HomeMy WebLinkAboutAgenda Packet 05-08-01
:j'
'-
"'"
MAY 8, 2001
9:00 AM
BOARD OF COUNTY
COMMISSIONERS MEETING AGENDA
WELCOME
GENERAL RULES AND PROCEDURES
Attached is the agenda which will determine the order of business conducted at today's Board
meeting:
CONSENT AGENDA- These items are considered routine and are enacted by one motion. There
will be no separate discussion of these items unless a Commissioner so requests.
REGUL<ill AGENDA ITEMS- Proclamations, Presentations, Public Hearings, and Department
requests are items which the Commission will discuss individually usually in the order listed on
the agenda.
PUBLIC HEARINGS- These items are usually heard on the first and third Tuesdays at 7:00 P.M. or
as soon thereafter as possible. However, if a public hearing is scheduled for a meeting on a second
or fourth Tuesday, which begins at 9:00 AM., then public hearings will be heard at 9:00 AM. or
as soon thereafter as possible. These time designations are intended to indicate that an item will
norbe addressed prior to the listed time. The Chairman will open each public hearing and asks
anyone wishing to speak to come forward, one at a time. Comments will be limited to five
minutes.
As a general rule, when issues are scheduled before the Commission under department request
or public hearing, the order of presentation is: (1) County staff presents the details of the Board
item (2) Commissioners comment (3) if a public hearing, the Chairman will ask for public
comment, (4) further discussion and action by the Board.
ADDRESSING THE COMMISSION- Please state your name and address, speaking clearly into the
microphone. If you have backup material, please have eight copies ready for distribution.
NON-AGENDA ITEMS- These items are presented by an individual Commissioner or staff as
necessary at the conclusion of the printed agenda.
PUBLIC COMMENT- Time is allotted at the beginning of each meeting for general public comment.
Please limit comments to five minutes.
DECORUìvI- Please be respectful of others opinion.
MEETINGS- All Board meetings are open to the public and are held on the first and third Tuesdays
of each month at 7:00 P.M. and on the second and fourth Tuesdays at 9:00 AM., unless otherwise
advertised. Meetings are held in the County Commission Chambers in the Roger Poitras
AdrninistrationAnnex at 2300 Virginia Ave., Ft. Pierce, FL 34982. The Board schedules additional
workshops throughout the year necessary to accomplish their goals and commitments. Notice is
provided of these workshops. Anyone with a disability requiring accommodation to attend this
meeting should contact the St. Lucie County Community Services Manager at (561) 462-1777 or
TDD (561) 462-1428 at least forty-eight(48) hours prior to the meeting.
BOARD OF COUNTY
COMMISSIONERS
fl
'-'
-...I
John D. Bruhn
Doug Coward
Paula A. Lewis
Frannie Hutchinson
Cliff Barnes
Districtl
District 2
District 3
District 4
District 5
www.stlucieco.gov
May 8, 2001
9:00 AM.
AGENDA
INVOCATION
PLEDGE OF AlLEGIANCE
1. MINUTES
Approve the minutes of the meeting held May 1, 2001.1ppròJf.d.
2. PROCLAMATION/PRESENTATION
A
B.
First Annual St. Lucie County Commercial Recycling Partnership Award -
The Board and Herb Burgart, Recycling/Waste Reduction Manager, will
present a certificate to Bev smi~~l;E.f!~M{1..f'd¡;rr£IJM .
Resolution No. 01-94- Proclai~ng June 2,2001 as "YMCA Day" in St. Lucie
County, Florida. v' frP¡J0./-d
Resolution No. 01-100 - Proclajrning the jUonth of Mayas "Civility Month"
in St. Lucie County, Florida. v ttpjJí{)reO
Resolution No. 01-101 - Proclaiming the week of May 6, 2001 through May
12,2001, as "Drinking Water Week" in St. Lucie County, Florida. ihz¡p(Jtle-rl
Ray Wazny, Public Works Director will update the Board on the Scoping
Document for Marine Protection.
c.
D.
E.
3. GENERAl PUBLIC COMMENT
4. CONSENT AGENDA pi uS (!,-A ( -ApprùNCÍ
NOTICE: All Proceedings before this Board are electronically recorded. Any person who decides to appeal any action taken by the Board
at these meetings will need a record of the proceedings and for such purpose may need to ensure that a verbatim record of the proceedings
is made. Upon the request of any party to the proceedings. individuals testifying during a hearing will be sworn in. My party to the
proceedings will be granted the opportunity to cross-examine any individ,..1 testifying during a hearing upon request. Myone with a disability
requiring accommodation to attend this meeting should contact the St Lucie County Community Services Manager at (561) 462-1777 or
TDD (561) 462-1428 at least forty-eight(48) hours prior to the meeting.
,
'"
....,,¡
REGULAR AGENDA
MAY 8, 2001
PAGE TWO
PUBUC HEARINGS
SA. There are no public hearings scheduled for May 8, 2001.
End of Public Hearings
G COUNTY AlTORNFY
jC%~l~;)J.\O Resolution No. 01-87 - Consider staff recommendation to adopt Resolution No. 01-
"\ - {~ín~~ 87 as drafted, requesting the State of Florida Enforce the Usury Law and Other
.9 ~ J y::onsumer Protections Against Payday Lenders.
7. PURCHASING
Bid No. 01-032 / Indian River Lagoon Trace - Consider staff recommendation to
award the bid to Dickerson, Florida, Inc. for $990,038 and authorize the Chairman
to sign the contract as prepared by the County Attorney. ¡~(OV't'Æ .
8. ADMINISTRATION
A County Extension Campus Expansion - Consider staff recommendation to
proceed with the purchase of approximately 12 acres of land from the
University of Florida in the amount of $88,800 plus closing costs, and that
this amount be loaned from Contingency for this purpose. This purchase
would be subject to the review and approval of the title policy and
environmental assessment by the County Attorney. j HPP¡ðJ"lÆ .
B. Bi-weekly Committee Reports - The Board will give updates on the various
committees and advisory boards that they serve on.
bruhn - ~e (omfì1f()dah dY) m r ~ by 121f/m/¿J .
~
'-/
'wi
CONSENT AGENDA
Mav 8. 2001
1. WARRANTS LIST
Approve warrants list No. 31.
2. PARKS AND RECREATION
A Budget Amendment 01-142/Equipment Request 01-250 - Consider staff
recommendation to approve the budget amendment and equipment request
to purchase add-on's for a forklift for the Civic Center in the amount of
$1,901.44.
B. Budget Resolution No. 01-97 / Budget Amendment No. 01-143 - Consider
staff recommendation to approve the budget resolution and budget
amendment to appropriate and expend funds from the Children's Services
Council grant for softball batting cages at Lawnwood Stadium.
C. Budget Amendment 01-144/Equipment Request 01-251 - Consider staff
recommendation to approve the budget amendment and equipment request
to purchase a Kronos time clock for the Fairwinds Golf Course Maintenance
Shop in the amount of $2,500.
3. INVESTMENT FOR THE FUTURE
Central Services / Project Manager - Consider staff recommendation to approve the
hiring of a Project Manager to oversee new projects, including the Fairgrounds
Project. This position is one of the two requested in the Phase ill/Decision Packets.
4. PUBLIC WORKS
A Solid Waste / Equipment Purchase - Consider staff recommendation to
approve the purchase of three Motorola mobile radios for a total amount of
$3,438.
B. Engineering / Resolution No. 01-080 - Consider staff recommendation to
adopt the resolution establishing a MSBU Administrative Policy, and
authorize the Chairman to execute the resolution.
C. Lennard Road / Permission to Advertise - Consider staff recommendation
to grant permission to advertise for consultant services for the Lennard
Road PD&E Study.
5. MANAGEMENT AND BUDGET
A Budget Resolution 01-98 - Consider staff recommendation to approve the
budget resolution to appropriate and expend funds from the SFWMD Taylor
Creek Restoration Grant in the amount of $700,000.
B. Budget Resolution 01-99 - Consider staff recommendation to approve the
budget resolution to appropriate and expend funds from the FDEP Urban
Mobile Irrigation Lab (MIL) Grant in the amount of $55,000.
,
\w
...",¡
CONSENT AGENDA
MAY 8.2001
PAGE TWO
5. MANAGEMENT AND BUDGET (CONTINUED)
C. Sheriff's Local Law Enforcement Block Grant - Consider staff
recommendation to approve the request to modify the type of equipment
to be purchased from the grant.
6. COUNTY ATTORNEY
A Declarations of Unity of Title / Diocese of Palm Beach and George and
Patricia Fulmer - Consider staff recommendation to approve the proposed
lot line adjustment under the Declarations of the Unity of Title and
authorizing the Unity of Title for the Diocese and Fulmer parcels, subject
to receipt of a copy of the executed and recorded Corrective Special
Warranty Deed and Special Warranty Deed.
B. Permission to File Suit - Consider staff recommendation to grant permission
to file suit against Robert L. McClain to request an injunction to require Mr.
McClain to remove the trash, junk and debris from his property at 5020
Garner Street in Fort Pierce.
C. St. Lucie Soil and Water Conservation District Interlocal Agreement for
Administration of Mobile Irrigation Lab (MIL) Grant - Consider staff
recommendation to approve the proposed Interlocal Agreement, and
authorize the Chairman to sign the agreement.
D. Extension of Lease Agreement with State of Florida Department of Juvenile
Justice - Consider staff recommendation to approve the Modification to
Extend and authorize the Chairman to sign the Modification.
7. AIRPORT
A Florida Department of Transportation (FDOT) Joint Participation Agreement
(JPA) - Consider staff recommendation to accept the agreement, and
authorize the Chairman to execute the JP A and a resolution authorizing the
Chairman to sign the agreement for the construction of a fire protection
system at St. Lucie County Airport.
B. Florida Department of Transportation (FDOT) J oint Participation Agreement
(JPA) - Consider staff recommendation to accept the agreement, and
authorize the Chairman to execute the JP A and a resolution authorizing the
Chairman to sign the agreement for the construction of a security fencing
at St. Lucie County Airport.
8. COMMUNITY SERVICES
Resolution No. 01-96 - Consider staff recommendation to adopt the resolution
authorizing the County Administrator to execute the Satisfaction of Mortgage for
each satisfied SHIP second mortgage.
"
'-
CONSENT AGENDA
MAY 8, 2001
PAGE THREE
..."
9. COMMUNITY DEVELOPMENT
Budget Amendment No. 01-146/ Amendment to Equipment Request Nos. EQOl-
038, EQ01-041, EQ01-042, EQ01-043, and EQOI-148 - Consider staff
recommendation to approve the budget amendment and equipment requests for
$705 to purchase computers that were estimated in March 2000 at a lower cost.
10. ADMINISTRATION
A Port of Fort Pierce - Consider staff recommendation to approve the bond
from Walter W. Ergle, Jr., to guarantee his performance as Harbormaster for
the Port of Fort Pierce.
B. Recreation Update - Staff will give a progress report to the Board.
..
'-
...,-
BOARD OF COUN1Y COMMISSIONERS
ADDITIONS AGENDA
May 8. 2001
REGUlAR AGENDA
COUN1Y ATTORNEY
R-A.l Proclamation / Resolution No. 01-106 - Proclaiming the week of May 13,
2001 through May 19, 2001, as "Law Enforcement Week" and designating
May 15, 2001, as "Peace Officers' Memorial Day" in St. Lucie County, Florida.
/ J+(JfJ (O:J £ cL
CONSENT AGENDA
COUN1Y ATTORNEY
C-A.l St. Lucie Metropolitan Planning Organization Major Update of the Year 2001
Transit Development Plan/Transportation Disadvantaged Service Plan -
Consider staff recommendation to approve the proposed agreement
between the MPO and Tindale-Oliver and Associates, Inc., subject to
approval of the agreement by the Florida Department of Transportation.
j GLPpíONJ1.
NOTICE: All Proceedings before this Board are electronically recorded. Any person who decides to appeal any action taken by the Board
at these meetings will need a record of the proceedings and for such purpose may need to ensure that a verbatim record of the
proceedings is made. Upon the request of any party to the proceedings, individuals testifying during a hearing will be sworn in. Any
party to the proceedings will be granted the opportunity to cross-examine any individual testifying during a hearing upon request.
Anyone with a disability requiring accommodation to attend this meeting should contact the 51. Lucie County Community Services
Manager at (561) 462-1777 or TDD (561) 462-1428 at least forty-eight(48) hours prior to the meeting.
"
'-'
,..,¡
BOARD OF COUNTY COMMISSIONERS
ST. LUCIE COUNTY, FLORIDA
REGULAR MEETING
Date: May 1,2001
Tape: 1-3
Convened: 7:00 p.m.
Adjourned: 10:45 p.m.
Commissioners Present: Chairman, Frannie Hutchinson, Doug Coward, John D. Bruhn, Paula A.
Lewis, Cliff Barnes
Others Present: Doug Anderson, County Administrator, Robert Bradshaw, Asst. County
Administrator, Dan McIntyre, County Attorney, Paul Phillips, Airport Director, Ray Wazny,
Public Works Director, Bill Blazak, Utilities Director, Dennis Murphy, Asst. Community
Development Director, Don West, County Engineer, Gayla Barwick, Tourism; A Millie
Delgado, Deputy Clerk
1. MINUTES (1-027)
It was moved by Com. Barnes, seconded by Com. Coward, to approve the minutes of the meeting
. held April 24, 2001; and, upon roll call, motion carried unanimously.
2. GENERAL PUBLIC COMMENTS
Mr. Tom Walks, Tennis Coach for Lincoln Park Academy, addressed the Board regarding the
funding for the Sunrise Theatre and asked the Board not to utilize the funds for the Lawnwood
Tennis Courts for the project.
Mr. Denny Green, resident, addressed the Board regarding the Fair Association and stated they
had concerns regarding the commitment previously made and requested the Board keep that
commitment.
Ms. Hazel Jacks, petitioner for item RA-l addressed the Board on this request and asked the
Board to consider favorably on this request.
Mr. George Gettler, Brocksmith Road resident, addressed the Board and stated that he was not
against the Sunrise Thcatre renovation, however, he felt this was a project the county should not
be funding with taxpayer funds.
Mr. Ed Lounds, Vice Chairman of the Citizens Budget Committee, requested the Board given the
committee the opportunity to find other means offunding the Sunrise Theatre renovation. He
asked the Board not to utilize the funds presently under consideration.
3. PRESENTATION
Sunrise Theatre - The following board members from the Sunrise Theater renovation
project gave a presentation.
Mr. Mike Horowitz, Chairman, Sunrise Theatre Board of Directors.
-1-
I
'-'
,...¡
May 1,2001
TO: Board of County Commissioners
From: Robert Anderson
I would like this read into the record at the Commission Meeting tonight as I will not be able to
attend.
I oppose funding the Sunrise Theater. It takes too much money from what I thought was
budgeted funds for the 2001 - 2002 budget year.
I believe the funds were already ear marked for Lakewood Park Tennis Courts, County
Courthouse renovation, etc.
Sincerely,
Robert Anderson
~?t~ p )~))\,JF:;;:---
.
\..r
"wII
Mr. Mike Brown, member of the Board, Sunrise Theatre also advised Com. Bruhn that if the
balance of the money needed was not raised for the entire project, then they would not utilize the
county's $1 million allocation. .
Dr. Maxwell King, volunteer for the project.
Ms. Peggy Anderson, Asst. Principal Lincoln Park Academy, addressed the Board on the project
and requested the Board approve the funding.
Mr. Bob Taber, area resident, questioned if the size of theater would work for certain types of
performances.
Mr. Dennis Beach, City Manager, City ofFt. Pierce, addressed the Board and stated he had
brought various issues to them in order to have the issue focus on it's own merit.
Mr. Bob Benton, Ft. Pierce City Commissioner addressed the Board in favor of the project and
funding.
Ms. Jenna Laitman, area resident, addressed the Board in favor of the project.
The attached letter from Mr. Robert Anderson, was entered as part of the record.
BOARD COMMENTS ON THE SUNRISE THEATRE FUNDING
Com. Barnes commented on the fact that they had been reviewing this request since January and
that the Board had plenty of time to research the item and have had enough time to make a
. decision.
Com. Lewis stated she did not have a question in her mind as to the benefit of this project,
, however, there is a question in her mind about priorities she took on when she accepted her
position as Commissioner. She recalled the budget process last summer and how the county has
been struggling the last 4 years to keep things in tact to provide the basic services. She has a real
problem with taking public funds for this project. She feels she must do what she must do and
she cannot find it in her, to turn away all the groups in need and have 1 million dollars to give
away tonight and in looking at the sources of funding, she has a problem with every one of them
and she cannot say tonight that she could commit this money to the Sunrise Theatre project.
Com. Barnes commented in favor of the funding for the theatre and stated the county has
provided for other projects such as QVC, ConVergys, and other incentives for businesses.
Mr. Ed Lounds stated he understood what Com. Barnes was trying to say and he agreed that the
Sunrise would be of great benefit to the county, but, he felt it needed time to be look at closer and
he thinks the county would be making a large leap when they put money into the Sunrise. He
again asked if the committee could be given time to find budgeted revenues for the project.
Com. Coward stated the most appropriate thing said today deals with the process they are going
through and the fact that this issue is not currently budgeted and they would be embarking on the
upcoming budget process and it was quite clear that they were not going to be dealing with
individual items outside of that process and have to turn people away. The issue is less of an
issue of whether or not you are for or against the theatre, because he is a long standing supporter
ofthe project, but he is not comfortable with a request coming from outside the budget process.
This item should be made a part of the un-going budget discussion which are forthcoming within
the next few weeks. He felt this discussion should take place within the next few weeks when
they scrutinize the budget. He does not see a million dollars identified that he could be
èomfortable with.
-2-
'-"
......1
He asked if the Board would be ready to allocate a request from the city of Port St. Lucie should
they come forward six months from now. This has tobe addressed in the context of the overall
budget, not independently. Ifhe is forced to vote on this issue tonight, he would be forced to vote
against it.
Com. Bruhn stated he felt a decision could be made tonight. He felt that cultural events are
needed in this county and that our residents should not have to drive to Palm Beach to view a
show. He also felt it was a quality of life issue and would vote in favor of the funding.
Com. Hutchinson requested the County Administrator review the recommended funding sources
one at a time for discussion purposes.
1. a) Tourist Development Council- $120,000- the TDC has a reserve from previous years
of $220,000. The Board would have to amend the Ordinance allocating these funds to the
Sunrise Theatre.
b) Alternative to Tourist Development Council Funding- Cash Carry Forward-$130,000-
$250,000. Each year the county has a cash carry forward derived from non-expended
funds and revenues exceeding budget. Although we are still calculating this year's cash
carry forward, it will exceed last year's and would cover the $250,000.
Com. Barnes stated the TDC issue has received a: lot of controversy and would not have a
problem taking the $250,000 from the cash carry forward.
Com. Bruhn asked why not take it out of our reserve fund.
Com. Barnes explained that the $250,000 would be made part of the reserve.
. The County Administrator advised Com. Bruhn how the cash carry forward would have been
used in the upcoming budget year.
Com. Hutchinson advised the Board that at the last TDC meeting, it was recommended their
funds not be touched.
Com. Hutchinson, Barnes and Bruhn stated they would rather go forward with the cash carry
forward.
2. b) Amphitheater- $75,000 Next year's capital budget includes $75,000 toward the
Amphitheater. Ft. Pierce has indicated they will accept responsibility for the
Amphitheater if the Sunrise Theatre is funded by the County. Therefore, these funds
would be allocated to the Sunrise Theatre.
Com. Hutchinson advised the Board of her concerns regarding the funding for the Lawnwood
Tennis Courts being used for the Sunrise Theatre and then not having the funds should the
referendum not pass. How would the Board honor their commitment.
The County Administrator advised the Board that the money for the Sunrise Theatre would be
coming from this year's budget as well as next years. The tennis courts and the amphitheater
were items in next year's capital budget. However, he would work with staff regarding the
funding for the tennis courts and come back to the Board with recommendations.
Com. Hutchinson requested staff hold discussions with the School Board in order to obtain some
assistance in the funding of the tennis courts since they are also utilized by the schools.
-3-
'-'
'wII
3. Courthouse Renovation- $200,000- approximately $900,000 has been previously set aside
for Courthouse renovations. Following the end of the past fiscal year, we have identified
$200,000 in unallocated utility franchise fees. As part of the upcoming budget process,
staffwas going to recommend that the $200,000 be allocated to the Courthouse
renovation account. This money could be used for the Sunrise Theatre. Staff would then
recommend budgeting these funds in future years.
Com. Hutchinson requested an update of the study.
The County Administrator advised the Board that the South County Annex is now being utilized
for court purposes. Juvenile is being transferred to 7th St. which would free another courtroom.
In speaking with the Court Administrator, he felt this would satisfy the rooms needed for the
moment with the expansion of St. Lucie West for the next 2 to 3 years. The County
Administrator stated they are planning on moving the Clerk of Courts out of the courthouse
totally. They would build a new building ëonsisting of 40,000 sq. feet where the legal arts
building now exists. They are working with FEMA who would pay for the demolition of the
building and would also provide funds towards the facility, not much, but, some. The new
building would be a 4 story building, 10,000 sq. ft. per story. They need to work with the City of
Ft. Pierce for concurrence, the price would be approximately $4 million. He recommended as
excess money becomes available in the capital fund, it be put aside for this purpose.
This $200,000 is not taking away from the $900,000 in reserve for the renovation. In speaking
with JoAnne Holman and the Court Administrator, he advised them that the renovation may be 3
years away. Any excess money which would become available in the future, he would
recommend it be added to this fund. He would like to move the Clerk of Court from the old
. courthouse to the new building and then start renovations at the old building.
Com. Coward questioned the $3.1 million dollar shortfall on the approximate cost of the
, courthouse.
The County Administrator stated he hopes that some of the ne~ded renovation at the existing
courthouse could be done through the performance contract.
Com. Barnes stated the $200,000 was okay with him and he was ready to take it from the general
fund contingency.
4. General Fund Contingency- $350,000 The County loaned $200,000 to the Smithsonian
project in lieu of the FRDAP grant that we have applied for. Staff is optimistic that we
will receive this grant. Once the General Fund Contingency is reimbursed this amOlmt
could be used for the Sunrise Theatre. The remaining $150,000 of the $1,000,000
allocation could come from the General Fund Contingency. This would leave a balance of
$443,000 in General Fund Contingency.
In addition to the City taking over the operation and the maintenance of the Amphitheater,
Dennis Beach has said that he would support recomInending to the City Commission the
allocation of the City's portion of the L Pierce Pari~ Impact Fees to the new fairgrounds. The
approximate balance in this account is $125,000.
The County Attorney advised the Board that there would be some type of commitment from the
Sunrise that the building would be available for public use and there are a variety of ways to
accomplish this.
Com. Hutchinson asked the County Administrator to confirm that this is a one time request and
that this would be for capital and not for operating.
-4·-
'-'
""""
Com. Coward stated he hoped the Board was willing·to make the same commitment to the City
of Port St. Lucie as well in the future. He believes the cultural aspects are countywide and they
will see similar requests from Port St. Lucie. He felt the majority vote was setting a precedent
and hoped they are prepared to back it up in the future when those requests come forward.
Com. Barnes stated the various projects he was asked ~o approve he did not take into
consideration that they were in Port St. Lucie, thè µnincorporated area or the city of Ft. Pierce, it
was a consideration for the county regardless of what city it was in.
Com. Coward stated the cultural endeavors need to be developed countywide. If they are making
this type of a commitment to downtown Ft. ;Pierce, then they need to be prepared to make the
same commitment to other areas within the county. .
He also stated he felt the way this was proceeding tonight was not a responsible way to move
forward.
Com. Lewis stated that there seems to be an assumption here that St. Lucie County is a cultural
waste land and she does not agree with this there are other cultural things happening within the
county .
Com. Hutchinson advised those present of what influenced her decision tonight in voting in favor
of allocating the funds.
The County Administrator advised the Board that the funds would be available after the budget
process after October 1,2001 and Mr. Brown has advised him that they would not require the
money until they were ready to go into construction of the project. The money would be set
aside and any interest received on the money would remain in the county accounts.
It was moved by Com. Barnes, seconded by Com. Bruhn, to allocate the $1 million from the
funds as identified; (should any Com. or anyone from the budget committee have a better idea
. they can substitute) and direct the County Attorney and staff to prepare the appropriate
documents and to accept the cities agreement to give $125, 000 from park impact fees to the
Fairgrounds; and upon roll call, the vote was as follows: Aye's: Bruhn, Barnes, Hutchinson;
Nay's: Coward, Lewis; motion carried by a vote of3 to 2.
4. CONSENT AGENDA (2-2056)
It was moved by Com. Bruhn, seconded by Com. Lewis, to approve the Consent Agenda; and,
upon roll call, motion carried unanimously. .
1. WARRANT LIST
The Board approved Warrant List No. 30.
2. PUBLIC WORKS
A Engineering/Taylor Creek/C-25 Restoration Dredging Project- The Board approved
Works Authorization No.1 with BCI Engineers, Inc., in the amount of$137,000 for
design and permitting and authorized the Chairman to sign the authorization.
B. Engineeringffaylor Creek/C-25 Restoration Project- The Board approved the Cooperative
Agreement with South Florida Water Management District in the amount of $700,000
and authorized the Chairman to sign the agreement.
-5-
r'UND '-1ARY
, FUND
'-'
TITLE
001
001106
001117
001124
001125
001128
001129
001130
001135
001252
001258
001259
001262
001809
001813
101
101003
101006
101211
102
102001
]
L.
107002
107003
111
112
113
114
116
117
119
120
122
123
126
136
138
139
140
1..40001
140275
140307
L40308
L60
.83
_('O~f)Ol
J04
85001
85203
85204
86
86204
35
01
04
16
30
32
~O
n
L8
21
n
31
)'1
71
11
)1
General Fund
FTA-001-49 USC Sec 5307 (Sec 9)'¡
FTA 49 USC Sec 5307 98/99
FTA USC Section 5307 FY 99/00
TC Community Action Agency FY 99/00
Section 112/MPO/FHWA/Planning FY01
FTA USC Section 5307 FYOO/01
TC Community Action Agency FYOO/Ol
Blind Creek Park Dune Crossover
Urban Mobile Irrigation Lab Grant
TDC Planning Grant FYOO/01
Emergency Mgmt. Prep & Asst. FY 00/
Manatee Protection Plan II/ FI Fish
SFWMD-Floridian Aquifer Well 01/04
C/S/C Lawnwood Stadium Batting Cage
Transportation Trust Fund
Transportation Trust/Local Option
Transportation Trust/Impact Fees
FDEP Canal & Stormwater Retrofit
Unincorporated Services Fund
Drai~age Maintenance MSTU
Librãry Special Grants Fund
Fine & Forfeiture Fund
Fine & Forfeiture Fund-E911 Surchar
Fine & Forfeiture Fund-800 Mhz Oper
River Park I Fund
River Park II Fund
Harmony Heights 3 Fund
Hàrmony Heights 4 Fund
Sunland Gardens Fund
Sunrise Park Fund
Holiday Pines Fund
The Grove Fund
Indian River Estates Fund
Queens Cpve Lighting Dist#13 Fund
Southern Oak Estates Lighting
Monte Carlo Lighting MSTU#4 Fund
. Palm Lake Gardens MSTU Fund
Palm Grove Fund
Port & Airport Fund
Port Fund
bOT-140-Airport Maintenance Bldg
Const. Parking Apron#405823-1-94-01
FDOT Const. of Perimeter Fencing #4
Plan Maintenance RAD Fund
Ct Administrator-19th Judicial Cir
Ct Administrator-Arbitration/Mediat
Ct Admin.- Teen Court
SHIP Housing Assistance FY 00/01
FHFA-SHIP 98/99
FHFA SHIP 99/00
Recycling Operating Fund
Recycling & Education Grant FYOO/01
Becker Road I&S Fund
So. County Regional Stadium
Communication System Fund
County Capital
Lakewood Park Fund
Environmental Land Capital Fund
Treasure Cove/Ocean Harbor S Cap
Sanitary Landfill Fund
Golf Course Fund
H.E.W. Utilities Fund
North Hutchinson Island Utilities
S. Hutchinson Utilities Fund
Sports Complex Fund
Holiday Pines Utilities Fund
Building Code Fund
Inf~ation Technology Fund
Heal~h Insurance Fund
Pr0perty/Casualty Insurance Fund
Service Garage Fund
Tourist Development Trust-Adv Fu~d~
Law Library
'.. J01
.0
.1
~5
GRAND TOT~L:
...,;
EXPENSES
487,434.26
·17,044.00
27.35
89.00
1.49-
1 , 939 . 63
678,251.00
455.62
133.64
396.66
251. 41
2,559.01
10,375.00
90.95
65.00
167,216.60
1,813.25
6,990.00
662.50
23,523.03
18,190.56
2,242.69
2,965,580.26
14,074.86
87.97
2,660.16
527.89
210.32
461.46
513.27
127.99
761.18
158.41
896.01
263.76
113.39
1,339.90
109.67
682.38
5,890.53
75.90-
8,100.00
2,703.29
18,123.69
2,647.20
1,777.45
854.93
819.29
1,411.92
57.06-
0.00
1,922.29
343.84
2,099.52
41,742.00
1,537.39
65,072.14
1,560.00
2,830.36
2,050.00
91,551.67
18,284.94
102.78
2,161.65
4,540.04
15,145.93
845.57
12,604.08
46,661. 33
314,564.38
921. 09
10,507.88
3,710.54
3,355.55
5,094,628.86
PAYROLL
273,305.41
0.00
310]3.66
.0.00
19.42
4,688.83
0.00
796.57
0.00
1,188.80
636.80
3,470.36
0.00
1,188.80
0.00
97,372.75
0.00
0.00
0.00
45,737.86
3,803.02
2,164.00
43,923.57
31,327.24
1,150.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0.0
0.00
0.00
6,722.28
0.00
0.00
0.00
0.00
2,336.13
3,405.03
1,850.58
2,673.72
2,468.06
38.84
38.84
1,789.01
596.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30,022.52
18,873.59
206.07
3,740.36
2,228.28
10,873.67
1,870.76
19,685.86
68,536.05
3,034.75
1,707.53
9,239.54
3,329.57
0.00
706,404.49
""..
..",,¡
3. COUNTY ATTORNEY
St. Lucie Village/Road, Public Buildings, Library and Parks Impact Feeds- The Board
approved the Interlocal Agreement and the Memorandum of Understanding, and authorized the
Chairman to sign the agreements and memorandum.
4. CENTRAL SERVICES
A RFP No. 01-043- Professional Landscape Architect & Planning Serviced Continuing
Contract- The Board approved the selection committee evaluation and choice of Glatting,
Jackson Kercher Anglin Lopez Rinehart, Ge~ & Jensen and Kimley-Horn allowing them
to enter into a continuing contract with these three venders.
B. North Causeway Island Boat Ramp- The Board approved final payment of retainage to
Recreational Design & Construction for work completed at North Causeway Island Boat
Ramps.
CA-l Resolution No. 01-22/American Concrete- The Board approved the resolution granting a
Major Site Plan Approval for the project known as American Concrete to allow for the
addition of 16, 125 sq. ft. of manufacturing space to an existing 12,250 sq. ft. facility for
a total of28,750 sq.ft.
REGULAR AGENDA
5. A Resolution No. 01-016-/Wetwol Construction- Consider staff recommendation to approve
the resolution granting a change n zoning from the CN Zoning District to the CO Zoning
District to allow for the relocation of a construction office as a dual use within an existing
real estate office.
It was moved by Com. Bruhn, seconded by Com. Coward, to approve Resolution No. 01-016;
and, upon roll call, motion carried unanimously.
B. Resolution No. 01-015- Pan Am International Flight Academy- Consider staff
recommendation to approve the resolution granting a Major Adjustment to the existing
81. Lucie County International Airport Conditional Use for the project known as Pan Am
International Academy for the addition of two student dormitories.
Com. Barnes stated he would not vote in favor of this pròject because he felt they had not made
enough progress on the noise issue.
It was moved by Com. Bruhn, seconded by Com. Lewis, to approve Resolution No. 10-015; and,
upon roll call, the vote was as follows: Nay: Barnes; Aye's: Lewis, Bruhn, Hutchinson, motion
carried by a vote of 4 to I.
C. Ordinance No. 01-05- Local Option Motor Fuel Tax Extension- Consider staff
recommendation to adopt Ordinance No. 01-05 as drafted.
Mr. Ed Lounds, representing the Budget Advisory Committee, advised the Board of their support
for this extension.
It was moved by Com. Lewis, seconded by Com. Bames, to approve Ordinance No. 01-05; and,
upon roll call, motion carried unanimously.
-6-
<, .
....
'oJ
6. ADMINISTRATION (3-565)
Recreation Update- Staff gave a progress report to the Board.
RA-l Distance Waiver/Quarterdeck Bar & Grille- Consider staff recommendation that the
Board interpret the intent of Section 7.1 0.11 of the Land Development Code, entitled,
"Distance Requirements for Alcoholic Beverages".
Staff was directed to advertise the waiver hearing for May 15,2001.
There being no further business to be brought before the Board, the meeting was adjourned.
Chairman
Clerk of Circuit Court
-7-
'" "
"-"
'WI
MAY 8, 2001
9:00 AM
BOARD OF COUNTY
COMMISSIONERS MEETING AGE~l2A
~LCOME I
I
GENERAL RULES AND PROCEDURES I
Attached is the agenda which will determine the order of ~Usiness conducted at today's Board
meeting: !
CONSENT AGENDA- These items are considered routine a d are enacted by one motion. There
will be no separate discussion of these items unless a Co issioner so requests.
REGULAR AGENDA ITEMS- Proclamations, Presentations, Public Hearings, and Department
requests are items which the Commission will discuss indi . dually usually in the order listed on
the agenda.
PUBIlC HEARINGS- These items are usually heard on the f st and third Tuesdays at 7:00 P.M. or
as soon thereafter as possible. However, if a public hearing i scheduled for a meeting on a second
or fourth Tuesday, which begins at 9:00 A.M., then public earings will be heard at 9:00 AM. or
as soon thereafter as possible. These time designations are' tended to indicate that an item will
norbe addressed prior to the listed time. The Chairman . open each public hearing and asks
anyone wishing to speak to come forward, one at a timej Comments will be limited to five
mmutes. I
I
As a general rule, when issues are scheduled before the C0f:!ssion under department request
or public hearing, the order of presentation is: (1) County s aff presents the details of the Board
item (2) Commissioners comment (3) if a public hearin , the Chairman will ask for public
comment, (4) further discussion and action by the Board. I
I
ADDRESSING THE COMMISSION- Please state your name td address, speaking clearly into the
microphone. If you have backup material, please have eig t copies ready for distribution.
NON-AGENDA ITEMS- These items are presented by an . dividual Commissioner or staff as
necessary at the conclusion of the printed agenda. ,
I
PUBLIC COMMENT- Time is allotted at the beginning of eachlmeeting for general public comment.
Please limit comments to five minutes. i
DECORUM- Please be respectful of others opinion. i
MEETINGS- All Board meetings are open to the public and ar held on the first and third Tuesdays
of each month at 7:00 P.M. and on the second and fourth Tu sdays at 9:00 AM., unless otherwise
advertised. Meetings are held in the County Commiss on Chambers in the Roger Poitras
Administration Annex at 2300 Virginia Ave., Ft. Pierce, FL 3 982. The Board schedules additional
workshops throughout the year necessary to accomplish th iT goals and commitments. Notice is
provided of these workshops. Anyone with a disability req . ing accommodation to attend this
meeting should contact the St. Lucie County Community S rvices Manager at (561) 462-1777 or
TDD (561) 462-1428 at least forty-eight(48) hours prior to he meeting.
/'
\.t
BOARD OF COUNTY
COMMISSIONERS
www.stlucieco.gov
AGENDA
May 8, 2001
9:00 AM.
INVOCATION
PLEDGE OF AlLEGIANCE
1. MINUTES
...,
John D. Bruhn
Doug Coward
Paula A. Lewis
Frannie Hutchinson
Cliff Barnes
District 1
District 2
District 3
District 4
District 5
Approve the minutes of the meeting held May l2001.
A TION PRESENT AnON i
,
I
,
First Annual St. Lucie County commercr· I Recycling Partnership Award -
The Board and Herb Burgart, Recyclin aste Reduction Manager, will
present a certificate to Bev Smith Toyota
I
Resolution No. 01-94- Proclaiming June ~. 2001 as "YMCA Day" in St. Lucie
County, Florida. I
Resolution No. 01-100 - Proclaiming the ~onth of Mayas "Civility Month"
in St. Lucie County. Florida. I
I
Resolution No. 01-101 - Proclaiming the ~eek of May 6,2001 through May
12,2001, as "Drinking Water Week" in S~. Lucie County, Florida.
Ray Wazny, Public Works Director will ~pdate the Board on the Scoping
Document for Marine Protection. I
I
I
I
2.
vi
j
y
v/
3.
GENERAl PUBLIC COMMENT
4.
CONSENT AGENDA
NOTICE: All Proceedings before this Board are electronically recorded. Any person ho decides to appeal any action taken by the Board
at these meetings will need a record of the proceedings and for such purpose may nee to ensure that a verbatim record of the proceedings
is made. Upon the request of any party to the proceedings, individuals testifying uring a hearing will be sworn in. Any party to the
proceedings will be granted the opportunity to cross-examine any individ' ,~I testifying d ring a hearing upon request Anyone with a disability
requiring accommodation to attend this meeting should contact the St. Lucie Coun Community Services Manager at (561) 462-1777 or
TOO (561) 462-1428 at least forty-eight(48) hours prior to the meeting.
~
\.or
..I
REGULAR AGENDA
MAY 8, 2001
PAGE TWO
PUBUC HEARINGS
SA. There are no public hearings scheduled for Mar 8, 2001.
I
End of Public Hear/fS
I
6,<; COUNTY ATTORNEY I
!I I) 87 as drafted, requestmg the State of Flonda nforce the Usury Law and Other
1 Consumer Protections Against Payday Lenders
I
7. PURCHASING I
Bid No. 01-032 / Indian River Lagoon Trace - ~onsider staff recommendation to
award the bid to Dickerson, Florida, Inc. for $990,038 and authorize the Chairman
to sign the contract as prepared by the Count Attorney.
I
8. ADMINISTRATION
A County Extension Campus Expansion - onsider staff recommendation to
proceed with the purchase of approxi ately 12 acres of land from the
University of Florida in the amount of $ 8,800 plus closing costs, and that
this amount be loaned from Contingen for this purpose. This purchase
would be subject to the review and pproval of the title policy and
environmental assessment by the Coun y Attorney.
B. Bi-weekly Committee Reports - The Bo d will give updates on the various
committees and advisory boards that t ey serve on.
~
'-'
...."J
CONSENT AGENDA
Mav 8. 2001
1. WARRANTS LIST
Approve warrants list No. 31.
2.
PARKS AND RECREATION
A
3.
Budget Amendment 01-142/Equipmentl Request 01-250 - Consider staff
recommendation to approve the budget ~endment and equipment request
to purchase add-on's for a forklift for tpe Civic Center in the amount of
$1,901.44. I
Budget Resolution No. 01-97 / Budget ALendment No. 01-143 - Consider
staff recommendation to approve th~rbudget resolution and budget
amendment to appropriate and expend f~mds from the Children's Services
Council grant for softball batting cages tt Lawnwood Stadium.
Budget Amendment 01-144/EqUiPmen~tl Request 01-251 - Consider staff
recommendation to approve the budget endment and equipment request
to purchase a Kronos time clock for the F irwinds Golf Course Maintenance
Shop in the amount of $2,500. I
I
I
Central Services /Project Manager - Consider st~' frecommendation to approve the
hiring of a Project Manager to oversee new pr jects, including the Fairgrounds
Project. This position is one of the two requeste in the Phase III/Decision Packets.
PUBLIC WORKS I
i
Solid Waste / Equipment Purchase - Cfnsider staff recommendation to
approve the purchase of three Motorola obile radios for a total amount of
$3,438.
I
Engineering / Resolution No. 01-080 - ~onsider staff recommendation to
adopt the resolution establishing a SBU Administrative Policy, and
authorize the Chairman to execute the resolution.
Lennard Road / Permission to Advertisel- Consider staff recommendation
to grant permission to advertise for cohsultant services for the Lennard
Road PD&E Study. I
I
i
MANAGEMENT AND BUDGET I
A Budget Resolution 01-98 - Consider sta1 recommendation to approve the
budget resolution to appropriate and ex end funds from the SFWMD Taylor
Creek Restoration Grant in the amount f $700,000. .
Budget Resolution 01-99 - Consider staff recommendation to approve the
budget resolution to appropriate and dpend funds from the FDEP Urban
Mobile Irrigation Lab (MIL) Grant in the þount of $55,000.
I
I
I
I
i
I
B.
c.
INVESTMENT FOR THE FUTURE
4.
5.
A
B.
c.
B.
ì
\w
...,;
CONSENT AGENDA
MAY 8. 2001
PAGE TWO
5.
6.
7.
8.
MANAGEMENT AND BUDGET (CONTINUED)
C.
A
Sheriff's Local Law Enforcement ~ ock Grant - Consider staff
recommendation to approve the reques~ to modify the type of equipment
to be purchased from the grant. ¡
i
i
i
Declarations of Unity of Title / Dioces of Palm Beach and George and
Patricia Fulmer - Consider staff recomm ndation to approve the proposed
lot line adjustment under the Declar tions of the Unity of Title and
authorizing the Unity of Title for the Di cese and Fulmer parcels, subject
to receipt of a copy of the executed d recorded Corrective Special
Warranty Deed and Special Warranty De d.
I
Permission to File Suit - Consider staff recþmmendation to grant permission
to file suit against Robert L. McClain to rruest an injunction to require Mr.
McClain to remove the trash, junk and ebris from his property at 5020
Garner Street in Fort Pierce. .
COUNTY ATTORNEY
B.
C. St. Lucie Soil and Water Conservation istrict Interlocal Agreement for
Administration of Mobile Irrigation L b (MIL) Grant - Consider staff
recommendation to approve the pro osed Interlocal Agreement, and
authorize the Chairman to sign the agre ment.
D. Extension of Lease Agreement with State of Florida Department of Juvenile
Justice - Consider staff recommendatio to approve the Modification to
Extend and authorize the Chairman to s gn the Modification.
AIRPORT
Florida Department of Transportation (FdOT) Joint Participation Agreement
(JPA) - Consider staff recommendatio~ to accept the agreement, and
authorize the Chairman to execute the JP and a resolution authorizing the
Chairman to sign the agreement for th construction of a fire protection
system at St. Lucie County Airport. ,
,
I
Florida Department of Transportation (F~T) Joint Participation Agreement
(JPA) - Consider staff recommendatio to accept the agreement, and
authorize the Chairman to execute the JP and a resolution authorizing the
Chairman to sign the agreement for the ronstruction of a security fencing
at St. Lucie County Airport.
I
COMMUNITY SERVICES I
Resolution No. 01-96 - Consider staff recommlendatiOn to adopt the resolution
authorizing the County Administrator to ex~~~te the Satisfaction of Mortgage for
each satisfied SHIP second mortgage. ¡
I
i
I
I
i
i
I
A
B.
'\
"-"
CONSENT AGENDA
MAY 8, 2001
PAGE THREE
'WI
9. COMMUNITY DEVELOPMENT
Budget Amendment No. 01-146 / Amendment tq Equipment Request Nos. EQOl-
038, EQOI-041, EQ01-042, EQOI-043, and I EQ01-148 - Consider staff
recommendation to approve the budget amenilirlent and equipment requests for
$705 to purchase computers that were estimate4 in March 2000 at a lower cost.
I
10. ADMINISTRATION I
A
Port of Fort Pierce - Consider staff recom*endation to approve the bond
from Walter W. Ergle, Jr., to guarantee his erformance as Harbormaster for
the Port of Fort Pierce. i
Recreation Update - Staff will give a progr~ss report to the Board.
B.
BOARD OF COUNlY CO SSIONERS
ADDITIONS AGEN A
MayB.2001
....,.¡
")
'"
REGUlAR AGEND~
COUNTY ATTORNEY
i
R-A.l Proclamation / Resolution No. 01-106 -I Proclaiming the week of May 13,
2001 through May 19, 2001, as "Law Enforcement Week" and designating
May 15, 2001, as "Peace Officers' Memor*l Day" in St. Lucie County, Florida.
I
I
!
i
CONSENT AGEN~
!
COUNTY ATTORNEY
¡
I
C-A.l St. Lucie Metropolitan Planning organiz1ion Major Update of the Year 2001
Transit Development Plan/Transportat'on Disadvantaged Service Plan -
Consider staff recommendation to a prove the proposed agreement
between the MPO and Tindale-Oliver and Associates, Inc., subject to
approval of the agreement by the Floridt Department of Transportation.
NOTICE: All Proceedings before this Board are electronically recorded. Any person ho decides to appeal any action taken by the Board
at these meetings will need a record of the proceedings and for such purpose may n ed to ensure that a verbatim record of the
proceedings is made. Upon the request of any party to the proceedings. indMduals estifying during a hearing will be sworn in. Any
party to the proceedings will be granted the opportunity to cross-examine any indMd al testifying during a hearing upon request.
Anyone with a disability requiring accommodation to attend this meeting should con ct the St. Lucie County Community Services
"'00"", " (561)462-1777 0< roD O'¡¡ii".... .."..""""" ""'"' p'; "" <he _-
,-,..
,
AGENDA REQUESl1
ITÈi1 NO. 7
DATE: May 8, 2001
REGULAR [x]
PUBLIC HEARING [ ]
CONSENT ['
TO: BOARD OF COUNTY COMMISSIONERS
PRESENTED BY:
SUBMITTED BY(DEPT): PURCHASING
RUTH TOTTON
SUBJECT: Award of Bid #01-032 Indian River Lagoon Trace PulbliC Works/Engineering
I
BACKGROUND: On March 21, 2001 bids were opened for th~' Indian River Lagoon Trace. Three
Hundred Forty four vendors were notified, Thirty sets of bid docu ents were distributed and three bids
were received. Staff recommends the second lowest bidder (see ttached) Dickerson Florida, Inc in the
amount of $990,038.00. I
I
I
FUNDS AVAIL.: Funds for this project will be made available fr~m reserves within the Transportation
Trust/Impact Fees in account 101 006-4116-563000-4904. Th~ proposed project budget is outlined
below.
Construction
Testing
Reserves
$990,038.00
5,000.00
99,004.00
Total$1,094,042.00
PREVIOUS ACTION:
N/A
RECOMMENDATION: Staff recommends award Ofbid#01-0321~dian River Lagoon Trace to Dickerson
Florida, Inc. for $990,038.00 and authorize the chairman to sign t~e contract as prepared by the County
Attorney.
COMMISSION ACTION:
[X] APPROVED [] DENIED
[ ] OTHER:
Originating DeptX:
."\ /
, ,/ /
, '/
tb
~.. /
'.' /.' , .
1·'. "V¿"v ---
Mgt. & BudgetX
4
.~.I
,/
d
/ ;
Purchasing Mgr.:X C.. I
County Attorney:X
/
Other:
Other:
Finance: (Check for Copy only, if Applicable)
EIf,1/97
G,\COMMON\AGENDAS\BIDS\lAGENDA.FRM
'-"
""'"
..
,
ENGINEERING DM$ION
MEMORANDUM
01-117
TO: Ruth Totton, Interim Purchasing Director
FROM: Michael Harvey, Engineering Intem iI/I
VIA: Don West, County Engineer ;>'::\.;..
.. ~
DATE: April 24, 2001
SUBJECT: Indian River Lagoon Trace, Bid #01-032
Bids for Bid #01-032 were opened on March 21, 2001. 4e have reviewed the bids and in
accordance with the memo written April 16, 2001 by ay Wazny (see attached) we
recommend that the project be awarded to Dickerson Flori a, Inc.
. :
Funds for this project will be made available from re~èrves within the Transportation
Trust/Impact Fees in account 101006-4116-563000-4904.1 The proposed project budget is
outlined below.
Construction
Testing
Reserves
$990,038.00
5,000.00
99.004.00
Total: $1,094,042.00
attachment
CC: Dan Mcintyre, County Attorney
Ray Wazny, Public Works Director
Michael Powley, Capital Projects Engineer ~:
Barbara Meinhardt, Department Revenue Coordinator ~"
,.
.......
...,
,
-
PUBLIC WORKS þEPARTMENT
I
MEMO~NDUM
TO:
Dan Mcintyre, County Attorney
Ray Wazny, Public Works Director ¿lvJ(
!
I
FROM:
DATE:
April 16, 200j
I
I
SUBJECT: Award of Bid - Indian River Lagoon Trace prfject
I
I
In awarding the bid for the Indian River Lagoon Tracß Project, the Public Works
Department recommends thatthe award not be made to Adn~m Investment & Development
Inc. (Adnan). the lowest bidder. The Puþlic Works Departry,ent has had recent problems
with Adnan on two other projects, and docüments concerning these problems are attached.
As a result of these problems, the Department has serious qoncems about Adnan's ability
to complete a project of the magnitude and complexity of t~e Indian River Lagoon Trace
Project in a proper and timely manner. This project consi. st of 9 catch basins. installation
of 2840 feet of exfiltation trench, 5!;i feet' of side drain, -.?: . 0 feet of curb. landscaping,
construction of swales, installation of weather sheltérs and rest areas_
I
In view of the above the Department recommends that the ~oard determine that Adnan is
not a responsible bidder for this project and award the bid t the second high bidder.
I
I
I
RL W Ism
CC: County Administrator
Attachments
~
!
.~
g
M
ø
ø
°
~
g
M
~
~
°
"
.
~
~
s¡
~
a>
s
~
..
m
o
...
Õ
z
.
~
,.
~
g
~
.~
g
w
.
..
o
.-
g
t
~
."
¡;;
~
M
"
.
w
!
°
.I
ø 1
~ ~
~ 1:)
I'
î
CD
~h¡¡~
~.:. ~ ~!
~ ~
..
1'1'
~~
H
a»
lîll~~[ifi! ¡iii~ii¡~~!I¡
~!~~t~g§i~~,j~~&I~~~~~li~
~2.W~W w~m ¡I~' -i~ ~~'I~
~$!!il¡I~~~' I~: l~$ ~[~~
~ ~ð~~ -ai ¡~i ~ ilš
~1~~:!-iÞ~ l I I¡~ F ðf"
!t~ p;~ i ~ .- I
ª ~. £1
It ~ II' 0 õ
It CD ì;
~
~
~~~
~~îîifi~~
W~~~'¡"WNm
i
i
~
mmmmïrmmmmm~~mmø0øwœ:~ïrr
»»~~»~»~~»~~~~~~~~~~
t; ....
~__N~~WNt---w8¡~â~§8-----
M!Øt - -- - ¡----
~§~~~ii¡~§§i§~~E~~~~~i§~~
gggg88i;:88g8888~088808i;:i;:8~
_ ø ~_ - ~------
_!_=__~~~~~=:=_~~_g_~N___
§~§~~~§~~ßß88ß~I~~I§ii§§§i
8888g88°888 88 gg 88i;:i;:i;:88
-~:~~~=~.=~~- - ~-- ¡~:~:
~8~ß~~8~~8~*~*8~~~~~~~ª~~~~~
888880 888 c 8 i;:8888
~~~~~~~-~~~~~~~~!~¡~m~;~~
UUH~~u~n~~~~~· ;;¡~ß~U
88g88g888888888888~8g8888
==;~ --- -~--_ ~__ ~R.~~
111~1~1~~§§øßf~~~~~!III~1
g8g88888 88880 8~"~88888
_ _. - =__M
~~~.õs~ ~~~~.~-~~~~~~~~~~
8§1§§I~~~8Igl~~~§~I~III§~
88888i;:8808888g08i;:i88i;:8888
ß~
':"':1
~ ~ ~ ~-
~. 9 ....¡ ....¡~ ~ 01 I 01.. ~ ~ ~. ~ ~ ~ 9' a." ~ :: f ... .... -~
::: =. :::....~ f{lyt N'ï51p N ~9'OC
-t: ~ {.)_!:;..' t-_ï", N...a !i ï"~~~1
o $ n> œ>~-.-~ 4>
~lii~i~~~¡~~!¡~iíii"'~~E!l~Eli~
~ !lii7'!I'!I1·..,,·-;tI~i!l"¡·= ..¡-
i ia;~O~~~:g~ll~pg=S;¡~~~~I~
~~mm - ~~ ~e~ . R~~~_i~~ ~~. g
.~g§¡ ;g ~ga ~~~ !~ ~= JQ~~ I
....~D£ .-~ Ei~ ~~ ~ !g
1~1~~:~ ~ ~ ~ ~ ~ ~~ ~ þ
!B .[ ~ i J ~ ~ ~ ~iî
Ii g & m ã . .
f" I;;~H
Þg
...
mmï~mmmmmmmmmrmœrrr~m~rï~rr~ ..
»~~»~»»>~~~~~~~~>~~~~~~~ I
_ .... to» tit
-~~~N-~--~S~~-g~8$gN~§-----
o
~~__~M_~.~. ; _ _~~ E~~g~.
~ß~8~8ßß8;8~~§~¡~§~~8~8~8~8~*~§I*g~~
88 8 8°8° i;: 88 888i;:g8
_.MM. M __ ø M_~ MMMM..-
õ~~;wM~~~~--~~~f~~~~õ=b~~ô~~
~ß8~~ß~ 8§~~~IßI§~8§~~~I§§§~
g8i;:i;:88i;:888888g888~888g8g8i;:g8
M.UM ..,_
!D-__'t;M.~:-
§8~8~$:8g.
8U888088
M. t.M ~_~~ o~~~~~
~~~~~~~~~g*E§18~~i
88 ~~8~..888~g88888
~~~~~.~~~
I ¡; - ~.;'"§.
. . !S188· 08. .
88888 888
~~~E~~~~~=;~~~~~;t
~~~~~~_~~ä!~§~i~§¡
888g8~8~88888888g8
~""---t ....
UI}AUI.....§~...to:I-..¡
U~~·. ~8~
888888 i;:8
_~_~.__~...~~.E;~~~
~~~~~~~a~8~~8~~§~§
g888Ø8c8f88!8i;:888i;:
. .. . __.M ~. .......
~.__~~~~_ ~~~_œ !.~--.
i*¡i~~8~8~. i~8~~ii.~~§~ii
i;:8888 88° g 8i;:ai;:88~8888
~~~~
UH
8888
c;ro
o a:
~i~O
="'s¡1;
-?:
3w
~ j;;J
~
, :
..
r
~~.
Ht
. ... II
,
S"
~
~
.. ... .
ili
~!i'
g ..
"
~
.
;
.
.. ...'
'" .
g !
.. "
'" ,
g ..
o
i
~
.. .....
H
z
u
~
;:c
<:
fT1
;:c
~
o
o
z
-<
~
fT1
."
OJ:
>
<JJ
m
o
z
fT1
<JJ
m
()
-;
õ
z
>
..
<JJ
m
c;
-<
õ
z
'"
'"
6
~
ro
C
~
Õ
Z
<JJ
OJ:
m
fT1
-<
/
'-"
'wi
PUBLIC WORKS DEPARTME+
MEMORÀNDUM
TO: Charlie Bicht, Purchasing Director
FROM:
Ray Wazny, Public Works Director ',.' 1,..-
SUBJECT: Adnan K. Alghita
DATE:
September 28, 2000
******************************************* **********************
In the last year the Public Works Department has e perienced two problems in
contracting with Adnan Investment and Development, Inc. (AIDI). Last year AIDI
installed a culvert in the wrong location (see attached c rrespondence) on the Glades
Cutoff Road Stormwater Improvement ¡Project. This y. ar·we had a problem because
AIDI failed to obtain required rough inspections átthe S. Lucie County Jail Addition
and Renovation Project. Both of these problems were ignificant. Theses problems
caused County Staff to spend a substantial amount oft me resolving the problems.
Based on the experiences noted above, we recommend þat the County consider not
awarding future contracts to AIDI. I
Please call me at 462-1485 if you have any questions. I
RLW/sm
cc: County Attorney
St. Lucie County Administrator
,.
'-"
'wi
PUBLIC WORKS DEP1RTMENT
I
MEMORANDUM¡
. I
I
I
lùymond L. W=y. Fohlic Works Director I
Charles A. Cangianelli, Building and Zoning ~anager C~
August 28, 2000 I
I
St. Lucie County Jail - Permit No. 99090341 I
I
I
Attached is the recent correspondence between our Departme+ and Adnan K. Alghita.
It is my understanding from Jack Scott, the architect for the *oject, that the outstanding issues
are as foIIows: I
· Roof insulation and concrete ,thiclmess do not Jeet
design drawings; ... ·-::1
Paint finish on the interior walls;
TO:
FROM:
DATE:
RE:
.
· Roof drains;
. Sanitary sewer line
Without these items approved, a Certificate of Occupancy may tot be issued as requested by Mr.
Alghita.
I
CAG:ewc
Attachments as noted
\... v ,. .....:..,
.~ L~ 6:MS W:~KERòON ENC1~E£R[NC
407'645:2399
PAC=:
I
""'
{ ~
'wi
Sims Wilkerson Engineering, Inc.
MEMORANDUM
August IS, 2000
I
,
I
I
I
I
I
I
To: Jack Scott
Stebbins Scott & Bergman Archit(;cts
From: Gary A. Wilkerson, P.E.
Reference: Rock Road Correctional
Booking Addition
SWE# 98003
Subject:
Inspection of Underground Plumbing
You have indicated that the installing contæctor did not O:$the required inspections
during the progress of tbe plumbing installation for the ahov referenced project. The
following is our l)pinion of the minimum that should be requi in lieu of exposing the
piping for inspection. t".
]. I)çtenniue the credentials of the installing contractor. T a master plumber was on
site and in direct supervision of the installation,. ask for certification that the
installation is in accordance with the p~amng codes. I
2. Provide a hydrostatic pressure test of the sanitary piPt. by plUgging the drain
and maintaining a mínimum often feet ofhcad for a peri of twenty-four bours.
3. Verify the invert (If the ~tary piping at the point of co· ection of the new to the
existing then ca.lculatc: the available :;[opc. , _
,
~.~
.1
i
'1
o
J
I
i I
·1
! i
I
! I
II
,
.¡ ,
;
! I
1555 Howell ßrancb Rond. Suite A-I' Winta Park. Florida 32789. (41)7) 645-1 M. FAX (407) 645.2J99
-----.--
:/
'-'
",¡
, ., .
~'4 þ J S~EBBINS,
... SCOTT &
J .... BERGMAN
ARCHITECTS. P.A· #AAOJ01468
August 9, 2000
Roger Shinn
St Lucie County, Central Services
2300 Virginia Avenue
Ft. Pierce, Ronda 34950
RE: St. Lucie County Jail Addition & Renovation
Dear Roger,
Please find attached a letter and warranty, both dated August 7, 2000, from ~e Decks, In<:.
I
These two documents provide credible evidence that the roof deck was prope+ installed.
AirUte has been in business, under the same family ownership, since 1955 and lenjoys a superb reputation. Based
on the above, and the fact that I have known of Airlite's operation for over 4þ years, I strongly believe that this
work was performed as specified
Sincerely,
STEBBINS, SCOTT & BERGMAN, ARCHITECTS, P A
\
J~ 1-\. S?~
Jack H. Scott
President
-,·.·1
JHS;bja
cc: Adnan Investment & Development, Inc.
.......--.St. lucie County BuiJding Department
AirIite Decks, Inc.
2101 Sunrise Boulevard . Fo~t fierce. Fl34950 . PHONE (561) 464-3122 . FAX (561) 464-5068
'-'
-...J
ßOARD OF COUNTY
COMMISSIONERS
PUBLIC WORKS
DIRECTOR
Roy Wozny, P.E.
August 8, 2000
Mr. Adnan K. Algbita
P. O. Box 517
Jensen Beach, FL 34958
Dear Mr. Alghita:
You recently requested final inspections for your Building Pe "t #99090341 at 900 Rock Road.
In reviewing the permit files we have determined that Rough PI bing (420), Plumbing Top Out
(423), Insulation (141), and Construction Framing (140) inspe 'ons were not conducted. As a
result, the County cannot approve final inspections because of our failure to request and obtain
inspections of the required "rough in" phases of construction.
I
I suggest the following alternatives in completing your cons ction. First, you can expose
plumbing, insulation and :&aming for inspection by the COUll " Alternatively, you can have a
Florida Registered Professional Engineer certifY that the r ugh plumbing, insulation, and
construction framing meet the requirements of the 1997 Standar Building Code.
, ,
-co.··j.
It is extremely rare that a General Contractor would requ~st a ~ inspection without first having
a rough inspection approved. Would you please let me know hot this happened:
Please call me at (561) 462-1485 if you have any questions.
Sincerely,
£'
~d~~E
P1iC Works ¡fecir
CC' S1.. Lucie County Administra10r
S1.. Lucie County Attorney
Sl. Lucie County Purclwing Manager
SI. Lucie County Building and Zoning Manager
51. Lucie County Cenlnil Services Manager
JOHN D. DRUHN. D,",:" No " . DOUG COWARD. Di'rrid No 2 . PAULA A .:';.'!S Di"ne! No. J . FRANNlf HUTCHINSON. Dimie, No.4. CUFF DARNES. Dimic No.5
County AdmIl1!.s~~C;-::· . J.:Juglos M. Anderson I
2300 Virginia Avenue . Fr. Pierce, FL 34982
Public Worl~s: (561) 462-1485 . FAX (561 )4162-2362
Division of Engineering (561) 462-1707 Fox 462-2362 . Division of Rood & !}~idge: (561) 462-2511 FAX 462-2J63
Division of Solid Wasre: :5c~) 462-1765 FAX 46þ-6957
D,v,s,on of !}uilding & 'n.specrlons: (561' ':62< 55J Fox 462-17J51 . TDD (561) 462-1425
~ f ,
1
?
\r
...J
'~\' þ ~ S~EBBINS,
.... SCOTT &
J .... BERGMAN
ARCHITECTS. P.A.. #AACOOl468
August 8, 2000
Roger Shinn
St Lucie County, Central Serviçes
2300 Virginia Avenue
Ft. Pierce, Ronda 34950
RE: St wcie County Jail Addftioo & RenO\lation
Dear Roger, I .
Please find attached a letter and warranty, both dated August 7, 2000, from ~ite Decks, Inc.
These two documents provide credible evidence that the roof deck was prope~ installed.
,
I
Airlite has been in business, under the same family ownership, since 1955 an~ enjoys a superb reputation.
Sincerely,
STEBBINS, SCOTI & BERGMAN, ARCHITECTS, P.A
J d.~ !t. '=S".... .ç ~
-.
Jack H. Scott
President
JHS;bja
cc; . Adnan Investment & Development, Ine.
St Lucie County Building Department
Airlite Decks, Inc.
2101 Sunrise Boulevard· Fort Pierce. Fl 34950 . PHONE (561 464-3122. FAX (5ó 1) 4ó4-50ó2
"
\.;
{
(
wi
Airlite Decks, Inc.
Airlite Decks, Inc.
3505 65'" Street
Vero Beach, Fl 32967 .
561,/5'32-3516
Fax: 561/778-8456
August 7, 2000
Adnan Investments & Development, Inc.
P.O. Box 517
Jensen Beach, FL 34958
Attn: Adnan Alghita (561/460-0583)
RE: St Lucie County Correctional Center
Dear Mr. Alghita,
. j
We furnished and installed the following insulating co -ete roof deck system:
2" minimum Perlite insulating concrete (125 PSI) over s epped polystyrene
insulation board to provide 114" per foot slope - appro mately 2,273 square ft.
(Metal decking was installed by Bandy.)
Sincerely,
AirIite Decks, Inc.
JÚiduJtJ: ÚJ
Michelle K. Lockwood
Sales/Estimator
~ .
"
\...-
i 1.
....",¡
Airlite Decks, Inlc.
3505 65th Street
I
Vero Beach, florlda 329tJ7
561/562-3518 faxff: 77~/8456
WARRANTY
WE DO HEREBY CERTIFY THAT WE WERE THElnsulatin O>ncrete Ro f Deck S stem subcontràctor on
the ST. LUCIE COUNTY CORRECTIONAL CENTER which was complete and accepted on the date of
substantial completion_ I
WE FURTHER CERTIFY that the above referenced project to be free from tefects in the materials and
workmanship for a period of 1 year from the acceptance date, and we sha I at our own expense repair and/or
replace all such defective work, and all other work damaged thereby, whi h becomes defective during the
term of the Warranty, except such defects caused by failure of work of O~rs, if such defects were impossible
to detect at time of examination of the other's work. This subcontractor sh II not be held responsible for
nonnal wear and tear and damage by acts beyond the subcontractor's con oJ.
/2 7'-~ J
Roger l. Smith, President c :
I
Airlite Decks, Inc. ¡
I
I
I
I
I
Sworn to and subscribe~ before me this 7th day of August 2000
~,da . ; tj-d
Linda D. pfund
Notary Public
Commission #CC948762
Expires August 25, 2004
,,'h" Und. 0 Pfund
~ ¥ * Mot CommisaJon CC948762
.~..:;.; Expires August 25. 2004
/
"""
t f
..,¡
Airlite Decks, Inc.
th I
3505 65 Street i
Vero Beach, florida 329é7
561/562-3518 fax": 77'/8456
WARRANTY
WE 00 HEREBY CERTIFY THAT WE WERE THE Insulatin Concret Roo Deck S stem subcontraètor on
the ST. LUCIE COUNTY CORRECTIONAL CENTER which was completed and accepted on the date of
substantial completion.
WE FURTHER CERTIFY that the above referenced project to be free from fects in the materials and
workmanship for a period of 1 year from the acceptance date, and we shal at our own expense repair and/or
replace all such defective work, and all other work damaged thereby, whi becomes defective during the
term of the Warranty, except such defects caused by failure of work of oth rs, if such defects were impossible
to detect at time of examination of the other's work. This subcontractor sha I not be held responsible for
normal wear and tear and damage by acts beyond the subcontractor's con 01.
/~7¡~
Roger L. Smith, President
Air/ite Decks, Inc.
Sworn to and subscribed before me this 7th day of August 2000
Xu>!..; ~J
Linda D. Pfund
Notary Public
/h." Und. C Pfund
~¥ * My Commission CC9048762
'''''~ Expiras August 25. 2004
Commission #CC948762
Expires August 25, 2004
/ .:
~.
PUBLIC WORKS DEPARTME~T
MEMORANDUM
TO: Charlie Bicht, Purchasing Manager
Ray Wazuy, Public Works Director 4~
FROM:
SUBJECT: Adnan Investment Evaluation
DATE:
October 11, 1999
....J
********************************************f'**********************
Attached for your information is a Memorandum da ed September 3, 1999 from
Mike Wrock, Engineering Intern concerning Mr. Wr ck's experience with Adnan
Investment and Development, Ine. on the Glad~ Cutoff road Stormwater
Improvements Project I
I
I
RLW/sm
-
cc: County Administrator
County Attorney
County Engineer
"
\...
....,¡
DIVISION OF E~GINEERING
!
MEMOR~NDUM
99-35 .
~M~@~~~~~M~~~~@~~@~~~~l~1t~~~~~@~@~@~@~@~~~~~@1~. @~~~~~~~@~@~@~[~~~~~~~H~J@~~m~~~~@~~@~@~@~@~
TO:
Ray Wazny, Public Works Director
FROM:
Mike Wrock, Engineer Intern ~_~
DATE:
September 3, 1999
SUBJECT: Adnan InvestTTient and Development, Inc. - fvaluation of Contractor
Per your request, I am summarizing my experiences worki g with Adnan Investment and
Development, Inc_ (Adnan). The Glades Cutoff Road Sto water Improvements Project
is the only project that I have worked on with this contra tor. The contract amount was
$128,858 and included several culvert replacements. The Final Payment was approved
by the BOCC on August 24, 1999. Below are some of the is ues that should be considered
in the evaluation and Mure use of this contractor. !
Adnan does not do any of the actwal construction,::~heY subcontract 100% of the
work, and do not necessarily use the same siJ contractor for each project.
Therefore, there may not be any consistency in the quality of work_ .
Prior to awarding the contract, Adnan said they wer using Custom Built Marine as
the subcontractor and they provided references for hem. We based our selection
of Adnan and recommendation to the BOCC on t at assumption. Following the
award of the contractto Adnan by the BOCC, they th n introduced John Ward.and
Sons as being an additional subcontractor along ,ith Custom Built Marine. We
investigated John Ward and Sons and gave them ap~roval. As I realized during the
course of the project, John Ward and Sons was fhe prime subcontractor and
Custom Built Marine was never used. In my opini~n,. Adnan's representation of
subcontractors to be used on the project was mislelding.
Adnan made a claim for additional compensation fro the County in the amount of
$36,239 due to a drafting error on the project plans elated to the mitered ends of
the culverts. The drafting error in question was raise by Adnan prior to submitting
their bid on the project, as they acknowledged. The rafting error was clarified for
Adnan at that time. Adnan had the opportunity at th t time to revise their bid or to
not submit a bid at all. : ~;',"'
1-
I
! c:r'" - 7
lo.I_r'
!
I
.'
~
....,¡
i
I
Having said that, and the fact that the cfaim was e~entuallY dropped, the following
information is not really relevant but should be no ed. Adnan's claim for $36,239
was always expressed as being related to three of he culverts in which there was
a drafting error, however, as could be seen on thbir tabulations, $27,808 of the
claim was for mitered ends for all of the other cylvert crossings ?S well on this
project. To my knowledge, there was never any V~rbal or written claim by Adnan
related to these other culverts, other than what was n their tabulated amounts, and
there would have been no reason to be. This leav s $8,431 which I perceived as
any claim. ' ,
i
I
I
In trying to work with Adnan on this matter, which I do not believe I was obligated
to do, I reduced the quantity of pipe which was call for on other culvert crossings
(with no reduction in the contract amount), which i my judgement could be done
without sacrificing the stormwater improvements The monetary value or the
reduction in the quantities of pipe on this project was $10,711. Adnan still continued
to pursue their claim through their attorney, but ev ntually dropped it.
I
Adnan's subcontractor replaced a 47" x 71" ellipti I culvert at the wrong location
(approximately 1 mile away from the culvert that wa intended to be replaced). This
was an approximate $14,000 mistake. In my opin on, this was clearly a lack of
communication between Adnan and theirsubcontrac or. The pre-bid meeting, which
Adnan attended, was held in the field at the location ~fthe culvert that was intended
to be replaced. i
i-
. t
Adnan had always expressed to me that they wO' Id take responsibility for the
mistake, however, their attorney later made a reques for Adnan to be compensated
to some extent for this culvert. That claim was later ropped.
I
. Adnan requested compensation on each of their ~Yment applications for work
which was not completed. This was either due to a I k of communication between
Adnan and their subcontractor and a failure by Adn n to inspect the work, or just
an unjustifiable request for compensation. .. I
. I
The work on the Glades Cutoff Road Project was cJmPleted satisfactorily and on
schedule, and met the requirements of the project plans and specifications.
cc: Don West, County Engineer
~
I
-..,If' V~
BOARD OF COUNTY
COMMISSIONERS
PUBLIC WORKS
DIRECTOR
Roy Wozny, P.E.
i 1llð'
August 8, 2000
Jv1r. Adnan K. Alghita
P. O. Box 517
Jensen Beach, FL 34958
Dear :Mr. Alghita:
You recently requested final inspections for your Building pemrt #99090341 at 900 Rock Road.
In reviewing the permit files we have determined that Rough P~mbing (420), Plumbing Top Out
(423), Insulation (141), and Construction Framing (140) inspeftions were not conducted. As a
result, the County cannot approve final inspections because of our failure to request and obtain
inspections of the required "rough in" phases of construction.
I
I suggest the following alternatives in completing your con crion. First, you can expose
plumbing, insulation and framing for inspection by the Coun Alternatively, you can have a
Florida Registered Professional Engineer certify that the ough plumbing, insulation, and
construction framing meet the requirements of the 1997 Stand d Building Code,
,
, .
It is extremely rare that a General con.tractor would reqÜest i~al inspection without first having
a rough inspection approved. Would you please let me know hrW this haþpened.
Please call me at (561) 462-1485 if you have any questions.
Sincerely,
¿ ~ft) .
~dL. y. .E.
PwriC Works re r
ee: SL Lucio County Administrator
St. Lucio County Attornoy .
51. Lucio County Purchasing Manager
St Lucio County Building and Zoning Manager
51. Lucio County Central Services Manager
JOHN D. ORUHN. D1S,,"cr No 1 . DOUG COWARD D'SfIICI No.2. PAULA A LEWiS D,smc:r No.:¡ . Ff\~NNIE HUTCHINSON. Cisrrrc:r NO.4· CUFF OARNES. DlSrrrc' No 5
Counry Adminisrrorcr . Douglos M. Ander n
2300 Virginia Avenue . Ft. Pierce, F 34982
Public Works: (561) 462-1485 . FAX (56 ) 462-2362
Division of Englneenng: (561) 462-1707 Fax 462-2.362 . DIvIsion of ROOdlG Dridge: (561) 462-2511 FAX 462-2.36.3
DivIsion of Solid Wasre: (561) 462-1768 F~ 462-6987
Division of ()uilding G Inspecrions: (561) 462-1553 Fox 462-11735 . TDD (561) 462-1428
. ? I
. I
;,
.\wot
C-'i - fIJJ
i
S T. L U C I E C 0 U N t Y
2300 Virginia Av~ue i
Ft. Pierce, Florida 3498~
Growth Management Diviè~4n
PERMIT 'I.,
-........
·......Insp Area 3
Master Nbr.
Yo 0ex 5) )
~~, fC
J Y1sJ
Page 1.
Permit #: 99090341 Type: BUILDING COMMERCIAL
Issued: 10/22/99'
Job Location: 900 ROCK RD N / FT PIERCE
Jurisdiction: ST LUCIE COUNTY
Lot: Blk: SUbdiv:
Parcel: 2311-210-0000-000/6
Owner's Name: ST LUCIE COUNTY,
Project:
Job Description: * NEW COMMERCIAL BUILDING - BOOKING ADDN
INTERIOR RENOVATIONS TO EXISTI G BOOKING AREA
99090341 -7""7
Elev:
Applicant Name: ADNAN K ALGHITA
Contact Phone: (561) 229-8557
I
Double Fee: N I
i
Contractor Name: ALGHITA, ADNAN K ~ert Nbr:
Business Name: ADNAN INVESTMENT &; DEVELOPMENT INþ
I
I
i
i
i
i
Addl Information: *RCVD 30 DAY POWER RELEASE FO~ 10/06/99 MS*
SUB-PERMITS I
STATUS PT CERT # DBA . i JOB DESCRIPTION
ISSD BC 10504 ADNAN INVESTMENT &; D, * NEW COMMERCIAL BUI
ISSD EP 17H9 LIGHTNING ELECTRIC- Im! ELECTRICAL SUB FOR C
ISSD PP 8742 PLUMB-ALL INC PLUMBING SUB FOR COM
ISSD ME 10264 HI-TECH COOLING INC I MECHANICAL SUB FOR C
ISSD RP 1.0304 WEATHERSEAL INC I ROOFING SUB FOR COMM
INSPECTIONS - For Requests, Call: (51) 462-1.261
~eq Description Pr Date Res Descriptio Inap Date
Setbacks Left:
Fire Marsh Nbr:
Utility COs:
PERMIT #
99090341.
99090342
99090343
99090344
99090345
L04 (ST) COMPACT JON TE 1
LOS' (ST) FORM BOARD SU 1
120 (PL) PLUMBING ROITG 1.
b27 (PL), TEMP.TOILET
.03 (EL) EUFFER GROUND
.15 (ST) SLAB
.21 (ST) TERMITE SPRAY
18 (ST) COLUMN
25 (ST) TIE-BEAM
:/0
2 - ¡.." ð h'GCc~~y Pt7'-'"'(.Þ" ov U £..oJo" e.X'''¡~
2/ ./-~ ï..-O'il I\~ i>
r J - ¡'" - fj 6. c r-I ~ ?...I ð:J.' y/'o. :,\,,0+
2 þ 'v? ,7 . I ~-"'" If' ~.
3 . ~ttt/f1 ,..,~II;¡ 1,-) t'-.,.Js .~
rf"I4rlat ' f '()D ð ¡...
I .J-o,- .
~"f¡ÁL It~B"~~ ~·I .1/-h2ýý
í"o--h:vt- T Óf? f3"""-,;;v f I ~ """ ~ Iy I"'" rJ-Co.,# G. 5.
jo~l ~ Î6JP ~B::Ðk~')-+ 1Vwjl~-~ 2--~: ;OD
FíJ~1í'¿ f3P~ rrL--f."V'/~'-~ u~
Type: CONTRACTOR
10504
Right:
Front:
Stub Out:
Rear:
T-Pole:
f r fJ"",j.; A,{
(ð '/¡~ t./ '7 c¡ f3. 1....
~',JJ
À -IY-oð S.,ß
110
1.
3
Z~tfJ
gz~
E-t~-ªì
U ~\
¡.i tn'
~~....;
tIJ........~
~~~
~E-tC'!
oc:::::~
tI.10~
u--¡::
.....~o
E-t .-
o t:J
Z J$
Z
OE-ttfJ
_ZID
E- '5
U~1ü
¡¡'¡¡§t>
0..___.....:
tIJ,,-~
Z ¡¡,¡ "
- 0::: ~ I
~E-N
00:::C"i
¡¡,¡oOO
u--~
.....°0
E- z.-
~<E
CIJ
I:
&ill =ra¡
f"
\.-
......"
S T. L U C I E C 0 U N T Y
2300 Virginia Avenue I
Ft. Pierce, Florida 349ß2
Growth Management Divisfon
PERMIT
Page 2
Permit #: 99090341 Type: BUILDING COMMERCIAL
Issued: 10/22/99
Job Location: 900 ROCK RD N / FT PIERCE
Jurisdiction: ST LUCIE COUNTY
Lot: Blk: Subdiv:
Parcel: 2311-210-0000-000/6
Owner's Name: ST LUCIE COUNTY,
Proj ect : .
Job Description: * NEW COMMERCIAL BUILDING - BOOKING ADDN
INTERIOR RENOVATIONS TO EXIST NG BOOKING AREA
-Insp Area 3
Master Nbr. 99090341
INSPECTIONS - For Requests, Call: (561) 462-1261
Reg Description Pr Date Res Descript'on +- I~p Date
137 (ST) STRAPPING 4"l-7'-æ>o G·S. ~tl;1 'f; {jAr r;r
140 (ST) CONR/PRAMING 4 I fh-
r f'-\<-l- <- W e' .:., ~- ,joo L": P:: 2(-,: .
238 (EL) ELECTRIC ROUG 4 ~ I ~y J " ~
351 (ME) MECHANICAL RO 4 p......i~.J1.- v',,~+. ~ ß"..b...S a.-.lðW~ :;-?7_ïJ r' _ l-/_2.j~vO
\ f'.,.,J-.~. J).......\ ~""'SL -"7 l '1- :z.::J-C'Þ I
423 (PL) PLOMBING TOP 4 I
I
I
~.I
Elev:
141 (ST) INSULATION
5
259 (EL) POWER RELEASE 5
260 (EL) 30 DAY FOR TE 6
167 (ST) ROOF FINAL 7
180 (ST) BUILDING FINA 7
261 (EL) 30 DAY EXPIRE 7
280 (EL) ELECTRIC FINA 7
380 (ME) MECHANICAL FI 7
480 (PL) PLUMBING FINA 7
700 (FM) FIRE DEPARTME 7
300 (ZCJ ADDRESS FINAL 7
301 (ZC) PAVING AND DR 7
308 (ZC) LANDSCAPING/T 7
,
~
...."
ST. LUCIE COUNTY
2300 Virginia Avenue i
Ft. Pierce, Florida 349812
Growth Management DivisiÞn
PERMIT
Page 1
Permit #: 99090341 Type: BUILDING COMMERCIAL
Issued: 10/22/99
Job Location: 900 ROCK RD N / FT PIERCE
Jurisdiction: ST LUCIE COUNTY
Lot: Blk : Subdi v:
Parcel: 2311-210-0000-000/6
Owner's Name: ST LUCIE COUNTY, . F~ood: NA
Project: I
Job Description: * NEW COMMERCIAL BUILDING - NEW BOOKING, ADDN
INTERIOR RENOVATIONS TO BXISTI~G BOOKING AREA
I
Inap Area 3
Master Nbr. 99090341
Blev:
Applicant Name: ADNAN K ALGHITA
Contact Phone: (56l) 229-8557
Type: CONTRACTOR
Setbacks Left:
Fire Marsh Nbr:
Utility COs:
I
Double Fee: N i
¡
Contractor Name: ALGHITA, ADNAN K I Cert
Business Name: ADNAN INVESTMENT & DEVELOPMENT IfC
I
Front: i
Stub OUt: I
Nbr:l0504
Right:
Rear:
T-Pole:
Addl Information: *RCVD 30 DAY POWER RELEASE FO 10/06/99 MS*
SUB-PERMITS
STATUS PT CERT # DBA I .
ISSD BC 10504 ADNAN INVESTMENT & DMLO
. ISSD EP 1 ?¡49 LIGHTNING ELECTRIC rÑ¢
rSSD PP 8742 PLUMB-ALL INC. I
ISSD ME 10264 HI-TECH COOLING INC I
ISSD RP 10304 WEATHERSEAL INC I
INSPECTIONS - For Requests, Call: (~61)
Req Description Pr Date Res Deacripti4n
I
I
I
PERMIT #
99090341
99090342
99090343
99090344
99090345
JOB DESCRIPTION
* NEW COMMERCIAL Bur
ELECTRICAL SUB FOR C
PLUMBnTG SUB FOR COM
MECHANICAL SUB FOR C
ROOFING SUB FOR COMM
~
462-1261
Inap Date
NOTICE OF INSPECTION
AND/OR TREATMENT
Section 482.226,F1.statutes
104 (ST) COMPACTION TE 1
105 (ST) FORM BOARD SU 1
420 (PL) PLUMBING ROUG 1
427 (PL) TEMP. TOILET 1
103 (EL) EUFFER GROUND 2
2 7/-JJ-ð~et ,
,
115 (ST) SLAB I
Lt (1-' ø c,..- ~ J
121 (ST) TERMITE SPRAY 2 I
i
SOUTHCOAST PEST CONTROL
3849 N.E. LINE DR.
JENSEN BEACH, FL. 34957
561-225-0999
118 (ST) COLUMN
¡
I
I
(ST) TIE-BEAM 3 I
I
foOT; I\~!. .1Ä~:nÅL Vfõ.5TIiS<...ê. 1'1Zd1? Ck.
j/V/:'bV/0 y;'~ rJ úLvJ< /-/;-2A;OOIl;J1l'
3
125
\ ) 0
"'"
"'"
Permit #: 99090341
Issued: 1.0/22/99
Job Location: 900 ROCK RD N / FT PIERCE
Jurisdiction: ST LUCIE COUNTY
Lot: Blk: Subdiv: .
Parcel: 2311-210-0000-000/6 Prop. Name: ST LUtIE COUNTY CORRECTIONAL CENTER
Owner's Name: ST LUCIE COUNTY, F~ood: NA Elev:
Project: I
Job Description: * NEW COMMERCIAL BUILDING - NEW BOOKING ADDN
INTERIOR RENOVATIONS TO EXISTI*G BOOKING ARE'
I
!
S T. L U C I E C 0 U N t Y
2300 Virginia Avenue I
Ft. Pierce, Florida 3498t
Growth Management Divisifn
PERMIT !
CNF# 67 SType: BUILDING CO~RCIAL
I Master
I
Page 1
Insp Area 1
Nbr. 99090341
Applicant Name: ADNAN K ALGHITA I Type: cr
Contact Phone: (561) 229-8557 Double Fee: NI
Contractor Name: ALGHITA, ADNAN K I Cert Nbr: ~ ~
Business Name: ADNAN INVESTMENT & DEVELOPMENT n~'c fJYt-ß I)J.t .
. ~K 34945
Addl Information: TIE BEAM IS FOR THE VESTIBULE 1/14/00
THIS IS PARKING GARAGE ON SID~-OF BLDG PER ~
*RCVD 30 DAY POWER RELEASE FO~ 10/06/99 MS*
SUB-PERMITS I .
STATUS PT CERT # DBA ' >_ ' -ce,}I.
FINL EP 18114 MALANCZYN ELECTRIC IN
INSP BC 10504 ADNAN INVESTMENT & DE LO
ISSD EP 17149 LIGHTNING ELECTRIC IN
ISSD PP 8742 PLUMB-ALL INC !
!
ISSD ME 10264 HI-TECH COOLING INC--1
ISSD RP 10304 WEATHERSEAL INC .
Setbacks Left:
Fire Marsh Nbr:
Utility COs:
Right:
Front:
Stub Out:
/CONTR
PERMIT #
20030522
99090341.
99090342
99090343
99090344
99090345
JOB DESCRIPTION
INSTALL NEW A/C CONT
* NEW COMMERCIAL BUI
ELECTRICAL SUB FOR C
PLUMBING SUB FOR OM
MECHANICAL SUB F C
ROOFING SUB FOR MM
~
~
I~SPECTIONS - For Requests, Call: ( 61.) 462-1261
REINSPECTION FEES REQUIRED: 1 REINSPE TION FEES PAID: 0
I
Req Description Pr OptJ;d~1te Res Descr'ption ~ InSPj te
140 (ST) CONR/FRAMING 4 ~OS/01/00 ~ .;:¡r>'s;-D-
351 (ME) MECHANICAL R 4 9~dO~ OS/01/0~ LJ .
COMMENTS: REQ DUE TO FAILED INSP 14: : 2 2 IAPR 2~00 ø J
423 (PL) PLUMBING TOP 4 ~OS/01./00 ~: /
104 (ST) COMPACTION T 1 BLD13 10/26/9 90 APPRO~ BLD13 1.0/26/99
110 (ST) FOOTER/FOUND 1 VOX 10/26/99 91 PARTI~,APPROVED BLD21 10/26/99
COMMENTS: VESTIBULE ONLY I
AUTOMATED REQUEST 13:25:31 25 OCT ~999
I
105 (ST) FORM BOARD S 2 BLD03 10/26/99 93 NOT R~QUIRED BLD05 10/26/99
\.,..-
.-./
S T. L U C I E C 0 U N'T Y
2300 Virginia Avenue,
Ft. Pierce, Florida 349812
Growth Management Divis~on
PERMIT: Page 2
I
Permit #: 99090341 CNF# 678Type: BUILDING COMMERCIAL Insp Area ~
Req Description Pr Op.Id Date Res Desc~iption Insp Date
I
~10 (ST) FOOTER/FOUND ~ VOX 11/04/99 91 PARTI~,APPROVED' BLD18 11/04/99
COMMENTS: AUTOMATED RESULT 11:46:07 04 NOV 11999
125 (ST) TIE-BEAM 1 BLD13 ~1/15/99 91 PARTIkL,APPROVED BLD21 11/16/99
COMMENTS: 1ST LIFTS - BRYAN 971-4677 I
427 (PL) TEMP.TOILET 1 BLD13 11/15/99 93 NOT ~bQUIRED BLD21 11/16/99
COMMENTS: BATHROOM FACILITY IN EXISTING BLDG or
125 (ST) TIE-BEAM ~ VOX 11/22/99 91 PARTI~T.,APPROVED BLD23 11/22/99
COMMENTS: NEW SALLY PORT TOP OF BEAM ONLY. r-
I
103 (EL) EUFFER GROUN 2 BLD13 12/06/99 93 NOT R~QUIRED BLD23 12/06/99
COMMENTS: POWER TO COME FROM EXISTING BLDG I
EARLY MORNING PLEASE
115 (ST) SLAB 2 BLD13 12/06/99 91
COMMENTS: NEW SALLY PORT ONLY
AUTOMATED RESULT 16:41:26 06
121 (ST) TERMITE SPRA 2 BLD13 12/06/99 9~
COMMENTS: AUTOMATED RESULT 16:42:06 06
104 (ST) COMPACTION T 2 BLD03 12/22199 90
~37 (ST) STRAPPING 2 BLD13 01/05/00 90
COMMENTS: AUTOMATED RESULT 16:20:19 05
125 (ST) TIE-BEAM 2 VOX
COMMENTS: VESTIBULE
AUTOMATED RESULT ~5:51:36
01/18/00 90
1~5 (ST) SLAB 0 VOX 0~/26/oo 91
COMMENTS: AUTOMATED RESULT ~5: 59 : 08 26
121 (ST) TERMITE SPRA 0 BLD13 01/26/00 91
COMMENTS: AUTOMATED RESULT 15:59:34 26
110 (ST) FOOTER/FOUND 0 BLD03 02/14/00 90
COMMENTS: NEW OFFICE SPACE
115 (ST) SLAB 0 VOX 02/17/00 90
COMMENTS: AUTOMATED RESULT 09 :53 :45 17
125 (ST) TIE-BEAM 2 VOX 02/29/00 91
COMMENTS: BOOKING & NURSES STATION
AUTOMATED RESULT 16:32:23 29
PARTIp"APPROVED
DEC 1P99
PARTIhT'1 APPROVED
DEC 1~9
I
I -
~~~
APPROYED
18 :::T:tO~APPROVED
JAN 2 ~o
PARTIAL, APPROVED
JAN 2~00
APPRO~D
I
,
APPROTm
FEB 2~00
I
PARTI¥/APPROVED
FEB 2~00
BLD23 12/06/99
BLD23 12/06/99
BLD03- 12/22/99
BLD23 01/05/00
BLD05 0~/18/00
BLD18 01/26/00
BLD18 01/26/00
BLD18 02/14/00
BLD18 02/17/00
BLD23 02/29/00
\."..-
....,
S T. L U C I E C 0 UNiT Y
2300 Virginia Avenuei
Ft. Pierce, Florida 349t2
. Growth Management Divis on
PERMIT
Permit #: 99090341 CNF# 678Type: BUILDING C0M¥ERCIAL
Req Description Pr Op.Id Date Res Descfiptiòn
119 (ST) STEM WALL 2 VOX 03/07/00 90 APPR~VED
COMMENTS: AUTOMATED REQUEST 13: 06 :42 06 MARI2000
351 (ME) MECHANICAL R 2 BLD03 03/07/00 91 PART1AL,APPROVED
COMMENTS: PARTIAL FOR VESTIBLE & BOOKING ROOf ONLY
125 (ST) TIE-BEAM 2 VOX 03/23/00 90 APPR~VED
COMMENTS: FINAL TIE-BEAM INTERIOR WALLS. T
AUTOMATED RESULT 16:16:31 23 MAR ~OOO
i
351 (ME) MECHANICAL R 2 VOX 03/23/00 91 PARTiAL,APPROVED BLD19 03/23/00
COMMENTS: DUCT SEALING ONLY I
AUTOMATED REQUEST 08:20:43 22 MAR¡2000
238 (EL) ELECTRIC ROU 2 VOX 04/04/00 91 PARTiAL, APPROVED BLD19 04/04/00
COMMENTS: SALLYPORT ONLY. ¡
AUTOMATED RESULT 12:51:22 04 APR ~OOO
I
Page 3
Insp Area 1
Insp Date
BLD18 03/07/00
BLD19 03/08/00
BLD23 03/23/00
238 (EL) ELECTRIC ROU 2 VOX 04/26/00 90 APPR~VED BLD19 04/26/00
COMMENTS: AUTOMATED RESULT 14:02:42 26 APR 1000
351 (ME) MECHANICAL R 2 VOX 04/26/00 82 DIS~VD/REINSP FE BLD19 04/26/00
COMMENTS: DUCT WRAP & JOINT SEALING NOT COMp· E'Ì'E.
AUTOMATED REQUEST 13: 32: 22 25APR -2000
,/
~
"""'"
ßOARD OF COUNTY
COMMISSIONERS
PUBLIC WORKS
DIRECTOR
Roy Wozny. P.E.
September 1, 2000
Adnan K. Alghita
P.O. Box 517
Jensen Beach, FL. 34958
Dear Mr. Alghita:
The approved permitted plans for construction of the St. Lucie County
CorreCtion Facility addition provided for an insulate~ roof structure. When you
asked the St. Lucie County Building Inspection D~vision to approve the roof
structure, you indicated that insulation had been plaþed as required. We did not
accept your representation and asked that an engine4r certify insulation had been
placed on the roof as specified in the plans. On A~9Ust 8, 2000, Jack Scott,
President of Stebbins, Scott and Bergman Architect sent a letter (attached) in
which he stated that creditable evidence had been rovided that the roof deck
was properly installed. · .-:.+
i
I
This was rejected and. I sent you a letter on August 8, 2000 (copy
attached) suggesting alternatives to obtaining a Ce ificate of Occupancy. You
responded by core drilling the roof structure. The results of the core drilling
were provided in a letter (copy attached) dated Augu t 30, 2000 from Mr. Scott
indicating .that insulation was not installed as requir d by the plans, resulting in
an. actualR-Value of 5.6 instead of the planned 16" .
I
I
!
j,:;';':.;:.
In Mr. Scott's letter of August 30, 2000, he ~ndicates that Roger Shinn,
Interim Central Service Director, approved a reco~menpation to increase the
roof envelope of the booking area by adding batfs of insulation above the
suspended ceiling. Installation of batts above the s*pended ceiling, will make it
more difficult to service mechanical components, land will require insulation
replacement when roof leaks occur. Batt installation I is therefore not approved.
I
I
I
:. - -', c.,·:c: "0 , . oC·.iG cowArD. Ois,.,c: "0 2 . "AULA A. c'WIS. Di\r"C NO. :) . mAN~IE HUTCHINSON. Oioe'icr Nc. , . CLIff Q.,RNES )"rncr 1,,, 5
Counry Admi,:'lisrrûror . DOUQI-:1S M. AnGer:son I
2300 Virginia Avenue . Fr. Pierce. FL Jf'1-982
Public Worl~s: (561) 462-1485 . FAX (561) ~62-2J62
; C'9lfleenr.g (561) 462-1707 Fox 462-2362 . DivlslO:l of fì::>8d (, bridge: (561) 462-2511 F¡c.X .:16':'2J(;J
Division of Solid Wos;e: (561) 462-: 7613 FAX 462-6987
DI\li~iù(~ of DuddIng & Inspecrions Sò1 \ ·:!o2-155J ::'0Y. 462-17.Jb . TDD (5ó1) .'-;6~' 1.~')(:
' i
~
'-'
The problems noted above were caused by yoµr failure to request a rough
inspection_ I suggest removal and replacement of ~he improperly installed roof
structure. I
i
Please call me at (561) 462-1485 if you hav~ any question~.
Sincerely,
//~' /j
..r~. [,0"~;
Ray and L ry-
RLw}Jm ¡.
cc: BOCC
St. Lucie County Administrator
Jack Scott, President Stebbins, Scott, Bergman Arch,tects
Roger Shinn, Interim Central Services Director
Charles Bicht, Purchasing Director
-C-l
\.,...
...."
l\t1 ì
~ " ~ ~ ~g'g~"i
;. . lJ .J BERGMAN
ARCHITECTS. P.A. . #MC001468
August 30, 2000
Roger Shinn
St. Lucie County Central Services
3071 Oleander Avenue
Fort Pierce, FL 34982
RE: St. Lucie County Correctional Facility Addition
Dear Roger:
The new roof deck installed over the Booking area has a m~urn thickness of 3", ± and a
maximum thickness of 4 ~", ±. . There is 1" of insulation inçluded in parts of the thi<:ker
portion but its extent is unknown and adds little insulation value. I
! .
The deck, as installed, has an R-value of 5.6. The contract d<><iments called for an R" . 'Q of
16.7.
The ductwork does have an R-value of 6.0; therefore additional bulation may be installed on
top of the lay-in ceiling (see memo from Sims, Wilkerson EnQineering and air conditioning
submittals reviewed by S. WE, attached.) . -:: l -
Based on the above, I recommend that the contractor be 4ii-ected to install 2'x4' R-11
insulation batts on top of each ceiling panel in the newly constr1ucted portion of the Booking
area.
Please advise me as to how to proceed.
Sincerely,
STEBBINS, SCOTT & BERGMAN, ARCHITECTS, P A
J¡¿Jt.. H. .S=.r--
Jack H. Scott
President
JHS:ab
cc: St, LUCÎe County Building Department
Adnan AIghita, Adnan Investment & Development, Inc.
Brian Hessinger, Sims Wilkerson Engineering
2 ¡ 0 ì Sunrise Boulevard· Fort Pierce. Fl 34950 . PHONE (56 J) 464-3122 . FAX (561) 464-5068
'-'
Sims ,Wilkerson Engineering, Inc.
MEMORANDUM
...,
July 21, 2000
To:
Jack Scan
Stehbins. Scott & Bergman
Brian S. Hessinger. P.E. r
Rock Road Booking
SWE #93003
-
From:
Project:
Subject:
Roof Insulation
It has come to our attention that the contractor did not instal! th. e ~pecifieå amount (If inSUI. aticm
on the roof deck, A core plug taken near the roof drain was app oximatc1y 3 inches thick and
one taken near the perimeter of the roof was appro~m:Rtcly 4.5 ches. There was almost no
instùation in the shorter plug and vcry little in the taller plug, I
It appears that the roof deck as installed will cause the new additii. n to fail the State of Florida
Energy Efficiency Code, The code states that a "roof or ceiling w eh functions as the building's
thermal envelope shall be insulated to a R-value of at least R-IO",
If ¡osutation were to be installed on top of the lay-in ceiJing tit would be necessary to
increase the R-value of the ductwork insulation to a minimum of 6 If the insulation is instaJled
ligbtlo the unùerside of the roof deck then the ductwork insulaticlll 'II not require modification,
I
I
END OF MEMORANDUM -l
L%' ll~·~ .""'" ..... . '"''' A·' . """" "'... "..,,, ",,,. "." "'"~,;;;-¡"" ~'m'
I
i
I
I
I
I
I
I
I
I
r
I
I
I
I
I
I
I
i
I
!
\.".-
'WtII
Hi Tech CooIiI1g, Inc.
I
I
I
I
,
I
I
Date:
August 24, 1!)99
Contractor: Adnan Investments
Project:
St. Lucie County Correctional Institute
Engineer:
Sims Wilkerson Engineering, Inc.
Insulation Submittal..
RECEIVED
5EP 2 0 1999
f?C¥v'\ -, ",¡m" 'MJk9l'!lon
I 7()~ En .Inc.
. Tech C~oIin" Inc. SHOP DRAWING REVIEW ..#J...
I i 0 NQ EXCEPTIONS 0 REVISE AND
I! TAK!:N RESUBMIT
¡
I ;' NOTE MARKINGS . 0 REJECTED
I ; :=;::::":;"r'~ rt'viow is ror I)""lEtraf con·C''''Dn~... v:i:h :~.,~ ¡
II .17':"». :t; :::'1"'C~~i ~n~ c.(.;"'~t¿,~t d~·;Jfq-;n~3. Hai'J.;.ir~J <;r ¡:
. : _~.:r';'~')'~!3 ;.t..;., !u:: t-r ~Cf<Z;t"t;..a ¡os (of;el'hç tt\9 ; !
t '.. .
I i. c....;) ~ir~ct'~.!' 1:1:'01 ~·j.-:.1~:í.a·1r,Cr wH:t .itJ3 ¡: rnJecc plaos ar.., ; ¡
I ::;:;'::J~:~lc~!·cn::. nor Q:::':\:lt:'¡l~e$ ~t't1:l:raf!,,:.;Jh. ¡.
t f"~ ë.jI11;a~t'.( r~rr.al~s !"espor:::;iLJe fOr C~!,:];tc; anè It!.
I i :.1::C.l:¡&C~/. c.;.:rrpoH¡¡ncG 'NÎ[h the Com¡¡:r.t ~O~'Jmeut~ I
¡ '~f1.1 h'e,,:. f,): cc.r..fir;;¡ir,~ ¡;ond c;orfC¡ling a!l Q:;;1"~¡t;¿J I
I j an·:; c:marnk~n$. tc: :::~f9C'!:r.~ appiCPrJcJte fatnc&t,on !
I· ::::·r:=Ii::S~S, fC.l( !'3Cl~n;~t:a3 (j~ aS5er,;br¡ ~!'1a for
, I ·...e:/....rma:¡;,¡; cf WOif( iil a $are ruaOi.or. I ¡
I r ,. - I
Iii SIrt.S WILK:::: SON ENG., !NC I I
I , .!
¡ f:3v'.."ed oy: I !
Ii ;;~,'3: - ! ¡
Ln
1.
f.?--
Provide a minimum of Type 100 2" normal thickness
with an installed R-value = 6.
Insulation joints to be secured with mastic plus
embedded fabric1'er Specification Section 15290,
Paragraph 2.2.B.3.
2.
/
J
-<~
j,
¡
/
" \..-
II· Submittal Sheet
Type
075
0100
0150
Thickness
01.5" Or
01.5" OZ"
0,.5" OZ"
02.2" 03"
Uses
Owens COrDing .AJJ-S~rvice faced duct
wrap insulation is used to insulate
commercial and resiéenrial heating. air
conditioning and dual-temperature duc;.s
oper?ùng at temperarures from 4O"F
to 250°F.
This insulation. when applied in
accordance with Owens Coming-'s
installation instructions. will provide the
~Installed R-Value" 3S published for the
product and printed on the facing. thus
assuring specified in-place the=a1
¡Jerrormance.
Description
.AJJ-Service faced duct v.'1":lp insulation
consis;.s of a blanket of glass fibers
factory-laminated to a reinforced foiJ/
kraft (FRK) vapor barrier facing. A 2"
sœpling and raping flange is provided on
one edge. This product is designed to
meet existing ~rfonnance standards as
published bv Ì'iFP A 90A and other mode:!
building and energy codes.
Facings
~r2J1i.lfa.ctur:rs of filCiüg materials U$ed in
Owens Corning AII-Suvice duct v.'1":lp
~e required ¡O c:::;:ify that ¡heir products
meet the physical prop:::;:y requirements
of Fedei.l! Specification HH-B-IOOB.
B.J.rrier ?vlater1aL Vapor (for Pipe. Duct
and Equipmem InsuIatiol'l). Type II. when
the surface bur.:ing ch~ac¡eristics are
deter.nind in ac::crdance with A5T?vf
E 84. . Test resdts co verify this con-
-orm~:1c~ :tr~ fur:-:is:t~¿ to Owr:ns
Coming"by ¡he r.¡anuf;¡c:¡,:r::r of the
f~cing m.:lte;::lJ. ~
The installed R- Value is based op
insralJation of product over sea1edlshe~i:
m~tal ductwork with the averag~
installed thickness at 75% of no . al
thickness and thermal conductÎvi (k) at
the installed compressed density. I
Type 75 I
Nominal In:nalled Out-Of-patkage
Thickness R-Value R-Value' I
r-
1.5"
4.2
5.6
6.0
8.3
2-
2.2"'
3-
¡
I
f--
I
I
Out-of-Pac~ge
R-Value I
I
I
I
I
I
I
I
I
Out-of-pactage
R-Value I
6.0 I
8.0'
I
I
,
,
I
I
5.0
6.7
7.4
10.0
Type 100
Nominal Installed
Thickness R-Value
(S1.5" 4..5
2- ,- 6.0 )
---'
Type 150
Nominal Installed
Thickness R-Value
1.5-
2"
4.8'
6.4
Physical Properties
5.6
7.4
:-.~:.. :·'".t;:;.~~ ·.~1'ION . ':~.
:,,",;. '~ '<>~:.~..:~~,.~ i'> "_:'....~~:;[~<~~;:.:. ~...~~:.
All-SerVice Faced
Duct \Vrap Insulation
Availability
Product
Thickness
'.5"
2"
2.2"
3-
Type 75*
Type 100"
Type 150*
Sændard Roll Width 48-
.. Tvce nurnè~:s C:JrT'eScond co .i10miö4:1J dc.."'1Sjci~ of
0.75: 1.0 and 1.5 ib/cu:ft., '
Property est Method
Opcr?tÏng temperarure limit 5Th£ C 411
Vapor penncability .f.,ST:VI E :~_
,Moisture absoq)!ion +STh£ C :D:
Mold or fun!roS ~owth -4-5Th! C 665
Th~=1 conducevl["! (k) .4-.sT::vr C ,') ! S
at 75~F (24°C) me:ll1 temcerarure. I
. I
Bru " inlhr . ft: . of I
Surrac: burning charactcristics iSTM E ~*
. Specifica1:ion
250cF(l21'C)
a.o::! perms ma.-.:¡mum
<: 3% a.t I:!O°F. 90C::C R.H.
WiU not Sl.:ppor: or promotc
Typ~ 75 Type 100 Typt: 150
0.30 0.27 0.25
Fì=~ Spre:lé: 25'
Smok: developed: 50
. The suri'x= burning char:r.c:erisdcs of this pr Cue: h:r.vc: Oc:~:J c~:=::':'I.inc:::1 :n :1c:;orcb.nc::: \&oit..~ :':L 7:3.
This sttnd:1rd should Oe used to mc:zure ~d dc:so-ibc Ehe proçen:i~ \Jf ~("::-::11:i:. produc:s or
~~mbtic:s in response to her :1nd fbme undF: concroUc::d .J,bo~or:"· conéitions :md $hould not ::c: us~:::
[0 de~~ribc: or ;1?pr:1isc me fire haz~ or ftte ¡risk of m:1tr:r:~¡s~ proeu.c:-..s _ or ~sC::TlbEic:::s unCCi :'':::'::11 ."'1::
condlUOn!. How-c:vc:". results of thIS teSt m3y1 be us<:d .JS ::C'mC::1lS or :a ~I:!' ':sk J.ss<:ss;:-:,:~: ·.\,;~:c.' c...~::::s
into .xCQunt :111 of the f:::lC..-:O~ whic~ :m: p~:tir.ent to :m :us~ss:¡:<;u .::Jr' :t;: ii;~ h':::l:-..j ~{.: :.::-::cuJ.:1: c:¡,~
I.:s.c:. V:::¡,h.:c:s J.ft :"C?Ot"t~: (0 th<, nc:.:Lf:s: fivc: :":l~il1,g. .
·~-.
--
\ ; r ....,,
,OARD OF COUNTY
COMMISSIONERS
PUBLIC WORKS
DIRECTOR
[\oy Wozny. P.E,
August 8, 2000
Mr. Adnan K. Alghita .
P. O. Box 517
Jensen Beach, FL 34958
Dear Mr. Alghita:
You recently requested.'firial inspections for your Building Pennit #~9090341 at 900 Rock Road. .
In reviewíng the permit files we have determined that Rough Plumbtg (420), Plumbing Top Out
(423), Insulation (141), and Construction Framing (140) inspection were not conducted. .A3 a
result, the County cannot approve final inspections because of your ,failure to request and obtain
inspections of the required "rough in" phases of construction. .
I suggest the follomng alternatives in completing your cons1:ruc4on. First, you can expose
plumbing, insulation and fio.ming for inspection by the County. 4Iternative1y, you can have a
Florida . Registered Professional Engineer certify that the rou~ plumbing, insulation., and
. construction fi'aming meet the requirements of the 1997 Standard B~lding Code,
! -
It is extremely rare that a General Contractor would request a final-c~ection mthout first having
a rough inspection approved. Would you please let me know how 1$s happened.
Please call me at (561) 462-1485 if you have any questions_
Sincerely,
d~~) .
~nd L. yç .E.
~cWorks re r
cc: St. Luci~ County Administrator
St. LucÎ< County Attorney .
Sl Luci~ County Purchasing Manager
Sl Luci~ County Building and Zoning Manager
St. Luci~ County Centnl Services Manager
)HN O. GRUHN. O""io No.1' DOuG COWARD. Di,,,i,, No.2' PAULA A, LE\\!'S Oisrricr No.;¡ . FRANNIE J!iUTCHIN~ON. Oi,,,io No. <I - CLiFF GAf\NE~. Oi",;O 1'10. S
County Admînisrro;c' . Oouglos M. Ander:,on' i
2JOO Virginia Avenue . Fr. Pierce. FL J4~82
Public Works: (561) 462-1485 . FAX (561) 4~2-2J62
Division of Engineering: (561) 462-1707 Fox 462-2362 . Division of Rood & Oriþge: (561) 462-2511 FAX 462-2363
Division of Solid 'WasTe: (561) 462-1768 FAX 4616987
Division of Ouilding & inspecrions: (561) 462-1553 Fox 462-1735 !. TDD (561) 462-1428
.' i
/
\...
'WI
r~\4 þ ~ STEB~INS,
1 SCOTT &
J .... BERGMAN
ARCHITECTS. P.A. . #AACOO1468
August 8, 2000
Roger Shinn
St. Lucie County, Central Services
2300 VIrginia Avenue
Ft. Pierce, Aorida 34950
RE: St. Lucie County JaB Addition & Renovation .
Dear Roger,
Please find attached a letter and warTanty, both dated August 7, 2000, from Airl*e Decks, Inc.
I
These two documents provide credible evidence that the roof deck was pro~ installed.
I
Airlite has been in business, under the same family ownership, since 1955 and dnjoys a superb reputation.
SincereJy,
STEBBINS, SCOlT & BERGMAN, ARCHITECffi, P.A
Ja.tÍ. b{-. S~~
Jack H. Scott
President
JHS;bja
cc: Adnan Investment & Development, Inc.
St. Lucie County Building Department
Åirlite Decks, Ine.
2101 Sunrise Boulevard. Fortrierce. FL 34950 . PHONE (561),464-3122 . FAX (561) L1ó4-50ó8
'-'
"-"
.,.. ,
). .' 1.~~EBBINS.
.'. . SCOTT &
. jJ¡.... BERGMAN
ARCHITECTS. P.A. . #AAC001468
August30,2000
Adnan K. Alghita
PO Box 517
Jensen Beach, R. 34958
RE: St Lucie County Correctional Facility Addition
Dear Adnan:
On the afternoon of August 30, 2000, Roger Shinn approved m~ recommendation of the same
date as to the method to increase the R-value of the new roof e~lope.
If this method is satisfactory, please submit one (1) 2' x 4' R-~ 1 insulation batt for approval
prior to starting work.
Sincerely,
SlEBBINS, SCOTT & BERGMAN, ARCHITECTS, P A
J uL tt. s;: C-ø or-
- .
Jack H. Scott
President
JHS:ab
cc: Roger Shinn, St. Lucie County Central Services
St Lucie County Building Department ./
Brian Hessinger, Sims Wilkerson Engineering
End: Letter dated 8/30/00 to Roger Shinn with attachments
2101 Sunrise Boulevard· Fort Pierce. FL 34950 . PHONE (56 ) 464-3122 0 FAX (561) 464-5068
ÞvvL -
/17 ~ ~
() ft-..-rv..- A.1.. ~
~~,
7
~EP-~4-0Ø 02:'6 p~
ADNAN I NV AND DEV 1 NC
,5'" 12293538
\...
"'"
-
ACNAH IHVE~!NT & C~ã.HT, INC.
CÞft"C1I <J--. eo.."",-,,- . cø ~ð..~
p,O. BOil ð 7 ,
JIU·,rH BtAC.... 1'l3..aða !
TtL.. (eO ) ZZ~&~57 I"AX (ISo I i!~Q-.3!!1Jð
t·...4JL.: aål1lnta10HolrnaJl.oortI
i
!
I
,
A41_ K. ""-""itA
",,&~-
,
I
~ S, 2000
Mr. Roser Shinn
St Lucie COUIIty Centrl1 StfYic81
3071 Oleander Ave
Ft Pierct, PL 3498Z
Re; St. Lucie County Correctional C'nler
Dear Mr. Shinn.
ÅJ per r.qutat afMt. Ray WIZII)' (St. Lucie County BU!ldia¡~II'Un'DC) for othtll'
DpÞOQI available, rlgll'ding Mr. Jack Soottt. requea to add ditional inl1l1aâon 2'X4'
R·II ÌDIUlItion Baltl On top of each CetUn, pine) iD the new CODatructed ~ ortbe
òookú!f area. 1brolllh reM:lrl;h of this iuue With ICYCI'aJ roo III Ii insulation
CDntrllCtOB (lilt attaehod) the following opCiOM are lVIiIaIIle:
J) Adding Iblm ùuulatioD 011 top oC thti DIW roof q
2) . SP!'Iy!D, tile tbam JDsuJltloA a¡a.iZllt tll. metII inside the buiJdtnl ÍII the
atüc.
3) AttadIin¡ die R·t t Blttl d1recUy.,aln.t the oct mew in the attic.
4) Addin81be lI.-ll Battl 2'X4' aesmontl on to~ oft ICOUIÙc: cellina.
Wo have dj3ÇUlaed aUrbae Option. with the roo&ø and iniul -'on contraDton Oilt
attacbed} II1II they III .. with die fÞUowm, fiotJ:
A) Addin¡ roam iDtulltion DrI top of "istin¡ roofwiB Id the pruent ~
of our MIW roofbut the foam DOIIlrlctor ¡, willing lJaJe another lilllie:.d
wlITInIy. Tho ra.m c:ontradQr Itron¡ly recollllDtn . tpÙII11hia option IDd
recommends option 4. ICcepm,ln mind that tIuJre NY...I roWI of wires
llid on top of' pteIC4t roof for the li¡btnina preveuti D ayRem.
B) Tbèy aU a¡ne thai tprl)'in¡ roam Iia1nst the meq eck wiU cauJe rull
problem. tor all the IDItIb ¡n the attic and tb.y rcco mend apÏDJt thit
aptioa. i
C) Theyall a¡ree that IttIClW2a Jl·l1 Batta il pellible r is ~t the beal .
altemativt *U.otthe jJltertìruce ottheaireo . '011 cb;t.~steaJ.
D) They a1J l'ICDmnlltad that 2X4 Blttl H.-II 5ra proof 0 be placed on lop of
2X4 ~ plnttl il the best oplÍoa and Lted lmWation Co.
ItrOftJIy recommends thll optioft becau.. tbey plefer tbe Air ElIve)ope aad the
iuuWloa to be beto,., the deck.
P.e2
.
\..,..
Plcae ltUdy &U the ÞIIiJabJe options. We wI!J be Iwlitin¡: ~ reply.-
Sinoe:ely,
~/¿:~
Adlllll X. AI¡bíta
PreádeJtt
cç; Mr. lWy W&zn)'
Mr.laclt S~
Mr. Brian Rellln¡cr
SIft\J WUbrIoQ iqin....
Lilli oflAadation aDd 1lca1J. qOlmactcr.
I
I
¡
,
!
W-.d1cr..e1 Ino.
kooSIII COntradar.SIU4e Dev.ac
561-466-9777
Lccd fire ~ ~ INuJatiOft Contraotorl
Bob Tina'
561~060I
1~ 1WInert EntS'priMI lac.
Pounlaaulatioa. Coalrlc1or
Rod MoniJOn .
561-23<406900
.-
""""
~
BOARD OF COUNTY
COMMISSIONERS
September 7, 2000
Mr. Adnan K. Alghita
P.O. Box 517
Jensen Beach, FL. 34958
Dear Mr. Alghita:
..."
PUBLIC WORKS
DIRECTOR
Ray Wozny. P. E.
Thank you for your letter of September 6, 20~0, concerning installation of
batt insulation St. Lucie County Jail Addition. I
As I indicated to you in my letter of Septem~er 1, 2000, installing batts
is not an acceptable alternative. Thère is no pr~vision for the progressive
damage which occur if a water soaked insulation I batt should fall onto the
suspended ceiling system. This could cause damage to the ceiling and personal
injury in the booking area.
,
--:- - ~.
Please call me at (561) 462-1485 if you have iany questions.
Sincerely,
R~d ~):w
RLW/sm
cc: St. Lucie County Administrator
Jack Scott, President of Stebbins, Scott, Bergman Ar~hitects
Roger Shinn, Interim Central Services Director i.
,
}OHi~ L) Df\UHN DISfric: NCi ~ . =- :=::)G CDWARD. DisrrÎC: No. '2 . PAULA A. LEWIS Disrncr No. ,J .. FRANN~E HUTCHINSON Jimicr No.4. CUFF !)ARNE5. D¡5~~i,r NO.5
Counry Adminisrroror . Douglas M. Andersof'1
2JOO Virginia Avenue . Fr. Pierce, FL J~982
Public Warl,s (561) 462-1485 . FAX (561) ~62-2Jó2
D,v,sion of En9íne·~"-,' 561) 462,170,? Fox 462-2J62 . Division of Rood & $ndge: (561' -"62-2511 FAX 462.2J6J
Division of Solid Wasre: (561) 462-1766 FAX 4q,2-6967
D,. '.' ::J: Guddi"g & InspeClions (561) 462-155J Fox 462-'7J$ . TOD (561 462-'142&
.-..~. .,.,.. .... ~ .
. .~...
I'
\..-
'WI
/"
IFAX COVER SHEET
Ad~nmvH&nent'OI~/~m~~m~
P.O. BOX 517
Jensen SðSçh, F.L 34958
CGC 056992
Phofls 561-229-8557
fax 561-229-3538
..
Ph~ number
.51.:1 \-
o IJrgent
DR~ASAP
o PIau. CO/l1l1M/7t
o PI".' ~"ltvI
i
o For your Info,."".tJon
Totltl plt'JltS, including e:¡~r: :3
COMMENTS
. ................................................................................. ...........................11...................·....·..·
.....................................................-.-........................_.....................~.
. ..................................:::.:+.......................................................-.-...-.............
I
..... ....n...._.............................................................................._...............................................--.....,................ .............-.......................-.....................'u_
I
...............-......................................... ..........................[.........-...........................................'........................
..........................-.....
..-......................,.
.......-......-..-....
............................ . . ....................................................... ....·....··..........·..·......·...............t....··............·..·........·......·....·.......-.............................
...... ......-..................... ...................... .......... ..... ......... ................ ..-....-.................... .....~....... ..... ...... ._........................... ........ "......
,
... ................ ............. h . ...._ ......n........... _. ..n..n.............······· ....... ... ........... ....-.... ....... ..............
....··1·..·············..··..·..······
...........................................
..........................
..... ....... ...,. ................. ......... ............................. ........... ..... ... ..... ................ ....... ........ .......~......... .. _. ....n._...... .... ....... ..... ............ .. n. ................
I
........--............................................. ................................................ .......................!.......................-....... ... ..........................................
. _ ._ _ _ '....................... ............... .... ............... _ _........ .._..., ..._.............. . . ....,... ................ ................... ...... ··i··..·..·..·· .... ..... ................. ....... ...... ........ '....... .............
.. ...........................,..... ...-....-........,............, ..................... .-.. ......................._....._.......¡.....................,.......................".........,................... .--
............................... ........................................................................ . .................. ..............-..............-.¡......... ......................;......................
....................................................... .................................-.-...+................................................................................
.. . .............................................................. . ................. ....................... ........!".......................................................... ..............
.........................................
..............._..........u.....................·..·.··········'·.........................,.................................,..·..······..·..········..···..·r·······..···....················
u. ....................
... _. ........................................................ ........... ..... ............... . no. ................. . ... ........._........... .. ..........~....u. ..h.........~...........·.... .......................
I
...................................................................... .............................. .. .................................._........ ··1........·..·..·....·....·....·....···..·..·....·..·........· ..................
I
.........................................................................................................................................................!................................................... ..........................
¡
. ...........................,.........,.................................._........_..........................................................................10....·.········-······..·.."......,....................,.....,.........
I
...._._.__...._..................... .......,.............................._....................... .... ............. . ....................................10..........--................ ...........,........._.....n..............·......·
,
...................
..,.................-..'.. . ... ...............................--......-....... ...,...............................................~..................................--...
i..........................
..... ........................................................................ ..~.................... ...................... ....ï....·......·
I
..-............................-"
.......................-..........,.....
..................
SED .. ::;
'-" '-'
ADNAN INVESTMENT õ. DEVELOPMI;:NT, INC.
CDm"'~ OEHDlAL COHT'RACTOI!' co COðþ"Ø2
P.O. Box :5 17
"'e:N~~ 6£ACH. FI.. 34950 :
TEL... I!SO') 22Q-6:557 FAX (50 II 22~'353e
E-MAIL..:adnan1010Hotmall.ComIÀ
i
AÞNAN X. At.OHIT..
PR£~ICCNT September 06, 2000
Mr. Ray Wamy, P.E.
S1. Lucie County Engineering Department
2300 Virginja Ave.
Ft. Pierce, FL 34982
Re: St. Lucie County Jail Addition & Renovation
Dear Mr. Waxny.
Attached is the letter which we received trom Airfue Decks, Inc. 'Þie would be guaranteeing the
watTBnty with Airate Decks. Inc., jointly and separately. I
I
If this is acceptable to you. p1ease let us know so that we will ask ~e acoustic ceiling contractor
to remove all the grid system and re-install the acoustic: çeiling aft~r the work is completed.
Sincerely,
~%'~
.CO¡.
Adnan K. Alghita
President
AKA: wss
Ene: tetter from Airlite Corp.
cc: Jack Scott
Roger Slúnn
as; 8&/2566
561778645&
.::IIRLITE CORP
PAGE
14:\.,.
...."
"
AirJite Decks, Inc~
3110S 6Slh &treet '
"ero Beach, rlonda 3296 ~
.,
861/162-3518 tllX I: 778/1480
septemcer 6, 2000
Mr. Adnan Algnlta
Adnan Investment & Developmen~ Inc.
P.O. BOX 517
Jensen BeaCh. F! 34958
RE: St Lucie county Jail AOdltton & Renovation
Dear Mr. Alghita:
In an effort to resorve thIs issue we DrODose th tun-faced fiberglas
R-11 InsulatIon batts be fastened to the underside Of the metal deck using
screws and dlsleS as recommended by the inSulation nstaller. The screws .
will be Of SUfficient length to proVIde a secure attac ment, but not so
long that they could possible Duncture the rooflng embrane.
we will warrantY that for 10 years the batts WltDerfOrm 3$ Intended.
and should they become csamaged Clue to a roof lei -; or fail to remaIn
secured to the undersIde Of the decl< durIng normal ear and tear, we will
repair or replace them as reqUh'éd.
SlncerelV,
¡¡~
PresIdent
Ims
111/61
'-'
...;
ßOARD OF COUNTY
COMMISSIONERS
PUßLlC WORKS
DIRECTOR
Roy Wozny, P.E.
October 12, 2000
Adnan K. Alghita
P.O. Box 517
Jensen Beach, FL. 34958
Dear Mr. Alghita:
Thank you. for your letter of October 5, 2000 Our recommendation to the
Purchasing Director is to award no future contro¢ts to Adnan Investment &
Development, Inc. This recommendation is made based ~pon the Engineering Division's
experience with your performance in the culvert replac4ment project and the Building
Inspection Division's experience with your perform9nce in the jail addition and
renovation project.
.-::--1.
Sincerely,
~!~. Í/V<frl~ /
R azn
RLW/ m
CC: BOCC
Douglas M. Anderson, County Administrator
Robert Bradshaw, Assistant County Administrator
Dan McIntyre, County Attorney
Charles Bicht. Purchasing Director
,
JOHN D. [!:-.U~N DiSHICi NO.1· DOUG CO\ì/ARD. Disrrier NO.2· PAULA Ä. lE')'/JS. DisrilC! No..J . FRAN!NIE HUTC~:~~50N. Disrrier No. 0:1 . CLIFF DARNES. DisrriC'T No 5
Counry Adminisrrarcf - DouOlos M. A."defsoni
2300 Virginia Avenue . F-r. Pierce, FL ~4982
Public Worl~s (561) 462-1485 . FAX (561)1462-2362
i, _
D"/;$IOn .of Eng;neel!:,g: <561) 462·1707 Fox 462-2J62 . Dlvisian .of Raad ~ Or¡dgE' . :;61) 462-2511 FAX 462-2J6::'
Divlslan .of Salid Wasre (501) dó2-176ó FAX 462-6987
D,vIS,on at Dudding & Inspections: (561) 462-155J Fox 461-1 7fS . TDD 561) 46'2-1428
,t
'-'
....I
FAX COVER SHEET
Adnan Invostment & Development, Inc.
P.O. BOX 517
Jef7s~n Buch, FL 34958
eGO 056992
Phone Sð1~229-8557
Fsx 561-229-3538
Fnm~ '
Dete - ~
__._l.oJ ~ . b 0
,
i
RE:
FIlX nUlllber
4u,~ ~~Lo'}-..
Pholl<' nUl7lMi ¡.
cQd-Cf _I~SS 7
---. 1-
!
o Urgent
o Reply ASAP
o PlfIiIle comment
o Ploa~/t revIew
~r your infonnstlon .
ToIel pages. ínc:Juding cover.
~
COMMENTS
;~~-:·i;."1\·,,·· '. . --
..........!.......................
......-............................................,........
.............................
........................................-......
........................................
.........................,.......
.........,...............,.......... .......................................................................,.............!...........,....................'......
.. ......................___...n............
.............................-..............-...
.............................................
.......-+............-............................!.........,...:...
...............,..'................................................
........... ..............................,...... ..
.......... ............"................
..... .... .....--'...--...¡..-..."................ ........,......
............,.............................
. .,..,...............................,.
.......................... ..... ......·..···r·..···..···..···.. ...-. .... ........ ............... .............".............
.....n.'....'....·...·
.................... ........................
,
. ......."............................................................. ............................................................-..-.
.......,.......................,...,.... .n..............·.....·........·........·..·.......
... ··..··....··1..·..· .......................
._...........h ...........,...........
....................,........................,...........,..............,.........................--.
. ..... ............ .-... ...-..--...... ................ ..,.. . .. ....... ........,.........."............ ...,............. .. ..........-...¡................................... ....-......-........................
.... ..- . -.......,.......... ........".......-.... .
...........,.............................
.......-.....+........,.........-...... ..-..............................'''...........,.
.............................."...........,.........................,..............-..........
................!.....
.............,...................-...........
.............. .... ...,..."....
............................. ............."..............
..-.............--.
.............................-... .............
.... .... .u. .......".................................................
...................
.. ................1.......... ....... .....- ............. ..........-...-......... .........,."........
..........................................
.......".....,..................,,,...............
..,..........."...
.. ..............1·.........··......
......................".......,........
..............,......
.........................
......,..........".....................
.............,................,................
,
.................'')...................'.....'........................
.n...n.......·...............···
.........,.............
........,..............
.-.........,.......,.....
.n·t···..·....·..···..·
..........,.........
.-...............".,...
.......................
.......,...........................,............................. .-............,..........,............
..--..-......"................,..."..............
.................. ..n...............·..
.....,......,..........."......"...,....-..
..·1···..·....
.... ..................................
........ ..................
......"......"..........
....................,...........'..............................,
.- ....+.......".......
,
............c...........···..···....··..···
...............,...........-....,.....
.............-.....
.................................................--. ........ ..,."...."........,....."..
.n. ...... ........................................
... ........,..... ..... .--...........,...'''....................-................................. ... ..,.,............¡.................
.,..............,..................,...,..........
...........................................
.....................,................................... .....,............t"......
................................................................
OGT-5
·r
~
~
AONAN INVESTMENT õ.. DEVELOPM E"fr. INC.
C~'II!Ø G£"I:IW. COIm'.,t.C1'OA . CG COðe~þ.2
P.O. Box ð 17
Jr:H:5!;M BEACH. Fl. 34958 I
T£~. (50 II 229·e557 F.x (!SO I) 2 Zg'4353S
E·MAIL.: adnan 1 01 0 Hotmail.com À
AD".... 1<. A!.OHrr..
PAI:3ID£NT October 05, 2000
Mr.R.ayWazny
St. Lucie COunty Florida
2300 Virginia Ave.
Ft. Pierce, FL 34982
Re: Your Memorandum Dated September 28, 2000
Dear Mr. Wazny.
Your memorandum dated September 28, 2000 was brought to Ollræ- tion yesterday. We are
very disappointed by the recommendations you made to the pure director. The incidents
you sited were clearly misrepresented by not telling the complete 18 of each incident. Our firm
has done six projects in the past two years for St. Lucie County. Alllthesc projects were built to
the highest quality 4C¢Ordins to pWls and specifications and we did lot have to go bade to fix any
deficiencies in them at all. 'I"œy are as foRows;
I
1) Glades Cut.OffRoad StonnwaterImprovement Project ~779) completed April, 1999.
2) Hurricane Protective WaDs (9941) completed June, 1999f .
3) Island Barriers (9927) compteted March. 1999. .~ I .
4} Insta1Iation of2 Park Pavilions (9938) completed June, Ip99.
5) ADA Bathroom Facilities (990S7)@ I
. Oleander Park, McCorkle Field, and Savannah CampgroOnd completed Merch, 2000.
6) St. Lucie County Correctional Facility (99058) complet9I September, 2000.
Glades Cut-Off Road SlOnnwater ImproVe:men. 1 P",jeçt was~ s:hodukd !òr iœœIIø!io.
offourteen culverts, but due to budget problems only thirteen were proved for instaUation. The
origina] contract and documents indicated all fourteen. We rep the one that was omined
fiom the scope of work, in error. We absorbed the $11,000.00 costl associated with the
installation of the additional culvert, SO therefore St. Lucie County ~ained fÌ'om this error.
I
The problems with the rough inspections at the St Lucie CoW!ty J Addition and Renovation
Projett could have been avoided if your project manager bad been placed when we tried to
replace him. Approximately four months ago we let the project ger, Brian Ben, go because
we felt his work was not up to the standards we have set for this co oration. Upon the request
of Roger Shinn. acting Director of the Public Works Department 0 1St. Luclc County, we
reinstated Mr. BeD against our better judgment. Even considering tþe error with the inspections,
'-"
.....J
we still completed the project by the September 28, 2000 completi9n date, to the satisfaction of
the engineers, inspectors. and architects involved. ..
It is our opinion that not considering us for future contracts would pc a grave error OD Ø1e part of
S1. Lucie County, BS we insist on doing quality work on all the proj~t!l we are awarded. As is
evident in the projects we have completed in the past thirty years.
Sincerely,
~/r.~·
Adnan K. Alghita
President
cc: County Administrator
County Attorney
County Purchasing Director
Public Works Department
Parks &: Lcisure Services
Engineering Department
All County Commissioners
Jack Scott, Stebbins. Scott & Berman Architects
St. Lucie News
Stuart News
..
, .
. ~Êrlt By: ;:SL N.ËWS j
r·· "
. .
~
¡¡S1:335:1gg3¡
~
Oci.4-0a 4:17PM¡
...-~
""'"
MEMORANDUM
c
PU.8LIC WORKS DEPARTMENT
TO: Cbarlie Blebl, Purthasm¡ Director
lIROM, Ray Woz.,. Pwbllt W...... Director þv- /ði
SUBJECT: Ad... K. AIpIta 0 ~I ,0. p' ~
DATE: September 28, ~OOO " . J ' l ':Æ J .
I
...............*******..******.....***.....***.**.................
In the tut year lb. Pub1i; Ylorka Dcp~~ baa ~~ two ~~~~ ~.
cantractin¡ with Adnm Invcacment md Devè10pmeDt Inc. (AIDI). Lut)'elf AmI
~. culven in the WIW'f 1N'!.nQlÚICCI attached ...4Ø'CI~C'1ÇC) on the GIadoI
CutcffRoad StormwBtcr tmprovemat Project. 1'bit ~we had a problem ~..-
AlDI~ rnqþtètrcmdredMI'r~OQ,utthcšt1.ucicCoUD ailAddltiOft
~~~:- Both otthese prob1 were lip TheBei prc;I
ú&ed spcad. iubatantial amountof'tima resolvinl ~I
Based on the experiences noted above. we recommeftd that the County cODSide:r DOt
awarding future contracts to AIDI. . .
Please call me at 462-1485 i'you have 11ft)' question¡.
ILW/IIn
cc: ¡;~ry AUImtt)'
".. aLl.IICI. Coun\y AcImIø~!1)' ï . : . -"... _..
j . . Ii. ~ ;.: H -~ -¡"-f~-r
: . "-I~~'''!
S~ 2 '. r;
r;P 9 ~~ . .
"'''
. . ......
.
.
~ ----.,.
. ......--. ...-
,
\w-
..¡
Or-^;:,p1r-n
t ... l:. . _, :......; ....1 1- ...
MEMORANDUM
230~ tiDV 1 5 p~ 1,; 28
PROCUREtí::HT
TO:
Jon Gleason. Manager - Conrracl Administration
II } I~
THROUGH:
Tom Johns, Director - Construction Deparrme
Jim Kunard, Construction Manager 8rfìL
\\\\\.? \cD
FROM:
DATE:
November 16, 2000
SUBJECT:
Contract C-11472
Grassy Island Access Road
Bidder Responsibility Evaluation
Background: The Grassy Island Access Road project is a Lake Okeechobee Critical
Project element. and consists of a paved access off of SR 441. Bids ranged from
S48,900 to £96,870, and the pre-bid estimate was between $45,000 to £55.000 by the
engineer.
This is the Bidder Responsibility review for this construction solicitation.
A. I have reviewed the bid documenrs and researched the Districr's records and have
determined that the apparent low bidder, Adnan Investment & Development, Inc.
is a non-responsible bidder.
The contractor is non-responsible in accordance with Article 10.01 - Bidder's
Responsibility, in Section 00100 "Instructions To Bidders". My investigation
revealed an unsarisfactory performance history with the Disrrict:
1. District Contract C-I0420, Refurbishment of Pump Stations 127, 129 and
131.
· Contractor in violation of Articles 6.01.A and 6.01.B of General Conditions of
the conrract, the on-site supervision oflabor was intennittent, unskilled and.
ineffective.
· Work quality required inordinate inspections and excessive District
involvement.
· Contractor in violation of Article 6.06.B of the General Conditions of the
contract, as the Contractor did not perform work equivalent to 40% of the total
contract amount with contractor's forces.
\
.\
,
'-'
...J
, 2. District Contract C-9025, Lake Russell Environmental Center Access Road.
· Contractor in violation of Articles 6.01.A and 6.01.B of the General
Conditions of the contract, the lack of provision of skil1ed labor caused the
work to be performed inefficiently and incompetently.
· Work was installed incorrectly and beyond the contract completion period.
· The Contractor was assessed Liquidated Damages.
· Work quality required inordinate inspections and excessive District
involvement.
This contract, C-11472, is comprised of the very same type o/work.
3. District contrac~ C-9051, South Loop Microwave Buildin¡: Hardening
· Contractor in violation of Article 6.06.B of the General Conditions of the
contract, as the Contractor did not perform work equivalent to 40% of the total
COntract amount with contractor's forces.
4. Reference checks within the District.
· Personnel in the Water Resources Operation and Procurement Divisions. as
well as previous ConStruction Managers and inspectors unifoI11ÙY reported
that the contractor was deficient in on-site supervision, was prone to poor
quality, avoided responsibiJity for scope items, and was confrontational with
srMf.
B. I have reviewed the bid documents and researched the District's records and have
determined that the second apparent low bidder. Optimum Services, Inc. is a
responsible bidder.
1. We verified the contractor's license and corporate standing (attached).
2. We ca1led applicable. recent references, which reponed satisfactory work
experience with this firm (attached).
3. Contractor asserts no litigation in the last 5 years.
4. Credit availability is good (attached).
5. Although the firm has been in business for three years, there is no previous
worle history with the District.
We therefore, recommend award to Optimum Services, Inc.
If you have any questions or comments, please call me at extension 6711.
Three attadunents.
Copy: File
B. Kacvinsky
R. Hayden
Ç·II472..Respoll5ibì~1)o memo.16NovOO
,
So~ FLORIDA WATER MANAGEMENT DISTRICT
'....I
3301 G"" Club ¡(""d. W,'St Palm s"ach. Florida 33406 . (561) 686-8BOO . FL WATS 1-8oo.4J2-2045 . rOD {561) 697-2574
Mailins Add",.s: 1'.0. 60x 24680. West Palm &'ilch. FL 33416-4680 . "''''",.~f'''md.¡¡ov
Memorandum
To:
e iam. Deputy Executive Director, Corporate Resources
~
ann, nspector General
From:
Date:
February 26,2001
SUbject:
Review of Allegations of District Contracting Impropriety by Adnan
Investment & Development, Inc. IG Report No. 01-05
This review was performed in response to· a February 2, 2001 letter from Mr. Adnan K.
Alghitha, President of Adnan Investment & Development, Inc. (Adnan), to the Governor
and Director of the FBI alleging impropriety in the South Florida Water Management
District's contracting practices. To recap Mr. Adnan al/eges that he was improperly
denied four contracts despite being the lowest bidder and performing well on other
contracts. Mr. Adnan asked for -a full and comprehensive investigation of these cases"
and alleges "a persistent and deep rooted pattern of unlawful and maybe criminal
activities aimed against us {Adnan]."
Per your request the Office of Inspector General agreed to perform a review of these
allegations. Accordingly, we reviewed contract files and contacted key project
management and contracting officials at the District It should be noted that in August
1999 we (the Office of Inspector General) visited Adnan's office in Jensen Beach
Florida and performed a preaward review of the company's financial records and
determined that Adnan's financial capacity and company workforce limited his ability to
perform construction work for the District.
Apart from our previous audit. the records maintained by the District's Contracting
Officer and Project Manager reveal a history of unsatisfactory performance, and
violations of contract requirements for the projects previously awarded to Adnan. The
following table summarizes the documentation found in the District's Procurement
Department files regarding Adnan's work history for three of the contracts:
GOVER.'IING 8olll:r>
~1"h,t('J Çpllil'~. ()",i".:ml
~líl.·h,1t.'1 O. Mim\"ln. I/ia C//f/!r/lrdll
Mitchell h' Bcn:'-=f
EXECUTIVE OFFICE
V~ra M. Cart<r
Ci.·fMt.ÍO 13. f~".md~7.
Pi'lfrick J. Gt~ê1son
Nk·ol.as 1. CUli~rTez. Jr
Horkl<y R. T¡",,"ton
T rudi K. WiHlðm~
Fr.1nk R. FÌl\(~. P.E.. £,\'..I.'llIi,'l.' {)Ú~(,øf"
James E.. Blount, C/ti.:f.!fO:;t'!i[
/
Re:view of A..,gations - Adnan
February 26, 2001
Page 2 of5
'wi
HISTORY OF DISTRICT CONTRACTS AWARDED TO ADNAN
Contract
No.
C-9051
Project
South loop Microwave
Building Hardening
C-10420
Refurbishment of Pump
Stations
Excerpts From
Contract File Documents
Adnan did not perform work equivalent of 40%
of total contract with his own work: force. There
were three subcontractors who were
responsible for virtually the entire scope of
work. Article 6.06B under the General
Conditions of the District's construction contract
requires the contractor to perform at least 40%
of the total amount of work. This clause
contemplates that the contractor use
permanent employees on its payroll. 1
The Project Manager reported that tasks were
not completed, specified materials were not
used. The project was 69 days late.
Adnan violated General Conditions of the
contract:
1. On-site supervision of labor force was
intermittent. unskilled and ineffective
resulting in poor work quality that required
inordinate inspections and excessive
Construction Department involvement.
Article 6.01 of the General Conditions of the
District's construction contract requires
Adnan to provide appropriate supervision
and apply ·such skills and expertise as may
be necessary to perform the Work" required
under the contract.
I The Inspector General's report, 99-22 found that through June 30, 1999 the company's
records reflect that there were no payrolls. Calendar year 1997 and 1998 financial statements
and corporate tax retums reflect that there were no payrolls of any kind. Mr. Alghitha
indicated that up until 1999 all of the jobs were entirely subcontracted out including a number
of smaller jobs with the District. For the quarter ending June 30. 1999 there were only five
employees listed on the State of Florida Ouarterly payroll report to the' Department of Labor.
The entire quarterly payroll listed gross wages totaling $8,800.
¡ The use of temporary or leased work force has been a perpetual issue in the District's
contractual relationship with Adnan. The company was advised, in writing, in February, 2000
by the District's Office of Counsel that the District's position was that the use of leased
workers does not satisfy the District's requirement that the prime contractor shall accomplish
at least 40% of the work with its own work force.
"
Review of "'-'9ations - Adnan
February 2~001
Pag'ð 3 of 5
'-'
HISTORY OF DISTRICT CONTRACTS AWARDED TO ADNAN
Contract Excerpts From
No. Proiect Contract File Documents
2. Adnan did not perform work equivalent of
40% of total contract with his own work
force.z Contractor was apparently using a
company, labor Finders, Inc. to furnish
construction workers. The District received
a preliminary notice as the owner for a.
construction lien resulting from Adnan's
apparent nonpayment. At the time of our
previous audit we confirmed that Adoan was
usina "a temporary aQencv· for staffing jobs.
C-9025 lake Russell In addition to the problems noted for Contracts
Environmental Center C-9051 & C10420:
Access Road
1_ The roadway was not installed in
accordance with the contract documents.
2_ Contract completion was 74 days late;
liquidated damages were assessed against
the contractor.
3. Contractor did not certify completion of work
and cerform other close out requirements.
We also reviewed the contract files where Adnsn claims that he was improperly denied
award of these contracts. Generally, we found that Adnan was found non-responsive.
non-responsible, andlor was out bid. The following table summarizes the documentation
found in the District's Procurement Department files regarding Adnan's bid history for
contracts that were not awarded:
DISTR.ICT CONTRACTS NOT AWARDED TO ADNAN
Contract Excerpts From
No. Project Contract File Documents
C-11472 Grassy Island Access Adnan was found to be a nOh-responsible
Road bidder due to unsatisfactory performance on
previous District contracts: In addition, the
Director of Risk Management rejected Adnan's
Bid Bond because it didn't meet District's
Standards for Responsiveness - "Bid bond not
dated. ~
II
Review of ~ 'legations. Adnan
. ~ebruary -...., 2001
Page 4 of S
....,
DISTRICT CONTRACTS NOT AWARDED TO ADNAN
Contract Excerpts From
No. Project Contract File Documents
The contract was awarded to the second lowest
bidder who was deemed responsive and
responsible (second bid was 9% higher than
Adnan's bid of $48,900).
C-11415 Fort Pierce Substation Adnan's Bid Bond rejected by Director of Risk
Improvements Management due to the Surety's low
underwriting ratings.
Solicitation was subsequently cancelled
because bids exceeded funding.
C-10414 Pump Stations 5-6, S7 Adnan was the second lowest bidder.
Hardening/Renovations However, the lowest bidder was found non-
responsive. Adnan received an unfavorable
report from Inspector General's Office. See
Audit Report # 99-22.
All bids were rejected in order to combine the
work under the scope of this contract with work
needed for j)ump station 5-8
C-11488 Pump Station Contract was awarded to the lowest bidder who
Hardening 5133 & was found to be responsive and responsible
5135 (Adnan's bid was $10,567 higher).
The scope of our 'inquiry into Adnan's allegations was somewhat limited based on
external time constraints required to prepare a timely response. However, the
information disclosed by our inquiry suggests that there is a very low risk that the
contractor's aJlegations have any merit We uncovered no evidence that would suggest
or demonstrate reasonable cause to suspect that an employee of the District:
1. has violated any federal, state, or local law. rule or regulation; or
2 has committed an act of gross mismanagement, malfeasance, misfeasance,
gross waste of public funds, or gross neglect of duty.
Further, the potential for a full-fledged investigation into Adnan's complaint to yield any
such result is remote. Therefore: we have concluded our review as detailed in this
memo. Please let me know if you have any questions or if you require any further
assistance. I can be reached at 561-682-6220.
Attachment
""
Review of A~tions - Adnan
February 26, 2001
. PageS of 5
...,.;
Distribution List:
Frank Finch
James Blount
John Fumero
Glen Miller
Frank Mendez
Naomi Duerr
Zan Kugler
Tom Johns
James Kunard
Jessica Flathman
Johnathan Gleason
c.s·
P.O. 80x S I 7
..JENSEN 6E:ACH. f'L. ~049Se
TE:L.. (561 229-655,7 rl'U( (5e I) 2:Z9-~5~ð
E-MAlI..:adnan101@Holmail.com
JCEHVED
FEe 0 5 200t
."
.~
AoNAN INVESTMENT & DEVELOPMENT, INC.
CE"TI"'l:O GCIoc:Ao\L C""m..=".. . CG CO$e~~;z
-----------
ADJ'OII....#!I It, AI.O"",T"
Ptttcs'ØÆ.,.r
"8 -5
À 411 fO: 2,
¡,~~ F.bnouy 02, 2001 ~
fEB ã 2001 .-S;>"~
(¡
~
~ó'i)~
~
Lieutenant Governor ofFlori.da, Mr. Frank Bergman
Director of the FBI, Mr. Louis Frech
Oltiœol
~ Citltans' Services
Cfieu~ Govemo~~or ofthc: FBI; ..
With fùU respect. r am writing you about our situation. I am a general contractor, sinœ 197],
located in South Florida, since 1990, and have been rather disturbed by continuous problems with
S-ºuth Florida Water Management District's procedures on e\'aluating and selecting coutnciors in
their biddÏpJ¡: process_ £n the past two years we have been the lowc$ responsive bidder on five
projects in which we were either decied the contract or the project was canceled an together.
Our records with SFWMD shows that we have completed fourteen buildings and in&astructW'e
projectS with quaIity second to none. Listed are the projects awarded and completed:
1) Ten nñcrowave blJilÆng~ repaired. contract # C~90S1 completed April, 1999, Contract
amount: $102,904.50
2)Pump Stations 127, 129, and 131, cOntract #C-] 0420 completed January, 2000,
Contract amount: $98.500.00
3) built Lake Russell Environmental Center road project, contract #C-9025 completed
March. 2000, Contract amount: $97,900.00
4) Miami Field Station, col11r8Ct # C-I0433, completed March, 2000. Contract 8n1Oum:
S68,800.00
Listed below are the projects that were not awarded:
1) Grassy Island Access Road, project # C-11472, Bid Da~: OCtober 25,2000
our bid was rejected. They disqualified us. Bid amount: $48,900.
2) FoTtPierce Sub-Station Impro~ments, project #C-1 1415. Bid Date: August 3, 2000
all bids were rejected. Bid amount: $511,900.
3) Pump Station S-6 &; S-1 Repair Contract, project # C-10414, Bid Date: October 24,
2000, our bid was rejected. They said it was risky to award us the contract. Bid
amount: $296,800.
4) Pump Station Hardening 5133 & S135, project # C-114g8. Bid Date: October 25,
2000, we were the only general contractor qualified to deal with the
environments] issues of this projeçt, we hold Federal Certificates to deal with Lead
and A3bestos that meets EPA & OSHA requirements. yet SFWMD awarded the
OO"""'to tbo I.,""" biddB ($32t,OOO.). -Uih!boy did DO=Jood..
and asbestos qualifications. We are attaching co~ ~ ~~ó.~r\i-_~~. :~.: \
_ __._ _--!~cords. ~~ also ap~oved wrongly the ~~ tor Wð~ ;:
1'1 , (' .. '.
#2?g42C Algl\i!;a, lI.dna::l ILJ;j' FE~ c.;::. ,__.
~~~::~~f~:'Ol DEO' .AS \.__:D~L'-'¿~ff?T
!)ue; OZI2í/2iJ:Jl
--- .- ---. ~~.--
c:=-~ AO-, "'";)~"7
"17%
P.02
'"
'-'
...."
subcontractor status one day before the bid opening. We will be glad to show
details oftbis to you upon your requeSt_ Our bid amount was: $329,900.
The quality of our work is wen represented in all fourteen of these buvtfi'1g5. as well as .in
DUItIC1'OW other projects we have completed for other various entities. including IU1 IIl'Immi"1TBtion
buiIdiDg and barn for the State offJorida. Division of Forestry, City of Ft. Pierce, Florida, School
Board of Martin County, among others.
Onoœprojeçt, Pump Stations 127. 129. and 131. project #C-I0420, we were informed by Labor
Finders, Inc. that the superintendent and worlcers !'om Labor Ficders Inc. were U5Ïn¡ chugs. sold
to theiiì bÿ aji"ûñãeÏ'cOVéi" 8genfiii'Okëecliöòee countY. with tnë-NiiïcnOWiëdgèõ1'\ñspeciorS,-- .
station managers and other members ofSFWMD staff. SFWMD did not deem it 11ecess&ly to
infurm us ofany illegal activities going on at tbatjob site. Ifwe were ÎDfunned ofrhis problem
upon itS ctiscO'VCI}' by SPWMD,. the probJem. would have been eliminated imrnlodiately without
considerable cost associated with this problem (case pending in Glade County Court).
We are aslòog for 8 full and comprehensive investigation of these cases.
Our reason ror asking your offices for this investigation is that we believe tbcrc is a persistent aM
deep rooted pa.~cm of unlawful and may be clhuiw] actMtics aimed against us.
Sincerely.
~ £-ø---
Adnan Ie. AJghita
President
AKA: wss
--- ._- ----.....
....r""I....
'" I,n
-
... · 8 S....th Florida Water Management ~istrict
MGT 08-06F
MEMORANDUM
To:
Sheryl Wood, Director Procurement Division
Jonathan Gleason, Contract Manager
From:
Thomas Johns, Director Construction Division
Ralph Hayden, proje~r
~~~r Ge~raC Office oflnspector General
" Date;
August 26, 1999
Subject:
Preaward Review of Adnan Investments & Development, Inc.
RFP # C-10414 - Pump Station S-6 and S-7 Ventilation and Shutters
Report # 99-22
Pursuant to your request, we visited the office of Adnan Investments & Development.
Inc. (Adnan) in Jensen Beach Florida and performed a preaward review of the
company's finandal records to determine its capacity to perform construction work at a
higher dollar volume than it is currently performing for the District
The company was organized in 1982. and its business is primarily real estate
development and residential construction. We reviewed Adnan's financial statements,
prepared by Certified Public Accountants. The statements consist of unaudited
compilations for calendar year 1997 and 1998 and an interim review for the six-month
period ending June 30, 1999. While the company is involved in a modest amount of
commercial construction projects. a job order cost accounting system was only recently
established. According to the company's President, Adnan K Alghitha, the new system
is only two months old and was not fully functioning. Consequently, we did not review
the new system_
Total company sales were $229,000 and $610,000 for calendar years 1997 and 1998
respectively. For the six-month period ending June 30, 1999 sales were $292,000.
Adnan is the lowest responsive bidder on two pending awards with the District C-10414
for $296,800 and C-10433 for $68,800. In addition, Adnan was awarded two contracts
totaling $713,100 with St. Lucie County and is awaiting another award from the County
for $559.800. The company is currently working on two contracts totaling $196,400 for
the District, C-9025 and C-10420. Adnan recently completed District contract, C-9051.
We found that up until the last quarter of the current calendar year (period ending June
30, 1999) the company's records reflect that there were no payrolls. Calendar year
G""cmi"{ a.Nnd,
Mich.'" Collin'. CMnnan
Mich.eI D. Mint<:m. Viet Ch.:ti-rmao
M",holl W. Bcr¡:c,
Veta M. Carter
Gerardo B. F~,n.~ndoz
P~(r¡ck ¡. Gb.ron
NieO!~S J. Outiem:z, Jr.
Harklev R. Thomton
Trudi K. Wilhams
Frank R. Finch. r.E.. £UCUliw f),rwoT
Mich..,1 5layoon. Dcpury Ex."","" DirWDT
Trevor Campbd I, OCþu.r,. Excc"o\'t! Dir«wr
MililingAddreS1': P.O. Box Z46BO, WCSt Palm ~3Ch.1'L 33416-4680
.tf"
-Adpan InveJr¡¡"""cmts & Development, Inc.
· August 26, 19§9
Pag'a 2 of 2
1997 and 1998 financial statements and corporate tax returns reflect that there were no
payrolls of any kind. Mr. Alghitha indicated that up until 1999 an of the jobs were
entirely subcontracted out including a number of smaller jobs with the District. We
noted that the District contracts require a minimum of 40% participation by the prime
contractor. Mr. Alghith@ indicated that going forward; he planned to perform .
construction work for District projects using his own workforce. For the quarter ending
June 30, 1999 there were only five employees listed on the State of Florida Quarterly
payroll report to the Department of Labo~. The entire quarterly payroll listed gross
wages totaling $8,800.
..."
Additionally, the company has no equipment listed on its balance sheet that would
typically be associated with a construction company. The balance in this account as of
June 30, 1999 was $2,377 representing "furniture and equipment"
We confirmed that the company has a $2 million bonding capacity with the Cumberland
Casualty & Surety Company through Bob Barra Bonds, Inc. in Coral Springs, Florida.
Additionally, the company has commitments for lines of credit of $200,000 & $225,000
that would require substantial collateral: real estate and equipment respectively.
Sources of collateral for a loan from current balance sheet items would be limited,
thereby requiring the company to fund cash flow internally or seek alternative cash
sources. The most recent financial statement reflects a negative cash flow of $53,000
but current assets exceed liabilities by $175,000. However, the majority of the current
assets include -inventory" of $331,000, which consists of a vacant lot and a residence
currently being used as the company's office & Mr. Alghitha's dwelling.
Based on Adnan's volume of business, the nature and mix of the business performed.
and the other matters discussed above, we would consider it risky for the District to
award the planned larger dollar value construction contract to Adnan with any degree of
certainty that the project will be completed in a satisfactory manner and in accordance
with all of the Districfs terms and conditions.
Should you have any questions or require additional audit services please feel free to
contact Dan Soaker or me.
c: Frank Finch
Trevor Campbell
Bill Malone
Albert Basulto
Zan Kugler
Glen Miller
TOTAL P.12
MAY-0~-~1 11~ AM ADNAN INV AND DEY INC
56122935~
P.02
MIll ....t..... .......111....
".0. Box,I?
Jer11«t Botcb, FJmda 34958
Phone (561)229-8557
Pax (561)229-3538
..
.
May 2, 2001
Mr. Robert Bradshaw
Assistant County Administrator
2300 Virgjnia Ave.
Fort Pierce. Fi. 34982
RE: 1NDIAN RIVER LAGOON
Traçe Bid # 01-032
Dear Mr. Bradshaw,
We recently received a letter dated Apri124, 2001 in regards to the above tcfetenced
project. Mr. Ray Wazny has recommended awarding the contract to the second lowest bidder,
which was 1>ickmon Construction Co., at $41,000.00, more cost to the county.
Mr. Waznys' a11eaations against us arc wen knovvn to anyone fiuniliar with the six projects
which we have completed for St. Lucie County.
The 1AIL and CLADES CUT -OFF Culverts Replacement projec:ts were built and
completed with quality. second to none. Now is the time to judec for yourselfMr.Bradshaw, and
compare the quality and workmanship with similar projeçts the County has recently bui1t and.
completed. by comacting the appropriate peopk to verl1Y my statements.
These projects have beenperfomln¡ perfectly, and I 1m sure the current managers fur
these projects will attest to that.
We are attacbin¡ two letters for your information. The first is ftom the City of Fort Pierce
and the other is from the State of Florida, Department ofForcstry. These letters will speak for
themselves.
We ask you to make these letters avaiJable to the çommimoners attending the May 8th
meeting as well as this letter.
Sincerely.
~ß~
Acfnan K. AJ¡hita
Adnan Investment &:. Development, Inc:.
AKNIal
Cc: Daniel S. Mdntyre I Cty. Atty.
All CoW1ty commlsioners
~1AY-Ø2-01
12,-, PM
ADNAN lNV AND DEV lNC
,
561229<>~
P_0~
,j'
¡; I T Y Of
RT PI~R¡;~
..
OFFICE OF THE CITY ENGiNeeR j
TI!L, (861) 460-2200. EXi. 143 1
I
April 26, 2001
Adnan Alghlta
Adnan Investment & Development/ne.
P.O. Box 517
Jensen Beach, Florida 34958
SUBJEcr: AVENUE 0 STORM SewER REPLACEMENT
Deëlr Mr. AIghlta:
Please accept this letter as confirmation of the completion of the above referenced project.
as per your request The construction of the Avenue 0 Storm Sewer Replacement project
was achieved in a professional, and timely manner, and met with all City of Fort Pierce
SœndC!rds and Specifications.
If you require any additional information, please contact this office.
Sincerely yours,
~
Hector P. Arias, P.E.
City EngIneer
HPA:ncm
cc: City Mé'lnager
Project Engineer
O;\QIfI~\A_1It 0(12. 17111 SI~ olCon1>lctiœ lO........wpà
0lIl... F~e:AYS1LJO 0
"
MA~-02-f01 1.2.,,", ,.' PM A
, ~ DNAN INV AND DEV IHC
::;61229:?;~
P.04
:FR002'·æ!ll 151æ
. . ,'! I ' ).
Fi. D!~ ~%C & ca-e
.fØ2! 4e8 øe~ ".e:z
'"
:'1.:........
. \j" ...
..~~.~
Florida Department of Apicultnr8 & Consumer SerYioea
TEUY L. aBODES, C.cmn"i1mODef
.:
.--....... or..
~n.-r
3115 0........
.-:u. ¡,(&IJ lilt en
'r~ ~ " n. 3U501"Q
T.:.p1ø.: (ISO) ,,."St1.
r,«. (1fl/)~
AprlU4,lOOl
Mr. ram GraDtbam, ComrKtI S~on
Depa.rt1'06t\t ofTran.sf>Orta.tion
$05 SWIUWe Street
MIll Smtlon 55
'f1U.blUMe, Florlcl& '2399-0450
"kf: AdÐan'Development m.1 tnvemnant, Inc.
DtaI'Mr. Grantham,
ThII Jetter Is in rcprd co ~ DMopment and tnvut:me:l't. IDe. 1114 the work that they
have pcdormed fot' the DivUton of~o1'eatry.
AdnaA D~oPmel\Ì has recently compl11tt4 'CWO buildings fur our DMlioñ [n tho Stuart
1ft&. One is 8:11 admàUttatÏOD builcii.'1S and the otbtr lJ an equipment It1CS -=1' Wity.
Additiona"DY. they performed the åte v.-"Ortc for tbil proJoct:. The work "M.I performed
u.tistàctotily aÐd the ~u.ality or the CQIISU'I.Ic1ioft WU iOO~:t
You C&t\ can me at te 994-0$34 or (8S0) 414-0834 ¡fyou Med additional intbtmatlon
SÍ11Çm1y,
1J:RRY L. RHODES
COMMISSIONER. OF AGR[CU1. TURI:
~~:;r~
om wn
Cot1$tNCtion Projects Admùti~ator
1'ûM.. p,øz
"
,'I
I
i
f-
I
MAY-07-2001 . ~, 38
\...-
Six InullUlne:
LJALL I S GROUP
318 7~~ 1928 P.02/02
.....
,
.,
RecycllnCJ efforts cOIIvert trasll to trHsure for the emrOtlll\8nt.
ih is Gu:i
J u 11
'\7
eD\y~
I
10 ¡ I ¡ r-u 0 \ U k
\ s'Sue 0 t='
~~~LA IU-e I,
.ï-
.
...
.,
Bev SIIItII Toyot¡ IN, rteelved tile
Toyota PreslllHn AwIl'l1 for tll.
s~1I YNI'-
slandinl) commiblent tv make r''YcßIIQ
VIOrk throu\hollt its fadlty," says Herb
8LfQart. recyc;iIIq/wIs1f 1ÑIC1ion pro-
Wbllll the .mp~ It..., SmrttI Toyota ,ram manal)'r 'Of st. Ltlti. C:o...ty.
in Fort Pierce, FIa.. loDlild in Ihlir wash- "Their efforts IIftp redlCe air alld waler
baklts, they didn't $II trash. TIMy $IW . pollution, .nd CDIIIII'YIIlØIltaI resourcts
WIV to ,""III tileii' trNsund ¡ndsc.~ for _¡yon,'s hiUrt," lie says.
riOt'll bIcaônt¡ a ¡f¡~_ Becaøe 01 recydRQ. tile rlHlershlp lias
TIM deal""lp lallllCllell a rteyeliø9 pro- cut its trash In half. other IIN þwllIfSS-
gram. CDtllCliIIQ Øeryll'tiftl) lram papèI' es õII't folowiDQ Bev Sri!Þ To,tota's IH~
to st.eI In 11m IIIcmlllllrou"out th' by dl!(,.,sll\9 wlSt9 alII IIIa'NSInI) Ibe
facility. For their efforts on behaU of the resDtl'Ce5 tI1at ale bei.. saved.
enylronment. tile dNllIßbip and 0_ lIIInb 10 the efforts or leadeß lite Niå
Nidi Smitl1 have recei,ed the fm Snlllh and his dealership teala, future
CommerciallleqtllnQ Partnership Award qenlIitlons will haM tII, ~portll1ltV to
from tile St. Lucie COlllty BOlrd of treasure the envltl)Oment and et¥OY its
!:cmminlolltl'1. many wonden.
"Btv Srith Toyota has ~OIYn ., out-
-$
I
<:f)TOYOTA
101lOlD_'_....t,IqM__ .....-~"...IIIoIIoo_IDLIII1 IIIII.D.UDI
1IItIt....1.11I....1.., ........".~ OR www.Io!t--
-tb-
TOTFL P. Ø2
- -..
, ...
¡I"
~
'wi
ÿÚC1E COû,
~~. ~?
. .
8 ~
3: CI1
~ ~
~ f;.
~ ~~
~~CYCL\~Ú
""
'-'
"will
AGENDA REOUEST
ITEM NO.~
ADDITIONS [X] DATE: May 8, 2001
REGULAR [ ]
PUBLIC HEARING [ ]
CONSENT [ ]
TO: BOARD OF COUNTY COMMISSIONERS
PRESENTED BY:
SUBMITTED BY(DEPT): County Attorney
Daniel S. McIntyre
County Attorney
SUBJECT:
Resolution No. 01-106 - Proclaiming the week of May 13, 2001, through May 19, 2001, as "LAW
ENFORCEMENT WEEK" and designating May 15,2001, as "PEACE OFFICERS' MEMORIAL DAY" in
St. Lucie County, Florida.
The Congress and President of the United States have designated the week of May 13,2001, through May 19,
2001, as Law Enforcement Week; and May 15,2001, as Peace Officer's Memorial Day.
Reverend Jeffrey L. Owens, Chaplain for the St. Lucie County Sheriff's Office has requested that this Board
proclaim May 13, 2001, through May 19, 2001 as Law Enforcement Week; and designate May 15, 2001, as Peace
Officers' Memorial Day in St. Lucie County, Florida.
The attached Resolution No. 01-106 has been drafted for that purpose.
BACKGROUND:
FUNDS AVAIL.:
PREVIOUS ACTION:
RECOMMENDA nON:
Staff recommends that the Board adopt the attached Resolution No. 01-106 as drafted.
COMMISSION ACTION:
E:
[XI APPROVED [] DENIED
[ ] OTHER:
~
County Attorney:
Originating Dept.
'-'
Review and Approvals
:fv
¡t-~
Management & Budget
Other:
Finance: (Check for Copy only. if applicableJ___
Purchasing
Other:
.....,
Eff. 5/96
.., .'
'w'
...,,;
RESOLUTION NO. 01-106
A RESOLUTION PROCLAIMING THE WEEK
OF MA YB, 2001, THROUGH MAY 19,2001, AS
"LAW ENFORCEMENT WEEK" AND
DESIGNATING MAY 15, 2001, AS "PEACE
OFFICERS' MEMORIAL DAY" IN ST. LUCIE
COUNTY, FLORIDA
WHEREAS, the Board of County Commissioners ofSt. Lucie County, Florida, has made
the following determinations:
1. The Congress and President of the United States have designated the week of May 13,
2001, through May 19,2001, as Law Enforcement Week; and May 15,2001, as Peace Officers'
Memorial Day.
2. The St. Lucie County Sheriffs Office has been constituted by the State of Florida to
uphold the laws and play an essential role in safeguarding the rights and freedoms of the citizens of
S1. Lucie County.
3. It is important that all citizens know and understand the problems, duties, and
responsibilities of their law enforcement agencies; and that members of our Sheriffs Office
recognize their duty to serve the people by safeguarding life and property, by protecting them
against violence or disorder, and by protecting the innocent against deception and the weak
against oppression or intimidation.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners ofSt.
Lucie County, Florida:
1. This Board does hereby proclaim the week of May 13,2001, through May 19,2001, as
"LAW ENFORCEMENT WEEK" and does hereby further designate May 15, 2001, as "PEACE
OFFICERS' MEMORIAL DAY" in St. Lucie County, Florida.
~
",.
'.,J
2. This Board urges the citizens ofSt. Lucie County and all patriotic, civic and educational
organizations to observe the week of May 13,2001 through May 19,2001, as Law Enforcement
Week with appropriate ceremonies in which all of our people may join in commemorating law
enforcement and detention deputies, past and present, who by their faithful and loyal devotion to
their responsibilities have rendered a dedicated service to their communities, and, in doing so, have
established for themselves an enviable and enduring reputation for preserving the rights and
security of all citizens.
3. This Board further urges the citizens of St. Lucie County to observe Tuesday, May 15,
2001, as Law Enforcement Memorial Day in honor of those peace officers who, through their
courageous deeds, have lost their lives or have become disabled in the performance of their duty.
PASSED AND DULY ADOPTED this 8th day of May, 2001.
ATTEST:
BOARD OF COUNTY COMMISSIONERS
ST. LUCIE COUNTY, FLORIDA
BY:
DEPUTY CLERK
CHAIRMAN
APPROVED AS TO FORM AND
CORRECTNESS:
COUNTY ATTORNEY
/
/'
.....
.....
AGENDA REOUEST
...""
ITEM NO. A-I
ADDITIONS
DATE: May 8, 2001
REGULAR [ ]
PUBLIC HEARING [ ]
CONSENT [X ]
TO: Board of County Commissioners
PRESENTED BY:
SUBMITTED BY{DEPT):County Attorney
Heather Young
Assistant County Attorney
SUBJECT: St. Lucie Metropolitan Planning Organization - Agreement with Tindale-Oliver and Associates, Inc.
for Major Update of the Year 2001 Transit Development Plan/Transportation Disadvantaged Service Plan
BACKGROUND: See attached memorandum CA 01-686
FUNDS A V AlLABLE: Funds are available in Account Numbers 001211-151 0-531000-100, 001218-1510-531000-
100,001249-1510-531000-100, and 001131-1510-531000-100 (Professional Services)
RECOMMENDATION: Staff recommends that the Board of County Commissioners approve the proposed
agreement between the MPO and Tindale-Oliver and Associates, Inc., subject to approval of the agreement by the (
Florida Department of Transportation. ~
f
[ ~ APPROVED [] DENIED
[ ] OTHER:
COMMISSION ACTION:
ug as Anderson
County Administrator
County Attorney:
('.~
ð'riginating Dept.
Finance: (Check for Copy only, if applicable): L
91-1
;U
Review and Approvals
Management & Budget:
Purchasing:
Other:
Other:
,
'-"
.."
INTER-OFFICE MEMORANDUM
ST. LUCIE COUNTY, FLORIDA
TO: Board of County Commissioners
FROM: Heather Young, Assistant County Attorney
C.A. NO: 01-686
DATE: May 3,2001
SUBJECT: S1. Lucie Metropolitan Planning Organization - Agreement with
Tindale-Oliver and Associates, Inc. for Major Update of the Year
2001 Transit Development Planffransportation Disadvantaged
Service Plan
BACKGROUND:
Attached to this memorandum is a copy of the proposed agreement between the S1. Lucie
Metropolitan Planning Organization and Tindale-Oliver and Associates, Inc. for preparation of the
major update of the Year 2001 Transit Development Plan/Transportation Disadvantaged Service
Plan. Pursuant to the agreement, Tindale-Oliver will prepare the update at a total cost of eighty-two
thousand nine hundred ninety-nine and 62/100 dollars ($82,999.62), including expenses. The MPO
approved the proposed agreement during its meeting on May 3, 2001. Board approval is required
in order for the Finance Department to process payments under the agreement.
CONCLUSION/RECOMMENDATION:
Staff recommends that the Board of County Commissioners approve the proposed agreement
between the MPO and Tindale-Oliver and Associates, Inc., subject to approval of the agreement by
the Florida Department of Transportation.
Respectfully submitted,
')~~
Heather Young
Assistant County Attorney
Attachment
HY/
Copies to:
County Administrator
Community Development Director
Finance Director
Management and Budget Director
Deputy Clerk
"
'-'
....¡
CONSUL T ANT AGREEMENT
THIS AGREEMENT, made and entered into this
day of
,2001, by and
between ST. LUCIE METROPOLITAN PLANNING ORGANIZATION, hereinafter referred
to as the "MPO", and TINDALE-OLIVER AND ASSOCIATES, INC., hereinafter referred to as
the "Consultant".
WITNESSETH:
WHEREAS, the MPO desires to retain the professional services of the Consultant to prepare
the Major Update of the Y ear200 1 Transit Development Plan/Transportation Disadvantaged Service
Plan; and,
WHEREAS, the Consultant desires to provide the MPO with such services.
NOW, THEREFORE, in consideration of the premises and the mutual benefits which will
accrue to the parties hereto in carrying out the terms of this Agreement, it is mutually understood and
agreed as follows:
I. GENERAL SCOPE OF THIS AGREEMENT
The relationship of the Consultant to the MPO will be solely that of a consultant. The
Consultant is an independent contractor and is not an employee or agent of the MPO. Nothing in this
Agreement shall be interpreted to establish any relationship other than that of an independent
contractor, between the MPO and the Consultant, its employees, agents, subcontractors, or assigns,
during or after the performance of this Agreement. The Consultant will provide the professional and
technical services required for the successful completion of this Agreement in accordance with
practices generally acceptable within the industry and good ethical standards.
2. SCOPE OF WORK
The scope of work to be performed by the Consultant under this Agreement is:
-1-
/
'-"
'willi
Preparation of the 2001 Transit Development Plan Major Update, hereinafter
referred to as the "Project", as set forth in the Scope of Services attached hereto
and incorporated herein as Exhibit "A" .
3. PROJECT MANAGER
The Project Manager for the MPO is Cheri B. Fitzgerald, MPO Supervisor at (561) 462-
1593. The Project Manager for the Consultant is William L. Ball at (813) 224-8862.
,
The parties shall direct all matters arising in connection with the performance of this
Agreement, other than invoices and notices, to the attention of the Project Managers for attempte d
resolution or action. The Project Managers shall be responsible for overall resolution or action.
The Project Managers shall be responsible for overall coordination and oversight relating to the
performance of this Agreement.
4. TIME OF PERFORMANCE
The C~nsultant shall complete all work hereunder on or before March 31, 2002 in
accordance with the Project Schedule attached hereto as Exhibit "B".
5. COMPENSATION
The Consultant shall be compensated for all services rendered and expenses incurred under
this Agreement in an amount not to exceed eighty-two thousand nine hundred ninety-nine and
62/100 dollars ($82,999.62) based upon completion of the project tasks as set forth in the Project
Schedule attached hereto and incorporated herein as Exhibit "B" and the Project Budget attached
hereto and incorporated herein as Exhibit "C". Reimbursement for any travel expenses shall be
in accordance Section 112.061, Florida Statutes.
All invoices presented to the MPO for payment shall be on a Request for Payment form
approved by the MPO.
6. DEFAULT: TERMINATION
A. FOR CAUSE
If either party fails to fulfill its obligations under this Agreement in a timely and
proper manner, the other party shall have the right to tenninate this Agreemen t by giving written
notice of any deficiency and by allowing the party in default seven (7) calendar days to correct
the deficiency. If the defaulting party fails to correct the deficiency within this time, this
Agreement shall terminate at the expiration of the seven (7) calendar day time period.
With regard to The Consultant, the following items shall be considered a default
-2-
,
'-"
.....J
under this Agreement:
(l) Ifthe Consultant should be adjudged bankrupt, or if he, or it, should make a
general assignment for the benefit of his, or its, creditors, or if a receiver should be appointed on
account of his, or its, insolvency.
f
(2) If the Consultant should persistently or repeatedly refuse or fail, except in
cases for which an extension of time is provided, to provide the services contemplated by this
Agreement.
.
(3) If the Consultant disregards laws, ordinances, or the instructions of the Project
Manager or otherwise is guilty of a substantial violation of the provisions of the Agreement.
·
In the event of termination, the Consultant shall only be entitled to receive payment
for work satisfactorily completed prior to the termination date.
B. WITHOUT CAUSE
·
·
I
í
,: Either party may terminate the Agreement without cause at any time upon thirty (30)
calendar days prior written notice to the other party. In the event of termination, the MPO shall
compensate the Consultant for all authorized work satisfactorily performed through the termination
date.
7. FORCE MAJEURE
Neither.party shall be liable to the other for failure to perform its obligations hereunder if and
to the extent that such failure to perform results from causes beyond its reasonable control (financial
difficulty shall not be considered a cause beyond a party's control), all of which causes herein are
called "Force Majeure", including, but without being limited to, strikes, lockouts, or other industrial
disturbances; fires; unusual climatic conditions; acts of God; acts of a public enemy; or inability to
obtain transportation or necessary materials in the open market. The party unable to perform as a
result of force majeure promptly shall notify the other of the beginning and ending of each such
period, and MPO shall compensate Consultant at the rates set forth herein, for the services performed
by Consultant hereunder, up to the date of the beginning of such period. If any period of force
majeure continues for thirty (30) days or more, either party
shall have the right to terminate this Agreement upon ten (10) days prior written notice to the other
party .
8. ASSIGNMENT
The MPO and Consultant each binds itself and its successors, legal representatives, and
assigns to the other party to this Agreement and to the partners, successors, legal representatives, and
permitted assigns of such other party, in respect to all covenants of this Agreement; and, neither the
-3-
¡I
'-"
~
MPO nor the Consultant will assign or transfer its rights and obligations in this Agreement without
the written consent of the other. Nothing herein shall be construed as creating any personal liability
on the part of any officer or agent of any public body which may be a party hereto.
The Consultant agrees that the persons named in the scope of work shall provide services as
described therein. The services of the person(s) so named are a substantial inducement and material
consideration for this Agreement. In the event such persons can no longer provide the services
required by this Agreement, the Consultant shall immediately notify the MPO in writing and the
MPO may elect to tenninate this Agreement without any liability to the Consultant for unfinished
work product. The MPO may elect to compensate the Consultant for unfinished work product,
provided it is in a fonn that is sufficiently documented and organized to provide for subsequent
utilization in completion of the work product.
.
9. SUBCONSUL T ANTS AND SUBCONTRACTORS
In the event the Consultant requires the services of any subconsultant, subcontractor or
professional associate in connection with the services to be provided under this Agreement,
Consultant shflll secure the written approval of MPO Project Manager before engaging such
subconsultant;' subcontractor or professional associate.
.
,
I
10. AUDIT
The Consultant agrees that the MPO or any of its duly authorized representatives shall, until
the expiration of three years after expenditure of funds under this Agreement, have access to and the
right to examine any directly pertinent books, documents, papers, and records of the Consultant
involving transactions related to this Agreement. The Consultant agrees that payment( s) made under
this Agreement shall be subject to reduction for amounts charged thereto which are found on the
basis of audit examination not to constitute allowable costs under this Agreement. The Consultant
shall refund by check payable to the MPO the amount of such reduction of payments. All required
records shall be maintained until an audit is completed and all questions arising therefrom are
resolved, or three years after completion ofthe project and issuance of the final certificate, whichever
is sooner.
11. PUBLIC RECORDS
The Consultant shall allow public access to all documents, papers, letters, or other material
subject to the provisions of Chapter 119, Florida Statutes, and made or received by the Consultant
in conjunction with this Agreement.
12. INSURANCE
The Consultant shall procure and maintain during the life of this Agreement insurance of the
types and subject to the limits set forth below. The Consultant shall also provide the MPO with
-4-
;'
'-"
'wtI
evidence of this insurance in the form of Certificates of Insurance which shall be subject to the
MPO's approval for adequacy. The MPO shall be an Additional Insured on policies of Commercial
General Liability, and Commercial Auto Liability with respect to all claims arising out of the work
performed under this Agreement. The MPO shall be given thirty (30) days prior written notice of any
material changes or cancellations of the policies. If sub-contractors are used by the Consultant, it
shall be the responsibility of the Consultant to ensure that all its sub-contractors comply with all the
insurance requirements contained herein relating to such sub-contractors.
Except as otherwise stated, the amounts and types of insurance shall conform to the following
minimum requirements:
4
A. WORKERS' COMPENSATION
The Consultant shall provide and maintain during the life of this Agreement, at his, its or
their own expense, Workers' Compensation insurance coverage to apply for all employees for Florida
statutory limits'. Coverage B, Employers Liability, shall be written for a minimum liability at
$100,000.00 per occurrence.
I
B. , COMMERCIAL GENERAL LIABILITY
The Consultant shall provide and maintain during the life of this Agreement, at his, its or
their own expense, Commercial General Liability insurance on an occurrence basis for a minimum
combined single limit of $500,000.00 per occurrence, for claims of bodily injury including death,
property damage and personal injury. Contractual Liability coverage shall be included.
C. COMMERCIAL AUTO LIABILITY
The Consultant shall provide and maintain during the life of this Agreement, at his, its or
their own expense, Business Commercial Auto Liability for claims of bodily injury and property
damage for minimum limits of$100,000.00 combined single limit.
D. PROFESSIONAL LIABILITY
The Consultant shall provide and maintain during the life of this Agreement, at his, its or
their own expense, Professional Liability insurance on an occurrence basis for a minimum of
$1,000,000.00
E. OTHER INSURANCE PROVISIONS
The General Liability and Auto Liability policies shall contain or be endorsed to contain, the
following provisions:
I. The MPO, its Officers, Officials, Employees, Agents, and Volunteers are to be
-5-
,
'-"
'...I
covered as additional insureds for any and all liability arising out of the Consultant's
performance of this Agreement, or out of automobiles owned, leased, hired, or borrowed by
the Consultant. The coverage shall contain no special limitations on scope of protection
offered to the MPO, its Officers, Officials, Employee, Agents and Volunteers.
2. The Consultant's insurance coverage shall be primary insurance as respects the MPO,
its Officers, Officials, Employees, Agents and Volunteers for Consultant's activities. Any
insurance or self-insurance maintained by the MPO, its Officers, Officials, Employees,
Agents, or Volunteers shall be in excess of the Consultant's insurance and shall not
contribute with it.
4
3. Any failure to comply with the reporting provisions of the policy shall not effect
coverage provided to the MPO, its Officers, Officials, Employees, Agents, or Volunteers.
4. The Consultant's insurance shall apply separately to each insured against whom a
claim is made or suit is brought, except with respect to the limits of insurer's liability.
13. INDE¥NIFICATION
The Consultant covenants and agrees to save, hold, and keep harmless the MPO, its Officials
and Employees, and indemnify the MPO, its Officials, and Employees, against any and all claims,
demands, penalties, judgements, court costs, reasonable attorney's fees, and liability to the extent
arising out of or in any way connected or arising out of any negligent act of the Consultant. Only
those matters which are determined by a final, nonappealable judgment to be the result of the
~egligence of the MPO or the negligence of a third party who is not an agent, employee, invitee, or
subcontractor of the Consultant shall be excluded from the Consultant's duty to indemnify the MPO,
but only to the extent of negligence of the MPO or such third party. The Consultant hereby
acknowledges that the payments made under this Agreement include specific consideration for the
indemnification herein provided.
14. PROHIBITION AGAINST CONTINGENT FEES
The Consultant warrants that it has not employed or retained any company or person, other
than a bonafide employee working solely for the Consultant, to solicit or secure this Agreement, and
that he has not paid or agreed to pay any persons, company, corporation, individual or firm, other
than a bonafide employee working solely for the Consultant, any fee, commission, percentage, gift
or any other consideration, contingent upon or resulting from the award of making this Agreement.
15. ATTORNEYS' FEES AND COSTS
In the event of any dispute concerning the terms and conditions of this Agreement or in the
event of any action by any party to this Agreement to judicially interpret or enforce this Agreement
or any provision hereof, or in any dispute arising in any manner from this Agreement, the
-6-
/,
'-'
'wi
prevailing party shall be entitled to recover its reasonable costs, fees and expenses, including but
not limited to, witness fees, expert fees, consultant fees, attorney, paralegal and legal assistant
fees, costs and expenses and other professional fees, costs and expenses, whether suit be brought or
not, and whether any settlement shall be entered in any declaratory action, at trial or on appeal.
16. NON DISCRIMINATION
The Consultant covenants and agrees that the Consultant shall not discriminate against any
employee or applicant for employment to be employed in the performance of the Agreement with
respect to hiring, tenure, terms, conditions or privileges of employment, or any matter directly or
indirectly related to employment because of age, sex or physical handicaps (except where based on
a bonafide occupational qualification); or because of marital status, race, color, religion, national
origin or ancestry.
17. VERIFICA nON OF EMPLOYMENT STATUS
The Consultant agrees that it shall bear the responsibility for verifying the employment status,
under the Immigration Reform and Control act of 1986, of all persons it employs in the performance
of this Agreement.
18. NOTICE
All notices, requests, consents, and other communications required or permitted under this
Agreement shall be in writing and shall be (as elected by the person giving such notice) hand
delivered by messenger or courier service, telecommunicated, or mailed by registered or certified
mail (postage prepaid) return receipt requested, addressed to:
As To MPO:
With Copies To:
St. Lucie County Administrator
Administration Annex
2300 Virginia Avenue
Fort Pierce, FL 34982
St. Lucie County Attorney
Administration Annex
2300 Virginia Avenue
Fort Pierce, FL 34982
S1. Lucie MPO Supervisor
2300 Virginia Avenue
Fort Pierce, FL 34982
As To The Consultant:
Tindale-Oliver Associates, Inc.
1000 N. Ashley Drive, Suite 100
Tampa, FL 33602
-7-
....
'-"
'wi
or to such other address as any party may designate by notice complying with the terms of this
Section. Each such notice shall be deemed delivered (a) on the date delivered if by personal
delivery, (b) on the date upon which the return receipt is signed or delivery is refused or the notice
is designated by the postal authorities as not deliverable, as the case may be, if mailed.
19. COMPLIANCE WITH LAWS
The Consultant, its employees, subcontractors or assigns, shall comply with all applicable
federal, state, and local laws and regulations relating to the performance of this Agreement. The
MPO undertakes no duty to ensure such compliance, but will attempt to advise Consultant, upon
request, as to any such laws of which it has present knowledge.
.
20. TRUTH-IN-NEGOTIATION CERTIFICATE
Execution of this Agreement by Consultant shall act as the execution of as truth-in-
negotiation certificate stating that wage rates and other factual unit costs supporting the
compensation of this Agreement are accurate, complete and current at the time of execution of the
Agreement. Tþe original Agreement rates and any additions thereto shall be adjusted to exclude any
significant s~s by which MPO determines the Agreement rate(s) was increased due to inaccurate,
incomplete, or non-current wage rates and other factual unit costs. All such rate adjustments shall
be made within one year following the end of this Agreement.
21. NON-WAIVER
The rights of the parties under this Agreement shall be cumulative and the failure of either
party to exercise properly any rights given hereunder shall not operate to forfeit any of the said rights.
22. CONFLICT OF INTEREST
The Consultant represents that it presently has no interest and shall acquire no interest, either
direct or indirect, which would conflict in any manner with the performance of services required
hereunder, as provided for in Section 112.311, Florida Statutes. The Consultant further represents
that no person having any interest shall be employed for said performance.
The Consultant shall promptly notify the MPO in writing by certified mail of all potential
conflicts of interest prohibited by existing state law for any prospective business association, interest
or other circumstance which may influence or appear to influence the Consultant's judgment or
quality of services being provided hereunder. Such written notification shall identify the prospective
business association, interest or circumstance, the nature of work that the Consultant may undertake
and request an opinion of the MPO as to whether the association, interest or circumstance would,
in the opinion of the MPO, constitute a conflict of interest if entered into by the Consultant. The
MPO agrees to notify the Consultant of its opinion by certified mail within thirty (30) days of receipt
of notification by the Consultant. If, in the opinion of the MPO, the prospective business
-8-
,
~
'wi
association, interest or circumstance would not constitute a conflict of interest by the Consultant, the
MPO shall so state in the notification and the Consultant shall, at hislher option, enter into said
association, interest or circumstance and it shall be deemed not in conflict of interest with respect
to services provided to the MPO by the Consultant under the terms of this Agreement
23. LITIGATION SERVICES
It is understood and agreed that the Consultant's services under this Agreement do not include
any participation, whatsoever, in any litigation. Should such services be required, a supplemental
agreement may be negotiated between the MPO and the Consultant describing the services desired
and providing a basis for compensation to the Consultant.
·
·
24.
MEDIATION
·
In the event of a dispute between the parties in connection with this Agreement, the parties
agree to submit the disputed issue or issues to a mediator for non-binding mediation prior to filing
a lawsuit. The parties shall agree on a mediator chosen from a list of certified mediators available
from the Cler~ of Court for St. Lucie County. The fee of the mediator shall be shared equally by the
parties. To th~ extent allowed by law, the mediation process shall be confidential and the results of
the mediation or any testimony or argument introduced at the mediation shall not be admissible as
evidence in any subsequent proceeding concerning the disputed issue.
!
25. INTERPRETATION: VENUE
This Agreement constitutes the entire agreement between the parties with respect to the
subject matter hereof and supersedes all prior verbal or written agreements between the parties with
respect thereto. This Agreement may only be amended by written document, properly authorized,
executed and delivered by both parties hereto. This Agreement shall be interpreted as a whole unit
and section headings are for convenience only. All interpretations shall be governed by the laws of
the State of Florida. In the event it is necessary for either party to initiate legal action regarding this
Agreement, venue shall be in the Nineteenth Judicial circuit for 8t. Lucie County, Florida, for claims
under state law and the Southern District of Florida for any claims which are justiciable in federal
court.
f
f
IN WITNESS WHEREOF, the parties hereto have accepted, made and executed this
Agreement upon the terms and conditions above stated on the day and year first above written.
ATTEST:
ST. LUCIE METROPOLITAN PLANNING
ORGANIZATION
BY:
CLERK
CHAIRMAN
-9-
/.
""'
-...I
APPROVED AS TO FORM AND
CORRECTNESS:
COUNTY ATTORNEY
·
·
ATTEST:
TINDALE-OLIVER ASSOCIATES, INC.
BY:
·
SECRETARY
PRESIDENT
(SEAL)
!
g:\atty\agreemnt\~ontract\mpo. tindale. wpd
i
,
,
,
-10-
,
'-'
.....,
EXHIBIT "A"
t
~,
SCOPE OF SERVICES
MAJOR DPDA TE OF THE YEAR 2001 TRANSIT DEVELOPMENT PLAN/
TRANSPORTATION DISADVANTAGE SERVICE PLAN
Scope of Work: .
The St. Lucie Metropolitan Planning Organization (MPO) is seeking the services
of a consultant to assist in the development of a major update of the MPO's
Transit Development Plan.
Purpose:
The purpose of the study is to identify general public transportation needs in
relation to the overall mobility needs of St. Lucie County, develop transit service
alternatives to address the identified needs, evaluate the alternatives based on
the established criteria over a five year planning horizon to be determined by the
Florida Department of Transportation, and establish a transit service .,plan for
transit services. Currently St. Lucie County has public transportation service
provided by the St. Lucie County Council on Aging. The effort will identify
alternatives technologies and/or services either public or private, and address
previously adopted polices and objectives of local goverrunents with the MPO's
area. The study area includes St. Lucie County and will explore the potential for
intercounty connections to adjacent counties.
Objectives:
The Study shall address the requirements of, and be consistent with, the
Transportation Efficiency Act of the 21 Century, 1998 (TEA21) as amended
and/ or replaced, applicable NfPO and Florida Department of Transportation
(FDOT) regulations (see attachment 1), and any related policies of the Federal
Highway Administration (FHW A) and the Federal Transit Administration
(FT A).
The major update of the IDP shall include elements listed in A Manual for the
Preparation of Transit Development Plans (USF, Tampa, 1993), including; but not
limited to:
· Identify existing local transit services
· Evaluate existing transit resources
· Identify potential transit technologies
· Develop alternatives consistent with need
· Develop an implementation plan
· Determine future transit needs
. Develop Revenue Projection Plan
· Develop future Cost Feasible transit Plan
¡".
"
\...-
...."
~ ':
The major update to the Transportation Disadvantaged Service Plan (TDSP)
shall be based on the Florida Commission for the Transportation Disadvantaged
TDSP guidelines.
The CONSULT ANT shall ensure that these elements are addressed in the update
of the TOP.
Task I-I: Establish Mission and Goals and Objectives
.
1.
Draft Mission, Goals and Objectives based on the following:
· Chapter 427 F.S. and Rule 41-2 F.A.C
· American with Disabilities Act
· State and Local Comprehensive Plans
· . Discussions with County, Corrununity Transit and Municipal Staff
· Discussions with Transit user groups
· Chapter 341 Public Transit, F.S. and Rule 14-73 Public
Transportation F.A.C
.' Short and long range plans for Indian River and Martin Counties to
evaluate present and future demand for intercounty transit trips
· Public input from Public Involvement Plan (PIP)
· Transit Element of 2020 Long Range Transportation Plan
· 1997 Congestion Management Plan
· 1995 Strategic Regional Policy Plan, Transportation Element
· Chapter 163 and 9J-5 F.AC Concurrency Regulations
2. Summarize Public Involvement Program for the project.
3. Draft Technical Memorandum I-I: Draft Mission and Goals and
Objectives based on review by Techrùcal Advisory Committee (TAq,
NfPO staff, MPO Board, and Citizens Advisory Committee (CAq.
Task 1-2: Data Base Compilation
The consultant shall collect, but not linùted to the following:
1. Existing Conditions Assessment
· County Base Maps
· Current and Future Land Use and Zoning Maps
· Existing Major Trip Generators! Attractors for transit
· Major Employment Locatic.:ms
,;
'-"
''''';
· 1990 (2000 if available) Census Tract Data for Population,
Employment, Low Income, Auto Availability, and Dwelling Units
. 2000, 2010, 2020 Population and Employment by T AZ
. Available information from the Bureau of Economics and Business
Research regarding future growth in St. Lucie County.
· Community Transit existing services and ridership
· Review existing surveys of population regarding transportation
issues
· Parking supply and cost
· Planned future developments in St. Lucie County, including
identification of major activity centers
· Identify and forecast potential transit demand
· Forecast the number of trips reduced on the roadway from the
increase in transit use.
~
2. Review and summarize all pervious plans, and documents pertàining to
pubFc transportation in St. Lucie County, including but not limited to:
· Previous mass transit/public transportation needs studies
· Transportation Disadvantaged Service Plan for St. Lucie County
· Adopted Local Government Comprehensive Plans
· Transportation Improvement Programs
· Long Range Transportation Plan
· Chapter 427, Rule 41-2
· Chapter 504 Handicapped Accessibility Plan
· Other relevant documents as necessary
· Long and short range plans for Indian River and Martin Counties
Transit Element of 2020 Long Range Transportation Plan
· 1997 Congestion Management Plan
· 1995 Strategic Regional Policy Plan, Transportation Element.
'.
3. Identify Future developments.
4. Identify by Zone/Tract concentrations of transit dependant and potential
transit user populations.
5. Conduct a peer review of general public transit ~ervices in other similarly
sized counties. This review will include agencies both within and outside'
of the state of Florida and include operational and financial characteristics
of each. The peer review will include both fixed route and demand
responsive service types. Peer review will identify funding sources
""
~
-...J
utilized to develop and maintain both fixed route and demand responsive
service types.
6. Inventory existing public and private transportation providers operating
in the county. The consultant shall collect and analyze the following
information for each transit providers:
· Name and type of service, including days and hours of operation
· Facilities, location, age and general condition
· Service area, frequency, destinations and number of riders
· Equipment type, age and general condition
· Rolling stock type, age, condition, and special accessories
· Average annual daily riderslùp
· Eligibility requirements
.. Operating polices governing service areas, trip reservations, pick-
up and drop-off times, pre-scheduled trips, cancellations-and no-
shows, ect.
· Operating costs per velùcle-hour, velùcle -mile by rider, and by
trip type
· Annual operating maintenance, administrative, and capital costs
· Revenues classified by source.
.
7. A situation appraisal is required and will include at least
· Effects of land use, state and local transportation plans and other
governmental actions and policies, socio-economic trends,
organizational issues and technology.
· Demand estimation techniques must be approved by the
department supported by demographic, land use, transportation
and transit data and result in a five or ten year (as determined by
FOOT) annual projection of transit riderslùp
· A performance evaluation using the Transit Capacity and quality of
service measures.
8. Draft Technical Memorandum 1-2: Data Base Surrunary and Review of
Existing Services.
Task 1-3: Transportation Demand and Needs Estimation
1. Estimate potential demand for general public transit services based on
demographic data, total travel demand and appropriate modal split, and
other communities of similar size and characteristics with general public
/'
'-"
.....;
1,..
transit services. The St. Lucie County Tranplan/FSUTMS travel demand
model will be used to estimate the distribution and characteristics of
regional person trips. The appropriate modal split will be applied to the
person trip demand to determine transit travel demand.
2. Hold group meetings, and discussion groups, work with the county,
community transit and municipal staffs and conununity groups to identify
transit issues and needs.
t
3. Draft Technical Memorandum 1-3: Transportation Demand Needs
Assessment
Task 1-4: Alternative Analysis
1. Identify with input from Community Transit, appropriate public transit
service types given demand potential and characteristics of the study area.
This should include fixed route, demand responsive, and other service
type!>. Assess the appropriateness of the transit service types given the
tranSit service needs and characteristics of the study area. For this study,
the study area will be defined to include analysis of potential intercounty
transit connectionsf routesf trips.
2. Assess feasibility of new public transit services based on potential
demand, estimated costs, and ability to meet identified transit needs and
goals.
3. Develop revenue projections for each of the alternatives including federal,
state, and local sources and requirements.
4.
Identify potential funding sources for each of the alternatives including
federal, state, and local sources and requirements.
f
5. Identify short-term general route connectionsf service area alternatives for
any feasible public transit services identified from task 1-4.2.
6. Identify performance measure thresholds for the evaluation of
alternatives. Review those with the MPO and advisory committees for
their endorsemeDt. _-
7. Evaluate short term alternative route connectionsfservice areas based on
performance standards, funding opportunities, revenuef cost
comparisons, ridership potential, costs, ability to meet needs, and ability
,"
/
'-"
'wi
to address transit goals and objectives. Assess cost sensitivity of
adjustments in route connections/ service area alternatives.
·
8. Draft Technical Memorandum 1-4: Alternative Analysis.
Task 1-5: Selection of Preferred Alternative
1.
Identify recorrunended short-term alternatives for service improvements
based on evaluation results. This includes:
·
· Service Type
· Headways
· Verode Types
· General Route Connections
. Estimated Operating Costs.
t
2. Ide~tify appropriate entities to oversee, operate, and maintain any
pot~ntial general public transit services.
3. Review Selected Alternatives with TAC, CAC, and MFO as well as the
general public.
4. Draft Technical Memorandum I-5: Preferred Alternative.
Task 1-6: TDPfIDSP Service Plan Preparation
1. Develop Draft Plan Based on previous work tasks including the following:
· Map indicating areas served, type of service, and estimated
ridership.
· An organization/management chart and description of a financial
plan containing operating expenses, adIIÙIÙstration expenses,
capital expenditures, expected revenue and sources of revenue, and
unfunded improvements.
· Marketing Plan
· A mOIÙtoring program to track performance linked to the IIÙssion,
goals and targets.
· A public transit services TIP (if feasible) identifying unfounded.
capital improvements. This includes a phased implementation
plan and a financial plan for each year, including identifying
potential sources of revenue
·
--
'"
'-'
'...I
· Assess recommendation's consistency with local plans including
Comprehensive Plan, MPO Long Range Plan, The strategic
Regional Polìcy Plan and the Congestion Management System
· Identify strategies for coordination of transit development with
agencies responsible for land development
· Identify strategies for coordination of transit developmçnt with
agencies responsible for land development.
2. Prepare an implementation plan for the Transit Development Plan
identifying activities, responsibilities, and time frames.
3. Review Draft Transit Development Plan with MPO, CAC and T AC.
4. Prepare Final Transit Development Plan/Transportation Disadvantaged
Service Plan
Study Re~uirements and Provisions of Work:
A. Project Schedule.
The schedule for completion of the project will be July 1, 2001. However
the consultant may be under contract for twelve months from the date of
issuance of the Notice to Proceed. Prior to the MPO's issuance of the
Notice to Proceed, the CONSULTANT shall provide a schedule of
calendar deadlines for submittals accompanied by an anticipated payout
curve. A draft TOP, including a draft surrunary, must be submitted to the
lYfPO in June of 2001.
B. Meetings and Preseñtati"ons.
The CONSULTANT shall attend a Notice to Proceed meeting with MPO
representatives, where relevant project information shall be provided by
the lYfPO, along with procedures for administering the contract. The
CONSULTANT and staff shall also be available, with no more than a three
(3) business day notice, to attend meetings or make presentations at the
request of the MPO. Such meetings may be held at any hour between 7:00
a.m. and 12:00 midnight On any day of the week. The CONSULT ANT
--may be called upon to provide maps, press releases, advertisements, .
audiovisual displays and similar material for such meetings. The
CONSULT ANT shall meet with the MPO's Project Manager as often as is
deemed necessary by the MPO. The CONSULT ANT shall also provide
regular briefings to the general public, the MPO and its advisory
committees, and other entities as deemed necessary by the MPO. - The
'.
;#
\..-
~
f~
~;
r~
....
CONSULTANT is expected to prepare graphic displays, handouts, and
any other appropriate presentation aids for all meetings, as deemed
necessary by the MPO.
C. Public Involvement Plan
All public meetings and presentations held or conducted by the
CONSULTANT shall conform to, and be consistent with, the MPO's
current adopted Public Involvement Plan and documented fully in the
final reports. The CONSULTANT shall utilize the MPO's Public
Involvement Plan throughout the course of the project as (l means to
actively involve the general public and all interested persons and entities.
in the development of the final products. Public Involvement Plan should
be developed and approved by the .MFO prior to implementing the plan.
~
O. Quality Control.
TheÍ CONSULT ANT shall be responsible for ensuring that all work
prod.ucts conform to FOOT standards and criteria. Tills shall be
accomplished through an internal quality control process performed by
the CONSULTANT.
Prior to the submittal of the first invoice, the CONSULT ANT shall submit
to the .MFO's Project Manager for approval the proposed method or
process of providing quality control for all work products. The Quality
Control Plan shall identify the products to be reviewed, the personnel
who will perform the reviews, and the method of documentation.
E. Correspondence.
Copies of all written correspondence between the CONSULT ANT and
any party pertaining specifically to tlùs study shall be provided to the
lvIPO for their records within one (1) week of the receipt or mailing of said
correspondence.
'.
4
F. Progress Reporting and Invoicing.
The CONSULTANT shall meet with the MFO, at a mImmum, on a,
montlùy basis and provide written progress reports describing the work
performed on each task. The CONSULTANT shall submit one copy of a
draft invoice package to the MPO's Project Manager for approval prior to
submittal of a final version of each invoice package. The final invoice
package shall consist of five copies of each invoice, progress report,.. and
;'
'-'
'WI
project schedule. All copies of the invoice will be originally signed.
Judgement on whether work of sufficient quality and quantity has been
accomplished will be made by the MPO's Project Manager using a
comparison of reported percent work completed against actual work
accomplished.
G. Submittals.
The CONSULT ANT shall provide copies of the required documents as
listed below. These are the anticipated printing requirements for the
Project. This tabulation shall be used for estimating purposes, and the
Project Manager will determine the actual number of copies required prior
to each submittal.
.
Technical Memoranda (each)
Draft 2001 TDP
Final 2001 TDP
Draft TDP Update
Fimll TOP
5 + 1 unbound copies
5 + 1 unbound copies
10 + 1 unbound copies
5 + 1 unbound copies
10 + 1 unbound copies
All documents, graprucs, charts, and supporting material generated during the
course of tlús project will be furnished to the MFO in electroIÙc format at the
conclusion of the project. Necessary IBM compatible formats are identified
below.
Technical Memoranda and Correspondence Microsoft Word
6.0/7.0
Spreadsheets Microsoft_Excel
6.0/7.0
Graphics as negotiated
Maps/GIS
as negotiated
.
Final Report
Microsoft_Word
6.0/7.0
Where appropriate, the MPO and the CONSULT ANT may agree to utilize
electronic mail for the timely, cost-effective submission of interim work products
and data files. The MPO and the CONSULT ANT will utilize an Internet email
account with binary attachment capability as appropriate to reduce costs and
time for work product submissions and reviews.
The purpose of the technical memoranda is to inform all affected groups of the
project's progress. The technical memoranda shall be the basis of the final report.
,
~
'"
I
!';.
The final report shall document the entire study process. It will discuss
methodologies, findings, recommendations, and official actions as well as
community involvement, public meetings and response, the public involvement
process utilized, and other information. A draft report shall be circulated for
review and approval by all study participants, and comments shall be compiled
and incorporated into the final report by the CONSULT ANT. The final report
shall contain an executive summary outlining how the study was conducted, the
methodologies used, how the final five-year and ten-year alternatives were
chosen, the conclusions reached, and the public involvement process used
throughout the study.
c
.
.
. u.¡:n:U1
t.Y: 111
-O·ðl.J ;:~tj ~lUrs
11....UAU:. IJLl \ t.K
"
~
.t!. I.:: I 'J
---
"--_.
"""'"
29
24
i _. ,
! I
I ' 1
~-¡--
I ¡
1 I
I I
i I
", ----¡--. -. .
: . ; , '
I I ¡ I ¡
'--r-
¡ I I i
: 1--
-,--,.--
. I
I
I
/'.,:\;¡ 0 I 13 I ;:0 , 27
Activity Name
I
~$K '-1: Establ/5h Mís~lon Goal,;¡ and Ob¡8Cbves
~prëpare tor NCJtrce to I-'rocee,Ú~eetln9
, '-PaI'!IClpate iii ¡~once to °roëeed Meeting
~mPile and Re\llew Relevant Plans and Documents
Conduct Telep:,one interviews With Commul'lIty Leaderš
iõèi¡elop Io'ubhc ¡'r.volvement Program
: Draft TecfiOlC3tlllemòiandum 1-1
i rãsi( 1·2: Oatå'Base Compilätion
~iect and AnatŸze [Jara tor Existing CondltlOn$
IRëvlew and Summarize ReJevant'Plans and Oocumen1s
i Identity and-Gëccode Future Developments
Identlf¡ ConcemratJons or I ransit Dependant and Othei
I U$ó;lr Populations
¡-Prepare Map Sér.es f(, TDPfTDSP·.
¡ Oblalnl¡:;-¡$play OnglnS añd-DeShnatlons fò(Sample Mc~tn
I
~üé't a J rend AnalysIs of Hlstoricål p'erto~ance " _
¡ ConduC::: a Peer Re"'1w Analys,s of Io'ubliç TranSIt Services
~ñìifý Ex;sting Public and Pnv~te Transportatro;l ProVIders
; Conduct S,tu?-fior'! Appraisal
! -r~eet W~h MP-O and Convnunity' f ran Sit Staff' -- .I
r Dra!; I echnicãi 'Memorandum 1-2--'
I
, i-'repare Draft 2001 TDÞ~- ..
'-¡:r,:'eop3re ï=inal 2001 TDP: . I
'Give Two Preserita¡¡õns (Joint ìAC/ÇAC end MF'O Boaray-i-
¡ .
!'TaSJ(I.3: Transportation Oem_nod and Needs Eštimatlon
Eshmate Potential D'3rnand for General PUblic r ranslt
Se....~ces.
Conduct Flelc 0b'šervatlons Throughout the County
. R~r\Jit Participants for Discussion Group ana Public
, Workshop
¡Hoit One Öisc~s:;lon Group
: C105e' One Tradjli;¡naÎPubhc Worf(shop
,---¡:¡;ake roree Preser'\tations to Community Group Meetings
: 7repare Draft I e:.:hnocal Me'mor!lndum 1-3
ITa~k ;-4: AlternatJve-Analysis---
I' Develop ~etnõdclogy for Alterr.al/ve Analysis. ,
: RevieW' Methodology With MPO arid CO¡mmuni'ty·Tta.,slt s1äff
i \telephon,:) !
r Asse$S FeaSlb¡Jlty o(/'ÍJew ,",ubhc 'rranslt SeMces. .
f-Sooirrianze ¡.>otentiãrFurding Sources --- :
t-oeve,op Reveriue?rõ]ëct)cns tor !:ach AltematlvQ. i ..
, Identify Short. 1 ",rm Route Connections/ServIce Area
Alt"!matíves
'Kecommend Perrormance Measure Tlïreshclds tor
I Ev<!luation.
~view IhresholdsWith MPO ánd-communrty T~ansl( Sta'N
, (t.?jephone)
,
~ -
~;tL
~
i ~:
-;-
)
,
!
-I
,~
I "
'j
I
I' I
I'
-j
EXHIBIT "B"
I
1 ""__'.
í ~, ';
~ ~ ---..".,....~1.I1
. .......l.----L-_.. .
"
,
I I'
, , I ,. ¡--+--
I I ! 1--:..-. ' .__
r:"I-r. ,. I
I I : -'--¿- -- ---I
I 'T---'-~'~'- ~
,I i'
: -~--1
--L- !
1
- -_. 1- ~._--!
,
May '01
6ï13i20
. ,
--
i 2Tï3mlO
->¡
,
-J J
I
:
Y-7i
i
-j
!
\' ,I
....
m~
Ÿ I ; !
, " .
1-- ,. 1,
, .
..I I
.-;-
,
'.
;
r-
I
,I
I
i
1
!
l-
i
I i
I '
--"--
I
,
¡..-..l--¡
I
. I
I· I
I
-,
j.
:;
Jun 01
-~-----,
~~ ---rs- :;:2 ~
I, I
-1
~ j
I
I
'1
I
'1
I . -'--1 j'
, I
--.-
j ~+--
I
.
I
1
I
i··
,
IT-I
i~' 1
-¡-- I .---¡- !
I
,
~'tn .
'V"',
I
<-.
..'¡
I
:-; 1
,
I
--,
j
--¡- "·-1
"Ii I
i . !
___..L. ......J
.
I
!
'-.
1
I
I
I
1- I
+.
I
\'
1
f
; 1~
:-: -¡
i-- ---.- I
I
.-+---+-
: I
---
_¡._-L.
----··1
-¡----.-
I
I I
--;-- ¡ -
~u
1/
i
,
1
15 ~-~~
j ._;
24
1
à
. (I"':J'U1
U~· 1 ~
'O'UJ ;:~t ~lU~
11.\liAl..t:. UL1'.t:.~_
,
'-'
Activity Name
1;9
Aug '01 I
12 19 '26 I <:
~
ñ"å'sk 1.1: Establuih Mlss¡on Go;Js and Objectives
IPrëpare for Notice to Proceed MeetJr.g
: Partlclp¡;te ín Notice to Proceed Meeting
-Compile and Rell'ew Relevant Plans and DQcu~Eiñts
I Conduct Telëphone IntervIews vVrtlï Community L¡;:ade:s
~" ,
I Develop Public Involvemerll prcgram
Draft íechnlcsl MemorancJum 1~1
: Task 1-2: Datå Bas~ Compilation -,
~èt and Analyze Data foi ExiSting Conditions I
I Review and Summanze Relevant Plans and Documents "j "I" , i'
: IdentJfy and Geocode ruture Developments ¡ - "r--'"- I,
I ' I
[lOeñtífy" Concentrations of Trãnsifuependar:t and Other" ! ' , '
I' User Populatìon~ ! I' '
~ -!
¡- Prepare Map series'to IUPflLJSP, - I ,
I Obtall'1lDisplay 0(19'05 and Owstinàïio·ns lor sample MOnth~-- !' -I '!
I-Conduct a I renc Analysis õ(H,storll:.81 Performance" ~ 'I I ,
; -,_ __ ._1, ,
! t;onduct a Peer ,"{eVIE!¡W AnalysIS or-Public TranS11 ServlCils I ¡'
! JoentifŸ EXiSting Pub"p and Privãte 1 ransportation Providers: I ~J
! -COnduct SituatIon Apprã,sal l,~ ; ~-'-
Meet With MPO and'''CcímmuMy 1 ransit Staff' : ¡ I ,-
l""Draft I echnlçal Memorandum 1-2 '" ¡ , I i
: I-'repare Oråfi 2001 T DP. i I' I
, Prepare Final 2001 fOP.' .. , I . I I .
~Give Two Presentat'onS (Joint IAC/CAG and MPO B08tc!) I !~'
¡ TasK'I-:!: T~",sportation Demand a~d Needs-Estimation :.-.-),_,": w ,~...:...l__
f:::stlmate Potential LJemand for General?ubhc fransit L:,' I
Services, 'i ! I
COnduct ¡-,eld Obs'ervaltons 1 hroughoutthe-c.;ounty- "r I .,-:
II !, I '
KecrUlt Partiéipants lor Ulscusslon Group and Public '
Worksh~p ~ , i..
I-~ost One Discus$lon _Group . j i.: I _
¡Hose One frad,t,:¡nal Puok WorKshop I '. I ¡
I I
I Make Ihn:e Presentations to Community' Group Meetings- -I
I ..
Prepare Draft Technical Memorandum 1·3 I _, '" : I :.... i ,
I~.'~"k 14: Altet:atlve Analysis _ _ I'~_~""~""j=:'="-'-'~~""
, Develop Methodology lor Alternative AnalysIs. : T -; I I I, I I
: Reviéw Methodology VVith'MPO IInd COJmmunityT rans't Staff] I. j 1_,' ;
, ~eJePhOneJ , ~
, ssess FêaSlblil!y of New'Putjl!c I ranslt Ser,¡ces,: ~ -
I' Summa"..e Potent:al FUndlOg Sources': ' ! ì ,!' T
, OevelOp'Rèvenue Proedións fOr I:õlch Altemative, i ,I
~';titi Short- I erm Route 'Connechons/S",rvice Area i .'
j Alternatives, '''' ., ---t-I I I ì
: He<:ommel'd Performance Measur~ Thresholds Gr ,'- 'i '
Evaluatior1. I I I
,
f' Review I hresho"ds VVith MPO and C-ómnUMY franslt Staff i ' ' I
~telepr.one) I~! ó 112 ! 1!;i ; "0 1 2
i
n!.
--- -
~I'¡I.
-----
....¡
Sept '0' , 'fJë'f'~l
9 . 15-123 130 ; 114' 211
! c
--'
I
__I
1-
,
J---r-- I --I
. i
------,. !
I
..:~-~
, , . j
. : I
,
'1
¡'
I
. I
I
j,
"IT
J't
I
. j
!
¡-----¡
_I
i
-L-J
. i
~
--.-¡-
I
;--,----1
! -I
'-'-1
1
~
--Í-~l
.
'''-I
_,I
I
i
i
,
I
1
I
- I
-i
./
.11.... ;.
·1
I. :.
I
,
-l
I
,
,~-
-.!
,
i
L -,-_ - _j
, ;-1--1
I'-r 1
!.
---j
: i
--1
--c
,
,
--i----L
I
---L__
__0.---;
. ; i
~. -----1
!
~
/
;.';"'.+,_.,~
..I , _I
I .,' ,-,--¡
;--1
I I I
, "
--- ----
~
,
~~
,,---
I"
I,
I
,
,
::i It)
1--;-. I
I
1-
: 1
l I
._--.
1
I
23 : 30
" . í'I---;' ¿ 1 .-!
U",,'.:. J' 1)..1.
I)" , ':'IJ
'Q"HJ ~~O ~LU~
/ .
'-'
Ac;tivity Name
815 St3 18 ISSlon oa s an
repare for Notice to Proceed M~lin9
Participate In Notice to ¡.>roceed Mliuiliing-
ompde aria Review Re,,;!vs.ñt Plans end Documents
-Conduct relephone Interviews 'Nitl1 CommuMy Leaders
evelop 'Public involverneñr Progl'!lm
- Draft I ectlnlcaiMemorandum 1-1
ask 1~2:oäta Base COmpilation
o ect õncfÄnåtyze U¡¡¡la tor Existing Gond'tlons
eVI"êw and SummanzEi"Rerevant Plans añël Documents
deritlry and Geocode 'Future Developm'!nts
en I onœñtratlons of Transi'tDepe,dant anQ Öt~ I
User Populations .
repilre Map Senes fo TD~/I U::iI", I
Ôinaln/LJ:splay Ongins and Destmations for ~ampe Mont" I
on uct a Trend AnalySIs of Historical Perfcrmance I
onduet e ¡.>eer"evlew AnalysIs of PublIC TransIt ~érll'œs - 'j
I !
Iden!Jfy EXlsti",g PUblic and Pnvate TranspOr'..ation Providers
Conduct Situation Appraisåf'
eet --,tfi Mi-'U and Comrnuf.íry I ranslt Staff
rjlff Tê(-hn,cal Memorañàum 1-2-
Þrepãre Draft 200' TDf'
Prepare Flnal200ì TOP.
t/ve I wo PresentatlOI1$ (Joint TÄC1CAC and MPd 'Board)
as -: Tr.IfIspOl'tation oemånCl and Needs EStimation
¡imate Io'otentlal ûerriañd tor General PÜblic rranSlt
SeNiœs.
~on uct Field UbservatÎoris ìhrolJghout tM County
eci'Üit Pártrclpants far UISCUSSlon Group and Puolic'
Workshop
Host One DiscUssion Group
ose ne TraaltJonal Puolic iivarli.snop
ake Thri:!e Presentatioñ's-tõ Community G-'-oup Meetings
Prepare Draft Tecl1niåJl ¡""emora~dum-'1:3
'TaSk 1-4: Altematrve ÄI1;¡tJysis .. ----
evelöp lV1elhcdOI?gy for Alternative AnalysjS:--' -
He~le"" Mechodõlogy VVith MPO and COJmmunJty TranSIt Staff,
~~~~ :
'ASSess Feãsibillty ot New f5übric Ti'ãñSìt Serviœs, r
ummanze POlentlal furClmg Sources.
- 'OeŸelop Revenùe ProJeC:10rlS for Eactï Alternative'
enti hort:Term Route Cor,neCl/ons/Service Area
Alternatives,
àcommerd Peffömance Me¡¡¡suré Thresholds for'
Evaluation. I
eVliíw Threshold:;; Wltn MPO and COmmUnity I ransit :Staff i
(telephon~)
'-
ve$
D'ec '01 I 1
2 , 9 116~3~
'r!-:.~
I I I
, I ,
. I
-----'1
I I
-~j
J
-1
.f1
. "--;--; 'r=¡
!n I
.J_-J
l.L'-~j.l..J. ~c.l\
...,¡
~8T4
Nay '01
11 18·1 2,:,
~II,
,I
I
---
I"
- ..--¡-
I '
./I_¡-_I
. .
~ ,
i i i
i !
.,
I
I
-I
-,
I
I
.!
I
!
j
I
,.-,
I
,I-~
! I
, "'I
----¡- "
-I
,
-+----1
~
J
I
-¡
-/
, ,
-!~
_L
-¡-
,
"---.---
-,..--.---
-;-
i--+- I'~
--+- ¡-l
I I
-~
,,~
-...J
.. ,
¡-
L-H-
r
I.
'I
I
I
I
,
I
i
r-' ,
.. i
J
!
I ¡
, , I
--;--r- -:
,¡ ,
~--r
I
j
I
¡
,
, -
!-
! !
I
I' I
,
J
r
~ U~"~J"Ul
IJ~: ;:1
'Q"ð1J ;:¡:b ;:lUb
11'.U:\!.L VL l 't.J\
~I¡j,:'
/' ,
'-'
...".¡
Activity Name
I
1 2~
May '01
. ,
[) 13! 20 I 27 : ,j
Jun'01
10 17 24
1
Jul 01
0;-15
,
I
.' Z2 ~
-==--
¡
¡cmpare ¡In lIa ua ~ ort- erm. eesl e
~âre Drat! [ ecnmcsi Memorandum 1-4".
¡ Give Two PresentatJoris(Jolnt CAClTÄC and MPÖ Board),
: TasK 1-5: Selection of Preferred Alternative
! Recommend Short- rërm Service Improvements.
iAš'sess fransit Govertung and OperatIng OptIons.
¡ RecrUlfPartlctpants for DIscussIOn "GfI;IuP and Pubhç e I
I- Workshop. . .: I "
i Host One·Dlscusslon Group. ~
11106t TradttlonafPubllc wO(j(sr,op. , '
¡ FII,\allze-Recommen'dat,ons for Servrce Improvements. -I ; i--
I '
¡-prëSent' Recommendations at JÖint CAG/I AC and : I
; Mr:>OBoard. I I
i 'Prepare Draft Technical Memorandum 1-5. I I ,I
~1-6: TDPITDSP ServICe Plan Preparåtion I i ~
~are or9anlZatiOnlM~8gement Chart.! I: ~ 1'-,1 :. I. _!
, Prepare ~inanClilI Pia, n. ---:--¡---
I l ' , I
¡--oeveloP Merkeflng Plan. I I I i I
r' Develop Momlonng Program. "I ! : I' i
I : I '
¡Assess COnsiSI.ncy With Other Local Plans ! i I
:- Identify StrategÎes lor COordinating I ranslt and LandlJsë.~·
:='repare Implerr,entatlon Plari. . I
~ddre6$ Remaining ReqUiremeñts of I U~I"". . I -
I Meet VVlth MFO ana Commur.lly ¡ ransit Slatt.
,
; PreparåDraft lUi"rrDS-p and ¡"xecútive Summary. 1,'-
. I
~Present uraft TDPn USI-' to'jomtT AC/CA"C Bnd MI-'U SQard I ,
~are Fln:!!1 ¡UPt1'DSP and t::xecutlve Sum·mary. ¡i '
!Task 1-7; project Management ' -7 L
i~JonttllY Status 'Reports I -- r
. eëkl~ c_onference ~~IIS. ..._
I-'ro)ect Administration and Quality Cor.trol ..
,
1-
I
.L-i
I
"~
-~
,
!-
I.~...L T
I I
.1
·1
I
i I
,-¡-
! :
j
"I
I
,
I
1
Ii. i I
·1 '·'-1
-i'_I ; I.~
, I!
¡ :;'
¡-----;-¡- -I
I·--¡t-¡+'J
+--l--h. .-1
i~.i
I I :. \
1'- I I ._-~
I W~-¡
c_ll+_~-1
:,...: I .1-,
¡ ¡--¡ I " 1
~. t---~--r- ..1
] ! i
I
'1
i
1-
L_-':_._. _..j
_~_L I
i
I "-¡-,
i . \ I
, '~~~-w-' ! '-'--"~ _'u. ~~
... I.' ;+ . .~
-1
!
I Ó 15! 2¿~'1
, !
ö I 1~ : ~U
I <'7
I
.j ! 1U ¡ ¡I
,
24
.
I 29
I
- fJ-I,' 23 '0.11
t.l~: :ll 'Q"H,} 226 2106
'-'
Tll'iDALE OL!iER
/,
¡¡; II ~ 'J
'...I
Aug '01
12 ! 19
26
Sept '01 Oct 'ð"'1-'
2 I 9 -;-'Tô-' 23 -I 30 ì 14 t.1 I
)
,~ ì:' I
I~i
" I,· -','~_I
~-t:- ¡ : ·--1
, _: .,., '.; ~~--I
"r ~~-~~=1
, I " _-j
-: ---j
-/ . I I
I : I
i-'.I--Ll
. I
,,____',_ I
,';- ~
-''''--1 II
I ,_~)
, ~
,~.~
- ¡- --j--i -J
J -I,_L_~_,!
ì :___~
~
I ----I 'I
I , I
-r --¡--=r-î
I: '
L-..-....o..- .._.
Activity Name
I '
29
5
·1
ompare an
ï- Prepare Draft Teœnicii(Memorandum 1-4,
Give Two Presentabons (Joint è~rrAC and MP-O Soard),
¡Task 1-5: S~leciion i:í;-PreælTed Altemative
~ècoinfT1e"d Short-Term Service Improveinent~.
: Assess ¡ ransifGovemmg and Operating Options.
f-Recruit PSlÎlClpants för DiSCUS~õlon Group and PuollC
, Workshcp,
¡Host One DISCUSSion Croup.
" Host ¡ radltJónal Public Workshop.
¡- Finalize Recommendations tor Service Impr:)vements,
IP'resent Recommendatiöns' at J01nt C,;AC,;/I AC 'änd
¡ MPOBoard.
Prepare Oi'atfl'echmC81 Memorandum 1·5,
I task 1-6: TCP7'TDSP Se\'Vlce Plan Preparation
I
:-' Prepare OrganlZa~oNMänagemenl Charf.
~ Prepare Finàncli1 PI~n.:
: Develop t.la¡'j(etng Plan.
i Develop M6nj~ollng Program,
Assess Consistency With Uth!:!'loëãl Plans
Identify Strale\¡i~s for Coordlnallng Trànsit 2Ind Land Use.
Prepare ImplèmèntatJon ¡-'Ian.
Address Remall1lng ReqUirements Of IUSP.'
:-r;reet With MPO and comi'nuOlly Transit Staff.
I Prepare Draft Torn DSt' anëfExecutlve Summary. ' I
¡ . Present Dra" TDPrfOSP to JOint TÂC¡CAC 21M MPU t:!oard '
(prepare Final TDPfTDS? and E:xecutJVe Summary,
i Task 1·7: projë<::t Management"'
I
, Monthly Status Reports
i:eek,Y Conferer:ce Cãlls
, reject A':1mlnl:UratJon anã QU¡'¡¡lty Control
I
¡
I
1
¡o,
:
. . ~ .
I' I
i I
, ,
I
I
"
~-
, I
- j. L i
'-~-'I
I
-~
I I
i.
,
!
, Ii ; -; - ,
I:"""';'¡ _~_-...-...J.
_! , I I
, '.' . ,
I I j i
, , '
!
i
~-I
-ì
:...
~¡
, ,
i
I
I
I
,
'Î
-,
~
i
-I
,
"1
,
i
ì
'100
I
1_.
,,-
,
'J
,
,
I
1-·
'-
'.
,
~l
I"
:
,
-~--;
I
, I
¡ -, I --.
I ¡" . I
~ ". . I
~~"'~:-""'~"~~ , 'l~::-':::"T'-;,
I. 'I ¡ i I . ___I
I
1
..;---r
d
14 . ;':f_J
.~_...¡
I
, 29 I 5 I 12
,
19 , ;¿6
l_
'2 I 9
,
16 : 23 I 3"
I
. û~:~3, 01
'ð'H3 226 2106
T1.~D..u.J:: UL!\J::!<
O~;22
, .
\....
t::..;Hll.
...,
Activ:ty Name
I, Nov '[)1
'28 4 11 18 I Z5 2
Dee '01 I
9 ~ 16 i 2T 30 -I
ort- erm, easl e
reparé Or31'\ r ecnnlcaf Memorandum"l-4
G'ive Two PresentatIons (Jomt CÄ.~7TACañd M'PO Bcara),
-5. Selection of Preferred Alternative
Reçemmend Sr,ort-Term Service Impro~emen-ts.'---
ssess TransIt Governing and Operatiñg Option.';;
'Recrult "'artfcipants for DIscussion Grovp and P!Jblic
WOrkShop.
'-Host OM Discussion Group,
st Tra;:lltlonall-'UOliC Workshop.
I ~:neIlZe-P.ecomrnenCal]oñs-for Service Improvements.
Present RecomrnendatlOns 'afjoont CAUT AC-ã:1d
rv'!POBoard.
rGpare Draft I ed1niciii Memaranduml-5.
as :5; TbplTDSP Ser.íiee Plan Preparation
repare OrganttatlonJManagemenl Chart, ..
-. Prli!parE: F'!lanaal P'!<¡n,
I
[;VeIOP Ma*ellng Plan. . . ..
Dëvelop Monltoring-Progr2n·... .
ASsess ConsIstency Wtth Other Local"Plans
höentIty Stralegles for CöordmatJn9 I ransitãiiã['and Use:
n:::par'e ImplementatJõn·Plan.
ress Remalnmg fo{equlrements at I U~P.
eet I MPO and Commu'lity Tr;¡onslI Staft.
, .. . ._.... ¡ 1
Prepare Dralt TDP«ðsp and c'(ecutille Summary. l ~
reseñfõraft TDPfTCiSP 10 JOint r AC1CÃC ;¡ond Mi-'U 'fõard.; -I
repare Final TOPfTDSP and ExecutIVe summary, 'I' .
åSI':'·7: Project llllãnagetnent '
,
,onttlly Status ~epafíš'- : +
I
ee y C'onference Calls
proJecfAifministÍ'allon and QualítY Cor:trol
!
I n
't)'JfIE.':'1-'-W-'" "
\ - 1
·f
,
,
a.i
,
-¡-~
r- J
I _
i
'I
;
, , I
I :,.~
1--=4-Y
I :--1
;_.r~
--;~ ,¡
---w
~
: I ì
.__I~~
. T'
i ·
--¡¡.!
~I
l.~.' ~'-:,
, I I '
I '. 1 ·
.. I
-ì
þo<_à-
~..-:
, I
, .;
I .
--ï'
~'7
! i
'-I
,
1
!.
I
L I I
, ; i '
. ----L--,_ '
~ ;.
~ 7----r --
. ., --I'
I I I
.--+-----......0.--, '
r'
i
,
,
i
I .,
1281 4
, I
i I:, I
..1+ I ':I--r~--
¡-..-:-
'J : I
! .'+1 :-. ! ¡----
, , I ',.
I" ¡
~.;+!~
¡ .. I I ,? i
,~I
9 15; 23==:m=j
,
,
I ,
. '~¡"'-:'I
I ,_.
I .
11
16
;2
,,5
U~/2J,'1)1
/
(,)
Z
-.0
en 0..
w:!:
t-)-
:$1-
Oz
0::>
000
Cf.Iu
~w
c-
zO
«:J
a:~
wt-
~tJ)
""z
0«
.....
~Q.
~~
CZ
zw
1-==
.Q.
WO
t--J
<w
:ä:>
¡:::W
cf.IC
wI::
Q:;Cf.I
:::>z
0(2
~t-
«
:!1
o
UJ
Z
UJ
Q
a:
:J
CD
¡:
~:
...
.c
....
o
Þ-
'¡
ë
...
'"
ø
6
7i
;;
Q
c:
e
...
c
..
t=
..
III
-
...
'"
ë
Q:
lI~,55
"ö"~lJ ;:;:1) ;:11l1S
~
..,
«
I--
o
....
~; ~! ~I'
~.: :.! ~I
j4.¡..: ;
I
r; ~; ;: ~:
a) "" 1%)' d:
to(J --I O· <'tl
... .... Ni ~I
(,:) (1)1 enl
i
I ~ _I C',
'" ~I ::' ~i
:i: ~. :: 41&1
...¡ "'j I I
I HI f"') <'4,
~¡ :;...·1' ~! ~:
en! H ~ ní
~¡ :;f ~i Wj
I
, ð ,,¡ ql
cði ... _I CD'
~ '" ~, '
~ 1-1 I
0' "I 01
GI u:i: M ':1
; ~i I
..-- I i
... : I
,I ,
_" T~ï:IÎ
~ ~I ·1 ¡
"2 :: 1 I I i
~ -r I ,
'.. 1 _.
I .. 0
~! "'I
I ,
I
::.:
<I)
'"
....
o 01
=1 cØl
"I ~
1 I
1 ,
õi
..
'C
.
Ü
" I
¡: °1
~ &1
I
..
;, ~
~ ei!
Z ~!
,
o
.;,
..,
I
~
ë
..
Q,
..
S
<.>
~
Õ
Ni
""
i.
...,
tJ)
z, ~
21 t
:;:¡ '"
;1 ~
i .5'1
Q 0( õi
:.: ... Q/I
(I 11:1 :EI
~ ii' 'g,
~ 0 B'
eI), 01 ol
I ~¡ ~I
:! 8
i 'g
:1:' :::z:
ell I ~
;:j,
1111
<1:'
...'
",I
"':
,
"
~,
cñl ~j
ël :j
С ...J'
S! ,.j
u'~EI'
8~
_~ i: ~I
õí '"
2' ~¡
-01 IL,
B~ ~I
o ~
è:: 1)
j¡ il
cl 0::1
--, 'E1
!!I ai'
I:f! ~
ô: ,a.!
'21 gi
~I ul
~
--'I
EI
E '"
f!i "0'
gol ~I
c õi
~l ~i
~¡ ~I
~I;:I
~ '5!
-1 (II
.!:!. t- ¡
i:5' C!
æ[ ðl
w ,",
~; :;¡
> êi
c3 a.
III
:::>
U)
'"
<II
«
>-
i;
-¡ ~
t-
~I j ~j
~I ªi
! ,
I ,
,
q
'"
o
<Ø!
~I
¡
T
11 :-UAU:. UU \ toK
~ ~I ìi)1 ~ ~I ~ ~ ~ ~ ~I
to rC u:;; CI ..; "I <01 U 01 eol
áS: g ~, ~I ~I ~ ;: ;: ~ ~I
~. ~'lïILL\n1 V>: V>:t'" , ~:
.. ~ N ~I N .....1 .,.':'.-;: """ ~I
~; MI ;;; ~ ~, : ~ ~ ~ ci'
01 01 <:) ~ a), CO ..... ..... (91 Q
!'11 "'I..... .-, N ('\, N' ;'\.I ,... ,...
W' ~ ~ ~: ~ ~ ~ ~ ~ ~,
I! (
~I ~I :; ;i ~I
! !
c' ql 10,
~j .... ,.;:
I
,
CO'
u-'
.1
I
g, Q Q. Q
=: cO;, 01 0:
N "'.
I
co
,,¡
..
0' O'
...1 ",!
!
¡
1
¡ i
o~ o!
Nj N:
!
1
I
, I
: I
I
I
!
: ' 1
, '
õro+-ölH'
oil N, Ni
.,.1 : '
I '
i
1
! :¡
!
I
T
~
;¡
:;
o
c..
'.
! º'i
"'. ¡::i
. :)¡ -I
",' 11;1 0,
~I =1 :;,
E' 01 I!!:
Ö¡ "01 2!
~ åi ;! Æi
~, -g: !i '$ Ë,,~
-g: (II; ~ '0 ~:
:) "" c I
(.) c' 9~
~I æ: -2 ~ 'IØ,
~I ëi ¿; ¡Ã ~j .ê!
~I ~i a c ê ;¡
....1 .!!I :! ~ a.. ~'
~, ~: ~I =\ ~i ~¡
0: ~! ~ ~ w, .::i
~i E ... ~ ,~: ~Ol
:Ii, ~ g ~I J¡¡ >'
.< fJ:1 <.::J g ~ ~I
~~ ~! ~ 8, ~: ~
j: .~j ë ~ ~ ~:
~, wi ~ ~, ~I €
<,,), 11:, ¡¡: ._~I Cl.r
~i ~I ....:;:1' ,"" ...: '" '"
enl a 0' C' 0 0
011(1 <'oil N!~: Ni N
>-, ,
ocl
Q,
~I
=1
"",
81
::;1
0(1
a:,
0(,
1--1
0('
c~
T"VTTTnTm II........U
<;>'
..
0'
<Z>!
o
'"
o
e
0' 0
NI N1
, ~,
~·Lg
. '--'-0
tO~
- ·-¡-õ
N·
,
'n
S
':¡:
~
....J
~ ~, ~, ;, ~¡
a ;1 a ~ "I
N, C) 'V
~i ~') 0
~: Q ~'
;: ~ ~
...! .... ~'
I
'"
oó
..,
I
::> 0 '"
~; ~! ~
, I
:'r-
C· 0 Q.
o! co .....
""
~I ~1 ~,
~i
Co! , 01 0
.., ~! ~'
~1'4I';
..
...
....
'"
..,
-: ~
I...
...
,.
;g
= ~'i
~ 1"")1
("lotI Ir¡
:- ~!'
... ,
'l ~-I ;-
, CiJ "if"
' ..
I
-L
""I
~I
,
c 0
N '"
..
, i
~~
a:J ...:;'
'" ~
_.,-
,
o
...
'"
¿.
'"
, ' 1
,~--;~ - --
'C=; t;: ~
eD, ... 'V
~ ...
o lo-f--
N; NI
I
, 1
,.. I
1
;
,
I
I
~I
'"
c;¡
o
0-
:::
."
c
..
U'
«,
t:;'
(.,;
-C'
=j
c'
'õ
'3i
0..:1 ð.. ~
Oi c' ¿,
~ ¡-. :Ii
~ol' ~. ~;
0, ~I
o 0, QJ,
Nt N V1,
~' ~' ~:
c! ~ ~I
eJ ~ ~i
~; tt ~
Ê! ~I
0.. Co
~
:-
::-1
'" N,
'~
N,
:í:
z "
o ~
~ 'II
<t '"
::2;1 :
Þ=: g
, "'I =,
w, '
~: ~I
w' Cl.
Z: ID
~I
c
~
',:)
t
tð¡
;;
.."
-;z ~;
~ Q..:
~': '
g ~ ª,
rt: :5 ~'
! ~ "§~ ~¡
.g -; ~ ~!
~ ~ ii ,~I ~¡
~ ~;I ~: 5i
o Q 1~ S¡ ~¡
~ ~ \- ~-
_ >- a.; '2; t;
_ _ 'U' ~,E
Q -; ~: ï;: e Q
'~I ¿ .!il '~I §; ~
.1:'t :¡ 25! ~ 0: ~
ªI os: ¡J; 't:I' ¡:;
< U -I <:: ':1
'C :!. g-I ,2 .. t,
1:', .- 0, ¡....¡
~: i .~; ~ C-I c:
~, Co. Wl ~ ~
~I fQ ~! c,?; -£ Q
g! -g 0, -g ~ ~
'e ~ E¡ "'i ~
81 a ~, iJ'! I!! 1
:'~f-:I '"
~ ~ ~I ~j ~ ~: ('
. I !
C'
;z:
...
c' _
~ .2
15 :;
Q E
z "
o 0
t= ~
~I Ii
I ~! ~I
... ~
cr. -:¡:
>- :...J
'"
~
:..
:-::
æ' ,""".
0(
...
'"
-
,;
. fH'23:111
"
.
o
z
-:'0
""L
W:5
~~
Oz
0:::>
Cf.IO
Cf.I(.)
<w
0-
zO
«::>
..I
D::.
un-
>Cf.I
::ïz
0«
'...J
~Q.
«~
cz
zw
-~
P-:.a.
UJO
t--J
«UJ
~>
-w
~c
uJl-
a::(ñ
::)z
o~
~.-
«
:E
91 N N \('I ..n"':_1
~! ª; ªI:¡: :-:
.....' "":1 '''':1 : "I") I
.",1 "' _I ~ tn'
!
! i
___._I___¡
~ ~ :8¡ ~I
:;¡ :;i¡, S¡'I ~I
<'">1 "'I '" '"
"I ... ...,' ...¡
! :
Q Q Q' .;.
as¡ ~ 0 ..;
-',' ("\ N: C"II
! ¡
!
t I ¡ !
--~; ~¡ ~i : ~ 1:;;1
I , i 1
-.! I ""'j 1 ""
~;: I I i ~I ~ :!:
::'! I 1 I I
""1' <:;;i-J+-LI' Q r.!-J~: ~¡ .. .. co, Q
..,I'" ~ '" ! "'I ·1 N ~ ..;, g¡
:! I i "'¡ -; I
::¡ 1 (! I I
i ! I! ¡ I.~ I
e ~ ~i ;¡ ~! ¡ I ~I
~ ~ á¡' 'I:
·"1
.. 0,
ed: ~:
I N¡
IJ~: 56
'ð'H3 228 2106
'-'
c ¡ ~I
~ ~ ~I ~_I
c I- C(' <r'
a: ~ I- , ...
ii! !
<0'
j :¡
~ ~!
8 :1. ~¡
..
gl
I ~ '" 1:!:
I- ~ ::)0,
I~"'::
r-;-;-:'i¡
Ë .g ~
"' " ...
c[ êj ;;
I/) -;¡;
I ¡; ~
! ¡:
~~
, "
.. ¡¡:
e '"
I- '"
W
I
. I
"2 t!3 :1
õ' ~ cñ
ä: 2: t:'
~ 1
Y ~ fql'
Õ.. e ..
c" ë :,
I
ì
i I·
I' I ~ I.
I ~. I '"I I
51 ~ ;il ' I ~ I
~¡ 8! ~ ' I' 01 -'I
5, ~o-: I ' '"'
:f¡i:. ~ ~ j; ~
~¡ Æ i' 'j¡ j ~E',
all ",I :;)1 ~ .wI BI 4)'
~ ~; -~ ~I ~I ~: ~I
1/), ~..I °1 ~I Q., ª¡ ~I
:;; ~¡ .¡ ~ i-I ~
01 ¡: 3: ~ ~ ~
~I :~; .~ ~I ';! ~¡
¡¡. '"I' °1 ",I II 0'
~oll i ªI ~I ~ c..i~1
~I ,¡ :31':, _
Uj ~. _I Ii oC !
~; ~i ~I ~ ~: ~¡
";1.:1 M '"' "'! "'I
~, '
I œ >0:
;J en ..
I/) ~
L-__I
'" "'I
CO! ~
I "'I
~ Sl
~ '-'1
,
i , i
;:1 ~~__I' ?-~' ~.: ~' ~I ~I ~,
~j ., ~' ~I ~; ~I :: n' ªI','
~I "', ¡;¡¡ ¡¡I .., ..; .. B:: ~
, I
;1 ~I ~ ~ ~. :;: :1 ~ â: :cil ;1
¡ ¡ N; I ~I"': i
qi
""
TI~D.-\.L£ OU\'ER
:1 ~ ~I ~I ::2:
:¡ § ~ :;';1 ~'
~! ;.,. f¡, ~.: :,;
_I 114!
...'
ì :
I.ð T""'I ~~I ...,. M!
~ ~I ;; ~ ;!
* ~! ~ ~:
:n¡ (,().: ~: ....!'
!
: 1
I
~I' 31 ~I
~ ~I ;:
'""~ nl¡ .....,
... ,
I =
:i:
.. '
i
,
-
I
i
-'-r
,
,
,
,
I ~i
, I I'
I 1
: I
'~
I. ~! 0:
_,. Ni
-I
I !
Q' ~
cD, ....;
i
:::1' ~rn'-
I "',
, !
i
,
I
, --- I-
I II II ¡
~' iT I I ~
,gl I I c,
I ¡ c
I'w, I I ..I I ~
~ I i: ~ I
~I ! EI ~I ~I
~ i j,St' ii ~I ~:
i ~: ,! I ~!I il ~! ~: j:
, ,;1 ·u~~"ol¡ '~I I ~ .~: ¥! i ~I
" _""~I j! aol -5' :r
tJ) <, '" '" E ~
! ii ¡! ~: ~J ~:Il,: ~I ~I ~
~ 0: ~ ~ .s ! ~I ;, ~
'" ~ ~II "-I 51 [I ~: ~! ~I ~:
, ~I' c, ~ i: ~il il ~i ~; ;, ~,
~ -~ ;:, ZI 4. '0' "I '"I -"', .!!,
« co .., -' - -' or é 3:, <v,
Z' .5! QI( 01 ~ "-I' Ë C .., .£>1
<' 0' ~j :)o.¡ r:: Co' 't; "'C, ,..
1,&,1' ,,! 0, ::. GIll ::'II CD, Itl 01 ""
>, °'1 -g'" J3' '1$, æl 1';-: 0..: ", '
_ E -= .¡;; c", >, ~I "'I ~I !::
~¡ LV .. :::. 01 c..¡ ~: ç; ~. to;
~i ~I ~. ':i l ~I ~ i¡ ~: ~:
~, J' ,;, ~'I EI ~, ~I, u¡ ''>1 ,Ei
-'I ~Q)' .. ~ æ ~ Q,J, ~ Q,
0(1 0 a:: «' '" c, :;;¡'. 0::; C:. .'J;
... I , , I I I
~ '-1 ...." M' ...,.: In! CD .....1 '" O"',¡' '"
CIJ· ~I 0, C, 1;11 ';I! 0 Q q ~I-
c(! "lit 1 ..;¡ ...! ....1 ~ "if ...... q "'1 ~~ ...r~
~I ¡ I I I '
I I !
~I 0: C .. Q' o~..i
.. N! ...: N: ,.! ....1 NI
I' I I i
t , 1
I !,
i
I-II
0' ~: c:
, . .j
~, "I "I
I '
I
~I
..,
; I-¡
··Ii. 1-
.. ,""
NI r Ñ
!
I
c,
I : ¡ ~Ii
I '
Qj
~¡
,
i
J
"
êIi
0'
, aJ.
, ~'
I ::;:
! "'!
¡;¡
:!' <.:
E, ~:
ill ~¡
~ ~I
~i ~
(ùi '"
.21
~I ~I
,,"'I t:I
- ~',
~i ;,I~
~, ð:,
01 0'
~:
~I ~
~I d)i
e' >
[L' i:3
i: 1101
..",,¡
""I ,..., ~ M
.., 'o:t: co ~I
:;¡I
"'.
- -
., CCio <:)
:-¡ ~I ~I
"':
~~ ~
("" M' t;
è!" ¡g.1 c
;; ;;:1 :;' ;;1
..,0: 0: co... - ""I ~ co t,Q
~ ~ N ~. O"",~I ~,
::f ~; ~' b' g .., :¡;
a t¡¡ ;1 ¡¡, ::¡¡ '"' ~!
!
e¡ 0 i~~~·
;i ~ tC¡ ~¡ ~i ~, ~
, 1 I I
, .
'â¡~~
:-~:l
1 :
11- I !¡~
I ':2: ¡ ,
..t _! I
0' Qr---t;;1 q
;:i "'¡ ~I COI
r
I
o. 01"0-1
c:J~ u:I~ a)
:1
,
, ,I
~~
~I 01 I
: ~!
I ; , , ¡
....- 1----.--__
q¡ I' Q q e:
.~'' g:J' !E'.i, ('&.
I I
~I
¡ "'I
! ;
~I f I
- I
'"
N
I I
I
.....1
"
e.-
Q'
~:
'"
-><1
~I
4
~I
1·i>1: ;;;
llii ~i E
~ ""i C a..: cu
;> !' .- ~ :;:¡.
! ~: ~ ~ ~ !!
1 ~. Q. ~. ð; ,~
...J ;¡ Q.l1 ;:..
<I; 9<,' O~, Õ, ,:;, '~I
~¡ ~I !i :ª! ~ j! ~
~; ~i ,~. ð Æ; J, i,
~I ~ ~ ~: ~! ~j I
µ.: =1 (,.J. ,; !!' ~ ~
o fñ., ~I - C;. ~I i:
I ,,,,,',Ü!!!!:'" õ:
õl:o ~i ~I ''ë! 0 .9 ~!
¡::' e: ,=: ~' ~¡ ~I :t
u, E· ~I ·~i 0, '::1 ª
~' 81 ~~ èJ! Vi' ~I fti
1..:.11 Ga. r.nj Q,I ~\ ö:
cnl_C;;~ « 0::; I, ~
an' I I I
X N M ....i ~
(/f 0 QI c' 0 ð
4( \41 Iii i,(J'" U1 ;r\
...'
..,.
w
~
;;
;_L-_
1)~:5Î
li..\,o.J -'01
'Q'~ l:J :'::':ö ;:11)~
l "'"'AU:. IJLI.!:.~
.fL,oI ..¡
'-"
~
'wi
~ ~' ~: :1' ~ ~: ~~I ~ ~. ~ :; ~
~; c:i to .... ~ ,- ,...' C" N ,.;. -.. ~ 0
~I a! ~ ~: ~' ~I ~i ~ :;' ~ JJ ~. ~!
:!, ..., aøt !hI ~I .... ....1 'I't; ~' ..... ("';1 i.. ('oJ",
_I Ii.........! ........ ""'!
i I
3i ~r~1 ~,
!::.I N' ""'I N
.... ....,. :' c:
~! '4 ....., ~i
I
~! ~
~. '"
~ cg \1"11
U) 01 ~
.(" -' N
Þ- ""'I v.:II'
I
I
.. ..
;s:! ;! ~i
<t.Ii ~ ~,
::~ "91 """I
I I
'"
..,
,-.¡
...
N,
Ò
..
...
Q
w
;or::
IIJ
Q
a::
=>
Q
-'
~
o
~
..¡_.~
cn¡ aJl øl $'1 N r-.. ~, m N \()' 'o:r' '.t')~
.,..' f'-" t""J.i .~, ..... f" Nr~' <»' ~ ~
~I g¡ ~; ~I ~, ~: ;tJ ~; ~ ~i ~, g
; ~I ~i ~ ~I ~! ~' ~I ~, ~i ~ =.
: . I Ii' , 0+: ¡
~I
T' .
, ""
"'.
~i
...
.!
,..,
,
j:::
..
o
(,)
~
ig
II-
0: Q C' Q <;I 10:
fR ~¡ CD ~i ~; ~,
, I, I
I ' ,
I 1 I !
I··· -"1--,, 01' .. ...,.---'
~ J ~I: I 0' q¡ o¡ 0
I o:;p '~~ G:! ~I =1
--r-J 10 ·1'0
CC~ N' =1
~I
I
0' 0
rQ, :2' ~
:Ii
g¡
o
'"
g: ;,J.
:; ~,
o
Z
-:'0
Cl)A.
uJ~
~~
0%
0;:)
Cl)0
(1)(,)
<w
0-
zO
<=>
Q:~
wI-
>cn
::iz
0<
'...J
~a...
<I-
cz
zw
-:¡
...._ c:L.
uJQ
......J
«w
:!>
-w
t)c
wt:
a:::: (I)
;:)z
0£2
~I-
<
~
I<:
'"
«
...
I
S' ;1
i
I
, -'
g ~I
rt: o~
'"
-,
....-
'"
..
...
'i
~
.
u
-æ
!
""
<
0,
..,
.,ø,
..
...'
,
;:1 ~:
~I '
I
'"
",'
en :;
i3 D ;:
j " ~!
. ~ ....;
c .ct"
I
I
! ~¡ (31
""'! ....1 "'I ..,.1' ""I
I ¡ : I :: 'P':
, I I I
¡ i i ! 'I!
.i.-I':~
;j: ;~ ~ ~' ~! ~I ~i ~í :;¡
ii' i I
~I:::-r
, : ~ ! -I ¡~; , ~,
,r J t , I
! I
i.· ; ~T71 ::,.
I, ~
I· ...:
, ,
, '
. '
:;I~.
-I Ø'!.
11'141
, ..
, ~I
0'
",I
I
I
I
I
°1
::::1
.
..;
,""'
,
,
..
ò
= ~ì
e ¡: ~!
;! ø. ::;¡
'l .5 ...,
----
~
ci
£ "I.,: ; i.' -
... ~ ' I
.ñ", ' I
¡ I~: ~
at "If' _¡
! àl
.1
co
:'Ì
<>
.,¡
¡ i
i~
i
Ii
ë'
ir
1
,
I~
"
ü
.t
, !
o c. ¡.. ~I
cz:: CIJ ,0::1 en
, ~.
, ~ ! ~ ~ I
~'~
I ! ,..¡
! I :
i~
'I 1':-
¡
i
!
!
¡ .. ..'_..
0'
~!
,
,
I..._~
0: 10
N; toOl
, ,
o
~i
0,
°1
õ
õ
e :.
Q Mo!
N
'"
!
'e.
! '"
t g!
.."
, ~
'"
o
c..
:;¡
%, 1!
01 ij
i=; :.J
(1,1 0<:
¡¡:, t:::
UI U
"" «
~; u
~i 'õ
~: ...
~I -;
~I A
<IJ' .~
, ¡;
'.."
, <=
11
;:
1 ã
I~
I !
Iii:
1
..I :;
, on
. I
Oz ~I
;;:1
I ¡::<.J~'
"" !ii!
rn
-., <t'
, æ tf
<II
:5 1D'
U :))'
>- II:
=1 8
~' ;¡;:
....1 ;¿
< 1--
~I ;?¡
I:JI ...1
a:: I OJ
::) ~I
o \oj,
J; u'
Z'II:;
< J.I,
~~
."
..'
=>, o.
~! j ~¡ ~
~¡ !!; -gi ;
""0' =¡ CI:: ~;
~I -I ~ § u: $
..~: ~ gs:t; <" m!
§i ~¡::I~'~:~'
~I 0' ~I ~ ~! ð:
Ii ~: 11 ~ ~¡ !! ¡,
811 ~I 31 ¡I ~i ~I ~i
C, "'''' " (J)' tf) '"
~: ~'I a:1 ~¡ ê ~¡ ~:
~I -eæ -~c 0"', g¡: 01- 0,
t! .. ï-, :-Or
_'§¡' -l1 ~ !iE ~' ~ ~
el cz:: ¡;;; 25 Õ ;.¡:
~: ~! ~µ~; ~: ], ~"
EI ~"'C dJl c., rr. -
~ ~ :¥ ~ ~, ~ £:
.- ;1'- ,
0.1
-
J
~I
<31
~i
ti:i
31
,!<!. -gl
v: ~ ...,;
"=, '..J ci
5., ~I I
&:' ~i ~~
~ ~I ~:
:3: gl e:
en U "'0'
;...: >. «"
5! ~' ~~
. ~; ~I¡ ~:
...1 I
~, ö ¡:¡I
<II( t- r"-,
.... I
..
.31
c..
~,
, u
, ç'
I -J.j
I ;; ~
, é' E:
, '", :.1
c::~ ~ ~
~ ä:; ~
~ ~ ~:
~i ~I ~
t'II: 0 c:
~: :¡! c; I
O.J ~' L
~: ~j ~:
ct~ ~~ ~¡ ~I
~ ~; ;;! ¡gi
<.:i: t.è' I.Ø! u;'
¿
2
u
z
e
.."
'"
<::
~
Q
E
"
::;¡
-¡¡;
u
'E
.c
~
...
==
'"
ð
e
'"
a.
'"
~
-:;.
..
g¡
""
5i. ~I!
::: ~ «
I!I .!! ¡¡:
IV iQ ¡¡
gj ~I .~
,tl r¡;. ~
.' ~ c:
, ...., 0' u:
I ê ~I ~
IL.:
I ~i J:
...
'>1:1 _
:11 ~
....'
...
4:
, ~.
,.¡.
<:),
<.
~
<
:Z.
r-
u'
w,
.....
o
1::,
c..
~
'"
;:
'"
;;;,
'"
8i
-'
I
t__
'"
c:..
..;
. U~, 23/U1
II~: 5"
/'
\w-
'O'H3 ~26 ~lU~
o
z
--0
enQ.
W:æ
~~
Oz
O::J
enO
enU
<w
c-
ZO
ct:J
c:~
W~
>en
:JZ
Oct
'..J
~a..
<f-
ez
zw
¡:::æ
-a.
IJJQ
'-..J
<w
~>
-w
t)c
w~
"en
~z
o~
~f-
<
:!
o
w
z
w
c
a:
:I
III
....
0(
r-
o
....
¡:: :.:::
8 ~.
() ....
....
<:
....
o
....
'"
en
C
....
C __::I g!
'ë
:9 ; :!
, õ ~'
'" ~
~ ñi ~!
¡ ¥ ~i
c # :;¡
.! !ll
¡ s:: ....
~; ~.~i
c: c:
~ ë: ~
.... ¡¡¡, ...
... '" ..
I I') w ...
,
::;
..
e
11.
~'~1
.. Iri·
Ii ~I
:;; ....,
'---'
... I
'j 0 N'
Q) ~ IØ
ë ! ::
a.. ë "+1
i
,
fL"V....U:. ULl'.t:.k<
:1::1
U)
~!
I
1
""
"1
;;;
0:0
~
...
.,
'"
c>
'"
, N
<D
N
...
N
:;;
'"
"',
I
C Nt O. 0 0, N
~ «q¡ ~. a. 0 t,Q'
~ œ ~. o! 0 ~
"" ml ." 1ft' tII1> 0"1
~I ~I ã:
I
,
.
..
II.
ëi
~
a
e
e
"
(ð
I
I
I I
, I
~, ~ ~ ~
" '::1 '2!
!! ~I ~
~, j¡ !
.",c :n. .V)
,,'
'I
tZ:
,,-'
E
~
II)
a:
:;)
o
x,
~
~
Ü
>0
;¡
ïi 5
CI) g
~ ...
Õ> "
<0 "
~ ~
õ §:
.... 0
"'.
=,
, ::¡
..
6:
iIi Wi
151' ü
~ !!
\#1 Õ\.
0'
<: zf:
~! E:
!:.. ::II
'!:! rnl
~I ~
\/'t¡ =:II
CI ~i
8' S
"'5;' 0'
<i5L Þ-
_I rJi
. 01
.. '"
(J '"
0'
ïi -,
~,
g "I
.... I
0,
°
S 01
;¡ ~I
;;I
I
¿fo' -0 ,"0'1 0, 0 oio---CC;-
c 0 '-~i ':, ""!! 0 0 c' c c
oØ C"1 o! 10 .... Ó' ... ó' ... ~,
(Ø M col ,.... "'I "'" ~, ..., '"
_ tf) VI" ~ ;'1 ... or, '" ..... ....
... ... .. ....! Ñ
I ! I , I -
I i i
°1 ~I 0, CI 0 0 0 01 01
<", ~! ~: 0 0 0 o. 0'
0: <D' - - .. ", vi
'" -: i - -
! 1 ": ,
! ! I , ¡ ì
I :
, , ,
~: ~I ~!
\c.Î !.n' N
&It! m; ~i
,
,
8' 0 o· 01
q 01 0'
~I g' ~;
~! "'1
I
~. 0,
o· \,,"}
~; ~¡
..'
co
""
...
...
~
3'
~I
..
-=.1
, ..,
I il
1
~: ;1
O'
t=; .. 0;-
.., '" , 61
91:, c: 'S" ,
.' i il
Ir: ~ Q,
~i "I ¡
III' .0, 1 - ..
~. Õ, ..' -;;1 ",. ... :¡;
il '" '""
0' ". .., cr.; ..I ;;; ;"'1
:.:' ~ ;! ~ :!iJ "1 :-'i
I/) "I ~¡ 0, -
..., :J 0' "" ~ ,,,
'" 1;, ... "'I _: ¿....! ~
.... I; -- ~i "" .....1 ~I
ID .31 £1 E, :1 ::l ;0,
~ on' .., .~.I --, ~I ~: !::.
II) E; '"" ¡¡,; Q"
-I 'aJ ~¡ .. III'
C' .: 8. 0 :i5' l: "'.
g: ~, 0: ul ,,' C! ",
...; SJ !eo :to c
:" "I S' -, fl.. ,"'
õ' 0.1 g;1 Q,' '" /r' "'-
c. ~. fl.' t/)! c 6' 0:1:
.:. 0, 0: 0. 0' ..
¡-: '" :i "¡';
~.! ::< ~: 1:::' 1::, S!
ïi 8 -' 251 Ö. Š Q, ~
0' ...
~I " ~I :; õ
'¡: .., ....' >-1 C
~. .., ..I :.., ., ;;:
.s¡. -= .. .ÇI ..
~ ð s;: ð ., -'
::>1 ër "
... "-... ... ~
ID '"
I/)
;;) ~ .
III
.fJtrll)
....,
¡I
'-'
Bev Smith Toyota
AUn: Liz Ivy
3350 South U.S. 1
Ft. Pierce, FL 34982
ItJ)(j{
L/ tf,1þ
() r, !p fJ,J~ ( ~
'r~,Jr1
The St. Lucie County Board of County Cormnissioners, in conjunction with The Solid Waste and )
Recycling Division is proud to present you with the first Commercial Recycling Partnership
Award, 2000-2001. The county is in the second year of an increased effort to improve recycling
in the business sector. Many other businesses have joined the partnership but your company has
shown an outstanding cormnitment to make recycling work throughout your facility.
~~
.J
BOARD OF COUNTY
COMMISSIONERS
PUBLIC WORKS
DEPARTMENT
Dear Liz:
i
I
ì C'
L-....
APR - 5 2001 i !-0j i
° OO~ I
April S, 2001
-) @
---..-.--.----
Acting on an employee's suggestion, you have designed and managed an effective program that
cuts your waste to the landfill in half. Your recycling program accepts cardboard, mixed office
paper, cans, and bottles. By saving these materials from the landfill, they are returned to
manufacturing and used for new goods. Your efforts help reduce air and water pollution and
conserve natural resources for everyone's future.
Your recycling program sets an example for other businesses to follow. As a prominent member
of the bùsiness community you have shown that recycling at work is a success - even at a
workplace as diversified as yours. As other businesses follow your lead, more resources will be
saved. We thank you for your leadership role in St. Lucie County.
Congratulations to everyone at Bev Smith Toyota and thank you for your participation in our
recycling program.
¡VIr. !/-nde¡Jðf/. -
VJe platt -k P(eJ~-f
-fh';s caveu). o..f- ° a:
¡vta(1 {bvvz,m. ~dt'hj,-_
Doug Anderson, County Administrator This (fei/ä . í> VJYt If f:Vt t n;.-_
~~~:~~:;o~~f~~~~~::~~;r ~CAÞtce fð ./k,ee-f a.'<'è.~;\i~f
'0"" OW" '''.d '0 ,~:~:~s::d::~::n~r¡!!¡;r~r;ç~~~$ . ..... rum~ '0'
2300 Virginia Avenue . Ft. Pierce. FL 34982
Public Works: (561) 462-1485 . FAX (561) 462-2362
Division of Engineering: (561) 462-1707 Fax 462-2362 . Division of Road & Bridge: (561) 462-2511 FAX 462-2ð63
Division of Solid Waste: (561) 462-1768 FAX 462-6987
Division of Building & Inspections: (561) 462-1553 Fax 462-1735 · TDD (561) 462-1428
ì¡J'!4J-
Herb Burgart
Recycling !Waste Reduction Manager
cc:
.-
*'
'-"
"""'"
ITEM NO. 2 A
DATE: Mav 8.2001
AGENDA REQUEST
REGULAR: (XX)
PUBLIC HEARING: ( )
CONSENT: ( )
TO: BOARD OF COUNTY COMMISSIONERS
PRiD BY'
Herb Burgart
RecyclinglWaste
SUBMITTED BY (DEPT): Public Works Dept./Solid Waste Division
SUBJECT:
Staff requests the Board of County Commissioners present, along with Herb Burgart, RecyclinglWaste
Reduction Manager, a Certificate of Award to the winner ofthe First Annual St. Lucie County Commercial
Recycling Partnership Award, Bev Smith Toyota.
BACKGROUND:
One year ago, Bev Smith Toyota in cooperation with the county Office of Recycling implemented a
business-wide recycling program. The program has been so successful, Bev Smith Toyota has reduced
their solid waste being delivered to the landfill by 50%, as well as achieving a 50% savings in their overall
waste disposal fees.
FUNDS AVAILABLE:
N/A
PREVIOUS ACTION:
NIA
RECOMMENDATION:
Staff recommends the Board of County Commissioners present, along with Herb Burgart, RecyclinglWaste
Reduction Manager, a Certificate of A ward to the winner ofthe First Annual St. Lucie County Commercial
Recycling Partnership Award, Bev Smith Toyota.
COMMISSION ACTION:
CE:
o APPROVED 0 DENIED
ctOTHER: Award presented
~
sAnderson
County Administrator
Review and Approvals
BI County Attorney: :ry 0 Management and Budget:
181 Originating Dept: (Pub. Wk5.).t~<../18I Other: (Landfill! ~--
o Purchasing:
o Other:
o Finance: Check for copy only, if applicable:
Anyone with a disability requiring accommodations to attend this meeting should contact the St. Lucie County Community
Services Manager at 561-462-1777 or TTD 561-462-1428, at least 48 hours (48) prior to the meeting.
"
......,
PUBLIC WORKS DEPARTMENT
SOLID WASTE DIVISION
MEMORANDUM
',',', ',',',V ,..... '.',',".~ .... . ,........... ...... ..... . . .. .
'....,. . .... ....
" .. ..
···....·····.'...·.'...·.......u..·.·,
TO:
FROM:
Board of County Commissioners
Leo J. Cordeiro, Solid Waste Manage~
DATE:
May 8, 2001
RE:
Commercial Recycling Award
4
The Office of Recycling implemented a commercial recycling awareness program in the first quarter of
2000. Herb Burgart, Recycling Coordinator/Waste Reduction Manager, has been working with several
businesses that have implemented commercial recycling programs. The most successful program was
instituted by Bev Smith Toyota. The program has been verified to have reduced their waste stream and
level of trash service by 50%. The Office of Recycling has developed a commercial recycling partnership
award to be given away annually to the most successful program. Additionally, the program provides
all businesses wishing to be a commercial recycling partner with the County, a Certificate of Partnership
and a window decal to place in their establishment.
.
f
If you have any questions in regards to this program, please call me at extension 1631.
LJC/am
t
/
/
'-"
'-'
AGENDA REOUEST
ITEM NO. .;;" ,~
DATE: May 8, 2001
REGULAR [X]
PUBLIC HEARING [ ]
CONSENT [ ]
TO: BOARD OF COUNTY COMMISSIONERS
PRESENTED BY:
SUBMITTED BY(DEPT): County Attorney
Daniel S. McIntyre
County Attorney
SUBJECT:
Resolution No. 01-94- Proclaiming June 2, 2001 as "YMCA DAY" in St. Lucie County, Florida; and further
congratulating the YMCA of the United States of America on their 150th anniversary; and further congratulating the
YMCA of the Treasure Coast on their 40 years of service in building strong kids, strong families, and strong
communities.
BACKGROUND:
The year 2001 marks the 150th anniversary of the YMCA movement in the United States, and marks the 40 years
of service on the Treasure Coast of the YMCA of the Treasure Coast.
The YMCA is dedicated to building strong kids, strong families, and strong communities; and serves people
of all ages, incomes, and abilities, through a wide variety of programs and services designed to meet changing
community needs.
Mr. John M. Lass, President/CEO of the YMCA of the Treasure Coast, has requested that this Board proclaim
June 2,2001 as YMCA Day in St. Lucie County, Florida. The attached Resolution No. 01-94 has been drafted for
that purpose.
(
FUNDS AVAIL.:
PREVIOUS ACTION:
RECOMMENDATION:
Staffrecommends that the Board adopt the attached Resolution No. 01-94 as drafted.
'-"
""'"
COMMISSION ACTION:
[~APPROVED [] DENIED
[ ] OTHER:
u as Anderson
County Administrator
County Attorney:
Jd'
Review and Approvals
Management & Budget
Purchasing
Originating Dept.
Other:
Other:
Finance: (Check for Copy only. if applicable)___
Eff. 5/96
,
/ ;
'-'
.....,
RESOLUTION NO. 01-94
A RESOLUTION PROCLAIMING JUNE 2, 2001, AS "YMCA
DAY" IN ST. LUCIE COUNTY, FLORIDA; AND FURTHER
CONGRATULATING THE YMCA OF THE UNITED STATES
OF AMERICA ON THEIR 150th ANNIVERSARY; AND
FURTHER CONGRATULATING THE YMCA OF THE
TREASURE COAST ON THEIR 40 YEARS OF SERVICE IN
BUILDING STRONG KIDS, STRONG FAMILIES, AND
STRONG COMMUNITIES
WHEREAS, the Board of County Commissioners of St. Lucie County, Florida, has made
the following determinations:
1. The year 200 I marks the 150th anniversary ofthe YMCA movement in the United States,
and marks the 40 years of service on the Treasure Coast of the YMCA of the Treasure Coast.
2. The YMCA is dedicated to building strong kids, strong families, and strong communities;
and serves people of all ages, incomes, and abilities, through a wide variety of programs and services
designed to meet changing community needs.
3. YMCA of the Treasure Coast lives its mission every day. "To put Christian principals
into practice through programs that build a healthy spirit, mind and body for all".
4. The YMCA movement in the United States serves nearly 18 million members per year
as an organization that is volunteer-founded, volunteer-based and volunteer-led.
5. YMCA of the Treasure Coast programs provide a spirit of adventure that challenges
members to learn new skills, try new activities and explore other cultures while being good citizens
in their community.
6. YMCA of the Treasure Coast provides parents with high-quality, affordable child care;
provides teens with a safe place to go after school, provides families a fun, affordable place to spend
time together; provides seniors with social and wellness programs; and provides healthy programs
,.
I' I
'-'
,.""
and services for everyone in the community.
7. YMCA of the Treasure Coast is part of a national movement that serves 9 million
children per year, is the nation's largest child care provider, currently serves one in ten teens, and
incorporates the values of caring, honesty, respect and responsibility into all of its programs.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners ofS1.
Lucie County, Florida:
I. This Board does hereby proclaim June 2, 2001, as "YMCA DAY" in S1. Lucie County,
Florida; and further congratulates the YMCA of the United States on their 150 year anniversary; and
further, congratulates the YMCA of the Treasure Coast on their 40 years of service in building strong
kids, strong families, and strong communities.
2. This Board urges the citizens of St. Lucie County to participate with their families in the
activities provided by the YMCA of the Treasure Coast.
PASSED AND DULY ADOPTED this 8th day of May, 2001.
ATTEST:
BOARD OF COUNTY COMMISSIONERS
ST. LUCIE COUNTY, FLORIDA
BY:
DEPUTY CLERK
CHAIRMAN
APPROVED AS TO FORM AND
CORRECTNESS:
COUNTY ATTORNEY
fII1
" Apl"'", 03 2001 1: ~"'PM HP LASERJET 3200
\w
p" 1
""""
, 0 ý\
'7 rOG\Ct,l~
QOVì(ì lG\
~ liML schaiuiu
iÐ('jJtçi<6~
nð
SCGt ' ¡5~1Li ~ \{ ¡v\C~ /1
FAX "Drl
from
Y YMCA ofth. Treasure Coa,.
Deborab M. Johnson
Vice Pnmident CommunicatiollS
DATE:
April 3,2001
PAGES: 3
TO:
Diane Turner
FAX: 462-2131
RE: YMCA Proclamation
lJIG-? 5ent- flA1iCuL Pur cAð-lDcv()dd1 UJþ.
YMCA ofttle Treasure Coast
diobnson@vmca-tc£1 rq
1700 SE MOIIICrey R.oad Stuart, Florida 34996
(561) 221·9622 Ext. 238 Fax# (561) 22()-4198
, Apl"'., 03 2001 1: !'~PI1 HP LASERJET 3200
~ '-"
1$9
Corpanlt otI'kt
1700S.E.~ Road
StIw1. FL 34!/96,4109
('61)~86-444~
(561) 286-4643 FIX
(561)22J-91122 QiJiclt_u..
FlDaDdal ÐneloplIHnt 0fIIee
Fo.-in Plaza
10016 S.l'odtnIHi¡hwq¡
Port St Lucie. FL 349!2
(561) 337-7110
(561),)37-1113 Fax
Rkltaftl C. GeIII......, Sr. Bruù
11% S.E. Montony Rod
SNm.FL 1_4109
(561)286-4444
(561) 2$6-46., Fax
J"'p FIua C. Dame BnRdl
9113 So>uIh 21" S_
Ft~~.FL 32950
(S61)<I6S-03~
(S61)4óS-0944 F$K
lBd..atowa Brucb
11311 S,W. 151t S1mt
bxIia2>1o...,. FL 34956
(Slil) $91.3700
Port !It. LacIc Bruch
FOUIItain PI...
10016S, ._.IH'hway
1'ort St Luøío. FL 34952
(561) 33MIla
(56!)'>3?-?!l' Fa
YMCA Gy...-b
2769 S.E. M_ SImt
SIDa1t, fL 34m
($il) 223-!606
.$i1)223·18~1 fa>:.
Wo"otte
www.~fl.CII1I
p.2
....,I
y
YMCA of the Treasure Coast
We build strong kids, strong families, strong commurùùes.
April 4, 2001
Douglas Anderson
Administrator
St. Lucie County
VIA Fax# 462-2131
Dear Adminístrator Anderson,
On behalf of YMCA of the Treasure Coast r am writing to ask that you help UfI mark a
momentous occasion.
This year the YMCA movement is ce1ebratin¡ I SO years of community service in America.
The YMCA of the Treasure Coast is proud to be part of a movement with such an
extraordinary history and is planning celebrations throughout the year to mark both YMCAs'
collecmve histol'y and our own J'MCA., 4' yeMS of Hnlce 011 the TrwIsff1'Ø COtUt.
It would be a tremendous honor for the YMCA of the Treasure Coast if you were to issue a
proclamation recognizing the YMCA of the Tre8$UI'e Coast's and the YMCA movement's
achievements in building strong kids, strong families and strong communities.
. Specifically, we would like to have you issue a formal proo1amation. I have enclosed a fact
sheet that highlights the YMCA oftbe Treasure Coast'. wide nmge of programs and servi.çes,
all designed to serve our community regardless of the ability to pay. Upon review, I think you
wilL understand why r am a dedicated "'Presentative for this organization. Every day we live
our mission and serve people of all ages, moomes and abilities.
I look fOtWard to further discussing this most deserving proc1amation recognizing the
contributions the YMCA of the USA and the YMCA of the Treasure Coast have made to out
local <:ommunìties. I can be reached at «561) 221-9622 Ext 226 (Ø' via emai1 at jlasS@ymca-
tefl.erg.
"ll11.l,,µ/
lohn M. Lass
President/CEO
. YMCA ofthe.TreISUfe Cor4st
V"~i~ To f"" Cfi¡¡.,~ ,..onþJ~ m'. P"'~~¡ :...m. <1m' build h_.f,by '1"';'. """" I'" f~.u.
/
Ap~~ 03 2001 1:~3PM HP LASER JET 3200
'-'
...",1
p.3
Sample Text for Legislative Proclamation
WHEREAS, the year 2001 marks the 150th amiversary of the YMCA movement ín the United Statœ, and marks
the 40 years of service on the Treasure Coast of YMCA of the Treasure Coast; and
WHEREAS, the YMCA baa touched the lives of virtually all Americans, from pioneering camping, public lìbraries,
night schools, group sw.imming lessons and lifesaving, and teaching English as a second language to inventing
basketball and volleyball; and
WHEREAS, the YMCA is dedicated to building strong kids, strong famiHes, strong commwrities; and
WHEREAS, the YMCA serves people of al1 ages, mcom.es and abilities through a wide variety of programs and
services designed to meet changing community needs; and
WHEREAS, YMCA of the Treasure Coast lives its mission every day, "To put Christian principals into practive
'through programs that build a healthy spirit, mind and body for al1. "; and
WHEREAS, the YMCA movement in the United States seJ:V1:S nearly 18 million members per year as m
orgJlniza.tion that is volunteer-founded, volunteer-based and volunteer-led; and
WHEREAS, YMCA of the Treasure Coast programs provide a spirit of adventure that challenges members to learn
new skills, tty new activities and explore other cultures while being good citizens in their community; and
WHEREAS, YMCA of the Treasure Coast"provides parents with rogh-quality, affordable child care; provides teens
with a sage place to go after school' provides families a fun, affordable place to spend time together; provides
seniors with social and wel1ness programs; and provìdes healthy programs and servic~ for cvayone in the
community and
WHEREAS, YMCA of the Treasure Coast is part of a national movement that 5erve8 9 million children per year,
that is the nation's largest child care provider, that cmrently serves one in 10 teens, and that incorporates the values
of caring, honesty, respect and responsibility into all of its programs; and
WHEREAS, the YMCA movement bas a Jong history of partnerships with other community organizations, such as
schools, hospitals, police depart1ncDts and locally with the Martin County Sheriff's Office, The Stuart News, BJ's
Wholesale, BeUSoutb, Publix Supermarkets and so many more; and
WHEREAS, the 150th annìversuy of tbe YMCA movement and the 40 years of service to the Treasure Coast as
YMCA of the Treasure Coast celebraœs the distinguished history of the organization and benefits that the people of
Martin, St. Lucie and Indion River Counties have enjoyed all a result of'lhe proud tradition oftbis organization;
now,
THEREFORE, be it resolved
¡.Dianei:~rne~ ~RE~Proclar 'on
""
From:
To:
Date:
Subject:
"Deborah Johnson" <djohnson@ymca-tcfl.org>
<TurnerD@stlucieco.gov>
4/9/01 9:32AM
RE: Proclamation
Diane,
John forwarded your message to me regarding the proclamation. Here are
answers to your questions.
1. We would like to commemorate Saturday June 2, 2001. Our national office
if seeking a national proclamation from Congress to declare that day YMCA
Day.;&his day will also feature a celebration of the YMCA history.
2. - <!.~ay 8, 2001 on the agenda. John Lass,President/CEO and or
Deborah Johnson, VP of Communications to attend.
Should you have any further questions, please feel free to contact me.
Deborah M. Johnson
VP of Communications
YMCA of the Treasure Coast
(561) 221-9622 Ext 238
djohnson@ymca-tcfl.org
-----Original Message-----
From: John Lass
Sent: Friday, April 06, 2001 1 :59 PM
To: Deborah Johnson
Subject: FW: Proclamation
-----Original Message-----
From: Diane Turner [mailto:TurnerD@stlucieco.gov]
Sent: Friday, April 06, 2001 1 :07 PM
To: jlass@ymca-tcfl.org
Subject: Proclamation
.. Low Priority··
Mr. Lass,
Mr. Anderson has received your request for a proclamation to celebrate
your 150 years. I need to know what day, week or month you wish to
proclaim. Also, I need to know what Board meeting agenda to put it on. We
meet the 1 st and 3rd Tuesdays at 7:00 PM and the 2nd and 4th Tuesdays at
9:00AM. I will need to know the name of the person that will be present to
accept the Proclamation. You can reply via email, or by phone.
561/462-1156.
Thank you,
Diane Turner
Assistant to the County
Administrator
....,
Page 1 ¡
I"-""·"''T:
¡-Diane Turner -RE:. Proclar 'ion
~c.c
..",;
Page 2J
cc:
"John Lass" <lassj@YMCA.YMCAofTC.com>
~
....J
AGENDA REOUEST
ITEM NO. ..Æ...4.
DATE: May 8, 2001
REGULAR IX]
PUBLIC HEARING I ]
CONSENT I ]
TO: BOARD OF COUNTY COMMISSIONERS
PRESENTED BY:
SUBMITTED BY(DEPT): County Attorney
Daniel S. McIntyre
County Attorney
SUBJECT:
4
Resolution No. Ol-µOO - Proclaiming the month of May, 2001, as "CIVILITY MONTH" in St. Lucie County,
Florida. /
~
BACKGROUND:
4
The open exchange of public discourse is essential to the democratic system of government; and, as a cornerstone
of democracy, Americans have observed certain rules of behavior generally known as civility.
~
Alexandra M. MacLennan, Chair for the City, County and Local Government Law Section of The Florida Bar
has requested that this Board proclaim the month of Mayas Civility Month in St. Lucie County, Florida. The
attached Resolution No. 0 I-I 00 has been drafted for that purpose.
FUNDS A V AIL.:
.
PREVIOUS ACTION:
f
RECOMMENDATION:
Staff recommends that the Board adopt the attached Resolution No. 01-100 as drafted.
COMMISSION ACTION:
I ~ APPROVED [] DENIED
[ ] OTHER:
County Atto~ney:
O~iginating Dept.
'-'
Review and Approvals
G
, I
y--<
Management & Budget
Othe~:
Finance: (Check fo~ Copy only, if applicable)___
....-
Purchasing
Othe~:
Eff. 5/96
.
~
~
.
4
,
'-"'
...,¡
RESOLUTION NO. 01-100
A RESOLUTION PROCLAIMING THE
MONTH OF MAY, 2001, AS "CIVILITY
MONTH" IN ST. LUCIE COUNTY, FLORIDA
WHEREAS, the Board of County Commissioners of St. Lucie County, Florida, has made
the following determinations:
1. The open exchange of public discourse is essential to the democratic system of
government; and, as a cornerstone of democracy, Americans have observed certain rules of behavior
·
generally knOwD. as civility.
·
2. Civpity, derived from the Latin words "civitas" meaning city and "civis" meaning citizen,
is behavior worthy of citizens living in a community or in common with others.
·
3. Displays of anger, rudeness, ridicule, impatience, and a lack of respect and personal
t
attacks detract from the open exchange of ideas, prevent fair discussion of the issues, and can
discourage individuals from participation in government.
4. Civility can assist in reaching consensus on diverse issues and allow for mutually
respectful ongoing relationships; and can uplift our daily life and make it more pleasant to live in
t
an organized society.
·
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners ofSt.
Lucie County, Florida:
1. This Board does hereby proclaim the month of May, 2001, as "CIVILITY MONTH"
in St. Lucie County, Florida.
2. This Board urges the citizens ofSt. Lucie County to exercise civility toward each other,
not only during Civility Month but each day of the year.
..
'--' ....,tI
CITY ~OUNN AND LOCAL GOVERNMENT LAW SECTION
.,.>[\$.I'iIt,
,,'IP" &\.~
.~~
. .
~"f; .vi
"~ð'~.Oft\"#'''
-
www.loc-gov-Iaw.org
CHAIR:
Sandy MacLennan
225 Water Street, Ste. 2100
Jacksonville, FL 32202-5154
(904) 366-2462
amaclennan@ssd.com
CHAIR-ELECT:
Susan H. Churuti
315 Court Street
Clearwater, FL33756-5165
(727) 464-3354
schuruti@co.pinellas.tl.us
SECRETARYITREASURER:
Thomas Pelham
909 E. Park Ave.
Tallahassee, Fl32301-2646
(850)222-5984
tgpelham@aol.com
IMMEDIATE PAST CHAIR:
Mark P. Barnebey
Bradenton, FL 34205-7841
(941 )744-9691
SOARD LIAISON:
Louis Kwall, Clearwater
(727)441-4947
EXECUTIVE COUNCIL:
Terms Expiring 2001:
DIstricl1
Cari L Roth
Tallahassee
(850)488-0410
District 2
Kenneth W. Buchman
Plant City
(813) 752-3172
Terms Expiring 2002:
District 3
Craig H. Cotler
Miami
(305) 375-5t51
District 5
Kaye Collie
Orlando
(407) 836-5695
Terms Expiring 2003:
District 4
Eugene Steinfeld
Margate
(954) 972-6630
Terms Expiring 2001
At-Large Members:
Emeline C. Acton
Tampa
(613) 272-5670
Protessor James J. Brown
St. Petersburg
(727) 562-7855
Liz Hernandez
Coral Gables
(305)460·5218
Lawrence A. Levy
Miami Beach
(305) 673-7470
Susan L Trevarthen
Ft. Lauderdale
(954)763-4242
Maureen S. Sikora
Bradenton
(941)745-3750
Ex-Officio Members:
All Past Chairs
SECTION ADMINISTRATOR:
Carol Kirkland
The Florida Bar
ckirkland@flabar.org
~~
April 23, 2001
The Honorable Frances Hutchinson, Commissioner
St. Lucie County
2300 Virginia Avenue, Room 304
Fort Pierce, FL 34982-5652
Re: Proclamation and Pledge of Civility in the Month of May
Dear Commissioner Hutchinson:
Last year we successfully commenced our annual campaign to ask all cities and
counties in the State of Florida to proclaim Mayas Civility Month. This year we
have expanded our program to include Florida's district school boards.
We hope that the pledge of civility will uplift the tone and conduct in your
meetings. Civility uplifts our common life, and invites citizens to participate in
their school district. The art of civility requires constant application everyday.
For this reason, the members of the City, County, and Local Government Law
Section of The Florida Bar ask you to renew the pledge of public conduct, and ask
that your local government once again proclaim the month of Mayas Civility
Month. A sample proclamation is enclosed for your use. We urge all citizens to
exercise civility toward each other throughout the year.
Thank you for your attention to this important matter.
Sincerely, .
('JJNrl/McAAIJ. ~
Alexandra M. MacLennan
Chair
Enclosure
AMM:CK:kcT2.wpd
:=brcdfìOXì ~ u Son
34-0-ll~\
THE FLORIDA BAR/650 APALACHEE PARKWAYfTALLAHASSEE, FLORIDA 32399-2300/ (850) 561-5631/FAX: (850)561-5825
'ì [D.iane Turner- Sherri 3407~ 1
'-'
From:
To:
Date:
Caller:
Company:
Phone:
Angela Huff
Diane Turner
5/1/01 8:46AM
Sherri
Johnathon Ferguson's office
3407781
[] Telephoned
[] Will call again
[ ] Wants to see you
[ ] Urgent
Will accept civility month proclamation on May 8th.
'-'
[ ] Please call
[] Returned your call
[] Came to see you
Page~
'-"
'wi
AGENDA REOUEST
ITEM NO. ¿; b
DATE: May 8, 2001
REGULAR [X]
PUBLIC HEARING [ ]
CONSENT [ ]
TO: BOARD OF COUNTY COMMISSIONERS
PRESENTED BY:
SUBMITTED BY(DEPT): County Attorney
Daniel S. McIntyre
County Attorney
SUBÆCT:
,
H
Resolution No. CÜ-I01 - Proclaiming the week of May 6, 2001, through May 12,2001, as "DRINKING
WATER WEEK" in St. Lucie County, Florida.
BACKGROUND:
The American Water Works Association (A WW A) has designated May 6 - 12, 2001, as National Drinking Water
Week to educate consumers about the need for safe drinking water and water conservation and the ways in which
they can help save the state's precious water resources. The St. Lucie County Utilities Director has requested that
this Board proclaim the week of May 6, 2001, through May 12,2001, as Drinking Water Week in S1. Lucie County.
The attached Resolution No. 01-101 has been drafted for that purpose.
FUNDS AVAIL.:
PREVIOUS ACTION:
RECOMMEND A TION:
Staff recommends that the Board adopt the attached Resolution No. 01-101 as drafted.
~] APPROVED [] DENIED
[ ] OTHER:
D as Anderson
ounty Administrator
COMMISSION ACTION:
,
County Attorney:
Originating Dept.
.......,
r
L(¡
/-'''-
Review and Approvals
Management & Budget
Other:
Finance: {Check for Copy only. if applicablel___
,
'I
!;
~' ;;
Purchasing
Other:
.....J
Eft. 5/96
,
\..-
.~
AGENDA REOUEST
ITEM NO.
Lo
DATE: May 8, 2001
REGULAR [X]
PUBLIC HEARING [ ]
CONSENT [ ]
TO: Board of County Commissioners
PRESENTED BY:
SUBMITTED BY(DEPT):
Katherine Mackenzie-Smith
Assistant County Attorney
SUBJECT: Resolution No. 01-87 - Requesting the State of Florida Enforce the Usury Law and Other
Consumer Protections Against Payday Lenders
BACKGROUND: See attached memorandum
FUNDS AVAILABLE:
RECOMMENDATION: Staff recommends that the Board adopt the attached Resolution No. 01-87 as drafted.
[ ] APPROVED [] DENIED
~] OTHER: Pulled prior to meeting.
COMMISSION ACTION:
County Attorney:
/\
l/'\
k-J"" -
Review and Approvals
Management & Budget:
Purchasing:
Originating Dept.
Sheriff:
Other:
Finance:
"
" ~
'-'"
..."
RESOLUTION NO. 01-101
A RESOLUTION PROCLAIMING THE WEEK
OF MAY 6, 2001, THROUGH MAY 12, 2001, AS
"DRINKING WATER WEEK" IN ST. LUCIE
COUNTY, FLORIDA
WHEREAS, the Board of County Commissioners of St. Lucie County, Florida, has made
the following detenninations:
1. The American Water Works Association (A WW A) is an international nonprofit scientific
and educational society dedicated to the improvement of drinking water quality and supply.
Founded in 1881, A WW A is the largest organization of water supply professionals in the world.
¡~
2. With more than 50,000 members representing the full spectrum of the drinking water
community, the A WW A is dedicated to the promotion of public health and welfare in the provision
of drinking water of unquestionable quality and sufficient quantity.
3. The Association consistently promotes water conservation by establishing educational
networks, supporting research for water use efficiency, developing water conservation and quality
guidelines, and disseminating water conservation infonnation.
4. The American Water Works Association has identified an additional opportunity to raise
conservation awareness and has designated May 6-12, 2001, as National Drinking Water Week, to
educate consumers about the need for safe drinking water and water conservation and the ways in
which they can help save the state's precious water resources.
5. In order to promote water conservation, the A WW A has created programs and initiated
campaigns to be utilized by its members to educate the public on the issues of water conservation
such as the "Blue Thumb" campaign and the "Water Works Wonders" current campaigns.
6. To save water, many segments of agriculture and industry have converted to water
,
" I
\.or
'WIll
conserving systems for irrigation; and every business, industry and homeowner can make a
difference when it comes to conserving water, a natural resource that is vital to everyone.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners ofSt.
Lucie County, Florida:
1. This Board does hereby proclaim the week of May 6, 2001, through May 12, 2001, as
"DRINKING WATER WEEK" in St. Lucie County, Florida.
2. This Board urges the citizens of St. Lucie County to become more aware of the need to
save our preciol7s water supply and to take appropriate measures to conserve and protect this vital
natural resource.
"
H
PASSED AND DULY ADOPTED this 8th day of May, 2001.
ATTEST:
BOARD OF COUNTY COMMISSIONERS
ST. LUCIE COUNTY, FLORIDA
BY:
DEPUTY CLERK
CHAIRMAN
APPROVED AS TO FORM AND
CORRECTNESS:
COUNTY ATTORNEY
".
'-'
...." i}êfl\' j t
y
MEMORANDUM
PUBLIC WORKS DEPARTMENT
TO:
Board of County Commissioners
Ray Wazny, Public Works Director jL
FROM:
SUBJECT: Scoping Document/Marine Protected Areas
DATE:
May 3, 2001
******************************************************************
Attached is the Scoping Document which was passed out at a public meeting held on
May 2,2001. Staff will agenda this item for discussion at the Commission meeting
on May 8, 2001.
RLW/sm
cc: Douglas Anderson, St. Lucie County Administrator
Robert Bradshaw, Assistant County Administrator
Diana Waite, Planner III-Environmental
Mike Bowers, Road & Bridge Manager
Anna Smith, Eco-Systems Manager
Sandra Bogan, Superintendent of Children Leaning Center
'"
'-"
. "d 0 ~ aJ ~.. tn i./) OJ ~ ~ 6.D ~ t:: ait--..~ to
- _~~~ ._oocc< ~oo ~o;~-o
'" ::0, 0..... IOD ~ '" 0 ~ . ~..... '" . p.¡:Q 0 '" ~ '<i' ....
~ 00000 Q)-E'~ ~= ~~ ~Q_~O
~ U ...-. ... .0 0 ~ aJ ~ en ~ Õ Q) IV U ("I
'^>.:>u· ~~-SQ)..J-.¡ a:I~,...,...c::o;..;b.fJ U-:;;
M ~¿ ~ ~-v¿ ~aJooQ)~-~~oro 00
~ ~~<r.:~ =~~~g~""""u"'~ .....~~ØNIOD
:g .~~ ~.J=:C1) ~~ro'"C1gf°~~cØca -~ctŠ
aJ <aJ<¿ ~~~§Ica~~~~~~.~~~§~~
~ ~~~o ~o~...c::ooQ)~tn oo~oo"d ~~~c
~ ..... .,. to .¡:: ~ .... E-< ~.D - ~ "'.~ ~ ~ >.::0 ~ r--- r."
rn ~ ~ . Q) 0 0 ctS _ b.O r:::lrto-l t:; Q) :> ~'o...... ~
S-4 _ QD c]) '"d Q)'- tt-t . U]...... ~ bD cd...... d.n·- Q) en s... ___ U
Q) ~CQ)~Q)d~~~O'-'-~~cdQ ~ roMd
~ o·-...c::~~QS=~~~~oo~~o B~~~~~
~~o~""'..c::~",~0.....81~ IOD"'U>'~_~uOO",
'" "'.S"d..... U p..... ~ ~..... p. e 0 ~ 0 ~ '" ~ r>.. 0 _ ~ '"
~~ 0 Q)~~~Q) - ~,~uQ)EQ) ~oo
>.. ..-1 Q) c:::: s.... bIJ ~ ~ ...... Q) ro () ::s fIJ ...... ... U ...-"' 0 ...... ......
~~~""d gf'-U"a r:::lr~ §-5 ~-S-g -~'E -cIJ ~·.PT)M"C"C f
:;;:¡ gp~ ê·¡:: o:J ::g 2 ::: ¡¡¡ e ';:j ß ;;:: ~ ~ .¡:: S:: ëa,g § § B ~ ~ . .
ao-~v~r>..~= volOD £~o "''''=o~"''' .
o '" v V '" <r.: .~ ~ IOD.D ~ ~ ¡;' 0 ::g <r.: u ø ~ e
~~ .De~ø ~"'''''''- '" - p.
'P4
ell
E
o
.::
........ C\S I I 4.) "Ó ~ "0 C I t :::;¡....(/) Q) ~ cv s::
c]) Q) $-t s:: Ho ~ S::-Q.) b c: IV =-;5 ç;j "-£ ro ;::s Q)
s:: ...c:: a:I ...... 0 ...... (Ij..c: 0o··-:::s.....,.. >.S "'""
o~ ~=..c:~NU~ ....., "O.~o~~o~.S
~~. t:õ:::so......()Q)ro$-tb.O Q)O_--OO-C
.5~ oo8~5'~~BQ)~ =~~~i.!8:::s
u_ 0 "d"''''~''p... 0"''' ."'.~__
......-- .....Q) ¡;:;¡:¡¡-cuA...... --Q.¡VJv....._-
~~ ~Sc~~~~OO -- ~~~ooV
~ ~~~~N ~C ~Q)~·-~·D~~
~ ::0 oo~>.~o"'o o..",e~~ -
(l) 0 c:: Cj.S >o..c (.) c ...... 0 It)..c: ~..c:: 0."'0 ~
cu c:: '-.c '"' ._ C4-4 . 0 t ..... +-' rJ) () "'C
.D:;.. +-' b() UJ b.O~.~ CI'J 0 (I) r.n ....... C1) s.... bD 0 S-t.~ c::
~~ dc·_~·_~~ ~~ ~Q)c~Q)~~
"....... 0._ ~ ~ e ctI (/) 0 0 Of) >._ C 04'-
~~ urJ)8~t.......~"'CQ)~c~o~o~..c:.....
..c::", 00 '<i'~>.~p."'-~u"'e08~
IV C~=~!r>..o~"'~~~e~"'~p.::o
v.5 ~Q)o~~~~cS-t~o~ ~~~~~
J..4-:: tlD..c=~...-i"1;j08~Q)&O ..BcuCf.Q)(ljo
"'>.~~.....BSB..c::.......c::~..~~"'~~~~v
v0<r.:<r.:........ "'~'" 0- =~:>u"'"d.D
~"'~ ~~oo~~~~..~ ~~~~~~O
..c::"'" :>v~IODg~..c::IOD~ e~......D"'-.....
~ O~ 0 ~._._ .....
~
!rL1
! ....
1~
U) .=
I G.) e
I! lJ
=..-
cE
... .-
.:
=. CÞ -~
=.~=.V'
::1.- ='-1
. C -= ftI ~t
... U) = ¡!
U c¡:: U) gl
L:··
IIIIÎIIí
Q)
=.
::I
¡
,.",
,
!
f
!
I
!
¡
UJ Q) -0
'-:' UJ ~ (/) c
Q)~()coCO
:S'-ã:..c:~
.J:: Et-o.!;;
"C::g~~:5-:i5
.:B0ME.c1¡::
~~rno~Eq-
o=§~Q)o(J)
-E....t)m~m
"':U1"Cco ro,QM
:E''t''iC8C:oQ)
e:::>.CD+-'O.....g
ãi Q) UJ >'".-
m....."C CD co()(/)
.5m·~ Q.)Q (1)'0.0
s.§ (I)~ 0.2.::
UXQ)+-"+-'°o
o e= uo.c Cs=.
~~E.§~~g
.....ctSq-mc.DCO
1
.
~ee1
~ E .5 ~ ~ ~. ~
o .- cu..c: --
.c: ~t:"'~"d~
(.) Q) ",ctI;jo
~ ~_O"d bOO ~
ctI ctI... (Ij u......
>. e~8·5 ;:I
..0 O~.D ~:._~
~ ~ >.>.'" "'-. E
bD cnro~Q.¡a::sV) ~
'" ~"d~",p.~1-
e 0"':> ~.....
'" s.; p.~ ~ ~ ~ ;:;E
""0 ctI VoIf:-4 S-t.~ CfJ
"'~ "d"'.D~'"
~ IOD U .... ..... '" .... "d
¡::"::g;;¡"'..c::"d~
~~~s:::'5C1)~~
c:: ....... ~ 0 en ~ '..-.1 "C
ctI 0 CI) ~ cc ~ ë "ü)
~"d v~"'v~
g¡¡¡ ~~e:s8
N
III
~
()
Ii:
.s
OO'b[ 1~..s:::""'CfJ Q.).....Q)Q)~O..c:: ......-.¡s::co........ca $..t I I I I I I I I Q.)
"B¡o"'ß~ uß~"""'°t: ~S~~B "'Siœ~~!~~ee i:S~..c::
~.c:~>.ga'" ¡¡¡e~!E~o ~~g~~ ~.D~OEP.6~P.8B ~;;¡o"'"
!g~¡¡¡oo~~ i~~!~~Z ]t=~~ ~:~&~z~g.....o..oS :~]~
< õ ¡;:' C4-r i0oiii........ .~ VJ - s:::::: ~ - Q.) _ 0 C) t) èd ca $..t )0,,. Q) en - ..c: ~ co en
i'~~~S .~~~~ooc (fJ~ _cac~~~~~~$..tø~ ........·Gen~
ct-t ..c s:: Q) - Q) Q) ..., en 0 co c.~ 1;fJ..c o:::s ..~ ~ Q) c: 0 bO'~ ~ u
I:Bi"'¡¡ ~~~"d~~~ ~8:~';:j ",m~~i~Be~~e B~~¡
Pa:J ~ t t; ~ :> ...., CJ)"O c: 1û ~ T"1 .~ r.-r 0 ¡;;;;¡ ~ .. '; 0 en ~ C..d Q) .~;; CIS fá 00"' ~ C'\S
u=~-~~o &Q)!~~o<~ O~O ~'~""""'~~~S'~~~~o~VJQ)u_
¡:¡::; ¡:: g rx.. ~ ~ ~ ~ ~ ... s:: 18 S::'fÆU!'. :¡ S? "'";.::: ~ '" ~ ~ ~ 0 ~ ..<:! ,:' :> ~ .. 0 ,j B ~
fi..... ..... '" - p. ~ - "'.- ¡:Q"d as ~ - ".6'0 0 ~ ~ ~ P. ::0 =.c: ""..... ~ _ '" .., ~ 0 ~
.~~~~~~ca ·~§s~~c~s Jas~~o~~g8og~~o.~~§~~Q)
~!S"'~£'" ",s~u~o¡:¡::;o<u~v~uu;:;E~~~~"'~~gtB~""dS
-~ .- ~ ~CfJ ~oo ~Q.)r~_ ~1ooIII..d~~~_~~S::::::'-V_C
E-<"''''v~ ~vQ)~ "'~~ Ss::..~=~"d~ ...~o"'~"o""~"dp.::oo
ø:: ~ .... ~ 8.~:::: . bD Ets ~ a:I;a ....,.e CJ)' ca..c:: cd' $..t ~ ~ <1) "0 >....0 "'0 ~ - M ~ ~ S 8.~
~~i!p.§g~~~S5J~!E...u~ie:~~~8~~.D~j~~go~:~~t
~",,,,~~;:Io- O~~¡::~ ... ~"d~o"'"d p.",..¡S"'~""~~.c:-~~~~
~~s::::::~-........o ~~~.- ~CO ~ AMQ)~~CfJQ.)Q.)~~VJ ~
e '" ~'(ñ <r.: U e B ~ t-< "0 ~ Z :I: '" '" J:: r::: oj ~ B p. V 0 ~"O ~ '" p.~ "" ~
.c
!
;"
\..-
'-tÌ
MAGNUSON-STEVENSACT~PA
SCOPING DOCUMENT: USING MARINE
PROTECTED AREAS IN THE SOUTH
ATLANTIC
Spring 2001
.
South Aùantic Fishery Management Council
1 Southpark Circle, Suite 306
Charleston, South Carolina 29407-4699
(843) 571-4366
(843) 769-4520 (FAX)
Email: safmc@noaa.&ov
Website: www.safmc.noaa.gov
/.
.'
A publication of the South Atlantic Fishery Management Council pursuant to
National Oceanic and Atmospheric Administration A ward Number NA 17FCl 053
,.
'-'
Marine Protected Are~cOping Document
Scoping meetings are less formal than public hearings and occur prior to the
Council taking any position on a management issue. When the Council is
considering the need for management, scoping meetings provide an opportunity for
members of the public to make suggestions BEFORE the Council has made any
decisions.
The purpose of this document is to request that the public provide additional and specific
input on possible areas that the Council should examine in their consideration of marine
protected areas (nearshore and/or offshore, natural and man-made), emphasizing the
habitat and the species associated with the snapper grouper complex as an additional,
necessary management tool.
.
What are Marine Protected Areas?
The Council will now be using the term MARINE PROTECTED AREAS in
place of the term marine reserves. This change is necessary in order to be more consistent
with pending Federal guidelines.
Marine protected areas, as defined in Presidential Executive Order 13158, means
any area of the marine environment that has been reserved by federal, state, territorial,
tribal, or local laws or regulations to provide lasting protection for part or all of the
natural and cultural resources therein.
The Council further defines marine protected areas within its jurisdiction as a
network of specific areas of marine environments reserved and managed for the primary
purpose of aiding in the recovery of overfished stocks and to insure the persistence of
healthy fish stocks, fisheries, and habitats. Such areas may be over natural or artificial
bottom and may include prohibition of harvest on a permanent or lesser time period to
accomplish needed conservation goals.
f
The following types of actions are available to the Council, but during this
secoud scopiug process, the Council is focusing on Type 2 management actions to
protect the snapper grouper fishery:
.
Type 1. Permanent closure / no-take
Protects entire marine communities through prohibition of all fishing and collection of
marine organisms, with the exception of permitted scientific or educational activities.
Tvpe 2. Permanent closure / some take allowed
Protects specific elements of the marine community through prohibition of fishing and
collection of targeted species. Exceptions for permitted scientific and educational
activities.
Marine Prot~ Areas Sroping Document
-...I
. "
Tvpe 3. Limited duration closure / no-take
Protects entire marine communities through prohibition of all fishing and collection of
marine organisms for a specified period of time (minimum I year). Exceptions for
pennitted scientific and educational activities.
Type 3b. Spawning area closure / no-take
Protects known spawning areas of snapper grouper species through the
prohibition of all fishing and collection of marine organisms for a specified period
of time corresponding with spawning periods. Exceptions for pennitted scientific
and educational activities.
·
Type 4. Limited duration closure / some take allowed
Protects specific elements of the marine community through prohibition of fishing and
collection of targeted species for specified period of time (minimum of I year, with time
certain 5 year reviews for assessment of achievement of objectives). Exceptions for
pennitted scientific and educational activities.
·
Type 4b. Spawning area closure / some take allowed
Protects known spawning areas of snapper grouper species through the
prohibition of fishing for specific species for a specified period of time
corresponding with spawning periods.
·
During this second scoping process, the Council is focusing on Type 2
management actions. It is the Council's intent to specifically review areas suggested
by the public and the Marine Protected Areas Advisory Panel, using maps of
offshore areas, primarily aimed at protecting deepwater snapper grouper species
(e.g., speckled hind and warsaw grouper) and taking into consideration criteria the
Council has identified (Appendix B).
At this time, it is the Council's intent to prohibit fishing for and/or
harvesting/possessing species in the snapper grouper management unit (Appendix
C) in any areas designated as a Type 2 marine protected area. It is not the Council's
intent to prohibit fishing for and/or the harvesting/possession of pelagic species,
however, the law ~nforcement concerns listed in Appendix D are critical concerns
and must be addressed. The public is invited to comment on all types of actions the
Council has described.
What is the South Atlantic Fishery Management Council (SAFMC)?
The South Atlantic Fishery Management Council, headquartered in Charleston, S.C., is
responsible for the conservation and management of fish stocks within the federal 200-
mile limit (often referred to as the Exclusive Economic Zone or EEZ) off the coasts of
North Carolina, South Carolina, Georgia, and east Florida to Key West.
2
".
'-"
Marine Protected A~coPing Document
Congress established the Council along with seven other regional fishery management
councils with the passage of the Magnuson Fishery Conservation and Management Act
(now called the Magnuson- Stevens Act) in 1976.
The Council's membership is a balance of commercial and recreational fishermen,
marine scientists, and state and federal fisheries managers, who combine their knowledge
to prepare Fishery Management Plans (FMPs) to manage the living marine resources
within the South Atlantic region. Fishery Management Plans are prepared through a
deliberative planning process that includes public input provided by fishermen and other
persons concerned with management of these resources.
Council members serve on committees which address issues specific to certain species or
Council affairs. The Marine Protected Areas Committee (formerly the Marine Reserves
Committee) was established in 1997 in response to the growing realization of the
potential utility of marine protected areas as a fishery management tool.
.
The Council established a Marine Protected Areas Advisory Panel (formerly the Marine
Reserves Advisory Panel) in 1999 which is made up of recreational and commercial
fishermen, scientists, environmentalists, and other interested members of the public to
advise the Council. Appendix A contains a list of phone numbers and addresses of
Council Members, Marine Protected Areas Advisory Panel Members and Council staff
responsible for marine protected areas.
4
What is the history of marine protected areas in the South Atlantic?
1990 - The potential for using marine protected areas within the snapper grouper fishery
first originated with the Council's Snapper Grouper Plan Development Team (PDT).
This technical group prepared a report (April 1990) entitled The Potential of Marine
Fishery Reserves for Reef Fish Management in the U.S. South Atlantic. The Plan
Development Team offered this approach because they believed it was the only viable
option for maintaining optimum size, age, and genetic structure of slow growing, long-
lived species over the long-term. The Council received an extensive briefing on marine
protected areas at the February 1990 Council meeting. This provided an opportunity for
the Council to discuss marine protected areas as a concept and to hear about experiences
with marine protected areas in other parts of the world.
.
1992 - Marine protected areas were initially considered as a possible option in early
discussions on Amendment 4 to the Snapper Grouper Fishery Management Plan,
however, the Council determined the concept should be addressed separately and
scheduled scoping meetings in each of the states. During 1992 the Council held scoping
meetings.
1993 - During the 1992 scoping process support for and against the concept surfaced.
The Council reviewed the scoping information at the January 1993 meeting and decided
to (1) recommend to National Marine Fisheries Service that they convene a Scientific
Review Panel to review the concept of marine protected areas and (2) drop consideration
of the marine protected areas concept at that time.
3
Marine prot~ Areas Scoping Document
."",
,
~
1994 - The previously designated Oculina Bank Habitat Area of Particular Concern
(HAPC) off Ft. Pierce in eastern-central Florida was declared the Experimental Ocu/ina
Research Reserve (EORR). This area, measuring 4 by 23 nautical miles with depths
between 30 and 75 fathoms, was closed to bottom fishing for a period of 10 years to
allow for scientific studies in a closed area. The 10 year sunset was specified to ensure
establishment of a proper research and evaluation program. In 1995, the closure was
extended to include all anchoring within the boundaries of the experimental closed area.
The area was closed to bottom fishing to enhance stock stability and increase recruitment
by providing an area where deepwater species (snowy grouper, golden tilefish, speckled
hind, and warsaw, misty and yellowedge groupers) can grow and reproduce without
being subjected to fishing mortality. Fishing mortality results in severe reductions in
numbers of males and altered size/age structure. This effect is magnified when fishing in
areas where these groupers gather for spawning. Such spawning aggregations have been
observed in the Ocu/ina Habitat Area of Particular Concern.
.
1995 - A scientific review of the 1990 Snapper Grouper Plan Development Team report
was completed by the Scientific Review Panel as requested by the Council. The panel
consisted of international experts with different experience in fishery science, marine
protected areas, ecology, fish genetics, sociology, and economics.
The Scientific Review Panel concluded that properly designed marine protected
areas, in combination with other management measures, can be an effective management
tool for reef fish resources in the U.S. South Atlantic region subject to the following
conditions: (1) biological, ecological, social, and economic objectives of the marine
protected areas are clearly specified; (2) the relative biological, ecological, and economic
impacts of marine protected areas in the context of other fishery management measures
have been estimated for various constituents; and (3) the development of marine
protected area proposals proceed with the involvement of all constituencies and
stakeholders.
Also the scientific review panel concluded that recognizing the alanning declines
in stocks of key fishery species, the panel would urge that marine protected area options
be considered immediately as part of a comprehensive fisheries management plan to
prevent" irreversible loss to species and fisheries.
.
1997 - In further developing Snapper Grouper Amendment 8 (and later Amendment 9),
the Council realized that severe impacts would be felt by fishennen if necessary
percentage reductions in catches of overfished species were imposed to achieve the
mandated fishery management goals. Marine protected areas once again surfaced as a
potential alternative to fisheries closures.
Also in 1997 the Council accepted portions of the Final Management Plan to the
Florida Keys National Marine Sanctuary that designate one larger reserve that extends
into the Council's jurisdiction and 12 small preservation areas that also function as
marine protected areas. These areas are being evaluated and will be reexamined at a five
year review.
4
, .
\.,.-
Marine ProteCted A~coping Document
1998 - After deciding to reconsider the possibilities of marine protected areas, the
Council proceeded to take steps to initiate a fact-finding process using the Marine
Protected Areas Committee and the Advisory Panel.
1999 - In May 1999, the Marine Protected Areas Advisory Panel unanimously passed a
motion confinning that the Panel believes there is potential in using marine protected
areas as a fishery management tool.
2000 - The Council then laid out a deliberative process by which they would determine if
marine protected areas were a tool that they should use to manage fisheries in the South
Atlantic. This process included a series of infonnal meetings that Council members and
staff attended in the spring of 2000. Any organizations that requested to could have a
Council member and/or staff member come and talk with them about the potential use of
marine protected areas. It was the Council's intent to begin a dialogue with stakeholders
on ways to solve the overfishing problems in the South Atlantic Snapper Grouper
Complex and to ask the public if they thought marine protected areas may be one answer
to a complex problem.
The stakeholders voiced many different opinions on the use of marine protected
areas. There was an equal amount of support and opposition for no-take marine protected
areas, but many variations were offered from all sides. Many groups were in support of
protecting known spawning areas from fishing, and creating artificial habitats and
prohibiting fishing in these areas. The responses the Council heard from the more formal
scoping meetings they held later in the spring of 2000 were similar.
In September of 2000, after reviewing comments received from the informal
meetings and scoping meetings, the Council voted to move forward with the utilization of
marine protected areas.
2001- At its March 2001 meeting, the Council voted to move forward with a second
round of scoping meetings to request the public recommend specific areas to protect
deepwater snapper grouper species.
5
Marine Pro~d Areas Scoping Document
...,
. "
GOALS
Develop the concept of marine protected areas to:
· Supplement fishery management practices, thereby providing a buffer or insurance
against overfishing and directly increasing spawning stock biomass and providing
potential alternatives to fisheries closures;
· Manage the ecosystem as a whole, thereby providing a buffer against fishery collapse
caused by environmental change, or unexpected natural events or events resulting from
human activity;
· Protect, restore and improve Essential Fish Habitat (EFH) and EFH - Habitat Area
of Particular Concern HAPCs; and
· Provide areas to serve as a benchmark for management trials or experiments and
to improve scientific understanding of species under management.
Reasons why the Council has decided to use marine protected areas:
Faced with fishery closures for individual species, and with further extreme gear or quota
reductions, the Council reinitiated the question of using marine protected areas as a
fishery management tool. In 1997 and 1998, when the Council amended the Snapper
Grouper Fishery Management Plan, marine protected areas were included as a discussion
item for the purpose of evaluating them as a long-term approach to restoring and
maintaining the health of the snapper grouper resource. Although marine protected areas
were not proposed at that time, a number of realizations surfaced including:
'* Traditional fishery management practices aren't working to achieve all the
Council's objectives and mandates, and marine protected areas may be useful to
supplement traditional methods.
.
1. The snapper grouper fishery is a multi-species fishery and often times, when
single-species management plans are applied, they do not work. Many fish that
are prohibited or restricted are still being caught and killed (e.g., speckled hind
and warsaw grouper). Even if released alive, mortality is high. Traditional
management measures such as minimum sizes, quotas, and closure for individual
species don't work if the species continues to be caught and killed as bycatch.
2. The status of most reef fish stocks is unknown in the southeastern United
States, and stock information is available for only 23 out of 73 reef fish species in
the snapper grouper complex. This lack of information makes management more
difficult.
6
í
~
Marine Protected A~Scoping Document
3. Fishes produce eggs in proportion to their body size. A red snapper that is 24
inches long produces as many eggs as 212 red snappers that are 17 inches long.
Traditional fishery management plans use minimum sizes, which allow fish to
mature and spawn one or more times before being caught. However this practice
(and the desire by fishennen to catch large fishes) results in the biggest
genetically fit individuals, which produce the most eggs, being removed from the
population.
4. In addition to being very diverse, reef fishes have complex life histories that
make them more susceptible to being overfished. Certain reef fishes change sex at
some point in their life. When those species are overfished it changes the ratio of
males to females within the population. Many of them are very large (a jewfish
can reach 700 pounds), grow slowly, are long lived, and mature late in life. It
takes a long time to replace a large, old grouper. Because these fish mature late in
life, they often reach marketable size before they have matured and spawned for
the first time. Fishes that live long have evolved this behavior to survive years of
poor environmental conditions which limit survival of young fish. They have the
genetic makeup that insures survival of the species, and by spawning late in life
they pass these survival genes along to the next generation. Removing these fish
before they are mature results in fish that spawn at a smaller size contributing to
the gene pool of the species, which leads to undesirable genetic traits.
5. Many species fonn spawning aggregations on shelf-edge reefs, and
aggregations are predicable and easily exploited. Fishing of spawning
aggregations has also been implicated in the declining male to female sex ratios of
gag and scamp in the South Atlantic. Such losses may negatively affect
reproductive success. No management plans currently in effect are designed to
preserve the size, age, social structure, or the natural sex ratios of reef fish stocks.
6. For gag, red porgy and vennilion snapper to achieve optimum yield the
necessary percentage reductions in fishing mortality exceed 50%. Recognizing
the severe impact such reductions would have on fish ennen, and the potential for
similar reductions on other species, the long-tenn solution may require use of area
closures to achieve some of the necessary reduction in fishing mortality.
7. The worldwide demand for fish has increased dramatically in the last several
decades, primarily because of increasing populations but also because of per-
capita increases in consumption. In addition, an increased ability to locate and
capture fish, both recreationally and commercially, through advances in fishing
technology (GPS, loran, and electronic fish finders) has increased fishing
pressure. Coastal growth, coupled with the advent of better
navigational/locational electronics, more fuel efficient engines, more disposable
income such that more and more people can afford bigger boats and go farther
offshore, have made reef fishes everywhere more accessible to fishing pressure.
7
Marine protec~reas Scoping Document
.....J
\.
:&-.
~ The concept of marine protected areas will address management of the ecosystem
as a whole, much like terrestrial refuges, reserves and national park systems are used to
manage forest and other ecosystems.
1. Besides protecting stocks, pennanent closed areas also protect physical habitat,
age structure, biodiversity, and genetic diversity of the stock, and they produce a
natural balance of species and community structure within the ecosystem.
Protection of habitat is important because even greatly reduced fishing mortalities
cannot totally compensate for habitat degradation caused by harmful nonfishing
and fishing practices.
)
2. A marine protected area may work in the same way as discovering a virgin
wreck loaded with fish and no one being able to disturb it. Instead of fishing the
wreck out, it would instead be set aside much like a preserve on land. It's hoped
that the abundance of sealife, plantlife, and habitat in the closed area will benefit
outlying waters by fish having a safe haven, with some fish eventually moving out
of the closed areas into neighboring open waters. Also, fish eggs and larvae can
be carried to new areas by ocean currents which will produce more sealife outside
the marine protected area. In this manner, it's hoped that marine protected areas
can serve as insurance policies if fish populations decline elsewhere, and help
deter collapses of certain species.
.
.~ Marine protected areas will protect, restore, and improve Essential Fish Habitat
and Essential Fish Habitat - Habitat Areas of Particular Concern. The Council has
mandates to protect Essential Fish Habitat and has established an Essential Fish Habitat -
Habitat Areas of Particular Concern to initiate the process.
.
1. Essential fish habitat for snapper-grouper species includes coral reefs,
livelhard bottom, submerged aquatic vegetation, artificial reefs and medium to
high profile outcroppings on and around the shelf break zone from shore to at
least 600 feet (but to at least 2000 feet for wreckfish) where the annual water
temperature range is sufficiently wann to maintain adult populations of members
of this largely tropical complex. EFH includes the spawning area in the water
column above the adult habitat and the additional pelagic environment, including
Sargassum, required for larval survival and growth up to and including
settlement. In addition the Gulf Stream is an essential fish habitat because it
provides a mechanism to disperse snapper-grouper larvae. For specific life stages
of estuarine dependent and nearshore snapper-grouper species, essential fish
habitat includes areas inshore of the 100-foot contour, such as attached
macroalgae; submerged rooted vascular plants (seagrasses); estuarine emergent
vegetated wetlands (saltmarshes, brackish marsh); tidal creeks; estuarine
scrub/shrub (mangrove fringe); oyster reefs and shell banks; unconsolidated
bottom (soft sediments); artificial reefs; and coral reefs and live/hard bottom.
8
~"
'-'
Marine Protected A"'fJScoping Document
2. Areas which meet the criteria for essential fish habitat-habitat areas of
particular concern (EFH-HAPCs) for species in the snapper-grouper management
unit include medium to high profile, offshore hard bottoms where spawning
normally occurs; localities of known or likely periodic spawning aggregations;
nearshore hard bottom areas; The Point, The Ten Fathom Ledge, and Big Rock
(North Carolina); The Charleston Bump (South Carolina); mangrove habitat;
. seagrass habitat; oyster/shell habitat; all coastal inlets; all state-designated nursery
habitats of particular importance to snapper grouper (e.g., Primary and Secondary
Nursery Areas designated in North Carolina); pelagic and benthic Sargassum;
Hoyt Hills for wreckfish; the Ocu/ina Bank Habitat Area of Particular Concern;
all hermatypic coral habitats and reefs; manganese outcroppings on the Blake
Plateau; and Council-designated Artificial Reef Special Management Zones
(SMZs).
~
9
Marine ProtJi.fAreas Scoping Document
,..",
\,
Where are we in the marine protected areas process?
þ> Informal educational meetings were held by Council and Staff from January to
April 2000.
þ> Scoping meetings were held in May 2000 for public input on whether the concept of
marine protected areas has merit as a fishery management tool (written comments
were also accepted).
.
þ> Based on the 1992 scoping process, the workshop, Advisory Panels and Scientific &
Statistical Committee input, and the mid-2000 scoping process, the Council decided
the concept of marine protected areas should be used as a fishery management tool in
the South Atlantic to enhance the biomass of resources and provide greater
biodiversity within areas under their management authority.
)
þ> Because the Council decided the concept of marine protected areas should be used as
a fishery management tool, an additional round of scoping meetings is being held in
Spring 200 I to allow the public to suggest specific areas that should be additionally
regulated. A list of the scoping meeting dates and locations is in Appendix E.
þ> The Marine Protected Areas Advisory Panel (AP) will meet in May 2001 to
recommend areas that should be regulated.
þ> The Council will review scoping and AP input and decide whether to continue the
process of choosing areas to regulate. If the Council decides to continue the process
at their June 2001 meeting, an amendment to the Snapper Grouper FMP will be
developed and public hearings will be held in the fall of 200 1. The Council will
review the public hearing comments and finalize the action at the December 3- 7,
2001 Council meeting.
What other groups or agencies are currently discussing marine protected areas or
closed areas?
In 1990, Congress established the Florida Keys National Marine Sanctuary which
currently has existing and proposed marine protected areas for the Florida Keys. The
Council has expressed support for a proposed Sanctuary reserve in th~ Gulf Council's
jurisdiction at the Dry Tortugas. For more information on the Florida Keys National
Marine Sanctuary contact Billy Causey at (305) 743-2437.
In 1997, President Clinton signed Executive Order 13089 on Coral Reefs, establishing a
multi-agency Task Force to direct coral reef conservation in the United States. This Task
Force is exploring recommendations for establishing marine protected areas to protect
coral ecosystems. For more information contact: the NOAA Public Affairs office at (202)
482- 6090 or the Department of the Interior at (202) 501-4633.
10
,.
'-
Marine Protected Are~opíng Document
In 1999, Gray's Reef National Marine Sanctuary began collecting infonnation necessary
for reviewing the Sanctuary management plan. As a part of that process, Sanctuary staff
held a series of meetings to get the initial views of the public on possible changes to the
programs or regulations at Gray's Reef. The issue that received the greatest attention was
the concern by many at the meetings that Gray's Reefwould be closed to fishing through
designation as a marine reserve. This issue arose in part because at the same time
Sanctuary staff was holding meetings on the future of Gray's Reef, the Council was
preparing scoping meetings to explore the public's views on the concept of marine
protected areas, specifically closed areas in the region.
Within the National Marine Sanctuary Act there is a provision that calls for the
Council to participate in decisions affecting fishing in National Marine Sanctuaries. Both
agencies agreed to build upon this provision in the law and develop a Gray's
Reef/SAFMC agreement known as a Memorandum of Understanding. This agreement is
designed to facilitate the exchange of infonnation, advice, and technical assistance
between the two organizations. In the spirit of that agreement, Gray's Reefproposed to
the Council that they work together through the Council process to consider how the
marine protected areas may apply to Gray's Reef. The Sanctuary staff will work
cooperatively with the Council as they evaluate the issue of marine protected areas on a
broader regional basis.
For more infonnation on Gray's Reef National Marine Sanctuary contact Becky
Shortland at (912) 598-2381.
.
On May 26, 2000, the President signed Executive Order 13158 on Marine Protected
Areas (MPAs) to strengthen the protection of U.S. ocean and coastal resources. This
directs the Departments of Commerce and the Interior, and other federal agencies, to
strengthen and expand a national system of MP As by working closely with state,
territorial, local, tribal, and other stakeholders. As a result of this Executive Order, a
web site was created to provide infonnation on MPAs and a MPA Center was established
to coordinate implementation of the Executive Order. Also created was a Federal Marine
Protected Areas Advisory Committee to provide expert advice and recommendations to
the Secretaries of Commerce and the Interior on the development of a national system of
marine protected areas. Council Member Tony Iarocci (Chainnan of the SAFMC Marine
Protected Areas Committee) serves on the Federal Advisory Panel. For more infonnation
go to www.moa.gov.
11
Marine Protec~~eas Scoping Document
\",¡Î
"
APPENDIX A
South Atlantic Fishery Management Council
2000-2001 Membership
The names of the Council Members who serve on the Marine Protected Areas
Committee appear in bold.
.
Council Chairman:
Fulton Love
6817 Basin Road,
Savannah, GA 31419
912/925-3616
912/925-1900 (fax)
ofl jr@bellsouth.net
Council Vice-Chairman:
David Cupka
SC Department of Natural Resources
P.O. Box 12259 (217 Ft. Johnson Road)
Charleston, SC 29422-2559
843/762-5010 or 795-6350
843/762-5007 (fax)
cupkad@mrd.dnr.state.sc.us
Dieter N. Busch
Atlantic States Marine Fisheries
Commission
1444 Eye Street, N.W., 6th floor
Washington, D.C. 20005
202/289-6400
202/289-6051(fax)
dbusch@asmfc.org
Bill Cole
U.S. Fish and Wildlife Service
P.O, Box 972
Morehead City, NC 28557-0972
252/726- 7021
252/726-0254(fax)
BiIl_ W _ Cole/R4/FWS/DOJ@FWS.GOV
Lt. Commander Dave Cinnalli
Seventh Coast Guard District
Brickell Plaza Federal Building
909 S.E. First Avenue
Miami, FL 33131-3050
305/415-6778
305/536-4665(fax)
Dcinalli@D7.USCG.Mil
Louis Daniel
NC Division of Marine Fisheries
P.O. Box 769 (3441 Arendell St.)
Morehead City, NC 28557
252/726-7021 (ext.l 05)
252/726-0254(fax)
10uis.daniel@ncmaiLnet
John M. Dean
Baruch Institute
University of South Carolina
Columbia, SC 29208
803/777-0075
803/777-3935 (fax)
jmdean@sc.edu
Glenn H. Durden
2004 Chevy Place
Vidalia, GA 30474
912/537-7074
912/537-9033 (fax)
glennhd 13@yahoo.com
12
I.
'-
Marine Protected ~s Scoping Document
Jodie E. Gay
105 Friendly Lane
Hampstead, NC 28443
910/270-3718
910/270-3718 (fax)
oldsmokey@worldnet.att.net
Tony Iarocci
236 Guava Avenue
Grassy Key, FL 33050
305/743-7162
305/743-2697 (fax)
Joe Powers,
Acting Regional Administrator
National Marine Fisheries Service,
SE Region
9721 Executive Center Drive, North
St. Petersburg, FL 33702
727/570-5301
727/570-5300 (fax)
Joe.powers@noaa.gov
Ken Haddad
Florida Fish & Wildlife
Conservation Commission
2590 Executive Center Circle
East, Suite 201
Tallahassee, FL 32301
850/487-0554
850/487-4847 (fax)
ken.haddad@fwc.state.fl.us
.
Edward (Ebbie) B. LeMaster III
135 Ponte Vedra Blvd.
Ponte Vedra Beach, FL 32082
904/285-6017
904/285-2463 (fax)
eblhcl @aol.com
Jean-Pierre PIe'
Office of Marine Conservation
OES/OMC
Department of State, Room 7820
Washington, DC 20520
202/647-1948
Clarence Wayne Lee
3000 Raymond Avenue
Kill Devil Hills, NC 27948
252/480-1287
252/480-1631 (fax)
cwlee2@mindspring.com
Susan Shipman,
GA Department of Natural Resources
Coastal Resources Division
One Conservation Way, Suite 300
Brunswick, GA 31520-8687
912/264-7218
912/262-2318 (fax)
52@dnrcrd.dnr.state.ga.us
Charles Stone
296 Rum Gully Road
Murrells Inlet, SC 29576
843/651- 1654
843/651-7995 (fax)
cstone@sccoast.net
Council Staff Responsible for Marine protected areas:
Keny O'Malley
One Southpark Circle
Suite 306
Charleston, SC 29407-4699
843/571-4366
843/571-4520 (fax)
keny .omalley@noaa.gov
13
Marine prole~reas Scoping Document
\wi
"
Marine Protected Areas Advisory Panel
.
Outreach
Susan White
National Wildlife Refuge System
USFWS
4401 N. Fairfax Drive, Rm. 670
Arlington, VA 22203
703/358-2415
703/358-1826 (fax)
susan_ white@fws.gov
.
Sandy Seamans Ross
P.O. Box 32
Stumpy Point, NC 27978
252/473-6833
252/473-3411 (fax)
tradewinds@beachlink.com
Becky Shortland
Gray's Reef National Marine Sanctuary
10 Ocean Science Circle
Savannah, GA 31411
912/598-2381
912/598-2367 (fax)
becky .shortland@noaa.gov
t
Doug Kelly
P.O. Box 10692
Tampa, FL 33679
813/639-9636
813/639-9637 (fax)
dkelly@eangler.com
Conservation
Dr. Doug Rader
Environmental Defense Fund
2500 Blue Ridge Road, Suite 330
Raleigh, NC 27607
919/881-2601
919/881-2607 (fax)
dougr@edf.org
Jack Sobel, Chairman
Center for Marine Conservation
1725 Desales St., NW, Suite 600
Washington, DC 20036
202/429-5609
202/872-0619 (fax)
jsobel@dccmc.org
Alexander Stone
P.O.Box 490438
Key Biscayne, FL 33149
305/358-4600
305/358-3030 (fax)
a_stone@reefkeeper.org
Dr. William D. Anderson, Jr.
665 Clearview Dr.
Charleston, SC 29412
843/406-4028
843/406-4001 (fax)
andersonw@cofc.edu
Charter/Headboat
Patrick Karman
407 Maple Lane
Morehead City, NC 28557
919/240-0159
John Wierman
101 Eight Point Road
Goose Creek, SC 29445
843/797-2848
j. wierman@excite.com
Judy Helmey
P.O. Box 30771
(124 Palmetto Drive)
Savannah, GA 31410
912/897-2478
912/897-3460 (fax)
fishjudy2@aol.com
14
/ '-' Marine Protected Area~ping Document
Ron Rincones Reese Hair
3950 Corey Road 1297 Limestone Street
Valkaria, FL 32950-4119 Murrell's Inlet, SC 29376
407/727-1036 843/357-1667
407/724-1002 (fax) 843/357-3470 (fax)
fishrico@aoI.com
Jerry Schill
Recreational North Carolina Fisheries Association
Frank Gibson P.O. Box 12303
P.O. Box 789 (2606 Neuse Blvd.)
Beaufort, SC 29901 New Bern, NC 28561
843/522-2020 252/633-2288
843/522-0647 (fax) 252/633-9616 (fax)
fgibson@islc.net jschill_ ncfish@coastalnet.com .
Mac Currin Charles Phillips
801 Westwood Drive Route 2, Box 1672
Raleigh, NC 27607 Townsend, GA 31331
919/881-0049 912/832-4423
919/881-0049 (fax) 912/832-6228 (fax)
mcurrin@wans.nel pseafood@darientel.net
Robert Rowe Gregory P. DiDomenico
837 Fathom Road Monroe County Commercial Fishennen
North Palm Beach, FL 33408 P.O. Box 501404
561/626-655 I 11400 Overseas Highway, Suite 214-A
bbrowe1 @worldnet.att.net Marathon, FL 33050
305/743-0294
Joel Williams 305/289-1207 (fax)
P.O.Box 176
212 S.Main Street Ben Hartig
Reidsville, GA 30453 9722 S.E. Sharon St.
912/557-4242 Hobe Sound, FL 33455
912/557-4083 (fax) 561/546-1541
joel @reeloutdoor.com 561/546-9838 (fax)
Commercial Don DeMaria
Mark Marhefka, Vice Chairman P.O. Box 420975
P.O. Box 1231 Summerland Key, FL 33042-0975
John's Island, SC 29457 305/745-3045
843/729-5497 305/745-1235 (fax)
mmgoldenfisher@aol.com dondemaria@aol.eom
15
Marine ProtecteJl..{as Scoping Document
State Designees
Dr. Luiz Barbieri
100 Eighth Avenue SE
St. Petersburg, FL 33701-5095
727/896-8626
727/823-0166 (fax)
barbieri_l@epic7.dep.state.fl.us
.
Henry Ansley
GA DNR Coastal Resources Division
One Conservation Way, Suite 300
Brunswick, GA 31520-8687
912/264-7218
912/262-3143 (fax)
henry@dnrcrd.dnr.state.ga.us
.
George Sedberry
SC DNR MRRI
PO Box 12559
Charleston, SC 29422-2559
843/762-5045
843/762-5110 (fax)
sedberryg@mrd.dnr.state.sc.us
\wi
'\
Jim Francesconi
NCDEHNR
Resource Enhancement
PO Box 769
3441 Arendell Street
Morehead City, NC 28557
252/726-7021
252/726-9218 (fax)
james.francesconi @ncmai1.net
Melvin Bell
SC DNR Marine Resources Division
PO Box 12559
Charleston, SC 29422
843/762-5066
843/406-4060 (fax)
bellm@mrd.dnr.state.sc.us
16
,;
'-'
Marine Protected A;~coping Document
APPENDIX B
The following is a broad list of criteria being suggested by the Marine Protected Areas
Committee after taking into account public input received during the last round of
scoping meetings and input received rrom the Marine Protected Areas AP. The Council
will develop more specific criteria as they begin looking at sites suggested by the public
during this round of scoping meetings.
Regionally representative?
Not conserved elsewhere?
High habitat diversity?
~
Unique habitat?
Includes fragile habitat(s)?
Includes vulnerable species?
Includes vulnerable or rare stages?
Supports exploited species?
Supplies adjacent areas?
Is the area large enough?
Are adjacent coastal areas supportive?
Is it aesthetically appealing?
Is it accessible to user groups?
t
Can enforcement provide support?
Is there effective management?
Does it satisfy socio-cultural needs?
Does it preserve historical site(s)?
17
Marine protec~reas Scoping Document
.....,
"
APPENDIX C
Species in the Snapper Grouper Management Unit
·
SPR Estimates Available
Lane snapper Lutjanus synagris
Yellowtail snapper Ocyurus chrysurus
Gray snapper Lutjanus griseus
Mutton snapper Lutjanus ana/is
Vermilion snapper Rhombop/ites aurorubens
Red Snapper Lutjanus campechanus
SPR Estimates Unavailable
Black snapper Apsilus dentatus
Queen snapper Ete/is oculatus
Schoolmaster Lutjanus apodus
Blackfin snapper Lutjanus bueeanella
Cubera snapper Lutjanus eyanopterus
Mahogany snapper Lutjanus mahogoni
Dog snapper Lutjanus joeu
Silk snapper Lutjanus vivanus
SEA BASSES Serranidae
·
SPR Estimates
Black sea bass
SPR Estimates
Bank sea bass
Rock sea bass
Available
Centropristis striata
Unavailable
Centropristis ocyurus
Cen/ropristis philadelphiea
GROUPERS = Serranidae
·
SPR Estimates
G:g
Scamp
Red grouper
Black grouper
Speckled hind"
Snowy grouper"
Warsaw grouper'
Wreckfish
SPR Estimates
Rock hind
Graysby
Yellowedge grouper"
Coney
Red hind
Jewfish
Misty grouper'
Nassau grouper
Yellowmouth grouper
Tiger grouper
Yellowfin grouper
Available
Myc/eroperca microlepis
Myc/eroperca phenax
Epinephelus morio
Mycteroperea bonaei
Epinephelus drummondhayi
Ep;nephelus nivea/us
Epinephelus nigritus
Polyprion amerieanus
Unavailable
Epinephelus adseensionis
Epinephelus eruentatus
Epinephe/us fIavolimbatus
Epinephelus fulva
Epinephelus gulta/us
Epinephelus itajara
Epinephelus mys/acinus
Epinephelus stria/us
Myeteroperca interstitlalis
Mycteroperca tigris
Mycteroperca venenosa
SPR Estimates
Red porgy
SPR Estimates
Sheepshead
Grass porgy
Jolthead porgy
Saucereye porgy
Whilebone porgy
Knobbed porgy
Longspine porgy
Scup
Available
Pagrus pagrus
Unavailable
Archosargus proba/ocephalus
Calamus arctifrons
Calamus bajonado
Calamus calamus
Calamus leucos/eus
Calamus nodosus
S/en%mus caprinus
Sten%mus chrysops
TRIGGERFISHES - Balistidae
SPR Estimates
Gray triggerfish
SPR Estimates
Queen triggerfish
Ocean triggerfish
JACKS . Carangidae
Available
Balistes capriscus
Unavailable
Balistes vetula
Canthldermis suff/amen
SPR Estimates Available
Greater amberjack Seriola dumerili
SPR Estimates Unavailable
Yellow jack Caranx bartholomaei
Blue runner Caranx crysos
Crevalle jack Caranx hippos
Bar jack Caranx ruber
Almaco jack Seriola rivoliana
Lesser amberjack Seriola faseiata
Banded rudderfish Seriola zona/a
'These species form the deep water grouper fishery.
18
/
'-"
GRUNTS . Pomadasyidae
SPR Estimates
White grunt
SPA Estimates
Black margate
Porkfish
Margate
Tomtate
Smallmouth grunt
French grunt
Spanish grunt
Cotton wick
Sailors choice
Blue striped grunt
Available
Haemulon plumier;
Unavailable
Anisotremus surinamensis
Anisotremus virginicus
Haemulon album
Haemulon aurolineatum
Haemu~n ch~sa~y~um
Haemulon fIavolineatum
Haemulon macrostomum
Haemulon melanurum
Haemulon parrai
Haemulon sciurus
TilE FISHES . Malacanthidae
SPR Estimates Available
Tilefish (Golden)" Lopholatilus chamaeleonticeps
SPR Estimates Unavailable
Blueline tilefish" Caulolatilus microps
Sand tilefish' Malacanthus plumieri
Marine Protected Ar~coping Document
.
SPR ESTIMATES ARE UNAVAILABLE FOR THE FOllOWING SPECIES
SPADEFISHES - Ephippidae
Spadefish Chaetodipterus taber
WRASSES
Hogfish
Puddingwife
- labridae
Lachnolaimus maximus
Halichoeres radiatus
'These species form the deep water grouper fishery.
19
.
Marine protec~reas Scoping Document
.....;
"
APPENDIX D
Recommendations of the
Joint Law Enforcement CommiUee And Advisory Panel on Enforcement Criteria for
Establishing Marine Protected Areas
The Council's Law Enforcement Committee and Advisory Panel discussed the marine
protected area concept and enforcement criteria for establishing marine reserves (now
called marine protected areas) at their February 19-20, 1998 meeting. There was
unanimous agreement that one of the most critical aspects of establishing marine
protected areas, both from the scientific and enforcement standpoint, will be public
support. Consensus was the Council, through its Information & Education Committee,
should develop a plan for educating the public on the need for marine protected areas and
for selling the concept to the fishing community.
·
A motion was approved recommending that as the Council proceeds on establishing
marine protected areas, there should be a threat assessment conducted by the appropriate
state, NMFS, and Coast Guard enforcement personnel (potentially the AP) for each
marine protected area being developed. This assessment should be presented to the
Council before they take action.
·
The committee and advisory panel developed the following criteria for the Marine
Protected Area Committee's consideration:
1. A marine protected area should be configured in a square or rectangle.
» irregular shapes are very difficult to enforce
2. The bigger the better.
» wider areas are easier to enforce
» do not include buffer zones
·
3. The boundaries should be delineated in latitude and longitude.
» where possible the boundaries should actually be latitude and
longitude lines
» do not use water depths
» do not use County lines
4. Must be in an acceptable format to be included and identified on NOAA charts.
» will require coordination with appropriate NOAA personnel
20
/
L Marine Prot~ Areas Scoping Document
""""
5. Allowable activities in the marine protected area should be limited.
» No transit - best
» Prohibit all fishing - next best
» If any fishing activity or gear is allowed, enforcement becomes very
difficult.
6. Locate marine protected areas away from highly populated areas.
» the location should provide for the best possible buy-in by fishennen
» voluntary compliance is the most important element for insuring
enforceability
7. Provide for on-site enforcement capability.
» there will be costs associated with this capability
"
21
Marine Prot.J¡r.,iAreas Scoping Document
'wi
~ '"
APPENDIX E
Dates and Locations of Scoping Meetings
All meetings will begin at 6:00 P.M.
Monday. April 16. 2001
Crystal Coastal Civic Center
3505 Arendell Street
Morehead City NC 28557
Phone: 252-247-3883
Thursday. May 3. 2001
Holiday Isle's
US Highway I
Islamorada FL 33036
Phone: 305-664-2711
Wednesday. April 18. 2001
Blockade Runner
275 Waynick Boulevard
Wrightsville Beach NC 28480
Phone: 910-256-2251
Wednesday. May 9. 2001
Embassy Suites North Charleston
Convention Center
5055 International Boulevard
North Charleston SC 29418
Phone: 843-747-1882
Tuesday. May 1. 2001
Sea Turtle Inn
I Ocean Boulevard
Atlantic Beach FL 32233
Phone: 904-249-7402
Monday. May 14.2001
St. John's Inn
Oceanfront at 70'h A venue, N.
Myrtle Beach SC 29572
Phone: 843-918-8000
Wednesday. May 2. 2001
Radisson Beach Resort
2600 N. AlA
Fort Pierce FL 34949
Phone: 561-465-5544
Tuesday. May 15.2001
University of Georgia
Marine Extension Service
715 Bay Street
Brunswick GA 31520
Phone: 912-264-7268
Wednesday. May 16.2001
Richmond Hill City Hall
40 Richard R. Davis Drive
Richmond Hill GA 31324
Phone: 912-756-3345
Written comments will be must be received in the Council office (address on cover) on or
before May 21, 2001. The Council accepts comments sent by mail, fax, or E-mail.
22
,
;'"
....
...."
INTER-OFFICE MEMORANDUM
ST. LUCIE COUNTY, FLORIDA
TO: Board of County Commissioners
FROM: Katherine Mackenzie-Smith, Assistant County Attorney
C.A. NO: 01-629
DATE: April 30, 2001
SUBJECT: Resolution No. 01-87 -Requesting the State of Florida Enforce the Usury Law
and Other Consumer Protections Against Payday Lenders
BACKGROUND
Attached is a resolution opposing the practice of deferred deposit or deferred presentment
transactions, commonly referred to as payday loans, at highly usurious rates.
Currently, there are bills pending before the Senate and House that would regulate deferred
presentments. Senate Bill 1526 was read for the third time and the committee substitute passed
Apri126, 2001. House Bill 0213, committee substitute, was read for the first time April 24, 2001
and placed on the special order calendar April 27 ,2001. These bills create the Deferred Presentment
Act. These bills provide that no fees in excess of 10% of the amount financed may be charged,
limits the transaction amount to $500 and prohibits rollovers.
Mr. Clay Yates, Esquire, an advocate for the abolishment ofthe payday loan industry as well
as Cash Plus, a payday loan provider, have been invited to provide the Board information.
RECOMMENDATION/CONCLUSION:
Staff recommends that the Board adopt Resolution No. 01-87 as drafted.
Respectfully submitted,
Katherine Mackenzie-Smith
Assistant County Attorney
KMS/mt
Attachment
,
, "
'-"
...."
RESOLUTION NO. 01-87
A RESOLUTION REQUESTING THE STATE OF FLORIDA
ENFORCE THE USURY LAW AND OTHER CONSUMER
PROTECTIONS AGAINST PAYDAY LENDERS
WHEREAS, the Board of County Commissioners of St. Lucie County, Florida, has made
the following determinations:
1. Payday loans also known as "deferred presentment" or "deferred deposit" transactions
constitute predatory lending wherein consumers in this County are charged exorbitant interest for
short term loans. This practice has become significant in this community and throughout the
State of Florida.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of
St. Lucie County, Florida.
1. This Board condemns the practice of payday lending at highly usurious rates of
interest and requests the State of Florida through its agencies such as the Department of Banking
and Finance, the Attorney General's Office and the various State Attorney's Offices enforce the
existing statutory laws to prevent this type of predatory lending to Florida consumers.
2. The County Administrator is hereby directed to forward a copy of this resolution to
Governor Jeb Bush and the Legislative Delegation for St. Lucie County.
After motion and second the vote on this resolution was as follows:
.. f
\..
..."",
Chair Frannie Hutchinson XX
Vice Chairman Doug Coward XX
Commission Paula A. Lewis XX
Commissioner Cliff Barnes XX
Commissioner John D. Bruhn XX
PASSED AND DULY ADOPTED this day of May, 2001.
ATTEST:
BOARD OF COUNTY COMMISSIONERS
ST. LUCIE COUNTY, FLORIDA
BY:
DEPUTY CLERK
CHAIRMAN
APPROVED AS TO FORM AND
CORRECTNESS:
COUNTY ATTORNEY
,
, ,
'-"'
.....,
ITEM NO. g'a
AGENDA REQUEST
DATE: MAY 8, 2001
REGULAR [XX]
PUBLIC HEARING [ ]
CONSENT [ ]
SUBMITTED BY (DEPT) : ADMINISTRATION
DOUG ANDERSON
(~k
It
TO: BOARD OF COUNTY COMMISSIONERS
PRESENTED BY:
SUBJECT: COUNTY EXTENSION CAMPUS EXPANSION
BACKGROUND: SEE ATTACHED MEMORANDUM
FUNDS AVAIL. (State type & No. of transaction or NjA) :001-9910-599100-800
GENERAL FUND CONTINGENCY
PREVIOUS ACTION: NONE
RECOMMENDATION: STAFF IS RECOMMENDING THAT THE COUNTY PROCEED WITH THE
PURCHASE OF APPROXIMATE 12 ACRES OF LAND FROM THE UNIVERSITY OF FLORIDA IN
THE AMOUNT OF $88,800 PLUS $5,000 IN CLOSING COSTS AND THAT THIS AMOUNT BE
LOANED FROM CONTINGENCY FOR THIS PURPOSE. THIS PURCHASE WOULD BE SUBJECT TO
THE REVIEW AND APPROVAL OF THE TITLE POLICY AND ENVIRONMENTAL ASSESSMENT BY
THE COUNTY ATTORNEY.
[ X ] APPROVED
[ ] OTHER:
DENIED
COMMISSION ACTION:
County Attorney:
Review and Approv
Management & Budget
Purchasing
Originating Dept.
Other:
Other:
Finance: (Check for Copy only. if applicable)___
Eff. 5/96
Post-it" Fax Note
To
7671 Date
Co.lDept.
, .
\w
'will
."
M E M 0 RAN DUM #01-82
TO:
BOARD OF COUNTY COM
~
FROM:
DOUGLAS M. ANDERSON,
UNTY ADMINISTRATOR
DATE:
MAY 1,2001
SUBJECT: COUNTY EXTENSION CAMPUS EXPANSION
Since the fall of 1999 County staff has been working with Farm Credit of South Florida (Farm
Credit) and the U.S. Department of Agriculture (USDA) to locate an office building on Picos Road
on property owned by the State of Florida, Board of Regents, University of Florida (University of
Florida). Attached is a November 24, 1999, letter to Mr. Carson McCurdy, Principal Appraiser for
Farm Credit. Since then we have been working with the University of Florida, going through their
approval process, to purchase the approximate 12 acres from them.
On September 18, 2000, the University of Florida received an appraisal from Fuller-Armfield-
Wagner appraising the property at $90,000. The University of Florida had a second appraisal
performed of the described property which came out to $87,600. The average of these two
appraisals is $88,800. If the Board of County Commissioners approves to proceed with the
purchase of the property, the Department of Environmental Protection will present this at the June
12th Cabinet meeting. Farm Credit of South Florida would be our principal tenant in this facility with
the U.S.DA being an additional tenant. Should USDA not decide to rent from us, the size of the
building would be scaled back accordingly.
We also plan on constructing a County meeting room to accommodate County Extension Office
meetings and other County functions. The present County Extension office does not have
adequate meeting space available.
.
The financing plan will be that the lease payments cover the purchase cost ofthe land and the cost
of construction. Staff recommends that the County proceed with the purchase of the approximate
12 acres and transfer the funds from contingency for this purpose. The County would bond the
cost of construction and the land purchase cost at which time the General Fund would be
reimbursed the $88,800. If approved, staff will then work with the County's architect, Paul
Dritenbas, to provide us with a conceptual floor plan.
DMA:01-82
c: Robert Bradshaw, Assistant County Administrator
Anita Neal, Interim County Extension Director
Don Cole, Property Acquisitions Manager
Marie Gouin, ManagemenUBudget Manager
Dan Mcintyre, County Attorney
Roger Shinn, Central Services Director
"
r" ,I··,~, '2"U' '~"'.' '"):'~
J""'/ Â..../ t. ...,...,....._
858-..ee-337'
œ~ _BF'U~
"""" PA':iE ,_ ~
:j. TIME (iF' ACCEPTANCE:: It thi.'; cffe:: is no~ accepted by the
'fRUSTEES, the deposit shall be returned to the BUYER i:\::d ~:lJ.s
offer shall be null and void. No~ice of acceptance Or rajecti~o
of tr.is offer shall be sent to the BUYER after the TRUST:;;ES
decision.
4. CLOSING, EXPENSES AND POSSESSION: ThH cc,nt",act 5hall oe
clo3ed following apprcvdl by the TRUSTEES, and th~ d€ed delivered
after execution by the 7RUSTEES. The TRUSTEES wil~ delivçl'
possession of the Property to the SÇYER at closing. T~e
following are additional detai13 of cl~sing:
a. Time and 21,,:;.: The closing w111 be at a tU:1e, da':e
-""d location of mutual 19reezr.ent bet...ee~ the C}EP a:..j the BUYER;
b. Conveyanc~: At closing, the TRDSTEES will delive~ to
the BUYER a fully executed quit~lairo deed conveying tte pro~erty
and any i!\1provem<;onts in "AS IS, W¡ŒR~ IS CONDrTION, u W1.thout
loIarranties 0" repre:!'er.tations, s'lb)ect to a rese.:";ation in fav("r
of the TRUSTEES of an unåivide,j three-fourt:-ts in:¡¡,rest in
phosphate, mineral:.; and metals and an u:'ldivided one"half inte:es:
in 3.11 patroleUIII p1Jrsuant ':0 Section 270.11, Florida Stat utp-s.
The for:n of the Quitclaim Deed shall subst.''I'1tially comply '..1. th
the form 3:tached hereto <is EXHIBIT "B"; and
c. Expenses: The 3VlER shall pay all costs of clo",i:'l<J
including, but not linited tc, all COlts relftted to ap?raisal of
the property, environmental assess~ent, s~rvsy costs, doc~~ent~ry
stamp tax on the deed, recording fees, ab$t~act or ~it~e
insurance fees, or attor~eys' fees. The TRUSTE~S may require that
the closing oe processed by anà th~ough a t~tle ~n5ura~çe
company, off~cer, or other agent, designated by the TRUSTESS, ~nà
the BUYER sr.all pay a!'\y costs ct,arged by such comparl~' or agent:
for this closing service. If a survey is obtainea by BU::ER,
nothing contained therein shall affect the p'.1rchase pr ¡::e or
terms 0: :his contract.
,
.
5. REA!. .ESTATE T,'''XES, EASEMENTS, RESTR:CT IONS AN;) e:NCU;~3¡;P.NC:;:S:
ThG SUYER agrees to pay all oL¡tstandil1g rea~ estate taxes,
prorated up to the day cf clo:3ing. 7he 9t:YER agrees to r.ake
::i t1e tc the pro?erty subj eet to any special lÜms or
assessments, zoning and other government).l r..:¡s::=icti:ms, plat
restrictions and gualif:..car;i('ns, public uti:i':y easemer.ts,
restrictive covenants and all oëher easements, restri~tions,
reservaticns or m~r;ters ~f record.
.
t
6 . WET:"ANDS;
the per::n.tting
district.
Any wetlands on this property may be subJect to
requirement5 of the DIP or the water managcme~t
7. ~OND!TrqN OF THE PI\OPER'I"r: The BUYER, açkr.o...l"'Jge.~ that he
h<i8 inspected the premises, and agrees to ëo.ccept the property l.n
"1\S IS, viHf;RE IS CONDITION." The TR.;JSTEI::S make:1o wa=r·ar.ties or
;ep'e~entations whatever as to the condition of th9 property Qr
any inprovements iocated thereon, or the fitness of either for
any particular use or purpose.
B. RADON GAS: Radon is a naturally cccurring radioactive g<;'s
t~at, when it has accumulQted in a building 1:1 suf=icle~c
quantities, may present health risks to person3 who are expoged
to ~t over time. Levels of r¿¡<::un tha.t exceed f..èeral and state
guidelines have been found in buildings in Fèori;:ia. Additional
ir:formation regarding radon ar:d J:3don testit\g rr""y be Qbtai r:e:;
fro", your county p'.Jbll.c health lln:..t.
Page 2 of 7
CGn~ract No. 30697
St. Lucie County
;'
84/22:' 2eOl \..-::':J
85e-4~8-33 ,'i
DEF' _Bf'LA
"""" P AGE ~.: .3
CS:J1
FLORIDA DE~~RTXENT OF ~~vIRONMENTAL P~OTECTION
CONTRACT FOR SALE A~D PURCHASE
AND
JEPOSIT RECE:PT
THIS AGREEMENT is made this day of
2001, by and be~ween the SELLER and theišüŸER as follows:
SELLER:
The Board cf :~us~ees of the Internal !mprovemen: Trust
f\md of the State of Florida ("TRUSTEES") :,y and
through its agent the Division of State Lands of the
Florida Department 0: 8nvironmentai Pr::>tecticI'. ("DE:P").
ADDRESS: Florida Department of Enviro~men~al PrDtec~iDn
Division of State Lanà~
Bureau of Public ~and Administration
%Steve Remke. Land Acquisition Agant
39GO Co~~onwealth Blvd., M.S. 130
Tallahassee, Fl~rida 32399
BUY8R:
ST. LUCIE COUNTY, a po~itical .ubdiY~a~on of the St&te
of Florida
Feder'al I. D. Number
Address: St. ~ucle Coun~y
Açtn: Robert Bradshaw
2300 Virginia Avenue
~t, ~ierce, Florida 34982
.
rhorle:
(561) 462-1441
1. AGREEMENT TO SELL: The '!'RUSTEES hereby a9rea ';:0 sell ~fi(~
the BUYER h~reby agrees to bay in accordance with this ~Ontr3C';:
all tha: certain real property. together with all i",pro'/emer,t s,
easements and appurtenances, more particular:y described in
atr.a::hed EXHIBIT "A" of ':his ContraC1: for Sðle and Purcr.dse.
2. E'URC¡U\SE PRIe:::: BUYER hereby offers t!-e fcllr.>wing p~rct:,iise
price for the property in the amount of E:IGHTY :s:rGaT 'J:SOOSAND
EIGHT HUNDRED AND NO/10C Dollars ($SB,800,OO) whiç~ shall be paid
in r.he form of a Certifled or Cashier'.; Check If\ the follð...-ing
rna~ner :
4
a. Deposit: BUYER deposits .herewith EIGHT THOUSAND E,GHT
I-H;NDRED EIGHTY AND NO/lOG Dollars ($8. SSC. 00) in the form ôf--'¡
Certified or Cashier's Creck, money order or ar. ir~evoc~ble
Letter of Credit from a financial institution as defined by
Section 655.005, Florida Statutes, made payable to the Jepdrtment
of Environmental Protection representing ten percent of the tt'):al
p~rohase price as an earnest money deposit.
b. Bal~: The balance of the purchase price iD the
;'".ount of SEVENTY NWE THOUSII.ND NIN~ HUNDRED TWENTY AND N0/100
Dollars ($79,920.00) shall be paid by ëertified or Cashie:::'s
Check made payable to the Department of Environmental rrotect~on
a: the time of closing. Any costs of sa:e ir.~l1rred by tne
T~U$TEES shall be paid by sepazat€ Cert~fied or Cashier's Check
made payable to the Department of 8nvi~onmental Prc~~ct~on at the
ti~e of closing.
l'ëge 1 of 7
Contract No. 30697
Gt. Lucie Cou~ty
"
1;J~/·2?/2iJP.l 09: 213 \w858-488-3379
DEP_BPLA
-..J
F·AI~E. r<~
Department of
Environmental Protection
---=~~ -::=-:::-
Jeb Bysh
Go~eroor
Marjory Stoneman Douglas Buîlding
3900 Commonwealtn Boulevafd
Tallaha5see, Flonda 32399·3000
David B Struhs
Secret3ry
April 23, 2001
:Mr. DOll Cole
51. Lucie County
2300 Virginia Avenue
Ft. Pierce:, Florida 34982
F..,;: No. (561) 462-1440
c
Via }I'acsimile
RE: IF ASlFt. Pierce
Dear Don:
4
Please find the ac;;ompanying contract for your review and approval. 1 understand that if this
item is placed on the County Commission agenda for May 1, it may be possible for the contract to
be signed and returned to this office on or befOte May 3. If this is the case, we will schE"du1e this
item for the June 12 Cabinet meeting. If the c.OD.tract cannot be signed and returned until after
May 3, we will attempt the May J 7 deadline for the June 26 Cahinet meeting.
If you h!lve any questions, please: feel free to contact me at (850) 488-2291.
Sincere¡y,
~~
~eveRe~e --
Bureau of Public Land Administration
Division of State Lands
Isjr
Enclosure
"MQrt Pr()cecci"n. Leu f'roceu"
Prinm! on ",~led P"P" r.
,.
Co~.'·",)';'/"'G¡GI'" ,·70
v , .-. _~;u '1IIIIiIII" .-
8513-488-33/3
, 0,
[>E;P _BPLA
....J P,"G£ CG
I~ WITNESS WHEREOf, the parties have caused ëhis Cor.tr~ct
for Sale to be executed on the day and year firsc above ~rltt~c.
Wi.tness
Pri~t/Type Witness Name
Witness
?rint/Type Witness Name
APPROVED AS TO FORM AND
LEGl\LITY
8Y;
52P Þ.TTORNEY
Witness
?,~r.t/Type Witness Name
Witness
j~int¡Type Witness Narne
!?age 4 of 7
Ccntract No. 30697
St. Luc~e County
BOAR;) OF TFUSTEES OF THE U]T"RNAr..
IMPROVEMENT TF\:JST FUND OF' 1'11E ST1T;::
or E'LOR!D.".
By: ¡SEAL)
DIRECTOR, DIVISION OF ETATE
LANDS, DE?ARTMENT OF
ENVIRONMENTAL P~OTECTION
As agent for Board of Trustees
of the Internal Improveme~t
Trust Fund of the State of
Florida
"TRUSTEES"
4
ST. LUCIE COUNTY,
a ?olitical SubdivisiQn of the
State of Florida
BY;
signature of 3UYER
Print/Type Name cf BUYER
As: _____
(If ~ corporation, title of p~rson
signing. Affix cQrpcrate Seal ~f
officer other than P~e5ldent is
signing.
"8UYER~
·#
Co ,." ,on j¡. . '''J
~-".: ....:.. ~<..-v.........,J. ....
'35tj-482-:B7g
..
EXHIBIT "A"
LEGAL DESCRIPTION;
I;£~ _ElPLA
...." p",:,e: l c·
THE SOUTH 251.20 FEET OF THE NE y. OF TIlE SE ~ Of THE NW Yo AND THE
SE y. Of THE SE Y. OF THE NW Y. OF SECTION 14, TOWNSHIP 35 SOum,
RANGE 39 EAST. LESS M'D EXCEPT TIm EAST 70.00 FEET 'IEEREOF FOR
"ROCK ROAD" / ·COLUOOE ROAD" RIGHT OF THE WAY AND LESS AND
RXCEPT mE SOUTH 90.00 FEET1HEROP FOR "PICOS ROAD" PlGEn' OF WAY.
SUBJECT TO A 30.00 FEET WIDE FLORIDA GAS TRANSMISSION COMPANY
EASEMENT A$ RBCORDI:D IN omCIAL RECORD BOOK. 172, PAGE 1859; ÃNo
A 30.00 FEET WIDE FLORIDA GAS TRANSMISSION COMPANY EASEMENT AS
RECORDED IN DEED BOOK 248, PAGE 1&7¡ M"t! A 25.0D F.8E1' WIDE FLORIDA
GAS TRANSMISSION COMPANY EASEMENT NO. 29165, AND A 40.0C P.EBT
WIDE FLORIDA GAS TRANSMISSION COMPANY EASEMENT AS RECORDED
IN OFFICIAL RECORD BOOK. 887, PAGES 743 AND 755; AND OFFICIAL
RECORD BOOK 937,l'AGES 2698 AND 2707 OFnm PUBLIC RECORDS OF ST.
LUCJE COUNTI, FLORIDA.
Page 5 cf 7
Contract No. 30697
St. LUCle cou~ty
t
.
..
"'. ..il'"';~'·)r.lC"·'~ .....);1
. 04, ....... _~'-'.I....,.. ,-".J
8SEI-48=-J3,'3
DEP _BF"...A
...., p...£ 88
;I
~ia form is an examplo only, Qo not co~plete.
EXHIBIT '8"
BOARD OF TRUSTEES Or THE INTERNAL IMPROVEMEN~
7RUST FUND or THE STATE OF FLORIDA
QUITC:LAIM JEED
Oeed Number
KNOW ALL MEN bY THESE PRESENTS: That WHEREAS, the 8:)AR,) Or
T~vS7EES OF THE INTERNAL IMPROV~MENT TRUST FV~D OF 7HE STATE C,
FLO~IDA ~s by Section 253.03, F:crida S~a:ute3, authcrizeù ana
empo;.rered to convey certain land" \Jnde;: tne te"",.$ "ad cond~t:io"s
set forth herein; and,
WHSREA.S, said BOARD OF TRUSTEES OF THE: :;¡'."£?SJ\L IMPR:)VEME,·¡'r
.
TRUST FUND OF THE STATE OF FLORiDA did apprQv"" th':':s tran.;¡fer ("I
ti'e _ day of _._
, 2001.
NOW, THEREFORE, the unders igned BOARD OF 'l'i\USTEES OF :::~E
INTERNAL IMPROVEMEl~T TRCST FUN~) OF TH:: STATE OF FLORI DA, ,]$
"GRANTOR", \:.nder author,- ty of Section 253.:) 3, !"lo::ida Statute""
for "od in consideration of the sum of
($
_._--
and other çood anc vdluab~e
c~n8ide~ations, to it ir. nar.d paid by
whose
address
.is
--
as "GRANTEE," h¿¡~
remised,
released,
conveyed ~nd quitclaimeà,
i!nd by these
presents does remis~, release, =onvey
arid quitclaLm un~o
GRA~1TEE, ita successors, he:!..r:;, and assigns forever, all tr_e
right, tit.le, interest, claim and dema~ci wh:'ch GFA"ITCR may h,r.:e
ir. a~d to the following des=ribed lands in
------
CC\Jnt y,
Florida, to-wit:
SAVING ANC R8SERVING untc ~RANTCR and its successors an ~nd:'vijed
thre~-fourth$ interèst i"'l, and title in and to ar. ur:Ct';'vi:ie~
three-fourths interest in, all the phospha:e, minerala, an~
~etals that are or may be in, en, cr under the ~3ld lanj a~d a~
I?age 6 of 7
Contract No. 3C697
St. Lucie County
, .
e"/2:ne0~:2g
85Ø-48ô-3373
DE 10 _¡¡PLA
...., Pi>o:£ 0'3
J
undivided one-half i~terest ~n all the petroleum that is or may
be in, on, or under ëhe said lane.
TO HAVE AND TO HOLD the above·desçribed Lwds subJect -'_ a:'l
outs~anding easements, reservations and other intere3ts.
IN TîSTrMCNY ¡-¡HEREOF. the :n~",;;,ers of the BCARD OF T,(CS'l'<:ES
0"' THE: INTEFNAS IMPROVEI1ENl TRUST fUND Of THE STAn OF F:"ORICl".
have hereunto subscribed their names and have caused the Gff:cial
seal of said BOARD OF TRtJST>:ES OF" THE WTERNAL IMPROVEMENT TR:JST
F:J'JD OF THE STATE OF FLORIDA to be hereunto affi;~~à in the Ci T.Y
of Tal:ahassee, Florida, on this
day of
, A.'J. 2u02.
.
(SEAL)
BOARD OF TRUSTEES OF THE
INTERNAL IMPROVEMENT
TRUST fUND Cf THE STATE
OF FLORIDA
JZB BI.JSf!
GO'/EFNCR
.
KATHERIÑE HARRIS
SECRETARY or 5~ATE
B08 BUTTEX¡¡OR~H
ATTORNEY GE~ERAL
ROBERT F- 11ILLIGAl'<
COMP'TROLLER
'ro!o! GALLAGHE~
TREAS!JRER
---------
TERRY L. RHODES
COMMISSIONER OF AGRIC~~TJRE
CfLÎ1.RLI£ CRIST -----------
COMMrSS[O~ER OF EDUCATION
As ar.d Consti~uting thè BOARD
0, TRUSTEES OF THE INTER~A~
IMPROVEMENT TRUST ?JND OF THE
STATE OF FLORIDA
Approved as to forn a~d legaliT.y
By:
..-....----..
SEP Attc~ïley
Page -: of 7
Cu~tract No. 30697
St. Lucie County
-,
"
'-'
'-"
...,;
"""'"
ßOARD OF COUNTY
COMMISSIONERS
COUNTY
ADMINISTRATOR
DOUGLAS M. ANDERSON
April 21, 2000
Mr. Greg Rivers
Director of Facilities
Post Office Box 110850
Gainesville, Florida 32611-0850
Dear Mr. Rivers:
The County is in the process of determining the feasibility of constructing a building on
property the County leases from the Trustees of the Internal Improvem~nt Fund. A copy of a map
depicting the proposed site where the building would be located is enclosed as Exhibit' A". The
County would use the proposed building for the County's Agricultural Extension Department as well
as leasing portions of the building to the USDA and Farm Credit of South Florida, ACA, for office
use. The County would use the rents generated by USDA and Farm Credit to finance the
construction of the building.
In this regard, the County requests that you assist the County in initiating the process that
would result in a release of the property depicted in Exhibit' A" to the County.
If you have any questions, please let me know.
.- J ~ 4.;---
Do glas ¡. Anderson
County Administrator
DMA/ caf
Enclosure
Copy to:
Board of County Commissioners
Assistant County Administrator
County Attorney
County Extension Agent
D. Rice, Farm Credit
T. Lewis, Esq.
JOHN D, ORUHN, Di'tricr No, 1 . DOUG COWARD, DIStricr No, 2 . PAULA k LEWIS. Di'trict No,;) . FRANNIE HUTCHINSON. Dimicr No, 4 . CLIFF OARNES, D15rricr No, 5
COUl1ry AdmÎnisrroto( - Douglas M. Anderson
2JOO Virginia Avenue . FaIT Pierce, FL J4982-5652 · Phone (561) 462-1450 · TDD (561) 462-1428
FAX (561) 462-21J1
Phone #
.,.¡
'-'
Post-it-' 1 Note 7671
TOC4,¿ "", ~é' ¿-L. ¿.
CoJDept.
Phone #
Fax~.:P/-94>5 -9Q
Fax #
_Jot'"
1.10'
........,,'0
~
0
0
N
-
~ w
z -'
0 «
>= u
~ In
.
'-
-3
'a ~
.¡
~
Z
!Ii IV:
ll)l rV
~" '" .oc. .~O £fY ~
\ I~ ) V L'
J t
'vrf .
('y,V r,' ,~¡ )
,r t
(\/,"" ,)\
u r' .f
r ¡1 cr"
~pI'
i:5
"~'.~~~~~.:'~' "
~'-;;-d:E'¡¿
;~ ::; ~1:::"'··'};
. . -'--- ...
.-. -....-..- .'~
.-;.s.-·....-"';'c··;,
N89'41'4S"E
~
;!;
z
~~
~~
.~
\('
w
Z
:¡
~
~
~
6.76 ACRES
z
0' 0
""-I [ß
" 0>
<.'" [Å
~-;
"
z
o
o
,;
.,
..
/
'"
~
¡,.
0>
1.646 ACRES
'"
'"
'"
:..
'"
Na9'44'25~E .395.4,3
....·u· .-r
'cv
NOR TH R/W PIcas ROAD
C /? /2 ...x.. Æ/
./
:2J4?!" /.7
/~
c74.5e.D CN
/ð~LC 4-?-Þ Jç:-.,.-....., ,x./<> kL d
C4LCL.L477~/~
.,:5?., /2 Go- ..s-7
6</1
1;2 +
.1
'-'
-'
BOARD OF COUNTY
COMMISSIONERS
COUNTY
ADMINISTRATOR
DOUGLAS M. ANDERSON
December 11, 2000
Ms. Sheri Bryan
Administrative Assistant
UF /IF AS Facilities Planning & Operations
P.O. Box 110850
Gainesville, FL 32611
Dear Ms. Bryan:
Please accept this letter as St. Lucie County's official request to purchase approximately
12 acres of vacant land located at the University of Florida, Institute of Food and
Agricultural Sciences', Indian River Research & Education Center in Fort Pierce.
The property, located on the corner of Picos Road and Rock Road, is adjacent to property
that is maintained by St. Lucie County as an Agricultural Extension office. St. Lucie County
would like to purchase the 12 acres to build a building that would accommodate the
County's agricultural extension seJVice. This request is given with the understanding that
the sale price of the property will be based upon the appraisal currently being completed.
In addition, please note that any contract for sale and purchase of the property is subject
to the approval of the Board of County Commissioners of St. Lucie County, Florida.
We look forward to a continued cooperation and the successful transfer of this property.
D]\¡1A:esOO-203
c: Board of County Commissioners
Robert Bradshaw, Assistant County Administrator
Anita Neal, Interim County Extension Director
Dan Mcintyre, County Attorney
Don Cole, Property Acquisitions Manager
JOHN D. BRUHN, Distri" No.1' DOUG COWARD, District No.2' PAULAA. LEWIS, DiStrict No.:J . FRANNIE HUTCHIN50N, District NO.4' CLIFF BARNES, Disrrict NO.5
Counry Adm,nisrrotor - Douglos M. Anderson
2JOO Virginio Avenue . Fort Pierce, FL J4982-5652 · Phone (561) 462-1450 · TDD (561) 462-1428
FAX (561) 462-1648 · email: douga@stlucieco.gov
'!I
.. . '-'
. FtILLER-ARMFIELD- WAGNER A
."",¡
ralsal & Research Inc.
Daniel D. Fuller, MAl, SRA
SI. Cert. Gen REA OOOOS67
Scott N. Mattbew, SRA
SI. Cert. Res. REA 0000448
328 S. Second SI.
FI. Pierce, FL 34950
(561) 468-0787 Fax (561) 468-1103
email: realestate@FAWappraisaLcom
o 320 W. Ocean Blvd.
Stuart, FL 34994
1-800-273-7364'
www.FAWappraisal.com
September 18, 2000
Ms. Sheri Bryan, Administrative Assistant
University of Florida
Institute of Food and Agricultural Sciences
Facilities Planning and Operations
P. O. Box 110850
Gainesville FL 32611
RE: Purchase Order No. L66711
Dear Ms. Bryan:
As requested, I have inspected the ~. 'property located on the northwest comer of
Picos Road and Rock Road, St. Lucie County, Florida, and I have made an anàlysis of the
market influences affecting thê subject property. This is for the purpose of providing you
my opinion of the Market Value of the Fee Simple interest in the property, as of
September 12, 2000.
Per requirements of the Uniform Standards of Professional Appraisal Practice
(USPAP), my appraisal is a Complete assignment, presented to you in a Self-
Contained format. My apprai~al. and report is subject to the Limiting Conditions,
Special Limiting Conditions, and Certification included within this report. -
Based upon my analyses pres~nted in this report, it is my opinion, Market Value of the Fee
Simple Interest in the property appraised, as of September 12, 2000, is: ""'0;
I believe you will find my appraisal and report complete, but if there are questions
please feel free to contact me at your convenience.
AS FID0 F/asf f:commfile 147771tr
,
·M.R·n 200~
'USDA
~
--
Vnltlld St;!MS
Department of
Agrlr::ulture
Natural
~esourcBs
Con$arva~on
Servfce
2614 N.W. 43rd Si.
Galr¡gsvil/e, FIOI'ida
3260e-a611
P.O. Bc)C 141510
Gainesville, Florida
32614-1510
2 :\w-N
,,,,,,/" 5147
P.
April 23, 2001
FAX; 561-462-2131
Doüg .ÀIlderson
County Adrtrinistrator
St. Lucie County Board ofÇommissioners
2300 Virginia Avenue
Ft. Pierce, FL 34982
Dear Mr. Anderson
The USDA Service Center ~ Ft. Pierce, Florida, is interested in relocating to neW and larger
space, clos~ to the vicinity in which it is now located. We understand the County wishes to
construct a. building in this :vicinity conveniently located near other Agricultural facilities.
The USDA-Natural ResoUt'ces COtIservation Servìce will be soliciting for Service C<mt.er
space in the neat future and would b~ very interested in including the County in this
solicitation process.
Please contact mc at 352-3ßB-9530 if you have ¡my qU.~StiOnB.
Sincerely,
,.M..
Angeli . Miller
Re/l1 Property Leasing officer
co: Donna Smith, NRCS,;Ft. Pierce
The Natura\ ResO\lrèCI Conscmtion s.rv\ee works b.lld-in-h&nd
with the American people 10 co~lel'Ve n81\.'Ts1 Nlsoure<:! cn p1'iVlltç lB1lds.
AN EQUAL OPPORTUN11'Y EMPLOYER
, "
'-'
...",
,
6
~p
.®
Farm Credit of South Florida, ACA
~
v t,P ')
P/ '{Í
~.v l/ ø
'l}1? l ('
~,J
Ph. (5611965-9001 Fax (561) 965-9099
P.O. Box 5559, Lake Worth, Florida 33466
March 6, 2001
Mr. Doug Anderson
County Administrator
2500 Virginia Ave.
Ft. Pierce, FL 34981
RE: Office Space Lease
Dear Doug:
This is to follow up on FaTI11 Credit's continued interest in leasing office space in the
proposed county facility near the USDA research facility. Anita Neil had requested that I
write you a new letter of interest since it has been some time since our initial discussion.
We remain interested in the same space requirement as outlined in our specifications
previously provided to you. We also remain very negotiable regarding the teTI11 of the
lease. Moreover, we are receptive to the possibility of a purchase option of the building
or some portion of the land for future expansion of our offices.
If I can be of further assistance please feel free to contact me.
Sincerely,
,--.,
~
Don Rice
CEO
i,' Ii If D U œ'¡
---.'
I
I
MAR 12 2001 I ¡ ,,:.
.Lj
J
~E
.._---.
The Fann Credit System
www.fanncreditsfl.com
..
w·' .~,. ,~" 110.. ,'~O
~_. __. _1;;t;..I.,...,....
S5"-4~¿-33?3
D£~ _EF'LA
....." ,-!;4¡3£ t15
<;;. RI.'3K Of LCS~: I:l the event of any sub8taTltia~ damag~ to the
property (in excess of $5. t'QO¡ between ::he date ot this agreement
and the date of closing, -che TRUSTEES shall have the option O!
res~oring the damaged Property to its ccndition iw~ediately p~icr
:0 the occurrence can.ing the ct<:'.J1'.agp., in which evant, 8UYZR shall
coæplete the tran8actio~ ~8 originally planrced. If these rep~lrs
a!"e not completed pc:.or to oloSi:19 date, cI::Jsing \oIil':' be extended
until su,:!". ti:!!e as the repairs "re completed. If the T!US'!'£ES
elect not to repair thE' da:"aged property, the 3I,;YER'S s::Jle remedy
shall be ::he right to resci~è this contract by giving written
n,::>tice to the 'tRUSTEES a:;d tc) receive a refund of the earnes-
money deposit or, alternat.ively, to procee:i to closing en t~\t~
E'roperty, as damaged. wi thOU1: ad: ustment 1:'1 the purchase price.
I~ ~he even~ of any lesse~ damage, the parties ahall proceed to
closing as :hocgh no damage had occurred,
IC. CEFALJLT: If Bl:YER ~ai:'s t:.> perform any coven¿r:ts :;¡f thls
<3greerne!lt W'ithi~ ninety days a~ter receiv¡ng '...r~tt3!1 notice of
acce?ta!>ce 0: effer, the ea!"nest mcney deposit may be r€tained by
the TRUSTEES ",i thaut wai·JJng any action for damages ¡:<,sult i:1g
fro~ 8UY8R'S default. hltêrnatively, thê TRUSTEES ~ay see~
specific performance of the terms and conditions h~rein. If t~e
TRUSTSBS fail to perfo.rm any covenar.ts of this c::>ntract, the
deposit shall be retu.rned to BUYER as 8UYERIS sole ¡:emedy_ In
that even';, ell parties shall be released of their r:'ghts and
~bligations under this cor.tract.
~
.
1:. ~UCCESSORS: Upon exeç~tion of this contract by the SUYER,
this contract shall be blnding upon and inure to the ~enefit of
the 5UYER, 1:5 heirs, S~C2essçrs C~ assigns.
~
:2. RECOR::>ING, Neithe: this contract r:Qr any m.',:ic<ò oJ:: is may
bE: recarded in any cOt:nty by any p~rson_
13. ASSIG~.MENT: 'I'his contract shall not :,e assigned by =1)(0
SCYER without the ?rior written COnsent of the ~sp_
14. TIME OF E:SSENC~: Time is 0:: the essence in the perf::>rr.l<iTlc'O
of this contract.
l~. AMBNOMENT3: This contract contains
"':. l represen;:a t iens of the part iêS.
effective excepc when reduced to writing
the ent~re agreement dnd
~o amendr"ent will be
sigr.ed by all pdrties_
16, SURVIVI'_L: 'rh", covenants of this ccr.trace wi.il 9urvh-e
delivery önd record~ng of deed and possession of the prop~rty.
1 Î. ACCE:?TANCE DE' OFfER: The TRCSTEES ¡::e~erve tb<:! right ..
reject this offer. Theref'Jre, ":his COt'ltrðct shaL !1d bi.nd the
':KUSTEES or the State of F'iorida in any manner '~r.less or w:til it
is approved by the TRUSTEES and legally executed.
Pase 3 of 7
Contract N~_ 30697
S~. ~ucie County
~OV-22-:9';>
: e I
'-
At1
IHTEGRITYFIRST
l::>~ 1.4667('
.....- ..,
P.OI
~
No\'cmber 16, 1999
Doug Andcl50ll
~t. Lucie Counl)' Admin1SU"dtor
2300 Vil'{:jlla A \ ';-1,uC
Fj Picre;:, Floridu 34982
Dear Mr. Anderson.
AfY(I(1 (If<: ~\\'M~, FMm ("f/:rlil ofSolllh f'orida. ACA is ¡)l'(Ip(1~jnf, COQslructìo.lI ora ~,OOO +/- square foot
nf1'if~~ 1111i1dîot Th~ rar.i1ìI)' wnll'rll'lI~ IA"lil,;¡iflu',ÎI"l1 flfI11'U',;1ì!¡t1r:Tlf'flmΡla m\'rI1'"IH~url:nrrrl'I1T1y1tll'irti hy'u,
St. Llldc COunl}, on Picos RO.1.d The parcel is loealed l)J1 (hc tlorl1\ side of the road just west ortlle
Picos/Rock B-O'dd inten~ol1 imLUedi,rt~1y eil:iòt afthe "'IIurrícmc HOllsc."
It iö tlu,,'¡ntQIII ofF¡lrlTl ('rc¡il of SOli 111 Floridu, ACA lt1 o~p]orc the potentia! orcoug¡:rucùJlg: !lús building
for occllpanC) b)' th.;- USDA, 11\c Natural RC$Ourcc ConSC!'\alion SCI\i\;c, tllC COJ1s:olidutcd falm Scr\'ice
AgenC)' and the St Lucie Water and Conservation District as weLl by Farm Credit Perswull oul' inirjal
~U!l\·tl""liuu"" il,< ¡;U\t:IUlIl<:utdl "¡;''''l~i~~ ''''I" in: "V!,IU.\i'll,,¡dj 3,000 "'-¡"'"< r<:d ur offic-c "I"'C". The
JtlI'Jiji11lk1 ur lilt" bulldin.\; wuuld !J~ uliIiL~¡J IJ) F'itllU CJt"t1it.
F~ifm Cn.'dil of South Florida, ltCÄ 1I'oold require ¡¡ long term leal;e 011 the I¡u¡d ...itb iWlììiro.l·tc~~lkol·tз '"
beginning cowtmçtjQn, The final ~ì:r.ç Of t"ç ~1r¡lÇI\1rç r¡¡¡~ IlIç pçtçnli¡l! t\1 ~ ilmendo;d if s\lch is åç~ir¡lblç,
Wf; I1nticipalf. that SI 1 ,nck r.mn1\y will find Ihc pfO1()~111I1OCCI11ah1c ßlld as.';~ in ohtaining Ihe nccC;<iAAIj
permits to II1Iow COInplcti01l (¡fllle project
OncC aSS\ltance. l1<l\C becn obla.íned fl'Oln Slate and cown)' agencies for con.:eptual approval, Farm Credit
III(l"ll~ lu I-lIII'SlIl', b"j,1ine; ,,),'I ~jll': J11i\11~ whh:h Vo'iI! :'W1ti.o;fy h.~tl1Ihr.I1f\ì.o;pc¡;¡iv, 1c.~.~c.r:.\ and Cffi1DIY co¡k~
for construction and Ilse.
As further ÌJÚOJIdlIliOl1, Fanl1 CI'("Qi, or SOlllh Flol'irJa, Af' A i,~ a jJ\\'r.rnlIlr.nlaI R)OnROrl".rl f.111it)' r,IiITff.rl
with Ùle n1i~~ion of providing :I Slablc :U1d competitive source of credit to the ¡¡g¡icWtural community. It is
anticipat8d Ih:llthe (JÇ;uion within die l¡car¡ ofdle wowing ¡¡¡¡ri.çl1lmr¡¡1 resource ¡Ire" wiH be bCl!dki~1 to
311 concemçd p¡tt1iç~,
We are rC{llIcs!ing Icllers of support in principill from all itllcrCSlcd pMics including represMtatives of the
cmmly gowmnlom (}out'!XJll). Dr. C:¡lvin AmoTd or-the Univol'sil} ofF1orida Tndi~/1 Rh'er Research and
Educ;ujofl ('{'mtr, 111(' rfln~fllir1am1 'Pflnn ~rvi'I', A¡:i~m;). 1,,~ NH0I 111111 f1l~ Rs Lm;ir. W;ilç;¡ IIIKJ
Consc"'alion Dimict.
If I c:m be of allY furthçr il$siJiIM1CC or addItional clarirlQllion is needed, plca~ do 1101 hCiilalC to call.
Cordi¡¡lly.
~ ....
éjf!' ..'
.PD'~~ M,ÜlNly
PrincipaJ ^ppraiscT
Farm Credil OrSO\l(11 Florida, ACA
) -56 1-189-4661
I[J'J)) Ircritagc F¡¡rnl$ Rood
take Worth, Flori\t~ 33466
. ----.. .... .......- ......
'-
""
....."
'"
BOARD OF COUNTY
COMMISSIONERS
COUNTY
ADMINISTRATOR
DOUGLAS M. ANDERSON
November 24, 1999
Mr. Carson McCurdy, Principal Appraiser
Farm Credit of South Florida, ACA
10053 Heritage Farms Road
Lake Worth, FL 33466
Dear Carson:
St. Lucie County has been working for the past several months to put together a program to construct
a facility on the State of Florida, Board of Regents, University of Florida owned land on Picos Road.
This facility would house several agencies, including the United States Department of Agriculture
(USDA) and Farm Credit of South Florida, ACA. We are very much interested in the construction
of an approximate 5,000 square foot office building and are anxious to get the project underway.
As you know, the County staff and County representatives are working with representatives of Farm
Credit of South Florida, ACA and the USDA and support this project.
.
4
Sincerely
';I /J- 4----
D ug16.s M. Anderson
County Administrator
..
.
DMA:es99-l46
c: Board of County Commissioners
Robert Bradshaw, Assistant County Administrator
Anita Neal, Interim County Extension Director
Mike Durette, Interim Central Services Manager
Dan McIntyre, County Attorney
JOHN D. GRUHN, Disrrict NO.1. DOUG COWARD. District No.2' PAULA A. LEWIS. Disrrict No. J . FRANNiE HUTCHiNSON. District No.4· CliFF CARNES. DIStrict No.5
County AdminisrraTor - Douglas M. Anderson
2300 Virginia Avenue. Fort Pierce, FL 34982-5652 · Phone (561) 462-1450 · TDD (561) 462-1428
FAX (561) 462-2131
--
00"000'006$
OO"OOO'OLL.$
OO·OOO'OS£..$
""'"
){:J!lq 'Á.IO¡S aI~u!s lOJ 'U 'bs/00'06$ JO ¡SO:J pa¡tmI"!¡Sg:
>
O:J:Jn¡S 'Á.IO¡S-OM¡ 10J ·u 'bs/OO'LL$ JO ¡SO:J pa¡B1II"!¡sg:
O:J:Jn¡S 'Á.I01S aI~u!S 10J ·u bS/OO'ÇL$ JO ¡SO:J pa¡mrrpsg:
'000'01 JO ::J~B100J ::J1Bnbs pa1B1II"!1sg:
DNIU'lHlH .llUrn::> WHV.!I
~ 0/90
vl/vO
£ ~/lO
O~/vO
£~/£O
9~HO
80H~
£0/0 ~
l ~/60
31'10
......"
£qM' ~0I^jaN31^jV'\SI^j~O.::J\lV,~Ð\O~l1Vn0\13ÐÒn8\:Ð .
:UOJ:>'1 pasodoJd Ja»'1 alqel!eA'1 a:>uees
~6!ì'6v ~
008'£6$
Á1JsdoJd ¡!PSJ::J wJe.::J sse4:>Jnd 01 ueol
:UOWJe pðsodoJd
~6&'&VZ
609'9!ì1.
alqeneA'1 a:>ueles
:pasn 11!101
OOO'Og£ 00 ~ -00œ8g-006 ~- ~OO S¡usws^oJdWI JS¡eS41 sSiJuns uo!¡eJ¡s!u!WpV
OOO'OL Ol6~-000 ~£g-O ~ V~-~OO SS::>!NSS leUO!SssjoJd/uo!¡e6!¡il s¡e¡SIIV ÁSUJOnv Á¡un0::J
699'v$ 00 ~ -00 ~ vv9-006 k ~OO ~H / woo~ I!el^j JOj sU!4:>el^j s6e¡SOd sS::>Jnoss~ uewnH
009'<::l$ 00~-000~£9-006~- ~OO spssu suo!¡e::>!unww0::J uo 6u!llnsu0::J Á6oOU4::>S1 uo!¡ewJojul
6Ln~$ 6 ~6~-000~£9-006~-~00 (S)::>op SW!¡) SOUOJ)! O¡ snp s:Juees Á60OU4:JS1 uO!lewJojul
6LO'<::<::$ 00g-000v99-0 ~ £g- ~OO SS:J!NSS ueJS¡S^ JOj ueol ue^ SS::>!NSS ueJS¡S^
OOO'OOl$ 1.0091. -000<::99-0£6 ~ - ~OO (9~£ punj O¡ sueol) ue!UOS4¡!WS SS::>!NSS eJ¡us::J
<::80'~$ <::009~-~ ~0<::99-006~-~00 Isde4::J peo~ )::>O~ S)JOM :J!lqnd
000'9L$ 00 ~ -gao ~ ag-006 ~ - ~ 00 Á::>us6V ¡uswdos^spS~ Á¡!unww0::J uo!¡eJ¡S!U!WPV
OOO'OOO'~ 008-00 ~66!ì-0 ~66- ~OO Á:>us6u!luO:J la6png pSAOJdd'f
1NnOW'1 # .lNnO:X)'1 W311 .lN3WUI'1d3a
~6g'6v~$
:ÐNINI'o'1III3~ .lNnOIlll'o'
GNn:l Ttfè/3N3Ð
Á:JN3ÐNIJ.NO:J WOè/:I G3l\Oè/ddtf SGNn:l
~OOZ-OOOZ è/tf3Á 1tf:JS/:I
....,.
£qM' ~OI^JO N31^JV'\SI^J~0.::!\ l\i'....,r3Ð\OtJll 'VnOU3ÐOn8\:Ð
Lv~·~O
~6Ç'6v~$
00B'£6$
~6£'£v¡:$
a OJd ¡lpaJ8 WJe.::! asm.:)Jnd O¡ ueol
00B'£6$
.
A8N3ÐNl1N08
00B'£6$
9~£ ONn.::! 01 N'VOl ONn.::!~31NI
:AB 1ndNI '8 # 1N31111n:>Oa
:# 1N31111aN31111'1f 13ÐanB
:''1f^O~dd'1f BIIIIO
:''1f^O~dd'1f 1N311111~'1fd3a
:3:>N'1f''1fB ÐNINI'1f1lll3~
:lN3I111aN31111'1f SIH1
:3:>N'1f''1fB A:>N3ÐNI1NO:>
:lN3I111aN31111'1f 13ÐanB ~O.::! NOS'1f3~
OOB-OO ~66Ç-0 ~66-~00 :IIIIO~.::!
9~£
:01
~Ol ~O/ÇO
~OI£O/ÇO
NOI1'VtJ1SINII^JO'1f
:31'1fa'1faN3Ð'1f
:31'1fa a3~'1fd3~d
:lN311111~'1fd3a ÐNI1S3n03~
W~O:l .lS3n03~ .lN3WCN3W'9' .l3ÐCna
~
AGENDA REQUEST
ITEM NO.A....
DATE: May 8. 2001
REGULAR [X ]
PUBLIC HEARING [ ]
CONSENT [ ]
TO:
BOARD OF COUNTY COMMISSIONERS
PRESENTED BY:
SUBMITTED BY(DEPT): Admini6tration
Doug Ander60n
County Admini6trator
SUBJECT:
Bi-Weekly Committee Report6
BACKGROUND: At the April 11. 2000 Board of County Commi66ioner6 Meeting it wa6 decided by the
Board to place an item on the agenda, on a Þi-weekly Þa5i5. to give the Board an opportunity to provide
update6 on the variou6 Committee5 and Advi60ry Board6 that they 5erve on. It ha5 Þeen decided by the
County Admini5trator that thi6 item will Þe placed on the agenda on the 2nd and 4th Tue6day of each month.
FUNDS AVAILABLE: N/A
PREVIOUS ACTION:
RECOMMENDATION: Thi6 meeting the Board will provide update6 on the following Committee6 and Advi50ry
Board5 that they 5erve on:
Committee
Council on Aging
Indian River Lagoon NEP
Workforce Development Board
Land Acqui5ition Selection Committee
Law LiÞrary Board of Tru6tee6
Trea5ure Coa5t Community Alliance
Trea6ure Coa6t Council of Local Gov.
Value Adju5tment Board
Meeting Date
La6t Wedne6day
Quarterly a5 needed
A6 needed
Monthly
A6 needed
Monthly
Monthly
A6 needed
T ouri6t Development Council
Lake OkeechoÞee Coalition
Other Committee6:
Higher Education Committee
Healthy Kid6
1st Wedne5day
Quarterly
COMMISSION ACTION:
CONCURRENCE:
Commi55ioner
Lewi6
Barne5
Bruhn
Barne6
Bruhn
Hutchin60n
Hutchin60n
Barne6/Bruhn/
Lewi6
Hutchin50n
Bruhn/Barne6
Coward
Bruhn
[ ] APPROVED [] DENIED
[~OTHER: Reports given
;I
05/04/01
FZABWARR
---
FUND
001
001001
001128
001130
001136
001256
001262
001804
001813
101
101001
101002
101003
101006
102
102001
105
107
107002
115
118
1 . -
1 J01
145813
145814
160
183
183001
183002
183004
183212
183213
304
310002
310003
316
316001
352
382
390
401
418
421
441
451
461
471
~
'-'
"wfJÌ
ST. LUCIE COUNTY - BOARD DATA
WARRANT LIST #31- 28-APR-2001 TO 04-MAY-2001
FUND SUMMARY
TITLE
General Fund
Recreation Special Events
Section 112/MPO/FHWA/Planning FY01
TC Community Action Agency FYOO/Ol
Blind Creek Park Dune Replanting EP
CTD TRIP Grant FY 00/01
Manatee Protection Plan 11/ Fl Fish
SFWM/SLSWCD Well Monitoring Program
C/S/C Lawnwood Stadium Batting Cage
Transportation Trust Fund
Transportation Trust Interlocals
Transportation Trust/80% Constitut
Transportation Trust/Local Option
Transportation Trust/Impact Fees
Unincorporated Services Fund
Drainage Maintenance MSTU
Library Special Grants Fund
Fine & Forfeiture Fund
Fine & Forfeiture Fund-E911 Surchar
Sheraton Plaza Fund
Paradise Park Fund
Port & Airport Fund
Port Fund
IRL SWIM Impound Rest IX
2000-2001 Lagoon License Plate gran
Plan Maintenance RAD Fund
Ct Administrator-19th Judicial Cir
Ct Administrator-Arbitration/Mediat
Ct Admin.-County Arbitration/Mediat
Ct Admin.- Teen Court
OSCA-Court Reporting Grant 00/01
OSCA-Article V Transcribing 00/01
Communication System Fund
Impact Fees-Parks
Impact Fees-Public Buildings
Coúnty Capital
Transportation Capital
SHI Wastewater Treatment proj Fund
Environmental Land Capital Fund
Treasure Cove/Ocean Harbor S Cap
Sanitary Landfill Fund
Golf Course Fund
H.E.W. Utilities Fund
North Hutchinson Island Utilities
S. Hutchinson Utilities Fund
Sports Complex Fund
Holiday Pines Utilities Fund
Building Code Fund
EXPENSES
138,163.96
4,885.68
20.50
5,854.07
1,032.23
17,591.04
21.00
33.53
5,479.67
140,827.67
855.00
2,400.00
843,115.54
908.88
19,446.73
5,630.77
6,312.83
233,381.52
6,123.98
450.45
724.52
5,550.63
1,908.58
121.72
194.40
90.56
607.45
170.08
150.00
119.60
455.00
3,473.50
15,431.99
158,890.00
3,052.87
183,264.48
1,455.00
19,542.00
381,500.00
279.66
951,068.85
10,959.48
1,976.20
69,122.97
31,916.64
5,506.05
20,835.84
290.25
PAGE
1
PAYROLL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
,.
05/04/01
FZABWARR
FUND
501
505
510
611
625
694
'-'
'WIll
ST. LUCIE COUNTY - BOARD DATA
WARRANT LIST #31- 28-APR-2001 TO 04-MAY-2001
FUND SUMMARY
TITLE
EXPENSES
Information Technology Fund
Health Insurance Fund
Service Garage Fund
Tourist Development Trust-Adv Fund
Law Library
Raintree Forest MSBU
120{712.08
216{581.63
41{008.80
904.73
425.00
7{127.49
GRAND TOTAL:
3{687{953.10
PAGE
2
PAYROLL
0.00
7{635.10
0.00
0.00
0.00
0.00
7{635.10
.
"
05/04/01
F7l>.BWARR
Fu¡~D: 001
'-'
...."
ST. LUCIE COUNTY - BOARD DATA
VOID LIST# 31- 28-APR-2001 TO 04-MAY-2001
- General Fund
CHECK INVOICE VENDOR TOTAL
00269387 12112669 Pozniak, Adam 86.40
00270183 12114817 Oriental Trading Co Ine 94.05
FUND TOTAL: 180.45
PAGE
1
.
.
-"'
'-'
.,J
05/04/01 ST. LUCIE COUNTY - BOARD DATA
FZABWARR VOID LIST# 31- 28-APR-2001 TO 04-MAY-2001
F......ù: 107 - Fine & Forfeiture Fund
CHECK INVOICE VENDOR
00269182 I2112165 Oriental Trading Co Ine
FUND TOTAL:
TOTAL
5.00
5.00
PAGE
2
'"
05/04/01
F7,I\BWARR
E'udD: 140
CHECK
00270125
00270126
'-'
'WI
ST. LUCIE COUNTY - BOARD DATA PAGE 3
VOID LIST# 31- 28-APR-2001 TO 04-MAY-2001
- Port & Airport Fund
INVOICE VENDOR TOTAL
I2114829 Hilton Hotel 849.76
I2114849 Hilton Hotel 849.76
FUND TOTAL: 1,699.52
.
,
\rw.
""'"
05/04/01
ST. LUCIE COUNTY - BOARD DATA
PAGE
4
FZABWARR
VOID LIST# 31- 28-APR-2001 TO 04-MAY-2001
FLo..0: 352
- SHI Wastewater Treatment proj Fund
CHECK INVOICE VENDOR
TOTAL
00270952 12116788 St Lucie Co Board Of Commissio
12116790
CHECK TOTAL:
15,633.00
3,909.00
19,542.00
FUND TOTAL:
19,542.00
/'
'-'
....,
05/04/01 ST. LUCIE COUNTY - BOARD DATA
FZABWARR VOID LIST# 31- 28-APR-2001 TO 04-MAY-2001
FL,_.,): 505001- Property/Casualty Insurance Fund
CHECK INVOICE VENDOR
00270839 12117036 Elpex Inc
PAGE
5
FUND TOTAL:
TOTAL
25.00
25.00
.
;1'
'-'
05/04/01
ST. LUCIE COUNTY - BOARD DATA
,.."
FZA.BWARR
VOID LIST# 31- 28-APR-2001 TO 04-MAY-2001
Fi.J..¡); 694
- Raintree Forest MSBU
CHECK INVOICE VENDOR
00270952 12116734 St Lucie Co Board Of Commissio
12116736
CHECK TOTAL:
FUND TOTAL:
TOTAL
2,591.08
4,536.41
7,127.49
7,127.49
PAGE
6
.
f
,
\
~
'-"
.....,
I'
AGENDA REQUEST
ITEM NO. c-J.,k
DATE: 5-8-01
REGULAR []
PUBLIC HEARING
CONSENT [xx]
TO: BOARD OF COUNTY COMMISSIONERS
PRESENTED BY:
Pete Keogh, Director
SUBMITTED BY (DEPT) : Parks and Recreation
SUBJECT: Budget Amendment 01-142/Equipment Request 01-250
BACKGROUND: The Civic Center purchased a new forklift which did not include
some needed features as standard equipment. This equipment is safety and
efficiency related. Because it exceeds $750 in cost and was not included in this
year's budget, approval by the Board is needed. The cost of these add-on's is
$1901. 44.
t
.
FUNDS AVAILABLE: Funds are being transferred through the budget amendment to 001-
7510-546000-700 (Civic Center, Machinery and Equipment) .
4
PREVIOUS ACTION: N/A
RECOMMENDATION: Staff recommends approval of Budget Amendment 01-142 and
Equipment Request 01-250.
[x ]
[ ]
APPROVED
OTHER:
DENIED
COMMISSION ACTION:
CV'
I~
county Attorney: ~ I
Originat.ing Dept..· . (
Review and Approvals
Management. & BUd~.b~tt6
Ot.her: Othtr:
purChaSing:~
:-'
4
Finance: (Check for Copy only, if applicableJ___
~
JI'
'iIo..,¿
BUDGET AMENDMENT REQUEST FORM
REQUESTING DEPARTMENT:
LEISURE SERVICES / CIVIC CENTER
PREPARED DATE:
04/24/01
AGENDA DATE:
05/08/01
,
<O;:"j
""';~CCOÙNT"N'¡;';'E .
"'.
~ '" " -,'"..'" .
.¡. ,. ~ -, ,"'Ì-'·:·......~~P~-;.'.:...·"...t. >
ACCOUN.nNUMBER
.
TO:
001-7510-564000-700
MACHINERY & EQUIPMENT
FROM: 001-7510-546200-700
MAINTENANCE IMPROVEMENT PROJECTS
'-III
AMOUNT
$1,905
4
t
*
$1,905
4
fork lift.
REASON FOR BUDGET AMENDMENT: Funds to be used for additional attachments for the Civic Center's
CONTINGENCY BALANCE: nla
THIS AMENDMENT: nla
REMAINING BALANCE: n/a
DEPARTMENT APPROVAL:
OMB APPROVAL:
BUDGET AMENDMENT #:
01-142
DOCUMENT # & INPUT BY:
G:\BUDGET\QUA TTRO\GENERAL\FORMS\AMENDM01.wb3
.
" 1,-1
~ ~
fij
CI)
s:
LU
Q:
cn
0::
UJ.....
Zc
O~
Cñc:b
!!2c
::æ:~
::æ:o::
0«
OUJ.....
~~~
z«e
:)0'"
ocnc
oü:..
LLO::~
00«
CLLC
0::1-«
«cnC
OUJZ
m:)UJ
)-O'C)
I-UJ«
zO::
:)1-
OZ
oUJ
UJ::æ:
_0..
0-
:):)
.JO'
.UJ
I-
cn
ë
w
c
z
w
::¡¡¡
::¡¡¡
o
()
w
a:
CI)
LU
U
s:
ffi
CI)
LU
Q:
:::>
CI)
¡¡¡
-J
¡:.:
Z
W
::¡¡¡
I-
0:::
<I:
a..
w
c
o
<:
CI)
~
ë
w
>
o
0:::
a..
a..
<I:
¡:.:
z
w
::¡¡¡
w
()
<I:
...J
a..
w
a:
~
w
~
Q:
~
æ
u
u
s:
õ
I-
~
u
Ë
'«
I-
u..
~
Q:
o
u..
z
o
Ci)
:>
õ
¡:.:
z
w
::¡¡¡
a..
5
o
w
~
~
~
(1)
E
0.. .1::
's .;
0'(1)
(1)~
~.a
{g .~
1::....
C\ ° .
Ûjl::~
C/C/~
C\C\..-
C/~o
(!)~~
1;;.1::"-
.2C\6')
~ 1;j .~
"::OC/
~ (.)-
() I::
"'0 ·s 9
()O C/
(1) lO C\
I:: "- (1)
(1) 6') C/
E~,g
o().....
C/().....
() (.) °
~)(....
~(1):3
<.>:t:: 0
.S () (1)
õ~t:
I:: C\
(.) .
~(1)'E
'1:ICQC\
~ . &¡
.2 ~
~~(1)
~.!!!:S
!t::!IJ:...,
"::::'-.Q
~ :...,~
,£!g()
~ ·91 à5
(1)& ()
1::,.;: I::
C\ (1) C/
~ '-
~I::-
~ C\ ~
C\ :..., p
~....-
o~o..
I;;. C\ 0..
::J C/ C\
0.. ....:
.... .~ (1)
().... ....
.... I:: '5'
~ (1) ::J
uE.Q
(.) .9, ,C/
"- ::J ....
.~ 0' C\
U(1)~
Q) .~ CI)
t:t:Š
o
~
6
o
o
~
CD
lO
6
..-
lO
"-
,
..-
o
o
ö¿
w
m
::¡¡¡
::J
Z
I-
Z
::J
o
()
()
~
lO
o
0)
..--
6')
¡:.:
Z
::J
o
::¡¡¡
<I:
I-
W
C)
C
::J
m
z
o
~
()
¡:¡:
t=
II)
~
o
lO
C\
,
..-
o
o
lJ.J
:it
o
w
0:::
I-
Z
W
::¡¡¡
!!:
::J
o
W
Apr 20, 14:16 EDT by: Nã~ionãl Lift Truck
"
;
National ~ft Truck Service
-----------------------------------------
2901 N.W. 2nd Street
Fort Lauderdale, Florida 333ll
"hOD. (J05 462-65QO ,..~ (J05) 4ti2-42S5
Pg 2 of 3
.,
L
QUO T E # 03S2042850
PAGE 01
QUO T E * 0352042850
095390
8th COpy
PO# QUOTE
095390
QUOTE
rn BOARO OF CO.CO~1ISSIONER It I 30ARD OF CO.CO'~:SSIONER
& ST.LUCIE CO.FINANCE DEPT ~ ST.LUCIE CO.FINANCE DEPT
2300 VIRGINIA AVENUE 2300 VIRGINIA AVENUE
ð FT.PEIRCE,FL 349B2-5652Õ FT.PEIRCE,FL 34982-5652
~~=~=~~=~~~~~~~=~~~~~=======~~======~===~~===~~~=~=====~~=================
4
:Jnit ~:
Make:
M:.de 1 :
Se:- #:
10537
YALE
ERP035TGN36SV078
E807N03269Y
LIFT TRlfK
I
01 I
Hete!r:
I
·
o
PLEASE BE ADVISE THAT THIS QUOTE bOES
NOT INCLUDE FREIGHT CHARGES.
TH~{K YOU FOR THE OPPORTUN:TY TO QUOTE
YOU ON THE NECESSARY :T~{S YOU NE~D ON Y
YOUR FORK LIFT. PLEASE SIGN, DATE,; ADD PO
# AND FAX BACK TO ME AT 561 882 0683
THANK YOU.
4
I
1 1 1000: 4490010-48 HEX HJ BOLT .86 .66
I 10001
2 2: 5025669-02 WASHER .41 .82
i
1 11 10001 5040647-39 SPACER 1. 83 1. 83
i I
1 11 1000 5042342-66 NUT *B, 2.06 2.06
!
I' 1 1000 5062505-24 HANG ON sls ASS pj 595.35 595.35
ì , 1000 5042437-14 ,
I I i
l' 11 1000 5200656- 04 STROBE LIG3T AS 102.38: 102.38
I I
2 2, 10001 5241393-24 KIT-F:i~T DR LIGH 83.63 16'7.26
I
I lOOolJ08
2: i , 5059755-39 M::RROR *Ai 44.36 88.72
I
2: I I -'
i 1000~03 5059755-59 BR}I.CKET-IU~ROR B' 39.0 I 78.14 I
I I
i !
1 11 DODO' LABOR 464.00! 464.00
, ;
t ****'¡':****,lri*****i*****I***-w,lr C 0 N T I N U E " ****~*******.***I*******.* I
I ! I I w ,
, I
, , !
I I
! I
·
·
'0
Apr 20, 14:16 EDT by: Na:ional Lift Truck (14:23) Pg ] of 3
,
Nationak Aift Truck Service
-----------~----------------------------
l~Ol N.W. 2Ðd Street
Fort Lauderdale, Florida 33311
I'~OJl' (305) 462-6500 ru (305) 462-4255
""""
,
L
QUO T E # 0352042850
PAGE 02
QUO T E t 0352042850
095390
8th COpy
PO# QUOTE
095390
QUOTE
I!I J!~:~!~~~~~î~~~~;::::_5'52 1!1 f!~:~~i~~~~î~~~::::5'52
========~~~~~=======~==================================~r=================
,
TOTAL MATERIAL
TOTAL LABOR
TOTAL FREIGHT
1037.44
464.00
400.00
·
TO':'AL ORDER
1===========
1901. 44
*,* This Quote Expires 05/11/01 **,
Quote Faxed on: 04/19/01
4
·
·
,/.
'-'
""""
AGENDA REQUEST
ITEM NO. C-2B
DATE: May 8, 2001
REGULAR [ ]
PUBLIC HEARING [ ]
CONSENT [X]
TO: BOARD OF COUNTY COMMISSIONERS
PRESENTED BY: Pete Keogh
Director, Parks and Recreation
SUBMITTED BY(DEPT): Parks and Recreation
SUBJECT: The donation from the St. Lucie County School Board of $2000.00 and Budget
Resolution Approval # 01-97 and Budget Amendment # BA01-143.
BACKGROUND: On February 8, 2001, The Children's Services Council awarded the County a
grant in the amount of $7300.00 for the construction of the softball batting
cages at Lawnwood. The St. Lucie County School Board also donated
$2000.00 toward the completion of the batting cages. The $2000.00 has now
been received and in order to utilize the funds, staff must have BOCC
approval to expend the resources through a Budget Resolution. Staff is also
requesting the approval in the amount of $67.00 for Children's Services
Council matching fund shortage.
FUNDS AVAIL.: Funds will be available in 001-7216-563000-7659· (Parks-Improyements other th
buildings-Lawnwood batting cages project) ..
PREVIOUS ACTION: N/A
RECOMMENDATION:
Staff requests that the Board of County Commissioners approve
Budget Resolution # 01-97 and Budget
Amendment # BA01-143 .
[2] APPROVED [] DENIED
[ ] OTHER:
COMMISSION ACTION:
County Attorney:
<1"\
Æ'^"
&z-[f
Coordination/Siqnatures
Mgt. & BUdget~ f,oJl/I1fh,~
Other:
Purchasing Mgr.:
Originating Dept:
Other:
Finance: (Check for Copy only, if Applicable)
Eft 1/97
H, \Aqendas\aqendaslcmoney. wpd
,~
,
, .
'"
....,
RESOLUTION NO. 01-97
WHEREAS, subsequent to the adoption of the St. Lucie County Board of County Commissioners budget
for SI. Lucie County, certain funds not anticipated at the time of adoption of the budget have become
available thru a donation from the SI. Lucie County School Board for softball batting cages at Lawnwood
Stadium.
WHEREAS, Section 129.06 (d), Florida Statutes, requires the Board of County Commissioners to adopt a
resolution to appropriate and expend such funds.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of SI. Lucie County,
Florida, in meeting assembled this 8th day of May, 2001, pursuant to Section 129.06 (d), Florida Statutes,
such funds are hereby appropriated forthe fiscal year 2000-01, and the County's budget is hereby amended
as follows:
REVENUES
001-7216-366900-7659
Donations
$2,000
APPROPRIATIONS
001-7216-563000-7659
Improvements OIT Buildings
$2,000
After motion and second the vote on this resolution was as follows:
Commissioner John D. Bruhn
Commissioner Frannie Hutchinson
Commissioner Paula A. Lewis
Commissioner Cliff Barnes
Commissioner Doug Coward
xxx
XXX
XXX
XXX
XXX
PASSED AND DULY ADOPTED THIS 8TH DAY OF MAY, 2001.
ATTEST:
BOARD OF COUNTY COMMISSIONERS
ST LUCIE COUNTY, FLORIDA
BY:
CHAIRMAN
APPROVED AS TO CORRECTNESS
AND FORM:
COUNTY ATTORNEY
·.
;if
.-
BUDGET AMENDMENT REQUEST FORM
. """
REQUESTING DEPARTMENT:
PREPARED DATE:
AGENDA DATE:
PARKS AND RECREATION 1 LAWNWOOD
04/25/01
05/08/01
TO:
001-7216-563000-7659
FROM: 001-7215-546005-700
REASON FOR BUDGET AMENDMENT:
CONTINGENCY BALANCE:
THIS AMENDMENT:
REMAINING BALANCE:
DEPARTMENT APPROVAL:
OMB APPROVAL:
BUDGET AMENDMENT #:
DOCUMENT # & INPUT BY:
IMPROVEMENTS OfT BUILDINGS
$67
SERVICE GARAGE MAINTENANCE
$67
Funds to be used for matchin fund shortage for batting
ca e at Lawnwood Stadium
n/a
n/a
n/a
'WJ
01-143
G:\BUDGET\QUA TTRO\GENERAL \FORMS\AMENDM01. wb3
..
It, "
.....
AGENDA REQUEST
.,j
ITEM NO. C-2C
'-'
DATE: Mav 8, 2001
REGULAR
PUBLIC HEARING
CONSENT [ X ]
TO: BOARD OF COUNTY COMMISSIONERS
PRESENTED BY:
SUBMITTED BY (DEPT) : PARKS & RECREATION/GOLF COURSE. PETER KEOGH,
Parks& Recreation Director
SUBJECT:
Fairwinds Golf Course Maintenance Shop Kronos Time Clock purchase.
BACKGROUND:
NA
FUNDS AVAILABLE: Funds will become available in 418-7250-564000-700
Golf Course, Machinery & Equipment.
PREVIOUS ACTION:
None
RECOMMENDATION:
Parks and Recreation staff recommends the Board of County Commission approve:
1. Transfer of funds, $2500, from 418-7250-531000-700 Professional Services
into 418-7250-564000-700 Machinery & Equipment.
2. Approve the attached Equipment Request No. EQOl-251 and Budget Amendment
No. BAOl-144 in the amount of $2500 for the purchase and installation of a
Kronos time clock at the Fairwinds Golf Course maintenance shop.
[X
[
APPROVED
OTHER:
DENIED
-----..
sAnderson
y Administrator
COMMISSION ACTION:
y\~~~ew and Approvals
X) Management & Budge~ \!JI ~ I
X) Leisure Services/Golf: ~
X)
Pur c has i n 9
Eff. 11/4/93
('"
'-'
""""
,;' ;p
"
LEISURE SERVICES DEPARTMENT
Fairwinds Golf Course
MEMORANDUM
TO:
Board of County Commission
FROM:
Peter Keogh, Parks & Recreation Director
VIA:
Timothy Coolican, Golf Course Manager
DATE:
May 8, 2001
SUBJECT:
Fairwinds Golf Course Maintenance - Kronos Time Clock
The Finance/Payroll Department, in collaboration with Information
Technology Department are working towards all County offices to report
payroll through Kronos/Banner interface. In order for Fairwinds to report
payroll to Finance from the Maintenance Shop area, it is necessary to
purchase and install a Kronos time clock.
RECOMMENDATION:
The Parks & Recreation staff recommends the Board of County Commission
approve:
1. Transfer of funds, $2500, from 418-7250-53100-700 Professional Services
into 418-7250-564000-700 Machinery & Equipment.
2. Approve the attached Equipment Request No.EQOl-251 and Budget Amendment
No.BAOl-144 in the amount of $2500 for the purchase and installation of the
Kronos time clock at Fairwinds Golf Course maintenance shop.
"
'-'
...,
'" --
,
BUDGET AMENDMENT REQUEST FORM
REQUESTING DEPARTMENT: PARKS AND RECREATION 1 GOLF COURSE (MAINT)
PREPARED DATE: 05/02/01
AGENDA DATE: 05/08/01
ACCOUNT NUMBER ACCOUNT NAME AMOUNT
TO: 418-7250-564000-700 MACHINERY & EQUIPMENT $2,500
-
FROM: 418-7250-531000-700 PROFESSIONAL SERVICES . $2,500
REASON FOR BUDGET AMENDMENT: Funds to be used for a new Kronos time clock for the
Golf Course Maintenance area.
CONTINGENCY BALANCE: nla
THIS AMENDMENT: nla
REMAINING BALANCE: nla
DEPARTMENT APPROVAL:
OMB APPROVAL:
BUDGET AMENDMENT #: 01·144
DOCUMENT # & INPUT BY:
G:\BUDGEnaUA TTRO\GENERAL \FORMS\AMENDM01.wb3
/'
, ì
m c.... DJ m ,~ 0
D c c D m
c en 0 c "'0
"'0 :::! G) "'0 en :Þ
3: "T1 m 3: Õ ;1J
Õ -I Z -I
m m 3:
z :Þ :Þ z
-I -I 3: :-:I m
:;0 Õ 0 z
m z c :-:I
D .. z
~ . :-:I
rn -0:-1 "&9 :::! G) j;
0 ::J-~:::J" .foV
ct> -, ct> ~ 0
<::> $:() U'I r- ~
..... QJ ~ :!1 <::> ."
I <::> 0
foV _....... :::s 0 en
U'I ::J 0 QJ r- Þ
..... <D~::;' 0 0
::J ct> () 0 c: êJ
QJ ï::J ct> ^ ::t:J
::JO' C/) ::t:J
()4lJ
ct> ï::J QJ rn Iì1
enQ:¡~ , 0
::J- '" 0 ~ ::t:J
aè3::::: ~
ï::J ::::: t1 .~
Q:¡ SO ct> :::!
'"' ï::J rrl U'J
ct> a Q:¡ 0 -I
.Q:¡ c: ;:¡ ~ <: m~
;:;: (Q :3
èij' :r- CD <: Dc
::J g~ 0 C("')
Iì1
~ ::J 5' ,,-
<D 0 () s::m
CI> CI> 0 m("')
~........=::::
~ OJ Q:¡ zO
Q:¡ t)' -IC
õ::J ~ Z
::J Qj »;;tI-I
"'C~~ .
s¡ -.g G')m-<
() ::J mDm
::J-ro::E
QJ;:¡';:;: ZCO
CI> Q:¡ ::J- crn»
<D () _
>" Q:¡ ct> ::J '- »-I;;tI
::J' Õ'
~:;¡-~ z ; :Þ ;1J C"T1C
(") m "'0 m »00
(") ::J 0 0> ~ "'0 (")
0 ~a.~ ¡.... :;0 0 -I;:tI"T1
:;0 m
c QJ ct> 0 0 3: .. "T1 ("')
Z :::;....,:J m <
-I O>Õ':-I "'0 m 3: C ëño
x-,<D r- 0 m ("')C
z a."g. :Þ z CJ1
- »z
c ::J 0> ::J (") 0 C
3: o _. 0 m m co r-l
CI>~õ 3: 0 - -<-<
DJ ~ -'CC C
m _. :J '< m .... m("')
? ~ ~ Q:¡ z »0
QOca :-:I ;;tis::
o -, ::E NS::
() (j 0 .
:>;-ï::J ,., C -
. 0:>;- I· cU'J
~ 5' I· cU'J
ï::J(Q . -
Q:¡ - NO
~ '" 0 ~ ~ gz
..... a ::E
0:> :::::0> ....m
, -èl ~ C/) ;;tI
"-I
foV o CI> U'J
U'I ::!1Q:¡
<::> :::s' :::::
, Q:¡ 0
U'I
0) :J 0
~ () c:
C ct> ::J
C d~
c
, :3
c¡ <:
c 0
::t:J
Iì1
:s
en
. t9
,f
'-'
~
C:3
,
~- .......~
AGENDA REQUEST
ITEM NO
:r(\"l~nf-f,rtk~1u(ll. DATE: May 8, 2001
. REGULAR [ ]
PUBLIC HEARING
CONSENT (X)
TO: BOARD OF COUNTY COMMISSIONERS
PRESENTED BY: Roqer A. Shinn
SUBMITTED BY (DEPT) :Central Services
SUBJECT: Hiring of Project Manager
BACKGROUND: With the growth of this County, a
oversee improvements to County facilities,
Fairgrounds Project.
Project Manager is needed-to
new construction and the
PREVIOUS ACTION:
Approval of Investment for Future Fund
FUND AVAIL.: Funds will be transfered into the appropriate salary & benefits
accounts. Funded by Investment for the Future (316)
RECOMMENDATION: Staff is requesting the Board approve the hiring of a Project
Manager to oversee new projects, including the Fairgrounds Project. This
position is one(l) of the two(2) requested in our decision packet, part of
Phase III.
[X ]
[ I
APPROVED
OTHER:
[ ]
DENIED
COMMISSION ACTION:
County Atty: ()
Purchasing: ()
(k
Review and APpr;; ~
Management & t: ()
Origin. DePt:(~ Other: ()
Eff. 6/3/96
~
;' -
,
~
..."
MEMORANDUM
CENTRAL SERVICES
TO: Board of County Commissioners
FROM: Roger A. Shinn, Director, Central Services
DATE: May 2, 2001
SUBJECT: Agenda Request
Hiring of Project Manger
BACKGROUND:
The Board of County Commissioners made an all-important commitment to the growth ofthis County
several years ago by approving the Investment for the Future Fund (Utility Franchises Fee) and the
various Impact Fees. These two(2) items provided the funding source, not only to continually improve
existing facilities, but to develop a plan for future growth. This funding source has also provided us
the opportunity of applying for additional grants.
As the County grows so do the number of projects. It is becoming increasingly difficulty to keep up
with on-going projects, put together specifications for new projects and keep things moving as
scheduled. As a result, Public 'Works has taken on the added responsibility of managing the Regional
Sports Stadium Project, which illustrates the need for another Project Manager to oversee facility
improvements and new construction. On January 26, 2001, the Board recognized the need for an
additional Project Manager.
We are requesting that the Board move up the hiring of this individual due to the growing concern
over the new Fairgrounds. This is going to be a very involved project. It would benefit us to have a
person dedicated and aware of every aspect ofthe project as it proceeds from beginning to end. Time
is slipping away on this project if we expect to utilize the site for the fair next year.
RECOMMENDATION:
Staff is requesting the Board approve the hiring of a Project Manager to oversee new projects coming
on line including the Fairgrounds. This position will be funded by Investment for the Future Funds.
This position is one(l) of two(2) requested in our decision packet. It was to be part of Phase III.
-----=)
"'.~~ ~ML'
RO ER A. SHINN
RAS:bk
.;
"" - .
f " .
.....
...;
JOB CODE 518
PAY GRADE 21
SALARY $37,128.41 - $58,638.96
PROJECT MANAGER
MAJOR FUNCTION: Project Manager is responsible for the administration, management,
directing and coordinating of both Capital Projects and Improvements. Develop required
specifications and contracts to accomplish specific projects.
KNOWLEDGE. ABILITIES. and SKILLS NEEDED TO PERFORM JOB FUNCTION:
Knowledge: Knowledge of modem techniques, methods, practices and procedures of Capital
Projects. Knowledge of the practices and procedures used in the planning, development and
construction of projects.
Abilities: Ability to write job specifications and contracts to accomplish special projects. Ability
to establish and maintain effective working relationships with consultants, the general public,
employees and officials. Ability to express oneself clearly and concisely, orally and in writing.
Ability to supervise, coordinate, review and evaluate all phases of capital projects. Ability to apply
and understand some of the principles, methods and techniques of a limited range of architectural
and engineering systems.
ESSENTIAL JOB FUNCTIONS: Act as a Project Manager on a variety of projects. Direct all
phases of project construction. Acts as Liaison/Project Manager between field operations, various
County Departments, and outside contractors. Coordinates construction management activities
and advises departments on various projects. Keeps apprized of new developments. Responsible
for keeping contract and specification documents up to date. Responsible for the coordination of
various regulatory and permitting requirements. Attends Board of County Commission Meetings
when required.
ESSENTIAL PHYSICAL SKILLS: Occasional walking and standing. Ability to communicate
concisely orally and in writing.
ENVIRONMENTAL CONDITION REOUIREMENTS: Work inside an office for long
periods and in the field with dust, heat and physically dangerous areas during construction
operations.
ENVIRONMENTAL WORK HAZARDS: Working in areas while construction operations are
occurnng.
EDUCATION: Four year degree trom an accredited college or university in Public
Administration, Contract Management, Project Management or related field. A comparable
amount of training or experience may be substituted for the minimum qualifications.
EXPERIENCE: Candidate must possess a sound background in facilities construction,
repair, maintenance and management. Needs to possess a thorough knowledge of County
operations, periodic inspections and budgeting. Computer experience with speadsheets and
wordprocessing is required; experience with Wordperfect and Quattro Pro is preferred. A
comparable amount of training or experience may be substituted for the minimum qualifications
LICENSE. CERTIFICATION. OR REGISTRATION: Florida drivers' license and a good
driving record are required.
"
...
'........
....,
ITEM NO.
DATE:
C-4 t!-
.
Mav 8. 2001
AGENDA REQUEST
TO: BOARD OF COUNTY COMMISSIONERS
REGULAR: ( )
PUBLIC HEARING: ( )
CONSENT: ( )
~:.
teo J. Cordeiro
Solid Waste Manager
SUBMITTED BY (DEPT): SOLID WASTE DIVISION
SUBJECT:
Staff requests the Board of County Commissioners' approval for the purchase of three Motorola
mobile radios.
BACKGROUND:
When the initial listing for radios was compiled to comply with the new county wide radio system,
three vehicles were inadvertently left without radios. This request is purchase radios to provide
communication capabilities for these vehicles.
FUNDS AVAILABLE:
Funds are available in Equipment Account #401-3410-564000-300
Line to line will be done after Board approval moving funds to proper program number for
expenditure. Equipment Account #401-3410-564000-2609.
PREVIOUS ACTION:
N/A
RECOMMENDATION:
Staff recommends the Board of County Commissioners' approval for the purchase of three Motorola
mobile radios for a total of $3,438 (Equipment Request # 01-252).
Review and Approvals
COMMISSION ACTION:
ClAPPROVED
o OTHER:
o DENIED
County Attorney:
Management and Budget:
~,JOther: (Landfill)
fp;m~
Purchasilt$J:
Other:
jJ,~
,
Originating Dept: (Pub. Wks.)
Finance: Check for copy only, if applicable:
H:\\W\Agendas\Radios.wpd
m c c
,. D '-' c <: m
c en "tI
;:¡ -I ëñ >
~ õ ~
i: Õ
m z
z > 3!:
-I -I m
::u Õ z
m ¡;¡;: :-:I
D
;I!:
IT1 èii ~ (I) '1J
0 ;:! 0 ¡j5
c ~ CD r-
.... ::. 6 r-
, ...: Õ
I\) ::.- ~
01 0 ~
I\) c: CD ~
..... :3'
¡¡¡ ;::;: (I)
sa. 9i: iT1 :u
o' :x;
fII Ðr (I)
s:
~CQ
¡;;. Õ'
CD ~ en
..Q ¡¡¡ -I
c: Q, m"
CD ~. t
(I Or-
..... e:e:
¡;;. ~ -(')
Õ en ,,-
" g. š::m 4
c: m(')
Ò ::.
::.- CD zO
Q õ -Ie:
(I :::uZ
CD 8
to) 3 m=<!
Q " Om
&~ ·
~ ::¡: e:o
g §: rn>
9?. St -I:::U
> 3 CD > ::u "11C
0 0 ::. "tI m 00
0 0- CD "tI 0
0 ~ ::¡: ::u 0 :::U"11
C ¡¡¡ 8 0 s::: "11(')
Z < s::: enO
-I sa. § m t
o' c m (')e:
z fII ~ Z >z
c c
s::: ~ m ~=<! ·
OJ c:¡: C
m (þ
?:' ¡¡¡ m(')
sa. >0
o' :::uš::
(I Nš::
~ 0-
(j) oen
,3 oen
,_
~ NO ·
.;.. ~ ~ 8z
c ø
.... (þ .....m
I C/) c:: :::u
to) ~
.;.. -I en
.... ::.- t:IJ
<;:> õ' -<
01 èii
0) (I 0
.;.. ~ ~
c
c
<;:> ø
I\) :3' ð
0)
c Q
<0 Q,
(ß
it
::.
~
~
S
~
...
""'"
AGENDA REQUEST
TO: BOARD OF COUNTY COMMISSIONERS
SUBMITTED BY(DEPT): ENGINEERING DIVISION 4115
SUBJECT:
BACKGROUND:
4.
,
..",,¡
ITEM NO. C:1.\ "ß
DATE: May 8,2001
REGULAR [ ]
PUBLIC HEARING []
CONSENT [XX]
PRESENTED BY:
~t"l\&-i.~ __
íDonald B. WeJ.., P.E.
County Engineer
Establishing MSBU Administrative Fee Policy
See Attached Memorandum
FUNDS AVAIL. N/A
PREVIOUS ACTION: None
RECOMMENDATION:
Staff recommends that the Board adopt Resolution No. 01-080 establishing a MSBU Administrative Fee
Policy; and authorize the Chairman to execute the resolution.
COMMISSION ACTION:
[X] APPROVED
[ ] OTHER:
[xJCounty Attorney
[x]Public w~
[x ]FinanC~
[ ] DENIED
~/
¿~
Coord Ination/Slanatures
[x ]Mgt. & Budget 1ti£) frlnl:
[X ¡Co. Eng -ì~ .
r
[ ]Purchasing
[ ]Other
·
'"
""
....,,¡
COMMISSION REVIEW: May 8, 2001
ENGINEERING MEMORANDUM NO. 01-118
TO:
Board of County Commissioners
FROM:
Donald B. West, County Engineer
DATE:
April 23, 2001
SUBJECT: MSBU Administrative Fee Schedule
BACKGROUND:
Attached is Resolution No. 01-080 which establishes an "Administrative Fee" policy for MSBU projects.
Five (5%) percent of the capital costs, or a minimum of $6,500, whichever is greater, shall be collected
for the administration and management of MSBU projects. Four (4%) percent will be allocated to the
Transportation Trust Fund and One (1 %) percent to the General Revenue Fund. These fees will be
used to offset the administrative, legal and budgetary costs.
Five (5%) percent fairly represents the cost of services necessary for managing MSBU projects and is
comparable to the administrative fees charged by other counties.
RECOMMENDATION:
Staff recommends that the Board adopt Resolution No. 01-080 establishing a MSBU Administrative Fee
Policy; and authorize the Chairman to execute the resolution.
cc: Staff Concurring
MSBU Coordinator
policy\aga-admfee. wpd
>/- -
(
r
~
~
RESOLUTiON NO. 01~080
A RESOLUTiON OF THE BOARD
OF COUNTY COMMiSSiONERS
FOR ST. LUCiE COUNTY,
FLORiDA, EST ABLŒHiNG A
POLiCY FOR MUNiCRPAL
SERViCE BENEFRT UNiTS
ADMiNiSTRATiVE FEES
WHEREAS, the Board of County Commissioners of St. Lucie County, Florida (the
"Board") has made the fonowing determinations:
1. lo/1!.unicipal Service Benefit Units (MSBUs)are created to be self supporting.
lVJ\.SBU's require that the Board and its staff manage the special assessments.
2. The costs for the administrative, legal and budgetary management is financiaHy
funded by the Transportation Trust Fund and the General Fund. Therefore,
staff time that is specifically related to a MSB U shouM be reimbursed to the
Board for such support.
3. This Board should rescind all past policies with regard to administrative fees and
establish a new policy for the administrative, legal and budgetary fees.
NOW, THEREFORE, BE iT RESOLVED by the Board of County
Commissioners of St. Lucie County, Florida, as fonows:
1. This Board does hereby rescind an past policies with regard to administrative fees
for MSBU's.
2. This Board hereby establishes a new policy of administrative fees for MSBUs.
~
.
'-'
.,
3. The .i\dministJrative Fee shaH be a minimum of five per cent (5%) of the total
capital costs, or a minimum fee of five thousand JoBars ($5,000.00) to
reimburse the Transportation Trust Fund together with One thousand five
hundred doHars ($1,500.00) to reimburse the Genera} Fund, whichever is
greater, Capita1 costs wiH indude, but not be limited to, the foHowing:
construction costs, engineering, design, surveying, permitting, soil testing and
environmental costs.
4. The Administrative Fees shal1 be paid upon the completion of each ]V[SBU
project.
~f\fter motion and second, the vote on this resolution was as follows:
Commissioner Frannie Hutchinson, Chairperson
Commissioner Doug Coward, Vice~Chail'person
Commissioner Cliff Barnes
Commissioner Paula A. Lewis
Commissioner John D. ]Bruhn
xxx
XXX
XXX
XXX
XXX
PASSED AND DULY ADOPTED this XX day of XXXXX, 2001.
ATTEST:
BOARD OF COUNTY
COMMKSSKONERS OF ST. LUCKE
COUNTY, FLORKDA
Deputy Clerk
Chairperson
APPROVED AS TO FORM AND
CORRECTNESS:
County Attorney
'"
-
.,
'-'
v,
AGENDA REQUEST
ITEM NO. C-4C
DATE: May 8, 2001
SUBMITTED BY(DEPT): ENGINEERING DIVISION 4115
REGULAR [ ]
PUBLIC HEARING [ ]
CONSENT [x]
PRESENTED BY:
(~~~1t~
County Engineer
TO: BOARD OF COUNTY COMMISSIONERS
SUBJECT:
Permission to advertise for consultant services for the Lennard Road PD&E Study.
BACKGROUND:
The section of Lennard Road between Cane Slough Road and the Port St. Lucie High School is planned
to be constructed as a four-lane divided road using state advance funding through the Florida
Department of Transportation. Additionally, the section of Lennard Road between Port St. Lucie High
School and Silver Oak Drive is planned to be constructed as a two-lane road using the state advance
funding. (See attached map).
The FDOT has pledged $15.26 million in state advance funds for this project. The County will receive
a Notice-to-Proceed authorization letter from FDOT on or about July 1,2001. (See attached letter). This
action will allow the County to proceed with initiating a Project Development and Environmental (PD&E)
Study for Lennard Road.
County staff proposes to begin the process of advertising for selection of a consulting engineer to
complete the PD&E Study for Lennard Road.
.
FUNDS AVAIL.: Bond secured with FDOT state advance funding in the amount of $15.3 million dollars.
PREVIOUS ACTION: n/a
RECOMMENDATION: .
Staff is requesting permission to advertise for consultant services for the Lennard Road PD&E Study.
[x] APPROVED
[ ] OTHER:
[ ] DENIED
COMMISSION ACTION:
Do gl Anderson
County Administrator
~/
If iÍ. /
[x]Originating Dept. Public Works !: ~
lennardpd&eadv.ag
Coordination/Signatures
[x]County Attorney
[ ]Mgt. & Budget
[x]Co. Eng ~f~'
(
[x]Revenue coord.~
[ ]other
¡!
.\w
C'-: f;c G
... (J ()V-(,. Ir
/JON ¿,;.
I) A IV ,......
tJç/!J C
Florida Department of Transportation
JEB BUSH
GOVERNOR
rnOMAS F. BARRY, JR.
SECRETARY
March 20, 200}
Raymond L. Wamy
Public Works Director
St Lucie County
2300 Virginia Avenue
Fort Pierce, FL 34982
Dear Mr. Wamy:
RE: Advance Funding for the Design, Right of Way Acquisition. and Construction of Lennard Road
This is to advise you that the funding approval is on schedule. The LAP Agreement has been executed by our
District Secretary, and the total funds have been encumbered. We will obtain federal authorization after July
},zoo} for the Design and Right of Way portion of the project. I will send you a Notice to Proceed letter at
that time. Yau are not to proceed with any reimbursable work until you receive that N. T.P.leUer.
Call me at (954) 777-4684 if you have any questions.
~
Gary M. Keife, P.E.
Local Agency Program Administrator
c
.
Cc: M. DeRosa
C. Balogh
Letter.
St. LUCie C
OUnty PUb/'
IC Works
www.dot.state.fl.us
ø RECYCLED PAPER
~
AGENDA REQUEST
I"" NO. c-sA
DATE: May 8, 2001
REGULAR [ ]
PUBLIC HEARING [ ]
CONSENT [X ]
TO: ST. LUCIE COUNTY BOARD OF COUNTY COMMISSIONERS
SUBMITTED BY: OMB
PRESENTED BY: Marie M. Gouin
·
SUBJECT: Budget Resolution 01-98 for the $700,000 Taylor Creek Restoration Grant awarded by the South Florida
Water Management District (SFWMD).
BACKGROUND: N/A
FUNDS WILL BE AVAilABLE: 140800-4315-337310-4657 SFWMD Taylor Creek Restoration Grant
PREVIOUS ACTION: On May 1,2001 the St. Lucie County BOCC accepted the $700,000 grant from SFWMD for the
Taylor Creek Restoration and approved Work Authorization No.1 with BCI Engineers, Inc. for the design and
permitting phase of the project.
·
RECOMMENDATION: Staff recommends that the Board of County Commissioners approve Budget Resolution # 01-
98 to appropriate and expend funds from the SFWMD Taylor Creek Restoration Grant.
·
[x] APPROVED [] DENIED
[ ] OTHER:
·
COMMISSION ACTION:
Coordi nation/SiQnatures
County Attorney: XX
~
" 11M,. mllÎ^^"
Management & Budget: ~Furchasing:
Originating Dept:
Public Works:
Other:
Finance: (Check for Copy only, if applicable) XX
G: IE U DGET\ WP\A GENDA'S\AgendaO 115'8 T aylorCr _gran 1. "']Jd
/
"-'
RESOLUTION NO. 01-98
...,
WHEREAS, subsequent to the adoption of the 5t. Lucie County Board of County Commissioners budget for 5t. Lucie
County, certain funds not anticipated at the time of adoption of the budget have become available from the South
Florida Water Management District in form of a $700,000 grant for the Taylor Creek Restoration project.
WHEREAS, Section 129.06 (d), Florida Statutes, requires the Board of County Commissioners to adopt a resolution to
appropriate and expend such funds.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of St. Lucie County, Florida, in
meeting assembled this 8th day of May, 2001, pursuant to Section 129.06 (d), Florida Statutes, such funds are hereby
appropriated for the fiscal year 2000-01, and the County's budget is hereby amended as follows:
t
REVENUES
140800-4315-337310-4657
South Florida Water Management
$700,000
APPROPRIATIONS
140800-4315-563005-4657
140800-4315-563000-4657
Imp orr Buildings - Consulting Engineering
Improvements orr Buildings
$150,000
$550,000
After motion and second the vote on this resolution was as follows:
Commissioner Frannie Hutchinson
Commissioner Doug Coward
Commissioner Cliff Barnes
Commissioner John D. Bruhn
Commissioner Paula A. Lewis
xxx
XXX
XXX
XXX
XXX
PASSED AND DULY ADOPTED THIS 8TH DAY OF MAY, 2001.
ATTEST:
BOARD OF COUNTY COMMISSIONERS
ST LUCIE COUNTY, FLORIDA
BY:
CHAIRMAN
APPROVED AS TO CORRECTNESS
AND FORM:
COUNTY ATTORNEY
G:\B UDG En WPIAG ENDA 'SlAgen daG 1 \5'8TaylorCr -1!I'an t. wpd
'8
ORJ'JNAL
SOUTItFLORIDA WATER MANAGEMENT DISTRICT
AGREEMENT
THE SOUTH FLORIDA WATER MANAGEMENT This number must appear on all Invoices and Correspondence
DISTRICT (hereinafter referred to as DISTRICT) HEREBY
ENTERS INTO THIS AGREEMENT WITH:
Name: ST. LUCIE COUNTY. FLORIDA C-I0282
Address: 2300 Virginia Avenue M/WBE Goal: 0%
Ft. Pierce, FL 34~0700 COST SHARING INFORMATION
Project Manager: Don1West Total Project Cost: $ 1,435,000.00
Telephone No: (561) 462-1707
Fax No: (561) 462- 2362 COUNTY Contribution: $735,000.00
Hereinafter referred to as: COUNTY
PROJECT TITLE: INDIAN RIVER LAGOON TAYLOR CREEK DREDGING
The following Exhibits are attached hereto and made a part of this AGREEMENT:
Exhibit "A" - l'<ot Applicable Exhibit "H" - Not Applicable
Exhibit "B" - General Terms and Conditions Exhibit "I" - Not Applicable
Exhibit "C" - Statement of Work Exhibit "J" - Not Applicable
Exhibit "D" - Payment and Deliverable Schedule Exhibit "K" - Not Applicable
Exhibit "E" - Not Applicable Exhibit "L" - Not Applicable
Exhibit "F" - Not Applicable Exhibit "M" - Not Applicable
Exhibit "G" - Not Applicable
TOTAL DISTRICT CONSIDERATION: $700,000.00 AGREEMENT TYPE: Not·to-Exceed
Multi-Year Funding (If Applicable)
Fiscal Year: Fiscal Year:
Fiscal Year: Fiscal Year:
Fiscal Year: Fiscal Year:
·Subject to District Governing Board Annual Budget Approval
AGREEMENT TERM: 3 Years EFFECTIVE DATE: Last Date of Execution bv the Parties
District Project Manager; Paul Ezzo District Contract Administrator:
Telephone No: (561) 223-2600 Patrick M. Ryan (561) 682-6757
Fax No. (561) 223-2608 Fax No.: (561) 682-6397 or (561) 681-6275
SUBMIT INVOICES AND NOTICES TO THE DISTRICT AT: SUBMIT NOTICES TO THE COUNTY AT:
ST. LUCIE COUNTY, FLORIDA
South Florida Water Management District
3301 Gun Club Road 2300 VirgÎiúa A venue
West Palm Beach. Florida 33406
Attention: Procurement Department Ft. Pierce, FL 34950-0700
Attention: Donþ West
IN WITNESS WHEREOF, the authorized representative hereby executes this AGREEMENT on this date, and accepts all Terms and
Conditions under which it is issued.
ST. LUCIE COUNTY, FLORIDA SOUTH FLORIDA WATER MANAGEMENT DISTRICT
BY ITS GOVERNlNG BOARD
Accepted By: Accepted By:
Signature of Authorized Representative Jessica Flathmann, Acting Procurement Director
Date:
Title:
Date: Ie
1r~:rM~R~ Date: &5-~1
"
"".
\tÌ
EXHIBIT ''D''
PA YMENT AND DELIVERABLE SCHEDULE
The County shall submit the following deliverables as part of this project:
Payment and Deliverables
Deliverable Due Date Not-to-Exceed
Payment Amount
Task 1: June 11, 2002 $150,000.00
Obtain all necessary permits, design and prepare
bid specifications
Task 2: February 28, 2003 $0
Construct' and provide for suitable disposal
Task 3: August 29, 2003 $0
Remove sediment as necessary from Taylor
Creek downstream of S-50
Task 4: On-going $0
Continually monitor the Site
Task 5: November 29,2003 $550,000.00
Submit to the FDEP a final post-dredge
bathymetry (certification) of Taylor Creek as
final deliverable
Total Not-to-Exceed Amount $700,000.00
The County shall invoice the District in accordance with this Payment and Deliverable Schedule.
At the end of the project, the District will require the County to provide FDEP certification of the
project. Upon receipt and acceptance of deliverables by the District, the District agrees to pay the
County for actual costs incurred up to the not-to-exceed amounts specified above. The invoices
shall be accompanied by adequate supporting documentation as described in Article 3.2 of the
Agreement, including copies of invoices paid by the County.
Page t of t, Exhibit "D" to Agreement No. C-t0282
.~
8
so~ FLtJJllDA WATER MANAGEIV..ßNT DIITRICT
EXIDBIT "B"
GENERAL TERMS AND CONDITIONS
ARTICLE 1 - STATEMENT OF WORK
1.1 The COUNTY shall, to the satisfaction of the
DISTRICT, fully and timely perform all work items
described in the "Statement of Work," attached hereto
as Exhibit "C" and made a part of this AGREEMENT.
1.2 As part of the services to be provided by the
COUNTY under this AGREEMENT, the COUNTY
shall substantiate, in whatever forum reasonably
requested by the DISTRICT, the methodology, lab
analytical examinations, scientific theories, data,
reference materials, and research notes. The
COUNTY shall also be required to substantiate any
and all work completed, including but not limited to,
work completed by subcontractors, assistants,
models, concepts, analytical theories, computer
programs and conclusions utilized as the basis for the
final work product required by the AGREEMENT.
This paragraph shall survive the expiration or
termination of this AGREEMENT.
1.3 The parties agree that time is of the essence in
the performance of each and every obligation under
this AGREEMENT.
ARTICLE 2 .. COMPENSATIONI
CONSIDERATION
2.1 The total consideration for all work required
by the DISTRICT pursuant to this AGREEMENT
shall not exceed the amount as indicated on Page I of
this AGREEMENT. Such amount includes all
expenses which the COUNTY may incur and
therefore no additional consideration shall be
authorized.
2.2 Notwithstanding the foregoing, the amount
expended under this AGREEMENT shall be paid in
accordance with, and subject to the multi-year funding
allocations for each DISTRICT fiscal year indicated
on Page I of this AGREEMENT. Funding for each
applicable fiscal year of this AGREEMENT is subject
to DISTRICT Governing Board budgetary
appropriation. In the event the DISTRICT does not
approve funding for any subsequent fiscal year, this
AGREEMENT shall terminate upon expenditure of
the current funding. notwithstanding other provisions in
this AGREEMENT to the contrary. The DISTRICT
will notify the COUNTY in writing after the adoption
of the final DISTRICT budget for each subsequent
fiscal year if funding is not approved for this
AGREEMENT.
2.3 The COUNTY assumes sole responsibility for
all work which is performed pursuant to the Statement
of Work, Exhibit "C". By providing funding
hereunder, the DISTRICT does not make any
warranty, guaranty, or any representation whatsoever
regarding the correctness, accuracy, or reliability of any
of the work perfonned hereunder.
.
2.4 The COUNTY by executing this
AGREEMENT, certifies to ttuth-in-negotiation,
specifically, that wage rates and other factual unit costs
supporting the consideration are accurate, complete,
and current at the time of contracting. The COUNTY
agrees that the DISTRICT may adjust the
consideration for this AGREEMENT to exclude any
significant swns by which the consideration was
increased due to inaccurate, incomplete, or non-<:urrent
wage rates and other factual unit costs. The
DISTRICT shall make any such adjustmein within one
(1) year following the expiration or termination of this
AGREEMENT.
ARTICLE 3 . INVOICING AND PAYMENT
3.1 The COUNTY's invoices shall reference the
DISTRICT's Contract Number and shall be sent to the
DISTRICT's address specified on Page 1 of this
AGREEMENT.. The COUNTY shall not submit
invoices to any other address at the DISTRICT.
.
3.2 The COUNTY shall submit the invoices on a
completion of deliverable basis, pursuant to the
schedule outlined in the Payment and Deliverable
Schedule, attached hereto as Exhibit "D" and made a
part of this AGREEMENT. In the event the
schedule does not specify payment on a completion of
deliverable basis, all invoices shall be substantiated
by adequate supporting documentation to justify
hours expended and expenses incurred within the not-
to-exceed budget, including but not limited to, copies
of approved timesheets. payment vouchers, expense
reports, receipts and subcontractor invoices.
Page I of9. Exhibit "S"
Contract File:\County.doc 04/02/0 I
'"
soðtwB FL~.uDA WATER MANAGEIVu£NT MTRICT
EXIllBIT "B"
GENERAL TERMS AND CONDITIONS
3.3 The DISTRICT shall pay the full amount of the
invoice within thirty (30) days following DISTRICT
acceptance of services andlor deliverable(s) r~uired
by this AGREEMENT. However. failure by the
COUNTY to follow the foregoing instructions and
submit acceptable services and or deliverables(s) may
result in an unavoidable delay of payment by the
DISTRICT. .
3.4 Unless otherwise stated herein, the DISTRICT
shall not pay for any obligation or expenditure made
by the COUNTY prior to the conunencement date of
this AGREEMENT.
ARTICLE 4 - PROJECT MANAGEMENT/
NOTICE
4.1 The parties shall direct all technical matters
arising in connection with the perfonnance of this
AGREEMENT, other than invoices and notices, to the
attention of the respective Project Managers specified
on Page 1 of the AGREEMENT for attempted
resolution or action. The Project Managers shall be
responsible for overall coordination and oversight
relating to the performance of this AGREEMENT.
The COUNTY shall direct all administrative matters,
including invoices and notices, to the attention of the
DISTRICT's Contract Administrator specified on
Page I of the AGREEMENT.
All fonnal notices between Ùle parties under this
AGREEMENT shall be in writing and shall be
deemed received if sent by certified mail, return receipt
r~uested, to Ùle respective addresses specified on Pagè
I of the AGREEMENT. The COUNTY shall also
provide a copy of all notices to the DISTRICT's
Project Manager. All notices r~uired by this
AGREEMENT shall be considered delivered upon
receipr. Should either party change its address. written
notice of such new address shall promptly be sent to the
other party.
All correspondence to the DISTRICT under this
AGREEMENT shall reference the DISTRICT's
Contract Number specified on Page I of the
AGREEMENT.
ARTICLE 5 - INSURANCE
5.1 The COUNTY assumes any and all risks of
personal injury, bodily injury and property damage
attributable to the negligent acts or omissions of the
COUNTY and the officers, employees. servants, and
agents thereof. The COUNTY warrants and
represents that it is self-funded for Worker's
compensation and liability insurance, covering at a
minimum bodily injury, personal injury and property
damage with protection being applicable to the
COUNTY's officers, employees, servants and agents
while acting within Ùle scope of their emploYITl"'nt
during perfonnance under Ùlis AGREEMENT. The
COUNTY and the DISTRICT further agree that
nothing contained herein shall be construed or
interpreted as (1) denying to either party any remedy
or defense available to such party under the laws of
the State of Florida; (2) the consent of the State of
Florida or its agents and agencies to be sued; or (3) a
waiver of sovereign immunity of the State of Florida
beyond the waiver provided in Section 768.28.
Florida Statutes.
.
,
5.2 In the event the COUNTY su!x:ontracts
any part or all of the work hereunder to any third
party. the COUNTY shall require each and every
subcontractor to identify the DISTRICT as an
additional insured on all insurance policies as
required by the COUNTY. Any contract awarded by
the COUNTY for work under this AGREEMENT
shall include a provision whereby the COUNTY's
su!x:ontractor agrees to defend, indemnify, and pay
on behalf, save and hold the DISTRICT harmless
from all damages arising in connection with the
COUNTY's su!x:ontract.
.
ARTICLE 6 - TERMINATIONIREMEDIES
6.1 [f eiÙler party fails to fulfill its obligations under
Ùlis AGREEMENT in a timely and proper manner, Ùle
other party shall have the right to terminate this
AGREEMENT by giving written notice of any
deficiency. The party in default shall then have ten
(10) calendar days from receipt of notice to correct the
deficiency. [f the defaulting party fails to correct the
deficiency within this time, the non-defaulting party
Page 2 of9. Exhibit "B"
Contract File:\County.doc 04/02/0 1
/
8
SO~I FLOKIDA WATER MANAGE~NT ntIITRICT
EXHIBIT "B"
GENERAL TERMS AND CONDITIONS
shall have the option to tenninate this AGREEMENT
at the expiration of the ten (10) day time period.
Should the DISTRICT elect to tenninate for default in
accordance with this provision, the DISTRICI' shaIl
be entitled to recover reprocurement costs, in addition
to all other remedies under law and/or equity.
6.2 The DISTRICT may terminate this
AGREEMENT with or without cause at any time for
convenience upon thirty (30) calendar days prior
written notice to the COUNTY. The performance of
work under this AGREEMENT may be terminated by
the DISTRICT in accordance with this clause in
whole, or from time to time in part, whenever the
DISTRICT shall determine that such termination is in
the best interest of the DISTRICT. Any such
termination shall be effected by delivery to the
COUNTY of a Notice of Tennination specifying the
extent to which performance of work under the·
AGREEMENT is terminated. and the date upon which
such termination becomes effective.
In the event of tennination for convenience, the
DISTRICT shall compensate the COUNTY for all
authorized and accepted deliverables completed
through the date of termination in accordance with
Exhibit "C", Statement of Work. The DISTRICT shaIl
be relieved of any and all future obligations hereunder,
including but not limited to lost profits and
consequential damages. under this AGREEMENT.
The DISTRICT may withhold all payments to the
COUNTY for such work until such time as the
DISTRICT determines the exact amount due to the
COUNTY.
6.3 If eiti.er party initiates legal action, including
appeals. to enforce this AGREEMENT, the prevailing
party shaIl be entitled to recover a reasonable attorney's
fee, based upon the fair market value of the services
provided.
6.4 In the event a dispute arises which the project
managers cannot resolve between themselves, the
parties shall have the option to submit to non-binding
mediation. The mediator or mediators shaIl be
impartial. shall be selected by the parties, and the cost
of the mediatior'l shall be borne equaIly by the parties.
The mediation process shall be confidential to the
extent permitted by law.
6.5 The DISTRICT may order that aU or part of the
work stop if circumstances dictate that this action is in
the DISTRICT's best interest. Such circumstances
. may include, but are not limited to, unexpected
technical developments, direction given by th~
DISTRICT's Governing Board, a condition of
inunediate danger to DISTRICT employees. or the
possibility of damage to equipment or property. This
provision shall not shift responsibility for loss or
damage, including but not limited to. lost profits or
consequential damages sustained as a result of such
delay, from the COUNTY to the DISTRICI'. If this
provision is invoked, the DISTRICT shall notify the
COUNTY in writing to stop work as of a certain date
and specify the reasons for the action, which shall not
be arbitrary or capricious. The COUNTY shall then
be obligated to suspend all work efforts as of the
effective date of the notice and until further written
direction from the DISTRICI' is received. Upon
resumption of work, if deemed appropriate by the
DISTRICT. the DISTRICI' sha1l initiate an
amendment to this AGREEMENT to reflect any
changes to Exhibit "Cft, Statement of Work andlor the
project schedule.
6.6 The DISTRICT anticipates a total project cost
as indicated on Page 1. with the balance of matching
funds and/or in-kind services to be obtained from the
COUNTY in the amount as specified on Page 1 of this
AGREEMENT. In the event such COUNTY
matching funding andlor in-kind services becomes
unavailable, that spall be good and sufficient cause for
the DISTRICI' ·to tenninate the AGREEMENT
pursuant to Paragraph 6.2 above.
ARTICLE 7 . RECORDS RETENTION!
OWNERSHIP
7.1 The COUNTY shall maintain records and the
DISTRICT shall have inspection and. audit rights as
follows:
A. Maintenance of Records: The COUNTY
shall maintain all financial and non-financial records
Page 3 of9, Exhibit "S"
Contract File:\County.doc 04/02/0 I
'"
soo-a FL0rtIDA WATER MANAGElVlliNT MTRICT
EXIllBIT "B"
GENERAL TERMS AND CONDITIONS
and reports directly or indirectly related to the
negotiation or performance of this AGREEMENT
including supporting documentation for any service
rates. expenses. research or reports. Such records shall
be maintained and made available for inspection for a
period of five years from completing performance and
receiving final payment under this AGREEMENT.
B. Examination of Records: The DISTRICT
or its designated agent shall have the right to examine
in accordance with generally accepted governmental
auditing standards all records directly or indirectly
related to this AGREEMENT. Such examination may
be made only within five years from the date of final
payment under this AGREEMENT and upon
reasonable notice. time and place.
C. Extended Availability of Records for Le2al
Disputes: In the event that the DISTRICT should
become involved in a legai dispute with a third party
arising from performance under this AGREEMENT,
the COUNTY shall extend the period of maintenance
for all records relating to the AGREEMENT until the
final disposition of the legal dispute, and all such
records shall be made readily available to the
DISTRICT.
7.2 The DISTRICT shall retain exclusive title.
copyright and other proprietary rights in all work items.
induding but not limited to. all documents. technical
reports, research notes, scientific data, computer
programs, including the source and object code,
which are developed, created or otherwise originated
hereunder by the COUNTY. its subcontractOr(S),
assign(s), agent(s) and/or successor(s) as required by
the Exhibit "C", Statement of Work (the "Work"). In
consideration for the DISTRICT entering into this
AGREEMENT. and other good and valuable
consideration the sufficiency and receipt in full of
which is hereby acknowledged by the COUNTY, the
COUNTY hereby assigns, transfers, sells and
otherwise grants to the DISTRICT any and all rights
it now has or may have in the Work (the "Grant").
This Grant shall be self-operative upon execution by
the parties hereto, however the COUNTY agrees to
execute and deliver to the DISTRICT any further
assignments or other instruments necessary to
evidence the Grant. without the payment of any
additional consideration by the DISTRICT. The
COUNTY may not disclose, use. license or sell any
work developed. created, or otherwise originated
hereunder to any third party whatsoever. This
paragraph shall survive the tefIIÙnation or expiration
of this AGREEMENT.
7.3 The COUNTY represents and warrants that
proprietary software, if any, to be provided to the
DISTRICT by the COUNTY hereunder, as
specifically identified in Exhibit "C", Statement of
Work shall have been developed solely by or for the
COUNTY, or lawfully acquired under license frOIr. a
third party, including the right to sublicense such
software. The COUNTY shall include copyright or
proprietary legends in the software and on the label of
the medium used to transmit the software. The
COUNTY shall grant to the DISTRICT a perpetual,
non-transferable. non-exclusive right to use the
identified software without an additional fee. The
DISTRICT acknowledges that title to the software
identified in Exhibit "C" shall remain with the
Licensor.
7.4 Any equipment purchased by the COUNTY
with DISTRICT funding under this CONTRACT
shall be returned and title transfcned from the
COUNTY to the DISTRICT immediately upon
tennination or expiration of this AGREEMENT
upon the written request of the DISTRICT not less
than thirty (30) days prior to AGREEMENT
expiration or tennination. Equipment is hereby
defined as any non-consumable items purchased by
the DISTRICT with a value equal to or greater than
$500.00 and with, a normal expected life of one (I)
year or more. The COUNTY will maintain any such
equipment in good working condition while in its
possession and will return the equipment to the
DISTRICT in good condition, less normal wear and
tear. The COUNTY will use its best efforts to
safeguard the equipment throughout the period of
performance of this AGREEMENT. However the
DISTRICT will not hold the COUNTY liable for
loss or damage due to causes beyond the COUNTY's
reasonable control. In the event of loss or damage,
the COUNTY shaH notify the DISTRICT in writing
within five (5) working days of such occurrence.
.
Page 4 of 9, E;(hibit "B"
Contract File:\County.doc 04/02/01
,
8
SOU'-d FLOKIDA WATER MANAGEM~NT _mCT
EXIllBIT "B"
GENERAL TERMS AND CONDITIONS
7.5 The DISTRICT has acquired the right to use
certain software under license from third parties. For
purposes of this AGREEMENT. the DISTRICT
may permit the COUNTY access to certain third
party owned software on DISTRICT computer
systems. The COUNTY acknowledges the
proprietary nature of such software and agrees not to
reproduce. distribute or disclose such software to any
third party. Use 0 f or access to suc h so ftware shall be
restricted to designated DISTRICT owned systems
or equipment. Removal of any copy of licensed
software is prohibited.
ARTICLE 8 . STANDARDS OF
COMPLIANCE
8.1 The COUNTY, its employees, subcontractors
or assigns, shall comply with all applicable federal,
state. and local laws and regulations relating to the
performance of this AGREEMENT. The DISTRICT
undertakes no duty to ensure such compliance. but will
attempt to advise the COUNTY. upon request, as to
any such laws of which it has present knowledge.
8.2 The COUNTY hereby assures that no person
shall be discriminated against on the grounds of race,
color, creed, national origin. handicap, age, or sex. in
any activity under this AGREEMENT. The
COUNTY shall take all measures necessary to
effectuate these assurances.
8.3 The laws of the State of Rorida shall govern all
aspects of this AGREEMENT. In the event it is
necessary for either party to initiate legal action
regarding this AGREEMENT, venue shall be in the
Fifteenth Judicial Circuit for claims under state law and
in the Southern District of Rorida for any claims which
are justiciable in federal court.
8.4 The COUNTY, by its execution of this
AGREEMENT. acknowledges and attests that neither
it, nor any of its suppliers. subcontractors, or
consultants who shall perfonn work which is intended
to benefit the DISTRICT is a convicted vendor or, if
the COUNTY or any affiliate of the COUNTY has
been convicted of a public entity crime, a period longer
than 36 months has passed since that person was placed
on the convicted vendor list The COUNTY further
understands and accepts that this AGREEMENT shaH
be either void by the DISTRICT or subject to
immediate termination by the DISTRICT. in the event
there is any misrepresentation or lack of compliance
with the mandates of Section 287.133. Florida Statutes.
The DISTRICT. in the event of such temúnation.
shall not incur any liability to the COUNTY for any
work or materials furnished.
8.5 The COUNTY shall be responsible and liable
for the payment of all of its FICNSocial Security and
other applicable t'ixes resulting from this
AGREEMENT.
8.6 The COUNTY warrants that it has not
employed or retained any person. other than a bona fide
employee working solely for the COUNTY. to solicit
or secure this AGREEMENT. Further the COUNTY
warrants that is has not paid or agreed to pay any
person, other than a bona fide employee working solely
for the COUNTY, any fee, commission, percentage,
gift. or other consideration contingent upon or resulting
from the awarding or making of this AGREEMENT.
For breach of this provision. the DISTRICT may
terminate this AGREEMENT without liability and, at
its discretion, deduct or otherwise recover the full
amount of such fee, commission, percentage, gift. or
other consideration.
8.7 The COUNTY shall allow public access to all
project documents and materials in accordance with the
provisions of Chapter 119. Rorida Statutes. Should the
COUNTY assert any exemptions to the requirements
of Chapter 119imd related Statutes. the burden of
establishing such exemption, by way of injunctive or
other relief as provided by law. shall be upon the
COUNTY.
4
8.7.1 Pursuant to Sections 1l9.07(3)(o). and
240.241 Florida Statutes. data processing software
obtained by an agency under a license
AGREEMENT which prohibits its disclosure and
which software is a trade secret, as defined in
Sections 812.081(c). Florida Statutes is exempt from
the disclosure provisions of the Public Records law.
However, the parties hereto agree that if a request is
made of the DISTRICT. pursuant to Chapter 119.
Page 5 of9. Exhibit "B"
CO[Hract File:\County.doc 04/0210 I
,/
8
SO~H FLv.tUDA WATER MANAGE~IßNT ~TRICT
EXlllBIT "B"
GENERAL TERMS AND CONDITIONS
Florida Statute, for public disclosure of proprietary
property being licensed to the COUNTY (Licensee)
hereunder, the DISTRICT shall advise the
COUNTY (Licensee) of such request and, as
between the DISTRICT and the COUNTY
(Licensee), it shall be the COUNTY's (Licensee's)
sole burden and responsibility to immediately seek
and obtain such injunctive or other relief from the
Courts and to immediately serve notice of the same
upon the Licensor to protect the Licensor's claimed
exemption under the Statute.
8.8 The COUNTY shall make reasonable efforts
to obtain any necessary federal, state, local, and other
governmental approvals, as well as all necessary
private authorizations and permits, prior to the
commencement of performance of this
AGREEMENT. A delay in obtaining pennits shall
not give rise to a claim by the COUNTY for
additional compensation. If the COUNTY is unable
to obtain all necessary permits in a timely manner,
either party may elect to terminate this
AGREEMENT, each party to bear its own costs,
notwithstanding other provisions of this
AGREEMENT to the contrary.
8.9 Pursuant to Section 216.347, F.S., the
COUNTY is prohibited from the expenditure of any
funds under this AGREEMENT to lobby the
Legislature, the judicial branch, or another state agency.
8.10 The DISTRICT is a governmental entity
responsible for performing a public service and
therefore has a legitimate interest in promoting the
goals and objectives of the agency. The work under
this AGREEMENT involves a project consistent
with these goals and objectives. Consequently, the
DISTRICT is desirous of satisfactorily completing
and successfully promoting this project with the
cooperation of its COUNTY. Therefore, as the
DISTRICT'S COUNTY for this project, the
COUNTY assures the DISTRICT that the
COUNTY, its employees, subcontractors and assigns
will refrain from acting adverse to the DISTRICT'S
legitimate interest in promoting the goals and
objectives of this project. The COUNTY agrees to
take all reasonable measures necessary to effectuate
these assurances. In the event the COUNTY
determines it is unable to meet or promote the goals
and objectives of the project, it shaJI have the duty to
immediately notify the DISTRICT. Upon such
notification the DISTRICT, in its discretion, may
terminate this AGREEMENT.
ARTICLE 9 . RELATIONSIßP BETWEEN
THE PARTIES
9.1 The COUNTY shall be considered an
independent contractor and neither party shall be
considered an employee or agent of the other party.
Nothing in this AGREEMENT shall be interpreted to
establish any relationship other than that of
independent contractor between the parties and their
respective employees, agents, subcontractors, or
assigns during or after the perfonnance on this
AGREEMENT. Both parties are free to enter into
contracts with other parties for similar services.
9.2 It is the intent and understanding of the Parties
that this AGREEMENT is solely for the benefit of the
COUNTY and the DISTRICT. No person or entity
other than the COUNTY or the DISI'RICT shall have
any rights or privileges under this AGREEMENT in
any capacity whatsoever, either as third-party
beneficiary or otherwise.
9.3 The COUNTY shall not assign, delegate, or
otherwise transfer, its rights and obligations as set forth
in this AGREEMENT without the prior written
consent of the DISTRICT. Any attempted assignment
in violation of this provision shall be void.
9.4 The COUNTY shall not pledge the
DISTRICTs credit or make the DISTRICT a
guarantor of payment or surety for any
AGREEMENT, debt, obligation, judgement. lien, or
any form of indebtedness.
9.5 The DISTRICT assumes no duty with regard to
the supervision of the COUNTY and the COUNTY
shall remain solely responsible for compliance with all
safety requirements and for the safety of all persons and
property at the site of AGREEMENT performance.
ARTICLE 10 -l\-VWBE PARTICIPATION
Page 6 of9, Exhibit "B"
Contract File:\County.doc 04/02/0 I
/
SOU\.I FLO.rdDA WATER MANAGEM.c.NT DillrRICT
EXIllBIT "B"
GENERAL TERMS AND CONDITIONS
10.1 The COUNTY hereby acknowledges that no
Minority and Women Business Enterprises (M/WBE)
participation goal has been established for this
AGREEMENT; however. both parties agree to
provide the other advance notice of competitive
contracts that may result from this AGREEMENT
along with timelines for public notice and award of
such contracts. In the event subsequent competitive
contract awards do result in MlWBE participation.
such participation shall be reported to the other party.
Both the COUNTY and the DISTRICT will ensure
compliance with the provisions of their respective
program. laws. ordinances and policies and will
support the other's initiatives to the extent allowed by
law.
ARTICLE 11 - YEAR 2000 COMPLIANCE
In the event that the COUNTY's performance. as
required by this AGREEMENT, involves the use
and/or delivery of a software, fumware andlor
hardware product of any kind, the following language
in this Article 11 shall apply:
ILl COUNTY represents and warrants that the
software, firmware andlor hardware is designed to be
used prior to, during, and after the calendar year 2000
A.D., and that the software. firmware andlor
hardware will operate during each such time period
without error relating to date data. specifically
including any error relating to, or the product of. date
data which represents or references multiple
centuries.
11.2 Without limiting the generality of the
foregoing, COUNTY further represents and warrants:
I) that the software. fumware andlor hardware will
not abnormally end or provide invalid or incorrect
results of date data. specifically including date data
which represents or references multiple centuries; 2)
that the software. fmnware andlor hardware has been
designed to ensure Year 2000 Compliance, including,
but not limited to, date data century recognition,
calculations which accommodate same century and
multiple century formulas and date values, and date
data interface values that reflect the century; and 3)
that the software. firmware andlor hardware includes
Year 2000 Compliance. For the purposes of this
AGREEMENT. Year 2000 Compliance also means
that the software. firmware andlor hardware will:
(i) manage and manipulate data involving
dates and leap year calculations. ineluding single
century formulas and multi<entury formulas. and will
not cause an abnormally ending scenario within the
application or generate incorrect values or invalid
results involving such dates; and
(ii) provide that all date-related user interface
functionalities and data fields include the indication
of century.
11.3 Included as part of this Year 2000 Compliance
Warranty, COUNTY shall provide to the
DISTRICT. at no additional charge with, (i) fixes.
corrections and updates to the software, firmware
andlor hardware that are necessary to ensure Year
2000 Compliance as defined herein. and (ii) advice,
consultation and assistance to use the software.
firmware andlor hardware and diagnose and correct
Year 2000 Compliance problems that may exist with
either the software, fmnware andlor hardware. (iii)
and, if deemed necessary by the DISTRICT,
replacement software, fumware anellor hardware
which is compliant with this Year 2000 Compliance
Warranty.
11.4 If this AGREEMENT involves the purchase
andlor license andlor receipt of a software, firmware
andlor hardware product of any kind previously
developed by thèCOUNTY or other third party. and
in the event fixès, corrections and updates of the
software are not technically feasible. the COUNTY
shall accept the return of the software, fumware
andlor hardware if this Year 2000 Compliance
Warranty is breached. and terminate any and all
applicable Schedules andlor License Agreements.
Further, the COUNTY shall refund to the
DISTRICT the fuIl amount of the License Fee
actually paid to the COUNTY for the software; and,
in the case of hardware return, the COUNTY shaIl
refund to the DISTRICT the fuU amount of the
hardware actually paid to the COUNTY by the
DISTRICT. In addition to the foregoing, the
Page 7 of9, Exhibit "8"
Contract File:\County.doc 04/02/0 t
,
8
SOl~:1 FLOKIDA WATER MANAGE~NT ~TRICT
EXHIBIT "B"
GENERAL TERMS AND CONDITIONS
COUNTY shall refund to the DISTRICT all
maintenance fees paid by the DISTRICT, if any, for
on-going support, new software releases and product
updates. All such refunds shall be made to the
DISTRICT. Notwithstanding any other provision in
the AGREEMENT to the contrary, the DISTRICT
hereby reserves all rights to obtain all remedies to the
fullest extent of the law, without any limitation
whatsoever; as may be determined by a court of
competent jurisdiction (including damages and
equitable reliet).
11.5 The term Year 2000 Compliance Warranty
shall mean, collectively, the warranties set forth
herein. This Article 11, in its entirety, shall survive
the expiration or termination of this AGREEMENT.
ARTICLE 12· GENERAL PROVISIONS
12.1 Notwithstanding any proVIsIons of this
AGREEMENT to the contrary, the parties shall not be
held liable for any failure or delay in the performance
of this AGREEMENT that arises from fires, floods,
strikes, embargoes, acts of the public enemy. unusually
severe weather, outbreak of war, restraint of
Government, riots, civil commotion. force majeure, act
of God, or for any other cause of the same character
which is unavoidable through the exercise of due care
and beyond the control of the parties. Failure to
perform shall be excused during the continuance of
such circwnstances, but this AGREEME,NT shall
otherwise remain in effect This provision shall not
apply if the "Statement of Work" of this
AGREEMENT specifies that perfonnance by
COUNTY is specifically required during the
occurrence of any of the events herein mentioned.
12.2 In the event any proVISIons of this
AGREEMENT shall conflict, or appear to conflict,
the AGREEMENT, including all exhibits, attachments
and all documents specifically incorporated by
reference, shall be interpreted as a whole to resolve any
inconsistency.
12.3 Failures or waivers to inSIst on strict
performance of any covenant, condition. or provision
of this AGREEM&'IT by the parties. their successors
and assigns shall not be deemed a waiver of any of its
rights or remedies, nor shall it relieve the other party
from performing any subsequent obligations strictly in
accordance with the terms of this AGREEMENT. No
waiver shall be effective unless in writing and signed
by the party against whom enforcement is sought Such
waiver shall be limited to provisions of this
AGREEMENT specifically referred to therein and
shall not be deemed a waiver of any other provision.
No waiver shall constitute a continuing waiver unless
the writing states otherwise.
12.4 Should any term or proVIsIOn of this
AGREEMENT be held, to any extent, invalid or
unenforceable, as against any person, entity or
circumstance during the term hereof. by force of any
statute, law, or niling of any forum of competent
jurisdiction. such invalidity shall not affect any other
term or provision of this AGREEMENI', to the extent
that the AGREEMENT shall remain operable,
enforceable and in full force and effect to the extent
permitted by law.
12.5 This AGREEMENT may be amended only
with the written approval of the parties hereto.
12.6 This AGREEl-ŒNT states the entire under-
standing and AGREEMENT between the parties and
supersedes any and all written or oral representations,
statements, negotiations, or contracts previously
existing between the parties with respect to the subject
matter of this AGREEMENT. The COUNTY
recognizes that any representations, statements or
negotiations made. by DISTRICT staff do not suffice
to legally bind the DISTRICT in a contractual
relationship unless they have been reduced to writing
and signed by an authorized DISTRICT
representative. This AGREEMENT shall inure to the
benefit of and shall be binding upon the parties, their
respective assigns, and successors in interest.
ARTICLE 13 - SAFETY REQUIREMENTS
13.1 The COUNTY shall require appropriate
personal protective equipment in all operations where
there is exposure to hazardous conditions.
Page 8 of 9, Exhibit "8"
Contract File:\County.doc 04/02/0 I
;'
8
S0l\.;I FLG...JDA WATER MANAGElY.u:.NT EJTRICT
EXHIBIT "B"
GENERAL TERMS AND CONDITIONS
13.2 The COUNTY shall instruct employees
required to handle or use toxic materials or other
hannful substances regarding their safe handling and
use. including instruction on the potential hazards.
personal hygiene and required perwnal protective
measures. A Material Safety Data Sheet (MSDS)
shall be provided by the COUNTY to the
DISTRICT on each chemical product used.
13.3 The COUNTY shall comply with the
standards and regulations set forth by the
Occupational Safety and Health Administration
(OSHA). the Florida Department of Labor and
Employment Security and all other appropriate
federal, state, local or DISTRICT safety and health
standards.
13.4 It is the COUNTY's sole duty to provide safe
and healthful working conditions to its employees and
those of the DISTRICT on and about the site of
AGREEMENT perfonnance.
13.5 The COUNTY shall initiate and maintain an
accident prevention program which shall include, but
shall not be limited to. establislùng and supervising
programs for the education and training of employees
in the recognition. avoidance. and prevention of
unsafe conditions and acts.
13.6 The COUNTY shall erect and maintain. as
required by existing conditions and perfonnance of
the AGREEMENT. reasonable safeguards for safety
and protection. including posting of danger signs and
other warnings, against hazards.
13.7 The COUNTY shall take reasonable
precautions for safety of. and shall provide reasonable
protection to prevent damage. injury. or loss to:
13.7.1 employees on the work and other
persons who may be affected thereby; including
pedestrians, visitors, or traveling public;
13.7.2 the work, materials, and equipment to
be incorporated therein; whether in storage on or off
the site, under care, custody or control of the
COUNTY. or the COUNTY's subcontractors; and
13.7.3 other properties at the site or adjacent
thereto; such as trees, shrubs, lawns, walks, utilities,
pavement, roadways, Structures, building, vehicles,
and equipment not designated for removal. relocation
or replacement in the course of work.
13.8 The COUNIT shall provide first aid services
and medical care to its employees.
13.9 The COUNTY shall develop and maintain an
effective fire protection and prevention procedures
and good housekeeping practices on the work site
throughout the AGREEMENT.
13.10 Emergencies: In emergency affecting safety of
persons or property on or about the site or as a result
of the work; the COUNTY shall act, timely and with
due diligence. to prevent threatened damage, injury.
or loss.
13.11 Environmental: When the COUNTY,
COUNTY's subcontractors, or subcontractors. use
petroleum products. hazardous chemicals, or any
other chemicals used on or about the site. the
COUNTY shall be responsible for handling these
chemical constituents in accordance with federal.
state and local regulations during the terms of the
AGREEMENT. For accidental discharges or
releases onto the floor. air. ground. surface waters,
ground waters, it shall be the COUNTY's sole
responsibility to respond inunediately to clean the
site, at his expense, to the complete satisfaction of
federal. state. local regulatory agencies and to the
mSTRICT r~uirements.
13.12 The DISTRICT may order the COUNTY to
halt operations under the AGREEMENT. at the
COUNTY's expense, if a condition of immediate
danger to the public and/or DISTRICT employees.
~uipment, or property exist. This provision shall not
shift the responsibility or risk of loss for inj uries or
damage sustained from the COUNTY to the
mSTRICT; and the COUNTY shall remain solely
responsible for compliance with all federal. state and
local safety requirements, provisions of this section.
and safety of all persons and property on or about the
site.
Page 9 of 9. Exhibit "B"
Contract File:\County.doc 04/02/0 I
,
'-'
~
EXHIBIT "C"
STATEMENT OF WORK
Taylor Creek/C-25 Canal Restoration Project
1.0 INTRODUCTION
The Indian River Lagoon (llli..) waterbody is a shallow, microtidal ecosystem located along
Horida's east coast from.volusia County to northern Palm Beach County. The potential of
the lagoon to function as a productive ecosystem has been adversely affected by water
management practices and land development within the associated watersheds.
The IRL Surface Water Improvement and Management (SWllv1) Plan identifies poor
water quality and sediment loading in ditch and canal inputs as major impacts to the
health of the system. The sediments, which contain high amounts of nutrients, metals
and other poIIutants, fonn a habitat that is not conducive to the maintenance of desirable
bent.~ic communities. The South Florida Water Management District (District), in an
attempt to reverse the degradation of the IRL and the St. Lucie Estuary, is developing
programs to reduce sediment loads to the lagoon by identifying water quality treatment
techniques within the canal system. The proposed project is an effort to reduce sediment
loadings and enhance water quality of canal (C-25) input that discharges directly to the
IRL. The C-25 CanaVfaylor Creek area provides drainage for the northern 1/5 of St.
Lucie County and northeastern portion of Okeechobee County. The land uses within the
C-25 basin are mainly agriculture (citrus) with low-density residential and urban areas to
the east. The canal is used for surface and groundwater drainage as well as providing
irrigation water. It is used by agricultural interest in the Ft. Pierce Farms and North St.
Lucie Water Control Districts.
Several agencies are partnering with St. Lucie County under separate agreements to
accomplish the restoration of Taylor Creek, including: St. John's River Water
Management DistrictlNational Estuary Program, Florida Ports Council, and Florida
Inland Navigation District (FIND).
2.0 SCOPE-OF WORK
The Taylor CreeklC-25 Canal Restoration Project involves the dredging of Taylor Creek
from the C-25 spillway structure, and the Fort Pierce Fanns C-l Canal spillway structure
to the llli.. Intracoastal Waterway. The project will involve the removal by St Lucie
County (County) of approximately 220,000 cubic yards of sediments to restore Taylor
Creek to original depth design or hard sand bottom. The sediments have been
accumulating in the creek for the last 40 years. The sediments contain fine-grained
organic silt that represents a threat to the health of the sea grasses in the IRL Estuary.
Over the years, the sediments have accumulated to a depth of about 6-7 feet deep in the
center channel.
Page I of2. Exhibit "C" to Agreement No.C-I0282
#
'-'
Once the sediments are removed Taylor Creek will function as a silt trap to accumulate
fine-grain silt before it is discharged to the IRL. In addition, the navigation channel will
be restored to its full depth to benefit the public.
.."
3.0 WORK BREAKDOWN STRUCTURE
St. Lucie County (County), as part of this cooperative agreement, shall: 1) obtain all
necessary pennits, design and prepare bid specifications; 2) construct and provide for
suitable sediment disposal; 3) remove sediment as necessary from Taylor Creek
downstream of S-50; 4) continually monitor the site; and 5) will submit to the FDEP a
final post-dredge bathymetry (certification) of Taylor Creek as the final deliverable.
District staff will conduct site inspection along with the County engineer to verify that the
work is acceptable.
Page 2 of 2. Exhibit "C" to Agreement No.C-10282
,.4
~ ,",nth I .>rida Water Manag<:m.<IIííIt Dis1rict
~ M""'nlSt r...ci< &n;." c.n,~. 210 ^,""" A,""" . S<=a. Fl.J4""· (561) 223-26OQ
GOV 08-32 Suncom (561) 269-2600 . W:¡ts Line 1 (800) 250-4100' F:zx (561) 223-2608
May 21, 1999
O p, ¡:. [,
Mr_ Douglas Anderson /I . : \.(.¡) 1 C. \ 1 ~
i~~:-' I ~\'~. ø), f r'vì .
2300 Virg. inia Ave. nue ~ 0& (). T I ç~.?J ~
Ft Pierce, FL34982 '../" ~ \.. r ~i\\ VQ (
u_u~ .l p
Dear ~rson:
At a recent commission meeting. the St Lucie County Board of County Commissioners, voted to move
forward on the Taylor Creek dredging project fi-om the confluence of Taylor Creek and C-25, dOwnstream
to the Indian River Lagoon. At that meeting. there was uncertainty expressed as to the'Soµth Florida.
Water Managanent District's (SFWMD) commitment to the pròject. The purpose of this letter is to
document the District's commitment - both as a project partner and a. funding partner.
The District has reviewed the draft scope of work for the project. and submitted suggestions and minor
revisions to the St Lucie County Engineer and the county's consultant (BCl). As a result of the request
trom St Lucie County, the District submitted the FIND grnnt application for this project.
The District has $500,000 in legislatively appropriated money (FY98) for the project and is committed to
contribute up to $500,000 of its own funds (FY99) to provide for dredging work and canal bank
stabilization of the C-25 canal. directly up-stream of the S-50 structure. The extent of that work bas yet to
be detennined. Additionally, St Johns River Water Management District has committed $188,000 in this
year's funds to cany out the proposed worl<. Should the County not move forward with this project the
District would then redirect the District funds to the C-23 canal shoal remoV3l project and re-request
Taylor Creek funding for FY99/00_
Hopefully, this information will assist the County in moving forward with this project.
questions, please call me at (561) 223-2600, CÃ1ension 3602.
S7~;%Ø,-
. Paul S. Millar, Director
MartinlSt Lucic Service Center
ff you have any
..
.. t·. i; !! Wi Œ ì ~:-.¡:
.. -'~!j~:1
i .::
. :~ ""
MAY 2.- "',""--,,,... I'-,!
:> r~~~ ; i.-l .
i
,
-._~
--. ~---.
PSM/rb
c: Michael Minton, Governing Board Member
Board of County Conunisioners, StLucie County
Marty Smithson. SJRWMD
...
:....... ..~...::...:~. (Jt=FlCE
CIj:-",OIÚ"Jh't¡m'.tl.
Ff;l:1k \Vi!l¡:1I11~'''.Jr.. (;1;1;::11.1.1
EU:;t'nc; f\. Pcais. \/¡~C Ch:¡i..aua
;\1ir{'hcll \\1. Bcr:;c.'(
\"":(:1.:\1. (;1((,;(
\\'illi~m E.Cc;d'.:.I1II
\\ïlli:1U1 11;LI11"1«111(1
{{iehord :\. )hc!,c~
;l1¡c!,.cI D. !-1in,on
~iirì:u" Singcr
S.muel E. Pook II!. ~'¡\'e DireCtor
\·{iclucl S¡')~on.. Dcpury Executive OireCtor
P2ul ~1ilb..... ì\hninlSr. Lucic Sct\.icc Centcr Difl:cr..l!"
Djwier lIe.dqll.rtcr.< - 33111 GUll Ou{. {¡".d. 1'.0. Bo, l~{¡SO. We" 1';1110 BeJCh. FL 33~ló-4{¡¡;0 - (~07) ó86'8800. Fr. W ^ TS 1-SOO-~32-20~.'
.""'t
AGENDA REQUEST
ITlIiAO.
C-5b
DATE: May 8,2001
REGULAR [ ]
PUBLIC HEARING [ ]
CONSENT [X ]
TO: ST. LUCIE COUNTY BOARD OF COUNTY COMMISSIONERS
SUBMITTED BY: OMB
PRESENTED BY: Marie M. Gouin
SUBJECT: Budget Resolution 01-99 for the $55,000 Urban Mobile Irrigation Lab (MIL) Grant awarded by the Florida
Dept. of Environmental Protection (FDEP) to St. Lucie Soil & Water Conservation District (SLSWCD).
4
BACKGROUND: Due to limited administrative and financial resources, SLSWCD does not maintain an accounting
system to handle grants. St. Lucie County BOCC has been assisting SLSWCD with the fiscal administration of certain
grant projects for a fee equal to 5% of the grant funds. The role of St. Lucie BOCC is limited to setting up budgets,
receiving revenues and disbursing funds from the grants. On 4/23/01 SLSWCD received and accepted a new $55,000
FDEP grant contract allowing for a continuation of the Urban Mobile Irrigation Lab Project, which combines funds for
irrigation systems evaluations and for a Urban Mobile Irrigation Lab Team Leader. County Attorney's Office is in
process of preparing a new interlocal agreement between SLSWCD and St. Lucie BOCC.
4
FUNDS WILL BE AVAILABLE: 001269-3720-334391-300 FDEP Urban MIL Grant
1
.
PREVIOUS ACTION: N/A
4
RECOMMENDATION: Staff recommends that the Board of County Commissioners approve Budget Resolution # 01-
99 to appropriate and expend funds from the FDEP Urban MIL Grant.
~
[XI APPROVED [] DENIED
[ ] OTHER:
.
COMMISSION ACTION:
Coordination/Sianatures
County Attorney: XX
J-r'
9'~
Management & Budget: xxI~~ í1\ Purchasing:
Public Works: Other:
Originating Dept:
Finance: (Check for Copy only, if applicable) XX
G:\B UDGE1ì WP\AGENDA'S\AgendaO I '5'8 UrbanM [L ~ant. wpd
"
'-'
RESOLUTION NO. 01-99
.J
WHEREAS, subsequent to the adoption of the St. Lucie County Board of County Commissioners budget for St. Lucie
County, certain funds not anticipated at the time of adoption of the budget have become available from the Florida
Department of Environmental Protection in form of a grant for the Urban Mobile Irrigation Lab awarded to the St. Lucie
Soil and Water Conservation District.
WHEREAS, Section 129.06 (d), Florida Statutes, requires the Board of County Commissioners to adopt a resolution to
appropriate and expend such funds.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of St. Lucie County, Florida, in
meeting assembled this 8th day of May, 2001, pursuant to Section 129.06 (d), Florida Statutes, such funds are hereby
appropriated for the fiscal year 2000-01, and the County's budget is hereby amended as follows:
REVENUES
001269-3720-334391-300
Department of Environmental Protection
$55,000
APPROPRIATIONS
001269-3720-512000-300
001269-3720-521000-300
001269-3720-521100-300
001269-3720-522000-300
001269-3720-523000-300
001269-3720-523100-300
001269-3720-524000-300
001269-3720-525000-300
001269-3720-549110-300
001269-3720-551200-300
001269-3720-540000-300
001269-3720-551000-300
001269-3720-552000-300
Salaries
FICA
FICA Mandatory
Retirement
Group Insurance
Life Insurance
Worker's Compensation
Unemployment Compensation
General & Administrative Fee
Equipment Under $750
Travel
Office Supplies
Operating Supplies
$39,424
$2,444
$572
$3,607
$1,545
$218
$986
$130
$2,750
$700
$1,000
$700
$924
After motion and second the vote on this resolution was as follows:
Commissioner Frannie Hutchinson
Commissioner Doug Coward
Commissioner Cliff Barnes
Commissioner John D. Bruhn
Commissioner Paula A. Lewis
xxx
XXX
XXX
XXX
XXX
PASSED AND DULY ADOPTED THIS 8TH DAY OF MAY, 2001.
ATTEST:
BOARD OF COUNTY COMMISSIONERS
ST LUCIE COUNTY, FLORIDA
BY:
CHAIRMAN
APPROVED AS TO CORRECTNESS
AND FORM:
COUNTY ATTORNEY
G\BUDGET\ WP\AGENDA'S\AgendaO 1 'S'8UrbanM IL _grant. wpd
...
'-'
~
(' .. -" /)
J Î. -... .... '--:
~
St, Lucie Soil and Water Conservation District
Suite 202, 8400 Picos Road - Ft. Pierce, FL 34945
Date: 26 April 2001
To: Heather Young, Assistant County Attorney
St. Lucie County
From: Bess P. McKinney, District Administrato~
St. Lucie Soil and Water Conservation District
Subject: New Urban Mobile Irrigation Lab
DEP Agreement No. WAP044
I am sending a copy of the new MIL contract from DEP to you in the county Inter-
Department mail. Things have changed since our last meeting. The St. Lucie
Soil and Water Conservation District (SWCD) has decided not to have the
Treasure Coast RC&D administer the funds, but to have St. Lucie County
administer all the funds, not just the salary as I had discussed with you and Maria
Gornieiwicz of Management and Budget. I have already discussed this with her.
I will need to fill out a payroll change some time around May 11th. Will J need a
new inter-local agreement for this grant, and if so how soon could this be done?
The money for the old contract will run out sometime around May 15, 2001.
I am sorry for any inconvenience this may have caused you. (look forward to
working with you again.
If you have any questions, please fill free to contract me at 461-4546 or email
bess.mckinney@fl.nacdnet.org
cc: Maria Gornieiwicz, Management and
Budget
APR 2 6 1001
CONSERVATION DEVELOPMENT - SELF-GOVERNMENT
, .
,
\w
..,
JC" /., r."I"
. " 1\ _ 0 tJi!
DEP AGREEMENT NO. W AP044
STATE OF FLORIDA
WATER ADVISORY P AI'ŒL GRAI"IT ASSIST AI"ICE
PURSUANT TO LINE ITEM 1591G OF THE 2000 - 2001 APPROPRIATIONS ACT
THIS AGREEMENT is entered into between the STATE OF FLORIDA DEPARTMENT OF
ENVIRONMENTAL PROTECTION, whose address is 3900 Commonwealth Boulevard, Tallahassee, Florida 32399
(hereinafter referred to as the "Department") and the ST. LUCIE SOIL AND WATER CONSERVATION DISTRICT,
whose address is 8400 Picos Road, Suite 202, Fort Pierce, Florida (hereinafter referred to as "Grantee" or "Recipient"), a
unit oflocal government, to operate an Urban Mobile Irrigation Lab (MIL) in St. Lucie County, Florida.
In consideration of the mutual benefits to be derived herefrom, the Department and the Grantee do hereby agree as
follows:
I. The Grantee does hereby agree to perform in accordance with the terms and conditions set forth in this
Agreement, Attachment A (Project Work Plan), and all attachments and exhibits named herein which are
attached hereto and incorporated by reference. For purposes of this Agreement, the terms "Contract" and
"Agreement" and the terms "Grantee", "Recipient" and "Contractor", are used interchangeably.
2. 11ús Agreement shall begin upon execution by both parties and end no later than October 31, 2002, inclusive.
The Grantee shall not be eligible for reimbursement for work performed prior to the execution date of this
Agreement. This Agreement may be amended to provide for additional services if additional funding is made
available by the Legislature.
3. As consideration for the services rendered by the Grantee under the terms of this Agreement, the Department shall
pay the Grantee on a cost reimbursement basis in an amount not to exceed $55,000 toward the total project cost
estimate of $110,000. The parties hereto agree that the Grantee is responsible for providing a minimum match of
$55,000 (or 50% of the total project costs, whichever is less) toward the project descnòed in Attachment A. If
the Grantee finds, after receipt of competitive bids, that the work described in Attachment A cannot be
accomplished for the current estimated amount, the parties hereto agree to modify the Project Work Plan described
in Attachment A to provide for the work that can be accomplished for the funding identified above. The Grantee
shall be reimbursed on a cost reimbursement basis for all eligible project costs upon receipt and acceptance of a
properly completed Payment Request Summary Form (provided as Attachment B). In addition to the summary
form, the Grantee must provide from its accounting system, a listing of expenditures charged against this
Agreement. The listing shall include, at a minimum, a description of the goods or services purchased, date of the
transaction, voucher number, amount paid, and vendor name. All requests for reimbursement of travel expenses
shall be based on the travel limits established in Section 112.061, Florida Statutes. Periodically, the Department
may request proof of a transaction (invoice, payroll register, etc.) which must be provided within thirty (30)
calendar days of such a request. The Department also reserves the right to audit the Grantee's disbursements as it
deems necessary. All bills for amounts due under this Agreement shall be submitted in detail sufficient for a
proper pre-audit and post-audit thereof.
4. The State of Florida's performance and obligation to pay under this Agreement is contingent upon an annual
appropriation by the Legislature. The parties hereto understand that this Agreement is not a commitment of future
appropriations.
5. The Grantee shall submit quarterly invoices in conjunction with quarterly progress reports describing the work
performed, problems encountered, problem resolution, schedule updates and proposed work for the next reporting
period. Quarterly reports shall be submitted to the Department's Grant Manager no later than twenty (20) days
following the completion of the quarterly reporting period. It is hereby understood and agreed by the parties that
the term "quarterly" shall reflect the calendar quarters ending March 31, June 30, September 30 and December 31.
DEP Agreement No. WAP044, Page 1 of 4
./
'-'
v,
IN WITNESS WHEREOF, the parties have caused this Agreement to be duly executed, the day and year last
written below.
By:
~
Date:
4/&3(ó\
I
etary
D'"~\ I '1l c¡
~~~~
~4.~~
DEP Contracts Administrator . 6
APfl¡~d~s:fonn~d~
ÐEFtttomey
FEID No.: 59-2440607
*For Agreements with govermnental boards/commissions: If someone other than the Chairman signs this Agreement, a
resolution, statement or other document authorizing that person to sign the Agreement on behalf of the Agreement or must
accompany the Agreement.
List of attachments/exhibits included as part of this Agreement:
Specify
Type
Letter!
Number
Description (include number of pages)
~
-ª-
..£..
..Q...
Proiect Work Plan (3 Pages)
Payment Request Summary Form (1 Page)
Special Audit Requirements (5 Pages)
DMS. Division of Purchasing Memorandum No.6 (1998-99) (3 Pages)
Attachment
Attachment
Attachment
Attachment
DEP Agreement No. WAP044, Page 4 of 4
/
'-'
ìtiÌ
ATTACHMENT A
PROJECT WORK PLAN
URBAN MOBILE IRRIGATION LAB
1.0 INTRODUCTION
This is a continuation of a project that was started under Florida DEP contract No.SP534.
The St. Lucie Soil and Water Conservation District (Grantee), with the technical
assistance of the USDA Natural Resources Conservation Service (NRCS), and with the
Contract and financial Management of the Treasurer Coast Resources Conservation and
Development Council (TCRC&D), plans to continue operation of an Urban Mobile
Irrigation Lab (MIL) in St. Lucie County, Florida. The NlIL was well received by the
community and they intend to continue this program beyond the scope of this contract.
The mission of an Urban MIL is to provide technical assistance to residences, golf
courses, condominiums, and public buildings for the evaluation, improvement, and
management of their irrigation system. A public awareness program, mostly aimed at
homeowner's associations, will be a part of the overall approach_ Onsite evaluations of
irrigation systems will be made and recommendations for improvement are given to the
irrigator along with an irrigation water management plan. The MIL will promote the use
of rain shutoff valves and recommendations will be made relative to the use of irrigation
scheduling and proper selection and placement of sprinklers.
A typical urban MIL, will perfonn 140 evaluations per year, saving an average of 50 to
60 million gallons of water per year. This will result in less stonnwater runoff into the
St. Lucie Estuary. This is intended to be an on-going program to last longer than one
year.
2.0 BACKGROUND
The South Florida Ecosystem Restoration Working Group fonned the St. Lucie Estuary
Issue Team in May 1998. It's purpose was to develop federal, state and stakeholder
consensus on an action plan to immediately accelerate progress toward improving water
and habitat quality in the St. Lucie Estuary and to achieve further and more
comprehensive local ecosystem restoration goals. The Issue Team was fonned after El
Nino rains during the winter and spring of 1998 caused a drastic decrease in salinity of
the St. Lucie Estuary and 33 different species of fish were found with lesions.
The Issue Team developed an action plan, which assesses the current problems in the St.
Lucie Estuary and set direction for achieving improvements both in water quality and
estuarine ecosystem functions (e.g., fish and wildlife habitat) in the next few years.
The St. Lucie Estuary is located on the Martin and St. Lucie County line on the East
Coast of south central Florida. The inner St. Lucie Estuary is comprised of the North
DEP Agreement No. W APO~4, Attachment A, Page 1 of 3
/
'-'
J
Fork and South Fork of the S1. Lucie River, and has a total surface area of about 6.4
square miles. The two forks converge to form a single middle estuary with a surface area
of 4.7 square miles. The middle estuary extends east for approximately 5 miles until it
meets the Indian River Lagoon, which opens to the Atlantic Ocean at the St. Lucie Inlet.
Five tributaries to the estuary provide drainage for a watershed that encompasses 827
square miles. Ten Mile Creek, C-24, and C-23 empty into the North Fork, while the
South Fork and the S1. Lucie canal (C-44) discharge into the South Fork.
All of the irrigation evaluations performed as a result of this scope of work will be
performed in St. Lucie County.
3.0 COOPERATIVE FUNDING RESPONSIBILITIES
The amount of cost share is 50-50 between the Issue Team grant and NRCS/St. Lucie
SWCD
st. Lucie Urban Mobile Irrigation Lab. Budget
Items DEP Funds Match Funds Total Funding
Budget Items:
Salaries:
Staff Personnel $48,600.00 $48,600.00
Farm Manager $30,000.00 $30,000.00
Fringe Benefits:
Farm Manager $18,926.00 $18,926.00
Contract Administrative Fee (5%) (2,619.05)
St. Lucie County for Personnel Funds $2,446.30 $2,446.30
Treasure Coast Resources Conservation
and Development Council for general
contract management $172.75 $172.75
Travel (if authorized) $1,000.00 $1,000.00
Equipment Purchases:
Binding Machine $200.00 $200.00
CD writer $250.00 $250.00
Supplies/Other Expenses $2,004.95 $2,004.95
Vehicle-gas and Maintenance $4,100.00 $4,100.00
Overhead- office Space/ equipment usage $2,300.00 $2,300.00
Total $55,000.00 $55,000.00 $110,000.00
Note: The Contract Administrative Fee is limited to 5% of the total costs of the DEP Funds
expended. The Grantee is responsible for matching every dollar expended under this Agreement on
a one to one basis (including the administrative fee identified above).
4.0 PROCEDURE AND DELIVERABLES
As there are several urban and agricultural MIL's in Florida, all software, evaluation
methods, and goals are standard throughout the state. The MIL's meet regularly and
DEP Agreement No. WAP044, Attachment A, Page 2 of 3
/
'-
...,
NRCS engineers review techniques and methods. The urban MIL will perfonn 35
evaluations per quarter, for a total of 140 evaluations per year.
Quarterly reports shall be submitted to the Department in the standard formª1. Each
report shall detail the number of evaluations completed in the quarter, the findings of
these evaluations, and the projected benefits trom implementing the recommendations.
NRCS policy prevents the releasing the specific information about each site, which
would allow identification of the owner.
Date
IDeliverables
2000-2001
1 st Quarter 6/3 I/O I
Quarterly report Due July 20
35 Evaluations
2nd Quarter 9/30/0 I
Quarterly report Due October 20
35 Evaluations
3rd Quarter 12/30/0 I
Quarterly report Due January 20
35 Evaluations
4th Quarter 3/31/02
Quarterly report Due April 20
35 Evaluations
5th Quarter 6/30/02
Quarterly report Due July 20
6th Quarter 9/30/02
Quarterly report Due October 20
Final Report Due
5.0 EQUIPMENT
The S1. Lucie Soil and Water Conservation District Urban Mobile Irrigation Lab would
like to retain all equipment purchased in the project when the grant ends, to further the
use of this project as the legislative designed for it to be used.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
DEP Agreement No. W AP044, Attachment A, Page 3 of 3
"
\.;
A TT ACIDIENT B
PAYMENT REQ,(JEST SUlVIMARY FOR\I
,,
GR·\.NTEE:
GRANTEE'S GRAJ."lT MANAGER:
PAYMENT REQUEST NO.:
PERFORJ.'1ANCE
PERIOD:
PERCENT MATCHING
REQUIRED:
GRANT EXPENDITURES SUMMARY SECTION
DEP AGREEMENT NO.:
DATE OF REQUEST:
Al"1O UNT
REQUESTED:$
Al\lOUNT OF THIS TOTAL MATCHING
CATEGORY OF EXPENDITURE REQUEST CtJMULA TIVE FUNDS
P A Yì\iIENTS
Salaries S $ $
Fringe Benefits $ S $
Travel (if authorized) S S $
Subcontracting: $
Planning $ $ S
Design $ $ $
Construction $ S S
Construction Related Costs $ $ $
Equipment Purchases S S $
Supplies/Other Expenses $ $ $
Land $ $ $
Overhead $ S $
TOTAL REQUESTED S S $
TOTAL GRANT AGREEMENT S
Less Total Cumulative Payments of: S
TOTAL RElVIAINING IN GRAJ."IT S
[Effective Date of Grant through End-of-Grant Period]
GRANTEE CERTIFICATION
The undersigned certifies that the amounts being requested for reimbursement above were for items that were charged
to and utilized only for the above cited grant activities.
.
Grantee's Grant Manager's Signature Grantee's Fiscal Agent
Print Name Print Name
Telephone Number Telephone Number
DEP Agreement No. W AP044, Attachment B, Page 1 of 1
}I
'-
~
A TT ACHMENT C
SPECIAL AUDIT REQUIREMENTS
The administration of funds awarded by the Department of Environmental Protection (which may be referred to as
the "Department", "DEP", "FDEP" or "Grantor", or other name in the contract/agreement) to the recipient (which
may be referred to as the "Contractor", Grantee" or other name in the contract/agreement) may be subject to audits
and/or monitoring by the Department of Environmental Protection, as descnòed in this section.
MONITORING
In addition to reviews of audits conducted in accordance with OMB Circular A-l33, as revised (see" AUDITS"
below), monitoring procedures may include, but not be limited to, on-site visits by Department staff, limited scope
audits as defmed by OMB Circular A-133, as revised, and/or other procedures. By entering into this agreement, the
recipient agrees to comply and cooperate with any monitoring procedures/processes deemed appropriate by the
Department of Environmental Protection. In the event the Department of Environmental Protection determines that
a limited scope audit of the recipient is appropriate, the recipient agrees to comply with any additional insttuctions
provided by the Department to the recipient regarding such audit. The recipient further agrees to comply and
cooperate with any inspections, reviews, investigations, or audits deemed necessary by the Comptroller or Auditor
General.
AUDITS
PART I: FEDERALLY FUNDED
This part is applicable if the recipient is a State or local government or a non-profit organization as defmed in OMB
Circular A-l33, as revised.
1. In the event that the recipient expends $300,000 or more in Federal awards in its fiscal year, the recipient
must have a single or program-specific audit conducted in accordance with the provisions of OMB Circular
A-133, as revised. EXHIBIT I to this agreement indicates Federal funds awarded through the Department
of Environmental Protection by this agreement. In detennining the Federal awards expended in its flScal
year, the recipient shall consider all sources of Federal awards, including Federal funds received from the
Department of Environmental Protection. The determination of amounts of Federal awards expended
should be in accordance with the guidelines established by OMB Circular A-l33, as revised. An audit of
the recipient conducted by the Auditor General in accordance with the provisions OMB Circular A-133, as
revised, will meet the requirements of this part.
2. In connection with the audit requirements addressed in Part I, paragraph 1., the recipient shall fulfill the
requirements relative to auditee responsibilities as provided in Subpart C of OMB Circular A-133, as
revised.
3. If the recipient expends less than $300,000 in Federal awards in its fiscal year, an audit conducted in
accordance with the provisions of OMB Circular A-133, as revised, is not required. In the event that the
recipient expends less than $300,000 in Federal awards in its fiscal year and elects to have an audit
conducted in accordance with the provisions of OMB Circular A-133, as revised, the cost of the audit must
be paid from non-Federal funds (i.e., the cost of such an audit must be paid from recipient funds obtained
from other than Federal entities).
4. The recipient may access infonnation regarding the Catalog of Federal Domestic Assistance (CFDA) via
the internet at http://aspe.os.dhhs.gov/cfda.
DEP Agreement No. W AP044, Attachment C, Page 1 of 5
;
'-
...."
PART II: STATE FUNDED
This part is applicable if the recipient is a nonstate entity as defined by Section 215.97(2)(1), Florida Statutes.
1. In the event that the recipient expends a total amount of State awards (i.e., State fmancial assistance
provided to the recipient to carry out a State project) equal to or in excess of $300,000 in any fiscal year of
such recipient, the recipient must have a State single or project-specific audit for such fiscal year in
accordance with Section 215.97, Florida Statutes; applicable rules of the Executive Office of the Governor
and the Comptroller, and Chapter 10.600, Rules of the Auditor General. EXHffiIT I to this agreement
indicates State funds awarded through the Department of Envirorunental Protection by this agreement. In
determining the State awards expended in its fiscal year, the recipient shall consider all sources of State
awards, including State funds received from the Department of Envirorunental Protection, except that State
awards received by a nonstate entity for Federal program matching requirements shall be excluded from
consideration.
2. In connection with the audit requirements addressed in Part II, paragraph I, the recipient shall ensure that
the audit complies with the requirements of Section 215.97(7), Florida Statutes. This includes submission
of a reporting package as defmed by Section 215.97(2)(d), Florida Statutes, and Chapter 10.600, Rules of
the Auditor General.
3. If the recipient expends less than $300,000 in State awards in its fiscal year, an audit conducted in
accordance with the provisions of Section 215.97, Florida Statutes, is not required. In the event that the
recipient expends less than $300,000 in State awards in its fiscal year and elects to have an audit conducted
in accordance with the provisions of Section 215.97, Florida Statutes, the cost of the audit must be paid
from non-State funds (i.e., the cost of such an audit must be paid from recipient funds obtained from other
than State entities).
4. For information regarding the Florida Single Audit Act, including the Florida Catalog of State Financial
Assistance (CFSA), a recipient should access the website for the Governor's Office located at
http://sun6.dms.state.fl.uslfsaal for assistance. In addition to the above website, the following websites may be
accessed for information: Legislature's Website http://www.1eg.state.fl.usl. Governor's Website
http://\vww.fhzov.com/, Department of Banking and Finance's Website
http://www.dbf.state.fl.uslaadir/FSAATndex.html. and the Auditor General's Website
http://sun6.dms.state.fl. us/audgen.
PARTm: OTHER AUDIT REQUIREMENTS
(NOTE: Pursuant to Section 215.97(7)(m), Florida Statutes, State agencies may conduct or arrange for audits of
State awards that are in addition to audits conducted in accordance with Section 215.97, Florida Statutes. In such
an event, the State agency must arrangeJor funding the full cost of such additional audits. This part would be used
to specify any additional audit requirements imposed by the State agency that are solely a matter of that State
agency's policy (i.e., the audit is not required by Federal or State laws and is not in conflict with other Federal or
State audit requirements).)
PART IV: REPORT SUBMISSION
1. Copies of audit reports for audits conducted in accordance with OMB Circular A-133, as revised, and
required by PART I of this agreement shall be submitted, when required by Section .320 (d), OMB
Circular A-133, as revised, by or on behalf of the recipient directly to each of the following:
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
DEP Agreement No. WAP044, Attachment C, Page 2 of 5
,/
~
"WI
A. The Department of Environmental Protection at each of the following addresses:
Judy Dolan
Florida Department of Environmental Protection
Southeast Disnict
P.O. Box 15425
West Palm Beach, Florida 33416
Audit Director
Florida Department of Environmental Protection
Office of Inspector General
2600 Blair Stone Road, MS40
Tallahassee, Florida 32399-2400
B. The Federal Audit Clearinghouse designated in OMB Circular A-l33, as revised (the number of
copies required by Sections .320 (d)(1) and (2), OMB Circular A-l33, as revised, should be
submitted to the Federal Audit Clearinghouse), at the following address:
Federal Audit Clearinghouse
Bureau of the Census
1201 East lOth Street
Jeffersonville, IN 47132
C. Other Federal agencies and pass-through entities in accordance with Sections .320 (e) and (t),
OMB Circular A-133, as revised.
2. Pursuant to Section .320(t), OMB Circular A-l33, as revised, the recipient shall submit a copy of the
reporting package described in Section .320(c), OMB Circular A-133, as revised, and any management
letters issued by the auditor, to the Department of Environmental Protection at each of the following
addresses:
Judy Dolan
Florida Department of Environmental Protection
Southeast Disnict
P.O. Box 15425
West Palm Beach, Florida 33416
Audit Director
Florida Department of Environmental Protection
Office of Inspector General
2600 Blair Stone Road, MS40
Tallahassee, Florida 32399-2400
3. Copies ofreporting packages required by PART II of this agreement shall be submitted by or on behalf of
the recipient directly to each of the following:
A. The Department of Environmental Protection at each of the following addresses:
Judy Dolan
Florida Department of Environmental Protection
Southeast Disnict
P.O. Box 15425
West Palm Beach, Florida 33416
DEP Agreement No. W AP044, Attachment C, Page 3 of 5
,I
\w
...",¡
Audit Director
Florida Department of Environmental Protection
Office of Inspector General
2600 Blair Stone Road, MS40
Tallahassee, Florida 32399-2400
B. The Auditor General's Office at the following address:
State of Florida Auditor General
Room 574, Claude Pepper Building
111 West Madison Street
Tallahassee, Florida 32302-1450
4. Copies of reports or management letters required by PART III of this agreement shall be submitted by or
on behalf of the recipient directly to the Department of Environmental Protection at each of the following
addresses:
Judy Dolan
Florida Department of Environmental Protection
Southeast District
P.O. Box 15425
West Palm Beach, Florida 33416
Audit Director
Florida Department of Environmental Protection
Office of Inspector General
2600 Blair Stone Road, MS40
Tallahassee, Florida 32399-2400
5. AJty reports, management letters, or other information required to be submitted to the Department of
Environmental Protection pursuant to this agreement shall be submitted timely in accordance with OMB
Circular A-B3, Florida Statutes, and Chapter 10.600, Rules of the Auditor General, as applicable.
6. Recipients, when submitting audit reports to the Department of Environmental Protection for audits done in
accordance with OMB Circular A-133, Florida Statutes, and Chapter 10.600, Rules of the Auditor General,
should indicate the date that the audit report was delivered to the recipient in correspondence
accompanying the audit report.
PART V; RECORD RETENTION
The recipient shall retain sufficient records demonstrating its compliance with the terms of this agreement for a
period of 3 years from the date the audit report is issued, and shall allow the Department of Environmental
Protection or its designee, access to such records upon request. The recipient shall ensure that audit working papers
are made available to the Department of Environmental Protection or its designee, upon request for a period of 3
years from the date the audit report is issued, unless extended in writing by the Department of Environmental
Protection.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
DEP Agreement No. W AP044, Attachment C, Page 4 of 5
/
-
I
Eo<
-
=
-
=
x
r-:¡
\w
o
z
§;
o
....¡
....¡
o
¡".
~
:I:
¡...
¡".
o
¡...
CI)
f.;)
z
o
U
¡...
Z
~
~
~
¡;j
o
-(
CI)
æ
E-<
o
¡...
¡...
z
<
::J
CI)
~
::J
""
¡...
z
~
il:
ëJ
¡;j
~
:I:
¡...
o
¡...
Q
w
ê
-(
~
-(
CI)
Q
5
¡".
.§ ~
<J .~ 0
;; Q. OJ)
ri5 o ~
- '"
ê::U
<:
ë
::I
g
.;¿
01)
c:
'Õ
::
.::
~
¡.::
~ <:
0
.~ ¡",
U
..2
-=
'"
~
'-
'"
-
..
'S
¡;
U
~
;¡¡
<J
... ...
... -( <J
<: .&>
~ 0 E
¡",
U ::I
Z
..2
-
=
..
::I
..
...
::I
C.
-
¡¡ >.
'Q.. '-'
=
'" <J
" 01)
c:: <:
~ -¡;
...
<J
..2 ""
<J
¡",
11
¡:
..
~
-<
..
]
~ "'§ E ...
<J
.. .&>
-¡; " ~ E
... 13 2 ::I
~ ¡", "- z
a:
t.:..
,2 >.
<J ;; ...
'¡: 0
;:; "- 01)
ri5 o ~
- '"
§:u
<:
Š
g
.;¿
;0
'6
~ c:
::I
;¡ ¡",
...
..
'"
::
c
~
¡¡
'"
..:
..
::
~
.§ ~
;:¡ ¡.::
" <:
:2: 0
æ:' ¡",
U
.;¡:
.§
-=
'"
~
'-
'"
..
.~
¡;
U
;¡¡
"
;¡¡
.. <:
... 0
..
<: ¡",
~ U
..2
-
"
::I
..
...
::: ,..
- '-'
i c:
<J
OJ)
;:¡ <:
.. :;
c:: ...
-š "
""
"
¡",
..2
""
~
¡:
..
~
-<
..
:: ~ " ...
ë <J
~ .&>
" "" E
"0
.. " 0 ::s
" "- c: z
ri5
=
,:: ~'oO
<J .§ 0 -
;; Q. ""-
ri5 o ~ -
'"" :: "'!'
ê::u -
<:
0
~ ~
~ 0
0
0
<: ",.
;> '"
Oo't
S
en .::
¡i
..:
'"
iii
-
....
.2 ª
<: '"
.. ü
CI) '"
'- - 'õ'
'" '-'
~ '" ...
<: " A.
.. 0 ~
:õ' " ,12
= ;;:. <; ~
CI) " ~
~ ëi5 ...
U CI) .9
"" ..
:; = ~
'" ~
æ:' :; '"
-::>
.;¡: t.:.. '~
.§ '"
-= E
'" CI)
~ '- "
'- 0 :; '-' -
'" "" " 'ü c: " a-
- 0 ;; = '" § M
.~ -¡;; ci5 '" ;;; 0
: ;; = '0; Ž r--
Õ ¡;: '" M
U U <:
-
;¡¡
E - -
.. '" 0
.. <J 0
... " )0- N
... ;; :; 0
-( ci5 " 0
~ '"
¡;: 0
N
..2
;;
'"
::I
¡: '"
::I <:::
c. " :¡
;; ~
~ ::s I
c. 0 .,
;:; CI) ::s
~ <:::
.. '"
c:: :.¡; > 0
~ '"
c: ~ -
::I a-
t.:..
..2 -¡; '"
... -
"" '" :::
.. <:::
"" '" £
... 0
'" -
~
-( = ë
.. § ~
:: - "
""... E
:; "'~
... ~ :§ "
'" c. :: "
..:! ... Ž ... ...
;:; 0 OJ)
'" -(
ci5 ri5
~
o
o
o
o
O.
'"
\1'\
io'I
:<cŠ
Q
¡". '"
U ~
__ 0 g
'" p.....
~ :3 ë
a c. 0
v;~()
.~ .~ -5
-( 1: ~
.~ ~ "'0
~ ~ u
co - c;
E ¡... '-'
o '6
o~c
e.- ~.-
o~~
~~ å
.9 "ùI '"
~ = u
"; ¿.~
U .,;
ë; c:; ~
~ v; 'Õ,.
~ ~'ü
~ -õ ~
-ë~-š
~ ¡¡;
~~
'"
~
'¡:
t,)
..
'"
"0
'"
ë
'"
E
'"
,=
6-
"
... '"
E<
co
... -
öO .~
E t,)
c.;
'" "
-5~
"2
"
~
<:
]
'"
>.
~
"0
J:: '"
~.;
~cr'
-( ~
CI) ~
¡".-
U~
.....,'"
'" E
~ ~
š<
,:!1
..>oi
...
o
~
-.
..
'"
u
't
...
'"
';:oc-
~ 0
.~ ciJ 8-
~c.- 0
c.. 0 ~
E OJ) t>
00'"
(,J _.::
.!3 <:::
ë;cuo
-£iUU
'" ...
<:::"O..c::
.~ '¡: -
c.. 0.5
'ü ¡::; "0
... ...
... "'"0
_~ -:S ::s
_'-U
. 0.5
~ ~ ...
~ ; ;
"'~"O
"'O.s~
\) c.;:: ~
:;~o
->..0
~ SJ B
:'2 0
...
'"
'"
~
¿
-5
E
'"
...
OJ)
o
...
c.
..c::
t,)
co
"
..c::
'- .~
~.:.~
~
'-
Q
~
..
O>Ð
..
¡:.,
û
-
~
¡;
S
<::
~
<
...ç
"'!'
Q
::.
<
~
c:õ
;z;
-
~
¡;
E
...
...
...
O>Ð
-(
::.
¡,:¡
Q
'-
ATTACH:\oIE="T D
....,
.
DUJIIII}t£J<T(1f ~
SERVICES
1Q~ ü~ Wlr' T~_ ¡:¡.,.;.¡. .nm-œ~o
I!.5U$k.~
T0/.4 MCCuu. SeauA JY
Fehruary 5. \999
Suire: :n5
MF.MCJRANDUM NO.:
6 (~S·9~)
TO:
Stat~ Ag::['I~Y Pu.n:b.asing D[rec1OTi,
Chi(:[ [11 fOrm.:lli on Off1cm
~ George C Bank$. çp?o
W v ")irCCLOt, SE:lCC' Plm:h.:Ising
Ycar 2000 COlT>pJi;¡m:e Wmant)l Clause
FROM:
SUBJECT:
The Offiœ of IOC Anamcy Gr::oCr:L1 i'l conjunction with tbe Ytat 2000 Project Gmtc .md State
¡'urchæing. biS dçvo;]QpccI a compr!:hcn~iyc YCIIl :moo CompJ1:11lCe cl"tI~ which includes 1
complùmce w~rr~ty. nmedy. ar1d rcsc:lJr:r'~ r~poMibillty.
II is ~omm<:tK1.e6 chat this Year 2000 CompliaClC~ language be included (in Îls entirety) in :my
proçun:ment documeot and contnc:c for lnfofation technology hardwar~. software, and services.
11<\4 cth~ "produc~s" whi~b .11-= or contain so1twan:. fim¡wart. microcode, or embedded chip
tedmology.
It is not tJece5.W}' to replace che Year 2000 J.\ogU2gt In exisúnF; procllrcrnent document; OI
contractS. but instead. utilize Ibis new language in :my ßI:W pCOC'\1rc:m~1'LlS md COCtr:lClS. Also.
fot "!,rOOucu" or services cQUg hi from St2l.tc CO!\trllC~ il i~ r\O( ¡eœss:uy 10 include the Year
2000 J.1!Igu3gc in the procurement document or CtJl1!r:LC't, since vendors arc a~ady bound. by Iht
Yeu2000 language jn I~e Sta.te COßlcacl.
This ¥QIJ' 2000 Còmp/I.1I1ce language is ~y.il¡¡br: it! SPURS.
~
r...~"''''
DEP Agreement No. W AP044, Attachment D, Page 1 of 3
/
'-
....,¡
St:¡te Ag=n.:y Putchasi¡¡g Director.q
Fo:brt.lary 5. 1999
Page 2
YEAR 2000 q)M I'LlANCE WAR RA¡.,-ry
Fer purpos.es of this Yc,,~ 2000 WaJT3ttt}'. the term "Product" sh¡¡1l indud= sof.ware, t1rmw:w~,
microcode. ha!dware 3tJd ~mbedded chip technology.
V~or waaan,s tbat (he Product IS Year 2000 CompJiant. All vc¡sivTls of the Product offered by
the vendo~ and jfurcha;:;ed by the Sc<\te. for wþich Vl:!ldor is obligaled to provide m.1intcn¡¡n,;:c
service arc. <ir¡d in tM futu~e. will be, Year 2000 Compliant_ Yt.:Jr 2000 Comp]i¡¡.nt IJ1I;:¡¡Cl5 ,he
Produc1 wil] ;nclooe the J.bili.ly to~ consistenúy haM]e- date infonna.tjon bçfurc. during. and after
Il1J1u:lTY ].2000. joeluding accepting date input. providing date output, .and proces.sing d3!es:
functiol1 before, tloring and :lÍt.er J3m'ary 1.2000. without thc nc:c.CI for fll'08ram change:; ca~cd
by the advcnt oflhl:: ~w C8lttury: p~opedy h.a.ndle aU dale related information bcfore nd
following J¡m I, 2OC!, including but pot limited to ¡"curate: 3nd rc:tiablc pcl'ÍQI'm¡\'1CC in
pr\.>l:c~\ing d31e and d:!.cc r=[ated d.ata. im:luding c~çuJating. compwiog nù sequ~ru:ing: properly
process MY and all date ca.lculations bd~, on .1nd dlcr thl;: I<:~ ye:u dale. of F~bruaJ)' 29. 2000
and sJ,O1: ¡Hid provIde oUlpui of date information in .......y.~ Ihoill are una.mbigllou$ as 10 century.
'Il1eduratio.n ofchi.q Watnnty and tbc n;mcdi~!t av:1ilablc 10 tbe State forbrea.c:h of.his warnnty
shaH be i'S d~nnt.d in. .'led subject tu, lhe: teems and limiLations of an)' general w.atranty provisions
or~hi~ contt:¡ct. provided Ih~c oQtwjthstandiog jIIJ}I pto\tisioD 10 the contn.ry in such wan:anly
prn....i!tLou(S). or in the .bsence of any 5uc:b wamlt'lty provision(s). defects in the r'roduct with
regard to YCl!or 2000 Compliance:. if ¡¡ny. will be correcte:d by Vendor;t VCCldor's ¡;:ust within a
li=fnJ.uJO!: mutually 3g~ upon .....lth the State- Vendo! c:m not be hdd re~pun$;ble for erron
t'es.ulting from do:vi~ or S)'$œms e.;o¡lErnalto tbi~ CQn!r:lCI whicb ;J.CC perrru.tted to dj reetly a~ss
.any dac ~ba$c 'Provided U!lder Ihj s Agr~met'll 2nd ovcrw.ri tr; Product eWe fie:lds or from tbe USers.
improper inte.gration of n<Jn· Y c.'Ir 2000 Compliant sY'l~m..'- Nothing in thi$ warranty shall be
cotlstL'Ue-d to limit any righu or reme.dJcs the SIa1e tn.'Iy oth.erwizc have under this coctrac:t with
respect to defects other (It an Year 2000 perr.ol'tOalIce.
YEAR '2000 REMEDY CLAUSE
In tbe ~venl of anydc:crcuc i~ product funcliona]ily rcl1ted to time and datcrel¡tted codes :md
buernaJ subroutines I bOlt impe<1e the hardware 01' ~o{twar<: programs !roD! ope~liD¡ beyond Ih~
M ¡}leon ium D:l1e Chsnge., Licensors and Veodors of Li<:efUul'S products. ag.m:: to i rmncdi atC:l~
make requjred comc:nCX1S tQ l'e3tore hardW3r'e and soft W2lr~ progr:illn.\ to thr. same Icvel of
functJona.lilY!lli W:smu1t=d t1erejo at no c:bnrgo: to Û1e liœnsc:e. aod without intcrruption 10 Ibo
ongoing busincss of the: Jicen~. time being or the essenc:1:.
DEP Agreement No. WAP044, Attachment D, Page 2 of 3
,
'-'
.....I
StJ.te Agenc:y P'lJrr;n¡¡,:;ing Direclors
Fcbnmy 5, ] 999
P'.-gr::3
RE:S.ëU.ERS
All produt;\s bid under thl!õ bidl~ocnnLCt wiJl œ Year 2000 compliam. Year 2000 CompJi"nL
means lho:: :Product will incJudc tbe: :l.bility to: consistently h.õlndlc date illfonn"cion before.
dunn!ii. and ~er J:I!luary t. 2000, including ac.c:epcing å:¡te jnput. providing date I>ULput. and
proœ~~jt!g datc3; fune~io!l before, during and a{ler J,¡nuary 1. 2000. wjthol,lL t"" pcc:d t'or program
¡;bange~ cau,SCd by the advent of tbe nc:w ecntulj'; propc.rly b...ndJ.. õlll di1l.c rela1ed infonnation
~forc and fQUowinS lan 1,200]. including 'ow: not limit<=d to a.ccW'õlt~ and æJi.:lbl1:: performance
m proc<:ss;ng date aod date related data, including ca!cu~õlting.. comparjng.aDd liCcycncing;
properly proce~~ any ðnd all dIIIc: c31culacion!õ before. on. :1nd after the ko\lp )":ar d:ltc of February'
29.2000 and store and pro"icle output of date infonna1Ìct1 in \II¡¡)/5 Ibal are unambiguous u to
century. R.esdlcIS InJ\y provide Ii 'PU5 through w3I'1'anty" frorn ,be 1'IIanufactw:erlsoftwacc:
developer, which meet~ aU 1he. w:unnc)' requirement5 by t~ Slate. and wbich shill it"JC1u.l~ all
o<her watTantjes provided by the ~nut'aclurer or software d.t:vclopcr. R~c:l1er :;1uùl1>e
re~ponsjble forwamUlt)' ¡o:s~ur.lllce. n~iistance.enforocrncnt amJ an)' (nt."" actions or ~mcdialion.
required to sill.isfy W.1..cJ:uuy ~uiremc:n1S.
Please contacl Del Hicks l4S7-Q411. Suneom 277-04l 7. shouJd )Iou have qu.esdon5 or need
additionõ1l inCorm\(ion.
GCBldgh
DEP Agreement No. W AP044. Attachment D, Page 3 of 3
/
AGENDA REQUEST
IT~O. C-5c
DATE: May 8,2001
REGULAR []
PUBLIC HEARING [ ]
CONSENT [ X ]
TO: BOARD OF COUNTY COMMISSIONERS
SUBMITTED BY:
OMB
PRESENTED BY: Marie M. Gouin
SUBJECT:
Request to modify the type of the records system equipment to be
purchased from the Sheriff's Local Law Enforcement Block Grant
(LLEBG) 2000-LB-BX-2250.
BACKGROUND:
Please see the attached memo from the St. Lucie Sheriff dated April 30, 2000.
FUNDS Will BE AVAilABLE: 107120-2110-331210-200 Local Law Enforcement Block Grant 2000
PREVIOUS ACTION:
On November 8,2000, St. Lucie BOCC accepted the $68,016 Local Law
Enforcement Block Grant 2000-LB-BX-2250 and approved the use of funds in the
Purpose Area #1 c - Equipment, as required by the granting agency.
I
RECOMMENDATION: Staff recommends that the St. Lucie County Board of County Commissioners
approve the request to modify the type of equipment to be purchased from the
Sheriffs LLEBG Grant 2000-LB-BX-2250.
COMMISSION ACTION:
[X] APPROVED [] DENIED
[ ] OTHER:
County Attorney: XX
(k/
Originating Dept:
Public Works:
Coordination/Sionatures
1
- I 1{'lf/!J
Management & Budget: " ..; ¡Purchasing:
Othec';1Í O.-A 1f
Finance: (Check for Copy only, if applicable) XX
G :\BUDGET\ WPIAGENDA'SIAgendaO t \5'8 LLEBG _Grant. wpd
I'
'-'
....,¡
MEMORANDUM
FROM:
Mika Gomiewicz, Budget Analyst
St. Lucie County Management & Budget Department
Sheriff Ken Masca~
April 30, 2001
TO:
DATE:
SUBJECT:
Agenda Request
Local Law Enforcement Block Grants Program
2000-LB-BX-2250
NUMBER:
010501
We are submitting a request to modify the use of our Local Law Enforcement Block Grant
(LLEBG) 2000-LB-BX-2250 award from the United States Department of Justice, Bureau of
Justice Assistance (B.JA). The previous administration intended to purchase an IBM AS 400 (or
equivalent) mini main frame computer system to support our records system. The IBM AS 400
is much costlier (total project approx. $150,000.00) than the grant award and required match. The
Federal LLEBG award is $68,016.00 and the required minimum match is $7,557.00.
At this time, the most important issue before us is to improve the efficiency of our deputies toward
providing a safe community. We also want our efforts to remain cost effective. We intend to
integrate our records system directly, via cellular data packet delivery (CDPD). This will provide
patrol deputies and supervisors in the field the ability to transmit offense/incident reports directly
to the Sheriff's Office HTE Records system. It will also provide a more efficient manner of data
entry than what is currently deployed. This direct wireless transmission from the field to our
records system will be funded in part through other federal grants. In addition to offense/incident
reports, we also wish to transmit motor vehicle crash reports via CDPD wireless transmission. To
do this we intend to modify our use of the existing LLEBG award and contract with HTE to acquire:
100
Field Accident Reporting Application Software & Licensing
@ $750.00 ea.
Field Accident Form included
Field Accident Reporting for CRIMES - Installation
Field Accident Reporting for CRIMES Training - 2 days /1 trip
Project Management Services - Level 1
Total Project
Federal Award
Agency Match
$ 75,000.00
0.00
1,000.00
2,000.00
+ 1.160.00
$ 79,160.00
- 68.016.00
$ 11,144.00
1
1
1
1
We believe the acquisition of the above will reduce the time needed to transmit reports and allow
us to redeploy personnel into community policing endeavors more efficiently. The Sheriff's Office
will continue to function under the program purpose area that allows LLEBG funds to be spent
supporting law enforcement by procuring equipment, technology and other material directly related
Page 1 of 2
I'
,-.
...,¡
to basic law enforcement functions. The title of this endeavor will be the Accident Reporting 2001
Project. The Sheriffs Office will be responsible for the required cash match.
We are in the process of contacting the LLEBG Advisory Board and will convene either an in-
person or electronic board meeting. We will attempt to convene this meeting prior to the next
BOCC meeting. We are confident the LLEBG Advisory Board will endorse the modification.
However, at this point, the findings of the LLEBG Advisory Board are non-binding and not
necessary for the BOCC to approve our modification and for us to move forward. It is critical, due
to other grant deadlines, that we implement various programmatic phases including the Accident
2001 Project in a timely manner.
St. Lucie County remains the applicant jurisdiction and St. Lucie County Sheriff's Office continues
to be the implementing law enforcement agency. Our Information Services Section Commander,
Ms. Emilie Enzmann will continue as the Accident Reporting 2001 Project Officer functioning to
implement and track system progress and acquired equipment. Our Professional Standards
Division Commander, Capt. Mike Graves, will function as the Program Contact Person with the
B.J.A. and with the County. It is our understanding that Maria Gomiewicz will function as the
Jurisdiction Contact between the County and B.J.A.
A copy of the BOCC minutes authorizing this modification and the submission of an on-line
drawdown of funds is all that is required for us to proceed. Upon approval by the B.O.C.C. the
County Administrator should authorize Maria Gomiewicz to electronically submit the online request
for drawdown. Prompt attention to this matter will assure our meeting numerous required grant
programmatic deadlines before September 30, 2001. If you have any questions, please contact
Captain Mike Graves, who also functions as our agency-wide grant coordinator. His pager number
is 343-4099.
mg
cc: Major Tom Mclnemey, Director of Administration
Captain Mike Graves
Inspector Bucky Walters
Mr. Henry Walker, Comptroller
Ms. Emilie Enzmann, Project Officer
attachment
Page 2 of 2
. W~-r'. .." -.- . _u,,__..~u
,I
Acclication
Award
Award Handbook
Overview
Review CEO Information
Review Jurisdiction
Information
Accept Award
View Award Document
Financial Institution
Information
Decline Award
Help/Frequently Asked
Ouestions
LLEBG Home
].Qg:Qff
~ '-,:,'- .. .,.,... ...
-..",;I
Recorts
Correscondence
FY 2000 Local Law Enforcement Block Grants Program
St Lucie County, FL
Please verify that you are are ACCEPTING your jurisdiction's FY 2000 LLEBG Award and ce
that all Applicant infonnation displayed in the previous screens is accurate and truthful. Please
ensure that a street address has been included and not just a post office box, and ensure that bOI
uppercase and lowercase lettering has been used.
Once accepted, no changes can be made to the A ward, including special conditions, without a j
request to BJA for a Grant Adjustment Notice (GAN).
Verify you are accepting the award and special conditions by clicking on the Accept button be:
you need more time to consider accepting this award, please click on the Cancel button below.
Please note that clicking Cancel does NOT decline this award.
If you have questions, please contact the GMS Hotline at 1-888-549-9901.
Signature
· Title IMr.
· First Douglas
Name
· Last Anderson
Name
· 1561-462-1450
Phone
· I
EMail
P" I have examined the information provided here regarding the signIng authority and CI
it Is accurate. I am the signing authority, or have been delegated or designated formally;
the signing authority by the appropriate official, to provide the information requested
throughout this application system on behalf of this jurisdiction to the Local Law
Enforcement Block Grants Program. Information regarding the signing authority, or the
delegation of such authority, has been placed In a file and is available on-site for immedi
review.
f.·~t¿äp1/ I~Gan¿él····1
AUTHORIZATION TO ACCEPT GRANT AWARD
ELECTRONIC LY:
County Administrator
RFD
Grant Chanaes
II Ij~/fX)
https://grants.ojp.usdoj.gov:8004/grns_user/plsq V award. accept_ award_verification
Accept Award
10/26/00
.... _':>'" .. v.... ...
'-' 'WI
Iif FY 2000 Local Law Enforcement Block Grants Program
~'::" ~ St Lucie County, FL
"',:,::=_.~
Application Award RFD Grant Changes Reports Correspondence
.,.
Award Handbook
Overview
Review CEO
Information
Review Jurisdiction
Information
Accept A ward
. View Award Document·
Financial Institution
Information
Decline A ward
Help/Frequently Asked
Questions
LLEBG Home
Log-Off
Overview
The Award Section of your handbook allows you to check if FY 2000 LLEBG Award
documents have been approved by BJA and are ready for your acceptance. You are
able to accept or decline your award and print the formal award documents for your
records. To ensure that the jurisdiction and CEO information provided during the
application process is current and accurate, please verify the information on the
following screens.
.
I
,
The date of your award is 30-SEP-2000, and it is now ready for your acceptance.
You have 45 calendar days to accept this award and 90 calendar days to complete
the Request for Drawdown (RFD) process.
FY 2000 LLEBG Award Information
FY 2000 LLEBG Final Award Amount-
'This amount reflects the final award amount for FY $ 68,016.00
000 plus any needed adjustment to the FY 1999
",ward amount
Matching Amount $
7,557.00
Please click on the Continue button to review CEO information, view the award
documents, and accept the award. If you choose to decline your award, please skip
to the Decline Award step on the left.
"'~çóritinu~-"I
https:llgrants.ojp.usdoj.gov:8004/gms_ user/plsq Vaward.overview?p _ bgid=2
10/26/00
"
¡;,LEBG Program Online Help, " ...
,..¡;
\w"
Page 1 of 3
.'
~
...."
LLEBG PROGRAM ONLINE HELP
F AQ INSTRUCTIONS MORE HELP SEARCH
Request for Drawdown System Guidance (LLEBG)
Welcome to the Local Law Enforcement Block Grants (LLEBG) Program Request for Drawdown (RFD) System!
The information provided in the RFD process will allow the Bureau of Justice Assistance (BJA) to better address
the future needs of local communities across the country, as well as provide expanded data regarding crime-
fighting initiatives and innovative programs that grantees are implementing in their respective jurisdictions. The
data will allow BJA to measure the direct impact that the LLEBG Program is having on crime and our
communities. This information will also demonstrate compliance with cross-cutting federal laws.
The following information is being provided in an effort to assist each grantee in preparing for the RFD process:
Accepting Your Award
Receiving your Award Documents and accepting the Award does not provide your jurisdiction with immediate
access to the Program funds. Prior to actually receiving funds, you must first complete the Request for
Drawdown process.
Your jurisdiction will be notified on-line, via the Grants Management System (GMS), when the RFD
process is on-line and ready to be completed. It is each jurisdiction's responsibility to check the GMS for
notification of the availabilfty of the RFD process.
In the interim, you may proceed with your Advisory Board meeting and Public Hearing, as these conditions must
be met prior to completing the RFD process and prior to obligating any grant funds.
10% Match
4
The LLEBG Program requires a 10% cash match; federal funds may not exceed 90% of total program costs.
Interest derived from the award does not have to be matched, but interest generated from the trust fund may not
be used as part of the local match. Matching contributions need not be applied at the exact time or in proportion
to the obligation of federal funds. However, the full match must be obligated by the end of the project period.
There is no waiver provision for the match requirement (except for American Samoa, Guam, Northern
Mariana Islands and U.S. Virgin Islands).
ObliÇlating Funds
«
Prior to obligating (writing purchase orders, entering into contracts or service agreements) any LLEBG funds,
Grantees must
. Hold both the Advisory Board Meeting and Public Hearing.
Expenditure of LLEBG Funds
You may not expend any grant funds until you have completed the RFD process. You have exactly 24
months in which to expend (pay for goods and services) all funds, including local match funds and any
interest earned. No later than 90 days after the expenditure period ends, all unexpended funds must be
returned to the OJP Office of the Comptroller for reallocation to the LLEBG Program for the following
year's award cycle.
Preliminary Instructions for the Request for Drawdown Process
The following information is being provided to help you prepare for the completion of the RFD:
https:l/grants.oip.usdoi .gov: 8004/ doc/instructi ons. htm
10118/00
,_~Lt.jjl.J Program Unlme Help ...I'"
.... '),
'-"
.)
'"
"WfIII
I. Advisory Board Meeting and Public Hearing
Both of these meetings must have been held prior to obligating (writing purchase orders, entering into
contracts or service agreements) any LLEBG funds. You will need to provide the following information
regarding these meetings:
The date the public hearing was held.
The date the Advisory Board completed its review of the proposed allocation of funds.
Certification that the Advisory Board has reviewed the proposed allocations.
Certification of Public Hearing Notice and method of notification.
List of Advisory Board members (by organization).
11. LLEBG Program/Purpose Areas
Jurisdictions are reminded that they may not use LLEBG funds to supplant/replace local funds.
The seven (7) purpose areas in which LLEBG funds may be allocated are the same as in previous LLEBG
program years. You will be required to indicate the total dollar amounts allocated to each of the seven (7)
program/purpose areas. The sum of the purpose area allocations must equal your total award plus match.
·
Purpose Area #1a: Hiring and Training oflaw enforcement and support personnel (You will be required to
provide information regarding the number of FTE's funded with LLEBG funds and indicate the
category/classification of employee)
Purpose Area #1 b: Overtime for law enforcement and/or support personnel (You will be required to indicate the
programmatic purpose areas for which the overtime is expended.)
·
Purpose Area #1 c: Equipment (You will be required to indicate the type of equipment being purchased and the
initiatives to be addressed by the use of the equipment.)
Purpose Area #2: Enhanced Security Measures in and around Schools or Locations that are a special risk (i.e.,
domestic violence shelters, elderly housing, etc.). (You will be required to indicate the facility for which security
measures are being enhanced. If the proj ect includes the purchase of equipment in order to meet the project goals, you
will be asked to provide information regarding the type of equipment being purchased.)
·
Purpose Area #3: Establish or Support Drug Courts (You will be required to identify the specific population
involved in the drug court [juvenile, adult or both] and provide information regarding the drug court program.)
Purpose Area #4: Enhance adjudication of cases involving violent offenders (You will need to identify the age
group targeted by the project, provide data relative to the number ofFTE's funded, and the initiative behind the
program [i.e., increasing space in correctional and holding facilities].)
Purpose Area #5: Establish Multi-jurisdictional Task Forces (You will be required to identify both local and
federal agency partners as well as the specific focus of the task force.)
Purpose Area #6: Establish Co=unity Crime Prevention Programs to control, detect, or investigate crime or to
prosecute criminals (You will be asked to identify the program focus and target population of the program.)
Purpose Area #7: Defray the Cost of Indemnification Insurance for law enforcement officers (You will be required
to provide information regarding the total amount of indemnification insurance purchased by your jurisdiction.)
https://grants.ojp.usdoj.gov:8004ldoc/instructions.htm
10/18/00
c....LEBG Program Unlme tlelp..,_
,,'\
'-'. . . .~
Note: The following list indicates those expenses that are not allowable unde~e LLEBG
guidelines:
o Tanks or Annored Vehicles
o Fixed-Wing Aircraft
o Limousines
o Real Estate
o Vehicles (not primarily used for law enforcement)
o Consultants
o Yachts
o New Construction
(* Renovations to existing facilities require prior approval by BJA staff and the federal share cannot exceed 10%
of the total renovations costs.)
~
Louisiana State Applicants (FY 1999 ONLY)
LLEBG legislative language requires Lousiana grantees to consider Advisory Board recommendations as
binding. In prior years, the Bureau of Justice Assistance (BJA) has requested these be submitted in writing
to BJA prior to allowing for the drawdown of funding. For Fiscal Year 1999 funding, Lousiana grantees will
be required to establish and maintain a file of all Advisory Board recommendations as part of the LLEBG
grant files on-site and to make these available for BJA review upon request during anyon-site visits
conducted by BJA. Please do not submit copies of these to BJA as part of the RFD process.
.
https://grants.ojp.usdoj . gov: 8 004/ doc/instructions.htm
10/18/00
."
AGENDA REQUEST
I...." NO. _ 11- J
DATE: Nov. 8, 2000
REGULAR [ ]
PUBLIC HEARING [ x]
CONSENT [ ]
TO: BOARD OF COUNTY COMMISSIONERS
SUBMITTED BY:
OMB
PRESENTED BY: Marie M. Gouin
~
SUBJECT:
Acceptance of the Local Law Enforcement Block Grant award on behalf of
the Sheriffs Office and Budget Resolution No. 00-251 to increase the Fine
and Forfeiture Fund.
BACKGROUND:
St. Lucie County Sheriffs Office applied for and was awarded $68,016 for the
Local Law Enforcement Block Grant to be used for purchase of a computer
mini frame to support the records system (memorandum from the Sheriffs
Office is attached). Local match in the amount of $7,557 is included in the
FY01 Sheriffs Office. Granting agency requires a public hearing to be held
regarding the proposed use of grant funds.
.
t
.
FUNDS WILL BE AVAILABLE:
107120-2110-331210-200 USDOJ Local Law Enforcement Slack Grant
2000.
PREVIOUS ACTION:
Application for this grant was approved by the SOCC on 9/19/00. On 10/24/00 St.
Lucie County BOCC approved OMB's request to advertise the public hearing.
RECOMMENDATION: Staff recommends that the St. Lucie County Board of County Commissioners to
authorize the County Administrator to accept electronically the Local Law
Enforcement Block Grant, and to approve Resolution No. 00-251 to increase the
Fine and Forfeiture Fund by $68,016. To have effective redundancy anc
to provide more effective protection from natural disaster~C
COMMISSION ACTION: per 28 CFR Part 23. The AS4001 CONC RENCE:
mini-frame computer must be locate
at the Emergency Operations Center.
[x] APPROVED [] DENIED
( ] OTHER:
County Attorney: XX
q.
¡ykf
Coordination/Sionatures
Management & Budget: xJr¡~/ ~vy Purchasing:
Public Works: Other:
Originating Dept: XX
Finance: (Check for Copy only, if applicable) XX
G:"BCDGET,WP'AGE:\DA'S\Agend>O t 11'3LL3G_ GronLwpd
~.
MEMORANDUM
'-'
TO:
Mika Goriewicz, Budget Analyst
St. Lucie County Management & Budget Department
Undersheriff Dennis M. Williams ~ I
September 5, 2000
.;
DATE:
'. 1 /1 '7 .
"
FROM:
SUBJECT:
Grant Application to Bureau of Justice Assistance
FY 2000 - Local Law Enforcement Block Grants Program
.'
/' \
. /.
,/~';'
I' , ~
.
NUMBER:
00.09.01
j
The Sheriff's Office is applying for a Local Law Enforcement Block Grant (LLEBG) from the United
States Department of Justice, Bureau of Justice Assistance (8.JA). The Sheriffs Office intends
to apply under the program purpose area that allows LLE8G funds to be spent for supporting law
enforcement by procuring equipment, technology and other material directly related to basic law
enforcement functions. The Sheriff Office intends to purc:hase an IBM AS 400 (or equivalent) mini
main frame computer system to support our records system. We will title this endeavor the
Records System 2001 Project.
The Sheriff's Office will make application to the B.JA seeking an allocation from the LLEBG
program. Federal LLE8G funding will cover up to $68,016.00 of the cost of the Records System
2001 Project. LLE8G funds may not exceed ninety percent (90%) of total program costs.
Program participation requires the remainder in a cash match. The IBM AS 400 (or equivalent)
mini main frame computer system costs approximately $150,000.00. The Sheriffs Office will be
responsible for the required cash match ($7,557.00) and remaining costs. _.
f
Once our application is approved, St. Lucie County will be the applicant jurisdiction and St. Lucie
County Sheriff's Office will be the implementing law enforcement agency. Our Information
Services Section Commander, Ms. Emilie Enzmann will function as the Records System 2001
Project Officer functioning to implement and track system progress and acquired equipment. Our
Administrative Services Division Commander, Capt. Mike Graves, will function as the Program
Contact Person with the 8.JA and with tlíe County. It is our understanding that Maria Gomiewicz
will function as the Jurisdiction Contact between the County and 8.JA
Attached is a hard copy of the on-line application which I have endorsed and certified. Upon
approval by the B.O.C.C. the County Administrator should direct Maria Gomiewicz to submit the
on-line application. Prompt attention to this matter will assure our meeting the submission
deadlines. If you have any questions, please contact Captain Mike Graves, who also functions
as our agency-wide grant coordinator. His pager number is 343-4099.
mg
cc:
Major Richard Duncan, Director of Administration
Captain Mike Graves
Mr. Henry Walker, Comptroller
Ms. Emilie Enzmann, Project Officer
Attachment
.",
-
AGENDA REOUEST
ITEM NO. c-&wI
DATE: May 8, 2001
REGULAR [ ]
PUBLIC HEARING [ ]
CONSENT [ X ]
TO: Board of County Commissioners
PRESENTED BY:
SUBMITTED BY(DEPT):County Attorney
Heather Young
Assistant County Attorney
,
f
SUBJECT: Declarations of Unity of Title - Diocese of Palm Beach and George and Patricia Fulmer
BACKGROUND: See attached memorandum CÀ ·01-645,':
I
FUNDS AVAILABLE: N/A
f
PREVIOUS BOARD ACTION: N/A
RECOMMENDATION: Staff recommends that the Board of County Commissioners approve the proposed lot line
adjustment under the Declarations of the Unity of Title and authorizing the Unity of Title for the Diocese and
Fulmer parcels, subject to receipt of a copy of the executed and recorded Corrective Special Warranty Deed and
Special Warranty Deed.
COMMISSION ACTION:
.
[XJ APPROVED [] DENIED
[ ] OTHER:
o
,A. ,-<-~
County Anorney: .'
Review and Approvals
Management & Budget:
Purchasing:
Originating Dept
Other:
Other:
Finance: (Check for Copy only, if applicable): _
J
'-'
...,
INTER-OFFICE MEMORANDUM
ST. LUCIE COUNTY, FLORIDA
TO: Board of County Commissioners
FROM: Heather Young, Assistant County Attorney
C.A. NO: 01-645
DATE: April 25, 2001
SUBJECT: Declarations of Unity of Title - Diocese of Palm Beach and George
and Patricia Fulmer
BACKGROUND:
Attached to this memorandum are Declarations of Unity of Title from ofthe Diocese of Palm
Beach and George and Patricia Fulmer.Tht} Decl~rations have been prepared on behalf of the
property owners in conjunction with lot line adjustments proposed to correct errors in the legal
descriptions which appear in the chains of title for the subject parcels. Copies of the proposed
Corrective Special Warranty Deed and Special Warranty Deed which must also be executed in
conjunction with the lot line adjustment are also attached. Staff has reviewed the proposed
documents and they appear to be in order.
CONCLUSION/RECOMMENDATION:
Staff recommends that the Board of County Commissioners approve the proposed lot line
adjustment under the Declarations of the Unity of Title and authorizing the Unity of Title for the
Diocese and Fulmer parcels, subject to receipt of a copy of the executed and recorded Corrective
Special Warranty Deed and Special Warranty Deed.
Respectfully submitted,
~~
Heather Young
Assistant County Attorney
Attachments
HY/
Copies to:
County Administrator
Community Development Director
Public Works Director
Deputy Clerk
'-'
-...I
Prepared By and Return to:
Harold G. Melville, Esquire
MELVILLE & SOWERBY. P.L.
2490 South 25th Street
Fort Pierce, Florida 34981
Courthouse Box #63
PARCEL I.D. NO. 2408-324-0002-000n & 2408-324-0002-010/0
[Space Above TIûs Line For Recording Data)
CORRECTIVE SPECIAL WARRANTY DEED
This Corrective Special Warranty Deed is being recorded to correct the legal description contained in
the original Special Warranty Deed recorded in O.R. Book 1304, Page 1493.
This Corrective Special Warranty Deed is made and executed this _day of
200 I, by and between NORBERT GUETTLER and PATRICIA GUETTLER, husband and wife, (hereinafter
"Grantor"), and The Most Reverend Anthony J. O'Connell, BISHOP OF DIOCESE OF PALM BEACH, his
successors in office and assigns, a corporation sole, whose post office address is 9995 North Military Trail,
Palm Beach Gardens, of the County of Palm Beach, State of Florida, 33410-9650 (hereinafter "Grantee").
Witnesseth: That the Grantor, for and in consideration of the sum of $10.00 and other good and
valuable consideration to Grantor in hand paid by Grantee, the receipt whereof is hereby acknowledged, has
granted, bargained and sold to the said Grantee and Grantee's heirs and assigns forever, the following describéd
land, situate, lying and being in the County of St. Lucie, State of Florida, to wit:
The West 165 feet of the North 316 feet of the South 346 feet of the Southeast one-quarter
of the Northwest one-quarter of the Southwest one-quarter of Section 8, Township 35 South,
Range 40 East of the Public Records of St. Lucie County, Florida.
Subject To restrictions, reservations and easements of record, if any, which are not reimposed
hereby, and real estate taxes subsequent to December 31, 1999.
TOGETHER with all tenements, hereditam~ts and appurtenances thereto belonging or in anywise
appertaining.
TO HAVE AND TO HOLD, the same in fee simple forever.
AND the grantor warrants the title to said land and will defend the same against the lawful claims of
all persons claiming by or through grantor.
In Witness Whereof, the Grantor has hereunto set their hands and seals the day and year first above
written.
Signed, Sealed and Delivered
in the presence of:
NORBERT GUETTLER
7912 Fisher Field Road, Blairsville, GA 30512·5858
Print Name:
PATRICIA GUETTLER
7912 Fisher Field Road, B1airsville, GA 30512-5858
Print Name:
STATE OF GEORGIA
COUNTY OF
The foregoing instrument was acknowledged before me, this day of , 200 I, by
NORBERT GUETTLER and PATRlCIA GUETTLER, husband and wife, ~ who are personally known to me, or
~ who produced their driver's licenses as identification.
(NOTARY SEAL)
Notary Public
STATE OF GEORGIA
My Commission Expires:
¥
....
'-"
....,
Prepared By and Return to:
Harold G. Melville, Esquire
MEL V1LLE & SOWERBY, P.L.
2490 South 25th Street
Fort Pierce, Florida 34981
Courthouse Box #63
PARCEL J.D. NO. Portion of2408-324-0002-000/7
[Space Abtwe This Line For Recording Dat.a]
SPECIAL WARRANTY DEED
This Special Warranty Deed made and executed this _day of ,2001, by
and between The Most Reverend Anthony J. O'Connell, BISHOP OF DIOCESE OF PALM BEACH, his
successors in office and assigns, a corporation sole, whose post office address is 9995 North Military Trail,
Palm Beach Gardens, of the County of Palm Beach, State of Florida, 33410-9650 (hereinafter "Grantor"), and
GEORGE CRAIG FULMER and PATRICIA ANN FULMER, husband and wife, (hereinafter "Grantee").·
Witnesseth: That the Grantor, for and in consideration of the sum of $10.00 and other good and
valuable consideration to Grantor in hand paid by Grantee, the receipt whereof is hereby acknowledged, has
granted, bargained and sold to the said Grantee and Grantee's heirs and assigns forever, the following described
land, situate, lying and being in the County of St. Lucie, State of Florida, to wit:
The East 60 feet of the West 165 feet of the North 316 feet ofthe South 346 feet of the
Southeast one-quarter of the Northwest one-quarter of the Southwest one-quarter of
Section 8, Township 35 South, Range 40 East, ofthe Public Records ofSt, Lucie County,
Florida.
Subject To restrictions, reservations and easements of record, if any, which are not reimposed
hereby, and real estate taxes subsequent to December 31, 1999.
TOGETHER with all tenements, hereditaments and appurtenances thereto belonging or in anywise
appertaining.
.'".---
TO HAVE AND TO HOLD, the same in fee simple forever.
AND the grantor warrants the title to said land and will defend the same against the lawful claims of
all persons claiming by or through grantor.
In Witness Whereof, the Grantor has hereunto set their hands and seals the day and year first above
written.
Signed, Sealed and Delivered
in the presence of:
Print Name:
THE MOST REVERENT ANTHONY J. O'CONNELL
BISHOP OF DIOCESE OF PALM BEACH .
9995 North Military Trail
Palm Beach Gardens, FL 33410-9650
Print Name:
STATE OF FLORIDA
COUNTY OF PALM BEACH
The foregoing instrument was acknowledged before me, this day of ,2001, by
The Most Reverend Anthony 1. O'Connell, BISHOP OF DIOCESE OF P ALMBEACH, LJ who is personally known
to me, or LJ who produced their driver's licenses as identification.
Notary Public
STATE OF FLORIDA AT LARGE
My Commission Expires:
~
'.
'-'
"'-'
This Instrument Prepared By
Harold G. Melville. Esq.
MELVILLE & SOWERBY, P.L.
2940 South 25th Street
Fort Pierce, Florida 34981
PARCEL J.D. NO. 2408-324-0003-000/4 and Portion of2408-324-0002-000/7
(Spice Above This Line For Recording Dati)
DECLARATION OF UNITY OF TITLE
KNOW ALL MEN BY THESE PRESENTS that GEORGE CRAIG FULMER and P A TRlCIA
ANN FULMER (hereinafter "Declarant"), hereby declare the unification of title of the property more
particularly described herein in accordance with the tenns and conditions contained herein.
WITNESSETH:
WHEREAS, Declarant is the owner in fee simple of the real property (hereinafter "Existing Property")
more particularly described as follows:
Property Tax J.D. #2408-324-0003-000/4
PARCEL 1: Commencing at a ·point where the West line ofthe SE 1/4 ofNW 1/4 of
SW 1/4 of Section 8, Township 35 South, Range 40 East, intersects the
N orth right-of~way line of Delaware A venue Extension, thence rurl East
along said North right-of-way line a distance of 165 feet for the Point of
Beginning, thence run North a distance of 135 feet, thence east parallel
to the North right-of-way line of Delaware Avenue Extension a distance
of 165 feet, thence South to the North right-of-way line of Delaware
Avenue Extension, thence West along said right-of-way line to the Point
of Beginning.
PARCEL 2: Commencing at point where the West line of the SE 1/4 of the NW 1/4
ofthe SW 1/4 of Section 8, Township 35 South, Range 40 East intersects
the North right-of-way line of Delaware Avenue Extension, thence run
East along said North right-of-way line a distance of165 feet, thence run
North a distance of135 feet for the Point of Beginning, thence run North
a distance of 181 feet, thence East parallel to the NorthTight-of-way line
of Delaware Avenue Extension a distance of 165 feet, thence South a
distance of181 feet, thence West parallel to the North right-of-way line
of Delaware Avenue Extension to the Point of Beginning.
WHEREAS, Declarant has acquired real property (hereinafter "Adjustment Property") as a result of
a lot line adjustment duly approved by S1. Lucie County, Florida, as evidenced by the approval letter attached
hereto as Exhibit "A" and incorporated herein by reference. The Adjustment Property being more particularly
described as follows:
Property Tax J.D. #: Portion of 2408-324-0002-000/7:
The East 60 feet ofthe West 165 feet of the North 316 feet of the South 346 feet of the
Southeast one-quarter of the Northwest one-quarter of the Southwest one-quarter of
Section 8, Township 35 South, Range 40 East, ofthe Public Records ofSt. Lucie County,
Florida.
WHEREAS, the attached approval letter contemplates consolidation of the "Existing Property" and
the "Adjustment Property".
F
-~
'-'
....,
NOW, THEREFORE, in accordance with the provisions of the attached approval letter, the Declarant
herein hereby declares that the "Existing Property" and the "Adjustment Property" are hereby combined under
common ownership and unity of title to fOlm a common parcel of property to be identified as Prope~ Tax L D_
#2408-324-0003-000/4 or such other Property Tax LD. number as assigned by the appropriate department of
S1. Lucie County, Florida.
IN WITNESS WHEREOF, the Declarant has hereunto caused this Declaration to be executed this
_ day of , 2001.
Signed, Sealed and Delivered
in the presence of:
Print Name:
GEORGECRMGFULMER
Print Name:
PATRICIA ANN FULMER
STATE OF
COUNTY OF
The foregoing instrument was acknowledged before me, this day of
2001, by GEORGE CRMG FULMER and PATRICIA ANN FULMER, husband and wife, [ ] who are
personally known to me, or [ ] who have produced their drivers' licenses as proof of identification.
Notary Public
Print Name:
STATE OF
My Commission Expires:
(NOTARY SEAL)
''"..-"
'-'
."
Tlús Instrument Prepared By
Harold G. Melville, Esq.
MELVILLE & SOWERBY, P.L.
2940 South 25th Street
Fort Pierce, Florida 34981
Parcell.D. 2408-324-0001-000/0; 2408-324-0002-010/0; and Portion of2408-324-0002-00017
(Space Above 11ù£ Line For Rccording Data)
DECLARATION OF UNITY OF TITLE
KNOW ALL MEN BY THESE PRESENTS that The Most Reverend Anthony 1.
O'Connell, BISHOP OF DIOCESE OF PALM BEACH (hereinafter "Declarant"), hereby declares
the unification oftitle ofthe property more particularly described herein in accordance with the terms
and conditions contained herein.
WITNESSETH:
WHEREAS, Declarant is the owner in fee simple of the real property (hereinafter "Existing
Property") more particularly described as follows:
Pronerty Tax I.D. #2408-324-0001-000/0
The SE 1/4 of the NW 1/4 ofthe SW 1/4 of Section 8, Township 35 South, Range
40 East, LESS AND EXCEPT THEREFROM the South 346 feet thereof.
".,.-
WHEREAS, Declarant has acquired real property (hereinafter "Acquired Property") more particularly
described as follows:
Prooerty Tax J.D. #: Portion of 2408-324-0002-00017:
The West 165 feet of the North 316 feet of the South 346 feet of the Southeast one-
quarter of the Northwest one-quarter of the Southwest one-quarter of Section 8,
Township 35 South, Range 40 East, of the Public Records ofS1. Lucie County, Florida.
LESS the East 60 feet thereof.
WHEREAS, Declarant desires to consolidate the "Existing Property" with the "Acquired Property"
and the approval letter attached hereto as Exhibit "A" contemplates consolidation of the "Existing Property"
and the "Acquired Property".
NOW, THEREFORE, in accordance with the provisions of the attached approval letter, the Declarant
herein hereby declares that the "Existing Property" and the "Acquired Property" are hereby combined under
common ownership and unity of title to form a common parcel of property to be identified by such Property
Tax J.D. number as assigned by the appropriate department of S1. Lucie County, Florida.
\w
....,
IN WITNESS WHEREOF, the Declarant has hereunto caused this Declaration to be executed this
_ day of ,2001.
Signed, Sealed and Delivered
in the presence of:
Print Name:
THE MOST REVERENT ANTHONY J. O'CONNELL
BISHOP OF DIOCESE OF PALM BEACH
9995 North Military Trail
Palm Beach Gardens, FL 33410-9650
Print Name:
STATE OF FLORIDA
COUNTY OF PALM BEACH
The foregoing instrument was acknowledged before me, this day of .2001, by
The Most Reverend Anthony J. O'Connell, BISHOP OF DIOCESE OF PALM BEACH,LJ who is personally known
to me, or LJ who produced his driver's license as identification.
Notary Public
ST ATE OF FLORIDA AT LARGE
My Commission Expires:
."'.--
AGENDA REQUEST
ITEM NO. ~~ b_
DATE: May 8,2001
REGULAR [ ]
PUBLIC HEARING [ ]
4
CONSENT [x ]
TO: BOARD OF COUNTY COMMISSIONERS
PRESENTED BY:
f
SUBMITTED BY(DEPT): County Attorney
SUBJECT:
BACKGROUND:
FUNDS AVAilABLE:
PREVIOUS ACTION:
RECOMMENDATION
CONCLUSION:
COMMISSION ACTION:
Katherine Mackenzie-Smith
Assistant County Attorney
Permission to file suit against Robert L. McClain to request an
Injunction to requir.e._Mr. McClain to remove trash, junk and debris
from his residence at 5020 Garner Street in Fort Pierce.
.
See attached memorandum
Staff recommends that the Board of County Commissioners grant permission
to allow the County Attorney to file suit against Robert l. McClain to request
an injunction to require Mr. McClain to remove the trash,junk and debris from
his property.
[~APPROVED [J DENIED
[ ] OTHER:
[X) County Attorney:
Review and Approvals
[ ]Managomont & Budgot:
[ ]Purcha5ing:
[ ] Information T och.:
[ ] Pub;;c Work5 Diroctor
[ ] Solid Wa5u. Mgr
Effoctivo 5/96
[ ]Financo:(chock for coPy only, if applicablo)
.I'
~
..."
INTER-OFFICE MEMORANDUM
COUNTY ATTORNEY'S OFFICE
ST. LUCIE COUNTY, FLORIDA
TO: Board of County Commissioners
FROM: Katherine Mackenzie-Smith, Assistant County Attorney
C.A. NO: 01-619
DATE: April 27, 2001
SUBJECT: Permission to File Suit against Robert L. McClain to request an Injunction to
require Mr. McClain to remove trash, junk and debris from his residence
BACKGROUND:
On July 5, 1989, the St. Lucie County Code Enforcement Board found Robert L. McClain, Case
No. 89-526, in violation of Section 1-9-19 of the St. Lucie County Code of Ordinances. Mr.
McClain had accumulated trash, junk and debris at his residence, 5020 Garner Street, Fort
Pierce. At the August 2, 1989 fine hearing, the Code Enforcement Board levied a fine of thirty-
five dollars ($35.00). On October 4, 1989, the Code Enforcement Board levied a fine of Three
hundred and fifteen dollars ($315.00). On November 1, 1989, the Code Enforcement found the
property to be in compliance. On November 13, 1989, Mr. McClain paid the fines for a total of
three hundred and fifty dollan, ($350.00).
On April 3, 1991, the St. Lucie County Code Enforcement Board found Robert McClain, Case No.
91-349, to be in repeat violation of Section 1-9-19. St. Lucie County Code of Ordinance for
accumulation of trash, junk and debris at his residence 5020 Garner Street, Fort Pierce. A fine
of fifty dollars ($50.00) per day was imposed for each day the violation existed starting March
19, 1991. The violation was abated as of June 3, 1991. On August 7, 1991, the Code Enforcement
Board reduced the fine to three hundred dollars ($300.00) which was paid by Mr. McClain.
On November 1,1991, the St. Lucie County Code Enforcement Board sent a Notice of Violation to
Mr. McClain for repeat violation of Section 1-9-19 St. Lucie County Code of Ordinances. The
violation was abated as of November 12, 1991.
On February 2, 1994, in Case No. 93-1126, the St. Lucie County Code Enforcement Board found
Robert McLain to be in violation of Section 1-9-19 St. Lucie County Code of Ordinances for
accumulation of trash, junk and debris. The Code Enforcement Board levied a fine of ten dollars
($10.00) per day beginning February 3, 1994. The violation was abated as of June 7, 1995. On
June 7, 1995, the fine was reduced to five hundred dollars ($500.00) and was paid in full.
..
/
'-r
...,¡
On June 2, 1999, the St. Lucie County Code Enforcement Board found Robert L. McClain, Case
No. 99-010015, in violation of Section 1-9-19 of the St. Lucie County Code of Ordinances (the
"Code"). Mr. McClain had deposited an enormous amount of various types of trash, junk and
debris on his property located at 5020 Garner Street, Fort Pierce. The debris included
cardboard boxes, trash bags, unserviceable vehicles, tall grass and weeds. The trash. junk and
debris appeared to have filled the entire home, carport and was overflowing into the yard. On
July 7, 1999. the St. Lucie County Code Enforcement Board fined Mr. McClain twenty-five ($25)
per day for each day the violation continued beginning June 2, 1999. The fine has reached the
maximum amount of $5,000.
On May 8, 2000, St. Lucie County Code Enforcement received another complaint concerning the
junk, trash. debris and overgrowth at Mr. McClain's residence. A notice of violation was issued
and Mr. McClain was given to May 25. 2000 to correct the violation. The trash, junk and debris
had spread almost to the road. Local service agencies were contacted and a combined effort
was put forth from the County, local service agencies and neighbors. The trash, junk and debris
and overgrowth were removed from the yard.
.
'''.--
As of April 2001, trash,junk and debris has again be'ên accumulating. It is spreading from the
carport to the yard again. The yard is again overgrown (please see attached photographs).
Mr. McClain's property is homestead and therefore, pursuant to state law, the Code
Enforcement lien from Case No. 99-010015 cannot be foreclosed as to the real property. Since
the traditional remedy of lien foreclosure is not an option in this case, staff believes that the
County will need to seek judicial relief to require the property owner to clean up his property.
RECOMMENDATION/CONCLUSION:
Staff recommends the Board of County Commissioners grant permission to allow the County
Attorney to file suit against Robert L. McClain to request an injunction to require Mr. McClain
to remove the trash, junk and debris from his property or in the alternative. to permit the
County to clean the property.
«
Respectfully submitted,
J¿¿.
KMS/cb
Attachment
Katherine Mackenzie-Smith
Assistant County Attorney
Copies to:
County Attorney
Public Works Director
Staff Concurring
Clerk Secretary
Press Public
"
.
'"
..."
.
ROBERT MCCLAIN
5020 GARNER ST
4/18/01
OFFICER: MICHELLE PRESTRIDGE
.
4
,
'"
\p
-...I
ROBERT MCCLAIN
5020 GARNER ST
4/18/0 I
OFFICER: MICHELLE PRESTRIDGE
..
'-'
AGENDA REOUEST
"""""
ITEM NO. C-6.C
DATE: May 8, 2001
REGULAR [ ]
PUBLIC HEARING [ ]
CONSENT [X ]
TO: Board of County Commissioners
PRESENTED BY:
SUBMITTED BY(DEPT):County Attorney
Heather Young
Assistant County Attorney
SUBJECT: St. Lucie Soil and Water Conservation District - Interlocal Agreement for Administration of Mobile
Irrigation Lab ("MIL") Grant -
BACKGROUND: S~e attached memorandum CA 01-670
FUNDS AVAILABLE: Funds will be appropriated pursuant to Resolution 01-99 which will be presented to the
Board on May 8, 2001.
RECOMMENDA nON: Staff recommends that the Board of County Commissioners approve the proposed
interlocal agreement with the St. Lucie County Soil and Water Conservation District, and authorize the chairman
to sign the agreement.
[19 APPROVED [] DENIED
[ ] OTHER:
COMMISSION ACTION:
County Attorney:
c~
V
Review and Approvals
Management & Budget:
Purchasing:
Originating Dept.
Other:
Other:
Finance: (Check for Copy only, if applicable): _
."
"-,
.,
INTER-OFFICE MEMORANDUM
ST. LUCIE COUNTY, FLORIDA
TO: Board of County Commissioners
FROM: Heather Young, Assistant County Attorney
C.A. NO: 01-670
DATE: May 1,2001
SUBJECT: St. Lucie Soil and Water Conservation District - Interlocal Agreement
for Administration of Mobile Irrigation Lab ("MIL") Grant
BACKGROUND:
The St Lucie County Soil and Water Conservation District has entered into an agreement
with the Florida Department of Environmental Protection (DEP Agreement No. W AP044) which
I
provides for the continuation of the mobile irrigation lab ("MIL") project. The District has requested
that the County assist it with the program by coordinating the fiscal administration of the grant. The
County has provided similar services to the District for past grants. Attached to this memorandum
is a copy of a proposed interlocal agreement drafted for this purpose. Pursuant to the agreement, the
County will retain five percent (5%) of the grant funds as compensation for its services to the
District.
CONCLUSION/RECOMMENDA TION:
Staff recommends that the Board of County Commissioners approve the proposed interlocal
agreement with the St. Lucie County Soil and Water Conservation District, and authorize the
chairman to sign the agreement.
Respectfully submitted,
~~
Heather Young
Assistant County Attorney
Attachments
BY/
Copies to:
County Administrator
Finance Director
Management and Budget Director
Deputy Clerk
.:J'If ¡
~
..,,;
INTERLOCAL AGREEMENT
THIS AGREEMENT is entered into this day of ,2001, by and between
ST. LUCIE COUNTY, a political subdivision of the State of Florida (the "County") and the ST.
LUCIE SOIL AND WATER CONSERVATION DISTRICT, a special taxing district (the
"District").
WHEREAS, the District has entered into DEP Agreement No. W AP044 with the Florida
Department of Environrnental Protection (the DEP Agreement) which provides for the District's
continued operation of an Urban Mobile Irrigation Lab in St. Lucie County (the "Project"); and
WHEREAS, the District has requested that the County assist it by coordinate the fiscal
administration, including processing the payroll and benefits for the employee hired by the District
to operate the Urban Mobile Irrigation Lab ("MIL") of the DEP Agreement on behalf of the
District; and .:
WHE~AS, the County is willing and able to assist the District in this regard.
NOW, THEREFORE, in consideration of the mutual promises and covenants contained
herein, the parties agree as follows:
1. GENERAL.
This Agreement is entered into pursuant to Section 163.01, Florida Statutes, the Florida
Interlocal Cooperation Act. This Agreement embodies the whole understanding of the parties. There
are no promises, terms, conditions, or obligations other than those contained therein, and this
Agreement shall supersede all previous telecommunications, representations, or agreements, either
verbal or written, between the parties hereto.
2. PROJECT MANAGERS.
The Project Manager for the County is the Bess McKinney at (561) 461-4546. The Project
Manager for the District is Philip C. "Flip" Gates, Jr. at (561) 461-4546.
The parties shall direct all matters arising in connection with the performance of this
Agreement, other than invoices and notices, to the attention of the Project Managers for attempted
resolution or action. The Project Managers shall be responsible for overall resolution or action. The
Project Managers shall be responsible for overall coordination and oversight relating to the
performance of this Agreement.
1
",
""
."wII
3. COUNTY RESPONSIBILITY.
A. The County agrees to coordinate the fiscal administration of the DEP Agreement on
behalf of the District. The County shall deposit into an interest bearing account funds received from
the Florida Department of Environmental Protection on behalf of the District pursuant to the FDEP
Agreement. Upon receipt and verification of invoices from the District for services or equipment
obtained by the District pursuant to the DEP Agreement, the County shall pay such invoices on
behalf ofthe District using the funds received from DEP. The County shall retain five percent (5%)
of the funds received from DEP as compensation for its services on behalf of the District under this
Agreement. Within forty-five (45) days following the date oftennination of this Agreement and
payment of all outstanding invoices under the DEP Agreement, the County shall return the remaining
funds and any accrued interest to the District.
B. The County agrees to be responsible for payment of the salary, benefits, and
withholding for:the employee hired by the District to operate 1he MIL (the "Employee"). The DEP
funds shall be used for the payment of such expenses. The Employee shall be not be considered an
employee of the County.
I
4. DISTRICT RESPONSIBILITY.
A The District shall be responsible for the perfonnance of the Project under the DEP
Agreement as set forth in the Scope of Work thereunder incorporated herein by reference. The
District shall submit to the County invoices for services or equipment obtained by the District
pursuant to the DEP Agreement. The District shall cooperate with the County in providing any
documentation or infonnation required for the County to process such invoices for payment or
otherwise administer the DEP Agreement.
B. The District shall be responsible for the hiring and supervision of the Employee to
operate the MIL. The District shall detennine the salary and benefits for such the Employee. The
District shall provide the County Finance Department with the employee's timesheets on or before
the Monday preceding a payday.
C. The District shall notify the Employee and the County Finance Department regarding
any changes in the Employee's status, including tennination of employment.
D. The District shall be responsible for the collection of funds from DEP. In the event
the funds awarded become unavailable or must be returned to DEP, the District shall repay all
payroll and other expenses incurred by the County on behalf of the District.
E. The District shall be solely responsible for the Employee's perfonnance and
professional conduct.
2
;'
~
....J
F. The District shall be solely responsible for any work related licenses or insurance
which may be required for the Employee.
5. TERM: TERMINATION.
The term of this agreement shall commence on the date set forth above and shall continue
tmtil the DEP Agreement and any extensions thereof are terminated. Either party may terminate this
agreement with or without cause upon thirty (30) days prior written notice to the other party.
6. NOTICES.
All notices, requests, consents, and other communications required or permitted under this
Agreement shall in writing (including telex and telegraphic communication) and shall be (as elected
by the person giving such notice) hand delivered by messenger or courier service, telecommunicated,
or mailed by registered or certified mail (postage prepaid), return receipt requested, and addressed
to:
AS TO COU1iIL
WITH A COPY TO:
COtmty Administrator
2300 Virginia Avenue
Administration Building Annex
Fort Pierce, Florida 34982
St. Lucie COtmty Attorney
2300 Virginia Avenue
Administration Building Annex
Fort Pierce, Florida 34982
AS TO DISTRICT:
St. Lucie Soil and Water Conservation District
8400 Picos Road, Suite 202
Fort Pierce, Florida 33945
or to such other address as any party may designate by notice complying with the terms of this
Section. Each such notice shall be deemed delivered: (a) on the date delivered if by personal
delivery, (b) on the date telecommtmicated if by telegraph, (c) on the date of transmission with
confirmed answer back if by telex, and (d) on the date upon which the return receipt is signed or
delivery is refused or the notice is designated by the postal authorities as not deliverable, as the case
may be, if mailed.
7. AUDIT.
The parties agree that the other party or any of its duly authorized representatives shall, tmtil
the expiration of three (3) years after expenditure of funds under this Agreement, have access to and
the right to examine any directly pertinent books, documents, papers, and records of that party
3
# i
""
.-..J
involving transactions related to this Agreement.
8. PUBLIC RECORDS.
The parties agree to allow public access to all documents, papers, letters, or other material
subject to the provisions of Chapter 119, Florida Statutes, and made or received by them in
conjunction with this Agreement.
9. ASSIGNMENT.
Neither party shall assign this Agreement to any other persons or firm without first obtaining
the other parties' approval.
10. FILING.
, '
This Agreement and any subsequent amendments thereto shall be filed with the Clerk of the
Circuit Court rfSt. Lucie County pursuant to Section 163.01(11), Florida Statutes.
;
IN WITNESS WHEREOF, the parties have caused the execution by their duly authorized
officials as of the date stated below.
ATTEST:
BOARD OF COUNTY COMMISSIONERS
ST. LUCIE COUNTY, FLORIDA
BY:
DEPUTY CLERK
CHAIRMAN
DATE:
APPROVED AS TO FORM AND
CORRECTNESS
COUNTY ATTORNEY
4
.#
","'
ATTEST:
SECRETARY
wp \g: 1agreemn/\;n/e1'/oca/\,)'wcdm;/. 01. wpd
'J
ST. LUCIE SOIL AND WATER
CONSERVATION DISTRICT
BY:
CHAIRMAN
DATE:
5
/
'-'
AGENDA REQUEST
-:.;I
ITEM NO. C.~lob
DATE: May 8, 2001
REGULAR []
PUBLIC HEARING []
CONSENT [XX]
TO: BOARD Of COUNTY COMMISSIONERS
PRESENTED BY:
SUBMITTED BY(DEPT): County Attorney
Daniel S. McIntyre
County Attorney
SUBJECT: Extension of Lease Agreement with State of Florida Department of Juvenile Justice
BACKGROUND:
'See attached memorandum
fUNDS AVAILABLE:
PREVIOUS ACTION:
RECOMMENDA TION: Staff recommends that the Board approve the Modification to Extend and
authorize the Chairman to sign the Modification
COMMISSION ACTION:
[x] APPROVED [] DENIED
[ ] OTHER:
ouglas Anderson
County Administrator
County Attorney:
w
Review and Approvals
Management & Budget
Purchasing:
Originating Dept.
Central Svcs Dir.:
County Eng.:
Finance: (Check for Copy only, if applicable)
Eft. 5/96
, OJ
'-'
~
INTER-OFFICE MEMORANDUM
ST. LUCIE COUNTY. FLORIDA
TO:
Board of County Commissioners
FROM:
Daniel S. McIntyre, County Attorney
C.A_ NO.
01-673
DATE:
May 1, 2001
SUBJECT:
Extension of Lease Agreement with State of Florida Department of
Juvenile Justice
-------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------
BACKGROUND: .
The C04nty owns property including a building located at 119 South 10th Street in Fort Pierce.
The County has leased this property to the State of Florida Department of Juvenile Justice
("Department") since June 30,1998. The Department is using the property to provide social services
to area residents. The Department is paying the County rent in the amount of five hundred and 0/100
($500.00) dollars per month. The current Lease expires on August 31, 2001. Attached is a copy of
a letter dated April 24, 2001 from Michele Lewis of the Department requesting that the County
agree to sign a "Modification to Extend" which would extend the lease term until August 31, 200~
RECOMMENDATION/CONCLUSION:
t
Staff recommends that the Board approve the Modification to Extend and authorize the
Chairman to sign the Modification.
DSM/ caf
Attachment
'-'
...."
,;'
STATE OF FLORIDA
DEPARTMENT OF JUVENILE JUSTICE
April 24, 2001
Mr. Daniel S. Mcintyre
2300 Virginia Avenue
3rd Floor Admin. Annex
Ft. Pierce, FL 34982-5652
'.I
I..
Re: Lease Number: DJJ 15 001
Location: Ft. Pierce
Dear Mr. Mcintyre: ¡
Enclosed is the new Modification to Extend for the above location for your review and signatures.
Please have the appropriate signature placed on all five (5) copies of the modification. Also, two (2)
separate individuals must witness the signature on all forms and print their names in the proper
location.
If you have any questions concerning this package or need further assistance you may contact me at
(850) 921-6575.
Sincerely,
ÎYLt'~ ~
Michele Lewis
OMCI
.
Enclosures
2737 CENTERVIEW DRIVE
JEB BUSH, GOVERNOR
TALLAHASSEE, FLORIDA 32399-3100
W.G. "BILL" BANKHEAD, SECRETARY
1"/
~ ì/ I &'~
I \ 11 ì I
V0V ~ \"~~ ,r
'0~ In
.J \ .
, I
, ,I
·i ~)
'"
'-'
STATE OF FLORIDA
..."J
~Jm-~
!:~ .tt..~~1
j._ .: .~~~t:l
, '~~-'
",,- ,-
~' .J
""... -!::~-:- '. ~..
'c..w
" '
DEPARTMENT OF JUVENILE JUSTICE
AGREEMENT FOR MODIFICATION TO EXTEND TERM
ZONE:
LEASE NO,:
MODIFICATION NO.:
20
DJJ 15 001
02
WHEREAS, the Department of Juvenile Justice
, as Lessee, has previously
entered into Lease Number DJJ 15 001 , on June 30
, 19~ A.D., for a term
comrnencmg July 1
, 19~ A.D., which now terminates the2,L day
of August
, 20J!L, A.D.,; the current Lessor being St. Lucie County. Florida. A
political subdivision of the State of Florida
(Owner's name)
and;
WHEREAS, both the Lessor and the Lessee wish to amend and modify said lease so as to
change the term of the lease;
NOW, THEREFORE, in consideration of the mutual promises and covenants herein
contained, the parties hereto hereby agree as follows:
1. The above described Lease No. DJJ 15 001 is hereby amended and modified to
extend the term to and including the 31 day of AU2ust
, 20-ºL, AD., and
«
2. The covenants and conditions contained in the original State of Florida,
Department of Juvenile Justice Lease Agreement No. DJJ 15 001 as amended by the
above modifications, are readopted by the Lessor and Lessee and incorporated herein.
., ~,... ......
""
'-'
"-'"
LEASE NO.: DJJ 15 001
MODIFICATION NO.: 02
IN WITNESS WHEREOF, the parties hereto have hereunto executed this instrument for
the purpose herein expressed, this _ day of , 20_, A.D.
ANY MODIFICATION OF A LEASE AGREEMENT SHALL NOT BECOME LEGALLY
EFFECTIVE UNTIL APPROVED/ACCEPTED BY THE DEPARTMENT OF
MANAGEMENT SERVICES.
If Lessor is a Corporation, Partnership, Trust, Name of Corporation, Partnership, Trust, etc.:
etc.: St. Lucie County, Board of County Commissioners
Signed, sealed and delivered in the presence
of: f By: (SEAL)
Its Chairman
ATTEST: (SEAL)
AS TO President, General Partner, Trustee Its Secretary
Signed, sealed and delivered in the presence LESSEE: STATE OF FLORIDA
of: DEPARTMENT OF Juvenile Justice
By:
AS TO LESSEE Larry Ochalek, Chief
Bureau of Contracting & Purchasing
ORIGINAL SIGNATURES REQUESTED ON ALL COPIES
.
.
f
c
2of2
"..,-
,;
l,;
ù
AGENDA REQUEST
ITEM NO. c-7A
DATE: May 6, 2001
REGULAR [ ]
PUBLIC HEARING [ ]
CONSENT [ X ]
PRESENTED BY:
TO: BOARD OF COUNTY COMMISSIONERS
SUBMITTED BY: Airport Paul Phillips
SUBJECT: Accept the Florida Department ofTransportation (FDOT) Joint Participation Agreement (JP A),
and authorize the Chairman to execute the JP A and resolution 01-104 authorizing the Chairman to sign
the agreement, for the construction of a fire protection system at St. Lucie County International Airport.
This IP A provides for $400,000 of the $500,000 necessary for the project. This is a 80% matching fund
IPA with the Florida Department of Transportation.
BACKGROUND: On March 2000, the Board approved the construction of a ground storage tank at St.
Lucie County International Airport. The existing water system at the Airport does not provide adequate
continuous water supply to support the fire protection and suppression systems required for the
construction of some types of hangars. As indicated in the attached Water System Analysis prepared by
PBS&J, supplemental fire protection enhancements are necessary to ensure adequate fire protection at the
Airport. This JPA will provide $400,000 of the $500,000 necessary for the construction of fire protection
enhancements at the airport.
.
FUNDS AVAILABLE IN ACCT#: Matching funds of $1 00,000 were available in the Airport Signage
project. However, due to a federal grant, the signage project required only $22,900 of the $100,000
approved by the Board. The balance of matching funds of $77,100 are available in the Improvements oft
Building account (140-4220-563000-400) and the remainder of $22,900 needed for the project are
available in Airport funds carryforward balance (140-9910- 599900-800).
.
PREVIOUS ACTION: In March 2000, the Board approved the fire protection system project at St. Lucie
County International Airport.
~
RECOMMENOA TION: Staff recommends that the Board accept the Florida Department ofTransportation
(FOOT) Joint Participation Agreement (JPA), and authorize the Chairman to execute the JPA and
resolution 01-104 authorizing the Chairman to sign the agreement, for the construction of a fire protection
system at St. Lucie County International Airport. This IP A provides for $400,000 of the $500,000
necessary for the project. This is a 80% matching fund JP A with the Florida Department of Transportation.
COMMISSION ACTION:
peJAPPROVED [ ]DENIEO
[ ]OTHER:
Reviews & Approvals f
County Attomey'~OMB
Originating Dept: ~ 'Other:
Finance:(Check fì r Cop y, If applIcable)
Purchasing
Other:
)
~
·
·
·
WATER SYSTEM ANAL YSIS
FOR THE
ST. LUCIE COUNTY
INTERNATIONAL AIRPORT
PBS&J PROÆCT NUMBER 01-1234.01
MAY 2001
PBS'
~
,
\w
....,¡
Table of Contents
Section
Pa1!e
1 Introduction........................................ .......................................................... ...... .... ........ .... 1-1
1.1 Background ..................... ................................................................. ........ .................. 1-1
1.2 .Purpose.............................................................. .... ................................. ... .... ............ 1-2
2 Existing and Future Conditions ...................................................._.................................... 2-1
2.1 Existing Facilities, Equipment and Structures...................._...................................... 2-1
2.2 Existing Potable and Fire Demands........................................................................... 2-1
2.2.1 Existing Potable Demand................................................................................... 2-1
2.2.2 Existing Fire Demand ............._..........................................................................2-4
2.3 Future Potable and Fire Demands.............................................................................. 2-4
2.3.1 Future Potable ..Demand.................................................................................... 2-4
2.3.2 Future Fire Demand ......................................................_.................................... 2-5
.
3 Water System Analysis and Recommendations ................................_............................... 3-1
3.1 Existing and Future Condition Computer Models .........._.......................................... 3-1
3.2 Model Results ............................................................................................................ 3-1
3.3 Recommendations..................... ................................................................................. 3-4
,
ST. LUCIE COUNTY
INTERNATIONAL AIRPORT
WATER SYSTEM ANALYSIS
Project No. 01-1234.01
'-"
'wi
.....
Table of Contents
Appendices
Appendix A.................. ............... ............... .._................................ .. Hydrant Maintenance Reports
Appendix B ......... ......... ............ ...... ............ .............................................................. Model Results
.
Figures
Figure 2-1 Existing System - Major System Components ........................................................2-2
Figure 3-1 Recommended System - Major System Components.............................................. 3-5
,
Tables
.
Table 2-1 Existing Potable Water Demand..._............................................................................ 2-3
Table 2-2 Future Potable Water Demand .................................................................................. 2-5
Table 3-1 Analysis Summary......................_....................... ............... ........................................ 3-3
þ
I
,
ST. LUCIE COUNTY
fNTERNA TIONAL AIRPORT
WATER SYSTEM ANALYSIS
Project No. 01-1234.01
II
"
'-'
.....,I
Section 1.0
Introduction
1.1 Background
The St. Lucie County [ntemational Airport (the airport) is one of the largest employers in St. Lucie
County (the County). The County owns and operates a water distribution system that is located
within the airport property boundaries. The water system serves the airport terminal and the on-site
fixed base operators that are tenants on the airport site. The airport is located adjacent to 81. Lucie
Boulevard in northeast St. Lucie County. The main portion of the airport water distribution system
was originally constructed in 1984, and the system was extended in 1992. Water for the system is
purchased from the Ft. Pierce Utilities Authority (FPUA) through a bulk water user agreement. [n
addition to the water supplied by the FPUA, there are several water users who are connected to
private wells. These systems are not interconnected tot the main portion of the airport system.
The County contracts maintenance of the system to a private contractor. The contractor is
responsible for the overall system operation that includes making system repairs when needed as
well as exercising key components such as hydrants and valves.
Sufficient water system capacity and fire flow protection must be available in order to accommodate
anticipated expansion at the airport.
ST. LUCIE COUNTY
[NTERNA TIONAL AIRPORT
WATER SYSTEM ANAL YSIS
Project No. 01-[234.01
1-1
\.;i
\wi
\.
Section 1.0
Introduction
1.2 Purpose
This purpose of this project is to analyze, utilizing a steady-state hydraulic model, the existing water
distribution system within the airport to detennine the adequacy of the system based on existing and
future demands, including fire flow requirements. This report is intended to outline the specific
modeling parameters based on 81. Lucie County Utility Department standards, Utility Department
field investigations and recommendations, PBS&J site visits and recommendations, and proposed
airport expansions.
,
ST. LUCIE COUNTY
INTERNATIONAL AIRPORT
WATER SYSTEM ANALYSIS
Project No. 01-1234.01
1-2
¡;
'-'
...I
Section 2.0
Existing and Future Conditions
2.1 Existing Facilities, Equipment and Structures
Currently, there are two water mains that feed the St Lucie County International Airport (SLCIA):
one is a 12" main located on the east side of the airport and the other connection point is an 8" main
on the west side of the airport. Both of these water mains connect to Fort Pierce Utility Authority
(FPUA) mains. The main lines within the airport consist of 8 and 12-inch lines. Other system
components include water lines ranging in size from %-inch to 6-inch, valves, meters, fire hydrants
and other miscellaneous appurtenances. The major system components are shown in Figure 2-1.
2.2 Existing Potable and Fire Demands
2.2.1 Existing Potable Demand
Existing potable demands were based on meter data provided by the airport staff for October 2000
through February 2001 from the 14 existing water meters located within the airport. An average
demand was calculated based on this data and this average demand was utilized as the existing
potable demand. This data is provided in Table 2-1.
ST. LUCIE COUNTY
INTERNATIONAL AIRPORT
WATER SYSTEM ANALYSIS
Project No. 01-1234.01
2-1
'-"
'wi
\.
Section 2.0
Existing and Future Conditions
Table 2-1
I
Existing Potable Water Demand
ble Aviation 16,780 19,790 25,460 15,336 17,290 18,931 0.44
ircraft
round 950 1,220 1,080 1,040 1,470 1,152 0.03
ircraft Paint 24,130 34,800 35,600 27,290 36,890 31,742 0.73
. irport
errninal 57,800 71,800 76,200 60,000 74,100 67,980 1.56
ir Traffic
ontrol 12,000 1I,9oo 10,900 6,800 14,500 11,220 0.26
15,300 42,600 42,300 33,700 14,200 29,620 0.68
76,690 2,290 910 330 8,900 17,824 0.41
22,610 26,520 31,580 35,810 35,510 30,406 0.70
t
15,800 17,820 15,650 14,340 28,150 18,352 0.42
2,630 2,090 1,080 270 1,060 1,426 0.03
10,000 15,400 12,400 10,200 16,300 12,860 0.30
16,54Ö 16,730 112,410 95,370 24,730 53,156 1.22
55,550 132,220 70,240 71,410 82,355 1.91
ST. LUCIE COUNTY
INTERNATIONAL AIRPORT
WATER SYSTEM ANALYSIS
Project No. 01-1234.01
2-3
.,
'-"
....,
Section 2.0
Existing and Future Conditions
2.2.2 Existing Fire Demand
The existing fire demand was determined based on the existing building square footages, usage and
National Fire Protection Association (NFPA) standards.
2.3 Future Potable and Fire Demands
2.3.1 Future Potable Demand
Future potable demands \vere projected based on anticipated expansion information provided by
airport staff and their planning documents, utilizing existing meter data to estimate future demands
based on building usage and area. The proposed buildings included in these additional demands are
summarized in Table 2-2.
ST. LUCIE COUNTY
INTERNATIONAL AIRPORT
WATER SYSTEM ANALYSIS
Project No. 0 I - I 234.0 I
2-4
\.f
Section 2.0
....,
\.
Existing and Future Conditions
Table 2-2
,
Future Potable Water Demand
,
A\'Cra~e Potable
Estimated Water Demand,
Facility Descriptiun Square Footage gpm
. . .
I amtmg Hanger
aintenance Hanger
ir Craft Manufacturing
anger
csearch. Development and Manufacturing
~
aintenance Hangers
anger
aintenance Hanger
torage Hangers
ainting Hanger
irport Maintenance Facility
anger
irportlFirelRescue
40.000
35.000
60.000
12,000
70,000
35,000
22,000
8,000
12,000
14,400
12,000
10,000
10.000
5.000
2.57
1.45
0.90
0.77
1.04
0.92
1.41
0.51
0.77
0.93
0.77
0.22
0.64
0.11
J
J
2.3.2 Future Fire Demand
The future fire demand was estimated based on proposed expansion information provided by airport
staff. This information consisted of proposed building locations, square footages, usage and type of
fire suppression system planned.
ST. LUCIE COUNTY
INTERNA T[ONAL AIRPORT
WATER SYSTEM ANALYSIS
Project No. 01-1234.01
2-5
í
\r
....,
Section 2.0
.Existing and Future Conditions
Based on NFP A 409 Standard on Aircraft Hangers, four different type of possible fire suppression
systems were considered as possibilities for future hangers: foam-water, low expansion foam, high
expansion foam and closed head foam-water. The maximum fire flow demand, both in tenns of flow
rate and volume of water, calculated from the four methods was utilized for this analysis.
4
·
·
·
·
·
ST. LUCIE COUNTY
fNTERNA TlONAL AIRPORT
WATER SYSTEM ANALYSIS
Project No. 01-1234.01
2-6
\.I
....J
'"
Section 3.0
Water System Analysis and Recommendations
J
3.1 Existing and Future Condition Computer Models
A steady-state hydraulic model of the water system was prepared using Cybernet Version 3.1. The
model contained the following significant assumptions:
·
1.
All valves within the system are fully open,
2. The pressures at the two tie-in locations was estimated based on the static pressure measured
at the ten fire hydrants located within the airport (see Appendix A for test data).
t
For the existing condition, the worst-case fire demand (based on demand and location of existing
buildings) was added to the model. Once the existing system model was established, future
conditions were introduced into the model. Again, based on the planned building locations and fire
flow demands, a worst-case fire demand was added to the future model.
·
3.2 Model Results
)
3.2.1 Existing System
The existing system model run indicated that even under current conditions, the system is deficient
with regard to providing adequate fire flows. In order to meet the NFP A standards, storage and
booster pumps would be required to supplement the existing system. These components were added
to the existing model in order to meet existing fire flow demands. The model results for existing
conditions with the additional fire suppression components are included in Appendix B.
t
·
3.2.2 Future System
The increased fire flow requirements associated with the planned expansion produced greater system
deficiencies under the conditions modeled in the future scenario. The results from this model are
included in Appendix B.
ST. LUCIE COUNTY
INTERNA TIONAL AIRPORT
WATER SYSTEM ANALYSIS
Project No. 01-1234.0 I
3-1
,
\...
...J
Section 3.0
Water System Analysis and Recommendations
3.2.3 Alternative Analysis
In order to correct the deficiencies identified under future conditions, five different scenarios were
modeled and are discussed below and summarized in Table 3-1. Under each scenario, the maximum
flow and duration that could be supplied by the proposed system was estimated and the additional
fire suppression required via storage and booster pumps was calculated. The model results under
each of these scenarios are included in Appendix B.
·
t
3.2.3.1
Alternative 1
This alternative considered only the addition of a ground storage tank and fire suppression booster
·
pumps.
·
3.2.3.2 Alternatives 2,4 and 5
In order to decrease system losses and increase system capacity, the existing 4,400 linear feet of 8-
inch line which runs from the west connection at Hammond Road to the existing 12-inch line
running north-south on Aviation Way was replaced in the model;
· In Alternative 2 with a 12-inch,
· In Alternatives 4 and 5 with 12-inch and 16-inch lines, respectively, and an additional
hydrant.
~
3.2.3.3 Alternative 3
This alternative considered only the addition of a ground storage tank, fire suppression booster
pumps and an additional fire hydrant.
~
ST. LUCIE COUNTY
INTERNA TIONAL AIRPORT
WATER SYSTEM ANAL YSIS
Project No. 0 I -1234.0 I
3-2
\.I
'wi
\.
Section 3.0
Water System Analysis and Recommendations
·
Table 3-1
Analysis Summary
·
Existing 6,500 1,750 4,750 213,750
Alternatives
·
1 Future with new 8,000 1,880 6,120 275,400 $511,000
storage tank and
pumps
,. Future with new
2 12-inch main, 8,000 2,630 5,370 241,650 4,400 $740,000
storage tank and
pumps
Future with new
3 fire hydrant 8,000 2,200 5,800 261,000 $500,000
storage tank and
· pumps
Future with new
12-inch main and
· 4 new fire hydrant 8,000 4,000 4,000 180,000 4,400 $657,000
storage tank and
- pumps
Future with new
16-inch main and
5 new fire hydrant 8,000 4,140 3,860 173,700 4,400 $777,000
storage tank and
pumps
The estimated costs provided in Table 3-1 include construction, engineering and a contingency.
rio
Additional
Fire
:\Iaximum Flow Availahle Suppression
Demanù from :\Iunicipal Required
(gpm) System (gpm) (gpm)
Storage
Requireù
(gallons)
New
Piping
(LF)
Total
Estimate
Cost
ST. LUCIE COUNTY
INTERNATIONAL AIRPORT
WATER SYSTEM ANALYSIS
Project No. 01-1234.01
3-3
,
'-'
""""
Section 3.0
Water System Analysis and Recommendations
3.3 Recommendations
The lowest cost alternative that meets the future needs of the airport is Alternative 3 that includes a
new fire hydrant, a 26 I ,OOO-gallon storage tank. and fire suppression booster pumps at an estimated
cost of $500,000. Figure 3-1 is a schematic representation of the Recommended System's Major
Components.
.
ST. LUCIE COUNTY
INTERNA TIONAL AIRPORT
WATER SYSTEM ANALYSIS
Project No. 01-1234.01
3-4
ST. LUCIE CO. ATTœt£Y Fax:561-462-14110
Ma!: l"W 1 ( ;lA:j
t'.UL
\.I
...,
'",
RESOLUTION NO. 01-104
)
A RESOLUTION ACCEPTING THE ST ATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION PUBLIC
TRANSPORTATION JOINT PARTICIPATION AGREEMENT
(FIN. PROJ. NO. 407348-1-94-01) FOR THE PURCHASE OF
FIRE PROTECTION EQUIPMENT FOR THE ST. LUCIE
COUNTY INTERNATIONAL AIRPORT AND AUTHORIZING
THE CHAIRPERSON TO EXECUTE THE AGREEMENT
AND FURTllERAUfHORlZING THE COUNTY A TIORNEY
TO EXECUTE THE AGREEMENT BY APPROVING IT AS
TO FORM AND CORRECTNESS
WHEREAS, the Board of Cmmty Conunissioners of St. Lucie County, Florida, has made
the following detenninations:
j
1. The Florida Department of Transportation has awarded the County funding for the
purchase of fire protection equipment for the St. Lucie County International Airport (Fin. Proj. No.
407348-1-94-01 ).
.
2. The Board should authorize and approve execution of the Publie Transportation Joint
Participation Agreement with. the: State of Florida Department of Public Transportation for th.e
above-referenced project.
NOW, THEREFORE. BE IT RESOLVED by the Board ofCountyCommis5Ïonè[$ orSt.
Lude County, Florida:
1. The Board h.ereby accepts and approves the Public Transportation Joint Participation
Agreement with the State of Florida (Fin. Proj. No. 407348-1-94-01) to provide funding for the
purchase of fire protection equipment for the St. Lucie County International Airport.
.
2. The Board hereby authori7.es the Chairperson to execute the above-referenced agreement
and further authorizes the County Attorney to execute the agreement by approving it as to fonn and
correctness.
t
After motion and second, the vote on this resolution was as follows:
Chairperson Frannie Hutchinson
Vice-Chairperson Doug Coward
Commissioner ClitTBames
Commissioner Paula A. Lewis
Commissioner John D. Bruhn
xx
XX
XX
xx
XX
1
ST. LUCIE CO. ATTORNEY Fax:561-462-1440
May 1 'Ul l(;Uö
r.UJ
;'
'-'
..J
PASSED AND DULY ADOPTED this XX day of XX, 2001.
ATTEST:
BOARD OF COUNTY COMMISSIONERS
ST. LUCIE COUNTY. FLORIDA
«
BY:
DEPUTY CLERK
CHAIRPERSON
·
APPROVED AS TO FORM AND
CORRECTNESS:
·
COUNTY ATIORNEY
4
t
·
t
2
~
"wi
"
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
FORM 725-03O-œ
PUBLIC TRANSP ADMIN
07/00
Page 1 of 12
PUBLIC TRANSPORTATION
JOINT PARTICIPATION AGREEMENT
·
FINANCIAL PROJECT NO.: Fund: OS FLAIR Approp: 088719
407348-1-94-01 FLAIR Obj.: 750004
(Item-segment-phase-sequence) Function: 637
Org. Code: 55042010428
Contract No: Federal No: N/A Vendor No: VF 596000835030
Catalog of Federal Domestic Assistance Number: Catalog of State F1I1ancial Assistance Number: 55004
þ
·
THIS AGREEMENT, made and entered into this
day of
by and between the STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION, an agency of the State of Florida,
hereinafter referred to as the Department, and
St. Lucie County Board of County Commissioners
hereinafter referred to as the AGENCY.
·
W IT N ESE T H:
·
WHEREAS, the Agency has the authority to enter into said Agreement and to undertake the project hereinafter
described, and the Department has been granted the authority to function adequately in all areas of appropriate
jurisdiction including the implementation of an integrated and balanced transportation system and is authorized
under 332.006 (6) , Florida Statutes, to enter into this Agreement;
·
NOW, THEREFORE, in consideration of the mu1ual covenants, promises and representations herein, the parties
agree as follows:
1.00 Purpose of Agreement: The purpose of this Agreement is to purchase Fire Protection Equipment.
and as further described in Exhibit(s) A.B.C & F attached hereto and by this reference made a part
hereof, hereinafter referred to as the project, and to provide Departmental financial assistance to the Agency and state the
terms and conditions upon which such assistance will be provided and the understandings as to the manner in which the
project will be undertaken and completed.
,
\w-
...."
FORM 725-030-06
PUBLIC TRANSP ADMIN
07/00
Page 2 of 12
2.00 Accomplishment of the Project:
.
2.10 General Requirements: The Agency shall commence, and complete the project as described in Exhibit "A"
attached hereto and by this reference made a part hereof, with all practical dispatch, in a sound, economical, and efficient
manner, and in accordance with the provisions herein, and all applicable laws.
2.20 Pursuant to Federal, State, and Local Law: In the event that any election, referendum, approval, pennit,
notice. or other proceeding or authorization is requisite under applicable law to enable the Agency to enter into this .
Agreement or to undertake the project hereunder, or to observe, assume or cany out any of the provisions of the
Agreement, the Agency will initiate and consummate, as provided by law, all actions necessary with respect to any' such
matters so requisite.
2.30 Funds of the Agency: The Agency shall initiate and prosecute to completion all proceedings necessary
including federal aid requirements to enable the Agency to provide the necessary funds for completion of the project.
2.40 Submission of Proceedings, Contracts and Other Documents: The Agency shall submit to the .
Department such data, reports, records, contracts and other documents relating to the project as the Department may
require as listed in Exhibit MCM attached hereto and by this reference made a part hereof.
3.00 Project Cost The total estimated cost of the project is $ 500.000.00 . This amount .
is based upon the estimate summarized in Exhibit "aM attached hereto and by this reference made a part hereof. The
Agency agrees to bear all expenses in excess of the total estimated cost of the project and any deficits involved.
4.00 Department Participation: The Department agrees to maximum participation, including contingencies, in
the project in the amount of $ 400.000.00 as detailed in Exhibit "B", or in an amount equal
to the percentage(s) of total project cost shown in Exhibit "B", whichever is less.
4.10 Project Cost Eligibility: Project costs eligible for State participation will be allowed only from the effective
date of this Agreement. It is understood that State participation in eligible project costs is subject to: .
(a) Legislative approval of the Department's appropriation request in the work program year that the project
is scheduled to be committed;
(b) Availability of funds as stated in paragraph 17.00 of this Agreement;
(c) Approval of all plans, specifications, contracts or other obligating documents and all other terms of th is
Agreement;
(d) Department approval ofthe project scope and budget (Exhibits A & B) at the time appropriation authority
becomes available.
4.20 Front End Funding: Front end funding ~is not) applicable. If applicable, the Department may initially pay
100% of the total allowable incurred project costs up to an amount equal to its total share of participation as shown in
paragraph 4.00.
5.00 Retainage: Retainage (i&) (is not) applicable. If applicable, N/A percent of the
Department's total share of participation as shown in paragraph 4.00 is to be held in retainage to be disbursed, at the
Department's discretion, on or before the completion of the final project audit.
6.00 Project Budget and Payment Provisions:
6.10 The Project Budget: A project budget shall be prepared by the Agency and approved by the Department.
The Agency shall maintain said budget, cany out the project and shall incur obligations against and make disbursements
of project funds only in conformity with the latest approved budget for the project. No budget increase or decrease shall
be effective unless it complies with fund participation requirements established in paragraph 4.00 of this Agreement and is
approved by the Department Comptroller.
'-'
'...I
"
FORM 725-030-06
PUBLIC TRANSP ADMIN
07/00
Page 30112
·
6.20 Payment Provisions: Unless otherwise allowed under paragraph 4.20. payment will begin in the year the
project or project phase is scheduled in the \NOrk program as of the date of the agreement. Payment will be made for
. actual costs incurred as of the date the invoice is submitted with the final payment due upon receipt of a final invoice.
7.00 Accounting Records:
·
7.10 Establishment and Maintenance of Accounting Records: The Agency shall establish for the project. in
conformity with requirements established by Department's program guidelines/procedures and "Principles for State and
Local Govemments", separate accounts to be maintained within its existing accounting system or establish independent
accounts. Such accounts are referred to herein collectively as the ·project account". Documentation of the project
account shall be made available to the Department upon request any time during the period of the Agreement and for
three years after final payment is made.
~
,
7.20 Funds Received Or Made Available for The Project: The Agency shall appropriately record in the project
account, and deposit in a bank or trust company which is a member of the Federal Deposit Insurance Corporation, all
payments received by it from the Department pursuant to this Agreement and all other funds provided for, accruing to, or
otherwise received on account of the project, which Department payments and other funds are herein collectively referred
to as "project funds". The Agency shall require depositories of project funds to secure continuously and fully all project
funds in excess of the amounts insured under federal plans, or under State plans which have been approved for the
deposit of project funds by the Department, by the deposit or setting aside of collateral of the types and in the manner as
prescribed by State Law for the security of public funds, or as approved by the Department.
·
·
7.30 Costs Incurred for the Project: The Agency shall charge to the project account all eligible costs of the
project. Costs in excess of the latest approved budget or attributable to actions which have not received the required
approval of the Department shall not be considered eligible costs.
7.40 Documentation of Project Costs: All costs charged to the project, including any approved services
contributed by the Agency or others, shall be supported by property executed payrolls, time records, invoices, contracts,
or vouchers evidencing in proper detail the nature and propriety of the charges.
·
7.50 Checks, Orders, and Vouchers: Any check or order drawn by the Agency with respect to any item which is
or will be chargeable against the project account will be drawn only in accordance with a proper1y signed voucher then on
file in the office of the Agency stating in proper detail the purpose for which such check or order is drawn. All checks,
payrolls, invoices, contracts, vouchers, orders, or other accounting documents pertaining in whole or in part to the project
shall be clear1y identified, readily accessible, and, to the extent feasible, kept separate and apart from all other such
documents.
1.60 Audit Reports:
1. All federal awards are to be identified using the Catalog of Federal Domestic Assistance (CFDA) title and number,
award number, and year, and name of the federal agency. State grant and aid funded grants are to be identified
with the Financial Project Number (FPN) and contract number.
2. Audits shall be conducted under the guidelines of A-133, Section 215.97, Florida Statutes, and Chapter 10.600,
Rules of the Auditor General.
3. For fiscal years beginning after June 30, 1998, the reporting packages and data collection forms are to be
submitted within the eaf1ier of 30 days after the receipt of the auditor's report, or 9 months after the end of the
subrecipient's (Agency's) fiscal year. The date the audit report was delivered to the subrecipient (Agency) must
be indicated by the subrecipient (Agency) in correspondence accompanying the audit report, or reporting
package, and data collection form.
"
'-"
....,
FORM 72!HJ30-06
PUBLIC TRANSP ADMIN
07100
Page 4 of 12
4.
The Agency shall follow up and take corrective action on audit findings. A-133 further requires the preparation of
a summary schedule of prior audit findings and a corrective action plan for current year audit findings.
·
5. Project records shall be retained and available for at least three years after the final payment. Records related to
unresolved audit findings, appeals, or litigation shall be retained until the action is completed or the dispute is
resolved.
Reports of audits conducted in accordance with OMB Circular A-133, and corresponding data collection forms
shall be sent to:
·
Federal Audit Clearinghouse
Bureau of the Census
1201 East 10th Street
Jefferson, IN 47132
and the District Public Transportation Office identified in paragraph 8.10 of this agreement.
·
Reports of audits conducted in accordance with Section 215.97, Florida Statutes, and Chapter 10.600 Rules of
the Auditor General shall be sent to:
"
·
State of Florida Auditor General
P.O. Box 1735
Tallahassee,Fl 32302-1735
and the District Public Transportation Office identified in paragraph 8.10 of this agreement.
7.70 Insurance: Execution of this Joint Participation Agreement constitutes a certification that the Agency has
and will maintain the ability to repair or replace any project equipment or facilities in the event of loss or damage due to
any accident or casualty for the useful life of such equipment or facilities. In the event of the loss of such equipment or
facilities, the Agency shall either replace the equipment or facilities or reimburse the Department to the extent of its
interest in the lost equipment or facility.
·
In the event this Agreement is for purchase of land or for the construction of infrastructure such as airport runways the
Department may waive or modify this section with an Exhibit PC".
·
·
8.00 Requisitions and Paymen1s:
8.10 Action by the Agency: In order to obtain any Department funds, the Agency shall file with the Department
ofTransportation, District Four, Public Transportation Office 3400 W. Commercial Blvd. Ft. Lauderdale, Florida, 33309 its
requisition on a fonn or tonns prescribed by the Department, and other data pertaining to the project account (as defined
in paragraph 7.10 hereof) to justify and support the payment requisitions.
8.11 Invoices for fees or other compensation tor services or expenses shall be submitted in detail
sufficient for a proper preaudit and postaudit thereof.
8.12 Invoices for any travel expenses shall be submitted in accordance with Chapter 112.061, F.S.
The Department may establish rates lower than the maximum provided in Chapter 112.061, Florida Statutes.
8.13 For real property acquired, submit;
(1) the date the Agency acquired the real property,
(2) a statement by the Agency certifying that the Agency has acquired said real property, and actual
consideration paid tor real property.
'-"
'...I
"
FORM 725-030-06
PUBUC TRANSP ADMIN
07/00
Page 50112
·
(3)
a statement by the Agency certifying that the appraisal and acquisition of the real property
together with any attendant relocation of occupants was accomplished in compliance with all
federal laws, rules and procedures required by any federal oversight agency and with all state
laws, rules and procedures that may apply to the Agency acquiring the real property.
·
8.20 The Departmenfs Obligations: Subject to other provisions hereof, the Department will honor such
requisitions in amounts and at times deemed by the Department to be proper to ensure the carrying out of the project and
payment of the eligible costs. However, notwithstanding any other provision of this Agreement, the Department may elect
by notice in writing not to make a payment on the project if:
·
8.21 Misrepresentation: The Agency shall have made misrepresentation of a material nature in its
application. or any supplement thereto or amendment thereof, or in or with respect to any document or data
furnished therewith or pursuant hereto;
·
·
8.22 Litigation: There is then pending litigation with respect to the performance by the Agency of any
of its duties or obligations which may jeopardize or adversely affect the project, the Agreement, or payments to
the project;
8.23 Approval by Department: 'the Agency shall have taken any action pertaining to the project
which, under this agreement, requires the approval of the Department or has made related expenditures or
incurred related obligations without having been advised by the Department that same are approved;
·
8.24 Conflict of Interests: There has been any violation ofthe conflict of interest provisions contained
herein; or
}
8.25 Default: The Agency has been determined by the Department to be in default under any of the
provisions of the Agreement.
,
8.26 Federal Participation (If Applicable): Any federal agency providing federal financial assistance
to the project suspends or terminates federal financial assistance to the project. In the event of suspension or
termination of federal financial assistance, the Agency will reimburse the Department for all disallowed costs.
~
·
8.30 Disallowed Costs: In determining the amount of the payment, the Department will exclude all projects
costs incurred by the Agency prior to the effective date of this Agreement, costs which are not provided for in the latest
approved budget for the project, and costs attributable to goods or services received under a contract or other
arrangements which have not been approved in writing by the Department.
8.40 Payment Offset: If, after project completion, any claim is made by the Department resulting from an audit
or for Y«>rk or services performed pursuant to this agreement, the Department may offset such amount from payments due
for wort< or services done under any public transportation joint participation agreement \\'hich it has with the Agencf owing
such amount if, upon demand, payment of the amount is not made within sixty (60) days to the Department. Offsetting
amounts shall not be considered a breach of contract by the Department.
9.00 Tennination or Suspension of Project:
9.10 T ennination or Suspension Generally: If the Agency abandons or, before completion, finally discontinues
the project; or if, by reason of any of the events or conditions set forth in paragraphs 8.21 to 8.26 inclusive, or for any
other reason. the commencement, prosecution, or timely completion of the project by the Agency is rendered improbable,
infeasible, impossible, or illegal, the Department will, by written notice to the Agency, suspend any or all of its obligations
under this Agreement untif such time as the event or condition resulting in such suspension has ceased or been
corrected, or the Department may terminate any or all of its obligations under this Agreement.
,
\..;
...,¡
FORM 725-0»-06
PUBLIC TRANSP ADMIN
07/00
Page 6 of 12
9.11 Action Subsequent to Notice of Termination or Suspension. Upon receipt of any final
termination or suspension notice under this paragraph, the Agency shall proceed promptly to carry out the actions
required therein which may include any or all of the following: (1) necessary action to terminate or suspend, as
the case may be, project activities and contracts and such other action as may be required or desirable to keep
to the minimum the costs upon the basis of which the financing is to be computed; (2) fumish a statement of the
project activities and contracts, and other undertakings the cost of which are othenNise includable as project costs;
and (3) remit to the Department such portion of the financing and any advance payment previously received as
is determined by the Department to be due under the provisions of the Agtèement. The termination or suspension
shall be carried out in conformity with the latest schedule, plan, and budget as approved by the Department or
upon the basis of terms and conditions imposed by the Department upon the failure of the Agency to fumish the
schedule, plan, and budget within a reasonable time. The approval of a remittance by the Agency or the closing
out of federal financial participation in the project shall not constitute a waiver of any claim which the Department
may otherwise have arising out of this Agreement.
·
·
9.12 The Department reserves the right to unilaterally cancel this Agreement for refusal by the contractor
or Agency to allow public access to all documents, papers, letters, or other material subject to the provisions of
Chapter 119, Florida Statutes and made or received in conjunction with this Agreement.
,t
·
10.00 Remission of Project Account Upon Completion of Project: Upon completion of the project, and after
payment, provision for payment, or reimbursement of all project costs payable from the project account is made, the
Agency shall remit to the Department its share of any unexpended balance in the project account.
11.00 Audit and Inspection: The Agency shall permit, and shall require its contractors to permit, the
Departmenfs authorized representatives to inspect all work, materials, payrolls, records; and to audit the books, records
and accounts pertaining to the financing and development of the project.
12.00 Contracts of the Agency:
·
12.10 Third Party Agreements: Except as otherwise authorized in writing by the Department, the Agency shall
not execute any contract or obligate itself in any manner requiring the disbursement of Department joint participation
funds, including consultant, construction or purchase of commodities contracts or amendments thereto, with any third
party with respect to the project without the written approval of the Department. Failure to obtain such approval shall be
sufficient cause for nonpayment by the Department as provided in paragraph 8.23. The Department specifically reserves
unto itself the right to review the qualifications of any consultant or contractor and to approve or disapprove the
em:loyment of the same.
·
12.20 Compliance with Consultants' Competitive Negotiation Act It is understood and agreed by the parties
hereto that participation by the Department in a project with an Agency, where said project involves a consultant contract
for engineering, architecture or surveying services, is contingent on the Agency complying in full with provisions of
Chapter 287, Florida Statutes, Consultants Competitive Negotiation Act. At the discretion of the Department, the Agency
will involve the Department in the Consultant Selection Process for all contracts. In all cases, the Agency's Attomey shall
certify to the Department that selection has been accomplished in compliance with the Consultanfs Competitive
Negotiation Act.
12.30 Disadvantaged Business Enterprise (DBE) Policy and Obligation:
12.31 DBE Policy: It is the policy of the Department that disadvantaged business enterprises as defined
in 49 CFR Part 26, as amended, shall have the maximum opportunity to participate in the performance of
contracts financed in whole or in part with Department funds under this Agreement. The DBE requirements of 49
CFR Part 26, as amended, apply to this Agreement.
~
\..f
\J
"
FORM 72S-03G-06
PUBLIC TRANSP ADMIN
07/00
Page 7 of 12
12.32 DBE Obligation: The Agency and its contractors agree to ensure that Disadvantaged Business
Enterprises as defined in 49 CFR Part 26, as amended, have the maximum opportunity to participate in the
performance of contracts and this Agreement. In this regard, all recipients, and contractors shall take all
necessary and reasonable steps in accordance with 49 CFR Part 26, as amended, to ensure that the
Disadvantaged Business Enterprises have the maximum opportunity to compete for and perform contracts.
Grantees, recipients and their contractors shall not discriminate on the basis of race, color, national origin or sex
in the award and performance of Department assisted contracts.
·
13.00 Restrictions, Prohibitions, Controls, and Labor Provisions:
·
13.10 Equal Employment Opportunity: I n connection with the carrying out of any project, the Agency shall not
discriminate against any employee or applicant for employment because of race, age, creed, color, sex or national origin.
The Agency will take affirmative action to ensure that applicants are employed, and that employees are treated during
employment, without regard to their race, age, creed, color, sex, or national origin. Such action shall include, but not be
limited to, the following: Employment upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or
termination; rates of payor other forms of compensation; and selection for training, including apprenticeship. TheAgency
shall insert the foregoing provision modified only to show the particular contractual relationship in all its contracts in
connection with the development or operation of the project, except contracts for the standard commercial supplies or raw
materials, and shall require all such contractors to insert a similar provision in all subcontracts, except subcontracts for
standard commercial supplies or raw materials. When the project involves installation, construction, demolition, removal,
site improvement, or similar ~r1<, the Agency shall pOst, in conspicuous places available to employees and applicants for
employment for project ~r1<, notices to be provided by the Department setting forth the provisions of the
nondiscrimination clause.
þ
13.20 Title VI - Civil Rights Act of 1964: Execution of this Joint Participation Agreement constitutes a
certification that the Agency will comply with all the requirements imposed by Trtle VI of the Civil Rights Act of 1964 (78
Statute 252), the Regulations of the Federal Department of Transportation issued thereunder, and the assurance by the
Agency pursuant thereto.
~
·
13.30 Title VIII - Civil Rights Act of 1968: Execution of this Joint Participation Agreement constitutes a
certification that the Agency will comply with all the requirements imposed by Title VIII of the Civil Rights Act of 1968, 42
USC 3601 ,et seq., which among other things, prohibits discrimination in housing on the basis of race, color, national
origin, religion, sex, disability and familial status.
·
·
13.40 Americans with Disabilities Act of 1990 (ADA): Execution of this Joint Participation Agreement
constitutes a certification that the Agency will comply with all the requirements imposed by the ADA, the regulations of the
federal govemment issued thereunder, and the assurance by the Agency pursuant thereto.
13.50 Prohibited Interests: Neither the Agency nor any of its contractors or their subcontractors shall enter into
any contract, subcontract, or arrangement in connection with the project or any property included or planned to be
included in the project, in which any member, officer, or employee of the Agency during his tenure or for two years
thereafter has any interest, direct or indirect. If any such present or former member, officer, or employee involuntarily
acquires or had acquired prior to the beginning of his tenure any such interest, and if such interest is immediately
disclosed to the Agency, the Agency with pñor approval of the Department, may waive the prohibition contained in this
subsection: Provided, that any such present member, officer or employee shall not participate in any action by the
Agency relating to such contract, subcontract, or arrangement. The Agency shall insert in all contracts entered into in
connection with the project or any property included or planned to be included in any project, and shall require its
contractors to insert in each of their subcontracts, the following provision:
"No member, officer, or employee of the Agency during his tenure or for t1No years thereafter shall have any
interest, direct or indirect, in this contract or the proceeds thereof."
The provisions of this subsection shall not be applicable to any agreement between the Agency and its fiscal depositories,
or to any agreement for utility services the rates for which are fixed or controlled by a Govemmental agency.
,/
"-"
...¡
FORM 725-0J0.Q6
PUBLIC TRANSP ADMIN
07/00
Page 8 of 12
13.60 Interest of Members of, or Delegates to, Congress: No member or delegate to the Congress of the
United States shall be admitted to any share or part of the Agreement or any benefit arising therefrom.
14.00 Miscellaneous Provisions:
14.10 Environmental Pollution: Execution ofthis Joint Participation Agreement constitutes a certification by the
Agency that the project will be carried out in confonnance with all applicable environmental regulations including the
securing of any applicable permits. The Agency will be solely responsible for any liability in the event of non-compliance
with applicable environmental regulations, including the securing of any applicable permits, and will reimburse the
Department for any loss incurred in connection therewith.
14.20 Department Not Obligated to Third Parties: The Department shall not be obligated or liable hereunder to
any party other than the Agency.
14.30 When Rights and Remedies Not Waived: In no event shall the making by the Department of any
payment to the Agency constitute or be construed as a waiver by the Department of any breach of covenant or any default
which may then exist, on the part of the Agency, and the making of such payment by the Department while any such
breach or default shall exist shall in no way impair or prejudice any right or remedy available to the Department with
respect to such breach or default.
,I
14.40 How Agreement Is Affected by Provisions Being Held Invalid: If any provision of this Agreement is held
invalid, the remainder of this Agreement shall not be affected. In such an instance the remainder would then continue to
conform to the terms and requirements of applicable law.
14.50 Bonus or Commission: By execution of the Agreement the Agency represents that it has not paid and,
also, agrees not to pay, any bonus or commission for the purpose of obtaining an approval of its application for the
financing hereunder.
14.60 State or Territorial Law: Nothing in the Agreement shall require the Agency to observe or enforce
compliance with any provision thereof, perform any other act or do any other thing in contravention of any applicable State
law: Provided, that if any of the provisions of the Agreement violate any applicable State law, the Agency will at once
notify the Department in writing in order that appropriate changes and modifications may be made by the Department and
the Agency to the end that the Agency may proceed as soon as possible with the project.
14.70 Use and Maintenance of Project Facilities and Equipment: The Agency agrees that the project facilities
and equipment will be used by the Agency to provide or support public transportation for the period of the useful life of
such facilities and equipment as determined in accordance with general accounting principles and approved by the
Department. The Agency further agrees to maintain the project facilities and equipment in good working order for the
useful life of said facilities or equipment.
14.71 Property Records: The Agency agrees to maintain property records, conduct physical inventories
and develop control systems as required by 49 CFR Part 18, when applicable.
14.80 Disposal of Project Facilities or Equipment: If the Agency disposes of any project facility orequipment
during its useful life for any purpose except its replacement with like facility or equipment for public transportation use, the
Agency will comply with the terms of 49 CFR Part 18 relating to property management standards. The Agency agrees to
remit to the Department a proportional amount of the proceeds from the disposal of the facility or equipment. Said
proportional amount shall be determined on the basis of the ratio of the Department financing of the facility or equipment
as provided in this Agreement.
14.90 Contractual Indemnity: To the extent provided by law, the Agency shall indemnify, defend, and hold
harmless the Department and all of its officers, agents, and employees from any claim, loss, damage, cost, charge, or
\..;'
'....I
"
FORM 725-030-06
PUBLIC TRANSP ADMIN
07/00
Page 9 of 12
expense arising out of any act, error, omission, or negligent act by the Agency, its agents, or employees during the
perfonnance of the Agreement, except that neither the Agency, its agents, or its employees will be liable under this
paragraph for any claim, loss, damage, cost, charge, or expense arising out of any act, error, omission, or negligent act by
the Department or any of its officers, agents, or employees during the perfonnance of the Agreement.
The parties recognize and accept the funding restrictions set forth in Section 339.135(6)(a), and Section 129.07, Florida
Statutes, which may affect each of the parties' obligations. Those provisions are as follows:
(a) The Department during any fiscal year shall not expend money, incur any liability, or enter into any contract
which, by its tenns, involves the expenditure of money in excess of the amounts budgeted as available for
expenditure during such fiscal year. Any contract, verbal or written, made in violation of this subsection is null
and void, and no money may be paid on such contract. The Department shall require a statement from the
Comptroller of the Department that funds are available prior to entering into any such contract or other binding
commitment of funds. Nothing herein contained shall prevent the making of contracts for periods exceeding one
(1) year, but any contract so made shall be executory only for the value of the services to be rendered or agreed
to be paid for in succeeding fiscal years. Section 339.135(6)(a), Florida Statutes.
(b) It is unlawful for the Board of County Commissioners to expend or contract for the expenditure in any fiscal
year more than the amount budgeted in each fund's budget, except as provided herein, and in no case shall the
total appropriations of any budget be exceeded, except as provided in s. 129.06, and any indebtedness
contracted for any purpose against either df the funds enumerated in this chapter or for any purpose, the
expenditure for which is chargeable to either of said funds, shall be null and void, and no suit or suits shall be
prosecuted in any court in this state for the collection of same, and members of the Board of County
Commissioners voting for and contracting for such amounts and the bonds of such members of said boards also
shall be liable for the excess indebtedness so contracted for. Section 129.07, Florida Statutes.
When either party receives a notice of claim for damages that may have been caused by the other party in the
performance of services required under this Agreement, that party will immediately forward the claim to the other party.
Each party will evaluate the claim and report its findings to each other within fourteen (14) working days and will jointly
discuss options in defending the claim.
.
15.00 Plans and Specifications: In the event that this Agreement involves the purchasing of capital equipment
or the constructing and equipping of facilities, the Agency shall submit to the Department for approval all appropriate
plans and specifications covering the project. The Department will review all plans and specifications and will issue to the
Agency written approval with any approved portions of the project and comments or recommendations concerning any
remainder of the project deemed appropriate. After resolution of these comments and recommendations to the
Departmenfs satisfaction, th.e Department will issue to the Agency written approval with said remainder of the project.
Failure to obtain this written approval shall be sufficient cause for nonpayment by the Department as provided in
paragraph 8.23.
16.00 Project Completion, Agency Certification: The Agency will certify in writing on or attached to the final
invoice, that the project was completed in accordance with applicable plans and specifications, is in place on the Agency
facility, that adequate title is in the Agency and that the project is accepted by the Agency as suitable for the intended
purpose.
17.00 Appropriation of Funds:
17.10 The State of Florida's performance and obligation to pay under this Agreement is contingent upon an
annual appropriation by the Legislature.
17.20 Multi-Year Commitment: In the event this Agreement is in excess of $25,000 and has a tenn for a period
of more than one year, the provisions of Chapter 339.135(6)(a), Florida Statutes, are hereby incorporated: "(a) The
Department, during any fiscal year, shall not expend money, incur any liability, or enter into any contract which, by its
~
\..
.".J
FORM 725-030-06
PUBLIC TRANSP ADMIN
07/00
Page 10 of 12
terms involves the expenditure of money in excess of the amounts budgeted as available for expenditure during such
fiscal year. Any contract, verbal or written, made in violation of this subsection is null and void, and no money may be
paid on such contract. The Department shall require a statement from the comptroller of the Department that funds are
available prior to entering into any such contract or other binding commitment of funds. Nothing herein contained shall
prevent the making of contracts for periods exceeding 1 year, but any contract so made shall be executory only for the
value of the services to be rendered or agreed to be paid for in succeeding fiscal years; and this paragraph shall be
incorporated verbaüm in all contracts of the Department which are for an amount in excess of 25,000 dollars and which
have a term for a period of more than 1 year."
18.00 Expiration of Agreement: The Agency agrees to complete the project on or before
June 30. 2003 . If the Agency does not complete the project within this time period. this Agreement
will expire unless an extension of the time period is requested by the Agency and granted in writing by the District
Secretary, District Four . Expiration of this Agreement will be considered termination of the project and the
procedure established in paragraph 9.00 of this Agreement shall be initiated.
18.10 Final Invoice: The Agency must submit the final invoice on this project to the Department within 120 days
after the expiration of this Agreement. Invoices submitted after the 120 day time period will not be paid.
19.00 Agreement Format All words used tiérein in the singular form shall extend to and include the plural. All
words used in the plural form shall extend to and include the singular. All words used in any gender shall extend to and
include all genders.
20.00 Execution of Agreement: This Agreement may be simultaneously executed in a minimum of two
counterparts, each of which so executed shall be deemed to be an original, and such counterparts together shall
constitute one in the same instrument.
21.00 Restrictions on Lobbying:
21.10 Federal: The Agency agrees that no federal appropriated funds have been paid or will be paid by or on
behalf of the Agency, to any person for influencing or attempting to influence any officer or employee of any federal
agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in
connection with the awarding of any federal contract. the making of any federal grant, the making of any federal loan, the
entering into of any cooperative agreement, and the extension, continuation, renewal, amendment or modification of any
federal contract, grant, loan or cooperative agreement.
If any funds other than federal appropriated funds have been paid by the Agency to any person for influencing or
attempüng to influence an officer or employee of any federal agency, a Member of Congress, an officer or employee of
Congress, or an employee of a Member of Congress in connection with this Joint Participation Agreement, the
undersigned shall complete and submit Standard Fonn-LLL, "Disclosure Form to Report lobbying," in accordance with its
instructions.
The Agency shall require that the language of this section be included in the award documents for all subawards at all
tiers (including subcontracts, subgrants, and contracts under grants, loans and cooperative agreements) and that all
subrecipients shall certify and disclose accordingly.
21.20 State: No funds received pursuant to this contract may be expended for lobbying the legislature or a state
agency.
22.00 Vendors Rights: Vendors (in this document identified as Agency) providing goods and services to the
Department should be aware of the following time frames. Upon receipt, the Department has five (5) working days to
inspect and approve the goods and services unless the bid specifications, purchase order or contract specifies otherwise.
The Department has 20 days to deliver a request for payment (voucher) to the Department of Banking and Finance. The
\w'
v
'-
FORM 725-0»-06
PUBLIC TRANSP ADMIN
07/00
Page 11 of 12
20 days are measured from the latter of the date the invoice is received or the goods or services are received, inspected
and approved.
If a payment is not available within 40 days after receipt of the invoice and receipt, inspection and approval of goods and
services, a separate interest penalty in accordance with Section 215.422(3)(b) will be due and payable, in addition to the
invoice amount to the Agency. The interest penalty provision applies after a 35 day time period to health care providers,
as defined by rule. Interest penalties of less than one (1) dollar will not be enforced unless the Agency requests payment.
Invoices which have to be retumed to an Agency because of vendor preparation errors will result in a delay in the
payment. The invoice payment requirements do not start until a properly completed invoice is provided to the
Department.
A Vendor Ombudsman has been established within the Department of Banking and Finance. The duties of this individual
include acting as an advocate for Agencies who may be experiencing problems in obtaining timely payment(s) from the
Department. The Vendor Ombudsman may be contacted at (904)488-2924 or by calling the State Comptroller's Hotline,
1-800-848-3792.
23.00 Public Entity Crime: Pursuant to 287.133(3)(a) F.S. the following is applicable to this agreement.
287.133(2)(a)"A person or affiliate who has been placed on the convicted vendor list following a conviction for a public
entity crime may not submit a bid on a contract to pro\¡ide any goods or services to a public entity, may not submit a bid
on a contract with a public entity for the construction or repair of a public building or public work, may not submit bids on
leases of real property to a public entity, may not be awarded or perfonn work as a contractor, supplier, subcontractor, or
consultant under a contract with any public entity, and may not transact business with any pUblic entity in excess of the
threshold amount provided in s. 287.017 for CATEGORY TWO for a period of 36 months from the date of being placed on
the convicted vendor list."
.
,
'-
....,;
FORM 725-030-06
PUBLIC TRANSP ADMIN
07/00
Page 12 of 12
Financial Project No. 407348-1-94-01
Contract No.
Agreement Date
IN WITNESS WHEREOF, the parties hereto have caused these presents be executed, the day and year first above
written.
AGENCY
FOOT
St. Lucie County Board of County
Commissioners
COMPTROLLER FUNDING APPROVAL
DATE:
BY:
,¡
ATTORNEY
DEPARTMENT OF TRANSPORTATION
TITLE:
ATTEST:
TITLE:
(SEAL)
DISTRICT SECRETARY
OR
DIRECTOR OF PLANNING & PROGRAMS
4
ATTEST:
APPROVED AS TO FORM, LEGALITY
TITLE:
(SEAL)
~
\wi
"'-
Fin. Proj. No.: 407348-1-94-01
Contract No.:
Agreement Date:
EXHIBIT "A"
PROJECT DESCRIPTION AND RESPONSIBILITIES
This exhibit forms an integral part of that certain Joint Participation Agreement between the
State of Florida, Department of Transportation and
S1. Lucie County Board of County Commissioners
PROJECT LOCATION: S1. Lucie County International Airport
PROJECT DESCRIPTION: Fire Protection Equipment
,
SPECIAL CONSIDERATIONS BY AGENCY:
The audit report(s} required in paragraph 7.60 of the Agreement shall include a schedule of project
assistance that will reflect the Department's contract number, Financial Project number and the
Federal Identification number, where applicable, and the amount of state funding action (receipt and
disbursement of funds) and any federal or local funding action and the funding action from any other
source with respect to the project.
SPECIAL CONSIDERATIONS BY DEPARTMENT: N/A
,
\.r
""""
Fin. Proj. No.: 407348-1-94-01
Contract No.:
Agreement Date:
EXHIBIT "B"
PROJECT BUDGET
This exhibit forms an integral part of that certain Joint Participation Agreement between the
State of Florida, Department of Transportation and
81. Lucie County Board of County Commissioners
I. TOTAl PROJECT COST: $500,000
II. PARTICIPATION:
Federal Partidpation:
FAA, FTA, UMTA, etc. O.()()ofo $0
<.'
Agency Partidpation:
In-KJnd $0
Cash 20. ()()Ofo $100,000
Other $0
Maximum Department Partidpation:
Primary (DS) (DDR) (DIM) (PORl) 80. ()()Ofo $400,000
Federal Reimbursable (DU) (FRA) (DFTA) $0
Local Reimbursable (DL) $0
III. TOTAL PROJECT COST: $500,000
~
v
"-
Exhibij C Page 1 of 2
Fin. Proj. No.: 407348-1-94-01
Contract No.:
Agreement Date:
EXHIBIT "C"
(GENERAL)
This exhibit forms an integral part of that certain Joint Participation Agreement between
the State of Florida, Department of Transportation and
St. Lucie County Board of Cot.intv Commissioners
Documents required to be submitted to the department by the Agency in accordance with
the terms of this agreement
SUBMITT AUCERTIFICATION
BASIS FOR ACCEPTANCE
·
Consultant Selection Compliance
Design Submittal"
100% Plans, Specifications and Contract Documents,
signed and sealed by Registered Professiónal Engineer
Agency Attorney's Certification
Engineer Certification""
Construction/Procurement
Department Letter
Safety Compliance
(a) Department Review
(b) Agency Certification
Release for Notice to Proceed
Department Letter
Annual Audit Reports
Agency Certification
·
Completion Per Specifications
Agency Certification
·
" Plans, Specifications, Engineering Report
One (1) Full Size set and (1) 11x17 set to be sent directly to:
Rebecca L. Rivett
Aviation Specialist
Public Transportation Office, D4
3400 West Commercial Boulevard
Fort Lauderdale, FL 33309-3421
.... Criteria for development and certification of plans, specifications, and contract
documents is defined in the DESIGN DEVELOPMENT CRITERIA Section of
this Exhibit.
,
......
...."
Exhibit C Page 2 of 2
Fin. Proj. No.: 407348-1-94-01
Contract No.:
Agreement Date:
DESIGN DEVELOPMENT CRITERIA
The plans, specifications, construction contract documents, and any and all other similar
engineering, construction, and contractual documents produced by the Engineer for the project
are hereinafter collectively referred to as "plans" in this Exhibit.
Plans shall be developed in accordance with sound engineering and design principles, and with
generally accepted professional standards.
Plans shall be consistent with the intent of the project as defined in the Joint Particìpation
Agreement. Section 1.00, "Purpose of Agreement", and Exhibit "A" of this Agreement.
The Engineer shall perform a thorough review of the requirements of the following standards and
make a determination as to their applicability to this project. Plans produced for this project shall
be developed in compliance with the applicable requirements of these standards.
· Federal Aviation Administration Regulations and Advisory Circulars
,
. Florida Department of Transportation Standards of Design for General Aviation
Projects
· State of Florida Manual of Unlfonn Minimum Standards for Design, Construction and
Maintenance for Streets and Highways
· State of Florida Manual on Unifonn Traffic Control Devices
. State of Florida Roadway and Traffic Design Standards
Development of the plans shall comply with all applicable laws, ordinances, zoning and permitting
requirements, public notice requirements, and other similar regulations that apply to the scope
and location of the project. .
Note: The current version(s) or edition(s) as of the execution date of the Engineering Agreement
for the design of the project.
'-'"
""'"
,.
------
~
~ ....I
~
AGENDA REQUEST ITEM NO. C - 7 B
DATE: May 6, 2001
REGULAR [ ]
PUBLIC HEARING [
CONSENT [ X ]
BOARD OF COUNTY COMMISSIONERS PRESENTED BY:
TO:
SUBMITTED BY:
AilJ>ort
Paul Phillips
SUBJECT: Accept the Florida Department ofTransportation (FDOT) Joint Participation Agreement (JP A),
and authorize the Chairman to execute the JPA and resolution 01-105 authorizing the Chairman to sign
the agreement, for the construction of security fencing at St. Lucie County International Airport. This JP A
provides for $8,333 of the $166,666 necessary for the project. This is a 5% matching fund JPA with the
Florida Department of Transportation.
BACKGROUND: Last year, Congress passed a multi-year funding bill for airports. For the first time ever,
Congress appropriated $150,000 per year for three consecutive years to be used for infrastructure projects
at general aviation airports. This $150,000 is a 90% matching grant from the Federal Aviation
Administration (FAA) with the balance of$8,333 from FDOT and $8,333 from local funds. As airport
safety and security is the Airport's number one concern, this project consists of the installation of security
fencing. This JPA will provide for FDOT's share of the installation of the security fencing.
FUNDS AVAILABLE IN ACCT#: Matching funds of $8,333 are available in the Airport funds
carryforward balance account. (140-9910-599900-800).
PREVIOUS ACTION: n/a
.
RECOMMENDATION: Staff recommends that the Board accept the Florida Department ofTransportation
(FDOT) Joint Participation Agreement (JPA), and authorize the Chairman to execute the JPA and
resolution 01-105 authorizing the Chairman to sign the agreement, for the construction of security fencing
at St. Lucie County International Airport. This JPA provides for $8,333 of the $166,666 necessary for the
project. This is a 5% matching fund JP A with the Florida Department of Transportation.
COMMISSION ACTION:
[~APPROVED [ ]DENIED
[ ]OTHER:
Reviews & Aoprovals
County Attorney:
Originating Dept: ,
Finance:(Check for Copy
ST. LUCIE CO. RTTDRNEY Fax:561-462-1440
May 1 '01 17:~( t-'.U1
\..I
'wi
"-
A
RESOLUTION NO. 01-105
o'
A RESOLUTION ACCEPTING THE STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION PUBLIC
TRANSPORTATION JOINT PARTICIPATION AGREEMENT
(FIN. PROJ. NO. 411090-1-94-01) FOR THE INSTALLATION
OF SECURITY FENONG AT THE ST. LUCIE COUNTY
INTERNA TlONAL AIRPORT AND AUTHORIZING THE
CHAIRPERSON TO EXECUTE THE AGREEMENT AND
FURTHER AUfHORlZING THE COUNTY ATTORNEY TO
EXECUTE THE AGREEMENT BY APPROVING IT AS TO
FORM AND CORRECTNESS
)
.
WHEREAS, the Board ofCouoty Commissioners ofSt. Lucie County, Florida, has made
the following detenninations:
t
l. The Florida Department of Transportation has awarded the County funding for the
installation of security fencing at the St. Lucie CO\Ulty lnternational Airport (Fin. Proj No. 411090-
1-94-0 I).
2. The Board should authorize and approve execution of the Public Transportation Joint
Participation Agreement with the State of Florida Department of Public Transportation for the
above-referenced project.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of St.
Lucie County, Florida:
,
.
1. The Board hereby accepts and approves thc Public Transportation Joint Participation
Agreement with the State of Florida (Fin. Proj. No. 411090-1-94-01) to provide funding for the
installation of security fencing at the St. Lucie County International Airport.
2. The Board hereby authorizes the Chairperson to execute the above-referenced agreement
and further authorizes the County Attorney to execute: the agreement by approving it as to fonn and
correçtness.
After moùon and second, the vote on this resolution wa.~ as follows:
Chairperson Frannie Hutchinson XX
Vice-Chairperson Doug Coward XX
Commissioner Cliff Barnes XX
Commissioner Paula A. Lewis XX
Commissioner Jo1m D_ Bruhn XX
ST. LUCIE CO. ~TTORNEY Fax:561-462-1440
May 1 '01 1(:~(
t'.Uj
'"
'-'
....,
PASSED AND DULY ADOPTED this XX day of XX, 2001.
ATTEST:
BOARD OF COUNTY COMMISSIONERS
ST. LUCIE COUNTY. FLORIDA
BY:
CHAIRPERSON
DEPUTY CLERK
.
APPROVED AS TO FORM AND
CORRECTNESS:
COUNTY ATTORNEY
2
~
'vi
"
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
FORM 725-<)30-06
PUBLIC TRANSP ADMIN
07/00
Page 1 of 12
PUBLIC TRANSPORTATION
JOINT PARTICIPATION AGREEMENT
.
.
FINANCIAL PROJECT NO.: Fund: OS FLAIR Approp: 088719
411090-1-94-01 FLAIR Obj.: 750004
(Item-segment-phase-sequence) Function: 637
On;¡. Code: 55042010428
Contract No: Federal No: N/A Vendor No: VF 596000835030
Catalo9 of Federal Domestic Assistance Number: Catalog of State Financial Assistance Number: 55004
,
THIS AGREEMENT, made and entered into this
day of
I
by and between the STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION, an agency of the State of Florida,
hereinafter referred to as the Department, and
S1. Lucie County Board of County Commissioners
hereinafter referred to as the AGENCY.
WIT N ESE T H:
WHEREAS, the Agency has the authority to enter into said Agreement and to undertake the project hereinafter
described, and the Department has been granted the authority to function adequately in all areas of appropriate
jurisdiction including the implementation of an integrated and balanced transportation system and is authorized
under 332.006 (6) , Florida Statutes, to enter into this Agreement;
NOW, THEREFORE, in consideration ofthe mutual covenants, promises and representations herein, the parties
agree as follows:
1.00 Purpose of Agreement: The purpose of this Agreement is to Install Security Fencing.
and as further described in Exhibit(s) A.S & C attached hereto and by this reference made a part
hereof, hereinafter referred to as the project, and to provide Departmental financial assistance to the Agency and state the
terms and conditions upon which such assistance will be provided and the understandings as to the manner in which the
project will be undertaken and completed.
/
\w
...",I
FORM 725-0:\0.06
PUBLIC "TRANSP ADMIN
07/00
Page 2 of 12
2.00 Accomplishment of the Project:
2.10 General Requirements: The Agency shall commence, and complete the project as described in Exhibit "A"
attached hereto and by this reference made a part hereof, with all practical dispatch, in a sound, economical, and efficient
manner, and in accordance with the provisions herein, and all applicable laws.
2.20 Pursuant to Federal, State, and Local Law: In the event that any election, referendum, approval, permit,
notice, or other proceeding or authorization is requisite under applicable law to enable the Agency to enter into this .
Agreement or to undertake the project hereunder, or to observe, assume or carry out any of the provisions of the
Agreement, the Agency will initiate and consummate, as provided by law, all actions necessary with respect to any such
matters so requisite.
2.30 Funds of the Agency: The Agency shall initiate and prosecute to completion all proceedings necessary
including federal aid requirements to enable the Agency to provide the necessary funds for completion of the project.
2.40 Submission of Proceedings, Contracts and Other Documents: The Agency shall submit to the
Department such data, reports, records, contracts and other documents relating to the project as the Department may
require as listed in Exhibit "C" attached hereto and by this reference made a part hereof.
3.00 Project Cost The total estimated cost of the project is $ 166.666.00 . This amount
.,
is based upon the estimate summarized in Exhibit "B" attached hereto and by this reference made a part hereof. The
Agency agrees to bear all expenses in excess of the total estimated cost of the project and any deficits involved.
.
4.00 Deparbnent Participation: The Department agrees to maximum participation, including contingencies, in
the project in the amount of $ 8.333.00 as detailed in Exhibit "B", or in an amount equal
to the percentage(s) of total project cost shown in Exhibit "B", whichever is less.
4.10 Project Cost Eligibility: Project costs eligible for State participation will be allowed only from the effective
date of this Agreement. It is understood that State participation in eligible project costs is subject to:
(a) Legislative approval of the Department's appropñation request in the work program year that the project
is scheduled to be committed;
(b) Availability offunds as stated in paragraph 17.00 of this Agreement;
(c) Approval of all plans, specifications, contracts or other obligating documents and all other terms of this
Agreement;
(d) Department approval of the project scope and budget (Exhibits A & B) at the time appropriation authority
becomes available.
4.20 Front End Funding: Front end funding (i&His not) applicable. If applicable, the Departmðl1t may initially pay
100% of the total allowable incurred project costs up to an amount equal to its total share of participation as shown in
paragraph 4.00.
5.00 Retainage: Retainage (i&) (is not) applicable. If applicable, N/A percent of the
Department's total share of participation as shown in paragraph 4.00 is to be held in retainage to be disbursed, at the
Department's discretion, on or before the completion of the final project audit.
6.00 Project Budget and Payment Provisions:
6.10 The Project Budget A project budget shall be prepared by the Agency and approved by the Department.
The Agency shall maintain said budget, carry out the project and shall incur obligations against and make disbursements
of project funds only in conformity with the latest approved budget for the project. No budget increase or decrease shall
be effective unless it complies with fund participation requirements established in paragraph 4.00 of this Agreement and is
approved by the Department Comptroller.
\..I
"'WI
"
FORM 725-030-06
PUBLIC TRANSP AOMIN
07/00
Page 3 of 12
6.20 Payment Provisions: Unless otherwise allowed under paragraph 4.20, payment will begin in the year the
project or project phase is scheduled in the work program as of the date of the agreement. Payment will be made for
actual costs incurred as of the date the invoice is submitted with the final payment due upon receipt of a final invoice.
7.00 Accounting Records:
»
~
7.10 Establishment and Maintenance of Accounting Records: The Agency shall establish for the project, in
conformity with requirements established by Department's program guidelines/procedures and ·Principles for State and
Local Govemments", separate accounts to be maintained within its existing accounting system or establish independent
accounts. Such accounts are referred to herein collectively as the ·project account". Documentation of the project
account shall be made available to the Department upon request any time during the period of the Agreement and for
three years after final payment is made.
7.20 Funds Received Or Made Available for The Project: The Agency shall appropriately record in the project
account, and deposit in a bank or trust company which is a member of the Federal Deposit Insurance Corporation, all
payments received by it from the Department pursuant to this Agreement and all other funds provided for, accruing to, or
otherwise received on account of the project, which Department payments and other funds are herein collectively referred
to as "project funds·. The Agency shall require depositories of project funds to secure continuously and fully all project
funds in excess of the amounts insured under federal plans, or under State plans which have been approved for the
deposit of project funds by the Department, by the deposit or setting aside of collateral of the types and in the manner as
prescribed by State Law for the security of public funds, or as approved by the Department.
, 7.30 Costs Incurred for the Project The Agency shall charge to the project account all eligible costs of the
project. Costs in excess of the latest approved budget or attributable to actions which have not received the required
approval of the Department shall not be considered eligible costs.
) 7.40 Documentation of Project Costs: All costs charged to the project, including any approved services
contributed by the Agency or others, shall be supported by properly executed payrolls, time records, invoices, contracts,
or vouchers evidencing in proper detail the nature and propriety of the charges.
7.50 Checks, Orders, and Vouchers: Any check or order drawn by the Agency with respect to any item which is
or will be chargeable against the project account will be drawn only in accordance with a proper1y signed voucher then on
file in the office of the Agency stating in proper detail the purpose for which such check or order is drawn. All checks,
payrolls, invoices, contracts, vouchers, orders, or other accounting documents pertaining in whole or in part to the project
shall be clear1y identified, readily accessible, and, to the extent feasible, kept separate and apart from all other such
documents.
7.60 Audit Reports:
1. All federal awards are to be identified using the Catalog of Federal Domestic Assistance (CFDA) title and number,
award number, and year, and name of the federal agency. State grant and aid funded grants are to be identified
with the Rnancial Project Number (FPN) and contract number.
2. Audits shall be conducted under the guidelines of A-133, Section 215.97, Florida Statutes, and Chapter 10.600,
Rules of the Auditor General.
3. For fiscal years beginning after June 30, 1998, the reporting packages and data collection forms are to be
submitted within the ear1ier of 30 days after the receipt of the auditor's report, or 9 months after the end of the
subrecipient's (Agency's) fiscal year. The date the audit report was delivered to the subrecipient (Agency) must
be indicated by the subrecipient (Agency) in correspondence accompanying the audit report. or reporting
package, and data collection form.
,.
'-'
.....,
FORM n5-0J0.06
PUBLIC lRANSP ADMIN
07/00
Page 4 of 12
4. The Agency shall follow up and take corrective action on audit findings. A-133 further requires the preparation of
a summary schedule of prior audit findings and a corrective action plan for current year audit findings.
5. Project records shall be retained and available for at least three years after the final payment. Records related to
unresolved audit findings, appeals, or litigation shall be retained until the action is completed or the dispute is
resolved.
Reports of audits conducted in accordance with OMB Circular A-133, and corresponding data collection forms
shall be sent to:
.
Federal Audit Clearinghouse
Bureau of the Census
1201 East 10th Street
Jefferson, IN 47132
and the District Public Transportation Office identified in paragraph 8.10 of this agreement.
Reports of audits conducted in accordance with Section 215.97, Florida Statutes, and Chapter 10.600 Rules of
the Auditor General shall be sent to:
,I
State of Florida Auditor General
P.O. Box 1735
Tallahassee, FL 32302-1735
and the DistrictPublic Transportation Office identified in paragraph 8.10 of this agreement.
7.70 Insurance: Execution of this Joint Participation Agreement constitutes a certification that the Agency has
and will maintain the ability to repair or replace any project equipment or facilities in the event of loss or damage due to
any accident or casualty for the useful life of such equipment or facilities. In the event of the loss of such equipment or
facilities, the Agency shall either replace the equipment or facifities or reimburse the Department to the extent of its
interest in the lost equipment or facifity.
In the event this Agreement is for purchase of land or for the construction of infrastructure such as airport runways the
Department may waive or modify this section with an Exhibit "C".
8.00 Requisitions and Payments:
8.10 Action by the Agency: In order to obtain any Department funds, the Agency shall file with the Department
ofTransportation, District Four, Public Transportation Office 3400 W. Commercial Blvd. Ft. Lauderdale, Florida, 33309 its
requisition on a form or forms prescribed by the Department, and other data pertaining to the project account (as defined
in paragraph 7.10 hereof) to justify and support the payment requisitions.
8.11 Invoices for fees or other compensation for services or expenses shall be submitted in detail
sufficient for a proper preaudit and postaudit thereof.
8.12 Invoices for any travel expenses shall be submitted in accordance with Chapter 112.061, F.S.
The Department may establish rates lower than the maximum provided in Chapter 112.061, Florida Statutes.
8.13 For real property acquired, submit;
(1) the date the Agency acquired the real property,
(2) a statement by the Agency certifying that the Agency has acquired said real property, and actual
consideration paid for real property.
v
\wi
"
FORM 725-0JO.OO
PUBLIC TRANSP ADMIN
07100
Page 5 of 12
(3) a statement by the Agency certifying that the appraisal and acquisition of the real property
together with any attendant relocation of occupants was accomplished in compliance with all
federal laws, rules and procedures required by any federal oversight agency and with all state
laws, rules and procedures that may apply to the Agency acquiring the real property.
8.20 The Departmenfs Obligations: Subject to other provisions hereof, the Department will honor such
..~ requisitions in amounts and at times deemed by the Department to be proper to ensure the carrying out of the project and
payment of the eligible costs. However, notwithstanding any other provision of this Agreement, the Department may elect
by notice in writing not to make a payment on the project if:
8.21 Misrepresentation: The Agency shall have made misrepresentation of a material nature in"its
application, or any supplement thereto or amendment thereof, or in or with respect to any document or data
fumished therewith or pursuant hereto;
8.22 Litigation: There is then pending litigation with respect to the performance by the Agency of any
of its duties or obligations which may jeopardize or adversely affect the project, the Agreement, or payments to
the project;
8.23 Approval by Deparbnent: 'The Agency shall have taken any action pertaining to the project
which, under this agreement, requires the approval of the Department or has made related expenditures or
incurred related obligations without having been advised by the Department that same are approved;
8.24 Conflict of Interests: There has been any violation of the conflict of interest provisions contained
herein; or
8.25 Default The Agency has been determined by the Department to be in default under any of the
provisions of the Agreement.
8.26 Federal Participation (If Applicable): Any federal agency providing federal financial assistance
to the project suspends or terminates federal financial assistance to the project. In the event of suspension or
termination of federal financial assistance, the Agency will reimburse the Department for a/l disallowed costs.
8.30 Disallowed Cos1s: In determining the amount of the payment, the Department will exclude all projects
) costs incurred by the Agency prior to the effective date of this Agreement, costs which are not provided for in the latest
approved budget for the project, and costs attributable to goods or services received under a contract ór other
arrangements which have not been approved in writing by the Department.
8.40 Payment Offset If, after project completion, any claim is made by the Department resulting from an audit
or for work or services performed pursuant to this agreement, the Department may offset such amount from payments due
for work or services done under any public transportation joint participation agreement which it has with the Agency owing
such amount if, upon demand, payment of the amount is not made within sixty (60) days to the Department. Offsetting
amounts shall not be considered a breach of contract by the Department.
9.00 Termination or Suspension of Project:
9.1 0 Termination or Suspension Generally: If the Agency abandons or, before completion, finally discontinues
the project; or if, by reason of any of the events or conditions set forth in paragraphs 8.21 to 8.26 inclusive, or for any
other reason, the commencement, prosecution, or timely completion of the project by the Agency is rendered improbable,
infeasible, impossible, or illegal, the Department will, by written notice to the Agency, suspend any or all of its obligations
under this Agreement until such time as the event or condition resulting in such suspension has ceased or been
corrected, or the Department may terminate any or all of its obligations under this Agreement.
"
'-"
..,J
FORM 725-030-06
PUBLIC TRANSP ADMIN
07/00
Page 6 of 12
9.11 Action Subsequent to Notice of Termination or Suspension. Upon receipt of any final
termination or suspension notice under this paragraph, the Agency shall proceed promptly to cany out the actions
required therein which may include any or all of the following: (1) necessary action to terminate or suspend, as
the case may be, project activities and contracts and such other action as may be required or desirable to keep
to the minimum the costs upon the basis of which the financing is to be computed; (2) furnish a statement of the
project activities and contracts, and other undertakings the cost of which are othel'Nise includable as project costs;
and (3) remit to the Department such portion of the financing and any advance payment previously received as
is determined by the Department to be due under the provisions of the Agreement. The termination or suspension
shall be carried out in conformity with the latest schedule, plan, and budget as approved by the Department or
upon the basis of terms and conditions imposed by the Department upon the failure of the Agency to furnish the
schedule, plan, and budget within a reasonable time. The approval of a remittance by the Agency or the closing
out of federal financial participation in the project shall not constitute a waiver of any claim which the Department
may otherwise have arising out of this Agreement.
9.12 The Department reserves the right to unilaterally cancel this Agreement for refusal by the contractor
or Agency to allow public access to all documents, papers, letters, or other material subject to the provisions of
Chapter 119, Florida Statutes and made or received in conjunction with this Agreement.
'.'
10.00 Remission of Project Account Upon Completion of Project: Upon completion of the project, and after
payment. provision for payment, or reimbursement of all project costs payable from the project account is made, the
Agency shall remit to the Department its share of any unexpended balance in the project account.
11.00 Audit and Inspection: The Agency shall permit, and shall require its contractors to permit, the
Departmenfs authorized representatives to inspect all work, materials, payrolls, records; and to audit the books, records
and accounts pertaining to the financing and development of the project.
12.00 Contracts of the Agency:
12.10 Third Party Agreements: Except as otherwise authorized in writing by the Department, the Agency shall
not execute any contract or obligate itself in any manner requiring the disbursement of Department joint participation
funds, including consultant, construction or purchase of commodities contracts or amendments thereto, with any third
party with respect to the project without the written approllal of the Department. Failure to obtain such approval shall be
sufficient cause for nonpayment by the Department as provided in paragraph 8.23. The Department specifically reserves
unto itself the right to review the qualifications of any consultant or contractor and to approve or disapprove the
employment of the same.
12.20 Compliance with Consultants' Competitive Negotiation Act: It is understood and agreed by the parties
hereto that participation by the Department in a project with an Agency, where said project involves a consultant contract
for engineering, architecture or surveying services, is contingent on the Agency complying in full with provisions of
Chapter287, Florida Statutes, Consultants Competitive Negotiation Act. At the discretion ofthe Department, the Agency
will involve the Department in the Consultant Selection Process for all contracts, In all cases, the Agency's Attomey shall
certify to the Department that selection has been accomplished in compliance with the Consultant's Competitive
Negotiation Act.
12.30 Disadvantaged Business Enterprise (DB E) Policy and Obligation:
12.31 DBE Policy: It is the policy of the Department that disadvantaged business enterprises as defined
in 49 CFR Part 26, as amended, shall have the maximum opportunity to participate in the peñonnance of
contracts financed in whole or in part with Department funds under this Agreement. The DBE requirements of 49
CFR Part 26, as amende~, apply to this Agreement.
'-'
'~
,
FORM 725-030-06
PUBLIC TRANSP ADMIN
07100
Page 7 Of 12
12.32 DBE Obligation: The Agency and its contractors agree to ensure that Disadvantaged Business
Enterprises as defined in 49 CFR Part 26, as amended, have the maximum opportunity to participate in the
perfonnance of contracts and this Agreement. In this regard, all recipients, and contractors shall take all
necessary and reasonable steps in accordance with 49 CFR Part 26, as amended, to ensure that the
Disadvantaged Business Enterprises have the maximum opportunity to compete for and perfonn contracts.
Grantees, recipients and their contractors shall not discriminate on the basis of race, color, national origin or sex
in the award and perfonnance of Department assisted contracts.
13.00 Restrictions, Prohibitions, Controls, and Labor Provisions:
13.10 Equal Employment Opportunity: In connection with the carrying out of any project, the Agency shall not
discriminate against any employee or applicant for employment because of race, age, creed, color, sex or national origin.
The Agency will take affinnative action to ensure that applicants are employed, and that employees are treated during
employment, without regard to their race, age, creed, color, sex, or national origin. Such action shall include, but not be
limited to, the following: Employment upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or
tennination; rates of payor otherfonns of compensation; and selection for training, including apprenticeship. The Agency
shall insert the foregoing provision modified only to show the particular contractual relationship in all its contracts in
connection with the development or operation of the project, except contracts for the standard commercial supplies or raw
materials, and shall require all such contractors to insert a similar provision in all subcontracts, except subcontracts for
standard commercial supplies or raw materials. When the project involves installation, construction, demolition, removal,
site improvement, or similar wor1<, the Agency shall pœt. in conspicuous places available to employees and applicants for
employment for project wor1<, notices to be provided by the Department setting forth the provisions of the
nondiscrimination clause.
13.20 Title VI- Civil Rights Act of 1964: Execution of this Joint Participation Agreement constitutes a
certification that the Agency will comply with all the requirements imposed by Title VI of the Civil Rights Act of 1964 (78
Statute 252), the Regulations of the Federal Department of Transportation issued thereunder, and the assurance by the
Agency pursuant thereto.
13.30 Title VIII - Civil Rights Act of 1968: Execution of this Joint Participation Agreement constitutes a
certification that the Agency will comply with all the requirements imposed by Title VIII of the Civil Rights Act of 1968, 42
USC 3601 ,et seq., which among other things, prohibits discrimination in housing on the basis of race, color, national
origin, religion, sex, disability and familial status.
13.40 Americans with Disabilities Act of 1990 (ADA): Execution of this Joint Participation Agreement
J constitutes a certification that the Agency will comply with all the requirements imposed by the ADA, the regulations of the
federal govemment issued thereunder, and the assurance by the Agency pursuant thereto.
13.50 Prohibited Interests: Neither the Agency nor any of its contractors or ~heir subcontractors shall enter into
any contract, subcontract, or arrangement in connection with the project or any property included or planned to be
included in the project, in which any member, officer, or employee of the Agency during his tenure or for tv«> years
thereafter has any interest, direct or indirecllf any such present or fonner member, officer, or employee involuntarily
acquires or had acquired prior to the beginning of his tenure any such interest, and if such interest is immediately
disclosed to the Agency, the Agency with prior approval of the Department, may waive the prohibition contained in this
subsection: Provided, that any such present member, officer or employee shall not participate in any action by the
Agency relating to such contract, subcontract, or arrangement. The Agency shall insert in all contracts entered into in
connection with the project or any property included or planned to be included in any project, and shall require its
contractors to insert in each of their subcontracts, the following provision:
"No member, officer, or employee of the Agency during his tenure or for two years thereafter shall have any
interest, direct or indirect. in this contract or the proceeds thereof."
The provisions of this subsection shall not be applicable to any agreement between the Agency and its fiscal depositories,
or to any agreement for utility services the rates for which are fixed or controlled by a Govemmental agency.
;'
'-'
""'"
FORM 725-{)30-06
PUBLIC TRANSP ADMIN
07/00
Page 8 of 12
13.60 Interest of Members of, or Delegates to, Congress: No member or delegate to the Congress of the
United States shall be admitted to any share or part of the Agreement or any benefit arising therefrom.
14.00 Miscellaneous Provisions:
14.10 Environmental Pollution: Execution of this Joint Participation Agreement constitutes a certification by the
Agency that the project will be carried out in confonnance with all applicable environmental regulations including the
securing of any applicable permits. The Agency will be solely responsible for any liability in the event of non-compliance
with applicable environmental regulations, including the securing of any applicable permits, and will reimburse the
Department for any loss incurred in connection therewith.
14.20 Deparbnent Not Obligated to Third Parties: The Department shall not be obligated or liable hereunder to
any party other than the Agency.
14.30 When Rights and Remedies Not Waived: In no event shall the making by the Department of any
payment to the Agency constitute or be construed as a waiver by the Department of any breach of covenant or any default
which may then exist, on the part of the Agency, and the making of such payment by the Department while any such
breach or default shall exist shall in no way impair or prejudice any right or remedy available to the Department with
respect to such breach or default.
,I
14.40 How Agreement Is Affected by Provisions Being Held Invalid: If any provision of this Agreement is held
invalid, the remainder of this Agreement shall not be affected. In such an instance the remainder would then continue to
conform to the terms and requirements of applicable law.
14.50 Bonus or Commission: By execution of the Agreement the Agency represents that it has not paid and,
also, agrees not to pay, any bonus or commission for the purpose of obtaining an approval of its application for the
financing hereunder.
14.60 State or Territorial Law: Nothing in the Agreement shall require the Agency to obßerve or enforce
compliance with any provision thereof, perform any other act or do any other thing in contravention of any applicable State
law: Provided, that if any of the provisions of the Agreement violate any applicable State law, the Agency will at once
notify the Department in writing in order that appropriate changes and modifications may be made by the Department and
the Agency to the end that the Agency may proceed as soon as possible with the project.
14.70 Use and Maintenance of Project Facilities and Equipment The Agency agrees that the project facilities
and equipment will be used by the Agency to provide or support public transportation for the period of the useful life of
such facilities and equipment as determined in accordance with general accounting principles and approved by the
Department. The Agency further agrees to maintain the project facilities and equipment in good working order for the
useful life of said facilities or equipment.
14.71 Property Records: The Agency agrees to maintain property records, conduct physical inventories
and develop control systems as required by 49 CFR Part 18, when applicable.
14.80 Disposal of Project Facilities or Equipment If the Agency disposes of any project facility or equipment
during its useful life for any purpose except its replacement with like facility or equipment for public transportation use, the
Agency will comply with the terms of 49 CFR Part 18 relating to property management standards. The Agency agrees to
remit to the Department a proportional amount of the proceeds from the disposal of the facility or equipment. Said
proportional amount shall be determined on the basis of the ratio of the Department financing of the facility or equipment
as provided in this Agreement.v
14.90 Contractual Indemnity: To the extent provided by law, the Agency shall indemnify, defend, and hold
harmless the Department and all of its officers, agents, and employees from any claim, loss, damage, cost, charge, or
\..I
.....,
"
FORM 725-0J0.06
PUBLIC TRANSP ADMIN
07100
Page 9 of 12
expense arising out of any act, error, omission, or negligent act by the Agency, its agents, or employees during the
performance of the Agreement. except that neither the Agency, its agents, or its employees will be liable under this
paragraph for any claim, loss, damage, cost, charge, or expense arising out of any act, error, omission, or negligent act by
the Department or any of its officers, agents, or employees during the performance of the Agreement.
The parties recognize and accept the funding restrictions set forth in Section 339.135(6)(a), and Section 129.07, Florida
Statutes, which may affect each of the parties' obligations. Those provisions are as follows:
(a) The Department during any fiscal year shall not expend money, incur any liability, or enter into any contract
which, by its terms, involves the expenditure of money in excess of the amounts budgeted as available for
expenditure during such fiscal year. Any contract, verbal or written, made in violation of this subsection is null
and void, and no money may be paid on such contract. The Department shall require a statement from the
Comptroller of the Department that funds are available prior to entering into any such contract or other binding
commitment of funds. Nothing herein contained shall prevent the making of contracts for periods exceeding one
(1) year, but any contract so made shall be executory only for the value of the services to be rendered or agreed
to be paid for in succeeding fiscal years. Section 339.135(6)(a), Florida Statutes.
(b) It is unlawful for the Board of County Commissioners to expend or contract for the expenditure in any fiscal
year more than the amount budgeted in each fund's budget, except as provided herein, and in no case shall the
total appropriations of any budget be exceeded, except as provided in s. 129.06, and any indebtedness
contracted for any purpose against either of the funds enumerated in this chapter or for any purpose, the
expenditure for which is chargeable to either of said funds, shall be null and void, and no suit or suits shall be
prosecuted in any court in this state for the collection of same, and members of the Board of County
Commissioners voting for and contracting for such amounts and the bonds of such members of said boards also
shall be liable for the excess indebtedness so contracted for. Section 129.07, Florida Statutes.
When either party receives a notice of claim for damages that may have been caused by the other party in the
performance of services required under this Agreement, that party will immediately forward the claim to the other party.
Each party will evaluate the claim and report its findings to each other within fourteen (14) working days and will jointly
discuss options in defending the claim.
15.00 Plans and Specifications: In the event that this Agreement involves the purchasing of capital equipment
or the constructing and equipping of facilities. the Agency shall submit to the Department for approval all appropriate
plans and specifications covering the project. The Department will review all plans and specifications and ~II issue to the
Agency written approval with any approved portions of the project and comments or recommendations conceming any
. remainder of the project deemed appropriate. After resolution of these comments and recommendations to the
Department's satisfaction, the Department will issue to the Agency written approval with said remainder of the project.
Failure to obtain this written approval shall be sufficient cause for nonpayment by the Department as provided in
paragraph 8.23.
16.00 Project Completion, Agency Certification: The Agency ~II certify in writing on or attached to the final
invoice, that the project was completed in accordance with applicable plans and specifications, is in place on the Agency
facility, that adequate title is in the Agency and that the project is accepted by the Agency as suitable for the intended
purpose.
17.00 Appropriation of Funds:
17.10 The State of Florida's performance and obligation to pay under this Agreement is contingent upon an
annual appropriation by the Legislature.
17.20 Multi-Year Commitment: In the eventthis Agreement is in excess of $25,000 and has a term for a period
of more than one year, the provisions of Chapter 339.135(6)(a), Florida Statutes, are hereby incorporated: "(a) The
Department, during any fiscal year, shall not expend money, incur any liability, or enter into any contract which, by its
/'
'-'
....""
FORM 725-030-06
PUBLIC TRANSP ADMIN
07/00
Page 10 of 12
terms involves the expenditure of money in excess of the amounts budgeted as available for expenditure during such
fiscal year. Any contract, verbal or written, made in violation of this subsection is null and void, and no money may be
paid on such contract. The Department shall require a statement from the comptroller of the Department that funds are
available prior to entering into any such contract or other binding commitment of funds. Nothing herein contained shall
prevent the making of contracts for periods exceeding 1 year, but any contract so made shall be executory only for the
value of the services to be rendered or agreed to be paid for in succeeding fiscal years; and this paragraph shall be
incorporated verbatim in all contracts of the Department which are for an amount in excess of 25,000 dollars and which
have a term for a period of more than 1 year."
t
18.00 Expiration of Agreement: The Agency agrees to complete the project on or before
June 30. 2003 . If the Agency does not complete the project within this time period, this Agreement
will expire unless an extension of the time period is requested by the Agency and granted in writing by the District
Secretary, District Four . Expiration of this Agreement will be considered termination of the project and the
procedure established in paragraph 9.00 of this Agreement shall be initiated.
18.10 Final Invoice: The Agency must submit the final invoice on this project to the Department within 120 days
after the expiration of this Agreement. Invoices submitted after the 120 day time period will not be paid.
I
19.00 Agreement Format All words used herein in the singularform shall extend to and include the plural. All
words used in the plural form shall extend to and include the singular. All words used in any gender shall extend to and
include all genders.
20.00 Execution of Agreement This Agreement may be simultaneously executed in a minimum of two
counterparts, each of which so executed shall be deemed to be an original, and such counterparts together shall
constitute one in the same instrument.
21.00 Restrictions on Lobbying:
21.10 Federal: The Agency agrees that no federal appropriated funds have been paid or will be paid by or on
behalf of the Agency, to any person for influencing or attempting to influence any officer or employee of any federal
agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in
connection with the awarding of any federal contract, the making of any federal grant, the making of any federal loan, the
entering into of any cooperative agreement, and the extension, continuation, renewal, amendment or modification of any
federal contract, grant, loan or cooperative agreement.
If any funds other than federal appropriated funds have been paid by the Agency to any person for influencing or
attempting to influence an officer or employee of any federal agency, a Member of Congress, an officer or employee of
Congress, or an employee of a Member of Congress in connection with this Joint Participation Agreement, the
undersigned shall complete and submit Standard Form-lll, "Disclosure Form to Report lobbying,· in accordance with its
instructions.
The Agency shall require that the language of this section be included in the award documents for all subawards at all
tiers (including subcontracts, sUbgrants, and contracts under grants, loans and cooperative agreements) and that all
subrecipients shall certify and disclose accordingly.
21.20 State: No funds received pursuant to this contract may be expended for lobbying the legislature or a state
agency.
22.00 Vendors Rights: Vendors (in this document identified as Agency) providing goods and services to the
Department should be aware of the following time frames. Upon receipt, the Department has five (5) working days to
inspect and approve the goods and services unless the bid specifications, purchase order or contract specifies otherwise.
The Department has 20 days to deliver a request for payment (voucher) to the Department of Banking and Finance. The
\.I
\WI
"'
FORM 725-030-06
PUBLIC TRANSP ADMIN
07/00
Page 11 of 12
20 days are measured from the latter of the date the invoice is received or the goods or services are received. inspected
and approved.
If a payment is not available within 40 days after receipt of the invoice and receipt, inspection and approval of goods and
services, a separate interest penalty in accordance with Section 215.422(3)(b) will be due and payable, in addition to the
invoice amount to the Agency. The interest penalty provision applies after a 35 day time period to health care providers.
. as defined by rule. Interest penalties of less than one (1) dollar will not be enforced unless the Agency requests payment.
Invoices which have to be retumed to an Agency because of vendor preparation errors will result in a delay in the
payment. The invoice payment requirements do not start until a properly completed invoice is provided to the
Department.
A Vendor Ombudsman has been established within the Department of Banking and Finance. The duties of this individual
include acting as an advocate for Agencies who may be experiencing problems in obtaining timely payment(s) from the
Department. The Vendor Ombudsman may be contacted at (904)488-2924 or by calling the State Comptroller's Hotline,
, 1-800-848-3792.
23.00 Public Entity Crime: Pursuant to 287.133(3)(a) F.S. the following is applicable to this agreement.
287.133(2)(a) "A person or affiliate who has been placed on the convicted vendor list following a conviction for a public
entity crime may not submit a bid on a contract to prôvide any goods or services to a public entity, may not submit a bid
on a contract with a public entity for the construction or repair of a public building or public work, may not submit bids on
leases of real property to a public entity, may not be awarded or perfonn work as a contractor, supplier, subcontractor, or
consultant under a contract with any public entity, and may not transact business with any public entity in excess of the
threshold amount provided in s. 287.017 for CATEGORY lWO for a period of 36 months from the date of being placed on
the convicted vendor list."
tI'
'-'
....I
FORM 725-030-06
PUBLIC 1RANSP ADMIN
07/00
Page 12 of 12
Financial Project No. 411090-1-94-01
Contract No.
Agreement Date
IN WITNESS WHEREOF, the parties hereto have caused these presents be executed, the day and year first above
written.
.
AGENCY
FOOT
St. Lucie County Board of County
Commissioners
COMPTROLLER FUNDING APPROVAL
DATE:
BY:
,I
ATTORNEY
DEPARTMENT OF TRANSPORTATION
TITLE:
ATTEST:
DISTRICT SECRETARY
OR
DIRECTOR OF PlANNING & PROGRAMS
TITLE:
(SEAL)
ATTEST:
APPROVED AS TO FORM, LEGALITY
TITLE:
(SEAL)
.
\..I
\J
"
Fin. Proj. No.: 411090-1-94-01
Contract No.:
Agreement Date:
EXHIBIT "A"
PROJECT DESCRIPTION AND RESPONSIBILITIES
þ
·
This exhibit forms an integral part of that certain Joint Participation Agreement between the
State of Florida, Department of Transportation and
St. Lucie County Board of County Commissioners
PROJECT LOCATION:
St. Lucie County International Airport
,
PROJECT DESCRIPTION: Install Security Fencing
,J
·
SPECIAL CONSIDERATIONS BY AGENCY:
The audit report(s) required in paragraph 7.60 of the Agreement shall include a schedule of project
assistance that will reflect the Department's contract number, Financial Project number and the
Federal Identification number, where applicable, and the amount of state funding action (receipt and
disbursement of funds) and any federal or local funding action and the funding action from any other
source with respect to the project.
SPECIAL CONSIDERATIONS BY DEPARTMENT: N/A
·
-
/
\w
."j
Fin. Proj. No.: 411090-1-94-01
Contract No.:
Agreement Date:
EXHIBIT "B"
PROJECT BUDGET
This exhibit forms an integral part of that certain Joint Participation Agreement between the
State of Florida, Department of Transportation and
St. Lucie County Board of County Commissioners
,
I. TOTAL PROJECT COST: $166.666
II. PARTICIPATION:
Federal Participation:
FAA, FTA, UMT A, etc. 90.00% $150,000
.1
Agency Participation:
In-Kind $0
Cash 5.00% $8,333
Other $0
Maximum Department Participation:
Primary (OS) (DDR) (DIM) (PORT) 5.00% $8,333
Federal Reimbursable (DU) (FRA) (OFT A) $0
Local Reimbursable (DL) $0
III. TOTAL PROJECT COST: $166,666 .
'-'
'...I
"
Exhibit C Page 1 of 2
Fin. Proj. No.: 411090-1-94-01
Contract No.:
Agreement Date:
EXHIBIT "C"
(GENERAL)
.
This exhibit forms an integral part of that certain Joint Participation Agreement between
the State of Florida, Department of Transportation and
St. Lucie County Board of County Commissioners
,
Documents required to be submitted to the department by the Agency in accordance with
the tenns of this agreement
SUBMITTAUCERTIFICATION
BASIS FOR ACCEPTANCE
Consultant Selection Compliance
Agency Attorney's Certification
Design Submittal*
100% Plans, Specifications and Contract Documents,
signed and sealed by Registered Professiónal Engineer
Engineer Certification**
Construction/Procurement
Department Letter
Safety Compliance
(a) Department Review
(b) Agency Certification
Release for Notice to Proceed
Department Letter
Annual Audit Reports
Agency Certification
Completion Per Specifications
Agency Certification
.
* Plans, Specifications. Engineering Report
One (1) Full Size set and (1) 11x17 set to be sent directly to:
Rebecca L. Rivett
Aviation Specialist
Public Transportation Office, D4
3400 West Commercial Boulevard
Fort Lauderdale, FL 33309-3421
** Criteria for devetopment and certification of plans, specifications, and contract
documents is defined in the DESIGN DEVELOPMENT CRITERIA Section of
this Exhibit.
-
.
/
'-"
..",¡
Exhibit C Page 2 of 2
Fin. Proj. No.: 411090-1-94-01
Contract No.:
Agreement Date:
DESIGN DEVELOPMENT CRITERIA
The plans, specifications, construction contract documents, and any and all other similar
engineering, construction, and contractual documents produced by the Engineer for the project
are hereinafter collectively referred to as ·plans· in this Exhibit.
,
Plans shall be developed in accordance with sound engineering and design principles, and with
generally accepted professional standards.
Plans shall be consistent with the intent of the project as defined in the Joint Participation
Agreement, Section 1.00, "Purpose of Agreement". and Exhibit "AM of this Agreement.
The Engineer shall perform a thorough review of the requirements of the following standards and
make a determination as to their applicability to this project. Plans produced for this project shall
be developed in compliance with the applicable requirements of these standards.
· Federal Aviation Administration Regulations and Advisory Circulars
,I
· Florida Department of Transportation Standards of Design for General Aviation
Projects
· State of Florida Manual of Unlfonn Minimum Standards for Design, Construction and
Maintenance for Streets and Highways
. State of Florida Manual on Unifonn Traffic Control Devices
. State of Florida Roadway and Traffic Design Standards
Development of the plans shall comply with all applicable laws, ordinances, zoning and permitting
requirements, public notice requirements, and other similar regulations that apply to the scope
and location of the project.
Note: The current version(s) or edition(s) as of the execution date of the Engineering Agreement
for the design of the project.
.
~..
,..
'-
....,¡
AGENDA REQUEST
ITEM NO. C-~
DATE: May 8, 2001
REGULAR
PUBLIC HEARING
.
CONSENT
x
TO: BOARD OF COUNTY COMMISSIONERS
PRESENTED BY:
SUBMITTED BY:
Community Services Division
Beth Ryder, Director@~
SUBJECT: Adopt Resolution No. 01-96 authorizing the County Administrator to execute the Satisfaction
of Mortgage for each satisfied SHIP second mortgage.
BACKGROUND: See Memo 01-45
FUNDS AVAIL. N/A
PREVIOUS ACTION: On March 13, 2001, the Board of County Commissioners approved Resolution No. 01-75 which
adopted the St. Lucie County Housing Assistance Plan for fiscal years 2001102, 2002/03 and
2003/04 for the State Housing Initiatives Partnership program.
RECOMMENDATION:
Adopt Resolution No.01·96 authorizing the County Administrator to execute the Satisfaction of Mortgage for each
satisfied SHIP second mortgage. .
COMMISSION ACTION:
County Attorney:
/i1
[2i APPROVED [] DENIED
[ ] OTHER:
Coordination/Signatu res
Management & Budget
Purchasing:
Originating Department:
Other;
Other:
Finance; Check for copy only, if applicable
,.. .
'-'
.."J
~
COMMUNITY SERVICES
MEMORANDUM #01-45
SUBJECT:
Board of County Commissioners
Beth Ryder, Director & G-
Resolution 01-96
TO:
FROM:
DATE:
May 8, 2001
On March 13, 2001, the Board of County Commissioners approved Resolution 01-75 which
adopted the St. Lucie County Housing Assistance Plan for fiscal years 2001/2002, 2002/2003 and
2003/2004 for the State Housing Initiative Partnership program.
On April 24, 2001, the Board of County Commissioners approved the first group of 5 year
deferred mortgage satisfactions under the St. Lucie County SHIP program. Since the SLC SHIP
program is in its fifth year, these satisfaction:"will be occurring on an on going basis. To expedite
this process, staff is requesting:
(1) that the County Administrator be authorized to execute these satisfactions; and further,
(2) that the Board approve the language clarification requested by the funding authority as
stated in accordance with Section 420.9072, Florida Statutes, that the County has found
that 5% of the local housing distribution plus 5% of program income is insufficient to
adequately pay the cost of administering the program.
,/
, .
'-'
""""
RESOLUTION NO. 01-96
A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF ST. LUCIE
COUNTY, FLORIDA, AMENDING RESOLUTION NO. 01-75 TO AMEND THE LOCAL
HOUSING ASSISTANCE PLAN FOR ST LUCIE COUNTY, AS REQUIRED BY THE
FLORIDA STATE HOUSING INITIATIVES PARTNERSHIP (SHIP) PROGRAM.
WHEREAS, on June 15,1993, this Board adopted Ordinance No. 93-017, which established Chapter 1-10.5, Article
IV, State Housing Initiatives Partnership of St. Lucie County (SHIP-SLC), of the St. Lucie County Code of Ordinances and
Compiled Laws; and,
WHEREAS, on November 14, 2000, this Board adopted Resolution No. 00-269 which provided for the adoption of the
amended local housing assistance plan for St. Lucie County, as required by the Florida State Housing Initiatives Partnership
(SHIP) Program; and,
WHEREAS, on March13, 2001, this Board adopted Resolution No. 01-75 which provided for the adoption of the
amended local housing assistance plan for St. Lucie County, as required by the Florida State Housing Initiatives Partnership
(SHIP) Program; and,
WHEREAS, in accordance with Ordinance No. 93-017, as amended, and the State Housing Initiatives Partnership
Act, Section 420.907, Florida Statutes, this Board must approve, by resolution, any amendment to the Local Housing Assistance
Plan which delineates affordable housing strategies and identifies the average and maximum purchase prices for eligible
property; and,
WHEREAS, this Board is required to adopt the new Local Housing Assistance Plan for St. Lucie County for State
of Florida fiscal years 2001-2002, 2002-2003, 2003-2004; and,
WHEREAS, the County may move funds between strategies as necessary to maintain compliance with State
requirements and/or meet specific community needs; and,
WHEREAS, in order to expedite the closing process for approval of SHIP closing cost and down payment assistance
mortgages, this Board has determined it is appropriate to increase the SHIP program signing authority for the Community
Services Director, flk/a Human Services Manager, up to and including Twenty Five Thousand and no/100 Dollars ($25,000.);
and,
WHEREAS, in accordance with Section 420.9072, Florida Statutes, the County has found that 5% of the local housing
distribution plus 5% of Program Income is insufficient to adequately pay the cost of administering the Program: and,
WHEREAS, in order to expedite the process of filing the Satisfaction of Mortgage, this Board has determined it is
appropriate to authorize the County Administrator to execute the Satisfaction of Mortgage.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of St. Lucie County, Florida:
A. Resolution No. 01-75 is hereby amended by amending the Local Housing Assistance Plan for St. Lucie County,
incorporated herein by reference, for State of Florida fiscal years 2001-2002,2002-2003,2003-2004, to add
the following provisions:
1. The County Administrator is authorized to execute the Satisfaction of Mortgage for each satisfied SHIP
second mortgage.
;/
"" ..
'-
....,.¡
After motion and second the vote on this resolution was as follows:
Chairman Frannie Hutchinson
Vice Chairman Doug Coward
Commissioner Cliff Barnes
Commissioner Paula Lewis
Commissioner John D. Bruhn
xxx
XXX
XXX
XXX
XXX
PASSED AND DULY ADOPTED this 8th day of May, 2001.
ATTEST:
Deputy Clerk
BOARD OF COUNTY COMMISSIONERS
ST. LUCIE COUNTY, FLORIDA
BY:
Chairman
APPROVED AS TO FORM AND
CORRECTNESS:
County Attorney
,
).--'
f
'-
....,¡
Agenda Request
Item Number
Date:
C9
May 8, 2001
Consent
Regular
Public Hearing
Leg. [ ]
[xl
[ ]
[ ]
Quasi-JD [
To: Board of County Commissioners
Submitted By: Community Development
SUBJECT: Request to approve Budget Amendment 01-146, and· mend equipment r quests EQ-
01-038, EQ-01-041, EQ-01-042, EQ-01-043, and EQ-01-148
BACKGROUND: Attached is a copy of Budget Amendment 01-146. This budget amendment provides
for amending equipment requests EQ-01-038, EQ-01-041, EQ-01-042, EQ-01-043,
and EQ-01-047. These equipment requests, originally approved as part of the FY-
00101 budget process, need to be revised to account for cost changes between the
time they were estimated in March 2000, to what we are actually being quoted as the
final price for this equipment. The total amount of funds to be transferred is $705.
This transfer does not result in any overall increase in the Department budget. This
transfer does not involve the use of any contingency funding.
FUNDS AVAILABLE: From:
102-1520-546000-100
102-15101-551501-100
611-5210-531000-500
Equipment Maintenance - Office
Office Supplies - Computers
Professional Services
$255
$100
$350
To:
102-1520-564000-100
102-15101-564000-100
611-5210-564000-500
Machinery & Equipment
Machinery & Equipment
Machinery & Equipment
$255
$100
$350
PREVIOUS ACTION:
RECOMMENDATION:
Staff recommends that the Board approve budget amendment 01-146 and amend
equipment requests EQ-Ol-038, EQ-Ol-041, EQ-01-042, EQ-01-043, and EQ-01-147.
COMMISSION ACTION:
[i] APPROVED D DENIED
D OTHER
County Attorney
Originating Depl.:
Finance:
Coordination! Signatures
Mgl. & Budget: ~
Other:
Purchasing: i-
Other:
¿¿-:-
/
(AGEND552)
I~AY .4 2001
II"
'-
""""
COMMISSION REVIEW: May 8, 2001
MEMORANDUM
COMMUNITY DEVELOPMENT DEPARTMENT
TO:
Board of County Commissioners
FROM:
Dennis Murphy, Asst. Community Development Director
DATE:
May 2, 2001
SUBJECT:
Request to approve Budget Amendment 01-146, and amend equipment requests
EQ-01-038, EQ-01-041, EQ-01-042, EQ-01-043, and EQ-01-047.
Attached is a copy of Budget Amendment 01-146. This budget amendment provides for amending
equipment requests EQ-01-038, EQ-01-041, EQ-Q1-042, EQ-01-043, and EQ-01-047. These equipment
requests, originally approved as part of the FY-00/01 budget process, need to be revised to account for cost
changes between the time they were estimated in March 2000, to what we are actually being quoted as the
final price for this equipment. The total amount of funds to be transferred is $705. This transfer does not
result in any overall increase in the Department budget. This transfer does not involve the use of any
contingency funding.
Staff recommends that the Board approve budget amendment 01-146.
If you have questions, please let me know.
~
ICP
munity Development
.
County Adminlllratar
County Attamey
Management & Budget DirBCtor
Purcltaaing Director
,
'-'
..,,¡
BUDGET AMENDMENT REQUEST FORM
REQUESTING DEPARTMENT:
PREPARED DATE:
AGENDA DATE:
Community Development
05/02/01
05/08/01
TO: 102-1520-564000-100 Machine $255
102-15101-564000-100 Machine $100
611-5210-564000-500 Machine $350
FROM: 1 02-1520-546000-1 00 E ui men! Maintenance - Office $255
102-15101-551501-100 $100
611-5210-531000-500 Professional Services $350
REASON FOR BUDGET AMENDMENT:
CONTINGENCY BALANCE: n/a
THIS AMENDMENT: n/a
REMAINING BALANCE: n/a
DEPARTMENT APPROVAL:
OMB APPROVAL:
BUDGET AMENDMENT #:
01-146
DOCUMENT # & INPUT BY:
'"
en
c:
W,...
zo
o~
006
~o
:E~
:Ec:
O<t
Ow
»
I-...J
z<t
::JO
oen
o¡¡:
LL.c:
00
eLL.
C:I-
<ten
OW
m::J
>0
I-w
zC:
::JI-
OZ
OW
w:E
_D-
o-
::J::J
...Jo
W
¡...:
en
CI)
~.
-- ...
ë
w
c
Z
w
:E
:E
o
u
w
a:
·
'.
.
..::
c
w.....
ê) ';
a:
0-
0-
«
.'
::
:;
I,'
I
.....
rE
:¿
Q
a
¡¡j
::,;:
LU
o
:>-
.....
~
~
8
:2: I .
a
¡::
"{ ,:
Q:
¡....:
~..
~:
:¿
~.
¡:..:
Z
w
:E
I-
a:
«
0-
~
·
ž .,
o
00'
>.
15
I.,
"r-
@
CI)
s:
LU '.
a:
~
.....
rE
:¿
L¡j
(,)
~
LU
0:'
¡:..:
Z
w
:E
~ ';
...J
0-
W
a:
~
w
ZI·"
-I·'
1"-
I
I~
I"
I:'
.
..
;:"i
~,
¡g .'.
CI) lð ......
a: '1::1 ....
~ Q,)
::J .~ ,),
~ ~kÞ
(,) ~
Q ;¡
~
~ $.,,:
¡:..:
Z
:;:) .
o
~"""
I¡j..
(:
g..
m
·
·
¡:..:
Z
w
:E
0-
:;:)
o
W
¡~
..
,
....
.¡g 0
t: () !:
Q::' ..'!1
...,J E ~ ~
cd ~ Õ !: 'S
o 'ëiJ t: ê g-
;:§.gÖ()
() :;:, '1::1 £
C:~C:~CI)
S () Q () '-
.e§-'1::I()CJ)
'1::1~.!!1@~
£t:~Q.-6'_:
'§ <a 0 @ ~ œ
§¡e.£Je:ß
:@ ~ ~ ~ Q. 2
ð()§~~~
t:£~~E'1::I
.QQ5<a()~~
~ ~ ê .~ § ~
.~.a~'~õ..~
.S; '1::1 ~ :ß .IJ <-
.§ ~ Q..t: .è- §
'« () (,) -§ § '1::1
() () Q <a 0 t:
£:t:O)E()<a
.S; ê :§ () ~ '1::1
"w.22-S~C1>
~.IJ)(....""'s;
.J!!(,)()O~;!¡
::JQ()¡t:@
~o:ir:;¡:;()::J_lJ
() ¡¡¡. .¡: -
oc:~ .~:;::
§-()()Q,)~S:
~:ßt::E£ ~
1J¡:;<a~~,g
~ ·o.eEt:
ë;'() Q.() 0
.g> ,g ~ .§ E ~
."èìi_- ,Q.t: t: 0 '1::1 ()
() ¡..;. Q,) -
~~E '1j~
-, Q. . t: ?
S~o~~5
.e~~:¡¡:><:()
() <a () E()O)
() EO ~-g:§
.!!1 E .è-·S <a .g¡
¡¡} ::J .- 0' ....
o.;;;1J§@f:¡Q,)
£J¡E-êijiìi
1J'¡:"'~o~
:: l) ê5 F: -e .s;
1J~(,)::J()'t;
()<a()()£:
g. .¡: ~ 0 .S;
!J) () .... õ E Q,)
~ !.S; Q5 ;: ¡:;
t: IJ :2: "_ Q
(). '«~t:.
Eü...,J "'.¡: ~
.9- Q () 0 "'" .J!!
::Jc.¡:-;::S:::J
0' .... .... 1;.' ~
() .... t: 0 '"
'1::1 >( 0 E IJ 0
~(!)'1::IQ~o
t: ><:L¡j ~ E :ijo :ir:;
() <a- Q
E...,J- t:-e t:
<a a. Q..() Q,) 0)
IJ ¡:: g>.Q £ .S;
'- a. '- :t: 0 ~
¡:;alJ1;JE.o
.
Z
o
¡::
«
u
ü:
¡::
en
~
..""
'1::1
()
IJ
'S
@ 1::
() ::J
£ 8 ()
() £:
0) <a ....
~<-.e
<a 8:-
'" - ()
'" ìi) .g>
c' .... ::J
2 .J!! .Q
~ ::J 0)
È' ~ ·s
.... 0 1§
c: () ()
::J () Q.
o .c: 0
E -
<a E ~
Q5 .g ~
~.... 0
::J .S! Q,)
.Q ~ ¡:;
¡~1:i
.~ en en
o :§ ::.
-s e
~£J2:
() Q <a
._s IJ
£ '-
.S .9 (¡)
() () Q,)
IJ ._s ::J
<a 0-
~ <a ~
() .c: !:
·s ~ Q,)
¡¡¡ ~ .~ ~
10.... ~ ::J t:':"
.e '1::1 O'.s
~ ~ ~.~
'- ':> Q 'ö
15 e .~ <a
"- Q. :> (J)
Q.() ~:s
£J .Q IJ
.~ ~ :s ~
Ci5 Q) e
()~().c:
::J ¡:: § ....
O'::J '1::1
@ "" & ()
..... - c U)
t:<ac<a
() t: "t @
<- .Q (Q ()
C .'!:::: Ii) t:
.~ :g ~ '-
O'<aclJ
(þ Q) ,.... -
'1::1 IJIi) 0
Q .... t:
i¡:;~~
EO£Jt:
: ~ ?-o :~
'- c s;
£z(~â
'õ !: :g t:
Q,) O::J , .Q
IJ ........
o E c ~
e.<alò"èìi
5.. "d) ~ :ë:
().g>~~
¡:;.5~'«
c
c
c
~
....
c
....
Ii)
....
~
....
a:
w
m
:E
:;:)
Z
I-
Z
:;:)
o
u
u
~
·
,
·
·
~
....
c
@
*
o
w
a:
I-
Z
w
:E
0-
S
o
W
~
en
a:
w,..
zo
O~
ene
~o
:E~
:Ea:
0«
ow
»
J-..J
z«
::)0
oen
OJ¡:
u..a:
00
cu..
a:J-
«en
OW
CO::)
>0
J-W
za:
::)J-
OZ
OW
W:E
_c.
0-
::)::)
...10
W
~
en
c
w
c
z
w
:æ:
:¡¡
o
()
w
ex:
o
::=
I-
aJ
2[
o
ijj
:::;;
lU
Q
>-
I-
~
~
()
.:.:
z
w
:æ:
I-
ex:
«
c.
w
c
...J
~ ....
c: 0
III c:
E ~ ..!!!
<.g;~ §!
o èij õ t: ·S
§ .:5 c: ~ g-
~ ~ .g 8 ~
..... <IJ 'tJ ::::
g: g. ~ ~ .!!1
-J 'tJ 'tJ ~ CI)-
¡¡jC:@.!!!~
Q~~2-~~
::: <IJ 0 '" <IJ g¡
<IJ~e.~g:ß
~CI).g;~ìi(J
::J <IJ c: (t ..... ~
Q£::J~fß~
-£ Q¡ ~ ~ E 'tJ
.~ <IJ (t <IJ @ ~
E CI) I:: ::;:¡
1::0 ~ E -!!1 g Q!J.)(t
._ 0..:; _ '"
.~1JQ'-a.1.;;,
i!¡.g;1§g¡~€
:R 0.. ,I:: I:: 0
:ß1::~~::;:¡'tJ
.(J!J.) 'U 0 I::
'S:"'OIE(J(t
:¡¡ (t -s Q) e¡¡ 't:J
(J)-CI).~-£-£ e¡¡
_t)><......."-.s
~a.e¡¡0Q).ß1
'2: ::: e¡¡ 'tJ '2 ~
.c:<IJ¡t:Q)::Je¡¡
(J I:: r-- ~.c:' .Q
~<IJ 'I/)(J:::::
;¡,.:ß~Q)~'~
VJ ~ E -£ ::: II)
ë3 .1:::Q)~t5
e¡¡ c:- (t ::> 0 ~
-£.!;!5}EE:5
.S%~.§~~
~~~~~!!!
,g .g; E 'tJ ~
.ß1~~~~§
~~~~~(J
0...; '" e¡¡ E e¡¡ 01
~§Q.!g-g~
~ I/) ~ ::J tI! .!!1
,... 'tJ '2: tT I/) ~
VQ)::J@-e_
OI"5E.....tI!tI!
~I\Eä5°-6
I/):t::ol::;-e·s
"¡:;: tI! () ::J e¡¡ '6
e¡¡Q)e¡¡(J-£1::
... Q) .{;: ... 0 ._
õ ~.... Õ E e¡¡
~ _I/) ,S ... ::: ~
e¡¡()::=Q)e¡¡
~a.~Q)1::
Q.<::)-JE-£~
II) ..... Q) 0 :;;;; !!!
'" C\i .c: ..... :::.. ::J
o ..,. ... ~ ~
-<..c:o ¡¡,;:
.CI) 0 0 .,. <Ii 0
.:: ¡:: 'tJ q¡ -e (J
g¡~~E(t:::
::J r-- (t 0 e¡¡
tT~Q.I::-e I::
!J.) ~ ,Q) <IJ 01
,; gs .~ ~ -£ '~
~~~~~.Q
<::)
:5
~
,
......
<::)
......
Il)
......
~
......
ex:
w
m
:æ:
;:)
z
I-
Z
;:)
o
()
()
«
.
«
......
ó
,
......
<::)
@
:i¡;
o
w
ex:
I-
z
w
:æ:
c.
5
o
w
z
o
¡::
«
()
ü:
¡::
IJ
;:)
,
~
(/)
a:
W....
zo
O~
(/)0
~o
:æE~
:æEa:
O<c
Ow
»
~....I
z<c
::)0
O(/)
oii:
LLa:
00
eLL
a:~
<C(/)
OW
m::)
>0
~W
za:
::)~
OZ
OW
w:æE
_D..
0-
::)::)
....10
W
¡..:
(/)
~
)...
CD
I-
:::>
~
o
<:
ë
w
c
z
w
:E
:E
o
o
W
0::
ë
w
>
o
0::
a..
a..
c:(
I-
as
~
o
¡¡j
~
LI.J
Q
)...
I-
~
~
o
ü
~
s:
ffi
CJ)
-J
è3
~
~
u:¡
<5
¡:.:
z
w
:E
I-
0::
c:(
a..
w
c
ž
o
ëñ
:;
is
...,I
~
.¡¡¡ ~
~ !!! ~
CIJ .Q QJ
U ~ Q. c:
.~ .... ..... 0
QJ <u ~ <1
0) -s .~ 0)
~ ~ ~
v :t: .§ ~
§ Q Q U
"-- ~ 0 ·s
~Q¡-;;;QJ
c: -0 :::J .g
..Q ~ .~ a..
o ~ ê ~
c: QJ Q) ....
.!Q -0 Q-o
..... ~ -0 c:
:êo"3<U.,.:
oE~.91'-'
- ;:s;;..Q Q,)
Q QJ ..... <1 CI)
.!Q -S :ê i: ~
¡::: .Q .Q ~ ~
Q Q Ìii Q
c:: 0 .CI) c: Q)
.9 ~ ~ .!Q .Q
.~ [..~ ,....
::> 0 .....-
QE....::ê~
QJ :ê 0 >-.
gJE.QQ1::
"~ 1:: Q QJ I!!
~Q)Ìii¡:::Ìii
~~~ S:
- :::J .S; c:: ~
~ CI) 9:. .9 ~
.¡: Q) '-' ......
:¡, ::o:::J...
13<uC) ~
~.c:~~;;::
-.... Õ C? ~ Q
~~~:g.~
Q):gc:C)~
£ -0 .~~ Q
.S; Q¡ ~ CIS ~
.....:t::........Q
Q).Qn CIS:;:;
:t:: Q:t""C:
OQ .!2!:!
Q.,c:CIS.Q",
C)¡";:QQ~
C) .QQ;:'
æ Q :!;1 ~ ~
a.: ..... :::J ;:. "S
::r: ..... ~. <..
Q¡s.....~~
:§ ~ :ê 1:: 7ii
.CI) 1:: 0 ~ §
~OQ..5:;:;
Q8:1::o:g
.c: :::J Q Q) cr
....O)E.c:'
Q.....QJ~ .
UQJu.....è-
..!!1Q¡CIS~C:
QC:-;::: rn
¡D.QitCl)!o;
- 0 It.;. Q æ
.9c:~&S:
"!Q .!Q ¡..;: 0 ~
t¡ "2 <ri ::J .~
~ <u 0) Q Q)
0-.... QJ "0 0)
~ ~ g "~ .~
CJ) - t.:;;;. =: CJ)
'- c: Q 't '
¡::: 8 .9 ~ §
C)
8
~
6
fij
......
~
......
4
~
0::
W
m
:E
::I
Z
I-
Z
::I
o
o
o
c:(
.
.
C\
9
....
C)
ß
*
o
W
0::
I-
Z
w
:E
Q.
S
o
w
z
o
¡::
<I:
o
¡¡:
¡::
en
::I
...,
~
C/)
0:
w...
zo
o~
We
C/)o
~~
:Eo:
0<
Ow
»
1--'
z<
::»0
0C/)
ou:::
LLo:
00
eLL
0:1-
<(/)
OW
m::»
~ß
zo:
::»1-
OZ
OW
w:E
_c..
0-
::»::»
-,0
w
...:
C/)
o
<::
~
o
)..
Q)
I-
:::>
~
ë
w
C
z
w
:¡:
:¡:
o
o
w
a:
ë
w
>
o
a:
a.
a.
<
I-
~
&
-l
~
1.U
C
)..
I-
~
~
Ü
¡:.;
z
w
::E
....
a:
<
a.
w
(f)
a:
~
~
o
Ü
Q.
~
æ
C
-
~
C(j
~
lC'j
"
Q)
.S!!
::.
~
C)
C)
(Q
~
¡:.;
z
w
::E
a.
::::>
o
w
...,¡
....
.¡g 0 ~
I::!p ê: CIJ
cu - ~!IJ
E CIJ '"
-l .<::: §! CIJ
¡¡j ~ Õ 1: "5 _tJ)
Qìiil::~tTü
I:: 0 '-' Q) a...
:s: 0 " ::3 Q) Q)
Q):¡:;-o(,)::SfJ)
~ ~ ~ '¡ij .S!! ~
~ g.." 8 (1)' ¡...:
:S,,~.!!!~
51::~5}-5~
-E~8.28~
:SQ)"'èeQ)
.~~~C\~~
I:: ::3!2 I:: I::
ol!IJQ)~~
:¡;¡ .... ~ 0 !IJ "2
:;; Q¡ .- Q) '" ~
âQ)1I)1::8~
II)EE'S!!e5}
8.9.g:!:::0.'"
.~ " .!!! :g ,II) <-
Q) ~ 0..S: Ò §
(f)Q)Ü'<:::S:_
a... ~ ~ u
~~O)E8~
~ ~.§ Q)~'@
"oJ "'J .~ :5 --
~~ ~Q~~
Cì:5a...Q)"I::~~
-:s:¡::Q)::3Q),E¡
t!JQ) Q) '.Q~
~ 0.'<::: _ ....,
Q) - ~ tr.I .sa :-;::: tr.I
:SQ)Q¡Q)'<:::S:I::
.S: :g .§ :S~ ~ ~o ~
~ ¡:: ~ _ á'."!::: CIJ
,E¡,""ij}e E §~
::3I::CEQ.Q)Eo
Q. .0 E 0
~ .'§. ~ .; " ~ 0
Ot3E¡";;~::3~
00. g¡ 9.. . I:: o.E ~
_ "0 Q ~ <tI Q ......
Ìíè~¡¡¡~o~
~ClJcQ)E"O)"
..... E .~_ I:: .S: I::
.è:' E ò ::3 CIJ .~ ~
.;::; ::3 '2: tT II) à'í .S:
.S!! II) ::3 ~ 1:) _ I::
à'í "2 E 1:: Ci; CIJ I::
Q)..èE-O::3CIJ
Q)(.)o~-e~~
~:§('):5 Q)'6.<n
....ClJQ)O:S -
'- .<:::'-0.S:1::
::3 Q) .... ::J E Q) Q)
-EQ)I::0 ,e:E
Q)~'-"":S:¡"':'t:::
~~~~~I!?~
ì1a...-l :SQ)C
~C)l.9~~Q)
o-....è Q.E~
.......,.-.c:o ___
.S!!~oE.¡doO
.... '-' " Q) '-' (,,) "t:
g¡~8E~:S:CIJ
5--l.!!!I::-e¡g:;
~a...:;;'!!!Q)O)CIJ
II) ¡:: I:: .~ :S .S: "
'- a... .- :r:: 0 Š' ~
¡::O~¡¡¡E.Q::J
C)
C)
C)
~
6
~
-
~
-
iè
w
ID
:¡:
::::>
z
....
z
::::>
o
o
o
ct
C')
9
-
o
Ó
1.U
*
o
w
a:
....
z
w
::E
a.
:5
o
w
-~ .
",
.
en
a:
w...
zo
O~
ëñ6
~o
:E~
:Ea:
0«
ow
»
......J
z«
::10
oen
oi!
u.a:
00
cu.
a:....
«en
OW
ca::l
>0
....w
za:
::I....
OZ
UW
w:E
-Q.
u-
::1::1
..Jo
w
...:
en
CI)
~
01
LI.II
CI)
s::
LI.I
ex:
I
""
I,
I"
c
W
C
Z
W
:æ
:æ
o
()
W
a:
1
ël~:
~I
01 ,;
g:
Q.
«
I-
~
~
o
¡¡j
:::,;
lJ.J
Q
>-
I-
~
::::>
~
o
(,)
I-
~ \
~:
Q.
01
..,J
~
lJ.J
Q
I-
CI)
5,
:2
1
,
¡:.:
Z
W
:æ
I-
a:
«
Q.
W
C
Z
o
(ñ'
:>
i5
I
I ,-.
,
..
.'
I-
~
~
(,)
:s
fu
CI:
I·
I
I
¡:.:I
z.
WI
:æl
~I
:S I
Q.
WI
a: I
~
!fJ;:
I:
.
I
.
;
",
"
-..i;
....
~
gg
ì:ð}
'0'
()
.~
:>
()
~I
y) a
~ ~I.·
Cl g
I I,
¡:.:
Z
:J
o
:¡¡:
c:(
I-
W
c¡
C
:J
m
¡:.:
Z
W
:æ
Q.
5
o
W
1<
~
it
¡::
Cl
o
..,J
¡¡j
Q
S:
()
c:
S
.E
-£
'§
c:
.9
.\!1
:>
Õ
c:
.$'1
1ji
't:;
:ë:
~
'«
()
-£
.S:
I!!
.S:!
::J
~
o
o
0.. _<J)
~ ~
<J) S:
,gJ ()
(J) c:
·S æ ~
..... () ()
.\!1 ,t:: E
~ ¡..;: 1:::
S "2 ~
.E .£1 Q
~Q.-
"toJ ti c::
~ (I) Q)
5},gJ E
~ ~
.e è ()
ItS ::.
.\!1 E ()
~ E Q
::3 ~ :è
tr' '0 c:
~ () ::J
1: "¿3 ê
() :ê 0
E ItS (,)
.9. () ()
5- :¡¡ £
() '-- .S:
'0 .<J) <:
:¡¡ (,) '«
.s: Cl ..,J
~ ~ ()
.~ 't-.. :S
t: ð :5
'O~S:~
~ E ()
~()E;:~
..... :;::; ()
.g> 1: $: ~
(jj () E.....
..Q <3 0
ig ~ ~ 0
c: CI] Q¡ s:
ItS !!J 0 ()
E--ec:
-§~()(J)
..... '£ .S:
(¡jOo~
c: c: E ~
,g .g -c: ~
~ '0 () 0
(l) c:: t:: ê:
§-<1] ::J.9!
'0 '0 0 ~
c:: ~ 7ó 'S
1tS~~tr'
~ 0 .!!! ~
() e- 5} -£
5},gJ"'<J)
() c: 0 '-
-c: ::3 - CI]-
:: IJ è ~
Q) ;;:;¡ ca ::J
() "U CI] '0 .
E CI] CI] () è
E SI1 0 <1]
.e "" (¡) e CI]
'O~c:o..~
~.!!!.~1:~
()o..;!::()c:
() (,) CI] E :!::
C:Cl()~'O
~ (J)'S:::3 ()
1tS.s:"¿3oo
..... (tJ e .!2
.~ E 0.. 5}
() () .CI] '"
()-C:~~
¡C: .:::: c: c:
.- 0 ::3 0
'08'0
() () 16
() -£ '0
5} .... ()
() ~ .c:
£: c:: .§
() ::3 ~
::. -c:' ()
e 0 ..Q
Q.. ¡: :;;;
.S S: s:
~ è I!!
o 0
. E ;!::
.!!! () c:
c: E 0
() '0 E
~ ~ ~
's c: ::J
tr' ItS 0..
IJ §? E
- () 0
_ .... 0
c: '-'c: (J)
ê ItS .C:
a ~ ~
.... '" ><
::3 ItS ()
o 0 -
Q¡ -e gJ
~. () :0
~ -c: S:
E õ 'õ
.e E .S:
Z
o
¡::
«
()
u::
¡::
en
:J
,
....,
'0
()
.~
~
() CI] Q¡
-£ ()
(J)'~ ~
.S: ~ ::3
-"C () ..Q
<1] CI] (J)
E (¡j .S:
o § ~
tl) ._ ()
~ ¡g §-
::..~
~ ~ ~
::3 () ~
o -£ 0
~ E ,ê
....... e r-
() ""
~....-o
::3 ~ ~
..Q <I)
'0 c: e
() ~ !*
I\i ... .....
'\:: () ItS
o :§ .~
-£
::J .e ~
ItS () ::J
() :§ tr'
-£ ~
c: .e
'- 1:
() () ()
~ :§ E .....:
e: <1] .9. ¡¡¡
o-c:::3E
.S: ~ g- 't:;
c:e'O::3
a¡-£ ()'õ'
.È '0 .~ a¡
() oS! e: .~
"'0 '-' ~
.- .s; .!e .c:
~ e -£ ~
'" 0.. () ~
o..()oe
.9 ~ c: ~
--;; 0:::-
.~ 'S: ~ '0
... :so a ()
<I) a <I)
()igaa¡
5-c:~e:
e: ~ ~ 0
.S:
-Ci3c
53 c:: ~ ~
E ·9 .... -
.g. '5 ç\¡ 0
5 '1:J <::) c::
0- C13 ,..... ::::
() () .e S:
~ ~ a .:5
'2 t: a .~
() ~ r:::
~ g ~, ......
.CI] -.:- a ~
-£ g.... E
........~Q..o
o § ~
CD 0 ,.... ~
~ E ~ ()
e-a¡ Q
::J ....... 1: .....
0.. () ::3 .~
() ~ 0 ::J
t: .5 M ~
()
-£
....
.E
I
a
a
....
6
a
~
tl)
,
a
....
~
....
....
<0
I
4
~
a:
W
m
:¡¡:
:J
Z
I-
Z
:J
o
()
()
--=:£
.
.
r---..
9
....
a
@
#
o
W
a:
I-
Z
W
:æ
Q.
5
o
W
"
---
To:
Submitted By:
SUBJECT:
BACKGROUND:
FUNDS AVAilABLE:
PREVIOUS ACTION:
RECOMMENDATION:
'r
'wi
Agenda Request
Item Number t..... IDA
Date: May 8, 2001
Consent
Regular
Public Hearing
Le [ ]
[ x ]
[ ]
[ ]
Quasi-JD [
Board of County Commissioners
County Administrator
istrator
By
Port of Fort Pierce: Harbormaster Bond for Walter W. Ergle, Jr.
Governor Bush has recently appointed Walter W. Ergle, Jr., to serve as Harbormaster
for the Port of Fort Pierce. Mr. Ergle currently serves as the Pilot for the Port of Ft.
Pierce.
Section 313.01, Florida Statutes allows the Governor to appoint a Harbormaster for a
term of two years. In those counties having a population of more than 300,000,
according to the last official census, or in counties or municipalities where port
authorities have been created by special act or ordinance, the office and position of
harbormaster as provided in chapter 313 and chapter 314, Florida statutes has been
abolished Since St. Lucie County meets neither of these standards, the Governor is
empowered to make this appointment.
As part of the appointment process, Section 313.02, Florida Statutes, requires Mr.
Ergle to post a bond to the Governor in the amount of five hundred and 00/100 dollars
($500.00). This Bond must be approved by the Board of County Commissioners in
the county in which the port is located and the Department of Banking and Finance.
Staff recommends the Board approve the bond from Walter W. Ergle, Jr., to
guarantee his performance as Harbormaster for the Port of Fort Pierce.
COMMISSION ACTION:
W APPROVED D DENIED
D OTHER
County Attorney
Originating Dept.:
Finance:
J;Y
Coordination! Signatures
Mgt. & Budget:
Other:
Purchasing:
Other:
(AGEND551)
"
.....,,¡
COMMISSION REVIEW: May 8, 2001
MEMORANDUM
OFFICE OF COUNTY ADMINISTRATOR
FROM:
Douglas Anderson
TO:
Board of County C
DATE:
May 2, 2001
SUBJECT:
Port of Fort Pierce: Harbormaster Bond for Walter W. Ergle, Jr.
Governor Bush has recently appointed Walter W. Ergle, Jr., to serve as Harbormaster for the Port of Fort
Pierce. Mr. Ergle currently serves as the Pilot for the Port of FI. Pierce.
Section 313.01, Florida Statutes allows the Governor to appoint a Harbormaster for a term of two years.
In those counties having a population of more than 300,000, according to the last official census, or in
counties or municipalities where port authorities have been created by special act or ordinance, the office
and position of Harbormaster as provided in chapter 313 and chapter 314, Florida Statutes has been
abolished Since SI. Lucie County meets neither of these standards, the Governor is empowered to make
this appointment.
As part of the appointment process, Section 313.02, Florida Statutes, requires Mr. Ergle to post a bond to
the Governor in the amount of five hundred and 00/100 dollars ($500.00). This Bond must be approved by
the Board of County Commissioners in the county in which the port is located and the Department of
Banking and Finance.
The duties of the Harbormaster involve having the master of any vessel arriving at the port, that intends to
use the wharfarge at the port, to report to the Harbormaster for a station, or for a berth at the wharves, and
the Harbormaster shall regulate and station or assign berths at the wharves to said vessel. The
Harbormaster is empowered to remove or cause to be removed, from time to time, all vessels not employed
in receiving or discharging their cargos to make room for such others as required to be more immediately
accommodating for the purpose of receiving and discharging their cargo, and to facilitate their dispatch. The
Harbormasters shall be present at all times, either in person or by deputy, to facilitate by stationing or
assigning berths at the wharves to vessels arriving at the port, and to facilitate them in discharging and
receiving their cargo and to prevent confusion and delay. Also, the Harbormasters shall have full and
absolute power to determine how far and in what instance it is the duty of masters, and others having charge
of vessels, to accommodate each other in their respective situations.
Staff recommends the Board approve the bond from Walter W. Ergle, Jr., to guarantee his performance as
Harbormaster for the Port of Fort Pierce.
If you have any questions, please let us know.
SUBMITTED:
Douglas M. Anderson
County Administrator
DMAJdjm
pcrt1(h)
cc: County Attorney
Public Works Director
Community Deveklpmenl Direclor
,,;',
\w
NO. 462 P.2
~.3Ø.20Øl 1l:03RM
, .
....",
J I~II UllSII
(;nVI:ltNOlt OF TilE STATE Of' FI.()/l!I>i\
April 4, 2001
Mr. Walter W. Ergle, Jr.
7100 Georges Road
Fort Pierce, Florida 34951
Dear Mr. Ergle:
Based upon your qualifications and interest in serving the people
at Florida, I am pleased to appoint you as Harbor Master for Port
of Fort Þierce, Saint Lucie County.
You will soon receive your qualifying papers from the Department
of State. These papers, excluding Form 1, must be filed with the
Secretary of State, Room 1802, The Capitol, Tallahassee, Florida
32399. -
Section 112.3145, Florida Statutes, requires you to file financial
disclosure Form 1 with the Supervisor of Elections in the oounty
in which you permanently reside. Any inquiries may be directed to
the Appointments Office at 850/466-2183.
All qualifying papers and financial disclosure ferms mUst be filed
within 30 days of your appointment.
Congratulations, and! wish you the best in your new endeavor.
JB/omk
""
;'i,'
.,.1.'.;
","":, ~
:'- ~tf' ~
",
,
" : ~ ":'.
':"'{,,.:' !;r:
, .
;~,'.. ",I',
-"!~"':. ;i-,·~J.:.. ...:.t;04~~
'. . I ~ .. J!.. .. .
, .'
-"""~':-';I1iùI,1" ,;
:-0. ·ut.. J(,. ";,,,rllr ',f.
~.~ . 1---1,
.' ': ~::-:-;;".:..- -~-?-f:"'~-;~F:~' :';'Y;~çr'T-1'n~-'
,
.....:. ..
,.'
"
H....K.,:jIeJ.<::IeJIeJJ. J.l:I:J<:::H¡'¡
,uit.:&.; III tile .~'\"H1111)'
()01c-err(llIlqnatiomal H.CI:U.illll:o>
... UivÎÂanarrncéUon, ~
iii' ¡'1M o('\JtponI\io...
1J1"¡"""~'t:.11.",1^"1I,...
I>lris/<... nl'I1Í1"'ñcal a.,.'oUt«,
f)i,-iJiM øfl.ihftny -'ßI,I h,('on111.Iio" Service«
'>;"ifli«p ørttcawn¡
Ui\'IJft'" (1r ^dnlÌailtnuiva 5crvicC'~
DIVISION OF ELECTIONS
MEMORANDUM
. Ii\) . 4b¿·It~ i'îJ"' . 1 ,Ü:Ãiiil'irn'
5'"to O"".,¡ ofOduçol!Gu
Trustces of lilt' 1... ~ hflJ'l'Owmcnt 11111( fJurld
~!1"'il""«a. CO""",,,¡..
r'1ariCfllamlo,,4 WAter ^c(JudfCll'køy Camm¡"rOII
Silll 110>111
Oiyioia. a(Oond FIoo'lCf11ll
D<ponmanlor Lnw Eorfnrcen..."
DcpartulCul orlTillhw'Ir s..r\"'Y find Motor VullH;la
'''-l''''"",.'arv"",,,,,,, AIT.I..
~ ,"A\ ~¢~.
Ie>. \Y\ ~
r- I ~(,,\\
~'
)--~~
FLORIDA DEPARTMENT OF STATE
Katherine Harris
Secretary of State
To: Mr. Walter W. Ergle, Jr.
7100 Georges Road
Fort Pierce, FL 34951
From: Commission Issuance Section
D~~: April 10.2001
We have received notification of your appointment as Harbor Master for the Port of Fort Pierce,
Saint Lucie COUIlty.
If you accept this office, please complete the documents necessary for issuance of your
commission or certificate and return to tIùs office the following items:
- Oath of Office and Letter of Acceptance (Form DS-DE 56)
- Bond in the amount of $500 for a tenn ending 4/4103 approved by the County
Commissioner$ and tile Sccretaty of State
- FinlUlcial Disclosure Fonn 1 (filed with the local Supervisor dfElections)
- Questionnaire (Originally Executed)was received but had beeù executed over 6
months ago. Please update this infonnation and return the origmal questionaire to us.
Please note that Scction 114.01 (l)(h), Florida Statutes, provides that a vacancy shall Occur if
you fail to qualify within 30 days of tile beginning date of the term of office indicated.
According to the Letter of Appointment ftom the Governor, your tcnn of office begins on April
5,2001.
If you have any questions, Or if we may be of assistance to you, pleaSe contact this office at
(850) 413-9736.
Enclosures
~~~~b
I gø-t.l (0
The Capito] · Roonl1802 . TaJla!Ja.¡see., Florida 32399-0250 . (850) 413-9736 or (850) 413.9743
FAX: (8S0) 414-6448 . WWW Addre$~: http://www.dos.state.f1.us . B-Mail: eleclion@mail.doutate.f1.us
.~~. . ',¡.;~~ ~ ~rl
- , '1:
::i
1""1 .
"l.. :,,',1.,'.,
': '(.'
,:.-1,-,
Ma~
, ~
02 01 11:27a
Carol~n Greenou~h
'-" .
State of Florida
Seuetary of State
Di\1tiq of ElectloJl.
R.aom I iOZ, 1be OIpitol
T"I.~.~ PJoåda 32'Ø-02SO
Pubnc Official Bond
1-321-95"'-3325
'...I
p. 1
Bond No POB30l0042-00
County of St. Lucie
KNOW ALI..MRN'BYTHBSBPR.8SENTs. That we, Walter W. Ergle,
~~~
asPrinc:ipa1.-nd Fidelity & Deposit Company at Maryland
IS SJJniIIy.. 2ft: bound UII.tio" GoYGI!I« oftbe ~ ofF1oricM. __ his :successors irI a1fiee. in the
sum oU 500. 00 nvn.n. we bcIroby búid 0IIt'Ielws 8Dd each of ourhcíB.
exewtocs. ~ ~ -AIIipa,jaiatbr _--»,y.
Jr.
nŒ CONDlTtON OF THIS OBLIGAn<>N IS SUCH. TIIIf,. wheIeu, sOlÎd cdJÏlõÏa1
~ele." _ appeiJIW _ Harbor Mo.sterPort Ft. ,Pierce to hold this o1riœ
(}Ww -rt:!rJicd
foratambag;itmft>.. 5-1-01 andfIIIItiDg 4~4-03 ~dumi1
hist1J.. S1.U:ce9Sø{ is. qlWüied aacurdiDs to Ibe CaastitutiI1l.l md IAws of !he SIIIb! of Flaridt.
NOW, T.HE:R.1!FOB.E.U~~ü.1tAida1bIl1 t-1\nw!be \tIIri~ ot~ofJiç.
as pxovided 'by law, tb¡¡o obligaüL!II is "oid.
. Sill*! 0IQcI Sc:a1c:d dûI
X íAJ4~¿J'§¡f;ßL-
~"l!,IWIf Wal r E:.I;gle, J:r.
"'01 ~~ -" j¡6 <DOL
Fidelity
POBox 1227, ~altimore,MD21203
. ~~Md.~~
..
( -,'
'-.. ...
{SMl.} .
-.
, -.
Iht~ is ~y~ Ibi5
Sô__,.
ÞJ/ .1
,~
~tilby:
J btHut._ (IIHZJlltO
"
'-
""'"
ST. LUCIE COUNTY
EROSION DISTRICT
BOARD OF COMMISSIONERS
John D. Bruhn
District 1
Doug Coward
District 2
Paula A. Lewis
District 3
Frannie Hutchinson
District 4
Cliff·Barnes
District 5
AGENDA
May 8, 2001
1. MINUTES
Approve the minutes of the meeting held April 24,2001. OfproJ¿d1
2. GENERAl PUBLIC COMMENT
CONSENT AGENDA
1.
WARRANTS LISTS
Approve Warrants List No. 30 and ~
2.
PUBLIC WORKS
~
A Engineering / Contract Amendment - Consider staff recommendation to
approve Amendment NO.1 to Work Authorization NO.2 (C-00-12-181) with
Taylor Engineering, Inc. and authorize the Chairman to execute the
amendment.
B.
Engineering / South County Post-Storm Beach Condition Study - Consider
staff recommendation to approve Project Agreement (01SLl) with FDEP,
Budget Resolution No. 01-03, Work Authorization No. 1 with Coastal
Planning & Engineering, Inc. and authorize the Chairman to s,ign all
documents.
4
10fo 0 n ~c\T[lnsR-rl æYLMJo~CVô
NOTICE: All proceedings before this Board are electronically recorded. Any person who decides to appeal any action taken by the Board
at these meetings will need a record of the proceedings and for such purpose may need to ensure that a verbatim record of the proceedings
is made. Upon the request of any party to the proceedings, individuals testifying during a hearing will be sworn in. Any party to the
proceedings will be granted an opportunity to cross-examine any individual testifying during a hearing upon request. Anyone with a
disability requiring accommodation to attend this meeting should contact the St. Lucie County Community Services Manager at (561) 462-
1777 or TDD (561) 462-1428 at least forty-eight(48) hours prior to the meeting.
,
....
,..,
EROSION DISTRICT
ST. LUCIE COUNTY, FLORIDA
REGULAR MEETING
Date: April 24, 2001
Tape: 2
Convened: 11:16 a.m.
Adjourned: 11: 16 a.m.
Commissioners Present: Chairman, Cliff Bames, Frannie Hutchinson, Doug Coward, John D.
Bruhn, Paula A. Lewis
Others Present: Doug Anderson, County Administrator, Robert Bradshaw, Asst. County
Administrator, Dan McIntyre, County Attorney, Julia Schewchuk, Community Development
Director, Bill B1azak, Utilities Director, Deputy Nickel, A. Millie Delgado, Deputy Clerk
f
1. MINUTES (2-1579)
It was moved by Com. Bruhn, seconded by Com. Hutchinson, to approve the minutes of the
meeting held March 27,2001; and, upon roll call, motion carried unanimously.
2. GENERAL PUBLIC CO~NTS
,None
3. CONSENT AGENDA (2-1581)
It was moved by Com. Bruhn, seconded by Com. Lewis, to approve the Consent Agenda; and,
upon roll call, motion carried unanimously.
A. Engineering/Geotubes Contract- The District approved the Release of Retainage in the
amount of$11,176.65 change order no. 1 in the amount of$5,349.50 and final payment
in the amount of $38,233.45 to Underwater Engineering Services, Inc.
B. Engineering/Fort Pierce Beach Restoration Project (98SL1)- The District approved
Amendment No.2 and authorized the Chairman to sign the amended agreement.
There being no further business to be brought before the District, the meeting was adjourned.
Chairman
Clerk of Circuit Court
"'"
'-'
...."
ST. LUCIE COUNTY
EROSION DISTRICT
BOARD OF COMMISSIONERS
John D. Bruhn
District 1
Doug Coward
District 2
Paula A. Lewis
District 3
Frannie Hutchinson
District 4
Cliff Barnes
District 5
AGENDA
May 8,2001
1. MINUTES
Approve the minutes of the meeting held April 24,2001.
2. GENERAl PUBLIC COMMENT
CONSENT AGENDA
1. WARRANTS LISTS
Approve Warrants List No. 30 and No. 31
2. PUBLIC WORKS
A. Engineering / Contract Amendment - Consider staff recommendation to
approve Amendment NO.1 to Work Authorization NO.2 (C-00-12-181) with
Taylor Engineering, Inc. and authorize the Chairman to execute the
amendment.
B. Engineering / South County Post-Storm Beach Condition Study - Consider
staff recommendation to approve Project Agreement (OISLl) with FDEP,
Budget Resolution No. 01-03, Work Authorization NO.1 with Coastal
Planning & Engineering, Inc. and authorize the Chairman to sign all
documents.
NOTICE: All proceedings before this Board are electronically recorded. Any person who decides to appeal any action taken by the Board
at these meetings will need a record of the proceedings and for such purpose may need to ensure that a verbatim record of the proceedings
is made. Upon tbe request of any party to the proceedings, individuals testifying during a hearing will be sworn in. Any party to the
proceedings will be granted an opportunity to cross-examine any individual testifying during a hearing upon request. Anyone with a
disability requiring accommodation to attend this meeting should contact the St. Lucie County Community Sef';ices Manager at (561) 462-
1777 or TDD (561) 462-1428 at least forty-cight(48) hours prior to the meeting.
c*'
04/27/01
F71'<BWARR
FUND
184
TITLE
'-"
~
ST. LUCIE COUNTY - BOARD DATA
WARRANT LIST #30- 21-APR-2001 TO 27-APR-2001
FUND SUMMARY- EROSION
EXPENSES
Erosion Control Operating Fund
.....
..
2,956.81
GRAND TOTAL:
2,956.81
PAGE
1
PAYROLL
2,318.77
2,318.77
4
è
1
.
". T" A Y
L
O\.,K
G
L
N
E
E
R
N
April 25, 2001
N .J
N
E
Mr. Richard Bouchard, P.E.
St. Lucie County Engineering Division
2300 VirGinia Ave.
2nd Floor AnncK, Room 229
Ft. Pierce, FL 34982-5652
Re: St. Lucie County Beach Monitoring 2001-2001
Dear Mr. Bouchard,
I have attached the revised scope of services and cost proposal for the above-referenced project. The
revisions are the outcome ofthe April 23, 2001 teleconference with you and FDEP Office of Beaches and
Coastal Systems staff. The primary change is the elimination of the analytical modeling of beach fill
evolution subtask intended to estimate inlet and dispel'$ion effects in 2001. We will perf ann this subtask
in 2002 only. Detailed changes are as follows:
·
·
-
-
- ·
-
-
- ·
·
· Task I - We have increased Vice President time from 0.125 to 0.5 man-clays to include all
coordination activities with our beach and borrow site survey subconsu1tant.
· Task 2 - We have decreased Director time from 9 to 7.5 man-days, Staff Professional time from 2]
to 18 man-days, Senior Tech time from 9 to 6 man-days, and Staff Tech time from 9 to 6 man-
days. These changes reflect our elimination of the analytical modeling of shoreline response to the
inlet and beach fill subtask.
Task 3 - We have increased Vice President time from 0.125 to 0.5 man-days to include all
coordination activities with our tunle survey subconsultant.
Task 4 - We have decreased Dr. Taylor's rime from 4.5 to 4 man-days, Vice-President time from
3.5 to 0.5 man-days, and Director time from 6.25 to 5.75 man-days. These changes reflect
decreased agency and client coordination time and elimination of subconsultant coordination time.
Task S - We have increased Vice President time from 0.]25 to 0.5 man-days to include all
coordination activities with our beach and borrow site survey subconsultant.
Task 6 - We have decreased Senior Tech time from 5 to 4 man-days, and Staff Tech time from 5
10 4 man-days.
Task 8 - We have decreased Dr. Taylor's time from 45 to 4 man-days, Vice-President time from
3.125 to 0.5 man-days, and DireCTor time from 6.75 to 6.25 man-days. These changes reflect
decreased agency and client coordination time and elimination of subconsultant coordination time.
Our revised fee to perform this project is $157,410.50. We will perfonn the scope of services
outlined in Exhibit A for a fixed price ofSI57,410.50. The cost breakdown by task is presented in
Exhibit B.
Please fee I free to contact me in case of questions or comments.
YLßv-
R. Bruce Taylor, Ph.D., P.E.
President
:blw
cc: Robert Brantley
9000 CYPRESS CREEN DR ~VIT~ 200 J^CKSONVlllE Fl ]~2S' -rEL 904 7317040 FAX 904 7}1 9947
-~~,,,-,
"
'-"
COO"""¿ 81
(W A""'lf!, Amend #1)
FIRST AMENDMENT TO
WORK AUTHORIZATION NO.2
Engineering Services Related to Beach & Inlet Monitoring
Work Authorization No.2 between St. Lucie County Erosion District (the "District") and
Taylor Engineering, Inc. (the "Consultant"), for Beach & Inlet Monitoring Services, dated
February 13, 2001 (the "Agreement"), is hereby amended to decrease the amount of the
compensation to be paid to the Consultant to a total not to exceed One Hundred Fifty-Seven
Thousand, Four Hundred Ten Dollars, and Fifty Cents ($157,410.50). The Consultant's "Scope
of Services", "Work Compensation Sheet", and "Project Schedule" have also been amended and
attached hereto and made a part hereof as Exhibits "A", "B", and "C", respectively. All other
terms and conditions of Work Authorization No.2 (C-00-12-181) shall be the same and remain
in full force and effect.
IN WITNESS WHEREOF, the parties have caused this First Amendment to Work
Authorization No.2 (C-00-12-181) to be executed and delivered on the dates below.
WITNESSES:
ST. LUCIE COUNTY EROSION DISTRICT
BY:
CHAIRPERSON
Date:
APPROVED AS TO FORM AND
CORRECTNESS:
COUNTY ATTORNEY
WITNESSES:
TAYLOR ENGINEERING, INC.
BY:
Print Name:
Title:
Date:
H:/WP/MISCffA YLOR.WA
'"
\w
....I
EXHIBIT A
Scope of Senlces
St. Lucie COUDty Beach MODitoring 1001-2002
Taylor Engineering (with its subcontractors) will perform beach monitoring, data analyses, and
annual report preparation required by Florida Department ofEnvironmental Protection pennits No. 0126215-
00l-JC (Fort Pierce 1.3 mile beach renourisbment project) and No. 56-2855739 (Spur Jetty).
Task 1. Data AcquiaitioD - 2001
Taylor Engineering will engage Morgan &. EkJund,lnc. to perform beach and Capron shoal surveys.
We will obtain beach monitoring surveys at each FDEP monument from R·34 to R46 extending from the
FDEP monument to 3,000 ft offshore of the monument. We will obtain similar profi1e!l at 200 ft interVals
from the jetty to R-35 and three shore parallel profiles required for monitoring spur jetty peñonnance. We
will also obtain five profiles at R-47- R-51 for use in design and peñonnance analyses of the on~mile beach
nourislunent extension.
Task Z. Beach and Shoal Data AD.lyses - 2001
Taylor Engineering will review and analyze the data collected durin!: Task 1. This includes
characterization of2001 beach profiles; evaluation oftemporal changes in beach profiles, shorelines, and
volumes to assess project perfonnance; documentation of stonn impacts; development of beach sediment
transport pathways and magnitudes; characterization of2001 Capron shoal bathymetJy; and evaluation of
post-project changes in Capron shoal bathymetry. Analytical modeling of beach fill evolution to separate
dispersion and inlet effects will not be peñonned.
Task 3. Mariøe TurtJe Monitoring - 2001
Taylor Engineering will engage Ecological Associates, Inc. to perl'orm compaction monitoring, daily
nest monitoring and monthly scarp monitoring from FDEP monuments R-34 to R·4 J . Compaction and pre-
season scarp monitoring will be perfonned before March 1. Nest and scarp monitoring will be conducted
from March I to October 3 J. The nesting data will be tabulated and summarÏ2ed. Tunic reproductive success
will be estimated using data from representative marked nests. .
..
Task 4. Report and Agency Coordination -ZOOI
Upon completion of the annual monitoring activities, Taylor Engineering will prepare and submit the
required monitoring repons to the FDEP. This task also provides for coordination with the COImty, the
FDEP, the Corps of Engineers, and other regulatory agencies regarding the monitoring and reporting
activities.
Task S. Data AcquisitioD -1001
Taylor Engineering will engage Morgan & Eklund, Inc. to perfonn beach surveys. We will obtain
beach monitoring surveys at each FDEP monument from R-34 to R-46 extending from the FDEP monument
to 3,000 ft offshore of the monumeDL We will obtain similar profiles at 200 it intervals from the jetty to R35
and three shore parallel profiles required for monitoring spur jetty perfonnance. We'will also obtain five
profiles at R-47 - R-51 for use in perfonnance analyses oftbe one-mile beach nourishment extension.
lofl
;'
'-"
...I
Task 6. Beach Data Analyses .1001
Taylor Engineering will review and analyze the beach profile data collected during Task S. This
includes characterization of2002 beach profiles; evaluation of temporal changes in be~h profiles, shorelines,
and volwnes to assess project perfonnance; documentation of'stonn impacts; developsn,ent of beach sediment
transport pathways and magnitudes; and analytical modeling of beach fill evolution to doewnent dispersion
and inlet effects.
Task 7. Marine Turtle Monitoring -1002
Taylor Engineering will engage Ecological Associates, Inc. to porfonn compaction and scarp
monitoring from FDEP monwnents R·34 to R-41. Monthly scarp monitoring will be conducted from March
tllrough October. Compaction monitoring will be performed one time prior to the beginning of the turtle
nesting season. "
Task 8. Repor1 and Agency Coordination - 2001
Upon completion of the annual monitoring activities, Taylor Engineering will prepare and submit the
required monitoring reportS to the FDEP. This task also provides for coordination with the County, the FDEP,
the Corps of Engineers, and other regulatory agencies regarding the monitoring and reporting activities.
",
;.
20f2
"
'-'
....,¡
Exhibit B
Work Compensation Sheet
St. Lucie County Beach Monitoring 2001 - 2002
TASK 1: Data Acquisition - 2001
Labor Days Cost Task Totals
Vice President 0.500 480.00
Director 1.000 736.00
Administrative 0.500 200.00
Tota! Man-Days 2.000
Labor Cost 1,416.00
Non-Labor Units Cost
Beach Monitoring SUrvey 1.0 5,525.00
Spur Jetty Monitoring Survey 1.0 4,575.00
Capron Shoal survey 1.0 5,432.50
Beach Extension Survey 1.0 2,125.00
Computer Hours 4.0 24.00
Total Non-Labor Cost 17,681.50
Total Task 1 19,097.50
TASK 2: Beach & Shoal Data Analyses - 2001
Labor Days Cost ;fask Totals
R. Bruce Taylor, Ph.D. 1.500 2,280.00
Director 7.500 5,520.00
Staff Profe:>sional 18.000 9,380.00
Senior Technician 6.000 3,072.00
Staff Tecnnician 6.000 1,728.00
Administrative 2.000 800.00
Total Man-Days 41.000
Labor Cost 22,760.00
Non-Labor Units Cost
Computer Hours 300.0 1.800.00
Total Non-labor Cost 1,800.00
Total Task 2 --. 24,560.00
¡
Page 1 of 4
'ì
'-"
..,,¡
st. Lucie County Beach Monitoring 2001 . 2002
TASK 3: Turtle Monitoring - 2001
Labor Days Cost Task Totals
Vice President 0500 480.00
Director 1.000 736.00
Staff professional 5.000 2,600.00
Administrative 1.000 400.00
Total Man-Days 7.500
Labor Cost 4,216.00
Non-Labor Units Cost
Turtle Monitoring 1.0 34,065.00
Computer Hour.> 4.0 24.00
Total Non-Labor Cost 34,089.00
Total Task 3 38,305.0
TASK 4: Report & Agency Coordination - 2001
Labor Days Cost Task Totals
R. Bruce Taylor, Ph.D. 4.000 6,080.00
Vice President 0.500 480.00
Director 5.750 4.232.00
Staff Professional 6.000 3,120.00
Senior Editor 1.000 552.00
Senior Technician 2.000 1,024.00
Staff Teçhnician . 3.000 864.00
Administrative 3.250 1,300.00
Total Man-Days 25.500
Labor Cost 17.652.00
Non-Labor Units Cost
Computer Hours 80.0 480.00
Total Non-Labor CoBt 480.00
Total Task 4 $ 18.132.00
2001 Total: $ 100,094.50
Page 2 of 4
...,
-""'i
...¡
St. Lucie County Beach MQnltorlng 2001 . 2002
TASK 5: Data Acquisition - 2002
Labor Days Cost Task Totals
Vice President 0.500 480.00
Director 1.000 736.00
Administtative 0.500 200.00
T ctal Man-Days 2.000
Labor Cost 1,416.00
Non-Labor Units COst
Beach Monitoring Survey 1.0 5,525.00
spur Jetty Monitoring Survey 1.0 4.575.00
Beach Extension Survey 1.0 2,125.00
Computer Hours 4.0 24.00
Total Non-Labor Cost 12,249.00
To/al Task 5 S 13,665.00
TASK 6: Beach Data Analyses - 2002
Labor Days Cost Task Totals
R. Bruce Taylor, Ph.D. 1.000 1,520.00
Director 6.000 4,416.00
Staff Professional 15.000 7.800.00
Senior Tecnnician 4.000 2,048.00
Staff Technician 4.000 1.152.00
Administrative 1.000 400.00
Tota! Man-Days 31.000
LaDOr Cost 17,336.00
Non-Labor Units Cost
Computer Hours 300.0 1,900.00
Total Non-Labor Cost 1.800.00
Total TasK 6 $ 19,136.00
,
Page 3 of4
~
...,J
"
St. Lucie County Beach Monitoring 2001 - 2002
TASK 7: Turtle Monitoring - 2002
Labor Days Cost Task Totals
Vice President 0.125 120_00
Director 1_000 736.00
Staff Professional 3.000 1,560.00
Aaministrative 0.750 300.00
Total Man-Days 4.875
labor Cost 2.716.00
Non-Labor Units Cost
compaction/Scarp Monitoring 1.0 3,325.00
Computer Hours 4.0 24.00
Total Non-Labor Coat 3,349.00
Tota/ Task 7 $ 6.065.00
TASK 8: Report & Agency Coordination - 2002
LaÞor Days Cost Task Totals
R. Bruce Taylor, Ph.D. 4.000 6,080.00
Vice President 0.500 480.00
Director 6.250 4,600_00
Staff Professional 6.000 3.120.00
Senior Editor 1.000 552.00
Senior Technician 2.000 1,024.00
Staff Technician 3.000 864.00
Administrative 3.125 1,250.00
Total Man-Days 25.875
Labor COst 17,970.00
Non-Labor Units COst
Computer Hours 80.0 480.00
Total Non-Labor Cost 480.00
Total Task 8 $ 18,450.00
2002 Total: $ 57,316.00
Project Total $.157,410.50
Page 4 of 4
~
""'.
,.",.,
AGENDA REQUEST
ITEM NO. C-2B
DA TE: May 8, 2001
REGULAR [ ]
PUBLIC HEARING [ ]
CONSENT [X]
TO: ST. LUCIE COUNTY EROSION DISTRICT
PRESENTED BY:
ß(),{\&~,uJ~ ~
(Donald B. West, P.E.
County Engineer
SUBMITTED BY(DEPT): ENGINEERING DIVISION 4115
SUBJECT: South County Post-Storm Beach Condition Study; approval of 1) Project Agreement with FDEP
allocating $39,985 in state funds, 2) Budget Resolution No. 01-003, and 3) Work Authorization ($79,970) with
Coastal Planning & Engineering, Inc. (CPE) to perform the Study.
BACKGROUND: Protection of the upland development along the southern most shoreline (approx. 4 miles) of
St. Lucie County is becoming critical due to the continuing erosion. Beach erosion has been exasperated by the
high frequency of storms along the Atlantic coastline. The erosional impacts due to the inlet may also have some
far reaching effects in this area. The President's Council of Hutchinson Island has solicited assistance from the
County in seeking a critically eroded designation from the State (FDEP). As a result of two separate requests from
the County, FDEP has agreed to cost share (50%) in a Post-Storm Beach Condition Study of the South County,
commencing at the City of Fort Pierce limits (Ocean Village) south to the Martin County Line.
Project Agreement No. 01 SL 1 with FDEP allocates state funds of $39,985 for this Study. The scope of work for
this Study was developed by FDEP, the County, and CPE and is incorporated in Work Authorization NO.1
($79,970). The primary elements of the scope include: 1) past and current erosion conditions; 2) changing or
accelerating erosion trends, including the historical impact of Ft. Pierce Inlet; 3) Future threats to existing
development; and 4) short and long-term solutions, including dune restoration and beach restoration, to mitigate
the erosion.
FUNDS: Funds will be made available in Account No. 184204-3710-563005-36203; FDEP South County Post
Storm Beach Condition Study. Budget Resolution No. 01-03 allows for the appropriation and expenditure offunds.
PREVIOUS ACTION:
December 12, 2000: Board approved master consultant's agreement with Coastal Planning & Engineering, Inc.
RECOMMENDATION: South County Post-Storm Beach Condition Study---Staff recommends Erosion District
Board approval of 1) Project Agreement (01SL1) with FDEP, 2) Budget Resolution No. 01-03, and 3) Work
Authorization No. 1 with CPE; and authorize the Chairman to sign said documents.
COMMISSION ACTION:
[x] APPROVED
[ ] OTHER:
[ ] DENIED
[x]County Attorney
[x]Originating Dept. Public Works -t....?-,)
~
Coordination/S i~ natures
[x]Mgt. & Budget ~ -111l1\ q
[x]Co. Eng f2M,t-1\t\·
[x]BudgetlRevenue Coord. BPrt\
[x]Finance Dep~
f
~
....,
DEP Contract No. 01SL1
FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION
OFFICE OF BEACHES AND COASTAL SYSTEMS
FLORIDA BEACH EROSION CONTROL PROGRAM
Project Agreement
THIS AGREEMENT is entered into between the FLORIDA DEPARTMENT OF ENVIRONMENTAL
PROTECTION (hereinafter referred to as the "DEPARTMENT") and ST. LUCIE COUNTY (hereinafter
referred to as the "LOCAL SPONSOR") for the project described herein.
WHEREAS, the DEPARTMENT, pursuant to Chapter 161, Florida Statutes, provides
financial assistance to eligible governmental entities for beach erosion control
activities under the Florida Beach Erosion Control Program; and
~
~
WHEREAS, the LOCAL SPONSOR has the capabilities of performing the tasks associated
with the beach erosion control project as described herein.
NOW, THEREFORE, in consideration of the mutual benefits to be derived herefrom, the
DEPARTMENT and the LOCAL SPONSOR do hereby agree as follows:
1. The DEPARTMENT does hereby retain the LOCAL SPONSOR to implement the beach
erosion control project known as the South County Post-Storm Beach Condition Study,
(hereafter referred to as the PROJECT), as defined in Attachment "A", "Scope of Work",
attached hereto and incorporated herein by reference, and the LOCAL SPONSOR does hereby
agree to perform such services as are necessary to implement the PROJECT in accordance
with the terms and conditions set forth in this Agreement, and all attachments and
exhibits named herein which are attached hereto and incorporated by reference.
2. The LOCAL SPONSOR shall perform the services in a proper and satisfactory manner
as determined by the DEPARTMENT. Any and all equipment, products or materials necessary
to perform these services, or requirements as further stated herein, shall be supplied by
the LOCAL SPONSOR.
3. The LOCAL SPONSOR shall perform as an independent contractor and not as an
agent, representative, or employee of the DEPARTMENT.
4. The LOCAL SPONSOR shall implement the PROJECT and complete said PROJECT upon the
terms and conditions set forth in this Agreement and future requisite authorizations and
environmental permits. The PROJECT consists of an erosion study of the 13.1 mile segment
of shoreline between DEP Monument R46 and Rl15. The LOCAL SPONSOR shall develop a
detailed Scope of Work for each eligible PROJECT item, as specified below. Written
authorization to initiate each item must be obtained from the DEPARTMENT prior to the
initiation of said item.
5. The DEPARTMENT and the LOCAL SPONSOR agree that the estimated
costs of the PROJECT are:
Task
# Eligible PROJECT Items ESTIMATED PROJECT COSTS
Federal State Local Total
1.0 Erosion Study $-0- $39,985 $39,985 $79,t70
TOTAL $ 0 $39,985 $39,985 $79,970
6. The DEPARTMENT has determined that 100 percent of the PROJECT length is eligible
for state cost sharing. Therefore, the DEPARTMENT's financial obligation shall not exceed
the sum of $39,985 for this PROJECT or up to 50 percent of the non-federal PROJECT cost
for the specific eligible PROJECT items listed above, whichever is less. The DEPARTMENT
and the LOCAL SPONSOR agree that any and all activities associated with the PROJECT that
are not shown in the above eligible PROJECT items listing are the responsibility of the
LOCAL SPONSOR and are not a part of this Agreement. The LOCAL SPONSOR agrees that any
costs for the specific eligible PROJECT items which exceed the estimated PROJECT costs for
that item shall be the responsibility of the LOCAL SPONSOR. Any modifications to the
estimated PROJECT costs shall be provided through amendments to this Agreement.
DEP Project Agreement No. 01SL1, Page 1 of 6
,
/
'-'
....,I
7. The State of Florida's performance and obligation to pay under this Agreement is
contingent upon an annual appropriation by the Legislature. Funding for this PROJECT is
subject to the release of funds appropriated to the DEPARTMENT for the fiscal year 2000-
2001. The DEPARTMENT will not release funds for payment until such time as all requisite
authorizations and environmental permits, including those required pursuant to Chapters
161, 253, 258 and 373, Florida Statutes, have been obtained.
8. THIS PARAGRAPH INTENTIONALLY LEFT BLANK.
~
9. THIS PARAGRAPH INTENTIONALLY LEFT BLANK.
,
10. As consideration for the eligible work performed by the LOCAL SPONSOR, not cost
shared by the Federal government, under the terms of this Agreement, the DEPARTMENT shall
pay the LOCAL SPONSOR as specified herein. For satisfactory performance, the DEPARTMENT
agrees to compensate the LOCAL SPONSOR on a cost reimbursement basis for contractual
services rendered: The LOCAL SPONSOR will submit a request for reimbursement of funds on
such forms as attached hereto in Attachment "C", "Payment Request Forms", not more
frequently than quarterly. These forms shall be certified as accurate by the LOCAL
SPONSOR'S Project Administrator and the LOCAL SPONSOR'S Project Financial Officer and
submitted to the DEPARTMENT as a payment request. The DEPARTMENT'S Contract Manager has 30
days after receipt of the billing to determine that the work has been accomplished in
accordance with the terms and conditions of this Agreement prior to approving the billing
for payment. Upon approval of the payment request the DEPARTMENT shall disburse the funds
due the LOCAL SPONSOR less ten (10) percent which shall be retained on account. The
cumulative amount retained for each eligible PROJECT item shall be disbursed to the LOCAL
SPONSOR after the DEPARTMENT has certified that the LOCAL SPONSOR has complied with all
the terms and conditions of the Agreement and the applicable Scope of Work for said item.
All reimbursement requests shall be submitted in sufficient detail for a proper pre-audit
and post-audit review. Reimbursement requests for payment to subcontractors must be
substantiated by copies of invoices with backup documentation identical to that required
from the LOCAL SPONSOR.
1
1
«
11. Pursuant to Section 215.422, Florida Statutes, for work not cost shared by the
Federal government, the DEPARTMENT'S Contract Manager shall have five (5) working days,
unless otherwise specified herein, to inspect and approve the services for payment; the
DEPARTMENT must submit a request for payment to the Florida Department of Banking and
Finance within twenty (20) days; and the Department of Banking and Finance is given
fifteen (15) days to issue a warrant. Days are calculated from the latter date the
invoice is received or services received, inspected, and approved. Invoice payment
requirements do not start until a proper and correct invoice has been received. Invoices
which have to be returned to a LOCAL SPONSOR for correction(s) will result in a delay in
the payment. A Vendor Ombudsman has been established within the Florida Department of
Banking and Finance who may be contacted if a LOCAL SPONSOR is experiencing problems in
obtaining timely payment(s) from a State of Florida agency. The Vendor Ombudsman may be
contacted at 850/488-2924 or 1-800-848-3792.
.
12. In accordance with Section 215.422, Florida Statutes, the DEPARTMENT shall pay
the LOCAL SPONSOR, interest at a rate as established by Section 55.03(1), Florida Statutes
on the unpaid balance, if a warrant in payment of an invoice is not issued within forty
(40) days after receipt of a correct invoice and receipt, inspection, and approval of the
goods and services. Interest payments of less than $1 will not be enforced unless a LOCAL
SPONSOR requests payment. The interest rate established pursuant to Section 55.03(1)
Florida Statutes, may be obtained by calling the Department of Banking and Finance, Vendor
Ombudsman at the telephone number provided above or the DEPARTMENT'S Contracts Section at
850/922-5942
13. The LOCAL SPONSOR shall submit to the DEPARTMENT quarterly progress and
financial reports for the duration of this Agreement. Reports shall be submitted on such
forms as attached hereto in Attachment "D", "Quarterly Progress Report" and "Quarterly
Financial Report", no later than January 15, April 15, July 15, and October 15, of each
year in which the project is underway. Progress reports shall describe the work performed
since the last report and the percent completion of the task. Financial reports shall be
consistent with progress reports.
14. Upon completion of the PROJECT, the LOCAL SPONSOR shall submit to the
DEP Project Agreement No. 0ISLl, Page 2 of 6
'-"
...",
DEPARTMENT a certification of completion, attached hereto as Attachment "E", "Project
Completion Certification". A final PROJECT certification inspection will be made by the
DEPARTMENT within 60 days after the PROJECT is certified complete by the LOCAL SPONSOR.
15. This Agreement shall begin on the last date executed and end on May 30, 2002.
Pursuant to Section 161.101 (15), Florida Statutes, work conducted on this PROJECT by the
LOCAL SPONSOR or its subcontractor beginning on or after July 1, 2000, shall be eligible
for cost sharing by the DEPARTMENT.
16. The LOCAL SPONSOR shall, at a minimum, comply with monetary limits for
competitive acquisition of both materials and services as required by Chapter 287, Florida
Statutes, which is expressly made a part of this Agreement and is incorporated herein by
reference as if fully set forth.
I
17. The LOCAL SPONSOR shall have in place quality assurance procedures that insure
that proper quality control measures are incorporated into all work performed under the
terms of this Agreement.
1
J
18. The provisions of Chapter 62B-36, Florida Administrative Code, entitled Florida
Beach Erosion Control Assistance Program, are expressly made a part of this Agreement and
are incorporated herein by reference as if fully set forth.
19. The DEPARTMENT's Project Manager for all technical matters is Russell Snyder,
Phone: 850/487-1262, extension 170, and the Department's Contract Manager for all
administrative matters is C. Tony Tucker, Phone: 850/487-1262, extension 192, or their
successor(s). All matters shall be directed to the appropriate persons for action or
disposition.
1
.
20. Each party hereto agrees that it shall be solely responsible for the negligent
or wrongful acts of its employees and agents. However, nothing contained herein shall
constitute a waiver by either party of its sovereign immunity or the provisions of Section
768.28, Florida Statutes.
I
21. The DEPARTMENT may terminate this Agreement at any time in the event of the
failure of the LOCAL SPONSOR to fulfill any of its obligations under this Agreement.
Prior to termination, the DEPARTMENT shall provide ten (10) calendar days written notice
of its intent to terminate and shall provide the LOCAL SPONSOR an opportunity to consult
with the DEPARTMENT regarding the reason(s) for termination. The DEPARTMENT may terminate
this Agreement without cause and for its convenience by giving thirty (30) calendar days
written notice to the LOCAL SPONSOR. Notice shall be sufficient if delivered personally
or by certified mail to the address set forth in this Agreement.
22. Any and all notices shall be delivered to the parties at the following
addresses:
.
DEP Project Agreement No. 01SL1, Page 3 of 6
f'
'-"
....;
LOCAL SPONSOR
Richard Bouchard
Public Works Department
2300 Virginia Avenue
Fort Pierce, Florida 34982-5652
Telephone 561/462-1710
DEPARTMENT
C. Tony Tucker, Contract Manager
Department of Environmental Protection
Office of Beaches and Coastal Systems
3900 Commonwealth Blvd., MS 300
Tallahassee, Florida 32399-3000
(850) 487-1262
23. Pursuant to Section 216.2815, Florida Statutes, all records in conjunction with
this Agreement shall be public records and shall be treated in the same manner as other
public records are under general law. This Agreement may be unilaterally canceled by the
DEPARTMENT for refusal by the LOCAL SPONSOR to allow public access to all documents,
papers, letters, or other material subject to the provisions of Chapter 119, Florida
Statutes, and made or received by the LOCAL SPONSOR in conjunction with this Agreement.
24. The LOCAL SPONSOR shall maintain books, records and documents directly
pertinent to performance under this Agreement in accordance with generally accepted
accounting principles consistently applied. The DEPARTMENT, the State, or their
authorized representatives shall have access to such records for audit purposes during the
term of this Agreement and for three years following Agreement completion. In the event
any work is subcontracted, the LOCAL SPONSOR shall similarly require each subcontractor to
maintain and allow access to such records for audit purposes.
25. In addition to the requirements of Paragraph 24 of this Agreement, the LOCAL
SPONSOR shall comply with the applicable provisions contained in Attachment "F", Special
Audit Requirements, attached hereto and incorporated herein by reference. Exhibit "1"
summarizes the funding sources supporting the Agreement for purposes of assisting the
LOCAL SPONSOR in complying with the requirements of Attachment "F". A revised copy of
Exhibit "1" must be provided to the LOCAL SPONSOR for each amendment which authorizes a
funding increase or decrease. If the LOCAL SPONSOR fails to receive a revised copy of
Exhibit "1", the LOCAL SPONSOR shall notify the DEPARTMENT's Contract Manager to request a
copy of the updated information.
26. In accordance with Section 216.347, Florida Statutes, the LOCAL SPONSOR is
hereby prohibited from using funds provided by this Agreement for the purposes of lobbying
the Legislature, the judicial branch or a state agency.
27. The LOCAL SPONSOR covenants that it presently has no interest and shall not
acquire any interest which would conflict in any manner or degree with the performance of
services required.
28. This Agreement has been delivered in the State of Florida and shall be
construed in accordance with the laws of Florida. Wherever possible, each provision of
this Agreement shall be interpreted in such manner as to be effective and valid under
applicable law, but if any provision of this Agreement shall be prohibited or invalid
under applicable law, such provision shall be ineffective to the extent of such
prohibition or invalidity, without invalidating the remainder of such provision or the
remaining provisions of this Agreement. Any action hereon or in connection herewith shall
be brought in Leon County, Florida.
29. No delay or failure to exercise any right, power or remedy accruing to either
party upon breach or default by either party under this Agreement, shall impair any such
right, power or remedy of either party; nor shall such delay or failure be construed as a
waiver of any such breach or default, or any similar breach or default thereafter.
30. The LOCAL SPONSOR recognizes that the State of Florida, by virtue of its
sovereignty, is not required to pay any taxes on the services or goods purchased under the
terms of this Agreement.
31. This Agreement is neither intended nor shall it be construed to grant any
rights, privileges or interest in any third party without the mutual written agreement of
the parties hereto.
32. No person, on the grounds of race, creed, color, national origin, age, sex, or
DEP Project Agreement No. 0ISLl, Page 4 of 6
/
\r
..",
disability, shall be excluded from participation in; be denied the proceeds or benefits
of; or be otherwise subjected to discrimination in performance of this Agreement.
33. This Agreement is an exclusive contract for services and may not be assigned in
whole or in part without the written approval of the DEPARTMENT.
34. The LOCAL SPONSOR shall not subcontract, assign, or transfer any work under
this Agreement without the prior written consent of the DEPARTMENT's Contract Manager.
The LOCAL SPONSOR agrees to be responsible for the fulfillment of all work elements
included in any subcontract consented to by the DEPARTMENT and agrees to be responsible
for the payment of all monies due under any subcontract. It is understood and agreed by
the LOCAL SPONSOR that the DEPARTMENT shall not be liable to any subcontractor for any
expenses or liabilities incurred under the subcontract and that the LOCAL SPONSOR shall be
solely liable to the subcontractor for all expenses and liabilities incurred under the
subcontract.
35. The LOCAL SPONSOR warrants and represents that it is self-funded for liability
insurance, appropriate and allowable under Florida Law, and that such self-insurance
offers protection applicable to the LOCAL SPONSOR's officers, employees, servants and
agents while acting within the scope of their employment with the LOCAL SPONSOR.
36. The purchase of non-expendable equipment costing $500 or more is not authorized
under the terms and conditions of this Agreement.
t
37. The DEPARTMENT may at any time, by written order designated to be a change ,
order, make any change in the work within the general scope of this Agreement (e.g., f
specifications, time, method or manner of performance, requirements, etc.). All change I
orders are subject to the mutual agreement of both parties as evidenced in writing. Any
change order which causes an increase or decrease in the LOCAL SPONSOR's cost or time
shall require an appropriate adjustment and modification (formal amendment) to this
Agreement.
38. A person or affiliate who has been placed on the convicted vendor list I
following a conviction for a public entity crime may not perform work as a grantee, ~
contractor, supplier, subcontractor, or consultant under a contract with any public
entity, and may not transact business with any public entity in excess of the threshold
amount provided in Section 287.017, F.S., for Category Two for a period of 36 months from
the date of being placed on the convicted vendor list.
39. This Agreement represents the entire agreement of the parties. Any
alterations, variations, changes, modifications or waivers of provisions of this Agreement
shall only be valid when they have been reduced to writing, duly signed by each of the
parties hereto, and attached to the original of this Agreement, unless otherwise provided
herein.
REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK
DEP Project Agreement No. 01SL1, Page 5 of 6
.'
'-'"
...."
IN WITNESS WHEREOF, the parties have caused these presents to be duly executed, the
day and year last written below.
ST. LUCIE COUNTY
DEPARTMENT OF ENVIRONMENTAL PROTECTION
By:
By:
Secretary or designee
*Commission Chair
Date:
Date:
DEP Contract Manager
APPROVED AS TO FORM AND LEGALITY:
DEP Attorney
*If someone other than the Commission Chair signs the project agreement, a resolution,
statement or other documentation authorizing that person to sign the agreement on behalf
of the County must accompany the agreement.
List of Attachments/Exhibits included as part of this Agreement:
Specify
Type
Letter!
Number
Description (include number of pages)
Attachment
Attachment
Attachment
Attachment
Attachment
Attachment
A
B
C
D
E
F
Scope of Work (1 page)
Intentionally Left Blank(l page)
Payment Request Forms (2 pages)
Progress and Financial Reporting Forms (2 pages)
Project Completion Certification (1 page)
Special Audit Requirements (5 pages)
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
DEP Project Agreement No. 01SL1, Page 6 of 6
"
'--'
.....,
ATTACHMENT A
SCOPE OF WORK
ST. LUCIE COUNTY
SOUTH COUNTY POST-STORM BEACH CONDITION STUDY
The PROJECT shall be conducted in accordance with the terms and conditions set forth under
this Agreement and all applicable DEP permits. The PROJECT consists of a beach erosion
study of the 13.1 mile segment of shoreline between DEP Monument R46 and Rl15. The study
will evaluate the level of current coastal erosion, identify threats to existing
development, develop short-term and long-term protection alternatives, and consider
environmental impact issues.
A. Study
Conduct studies necessary to evaluate the level of coastal erosion and analyze short
and long-term erosion control measures which could be used along the south county
coastline and the extent of improvements necessary to accomplish the goals of the
PROJECT. Investigations shall include, but may not be limited to, the following:
hydrodynamic modeling; surveying and mapping; coastal engineering analysis; economic
studies; environmental analysis; real estate studies; and plan formulation.
Project Deliverables
A. Reports - Unless otherwise noted above, five copies of all written reports
developed under this Agreement shall be forwarded to the Department upon
completion of the project.
B. Additional Data - Two sets of all data (i.e., aerial photography, survey data,
etc.) developed as a result of this Agreement shall be provided to the
Department upon completion of the project.
C. Schedules- Project schedules shall be submitted concurrently with quarterly
progress reports and shall be provided in .MPP or tab delimited .TXT format.
Information provided shall be the best available and shall represent the most
accurate forecast of future events. Specific information to be included: tasks
to be completed, start and finish dates, task duration, actual start and
finish dates with actual task duration.
D. A copy of the Bids and construction contract, including a detailed scope of
work, shall be submitted to the DEPART.MENT prior to initiation of any task.
Data Development
All data developed as a result of this Agreement shall be developed in accordance with
standard formats acceptable to the Department.
Survey work to be performed shall meet the minimum technical standards for surveys in
accordance with Chapter 6IG-17, Florida Administrative Code. All monumentation set or
points of origin established shall be based upon those control markers designated on the
most recently recorded legal description of the Coastal Construction Control Line, except
that any First or Second Order federal or state horizontal control marker may be used to
establish or confirm position and direction and any First, Second, or Third Order federal
or state vertical control marker shall be used to establish or confirm elevation. G.P.S.,
Traverse, and Level Loop information shall be adjusted by Compass, Crandell, or Least
Square Method. Detailed field notes and computation records shall be kept of the survey
and copies shall be made available to the Department upon request. Abstracts of all
monumentation or points of origin shall be submitted in digital form and contain at a
minimum all field requirements for the Department's Monument Information Tracking System.
All profile data shall be submitted in digital form and conform to the standard formats
acceptable to the Department. All information submitted shall also be in electronic
format, and shall be based on the 1983/1990 North American Datum and State Plane
Coordinate system. This information shall be submitted in a .DXF format.
Attachment A, DEP Project Agreement No. OISLI, Page I of 1
\..r
'...I
ATTACHMENT B
FUNDING ELIGIBILITY
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
~
I
f
I
Attachment B, DEP Project Agreement No. OlSLl, Page 1 of 1
j1
~
....I
ATTACHMENT C
FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION
FLORIDA BEACH EROSION CONTROL PROGRAM
REQUEST FOR PAYMENT - PART I
Name of Project: South County Post-Storm Beach Condition Study
Grantee: St. Lucie County
DEP Contract Number: 01SL1
Billing Number:
Billing Period:
Costs Incurred This Payment Request
Total Cost
State Share
Local Share
Contractual
Cost Summary
State Funds Obligated
$39,985
Local Funds Obligated
$ 39,985
Less Previous Payment
Less Previous Credits
Less This Payment
Less This Credit
Less Retainage (10%)
Less Previous Retained
State Funds Remaining
Local Funds Remaining
Certification: I certify that this billing is correct and is based upon actual
obligations of record by the grantee; that payment from the State Government has not been
received; that the work and/or services are in accordance with the Department of
Environmental Protection, Bureau of Beaches and Coastal System's approved Project
Agreement including any amendments thereto; and that progress of the work and/or services
are satisfactory and are consistent with the amount billed.
Name of Project Administrator
Signature of Project Administrator
Date
Name of Project Financial Officer
Signature of Project Financial Officer
Date
Attachment C, DEP Project Agreement No. 01SL1, Page 1 of 2
~
'-'
....,¡
FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION
FLORIDA BEACH EROSION CONTROL PROGRAM
REQUEST FOR PAYMENT - PART II
Name of Project: South County Post-Storm Beach Condition Study
Grantee: St. Lucie County
DEP Contract Number: OlSLl
Billing Number:
Billing Period:
Summary of Invoices
Date of Invoice Amount of
Invoice Number Invoice
Task
#
Name of Vendor
Check
Number
Amount
Paid Vendor
$
TOTAL $
Certification: I certify that the purchases noted above were used in accomplishing the
project; and that invoices, check vouchers, copies of checks, and other purchasing
documentation attached hereto and are maintained as required to support the cost reported
above and are available for audit upon request.
Name of Proj. Administrator
Signature of Project Administrator
Date
Name of Proj. Financial Officer
Signature of Project Financial Officer
Date
Attachment C, DEP Project Agreement No. OlSLl, Page 2 of 2
'-'
...."
ATTACHMENT D
FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION
FLORIDA BEACH EROSION CONTROL PROGRAM
QUARTERLY PROGRESS REPORT
Name of Project: South County Post-Storm Beach Condition Study
Grantee: St. Lucie County
DEP Contract Number: OlSLl
Quarterly Report Period:
Status of Eligible Project Items: (Describe progress accomplished during report period,
including statement(s) regarding percent of task completed to date. Describe any
implementation problems encountered, if applicable.)
A. EROSION STUDY
Attachment D, DEP Project Agreement No. OlSLl, Page 1 of 2
" ,
~
>wi
FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION
FLORIDA BEACH EROSION CONTROL PROGRAM
QUARTERLY FINANCIAL REPORT
Name of Project: South County Post-Storm Beach Condition Study
Grantee: St. Lucie County
DEP Contract Number: OlSLl
Quarterly Report Period:
Project Expenditures
Eligible Project Items
Costs Incurred
This Quarter
Costs Incurred
to Date
Total Funds
Obligated
Erosion Study
$
$
$79,970
TOTAL
$79,'70
Attachment D, DEP Project Agreement No. 01SL1, Page 2 of 2
'-
...",
ATTACHMENT E
FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION
FLORIDA BEACH EROSION CONTROL PROGRAM
PROJECT COMPLETION CERTIFICATION
Name of Project: South County Post-Storm Beach Condition Study
1
Grantee: St. Lucie County
DEP Contract Number: OlSLl
I hereby certify that the above mentioned project has been completed in accordance with
the Project Agreement, including any amendments thereto, between the Department of .
Environmental Protection and grantee, and all funds expended for the project were expended ,
pursuant to the Project Agreement.
Name of Project
Administrator
Signature of Project
Administrator
Date
J
t
Attachment E, DEP Project Agreement No. OlSLl, Page 1 of 1
~
~
..""
ATTACHMENT F
FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION
FLORIDA BEACH EROSION CONTROL PROGRAM
SPECIAL AUDIT REQUIREMENTS
The administration of funds awarded by the Department of Environmental Protection (which
may be referred to as the "Departmen t", "DEP", "FDEP" or "Gran tor", or other name in the
contract/agreement) to the recipient (which may be referred to as the "Contractor",
Grantee" or other name in the contract/agreement) may be subject to audits and/or
monitoring by the Department of Environmental Protection, as described in this section.
MONITORING
In addition to reviews of audits conducted in accordance with OMS Circular A-133, as
revised (see "AUDITS" below), monitoring procedures may include, but not be limited to,
on-site visits by Department staff, limited scope audits as defined by OMS Circular A-133,
as revised, and/or other procedures. By entering into this agreement, the recipient
agrees to comply and cooperate with any monitoring procedures/processes deemed appropriate
by the Department of Environmental Protection. In the event the Department of
Environmental Protection determines that a limited scope audit of the recipient is
appropriate, the recipient agrees to comply with any additional instructions provided by
the Department to the recipient regarding such audit. The recipient further agrees to
comply and cooperate with any inspections, reviews, investigations, or audits deemed
necessary by the Comptroller or Auditor General.
AUDITS
PART I: FEDERALLY FUNDED
This part is applicable if the recipient is a State or local government or a non-profit
organization as defined in OMB Circular A-133, as revised.
1. In the event that the recipient expends $300,000 or more in Federal awards in its
fiscal year, the recipient must have a single or program-specific audit conducted in
accordance with the provisions of OMB Circular A-133, as revised. EXHIBIT F-l to this
agreement indicates Federal funds awarded through the Department of Environmental
Protection by this agreement. In determining the Federal awards expended in its fiscal
year, the recipient shall consider all sources of Federal awards, including Federal funds
received from the Department of Environmental Protection. The determination of amounts of
Federal awards expended should be in accordance with the guidelines established by OMB
Circular A-133, as revised. An audit of the recipient conducted by the Auditor General in
accordance with the provisions OMB Circular A-133, as revised, will meet the requirements
of this part.
2. In connection with the audit requirements addressed in Part I, paragraph 1., the
recipient shall fulfill the requirements relative to auditee responsibilities as provided
in Subpart C of OMB Circular A-133, as revised.
3. If the recipient expends less than $300,000 in Federal awards in its fiscal year, an
audit conducted in accordance with the provisions of OMB Circular A-133, as revised, is
not required. In the event that the recipient expends less than $300,000 in Federal
awards in its fiscal year and elects to have an audit conducted in accordance with the
provisions of OMB Circular A-133, as revised, the cost of the audit must be paid from non-
Federal funds (i.e., the cost of such an audit must be paid from recipient funds obtained
from other than Federal entities).
4. The recipient may access information regarding the Catalog of Federal Domestic
Assistance (CFDA) via the internet at http://aspe.os.dhhs.gov/cfda.
Attachment F, DEP Project Agreement No. 01SL1, Page 1 of 5
.II
~
.....,
PART II: STATE FUNDED
This part is applicable if the recipient is a nonstate entity as defined by Section
215.97(2) (1), Florida Statutes.
1. In the event that the recipient expends a total amount of State awards (i.e., State financial
assistance provided to the recipient to carry out a State project) equal to or in excess of $300,000
in any fiscal year of such recipient, the recipient must have a State single or project-specific
audit for such fiscal year in accordance with Section 215.97, Florida Statutes; applicable rules of
the Executive Office of the Governor and the Comptroller, and Chapter 10.600, Rules of the Auditor
General. EXHIBIT 1 to this agreement indicates State funds awarded through the Department of
Environmental Protection by this agreement. In determining the State awards expended in its fiscal
year, the recipient shall consider all sources of State awards, including State funds received from
the Department of Environmental Protection, except that State awards received by a nonstate entity
for Federal program matching requirements shall be excluded from consideration.
2. In connection with the audit requirements addressed in Part II, paragraph 1, the
recipient shall ensure that the audit complies with the requirements of Section 215.97(7),
Florida Statutes. This includes submission of a reporting package as defined by Section
215.97(2) (d), Florida Statutes, and Chapter 10.600, Rules of the Auditor General.
3. If the recipient expends less than $300,000 in State awards in its fiscal year, an
audit conducted in accordance with the provisions of Section 215.97, Florida Statutes, is
not required. In the event that the recipient expends less than $300,000 in State awards
in its fiscal year and elects to have an audit conducted in accordance with the provisions
of Section 215.97, Florida Statutes, the cost of the audit must be paid from non-State
funds (i.e., the cost of such an audit must be paid from recipient funds obtained from
other than State entities) .
4. For information regarding the Florida Catalog of State Financial Assistance (CFSA),
a recipient should access the website for the Governor's Office of Planning and Budget
located at http://www.eoq.state.fl.us/ for assistance. In addition to the above website,
the following websites may be accessed for information: Legislature's Website
http://www.leq.state.fl.us/, Governor's Website hLtp://www.flgov.com/, Department of
Banking and Finance's Website http://www.dbf.state.fl.us/. and the Auditor General's
Website http://www.state.fl.us/audgen.
PART III: OTHER AUDIT REQUIREMENTS
(NOTE: Pursuant to Section 215.97(7) (m), Florida Statutes, State agencies may conduct or
arrange for audits of State awards that are in addition to audits conducted in accordance
with Section 215.97, Florida Statutes. In such an event, the State agency must arrange for
funding the full cost of such additional audits. This part would be used to specify any
additional audit requirements imposed by the State agency that are solely a matter of that
State agency's policy (i.e., the audit is not required by Federal or State laws and is not
in conflict with other Federal or State audit requirements).)
PART IV: REPORT SUBMISSION
1. Copies of audit reports for audits conducted in accordance with OMB Circular A-133,
as revised, and required by PART I of this agreement shall be submitted, when required by
Section .320 (d), OMB Circular A-133, as revised, by or on behalf of the recipient
directly to each of the following:
A. The Department of Environmental Protection at each of the following
addresses:
C. Tony Tucker, Contract Manager
Florida Department of Environmental Protection
Office of Beaches and Coastal Systems
3900 Commonwealth Boulevard, MS*300
Tallahassee, Florida 32399-3000
Attachment F, DEP Project Agreement No. 0ISLl, Page 2 of 5
'*
\.,..t
....,
Audit Director
Florida Department of Environmental Protection
Office of Inspector General
2600 Blair Stone Road, MS40
Tallahassee, Florida 32399-2400
B. The Federal Audit Clearinghouse designated in OMB Circular A-133, as revised
(the number of copies required by Sections .320 (d) (1) and (2), OMB Circular A-133,
as revised, should be submitted to the Federal Audit Clearinghouse), at the
following address:
Federal Audit Clearinghouse
Bureau of the Census
1201 East 10th Street
Jeffersonville, IN 47132
C. Other Federal agencies and pass-through entities in accordance with
Sections .320 (e) and (f), OMB Circular A-133, as revised.
2. Pursuant to Section .320 (f), OMB Circular A-133, as revised, the recipient shall
submit a copy of the reporting package described in Section .320(c), OMB Circular A-133,
as revised, and any management letters issued by the auditor, to the Department of
Environmental Protection at each of the following addresses:
C. Tony Tucker, Contract Manager
Florida Department of Environmental Protection
Office of Beaches and Coastal Systems
3900 Commonwealth Boulevard, MS#300
Tallahassee, Florida 32399-3000
Audit Director
Florida Department of Environmental Protection
Office of Inspector General
2600 Blair Stone Road, MS40
Tallahassee, Florida 32399-2400
3. Copies of reporting packages required by PART II of this agreement shall be
submitted by or on behalf of the recipient directly to each of the following:
A. The Department of Environmental Protection at each of the following
addresses:
C. Tony Tucker, Contract Manager
Florida Department of Environmental Protection
Office of Beaches and Coastal Systems
3900 Commonwealth Boulevard, MS#300
Tallahassee, Florida 32399-3000
Attachment F, DEP Project Agreement No. 0ISLl, Page 3 of 5
\.,...; "-'
Audi t Director
Florida Department of Environmental Protection
Office of Inspector General
2600 Blair Stone Road, MS40
Tallahassee, Florida 32399-2400
B. The Auditor General's Office at the following address:
State of Florida Auditor General
Room 574, Claude Pepper Building
III West Madison Street
Tallahassee, Florida 32302-1450
4. Copies of reports or management letters required by PART III of this agreement
shall be submitted by or on behalf of the recipient directly to the Department of
Environmental Protection at each of the following addresses:
C. Tony Tucker, Contract Manager
Florida Department of Environmental Protection
Office of Beaches and Coastal Systems
3900 Commonwealth Boulevard, MS#300
Tallahassee, Florida 32399-3000
Audit Director
Florida Department of Environmental Protection
Office of Inspector General
2600 Blair Stone Road, MS40
Tallahassee, Florida 32399-2400
5. Any reports, management letters, or other information required to be submitted to
the Department of Environmental Protection pursuant to this agreement shall be submitted
timely in accordance with OMB Circular A-133, Florida Statutes, and Chapter 10.600, Rules
of the Auditor General, as applicable.
6. Recipients, when submitting audit reports to the Department of Environmental
Protection for audits done in accordance with OMB Circular A-133, Florida Statutes, and
Chapter 10.600, Rules of the Auditor General, should indicate the date that the audit
report was delivered to the recipient in correspondence accompanying the audit report.
PART V: RECORD RETENTION
1. The recipient shall retain sufficient records demonstrating its compliance with the
terms of this agreement for a period of 3 years from the date the audit report is issued,
and shall allow the Department of Environmental Protection or its designee, access to such
records upon request. The recipient shall ensure that audit working papers are made
available to the Department of Environmental Protection or its designee, upon request for
a period of 3 years from the date the audit report is issued, unless extended in writing
by the Department of Environmental Protection.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
Attachment F, DEP Project Agreement No. OlSLl, Page 4 of 5
'"
r4
E-t
H
III
H
tEl
Þ<
rz:I
'-"
~
o
-M :>.
-W H
(J ro 0
.w -,..-j t::J¡
ro "(J
-W o.-w
'" 0 ro
~U
0.
~
-w
~
'"
j
C9
Z
H
:so
o
H
H
o
Þ-<
µ:¡
~
10-<
Þ-<
o
10-<
UJ
H
UJ
Z
o
U
10-<
Z
µ:¡
:s
µ:¡
µ:¡
IX:
(!J
<1;
to>'
~
-M
"Ö
~
G;
tJI
¡::
....
:J
o
rl
rl
o
rz.
iD
.<:
-I-'
....
o
-I-'
01
....
01
¡::
o
U
-I-'
¡::
m
iD
...
~
<1J
rl
-W
-M
E-<
~
o
r.,
u
01
....
:5
UJ
H
~
10-<
o
10-<
10-<
Z
<1;
P
UJ
IX:
P
0.
10-<
Z
µ:¡
H
0.
H
U
µ:¡
IX:
µ:¡
~
10-<
o
10-<
o
µ:¡
o
IX:
<1;
~
UJ
o
z
P
Þ-<
o
-I-'
-I-'
¡::
OS
::I
01
...
::I
1>0
-I-'
¡::
iD
....
Do
....
U
~
iD
.<:
-I-'
o
-I-'
'C
~
...
OS
~
01
'C
¡::
g rl "' "
rl ro ro ()
OS ""@
... <1J to>'
iD "Ö 0
'C () HZ
iDr.,P,
rz.
H
~ (J
~~
Z
:>.
o
~
<1J
to>'
.:t:
rl
ro
"
<1J
"Ö
<1J
r.,
rl
OS
...
iD
'C
Æ
...
o
....
01
'C
æ
¡:
a
-M >,
-w H
<1J <1J 0
.µ 'r-! tro
<1J H <1J
-w o.-w
'" a <1J
~u
0.
~
tJI
¡::
-...
.<:
u
-I-'
~
tII
¡::
-...
:J
o
rl
rl
o
'"
iD
:5
....
o
-I-'
III
-...
01
¡::
o
U
-I-'
¡::
m
iD
...
~
<1J
H
+J
-M
E-<
~
o
r.,
u
III
-...
:5
o
-I-'
-I-'
¡::
os
::I
01
...
&
~
o
r.,
U
-I-'
¡::
iD
....
Do
-...
o
~
:>.
o
~
<1J
to>'
~
iD
:5
o
-I-'
'C
~
...
os
~
01
'C
æ .. rl "'
en Có rei ....
~ " " <1J
iD ... <1J t"'~
-I-' tII'd 0 ;'j
os 0 <1J "z
-I-'...r.,p,
001>0
rl
ro
H
<1J
'd
(J
r.,
+J
¡:
'"
a
~
~
a
-M :>.
-w H'-P
()) nj 0 N
.¡..J ...-1 b1,........¡
¡:: (j H () 0
0 -t-J ~.µ ~
.... [()OC1j.---1
-I-' ~U
U
iD .ê'
00
....
0 +J
-I-' ¡:
U '"
iD aU')
·n ~ro
~ m
00 to>' m
~ M
01 -M <J}
'C "Ö
¡:: ~
~ '"
r.,
tJI
¡::
.... ~
:J 0
0 'M rl
rl +J 0
rl ~"
~ " +J
U ~
iD <1J CJJ 0
.<: H (JU e
-I-' -w Q
-M ~ <1J
.... E-< H (J 0 H
0 o 0 -M to>'
~ " CJJ 0
o "
-I-' r., '" """
III [f) 0 µ:¡
-... U [f)
01 to>'.c:
¡::
0 ~ 0
U -M <1J
"Ö <1J
-I-' ¡: (Q
¡:: "
m r.,
iD
... 4-< ()
~ 0 H 0
rd ¡:: H <'1
to>' .,., rtI (l) 0
III 0 u..µ~o
.... rl <1J ~ CJJ .
:5 I'd ....J cd·r-I r-
.µ en s:: Lf) Z C"Ï
t1j .¡.J-,..., U)
0 U[f)r.,~
-I-'
-I-' "
ß <1Jrl
(JO
::I <1J ~ 0
01 +J '"
H <1Jrl I
& +J<1J0
"'00
-I-' "'0
-M '"
¡:: r.,
iD
....
Do
-...
U +J
~ <1J "'
0 "
iD H "' H
" <1JE-<
.<: a
-I-' '" -w-w"Ö
"' ~ ~
0 to>' :>'(J"
-I-' ~ "'er.,
'C -M o <1J
'd o to>'
~ ~ µ:¡ <1J
" ~
H r., <1J
OS :8
~ ..
11100
'C .
¡::rz. "' H
, - <1J ~ir-
I' -w
QlOI <1J 8' M
-I-' . -w
OSItl '" ~z
-1-'....
00"1
to>'
~
-M
'd
¡:
"
r.,
....,J
rl
rt1
"rl
QJ rt1 QJ
1J -M ..c:
QJ U -I-'
Þ-< ¡:: QJ
rt1 " ¡::
QJ ¡:: m -rl
..c: -rl
-I-'Þ-<1J1J
QJ ()
¡:: QJ UJ-I-'
-rl -I-' ;:J m
m U
1J -I-' QJ -M
QJUJ~1J
~ ¡::
-rl 'H o ·rl
" 0-1-'
U >,
UJ tnQJrl
() 0 '-' '-'
1Jrl m rt1
m QJ
UJ-I-' UJrl
U') -I-' m1J U
00 ¡::u ¡::
m QJ ;:J UJ
,;; e rt1 'H -rl l1')
M QJ1J 'H
{J]- H -rl QJ-I-' 0
-rl "..c: ~
;:J O.¡J QJ LI1
tJ'rl -rl
()Þ-<..c: 0. (lJ
'-' U ·rl tn
(lJ-rl U
"Ö e..c:..c: QJ rt1
" rt1.¡J ;¡: '-' 0.
ro '-'
~ 01'-' H () rl
0 0 o..c: H
'-''_..'H.¡J
rl 0.1J UJ
ro rl
-w ¡:: UJ >, 0
0 QJ m ()~
E-< ..c: UJ
.¡J~01J 0
m o.(lJ z
..c:1J '-' '-'
.¡J'H ;:J -rl .¡J
-rl U 0.;:J
;¡: '-.. '_.. tJ' ¡::
:> UJ () QJ
>'0 (lJ '-' e
rl O1U QJ
0. . -rl ..c: QJ
e W :> U '-'
01
O..c:H.¡J .:t:
u..c: (lJ m
1J UJ e -w
rl
rl W () >, U
m o..c: ¡:: QJ
..c: .10-< <1; -n
(J) QJ 0
P '-'
.¡J (J) 0.
¡:: rt1~~ 0.
(])" H µ:¡
.,..,........... ffJ 0
0." ;:J 3: 0
-rl . '-..
U.¡JrlUJ Þ-<
Q) ...u '+-J Q)
'-'.L: ,U .¡J
~QJ'rl ¡:::
QJ -I-' :>
..c:~rt1 '-' QJ
.¡J<1;.¡JQJ e
0 W UJ ..c:
,þ-< U
QJU tJ>'H rt1
:>- 0 0 .¡J
0 QJ .¡J
~ QJ QJ ~
m U :;: 0.
¡::: 3: 0
1J m :;: U
(lJ.¡J'_.. UJ
-rl (J}'_..
'H -rl ...¡J
-rl W U
-I-' W +-' rt1
¡::~-I-'H
QJ ..c:.¡J
1J u~¡::
-rl-rl 0
.¡J~U
ew<1;
m()UJ QJ
H eÞ-<..c:
O1OU.¡J
oo~
'-' ¡::
0.'H () ·rl
o U
..c: ¡::1J.¡J
U Ü'rt1 QJ U
mO.¡J1Jm
(lJrl w ;:J H
m -c- rl -I-'
'-'-I-'W U ¡::
o m w ¡::: 0
µ, u ~ .c- u
'-'
....,J
RESOLUTION 01-03
WHEREAS, subsequent to the adoption of the St. Lucie County Erosion District's Budget, certain funds have become
available from Florida Department of Environmental Protection in the amount of $39,985 for the South County Post-Storm
Beach Study.
WHEREAS, Section 129.06 (d), Florida Statutes, requires the St. Lucie County Erosion District to adopt a resolution to
appropriate and expend such funds.
NOW, THEREFORE, BE IT RESOLVED by the Erosion District of St. Lucie County, Florida, in meeting assembled this 8th
day of May, 2001 pursuant to Section 129.06 (d), Florida Statutes, such funds are hereby appropriated for the fiscal year
2000-2001, and the Erosion District's budget is hereby amended as follows:
REVENUES
184204-3710-334391-36203
Dept. of Environmental Prot-Physical
$39,985
APPROPRIA TIONS
184204-3710-563005-36203
Imp. OIT Bldg-Engineering
$39,985
After motion and second the vote on this resolution was as follows:
Chairman Clifford Barnes
Vice Chairperson Paula A. Lewis
Commissioner John D. Bruhn
Commissioner Doug Coward
Commissioner Frannie Hutchinson
xxx
XXX
XXX
XXX
XXX
PASSED AND DULY ADOPTED THIS 8TH DAY OF MAY, 2001.
ATTEST:
EROSION DISTRICT
ST LUCIE COUNTY, FLORIDA
DEPUTY CLERK
BY:
CHAIRMAN
APPROVED AS TO CORRECTNESS
AND FORM:
COUNTY ATTORNEY
E:\ WP\ WPMISCIO I-03Erosn. wpd
'-"
. iCOO-12-173
........(WA #1)
WORK AUTHORIZATION
Engineering Services Related to South County Post-Stonn Beach Condition Study
Pursuant to that certain Consultant Agreement between the St. Lucie County Erosion
District (the "District") and Coastal Planning & Engineering, Inc. (the "Consultant") dated
December 12, 2000 (the "Agreement"), Consultant agrees to perform and successfully complete
the scope of work as set forth in the Consultant's "Scope of Services", "Work Compensation
Sheet", and "Project Schedule" attached hereto and made a part thereof itS Exhibits "A", "B", and
"C" , respectively. The District àgrees to compensate the Consultant as set forth in Exhibit "B" and
the work shall be completed in accordance with Exhibit "C".
IN WITNESS WHEREOF, the District has as hereunto subscribed and the Consultant has
affixed his, its, or their names, or name, on the dates below.
WITNESSES:
ST. LUCIE COUNTY EROSION DISTRICT
BY:
CHAIRPERSON
Date:
APPROVED AS TO FORM AND
CORRECTNESS:
COUNTY ATTORNEY
BY:
~II.~
Print Name: THoµ, AS CAlvfPB£u
Title: f¡¿€S/Þ£NT
Date: 'I / f- / Of .
.
H:f\VP/MISC/CPE. WA
,.
\..-
,...."
EXHIBIT" A"
PROPOSED SCOPE OF WORK
ST. LUCIE COUNTY
SOUTH COUNTY POST-STORM BEACH CONDITION STUDY
Background
Erosion of the St. Lucie shoreline and dunes south of the Ft. Pierce Inlet has become
severe. An erosion study of the 13.1 mile segment of shoreline between the southern
limit of the proposed 2.3 mile Federal Ft. Pierce Shore Protection Project (DEP profile
monument R46) and the Martin County Line (R115) will be perfonned. The study will
evaluate the level of current coastal erosion, identify threats to existing development,
develop short-term and long-term protection alternatives, and consider environmental
impact issues. The study will form the basis for a determination by the Florida
Department of Environmental Protection (FDEP) of the areas critically eroded status and
a first approximation of management strategies.
Scope of Services
The study will evaluate the level of coastal erosion and analyze short and long-tenn
erosion control measures which could be used along the south county coastline. These
alternatives include dune restoration, dune relocation, beach restoration and limited
structural stabilization. Short-term beach fill placement alternatives will be limited to
trucked fill from an upland source with and without stabilizing geotextile tube structures.
Task 1. Past and Current Erosion Conditions. To document existing beach conditions, a
beach profile survey will be conducted from the landward extent of the dune offshore to a
depth of approximately -4 ft. NGVD along DEP profile lines R47 to Rl15. Data will be
submitted to the FDEP in a program compatible format. Historical beach and
hydrographic survey records, and aerial photography, will be collected and analyzed and
" ,
""
....J
compared to the new survey to detennine the extent of the erosion problem within the
study area. A site inspection will be conducted to document beach conditions.
Task 2. Changing or Accelerated Erosion Trends Including the Historical Imvact of Ft.
Pierce Inlet. Based on the data collected in Task 1 and historic data sources, rates of
erosion and recession for the area will be quantified. The level of detail included within
these estimates will be primarily restricted by the quality and quantity of historic data
sources. Trends in erosion will be identified and discussed. Possible links between
erosion behavior and Ft. Pierce Inlet Federal Navigation Project impacts will be included.
The FDEP will be provided with the Task 1 and 2 data and results and have several
weeks to review it before authorization is granted to proceed with Task 3.
Task 3. Evaluate Future Threats to Existing Development. Based on current erosional
trends, an assessment of future erosion threats to existing structures will be made. The
Hutchinson Island Nuclear Power Plant will be included as an existing structure. Current
and future projects in adjacent regions which may impact the area will be included within
this assessment. Severely eroded segments of shoreline requiring rehabilitation will be
identified.
Task 4. Short and Long-Tenn Solutions to Mitigate Erosion.
A. Develop Short-Tenn Erosion Mitigation Alternatives. This task will
involve the identification and schematic development of short-tenn dune
stabilization alternatives which could be implemented prior to a long-tenn,
pennanent erosion control project. The short-tenn alternatives will include dune
relocation with vegetation and possible stabilization with geotextile tubes. The
task will also identify possible locations of small scale beach fill projects utilizing
material from upland sand sources which could be trucked to the shoreline.
Stabilization of the beach fill material utilizing geotextile tubes will beeconsidered. The task will include the development of schematic construction
quantities and cost estimates.
'-"
...,J
B. Develop Long-Term Erosion Mitigation. An assessment of long-term
erosion control alternatives including beach and dune restoration utilizing
materials ftom offshore borrow sources will be developed. Current and planned
projects in adjacent regions which may impact the area will be included within the
assessment. The task will include the development of schematic construction
quantities and cost estimates.
Task 5. South County Post-Storm Beach Condition Study Re?ort. A summary report
will be prepared presenting the identified critical erosion locations, short-term
alternatives, long-term management strategies, results and recommendations.
Environmental issues will be considered utilizing available information to evaluate the
potential impacts of a project and the potential impact related to the erosion stresses on
the coastline. The report will include evaluating the permittability of the project by State
and Federal agencies. The effort \VÍIl include traveling to Tallahassee to meet with
Florida Department of Environmental Protection, Office of Beaches and Coastal Systems
personnel to discuss the project and the potential for receiving permits and State funding.
The fmal product \VÍll be a report documenting the findings of the study including an
evaluation of erosion control alternatives, environmental considerations, the
permittability of the project and the potential for receiving State fWlding.
i:\wp61 docs\St. Lucie\proposedsow
~
...".,
EXHIBIT "B"
BUDGET
ST. LUCIE COUNTY
SOUTH COUNTY POST -STORM BEACH CONDITION STUDY
The following provides our estimated cost for completion of the scope of services as described in
the previous section. Coastal Planning & Engineering, Inc. proposes to complete this project on a
not to exceed basis for a total project cost of $79,970 as described below:
TASK
AMOUNT
Task 1. Past and Current Erosion Conditions
$15,880
Task 2. Changing and Current Erosion Trends
$6,280
Task 3. Evaluate Future Threats to Existing Development
$6,560
Task 4. Short and Long-Term Solutions to Mitigate Erosion
$35,710
Task 5. Develop South County Post-Storm Beach Study Report
$14,660
TOTAL PROJECT COST
$79,970
--
)0
C
:;)
I-
</I
Z
o
¡::
15z
z;:
80
~:r:~
ZU<I:
:;)<l:w
OW II::
OIDID
w:S1-
_11::</1
UOO
:;)1-0
-''?c
..::;¡~
</10-
Q,~
)ow
I-C
Z
:;)
o
U
:r:
I-
:;)
o
</I
\..
ïi
'C
"
Ü
OB
o m
-<: 16
uQ.
o
<>"
" m
'C."
¡¡-
" "
¡;,¡j
.¡¡...
~
" -
"u
~ [
'"
o
<D
m
g
¡¡
C)
"
íj ;¡
N=
!~
~c%
u
" ;¡
"0
~:§
"'
J!iÌí
M~
u'¡¡
~UI ~
<D_<D
.. ~
;; "
.. "
0.5
u<>
."
¡;;w
~ ~
-"
2õ
0.. "
W
N N <D
!*
g.5
'C ê'
o..w
"
IJ)
<I
...
"
"
,,05
0:0
~crð
i~
88
C.M tIO
~ ~ '2 ~
.sû)~~%
_Ec..è:cuc
ceað=S~o
t:;.I:::2~
~_u_a.4I
U Cd ~ w:: "0 a.
"D~~~~~
C«JcP -
lQu......J::c.J::
_ ;:: >. 000
vto(\.)cv;;:;ru
:.~~~g~
..¡~;ê¥~
~~~.g~.g
CI 0 4> G) ro G)
I-OIJJQ..Oa..
N
..........
~
~~CX)
.........
N N N
o
...
0:
"
~
0:
o
.¡¡;
o
W
"
o
.~
"
o
l'
ë q:I ut
~ § Ü
::I -0 ~
~~-g!;
¡"§:~
bI c.!:: £
.5.Q œ olD
~:So;o
.~.r:.ü)
.s:: Q) c.1 en
U~~&
Ñ~.!!Icn
-:~~~
flU IV ca en
I-üü«
"
~
ë
"
E
...
o
;¡
t
Q
..
~
K :
... l'
2 '"
~ ~
:~cn~
.c~1a~
~.E~cn
f~~~
.aoc"'O
~·8·Q ~
.!~~:
1IIJ_4IQ;
~ifG:i
.s~~&>
0.20
M.n.".b
~ID~~
lilt In en ct)
{!:J.:J."C
<D~
~
~
...
~
... ~
<D~
~
~~CI)
~~$!NNN ~~~NN
<D<DN
~Cl:lCONNN ~cocg("H""
N N
CDNNNNN UlN"'NNCDNN
...
N
0:
o
'iõ
e
... "
~ ~
~.. 18 ~
:¡¡¡I: VJ .,= en $
o+: olD CU ñî
-. Ë '" ~ I/)
~ E ~ E ~ ~
O.!:J .!:J ~
:;:c ~ :;¡ ~ V en
~~cn~ ~cn~ ~ ~cnBcn~
E;I~ cuo"o'iõo~>~ ~~;C~
~- - g5~·g~
.l&Iëû~1I) 5~'::¡:::+-'cn --
...ecc:: u..... ,w~~8~2~~
ba~æO~ _œEE cœ-
c_=uo ~~~~88ñî-gG)U~
S~Eca~~ ~c~~~~~~~~~
~~""'~~cnE8~E~~E~~8m
~~~~~¡~~~¡~~~~~~~
1:: ø.i::-ø-ø 0.-- E o..õo-¡¡"¡)--~Lt..I E.!
o 0 0 L L E ~ ø 0 c ~ ~ ~ 0 D ø 0
~~~a.a.._ma.~oaa.~a.~a.a
~p .m~m~>-m·m._.ø
~&~~~~~~!~~~~~-~~~
~ .ã)EE2.2.2 .'G)EE.2.2Q;2.2
~<~~~~~~m~~~~~~~Z
~<D
N
N
N
N
on
~88
~g
.. ...
:i
...
...
&j88
e2
:..
<D
..
~88
cid
......
.. -
;;¡
æi88
me
..;r;
...
..
~88
5~
;;¡
<D
¡;:88
Iorio
¡:¡~
;f,
<D
~88
U
'"
..
...
'"
æ88
ono
¡:¡~
...
::t
;I;
~88
-gg
- ...
..""
;;¡
~
&188
H
..",
;;¡
...
~88
:è2
-...
..-
..
-
¡¡
...
"
a:
~
...
"
;:¡
.0:
U
"
"
"'
E
¡¡
;:¡
i;
o
...
Þ
0:
"
o
U
.0:
'!í
,g
...
o
-¡
~
,,¡
-:
"
...
"'IU""
~...'"
f- iH,
o f-
... m
"' ::>
::> '"
IJ)
...,I
oo~oo~
coco ....c
ION ......cø
~:I;;å~
...J.......J.........
~~~t!;!
00000
I-t-I-t-t-
.....NC')....IQ
~:..::::.:::..::¥
CI)(I)cnrncn
i!~:!~;!
'"
....
'"
øi
....
...
1
'"
;S
.5::
ã!
'0
::>
U
.!:
Õ
'"
1ij
8
ãi
,g
'i5
'0
'"
'"
'"
.!!!
!!
'"
.,
E
::>
'"
o
E
I
X!
'0
g
i
.,
n::
I-
</I
o
U
I-
U
W
a
II::
Q,
-'
<I:
I-
o
I-
8
~
.!:
e
'"
'"
"E
.,
E
::>
'"
o
E
.,
;g
:s.
.c
~
'"
.c
1ii
X!
E
::>
'"
'"
<I:
,...:
.¡;¡
'"
f-
a;
Õ
z
, ,
'-r
~
EXHIBIT "C"
WORK SCHEDULE
ST. LUCIE COUNTY
SOUTH COUNTY POST -STORM BEACH CONDITION STUDY
The following provides our time estimated cost for completion of the scope of services as described
in the previous sections.
TASK
COMPLETION TIME FROM
NOTICE TO PROCEED
Task 1. Past and Current Erosion Conditions
6 weeks
Task 2. Changing and Current Erosion Trends
3 weeks
Task 3. Evaluate Future Threats to Existing Development
2 weeks
Task 4. Short and Long-Term Solutions to Mitigate Erosion
A. Develop Short-Term Erosion Alternatives
B. Develop Long-Term Erosion Alternatives
4 weeks
4 weeks
Task 5. Develop South County Post-Storm Beach Study Report
4 weeks
, .---.
\...-
:,; \:;~~':':',.?'~-\,,:::;,.~',~~::: :/\~:' :"
,.:-.".-....~.':...~
'~":,:~..n,.::};'>-' >}~->~<:.!;:'i".' ,~,-i: ': ",', -' .';--:
""I "0
PRESIDENTS. COUNCIL
OF HUTCHINSON ISLAND
PO Box 6111, Hutchinson Island, FL 34957
Phone 561 229 9878
FAX 561 2298178
July 15) 2000
Commissioner Doug Coward, Chairman
ST LUCIE COUNTY EROSION CONTROL D1STR1CT
2300 Virginia Ave.
Fort Pierce) Fl. 34982-5652
Dear Doug:
As you know beach erosion is a major problem for our residents and our tourism
industry. Martin County has been successful in getting beach renourishment for their
portion of the Island. The President's Council has been active in seeking both state and
federal funding for beach renourishment for our area to the north of Martin County. To
maintain· our beaches and insure we also maintain our property values and our tourism
industry it will be necessary to request assistance rrom the State of Florida. We are
soliciting the County Commission to request the Florida Department of Environmental
Protection designate the Hutchinson Island beaches in S1. Lucie County as a critical
erosion area. Your cooperation in this matter is greatly appreciated.
Thank you.
cc: SLC BOCC
Ed Klima
'-'
....,
BOARD OF COUNTY
COMMISSIONERS
July 21, 2000
COUNTY
ADMINISTRATOR
DOUGLAS M. ANDERSON
Dr. Alfred B. Devereaux, Jr., P.E., Director
Office of Beaches and Coastal Systems
Department of Environmental Protection
3900 Commonwealth Boulevard, Mail Station 300
Tallahassee, FL 32399-3000
SUBJECT: UPDATE REQUEST: CRITICAL EROSION AREA DESIGNATION
ST. LUCIE COUNTY, FLORIDA
Dear Dr. Devereaux:
We request the Department update the State's inventory of beach erosion areas within 8t. Lucie
County and designate the most southerly shoreline in the County (approximately 4 miles) as
critically eroding.
The erosion and recession to this segment of shoreline and dune system has reached the degree
that upland development, recreational interest, and wildlife habitat are being threatened or lost.
Due to the severity of the hurricanes last season (Floyd & Irene), the Department issued several
emergency field permits for various developments in this area to reconstruct damaged structures
and stabilize severely eroding dunes. A letter from the Presidents Council of Hutchinson Island
expressing their concerns on this matter is enclosed for your information.
We would like to also thank you for allowing Ms. Jackie Thompson the opportunity to visit with the
concerned citizens who live along this stretch of eroding shoreline and explain the Department's
role in beach management.
Thank you in advance for your consideration of this important request. Please contact Mr. Richard
Bouchard, P.E., Coastal Engineer, at (561) 462-1710 or Suncom 259-1710 should you have any
further questions.
7
s;o?7 /1
'7.J -- ÆfJ-
Douglas M. Anderson
County Administrator
DMA:rb
ends
cc:
Board of County Commissioners
Dan Mcintyre, County Attorney
Robert Bradshaw, Assistant County Admin.
President's Council.of Hutchinson Island
Ray Wazny, Public Works Director
Don West. County Engineer
Richard Bouchard, Coastal Engineer
JOHr\ D. Or..UHN Obrricr NO.1. DOII(~ COWARD, DistriCt No '2 . PAULA A. LEWIS, Disrricr NO.3. FRANNIE HUTCHINSON. D;ST'cr No. d . CUFr: D/\.'·~,J~:':~ :>sl'icl ¡..;:_
Counry Admil"'\isrraror - Douglas M. Anderson
2JOOVirginioAvenue. ForrPierce,FL34982-5652. Phone(561)462-1450. TDD(561)462-1426
FAX (561) 462-2131
""'"
Department of
Environmental Protection
Jeb Bush
Governor
Marjory Stoneman Douglas Building
3900 Commonwealth Boulevard
Tallahassee, Florida 32399-3000
July 31, 2000
David B. Struhs
Secretary
------..'- ----
Douglas M. Anderson, County Administrator
St. Lucie County
2300 Virginia Avenue
Ft. Pierce, Florida 34982-5652
~ ;-----:, ;:: "2 :~
: i fi ¡ ,'" -
II",: i
, i :-; ,AI~ - 7 2000
I ' , ItUIC
I'
!
.-- ~ . ,.--_. ~:' . c- .
Dear Mr. Anderson:
RE: Request to Reevaluate Critical Erosion in St. Lucie County
We have received your request to evaluate the condition of the southern most four miles of
shoreline in St. Lucie County. The condition of beaches are determined to be critically eroded
when erosion of the beach or dune system occurs to such a degree that upland development,
recreational interests, wildlife habitat, or important cultural resources are threatened or lost. To
determine whether these beaches are critically eroded, the Department will evaluate the
historical erosion rates, the vulnerability of existing public and private resources, and
supplement this information with a field investigation.
Staff has scheduled a site visit to the area and will send a report of their findings to you upon
completion. If you have any questions before this time, please call Mr. Ralph Clark or Ms.
Jackie Thompson at 850/487-4469.
Sincerely,
/')
C_~'
Gene Chalecki, P.E.
Program Administrator
Office of Beaches and Coastal Systems
c~~£
GC/jtfp
cc: ' Ralph Clark, P.E. II, DEP/OBCS
ì'3!chard' Böucha~'St.;f.1.¡~:Co~nty
"More Protection, Less Process"
Printed on recycled ¡>Oþer.
, ,
'-"
.,
BOARD OF COUNTY
COMMISSIONERS
November 15, 2000
PUBLIC WORKS
DEPARTMENT
Dr. Alfred 8. Devereaux, Jr., P.E., Director
Office of Beaches and Coastal Systems
Department of Environmental Protection
3900 Commonwealth Boulevard, Mail Station 300
Tallahassee, FL 32399-3000
SUBJECT: FOllOW-UP REQUEST: CRITICAL EROSION AREA DESIGNATION
ST. lUCIE COUNTY, FLORIDA
Dear Dr. Devereaux:
In light of the severe beach erosion caused by the recent high tides and strong winds (northeast),
we request the Department revisit its final determination of the extent of erosion for the most
southerly shoreline in the County (approximately 4 miles), before formally responding to our July
21st request.
Since the Department's last visit to the site, conditions have drastically deteriorated. At the request
of concerned citizens, State Senator Ken Pruitt visited the site and offered to provide assistance.
To further depict the urgency of this situation, please find enclosed photographs and newspaper
articles of this area. Should this area be designated as critically eroded, we would like to proceed
with a feasibility study and request Department funding for FY -2001/02 through appropriate proviso
language. .
We anxiously await the Department's prompt decision. Once again, thank you in advance for your
consideration of this important request. Please contact Mr. Richard Bouchard, P.E., Coastal
Engineer, at (561) 462-1710 or Suncom 259-1710 should you have any further questions.
Sincerely,
r?~0--
Douglas M. Anderson ~ 1;),c,4
County Administrator -
DMA:rb
enels
cc:
Board of County Commissioners
President's Council of Hutchinson Island
State Senator Ken Pruitt
Kirby Green, Assistant Secretary, DEP
Deborah Flack, FSBPA
Dan Mcintyre, County Attorney
Robert Bradshaw, Assistant County Admin.
Ray Wazny, Public Works Director
Don West, County, Engineer
Richard Bouchard, Coastal Engineer
JOHN D. ßRUHN, Disrrict No.1' DOUG COWARD. District No.2' PAULA A. LEWIS, District NO.:I . FRANNIE HUTCHINSON. District NO.4' CUFF ßARNES, District No.5
County Administrator - Douglas M. Anderson
2300 Virginia Avenue · Ft. Pierce, FL 34982
Public Worl~s: (561) 462-1485 · FAX (561) 462-2362
Division of Engineering: (561) 462-1707 Fox 462-2362 . Division of Rood & ßridge: (561) 462-2511 FAX 462-2363
Division of Solid Waste: (561) 462-1768 FAX 462-6987
Division of ßuilding & Inspections: (561) 462-1553 Fax 462-1735 . TOD (561) 462-1428
, .
Marjory Stoneman Douglas Building
3900 Commonwealth Boulevard
Tallahassee, Florida 32399-3000
....",
.Department of
Environmental Protection
Jeb Bush
Governor
November 20, 2000
Doug Anderson, County Administrator
Sf. Lucie County
2300 Virginia Avenue
Ft. Pierce, Florida 34982
Dear Mr. Anderson:
David B. Struhs
Secretary
This is in response to your letter dated November 15, 2000 concerning critical erosion
designation of St. Lucie County beaches. The research, analysis and policy section of our office
will be reviewing the area to determine whether it should be considered a critical erosion area.
It is hoped that their review will be completed by mid-Decemb~ 2000. Once the review
process has been completed, the Departmetn will provide a final response indicating its
decision. Should you have any questions or concerns, please advise.
.----,-"..-.
œl~~__~~~~
ENGINEER!NG
Sincerely,
~M
---0/¡/l/ò- /? .
Alfré3 B. Devereaux, Jr f. Director
Office of Beaches and Coastal Systems
,.
ABD/rs/p
cc: Mark Leadon, P.E. Administrator
I":": r:-
i... ...::
.
NOV 2?
"More Protection, Less Process"
Printed on recycled poper.
,
."
'Ii
..."
. Department of
Environmental Protection
Jeb Bush
Governor
Marjory Stoneman Douglas Building
3900 Commonwealth Boulevard
Tallahassee. Florida 32399-3000
December 21, 2000
David B. Struhs
Secretary
Douglas M. Anderson, County AdministratO!/
Board of County Commissioners .
Public Works Department
2300 Virginia Avenue
Ft. Pierce, Florida 34982
Dear Mr. Anderson:
This is to respond to your request of November 15 to designate southem St. Lucie County an
area of critical erosion and sUbsequently to share the funding of a feasibility study to mitigate
the erosion. .
Please be advised that our staff is very còhcerned about the recent erosion trend along all of St.
Lucie County south of Ft. Pierce Inlet. In the wake of Hurricane Floyd last year, Hurricane Irene
caused perhaps the most significant countywide erosion in the 20 years subsequent to
Hurricane David in 1979. The severity of the erosion in St. Lucie County prompted the
Department to extend the noncritical erosion designation from R70 to R80. Staff believes that
monitoring the shoreline conditions and further evaluation are necessary before a determination
could be made as to whether additional critical erosion designations were necessary south of
RaG.
In early August of this year, in response to your first inquiry to designate the south county area
as critical, our staff conducted a field inspection which indicated there was no threatened
development and that the beach had substantially recovered since the hurricanes of 1999. Not
wanting to close the door on a serious issue, the Department allowed your staff the opportunity
to obtain additional information to support your request before we responded. Since then, in
October, a series of northeasters inflicted a new round of beach and dune erosion prompting
property owners' concerns and some sandbagging efforts in the area. Your letter and
attachments of November 15 directly resulted from these new erosion events.
On December 4, Mr. Ralph Clark of this office met with Mr. Richard Bouchard and Ms. Patricia
Pacitti, and visited much of the area and witnessed the continued erosion stress during
northeaster conditions. Our staff has sUbsequently viewed the photographs and video obtained
during this visit and discussed the problem at length.
,.- ",' .
Given the prudent landward siting of coastal development throughout this area, a relatively wide
vegetated dune still exists and buildings are not currently being threatened. There appears to
be no development other than beach/dune walkover structures, viewing decks, lifeguard stands,
or other expendable minor structures in close proximity to the beach, actually being threatened
by the erosion. In other words, the erosion conditions, though serious, do not currently threaten
the development to the extent that would normally trigger the designation of the area as critically
eroded.
"More Protection, Less Process"
Printed on recyded poþer.
I.
ji ~ ~
'-"
...,¡
Mr. Douglas M. Anderson
December 21, 2000
Page 2
However, staff recognizes that there is a recent trend of accelerated erosion in this area and,
although conditions may not have become critical as yet, if left unabated the erosion may
become critical in the near future or following a severe storm. Therefore, the Department would
like to cost-share with the county on a post-storm beach condition study with an expanded
coverage and scope from that which you requested. The Department will pay 50% of the costs
of the study or $30,000, whichever is less. This study should cover the entire area between the
Ft. Pierce beach restoration project and the Martin County project. Past and current erosion
conditions need to be examined and changing or accelerating e~osion trends, including the
historical impact of Ft. Pierce Inlet, need to "be" identified. Beach surveys and analyses would
provide better data" upon which to determine the future threat to" existing development. The
study should also identify short and long-term solutions, including dune restoration and beach
restoration, to mitigate the erosion.
Should you have any further questions, please contact Russell Snyder, Program Manager, at
850/487-1262 or Suncom 277-1262
Sincerely,
,
/,
Alfre B. Devereaux, J ., Director
Office of Beaches and oastal Systems
ABD/rs/p
" .
..,
Department of
Environmental Protection
Jeb Bush
Governor
Marjory Stoneman Douglas Building
3900 Commonwealth Boulevard
Tallahassee, Florida 32399-3000
David B. Struhs
Secretary
February 19, 2001
.-'-..-~.. '~- ----~-
i ;v.~.. [Ç 0 rc; n ~~~--;':_....'
1.1 r'..I. ,[ 1:,'1 I,. ,I I, 8,','
:' : ¡ .;. ,- :~::_-_Sf. . (,': : ':',..""." : r ;
¡ ~.", ,~ i ,
: j' f i
I'i. FEB 2 12001 ; ~¡,
¡
.j
Richard Bouchard, P.E.
St. Lucie County
2300 Virginia A venue
Fort Pierce, Florida 34982-5652
','.,
,
~]
-~"_..,..,. ...~."
Dear Richard:
SUBJECT:
South County Post-Storm Beach Condition Study
Department staff has reviewed the proposed scope of work concerning the above and feels that it,
in large part, departs from the original intent of the Department. The study's focus on
emergency response, while necessary and encouraged by the Department, is not appropriate for
state cost-sharing under the beach erosion control program. Rather, the study should provide a
comprehensive current data set based on field surveys of the entire area, with corresponding
analyses concerning:
1. Past and current erosion conditions;
2. Changing or accelerating erosion trends, including the historical
impact of Ft. Pierce Inlet;
3. Future threats to existing development; and
4. Short and long-term solutions, including dune restoration and
beach restoration, to mitigate the erosion.
The study area should include the coastline between the Ft. Pierce and Martin County beach
restoration projects.
Please provide a revised scope of work addressing the above with an estimate of hours, labor and
direct costs for staff review. If you have any questions or concerns, please advise.
~;:jJ
Russell Snyder, Project Manager
Office öf Beaches and Coastal Systems
,
.
"More ProtectIOn, Less Process"
Printed on recycled þaþer.
, ..
Department of
Environmental Protection
...¡
Jeb Bush
Governor
Marjory Stoneman Douglas Building
3900 Commonwealth Boulevard
Tallahassee. Florida 32399-3000
David B. Struhs
Secretary
March 28, 2001
röJ rn @ œ LW æ ~ I
W/ø ~220~~1
ENG!~'r: 1':.17:;,.' '1
Mr. Richard Bouchard, P.E.
Public Works Department
2300 Virginia A venue
Fort Pierce, Florida 34982-5652
~.-"....- .... _.~.
Dear Richard:
SUBJECT: South County Post-Stonn Beach Condition Study Revised Scope of Work
Staff has completed its review of the above and approves it with the following provisos:
1. Task 1: Data should be submitted to the Department in a program compatible
fonnat;
2. Tasks 1&2: The Department should receive this data and have several weeks to
review it before authorization is granted to proceed with Task 3;
3. Task 3: Power Plant facilities should be included under "existing structures;"
4. The study needs to fonn the basis for a determination by the Department of
critically eroded status and a first approximation of management strategies.
Furthennore, the Department approves of the cost increase and will pay up to $39,985, or
50% of the cost of the study, whichever is less. If you have further questions, please
advise.
Russell Snyder, Project Manager
Office of Beaches and Coastal Systems
cc: Bob Brantly
Ralph Clark
"More Protection, Less Process"
Printed on recycled paper,