July 23, 2013
IKO Industries, Ltd
40 Hansen Road South
Brampton, ON L6W 31-14
Canada
Re: Shingle Installation Instructions for 2010 Florida Building Code
i
Sir(s),
PRI Construction Materials Technologies has completed a technical review and attached sealed shingle
instructions in compliance the 2010 Florida Building Code.
This review was completed based on the receipt of following evidence from IKO Industries, Ltd:
1) IKO Shingle application Instructions—3 Tab.Shingles
(EN-3Tab_Appins_8AGXEFS-2012-11_reformatted 2013-02-rev07/13-Florida)
2) IKO Laminated Shingles Application Instructions
(EN-Laminated Appins_8TTEFS-2012-04 reformatted 2013-02-rev07/13-Florida)
3) ASTM D3161 Test Report(FM Approvals Project No. 3040947)
4) ASTM D7158 Test Report(PRI Project No. IKO-091-02-01)
i
i
The attached instructions should be used in conjunction with the published manufacturer's application
instructions and applicable code. In the event the instructions conflict, these instructions shall govern.
i
Regards,
-Duc Nguyen ``GW
IV e C5a3 41
Attachments: A)IKf3 Shingle Application Instructions-3-Tab
,l= ,
B)tKP Laminated Shingles Application instructions
�4/ 2,5
j ���{11UIItU��
IKOQN-02-01 j `O G•y`GE N
No 65034
�9STATE OF41
`
OR1 ,�.
%S;oavA� 10
,�,
PW CorstrLdcn bktuiak Tedmdogies,LLC.6412 Bader Drive T.pa FL33810 Tel:813621ZM Fax 813-627-5840 e-mail:mffierialstesli @pdcrnt.=n WebSitw Mtp'JANww.p0cnd.ccm
i
IKO
Installation Instructions fo�j
3-Tab and Laminated Shingles
Page 2 of 3
i
IKO Shingle Application Instructions — 3-Tab Shingles
;(ASTM D3161, Class F-IKO Marathon 25 AR and CRC Superglass 25 AR)
(ASTM D311,Class F-IKO Marathon Ultra AR and CRC Superglass Ultra AR)
(ASTM D7158, CLASS H -IKO Marathon 20 and CRC Superglass 20)
i
NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED
APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION
CONFLICT,THESE INSTRUCTIONS WILL GOVERN.
I
ROOF DECK: Solidly sheathed and fastened deck conforming to 2010 FBC.
I
UNDERLAYMENT: pplied in accordance with building code requirements.For areas where the roof slope is
less than.4" per foo down to 2" per foot, use 2 layers of undedayment conforming to building code
requirements,the fi i sheet overlapping the eave protection by 19",followed by full 36"widths overlapping
each preceding cour a by 19"or other Approved underlayments in accordance with the qualified application
instructions. For ar as where the roof slope is 4" per foot or greater, cover the deck with one ply of
undedayrnent laid parallel to the eaves,with 2"horizontal laps and 4"end laps. Apply metal drip edges on top
of any underlay along rake edges and directly to the deck along eaves in accordance with building code
requirements.
i
NAILING:Use galvanized(zinc coated)roofing nails, 11 or 12 gauge,with at least 3/8"diameter heads,long
enough to penetrate through plywood or 3/4"into boards. Use 4 nails per shingle placed 6-1/8"above the butt
edge,approx. 1"and h3"from each end and 1/2"above each cutout. Drive nails straight so that nail head is
flush with, but not cutting into shingle surface.
NAILING ON STEEPIsu
LOPES:For steep slopes of 21"per foot(600)or more,use 6 nails per shingle placed
as shown'below. Enre that no nail is within 2"of a joint/cutout of the underlying shingle. Seal down each
shingle at time of application with three 1"diameter(approx.size and thickness of a quarter)spots of asphalt
plastic cement placed under the shingle 2"above the bottom edge and equally spaced along the shingle.
Apply plastic cement+in moderation since excessive amounts may cause blistering. CAUTION: Shingles
should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the
heat of direct sunlight.
i
j STEEP SLOPES
a
1 i-1FZ' 1-tI2"
SEALING S1TZ3P
n_
NALLS
DO NOT NAIL INTO ORABOVETHE SEALING STWP
65034 '2
* - DV
TATE OFtj
0
0�''ssONAi E�C��.
i
PRI Corstrcrcfion Materials TecivrdocoM LLC.6412 Badges Drive Tanpa,FL 33610 Tei:813-621-6777 Fxc:813-521-5840 e4nail:mafefWstestkV o�pdcmt.ccm WebSite:httpJAm.priant.com
i
i
IKO
Irrstallation Instructions for
3-Tab and Laminated Shingles
Page 3 of 3
IKO Laminated Shingles Application Instructions
(ASTM D3161, Class F—IKO Cambridge AR and CRC Biltmore AR)
(ASTM D3161, Class F—IKO Grandeur)
i
NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED
APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION
CONFLICT,THESE INSTRUCTIONS WILL GOVERN.
i
ROOF DECK: SolidlIy sheathed and fastened deck conforming to 2010 FBC.
UNDERLAYMENT:Applied in accordance with building code requirements.For areas where the roof slope is
less than 4" per fot down to 2" per foot, use 2 layers of underlayment conforming to building code
requirements, the fir t sheet overlapping the eave protection by 19",followed by full 36"widths overlapping
each preceding course by 19"or other Approved undedayments in accordance with the qualified application
instructions. For areas where the roof slope is 4" per foot or greater, cover the deck with one ply of
underlayment laid pa r'�allel to the eaves,with 2"horizontal laps and 4"end laps. Apply metal drip edges on top
of any underlay along rake edges and directly to the deck along eaves in accordance with building code
requirements.
NAILING:Use galvanized(zinc coated)roofing nails, 11 or 12 gauge,with at least 3/8"diameter heads,long
enough to penetrate through plywood or 3/4"into boards. Use 4 nails per shingle placed in the nail line 7-3/8"
below the1op edge, a{pprox. 1"and 13"in from each end. Drive nails straight so that nail head is flush with,
but not cutting into shingle surface-
NAILING ON STEEPSLOPES:For steep slopes of 21"per foot(600)or more,use 6 nails per shingle placed
as shown`below. En ure that no nail is within 2"of a joint/cutout of the underlying shingle. Seal down each
shingle at time of application with three 1"diameter(approx.size and thickness of a quarter)spots of asphalt
plastic cement placed under the shingle 2"above the bottom edge and equally spaced along the shingle.
Apply plastic cement in moderation since excessive amounts may cause blistering. CAUTION: Shingles
should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the
heat of direct sunlight.
j NAILING-STEEP SLOPES APPLICATION
Use six nails as shown.
t
7 378-
a—_ NAIL LINE —�
6 Wt a=i
1
ra
NAILS CEMENT
PROPER APPLICATION REQUIRES THAT THE NAILS PENETRATE BOTH THE OVERLAY AND UNDERLAY PORTIONS OFTHE SHINGLE
NpNH'ty"to
•.
Q'• No 65034 `2
* ID v C 1 , f`f4 L 051,J
STATE OF :'Wj p, N o ��Q3
PRI Coreh don Materials TecMidogies,LLC,16412 Badger Drive Tampa,FL 33810 Tel:813621-5777 Fax:813-521-5840 e-mail:materialsteeingWemt.00m WebSite;trttp'lMvw.priant,com