Loading...
HomeMy WebLinkAboutDisregard this file6,~-c~ I L--~~t/~ TCERDA RESEARCH PARK Phase 1-Campus Master Plan Approval (Map 1) 1. Total acreage = 154 2. Bounded by Kings Highway on east; Rock Road on west; Pruitt Research Road on south; and Picos Road on north 3. Rezoned to PNRD 4. Proposed build-out development = 1,320,000 sq. ft. 5. Phase 1 development of Park to consist of 4 equal size "quads" Quad 1 Development (Map 2) 1. Located in southeast quad of Phase 1 Master Plan area 2. Total Quad 1 development: • 32 acres/256,000 sq. ft. • 8 buildings Initial Phase 1 Development in Quad 1A (see "Initial Development Phase" map) 1. Located on 8 acres 2. 76,000 sq. ft of laboratory and office development Proposed Utilities (Map 3) 1. FPUA to construct 12" water main 2. FPUA to construct 6" force main 3. FPUA to construct lift station 4. FPUA to construct sanitary collection system EDA Grant to include: 1. Water line extension and connection 2. Sanitary line extension and connection 3. New north/south collector roadway 4. Stormwater ponds 5. Adjacent roadway sidewalks