior Features View: - RoofCover: - RoofStruct: - ExtType: MHPK - MH Parks YearBlt: 1970 Frame: - Grade: C - C EffYrBit: 1970 PrimeWall: - StoryHght: 0010 - 1 Story No.Units: 152 SecWall: - Interior Features BedRooms: 152 Electric: - PrmintWall: FullBath: 0 HeatType: - AvgHt/FI: 1/26ath: 0 HeatFuel: - " Prm.Flors: - %A/C: 0 %Heated: 0 %Sprinkled: 0 Special Features and Yard Items Land Information Type Y/S Qty. Units Qual. Cond. YrBlt. No. Land. Use Type Measure Depth ASP1 - ASP1 HIGH Y 1 54300 AV AV 1970 1 2800-PRKG/MOBILE 127 -Site 152 THIS INFORMATION IS BELIEVED TO BE CORRECT AT THIS TIME BUT IT IS SUBJECT TO CHANGE AND IS NOT WARRANTED. FMIN. SETBACK SEC. NT to SIDES CNR SIDES REAR OJT" ZNG. a RBI' f<� �'Z'4 TECH. �- http://www.paslc.org/prc.asp?prclid=242760100600000 9/17/2007 3aoo S 7T" sr Are6e66�' F4 y w` 70 3y/��-o97yZ MIN, SETBACK REQ. FRONT j p/ SIDES CNR SIDES / REAR zNG. TECH. PERMIT WORKSHEET Page I of 2 PERMIT NUMBER Installer �/y,.v/� License # ff—y�y$Py Address of home 3a00 S 7 ST %O% * #IVV) being installer! New Home ❑ Used Home Home installed to the Manufaclurees Installation Manual ❑ Honie is insialled-in aocordancewith Rule 15-C Siingle wide Manufacturer Length x width , Double wide NOTE., if home is a single wide fill out once half of the b/ock/ng plan it home /s a frlp/e or, quad wide sketch In remainder of home I understand Lateral Arm 5yslerns cannot used on any horn& (new or used) where thasidewatl ties exceed 5'ft 4 In, q�rSF p Typical pier spacing I M�QUIROEtv�;®ANYCnROpOSFDw�-- TriplslQuad m 00 W m' N m m � N Wind Zone II D Wind Zohe III W Installation Decal # 27�-Ilr Serial ff l 6, PIER SPACING TABLE FOR USED HOMItS Load bea rig clry capaat Footer (sq In) size 1 W x 16' (25M 18 1/2' x 18 1/2' (342) W x 2a' (400) 22' x 22' (494)' 24' X 24' (576)* ZV x 2 V (676) 1 6 8 2 & 8 8 2 0 s . 8 3000 psi8 8 g 8 8 ts,g inlerpcmea uan Rwe iau-1 pier spacing tame. jI PIER PAD SIZES I-beam pier pad size 2- 2 Perimeter pier pad size Other pier pad sizes (required by the mfg.) ri Draw the approximate local Ions of marriage wall openings 4 toot or greater. Use this symbol to show the plers• 'gist all marriage wall openings greater than 4 fool and their pier pad sizes below. / Opening Pier C TIEDOWN COMPONENTS I 4ongltudlrra/ Stablildr q Device JLSD) Manufacturer Onalfudlnal SUNfizing Device w/Latena/ Arms Manufacturer POP LILAA SA I�_1 ltttttti �'*� E.ti FIB ��� ttttlllllllllrt�f.`4�� '��T� I�Iti-zs-s�z��y ANCtiOflS 4 q _4z'_5 tt FRAME TIES . Within Vol end of home spaced at 5' 44 cc OTHER TIES Number A 6M N N M ao cn m D Sldewalf m LangituOlnal Marriage wall w Shearwall PERMIT NUMBER v '- r POCKET ETRO EA S The pocket penetrometer lesls•are rounded wn to psi or check hereto declare I0001b. soil 1 Z without testing. x x x POCKET PENETROMETER TESTING METHOD I. Test the perimeter of the home at 6 locations. 2. Take the reading at the depth of the tooter. 3, Using 500 lb. increments, take the lowest reading avid round down to that increment. x 1, ' X TORQUEPROBE TEST x The results of the torque probe tes4 is 2-0 Inch ands or check ith here 11 you are declaring & anchors without testing =. A test showing 275 Inch pounds or less will require 5 foot anchors. Note: A state approved lateral arm system is being used and 4 It. anchors are allowed at the sldewall locations. I understand 5 It anchors are required at all centerline tie points where the torque test reading Is 275 or less and 4ere the mobile dome manufacturer may requires anchors with 4000 Ib h I cl capacity. Installer's initials ALL TESTS MUST BE PER FORMED BY A LICENSED INSTALLER Installer Name v Date Tested onnect electrical conductors between multi -wide units, but not to the main/wer w^_ rce. This includes the bonding *9 between mutt -wide units. Pg. r onnect all sewer drains to an existing s onnect aD potable water supply piping idependent water supply systems. 'Pg. i PERMIT WORKSHEET page 2 of 2 Bite Preparation Debris and organic material remp,6ed. & 5 Water drainage: Natural Swale Pad Other Fastening multi wide units Floor. Type Fastener Length: Spec 0� Walls: Type Fastener. Length: cing: Roof: Type Fastener: Lenglh' Spacing: For used homes a min. 30 8' wi e, galvanized metal strip will be centered over h oak of the roof and fastened with gals. roofinq nails on center on both sides of the centerline. I understand a properly installed gasket is a requirement of all Eed , and us homes and that condensation; mold, meidew and buckled marare a result of a poorly Installed or no gasket being Installed. I `un a strip of tape will not serve as a gasket. r Type gasket nstalled: Pg_ Between Floors Yes Between Walls Yes �7 Bottom of ridgebeam Yes Weatherproofing The bottomboard will be repaired andfor taped. Yes Pg. 'Siding on units is installed to manulacturees specifications. Yes Fireplace chimney installed so as not to allow Intrusion of rain . Yes Mleoeltaneaus Skirting to be installed. Yes No Oryer vent installed outside of skirting. Yes tWA Range downflow vent installed outside of skirting, es WA Drain lines supported at 4 foot intervals. Yes Electrical crossovers protected. Yes Other: m 00 N Q7- N m m N W N N A .m N N o, - co cn Installer verifies all information given with this permit woirksheet D Is accurate and true based on the 4TI Date m 2 m W Uzf z.d/ Lt7174 10: Gt5 b 100140I Uri DMIHIV VHLCIY I G s , • , i 77 13BAC-0 FOR UP TQ 4112 ROOF PITCH ALL WIDTHS; AND LENGTHS UP TO 62' 7I— �. GT i 0 ALL WIDTHS; AND LENGTHS OVER 52' TO 80' � i • HOMES -in, WTH-i 1 : 0QF FIT-C-H' R�Q'UI :.'� p1.at le•:regUr cl, at ;each Iatet* ,hors mey be used in all Salons except where home nuractulera specifications sidem11 straps Rro In yes or 4,000 Its. Th-0 ationt roqulre a 5' enollor. D - Ground Pen tmnsverae. connectom E-To 1(1.2 Tu �� � Top (1.25') Bottom - Ground Pan ��nr `horhi�s:�•i��rer:. �.:.......... i • w i i is C = GROUND PAN D U BRACKETS CONNECTOR TELESCOPING V BRACE E TUBE ASSEMBLY W 1 HOT- �� TUBE AND 1.25 TUBE INSERT BRAM EMBLY CONNE;C� H AR I SEWO TRANSVERSE SMk �4' N = BE 00 ECTOR ARM I•BEAM F- :NV" bt connector., f0 NT �old V BRACKET - ground Pan 6p� D IN NS 4123103 V Bracket dj�o NOTES: F 1, LENGTH 0 US S THE ACTUAL BOX SIZE Z, • = STABILIZER TE AND FRAME TIE LOCATION (needs to be located within 1$11 from center of ground pan) 3, LOCATION OF ASP MODEL 11011F (LAtE,RAL & LONGITUDINAL BRACING). 4, S3 = LOCATION OF MODEL 1101-L"V'1 PATENT PENDING (LONGITUDINAL BRACING ONLY): r Telephone:931-753 C35 MANUFACTURED HOUSING FOUNDATION SYSTEMS 59X: 931-7g�N3t311 A DIVISION OF 01-IVER TECHNOLOGIES, INC. ,Nun, alivartechnalosies.com 1-800-284-7437 OLIVER TECHNOLOGIES, INC. FLORIDA INSTALLATION INSTRUCTIONS FOR THE MODEL 1101 "V" SERIES ALL ST-E LL FOUNDATION SYS M MODEL 1101W" (STEPS 1-15) MODEL 1101.1."V" LON017VDINAL ONLY: FOLLOWSTEPS 1-8 FOR ADDING LATERAL ARM: ENGIN9018 STAMP Follows" 10.15 F.NCIN6ERS STAMP 1. SPECIAL CIRCUMSTANCES: If the following conditions occur- STOP! Contact Oliver Tec/Inologies at 1-800-284-7437 a) Pier height exceeds 48" b) Length of home exceeds 76' c) Roof eaves exceed 16" d) Sidewall height exceed 96" e) Location is within 1500 feet of coast INSTALLATION OF GROUND PAN 2• Remove weeds and debris in an approximate two foot square to expose firm sail for each ground pan (0) _ 3. Place ground pan (0) directly below chassis I-beam . Press or drive pan firmly into soil until flush with or below soil. SPECIAL NOTE: The longitudinal "V" brace system serves as a pier under the home and should be loaded as any other pier. It is recommended that after leveling plers, and one-half inch (1/2") before home is lowered completely on to piers, complete steps 4 through 9 below. INST_NLILATION OF -LONGITUDINAL "V" BRACE SYSTEM NOTE: WHEN INSTALLING THE MODEL # 1101-L" V" LONGITUDINAL SYSTEM gyLY A MINIMUM OF 2 SYSTEMS PER FLOOR SECTION IS REQUIRED. SOIL TEST PROBE SHOULD BE USED TO DETERMINE CORRECT TYPE OF ANCHOR PER SOIL CLASSIFICATION. IF PROBE TEST READINGS ARE BETWEEN 175 & 276 A 15 FOOT ANCHOR MUST BE USED, IF PROBE TEST READINGS ARE BETWEEN 276 8r 350 A 4 FOOT ANCHOR MAY BE USED. USE GROUND ANCHORS WITH DIAGONAL TIES AND STABILIZER PLATES EVERY S'4" . VERTICAL TIES ARE ALSO REQUIRED ON HOMES SUPPLIED WITH VERTICAL TIE CONNECTION POINTS (PER FLORIDA REG.) . 4. Select the correct square tube brace (E) length for set - up (pier) height at support location. (The 18" tube is always used as the bottom part of the longitudinal arm). Note: Either tube Can be used by itself, cut and drilled to length as long as a 40 to 45 degree angle is maintained. PIER HEIGHT 1.26" ADJUSTABLE 1.50" ADJUSTABLE (Approx. 45 degrees Max.) Tube Length Tube Length 24 3/4' to 32 1 /4" 32" 113" .y 1 0; ''3n 3,: 4��4.:. 447 40" to 48" 54" 18" 5. Install (2) of the 1.50" square tubes (E (18" tube) ) into the "U" bracket (J), insert carriage bolt and leave nut loose for final adjustment. 6. Place I-beam connector (F) loosely on the bottom flange of the I-beam. 7. Slide the selected 1.25" tube (E) into a 1.50" tube (E)-and attach to I-beam connectors (F) and fasten loosely with bolt and nut. 8. Repeat steps 6 through 7 to create the "V" pattern of the square tubes loosely in place. The angle is not to exceed 45 degree and not below 40 degrees. 9. After all bolts are tightened, secure 1.25" and 1.50" tubes using four(4) 1/4"-14 x 3/4" self -tapping screws in pre -drilled holes. INSTALLATION OF LATERAL T LESCOPING TRANSVERSE_ARM SYSTEM THE MODEL 1101 "V" (LONGITUDINAL & LATERAL PROTECTION) ELIMINATES THE NEED FOR MOST STA131LIZER PLATES S FRAME TIES. NOTE: THE USE OF THIS SYSTEM REQUIRES VERTICAL TIES SPACED AT 641'. FOUR FOOT (4') GROUND ANCHOR MAY BE USED EXCEPT WHERE THE HOME MANUFACTURER SPECIFIES DIFFERENT. 10. Install remaining vertical tie -down straps and 4' ground anchors per home manufacturer's instructions. NOTE: Centerline anchors to be sized according to soil torque condition. Any manufacturer's specifications for sidewall anchor loads in excess of 4,000 lbs. require a 5' anchor. 11. NOTE: Each system is required to have a frame tie and stabilizer attached at each lateral arm stabilizing location. This frame tie & stabilizer plate needs to be located within 18" from of center ground pan. 12. Select the correct square tube brace (H) length for set-up lateral transverse at support location. The lengths come in either 60" or 72" lengths. (With the 1.50" tube as the bottom tube, and the 1.25" tube as the Inserted tube.) 13. Install the 1.50 transverse brace (H) to the ground pan connector (D) with bolt and .nut. 14. Slide 1.25" transverse brace into the 1.50" brace and attach to adjacent I-beam connector ( I ) with bolt and nut. ecure ransverse arm totransverse arm using our - 14 x Se - ppmg screws In pre -drilled ho es. MANUFACTURED HOUSING FOUNDATION SYS79MS Telephone: 931-795-4555 A DIVISION OF OLIVER TECHNOLOGIES, INC. Fax: 931-796-8811 1-800-284-7437 www.oiivertechnologles.wrn '7,41<C bpi ft ,5,COE5 t J STC¢2S V PA o AR�S��NSANDALL P crTO ,u Y sE NEC yF FLD AIS C tyECNo S . HK p�'C � NpLr�,�T�SSAA CW rKAr OD,65, ! �•cJ l �,_ /� rev//r ,CIG 5 19n%� TP, "O-601V K-t3w6 PZ4 TL w.l Y l i Fy, MANUFACTURER'S STATEMENT OF ORIGIN : . x `:1;:s: ' , —` '""'� TO A MANUFACTURED HOME The undersigned CORPORATION hereby certifies that the now Manufactured Home described below, the property of said CORPORATION, has. been transferred this _U_ day of Novem ber 2004 oninvoice # 16-118733 to EENA Luistio Center QbtftWor, Rataftr, a14 whose address is 1l6ol pp Rd. Cumberland, MD 215Q2 SU-k cilyo sty ZP Trade Name of Manufactured Home FEMA Houses_ Year/Model 2005/RVI 45623 SerialNo.16LO 9742 No. Wheels Width 14 Length 56 Sq.Ft. The CORPORATION further certifies that this was the first transfer of such new manufactured home in ordinary trade and commerce. LIBERTY HOMES, INC. LIB-300DOC 7109 a e)C 103NO�J 0 0 0 0 03 Co H Z U.1 F— C3 p _ cx w N Q g w Z � u-i o Q d ` g p �` 0 CM ru 0 i m o C3 o P Cl- uj Ln I Ramilw9a i Mflu IN; m 'g i3i JOISLiIi H-ri, � ^ w s lilt fla 0 13 ao r- Co �r CU r- U7 IL LL W H * W d z b m V4 e4 N m Code Compliance Division Review Comments 2300 Virginia Avenue Ft. Pierce, FL 34982 Phone: (772) 462-1553 Fax: (772) 462-2522 Page 1 http://stiucieco.gov/ce PROPERTY INFORMATION Address: 3200 7TH ST S 64 City l State I Zip; FORT PIERCE Parcel # : 2427-601-0060-000/0 Zoning: RMH-5 FL 34982 Jurisdiction: St. Lucie County Lot # : 64 Block: Owner(s): WINDSONG MOBILE VILL LTD F APPLICATION INFORMATION Permit Number: 0709-0178 Application Type: Master Permit w/subs Activity Type: New Other Activity: - i Permit Type: Mobile Home Stories: 1 Automatic Sprinkler System? ❑ CONTRACTOR INFORMATION ". Contractor Name: THOMAS N. HUNTER Fax Number 904-213-0150 Business Name: NEVER•QUIT ENTERPRISES, INC Business Addr: 331 PARKRIDGE AVE SUITE 3 City / State / Zil ORANGE PARK, FL 320( REVIEWS AND COMMENTS Review Type Status Reviewed By Documents Missing Pending 09/17/2007 4 Comment NEEDS SUB SUMMARY 09/17/2007 5 Comment NEEDS PLUMBING SUB 09/17/2007 6 Comment NEEDS OWNER'S PHONE NUMBER Front Counter Review Complete Audrey Humphrey Date Started Date Complete Date Released 09/17/2007 09/17/2007 Notified for Pickup Pending Plans Examiner Review Incomplete Kathy Cicio 09/27/2007 09/27/2007 1 Comment SIZE OF UNIT ON PLOT PLANS & PERMIT WORKSHEETS DOES NOT MATCH SIZE OF UNIT ON STATEMENT OF ORIGIN REPORT Supervisor Review Complete Diane Flanigen 09/25I2007 IC512.0-1 Code Compliance Division Review Comments 2300 Virginia Avenue Ft. Pierce, FL 34982 Phone: (772) 462-1553 Fax: (772) 462-2522 Pa e 2 http://stiucieco.gov/ce g Zoning Review Complete Lesli Hunt 09/21/2007 09/27/2007 TRANSMISSION VERIFICATION REPORT TIME 09/27/2007 01:44 NAME : FAX 4622885 TEL SER.# : BROM5J411427 DATE,TIME 09127 01:44 FAX NO./NAME 819042130150 DURATION 00:00:33 PAGE(S) 02 RESULT OK MODE STANDARD ECM Cade Compliance Division 2300 Virginia Avenue Ft. Pierce, Ft_ 34982 i Phone: (772) 462.1553 Eax: (772) 462-2522 http:llst1u Ore co.govlce PROPERTY INFORMATION Address: $200 7TH ST 5 64 City / Stata 1 Zlp: FORT PIERCE Parcel # : 2427-601-0060-00010 Zoning: RMH-5 APPLICATION_1NFORMA 77ON Permit Number. 0709.0178 Activity Type: Now Permit Type: Mobile Horne Review Comments FL 34982 Jurisdiction: St. Lucie County Lat # : 64 Blook: CONTRACTORR !NFORMATION Contractor Name- THOMAS N. HUNTER Business Name: NEVER QUIT ENTERPRISES, INC Business Addr: $31 PARKRIDGE AVE SUITE 3 city 1 state I ZI1 ORANGE PARK, FL 3201 REVIEWS AND COMMEN%S Review Tvpe S- tatus Documents Missing Pending 09/17/2007 4 Comment NEEDS $US SUMMARY Page 1 Owner(s): WINb$ONG MOBILE VILL L7b P Application Type: Master Permitwlsubs other Activity: `Stories: 1 Automatic Sprinkler System? [� Fax Number 904-213-0150 �.....+.nnn.. r. �,-.,.. _.-. ►,ccnc or I,u61KN± MI 1n 'L OFFICE USE ONLY: 1 a DATE FILED: /oa ' /y- U REVISION FEE: f9 1. 2 0 4. PERMIT NUMBER: U762el- d/ %P RECEIPT NO.: �f z�� ST. LUCIE COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT BUILDING & ZONNG 2300 VIRGINIA AVENUE FORT PIERCE, FL 34982-5652- .462-1553 APPLICATION FOR BUILDING PERMIT PROJECT INFORMATION LOCATIO\:SITE ADDRESS: 3, DETAILED DESCRIPTIONS OF PROJECT REVISIONS: Z i bW,- �,G,4 CONTRACTOR INFORMATION: ST. OF FL REG./CERT# .EW OCOO-6-79 B[;SINESS \AME: Qualifiers Name: ADDRESS: oq- CD/ 7 ST. LUCIE COUNTY CERT.= y � 3 CITY: STATE:. ! L ZIP: PHONE' (DAYTI}IE): FjX/ 2/ 3 OCR/ 3 FAX # 9C-,-y 2/ 3 0/5-0 ARCHIT/E`GINEER: NAME: ADDRESS: CITY: PHONE (DAYTI.NIE): ST. LUCIE COUNTY BUIILIaIt�NpC�{�t��plVISION REV Y Lio CYS@ ���eR DATE tit gyp, 1 P65 fa,,. MUST L' E KEPT ON JOB R Ito t"s'piy�49�t~� V�1t11: 4✓ - STATE: ZIP: _ FAX# �iJ 1 / , p .r k " Building Code Compliance Divisions' Receipt 2300 Virginia Avenue Ft. Pierce, FL 34982 Phone: (772) 462-1553 Fax: (772) 462-2522 http://stiucleco.gov/ce Date: 18 December 2007 Receipt M 0000059594 Job Address: 3200 s 7TH ST 64 'ermit Number: SLC- 0709-0178 Received By: humphreya Amount: $52.00 Paid With: VS �redit Card Number: XXXXXXXXXXXX2032 Check Number: Paid By: NEVER QUIT ENTERPRISES INC Sign: OP tauati t }ro Sze. e 1 . PC opm '_�:4�s�• l} ?•it5 i.:�i'�� T..it-ti:[ Revised: 23 May 2006 Chapter 1- Introduehon 4.2.2. Footer Placement ............................................. 6 4.2.3. Proper Sizing of Footings ................................. 6 1.1- How to Use This Manual ............................... 1 4.2.4. Other Footing Design Consideration ................ 6 1.2. Pre -Installation Considerations .......................1 1.3. Safety ...................... 4.3. Permanent Foundations ................................... 6 4.3.1. Flood -Prone Areas ..... ...................................... 6 4.3.2. Severe Wind Areas ........................................... 6 4.3.3. Special Snow Load Conditions ......................... 6 1.4. Consumer information Card ...........................1 4A. important Reference Documents ....::..:::::........ 6 1.5. Alterations...................................................... 1 Required Footing and Pier Blocking ................. 8 Chapter 2-initions 2 (With Perimeter Blocking)................................10 Chapter 3 Site Preparation .......................... 3 3.1. Location and Layout, Use of Zone Maps............................................................... 3 3.1.1. Access for Transporter ................................. 3 11.2. Encroachments and Setback Distances ...4.................................................................... 3 3.1.3. Issuance of Permits ...................................... 3 3.2. Soil Conditions ............................................... 4 3.2.1. Requirements ................................................ 4 3.2.2. Bearing Capacity ........................................... 4 3.2.3. Soil Bearing Testing Methods and Equipment..................................................... 4 3.3. Removal of Organic Material ........................ 4 3.4_ Drainage........................................................ 4 3.4.1. Purpose ........................... ....... *"** '*"*........... 4 3.4.2. Elimination of Depressions ........................... 4 3.4.3. Drainage Structures ...................................... 4 3.5. Ground Moisture Control .........................— 4 3.5.1. Importance ................................................... 4 3.5.2. Acceptable Type of Ground Cover_______________ 4 3.5.3. Proper Installation ......................................... 4 Chapter 4 - Foundations 4.1. Piers .............................. .............................. - 5 4.1.1. Importance.................................................... 5 4.1.2. Acceptable Types ......................................... 5 4.1.3. Design Requirements ................................... 5 4.1.4. Design Procedures ....................................... 5 4.1.5. Location and Spacing ................................... 5 Chapter S - Set Up Procedures 5.1. Moving Horne to Location.................................13 5.2_ Leveling and Blocking (Singiewides) ................13 6.3. Leveling and Blocking (Multi --sections) .............14 5A. Crossover Connections for Multi -Section .........15 5.4.1. Utility Crossovers............................................15 6.4.2. Ductwork Crossovers.......................................15 5.5- Tie -down Requirement for Single and 'Multi -Section Homes . ................................20 5.5.1. Anchoring Instructions.....................................20 5.5.2. Severe Climatic Conditions..............................20 5.6. Installatiorr of On -Site Attached Structures ......20 5-6.1. Attached Garages............................................20 5.6.2. Porches.........................................................20 5.6.3. Steps, Stairways and Landings ........................20 5.6.4. Skirting................................... -- ..................... 20 5.7. Protection of Window and Doors ..................... 26 Chapter 6 - Installation of Optional Features 6.1. Awnings and Carports.....................................28 '6.2. Accessory Windows........................................28 6.3. Miscellaneous Lights and Fixtures ..................2-8 6.3.1. Exterior Lights..................................................28 6.3.2. Ceiling Fans....................................................28 6.3.3. Whole House Ventilation .................................28 4,2_ Footings........................................................ 6 6.4. Telephone and Cable Television .....................28 4.2.1. Acceptable Types of roofings ....................... 6 Table of contents, continued Chapter 7 -.Preparation Of Appliances 7.1 Clothes Dryer Vent ........................................... 29 7.2 Comfort Cooling Systems ................................ 29 72.1. Air Conditioners .................. .......................... 29 722. Heat Pumps ... ............ ................................ ; ..... 30 7-2.3. Evaporative Coolers ........................................ 30 7.3 Fireplace, Chimneys And Air, inlets .................. 39 7.3.1. Minimum Extensions Above Roof .................... 30 7.32. Required Components ................................. _ 30 7.3.4. Combustion Air Duct Inlets................................30 7.4 Range, Cooktop And Oven Venting .................. 30 7S Water Heater ....... ........ ............I.......................... 32 7.6 Whole House Ventilation ................................... 32 Chapter 8 - Utility System .Connection And 33 Testing . 33 8.1 Proper Procedures ................. ........................... 33 33 8.2 Water Supply ........................................... 33 8.2.1. Maximum Supply Pressure And Reduction ..... 33 8.2.2. Connection Procedures ................................... 34 8.2.3. Freezing Protection ......................................... 8.2.4. Testing Procedures .............:.......................... 34 8.2.5. AniitSiphon Fh%VPrtrof Sill Cock (Faucet) .... 34 34 8.3 Drainage System ............................................ 34 8.3.1. Assembly And Support .................................... 34 8.3.2. Proper Slopes And Connector Sizes ................. 34 8.3.3. Crossovers....................................................... 34 8.3.4. Soivent Welding Procedures .- ...................».... 34 3 8 .5. Protection From Freezing .....................:........... 34 8.3.6. Flood -Level Test Procedure edure ............. ................34 34 BAGas Supply ................. .......... ........... I............... 35 8.4.1. Type Of System Furnished With Home ............ 35 8.4.2.. Proper Supply Pressure .................................. 35 8.4.3. Orficing For Specific Gases ............................ 35 8.4.4. Crossovers....................................................... 35 8.4.6. Testing Prior To Connection To Mains ............. 35 8.4.6. Connection Procedures .................................... 35 8A.7, Gas Appliance Startup Procedures .................. 35 8.5 Heating Oil Systems ......................................... 35 APPROVED BY REVISED ON A MAY 2 6 Zoos INC. FEDFRAI ' MANUFACTMW HOME -- 1C;:"5TWCT1QN AND SAFETY STANDARDS. 8.6 Electricity ............ ..................................... 35 8.6.1. Description And Rating Of House Wiring ........ 35 8.6.2. Grounding Of Homes With Feeder Connections .........................................:.. 36 8.6.3. Connection Methods ....................................... 36 8.6.4. Crossover Connections ............................. 37 8.6.5. System Test Procedures And Equipment ....... 37 Chapter 9 - Final Inspection 9.1. Water And Drain System ................................ 44 92 Appliance Function And Operation .................. 44 9.3. Windows, Doors And Drawers ....................... 44 9.4. Exit Windows ................................................. 44 9.5. Exterior Siding And Trim ................................. 44 9.6. Stack Heads And Vern Pipe Flashings On Roof .................... »».................................... 44 9.7 Composition Roof ........................................... 44 9.8 Skirt Venting ................................................... 44 9.9 Low -Hanging Trees And Bushes .................... 44 9.10 Exhaust Fan Operation And Air Flow ............... 44 9.11 Bottom Board .................................................. 44 9.12 Ground Cover N.N.....YN..f.......... 44 9.13 Anchors And Straps ....................................... 44 9.14 Interior Details ................................................ 44 Chapter 10 - Relocating The Home 10.1 Relocation. Of Home ............. ................... 44 10.1.1. New Zones ................................................... 44 10.12. Tires And Axles ............................................ 44 10.1.34 Appliances.......f............... .... .......::.::::.:......... 44 10.1.4. Dust Caps................................................:.....44 10.1.6. Blocking During Storage ............................... 44 10.1.6. Transit Of Furniture And Belongings ............. 44 10.1.7. MUltisectiorf HoMas..................................... 44 INTRODUCTION Thank you for purchasing one of our manufactured homes. This installation Manual contains instructions that must be followed for the proper installation of your home. PLEASE READ ALL INSTRUCTIONS PRIOR TO SET-UP. 1. Chapter One - Introduction 1.1. How To Use This Annual. This mantas contains detailed installation instructions, wing specificatioris and. procedures for erection and hookup of your manufactured home. it has been written in an objective and easy4o-understand manner so it can be understood by people without wftm ive technical training. It discusses the set-up of the home from preparing the site through gnat inspection. It includes many tables and figures giving important data for proper set -tip Careful adherence to this manual by the homeowner and installation crew will assure you of a Quality, safe and affordable home for many years to come. 1.2 Pre -instal Don Consideraftne. Prior to locating or relocation of your home, contact the local authority having Jurisdiction for installation to see If permits for such procedures as bloddng, anchoring, or utility connections are required. Inspections may be required during insWaition. On private property, coning or development covenants may apply and should be taken into consideration. (NOTE Preparations of the site, when accomplished by someone other than the home Installer, may not be in acoondance with those I nsfiruction%) 1.3. SAFETY, ONLY TRAINED CREWS SHOULD INSTALL THE HOME. INSTALLERS SHOULD FOLLOW THE SAFETY INSTRUCTIONS PROVIDED IN THIS MANUAL. .1.4_ Consumer Information Card. See your Homeowners Manual for information, If you bought your bone from a retailer, please be sure that your retailer has completed and mailed the card for you. If you acquired your home from. someone who is not a retailer, you should promptly fill out and send - a card to us. 1.5. Alterations. Prior to altering this home after installation, (such as modifying the electrical, plumbing or heating systems, adding a room, carport, garage, or major repairs) be sure to contact the authiority having Jurisdiction as a permit or plan approval may be required. ALSO, SUCH ALTERATIONS MAY VOID, IN WHOLE OR IN PART, THE UMITED WARRANTY CONTAINED IN THE HOMEOWNER'S MANUAL THIS HOME WEIGHS SEVERAL TONS USE ENOUGH TEMPORARY WOOD BLOCKING TO SUPPORT THE HOME DURING SET-UP OR WHEN LOCATED AT DEALER LOTS OR FACTORY FOR AN EXTENDED PERIOD OF TIME. NO ONE SHOULD BE ALLOWED UNDER THE HOME UNLESS THE BLOCKING IS SECURELY IN PLACE, EVEN IF THE HOME IS NOT MOVING. U-Up Manual - Page 1 2. Chapter 2 - Wiriiiians AnchoNng EQUiMU"t: Straps, cables, tumbucldes and chains, including tensioning devices, that are used with ties to secure a manufactured home to ground anchors. Anchoring System: A combination of ties, - anchoring equipment, and ground anchors that will, when property designed and the home or move it sideways. fooUnn: The part of the support system the sits directly on the ground at, below or partly below grade to support the piers or foundations. Foundation: That part of a building that is an engineered structure designed to transfer the weight of the building or structure to the saff. That portion of the support system between the footing and the manufactured home, exclusive of caps and shims. Types of piers include, but arenot limited to, tha following_ 1.Manufactured steel stands . 2.Manufactureu concrete stands, and 3.Concrete blocks Site. Manufactured Homes: A parcel of land' designed and designated for the location of F one manufactured home, its accessory = buldings or structures, and accessory equipment for exclusive use of the home's occupants. Stabilizing_ System• A combination of property installed anchoring and support system. end. Manufactured Home: That area of a manufactured home site which has been reserved for placement of a manufactured home. Support System: A combination of footings, piers, caps and shims that will, when properly installed, support the manufactured home. Set -Up Manual - Page 2 dwaamidom E aftd - lenu8W dn4ag I )zwnos AWOZ Fl mm 3MCHVI asd as m 3Noa ism uid E& •s•n 'SMmm %v.wd m Ampoi, mul ww wed 'spuem a mpm Wa WON 'fl a 'semis wmawv I. mwl 1, 5n 3OW1ISNV uc IV 1M et&i>+�dwrplgg18 geelos! ttdw OB atti aaax�tt IsfseoO V)ISViM iM .E VHJOGM auoZ PuIAA WtB.mn aie seuolural Pue Salop BUWM t ou ................. 4............................. Q04 JeO 'IaraU8O - VNnOMM H17SON WUoqaVaums 7S 'sa p-t im 's u"m 'aya�noiea� dNV m-, gOSSMS'Seg-ud'g M Wind -"Wn'awnmw'u 'Sal'NPuaH IInJ u!Plta�j SPet7 �eliloO'8llotle4a'Rre�ot8-VMO'W :s auk ptnNt uppina an (estiy{a pat}, ads salon 'satrWed m sa4-03) 'a)%S jq PaMl a3uattwlaAo9 IBOW 6ulMoflor our cm 3Noz amm:3me m "N allo mvm-o 4 88 taw, z alloz Im 8 3NOZ d UeS VPOU VMtejo'sawnN W20ftM T-gaix'4-M 'ttt>sMW 'ttWq NM 'aragwuo 'twWjM ' kgoo *MOM 'OOWW - svuat 180 tP40 't"moo 'umam4o 'Aopae�• UU*N-M'Uerrt(L ateugrduad Js wed til-Anbsed 'awgwed 'MGFuO A--H -t 'SOW 'IP WMO *-AM J 'sngw400 ', o %aptueo 144�6 'Uogtea8 - VNl7 wa RLHON 40uqg'-AIMPead'u VLT' H' 7eH'QaMe-IddISSISM wm4d 1aolo<gueN 'aegnt7'IolauB'e►gaiaurag - simnHowasVNl uClgaeMVOOPueH - 3NIaw MuRapa WOM 'afinoN u(4e8 MM VOI& 24M 'UOMMUGA 'eoqudlfittel 'Auawwi!L iS 'UWM is 'kpuln is OOG an u40t 19 'Sawsr is 'eumaH v 'aadnao awlod 'uoulMl uota8 ls013 'uoieweo 'nQls8*o 'uolldwnsW 4ucgmm sV 'ua9V 'Eqp-V - VNVISQIQ'I WMuPW '4mtl 'uurUs'tt W43 'uaptue0'ae tre - VWH039 c auoz pum um*A (4alaq se pamem 8-8 ow- sbqu— ov - VCAa;lo-u aLWWN'u!+ p" - VWVMnV sseiun 'opw jo salPmoa) altils lq PaM m u�( 8 s Wt gosVnSNV 83wzcm Q aln d m P"*Qds Bi aumifibm Sul ow m Maim UM ONQ trrGVAG tlOIMUnol Pue SuUottoue sI pus atuoq atp scafun '£ PUB i seuoz Pum ul aulpow atp jo mg, � Qm Paled aq aallortuatM Sou pings Pue were I@14e0,?J IMQ doj perinber sugslA ud duuogoue Pue emssard ptgm jai{ eta rW paueop lou seq atwg slgl t Mtoz OW '£ ro z euoz pwm tq Bum se paP mmn awmeglo lou are wo saijawal sv PUB so= Pawn eta p scare sa pul ❑ Wu T z vied swj Pue Paulggo- ugaq SAe4 Wued leool Ajessaoau Ile w41 erns ag 'sMuusd JO aalusnssl •swow ul;Ls pus SBulunne se 4ons `suo. ppe aJrqnj mplsuoJ 'spec allgnd Pue sawl 4mftd =4 saouelslp *)Bglas elglssluuad pug 'sjlnoo pue spleA 'spas ul slual,u4mmua BulPjeOw SMM Iw1 Aago snuumQ 3I=qps pW quowyatmu3 sleawo Apo 10 AMOO '8M wog pambej eq Aoui spwjad w.gepodsue4 lepod9 saquu pampsAo Aug egej aq Auedwoo AjHgn Ieoq jnoA pej = Pue satpuejq BuIBue4jano Aue anowa8 •46nojtll ISO ueo luawdlnbe uogspodsua4 eta erns eq 'agls nol;gl SM ft a4 gwo4 tno( anour of Bundwelle aao408 'japodsur jl jo: sS' =V FEE iJid� 'mm PM JM U1041m a# uI pwAs eq Aaw led ov JO Peol I= utatl}lou a J% peuSpep swotl a `aldume j0- -oluewo4nbei istoem jo peol jamq 4ilM tie ue ul emq most spM of qm sl V 'JQAO=H W VC 'PaU&SeP st3nit V 4o14M joi G41 uma sagglgedso 6u11ow/64lea4 jo 'Peq #ool 'Ptxat lalewi6 Bulllnbal aura a ul eufo4 jnoA awwW jo aus lou oa '(pmuew 9114 JO 6'E GiAl Pue hued 1eo40ala ulew JOsu JO 189410 ulmpaq a ul sdew euoz ess) speol fool PUe SuOPAPuoo MOM ulm jq PauBlwP SI aw04 lnOA 'sdm euoz;o son -;noA1 pun twavoo1 IT ITE uoWedaJd aVIS - C JMdeyO •g 32- Sail Conditions. 3 d.3. Drainage Structures. Depending on the local 32A. -Requirements. To help prevent seiHing of your landscape, ditches and culverts may be needed to home, site it on firm, undisturbed sod or 91 drain surface runoff. If so, consult a registered compacted at least 90% of its maximum relative professional engineer. _ density. Installation on loose, uncompacted fill 3.5. Ground Moisture Control. may cause the home to shift and settle in such a ' 3.5.1. Importance. If the crawispace under the home is way as to damage the home which may invalidate to be enclosed with skirting or other material, a the homes limited warranty. vapor retarder .ground cover shah be installed that - 3.2.1 Bearing Capacity. Test the bearing capacity of keeps ground moisture out of the home Where a the soil at the depth of the footings SW completing concrete pad is installed (solid) under the entire ' any grading and filling (see 3.2.3). If you can't test hone floor area, the vapor barrier isnot required, if the soh but can identify its type, use the foundation the concrete is a minimum of 4" thick bearing pressure shown in Figure 32 as a guide. 3.5.2._ Acceptable !Ypes of Ground Cover. Use If you cannot identify the soil, use the lowest value polyethylene sheeting or Its equivalent, at least six (1,0Q0 psf from Figure 3.2). Under unusual miles thick conditions, or if the soil appears to be peat or - 3.5.3. Proper Instillation. Cover the entire area Under professional engineer. the nome with the Rj7a6"an ov it at RM 6' at all joints. Where soil and frost condition 32.3. ' Sell Bearing Testing Methods and Equipment. permit placement of footings at grade levy, place A poc�tet penetrometer (available from engineering the sheeting directly beneath them supply houses) or other methods acceptable to local jurisdictions may be used. 3.3. Removal of Organic Material. Remove all decayabie material such as grass, roots, and wood scraps from beneath the home, especially in areas where footings are to be placed, to minimize settling of footings and insect damage. Remove shrubs and overhanging branches from the immediate vicinity of the hontesite to prevent windstorm damage. 3.4. Drainage. 3.4.1. Purpose. Drainage prevents water buildup under the home which may cause settling of the foundation; dampness in the home, damage to . siding and bottom board, buckling of walls and floors, problems with the operation of doors and windows, AND COULD VOID YOUR WARRANTY. 3A.2. Elimination of Depressions. ' Grade the homeslte to permit water to drain from under the home and away from home for a minimum of 10 feet from the silo of the home. See Figure 3.3. FIG. 3.2 GENERAL DESCRIPTION OF SOILS SOIL TYPE BASED ON THE UNIFIED ALLOVMLE PRESSURE CLASS ICATION SYSTEM (POUNDS PER SQUARE FOOT) ROCK OR HARD PAN 4,OQDAND UP SA!>DYGRI►V6 M1DtiRAVEL 2.000 9ANEkOLl Y SIWD. CLAVEYSANIX 15on SILTY GRAVEL. OR C1AYRY GRAVEL CLAY. MW CLAY, SILTY CLAY, OR i o00 CLAYEY SILT UNCOMMITTED FILL (TYPES OF SOL SPECIAL ANALYSIS Is REQUIRED J NOT LISTED) PEAT OR OROANtC CLAYS SPECIAL ANALYSIS Is REQUIRED NOI& IM 9AAM is TO BE USED ONLYwHEN NONE OF THE FOLLOWING IS ' AVAILAISLC A SOILTESTM WVEST►GATM AND AHALYS)S OF THE GYM. S. COMWANCE VOIN THE LOCAL iHIp.DING COM C. COMPETENT OPWION SYALOCAL ENGO ER OR SURDM OFFIC AL. • NO ALLOWANCES MAID FOR OYERSURDEN PRESSURE, EMBEDMENT UEPTFL WATER TABLE HEIGHT SETTLEMENT PROBLEMS FIGURE 3.3 - ELIMINATION OF WATER BENEATH THE HOME DO: Crown and grade site to slope away from home DON'T: Grade aft so that Water collects benwh and Dover with 6 ran thick polyethylene sheeting or bmw or place footers above frost One. equivalent. Set -Up Manual — Page 4 g eBed - lenuen d"S :smoll(4 se ewby fiM0A to sja!d "d (pay!aads ssalun) pus jagpo W94 ,Z uey} ajow ou scald qwq jameB ul sjrglwtg 10 =ald Mow Pus duluedo Jew m MOP #o suo!}eool e41 so 40ns Qx4m Jet o Pue umpn4suoa jo edf4 a p 'suoz peal low a4l 'awoq 6cl1 Io 14clem Pus suotsU8WjP e41 uodn spuedep sjeld jo &pWs PUB UOIMq aLm •BulaedS puV uolpool gL b •raauiBue lempruls jo leuolssejojd pajaMew e Aq Peu6.WP 4fkf ,.Of3 MAO sold-GA84 'sePOD leool Aq poWmed jou sl uogon4suao flans ejeW "e pmoo 4ilm sojo e(# II8 pug echo **Iq e41 ul Papmu! sM Bulwglulw laqs Wm -10POW epnwo ut uj" Al 4qm leog A PaR PmQd we4M NOW „00 JOAO Maid 'ET L'V W4nbal aq Alleuuou jou illmjgM '(l.'v wnB}-d e9s) SXOIq GPJMuM P83100194u! 'elgnoP to ino '46i4 SVM QQJ41 JOAO scald jawoo He pue 4614.09 pue „9E uga" smid no ?AM- suoo 'yBIH .,09 of K q+ald 'Z'tr' L'f: 'fold e41 jo-mMo jnuew a4I Aq MOO& spwp eel puoAeq sprgs Buqsnfpe amyl pualXG IOu OU : 'Patagal Pins Pam eq pino4s scald parnpe}nueW •paxobei AMMOU lou st jepow u q of dw ,.ZfL , pmxa pu pings WsDo IetucimH 'w ey1 q3 SGI&M I46fj w qw undo uomsod '(L'tr aunfkq aes) weaq-1 palroddns a4I W sgBue lop IS sl opts Buol a41 4an be uuwu Imsul '.9L X d9 X a9 'sMoolq opmoo peo-pasop jo uedo 'elBws jo Ino 4B14 „ e ue4l ssel sjstd Ion4suoo Qew noA *gaiH ..9E oj, do woad ' L'fr' L'b 'sarnpaamd uGISGtl 'v' L'b 'L'y WnB�A u! paqu=V wnupmw 041 umg a= ou eq pino4s Gouereap wnwp u SU •punorB e% col jou A9U 1nq punoiB ay1 aAcqe ZL umS ssal .aq Hew awoy a4I to japimum e41 •aUr04 G4f 10 01*9L J% . ZL Me41 sm ou aq Isnw punoiB ft PAM epm eyo a# to u Moq g41 usamq MMOP Bulllnsaj a41 'pal" sl ewoq MR jallb : •SWOH Ou japup. GIMMISOa •e=4 jnoA.41uswuo4mm eMp e ep.mid of se os jeuuew a 4om ut peter! cue (Z't, gdBJftmd ses) 86ug0o4 Uo ;as eq }snw weed ItV ,PeuolpsOd Ateug UNM „E ue41 ejou► puwe IOU oP sjasp emew.PB M os s146te4 fold pejr VWUM p%9S •sdeo Gy1 spun pasn eq Aew jegwnl uolsuaugp POompje4 Pewee aansswd ,mpolq apmoo jo sdoo aRgane jo ssegoliR wnwlww a4I uetq ssal sl pawwl4s eq 01 Goods a41 uagM 'coeds MgJaA lO.1 ue41 wow ddn000 leu OP AOW 94 440.4 uq wa41 eApq '(L'P ejnBld am) 04ed ul wAys son skmW •deo -td eta jo dal a41 pue weeq-1 e41 to aseq a41 uaamleq sdeB Aue Ipl Pue awo4 a41 lane! o1 sw!4s Poo"►!le,4 a9 X „jr Gen •IuGure=" ja Bwplas p%uemun (} poei Amu I se 'PoomRld Plow •uodn pm Ilayl scald 0% se 40" Piro W&M awes stop PUS 'Po MM4 jo fjuosew Ppos jo eq pegs WOO uGy1 sstuae RluaAa Pool lwrgoruls OW slnqulslP W L'tr ajnlmd U! umoys se weld Xoqq Ago4 de j •(L•lr amBtd Gas) auo snogajd a41 of 6816ue 114N IS eq Isnw jeAq kam 'ap!"q -GM pads WPM 16 PapMs= am sja!d UGW "ItlRDWA Psurme qpo mWle4 j!at;14w Peyjw eq Ismwu Asu '..% X.8 Met le p "suat ip leu!WOU GAN .q we s*x)lq al MG3 89!�uo papnjlsuoa sjetd )la(3lq slamoo to Vie a iBumis papuawwom n mop L'tr aunBU waawnemuoc 'Z'E'L'fr •(Z'g'L•ti Gas) speol pa4ou "IsIm al PXW aq Isnw wqd 'mil cold j% E'ti pUe rV salgel egg •Mm4 u 1pw jol pautnbw sl BugooR rA aftMuAueaq jewso •awo4 eta voddns W Pam am Aayl Am a41 pus 'scald a41 p Buaeds " 'psi Gall low W `&Lwq a41 10 suotsuawlp 041 $e 4M WO,-Rj uo spuadep Aueo Isnw .raid 4oea let# Peq e4.1 'AlpWe3 6ulaees3 qmn ' L'£' L-ti 's�tiewMlrlba;l uBl�ii 'E'L'� Iry ajnf-A ass) spuels alejswoa jo Imew Pwtgomuew 2tgelsn108 1O ' PWMW Pus padded gogq Mmum eq o} am stela -sedAL aMelex►b Z,L,t, 'Aueuem pW-up jnoA PMA pfnoo Pue 'sjooj Pue sl-m'sjooµ Bulgy of pal Amu os op OI ednLe1 'Gwoq most jot pomAbau M InWmpeed ail punwe sratd pelsul W lueuodw! sl II 'awo4 jn A.q 96ounp lernpruls snap es esneo Am woo Io Butaeds jO U011aoaf 'ezp pw—=ul 'eougjad" L'L'fr 'NOId TV 9 jsldego ul PQ=mip am uopepurw4 s1! ol awo4 eq Buunoes jot sprullew pus sampa,oid dn-jeS •seA tense a41 samewma L•y eMjL pue L'ti amOW 'sUoAePun% 4W sraAoo jgdmp st41 WO-N euoilepuno j -V .te4duq 4.1.5.1. Single And Multi on Homes. ' A) Homes not requiring perimeter support Figure 4.2 shows the recommended location _ and spacing of piers for homes not requiring perimeter blocdng generally located at south (20 PSF) and middle (30 PSF) roof zone areas. - B) Homes requiring perimeter support. See Figure 4.3 for homes requiring additional perimeter supports; (generally at 40 PSF or higher roof load zones). 4.1.52. Under Doors And Heavy Furniture. Place piers on both sides of all exterior doors, sidewali openings wider than V (such as entry and sliding glass doors), under porch pasts, 4.�.1. permanent foundation design that meets most local codes by writing to the address located on the back cover of manual, Attention Customer Service. hood -Prone Areas. We do not recommend setting your home in river or coastal flood- prone.areas. Special local regulations or flood insurance provisions may apply. Special elevation and anchoring techniques are required when locating in a flood -prone area Consult a registered professional or structural engineer to make sure that the home design and construction conform to applicable federal, state and local codes and regulations. The FEMA publication listed in Section 4.4.3 contains . design and construction fireplaces and wood stoves, and under the recommendations. expected locations of heavy pieces of furniture 4.32. Severe Wind Areas. Specal foundation and such as pianos, waterbeds, etc. This anchoring techniques are required when your additional blodtdng is required with all types of home is located in a a severe wind are foundation. Consult a registered professional or structural 4.2. Footings. Support every pier with a properly engineer. HUD foundations design guide listed designed footing as follows: in Section 4.4.4 contains recommendations for 4.2.1. Acceptable Types Of Footings. designing foundations and anchoring systems. not place your home in a wind zone more 4 .2.5.1. Concrete. Footings may consist of recast of P severe than the one indicated on your home's se poured -In -place concrete, pads slabs, or Data Plate. ribbons with a 28-day compressive strength of at least 3,000 psi (see Figure 4A for minimum 4.3.3. Special Snow Load Conditions. Homes footer thickness). designed for and located in heavy snowbi areas or subject to other extreme loading _ 41.5.2. Other Materials. You may also use other conditions will require special piers or footings. materials approved for this use by local See Table 42 for pier loads up to 50 psf roof - ; authorities if they provide equal load -bearing bad. For higher roof load consult a registered capacity and resistance to decay. professional engineer for : your foundation 4.2.2. Footer Placement. For homes which are to design. Do not place your home in a roof zone be set in areas susceptible to frost, in order to more severe than the one indicated our your prevent the potentially harmful effects of frost home data plate. heave, footings should be placed below the 4.4. important Reference Documents. frost tine or the home must be installed in such 4.4.1. AN611NCSBCS A225.1 -1987, "Manufactured a manner as to provide a stable environment Home installations." NCSBCS, 606 Huntmar 4.2.3. Proper Suing Of Footings. Proper sizing Of park Drive, Herndon VA 22070 (703) 437- footings depends upon the load -carrying 0100. 'capadly of both the piers and the soil. See 4A.2. ANSI A58.1 - 1982, "Minimum Design Loads Table 4.4 for recommended footing 81209 for Buildings and Other Strwetures," ANSI, based on pier load (Table 42 and 4.3) and 1430 Broadway, New York NY 10018. minimum soil bearing capacity. 4.4.1 FEMA 85, "Manufactured Home Installation in 4.2.4. Other Footing Design Considerations. You flood Hazard Areas," FEMA, Washington DC should check with applicable state or local 20472 (202) 646-2708, September,1985. building authoritiees conceming any other 4.4.4. HUD Handbook 4930.3 (1989), "Permanent requirements they may have concerning Foundations Guide for Manufactured Housing," design; construction or placement of HUD, 415 7th Street, SW, Washington DC acceptable footings. 20036, June, 1976. 4.3. Permanent Foundations. Check local _ building codes and regulations and consult a registered professional or structural engineer when you are setting your home on a permanent foundation. (such as a full basement, crawl space or load -bearing _perimeter foundation). You may get a Set Up Manual — Page 6 FIGURE 4.9 - TYPICAL FOOTING & PIER . INSTALLATION Single blocks, maximum height of 28 Inches Steel or concrete manufactured pier Double interlocked blocks, ffodmum height of 70 inches For piers exceeding 70" in height, the concrete blocks must be filled with Concrete grouting and steel bars must be utiltzed. TABLE 4.1 TYPE OF CONCRETE BLOCK MAXIMUM PIER HEIGHT SINGLE STACK 28!1 DOUBLE INTERLOCK 70" NORMAL MANUFACTURED HOME INSTALLATION . Type of Foundation System 1.. viers - Ground Anchors - biome rests on piers of concrete block, formed -in -place concrete, permanent wood or steel pedestals on permanent wood, crushed stone or concrete footers: Ground anchors in soil angled to resist straps or embedded in concrete deadmen soil. Straps tied to the frame, with or without over -the -top straps. 2. Concrete slab or continuous footing. Home rests on a concrete slab or ribbons of concrete. Straps tied between frame and perimeter footers or concrete slab. Recommend installing earth anchors prior to pouring concrete stab_ Concrete slab should be sloped to prevent water accumulation under home. 3. Pilelpost system. Home nests on piles/posts. Mace sufficiently deep in the around to resist all wind, snow, frost heave and earthquake forces. Straps fasten home to piles/posts or caps placed thereon. 4. Concrete or concrete block toad -bearing perimeter walls (basement or crawl space). Home rests on exterior load bearing walls which sit on concrete footings, sufficiently heavy to hold down home to resist all external forces. Set -tip Manual- Page 7 REQUIRED FOOTINGS & PIER BLOCKING (For Homes NOT Requiring Perimeter Blocking) In Table 42 below are the design loads used to determine the support structure for homes not requiring perimeter blocking. The minimum values to be used for pier and footing design based on the Indicated root Uve load and a floor live load of 40 pounds per square foot (PSF) are specified to Table 42. see Figure 42 for typical pier layout. All required support locations for marriage wall columns, side wail openings and arty other special supports are marked by paint, label, decal or stencil. Provide support (piers & footings) at all marked locations per tables 4.4 & 4.5 as required. Note: Do not remove this support location marking as these locations must be visible after home Is installed. All load bearing pier supports and footings may be subject to approval by the local enforcement agency. As specified in Table 42, each pier shall have adequate capacity to support the design load shown. The required sizes of footings will depend on soil bearing capacity test results. In lieu of soil tests, confer with the local.building authority for recommended soil bearing capacity in your area. The areas beneath the footing shall have all grass and organic materials removed before Installation. All footers must be placed on either undisturbed soil or compacted fill. .0" r�u4ru-rnrr..r°'��r.. s:Qw its ;� TABLE 4.2 PIER LOADING UNDER MAIN I -BEAMS s A (When only frame Flocking is required.)-._y� pa; 12' or 24' WIDE HOMES 141, 28', or 42' WIDE 16' or 32' WI ES HOMES Pier Pier . Pier Pier Pier Pier Pier Pier Pier Pier Spacing Load Load Load Load Load Load Load Load Load Under (Lbs) (Lbs) (Lbs) (Lbs) (Lbs) (Lbs) (Lbs) (Lbs) (Lbs) Main 20 PSF 30 PSF 40 PSF 20 PSF 30 PSF 40: PSF 20 PSF '30 PSF 40 PSF I -Beams Roof Roof Roof Roof Roof Roof Roof Roof Roof (Ft) Load Load Load Load Load Load Load Load Load (South (Middle (North (South (Middle (North (South (Middle (North Zone) Zone) Zone) Zone) Zone)., Zone) Zone) Zone) Zone) 4 2130 2420 2560 2410 2740 2940 2700 3060 3320 5 2660 3020 3190 3020. 3420 3670 3370 3830 4150 6 3190 3620 3830 3620 4110 4410 4050 4590 4980 7 37220 4230 4470 4220 4790 5140 4720 5360 5810 8 4250 4830 5110 4820 5480 5880 5400 6120 6640 9: 4780 5440 5750 $430 6160 6610 6070 6890 7470 10 5320 6040 6380 6030 6850 7340 6750 7650 8300 12 W90 7250 7660 7250 '8250 8800 8100 9200 9950 NOTES: 1. See Table 4.4 for minimum footing sizes based on pier loads and allowable soil bearing capacities. The footing sizes and pier loads are minimums required for the applicable conditions. The footing shall not be smaller than the pier it supports or 256 square inches. 2. The maximum spacing of supports is not to exceed 12 feet. 9. Where it Is impmobcal to maintain spacing, such as In the axles area, file average of the distance to each adjacent support may be used to determine support requirements, for example: if the distances to the adjacent supports were 6'-0' and 8'-0", the average spacing would be T-O'. 4. Homes located in the north (40 PSF) root load zones MUST have perimeter blocking per Table 4.3 unless Indicated otherwise by a letter from plant of manufacturing. Set -Up Manual - Page 8 FIGURE 4.2 PIER LAYOUT FOR HOMES @ SOUTH AND MIDDLE ROOF LOAD ZONES TOP VIEW - SINGLE SECTION MAIN I SFAM PIER BLOCION% SEE NOTE 94 6EM �°-o•L 12W" MAXIMUM tLwc� SEETABLE42 ' ( ( SEE PtBLOLIG Mom SEE NOTE BI TOP VIEW -DOUBLE SECTION TOP VIEW - TRIPLE SECTION SEENOTEHi4 1�WN18EAMBELOEa BI.Jow G MAptFBEAMP RBLOtEfR10 --- ' SEENOREIPOBELOW SEETABLE4.2 ' 9 {TYPICAL? _ WE7ABLE4.2 ( SEE NOTE 91 (. ( S TYp. t BFI�A 1dg1D1 RAILS P�2 BLOCmG TYRC I NSUpFMPMWATEACHSIBS OF MARRNGE WALLOP9M t TYP.I.BEAM r WJNRAILS. PIER BLOCIONG "wmS GENERAL NOTES 1. PERIMETER PIER BLOCPIRiG MIST 88 PROVbEDA7 BOTH SIDES OFALLEXTERIOR DOORS (EXCEPTAT ENDS OF HOMES)AND ANY OPENING IN THE EXTERIOR SIDEWALL4A'OR WIDER (INCWDING PA`p * 000ft 09CWJED WWA DAY WINDOWS. AND PORCHES). 2. FODTUSGSAND PIER SUPPORTSMUSTBEDESIGNED TO 6UPPOiiTTHti LOAD VALUE$ SHOYYN. 9. COLUMN SUPPORT POM. LOCATE MXAT SOTH SMES OF CENTER LINE WALL OPENING. 4. THE TABULATED PER LOADS INCLUDE THE INDICATED LIVE LOADS PLUS HOME DEAD LOADS (INGLUoM CHASSIS AND WAIJZ3 S. RECOMMENDED MAXIMUM PIER SPACING FOR MAIN MAM FOR THE FOLLOWtHG F WAM StwS m.. iD' FBEAM...»1D�0' OC Hr �BeAM_.-+2Woc PIER9LOCaaNO ABEAMS € OFMAMWW WALLOPBIM PIER BLOCKING I -BEAMS : TYFLOOUAld611ppORTP109 OTEACHSDE OFMAWAM WALLOPMUS PIERBLOCIBNG Sd-Up Manual - Page 9 REQUIRED FOOTINGS & PIER BLOCKING (For Homes Requiring Perimeter Flocking) In Table 4.3 below are the design bads used to determine the support stnucture for homes requiring perimeter blocking. The minimum values to be used for pier and footing design based on the indicated roof live load and a floor live load of 40 pounds per square foot (PSF) ate specified in Table 4.3. See Flgure 4.3 for typical pier layout.. All required support locations for marriage wail columns, side wall openings and any other spedal supports are marked by paint, label, decal or stencil. Provide support (piers & footings) at all marked locations per tables 4.4 & 4.6 as required. Note: Do not remove this support location marking as these locations must be visible after home is installed. All load bearing pier supports and footings may be subject to approval by the focal enforcement agency. As specified in Table 4.3, each pier shall have adequate tapa&ty to support the design load shown. The required sizes offootings will depend on soil bearing capacity test results: In Gnu of soil tests, confer with the local building authority for recommended soil boaring capacity in your area. The areas beneath the footing shall have all grass and organic materials removed before installation. All looters should be placed on either undisturbed sal or compacted fill. ...11ttrrta„r,� TABLE 4.3 PIER LOAD. ;'o,�; FRAME PLUS PERIMETER BLOCKING (When Both Frarrle And Perimeter Blocking Are Required. See Note 6 Maximum pier bads: Maximum pier spacing Section Width Roof Uve Load Ft. PSF Pier Location IV 6' 8' 12',14% or 1 V 20 Frame 1400# 2100# 2800# Single Section Perimeter 1470# 2206# 2941 # 30 Frame 1400# 2100# 2800# Perimeter 1800# 2701 # 3601 # 40 Frame 14009 2100# 2800# Perimeter 2130# 3196# 4261 # 60, 80, or 120 Frame 1100# 2100# 2800# Perimeter See note 2 See note_ 2 See note 2 24', 28', 32' or 20 Frame 1400# 2100# 2800# 42' Perimeter 1470# . 2206# 2941 # Multi -Section Maniagg Line 2941 # 4411 # 5882# 30 Frame 1400# 2100# 2800# Perimeter 18004 2701 # 3601 # Marcia a Line 3601# 540141 7202# 40 Frame 1400# 2100# 28004 Perimeter 2130# 3196# 4261 # Mamma Line. 1 4261# 1 6391# 882" 60, 80, or 120 Frame 1400# 2100# 2800# Perimeter See note 2 See note 2 1 See note 2 Marriage Line See note 2 See note' 2 See note 2 NOTES: 1. Perimeter blocking is required at North Zone (40 PSF) or higher roof load areas. Use above loads when optional perimeter blocking is provided at South (20 PSF) and Middle (30 PSF) roof load tongs. 2. Homes at 60, 80 and 120 PSF roof load areas MUST have a continuous perimeter and marriage line foundation support. Set -Up Manual — Page 10 FIGURE 4.3 PIER LAYOUT FOR HOMES @ NORTH ROOF LOAD ZONE TOP VIEW - SINGLE SECTION mAati Maewq r2rc n4w7uwur, bCC IRJIC M tlCL17R - L VmV MAXIMUM L L L L L SEETABLE43 t TYP.4BEAM MAIN RAW 1 PIERBLOGIUNG FBEAMS i TYPICAL PERMETER PIER BLOCKING SEE HATE #11 W41 MAXIMUM (TYPICAL) PERIMETER Phi BLOCKING TOP VIEW - DOUBLE SECTION MAIN I•BEAM PMR ft=KINO 1 AV-VLv-o*MAXIMUM {TYPICAL) i SEE TABLE 4.3 1 I SEE TE11N TYP. I•BEAM MAIN RAILS PIER BLOCKM REAMS w-v mmMUM OTR TO am MAARWGELINE K OC KM AND ALSO tGM UNDER EACH 01"ORTOOLUMN LOrAYMN 7 TYP, I -BEAM MAW RAILS PIER BLOCIONS F9EAMS � ) ENo7ESi p OLOCIUNi9O W-V MAXIMUM (TYPICAL) PERIMETER PER BLOCKING GENERAL NOTES 9. ADDTTKNNAL PERR.ETM PER BLOCKING MUST BE PROVIDED AT BOTH SIDES OF ALL EKiERIOR DOORS PICEPTAT ENDS OF HOMES) ANDANY OPENING IJ THE EXTERIpRSIDEWALL4. ORVWBtPlC LW" PATION DOORS. RECESSED ENTRIES. SAYIAIINOM AND PORCHES} 2. FOOTINGS AND PIER SUPPORTS MUST BE DESIGNED TO SUPPORT THE LOAD VALUES MOWN. 3. COLUMN SUPPORT PIERS, LOCATE M&YAT WM SIDES OF CENTER LINE WALL OPENING. 4. THE TABULATED PIER LOADS INCLUDETHE INDICATED LPM LOADS PLUS HOME DEAD LOW (RQMUDING CHASSIS AND WALLS). TOP VIEW - TRIPLE SECTION � c�nu ai�x ae rrxmn 1 1 Set -Up Manual - Page 11 (MAX) TABLE 4A FOOTING SIZES capacities venfted by a local Registered Professional Engineer familiar with local site conditions. TABLE 4.5 PIER LOADING UNDER MARRIAGE LINE OF MULTI SECTION HOMES. . 24' WIDE HOMES 28, 28, & 42' 1MDE HOMES 32' WIDE HOMES. Span Between Columns (FT.) See Note Pier Load (Lbs) 20.PSF Roof Zone Pier Load (Lbs) 30 PSF Roof Zone Pier Load (Lbs) 40 PSF Roof Zone Pier Load (Lbs) 20 PSF Roof Zone Pier Load (Lbs) 30 PSF Roof I Zone Pier Load (Lbs) 40 PSF Roof Zone Pier Load (Lbs) 20 PSF Roof Zone Pier Load (Lbs) 30 PSF Roof Zone PW Load. (Lbs) 40 PSF Roof Zone _ 6 1080 1440 1800 1260 1680 2100 1440 1920 2400 10 1800 2400 3000 2100 28M 3500 2000 3200_4000 12 2160 2880 3600 2520 3360 4200 2880 3840 4800 14 2520 3360 4320 2940 3920 4900 3360 4480 5600 16 2880 3840 4800 3360 4480 5600 3840 5120 64Q0 18 3240 4320 5400 3780. 6040 6300 4320- 5780 7200 20 MW _ 6000 4200 5600 7000 4800 6400 8000 .24- 4320 --;.-4800 5460. 7200 5040 6720 8400 5760 1 7680- gw0 ILMR-1i 1. Where a column Is located between two operi w or when two columns are too ctose for separate piers, aurr the loads for each opening to obtain the required pter Toad. 2. See Table 4A for minimum footing sizes based at pies` toads and allowable sol bearing capadies. 3. The mcwtrated toads consists of roof toads only. 4. Pier locations at the marriage wall are marked with paint or metal Indicator straps (or we speaft foundation plans for pl r Weations.) 5. USe ftre foBowaig procedure for pier bads at each sides of openkWe) In 60, 80, & 120 psf roof loads: Pier load a 30 psf from above table x 2 = Pier load at 60 psf Pier toad Q 40 psf from above table x 2 a Pier load at 80 psf Fier toad Q 40 psf from above table x 3 - Pier load at 120 psf Set Up Manual - Page 12 : t P 5. 'Chapter 5 - Set -Up Procedures 5.1. Moving Home To Location. Make sure the following items are completed before placing the home: I. The site Is properly prepared. See Chapter 3. 2. All concrete work necessary to setting the home is finished. 3. Utilities are installed or available. 4. Any trenching, for crossover drain fines or for wheels that will be left in place, is complete. 5. Items that couid be difficult to install after the home is sited (such as anchors and ground moisture retarders) are in thefrproper locations. CAUTION: THE HOME ur►rWHS cFvcier NS I ADEQUATE EWQRAPY....AVPPORT BLOCKING TO SAFEGUARD WORKERS WOOD BLOCWNG FOR HOME IS t2E0OMMENDiD 5.1.1. PosiBoning the home. When not placing the home on a concrete slab or poured -in -place footings, mark the comers of the home and lay out footings, and support devices close to where they will be used. 5.1.2. Then move the home or first section into position. 52. Singlemdde Homes - Blocking and Leveling 5.2.1. Before doing any jacking, place support piers for the home in the locations under the home as specified in the home_ installation instructions. 5.22. Use a minimum of two jacks, each with a rating of at least ten tons. 52.3. Jack only on the main chassis t-Beank Locate the jack directly under the vertical web of the I -Beam. Do not jack on the seam (joint between flanges) of a twin 1-Beam. 5.2A. Use a large 318 inch thick steel plate, C-channel or other equivalent plate between the main chassis I - Beam and the jack head to distribute the load. 6.2.5. The jack base, and any blocking, must be located on firm ground. 5.2.6. Do not operate the jacks while you are under the main I -Beams of the home. 5.2.7. Use jacks only for raising the home. Do not rely on the jacks to support the home. 5.2.8. Ptace4" x 6" x 48" minimum safety timbers between the 1-Beams and ground in case of jack failure. Timber should be hardwood. 5.2.8. Raise the home in small increments and provide additional. blocking between the home and the piers and safety piers as the home is raised. 52.10. Do not go under the home while it is supported on the jacks. FAILURE TO FQLLOYiI THESE WA NrNg4 mAY RESULT IN RIOUS INJURY OR DEATH Reminders before jacking... 1. Use only Jacks In good condition with a minimum rating of 10 tons. 2. Use a Minute Man C-Channel jacking plate or equivalent between jack and steel 1-Beam to distribute the concentrated loads from jack to 1-Beam. 3. Use a firm support under the jack base to prevent tipping or settling of the jack A 12" x 12" or larger pad Is recommended. 4. Always follow, the sequence of jacking outlined below to avoid overstressing structural members. 52.11. The jading procedure is ae follows: 52-11.1.After the home Is located in its final positlon, you can preliminary level it by using the hitch jack but only aft adequately wheel blocking the home so it does not roil. 52.11.2.Jack up one side of the home by placing one jack just forward of the front spring hanger and the other just behind the rear spring hanger of the same I -Beam. These two jacks must be operated simultaneously to raise the home. Jack low side of the home first. Install footings and piers; _ one just fiorm►ard of the front jack and another just behind the rear jack (taking care not to exceed the correct spacing selected from Table 4.2.) 5.2.11.3.Next, jack the -main I-beam at the front and position. a pier within 2'-0" of the. end of the I -Beam At the completion of this step, this side of the home should be approximately level. 5.2.11.4.Repeat:Steps 62-11.2 and 5.2.11.3 for the other side of the home. At the completion of this step, the home should be roughly level from front to rear and from side to side. 5.2.11.5.13lace the remaining pier supports under the ►rain 143eam on each side taking care to maintain a navdmum distance of no more than the spacing determined from Table 4.2 with piers located as specified at each end of each 1-Bearn (see Figure 4.2). 5.2.11.6.Level the hors within reasonable tolerances, using a 6 foot carpenter's level, water level or similar equipment. The final height adjustment is obtained by jading the i-Beam and placing hardwood shims between the piers and I -Beam or other approved methods such as adjustable piers. THIS LEVELING . PROCESS IS IMPORTANT FOR THE APPEARANCE Sot -Up Manual - Page 13 AND IS ESSENTIAL FOR THE PROPER OPERATION OF DOORS, WINDOWS AND THE DRAINAGE SYSTEM. 5.2-11.7.Place additional supports at each side of sidewall openings over 4'-0" wide and each side of exterior doors. 5.2.11.8.Within 90 days after initial set-up, the home should be releveled, If necessary, to compensate for any pier settlement Following the procedure in Item 62.11.6. above. 5.2.11.9.NOTE: - DURING THE LEVELING OR RELEVELING PROCESS, LOOSEN FRAME TiES AND OVER -THE -ROOF TIES (IF RFtiOR TO —JACKING THE HOME. 5.3. Multi -Section Homes Blocking and Levering Vlfith the exception of the requirement for support under: the marriage walls of multisedion units, leveling and blocking procedure are the same as for single section units. Prepare the site as previously described. it may be desirable to construct the footing and piers (to grade height) prior to moving the home to its final location. Figure 4.2 and 4.3 illustrate the typical pier layouts, mating special note of additional piers required at center beam support locations. The following procedure describes the setting of a double -section hone only.. The procedure required for a triple -section home is similar, except for the blocdng & leveling the 'T- Section" first, prior to that of the "U" Section and "X" section. 5.3.1. Leveling and blocking the U Half. Figure 5.1 shows the way we recommend you level the home. To prevent tipping or settling, use a firm support under jacks. Use a steel channel or plate between jacks and steel beams to distribute the load. Use equipment in good working condition and strong enough to handle the loads. Work safely whenever you are under, in, or around a home that is being set Use the following jacking sequence: 5.3.1.1. Using the water level described in Figure 5.1 or a 6' level, check the level of the floor crosswise in the axle area. if the floor is not level from side to side, place the 10 ton jack under the low side 1- beam at the axle area and carefully raise the 1- beam until the floor is level. Place blocks under the i-beam, on each side, at the pier points closest to the jack Insert wedges, as shown on Figure 5.1, so that the blocks bear the weigh. 5.3.1.2. Place the level lengthwise on the floor, and working towards each end of the home. Place blocks and wedges under both I -beams, at selected pier spacings. Make continuous checks with the level, both lengthwise and crosswise. If you must jack the U-side to keep it level as you work towards the ends, jack it only under the I- beam and only enough to make it Level. ' 5.32. Lev9ling and Blocking the X Half. CAUTION: Do not proceed with the X4-df unfit the U4mV is completely level and properly blocked. After it is, proceed as follows: 5.3.2.1. Remove the plastic used to dose up the open side of each half during transportation, but DO NOT remove the wood supports molding up the calling at the open sides. Park the X-side as closely as possible to the U-stde. At this point, insert a mating gasket between the two halves at the floor line, endwails and roof. We. suggest use of 6' fiberglass insulation or an equivalent sill seaVer. slide ft sideways to the U-half by using two come -a - longs, placing one end on the U-half I-beam and the other end on the X-half 1-beam. Use one come -a -long at the front and one at the rear, or more if necessary at interim locations. 5.3.2.2.. Place a 10 ton jack under the X-half inside (- beam about 113 of the floor length from each end. Carefully jack the X hatf inside 1-beam until the X-half floor edge is about even with the U-half floor edge, as shown in Figure 5.3. &32.3. Loosely tag the X-half floor joists to the U-half floor per Figure 6.10 at Wind Zone i and per Figure 5.13 for Wind Zone 2 and 3. To prevent the splitting of run joist pre -drilling of holes may be required. Do not tighten these lags at this time. 5.3.2.4. Temporarily block the X-half inside I-beam at selected pier spacings, removing the jacks and place them under the X-half outside I-beam about 113 of the floor length from each end. 5.32.5. Carefully jack the X-half outside I-beam until the X-half floor is approximately Level crosswise. Temporarily block the X-half outside I-beam at pier points. The X-half should be very close to the U-half, and the small space (if any) between the floors and ceilings of the X and U halves should be the same. The two sides should now be loosely attached at the floor joists. The U-side is completely level and blocked. The X-side should ,be nearly level because the ceilings and floors were made to match up. You are now ready to level the X-half so that it is even with the U-half, and to permanently block it 5.32.6.- Place a 10 ton jack under each I-beam of the X-half at the axle area Carefully adjust the floor to the X-half until It Is level with the floor of the U-half. Go to the outside I-beam of the X- half and adjust it so that the X-half floor is level crosswise. The X-half floor should now be level crosswise and even with the U-half floor: Set -Up Manual - Page 14 6.3.2.7. Place blocks under the I -beams, on each side of the X-half at the pier points closest to the jacks. Insert wedges, as shown on the drawing, so that the blocks bear the weight 5.3.2.8. Work towards either end, placing blocks and wedges under the i-reams on both skies, at selected pier spacing. `Make continuous checks with the level to be sure that the floor of the X-half is level and even with the U-half. CAUTION: Do not over -jack the X-half or you Will strain the lags attaching the two halves together, make the floor unievel or cause other problem. 5.3.2.9. Both halves should now be blocked and level. Before tightening the lags through the floor joists undemeath the home, check all alignments. Are the front and rear end walls flush? Are the floors and ceilings flush? Space floor lags per Fig. 5.10 at Wind Zone 1 and Fig. 5.13 at Wnd Zones 2 & 3. NOTE: When the two sections are in place, aligned and leveled, gaps between floors or ridge rams, 1 1/2" wide maximum, which DO NOT extend the full length of the home may be closed up with plywood or lumber shims. The lag screws in the shimmed portion may need to be increased in length to . ensure that they engage both the floor rim or roof ridge beam wish the same penetration as area's without gap. Reduce the lag application angle to 30 degrees in gap area for proper penetration (see Detail "A" fig. 5.4). 5:3.5. Shingle Roof Close -Up. (see Figure 5.5) 5.3.6. interior Closure. 5.3.6.1. Carefully remove the ridge beam supports used to brace the ridge beam during shipment Do not damage the ceiling. 5.3.6.2. Interior marriage column support studs at each end of open span area must be 6Oe-nailed together with 16d nails 12" O.C. or #8 x 4" wood screws at 24" O.C. staggered. (see Figure 5.6). 5.3.6.3. Install the center beam furnished with the home. 5.3.6.4. Fit and secure carpet Use your carpet stretcher. Bond carpet seams with your heat bond tape and seaming iron. Put the tape (glue side next to carpet) under the seam and apply heat to the top of the tape, pressing the carpet into the glue. (NOTE: You must stretch the carpet up to the seam and tack it down temporarily until you get the carpet seamed.) 5.3.6.5. Install interior trim moldings, as necessary. 5.3.6.6. Adjust for proper operation all cabinet doors, Interior and exterior doors and sliding or folding doors, as necessary. 5.3.7. Exterior Closure. 5.3.2.11D. Now that each half is properly leveled and blocked, and the floors are securely lagged together, you are ready to move to the ridge beam. 5.4. 5.3.3. Roof Ridge Fastening. See Figure SA 5.3.4. End Wail Fastening. 6.3.4.1. Secure the end wail studs, where the two halves come together, by driving #8 x 4" wood screws every 8" into both sides of the matching and wall studs at Wind Zone 1 (Ref. Figure 5.13 at Wind Zone 2 & 3.) The home should now be level, property blocked and properly and securely fastened together. CAUTION: Once again, use the level and be sure that the floor is properly level throughout the home. Marry problems will result if the floors ale not level or If the home is not properly fastened togetTher. This is your final check for level. Adjust the wedges between the blocks and the i-beams so that the floor is level. 5.3.7.1. The house -type exterior lap siding (if applicable) needed to close-up the ends has been furnished with the home. Starting at the bottom, Install each course of siding, cutting to fit as necessary (see Figure 5.7). Crossover Connections For Multi-Sectlon Homes. 5A.1. Utility Crossovers. Connect water, drainage, gas, electricity, telephone and utility crossovers as outlined in Chaptar 8. 5.4.2. Ductwo* Crossovers. Clamp the ftable airconditioning andfor heating duds to the sleeves projecting through the bottom covering, seal the ducts adjustable collars with several wraps of duct tape, and suspend them above the ground, If sleeves are not installed, out opening for one sleeve and attach to main duct as dose as possible directly under furnace (see Figure 5.6); opposite sleeves) should be attached to the main duct(s) at a point where there are approximately as many registers forward as there are to the rear. Inspect to insure that duct work is not crushed or touching the ground and is as level as possible. Set -UP Manual — Page 15 usERn Horses. INC. PAGE MID-0015 REVISED: G 17JI12000 FIGURE &I - USE OF WATER LEVEL WATER LINE - — CONTAINER Matarial t0 Make Level Five gallon pail vivlth rid Plastic tubing -100 feet x 3W or 117 Cork -1-1W Male barbed fitting - 3W x 3tV Steel washer- 71W Nut - 314" Femate barbed fIltirtg - 31W x 11.r Male valve - lir Pipe sealant... Food coloring - 8 oz. Use RV solvent In cold weather. VALVE FIGURE &2 - WATER LEVEL PLACEMENT wEDGE / PIACEATANY POINT AROUND HOW "How to Use a Water Lever SUPPORT DEvlce used. Take care not to have kink in It. step on it or lay anything on IL.. Check for air bubbles: To remove bubbles,, lower valve below bottom of container and open. Close valve when bubbles are out... FIGURE 5.3 - JOINING OF MULTI -SECTION UNITS APPLYINSULATION — OR SILL SEALER ON THE MATINQ t:P= OF TK FLOOR, ENDWALLS,AND CEO. M NOTE 00 NOT BLOCK HEAT DUCT CROSSOVER WITH MULATIONI Container location: Located so valve can reach all areas of home. Build up container so water One in valve end of tubing is at the predetermined height support devices wig be set.., Leveling: Secure valve above detemdned height and open. Adjust device as needed. Close valve and move to next leveling location... NOTE: Level all support devices before lowering home. CAREFULLY JACK THE X-HALF INSIDE t-BEAM UNTIL THE X-HALF FLOOR EDGE IS ABOUT EVEN WITH THE U-HALF FLOOR EDGE Set -Up Manual - Page 16 FIGURE 5.4 FASTENING AT ROOF MATING LINE DETAIL "A" DETAIL "A" ALT. DETAIL "A" DOUBLE -SECTION MATING LINE TRIPLE -SECTION MATING LINE TRIPLE -SECTION MATING LINE ��u A ISMx(3/8"MIN.) PCS. OF ROOF DECKNG (SHIPPEb LOOSE) jC � aas xs ur DECi�dG Z=CR wmIDztxEP RID[iEBEAtA9 wam VfMZDW3 2M OR -DECKINGa` �r!1tZeOnSl►OtgR4OC RtpG BEAMS WRY 2'AfSE 1 2V GA %VMZ1OKE2 16" aG VfW ZONE 3 Wall TYPICAL IONGPOST. TYPICJIL OEM OR Yx M(S) ryP 04GIRM $UPPORt 7YPICAL ROOF TRUSS SoTtom (3p/O'4' LAGS, OR BRIM rm_ * /Vpi+LY IM BFJW� DETAIL "A" DOUBLE -SECTION MATING LINE (HINGED ROOF APPLICATION) FIGURE 5.5 SHINGLE ROOF CLOSE-UP FA9nW WITH MIMMUM 11 U& GAL.V. FASTENERS ON EACH SIDE AS SHpiIYN, O H07k � R®OECAP9HXMW "OWE DETAIL OW RIDGE CAP SHINGLE LAYOUT /r, DOUBLE --SECTION ALT. #1 STEP 1: - APPLY LAW AS SHOWN (WICONrIN= QN4V. STRAP MATF.lINE, sHiPPED LOOM SPACED PER APPLICABLE WIND ZONE PER DETAIL W. 1/2 THE DISTANCE OF MAY SPACING 7 STEP 4: IN TABLES ABOVE FIELD INSTALLED SHINGLES AT EACH HALF STEP 8: UNDERLAYMENT l OVER 30 GASTRAP / (MIN. 6. OVER LAP EACH SIDE OF MA'T'E LINE)�4,. STEP 2: INSTALL 6'k144'x30ga. (.ol20- MIN.) GALV. CONTINUOUS STRAP FASTEN To RAFTERS AT ENDS OF ROOF AND EVERY 4W. FASTEN WITH 10d NAILS OR 16 GA, x7Mft 24W. STAPLES 6" Q.C. AT EACH SIDE OF SEAM. 'ell 1witnu RMGE CAP OVER {�11 jnftiN%Tp,4 fLb MW OF SUPPLIED} (SEE DETAIL'81 tWDERLAYMENT OVER w cA srw►P STEP 2: (MIN. 0' OVER -LAP EACH SIDE OF PEAK) INSTALL 45 iWM go. (AM MIN.) GLAV. STRAPS, FASTEN TO TRUSSESAT ENDS OF ROOFAND EVERY4A'(DR CDMTINtK us, STRAPLEWM OFHOME). FASt9NVM (4)10d NAE.S OR (4)15"ArWiT STAPLES AT EACH ENDOF EACHSTRAP STEP 1: APPLY LAGS AS SHOWN SPACED PER APPLICABLE WIND ZONE PER DETAIL A. +ro W THE DSTANCE OF MAX SPACM IN TA91E8 ABOVE alovED PRCMTHE RO9f TFiL NAIL 0t2 D WIIH AROOANO CEItENT. 11PT THE IS AND APPLY CEMENT ON THE UNDER- ALT_ #2 SCEP 1: (Wl CONTINUM PLY. APPLY LAGS AS $HOWN MIATELINB, SHIPPED P SPACED PERAPPLICABLE� WIND ZONE PER DETAIL A. STEP 4: FIELD INSTALLED 112 THE DISTANCE OF MAX SPACING SHINGLES AT IN TABLES ABOVE EACH HALF STEP 3: UNDERLAYMENT �\ ' OVER ROOF DECK (MIN.12.OVER LAP AT EACH ROOF DECK JOINT). FASTEN W/ ROOFING NAILS 48" Q.C. NOTE: PLY-CLIPS,- (i) W/ RAFTERS 16: O.C. (2) W/ RAFTERS 24: Q.C. STEP 2: lfi%d-wt(3/8- MIN ) PCS OF ROOF DECKING TRIPLE --SECTION (SHIPPED LOOSE). FASTENING. -tM k1-12" ABATE -LINE A ' ZONE 3. 7 O.C. (A5 GA. STAPLES AT TONE 2 & 3 DBL ' & ROW OF FASTENERS AT DBL. TRUSSES) NOTE:DECKING BUTT JOINTS MUST BE Set -Up Manuel - Page 17 LOCATED AT TRUSSES. FIGURE 5.5 (continued) - SHINGLE ROOF.CLOSE-UP WIND ZONE 1 rfPICALSHING E 4+AS7 5 WIND ZONE TYPMAL ON04M e"FAST'EIRM SHINGLE FASTENING DETAIL I -XI "6 GA U MN) GALV. STAPLES OR OA07 x 1`x 12 GA. (MIN) ROOFING i LS (4 PER SHINGLE, MVQ 1@ WIND ZONE 1 (6 PER SHINGLE) ® WIND ZONE? AND 3 X. to+/ -I* Y ■ I'FROM END OF SHINGLE Z=SaWFROMEDGEOFSH NGLE FASTENERS ARE NOT TO BE ABOVE TARWRIPOR BELOW RAI'i BLOM 1_ INSTALL IM FELT RIDGE CAP OVER PREVIOUSLY INSTALLED 4x10 METAL 8TRAPSAND LAGM 2. ADD TWO ROWS OF SHINGLES AS SHOWN OVER 15# FELT RIDGE CAP. FIGURE 5.6 - TYPICAL FASTENING AT MARRIAGE WALL COLUMNS INTERIOR MARRIAGE WALL COLUMN SUPPORT STUDS (AT EACH END OF OPEN SPAN AREA) TOE NAIL TOGETHER WITH 16d NABS 12.O.C. oR # Sx4• WOOD SCREWS AT O.C. STAGGERED HOME CENTER LIRE FIGURE 5.7 - FIELD APPLIED HORIZONTAL LAP SIDING RIDGE CAP SHINGLES, FASTEN W11-aW ROOFING NAILS -ZONE 1. WH3W COON RESISTANT ANNULAR (SHIPPED LOOSE) RING SHANK NAILS-ZONE2 & 3 RIDGE VENT (SHIPPED LOOSE) SHINGLES PRE -FASTEN RIDGE VENT TO ROOF, LNG WM314" ROOFING NAILS EACH SIDE (SHIPPED LOOS (OPTIONAL) RIDGE VENT INSTALLATION �' J.� INsrau. sIDIN�a N�Ht FOLLowrNG DETAILs ATHROUGH E OR FOLLOW MANUFACTURES RWALLATION INSTRUCTIONS. WINDOW INSTALLED - O WITH J RAIL PORCH LIGHT AROUND HOME INSTALLER TO ALLPLASM CORNER SHEETING USED FOR TRIM, TRANSIT PROTECTION. INSTALLED I MULTI -SECTION HOMES WITH HORIZONTAL. LAP SIDING MAY BE SHIPPED WITIi NO SIDING, ON THE FRONT AND REAR END WALLS. LIBERTY HOMES WILL INSTALL: DOOSLWMDOWS TRIMMED WITH ,I-fL L CORNER TRIM AND COVER WITH PLASTIC SHEETING FOR TRANSIT. ALL SIDW6, STARTER TRIM, FASTENERS AND Vem WILL BE SHIPPED LOOSE IN THE HOME FOR INSTALLATION ON SET UP. DOORINSTALLED WITH J RAIL INSTALLED CORNER TRIM INSTALLED HOME INSTALLER TO COMPLETE INSTALLATION AFTER HOME IS SET UP. THIS WOULD INCLUDE THE INSTALLATION OF ROOF VENTS IF REQUIRED. Set -Up Manuel - Page 18 FIGURE 5.7 (CONTINUED) LAP SIDING INSTALLATION AS MARK TWO sew %OGLE PIECES OF FOR cur :TTER NFORE DETAIL G J-TR9�t WWPPROX) /� yr sally. DIVERTER J-TRIM ALL PURPOSE TR04 DETAIL D DETAIL E FIGURE 6.8 CROSSOVER DUCT INSTALLATION s C1ROSS-0VER DULL ADAPTER LOCATED AS CLOSE As POSS®LE DIRECTLY BELOW FURNACE. VINYL LAP SIDING Apply a T wide strip of dud tape at the marriage joint of the endwalls for the entire height of the walls. Apply the dud tape directly over the sheathing. The sWQ panels should be attached using 7116 x 1 1/2' x 16 gauge galvanized steel or aluminum staples. (6d galvanized nails may also be used.) Staples should be driven so that there Is a 1/32' clearance between the siding and staple cmwn to allow some lateral movement. Fasten every 18' to each stud. See Detail A for proper fastening. Snap the bottom course of siding into the starter strip and fasten to the wall. Leave a 114" space at comer posts and `J' channels around window and door openings to allow for expansion. Do not fasten within 4' of an accessory. Vertical butt joints in panels should overlap 1'. Do not fasten the panel within 4' of the joInL install vinyl, aluminum. felt or other suitable material for flashing at bottom comers of doors and windows per Detail E. Apply caulk around siting and fight blocks, water faucets. -or other small penetrations. Install successive courses similarly to the first. Butt joints in adjacent courses should be offset by at Wst 24 Joints in alternate courses should be aligned vertically (see Detail. B). Panels will have -to be out at headers and sills. A single panel should extend without joints across the width of the opening. When cutting a panel at a sill, measure the distance between the bottom of the opening and the top lock of the lower course, then deduct 1/4' (see Detail C.) Slide the cut panel into the under sill trim and install. Note that the undersill trim piece may. have to be furred to maintain the proper pitch of the siding. Measure and cart the header panel -in the same manner as indicated above. The top sections at the gable will need to be angle cut Use two scrap pieces of siding to make a pattern (see Detail D). Interlock one piece with the siding panel below. Holt the 60W plebe on top against the gable. Mark a line on the bottom piece and cart Use this piece as a pattern for cutting gable per. Instal the gable pieces by interlocking with the lower course, sliding into the gable V rail and fastening. USEADEQUATE DUCT SUPPORTS AT LFASTEVEM 10 FEET TO PREVENT GROUND CONTACT. NK CLEARANCE TO GROUND TO BE 4'L L t�TFLEXIBLE TEp) COZO.SSWER Set -Up Manual - Page 19 DUCTADAPTER 5.5. Tie Down Requirements For Single And Mufti Section Homes. Anchoring instructions. After bang and leveling, the InstalW should secure the home against the wind loads: The type of Installation determines how this should be done, as follows: CAUTION: in order to avoid electrocution and the possibility of damage to underground services, prior to digging for the purpose of securing anchors, make sure that the location of underground electrical cables, gas lines, sewer Ones, and water lines are clearly marked above ground. the thp which accepts a torque wrench. The 5.5.1.1. Number And Location Of Anchors. Select the torque required to turn the probe, when the probe number and location of straps and anchors from the charts des the desired anchor depth is measured mid gu .13-0flIt U§ a The anchor manufacturer provides a chart approved ground anchors capable of resisting at least the relating the measured torque value to the type of rriinimum toads given In the chart must be used. anchor required to provide the desired holding 5.5.1.2. Installation Of Anchors. To down systems are farce. AN INCORRECTLY SELECTED designed using anchors with minimum wonting capacity of ANCHOR WILL NOT PROVIDE THE 3160 lbs. Installation of anchors (angle, stabilizer plates, REQUIRED LOAD RESISTANCE. For example, type of . soiling, ...) should be per anchor's installation assume a torque of 300 inch -pounds was instructions. measured at a probe depth of 4 feet A class 4 When connecting more than one strap to a single anchor, soil is indicated from the anchor manufacturer lining the shaft of each anchor between the two straps is data. The correct anchor would be 'identified and recommended (refer to anchors installation instruction:) rated for a class 4 soil. 5.5.1.3. Tie -Down Instructions: Because high winds can occur anywhere, the home should be "tied down" to the ground in order to withstand sliding and/or overturning. See Figures 5.9 through 6J 3 for anchor and tie down strap = at applicable wind zones. Vertical ties or straps positioned at studs are available as an optional item for additional stability in Wind Zone 1 (standard at Wind Zone 2 and 3). When provided, attach to ground anchors with 3,150# minimum rating, 5.5.1.4. Steps to groper Tie Down. To properly instau = ground anchors and tie -down straps for a home, certain criterias must be established. These crit das are- as follows. 1. Wind zone area where home is to be placed. 2. Main I-beam spacing of the home. 3. Width and length of the home. 4. Distance from top of I-beam to ground. 5. Torque reading of the soil. 6_ Nominal roof pitch of unit (for doublesection.) After determining the above criteria - I. Make sure the distance from the bottom of the floor to ground level Is within allowable range noted on the tables: Note: Allowable heights vary based on the wind zone, width of the home and frames main I-beam spacing. For example, the Table in the Figure 5.11 would allow 42" maximum height from ground for 28' double section in Wind Zone 2 with 75.5' i-beam spacing. 2. Based on your wind zone, space the anchor and straps per Tables in Figure 5.9 through 5.13. Note: Homes with roof pitch higher than 4/12 (roof slope in excess of 20 degrees) may require additional tie downs. See addendum to installation instructions for this option. 3. Determine the correct soil anchors to be used An anchor soil test probe is required to test the soil where the home is to be set. The soil test probe looks like a long drill bit with a fitting at Soil anchors must be installed as directed by the anchor manufacturer. The anchor manufacturer installation instructions should describe the correct anchor placement with regard to direction, .water table level and frost line location. 6.52- Severe Climatic Conditions. 5.5.2.1. Freezing Climates. Be sure anchor augers are installed below the frost line. During period of frost heave, be prepared to adjust tension on the straps to take up slack 5.5.2.2. Severe Wind Zones. Installing your home In any zone that requires greater wind - resisting capabilities than those for which it was designed is not recommended. (See data plate.) 5.5.2.3. Fidod-Prone Areas. Installation of our manufactured homes in Hood prone areas are not recommended. Foundation considerations are discussed in section 4.3.1 and the FEMA document : referenced in Paragraph 4.4.3. Unconventional anchorage and tiedowns often are needed in designing and constructing the special elevated foundations that may be required in flood - prone areas. Consult a registered professional or structural engineer. 5.6. Installation Of On -Site Attached Structures. Design all attached buildings and structures to support all of their own live and dead loads, and to Have fire- separation as required by state a focal ordinances. Set -Up Manual - Page 20 5.6.1. Atfached Garages. Attached garages must be installed according to the manufacturers instructions and . to all applicable local codes. They must be supported independently of the factory -built portion of the home. Electrical quits in garages should be provided with ground faun interruption. 6.6.2. Porches. Site -constructed porches must be constructed and inspected according to applicable local building codes. They must be supported independently of the factory - built portion of the home. 5.6.3. Steps, Stairways and Landings. Steps, stairways and landings must be constructed and Inspected according to applicable local building codes. 5.6.4. Stdtting. Skirting installed around the home must have non -closing vents located at or near each comer and as high as possible to cross-ventlaie the entire space under the home. Open vent area must be equal to at lead one square foot for every 160 square feet of the home's floor area, and this area must be further increased when insect screens, slats, etc: are used over the open vent area. In freezing climates, install skirting so as to accommodate 1-2 inches of frost heave uprdt to prevent buckling of floors. Take care to Insure that rainwater cannot be channeled or trapped between the skirting and siding, and that normal move!%g�,V siding is not restricted. FIGURE 5.9 - TIE DOWN LOCATION REQUIREMENTS SINGLE SECTION WM FIGS 5.10 FOR W1ND Z0M 1 SEE FtOURE 5.11 FORVWND ZONE52 & 3 �1 I FRAMELBEAM , TYPICALANCHOR �1✓ I .?.7 �i.7A C!f?. �t?3 �19.7 NOTE: SHARP CORNER PROTECTION_ PLATE - 2 W STRAP PLATE OOGREATERsAME As ANCHOR R TRIPLE SECTION HOME NUMBERS NEXT TO SEE FIGURE 5.12 ANCHORS INDICATE s> E � �5-1 FOR RIND ZO + 2,-0„ sEe FIGlJRE8 5.11 & 5.t3 FOR WIND zotaE3 2 8 3 FOR TIEDOWN APPLICABLE WIND ZONE 2W MAX REQUIREMENT Q y q q q DOUBLE SECTION. HOME _ L_ _ _ J - _ - - _ SEE FIGURE 510 FOR WINDZONE 1 ! FRAME I BEAM ram, SEE FIGURES 5.11 & 5.13 Fad WM Z�S 2 & 3 — — — MAX. MAX. T PM& MARRIAGE UNE WT ANCHOR M IMPTW Q,a, Qi +ss Q+z, taPgas--�roroprls� eiroar►�s r L- J------�--- i FRAME S-SEAM I f FRAME WEAN - - - TYPICAL MARRIAGE LME SiRAAlANCFIOR ! TYPICAL MARRWC3E LINE WRAPIANCHOR � *— — — — — — — — — — — — — — � l-o* �k� �—-- _--- ------ - -- *r I TYPICAL ANCHOR FRAME MIEAM I I TYPICAL ANCHOR FRAME I-9EAM I NI�MeER[$) rIExT ro ANCHOR "-- NUMBER(by NEXT TO ANCHOR Ih`D1L'ATES APPLICABLE MD ZONE q�iCATE3 APP =5LE WIND ZONE Set -Up Manual - Page 21 FIGURE &10 -FLOOR FASTENING AND TIE DOWN REQUIREMENTS FOR WIND ZONE 1 $TAM sTaAPs 9d'TO41 .4 SINGLE -SECTION WSTALLANCHORSAND .••T, STwwslr-o-(MA)n =,NQ sEsrwrEe-TYPIrJiI At►a€AMF1Att3Fs o Q �?�= try' ✓ HC16CR.00R o • _s'�.:{1+ Y 1A r MABIFBFJW CF MAhI APPRO� w� j�idJ� ' : yV TE COIW t IGF1T �10 Srrorl M : PrgReLoclaNa PIERBLOCKM ;F STRAPS FROM $� • �. 1 �• �•`• adT047• GROUND ? !!! �� 't �lrr�t•�0��`�� ssl� LS � � .c.La3 lJL.. �.� INSTALLPIERS SDTHATLONG SIDE }� ; ISATARIGHTANGLETOTHEMAIN I -BEAM r� ANCHOR ANCHOR FASTEN FLOORS TOGETHER USING WIND ZONE 1 WIND ZONE i OR 3/8 xS" LAG SCREWS, TOED. WB� ZONE 2 WIND ZONE 2 161 aR 16.O,P SPACE LAGS PER * WIND ZDNE 3 Wpm ZONE 3 PRE-DRILFORLAGS u'ac U. AND STAGGER LOCATIONS. N ROOF H9D ROOF 1 r-TAll "A" MULTI -SECTION NO AODInO0 M 9tW ftAT ICE SIEDETAIL W WIDTH u»nL MIN. AND MAX. HEKW FROM GROUND 75-WP BM SP 82-IO BMW 59-1/r SM SP 12 18' TO 28` II TO 2V NIA IV 18'TO35' 18'T033' IWTO27' IV IVTO4r IWT041' 18'TO38' 24• 18"T03r 1S'T02S" NIA 2W 18"TO44' 18'7041' IWTO34' 37 2V TO 54" 24" TO 5r 2W TO 4W 4r IWT040 iWT041' 18 TOW INSTALLANCHORSAND STRAPS 1r4r O/C "%M antsme-TYPICAL ATF WhIFLANGM - STRAPS �.� *� HEtGW q�: ♦ FROM PERBLOCIGN6 i; , f wAp- �' PIER 9LOCIWO PIERBLOCM GROUND S0i`:'l`��-' •�' r. 30•TOH ` • ' � ------------- j FAGTORYtl�lSiALLHU AtEE3THAflS .3 NARRIAGRSPANS MEN G INS IPRCWIDEDDUSTOMARRMS s FtiR CCF11li �AN9—tom WALL NCHOR OEBKit!)t082tEDT01W ANCHOR ANCHCRVffM3 ULMPLRA7M INSTALL PIERS SO THAT LONG SIDE IS ATA RIGMANGLE TO THE MAW 1-BEAM EXCEPTION: PIER BLOCKS TINDER MARRIAW WALL OR SIDEVALL MAY BE TURNED 90 DEGREES SEE FIGURE 4.1 FOR TYPICAL PIER CONSTRUCTION f APPi�V� TGOOMp HElii'I% gtPAP3 FROM GROUND 1. OTHER METHODS APPROVED BY LOCAL BUILDING AUTHORMS MAYBE USER 2. STEEL ANCHORING EQUIPMENT EXPOSED TO THE WEATHER SHALL BE PROTECTED WITH AT LEAST 0.30 OZ OF ZINC PER SQUARE FOOT OF STEEL. 3. ANCHORING EQUIPMENT SHALL BE CAPABLE OF RESISTING AN ALLOWABLE LOAD OF 31509 AND SHOULD BE,CERTIFIED BY A REGISTERED PROFESSIONAL ENGINEER OR ARCHITECTTO RESIST THESE SPECIFIED FORCES IN ACCORDANCE W17H TESTING PROCEDURES IN ASTM STANDARD SPECIFICATION D3599-91, STANDARD SPECIFICATION FOR STRAPPING FLAT STEELAND SEAM. 4. ANCHORS SHOULD BE CERTIFIED FOR THESE CONDITIONS BYA PROFESSIONAL ENGINEER, ARCHITECT OR A NATIONALLY RECOGNI2ED TESTING LABORATORY AS TO THEIR RESISTANCE. BASED ON THE INSTALLED ANGLE OF DIAGONAL TIE ANNOR VEOICAL TIE LOADING AND ANGLE OF ANCHOR INSTALLATION, AND TYPE OF SOIL IN WHICH THE ANCHOR IS TO BE NSTALLED_ i 5. GROUND ANCHORS SHOULD BE INSTALLED TO THEIR FULL DEPTH AND EMBEDDED BELOW THE FROST LINE AND BE AT LEAST 12' ABOVE THE WATER TABLE. 6. TIEDOWNS MUST START NO MORE THAN V-0' FROM EACH END OF UNIT (LE. OPEN END ANCHORAGE). PROTECTION SHALL BE PROVIDED AT SHARP CORNERS WHERE THE ANCHORING SYSTEM REQUIRES EXTERNAL STRAPS OR CABLES. N ALL CASES, NO EXPOSED PART OF ANCHORING SYSTEM SHALL PROTRUDE PAST EDGE OF FLOOR 7. DESIGN BASED ON 75-1/2', 82-1/r, AND 99-1/2- I -BEAM SPACING WITH A MAXIMUM SIDEWALL HEIGHT OF v-0• Set -Up Manual - Page 22 FIGURE 5.11 -TIE DOWN REQUIREMENTS FOR WIND ZONE 2 & 3 AT EXTERIOR WALLS MULTI -SECTION s�amr,>R � AtO �eET = T047 OVVA0=22 22 me+ *W#dDtDMt * ANCHOR To BE RATED 31OWTOTAL FOR BOTH STRAPS - (INSTALL PER MANUFACTURERS INSTALLAT= giSTRUCTIONS) SINGLE -SECTION ST�TA�.EWRtAfrIDlfllNa. AND MAM rrNOM{RU►Elrfirr(FDRm 19-4'QfC@Wl MMZ HEIONraUtTRUCr7HE H9G}R FBEAN!) 4.rCV0@WNDZ0NE3 -- aTFWANOM — 0 TOP ANI1NpMM2 22 TOM eVAwl ? IlE3 W�Ttt MIN. AND MAX. HEK*ff FROM GROUM (SEE ABOVE) 0 WM ZONE ZONE2 ZONE Mllr SM SP WlJr SM SP 7r,-Wr SM SP ' WWr SM SP 12 18' TO aw NIA i8' T041' NIA 14' 21•TO4r 18 T038' 1g'TO68 18T041' IF 26'TOSir 18T041' 2rTO64' 18T048�' 24' 18 TO 3fl NIA 18 FO NIA 28' i8"TO4r 1t3"TOS& WTOW llaryosr 32' 18'70Sr 18704tr IW7061• 18TD4T 4Z 1B'T04r 18To38 i8 mar i877)38 No INSTALLANCHORS ANDS RAP& 5W GC@ WMZONE2 C-w0C@wwDz0NE3 STRAPAPOW 037047 � WIADIOPtE 22 T041 :V4MNDZ�23 INSTALL HLMRICAHE 87RAM C480 CILL a DIAGONAL) PERDETA2'A'ONLYATAf A'8WmmEAHC WRBSrRAP 11STAI IA7101 DMEDTLY W DER SEEN LLL 13 NOT POSSIBLE MlE TO CUT FLOOR AT ENDS PMW ED CORNBts)UR ENTRYATSMEWALL DETAIL W . Notes I. Vetical ties are mWked In addOm 10 *me tledu ms. Frw m ledm me and WWJWM are not provided. 2 Steet androtbt8 equlprnettt eotposed torite weather stud ba ptotesded 7rlh M feast 0 30 OL of 2tncper square foot of ateti. 3.Artchozirg equtpm�gtaRbe ofleals� an eltowablebedef31SWandebonldbecwO%d by a _ @I llmflon SWAnd Sea 4, Andwm MmWd be ce VW f r riroIIe carul6one by a Pmbs9lm f EnIneer, Amhibet, or a faftn* moo{pYead erlgte of � � a�rrd of anchorinsb ftm and type ofsol in %tich the anchor Iatobahwalad 6. Ground etrdwrm ehould be iretfed to flteirful depft wW embedded belmvft tmst Nee. and be al least 12' abm thevAtl3erte6l4. 8 Tkdowrrs moat alert no "me Wan 2'-0" bom each end of MR (L- open and anchmpm 7. Proteclmr steel be pravlded at sharp comets vote The anchafig system requires external straps or L InIolall cases, noa)pmed pert of anchoring system Shan $ Rm n ttmededgeof Q Andwr May be located witt►k, 9. Design based an 75-11Z'to 88.12't beam spacing and a rnm0num sidewel hetgltf of3'-$'. iol Set -Up Manual - Page 23 FIGURE 5.12 - LONGITUDINAL TIEDOWN STRAPS AT FRONT AND REAR OF THEHOME WIND ZONE 1: Only homes at length noted below or less would require longitudinal straps: Single section homes: 52' long or less would require longitudinal snaps. Low straps If ot more than t foot Double section homes: 55' long or less would require longitudinal straps. from efther side of Double section homes with hinged trusses: main 1-beam. / 63' long or less would require longitudinal straps. tl Triple section homes: 58' or less would require longitudinal straps. (lengths noted above are actual size and do not reflect the length of the hitch) Locate straps no more than t toot from either si& of main i beams. . Locate straps no more than t foot from either skie of main 14beams. WIND ZONE 2 AND 3: All homes in wind zones 2 & a would require longitudinal straps. Locate straps no more than i foot Vim from either We i- Locate straps no more than 1 foot from either side of main 1-beams. nYPIC,ALI Triple section lotngRud'inai strap mg. Front or rear of the unit -► Main t bean► Tiedown strap Ground level Ground anch See note 2. Measure height -W distance approximately equaling to 2 x H. Notes: 1) Longitudinal tie -downs are in addition to diagonal tie downs at the sidewolls. Longitudinal straps should be installed at front and rear of all homes at each 1-beam location per above details. 2) Longitudinal anchor must be rated for 3160# (design load) at wind zone 1 & 2 and 3700# (design load) at wind zone 3 (exception: I& single section and 28' double section homes with 7' ceiling height may use 3150# anchor system at wind zone 3 area's). Anchor should be certified for these. conditions by a professional engineer, architect.or a nationally recognized testing laboratory as to their resistance, based ,on the Installed angle and type of soil In which the anchor Is Installed. Sleet anchoring equipment exposed to the weather shall be protected with at least 0.30 oz. of 7jnc per square of steel. 3) Ground anchors must be installed to their full depth and embedded below the frost fine and to be at least 12" above the water table. 4) Care must be taken at sharp edges when tie down straps are connected to framing members. Sharp edges could cause premature failure of the straps. installtion of thick rubber or "U" shape steel between the tie down strap and the frame is one method to protect the sharp edges. Set -Up Manual - Page 24 FIGURE 5.13 -FLOOR FASTENING AND TIE DOWN REQUIREMENTS FOR WIND ZONE 2 & 3 AT MARRIAGE WALLS INSTALLEDAT REQUIRED SPACING FASTEN FLOORS TOOETHEt USING 3AT7b1` LAG St wmm � 3�` LAd SCRENS. TC>!B). SPADE UDS 11P GC (MAX)AT WIHDZOAE 2AND W 0)C (MAXq AT WINDZONE 3 `t PRE -DRILL FOR LAGS N r AND STAGGERLOCATWN& TANGLE (FA HALF) Ja , a L Ir ' 1Y 'f r ANGLEE((EACH SIM WHEN SPECIFIED IS ON OPPOSITE SIDE OF PIER AT COLUMN NOW; POSITIONING; OF ANCHOR& FROM EACH OTHERTO BE PER ANCHOR INSTRUCTIONS. ANGLES @ COUIMN ALT#1 MARRIAGE LINE STRAP DETAIL (SEE NOTE 42) ' STATE OF N♦ ROOF 1 F�7EIGURF NINGA "'�aNfi g11RN`ra,, FAGM ENDWALLS TOGET E RAT MARRME LpNE ,Q USI NGftW SCAEM 8` OAT VAAX)AT WRNDZONE 2, 8.1Q'OfOOWQATWIND ZONE& MAY13ETOEM AXCWM SEE DETAILS BELOW I 3 COLUMN STUD II FACTORY INSTALLED 801TCMd PLATE QOQSX'FIK` I HURRICANE STRAP i - ' �.,—RiIMJDWT SEETABLE4.1 FOR �a TYPICAL PIER ' CONSTRUCTION '>< r URR. STRAP MN£AHALFAT N72tORLOCATIONTRAPS MAY CONNECTDOUBLEHEAM R MARRIAGE LINE STRAP DETAIL OI�YOPIE>TEOT�IN>fH�IB SHOWN FOR CLAIM. NOTES: 1. MARRIAGE WALLANMAMTOBERATEDATSIM#MINIM 6CAPACRY(472WULTN&T4 2. OPTIONAL ANGLES OR 1-1f2'x1-1M11g& (MIN) STEELANGLE WITH TWO (2)� VW DIA HOLES aW MINIMUM FROM EACH END AND r TO r BETWEEN HOLE CENTERS, ANGLE IS LAGGED TO CEMERi.INE JOIST WITH (2) &Vo-lir LAGS. MAXIMUM OPENING AT ZONE 2 FOR 1 SET OF ANGLES ■ 2,11• MAXiMWY! OPENING AT ZONE 3 FOR 1 SET OLANGLES =1r-8` IF OPTIONAL ANGLES ARE USED, ANGLES ARE REMRED AT ALL COLUMN LOCATION. Set -Up Manual - Page 25 &11FOR EDOWNS 1 DETAILS RIIA JC ALT#2 MARRIAGE LINE STRAP DETAIL (BEE NOTE 62) 5.7 - PROTECTION OF WINDOWS & SLIDING GLASS DOORS BY HOME OWNER For homes designed to be located in Wind Zones 2 & 3, the homeowner should install shutters or -_ equivalent covering devices. It is strongly recommended that the home be made ready to be equipped with these devices with the following recommended methods: a) Window clips - Optional aluminum Gips may be provided with certain windows. The clips are designed to hold the protective plywood in place. If your home is equipped with this type of window, instructions for attaching the plywood and the clips will be shipped with your home. For plywood type and attachments, follow the instructions provided to you by the window manufacturer. If clip attachment and plywood specification are not provided, use Table 5.1 below for plywood and the figure shown below for a typical a- application of this type of protective covering. Exterior swing Wall studs Ci Aluminum clips WIN Plywood as per window manufacturer specifications b) Direct plywood attachment - If your home is not equipped with any of the previous types of protective window covering provisions, then the following instructions apply to your home. This type of wind storm protective window and door covering is plywood installed over the window and doors. Plywood is to be bolted to the window frame.witth a 0.19" dia. bolt with 5/8" washer, and a common nut. The bolts are spaced 8" on center along the long sides of the window frame. Holes will have to be predrilled Into,the window frame. Use plywood listed in table below for the application of this type of window covering. For doors, sliding glass doors and windows without flange, remove mounting screws holding the door or window frame to exterior wall. Place the required plywood (from table below) over the door or window framing and fasten the plywood and framing back into the wall studs through the same holes in the door'or window frame. Use #8x3' screws 8" o.c. for windows, and .#8x4" screws W o.c. for sliding glass doors. See Figure 6.14 for a typical application of this type of protective covering. MAXIMUM WINDOW SIZE TABLE SA WIND ZONE 2 WIND ZONE 3 PLYWOOD TYPE REQUIREMENTS 14.5' 31W APA rated ply. 2010 span rating 31W APA rated ply. 20/0 span rating 24.5" 3/8' APA rated ply. 24/0 span rating 1/2"APA rated ply. 32/16 span rating 30.5" 50 APA rated . 32116 span ratan 6/8" APA rated ply. 40MO Van rating 36.5" 5/8' APA rated ply. 40/20 span rating ' 7/8"APA rated ply. 48/24 span rating 40' 7/8' APA rated ply. 4824 span rating 3/4' APA rated ply. 48/24 span rat' 46.5" 3/8' APA rated ply. w/wood framing 3/8" APA rated ply. wlwood framing * 72' 3/8" APA rated ply. w/wood"framin 3/8" APA rated ply. w/wood framin * * See Figure 5.14 for wood framing construction Set -Up Manual - Page 26 FIGURE 5.14 - PROTECTION OF WINDOWS AND SLIDING DOORS BY HOME OWNER XIn withw washer and t tr o t. "audmurn) vkw :(MWft &m) at Wind Zone ar bahveen bon head and TabIG window f►arne ' sa Plywood fmmTabte 5.1 i x lumber (any gfatle SM on#ml ' 1X LUMBER -,PLY DOOR SIZE SEE TABLE 6.1 0SXXWO SCREWS O.C. Notes: 2 x 2 ANY GRADE, FASTEN TO a x 4'S W12-Od NABS R EACH KNMRSE=ON 2 x 4 172 SPF 16 O.C. LAID FIAT (REQUIRED FOR 45.5 OR LARGER VMDOWS) A8 x 3Ire WOOD SCREWS C WO.C. MTO RECEMM MEMBER SSE NOTES BELOW DOORFRAME WALL STUDS 1 48xTWOODSCREw3 ® l KNOB FRAMSW_,/ l 1 BOX OUT FOR ANY PROTRUSIONS ON DOOR SECTION AA 1) 30 plywood APA rated exterior sheathing with 2010 span rating 2) Locate plywood seam over-2 x 4 member 3) Fasten plywood to 2 x framing members with futi PVA white glue and lid nab or #8 x Y screws @ ti o.e. all around Set -Up Manual - Page 27 d 6. Chapter 6 - Installation of Optional Features 6.1. Awnings And Carports. Choose free standing products with columns to support their weight 6.2. Accessory Windows. Install accessory windows or components with the Installation materials supplied, and f &w the manufacturer's installation instructions. 6.3.3. Whole House Ventilation. Your house is equipped with one of the following to Introduce outdoor air to interior environment A) Fresh air through furnace. (Phitips-Ventline) How kworks: When the fuma( air circulator is ON, a negative 6.3. Miscellaneous Lights And Fixtures. pressure (suction) is created in the furnace plenum. This suction draws in fresh air which Is mixed with the NOTE Ciicuits must be turned off to eliminate the reium air from the room, and distributed through the risk of shock home duct system. The fresh air supply to your home may be energized at any tiros by switching the sofn --d—or lights, eeifing fans and chain hung =w (or trot if so equipped) fixtures may not yet be installed when the home is to ventilation. delivered. Ali of these failures must be grounded by a fixture -grounding screw or wire. For chain- B) Fresh air by an exhaust fan. hung fixtures, use both methods. When fixtures How itwarks: are mounted on combustible surfaces such as Inside air is exhausted outside by a mechanical fan hardboard, install a non-combustible ring to allowing fresh air in through the louvered grill installed completely cover the combustible surface exposed in exterior wall. Exhaust fan is operated by a manual between the fixture canopy and the wiring outlet switch box. if siding has not been installed at a fixture kmtlon, remove the outlet box and install the siding with a hole for the outlet box- Then reinstall the outlet box and proceed as for other fixtures. 6.3.1 6.3.2. Exterior Lights. Remove the junction box covers and make wire -to -wire 'connections using wire nuts. Connect wires black to black, white to white and ground to ground. Caulk around the base of the light fixture to ensure water tight seal to the sidewall. Push the wires into the box and secure the light fixture to the junction box. Install the fight bulb and attach to the globe. Refer to Figure 6.1(a). Ceiling Fans. Follow manufacturer's installation instructions. To reduce the risk of injury, install ceiling fans with the trailing edges of the blades at least 6!,C above the floor (see manufacturers Instructions). If no instructions are available, connect the wiring as shown in Figure 6.1(b) (max 35# ceiling fan). FIGURE 6.1- INSTALLATION OF EXTERIOR LIGHTS coed tearer u Coded tetbes- V*8ran --- - (iI req-i-o) 6.4. Telephone And Cable TV. CARELESS INSTALLATION OF THE TELEPHONE AND CABLE TELEVISION LIMES MAX BE HAZARDOUS. The watts and floors of your manufactured home contain electrical circuits, plumbing and duct work Avoid contact with these home systems when drilling through and placing cables within these cavities. Only trained professionals should handle such work FAILURE TO FOLLOW THESE- INSTRUCTIONS MAY RESULT IN SERIOUS PERSONAL INJURY OR DEATH. Figure 6.2 shows one procedure for telephone crossover connections in multi-secdon homes. FIGURE 6.2 - TELEPHONE WIRING FOR MULTI - SECTION HOMES Box Grotmd Me a) Exterior Light Fixture b) Chain hung fixture or cer7ing fan (M max.) 4 Cont. 24 G& Phone rabble Set -Up Manual - Page 28 Red UR 13ootdl Lode CMnador (iYP) Notes 1. Comwd blue to bko. red to red, yellow b bellow, and green to Tam 2, Do tot strip the btdnr wwW"& 3, inewt the 3eme color wires ldo the eam tar, then U*Q sham -el lock pbem lieu the rand portion to make me arte#on. 7. Chapter 7 - Preparation of Appliances 7.1. Clothes Dryer Vent. Your clothes dryer must exhaust to the exterior -of the home, or of _any perimeter skirting installed around it, through a moisture -lint exhaust system,' as shown in Figure 7.1 IMPORTANT: Do NOT LET THE EXHAUST SYSTEM END UNDER THE HOME WHERE EXCESS MOISTURE OR FLAMMABLE MATERIAL CAN ACCUMULATE Install a fleas duct after the home Is set up at the site. The access for the dryer vent is located under the home in the bottom board at the dryer location (bottom board is taped and marked with paint or colored tape for access): hold the duct in place with metal straps spaced 2' on center secured to the bottom of the floor joists or frame. Vent openings are located in either,the wall or the floor. After the duct is Installed, seal the openings, both inside and outside. Follow the dryer manufacturer's instructions ,for installing the exhaust system. If your home did NOT come equipped for a gas dryer, remember that installing one requires substantial alteration to the home. You must provide gas supply piping and adequate venting as specified by the gas dryer manufacturer. Onty a trained and experienced person should install a gas dryer. Cutting major structural elements (such as ratters or floor joist) to allow for gas dryer installation is not permissible. Home manufacturer is not responsible for any weakening of the home's structural soundness resulting from dryer installation, NOTE; Some dryer manufacturers require that metallic duct be connected to the dryer and vented through floor and or sidewall, 7.2. Comfort Cooling Systems. Only qualified personnel may Install any comfort cooling system not provided with the home. Follow the manufacturer's installation instructions and conform to all local codes. 7.2.1 _ Air Conditioners. The air distribution system of this home has been designed for a central air conditioning system. Equipment you install must not exceed the rating shown on the home's compliance certificate. The home's electrical distribution panel may contain optionai factory installed circuits (Figure 7.2) for air conditioning. The maximum full load amperes draw for the desire! air conditioning unit must not exceed the circuit rating shown. . On the other hand, .electrical circuits within the home may NOT have been sized for additional food or non -factory -installed air conditioning, and a separate outside electrical supply may have to be provided. Any field -installed wiring beyond the junction box must include a fused disconnect located within sight of the condensing unit_ The maximum fuse size is marked on the condenser data plate. Local codes will determine the acceptability of the air conditioning equipment, rating, location of disconnect means, fuse type branch circuit protaOon, and connections to the equipment WWI air conditioning units must be compatible and listed for use with the furnaces In the home. Follow . the air conditioner m anufadurer's instructions. If a remote (seil-contained, packaged) air' oonditioner (cooliing coif and bkMer located outside the home, Figure 7.3) is to be connected to the heating supply duct, install an automatic damper between the furnace and the home's air duct system, and another between the remote unit and the home's air duct system. Secure the duct system leading from the remote unit to the home and do not allow It to touch the ground. Insulate ducts with. material of thermal resistance (R) no less than 4, and a perm rating of not more than 1 perm. Conned the duct carrying air to the home to the main dud at a point where there are approximately as many registers forward of the connection as there are to the rear. Locate the return air dud in the center of the home. Do not cut or damage floor joists. Retum air and supply ducts are sized to fit between floor joists. Replace insulation removed during the irisWilatlon, and seal the bottom board around the duct connection. Set -Up Manual- Page 29 , Direct ail -condensation runoff away from the home by connecting a hose to the equipment runoff outlet or other means specified by the equipment manufacturer. 7.2-2. Heat Pumps. install heat pumps according to the heat pump manufacturer's installation. 7.2.3. Evaporative Coolers. Install a roof -mounted 7.3.3. Assembly And Seating Sequence. Assemble and seal your fireplace chimney in accordance with the fireplace manufacturer's instructions supplied .with the hone. Avoid cutting any roof trusses or floor joists when Installing chimney pipes or combustion air intakes. Carefully seal all roof penetrations to avoid leakage. Periodic inspections and resealing of all roof penetrations are required. cooler following the manufacturer's Instructions. 7.3.4. Combustion Air Duct Inlets. Combustion 7.3. Fireplace Chimneys And Air- - inlets. air intake duds end just below the bottom covering of Fireplaces require on -site installation of additional the floor. You must extend them to the outside when section(s) of approved, listed chimney pipe, a spark your home has a basement or crawispace. These arrestai and a rain cap assembly. See Rog-ure added ducts are not , pliedbutinay be purchased 7.3.1. itsfnimum Extensions Above Roof To at your local hardware , store. The fireplace assure sufficient draft for proper operation, extend the manufacturers insiructiore for installing combustion air ducts are in the finished chimney at least 3' above the highest point fireplace or with the chimney parts. Do not allow the combustion air inlet to drop material where it penetrates the roof and at least 2' higher than from the hearth beneath the home any Wilding or other obstruction located Within. a ;,.:� Locate its inlet horizontal distance of 10'. If the site has obstructions damper above expelled snow level, as shown in extending higher than the homes peak within 10' of Figure 7.4. the chimney, the installer may have to provide an 7.4. Range, Cook Tap And Oven Venting. If additional section of chimney pipe if required by local your home is equipped with a combination (cooktop) codes. range/grill or oven that contains its own exhaust 7.3.2. Required Components. The required components of a correctiy4nstalled chimney are as shown in Figure 7.4. FIGURE 7.1- DRYER. EXHAUST -SYSTEM r n,y, *9pmdhsW CAUTION. INSTALLATION OF THE EXHAUST SYSTEM MUST BE IN ACCORDANCE WITH THE DRYER MANUFACTURER'S INSTRUCTIONS. system, route the exhaust so that It does not exhaust under the -home. Connect flexible metallic duct between the elbow► protruding from the floor and the termination fifting, and support it according to the manufacturer's installation instructions. Set -Up Manual - Page 30 Mele aWmdamm CAUTION: THIS EXHAUST SYSTEM P1uST NOT TERMINATE )NDER THE HOME. wen ixhw,*t rood or sgWva*d wRh dereper FIGURE 7.2 - OPTIONAL FACTORY -INSTALLED AIR CONDITIONING CIRCUITS NOTE: REFER TO N.E.C. AND AIR CONDITIOMS INSTRUCTIONS FOR NSTALLATION REQUIRMENTS- PANELBOARDN NOW. Electrical connections made to energize air-conditioning equipment should . be made only by quardW personnel- The Completed installation must conforin to Article 440 of the National Electric Code and applicable local codes. When the electrical connection is made at the junction box, the field installation wiring beyond the junctioh box must incorporate a disconnect (sized in accordance with NEC Article 440) located within sight of the condensing unit. The acceptability of ail aw conditioning equipment and its installation are to be determined by the local Inspection authorities. FIGURE 7.3 - TYPICAL INSTALLATION OF SELF-CONTAINED OR AIR CONDITIONING EQUIPMENT REMOTE AIR CONDITIONING OR HEATING EQUIPMENT DUCT FLEXIBLE DUCT $HALL NOT m o AIR BE N CONTACTW HTHE CONDMONING GROUND OR HEATING EQUIPMENT SINGLE SECTION USEADEQUATE DUCT SUPPORTAT LEAST EVERY 10'70 PREVENT GROUNDCONTACT. MNMRN CLEARANCE TO GROUND TO BE C. DUCT AIR CONDITIONING DUCT OR I HEATING EQUWWN FLEXIBLE DUCT SHALL NOl BE N CONTACT WITH THE GROUND UMTiSECTION Set -Up Manual - Page 31 FIGURE 7A - FIREPLACE CHIMNEY AND AIR INTAKE INSTALLATION CLOSED ROUND-TOPASSEM&Y tRESTOR CAPADAPTER FLASHING FIRESTOP THWLE HANDLE IIIIIIIIItllklklit.. OPEN Illitlllkl t[Ikllilit AIR 041.ET DAMPER HANDLE PUSH DOWN TRM WRH SHEET -METAL SHEARS IF fT IS DWFIMXTTO STORM COLLAR MAKE FLASHING LAY FLAT ON ROOF CAULIONG FLASHING ABOVE SNOW LEVEL OVER BASEMENT OR CRAWL SPACE INSTALLATION Set -Up Manual - Page 32 8. Chapter 8 - Utility System Connection and Testing 8.1. Proper Procedures. Consult local, county or state authorities before connecting .any utilities. Only qualified service personnel, famillar with local codes and licensed where required, should make utility Connections and conduct tests. . 8.2. Water supply. 8.2.1. Maximum Supply Pressure and Reduction. The water system of your home were designed for a maximum inlet pressure of 80 psi. If you are located In a water district: where the local water supply pressure exceeds 80 psi, install a pressure - reducing valve. $.2.2. Connection Procedures. 8.2.2.1. To Supply Wins. Connect the home's water system to the water source through the inlet located under the house, usually below- the water heater Compartrrient A tag on the side of the home marks its location. The connection is via a single 3M inch Inlet beneath the home. A master shut-off full flow valve must be installed in the water supply fine adjacent to the home; this valve should be a full port gaffe or ball valve with threaded or solder joints. After removing the aerators from all the faucets, open all the faucet valves and allow the water to run for 15 minutes. This should remove any foreign particles left in the line that might cause an unpleasant taste or become lodged at faucet washers and cause dripping faucets. 8.2.2.2. Remove the shipping caps from the crossover water line connectors, provdded with the home, and install as shown (see Figure 8.2). 8.2.3. Freezing Protection. 8.2.3.1. Necessity. In areas subject to subfreezing temperatures, protect exposed sections of water supply piping, shut-off valves and pressure reducers, and pipes in water heater compartments with urfmsudated. doors, from freezing. Otherwise, burst pipes and costly damage may result 8.2.3.2. Use Of Heat Tapes. Heat tapes (either automatic or non autornatic) can protect exposed plumbing from freezing. USE ONLY HEAT TAPES LISTED BY A NATIONALLY RECOGNIZED TESTING LABORATORY FOR USE WITH MANUFACTURED HOMES, AND INSTALL THEM ONLY IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTION. Plug the 3- wire, grounded cordset of the heat- tape into the outlet under the home near the water supply (Figure 8.1). FIGURE 8.1 TYPICAL WATER CONNECTION WARNING! HEAT TAPE RECEPTICAL IS NOT GFCi PROTECTED DO NOT USE THIS OUTLET FOR ANY CONNECTION EXCEPT THE HEAT TAPE WASTER SHUT-W VALVE " WRAP WITH HEAT TAPE �- IF NECESSARY FOR LOCAL FREMM CONDITIONS. INSTALL HEAT TAPE IN �. ACCORDANCEWRH MANUFACTURER'S INSTALLATION TO HEAT TAPE R;STRUCTKM. HEAT RECEFrACLE TAPE IS TO BE LISTED OR APPROVED FOR MANUFACTURED HOME USE FIGURE 8.2 TYPICAL WATER LINE CROSSOVER HOLES IN SIDE RAILS FLOOR INSULATION INSPECTION COVERS ALLOW CONNECTION TO BE MADE AND INSULATED AFTER THE TWO HALVES ARE SET UP AND BLOCI(ED CAUTION: If freezing conditions exist: wrap water connector with insulation. Use water connectors supplied by manufacturer, where appioo". 8.2.3.3. Freezing Protection for Unoccupied Homes. If the home is to be left unheated in cold weather, drain the water lines and blow them dear with compressed air to prevent damage from freezing. 8.2A. Testing Procedures. Even though the water system was tested at the factory, it' must be rechecked for leaks at the Installation site. Close all water faucets, spigots and stool tank float valves, and use the following procedure: 8.2A.1. Hydrostatic. Be sure the water heater tank is full of water. Pressurize the system with water at 100 psi, and then Isolate it from the pressure source. The system must hold this pressure for at least 15 minutes without any loss. if the pressure fails off, re -pressurize the system and locate and correct leaks. Set Up Manual - Page 33 8.2.5. Anti -Siphon Frost -Proof Sill Cock (Faucet) - 8.3.3. Crossovers. Connect multi -section home All! Materials Provided drain line crossovers as shown in Figure 8.6. 82.5.1. Locate area on home for installation of faucet. 8.3.4. Solvent Welding Procedures. The solvent 8.2.5.2. Remove access panel, cover, etc. underside of cement used to connect drain Ones must be home at this location. compatible with the pipe installed in the home. Follow the manufacturer's instructions on the 8.2.5.3. Place putty tape material to back side of faucet container. (between mounting flange of faucet and home). 8.3.& Protection From Freezing. Fittings in the 8.2.5.4. Position siding wedge between faucet and side of drainage system subject to freezing, such as home. P-traps in the floor have been insulated. 82.5.5. Insert shaft of faucet through hole provided in side Replace this insulation if removed during ' of home from outside. assembly or testing. Insulate drain fines 8.2.5.6. Position faucet so the outside spout is pointing installed below the bottom board in areas down and in a slightly dowrivaird angle to ftoutside subject to freezing as shown in Figure 8.7. If (so it will drain properly). a me un ea a in co ld weather, pour an approved antifreeze into P- 8.2.5.7. Secure faucet to side of home with two (2) #8 or traps at all fixtures and stools. #10 wood screws (provided). Make sure that puffy Pape is between faucet mounting flange and 8.3.6. Flood Level Test Procedure. You muss side of home to provide weatherproof installation a conduct a Rood level test on the completed . drainage system before connecting it to the 8.2.5.8. Remove plug from end of factory installed tubing. site sewer. With the home in a level position, 8.2.5.9. Thread on end of factory installed tubing to end of all factures connected, and all tub and shower faucet tightly. y drains plugged, connect the drainage piping 8.2.5.10.Pressurize water tubing system with air to 100 system to the site -water inlet and fill the PSI and hold for 15 minutes. Check field installed system with water to the rim of the toilet bowl connection at exterior faucet. through a higher fixture. Release all trapped air. Allow the system to stand at least 15 8.2.5.11.Remave 100 PSI air from system and flit with on- minutes. Check for leaks. Drain the system. = site water and again check field installed Plug all fixtures, sinks, showers and tubs and connection for water leak fill with water. Release the water in each Replace access- panel, cover, etc. making sure fixture simultaneously to obtain the maximum the insulation is positioned between faucet/tubing possible flow in drain piping. Check all P-traps and access panel cover.. and the drain system for possible leaks. 8.3. Drainage System. Repair any leaks and retest. 8.3.1. Assembly And Support. If portions of the 8.4. Gas Supply. drainage system were not installed at the factory, 8.4.1. Type Of Gas System Furnished With Home. all materials and diagrams required to complete it All gas appliances in this. horse, including the have been shipped as loose items in the home. heating system, are equipped for rraturai gas. Assemble the drainage system following these If tP gas is to be used as the gas supply specific instructions and diagrams. Start at the instead, a qualified service person must most remote end and work toward the outlet, convert the appliances to LP gas following the supporting the piping with temporary blocking to instruction provided by each appliance achieve the proper slope (see Paragraph 8.3.2). manufacturer. When the entire system has been completed, 8.42. Proper Supply Pressure. THE GAS PiPiNG install permanent drain line supports at 4' on SYSTEM iN YOUR HOME HAS BEEN center, as shown in Figure 8.3. DESIGNED FOR A PRESSURE NOT TO 8.3.2. Proper Slopes And Connector Sizes, Drain EXCEED 14" OF WATER COLUMN (8 OZ. lines must slope at least 1/4" fall per foot of run OR 1/2 PSI). IF GAS FROM ANY SUPPLY unless otherwise noted on the schematic diagram SOURCE EXCEEDS, OR MAY EXCEED (see Figure 8.4). THIS PRESSURE, YOU MUST INSTALL A Exception: 1/8" fall per foot is allowed when a PRESSURE REDUCING VALVE. To operate deanout is installed at the upper end of the run. gas appliances safely and effidently, do not Connect the main drain line to the site sewer exceed the design pressure limitations. For hookup using an approved elastomer coupler natural gas systems, the incoming gas (Figure 8.5). pressure should remain between 6" and 8" of Set Up Manual - Page 34 Water column. For LP gas systems, the pressure should lie between 12" and 14" of water column. 8A.3. OrMcing For Specific Gases. SPECIAL ORIFICES AND REGULATORS ARE REQUIRED FOR EACH KIND OF GAS AND AT ALTITUDES ABOVE 2,000 FEET. SEE THE INSTRUCTIONS ACCOMPANYING EACH GAS -BURNING APPLIANCE FOR MODIFICATION INSTRUCTIONS. BEFORE MAKING ANY CONNECTIONS TO THE SiTE SUPPLY, CHECK THE INLET ORIFICES . OF ALL GAS APPLIANCES TO ENSURE THEY ARE CORRECTLY SET UP FOR THE TYPE OF GAS TO BE SUPPLIED. 8AA Crossovers. Install the gas line crossover in multi -section homes as shown in Figure 8.8 before performing any system tests or connecting the system to the gas supply. All crossovers and fittings must be listed for manufactured housing exterior use and be properly sized. Do not use tools to connect or remove the flexible connector quick disconnect Flex connector with shut off valve when used must be listed for outside use. Shut off valve (nondisplaceable rotor type) must conform to ANSI Z21.15 -1992. 8A.5. Testing Prior To Connection'To Mains. Even though the gas system was tested at the factory, it is essential that it be rechecked for leaks at the site. _ DO NOT APPLY PRESSURE IN EXCESS OF THOSE SPECIFIED BELOW OR YOU MAY DAMAGE GAS VALVES ANDIOR PRESSURE REGULATORS. Conduct the following test prior to any gas line connection to main supply hook- up.. 8.4.5.1.Test Of Gas Appliance Connections. Close all gas equipment controls and pilot light valves according to the individual gas equipment manufacturer's inst actions. Assure that gas shut- off valves. for all gas equipment are in the OPEN position. Attach a pressure gauge calibrated in ounces: at the home gas Inlet Pressurize the system with air to at least 6 oz. and no more than 8 oz. Check all gas shut-off valves and flex line connections to valves and appliances for leaks, using soapy water or bubble solution. DO NOT BUBBLE CHECK BRASS FITTINGS WITH SOLUTIONS CONTAINING AMMONIA. Repair any leaks found and retest Close all equipment shut-off valves upon completion. of testing. 8.4.6. Connection Procedures, Inspect gas appliance vents to ensure they have been connected to the appliance and make sure that roof jacks are installed and have not come loose during transit Have the gas system connected to the gas supply only by an authorized representative of the gas company. 8.4.7. Gas Appliance Start up Procedures. One at a time, open each equipment shut-off .valve. Light pilots and adjust burners according to each appliance manufacturer's instructions. MAKE SURE THE WATER HEATER IS FILLED WITH WATER BEFORE LIGHTING iTS PILOT. Check the operation of the furnace and wager heater thermostats .and set them to the desired ratureS. 8.5. Heating ON Systems. Homes equipped with oil burning furnaces must have their oti supply tankage and piping installed on site. These items are not supplied with your home. Consult the oil furnace manufacturer's instructions for proper pipe sizing and installation procedures. ALL OIL STORAGE TANK AND PIPING INSTALLATIONS MUST MEET ALL APPLICABLE LOCAL REGULATIONS AND SHOULD BE MADE ONLY BY EXPERIENCED QUALIFIED PERSONNEL. 8.6. Electricity. A large enough power supply must be available at the .site. An inadequate power supply may result in improper operation of, and possible damage to, motors and appliances. It may also increase your electricity. costs. The current rating in amperes of your home can- be found on the tag located outside next_ to the feeder or service entrance and also on the elecrical .diistribution panel. 8.6.1. Description And Rating Of Housing Wiring. Your home is designed for connection to an electrical wiring system rated at 120/240 volt AC. PROPER AND SAFE CONNECTION DEPENDS ON THE TYPE OF SUPPLY SYSTEM YOUR HOME 1S EQUIPPED WITH. The connection to this home requires feeder wiring at the site. The following paragraphs describe the wiring and grounding of electrical feeders; if your home is equipped with a service meter base, skip directly to Section 8.6.3A. 8.6.1.1.Proper Feeder Wiring And Junction Box Material And Size. The main breaker and the label on the electrical distribution panel give the feeder current capacity and amperes. Using this information, determine the required feeder size from the tables at Figures 8.9 and 8.10. These sizes are based on an ambient temperature of 86°F and do not take voltage drop into consideration. 8.6.1.2.Overhead Feeders. Homes equipped with overhead (mast weatherhead) feeder entrances contain all necessary conduit to the electrical distribution panel. However, you must install feeder conductors (not provided) on site. Refer to Figure 8.9. Set -Up Manual — Page 35 8.6.1.3. Underside Feeders. Homes with an under-ttwiloor entrance come with a permanently -attached conduit raceway that runs from the electrical distribution panel to a point under the floor. install an approved conduit panel to a point under the floor. Install an approved conduit fitting or junction box at the termination point. Refer to Figure 8.10. 8.62 Grounding Of Homes With Feeder Connections. 8.62.1. Necessity. The home must be grounded properly to protect the occupants. The only safe and approved method to ground your feeder -connected home is 8.6.3.1. A Feeder Cord. Your home may be. equipped with a permanently -connected 50 amp feeder cord stored in a compartment under the fkor. If so, it is ready to be plugged into a 5 amp, 3-pole, 4-wire, 1201240 volt grounding service receptacle after electrical tests have been completed (see 8.6.6). WARNING: MANY HOMES ARE EQUIPPED FOR 100 AMP OR GREATER SERVICE. UNLESS YOUR HOME IS EQUIPPED FOR ANY 50 AMP SERVICE, DO NOT ATTEMPT TO USE A FEEDER CORD OR 'PIGTAIL` CONNECTION. - through the grounding bar in the electrical distribution 8.6.3.2. Mast Weat herihead Feeder. The routing, panel. This bar grounds all noncurrent -carrying metal connection and support of the service drop must parts of the electrical system at a single point meet local codes. Homes equipped this way contain as necessary conduit to the eiec tical Procedure. The ground conductor of the power sappy- distribution panel. However, feeder conductors feeder cable connects the grounding bar to a good (not provided) must be installed on site in electrical ground. Follow the feeder connection accordance with Figure 8.9.. If the masthead is procedures descrr�ed in 8.6 3.1, - 8.6.32, w-8.6.3.3 to located above, the roof overhang, allow a achieve proper grounding. minimum 8' clearance above all roof points the Insulate the grounded circuit conductor (neutral or white wire) from the grounding conductors (green wires) and from equipment enclosures and other grounded parts. Insulate neutral circuit terminals in the distribution panel board — and in ranges, clothes dryers, and counter - mounted cooidng units — from the equipment enclosure. Bonding screws, straps or buses in the distribution panel board or in appliances should have been removed and discarded at the manufacturing facility. (Bonding screws, straps, etc. in appliances must be removed on appliances to be installed by persons other than the manufacturer.) You may provide the required continuity of ground between sections of multi -section homes by bolting outriggers together. When the outriggers or other overlapping metal joints of adjoining units are not bolted together on houses with shingle roofs and non- metallic siding, install a ground wire connection between the chassis. This bonding connection is commonly made with a #8 AWG bare copper wire or other approved positive connection between parts (Figure 8.11), using approved grounding lugs with bolts, star washers and nuts, or self4apping screws that are shipped with the home. 8.6.2.3; Unacceptable Methods .Of Grounding Homes. Grounding to a rod, a water pipe, or through the home's hitch ester will not satisfy the important grounding requirement NEVER USE THE NEUTRAL CONDUCTOR OF THE FEEDER CABLE AS A GROUND WIRE. DO NOT GROUND THE NEUTRAL BAR iN THE ELECTRICAL DISTRIBUTION PANEL. 8.6.3. Connection Methods. Connections should be made only by a qualified electrician. Connect homes equipped for 100 amp or greater service by one of the three following methods, conductors pass over. There are two exceptrons to this rule_ 1) The vertical clearance may be reduced to 3' if the roof has a minimum slope of 4 in 12; and 2) The vertical clearance may be reduced to 18" if no more than 4' of service -drop conductors pass above the roof overhang, and if they terminate at a through -the -roof raceway or approved support. A minimum clearance must also be provided from the final grade to the service -drop conductors. This measurement may vary from VY to 19 depending on the types. of traffic anticipated below the service drop (refer to the National Electric Code). Unless impractical, locate service heads above the point of attachment of the service -drop conductors and make them rain -light If individual conductors do not extend downward, form drip loops. 8.6.3.3. Underside Junction Box Feeder. A raceway from the main panel board to the underside of the home allows for installing an approved junction box or fitting, which must be used to connect it to the supply raceway (see Figures 8.10 and 8.12). Install property -sized conductors from the main power supply to the panel board. Refer to Figure 8.10 for conductors and junction box requirements. The homeowner or installer must provide the supply connection including the feeder conductors, junction box and raceway connectors. Protect conductors emerging from the ground from a minimum 1W below grade to 8' above grade, or to the point of entrance to the home. The distance measured from the top surface of a buried cable, conduit or raceway to the finished grade must meet minimum burial requirements outlined in the National Electric Code. Use a moisture -proof bushing at the end of the conduit from which the buried cable emerges. Set- Up Manual - Page 36 8.6.3A. Service Equipment L%Wr Base. Either an overhead or underground entrance may be provided. The exterior 'equipment and enclosure must be weatherproof, and conductors must be suitable for use in wet locations. When a meter is provided on the home, connect the neutral (white) conductor to the'system grounding (green) conductor on the supply side of the main disconnect. Refer to Figure 8.13 for typical meter base installation and on method of grounding the service equipment The homeowner must provide the grounding electrode conductor(s). The grounding electrode shag be an 8' length of 12" diameter copper rod or WC galvanized steel pipe. Drive it into the ground at feast 12" below the surface and 2' from the foundation, or bury it horizontally in a 2 11Z deep trench. Connect the grounding conductor wire to the grounding electrode with a grounding clamp. For added protection, homes with metal frames or siding should be connected to earth by means of an additional bonding wire to underground metallic water pipes, ground rings, additional ground rods, eta to prevent buildup of hazardous voltages. 8.6.4. Crossover Connections. Refer to Figure 8.14 for typal crossover wiring connections, for multi -section homes (located along the centerline between sections). Crossover locations can be distinguished by metal junction boxes or access cover panels. Remove these panels and connect the enclosed wires as illustrated., Some crossover connectors plug together and do not require junction boxes. 8.6.5. System Test Procedures And Equipment. 8.6.6.1. Pre -Connection Tests. Conduct both of.the following tests before any electrical power is suppried to the horse. 8.6.5.1.1. Circuit Conductor Continuity. Conduct a continuity test by placing all branch circuit breakers and switches controlling individual outlets in the "on" position. The test should give no evidence of a connection between any of the supply conductors (including the neutran and the grounding circuit. You may use a flashlight continuity tester. 8.6.5.1.2. Grounding Continuity. Using a continuity tester, test all noncurrent -carrying metal parts to assure continuity to ground. The parts to be checked include. appliance enclosures, including fans; fixture enclosures' and canopies; metal siding and roofs; metal wager Supply and gas lines, metal ducts (except foil - covered insulated ducts); and the home's frame. On multi -section units, perform this test only after completing aD electrical and bonding connections between the units. NOTE: Grounding is not required on the metal inlet of a plastic water system or on Plumbing fixtures such as tubs, faucets. shower risers and cal sinks when they are connected oniv to plastic water and drain Piping. 8.6.6.2. Post -Connection Testa. Conduct the following three tests after turning on the main circuit breaker and each 1ndWual circuit breaker. CAUTION: Allow the water heater to fill completely before activating the water heater circuit Failure to do so will use the wafer header element to bum an event not covered by the warranty. 8.6.52.1. Polarity And Grounding Of Receptacles. With receptacle and lighting circuits energized, check the polarity and grounding of each 120-volt receptacle and light socket using a polarity tester capable of determining an incorrect wiring configuration. A conversion device may be required to test various fixture bulb sizes and outlet configurations. Investigate any indication of reversed polarity, open grounds or shorts and correct it 8.6.5.2.2. Ground Fault Circuit Interruption (GFCI). Make certain that all receptacles requiring GFCI protection are in fact on the correct circuit(s). Check each ground fault circuit interrupter device by pushing the test button to determine if the power route to all receptacles requiring GFCI protection has been interrupted, and follow the manufacturer's instructions. Replace any GFCI that does not operate property. 8.6.5.2.3. Operational Checks. Check all fight fixtures by placing a bulb in the socket and turning the switch on and off. Using a pigtail light, check all 240 volt receptacles to determine if both legs of the circuit are powered. Check all 120 volt receptacles to be sure that each is operational. Switched receptacles require the switch to be turned on and off. it is not necessary to check appliances, but their power sources must be assured. Failure of electrical wiring or fixtures requires repair and re -testing, Set Up Manual - Page 37 FIGURE 8.3 - DRAINPIPE SUPPORT METHODS Two lea nails frdo fowtoM Two 118d nail Mb*men d2 x 3 rwh f anbm I Dann pare '\ (2) led naft er 7i16 xIs' x16ga, stWes each side Mlrft a of 2 x 34nch kxft or Galvanized or ahx "on shay FIGURE 8.4 - DRAINAGE SLOPES AND CONNECTIONS second efoa Main stout drop p Strap 4feet on mrhter Sttippi 4l eap Shh*ng-p L= 0 aT o sewer Field -installed, slope 114 inch per foot 16d palls Gakw ized or aGaoirtmn sasp (2)16-gmiM 7H6x 2' staples each erx! (i4ne h Gahm) o►(2)16d ants GAYdmem or 1 x 3kIc1 kmhber tboriaist Ko*nt n d - x ► Ganber (2)10d nails or 7f16x 2g x 16gastaples Galvanimd or each site elumknun strap FIGURE 8.5 CONNECTION TO SITE SEINER 'fYpfee! CMV-A g pipe am "Op rot Suppfed by (ft maaufachaer) ` Stp wit strap at ntroft= or 44bot interaals approved etastcow coupter Site sewer. hook-up Note: Fittings in the drainage system that are subject to freezing, such as P-traps in the floor, have been protected with insulation by the manufacturer. Insulation must be replaced if it is removed to gain access to the P-trap. Set -Up Manual - Page 38 FIGURE 8A - DRAM! LINE CROSSOVER CONNECTION mId chant HOME �IDP� �P a! maxarnm of Scopelmkwh pwfoot 4-footkdmals FIGURE 8.7 - DRAIN LINE FREEZE PROTECTION Stebgbw it 11 II it 11 le See Dell A See DOW B trstdeted Drain Erna wxmm DETAIL A 'z� ` >��� DETAIL B R-0 �:�� h6v�On R \` AHS Drain cute Ass Drain rme FIGURE 8.8 TYPICAL GAS LINE CROSSOVER Supprod mossover flex sne (property fisted and simd for outdoor use) dust Caps Deiors Supplied aird-0AvaNe (wrdarrl�tg to AtVst �°°`� T11.1&19M merMreiiy operated gas value) (OR) Suppliederossomflex line (Ilopg9/ listed and elmdloroutdocruse) NOTE: Removes dust asps DefMe Suppfied, fisted quak croconnect Flow -10 Set -Up Manual - Page 39 NOTE: Panel box is wired with the grounding N Main IBreaker G system insulated from the neutral E R system. Connect the grounding T o through a properly sized green- R U colored insulated conductor to the A N D service -entrance equipment (meter L base) located on or adjacent to the B B home. Do not use a 3 wire feeder A system that does not connect to the R Kl-A R ground bar. entrance Black -Power (Meter base) Blade or red - Power Ground to metal frame Green - ground . Electrical feeder sizing Main breaker size in panel box : Junction Box min. size (Inches) Min. size raceway Feeder conductors Conduit diameter with with Copper Aluminum conductors conductors Copper conductors [sizes Aluminum conductors / sizes black / red (Power) White (Nautraf) Green Grounding black I red (Power) White (Neutraq Green Grounding) 100 amp. I I Oxi Ox4l 1.25 " 1.5 1 #4 #4 #8 #2 #2 #6 125 amp. 10x12x4 1.5 " 2 " 1 #2 #2 #6 1 #1 /0 #110 #6 150 amp_ 10xl2x4 1-5 " 2- 1 #1 #1 #6 #210 #210 #4 200 amp. 12x12x4 2 " 2- 1 #2/0 1 #1 1 #6 #410 1 #2/0 #4 Clamp - type, service head. Color coded conductor - red, black. white & green. line. FIGURE 8.9 TYPICAL OVERHEAD FEEDER ASSEMBLY Bushing by Junction box, it required by others_ — See above chart for min. size. Color coded wires to distribution panel by others. Bushing by — others. FIGURE 8.10 TYPICAL UNDERSIDE FEEDER ASSEMBLY CAUTION: Be sure to connect double - section chassis together with bonding wire and lug. Connect wire with screw terminal on each end to frame parts on each half of the double -section home. Elec. raceway Conned wires of same color together with approved connectors, or hooked up direct. Flex electrical conduit with color -coded wires by others. Set: -Up Manual - Page 40 FIGURE 8.11 - MUL71-SECTION FRAME BONDING FRAME PART X K1LF GROUND CLAMP WITH SCREW GROU ND WIRE SHOULD BE THE SAME USED ON PANEL FIGURE 8.12 - TYPICAL UNDER CHASSIS FEED CONNECTIONS � � D FLOOR � � C A. nX-XCONDUTT B. FEEDER CONDUCTORS A C. JUNCTION BOX D. RACEWAY E. CONDUIT CONNECTOR B F_ APPROVED ELECTRICAL CONNECTORS A` G. INSULATED GUSHING U NAIF D FLOOR FIGURE 8.13 - TYPICAL METER BASE INSTALLATIONS AND GROUNDING BT:ANCEi DUCT MAIN DISCONNECT EXTERIOR MEWRN PANEL BOON COMBINATION METER METER BASE MAN PANEL GROUNDING ELECTRODE samm W MAIN PANEL ENCLOSURE ENTRY f—, I CHASSIS BONDING CONDUIT OR WIRE CABLE SERVICE GROUNDING LUG ON CHASSIS TO GROUNDING GROUNDING ELECTRODE ELECTRODE B MAIN PANEL GROUNDING ELECTRODE IANDpUND ENTRANCE CLEARANCES AND ATTACHMENT SHALL BE PER NEC 28M AND 23M Set -Up Manual - Page 41 y MAIN PANE. i METER SERVICE BASE HEAD STRAP CONDUIT GROUNDING ELECTRODE ENTRANCE BELOW ROOF NINE FIGURE 8.14 - ELECTRICAL CROSSOVERS cqmlnd vvhae CAXNWd= from dis� Branch aireult oonduofaa, wAh mffidem WtgW for aossom eoaed in)unctlon box Juxtinn eca tuncdon box m F[exmle taxbd shipped loose forted aeon. ConftWwaf =c iatr&~ panel boa d tannrnetea In MK box NM cable for branch c=u%%wilh sin broh teraossovercmW oboe access panel Juncti an Rm Dodo ic*4 for NM cable � — steel wia protecwra shipped loose for OW kwbfttkm as =panatS favmmd to tramtnq wiM seems. Words •elac amose pakftd on paneLc . IN FLOOR - ALTERNATE A (SIDE VIEW) THIS HOME MAY BE SHIPPED WITH ONE OR MORE PLUGIN CONNECTORS. THESE CONNECTORS ARE TO BE SNAPPED TOGETHER ON SET-UP. CONNECTORS WILL BE COLOR -CODED ANDIOR TAGGED TO PREVENT MWING OF CIRCUITS I I FadW VIM J — I R PvWcWm . . corsuct sban�sabuuon panel boars WmkwAsd h tuonbm Set -Up Manual - Page 42 r IN WALL - ALTERNATE Rn cable for branch cis, wAh suffioeot wgth rer«nasovw o9W above aoom pmel HM prwiCed for nm cable / Jund1mbw -1 prnvid¢d fieaitnstaflaGen T T— Aooess panels fastened torrmnirV vMh screws. Wads -etec --c painted on poets. IN FLOOR - ALTERNATE B (SIDE VIEW) (PERIMETER TYPE FRAME) THE CONNECTORS ARE INTENDED FOR FACTORY OR ON -SITE INTERCONNECTION OF MODULES OR OTHER BUILDING COMPONENTS. THEY MAY BE CONCEALED OR SURFACE -MOUNTED AS DESCRIBED IN ARTICLES 545.13. 55010(1) AND 551-le(A) OF THE NATIONAL ELECTRIC CODE FIGURE IL14 - TYPICAL ELECTRIC CROSSOVERS THE WIRES ARE COILED UP UNDER THE SHIPPING SEAL BEFORE THE UNITS ARE PULLED TOGETHER PLACE THE WIRES FROM 'LY HALF INTO JUNCTION BOX ON r 14ALF. WIRES WILL BE COLOR CODED AND/OR TAGGED TO PREVENT MIXING OF CIRCUITS. MAKE FINAL CONNECTIONS AFTER UNITS ARE PULLED TOGETHER Mira ALTERNATE ELECTRIC CROSSOVER CONNECT THE FLEX CONDUIT TO THE JUNCTION BOX ON THE W HALF_ THEN MAKE THE WIRE CONNECTIONS USING APPROVED WIRE CONNECTORS. WIRES WILL BE COLOR CODED AND/OR TAGGED TO PREVENT MIXING OF CIRCUITS. Blank Cover W9 dual ANI —t— 1131�v" Memo Junction B" Fimc Conau't (U owsed muse be popotp fis-W) THIS HOME MAY BE SHIPPED WITH ONE OR MORE PLUG-IN CONNECTORS. THESE CONNECTORS ARE TO BE SNAPPED TOGETHER ON SET-UP. CONNECTORS WILL BE COLOR -CODED AND/OR TAGGED TO PREVENT MIXING OF CIRCUITS. THE CONNECTORS ARE INTENDED FOR FACTORY OR ON -SITE INTERCONNECTION OF MODULES OR OTHER BUILDING COMPONENTS. THEY MAY BE CONCEALED OR SURFACE -MOUNTED AS DESCRIBED IN ARTICLES 545-13, 550-10M AND 551-16(0) OF THE NATIONAL ELECTRIC CODE. Set -Up Manua! - Page 43 f 9, Chapter 9 e Final inspection 10. Chapter 10 — Relocating the Horne Make a final inspection when home installation is complete to make sure that no items have been overlooked and that all work was done properly. Place special emphasis on the following "checklist° items. 9.1. Water and Drain Systems. All water and drain systems work property and do not leak. 9.1.1. Accesses Under Home. Access for p4raps, etc. located under the home in the bottom board are taped and marked with paint or colored tape for access_ 9.2. Appliance Function and operation. Appliances have been tested and work properly. 9.3. Windows, Doors and Drawers. All windows, doors and drawers work properly. .. EW Windav designated as a secondary exit to be used in case of emergency. Each exit window is labeled as such with operating instructions- lions_ All shipping hardware L should be removed, and the window should operate as explained in the window manufacturer's Instructions. 9.5. Exterior Siding and Trim. No gaps, voids or missing fasteners and all seams are seated. 9.6. Stack Heads and Vent Pipe Flashings on Roof. Ali stack head or vent pipe flashings are property attached and sealed. 9.7. Composition Roof. Shingles areproperly attached: none are loose or missing, and all holes are filled. 9.8. Skirt Venting. (See Page 20, 5.6.4) 9.9. Low -Hanging Trees and. Bushes. If there are any low -hanging trees or bushes near your home, trim or cut them. Think about the plants' possible movement during windy conditions or under snow or ice loads in limiting their future growth. 9.10. Exhaust Fan Operation and Air Flow. Check all exhaust fans for proper operation and air flow. 9.11. Bottom Board- Carefully inspect the bottom covering of the home for loosening or tears from Installation of pipes or wires. Seal openings around the. floor perimeter, pipes or pipe hangers and splits or tears with weather -resistant tape. 9.12. Ground Cover. Repair any cuts or tears in the ground cover with tape. 9.13. Anchors and Straps. Be sure the correct number of anchors have been installed at the proper angle, and that all straps have been tightened. 9.1.4. interior Details. Inspect for, and correct, all interior finishing details, such as loose molding, carpet seams, etc. The retailer's representative should inspect the home with the homeowner, give the homeowner a copy of the Homeowner's Manual, and • brief the homeowner about maintaining the home. 10,1, Relocation of Home. If it is necessary to move your home, have it moved by a professional manufactured home mover, making sure he uses enough temporary wood blocking, and check the following items: 10.1.1. New Zones. Check the roof and. wind load and the temperature requirements at the new location. If the new requirements are greater than those shown on your home's compliance certificate, check the cost of adapting the home before moving. Otherwise any resulting damages will not be covered under your warranty, and you may be held liable for any failures. Check with home's plant of manufacturing, your retailer, or a qualified manufactured home mover about makirig these home impfevernerAs. 10.1.2. Tires and Axles. Replace any removed tires or axles as required by the manufacturer. Be sure that tires are inflated correctly, have at least 1/16" tread, and do not have any cracks or splits. Check and repair bearings and brakes as necessary. 10.1.3. Appliances. Secure appliances to prevent movement during transportation. 10.1A. Dust Caps. Place dust caps on the ends of all pipe connections. 10.1.5. Blocking During Storage. Any home placed In storage, including those our sales lots, must be immediately blocked under each 1-beam, both at the near of the home and midway between axles and hitch, to prevent excessive deflection and possible structural damage. 10.1.6. Transit of Furniture and Belongings. Substantial damage may result if furniture, personal belongings, set-up materials or other items are stored in the home during transiL TRANSIT DAMAGE IS NOT COVERED UNDER YOUR WARRANTY. 10.1.7. Multi -Section Homes. Re -install temporary structural supports - and biAcing materials before moving the home. Cover open sides of sections with weather- proof material such as 6 mil plastic sheeting. After the sections have been separated, secure 2" x 6' shipping braces at the front end "and in the axle area. Place ridge beam supports in open areas or at a maximum of 4' on center. 10.1.8 Mufti -section homes with stairwell must have the stairwell cutout reinforced for transportation. Locate the factory Installed framing plug and fasten to floor framing with #8 x 3" wood screws. If the factory installed stairwell plug cannot be located, construct a temporary stairwell plug with 2 x 6's #3 SPF at 24" o.c. with 5/8" APA rated decking. Fasten all framing members with (3)16d nails and decking with 10d nails 6" or - Set -Up Manual - Page 44 Corporate Office Post Office Box 35 Goshen, Indiana 46527-0035 E1b31s