HomeMy WebLinkAboutState Legislative Sept 1998
ST. LUCIE COUNTY
BOARD OF COUNTY COMMISSIONERS
WORK SESSION
ST. LUCIE COUNTY CRITICAL IMPROVEMENT PROJECTS
SEPTEMBER 10. 1998
2:00 PM
CONFERENCE ROOM 3
I. INTRODUCTION BY THE COUNTY ADMINISTRATOR
II. PRESENTATIONS:
A. PROJECTS ALREADY SUBMITTED FOR 1998-1999 STATE BUDGET
-NORTH AND SOUTH CAUSEWAY ISLANDS EROSION CONTROL
PROJECT/JACK DOUGHNEY
-ST. LUCIE COUNTY FAIR RELOCATIONIDOUG ANDERSON
-TEN MILE CREEK REGIONAL ATTENUATION FACILITYIPIDL
FREELAND
-MORNINGSIDE BRANCH LmRARY IMPROVEMENTS/SUSAN KILMER
B. PROPOSED PROJECTS TO SUBMIT FOR 1998-1999 LEGISLATIVE SESSION
-AIRPORT ECONOMIC DEVELOPMENT PLANIRAY WAZNY
-PURCHASE JETTY PARK & ADJACENT PROPERTYIPHIL FREELAND
-HARBOUR POINTE IMPROVEMENT PLAN)/JACK KARlBO, RAY
W AZNY
-HUTCIDNSON ISLAND IMPROVEMENT PROJECTIDON MC LAM
-FOOTBALL AND SOCCER STADIUMlPETE KEOGH
-INDIAN RIVER ESTATES/SAVANNAS WATER RETENTION RETROFIT
PROJECTIDON WEST
-SOUTH 25ffi STREET, PHASE I AND MIDWAY ROAD WIDENINGIDON
WEST
-NORTH COUNTY WATER IMPROVEMENT PROJECTIBILL BLAZAK
-SAVANNAS RECREATIONAL AREA IMPROVEMENTSIBRAD KEEN
III. BOARD DISCUSSION AND DIRECTION
All proceedings before this Board are electronically recorded. Any person who decides to appeal any
action taken by the Board at these meetings will need a record of the proceedings and for such purpose
may need to ensure that a verbatim record of the proceedings, individuals testifying during a hearing will
be sworn in. Any party to the proceedings will be granted an opportunity to cross-examine any
individual testifying during a hearing upon request.
BOARD OF COUNTY
~ COMMISSIONERS
COUNTY
ADMINISTRATOR
DOUGLAS M. ANDERSON
September 4, 1998
Chairman Gary D. Charles, Sr. and
County Commissioners
S1. Lucie County
2300 Virginia Avenue
Fort Pierce, Florida 34982
Dear Chairman Charles and Commissioners:
I am pleased to present to you the projects that County staff would propose to send to the State
Legislature through our State Delegation for funding in FY 1999-2000.
~
We have provided you with a summary of each project, the budget for the projects and a brief
description of each of the fifteen projects. At the request of Representative Ken Pruitt, the first
four projects on the list have already been submitted for consideration in the State budget.
We request your review on these projects and ask for your approval to submit the projects to our
State Delegation for inclusion in the 1999-2000 State budget. A discussion of each project will
be presented as part of the September 10, 1998 workshop.
Thank you for your consideration.
,
. "7~~4~
Dougl~ M. Anderson \
County Administrator
DMA:rk
\.r
JOHN D. ßIìUHN, District NO.1' KEN SATTLm, District No.2' PAULA A. LEWIS, District No. J . GAIìY CHAIìLES, District NO.4' CLIFF ßAIìNES, District No.5
County Admini5trotor - Douglos M. Anderson
2300 Virginia Avenue · Fort Pierce. FL 34982-5652 · Phone (561) 462-1450 · TDD (561) 462-1428
FAX (561) 462-2131
)
'--
Tab 1
Tab 2
Tab 3
Tab 4
TabS
Tab 6
. Tab 7
Tab 8
) Tab 9
~ Tab 10
Tab 11
Tab 12
Tab 13
)
\...
TABLE OF CONTENTS
North and South Causeway Island Erosion Control Project
St. Lucie County Fairground Relocation
Ten Mile Creek Regional Attenuation Facility
Momingside Branch Library Improvements
Airport Economic Development Project
Purchase Jetty Park and Adjacent Property
Harbour Pointe Improvements
Hutchinson Island Improvement Project
Football and Soccer Stadium
Indian River Estates/Savannas Water Retention Retrofit Project
South 25th Street Phase I and Midway Road Widening
North County Water Improvement Project
Savannas Recreational Area Improvements
0 0 0 0 0 0 0 0 0 0 0 0 0 =>
0 0 0 0 ~ 0 0 0 0 0 0 0 0 ~
~ ...... 0 0 0 t'--~ 0 o~ 0 o~ 0 0 0 0 00
~ ô o~ o~ o~ Ô o~ o~ o~ Ô ~
M IF) 0 0
0 0 0 0 ...... 0 IF) 0 "1 0 ~ 0 IF) =>
0\ 0 O~ C"I C'! IF) t'--~ IF) t'-- t'--~ O\~ 0 00 ~
~ OÔ M ~ \0 <'Î ...... ~ ~ M C"I C"I~ ~ ~
~ ~ ~ ~ ~ ~ ...... ~ ~
~ E'-}
~
\..-
rJ1
~
U
f:;
o
~
~
~
Z
r-l
~
~
o
~
~
~
~
~
<
U
~
~
~
U
~
~
~
o
U
r-l
~
U
Þ
~
~
rJ1
~
~
ø
~
~
~
~
~
-<
~
rIl
0\
0\
0\
~
I
00
0\
0\
~
~
o
~
~
~
~
~
~
ê§
rIl
;>t
~
~
~
rIl
~
U
r:;
o
~
~
E-<
U
~
o
p:::
P-.
~
o
p:::
E-<
Ô ~
u t:: rIl
Z d E-<
o U ffi
§ Ô ;¿ ~
p::: E=: z ~
~ < 0 >
U - 0
~ 3 ~ g:
u3 ~ æ ~
~ ~ ~ ~
~ ~ ~ ~
9 p::: 0 ::r:
Ù < S U
~ ~ ~ ~
~ E-< ~ ~
?;5 8 ~ ~
o U U (;)
~ ~ ~ ~
~ g ~ ~
o . Z 0
Z ~ ~ ~
..- N ('I) ~
z
o
""'"
rIl
rIl
~
rIl
~
;:>
""'"
~
-<
~
rIl
""'"
ø
~
~
0\
0\
0\
~
I
QQ
CII\
0\
~
~
o
~
~
""'"
~
~
~
rIl
o
~
rIl
~
U
r:;
o
~
~
~
~
rIl
o
~
o
~
~
~
E-<
p:::
~
E-< P-.
U 0
~ p:::
>-a p-.
~ E-<
p-. ffi
~ U rIl
~ < E-<
~ a ffi
p-. < ~
3 0 ~
~ ~ 6
2:S ~ g:
U < ~
- p-. -
~ ~ ~
o ~ ~
ô ~ 0
U rT' P-.
~ r;¡ p:::
t; < ~
~ ::r: 0
~ ~ ~
E-<
U
~
o
p:::
P-.
E-<
-
~
o
~ 0
~ ~
Z 0
§ ~
~ ~ t)
t) ~ ~ ~
~ p:::~ ~
~ ~ ~ ~
~ ~ ~ ~
~ < 0 ~
~2~~6
~~>~~
p-. 00 < rIl _
~ p::: ~ ;§ p:::
- ~u r:g p-. ~
o U E-< E-< E-<
~o~~~
u3S r:g~ ~
- ~ p::: r;; E-<
Ô~~~5
~~ i:2~ 8
::r: ~ ~ ::r: ::r:
~b-~b~
~ 0 0 0
::r: ~ C/) Z
LOCDt'--oom
o ..-
..- ..-
C/)
E-<
ffi
~
~
>
o
p:::
p-.
~
-
<
~
<
~
Z
o
-
E-<
~
U
~
C/)
<
~
>
<
C/)
N
..-
('I)
..-
~
~
~
~
,~
'-..J
~
~
o
~
~
~
o
"~
~
I
J
\~
~
PROJECTS ALREADY SUBMITTED FOR 1999-2000
STATE BUDGET
,
~,
'-"
'-- BOARD OF COUNTY
COMMISSIONERS
COUNTY
ADMINISTRATOR
DOUGLAS M. ANDERSON
July 14, 1998
Representative Kenneth P. Pruitt
2400 S.E. Midport Road
Suite #310
Port St. Lucie, Florida 34952
Dear Ken:
We are proposing four critical improvement projects for State funding. They all are vital to the
future of St. Lucie County. We have provided detailed information on each project.
They include:
·
North and South Causeway Island Erosion Control Projects
Fairgrounds Relocation and Disaster Command Center Project
Ten Mile Creek Water Preserve Area
Momingside Branch Library Improvements
\.-.
·
·
·
We would appreciate your help in obtaining funding so that the projects can move forward as
soon as possible.
Thank you very much for your assistance.
DMAlrk
C: Board of County Commissioners
Philip Freeland, Assistant County Administration
Dan McIntyre, County Attorney
Jack Doughney, Leisure Services Director
Susan Kilmer, Library Manager
\... Jim Cummings, County Extension Manager
Jack Southard, Public Safety Manager
JOHN D. ßIìUH~~~e'4tqnK~K¿W, ~gg 2 . PAULA A. LEWIS, Disrricr No J . GAlìY CHAlìLES. District No.4' CLIFF ßAIìNES, District NO.5
County Adminisrroror - Douglos M. Anderson
2300 Virginia Avenue · Forr Pierce. FL J4982-5652 · Phone (561) 462-1450 · TDD (561) 462-1428
FAX (561) 462-2131
· \
\..-'
North and South Causeway Island
Erosion Control Projects
A proposal for $903,100 to make critical improvements on North
and South Causeway Island to stop a serious erosion problem.
~)
\..,.'
\.: ßOARD OF COUNTY
COMMISSIONERS
LEISURE
SERVICES
J. E. "Jocl~" Doughney III
Director
NAME OF PROJECT:
F1. Pierce Causeway Islands Shoreline Stabilization Project
AMOUNT OF REQUEST:
$903,100
.
DESCRIPTION OF PROJECT:
S1. Lucie County desperately needs assistance in combating tidal forces that are
~ quickly eroding both the North and South Causeway Islands. Discussions on
proposed remedies have resulted in a proposed coastal structure that will prevent
the erosion of the shoreline from wave and tidal forces resulting from annual
storm events, wakes resulting from ships using the F1. Pierce Inlet, and ever
present water current velocities.
REASON FOR FUNDING:
This request is part of the Department of Transportation's overall budget.
\...
JOHN D. ßIìUHN, District NO.1' KEN SATTLEIì. DisrflCt No.2' PAULA A. LEWIS, DiSTrict No. J . GAIìY CHAIìLES, District No.4' CLIFF ßAIìNES, District NO.5
County AdminiSTrator - Douglas M. Anderson
2300VirginioAvenue · Phone (561)462-1515 · TDD(561)462-1428
Moil: P.O. ßox 760, Fort Pierce. FL 34954-0760
~
ST. LUCIE COUNTY
BOARD OF COUNTY COMMISSIONERS
1999-2000 Legislative Budget Request
REQUEST:
St. Lucie County is requesting funding assistance in the
amount of $903,100 to construct a coastal structure that
will prevent the erosion of North and South Causeway
Islands.
JUSTIFICATION:
The uplands currently under attack of erosion are located
on both the North and South Causeways. These two land
masses parallel the Ft. Pierce Inlet Shipping Channel and
lie immediately east and adjacent to the Indian River
Lagoon. Within the Indian River Lagoon lies the
Intercostal Waterway. Both causeways are critical to the
area transportation network as they anchor the only two
bridges that connect the barrier island to the mainland.
~
The shorelines of both causeways are affected and under
the influence of two high and low tide cycles per day at
an average daily variance between two and three feet.
Further acerbating the problem are ship wakes that are
produced as a result of vessels entering and exiting the
Port pfFort Pierce via the Fort Pierce Inlet. Since 1989,
the shoreline of South Causeway Island has receded
approximately twenty feet while the shoreline on North
Causeway has experienced a slightly lessor amount of
erOSIOn.
In an attempt to resolve the existing erosion problem, we
are proposing to construct a coastal structure that will
prevent the erosion of the shoreline from wave and tidal
forces resulting from annual storm events, wakes from
passing ships and ever present water current velocities.
'-"
\...,}
ST. LUCIE COUNTY
BOARD OF COUNTY COMMISSIONERS
1999-2000 Legislative Budget Request
FUNDING NEEDS
I. Project Engineering & Design $ 36,000
II. Regulatory Permits $ 10,000
(Local, State and Federal)
III. Project Construction $675,000
(1,500 L.F. @ $450.00 per L.F.)
IV. Coastal Vegetation Restoration $100,000
'--) SUBTOTAL $821,000
CONTINGENCIES (10%) $ 82,100
TOTAL AMOUNT REQUESTED $903,100
\..,.. ,
~)
'--' )
)
\.."
Fairgrounds Relocation and Disaster Command/Special Needs Shelter Project
A proposal for $8,000,000 to relocate the County fairgrounds
and develop a Joint Use Disaster Control Center, Special Needs
Shelter, Exhibit Hall and a Horse and Livestock Park.
'> ßOARD OF COUNTY
\.,. COMMIS510NERS
LEISURE
SERVICES
J. E. "Jock" Doughney III
Director
NAME OF PROJECT:
Agriculture Exhibit & Training / Disaster Command Center / Special Needs Shelter
AMOUNT OF REQUEST:
$8,000,000.00
......)
DESCRIPTION OF PROJECT:
This project will relocate the Fair from the Airport grounds, provide a livestock/equine facility
for training and education. This facility will also be used as a Disaster Command Center
providing for a needed staging area, Command Post, Primary Special Needs Shelter, 911ÆOC
back up and an evacuation area for horses and other animals in the event of a natural disaster.
REASON FOR FUNDING:
This request is part of the Department of Agriculture overall budget.
ì
\..
JOHN D. ßIìUHN, District No.1' KEN SATTLm, District No.2' PAULA A. LEWIS, District No. J . GAIìY CHAIìLES. District No.4' CLIFF ßAIìNES, District No.5
County Administrator - Dougl05 M. Anderson
2300 Virginia Avenue' . Phone (561) 462-1515 · TDD (561) 462-1428
Mail: P.O. ßox 760. Fort Pierce, FL 34954-0760
\-.~
ST. LUCIE COUNTY
AGRICULTURE EXHffiIT, TRAINING/DISASTER
COMMAND AND SPECIAL NEEDS SHELTER
1999-00 Legislative Budget Request
~
I. Project Engineering & Design $ 600,000.00
. II. Water/Sewer $ 500,000.00
III. Infrastructure $1,200,000.00
\ ~
\
....... IV. Agriculture ExhibitlDisaster Center $3,000,000.00 -\ cþ
V. Livestock/Equine $1,500,000.00 -)
VI. Furnishings $ 500,000.00
VII. Contingency $ 700,000.00
TOTAL AMOUNT REQUESTED $8,000,000.00
\..,.
, \
\...-
AGRICUL TURE EXHIBIT & TRAINING / DISASTER
COMMAND / SPECIAL NEEDS SHELTER
A. Geo~raphic Information- The 200 acre sité is located in the heart ofSt. Lucie County,
west of the major population centers, bordered on the north by State Road 70 and on the
south by County Road 712. The site is geographically centered to serve the four county
area of Okeechobee, St. Lucie, Indian River and Martin Counties. This site is within 6
miles of the Florida Turnpike and 1-95 Interchanges along with being located outside the
emergency planning zone for the nuclear power plant.
B. A~ricultural- Fair Association will hold the annual county fair, along with the livestock
shows/sales and auctions. Facility will be used for agriculture training and education,
, trade shows, equine training/specialty classes, 4H events, farm equipment safety
training/exhibitions and rodeos. Building will include stable facilities for horses and an
adjoining arena. Emergency collection site for large animals, an estimated 200 head of
horses are residing east of U.S. Highway 1 in areas that are subject to flooding and
wildfires. This facility will provide a safe and secure location for livestock and large
'" animals in emergency situations in which residents are instructed to evacuate.
C. Disaster Command/Special Needs Shelter- Facility will be used as a staging and
distribution area of equipment along with the capability of providing for regional staging
of resources and primary command post during recovery stage of a disaster. It would be
the only Special Needs Population Shelter outside the 10 mile emergency planning zone.
Used as an alternate Emergency Operation Center outside the EPZ should we lose
capabilities at our primary 911 Central Communications and Emergency Management
location. Currently we havé inadequate locations for the evacuation of school children
during a nuclear power plant emergency, this facility will help and provide needed
shelter.
D. Facility- The 30,000 sf structure will meet Category 3 hurricane design requirements,
accommodate over 500 people, contain a full service kitchen, restrooms and showers and
dining for 250 people. Building interior will have folding walls to provide for more
versatile use. As an emergency center the facility will contain emergency lighting,
phones, data facilities and emergency generators. Both the on site water and wastewater
systems would incorporate an emergency generator system to provide reliability in
emergency situations. Water system would include a ground storage tank capable of
sustaining minimum fire protection needs and storage capability. This structure will be
completely self contained.
\.
Shelter space
.
at a prelDlUID
in 2 counties
S.PACE \
STORM PREPARATIONS
v
By Andrew Conte
ollhe News sIan
As hurricanes Bonnie and
Danielle . chum through the At·
lantic Ocean, emergency manage·
ment officials in St. Lucie County
have eliminated four stonn shel·
ters because of concerns they are
unsafe.
And officials in Martin
County, already dealing with. a
space shortage, plan to pack m
residents "shoulder to shoulder"
if necessary.
.,. .' On our Web site
~\(¡ For u~ates on
\\ Humcanes
. . Bonnie and
~ Danielle, visit
. our Web site at
http://wwW.tcpalm.com
~)
An informal jnspecti~n in July
found that foûr St. Lucie School
District buildings that were in-
cluded on the county's shelter list
do not provide enough protec-
tion from nying debris and high
winds. Don Daniels, St. Lucie
County's emergency manage-
ment coordinator, said the build-
ings either have too much glass
or structural problems that could
:a use them to collapse. .
Three schools removed from
he list are Weatherbee Elemeil-
ary and Forest Grove Middle
:chool in Fort Pierce and South-
art Middle School in Port St.,
ucie. Officials teinporarily re~
oved Manatee' Elementary in
)rt St. Lucie, which is under-
ling roof repairs. .
Those buildings will not be
ed as shelters during a stonn,
t Daniels said no place is abso-
ely safe in a hurricane.
Please see SPACE on A2
\
\...-
. CONTINUED FROM A 1
, "There's always a risk .when
YO\l're looIånè at a Category, 3
storm or hi er," he said. . It's
safer there t an if you stay in a
mobile home, oJ)·the beach or in a
car. ... (But) if you can stay at
home, stay at home."
. The closures in St. Lucie
Courity· come 'as officials in Mar-
tin ·County· assess space problems.
After a sarety inspec?Ûon in 1997,
Martin County eliminated several
shelters, leaving a deficit of about
6,000 spaces.
. Offici~ .will squeeze eeople
into the exISting shelters until they
are "shoulder to shoulder" if nec-
essary, said MeI Baxley, Martin
County's . emergency planner.
Meanwhile, the county contînues
to place hurricane shutters on
otherpub1ic buildings to increase
the number of places where pcople
can seek refu~e.
"We won t turn away pcople,"
he said. "If we have to, we will re-
duce the space (for each pcrson)
during the storm."
At the start of hurricane sea-
son in June, St. Lucie County offi-
cialssaid they had space for
15,000 people, which matches the
projected number of residents who
will need emergency shelter. With
four fewer shelters, the county
now has a deficit of spaces, partic-
ularly in north St. Lucie County,
wh~ thi~gs were already tight,
Damels said.. . .
In an earlier inSpection, emer-
gency officials deemed Fort Pierce
shelters at the campus of Indian
River Co~unityCollege and the
school' district's Dale Cassens
School unsafe for hurricane pro-
tection, said Betty DeStefano, cx-
ecuûVé 'director :of the American
Red Cross ùi St. Lucie County.
Besides having too much glass,
conimon problems. include long
roof.spans, unreinforced masonry,
weak external 'or internal walls
and tall trees nearby, cxpcrts said,
Any.of those factors could cause a
buildin~ to collapse during a ma-
jor humcane.
Emergency officials in St. Lu-
cie County found the problems
during an infonnal inspection of
about two-thirds of the shelters,
drew hit South Florida in 1992
the state required counties to find
enough sh~lter space for residel}ts
in evacuation areas, but· now m-
spectors are linding that many of
the shelters throughout the state
are inadeq,uate. ,¡
"If we re aware of a situation,
we're not going to deliberately put
somebodl at risk,'· DeStdano,
said. "0 course, if we have 120.
mph wind, who knows what's
safe?"
Under the county's emergency
plan, officials would opcn five
shelters first and then opcn more
as needed. DeStefano encouraged
residents to listen to mc4ia reports
to fmd out which shelters are
available. . ! .
She also advised that people.
need to bring water, food, clothing
and bedding to the shelters be-
cause the American Red Cross
does not provide cots or other re-
sources. Officials encouraged pco-
pIe to stay with family or friends
who live in safe places rather than
coming to the shelters.
"The shelter is safer - that's
the key word, safer - than a mo-
bile home and safer than a beach-
front home," DeStefano said.
"The shelter is not a motel."
After Hurricane Bònnie sat ofT
the southeastern coast of Florida
last weekend, emergency officials
said they are better prepared. and .
that the public seems readiedor a
major stonn.
. People who have not . yet· got-
ten, emerg~ncy supplies should d?
so ImmedIately as a second hum-
cane, Danielle, gathers strength in
the Atlantic, said Mary Sawyer,
director of the Martin. County'
chapter of the' American Red
Cross. .
"(BonlÙ~ '" j ce~aiI11y, ' haS
sparked a lot'Mmter.riÇ"'sli~ said.
"We hopc"niôre :pë'oj)Te wetÚ out
and got supplies and figured out
what their plan is. If they haven't
done that by now, they're i.n bad
shapc."
The group's chapters in both
caunties are seeking valunteers ta
run shelters and help with disaster
relief. For more infarmatian, resi-
dents can call the American Red
Crass at 287-2002 in Martin
c:ounty or 46/-5201 in St. Lucie
)
~
Ten Mile Creek
Water Preserve Area
A proposal for $3,000,000 to provide partial funding for a
$30,000,000 Regional Water Preserve Area along Ten
Mile Creek which is a prototype Water Quality
Restoration Project.
,
~
\
~
\.-} BOARD OF COUNTY
COMMISSIONERS
COUNTY
ADMINISTRATOR
DOUGLAS M. ANDERSON
NAME OF PROJECT:
Ten Mile Creek Water Preserve Area
AMOUNT OF REQUEST:
$3 Million
\ DESCRIPTION OF PROJECT:
......
This is a vital water quality restoration project to reduce the flow of polluted
stormwater into the 81. Lucie River. The project has been described as one of the
prototype projects for resolving the regional pollution and sediment discharge
problems in our rivers and estuaries. It will also resolve serious flooding issues in
the central portion of 81. Lucie County.
REASON FOR FUNDING:
This project should receive state support as a major regional water quality
improvement program.
\..ø
JOHN D. ßIìUHN, District NO.1' KEN SATTLm. District No.2' PAULA A. LEWIS, Disrrict No. J . GAIìY CHAIìLES, Disrricr NO.4' CLIFF ßAIìNES, District No.5
County Adm,,'1,srrotor - Douglos M. Anderson
2300 Virginia Avenue. Fort Pierce, FL 34982-5652 · Phone (561) 462-1450 · TDD (561) 462-1428
FAX (561) 462-2131
\
\...-1
\
~
.~
\....
ST. LUCIE COUNTY
TEN MILE CREEK WATER PRESERVE PROJECT
A. Water Quality - The principal outcome of this project is improved water quality in the St.
Lucie River. The State is carrying out major programs to improve water quality in the State's
waterways. One of the prime contributors to reduced water quality is stormwater runoff.
Pollutants and sediments, as well as excess freshwater, flow into the rivers and lagoons during
storm events, degrading water quality and destroying environmentally significant habitat. This
project will hold stormwater back in a 1,500 to 2,000 acre water reservoir. This preserve area
will allow pollutants and sediments to filter out and freshwater runoff to be reduced significantly.
. The Ten Mile Creek Project will positively impact the lives of over 200,000 people living
in the St. Lucie - Martin County area.
B. Flooding - A second principal outcome is that storm flows during significant rainstorms
creates dangerous flooding throughout central St. Lucie County. The water preserve area will
elimJnate the massive flow of stormwater after storm events and stop flooding. This project will
also reduce the flow of fresh water into the St. Lucie River, which will help to maintain the
proper salinity in the river.
.
The Ten Mile Creek Project will reduce flooding for over 20,000 people living in central
St. Lucie County.
C. Prototypical proiect - A third principal outcome of the Ten Mile Creek Water Preserve Area
is that, with its successful completion, it will become the prototype water attenuation type of
facility that can be used in many different locations throughout Florida to solve serious water
quality problems.
. This prototype project has the potential to generate 10-20 water preserve areas throughout
the state as a result of its successful completion. This would positively impact every
resident of South Florida.
Ten Mile Creek Project Budget
Federal Contribution
$15,000,000
State and Local Contribution
South Florida Water Management
State Assistance Request
Other Assistance
$ 10,000,000
$ 3,000,000
$ 2.000.000
Total Project Cost
$30,000,000
,
ì
\..,.'
Morningside Branch Library Improvements
A proposal for $200,000 to complete the Library's new
Technology Center
,
I
-......,
\.,..
) ßOARD OF COUNTY
\... COMMISSIONERS
LIBRARY
SUSAN [3, I~ILMER
Library Manager
NAME OF PROJECT:
St. Lucie County Department of Leisure Services/Library Division
Technology Grant
AMOUNT OF REQUEST:
$200,000.00
DESCRIPTION OF PROJECT:
) The Library, in cooperation with St. Lucie County School District, is
'-" developing a computer technology/distance learning lab and south county TV
Studio at the Morningside Branch Library. The first phase of funding allowed
for the development of the computer lab, a distance learning center and the
beginnings of a studio. The second phase of funding will complete the TV
studio, allowing for lighting and additional cameras; the further development of
the Distance Learning Lab; and administrative start-up costs.
REASON FOR FUNDING:
This request is part of the Department of State's Division of Library and
Information Services' overall budget.
)
'\.--
JOHN D. OIìUHN, District NO.1' KEN 5ATTLEIì. Distllct No.2' PAULA A, LEWIS, Disrricr No. J . GAIìY CHAIìLE5, Disrrict No.4' CLIFF OAIìNES, Districr No.5
County Administrator - Douglas M. Anderson
124 North Indion River Drive . Fort Pierce. FL 34950-4331 · Phone (561) 462-1615 · Suncom 259-1619
FAX (561) 462-2750 · TDD (561) 462-1428
)
'-'
)
"'"
)
.........
ST. LUCIE COUNTY
1998-99 Legislative Budget Request
A. Computer lab - This center would serve as a training lab for Adult
Continuing Education classes for Indian River Community College; a
training center to be used by Central Florida Library Cooperative for
South Florida libraries; after-school tutoring programs; computer classes
for local public and private schools; as well as a training center for local
public library staff and volunteers. Treasure Coast Computers User Group
have volunteered to help operate and train users of this facility.
B. , Distance Learning Lab - This would fall within the state initiative to
provide distance learning centers within public libraries. Indian River
Community College Library began this effort several years ago and we
have begun the process on a small basis with the Interlibrary loan program
offered through our Adult Services department. The Distance Learning
Lab would allow interactive programs with local visiting authors to speak
with students in the public schools as well as interact with participants at
the lecture.
C. TV Studio - This should be equipped to be fully operational as the south
county site for educati.onlgovernment access under the supervision of
Instructional Television (School District) in cooperation with S1. Lucie
County Library. The intent is to allow programming of local service and
social organizations as well as library programs and other county
sponsored programs or special events (ie., groundbreaking, special events
and special exhibits). We will have the use of the School District's
mobile production unit as part of this cooperative venture.
\
.
\.,.
)
~
\
\....-
The Morningside Branch Library was selected for this project due to the nature
of the design of the building and the original intent of the cooperative facility.
This facility has two separate buildings which opened in 1993, one building
serves as a fully operational branch library and the other building is designed to
hold a computer lab, science lab and TV studio with darkroom and editing lab.
These rooms have been used by outside service/social organizations since the
library opened due to the School District nor the County have appropriate funds
to equip or operate the special facility. The original funding for this facility
came through capital funds from the Board of County Commission and the
Community Education Facilities grant fund (grant written in cooperation with
St. Lucie County School Board and St. Lucie County).
FUNDING NEEDS:
Administrative start -up costs
$75,000
Distance Learning Lab
$35,000
4 monitors
2 scanners
large screen television
computer projection screen
CD player
2 printers
VCR
Laser disc player
Control panel, audio board
UPS server
Duknae Vicon (operates camera)
chairs
keyboard
vertical interval matrix switcher
editing control device
modem
mouse/mouse pad
desk
microphone
mounted camera
speaker phone
2-way video connection
projector
TV Studio
additional cameras
lighting
$90,000
-'1
'-'
\
.......
\
"-"
PROPOSED PROJECTS TO SUBMIT FOR 1999-2000
LEGISLATIVE SESSION
\
,-,'
Airport Economic Development Project Phase I-III
A proposal for $6,215,740 to build infrastructure and industrial facilities
at the St. Lucie County International Airport to create major
new economic development in the County.
~)
')
"-"
'-')
-.....)
\.)
AIRPORT ECONOMIC DEVELOPMENT PROJECT PHASE I - III
Project Manager:
Ray Wa:m.y, Community Development Director
The Airport Economic Development Plan will provide water, sewer and road infrastructure needs
at the Airport Industrial Park and the westerly portion of the airport itself. The cost of the initial
infrastructure improvements for the Airport Industrial Park are estimated at $1,215,740 with
construction slated for the summer of 1999 and completion by year end.
The westerly portion of the plan will provide water, sewer and road infrastructure needs for 150
acres of airport land that will be used for new industrial development. The cost of these
infrastructure improvements is estimated at $5,000,000 with construction slated for late 1999.
The request to the State will be for funding both sets of infrastructure improvements at a total cost
of$6,215,740.
ø- _ - - '-1
253.50' . 181.ð8" 181.!:"" 223.50'
T 3 ! 4 5 6 /0. : /3. /4 ·1
V ~ 2- ~
ER
I~
!:t
/ ¡.
;
~ 2. ).,
!t
J .' /8 J /8
.' /1
4 .'
Z¡:l.~'·
5 I .
;1 ..
;!t.."",
;¡
~
¡LS
~
'X:H
LF
LF
LF
LF
LF
LS
~
\.)
8
/3
9
_00__'"
;
I I·" ~:'. : :~.,:... \t;~-:'
i ~ - . ." .., '\r:-:
I :1 fi· "J-:-':';" -,"1(2'
1,:;~ï~\J{ .'
11..··iJ~....)."...,."il¡."..
Jt~J'~i(r!,
.. it,
ST. LUCIE COUNTY s::AlE AIRPORT Inwood~1NC. SEW)
P.E. PORT &. AIRPORT AUTHORITY r-4OO" INDUSTRIAL PARK CMI . Enviroiiiriental. TransportotIon
\
. )
~
~)
'\
\..-
Purchase of Jetty Park and Adjacent Property
A proposal for $2,500,000 to expand Jetty Park and provide new parking and
recreation facilities at this important Ft. Pierce park.
-..)
..)
~
,
'-"
PURCHASE OF JETTY PARK AND ADJACENT PROPERTY
Project Manager:
Jack Doughney, Leisure Services Director
The purpose of this project is to acquire parcels adjacent to the existing Jetty Park for additional
recreational uses and a parking area. The cost of the property is approximately $650,000.
Improvement of the park and parking will be a cooperative effort between the City of Fort Pierce and
the County. Improvements to the park and parking facilities are expected to cost $1,850,000.
Construction is anticipated in the 1999-2000 timeframe.
The County will be requesting $2,500,000 for these projects.
....."
,/
~ ------íl- \ .~ ~ ...
, \ ~ ~ i
~//O \~~'
\ ~
.1 : ~
,'}:. ~
/ ....,.
,//.;' " .....~ ~ !
\
\
,
~
I ;
\ \
. '""' ,~il
If'''. I ti
. \ \ \ "l
I ~ ~
\ \ \ \ ' J
: . t ~
. I \ n· ii
J\ . . . !I
\ ..'"
4 r ...
!s¡!
~ I' ø, , iI '<t
,. j ~: : .,)&.1 ~
,,~U"
II \ I r-.
~ .tiñ ,
I'! I'! ~
M
,
Q
Q
CO
,
,..
1'.
.~.
~4'
. "
..u!
o f ~t, /
fnj
,. & I ~ f
j .11
d II".
,/
\
~.
--
. \
J-.,
-
<0\
::: \
,~~-....
\
../
J'
//
".
J1/
"'" <tíj'
'. 0/:',
.
~ .
,,,,. þo
': 4 J
2 ,
¡.. 1 ·
J. ,I.
! ¡
~ · ' 'J
~: 11
ø 2 I
. 1'1
~ '/,
I' .
!..t"
lit
J. -~.
á
,¡¡
:>
2 cl
<I
ø
2
,..,..
..
..
I'!
VI N
I'!
.......
.r
~J.!.:··b
'\
\...-
1
.>
)
Q
æ
ã
...
'"
'"
;:
æ
~.
'"
is
w
ex:
~
f:'
\w.
)
~
~
Harbour Pointe Improvements
This proposal is for $1,750,000 to construct new roadway, recreational facilities,
and other infrastructure improvements on and adjacent to the Harbour Point
property at the north end of the Port of Ft. Pierce.
~
)
~
1
'-'
HARBOUR POINTE IMPROVEMENTS
Project Manager:
Jack Karibo, Interim Port Director
This property was purchased by the County in 1997 for commercial and recreational development
as a part of the Port of Fort Pierce. It has been used in 1998 for a trail ride staging area and in 1997
for the American Wind Symphony Orchestra concert. However, due to the lack if a suitable public
access, no infrastructure and public facilities, landscaping and other recreational amenities, no
improvement work has been undertaken on the site.
Use of the site will require roadway access which will cost approximately $125,000. The
approximate infrastructure cost to construct water and sewer on the site is $375,000 and it will take
approximately $250,000 for physical improvements to the site including a small-vessel docking
facility to make Harbour Pointe a usable quality recreational facility. Other improvements will
include bathroom facilities and fencing the site.
Additional infrastructure adjacent to the Harbour Pointe property to provide electrical, water, sewer
and stormwater facilities are needed. These facilities will compliment the new entry way project and
prepare for new development that will conform to the Port Charrette.
The County will be requesting $1,750,000 from the State for the improvements described above.
'-'
\.r
\."
Hutchinson Island Improvement Project
This is a request for $100,000 to plan and design improvements to improve the
quality of the beach environment and make Hutchinson Island a special place to
live and recreate.
\
~¡
'-')
\.)
HUTCHINSON ISLAND IMPROVEMENT PROJECT
Project Manager:
Jack Doughney, Leisure Services Director
This project involves long term beach development, recreation and a streetscape plan - including
beach amenities such as tables, grills, benches, dune crossover, fishing area, and boat launching
facility. These facilities are being developed for both North and South Hutchinson Island, and
North and South Causeway fÌ'om Indian River North to Martin County South AlA. They will
offer an entire new theme for Hutchinson Island that will enhance the beauty, useablility and
quality of the Island as a place to live and recreate. The initial schematic plan is represented by
the attached drawings, with actual design and engineering scheduled for 1999.
The'county will be requesting $100,000 for plans & design of the Hutchinson Island
Improvement Project.
". ßOARD OF COUNTY
'-' COMMISSIONERS
LEISURE
SERVICES
J. E. "Jacl~" Doughney III
Director
NAME OF PROJECT:
Hutchinson Island Plan
AMOUNT REQUESTED:
$500,000.00
.... :...-
\.,.
DESCRIPTION OF PROJECT:
Renovate the existing parks, develop collector sites, and connect each site with a six or eight foot
pathway through phases.
REASON:
To improve facilities and provide park sites along the barrier Islands in St. Lucie County to be
use as a continuous park system.
\.
JOHN D, BRUHN. Distticr No, 1 . KEN SATTLEr.. Disrr;a No.2. PAULA A. L£"),fIS, :::;s,-ict No.3' GAIìY CHAf\LES. Disttict NO.4' CLIFF ßAIìNES. District No.5
County AdmInistrator - 1/-.AJ9los M. Ande!'Son
2300 Virginia Avenue · Phone (561) 462-1515 · TCD (561) 462-1428
Moil: P.O. ßox 760. Fort pjerce. Fl34954-0760
~)
INFORMATION
Request:
Purpose:
~)
Info:
\.)
St. Lude County is requesting funding from the State of Florida in the
amount of $500,000.00 for the Hutchinson Island Plan.
The Hutchinson Island Plan is designed to improve and develop park
sites along the barrier island in St. Lude County to be used as a
continuous park system.
The goal of the Hutchinson Island Plan is to aeate a eoñdnuous park
System. This plan will take full advantage of existing parks and
mosquito impoundment by providing a natural experience for hiking,
biking, fishing, shell collecting, horseback riding, sunbathing, picnic,
swimming and an opportlJ1lity to obselVe nature with bird towers and
docks.
The Hutchinson Island Plan has three major parts or phases. First is to
renovate the existing parks; Second to develop collector sites; Third is
to connect each site with a'six to eight foot pathway.
The St. Lude Board of County Commissioners has committed
$500,000.00 in any effort to upgrade and improve our parks on
Hutchinson Island. Mosquito Control is in the continual process of
purchasing mosquito impoundment and Community Development is
working to improve pedestrian travel along A 1 A.
For the pedestrian, the parks will selVe as rest areas, points of interest
and collector locations with restrooms, bike racks, shelter and drinking
fountain.
Imagine being able to ride a bike over twenty miles round trip in and out
of beautiful beach parks and the natural Indian River Lagoon
environment. Stopping along the way to fISh, site see or just rest before
continuing on.
This is an important project to the County and State Tourism.
I
I
N
F
o
R
M
A
T
I
o
N
'-"
IMPROVEMENT SUMMARY
....,
·
·
·
·
·
·
·
..
\
\..-
LIST OF IMPROVEMENTS:
ENTRANCE
SIGNAGE ~,
NEW/RENOVATE DUNE CROSSOVEÚ'
RENOVATEINEW SHELTERS
RESTROOMS
PAVING· PARKING IMPROVEMENT
DRINKING WATER
BIKE RACKS
. ~. ~
LIST OF PARKS:
· BLUE HERON BLVD (EXCHANGE PARK)
· JOHN BROOK'S PARK
· FREDERICK DOUGLASS PARK
· MIDDLE COVE
· BLIND GREEK
· WALTON ROCK BEACH
· TOCEAN BAY
· HERMAN'S BAY
· NORMANDY BEACH
· DOLLMAN BEACH PARK
· WAVELAND
I
s
U
M
M
A
R
Y
BUDGET
\
'-"
· DEVELOPMENT Ad $ 1 00,000.00
· ENTRANCE 8l SIGNAGE $ 132,000.00
· DUNE CROSSOVERS $ 180,000.00
· SHELTERS $ 236,000.00
ì
~. · PARKING $ 200,000.00
· RESTROOMS $ 120,000.00
· PICNIC TABLES $ 20,000.00
· BIKE RACKS $ 6,000.00
· DRINKING WATER $ 6,000.00
$1,000,000.00
ST LUCIE COUNTY $ -500,000.00
REQUEST FROM STATE $ 500,000.00
-."
\..."
I
B
U
D
G
E
T
-..... \
"
,
\.,)
:-.;~.(~, '
~)
.' ,¡;;~!fR.
,:.1", ;''jJ.f.fW, "
~ß;, WI
;;If,-¡ft. ~., q--
>~tf~'I';; ':~~.
~r~;r:\
'~
,"r' . -,
;)\:.. .....
~~~. i/
~.,,' , .~-
'I
iIf.:,
.%\~~;
,~~;.:~~;~'/:<
. ':Ó'.~~ .
<~\
-:
o
o
ð
I
\
"
, \..
\ "-
\ \. ,
" '\
,\ '
'" " \
"-
"~ \.
" \.
~ '., \ \. ~ /
~~
~
~
.."~
~.
®
~
~
!§ã
!;I
II
E
N
T
R
A
N
C
E
(~
(\.r
(\....
Hutchinson Island Improvement Project
This is a request for $100,000 to plan and design improvements to improve the
quality of the beach environment and make Hutchinson Island a special place to
live and recreate.
\.,
(~
('-"
HUTCHINSON ISLAND IMPROVEMENT PROJECT
Project Manager:
Jack Doughney, Leisure Services Director
This project involves long term beach development, recreation and a streetscape plan - including
beach amenities such as tables, grills, benches, dune crossover, fishing area, and boat launching
facility. These facilities are being developed for both North and South Hutchinson Island, and
North and South Causeway from Indian River North to Martin County South AlA. They will
offer an entire new theme for Hutchinson Island that will enhance the beauty, useablility and
quality of the Island as a place to live and recreate. The initial schematic plan is represented by
the attached drawings, with actual design and engineering scheduled for 1999.
The county will be requesting $500,000 for plans & design of the Hutchinson Island
Improvement Project.
«'
~~
\\J~'
"
ßOARD OF COUNTY
'-" COMMISSIONERS
LEISURE
SERVICES
J. E. "Jacl~" Doughney III
Director
NAME OF PROJECT:
Hutchinson Island Plan
AMOUNT REQUESTED:
$500,000.00
,"0. :..._
'- DESCRIPTION OF PROJECT:
Renovate the existing parks, develop collector sites, and connect each site with a six or eight foot
pathway through phases.
REASON:
To improve facilities and provide park sites along the barrier Islands in St. Lucie County to be
use as a continuous park system.
:\..-
JOHN D. OI\UHN. DistriCT No.1' KEN SATTlEI\. Dlm:a No.2' PAULA A. LEVIS. ::Sricr No. J . GARY CHARlES. District No.4' CLIFF OAIìNES. Disrrlcr No.5
Counry Adminlstrciror - !/;oglos M. AndeßOn
2.300 Virginia Avenue · Phone (561) 462-1515 · TeD (561) 462-1428
Moil: P.O. OOX 760, Fort P:erce, FL 34954-D760
'-')
INFORMATION
I
Request:
.
Purpose:
"-)
Info:
~)
St. Luåe County is requesting funding from the State of Florida in the
amount of $500,000.00 for the Hutchinson Island Plan.
The Hutchinson Island Plan is designed to improve and develop park
sites along the banier island in St. Luåe County to be used as a
continuous park system.
The goal of the Hutchinson Island Plan is to create a 'continuous park
System. This plan will take full advantage of existing parks and
mosquito impoundment by providing a natural experience for hiking,
biking, fishing, shell collecting, horseback riding, sunbathing, picnic,
swimming and an opportu,nity to observe nature with bird towers and ,
docks.
The Hutchinson Island Plan has three major parts or phases. First is to
renovate the existing parks; Second to develop collector sites; Third is
to connect each site with a'six to eight foot pathway.
The St. Lucie Board of County Commissioners has committed
$500,000.00 in any effort to upgrade and improve our parks on
Hutchinson Island. Mosquito Control is in the continual process of
purchasing mosquito impoundment and Community Development is
working to improve pedestrian travel along A 1 A.
For the pedestrian, the parks wiD serve as rest areas, points of interest
and coßector locations with restrooms, bike racks, shelter and drinking
fountain.
Imagine being able to ride a bike over twenty miles round trip in and out
of beautiful beach parks and the natural Indian River Lagoon
environment. Stopping along the way to fISh, site see or just rest before
continuing on.
This is an important project to the County and State Tourism.
~
IMPROVEMENTSU~ARY
LIST OF IMPROVEMENTS:
l\w
+ ENTRANCE
+ ' SIGNAGE r---,
+ NEW/RENOVATE DUNE CROSSOVEÛ·
+ RENOVATEINEW SHELTERS
+ RESTROOMS
+ PAVING - PARKING IMPROVEMENT
· DRINKING WATER
. + BIKE RACKS
, . . .~..-
LIST OF PARKS:
"
· BLUE HERON BLVD (EXCHANGE PARK)
· JOHN BROOK'S PARK
· FREDERICK DOUGLASS PARK
+ MIDDLE COVE
+ BLIND GREEK
+ WALTON ROCK BEACH
+ "OCEAN BAY
+ HERMAN'S BAY
+ NORMANDY BEACH
+ DOLLMAN BEACH PARK
+ WAVELAND
.~
I
s
(
1\
1\
Î':
}
")
BUDGET
I
i
~
· DEVELOPMENT A&E $ 100,000.00
· ENTRANCE &: SIGNAGE $ 132,000.00
· DUNE CROSSOVERS $ 180,000.00
· SHELTERS $ 236,000.00
\
í~ · PARKING $ 200,000.00
· RESTROOMS $ 120,000.00
· PICNIC TABLES $ 20,000.00
· BIKE RACKS $ 6,000.00
· DRINKING WATER $ 6,000.00
$1,000,000.00
ST LUCIE COUNTY $ -500,000.00
REQUEST FROM STATE $ 500,000.00
..
.~
( \
~
"
'\
')
\
\
'-
\
\.
\
I '
'-'
.~~.~"
\
~
...::It!I.
:"" !I?"
Øl¡,,,· . '. I'!/.
'~r~·m: ,~(.
~f~;}:: '
~.'
'~t~'
/!
{~:i:
'~;.:~.' :'/;:;'.~~.?
"1~;~ .
..;~...
"
&=
o
o
ð
I
\
"
\ "-
\" '
\ ~
,\ "
..... \ "
" " \
"-
"~ "-
..... '!.\
, "-
~' '\'
, \ "-
-, \..\ ~ /
. ..J./
0j
®
ç:§j
"'''~
€3Ø...
~.
~
t:eJ
I ~
a{j
II
E
N
T
R
A
N
C
E
\'-"
.\.
\~
Football and Soccer Stadium
A proposal for $750,000 to build an new football and soccer stadium as a multi-
agency multi-purpose facility on property adjacent to the Thomas J. White
Stadium in Port St. Lucie.
(\..
i~
i \.,...
FOOTBALL AND SOCCER STADIUM
Project Manager:
Jack Doughney, Leisure Services Director
The 1998 request for the project was not funded however, the application is being updated and
coordinated with the School Board for submission to the State in the fall of 1998. This project
will develop a new regional sports facility to broaden the use of the Thomas J. White Stadium in
South St. Lucie County. This facility will be used by the School District as part of the new
Centennial High School Sports Program. The land for the stadíum has been donated by a private
developer and the project is ready to construct as soon as funding can be obtained.
Groundbreaking should occur in early 1999. The County will be requesting $750,000 from the
State for this project.
~ ßOARD OF COUNTY
COMMISSIONERS
LEISURE
SERVICES
J. E. "Jac1~" Doughney III,
DireCTor
NAME OF PROJECT:
Treasure Coast Sports Stadium
AMOUNT OF REQUEST:
$750,000.00
"" DESCRIPTION OF PROJECT:
..::-.-'":-~..
This proj ect will be located in the southern part of St. Lucie County, as part of the Thomas 1.
White Stadium/Sports Complex, and will be available year around for a variety of sports
including football, soccer, lacrosse, and rugby. It will also be available for professional spor;ts
games and training, as well as intra-scholastic, and private athletic club use. It will also be
available as a venue for entertainment and music events.
REASON FOR FtJNDING:
This will provide a much needed professional and amateur athletic facility for the southern part
of the county where there is none for football and soccer.
.'-'
H~WNACI'-MEM'Sf AlXUWLUSEPT. WI"D
JOHN D. CRUHN. Dlsrricr No. 1 . KEN SAm£R. Disnicr No.2' PAULA. A. LEWIS. Disrricr No. J . GARY CHARLES. Disnicr No. 4 . CUff CARNES. Disrricr No. 5
Gunry AdminlsTrotor - Douglas M. Anderson
'2300 Virginia Avenue · Phone (561) 462-1515 · TDD (561) 462-1428
TREASURE COAST SPORTS STADIUM
.\W
(
INTRODUCTION
Under this proposal, the current 10 million dollar St. Lucie County Sports Complex
would be expanded to include a 4000 seat, tri-county professional regional soccer/football
stadium facility. This facility would turn the sports complex into a year round destination,
attracting both tourists and local citizens to professional, amateur, collegiate, and intra-
scholastic competitive events and sports activities. The new venue will share existing
training rooms, parking, media area, office space, and all other amenities currently offered
at the 100 acre sports complex.
The St. Lucie County Sports Complex will now be able to host NFL pro football,
~ collegiate training camps and professional soccer events. Treasure C01{st-area high schools
will also be featured weekly during the fall by playing Friday night football. In addition,
other athletic events such as soccer, football, and baseball all star showcase, both on the.
~ . I
pro level and collegiate level will be held at the new facility during their respective seasons.
Live entertainment will also headline at the facility, which will be capable of hosting
concerts and music festivals. The use of existing support resources, county facilities, staff,
and operation dollars (funded locally by our TDC tax), will combine to make this facility
an instant success on the Treasure Coast. The proposed facility will be located 1/4 mile
north of the 1-95 interchange on St. Lucie West Boulevard in south St. Lucie County and
puts the expanded Sports Complex within 30 minutes driving time to over 350,000
residents of the Treasure Coast.
'-'
TREASURE COAST SPORTS STADIUM
'-'
I
CONSTRUCTION BUDGET
Cost Item
$ 170,000.00 Sports Facility Lighting
80,000.00 Buildings (Box Office, Office,
Lockers, Concessions, etc...)
140,000.00 Bleachers, Ramps, Storage Area
25,000.00 Scoreboard, Public Address System
15,000.00 Fences
18,000.00 RoadlWa(king Paths
30,000.00 Landscaping
5,000.00 Support Furniture
42,000.00 Irrigation/W ell
45,000.00 Sod - Bermuda/Field
~ 9,000.00 Press BoxlEquipment. :.'
4,000.00 Signage
8,000.00 Pedestrian Lighting
2,000.00 Football Goal Posts
2,000.00 Soccer Goals
50,000.00 Site Work
20,000.00 Drainage
15,000.00 Site Prep/Grub/Clear
70.000.00 ArchitecturallEngineering Services
$750,000.00 TOTAL
'--'
("-'
,
\w
'-'
TREASURE COAST SPORTS STADIUM
PROGRAMMING/ OVERVIEW
Football
Professional Training! Spring Site Facility
Varsity, Junior Varsity, Freshman
Pro - Mini CampI Compoundsffry-outsl Athletic Showcase Events
Soccer
Professional Soccerl GameslLeagueffournaments
Varsity - Boys'/Girls'
Junior Varsity - Boys'/Girls'
Lacrosse
Varsity, Junior Varsity, Intra scholastic, Club
-
Rugby
Games, Tournaments, League
Club Soccer
Boys' IGirls'
Marching Band Competition
Field Hockey
Cheerleading Competitions
-1
G)O
(1)0
<83
t33
-g.c
õ' :.:J
-;::+
:J'<
Õ
30
~(1)
-.<
g(1)
~o
cn"D
<ñ3 ~
~(1) ~T
~-.J-'~ b ~
z ~ ,,~. ,," ./ ~;/';r::--=-
,'''ì ì :>. ,'- -. I
II' \ ,II" X'(·· ..J- ... '-lC\,-\(" \
1 ,. '\\. ,'I' ,if' ,'y" 1,'1 1- Do - -- L ~ ,l-I fI¿ 'Z - ,
I (Î t :'i\ 1 ,1<- "~v~" 'à \.... ~" I 0: r) 'I J. -,/..'?<:' \ "' vJ.., 'r
~ V \. ,"', ,D",I" c. 1- i i' . ,I c""'" ,':0',
'.} , , rrmä\'" ~ . - PEAGO ' ,,' ¡ ;::i1..> '
__,_v ç-;,''- '.-:i ;. \ ~ lY.' '(;;__,._" If: ' ' - . \1.. ç- 1·· J _ _._ ~ -- ....-.- H.---- s.:..'y'
_~~_~. " ~"r'V,..".1 ,&Dc ' -..-....' , .-
,_, ¡.,¡ '-':"V .>;;:' \C '::: l'>;;l1FIT {I^'VIS ...1 J"- ,\ I' '- ,,'"''
I np ~ ,,1~ '/, ,:~':':: -:;"1::}6 DC; '>ßJlt Î.dd' \--.' en· \ ' ' I .:"> »
'Fl' '. ~ ,-<.10>:;/10'<:'11 " . ' u' . - ,. v '
, " I" '. ",.¡;< ,.""" '.: . ,,,....," ... i 0" I ,) ,-, . ,. ,
1 ' 'I ')1" <_", '/.. ',ê'V¿;;,Ãc:;:;;A.\o' I "'iff' ; cc,--< .C: " - \ . - . - </ /', '.
I~"" .!f"""" ",,:1 I ,;\,n7'i . :; .. , -.-",,'. \-C. 00 m /é' en .",' .. ..
~"" _ ", . """,n'!] _ ", \ \ . ",,' u '-'.'.. -
I.. ~' .,.. ..,,0; "'-"ffi' . . I " , en ~ . . ° ~.
.__; ..,- ," . _: 'c' .J' "f,;:; '~', -.?¿O: . " .. \ ¡;;", i \, ,,~. :
... '-.1 ~. . ,,;J!;" ..:i Qi'J/ '":,,,0/-6 'd · ß ro ~ .' . ' ,Pf' .
_, 'D" "",-,'W-" .",. ,,',;zw-j;' '/~ ''', .. ~ 0" ! ' ',\ ,0 °
I \' ra' ",.. '>i "dc"'''' ..::>~" -- /;:/ '. \i\» ' ' ", ,0' . · ' ..' l,\ '0 g
\' " LJR,' _ :,.; 1/,1:1/:--\( ) I 0' _~-' ~"'\ \ \ '," /"~ N' ¡!) , " ,--..., J 3'-:;)
).. I' \"1.1,, /'_ \1.r.... J Dt. .. «, , . ~ " v' en ' ¡ ~ -,-,:5
?. " ,:d '."" :! ' ,," '. ",(."'.! ',,.-" . ,. - ' " '. I ~ ""- "'"
,. m' ",., , '~',' ,.' , ' ,",'" .," =<p' r ro"
I /)''15' ....;;;.'i- ,:;Pc"''' ',:0"";, ' ," ,:~\ \rr(> ,¡ """"",,,,,,,,-;~-~' 'c-O ! ---..., ~ ':
V'- ,~. "<_,,.0$""", ,T-~ _ :iØ"~-~ ~""' f' :1,"" -"'00 Z ~- i Z ,:
~~;~~~~~~\>~J®\:~,~:~g /~{~\"'f??"~~ ¡~ ~~\"-~- ~'l·t-'_'--l'_'---"-'~'-
nHA'. ,"I(ZY'" Ii /,' \ ,,~(\ '(1) ";2, ",-,
~s~\:$¡ l.Jfi{-f\! .: ,~/,~~~\; '-~~~)~ ~~~?d- ~.ç./ ~
A', ~.W:'i1.\"\'\ 'Jf· i' .--,--~¿:&>JI'¡IJ"'!i$ ",( ,,1' z m
I "n.~ ~ ,CI," I "=\ 1_ ,,' -<"i fJ""'ID'~ ' . . I - :IJ
) 14r~~.!m\\17~U~ I~~ rf1~\ . . ~(., ~\ g C?~
I ' c' L lJI}""' c,JInJ"ID0'/ x,.,1 ~s \ ¿':: ;"j
I 1,," <;" v':'II j ~ ïl,';:;¿// ,-f;"; \ m' ....--', ;~', " \"
, _ # ,(IIU -~' H~' ~-' ".,
_I _~' =. r-~-*,,;8t! ' ," .\ \ ,.,' uI""""
" ',' '-" ;,;,\~1IJ\\\\""-<v '>,/"i i -f:.l\\ \ \\' U--'--~~- ~
~ ", :, "qr'! :'':1':': n5\¥:,4"f.'? \ ,8 \' Ii' \ // \ . 1
lJ ¡'j~¿"",1 ! V Op,\\<2";>"'\ \~f_'.-3-~\'- \ .-\ \ ,---' t_...J ,:
~"'T6' '-----.!¡\vB"~~Jy- \ \..-1' h"~" ! ,1 ' .
~ .." ,_' &=~. r< \ f\ (:~-",~_:, j
E ~ \. '':::{ }.IT~~\\ \\..-.\...._'-~, ,-~
o _ é _ ... ... .' · .' r .,,,,,-
ro' CD ._ /); / (...,., ~"1 (:::,-.;C?' ¡ç:~~
:<~. / v) ~" \ \ ,--' \ \!:!ðÄ "
ro 0 \: - .... ' " _.--....~
i ~ i ~ ~-:I¿è.':::l'.-LC\ï::=::1 v'ì<ti
0. en ' iI I '-":-"
ëi) g. I.. 1- L__! ! ! I' '~
° u' ,
g> º- l f \ 1 f-,
T ! \"'Ii l,L-
~ ,L;!'~"¡¡;!í\1 - . ~---"
~ ./.i",>-"!'\Jt~...QdJ¡¡II\1 ,it,1 JUre;:":!
~~1iîffi~~~.íll~I~~§
!, . ",r " ¡fbê ,: EEI'B¡±;-';EB1~mC;r":lH'HH+'i~!ê:FHI ....,! :1tHhm,,!ffi
_m ,"HFC;cc; ",''''~'=::--''': oj:, '. :1 ... [J=j milL; L1LÎ ffi :l~ 6rrültm i ~ ~'~mm:~
~- '<
v----,
_ '> .. ~ .-----_.J
~
Iii ~
)1 -0
p¡ ~
:.', ~
(I ~
I~' ~
'1'1 en
I 1 <D
!'J ¥
lit 3
IH ~
(Ii ~
1 CD
I-:==::C~/'
--.
.........................mm......._.
-a
o
:0
~
(f)
:-I
r
C
o
m
ïl
s;:
(f)-J
-o:IJ
Om
:IJ»
-J(f)
(f)C
:IJ
(f)m
-J
»0
00
C»
~~
.....c
..
,",
-0
:0
o
-0
o
(f)
m
o
)
~
)
'-'
)
'--'
Indian River Estates/Savannas Water Retention Facilities Retrofit Project
A proposal for $3.7 million to build a new water retention facility to improve the
flow of water, reduce flooding and improve water quality in Indian River Estates
and the Savannas.
~
INDIAN RIVER EST ATES/SA V ANNAS WATER RETENTION FACILITIES
RETROFIT PROJECT
Project Manager:
Don West, Acting Public Works Director
Currently, St. Lucie County is partnering with SFWMD, FDEP, and Indian River Lagoon
National Estuary Program (NEP), to design this facility. The project involves constructing a
storm water collection and treatment system to handle stonn water runoff from the Indian River
Estates Subdivision. Storm water runoff from the subdivision drains untreated into the Savannas
State Preserve. This is having a detrimental effect on the Savannas ecosystem. Storm water
from Indian River Estates Subdivision will be collected and pumped into a retention pond to
improve water quality, prior to being discharged to the Savannas. A conceptional design has
been completed at this time, and we are currently investigating land acquisition for the retention
pond. The project cost is estimated at approximately $3.7 million dollars, including land
purchase. Final design, permitting, land acquisition, and construction could be completed in
three years.
)
~ The County will be requesting $3.7 million from the State for this project.
)
'-"
I
'-'
~
)
'-
South 25th Street Phase I and Midway Road Widening
A proposal for $12,940,000 to build two critical roadways in central St. Lucie
County to improve traffic flows and reduce serious congestion and concurrency
problems.
)
'-'
SOUTH 25TH STREET PHASE I AND MIDWAY ROAD WIDENING
Project Manager:
Don West, Acting Public Works Director
The 25th Street project involves widening the existing two lane roadway to four lanes, from
Midway Road to Edwards Road, a distance of 2.4 miles. Construction would include a storm
water collection system with retention ponds, and pedestrian walkways. Land acquisition for
right-of-way and actual construction could be completed in 3 years. Design plans and permits
are completed. The cost, $7,730,000.
The Midway Road project involves widening the existing two lane roadway to four lanes, from
25th Street to U.S. Hwy 1, a distance of 1.3 miles. Construction would include a storm water
collçction system with retention ponds, pedestrian walkways, and widening of the bridge over
the North 81. Lucie River. Land acquisition for right-of-way and actual construction could be
completed in two years. Design plans and permits are completed. The cost is $5,210,000. ,
) The County will be requesting $12,940,000 for these two road projects.
\.r
)
'-
'-'
rORT PIERCE
INL£T
PROPOSED
S. 2mI SI'REET
($7,m,CXX'J)
PROPOSED
MIDWAY ROAD
($5,210,000)
..."
.....
PROPOSED TRANSPORTATION IMPROVEMENTS
FOR UNINCORPORATED ST. LUCIE COUNTY, FLORIDA
'-"
\.".
\..
North County Water Improvement Project
A proposal for $2,000,000 to build a new water transmission system in north St.
Lucie County to provide needed water to residents and to encourage economic
development in the St. Lucie County International Airport area.
'-'
'-'
)
\..
NORTH COUNTY WATER IMPROVEMENT PROJECT
Project Manager:
Bill Blazak, Utilities Director
With the need for new economic development in St. Lucie County, construction of a potable
water line to connect to the Indian River County water distribution system would be very
valuable. The connection to Indian River County would provide for an immediate source of
water to our North County residents and commercial/industrial interests. The connection would
serve as an interim source of water and establish a window for design and implementation of a
domestic water plant that would be completed in two to three years and be owned and operated
by St. Lucie County. As an alternate, a new water plant may be developed initially within St.
Lucie County, should the Indian River County concept not be feasible.
The estimated cost of the new potable water transmission system for the North County or for the
new In-County Water Plant is $2,000,000. This amount will be requested from the State.
ENGINEER'S REPORT
'-"
Mastellar & Moeler has prepared this Report to develop a plan for providing the North
U.S. Highway #1 And St. Lucie County Airport with potable water and fire protection facilities.
This report is an engineer's construction cost estimate for servicing the St. Lucie County Airport
and other areas of the North County with potable water.
It is proposed that a 12" diameter potable water transmission main connect to Indian River
County's potable water system at the intersection of Old Dixie Highway and Highland Drive
with a metered system and continue south along Old Dixie Highway to U.S.#I, thence south
along U.S. Highway # 1 to F airwinds Drive, thence west to the F airwinds Golf Course Clubhouse
Entrance, thence in a southerly direction to Industrial Avenue 3, thence west to Industrial 33rd
Street, and south to a point of connection north of St. Lucie Boulevard. We also propose three
(3) jack and bores under U.S. Highway # 1 for service to Harbor Branch Oceanographic Institute,
an existing developed area between Julian Drive and Amanda Road, and at Indrio Road.
We have proposed a number of points of connection for existing developed area along the west
side ofU. S. Highway # 1. In addition to the U.S. Highway #1 corridor, a line will be extended
east to Old Dixie Highway and located to provide potable service to Harbor Branch
Oceanographic Institute and future service to St. Lucie Village. Existing business in the area
will benefit by the extension as well.
\.. It is estimated that the construction cost of this transmission line will be $2,000,000.00.
The route described above is not the only alternative for serving St. Lucie County Airport and the
North County, but, demonstrates the magnitude of this project and is solely for the purpose of
discussion.
It is estimated that the construction.ofthis transmission main will be $2,000,000.00.
revised 9/3/98
'-'
ST. LUCIE AIRPORT I NORTH COUNTY WATER CONNECTION TO INDIAN
..... RIVER COUNTY'S POTABLE WATER SYSTEM.
ENGINEER'S PROJECT COST ESTIMATE
DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE
12" Dia. water main 44,443 LF $28.00 $1,244,404.00
6" Dia. water main 150 LF $14.00 $2,100.00
12" Dia. gate valve 31 EA $1,200.00 $37,200.00
8" Dia. gate valve 8 EA $600.00 $4,800.00
6" Dia. gate valve 10 EA $500.00 $5,000.00
Fire Hydrant Assembly 34 EA $2,000.00 $68,000.00
Master Meter 1 LS $40,000.00 $40,000.00
Jack & Bore US#1 - 120 LF w/12" 1 LS $40,000.00 $40,000.00
dia. pipe
'-"
Jack & Bore US#1 - 120 LF wI 8" 2 LS $30,000.00 $60,000.00
dia. pipe
Paved road restoration 1,600 LF $35.00 $56,000.00
Non-paved road restoration 600 LF $15.00 $9,000.00
Paved drive restoration 2,500 LF $30.00 $75,000.00
Non-paved drive restoration 2,100 LF $10.00 $21,000.00
Sod 30,4000 LF $2.50 $76,000.00
SUBTOTAL $ 1,738,504.00
CONTINGENCY $261,496.00
TOTAL $ 2,000,000.00
revised 9/3/98
""
\...-
""
~
Savanna Recreation Area Improvements
A proposal for $850,000 to construct new infrastructure and other recreational
improvements which will improve the quality of this environmentally important
area.
~ BOARD OF COUNTY
COMMISSIONERS
LEISURE
SERVICES
J. E. "Jacl~" Doughney III
Director
NAME OF PROJECT:
Savannas Outdoor Recreation Area Improvements
AMOUNT OF REQUEST:
$850,000
DESCRIPTION OF PROJECT:
In 1996, the Florida Department of Environmental Protection, Division of
Recreation and Parks inspected the Savannas and prepared a report outlining areas
\.. where changes and/or improvements could be made that would result in more cost
effective and efficient park operations. This project will implement several of the
state's recommendations including, developing a master plan for park
development, replace/relocate the park's entrance station, renovate/replace
existing restroom facilities, and upgrade the utility infrastructure within the park.
REASON FOR FUNDING:
St. Lucie County is requesting funding assistance in order make improvements to
the Savannas Outdoor Recreation Area. The improvements will bring existing
facility and service deficiencies into compliance with local building codes, in
addition to implementing many of the recommendations made by the state DEP
Division of Recreation and Parks. The Savannas Outdoor Recreation Area is an
integral component of the county's park and facility inventory designed to
promote eco-tourism within St. Lucie County.
'-"
JOHN D. ßIìUHN, District NO.1. KEN SATTLEIì, District No.2' PAULA A. LEWIS, District No. J . GARY CHARLES, Districr No.4' CLIFF ßARNES, District No, 5
County Administrator· Douglas M, Anderson
2300 Virginia Avenue . Phone (561) 462-1515 · TDD (561) 462-1428
Mail: P.O. ßox 760. Fort Pierce. FL 34954-0760
'-'
ST. LUCIE COUNTY
BOARD OF COUNTY COMMISSIONERS
Department of Leisure Services
SAVANNAS OUTDOOR RECREATION AREA
IMPROVEMENT PROJECT
'-'
'-"
/
'-'
ST. LUCIE COUNTY
BOARD OF COUNTY COMMISSIONERS
Department of Leisure Services
SAVANNAS OUTDOOR RECREATION AREA
IMPROVEMENT PROJECT
REQUEST:
S1. Lucie County is requesting funding assistance in the
amount of $850,000 in order to make capital
improvements to the Savannas Outdoor Recreation Area.
JUSTIFICATION:
The Savannas Outdoor Recreation Area is a 600 acre,
predominately wetland parcel located in central S1. Lucie
County. Owned by the City ofF1. Pierce, the Savannas
has been leased to S1. Lucie County since the mid 1960's
for the purpose of providing public outdoor recreation
opportunities
~
'-"
In 1968, the Savannas was developed into a full service
park and campground and offered park visitors a choice
of three types of camp sites: unimproved sites for tent
camping only, semi-improved sites offering water and
electric, and full service sites offering water, electric and
wastewater collection. In addition, the Savannas offered
an abundance of recreational activities including boating,
fishing, swimming, picnicking, hiking and nature
observation. The campground was heavily used during
the winter and spring months with campers coming from
across the United States to enjoy the Savannas
experience. In addition, local residents regularly utilized
the park on a "day use" basis. The Savannas serves as a
key facility in the County's effort to attract eco-tourism
to S1. Lucie County.
'-"
Since our initial investment in the Savannas over 30
years ago, many things have changed, including the
needs and demands of the modern day camping
enthusiast. Today's camper requires more in the way of
campground infrastructure and utilities. Camping
trailers and recreational vehicles (RV's) are bigger, and
more importantly, more common than in 1968. Existing
restroom facilities no longer meet the minimum building
codes and do not comply with the Americans with
Disabilities Act. Electrical service to most of the park is
dangerously outdated, and ~t times has damaged some
camping units due to electrical power surges. In sum,
the Savannas Outdoor Recreation Area is showing the
effects of 30 years of intense use with little or no capital
investment since 1968.
'-
St. Lucie County is proposing to revitalize the Savannas
by investing in several projects that will result in more
cost effective and efficient park operations. Our first
step will be to develop a master plan that will fully
utilize the natural areas in a more efficient manner. This
plan will serve as a guide for all future park
development. A second element will be the replacement
of the park entrance station. This station is integral to
the smooth operation of the park and will serve as the
park administration and operations hub. Finally, a major
infusion of capital is required to upgrade the existing
utility infrastructure. All existing restroom facilities are
proposed to be renovated or replaced in order to comply
with current accessability and building codes. In
addition, the electrical service to existing campsites will
be modernized to meet the demands of the modern day
camper. These improvements will ensure that the
Savannas Outdoor Recreation Area will be available to
the citizens and visitors of St. Lucie County for years to
come.
~
'-'
ST. LUCIE COUNTY
BOARD OF COUNTY COMMISSIONERS
Department of Leisure Services
SA V ANNAS OUTDOOR RECREATION AREA
IMPROVEMENT PROJECT
In 1996, the Florida Department of Environmental Protection, Division of Recreation and Parks,
was asked to inspect the Savannas Outdoor Recreation Area an~ recommend changes and/or
improvements to the park that would result in a more efficient operation. The following
proposed improvements were recommended by the state in a report dated September 5, 1996:
A. Master plan - Develop a master plan to fully utilize the natural areas in the most efficient
manner. This should be accomplished prior to making any permanent modifications to
the site such as replacing or adding new structures.
. Master plan $ 20,000
'-'
B.
Park Entrance Station - It is proposed to replace the entrance station, which is a key
structure to the park, both visually and functionally. The new station will also serve as
the park administration and operations hub.
. Entrance Station Replacement $ 80,000
C. Replace/Renovate Restroom Facilities - Existing facilities are to be renovated or replaced
in order to meet current accessability codes as well as meet minimum ADA compliance
standards.
. Restrooms $175,000
D. Utility Infrastructure Upgrades - Electrical, Water, and Sewer utilities within the park are
to be upgraded to meet the demands of the modem day camper as well as the present day
building and health codes.
. Utility Infrastructure Upgrades $190,000
E.
Lake & Pond Restoration - The existing upland lake and pond were once used for
recreational swimming by campers and visitors to the park. This activity was
discontinued several years ago due to the closing of the artesian wells which supplied
water to the park. Once restored, fishing decks will be constructed at key locations
around the lake and pond for use by park visitors that do not have access to a boat.
. Lake & Pond Restoration $ 80,000
. Fishing Decks $ 60,000
'-"
'--'
~
""
F.
SA V ANNAS OUTDOOR RECREATION AREA
IMPROVEMENT PROJECT
Natural Systems Restoration - All invasive exotic vegetation is proposed to be removed
ftom the upland portions ofthe park. These areas will be replanted with native tree and
shrub species that would typically be found within the Savannas natural ecosystem.
· Exotic Vegetation Removal $ 60,000
· Native Trees & Shrubs $ 90,000
G.
Camp Site Improvements - Existing campsites will be redesigned and upgraded to meet
the current demands of campers.
· Camp site Improvements $ 40,000
H.
Camp Activity/Social Pavilion - An informal gathering place is proposed where campers
can gather for evening socials, children's programs and other camp activities. The
structure is proposed to be an open sided screened pavilion.
· Camp Pavilion $ 55.000
TOTAL ANTICIPATED COSTS FOR IMPROVEMENTS